Appendix C

Detailed Mass Balance Sheets

-- Pre-Conceptual Designs of Various Alternatives for the V-Tanks

Rev. 0; November 2002

Page 2: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

._ . .

Page 3: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

Appendix C

C1. DETAILED MASS BALANCE SHEETS

For clarity and convenience of use, detailed mass balance data spreadsheets for each option are provided in the accompanying Appendixes A and C Spreadsheets volume. However, the data is being validated and is subject to change. The spreadsheets supplied include:

Vitrification Options

In situ

Ex situ

Thermal Desorption

On/off-Site

On-Site

Off-Site

Chemical OxidatiodStabilization

In situ COG Ex situ COG

C2. ASSUMPTIONS

The following assumptions were used in developing the spreadsheets in this appendix:

The treatment alternatives flow sheet represents a complete solution, with all secondary waste streams and stack emissions complying with applicable regulations.

Treatment of the tanks will be based on the contents of the waste. Separate treatment trains for solid and liquid are not a requirement, although treatment alternatives may allow for some level of decant steps.

Treatment of the main organic constituents (TCE, PCE, PCB, and BEHP) in a given treatment alternative will be robust, relative to the non-detect organics as to require material balance tracking of every non-detect specie that exceeds the Universal Treatment Standard.

The concentrations of the CFTs in the primary and secondary wastes will be tracked to the final waste form following all the necessary treatments. The concentration in the final waste form will

h. For gaseous releases, not all of the treatment alternatives will be held to the same standard, Le. some alternatives by the nature of contamination destruction will be held by the stringent MACT requirements. The specific regulatory status will be spelled out in each treatment alternative section.

Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

c- 1

Page 4: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

be lower than the treatment standard (TS) concentration when the TS is based on total concentration. For the contaminants that have to meet a toxicity characteristic leaching procedure (TCLP) TS, suitable process knowledge will be required for any CFT with a total concentration exceeding the divide-by-20 rule. '

i. The basis for the divide-by-20 rule is that the total concentration of a RCRA metal in a non-wastewater form could theoretically fail TCLP based on the assumption that all of the metal is soluble in the TCLP extract. If process knowledge of a particular treatment (extent of immobilization) exists to imply that the TCLP limit would not be exceeded, this would have to be articulated to persuade the reader to accept the assertion of successful treatment (immobilization) regardless of the final reported total concenlration.

c - 2 Pre-Conceptual Designs of Various Alternatives for the V-Tanks

Rev, 0; November 2002

Page 5: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

C3. IN SITU VITRIFICATION DATA SPREADSHEETS

4

each t a b

3A - ISV Vitrified

CAC Filter /u - FracNre & Excavate 1

Vitrified Monolith

12A - vimtied Waste Form Disposal

8 c - Grouted

8E - Aqua-Set - Stabilize

- 1 2 c 4 Wate Form

12E & Packaging 12B

Disposal - 8B - 12D ' - 12F

ICDF A,,-Set - 11 - Excavate

Tanks (& soil)

Figure C-1 . Alternative 1 .a. ISV process flow diagram.

_I__

Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

c-3

Page 6: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

--

C4. EX SITU DATA SPREADSHEETS

Vent

- 15 - Fines -

Super Metal Off-Gas Heater HEPA

Heat to 150°C. Filter

7 - Sludge + Liquid 1 - V-TANK (Generic)

(2 Stages) 11 - (1 00°C - 12 - 21 00°C

as necessary - > 150°C

Off-Gas 16-<100"C 17 - >lOO°C

Quench

Wet Spray Scrubber wlSump - 2o t-50"C

8 - Soil s k c i e n t to meet

In-LeTkaae 10 nCilg 2 - 20 yd3 Roll-Off BOX

13 - <I 00°C 14 - >I 00°C

2 - Decant Final Product ESV Batch Operation Liquid Pre-Vit Operations

(4 in. above sediments)

Soil

HEME Heater I - 10 - 20 yd3 Roll-Ofl BOX dT = 25°C

ESV Batch Operation Post-Vit Operations

Water w Addition

SDicient to fill

waste box - 32 - Vitrified Waste Form & Packaging

GAC Filter

1 - 28 - Aqra-Set Stabilize

3 - Fiitered Waste - Water 5 - Grouted

waste Form & Packaging 1

29+ ,

4 - - Disposal Aqiia-Set -- ICDF 4

33 - Excavate Tanks

Figure C-2. Alternative 1 .b ESV process flow diagram.

c -4 Pre-Conceptual Designs of Various Alternatives for the V-Tanks

Rev. 0; November 2002

Page 7: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

V-TANKS 0 off-Gas @ Super ~a b Heater --b I

C5. TD ON/OFF SITE DATA SPREADSHEETS

Metal Filter

Fines Sludge + Liquid 100 to 300 C

Soil

Soil

I I

Vacuum Thermal Desorption "Batch Operations" wmitrogen Carrier Gas

Y 3 (Hopper)

'"0 to3"°C

Botloms

I n

y n t f , Blower 54 Filters 'A

I W I HEPA I Filters

HEME Heater

To 150 C I Temp

Surge Tank Surge Tank Low Temp High Temp

Off-S i te Treatment &lor

Grout I Water I Disposal I

Stabilize Sample Disposal (3 ICDF

~~~ ~

SGAC Filters: 1 - GAC Filters 2 - SGAC Filters Monitor For V o C s & Hg Residence Time - 5 to 10 sec

Figure C-3. Alternative 2.a TD - odoff-Site process flow diagram.

c-5 Pre-Conceptual Designs of Various Alternatives for the V-Tanks

Rev. 0; November 2002

Page 8: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

C6. TD ON SITE DATA SPREADSHEETS

V-TANKS

L

Vent 100 to300c

Super 1 Heater

I I

@ v

Disposal @ ICDF t so11

+ 100 to 300 C

Thermal Desorption “Batch Operatlons” loo to 3(X) C

1 - GAC Filters 2 - SGAC Filters Monitor For VOCs & Hg Residence Time - 5 to 10 sec

7

Vacuum to Pump

S-GAC 6 ) Filters

Figure C-4. Alternative 2.b TD - on-site process flow diagram

C-6 Pre-Conceptual Designs of Various Alternatives for the V-Tanks

Rev. 0; November 2002

Page 9: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

C7. TD OFF SITE DATA SPREADSHEETS

To I5OC

_________________---------------

- I - I I ,

1 - GAC Filters 2 ~ SGAC Filters

(NTS, Hanford)

I Monitor For VOCs & Hg I Residence Time - 5 lo 10 sec Soil @ ICDF

Figure. C-5. Alternative 2.c - TD - off-Site process flow diagram.

_I-.

Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

c-7

Page 10: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

C8. CO/S IN SITU DATA SPREADSHEETS

contents

D C A 0

I 1 22 Heat to 80°C

23 * pH Adjust to 12 14 1 3 1 pH Adjust to 12

F

I + I

Reheater Ga 1 8 a Adjust/Cooling 27c7 Adj ust/Cool i ng

t 28 Grout Tanks

Contents Grout Tanks

Contents

t t t t I 1 I

ICDF 2r I I

Figure C-6. Alternative 3.a IS-COB process flow diagram.

c-8 Pre-Conceptual Designs of Various Alternatives for the V-Tanks

Rev. 0; November 2002

Page 11: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

C9. CO/S EX SITU DATA SPREADSHEETS

A B D H

Excavate Tank iw 2 tcavate Soil -I

Heat to 80°C

I I

4 10

AdiusffCoolina I ’ I ,

;y Mixer/Extruder

I Fpq Containerization

Gallon out Drums

G

1 1 1 Excavate Tank

+

Demister

L Reheater

4

2 ICDF

Figure C-7. Alternative 3.b ES-COB process flow diagram

__I_

Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

c-9

Page 12: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

c-10 Pre-Conceptual Designs of Various Alternatives for the V-Tanks

Rev. 0; November 2002

Page 13: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

d T = 2 5 C

4 SA - F ~ I C P ~ haste Water -

- 8B - Aqua-Set

- 8D 4 12A - Vitrified - 8E - - - Waste Form Disposal Stabilize - Aqua-Set

12c 4 8C - Grouted Waste Form

v & Packagme: 12B - -

Disposal - 12E - 12D ICDF '

In situ VIT

Page 14: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

00 00 + + w w

2 % 2:

00 00 + + w w

" $ 2:

o m o 00 0 + + + K: : 2; 2 m m m

Page 15: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

o m 0 0 + +

0 -

- *

Lom 00 + + w w ?.N m o F %

" - r

X B B N

+ + + + w w w W

r. m a *

- - O N

+ w O

+ + w : P x t - c m

O

+ UI N r. 0

Lo m *

O m 0 0 + + w w N N N N

O O m 0 0 + + + w w w a

*

B w O

m 2 8 % $ $

O 0

u a m o 0 0 + + w w m a N N ?

m *

* 0

W O

2 - 0

w

s

- 0 s

w w

h

? ? w w 00 m m

u * - N f h b

*-0 0 0 0 + + + w w w N - O

z q s - m ~

0 0 - 0 0 0 + + w w w 00 mLD 2 2: N

B Z 6 + + + w w w m N O

am " S O m ( D N

O N

+ + 0 0 $ $ $ p L 8 1 N h L o

O N l C q a a * L o

- r -

86s: a s B 8 + N

+ + + + + + m m a

w w w w w w w W

- N N ~ l n ~ m m

0 w m m .n x 0 m m * 3: 8

LDme Lo 000 + + + w w w

N O

? o m z h

m O O O O Lo 0 0000 0 + + + + + + m m o ~ o -r k r - 0 9 9 h g :I%: : a (Doh- - m

Page 16: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

- 15 - Fines

z - Sludge + Liquid Super Metal Heater HEPA

(2 Stages) Heat to 150°C. Filter

1 - V-TANK A (Generic)

as necessary > 150°C Blower

Quench

Wet Spray

dT = 25°C

Water

11 -<lOo"C

8 - Soil Skc ien t to meet 10 nCi/g

Final Product 2 - Decant Liquid

(4 in. above sediments)

Soil

ESV Batch Operation Post-Vit Operations

Addition

Tanks

to fill waste box

Waste

2 -Vitrified Waste Form & Packaging

I GAC Filter I 30 - 0

Stabilize , p z q 5 - Grouted

& Packaging Aqua-Set Disposal

ICDF

Ex situ VIT

Page 17: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

m

m N (1

+ w W

N w N - r. x m

m

W 8 4

8 :: w

N

ro 0 0

m N

(D 8

8 a N

(0

0

N

N ? P - N ? % -

N

9 2 -

8 E

8 % + + w w

& x 8 B W

2

0

W m 4

N

W h

m

m + w W

0 (1

N

W

m 0

- 0

W m m

O

W

0

8 8 8 % + + w w

2 : N

0 0

w N

t 2 N

-3

8 2 h w r

Page 18: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

* W

0 N 8 8 W w wv m

+ + O N - IC m m

N ' - 9

m 9 8 N

m

m g

g N

m

8 m 0

N

8

N 4 m c

N

N 4 % 0 N

N

l+! 8 N

O

W

N N N 0 0 + + w w W

O m 0 0 0

4 m 4 m iD - m 4 I

4

LO -

m Lo -

N N N 0 0 + +

C r . w w w

LO (1

8 % w w

N

+ + W

& I C m 2 2 0

0

+ W

a E 0

N

0

W

8 w, Lo N

m

w, x

Page 19: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

o

w

g N N 0 0 + + w w

N N 2 % u i d

8 8 + + w w N N

9 3 N

W

3 8 8 + + w w N N N N

$ 9

o .- o - - 0 0 0 + + + + W w w w m v ) N m m m

2

h q p 9 3 2 m 0 - - - 0 0 0

Lo a + t i

W w w w - m o m m o m 9 $ 4

0

W

N

N

8 8

M M + + w w

9 %

o

W v)

9

0

w Y)

Page 20: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

0

W m (1

N

8 2

m m + + w w m m

N 4

8 g m m m m 4 4

+ + w w

0 0 0 0 + +

i: 0 2 N N 0 0 + + w w m m

0 0 00 t t w w m m m m 2 3

(1

W .- $ S m

8 W 0

3 (1

W m 2

0 I i D - -

W w w w 0 0 0 + + + O O Y )

2

z d E - * m

i ! loow

e ; : N 3 3 N 0-7 0 0 0 i t +

W w w w

m O F 5 N -.?e

h 8 "

R I

0

W R

Page 21: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

L o N - 0 0 0 + + + w w w m o o

m m 3 $ E m

L O N - 0 0 0 + + + w w w

6" 0 - 0

O N - 0 0 0 i t + w w w r - o m B E % 0 - 0

L O N - 0 0 0 + + + w w w h o r n o h m 0 - m m m m

0

W u1

I

w w ? 4 4 w

8 f i 6 r . 5 cy - L o 0

Page 22: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

Fines loo to300C

Surge Tank Low Temp

soil

Surge Tank High Temp

I I n F F P _ . ^

Filter

Thermal Desorption

Vacuum I Pump I

Blower

Filters

“Batch Operations”

Bottoms

Containerize

Grout Water

50 to 70 c Low & High HEME

n To 150 C Temp

SGAC Filters: 1 - GAC Filters 2 - SGAC Filters Monitor For VOCs & Hg

OdOff-Site TD

Page 23: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002
Page 24: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002
Page 25: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002
Page 26: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

3 - ; F i y "

1 2

1 - 3 0 t + u w 3 0

? L

' ) Y

m 0

W 0

R

L . I Y

m 0

W r-

N 9 -_

rn 1 Y

Page 27: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002
Page 28: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002
Page 29: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

- N 0

w d 2 _.

2 Y N 0

8 2 -_

L

% Y N 0

W 0

m m __

L . I

Y N 0

W 0

2

w w w w w w w u I w w o - o ( o o o o o N b ~ $ ~ ~ g g ~ 8 w ~

Page 30: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

!

J C

<

,

< I i J ,

,

< C

: I ? L

, C

I

I , 1

I:

t

, L

I

, c

Page 31: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002
Page 32: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002
Page 33: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002
Page 34: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002
Page 35: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

m o

Page 36: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002
Page 37: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

1

Page 38: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002
Page 39: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

wmitrogen Carrier Gas loo0 to 1200 c

1 - GAC Filters 2 - SGAC Filters Monitor For VOCs & Hg Soil 1

On-Site TD

Page 40: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

t

Surge Tank Low Temp

Surge Tank High Temp

Off-Site TD

Page 41: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002
Page 42: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002
Page 43: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002
Page 44: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002
Page 45: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002
Page 46: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002
Page 47: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

T

111111111111

Page 48: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002
Page 49: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

+

i contents to v-9 v-2 I I (F) (F) Condenser I off-Gas I +l Heat to 80°C Heat to 80°C k4 Heat to 80°C

Grout Tank Off-Gas Dernister A I

r

I pH Adjust to 12 I 4 Off -Gas Reheater

Addition

Addition

Addition Addition

4 Sulfur

Impregnated GAC Cartridge

HEPA Filter

A

J r"7 Off-Gas Blower

)%*

Contents Contents Contents

Excavate Tank

t t t t ICDF

In-situ CO/S

Page 50: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

ci c a, u)

.- F - c C

z E v

I C m m m a,

-0

m a,

a

E 2 R I

E, x cn D m

- 5- x

C W c

E

!!

?

- i

- + u)

E D

3 9

a, 3 2 a c C

E 2 c

C

a,

- L

.- E

a zi 3 c

a, .K

Y

m - ci, ._ D

0

(0

- ._

c E 2

cn cn w 0 B a

- C

E

._ 9

2 ._ > a,

c

0 m

-0 K m

!!

i u) u)

!! a ??- - si a L E

Page 51: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

d cu

0

m

0 0 : k 9 x 0

Page 52: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

0

in

c

E - h c C

n 0

C

m a,

V m m

- +

a

0 e

E 2 V v) V m

F

$ p + E : 8

I

C

m

m P

ai - V 3 D m D - e n - c

: - in - L

c C

E 0 ._ > m m ._ c

m

V

m

?

@ in

? Q

@ c s Q

c E

v)

W J m

a 2

5 1 W 0

a m

5 a W I- a z

1

Page 53: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

W m 0 m 0 0

m m

0 0 0

7

-0 0 0 + + w w U O d o w o

- N 0 0 + + w w

a m $ 2

- c u 0 0 + + w w 3 : w m

- N 0 0 + + w u w - cum wr.

- a 0 0 + + w w w - N m w r .

- N 0 0 + + w w

m d m r - a m

- N 0 0 + + u w

In*

m r - w m

- 0 0

W W m d

- 0 0

W W in

U

- 0 0

w W In

d

L U m 0 x x - 0

3 5 $ 6 % E = e

N - m

m m m

m

r-

N N W N

W m m m m r.

2 m a

m W

0 m 0

m N m W

m

W W 0 r.

N T

m 2 W

m 0 a r. m m

0

W W -

- - m N

2 0 W

m 0 (D d m m U

in W -

7

N m r-

U

0 N N m

m

in

r- W in d W N W

m m

N

m m W

m N W

E

m

- . - F ' " c

c z E E

S B

5 6 : : P z P '0

m a - 0

L o

- 3

m 0

- 0

U c w 0 -

- m .- -

m

- 0 D c U

m

- 0 U

w 00

Y

0

Y c

F - m r c C -

r.

Page 54: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

- C

E

5:

E

E

3

0

._ 3 U

LL D

._ P E - W

6 m

e *

Page 55: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

m s TI z T

0 0 0 0 0

0 0 0 0 + + u u m o 0 0

m o

O N 0 0 + + u u m m o m m a ,

O N 0 0 + + w w m I n o w m a ,

O N 0 0 + + u u d h m m cur.

O N 0 0 + + w u 2 6 c u r .

O N 0 0 + + u w a m cum

- -

O N 0 0 + +

[ D m N m

w w

0 0 0

U e m 7

0 0 0

U d m -

00 0

W d m T

Ln c - G

L g - E 2 % - 0 0" % e 2 Z6 L

0 0 6 0 E r n

0 0

a _I 4 0 + 0 +

U m 0 I

a

m - 5

V

1

- 0

2 U

0 -

- 0 72

w 0 -

m

- 0 U

W m

- 0 U

U m

h

I-

m d - a m e - 0 NO, cum - a m m m m

m - m h -

m m m r.

m m N O % 2 % q m m 0 0 m a N O m or.

m m

m (O

r.r.

m m o m r. 0 N

d N 0 0 m b m

- -- m m m 9 5 5 5

3 LT

1 -- 3 e ? +

N - N - - o o O - - N . - -

m m * N w O N N r . N m N b

N - O u - d N ~ ~ 0 0 0 0 0

- N N N - - _

w u ~ u u w +

N - O b - d N

- N N N - - ,

N - o d - d N

N m w w b m N

N - O d - b N 0 0 0 0 0 0 0 w w + w w u +

(ON g g o m N g m m h g O i c i ~ W b m :

m d N

N W m -

In N 0

m (O

m

m m 0. N

m b N

m In (0 a3 m In m

U m -

- N N

W W cu

b m m

: N N

Page 56: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

Excavate Tank Batch Off -Gas

Reaction Condenser

Addition

I Tank Grouting I

I

AdjusUCooling '\, u +

1 Excavate Tank

I-

4-, Mixer/Extruder

Containerization

ICDF

Demister

Off -Gas Reheater

Sulfur

GAC Cartridge

HEPA Filter

' 1 Off-Gas Blower

I I

Ex-situ CO/S

Page 57: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

a m * ~ o o o o o - ~ o o o m a m o w 4 4 0 N b m 0, 0, 0, b c c u b. w 0 x 7 m m 0-0

Page 58: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

d W r.

0

d

0 0

m 7

7

8 8

0 0 0 0 + + w w m o b o w o

O N 0 0 + + # E r . m w m

O N 0 0 + + % E r . m w m

O N 0 0 + + W W d m m d w m

O N 0 0 + + W W * m m d w m

O N 0 0 + + w w

a 6 4 t-

0 t- u o, 0 I

N 0

W N N

m

N 0

W m

r. r

N 0

W m

r. r

N 0

W m m W

N 0

W N d

r.

N 0

W

N

- 3 0 m

0

0

u U m - c a, m

a, - m c - m

- 0 u W

m

U U

m

- 0 U

W m

U U

c m

a, i? -

r.

Y m

Y C

t-

W 0 z

Q 4 m

m w r r . W d m w r . m N

m - 7 w m m w

m m

m r. " $ -

Page 59: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

U 0

0 0

m W _I

m 9 U U > W 0

5 3

E t

J 9

I

Page 60: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

r.

m 0 0

m m

0 0 0

E N

0 0

I

3

0 m

m - E

r

- 0

2

0 8

72

3 I

I,; F

- 0

72 C W

:

U D

C I

m

a, - m E -

m

- 0 72

w m

U 72

I

C

m

72 C

U

m

m

a,

m

L 0

72

w m

U 72

+ L m -

8 - r. >

I

Lu 0 z

Q 4 m J Q LT w -

O b W c ? z 3 m

m

a 2

Q z

Q z o y y o

w ? m

Q z o m d m m - t.

N r.

Q z

m N 0 ." a m

>-oo-oCU

t + + + + 3 0 0 0 0 0 0

u p w w g w w p?t??:k$ - r.-

- c 3 c + i

u u * c * c D C

- c u 3 c t + U L L

5 m : P

- a > o I + 1 w

5,: 12

-0. ) O

I ?

N 0

w x

N 0

w t.

w m

N 0

W r.

9

0

0

3

U 2

>

?

m m

m m m m

7

8 N

W m m m

m

m

r.

z W

m W

0 in 0

m N m W

m

W W 0

N b

2 m

W

m

m

0 W r.

m

0 W W

7

d

m N z '? 0 W

m 0 W d m m

2 10 W

r N m r.

v 0 N N in

m

m r. W

m d W cu W

m m

cu

m m W

m N W

E

m

- - . - P C 0 2 - I

C U

0

a, 0

Page 61: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

,

tn VI W

0

a B

- E .- E

2 U ??

3 n 0 .- P 8

P I E 2

U

- E 5

Z E

Page 62: Appendix C Detailed Mass Balance Sheets · Appendix C Detailed Mass Balance Sheets -- Pre-Conceptual Designs of Various Alternatives for the V-Tanks Rev. 0; November 2002

m

0 9 9 0

r- 0

* N

0 - -

0

a a 1

0 k 0 c n m 0 I

1

- 0 m U

z

r

0 8 m U a w 4

Z I C

- <

W z U

u U

C a,

m

- m

??

- a, m

P F E lli

4 z m o r . u m

N g 0 T

3 m N 0 % a m

n m a 0 I C

o < o < + u t L o <

z :

o c o c + - w u m u 0 0

0 0

0 0 o c + i w u m u

z :

3 - 3 c + + ULU ur.

Nr. n a

3 N 3 0 + + u w Jr.

;?

3 N 3 0 e + ! E : z

> N > o - + i w 3::

, o

I

0

0

a, 0 0

e U c 0

0

r. (D m U m - -m N -

r. (D

* m

- 7 m u N

r. m m m

m

- N

u N

cu W

r. 0

m 7-

2 * hi

0

0 (D u m

m '4 m Lo N

m N 0

Lo W m

x 3

r. r. N r.

r.

m xt N

m -?

m Lo (D m Lo Lo

u m m -

b m

* m

2 m - N N

(D (D N

b 0

N N N

m

m

- 7 - E" C 0 F - c a,

c 8 ? a,

- c