arama valentina | portfolio

14

Upload: valentina-arama

Post on 25-Mar-2016

233 views

Category:

Documents


4 download

DESCRIPTION

ARCHITECTURAL TECHNOLOGY PORTFOLIO

TRANSCRIPT

Page 1: Arama Valentina | PORTFOLIO
Page 2: Arama Valentina | PORTFOLIO

INDEX

CURRICULUM VITAE

PROJECTS

SCHOOL RENOVATION

HOUSE EXTENSION

PREFABRICATION

SINGLE FAMILY HOUSE

½ DWELLING

INTERNATIONAL PROJECT

OTHER | PRACTICE

CONTACT

INNOVATION PROJECT

Page 3: Arama Valentina | PORTFOLIO
Page 4: Arama Valentina | PORTFOLIO

SCHOOL RENOVATION |

HYLKE SCHOOL

LOCATION: HYLKE, DENMARK AUTUMN 2013 | 5TH SEMESTER PROJECT , VIA UNIVERSITY

RENOVATION PROJECT OF AN OLD SCHOOL FOR 1-3 CLASS.

AIM: FLEXIBILITY & FUNCTIONALITY OF THE BUILDING IN ADVANTEGE OF ALL THE HYLKE MUNICIPALITY

NEW LOCAL ATTRACTION FOR SOCIETY

PROGRAMMES USED: REVIT 2013/ CLOUD 360 FOR RENDERINGS/ PHOTOSHOP

Page 5: Arama Valentina | PORTFOLIO

GROUND FLOOR

1ST FLOOR

2ND FLOOR

THE BUILDING DEVIDED INTO 4 MAIN PARTS

1.LIBRARY | INCLUDING COFFEE SHOP / MAIN ENTRANCE / SUSTAINABLE SOLUTIONS – SOLAR CELLS 2.MIDDLE BUILDING | CLUBS & EXTRA ACTIVITIES / CANTEEN AND COMMON PLACE3.GYM | SEPARATE ENTRANCE / CHANGING ROOMS4.EDUCATIONAL PART | CLASSES / TEACHERS OFFICE / GREEN ROOF FOR SUSTANABILTY , RAIN WATER COLLECTION, CLASSES

PHYSICAL MODEL MADE OF SUSTAINABLE MATERIALS ROOF – LASAGNA FOILSSITE – MOSS / CARDBOARD / WOOD / STONES/ SAND

Page 6: Arama Valentina | PORTFOLIO

HOUSE EXTENSION |

LONDON

LOCATION: LONDON, UNITED KINGDOMSPRING 2013 | 4TH SEMESTER PROJECT , UNIVERSITY OF WESTMINSTER

AIM: EXTENSION IN A VICTORIAN OLD BUILDINGREDISGNING THE LIVING ROOM AND THE KITCHEN WITH THE VIEW TO THE PERSONAL GARDEN

OTHER: 3D MODELING / DETAILS/ PHYSICAL MODEL / 3D DETAILING / SKETCHING TECHNIQUE / BUILDING ANALYSIS / SUSTAINABLE SOLUTIONS

PROGRAMMES USED DURING THE PROJECT: MODEL – REVIT 2013 3D DETAILING – REVIT FAMILIES 2013 RENDERINGS – REVIT CLOUD 360 EXISTING PLANS – AUTOCAD PRESENTATION – POWER POINTDOCUMENTATION – WORD/ EXCELLENERGY FRAME CALCULATION – BE 10, SAP BUILDING ANALYSIS – EXCELL SUSTAINABLE EXIBITION, FOSTER EMPLOYEE FEEDBACK / WEBELECTRICAL PLANS – MENTOR IN ELECTRICAL SOLUTIONS

Page 7: Arama Valentina | PORTFOLIO

THE EXTENSION OF AN APARTMENT IN A MULTISTOREY HOUSE IN LONDON

FAÇADE – VHMZINC PANNELS EXTERNAL STRUCTURE – KLH CROSS LAMINATED TIMBER BALCONY / FLAT PASSIVE HOUSE ROOF / SKYLIGHTS

ALL THE LSITED ABOVE BUILDING COMPONENTS GIVE THE BUILDING A NEW MODERN LOOK. THE CLIENT HAS THE CHANCE TO HAVE WONDERFUL TIME SPENDING IN THE GARDEN, AS WELL AS IN THE KITCHEN AS DUE TO CURTAIL WALL IS EVERYTHING INTEGRATED IN IT.

GROUND FLOOR 1ST FLOOR

Page 8: Arama Valentina | PORTFOLIO

PREFABRICATION|

VIA WINDOWS COMPANY

LOCATION: HORSENS, DENMARK AUTUMN 2012 | 3ND SEMESTER PROJECT , VIA UNIVERSITY

INDUSTRIALISED BUILDING / VIA WINDOWS PRODUCTION PLUS OFFICES/ CHANGING ROOMS FOR WORKERS/ CANTEEN/ ADMINISTRATION

AIM: BUILDING OF PREFABRICATED ELEMENTS ADMINISTRTION PART – WOODEN PREFABRICATED ELEMENTSPRODUCTION PART – CONCRETE PREFABRICATED ELEMENTS ROOF – TTS/RTP STRUCTURE

PROGRAMMES USED : REVIT 2013 / REVIT CLOUD 360/ SKETCH UP PRO 8/ PHOTOSHOP

PROJECT INCLUDES: ELEMENT DRAWINGS – LAYOUT SKETCH UP / REVIT FAMILIES ELEVATIONS/ DETAILS/ SECTIONS/ PLANS/ FIRE PLAN/ ENERGY FRAME/ GREEN SOLUTIONS/ VIEWS/ ANALYSIS/ DOCUMENTATION

OFFICE AREA & WORKERS – 25

EMPLOYEE

ADMINISTRATION AREA – MAX 700 M2

PRODUCTION AREA – 2000 M2

| ALL LISTED WHAT PROJECT INCLUDES FIND ON WEB PORTFOLIO http://aramavalentina.wix.com/portfoli

o#!prefabrication/c1ihp

Page 9: Arama Valentina | PORTFOLIO

SINGLE FAMILY HOUSE|

STENSBALLE, DENMARK

LOCATION: STENSBALLE, DENMARK AUTUMN 2011 | 1ST SEMESTER PROJECT , VIA UNIVERSITY

SINGLE FAMILY HOUSE WITH THE VIEW TO THE LAKE

AIM: BUILDING A SINGLE FAMILY HOUSE WITH ONE STOREY FAMILY CONSISTS OF 4 MEMEBERS / PARENTS / ONE GIRL/ ONE BOY THE HOUSE PROVIDED WITH TWO PARKING PLACES/ USING LOCAL PLAN REGULATIONS/ BUILDING REGULATIONS 2010 DENMARK

PROGRAMMES USED : SKETCH UP PRO/ SKETCH UP LAYOUT/SIGMA/ KOMMUNE PLANS

PROJECT INCLUDES: VIEWS/ PLANS/ COST ESTIMATION/ TIME SCHEDULE/ DETAILS/ POSTERS FOR DETAILS/ STEP BY STEP 3D DETAILING/ SITE PLANFURNITURE PLAN/ TAKE OFF SHEETS CALCULATIONS/ STRUCTURAL DESIGN CALCULATIONS/ PRESENTATION/ DOCUMENTATION/ BUILDING ANALYSIS / MIND MAPPING

Page 10: Arama Valentina | PORTFOLIO

½ DWELLING|

STENSBALLE, DENMARK

LOCATION: STENSBALLE, DENMARK SPRING 2012 | 2ND SEMESTER PROJECT , VIA UNIVERSITY

½ DWELLING / 2 STOREYS AND BASEMENT / NORDIC DESIGN / VIEW TO THE LAKE

AIM: USING THE SAME LOCATION AS THE SINGLE FAMILY HOUSE BUT A DIFFERENT PROJECTTHE PROJECT INLCUDES A NEW PHASE OF CONSTRUCTION ARCHITECURE DETAIL DESIGN 1,2 AFTER OUTLINE AND SCHEME DESIGN PHASES. DETAIL DESIGN 1,2 INCLUDES THE DRAWINGS THAT GOES TO AUTHORITIES: SITE PLAN, FLOOR PLANS, ELEVATIONS, SECTIONS , DETAILS

BASEMENT

GROUND FLOOR

1ST FLOOR

Page 11: Arama Valentina | PORTFOLIO

INTERNATIONAL PROJECT|

CHAMONIX RESTAURANT, FRANCE

LOCATION: CHAMONIX MOUNTAINS, FRANCESPRING 2012 | 2ND SEMESTER PROJECT , VIA UNIVERSITY

INNOVATIVE PROJECT WITH INTERNATIONAL STUDENTS & DANISH

AIM: 3 DAYS PROJECT ON OUTLINE OF A PUBLIC USED BUILDINGCHAMONIX RESTAURANT NAMED BY THE MOUNTATION WHERE IS LOCATED. THE PURPOSE OF THE BUILDING IS TO INTEGRATE NATURE WITH THE RESTAURANT. SO, INSIDE THE RESTAURANT THERE IS A MOUNTAIN BASED WALL.

THE PROJECT AIM WAS TO DEVELOP IN A NEW GROUP, WITH VARIOUS NATIONALITIES STUDENTS A BUILDING THAT WOULD WORK FOR THE PURPOSE OF COMMINITY

Page 12: Arama Valentina | PORTFOLIO

INNOVATION PROJECT|

SILKEBORG, DENMARK

LOCATION: SILKEBORG, DENMARK AUTUMN 2012 3RD SEMESTER PROJECT , VIA UNIVERSITY

INTERNATIONAL INNOVATIVE PROJECT OF ANOTHER VIA UNIVERISY CAMPUS

AIM: TRANSPROFESSIONAL COLLABORATIONS WITH CONSTRUCTION ARCHITECTS, TEACHERS, NURSES, SOCIAL EDUCATORS

FIND THE ISSUES OF THE CAMPUS – DEVELOP IDEAS – FIND SOLUTIONS – FLEXIBILITY AND ATTRACTION FOR MUNICIPALITY WEB PLATFORM: http://valentinaarama.wix.com/innovation

Page 13: Arama Valentina | PORTFOLIO

OTHER|PRACTICE

MEDIA ARCHITECTURE BIENNALE 2012

PROTOTYPING A NEW MODEL

INK & PAINTING BUILDING/ FLORAL COMPOSITIONS /PAINTING | FLORAL SCHOOL COURSES , “A.STARCEA” PAINTING CLASSES

PRACTICAL PLACEMENT IN KLAIBER + OETTLE ARCHITECTURE OFFICE, SCHWABISH GMUND, GERMANY | http://www.klaiberundoettle.de/

Page 14: Arama Valentina | PORTFOLIO

E-MAIL:

[email protected]

WEB PORTFOLIO:

http://aramavalentina.wix.com/portfolio

PHONE:

+45 81578732

LINKED IN:

http://www.linkedin.com/pub/arama-

valentina/29/284/a96