approved attendance boundaries

25
October 7, 2009 1 Approved Attendance Boundaries FONTANA UNIFIED SCHOOL DISTRICT

Upload: ivan-dudley

Post on 04-Jan-2016

19 views

Category:

Documents


0 download

DESCRIPTION

Approved Attendance Boundaries. FONTANA UNIFIED. SCHOOL DISTRICT. New Boundary Adoption – Process & Timeline. Board Goals. All schools single-track as space allows Desired school sizes (but may vary depending on school capacity): 750 student Elementary schools 1,200 student Middle schools - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Approved Attendance Boundaries

October 7, 2009 1

Approved Attendance Boundaries

FONTANA UNIFIED SCHOOL DISTRICT

Page 2: Approved Attendance Boundaries

2

New Boundary Adoption – Process & Timeline

Task Date Completed

Boundary ReviewCommittee Meetings

12/11 & 12/16/08, 1/7 & 1/22, (Subcommittee 2/2, 2/18)

2/11/09

Community meetings at high schools:

1/12, 1/13, 1/14, 1/15

Board Review and Direction February 18, 2009

Public Hearing, Board Review and Direction

March 4, 2009

Final boundary adopted March 18, 2009

JHHS Opens August 2010

October 7, 2009

Page 3: Approved Attendance Boundaries

3

Board Goals

• All schools single-track as space allows• Desired school sizes (but may vary depending on school

capacity):– 750 student Elementary schools

– 1,200 student Middle schools

– 2,500 student High schools

• Clear feeder patterns (minimize split feeders)• Foster neighborhood schools• Equitable programs and facilities to support learning

environment and student achievement

October 7, 2009

Page 4: Approved Attendance Boundaries

4

Assumptions

• Jurupa Hills High School• Opens in 2010• Initially serves grades 9 and 10• Adds one grade level each year until serves 9-12

• Elementary School #29• Opens in 2012• Serves grades K – 5

October 7, 2009

Page 5: Approved Attendance Boundaries

5

HIGH SCHOOL BOUNDARIES

October 7, 2009

Page 6: Approved Attendance Boundaries

Current HS Boundaries

2009-2010

October 7, 2009 6

Page 7: Approved Attendance Boundaries

HS Boundary Changes

(Current boundaries shaded,

Approved Boundaries in Red outline)

October 7, 2009 7

Page 8: Approved Attendance Boundaries

Approved HS Boundaries

2010-11

October 7, 2009 8

Page 9: Approved Attendance Boundaries

99

HS Boundary Enrollment Comparisons

High School

School Cap-acity

2008/09 Enroll-ment

(Actual CBEDS)

Wed, 9/16/09 Enroll- ment

Resident Students – Approved

Boundaries

2010 (JHHS 9th & 10th)

2012 (JHHS as 9-

12)

Fontana 4,073 3,796 3,937 3,623 2,893

Jurupa 2,042 0 0 1,062 1,898

Kaiser 2,596 2,561 2,633 2,592 2,276

Miller 3,975 3,014 2,918 3,263 3,170

Summit 2,614 2,527 2,763 2,182 2,245

Birch 658 439 417 n/a n/a

Citrus 842 486 351 n/a n/aOctober 7, 2009

Page 10: Approved Attendance Boundaries

10

ELEMENTARY SCHOOL BOUNDARIES

October 7, 2009

Page 11: Approved Attendance Boundaries

Current ES Boundaries

2009-2010

October 7, 2009 11

Page 12: Approved Attendance Boundaries

12

ES Boundary Changes

(Current boundaries

shaded, Approved Boundaries

in Blue outline)

October 7, 2009

Page 13: Approved Attendance Boundaries

13

Approved ES Boundaries

2010-11

October 7, 2009

Page 14: Approved Attendance Boundaries

14

Feeder Pattern Improvements

• Current Boundaries

– 9 ES split to 2 or more MS

– 13 ES split to 2 or more HS

– 2 MS to one HS

– 5 MS split to HS

• 2 split to 2 HS

• 2 split to 3 HS

• 1 split to 4 HS

– 12 Elementary School populations stay together K-12

• Approved Boundaries

– 3 ES split to 2 or more MS– 5 ES split to 2 or more HS– 0 MS to one HS– 7 MS split to HS

• 6 split to 2 HS• 0 split to 3 HS• 1 split to 4 HS

– 22 Elementary School populations stay together K-12

October 7, 2009

Page 15: Approved Attendance Boundaries

15

ES#29

October 7, 2009

NOTE: Numbers include SDC and out-of-district students

Boundary for future

ES #29 (Yellow dash

outline)

[portions of Palmetto, Maple,

S. Tamarind]Capa-city.. 2012 2013 2014 2015 2016 2017 2018

Maple935 694 723 742 751 751 747 740

South Tamarind895 477 445 427 416 410 404 402

Palmetto830 653 685 702 712 715 710 703

Porter890 739 773 785 794 796 792 784

ES #29675 -

775 647 675 688 696 698 694 688

Page 16: Approved Attendance Boundaries

ES Boundaries with future

ES #29(Blue outline)

October 7, 2009 16

ES #29

Page 17: Approved Attendance Boundaries

17

MIDDLE SCHOOL BOUNDARIES

October 7, 2009

Page 18: Approved Attendance Boundaries

Current MS Boundaries

2009-2010

October 7, 2009 18

Page 19: Approved Attendance Boundaries

MS Boundary Changes

(Current boundaries shaded,

Approved Boundaries in Green outline)

October 7, 2009 19

Page 20: Approved Attendance Boundaries

Approved MS Boundaries

2010-11

October 7, 2009 20

Page 21: Approved Attendance Boundaries

21

Implementation

October 7, 2009

Page 22: Approved Attendance Boundaries

Implementation-High School

• 3-year process-JHHS – Yr 1—Grades 9 &10 – Yr 2—Grades 9-11 – Yr 3—Grades 9-12

• 4-year process-other HS– Yr 1—Grade 9 – Yr 2—Grades 9 &10 – Yr 3—Grades 9-11 – Yr 4—Grades 9-12

• For other HS– Students who had previously attended a particular HS under the

old boundaries would continue at their original HS. – New 9th graders in 2010 in the new attendance boundary would

attend HS according to the new boundary

– One year only sibling option, if requested, for siblings of students completing their last year at the school. Sibling must move to new school the following year

22October 7, 2009

Page 23: Approved Attendance Boundaries

23

Implementation-Middle and Elementary School

• Middle recommended implementation – Existing 6th graders (going into 7th) attending a MS have option of staying at

current middle or moving to school of new attendance area– Existing 7th graders (going into 8th) stay at previous site for their last year– One year only sibling option, if requested, for siblings of students completing

their last year at the school. Sibling must move to new school the following year

• Elementary recommended implementation (same as new school openings for Binks and Beech Avenue)

– If requested, students who will be either 5th or 6th graders (depending on if the school is a K-5 or K-6) can complete their last year at their existing school

– One year only sibling option, if requested, for siblings of students completing their last year at the school. Sibling must move to new school the following year

• For all schools: Application process for intradistrict transfer based on consideration of hardship circumstances on a limited, case-by-case and space available basis

October 7, 2009

Page 24: Approved Attendance Boundaries

24

Implementation-General

• Begin parent notifications in Fall 2009– New boundaries– Implementation schedules– Specific guidelines for transportation to be provided– Hardship intradistrict transfer request procedures

• Planned Activities– Letters to parents of affected students in mid-October– JHHS informational meeting at FOHI on November 17th– Informational meetings for other 4 High Schools on November

30th and December 1st, 2nd, & 3rd – Second informational meeting for JHHS on December 10th

October 7, 2009

Page 25: Approved Attendance Boundaries

25October 7, 2009

END

BOUNDARY PRESENTATION