APPENDIX F FGT NOISE SOURCE
The noted sound power levels are the SWL for each equipment item/activity
(see section F.3 for these) and do not include sound character adjustments.
below.
F.1 Equipment and Activity Noise Levels
Noise Source Name Reference
number
Conveyor Belt
BELT FOR CONVEYORS
Shipping – Joint Venture
SHIPPING CONVEYOR 3 45
SHIPPING CONVEYOR 3 46
SHIPPING LEG 2 52
SHIPPING CONVEYOR 2 43
SHIPPING CONVEYOR 2 44
SHIPPING CONVEYOR 4 (SHUTTLE) 47
SHIPPING CONVEYOR 4 (SHUTTLE) 48
SHIPPING CONVEYOR 4 (SHUTTLE) 50
SHIPPING CONVEYOR 4 (SHUTTLE) 51
SHIPLOADER CONVEYOR 1 53
SHIPLOADER CONVEYOR 1 54
FRASER GRAIN TERMINAL EXPORT FACILITY
ENVIRONMENTAL NOISE ASSESSMENT
NOISE SOURCE DETAILS
for each equipment item/activity while operating/occurring, do not include operating time adjustmen
include sound character adjustments. Please refer to Figures G1 to G6 for the location of each item listed
Noise Levels
Equipment
Type Modelled As
SWL
(dBA) Data source
Due to conveyor belt being
fully enclosed, we can assume
there is no noise contribution
for this part of the system
DRIVE
Drive modelled as point
source, belt modelled as line
source
81 CMC
AIR SUP.FAN Point source 76 CMC
DRIVE Point source 88 CMC
DRIVE Point source 86 CMC
AIR SUP.FAN Point source 81 CMC
DRIVE Point source 84 CMC
DRIVE Point source 84 CMC
AIR SUP.FAN Point source 83 CMC
AIR SUP.FAN Point source 83 CMC
DRIVE Point source 81 CMC
AIR SUP.FAN Point source 78 CMC
L EXPORT FACILITY
ASSESSMENT
APPENDIX F-1 | PAGE
, do not include operating time adjustments
6 for the location of each item listed
Adjustment & Notes
APPENDIX F-2 | PAGE
Noise Source Name Reference
number
SHIPLOADER CONVEYOR 2 (BOOM) 55
SHIPLOADER CONVEYOR 2 (BOOM) 56
SHIPLOADER 1 57
SHIPLOADER 1 58
SHIPLOADER 1 59
SHIPLOADER 1 60
HYDRAULIC POWER UNIT (SHIPPING) 71
AIR COMPRESSOR (SHIPLOADER) 76
SHIP GENERATOR 82
Shipping - New Facility
SHIPPING LEG 1 5
RECLAIM CONVEYOR 63 6
RECLAIM CONVEYOR 20 34
RECLAIM CONVEYOR 40 37
RECLAIM CONVEYOR 61 39
RECLAIM LEG 1 40
RECLAIM LEG 1 41
SHIPPING CONVEYOR 1 42
SHIPPING CONVEYOR 2 43
SHIPPING CONVEYOR 2 44
SHIPPING CONVEYOR 4 (SHUTTLE) 47
SHIPPING CONVEYOR 4 (SHUTTLE) 48
SHIPPING CONVEYOR 4 (SHUTTLE) 50
SHIPPING CONVEYOR 4 (SHUTTLE) 51
SHIPLOADER CONVEYOR 1 53
FRASER GRAIN TERMINAL EXPORT FACILITY
ENVIRONMENTAL NOISE ASSESSMENT
BKL CONSULTANTS LTD. | 2720
Equipment
Type Modelled As
SWL
(dBA) Data source
DRIVE Point source 83 CMC
AIR SUP.FAN Point source 79 CMC
TRAVEL Point source 79 CMC
TRAVEL Point source 79 CMC
TRAVEL Point source 79 CMC
TRAVEL Point source 79 CMC
HPU Point source 101 CMC
AIR COMPR. Point source 91 CMC
GENERATOR Point source 111 BKL
DRIVE Point source 90 CMC
DRIVE Point source 86 CMC
DRIVE Point source 88 CMC
DRIVE Point source 88 CMC
DRIVE Point source 84 CMC
DRIVE Point source 88 CMC
DRIVE Point source 88 CMC
DRIVE Point source 95 CMC
DRIVE Point source 86 CMC
AIR SUP.FAN Point source 81 CMC
DRIVE Point source 84 CMC
DRIVE Point source 84 CMC
AIR SUP.FAN Point source 83 CMC
AIR SUP.FAN Point source 83 CMC
DRIVE Point source 81 CMC
L EXPORT FACILITY
ASSESSMENT
2720-15A | REVISION 5 | JUNE 2017
Adjustment & Notes
Low Frequency +5dB
HEMMERA
Noise Source Name Reference
number
SHIPLOADER CONVEYOR 1 54
SHIPLOADER CONVEYOR 2 (BOOM) 55
SHIPLOADER CONVEYOR 2 (BOOM) 56
SHIPLOADER 1 57
SHIPLOADER 1 58
SHIPLOADER 1 59
SHIPLOADER 1 60
HYDRAULIC POWER UNIT (SHIPPING) 71
AIR COMPRESSOR (STORAGE-GROUND) 75
AIR COMPRESSOR (SHIPLOADER) 76
SHIP GENERATOR 83
Receiving
RECEIVING CONVEYOR 1 1
RECEIVING LEG 1 2
RECEIVING LEG 1 3
TRANSFER LEG 1 4
TRANSFER CONVEYOR 1 7
TRANSFER CONVEYOR 2 8
TRANSFER CONVEYOR 3 (SHUTTLE) 9
TRANSFER CONVEYOR 3 (SHUTTLE) 10
TRANSFER CONVEYOR 3 (SHUTTLE) 12
TRANSFER CONVEYOR 30 (SHUTTLE) 21
TRANSFER CONVEYOR 30 (SHUTTLE) 22
TRANSFER CONVEYOR 30 (SHUTTLE) 24
HYDRAULIC POWER UNIT (RECEIVING) 68
AIR COMPRESSOR (RECEIVING) 72
FRASER GRAIN TERMINAL EXPORT FACILITY
ENVIRONMENTAL NOISE ASSESSMENT
Equipment
Type Modelled As
SWL
(dBA) Data source
AIR SUP.FAN Point source 78 CMC
DRIVE Point source 83 CMC
AIR SUP.FAN Point source 79 CMC
TRAVEL Point source 79 CMC
TRAVEL Point source 79 CMC
TRAVEL Point source 79 CMC
TRAVEL Point source 79 CMC
HPU Point source 101 CMC
AIR COMPR. Point source 91 CMC
AIR COMPR. Point source 91 CMC
GENERATOR Point source 111 BKL
HPU Point source 83 CMC
DRIVE Point source 95 CMC
DRIVE Point source 95 CMC
DRIVE Point source 90 CMC
DRIVE Point source 87 CMC
DRIVE Point source 90 CMC
DRIVE Point source 79 CMC
DRIVE Point source 79 CMC
DRIVE Point source 81 CMC
DRIVE Point source 83 CMC
DRIVE Point source 83 CMC
AIR SUP.FAN Point source 84 CMC
DRIVE Point source 101 CMC
DRIVE Point source 91 CMC
L EXPORT FACILITY
ASSESSMENT
APPENDIX F-3 | PAGE
Adjustment & Notes
Low Frequency +5dB
APPENDIX F-4 | PAGE
Noise Source Name Reference
number
AIR COMPRESSOR (STORAGE-TOP) 74
INDEXER 68
LOCOMOTIVE See Figure
G6
ROLLING STOCK See Figure
G6
SHUNTING See Figure
G6
LOCOMOTIVE WHISTLE 90
Loading Facility
HYDRAULIC POWER UNIT (CONTAINER
LOADING) 69
AIR COMPRESSOR (CONTAINER LOADING) 73
CONTAINER LOADING CONVEYOR 1 29
RECLAIM CONVEYOR 10 63
CONTAINER LOADING LEG 1 64
HYDRAULIC POWER UNIT (RC/T LOADING) 70
RC/T LOADING CONVEYOR 1 30
RECLAIM CONVEYOR 11 33
TRUCKS 84
RAIL CAR LOADING– ROLLING STOCK 91
RAIL INDEXER 86
FORKLIFT 87
FRASER GRAIN TERMINAL EXPORT FACILITY
ENVIRONMENTAL NOISE ASSESSMENT
BKL CONSULTANTS LTD. | 2720
Equipment
Type Modelled As
SWL
(dBA) Data source
AIR SUP.FAN Point source 91 CMC
HPU
Openings of indexer building
modelled as vertical area
source
103 CMC
RAIL Line source 120 BKL
RAIL Line source 87/m BKL
RAIL Line source 99/m BKL
RAIL Point source 140 BKL
AIR COMPR. Point source 101 CMC
DRIVE Point source 91 CMC
DRIVE Point source 84 CMC
DRIVE Point source 79 CMC
SHUTTLE Point source 83 CMC
SHUTTLE Point source 101 CMC
DRIVE Point source 76 CMC
DRIVE Point source 81 CMC
TRUCKING Road source, 100% heavy
traffic 69/m
NMPB
Standard
RAIL Line source 87/m BKL
RAIL
Openings of indexer building
modelled as vertical area
source
103 BKL
MOBILE
EQUIPMENT
Horizontal area source of the
area covering area of
movement
110 BKL
L EXPORT FACILITY
ASSESSMENT
2720-15A | REVISION 5 | JUNE 2017
Adjustment & Notes
Regular Impulsive / Low
Frequency / Tonal
+5dB
Regular Impulsive
+5dB
Highly Impulsive
+12dB
FGT Facility event SWL: 128 dBA
JV Facility event SWL: 126 dBA
Regular Impulsive / Low
Frequency / Tonal
+5dB
HEMMERA
Noise Source Name Reference
number
TOP PICK 88
BACKUP ALARM 89
Transfer to 100 Series Silos - Long Route
TRANSFER CONVEYOR 10 (SHUTTLE) 13
TRANSFER CONVEYOR 10 (SHUTTLE) 14
TRANSFER CONVEYOR 10 (SHUTTLE) 16
TRANSFER LEG 1 4
RECLAIM CONVEYOR 63 6
TRANSFER CONVEYOR 1 7
TRANSFER CONVEYOR 2 8
TRANSFER CONVEYOR 3 (SHUTTLE) 9
TRANSFER CONVEYOR 3 (SHUTTLE) 10
TRANSFER CONVEYOR 3 (SHUTTLE) 12
RECLAIM CONVEYOR 20 34
RECLAIM CONVEYOR 61 39
RECLAIM LEG 1 40
RECLAIM LEG 1 41
AIR COMPRESSOR (STORAGE-TOP) 74
AIR COMPRESSOR (STORAGE-GROUND) 75
Transfer to 100 Series Silos - Short Route
TRANSFER CONVEYOR 4 35
TRANSFER LEG 2 65
TRANSFER CONVEYOR 5 79
TRANSFER CONVEYOR 6 80
FRASER GRAIN TERMINAL EXPORT FACILITY
ENVIRONMENTAL NOISE ASSESSMENT
Equipment
Type Modelled As
SWL
(dBA) Data source
MOBILE
EQUIPMENT
Horizontal area source of the
area covering area of
movement
110 BKL
MOBILE
EQUIPMENT
Horizontal area source of the
area covering area of
movement for both forklift and
toppick area
109 BKL
DRIVE Point source 76 CMC
AIR SUP.FAN Point source 76 CMC
DRIVE Point source 78 CMC
DRIVE Point source 90 CMC
DRIVE Point source 86 CMC
DRIVE Point source 87 CMC
DRIVE Point source 90 CMC
DRIVE Point source 79 CMC
AIR SUP.FAN Point source 79 CMC
DRIVE Point source 81 CMC
DRIVE Point source 88 CMC
DRIVE Point source 84 CMC
DRIVE Point source 88 CMC
AIR COMPR. Point source 88 CMC
AIR COMPR. Point source 91 CMC
HPU Point source 91 CMC
DRIVE Point source 81 CMC
DRIVE Point source 87 CMC
DRIVE Point source 79 CMC
DRIVE Point source 84 CMC
L EXPORT FACILITY
ASSESSMENT
APPENDIX F-5 | PAGE
Adjustment & Notes
Tonal: +5 dB
APPENDIX F-6 | PAGE
Noise Source Name Reference
number
TRANSFER CONVEYOR 10 (SHUTTLE) 13
TRANSFER CONVEYOR 10 (SHUTTLE) 14
TRANSFER CONVEYOR 10 (SHUTTLE) 16
AIR COMPRESSOR (STORAGE-GROUND) 75
CN Pick-up and Deliveries
LOCOMOTIVE In PARY and
on Mainline
ROLLING STOCK In PARY and
on Mainline
SHUNTING In PARY and
on Mainline
LOCOMOTIVE WHISTLE In PARY and
on Mainline
FRASER GRAIN TERMINAL EXPORT FACILITY
ENVIRONMENTAL NOISE ASSESSMENT
BKL CONSULTANTS LTD. | 2720
Equipment
Type Modelled As
SWL
(dBA) Data source
DRIVE Point source 76 CMC
DRIVE Point source 76 CMC
AIR SUP.FAN Point source 78 CMC
AIR COMPR. Point source 91 CMC
and
RAIL Line source 120 BKL
In PARY and
RAIL Line source 87/m BKL
In PARY and
RAIL Line source 99/m BKL
In PARY and
RAIL Point source 140 BKL
L EXPORT FACILITY
ASSESSMENT
2720-15A | REVISION 5 | JUNE 2017
Adjustment & Notes
Regular Impulsive / Low
Frequency / Tonal +5dB
Regular Impulsive / Tonal
+5dB
Highly Impulsive
+12dB
Regular Impulsive / Low
Frequency / Tonal
+5dB
HEMMERA
F.2 Filter Unit Noise Levels
Equipment
Shipping - JV
SHIPPING CONVEYOR 3
SHIPPING LEG 2
SHIPPING LEG 2
SHIPPING CONVEYOR 2
SHIPPING CONVEYOR 2
SHIPPING CONVEYOR 4 (SHUTTLE)
SHIPPING CONVEYOR 4 (SHUTTLE)
SHIPPING CONVEYOR 4 (SHUTTLE)
SHIPPING CONVEYOR 4 (SHUTTLE)
SHIPPING CONVEYOR 4 (SHUTTLE)
SHIPPING CONVEYOR 4 (SHUTTLE)
SHIPLOADER CONVEYOR 1
SHIPLOADER CONVEYOR 2 (BOOM), SHIPLOADER
LOADING SPOUT 1
Shipping - FGT
SHIPPING BULK WEIGHER 1
SHIPPING LEG 1
SHIPPING LEG 1
RECLAIM CONVEYOR 63
RECLAIM CONVEYOR 20
RECLAIM CONVEYOR 40
RECLAIM LEG 1, RECLAIM CONVEYOR 61
RECLAIM LEG 1
SHIPPING CONVEYOR 1
SHIPPING CONVEYOR 2
SHIPPING CONVEYOR 2
SHIPPING CONVEYOR 4 (SHUTTLE)
SHIPPING CONVEYOR 4 (SHUTTLE)
SHIPPING CONVEYOR 4 (SHUTTLE)
SHIPPING CONVEYOR 4 (SHUTTLE)
SHIPPING CONVEYOR 4 (SHUTTLE)
SHIPPING CONVEYOR 4 (SHUTTLE)
SHIPLOADER CONVEYOR 1
SHIPLOADER CONVEYOR 2 (BOOM), SHIPLOADER
LOADING SPOUT 1
Receiving
RECEIVING LEG 1, RECEIVING CONVEYOR 1,
FRASER GRAIN TERMINAL EXPORT FACILITY
ENVIRONMENTAL NOISE ASSESSMENT
APPENDIX F
Noise Levels
Reference
Number
Equipment
Type
Level
dB L
54 FAN 75
61 FAN 68
62 FAN 68
52 FAN 77
53 FAN 75
55 FAN 77
56 FAN 77
57 FAN 77
58 FAN 77
59 FAN 77
60 FAN 77
63 FAN 77
SHIPLOADER CONVEYOR 2 (BOOM), SHIPLOADER 64 FAN 77
6 FAN 86
7 FAN 86
8 FAN 86
9 FAN 81
45 FAN 70
47 FAN 70
RECLAIM LEG 1, RECLAIM CONVEYOR 61 49 FAN 77
50 FAN 75
51 FAN 70
52 FAN 77
53 FAN 75
55 FAN 77
56 FAN 77
57 FAN 77
58 FAN 77
59 FAN 77
60 FAN 77
63 FAN 77
SHIPLOADER CONVEYOR 2 (BOOM), SHIPLOADER 64 FAN 77
RECEIVING LEG 1, RECEIVING CONVEYOR 1, 1 FAN 88
NAL EXPORT FACILITY
ASSESSMENT
APPENDIX F-7 | PAGE
Level
dB LAw
APPENDIX F-8 | PAGE
Equipment
RECEIVING HOPPER 1
RECEIVING LEG 1
TRANSFER LEG 1
TRANSFER LEG 1
RECEIVING BULK WEIGHER 1
TRANSFER CONVEYOR 1
TRANSFER CONVEYOR 2
TRANSFER CONVEYOR 3 (SHUTTLE)
TRANSFER CONVEYOR 3 (SHUTTLE)
TRANSFER CONVEYOR 30 (SHUTTLE), STORAGE BINS
301-308
TRANSFER CONVEYOR 30 (SHUTTLE)
TRANSFER CONVEYOR 30 (SHUTTLE)
Loading Facility
CONTAINER LOADING SPOUT 1, CONTAINER
LOADING SURGE BIN
CONTAINER LOADING LEG 1, RECLAIM CONVEYOR
10
CONTAINER LOADING LEG 1
CONTAINER LOADING CONVEYOR 1
RECLAIM CONVEYOR 11
RAIL LOADING SPOUT 1, RAIL LOADING SPOUT 2,
RAILCAR/TRUCK LOADING BINS 801-804, TRUCK
LOADING SPOUTS 3-4
RC/T LOADING CONVEYOR 1
RC/T LOADING BULK WEIGHER 1
TRANSFER LEG 2, TRANSFER CONVEYOR 5, WEIGH
BACK CONVEYOR
TRANSFER LEG 2
Transfer to Silos- Long Route
TRANSFER CONVEYOR 10 (SHUTTLE), STORAGE BINS
101-110
TRANSFER CONVEYOR 10 (SHUTTLE)
RECLAIM CONVEYOR 20
Transfer to Silos - Short Route
TRANSFER LEG 2, TRANSFER CONVEYOR 5, WEIGH
BACK CONVEYOR
TRANSFER LEG 2
TRANSFER CONVEYOR 4
TRANSFER CONVEYOR 6
TRANSFER CONVEYOR 10 (SHUTTLE), STORAGE BINS
FRASER GRAIN TERMINAL EXPORT FACILITY
ENVIRONMENTAL NOISE ASSESSMENT
BKL CONSULTANTS LTD. | 2720-15A | REVISION
Reference
Number
Equipment
Type
Level
dB L
2 FAN 86
3 FAN 86
4 FAN 86
5 FAN 86
10 FAN 81
11 FAN 81
12 FAN 88
14 FAN 88
TRANSFER CONVEYOR 30 (SHUTTLE), STORAGE BINS 26 FAN 88
28 FAN 88
29 FAN 88
CONTAINER LOADING SPOUT 1, CONTAINER 68 FAN 77
CONTAINER LOADING LEG 1, RECLAIM CONVEYOR 65 FAN 68
66 FAN 69
67 FAN 69
44 FAN 69
RAIL LOADING SPOUT 1, RAIL LOADING SPOUT 2,
804, TRUCK 75 FAN 77
73 FAN 69
74 FAN 69
TRANSFER LEG 2, TRANSFER CONVEYOR 5, WEIGH 69 FAN 68
70 FAN 69
TRANSFER CONVEYOR 10 (SHUTTLE), STORAGE BINS 16 FAN 79
18 FAN 81
45 FAN 70
TRANSFER LEG 2, TRANSFER CONVEYOR 5, WEIGH 69 FAN 68
70 FAN 69
71 FAN 69
72 FAN 69
TRANSFER CONVEYOR 10 (SHUTTLE), STORAGE BINS 16 FAN 68
L EXPORT FACILITY
ASSESSMENT
| REVISION 5 | JUNE 2017
Level
dB LAw
HEMMERA
Equipment
101-110
TRANSFER CONVEYOR 10 (SHUTTLE)
F.3 Equipment Operating Time
The daily operating times in the following table
Activity
Annual
Operating
Time (h
Fixed Equipment
Receiving - FGT and JV 2152
Shipping - FGT 1641
Shipping - JV
Container - Bin Charging 1200
Container - Loading 1880
Rail/Truck - Bin charging
Rail/Truck - Loading
Transfer to Silos - long
Transfer to Silos- short
Mobile Equipment
Receiving - FGT
Locomotive 1536
Rolling Stock 1255
Shunting Events* 8368
Train whistle* 4015
Receiving - JV
Locomotive
Rolling Stock
Shunting Events* 1984
Train whistle*
Loading
Forklift 2306
Toppick 2094
Forklift backup alarm 2306
Toppick backup alarm 2094
* For shunting & train whistle events, the values shown are the number of events rather than the operating
times
FRASER GRAIN TERMINAL EXPORT FACILITY
ENVIRONMENTAL NOISE ASSESSMENT
APPENDIX F
Reference
Number
Equipment
Type
Level
dB L
18 FAN 70
Equipment Operating Times
in the following table represent an average day over the course of a year
Annual
Operating
Time (hours)
Equivalent Daily Operating
Time (mins) Weekend operation?
Day Evening Night
2152 177 44 133
1641 135 34 101
950 78 20 59
1200 197 0 0
1880 309 0 0
920 151 0 0
776 128 0 0
830 0 0 136
830 0 0 136
1536 206 23 23
1255 206 0 0
8368 436 0 0
4015 11.5 0 0
512 55 10 19
456 55 10 19
1984 36 7 12
724 2.4 0.4 0.8
2306 373 0 0
2094 339 0 0
2306 373 0 0
2094 339 0 0
events, the values shown are the number of events rather than the operating
NAL EXPORT FACILITY
ASSESSMENT
APPENDIX F-9 | PAGE
Level
dB LAw
represent an average day over the course of a year.
Weekend operation?
Yes
Yes
Yes
No
No
No
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
No
events, the values shown are the number of events rather than the operating
HEMMERA
APPENDIX G FIGURES AND
G.1 Noise Source Location
FRASER GRAIN TERMINAL EXPORT FACILITY
ENVIRONMENTAL NOISE ASSESSMENT
APPENDIX G
FIGURES AND NOISE CONTOURS
Noise Source Locations
L EXPORT FACILITY
ASSESSMENT
APPENDIX G-1 | PAGE
2 3
4
5
6
7
74
1
2
3
4
5
6
7
8
9
10
11
12
13 14
15
16
17 1819
20
21 2223
24
25 2627
28
33
34
36
37
39
40 41
65
68
69
70
72
73
75
79
80
81
64
63
35
29
30
1419-G-SK-20160722-BST3A.dwg2016-Jul-22 / 16:26 2016-Jul-22 / 16:27
1419-G-SK-20160722-BST3A
SAVE DATE/TIME: PLOT DATE/TIME: S-FILE:
FRASER TERMINAL - NOISE SOURCE DATA
EXISTING
ELECTRICAL ROOM
MAINTENANCE
SHOP
OFFICE BUILDING
D
I
R
E
C
T
I
O
N
O
F
T
R
A
V
E
L
SECONDARY
STORAGE BINS
(TYP)
RAILCAR/
TRUCK
LOADING
PRIMARY
STORAGE
BINS (TYP)
CONTAINER
LOADING
TRUCK STATION #2:
LOADING FULL
CONTAINERS
TRUCK STATION #1:
UNLOADING EMPTY
CONTAINERS
TRUCK STATION #3:
EXIT PAPER WORK
TRUCK STATION #4:
BULK LOADING
RECEIVING
BUILDING
MAIN TRANSFER
TOWER
SHL1
TRL1
RAIL
REC1
REL1
TRC1
TRC2
RMC40
RMC61
RMC63
RMC11
RMC10
TRL2
RAIL
CLL1
TOP PICK 2
FORK LIFT 1
TRC30
TRC20
TRC10
TRC3
RML1
AC1
HPU1
HPU2
AC2
HPU3
AC4
TRC40
TRC4
TRC5
WBC1
TRC6
RTC1
CLC1
RMC30
RMC20
BELOW
LEGEND:
EQUIPMENT NOISE SOURCE LOCATION
AIR COMPRESSOR (ENCLOSED) LOCATION
68
HPU (HYDRAULIC POWER UNIT) LOCATION
SEE TABLE "EQUIPMENT NOISE LEVELS"
72
1
SHC1
AC3
FOR CONTINUATION SEE DRAWING
1419-G-SK-20160704-BST4
RMC61
1 2016-JUL-08 ISSUED FOR PER
1419-G-05-300.dwg
1419-G-05-300
1419 1:1000 U.N.O.
FRASER TERMINAL
SITE LAYOUT
GENERAL ARRANGEMENT
HYDRANTS AND FIRE LANES
PLAN
1
PRELIMINARY
FOR DISCUSSION
PURPOSES ONLY
-
T
R
U
E
N
O
R
T
H
PROJECT
NORTH
FIRE HYDRANT AND FIRE LANE PLAN
1:1000
S
E
A
L
(
w
h
e
n
r
e
q
u
i
r
e
d
)
THIS DRAWING IS THE PROPERTY OF CMC ENGINEERING
AND MANAGEMENT LIMITED AND MAY NOT BE COPIED OR
REPRODUCED WITHOUT THE EXPRESS WRITTEN
PERMISSION OF CMC ENGINEERING AND MANAGEMENT
LIMITED. THE INFORMATION CONTAINED HEREIN IS
PROPRIETARY AND MAY NOT BE DISCLOSED OR RELEASED
IN ANY WAY OR FORM WITHOUT THE WRITTEN PERMISSION
OF CMC ENGINEERING AND MANAGEMENT LIMITED.
DIMENSIONS IN
mm U.N.O
PROJECT NO.
DRAWING NO.
SCALE
REV.
S-FILE:PLOT DATE/TIME:SAVE DATE/TIME:
REVISION HISTORY
DESCRIPTIONDATEREV.
REFERENCE DRAWINGS
VERIFY PAPER SCALE ON LEFT BEFORE SCALING DRAWING10 CENTIMETRES505 INCHES43210
SIGNATURE
ENGINEER OF RECORD
EXISTING
FIRE HYDRANT
ROBSON ROAD
LEGEND:
FIRE HYDRANT
NOTES:
1. DISTANCE TO SURREY FIRE SERVICE HALL 3
5.8 km (ESTIMATED TIME: 8 MINUTES)
96
93
92
94
99
97
91
S
E
A
L
(
w
h
e
n
r
e
q
u
i
r
e
d
)
THIS DRAWING IS THE PROPERTY OF CMC ENGINEERING
AND MANAGEMENT LIMITED AND MAY NOT BE COPIED OR
REPRODUCED WITHOUT THE EXPRESS WRITTEN
PERMISSION OF CMC ENGINEERING AND MANAGEMENT
LIMITED. THE INFORMATION CONTAINED HEREIN IS
PROPRIETARY AND MAY NOT BE DISCLOSED OR RELEASED
IN ANY WAY OR FORM WITHOUT THE WRITTEN PERMISSION
OF CMC ENGINEERING AND MANAGEMENT LIMITED.
DIMENSIONS IN
mm U.N.O
PROJECT NO.
DRAWING NO.
SCALE
REV.
S-FILE:PLOT DATE/TIME:SAVE DATE/TIME:
REVISION HISTORY
DESCRIPTIONDATEREV.
REFERENCE DRAWINGS
VERIFY PAPER SCALE ON LEFT BEFORE SCALING DRAWING10 CENTIMETRES505 INCHES43210
SIGNATURE
ENGINEER OF RECORD
1 2016-JUL-08 ISSUED FOR PER
1419-G-05-502.dwg
1419-G-05-502
1419 1:1250
FRASER TERMINAL
SITE LAYOUT
RAIL SERVICE CONNECTION
LOOP TRACKS LAYOUT
1
PRELIMINARY
FOR DISCUSSION
PURPOSES ONLY
G-05-500 G-05-501
G-05-503
B'
B
T
R
U
E
N
O
R
T
H
PROJECT
NORTH
NOTES:
1. HATCH MOTT MACDONALD DWG.
347374-RW-120-S0-0400 REV.F
2. HATCH MOTT MACDONALD DWG.
34734-RW-2-4-AGRI TRACKS (RECEIVED
2015-OCT30).
3. REQUIRED CLEARANCE FROM
"ENGINEERING SPECIFICATIONS FOR
INDUSTRIAL TRACKS / CN-ENGINEERING
OFFICE OF DESIGN & CONSTRUCTION"
SEPTEMBER 12, 2011.
4. UPDATED LAYOUT AND P&H LICENSE/ROW
OVER PMV LAND AREA IN REVISION 2.
A'
A
LEGEND:
EXISTING PARY / LOOP TRACKS
NEW PARY TRACKS BY FSD
NEW PARY TRACKS BY OTHERS
EXISTING PARY TRACKS TO BE REMOVED
EXISTING PARY TRACKS TO BE REALIGNED
FSD UNLOADING LOOP TRACKS
COAL UNLOADING LOOP TRACKS
JV FACILITY LOOP TRACKS
APPENDIX G-6 | PAGE
G.2 Noise Contour Maps
FRASER GRAIN TERMINAL EXPORT FACILITY
ENVIRONMENTAL NOISE ASSESSMENT
BKL CONSULTANTS LTD. | 2720-15A | REVISION
Noise Contour Maps
L EXPORT FACILITY
ASSESSMENT
| REVISION 5 | JUNE 2017
HEMMERA
APPENDIX H RESULTS TABLES
H.1 Predicted Receiver Noise Levels
Receiver Baseline 2015
Name1
Lden
dBA
R 1 -1 65
R 1-2 65
R 1-3 66
R 1-4 66
R 1-5 67
R 1-6 67
R 1-7 67
R 1-8 67
R 1-9 67
R 1-10 68
R 1-11 68
R 1-12 68
R 1-13 68
R 1-14 68
R 1-15 63
R 1-15 63
R 1-16 64
R 1-17 62
R 1-18 66
R 1-19 65
R 1-20 65
R 1-21 64
R 1-22 63
R 1-23 63
R 1-24 63
R 1-25 62
R 1-26 59
R 1-27 58
R 1-28 55
R 1-29 53
R 1-30 49
R 2-1 66
R 2-2 70
FRASER GRAIN TERMINAL EXPORT FACILITY
ENVIRONMENTAL NOISE ASSESSMENT
APPENDIX H
RESULTS TABLES
Predicted Receiver Noise Levels
Future 2020 with Project Increase (Future – Baseline)
Lden Lden
dBA dBA
65 0.5
66 0.6
66 0.5
66 0.5
67 0.5
68 0.5
68 0.5
68 0.5
68 0.5
68 0.5
69 0.7
69 0.7
69 0.7
69 0.8
64 1.1
64 0.7
65 0.9
63 1.1
66 0.7
66 0.8
66 0.8
65 0.8
64 0.8
64 0.7
63 0.6
63 0.7
60 0.9
59 0.8
57 1.1
54 1.6
50 1.7
67 0.8
71 0.8
L EXPORT FACILITY
ASSESSMENT
APPENDIX H-1 | PAGE
Baseline)
%HA
0.8
1
0.9
0.9
0.9
1
1
1
1
1
1.5
1.5
1.5
1.7
1.5
1
1.3
1.3
1.2
1.3
1.3
1.2
1.1
1
0.8
0.9
0.8
0.7
0.6
0.7
0.5
1.5
1.9
Appendix H-2 | PAGE
Receiver Baseline 2015
Name1
Lden
dBA
R 2-3 69
R 2-4 70
R 2-5 71
R 2-6 70
R 2-7 69
R 2-8 71
R 2-9 71
R 2-10 71
R 2-11 72
R 2-12 66
R 2-13 66
R 2-14 63
R 2-15 63
R 2-16 62
R 2-17 63
R 2-18 66
R 2-19 66
R 3-1 72
R 3-2 73
R 3-3 67
R 3-4 68
R 3-5 68
R 3-6 68
R 3-7 69
R 3-8 70
R 3-9 70
R 3-10 70
R 3-11 71
R 3-12 71
R 3-13 75
R 3-14 74
R 3-15 67
R 3-16 69
R 3-17 61
R 3-18 61
R 3-19 63
R 3-20 64
R 3-21 62
FRASER GRAIN TERMINAL EXPORT FACILITY
ENVIRONMENTAL NOISE ASSESSMENT
BKL Consultants Ltd. | 2720-15A | REVISION
Future 2020 with Project Increase (Future – Baseline)
Lden Lden
dBA dBA
70 0.9
71 0.9
72 0.9
71 0.9
70 1.1
72 0.9
72 0.8
72 0.8
73 0.8
67 1.1
67 1.2
65 1.7
64 1.2
64 1.6
65 1.7
67 1.3
67 1.2
73 0.6
73 0.7
69 1.1
69 1.1
69 1
69 0.9
70 0.9
71 0.9
71 0.8
71 0.9
72 0.9
72 0.8
75 0.7
75 0.7
68 1.2
70 1
62 1
62 1.7
64 1.2
65 1.6
64 1.6
L EXPORT FACILITY
ASSESSMENT
| REVISION 5 | June 2017
Baseline)
%HA
2
2.2
2.3
2.3
2.5
2.3
2.1
2.1
2.2
2
2.1
2.5
1.6
2.1
2.5
2.3
2.1
1.6
2
2.3
2.3
2.1
2
2.1
2.2
2
2.3
2.4
2.1
2.2
2.1
2.4
2.3
1.1
1.9
1.6
2.4
2.1