Page 1: APS Ten-Year Plans 2006-2015 4 th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006

APS Ten-Year Plans2006-20154th BTA Presentation

Bob Smith

Manager Transmission Planning

June 6, 2006

Page 2: APS Ten-Year Plans 2006-2015 4 th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006

June 6, 2006 4th BTA 2

APS EHV & OUTER DIVISION 115/230 KVTRANSMISSION PLANS 2006 - 2015

SELIGMAN

ROUNDVALLEY

POWER PLANT

115KV & ABOVE SUBSTATION (EXISTING)

230KV & ABOVE SUBSTATION (FUTURE)

JOINT OWNSHIPJ/O

LEGEND

NORTH

ADAMS

MURAL

SAN MANUELORACLEJUNCTION

SAGUARO

N.GILA

YUMA

PALO VERDE-HASSAYAMPA

YUCCA

GILA BEND

500KVJ/O

TO CALIF.500KV

REDHAWK

JOJOBA

GILA RIVER/PANDA

RUDDLIBERTY

KYRENE

SANTAROSA

DESERTBASIN

WESTWING

500KV J/O

BAGDAD

YAVAPAI VERDE

FLAGSTAFF

PRESCOTT

PINNACLEPEAK

PREACHERCANYON

CHOLLA

230KV

345KVTO CALIF.

500KV J/O

500KV J/O

TOCRYSTAL

TO MEAD /MARKETPLACE

MOENKOPI

NAVAJO

PAGE

FOURCORNERS

500KV

TUCSON

PHOENIXLIBERTY

12/1/05Transmission Planning

2012MAZATZAL

COCONINO

Substation locations and line routings depict an electrical connection only anddo not reflect any assumed physical locations or routing.

CASAGRANDE

TAT MOMOLI

KNOX

GAVILANPEAK

(WAPA)

FLAGSTAFF(WAPA)

To GLENCANYON (WAPA)

(WAP

A)

EXISTING 500 KV LINESEXISTING 345 KV LINESEXISTING 230 KV LINESEXISTING 115 KV LINES

PLANNED 500KV LINES NUCLEAR POWER PLANT

2 circuits

WILLOWLAKE

PLANNED 345KV LINES

PLANNED 230KV LINES

PLANNED 115KV LINES

CORONADO(SRP)

FLAGSTAFF(APS)2009

SECONDKNOLL2009

2012J/O

2012

2009 TS52009

TBD

TBD

VV12009

RACEWAY2010

2010

Page 3: APS Ten-Year Plans 2006-2015 4 th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006

June 6, 2006 4th BTA 3

BELL RD.

I - 10 FWY.

BASELINE RD..

I-17

FWY.

I-17

FWY.

I - 10 FWY.

I-10

FWY.

SUPERSTITION FWY.

BASELINE RD..

MCDONALD RD.

PINNACLEPEAK

CACTUS

OCOTILLO

KYRENE

500kV

TO JOJOBA

KNOX(SRP)

TO BROWNING500kV

TO SANTA ROSA

REACH

LONE PEAK

SUNNYSLOPE

MEADOWBROOK

LINCOLN ST.

COUNTRY CLUB

ALEXANDER

J/O APS/SRP

To Prescott

GAVILAN PEAK

WAPA

2 - Circuits 2 - Circuits

345KV

TOGLEN

CANYON(WAPA)

TOCHOLLA

PHOENIX METROPOLITAN AREATRANSMISSION PLANS

2006-2015

Transmission Planning

GLENDALE

APS EXISTING 500KV LINESAPS EXISTING 345KV LINESAPS EXISTING 230KV LINES

UNDERGROUND

APS PLANNED LINES230KV

500KV

230KV SUBSTATION (EXISTING)230KV SUBSTATION (FUTURE)

GENERATING SITE &230KV SUBSTATIONJOINT OWNSHIPOTHER COMPANY LINES

J/O

CAREFREE HWY.

TB

D(S

RP

)

BETHANY HOME RD.

Substations locations and line routings are approximate345KV

TBD

SURPRISE

AGUAFRIA

EL SOL

DEERVALLEY

RUDD

TO PALO VERDE

WESTPHOENIX

WESTWING

LIBERTY/TS4

BUCKEYE

TOGILA BEND

To Navajo

WAPA

TOPALO VERDE

500KV

500KV

To NewWaddell

WA

PA

WHITE TANKS(APS)

TOPALO

VERDE

500kvJ/O

LIT

CH

FIE

LD R

D.

2010

2010Raceway

PIM

A R

D.

2010

2011TS2

2010TBD

TBD

TS12009

TS52009 2009

TBD

2010

2010

TS62010

2010J/O

SRPSRP

2007PALM VALLEY

2007

TB

D

AVERY2009

2009

Page 4: APS Ten-Year Plans 2006-2015 4 th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006

June 6, 2006 4th BTA 4

Changes from 2004 to 2006Project Status

2005 Gavilan Peak 230kV Completed

TS3 230/69kV substation Named Palm Valley

2006 Rudd-Palm Valley-TS4 230kV Changed to I/S date of 2007

2006 Flagstaff 345/69kV interconnection

Changed to I/S date of 2009

2006 Jojoba cut-in of TS4-Panda 230kV Changed to I/S date of 2011

South East Valley 500kV project - Hassayampa-Pinal West & Pinal West-Santa Rosa-Browning

Removed from APS plan - APS no longer participating

2007 PV Hub-TS5 500kV Changed to I/S date of 2009 and added interconnection options (AVGS & HQJNT)

Page 5: APS Ten-Year Plans 2006-2015 4 th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006

June 6, 2006 4th BTA 5

Changes from 2004 to 2006Project Status

2007 TS5-TS1 230kV Changed to I/S date of 2009

2008 TS1-TS2-Palm Valley 230kV

w/TS2 I/S of 2012

Changed to I/S date of 2010

w/TS2 I/S date of 2011

2008 RY-AV 230kV Changed to I/S date of 2009

2009 PP-TS6-AV 230kV Changed to I/S date of 2010

2009 Second Knoll 500/69kV Interconnect moved from CO-SK line to CO-CH line

2010 TS5-RY 500kV Changed to I/S date of 2012

2010 WW-RY 230kV Changed to I/S date of TBD

2012 Gila Bend-TS8 230kV Replaced with PV Hub-N.G. 500kV

Page 6: APS Ten-Year Plans 2006-2015 4 th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006

June 6, 2006 4th BTA 6

Changes from 2004 to 2006Project Status

2013 WW-ES 230kV Changed to I/S date of TBD

TBD Mazatzal 345/69kV Changed to I/S date of 2011

2009 VV1 500/69kV New Project

2010 TS9-PP 500kV New Project

2012 N.G.-TS8 230kV New Project

TBD Yucca-TS8 230kV New Project

TBD SR-Pinal South 230kV New Project

Page 7: APS Ten-Year Plans 2006-2015 4 th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006

June 6, 2006 4th BTA 7

Conceptual Projects

TransWest Express Transmission from Wyoming to Arizona and/or

southern Nevada Access coal and wind resources in Wyoming Three AC alternatives

Looking at 500kV and 765kV options One DC alternative Developing through open stakeholder process Compliments other planned projects Cost range $2B-$5B

Page 8: APS Ten-Year Plans 2006-2015 4 th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006

June 6, 2006 4th BTA 8

Conceptual Projects:TransWest Express Project

Page 9: APS Ten-Year Plans 2006-2015 4 th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006

June 6, 2006 4th BTA 9

Conceptual Projects

230kV west of White Tank Mountains Large developments planned for the area

immediately to the west of the White Tank Mountains

230kV line(s) between TS5 substation and Buckeye substation

Working with developers, gov’t agencies, and any identified stakeholders to stay ahead of the growth.

Page 10: APS Ten-Year Plans 2006-2015 4 th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006

June 6, 2006 4th BTA 10

BELL RD.

I - 10 FWY.

BASELINE RD..

I-17

FWY.

I-17

FWY.

I - 10 FWY.

I-10

FWY.

SUPERSTITION FWY.

BASELINE RD..

MCDONALD RD.

PINNACLEPEAK

CACTUS

OCOTILLO

KYRENE

500kV

TO JOJOBA

KNOX(SRP)

TO BROWNING500kV

TO SANTA ROSA

REACH

LONE PEAK

SUNNYSLOPE

MEADOWBROOK

LINCOLN ST.

COUNTRY CLUB

ALEXANDER

J/O APS/SRP

2010

AVERY2009

To Prescott

GAVILAN PEAK

WAPA

2 - Circuits 2 - Circuits

345KV

TOGLEN

CANYON(WAPA)

TOCHOLLA

PHOENIX METROPOLITAN AREATRANSMISSION PLANS

2006-2015

TS62010

Transmission Planning

GLENDALE

APS EXISTING 500KV LINESAPS EXISTING 345KV LINESAPS EXISTING 230KV LINES

UNDERGROUND

APS PLANNED LINES230KV

500KV

230KV SUBSTATION (EXISTING)230KV SUBSTATION (FUTURE)

GENERATING SITE &230KV SUBSTATIONJOINT OWNSHIPOTHER COMPANY LINES

J/O

CAREFREE HWY.

TBD

( SR

P)

BETHANY HOME RD.

Substations locations and line routings are approximate345KV

2010

TBD

SURPRISE

AGUAFRIA

EL SOL

DEERVALLEY

RUDD

TO PALO VERDE

WESTPHOENIX

2007PALM VALLEY

2007

2010

2012TS2

TS12009

WESTWING

LIBERTY/TS4

BUCKEYE

TOGILA BEND

To Navajo

WAPA

TOPALO

VERDE

TS52009

500KV

500KV

To NewWaddell

WA

PA

WHITE TANKS(APS)

2009

2010

TOPALO

VERDE

500kvJ/O

LIT

CH

FIE

LD R

D.

2010

2010Raceway

2009

PIM

A R

D.

TBD

TBD

TBD

2010J/O

SRPSRP

SUN

VAL

LE

Y P

KW

Y.

TBD