appendix d – agency correspondence

7
Appendix C Replacement Conceptual Engineering Drawings

Upload: others

Post on 24-Jan-2022

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: APPENDIX D – AGENCY CORRESPONDENCE

   

Appendix C   Replacement Conceptual Engineering Drawings 

Page 2: APPENDIX D – AGENCY CORRESPONDENCE

SH-75 Timmerman to Ketchum Final Environmental Impact Statement and Final Section 4(f) Evaluation

Project No. STP-F-2392(035), Key No. 3077

February 2008

APPENDIX C – REPLACEMENT CONCEPTUAL ENGINEERING DRAWINGS

The following figures replace those found in Volume II Conceptual Engineering Drawings of the DEIS. Figure II-36 Gannett Road Roundabout Figure II-64 Spruce Way Pedestrian Underpass Figure II-70 Approach to Ohio Gulch and SH-75 Intersection Figure II-70 Ohio Gulch/Starweather and SH-75 Intersection

Page 3: APPENDIX D – AGENCY CORRESPONDENCE

SH-75 Timmerman to Ketchum Final Environmental Impact Statement and Final Section 4(f) Evaluation

Project No. STP-F-2392(035), Key No. 3077

February 2008

This page intentionally left blank. 1

Page 4: APPENDIX D – AGENCY CORRESPONDENCE
Page 5: APPENDIX D – AGENCY CORRESPONDENCE
Page 6: APPENDIX D – AGENCY CORRESPONDENCE
Page 7: APPENDIX D – AGENCY CORRESPONDENCE