Bidders’ Conference IT-3927 « Revamping and Replacement of Obsolete EOT Cranes and Supply of New EOT Cranes » April 23rd-24th 2013 Handling Engineering Group

Upload: cory-bell

Post on 14-Jan-2016

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for

Handling Engineering Group

Bidders’ ConferenceIT-3927

« Revamping and Replacement of Obsolete EOT Cranes and Supply of New EOT Cranes »

April 23rd-24th 2013

Page 2: April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for

Handling Engineering Group 2

Introduction to CERN

April 23rd-24th 2013

CERN: European Organization for Nuclear Research

Founded in 1954 20 Member States + Associate Members CERN’s Mission:

Enable international collaboration in the field of high-energy particle physics research

Page 3: April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for

Handling Engineering Group 3

Accelerator Complex of CERN

April 23rd-24th 2013

Page 4: April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for

Handling Engineering Group 4

Organization of the “Handling Engineering” group

April 23rd-24th 2013

HE - Handling Engineering Group Leader: Ingo Rühl

Heavy Handling

(HE-HH) Caterina BERTONE

Lift Maintenance

(HE-LM) Antonino CALDERONE

Handling Maintenance

(HE-HM) Helder LOURENÇO

Handling Technologies

(HE-HT) Bruno FERAL

Assistance Works (HE-AW)

Antonio FORESTE

Page 5: April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for

Handling Engineering Group 5

“Handling Maintenance” section

April 23rd-24th 2013

HM - Handling Maintenance Section leader: Helder LOURENÇO

EOT cranes

Damien LAFARGE Gilles ROCHE Jean-Pierre GRANCHELLI Oliver BOETTCHER Roberto RINALDESI

I ndustrialTrucks

Jean Maurice CHEVALLEY Thierry FENIET

Page 6: April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for

Handling Engineering Group 6

Main activities of “Handling Engineering” group

April 23rd-24th 2013

Provide transport and heavy handling services

Page 7: April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for

Handling Engineering Group 7

Main activities of “Handling Engineering” group

April 23rd-24th 2013

Design, tender, installation, commissioning and maintenance of standard industrial and custom-built transport and handling equipment

Page 8: April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for

Handling Engineering Group 8

Main activities of “Handling Engineering” group

April 23rd-24th 2013

Develop, design and manufacture remote operated equipment for inspection, measurements or handling of radioactive components

Page 9: April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for

Handling Engineering Group 9

Main activities of “Handling Engineering” group

April 23rd-24th 2013

Page 10: April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for

10

EN-HE Transport and Handling Equipment

350 Cranes / 800 Hoists

2000 Lifting Beams

80 Working Platforms

400 Lifting Equipment

100 Tractors

50 Special Vehicles

About 4000 assets in Total

Page 11: April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for

Handling Engineering Group 11

Summary of crane projects

April 23rd-24th 2013

Crane project no. 1 2 3 4Type of operation on the

craneRevamping New crane New crane Replacement

CERN Site ISR / France ISR / France ISR / France ISR / FranceBuilding 184 184 375 (sectors 5/6) 184Location Indoor Indoor Indoor Indoor

Radioactive environment Yes Yes Yes Yes

Existing crane PR122 - - PR146

DescriptionDouble Girder Ceretti &

Tanfani 80T- - Double Girder Munck 60T

Commissioned in 1969 - - 1971

Capacity/ C.M.U. (Charge Max. Utile)

2x40t hoist trolleys will be replaced with 1x60t

5 t 30 t 60 t

Span 24000 mm 24000 mm 14300 mm 13500 mmLifting height 12,5 m 13 m 8 m 10,7 mMain Controls Remote Control Remote Control Remote Control Remote Control

Emergency Controls Remote control Remote Control Remote Control Remote Control

New power supply No / Existing Electrical Feed rail will be used

No / Existing Electrical Feed rail will be used

No / Existing Electrical Feed rail will be used

Yes

Special requirements

Motorized rotating hook, existing operation cabin

dismantling, double motors on all crane

movements

Electro-hydraulic manipulation system

attached to the hook incl. in the supply, camera

system, double motors on all crane movements

Special low headroom design, double motors on

all crane movements

Motorized rotating hook, double motors on all crane

movements, spreader beam for container

Page 12: April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for

Handling Engineering Group 12

Summary of crane projects

April 23rd-24th 2013

Crane project no. 5 6 7 8Type of operation on the

craneRevamping Revamping Replacement Replacement

CERN Site Prevessin/France Prevessin/France Prevessin /France Meyrin /SwitzerlandBuilding EHN1 EHN1 911 156Location Indoor Indoor Indoor Indoor

Radioactive environment No No No No

Existing crane PR538 PR 534 PR559PR37 / PR38

(2 cranes to be replaced by 1)

DescriptionDouble Girder S.E.P.A

40TDouble Girder S.E.P.A

40TDouble girder Zerbinati

40tDouble girder Ferrand-Frantz 30t

Commissioned in 1976 1976 1979 1962

Capacity/ C.M.U. (Charge Max. Utile)

40 t 40 t 40 t 35 t

Span 46.000 mm 46.000 mm 9.7 m 16.4 m Lifting height 21,0 m 21,0 m 18.6 m 10.6 m

Main ControlsCabin + integr. remote

controls Cabin + integr. remote

controls Remote controls Remote controls

Emergency ControlsSeparate set of Remote

ControlsSeparate set of Remote

ControlsRemote controls Remote controls

New power supply Yes, see technical annex

B5 for detailsNo; see technical annex

B6 for detailsYes Yes

Special requirements

Add. 10t hoist on separate rail;

Anti-collision system + coupled operation with PR534 on same rails

Add. 10t hoist;Anti-collision system + coupled operation with PR538 on same rails

Shaft craneNew rails part of the

supply

Page 13: April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for

Handling Engineering Group 13

Introduction to RWTC

April 23rd-24th 2013

Crane projects 1÷4

RWTC: Radioactive Waste Treatment Centre

The centre will be located in the Intersecting Storage Ring

(sector 4)

The purpose is to treat existing and future waste arising

from the operation, maintenance and decommissioning of

CERN accelerator installations Treatment and storage are centralized in one building

complex

Page 14: April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for

Handling Engineering Group 14

Introduction to RWTC

April 23rd-24th 2013

Meyrin site

ISR

ISR

Page 15: April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for

Handling Engineering Group 15

RWTC – Layout

Entrance / exit of trucks with radioactive waste containers

Unloading of containers with 60 ton crane (crane n.4)

April 23rd-24th 2013

Treatment area Storage area

in sectors 5-6Handling of containers with

trailer (out supply)

Page 16: April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for

Handling Engineering Group 16April 23rd-24th 2013

RWTC - Treatment area

60 ton crane (crane n.1) for containers handling

5 ton crane (crane n.2) with hydraulic grippers for waste handling

30 ton crane (crane n.3) for container storage

Control area

Page 17: April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for

Handling Engineering Group 17

Introduction to Consolidation Program

April 23rd-24th 2013

Crane projects 5÷8

Long-term program affecting the aged cranes

at CERN started in 2010

Already more than 50 cranes replaced or

revamped since

Program priorities as following CERN

operation requirement