appendix b: typical esc design details · existing minor contour proposed major contour proposed...

12
480 480 480 490 460 460 470 480 450 450 450 460 TURBINE 21 EASTING:484943.93 NORTHING:736153.72 CH 2800 CH 3000 CH 3200 CH 3400 500 500 450 460 470 480 ASSEMBLY AREA 3 (100x30) EASTING:485093.05 NORTHING:736109.06 DEB DEB DWD DWD DWD DWD DWD DWD DWD DWD DWD LEGEND - SUPPLEMENTARY INDICATIVE CLEAN WATER/STREAM FLO INDICATIVE DIRTY WATER FLOWS PROPOSED SUPER SILT FENCE PROPOSED FILTER SOCKS PROPOSED DIRTY WATER DIVERSION PROPOSED DECANTING EARTH BUND PROPOSED SEDIMENT PIT PROPOSED SEDIMENT DETENTION POND PROPOSED GRASS BUFFER ZONE PROPOSED TURKEY NEST PROPOSED NON ERODIBLE BARRIER DA INDICATIVE PUMPED FLOW INDICATIVE FLOW FROM PUMPING EXISTING SLOPE TRIANGLE GREATER THA SSF FS DWD < DEB T PROPOSED ROAD 7 TEKTUS Consultants Ltd PO Box 80212 Green Bay Auckland 0643 NZ p. 09 827 1191 m. 021 1434 874 www.tektus.nz VENTUS ENERGY (NZ) LTD 10/215 ROSEDALE ROAD, ALBANY AUCKLAND 0632 SYNERGY POSITIONING SYSTEMS LTD 3/52 ARRENWAY DRIVE, ALBANY, AUCKLAND 0632 KAIMAI WIND FARM ROTOKOHU ROAD, PAEROA PRELIMINARY CIVIL ENGINEERING DRAWINGS A RESOURCE CONSENT JT 15.06.18 1. FOR INFORMATION PURPOSES ONLY. 2. BOUNDARIES, CONTOURS AND OTHER BASE INFORMATION SHOWN IS INDICATIVE ONLY AND PRIMARILY INFORMED BY AERIAL LIDAR SURVEY BY SYNERGY POSITIONING SYSTEMS LTD IN APRIL 2016. 3. COORDINATES SHOWN ARE IN TERMS OF MT EDEN 2000 CIRCUIT AND LEVELS ARE RELATIVE TO THE AUCKLAND 1946 VERTICAL DATUM. 4. THE PROPOSED ROAD ALIGNMENT, TURBINE PLATFORMS, AND OVERALL EARTHWORKS ARE BASED ON AN INDICATIVE ROAD ALIGNMENT AND REMAIN SUBJECT TO DETAILED DESIGN. 15.06.18 JT JT T15022 A LEGEND EXISTING PARCEL BOUNDARY JACKSON PROPERTY BOUNDARY ROTOKOHU FARMS PROPERTY BOUNDARY DENIZE BROTHERS PROPERTY BOUNDARY HDC/MPDC TERRITORIAL BOUNDARY EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR EXTENT OF EARTHWORK PROPOSED TURBINE LOCATION EXISTING TRANSPOWER NATIONAL GRID LINES PROPOSED ROAD CENTER LINE AND EDGE OF CARRIAGEWAY EXISTING FENCE INDICATIVE QUARRY SITE INDICATIVE CLEANFILL SITE EXISTING CULVERT PROPOSED UPGRADED CULVERT STREAM (WRC REGIONAL MAP) P P RESOURCE CONSENT C Q 251-4 1:1500 05.10.18 ADDITIONAL PLAN FOR S92 RESPONSE LT 05.10.18 LT EROSION AND SEDIMENT CONTROL DETAIL SHEET 4 - ASSEMBLY AREA AND FILL SITE - INDICATIVE ONLY NOTES 1. EROSION AND SEDIMENT CONTROL TO BE INTEGRATED IF PRACTICABLE 2. STRIP TOPSOIL WHERE NECESSARY AND PLACE IN LOCATIONS WITH “INDEPENDENT” EROSION AND SEDIMENT CONTROL CAN BE ESTABLISHED 3. DECANTING EARTH BUNDS TO BE ESTABLISHED WITH DIRTY WATER DIVERSION TAKING FLOWS TO DEBS 4. ASSEMBLY IS LARGELY IN CUT MATERIAL AND WILL BE STABILISED AS CUT PROGRESSES 5. CLEAN WATER DIVERSION MAY NEED TO BE ESTABLISHED ABOVE THE WORK LOCATION ONCE SPECIFIC ON SITE VERIFICATION CONFIRMS 6. FILL SITE AS SHOWN INDICATIVE ONLY AND WILL BE ESTABLISHED WITH MAXIMUM BATTER SLOPES OF 25DEGREES TO MINIMISE EROSION AND ALLOW FUTURE STOCK GRAZING 7. STOCK EXCLUSION TO OCCUR DURING EARTHWORKS ACTIVITY 8. ALL PRINCIPLES AS PER ESCP SECTION 5.0 TO APPLY 9. DETAILED SSESCP TO BE ESTABLISHED PRIOR TO ANY EARTHWORKS OCCURRING 10. WRC EROSION AND SEDIMENT CONTROL GUIDELINES TO APPLY 11. MONITORING TO OCCUR AS PER ESCP SECTION 11 WITH AN ADAPTIVE CONTINUOUS IMPROVEMENT APPROACH FILL AREA AND ASSEMBLY AREA TREATED INDEPENDENTLY HOWEVER, INTEGRATION OF CONTROLS WHERE APPROPRIATE C

Upload: others

Post on 19-Mar-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

480

480

480

490

460

460

470

480

450

450

450

460TURBINE 21EASTING:484943.93NORTHING:736153.72

CH 2800

CH 3000

CH 3200

CH 3400

500500

450

460

470

480

ASSEMBLY AREA 3 (100x30)EASTING:485093.05NORTHING:736109.06

DEB

DEB

DW

D

DWD

DWD

DW

DD

WD

DWD

DW

DDWDDWD

LEGEND - SUPPLEMENTARYINDICATIVE CLEAN WATER/STREAM FLOWSINDICATIVE DIRTY WATER FLOWSPROPOSED SUPER SILT FENCEPROPOSED FILTER SOCKSPROPOSED DIRTY WATER DIVERSIONPROPOSED DECANTING EARTH BUNDPROPOSED SEDIMENT PITPROPOSED SEDIMENT DETENTION PONDPROPOSED GRASS BUFFER ZONEPROPOSED TURKEY NESTPROPOSED NON ERODIBLE BARRIER DAMINDICATIVE PUMPED FLOWINDICATIVE FLOW FROM PUMPINGEXISTING SLOPE TRIANGLE GREATER THAN 25°

SSF

FS

DWD

<

DEB

T

PROPOSED ROAD 7

TEKTUS Consultants LtdPO Box 80212 Green Bay

Auckland 0643 NZp. 09 827 1191

m. 021 1434 874www.tektus.nz

VENTUS ENERGY (NZ) LTD10/215 ROSEDALE ROAD, ALBANYAUCKLAND 0632

SYNERGY POSITIONING SYSTEMS LTD3/52 ARRENWAY DRIVE, ALBANY,AUCKLAND 0632

KAIMAI WIND FARMROTOKOHU ROAD, PAEROA

PRELIMINARY CIVIL ENGINEERINGDRAWINGS

A RESOURCE CONSENT JT 15.06.18

1. FOR INFORMATION PURPOSES ONLY.

2. BOUNDARIES, CONTOURS AND OTHER BASEINFORMATION SHOWN IS INDICATIVE ONLY AND PRIMARILYINFORMED BY AERIAL LIDAR SURVEY BY SYNERGYPOSITIONING SYSTEMS LTD IN APRIL 2016.

3. COORDINATES SHOWN ARE IN TERMS OF MT EDEN 2000CIRCUIT AND LEVELS ARE RELATIVE TO THE AUCKLAND 1946VERTICAL DATUM.

4. THE PROPOSED ROAD ALIGNMENT, TURBINE PLATFORMS,AND OVERALL EARTHWORKS ARE BASED ON AN INDICATIVEROAD ALIGNMENT AND REMAIN SUBJECT TO DETAILEDDESIGN.

15.06.18 JT JT

T15022 A

LEGENDEXISTING PARCEL BOUNDARY

JACKSON PROPERTY BOUNDARY

ROTOKOHU FARMS PROPERTY BOUNDARY

DENIZE BROTHERS PROPERTY BOUNDARY

HDC/MPDC TERRITORIAL BOUNDARY

EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

PROPOSED MAJOR CONTOUR

PROPOSED MINOR CONTOUR

EXTENT OF EARTHWORK

PROPOSED TURBINE LOCATION

EXISTING TRANSPOWER NATIONALGRID LINES

PROPOSED ROAD CENTER LINE ANDEDGE OF CARRIAGEWAY

EXISTING FENCE

INDICATIVE QUARRY SITE

INDICATIVE CLEANFILL SITE

EXISTING CULVERT

PROPOSED UPGRADED CULVERT

STREAM (WRC REGIONAL MAP)

PP

RESOURCE CONSENT

C

Q

251-4

1:1500 05.10.18

ADDITIONAL PLAN FOR S92 RESPONSE LT 05.10.18

LT

EROSION AND SEDIMENT CONTROLDETAIL SHEET 4 - ASSEMBLY AREA AND FILLSITE - INDICATIVE ONLY

NOTES

1. EROSION AND SEDIMENT CONTROL TO BE INTEGRATED IF PRACTICABLE

2. STRIP TOPSOIL WHERE NECESSARY AND PLACE IN LOCATIONSWITH “INDEPENDENT” EROSION AND SEDIMENT CONTROL CAN BE ESTABLISHED

3. DECANTING EARTH BUNDS TO BE ESTABLISHED WITH DIRTY WATER DIVERSION TAKING FLOWSTO DEBS

4. ASSEMBLY IS LARGELY IN CUT MATERIAL AND WILL BE STABILISED AS CUT PROGRESSES

5. CLEAN WATER DIVERSION MAY NEED TO BE ESTABLISHED ABOVE THE WORK LOCATIONONCE SPECIFIC ON SITE VERIFICATION CONFIRMS

6. FILL SITE AS SHOWN INDICATIVE ONLY AND WILL BE ESTABLISHED WITH MAXIMUM BATTERSLOPES OF 25DEGREES TO MINIMISE EROSION AND ALLOW FUTURE STOCK GRAZING

7. STOCK EXCLUSION TO OCCUR DURING EARTHWORKS ACTIVITY

8. ALL PRINCIPLES AS PER ESCP SECTION 5.0 TO APPLY

9. DETAILED SSESCP TO BE ESTABLISHED PRIOR TO ANY EARTHWORKS OCCURRING

10. WRC EROSION AND SEDIMENT CONTROL GUIDELINES TO APPLY

11.MONITORING TO OCCUR AS PER ESCP SECTION 11 WITH AN ADAPTIVE CONTINUOUSIMPROVEMENT APPROACH

FILL AREA AND ASSEMBLYAREA TREATED INDEPENDENTLYHOWEVER, INTEGRATION OFCONTROLS WHEREAPPROPRIATE

C

AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESCRIPTION:
AutoCAD SHX Text
REV:
AutoCAD SHX Text
BY:
AutoCAD SHX Text
Notes:
AutoCAD SHX Text
REVISION:
AutoCAD SHX Text
PROJECT NO:
AutoCAD SHX Text
DRAWING NO:
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
TITLE:
AutoCAD SHX Text
SCALE AT A3:
AutoCAD SHX Text
CLIENT:
AutoCAD SHX Text
SITE:
AutoCAD SHX Text
STATUS:
AutoCAD SHX Text
SURVEYOR:
AutoCAD SHX Text
SUBTITLE:

CH 2400

140

140

140

150

150

150

160

160

132

132

134

134

136

138

138

142

142

142

144

144

144

146

146

146

148

148

148

152

152

152

154

154

154

156

156

156

158

158

158

162

162

164

164

166 1

66

T

<<

LEGEND - SUPPLEMENTARYINDICATIVE CLEAN WATER/STREAM FLOWSINDICATIVE DIRTY WATER FLOWSPROPOSED SUPER SILT FENCEPROPOSED FILTER SOCKSPROPOSED DIRTY WATER DIVERSIONPROPOSED DECANTING EARTH BUNDPROPOSED SEDIMENT PITPROPOSED SEDIMENT DETENTION PONDPROPOSED GRASS BUFFER ZONEPROPOSED TURKEY NESTPROPOSED NON ERODIBLE BARRIER DAMINDICATIVE PUMPED FLOWINDICATIVE FLOW FROM PUMPINGEXISTING SLOPE TRIANGLE GREATER THAN 25°

SSF

FS

DWD

<

DEB

T

PROPOSED ROAD 1

TEKTUS Consultants LtdPO Box 80212 Green Bay

Auckland 0643 NZp. 09 827 1191

m. 021 1434 874www.tektus.nz

VENTUS ENERGY (NZ) LTD10/215 ROSEDALE ROAD, ALBANYAUCKLAND 0632

SYNERGY POSITIONING SYSTEMS LTD3/52 ARRENWAY DRIVE, ALBANY,AUCKLAND 0632

KAIMAI WIND FARMROTOKOHU ROAD, PAEROA

PRELIMINARY CIVIL ENGINEERINGDRAWINGS

A RESOURCE CONSENT JT 15.06.18

1. FOR INFORMATION PURPOSES ONLY.

2. BOUNDARIES, CONTOURS AND OTHER BASEINFORMATION SHOWN IS INDICATIVE ONLY AND PRIMARILYINFORMED BY AERIAL LIDAR SURVEY BY SYNERGYPOSITIONING SYSTEMS LTD IN APRIL 2016.

3. COORDINATES SHOWN ARE IN TERMS OF MT EDEN 2000CIRCUIT AND LEVELS ARE RELATIVE TO THE AUCKLAND 1946VERTICAL DATUM.

4. THE PROPOSED ROAD ALIGNMENT, TURBINE PLATFORMS,AND OVERALL EARTHWORKS ARE BASED ON AN INDICATIVEROAD ALIGNMENT AND REMAIN SUBJECT TO DETAILEDDESIGN.

15.06.18 JT JT

T15022 A

LEGENDEXISTING PARCEL BOUNDARY

JACKSON PROPERTY BOUNDARY

ROTOKOHU FARMS PROPERTY BOUNDARY

DENIZE BROTHERS PROPERTY BOUNDARY

HDC/MPDC TERRITORIAL BOUNDARY

EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

PROPOSED MAJOR CONTOUR

PROPOSED MINOR CONTOUR

EXTENT OF EARTHWORK

PROPOSED TURBINE LOCATION

EXISTING TRANSPOWER NATIONALGRID LINES

PROPOSED ROAD CENTER LINE ANDEDGE OF CARRIAGEWAY

EXISTING FENCE

INDICATIVE QUARRY SITE

INDICATIVE CLEANFILL SITE

EXISTING CULVERT

PROPOSED UPGRADED CULVERT

STREAM (WRC REGIONAL MAP)

PP

RESOURCE CONSENT

C

Q

251-5

1:500 05.10.18

ADDITIONAL PLAN FOR S92 RESPONSE LT 05.10.18

LT

EROSION AND SEDIMENT CONTROLDETAIL SHEET 5 - STREAMWORKS -INDICATIVE ONLY

NOTES

1. ALL CULVERTS TO BE INSTALLED IN DRY PERIOD. THIS PERIOD SHOULD MATCH THE CULVERTCONSTRUCTION PERIOD.

2. SANDBAG OR ALTERNATIVE NON ERODIBLE BARRIER TO BE PLACED UPSTREAM ANDDOWNSTREAM. FLOWS TO BE PUMPED AROUND WORKS AREA.

3. ECOLOGICAL INPUT WILL BE OBTAINED AS NECESSARY.

4. ANY DIRTYWATER PUMPED FROM CULVERT LOCATION WILL BE PUMPED TO TURKEYS NESTWHICH WILL THEN FLOW OVER GRASS PRIOR TO STREAM

5. PROVISION WILL BE MADE FOR RAIN EVENTS AND STABILISED FLOW PATHS AS NECESSARY

6. STOCK EXCLUSION TO OCCUR DURING STREAMWORKS ACTIVITY

7. ALL PRINCIPLES AS PER ESCP SECTION 5.0 TO APPLY

8. DETAILED SSESCP TO BE ESTABLISHED PRIOR TO ANY STREAMWORKS OCCURRING

9. WRC EROSION AND SEDIMENT CONTROL GUIDELINES TO APPLY

10.MONITORING TO OCCUR AS PER ESCP SECTION 11 WITH AN ADAPTIVE CONTINUOUSIMPROVEMENT APPROACH

ANY PUMPING OF DIRTYWATER WILL BE TO TURKEY NESTAND GRASS BUFFER ZONE

AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESCRIPTION:
AutoCAD SHX Text
REV:
AutoCAD SHX Text
BY:
AutoCAD SHX Text
Notes:
AutoCAD SHX Text
REVISION:
AutoCAD SHX Text
PROJECT NO:
AutoCAD SHX Text
DRAWING NO:
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
TITLE:
AutoCAD SHX Text
SCALE AT A3:
AutoCAD SHX Text
CLIENT:
AutoCAD SHX Text
SITE:
AutoCAD SHX Text
STATUS:
AutoCAD SHX Text
SURVEYOR:
AutoCAD SHX Text
SUBTITLE:

Appendix B: Typical ESC Design Details

DIVERSION TO BE LINED TO MINIMISEEROSION WHEN ON GRADIENTS GREATERTHAN 2% AND/OR WHERE FLOW VELOCITIESEXCEED 1m/sec

300mm MIN FREEBOARD

DESIGN FLOWDEPTH = 5%AEP STORM ORIGINAL

GROUND

MAXIMUMSLOPE 1:2

COMPACTED EARTHBUND

MAXIMUMSLOPE 1:3

FLOW

DIRTY WATER RUNOFF DIVERSION BUND

300mm MIN FREEBOARD

DESIGN FLOW DEPTH = 5% AEP STORM

ORIGINALGROUND

MAXIMUMSLOPE 1:2

COMPACTED EARTH BUNDHYDROSEEDED & MULCHED

MAXIMUMSLOPE 1:3

EXISTING VEGETATION TO REMAINUNDISTURBED

FLOW

CLEAN WATER RUNOFF DIVERSION BUND

MAXIMUMSLOPE 1:3

1m

TEKTUS Consultants LtdPO Box 80212 Green Bay

Auckland 0643 NZp. 09 827 1191

m. 021 1434 874www.tektus.nz

VENTUS ENERGY (NZ) LTD10/215 ROSEDALE ROAD, ALBANYAUCKLAND 0632

SYNERGY POSITIONING SYSTEMS LTD3/52 ARRENWAY DRIVE, ALBANY,AUCKLAND 0632

KAIMAI WIND FARMROTOKOHU ROAD, PAEROA

PRELIMINARY CIVIL ENGINEERINGDRAWINGS

A RESOURCE CONSENT JT 15.06.18

1. FOR INFORMATION PURPOSES ONLY.

2. BOUNDARIES, CONTOURS AND OTHER BASEINFORMATION SHOWN IS INDICATIVE ONLY AND PRIMARILYINFORMED BY AERIAL LIDAR SURVEY BY SYNERGYPOSITIONING SYSTEMS LTD IN APRIL 2016.

3. COORDINATES SHOWN ARE IN TERMS OF MT EDEN 2000CIRCUIT AND LEVELS ARE RELATIVE TO THE AUCKLAND 1946VERTICAL DATUM.

4. THE PROPOSED ROAD ALIGNMENT, TURBINE PLATFORMS,AND OVERALL EARTHWORKS ARE BASED ON AN INDICATIVEROAD ALIGNMENT AND REMAIN SUBJECT TO DETAILEDDESIGN.

15.06.18 JT JT

T15022 A

LEGENDEXISTING PARCEL BOUNDARY

JACKSON PROPERTY BOUNDARY

ROTOKOHU FARMS PROPERTY BOUNDARY

DENIZE BROTHERS PROPERTY BOUNDARY

HDC/MPDC TERRITORIAL BOUNDARY

EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

PROPOSED MAJOR CONTOUR

PROPOSED MINOR CONTOUR

EXTENT OF EARTHWORK

PROPOSED TURBINE LOCATION

EXISTING TRANSPOWER NATIONALGRID LINES

PROPOSED ROAD CENTER LINE ANDEDGE OF CARRIAGEWAY

EXISTING FENCE

INDICATIVE QUARRY SITE

INDICATIVE CLEANFILL SITE

EXISTING CULVERT

PROPOSED UPGRADED CULVERT

STREAM (WRC REGIONAL MAP)

PP

RESOURCE CONSENT

C

Q

ESCP STANDARD DETAILS - CLEANAND DIRTY WATER DIVERSION BUND

N.T.S

252-1

12.10.18

ADDITIONAL PLAN FOR S92 RESPONSE LT 12.10.18

LT

5. FINAL DESIGN OF DETAILS TO BE CONFIRMED IN SITESPECIFIC EROSION AND SEDIMENT CONTROL PLAN

NOTE:FINAL DESIGN TO BE CONFIRMED IN SITE SPECIFICEROSION AND SEDIMENT CONTROL PLAN

AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESCRIPTION:
AutoCAD SHX Text
REV:
AutoCAD SHX Text
BY:
AutoCAD SHX Text
Notes:
AutoCAD SHX Text
REVISION:
AutoCAD SHX Text
PROJECT NO:
AutoCAD SHX Text
DRAWING NO:
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
TITLE:
AutoCAD SHX Text
SCALE AT A3:
AutoCAD SHX Text
CLIENT:
AutoCAD SHX Text
SITE:
AutoCAD SHX Text
STATUS:
AutoCAD SHX Text
SURVEYOR:
AutoCAD SHX Text
SUBTITLE:

SEDIMENT PIT CUT INTOLEVEL IN SITU SOILMIN. 1m DEEP

ROAD/TRACK

CUT AND COVERMETHODOLOGY

OVERFLOW FLOWDIRECTION

FLOWFLOW

EVEN SLOPE INTO SEDIMENT PITTO AVOID EROSION (1:5 GRADE)

VEGETATED LEVEL LIP TO SPREADOVERFLOWS EVENLY

TOPSOIL BUNDS (GRASSED) TO ENSURE ALLFLOWS EXIT OVER LEVEL LIP

SEDIMENT PITS STANDARD DETAILS

TEKTUS Consultants LtdPO Box 80212 Green Bay

Auckland 0643 NZp. 09 827 1191

m. 021 1434 874www.tektus.nz

VENTUS ENERGY (NZ) LTD10/215 ROSEDALE ROAD, ALBANYAUCKLAND 0632

SYNERGY POSITIONING SYSTEMS LTD3/52 ARRENWAY DRIVE, ALBANY,AUCKLAND 0632

KAIMAI WIND FARMROTOKOHU ROAD, PAEROA

PRELIMINARY CIVIL ENGINEERINGDRAWINGS

A RESOURCE CONSENT JT 15.06.18

1. FOR INFORMATION PURPOSES ONLY.

2. BOUNDARIES, CONTOURS AND OTHER BASEINFORMATION SHOWN IS INDICATIVE ONLY AND PRIMARILYINFORMED BY AERIAL LIDAR SURVEY BY SYNERGYPOSITIONING SYSTEMS LTD IN APRIL 2016.

3. COORDINATES SHOWN ARE IN TERMS OF MT EDEN 2000CIRCUIT AND LEVELS ARE RELATIVE TO THE AUCKLAND 1946VERTICAL DATUM.

4. THE PROPOSED ROAD ALIGNMENT, TURBINE PLATFORMS,AND OVERALL EARTHWORKS ARE BASED ON AN INDICATIVEROAD ALIGNMENT AND REMAIN SUBJECT TO DETAILEDDESIGN.

15.06.18 JT JT

T15022 A

LEGENDEXISTING PARCEL BOUNDARY

JACKSON PROPERTY BOUNDARY

ROTOKOHU FARMS PROPERTY BOUNDARY

DENIZE BROTHERS PROPERTY BOUNDARY

HDC/MPDC TERRITORIAL BOUNDARY

EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

PROPOSED MAJOR CONTOUR

PROPOSED MINOR CONTOUR

EXTENT OF EARTHWORK

PROPOSED TURBINE LOCATION

EXISTING TRANSPOWER NATIONALGRID LINES

PROPOSED ROAD CENTER LINE ANDEDGE OF CARRIAGEWAY

EXISTING FENCE

INDICATIVE QUARRY SITE

INDICATIVE CLEANFILL SITE

EXISTING CULVERT

PROPOSED UPGRADED CULVERT

STREAM (WRC REGIONAL MAP)

PP

RESOURCE CONSENT

C

Q

ESCP STANDARD DETAILS -SEDIMENT PITS

N.T.S

252-2

12.10.18

ADDITIONAL PLAN FOR S92 RESPONSE LT 12.10.18

LT

5. FINAL DESIGN OF DETAILS TO BE CONFIRMED IN SITESPECIFIC EROSION AND SEDIMENT CONTROL PLAN

NOTE:FINAL DESIGN TO BE CONFIRMED IN SITE SPECIFICEROSION AND SEDIMENT CONTROL PLAN

ALL SEDIMENT PITS TO DISCHARGE OVER GRASS

AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESCRIPTION:
AutoCAD SHX Text
REV:
AutoCAD SHX Text
BY:
AutoCAD SHX Text
Notes:
AutoCAD SHX Text
REVISION:
AutoCAD SHX Text
PROJECT NO:
AutoCAD SHX Text
DRAWING NO:
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
TITLE:
AutoCAD SHX Text
SCALE AT A3:
AutoCAD SHX Text
CLIENT:
AutoCAD SHX Text
SITE:
AutoCAD SHX Text
STATUS:
AutoCAD SHX Text
SURVEYOR:
AutoCAD SHX Text
SUBTITLE:

ELEVATION

CROSS SECTION

SLOPE

2% OR LESS2% - 4%4% - 7%7% - 10%

OVER 10%

SPACING (m) BETWEEN DAMS(450mm CENTRE HEIGHT)

241285

USE STABILISED CHANNEL

SPACING (m) BETWEEN DAMS(600mm CENTRE HEIGHT)

3015116

USE STABILISED CHANNEL

SLOPE / FLOW

ROCK SIZE TO BE 100mm TO 300mm MIX

DOWNSTREAM FACE AT A SLOPE OF 1:2

300mm MIN

450mm MIN600mm MAX

SPACING (SEE TABLE BELOW)

STANDARD ROCK CHECK DAM

200mm MIN

TEKTUS Consultants LtdPO Box 80212 Green Bay

Auckland 0643 NZp. 09 827 1191

m. 021 1434 874www.tektus.nz

VENTUS ENERGY (NZ) LTD10/215 ROSEDALE ROAD, ALBANYAUCKLAND 0632

SYNERGY POSITIONING SYSTEMS LTD3/52 ARRENWAY DRIVE, ALBANY,AUCKLAND 0632

KAIMAI WIND FARMROTOKOHU ROAD, PAEROA

PRELIMINARY CIVIL ENGINEERINGDRAWINGS

A RESOURCE CONSENT JT 15.06.18

1. FOR INFORMATION PURPOSES ONLY.

2. BOUNDARIES, CONTOURS AND OTHER BASEINFORMATION SHOWN IS INDICATIVE ONLY AND PRIMARILYINFORMED BY AERIAL LIDAR SURVEY BY SYNERGYPOSITIONING SYSTEMS LTD IN APRIL 2016.

3. COORDINATES SHOWN ARE IN TERMS OF MT EDEN 2000CIRCUIT AND LEVELS ARE RELATIVE TO THE AUCKLAND 1946VERTICAL DATUM.

4. THE PROPOSED ROAD ALIGNMENT, TURBINE PLATFORMS,AND OVERALL EARTHWORKS ARE BASED ON AN INDICATIVEROAD ALIGNMENT AND REMAIN SUBJECT TO DETAILEDDESIGN.

15.06.18 JT JT

T15022 A

LEGENDEXISTING PARCEL BOUNDARY

JACKSON PROPERTY BOUNDARY

ROTOKOHU FARMS PROPERTY BOUNDARY

DENIZE BROTHERS PROPERTY BOUNDARY

HDC/MPDC TERRITORIAL BOUNDARY

EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

PROPOSED MAJOR CONTOUR

PROPOSED MINOR CONTOUR

EXTENT OF EARTHWORK

PROPOSED TURBINE LOCATION

EXISTING TRANSPOWER NATIONALGRID LINES

PROPOSED ROAD CENTER LINE ANDEDGE OF CARRIAGEWAY

EXISTING FENCE

INDICATIVE QUARRY SITE

INDICATIVE CLEANFILL SITE

EXISTING CULVERT

PROPOSED UPGRADED CULVERT

STREAM (WRC REGIONAL MAP)

PP

RESOURCE CONSENT

C

Q

ESCP STANDARD DETAILS - ROCKCHECK DAMS

N.T.S

252-3

12.10.18

ADDITIONAL PLAN FOR S92 RESPONSE LT 12.10.18

LT

5. FINAL DESIGN OF DETAILS TO BE CONFIRMED IN SITESPECIFIC EROSION AND SEDIMENT CONTROL PLAN

NOTE:FINAL DESIGN TO BE CONFIRMED IN SITE SPECIFICEROSION AND SEDIMENT CONTROL PLAN

AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESCRIPTION:
AutoCAD SHX Text
REV:
AutoCAD SHX Text
BY:
AutoCAD SHX Text
Notes:
AutoCAD SHX Text
REVISION:
AutoCAD SHX Text
PROJECT NO:
AutoCAD SHX Text
DRAWING NO:
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
TITLE:
AutoCAD SHX Text
SCALE AT A3:
AutoCAD SHX Text
CLIENT:
AutoCAD SHX Text
SITE:
AutoCAD SHX Text
STATUS:
AutoCAD SHX Text
SURVEYOR:
AutoCAD SHX Text
SUBTITLE:

3m minmum

3m minmum

3m minimum

10m minimum

4m minimum

CARRIAGEWAY

AGGREGATE (50-75mmWASHED)

CARRIAGEWAY

150mm THICKNESS OR 1.5 XAGGREGATE SIZE

GEOTEXTILE

STABILISED CONSTRUCTION ENTRANCE - PLAN VIEW

STABILISED CONSTRUCTION ENTRANCE - SIDE ELEVATION

TEKTUS Consultants LtdPO Box 80212 Green Bay

Auckland 0643 NZp. 09 827 1191

m. 021 1434 874www.tektus.nz

VENTUS ENERGY (NZ) LTD10/215 ROSEDALE ROAD, ALBANYAUCKLAND 0632

SYNERGY POSITIONING SYSTEMS LTD3/52 ARRENWAY DRIVE, ALBANY,AUCKLAND 0632

KAIMAI WIND FARMROTOKOHU ROAD, PAEROA

PRELIMINARY CIVIL ENGINEERINGDRAWINGS

A RESOURCE CONSENT JT 15.06.18

1. FOR INFORMATION PURPOSES ONLY.

2. BOUNDARIES, CONTOURS AND OTHER BASEINFORMATION SHOWN IS INDICATIVE ONLY AND PRIMARILYINFORMED BY AERIAL LIDAR SURVEY BY SYNERGYPOSITIONING SYSTEMS LTD IN APRIL 2016.

3. COORDINATES SHOWN ARE IN TERMS OF MT EDEN 2000CIRCUIT AND LEVELS ARE RELATIVE TO THE AUCKLAND 1946VERTICAL DATUM.

4. THE PROPOSED ROAD ALIGNMENT, TURBINE PLATFORMS,AND OVERALL EARTHWORKS ARE BASED ON AN INDICATIVEROAD ALIGNMENT AND REMAIN SUBJECT TO DETAILEDDESIGN.

15.06.18 JT JT

T15022 A

LEGENDEXISTING PARCEL BOUNDARY

JACKSON PROPERTY BOUNDARY

ROTOKOHU FARMS PROPERTY BOUNDARY

DENIZE BROTHERS PROPERTY BOUNDARY

HDC/MPDC TERRITORIAL BOUNDARY

EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

PROPOSED MAJOR CONTOUR

PROPOSED MINOR CONTOUR

EXTENT OF EARTHWORK

PROPOSED TURBINE LOCATION

EXISTING TRANSPOWER NATIONALGRID LINES

PROPOSED ROAD CENTER LINE ANDEDGE OF CARRIAGEWAY

EXISTING FENCE

INDICATIVE QUARRY SITE

INDICATIVE CLEANFILL SITE

EXISTING CULVERT

PROPOSED UPGRADED CULVERT

STREAM (WRC REGIONAL MAP)

PP

RESOURCE CONSENT

C

Q

ESCP STANDARD DETAILS - STABILISEDCONSTRUCTION ENTRANCE

N.T.S

252-4

12.10.18

ADDITIONAL PLAN FOR S92 RESPONSE LT 12.10.18

LT

5. FINAL DESIGN OF DETAILS TO BE CONFIRMED IN SITESPECIFIC EROSION AND SEDIMENT CONTROL PLAN

NOTE:FINAL DESIGN TO BE CONFIRMED IN SITE SPECIFICEROSION AND SEDIMENT CONTROL PLAN

AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESCRIPTION:
AutoCAD SHX Text
REV:
AutoCAD SHX Text
BY:
AutoCAD SHX Text
Notes:
AutoCAD SHX Text
REVISION:
AutoCAD SHX Text
PROJECT NO:
AutoCAD SHX Text
DRAWING NO:
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
TITLE:
AutoCAD SHX Text
SCALE AT A3:
AutoCAD SHX Text
CLIENT:
AutoCAD SHX Text
SITE:
AutoCAD SHX Text
STATUS:
AutoCAD SHX Text
SURVEYOR:
AutoCAD SHX Text
SUBTITLE:

300m

m

DECANT - 6 EQUALLY SPACEDROWS OF 10mm DIAMETERHOLES AT 60mm SPACINGSALONG THE FULL LENGTH OFTHE DECANT PIPE

RIP RAP PLACED AT POND OUTLETWITH GEOTEXTILE PLACEDUNDERNEATH

POURED CONCRETEANTI-SEEP COLLAR

POND BATTERS 2:1 TO 3:1

WIDTH OF TOP EMBANKMENT SHOULD BE WIDEENOUGH TO ENSURE MACHINERY ACCESS FORDE-SLUDGING OF POND IF THERE ARE NOOTHER ACCESS POINTS AVAILABLE

MINIMUMFREEBOARD300mm

SPILLWAY COMPACTED AND SMOOTHEDTO ELIMINATE ALL VOIDS PRIOR TO LAYINGAND PINNING APPROPRIATE GEOTEXTILE /CONCRETE CONCRETE RISER MAY REQUIRE

WEIGHING OR ANCHORING TOPREVENT FLOATING

UPPER DECANT OPERATES OVERTOP 1/3 OF LIVE STORAGE ONLY

MIDDLE DECANT OPERATES OVERTOP 2/3 OF LIVE STORAGE ONLY

LOWER DECANT OPERATESOVER FULL DEPTH OF LIVESTORAGE UP TO 1500mmDEAD STORAGE 400-600mm

WARATAH STAKES REQUIREDFOR ALL DECANTSLOWEST INLET PIPE TO RISER IS

ANGLED UPWARD AT 15° TO EASETENSION ON FLEXIBLE JOINT

300mm DIAMETERDISCHARGE PIPE LAID AT1% OR 2% GRADE

GEOTEXTILE SHOULD BE LAID INTO THEPOND TO A DEPTH OF AT LEAST 500mmBELOW THE SPILLWAY INVERT

WARATAHS AND STRONG NYLON CORDTO CONTROL LEVEL OF DECANT

GEOTEXTILE SECURED FIRMLY TO THEEMBANKEMENT FACE

RUNOFF DIVERSION CHANNEL /BUND TO ENSURE ALL FLOWENTERS AT THE INLET END

SEDIMENT FOREBAY 1m DEEPAND 2m WIDE

LEVEL SPREADER FULL WIDTH OF INLET END.SECURE THE ENDS BY BURYING WITHIN THEEARTH BUND

EXTRA CREST WIDTH MAY BE REQUIREDTO PROVIDE FOR MACHINERY ACCESSFOR CLEANING OUT

ALL BARE SURFACES TO BESTABILISED WITH VEGETATION IFTHE POND IS TO REMAINTHROUGH A WINTER PERIOD,OTHERWISE JUST THE OUTERBATTER NEEDS TO BE STABALISED

PINNED GEOTEXTILE OVERLAID WITHLARGE ROCK TO BREAK UP FLOW

WIDE SHALLOW LEVEL SPILLWAY OVEREXISTING GROUND WHERE POSSIBLE,RETAINING THE EXISTING GRASS COVER.BARE AREAS TO BE STABILISED WITHCONCRETE, GEOTEXTILE OR OTHERARMOURING

NYLON CORD TO BE TIED THROUGH THEEND HOLES IN DECANT AND SECURED TOTHE WARATAH

STANDARD WARATAH PLACEMENTAT EITHER END OF DECANT

SINGLE WARATAH FIXED FIRMLYBEHIND CABLE TIES / STRAPSREQUIRED TO WEIGHT DECANTDECANT

TYPICAL POND OUTLET DECANT DETAIL

FLOAT

FLEXIBLE RUBBER JOINTSGLUED AND CLAMPED - 2JOINTS TO BE USED ONLYFOR LOWER DECANT

WIRE OR STEEL STRAPS TOJOIN DECANT AND FLOAT

STANDARD END CAPS

ATTACH 1.8m LONGWARATAH TO WEIGHTDECANT. REFER SECTION A

WIRE LIMITING VERTICALMOVEMENT OF DECANT

2000

2000

300STANDARD TEE JOINT

WARATAHS PLACED EITHER SIDE OFDECANT ARM AS ALTERNATIVEMEANS OF SECURING DECANT

3:1 BATTER TO BE SMOOTHEDAND FREE OF VOIDS

TYPICAL POND ISOMETRIC PLAN VIEWS

TYPICAL POND OUTLET PLAN & SECTION VIEWS

EMERGENCY SPILLWAY TO BESIZED TO ACCOMMODATE THE 1%AEP EVENT WITHOUT ERODING

EARTH BUND WITHSITE CONCRETECOVER

LEVEL SPREADER150mm x 50mmTIMBER WEIR

LEVEL SPREADER FULL WIDTH OF INLET END, STABILISED FROMTHE BEGINNING OF THE INLET TO THE POND INVERT WITH 2LAYERS OF GEOTEXTILE

LEVEL SPREADERGEOTEXTILE WRAPPED

AROUND LEVEL SPREADERAND CONCRETE HAUNCHING CONCRETE HAUNCHING

3:1 INLET BATTER TO BE SMOOTHED ANDFREE OF VOIDS

SEDIMENT RETENTION PONDFOREBAY1m DEEP

TYPICAL POND LEVEL SPREADER DETAIL

TEKTUS Consultants LtdPO Box 80212 Green Bay

Auckland 0643 NZp. 09 827 1191

m. 021 1434 874www.tektus.nz

VENTUS ENERGY (NZ) LTD10/215 ROSEDALE ROAD, ALBANYAUCKLAND 0632

SYNERGY POSITIONING SYSTEMS LTD3/52 ARRENWAY DRIVE, ALBANY,AUCKLAND 0632

KAIMAI WIND FARMROTOKOHU ROAD, PAEROA

PRELIMINARY CIVIL ENGINEERINGDRAWINGS

A RESOURCE CONSENT JT 15.06.18

1. FOR INFORMATION PURPOSES ONLY.

2. BOUNDARIES, CONTOURS AND OTHER BASEINFORMATION SHOWN IS INDICATIVE ONLY AND PRIMARILYINFORMED BY AERIAL LIDAR SURVEY BY SYNERGYPOSITIONING SYSTEMS LTD IN APRIL 2016.

3. COORDINATES SHOWN ARE IN TERMS OF MT EDEN 2000CIRCUIT AND LEVELS ARE RELATIVE TO THE AUCKLAND 1946VERTICAL DATUM.

4. THE PROPOSED ROAD ALIGNMENT, TURBINE PLATFORMS,AND OVERALL EARTHWORKS ARE BASED ON AN INDICATIVEROAD ALIGNMENT AND REMAIN SUBJECT TO DETAILEDDESIGN.

15.06.18 JT JT

T15022 A

LEGENDEXISTING PARCEL BOUNDARY

JACKSON PROPERTY BOUNDARY

ROTOKOHU FARMS PROPERTY BOUNDARY

DENIZE BROTHERS PROPERTY BOUNDARY

HDC/MPDC TERRITORIAL BOUNDARY

EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

PROPOSED MAJOR CONTOUR

PROPOSED MINOR CONTOUR

EXTENT OF EARTHWORK

PROPOSED TURBINE LOCATION

EXISTING TRANSPOWER NATIONALGRID LINES

PROPOSED ROAD CENTER LINE ANDEDGE OF CARRIAGEWAY

EXISTING FENCE

INDICATIVE QUARRY SITE

INDICATIVE CLEANFILL SITE

EXISTING CULVERT

PROPOSED UPGRADED CULVERT

STREAM (WRC REGIONAL MAP)

PP

RESOURCE CONSENT

C

Q

ESCP STANDARD DETAILS -SEDIMENT RETENTION POND

N.T.S

252-5

12.10.18

ADDITIONAL PLAN FOR S92 RESPONSE LT 12.10.18

LT

5. FINAL DESIGN OF DETAILS TO BE CONFIRMED IN SITESPECIFIC EROSION AND SEDIMENT CONTROL PLAN

NOTE:FINAL DESIGN TO BE CONFIRMED IN SITE SPECIFICEROSION AND SEDIMENT CONTROL PLAN

AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESCRIPTION:
AutoCAD SHX Text
REV:
AutoCAD SHX Text
BY:
AutoCAD SHX Text
Notes:
AutoCAD SHX Text
REVISION:
AutoCAD SHX Text
PROJECT NO:
AutoCAD SHX Text
DRAWING NO:
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
TITLE:
AutoCAD SHX Text
SCALE AT A3:
AutoCAD SHX Text
CLIENT:
AutoCAD SHX Text
SITE:
AutoCAD SHX Text
STATUS:
AutoCAD SHX Text
SURVEYOR:
AutoCAD SHX Text
SUBTITLE:

SUPER SILT FENCE STANDARD DETAIL

UPPER TENSIONEDGALVANISED WIRE

LOWER TENSIONEDGALVANISED WIRE

GROUND LEVEL

ELEVATION

CHAIN LINK FENCING BETWEENPOSTS AND GEOTEXTILE

GEOTEXTILE - 2nd LAYER

GEOTEXTILE - 1st LAYER

EMBED GEOTEXTILE AND NETTING SUPPORT 200mmMIN. INTO GROUND (COVER WITH SUITABLE BACKFILLAND COMPACT)

CROSS SECTION

FLOW

FLOW FLOW

800mm MIN400mm MIN

200mm MIN

1m MIN

3m MAX

800mm MIN - 2nd LAYERGEOTEXTILE

400mm MIN - 1st LAYERGEOTEXTILE

WARRATAH BACK STAYSINSTALL AS EXTRA SUPPORTWHERE REQUIRED

WARRATAH ORSTANDARD WOODENFENCEPOSTS

TEKTUS Consultants LtdPO Box 80212 Green Bay

Auckland 0643 NZp. 09 827 1191

m. 021 1434 874www.tektus.nz

VENTUS ENERGY (NZ) LTD10/215 ROSEDALE ROAD, ALBANYAUCKLAND 0632

SYNERGY POSITIONING SYSTEMS LTD3/52 ARRENWAY DRIVE, ALBANY,AUCKLAND 0632

KAIMAI WIND FARMROTOKOHU ROAD, PAEROA

PRELIMINARY CIVIL ENGINEERINGDRAWINGS

A RESOURCE CONSENT JT 15.06.18

1. FOR INFORMATION PURPOSES ONLY.

2. BOUNDARIES, CONTOURS AND OTHER BASEINFORMATION SHOWN IS INDICATIVE ONLY AND PRIMARILYINFORMED BY AERIAL LIDAR SURVEY BY SYNERGYPOSITIONING SYSTEMS LTD IN APRIL 2016.

3. COORDINATES SHOWN ARE IN TERMS OF MT EDEN 2000CIRCUIT AND LEVELS ARE RELATIVE TO THE AUCKLAND 1946VERTICAL DATUM.

4. THE PROPOSED ROAD ALIGNMENT, TURBINE PLATFORMS,AND OVERALL EARTHWORKS ARE BASED ON AN INDICATIVEROAD ALIGNMENT AND REMAIN SUBJECT TO DETAILEDDESIGN.

15.06.18 JT JT

T15022 A

LEGENDEXISTING PARCEL BOUNDARY

JACKSON PROPERTY BOUNDARY

ROTOKOHU FARMS PROPERTY BOUNDARY

DENIZE BROTHERS PROPERTY BOUNDARY

HDC/MPDC TERRITORIAL BOUNDARY

EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

PROPOSED MAJOR CONTOUR

PROPOSED MINOR CONTOUR

EXTENT OF EARTHWORK

PROPOSED TURBINE LOCATION

EXISTING TRANSPOWER NATIONALGRID LINES

PROPOSED ROAD CENTER LINE ANDEDGE OF CARRIAGEWAY

EXISTING FENCE

INDICATIVE QUARRY SITE

INDICATIVE CLEANFILL SITE

EXISTING CULVERT

PROPOSED UPGRADED CULVERT

STREAM (WRC REGIONAL MAP)

PP

RESOURCE CONSENT

C

Q

ESCP STANDARD DETAILS -SUPER SILT FENCE

N.T.S

252-6

12.10.18

ADDITIONAL PLAN FOR S92 RESPONSE LT 12.10.18

LTNOTE:FINAL DESIGN TO BE CONFIRMED IN SITE SPECIFICEROSION AND SEDIMENT CONTROL PLAN

5. FINAL DESIGN OF DETAILS TO BE CONFIRMED IN SITESPECIFIC EROSION AND SEDIMENT CONTROL PLAN

AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESCRIPTION:
AutoCAD SHX Text
REV:
AutoCAD SHX Text
BY:
AutoCAD SHX Text
Notes:
AutoCAD SHX Text
REVISION:
AutoCAD SHX Text
PROJECT NO:
AutoCAD SHX Text
DRAWING NO:
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
TITLE:
AutoCAD SHX Text
SCALE AT A3:
AutoCAD SHX Text
CLIENT:
AutoCAD SHX Text
SITE:
AutoCAD SHX Text
STATUS:
AutoCAD SHX Text
SURVEYOR:
AutoCAD SHX Text
SUBTITLE:

T-BAR DECANT FIXED TOWARRATAH STAKES WITH NYLON

CORD

SPILLWAY STABILISED WITH TWO LAYERSOF GEOTEXTILE (MIN. WIDTH = 2m)

STABILISED SPILLWAY

100mm PVC PIPE THROUGH BUND

ENGINEERED FILL ON COMPACTEDGROUND

250mmFREEBOARD

EMERGENCY SPILLWAY

CROSS SECTION

DECANTING EARTH BUND

100mm

FLEXIBLE RUBBER/ NEOPRENEJOINT (SUCH AS PLUMBQWIK)HOSE CLAMPED

WIRE OR STEEL STRAPS TOJOIN DECANT AND FLOAT

STANDARD END CAPS

500mm LONG 100mm DIAMETER PVC PIPE FLOAT WITHSTANDARD 100mm END CAPS. FLOAT STRAPPED TO 40mmDIAMETER PVC DECANT PIPE WITH STAINLESS STEEL STRAPSOR ZIP TIES.

500mm

1200mmSTANDARD 40mmTEE JOINT (GLUED)

NYLON CORD TIES TO SUSPENDDECANT FROM WARRATAHS ATCORRECT HEIGHT

100mm TO 40mm REDUCERFITTING TO BE GLUED

JOIN TO BE MADE USING PKSCREWS ANDCONSTRUCTION TAPE

100mm DIAMETER PVC PIPE UPSTANDWITH TOP POSITIONED 100mm BELOWTHE LEVEL OF EMERGENCY SPILLWAY.THE TREATMENT VOLUME IS TO BEMEASURED TO THE TOP OF THISUPSTAND

STANDARD 100mmTEE JOINT (GLUED)

DECANT DETAIL

TEKTUS Consultants LtdPO Box 80212 Green Bay

Auckland 0643 NZp. 09 827 1191

m. 021 1434 874www.tektus.nz

VENTUS ENERGY (NZ) LTD10/215 ROSEDALE ROAD, ALBANYAUCKLAND 0632

SYNERGY POSITIONING SYSTEMS LTD3/52 ARRENWAY DRIVE, ALBANY,AUCKLAND 0632

KAIMAI WIND FARMROTOKOHU ROAD, PAEROA

PRELIMINARY CIVIL ENGINEERINGDRAWINGS

A RESOURCE CONSENT JT 15.06.18

1. FOR INFORMATION PURPOSES ONLY.

2. BOUNDARIES, CONTOURS AND OTHER BASEINFORMATION SHOWN IS INDICATIVE ONLY AND PRIMARILYINFORMED BY AERIAL LIDAR SURVEY BY SYNERGYPOSITIONING SYSTEMS LTD IN APRIL 2016.

3. COORDINATES SHOWN ARE IN TERMS OF MT EDEN 2000CIRCUIT AND LEVELS ARE RELATIVE TO THE AUCKLAND 1946VERTICAL DATUM.

4. THE PROPOSED ROAD ALIGNMENT, TURBINE PLATFORMS,AND OVERALL EARTHWORKS ARE BASED ON AN INDICATIVEROAD ALIGNMENT AND REMAIN SUBJECT TO DETAILEDDESIGN.

15.06.18 JT JT

T15022 A

LEGENDEXISTING PARCEL BOUNDARY

JACKSON PROPERTY BOUNDARY

ROTOKOHU FARMS PROPERTY BOUNDARY

DENIZE BROTHERS PROPERTY BOUNDARY

HDC/MPDC TERRITORIAL BOUNDARY

EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

PROPOSED MAJOR CONTOUR

PROPOSED MINOR CONTOUR

EXTENT OF EARTHWORK

PROPOSED TURBINE LOCATION

EXISTING TRANSPOWER NATIONALGRID LINES

PROPOSED ROAD CENTER LINE ANDEDGE OF CARRIAGEWAY

EXISTING FENCE

INDICATIVE QUARRY SITE

INDICATIVE CLEANFILL SITE

EXISTING CULVERT

PROPOSED UPGRADED CULVERT

STREAM (WRC REGIONAL MAP)

PP

RESOURCE CONSENT

C

Q

ESCP STANDARD DETAILS -DECANTING EARTH BUND

N.T.S

252-7

12.10.18

ADDITIONAL PLAN FOR S92 RESPONSE LT 12.10.18

LT

5. FINAL DESIGN OF DETAILS TO BE CONFIRMED IN SITESPECIFIC EROSION AND SEDIMENT CONTROL PLAN

NOTE:FINAL DESIGN TO BE CONFIRMED IN SITE SPECIFICEROSION AND SEDIMENT CONTROL PLAN

AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESCRIPTION:
AutoCAD SHX Text
REV:
AutoCAD SHX Text
BY:
AutoCAD SHX Text
Notes:
AutoCAD SHX Text
REVISION:
AutoCAD SHX Text
PROJECT NO:
AutoCAD SHX Text
DRAWING NO:
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
TITLE:
AutoCAD SHX Text
SCALE AT A3:
AutoCAD SHX Text
CLIENT:
AutoCAD SHX Text
SITE:
AutoCAD SHX Text
STATUS:
AutoCAD SHX Text
SURVEYOR:
AutoCAD SHX Text
SUBTITLE:

Appendix C: Weekly ESC Check List

WEEKLY ENVIRONMENTAL INSPECTION CHECKSHEET

Kaimai Wind Farm

CONTRACT NAME: Kaimai Wind Farm Chainage and Location

DATE:

TIME and WEATHER CONDITIONS:

NAME OF PERSON CARRYING OUT THE INSPECTION:

INSPECTION MAINTENANCE REQUIRED (refer notes below)

PASSED

URGENT ROUTINE

1. All of the erosion and sediment controls on site have been checked that they are free from rubbish and the operational

• Yes / No

2. All of the DEBs and SRPs on site have been checked and are fit for purpose.

• DEB #1

• DEB # 2

• SRP 1

• SRP 2

Yes / No

Yes / No

Yes / No

Yes / No

3. All forebays have been checked and sediment removed if necessary

• Yes / No

4. All dirtywater diversions have been inspected and are compliant with Guidelines and ESCP

• Yes / No

5. All stabilisation is in place and compliant with stabilised surfaces as required

• Yes / No

6. There is no sediment being washed directly to any watercourses

• Yes / No

7. All site accesses are clean • Yes / No

8. All silt fences are maintained • Yes / No

9. All previous actions as identified have been fixed as necessary

• Yes / No

10. It is confirmed that all earthworks areas have been viewed and risks identified

• Yes / No

Comment on remedial works noted above with recommended action and required completion date.

If urgent works noted these shall be immediately reported to the Project Manager

SIGNED: __________________________ PRINT NAME: ____________________________