DEH CHO BRIDGE FORT PROVIDENCE, NORTHWEST TERRITORIES TAB E File: RI09-1803-01.50 REVIEW OF SUBSTRUCTURE DESIGN AND CONSTRUCTION APPENDIX B APPENDIX B TAB E

Upload: others

Post on 27-Dec-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: APPENDIX B TAB E - library.assembly.gov.nt.ca

DEH CHO BRIDGE FORT PROVIDENCE, NORTHWEST TERRITORIES TAB E

File: RI09-1803-01.50 REVIEW OF SUBSTRUCTURE DESIGN AND CONSTRUCTION APPENDIX B

APPENDIX B

TAB E

Page 2: APPENDIX B TAB E - library.assembly.gov.nt.ca

DEH CHO BRIDGE - PIER FOOTING - CERTIFICATION Certification for Pier Footing - f'j " C \ S' Date: So (' )4. ?Vo"" ,

Item Description Y,N QC Comments No. or N/A Manager 1.0 Drilling 1.1 Drillina Inspection Test Plan filled ouVsianed off '< l>~vv

1.2 As-built location and elevation of holes '{ 9bW 2.0 Sheet Pile Installation 2.1 Sheet Pile Inspection Test Plan filled ouVsigned off ~ \)S>\J 2.2 As-built location and elevation of sheet piles '\ .'1> (>v.J 3.0 Cofferdam Excavation 3.1 Cofferdam Excavation Inspection Test Plan filled out '{ ) .I> "". and signed off 3.2 Excavation survey drawing showing surface '\ )l>'V

AI,. !"J-tt ,,~ co"",A ,,-t\ .. ,M( ~, Topoaraphv

3.3 Record of excavation surface "soft thickness" f\1/A \).\> II'-' -(~i> ""'9''';''~~. ,'""" '~1"v Measurements ~{{ ... ,",\ ",,< .... to.t~~ o-<t/.

4.0 Pier Footing Rebar Cage Intallation 4.1 Pier Footing Rebar Cage Assembly Inspection Test

'I »»I.V Plan - Option 1 or 2 filled out and signed off 4.2 Pier Footing Rebar Cage Installation Inspection Test

1 ~}>w , Plan - Option 1 or 2 filled out and sianed off 4 .3 Reinforcing Mill Certificates '( D~W 4.4 Cage inspection notes ciwproof of measurements I-.J ). .\>W ;r lV 1<0 i",~ . ·G"\&.P ..... ~o "\I-I~.~

4.5 As-built tocation and elevation of reinforcing cage 't p~(,u

5.0 Tremie Pour 5.1 Pier Footing Tremie Pour Inspection Test Plan filled i{ ..\l} V out and sic ned off 5.2 Approved concrete mix design "i 1>} VJ

5.3 Record of upper elevation of concrete surface ~ \:> \>: "" 5.4 Require concrete strength prior to dewatering

~ .l>'> \>.' document 6.0 Waler Installation and Dewatering 6.1 Waler Installation and Dewatering Inspection Test

~ },hv Plan filledout and signed off 7.0 Footing Concrete 7.1 Require deSign concrete strength document N »~"" \".:\", . :.-" ;\~ .... ,r{ 0 ' .. -.1·-/

I certify that Pier Footing ri~ \C \ 5 has been constructed in accordance with the applicable qSA Standards and with the Plans and Specifications'lPlease see the attached supporting documelrtation (as "sted above) that supports thiS certification. '-- (. -:J..C ( ,(1(' -{, ~ P" ,<, ( ,.( ·C" ..• \ J. ( S \..!> '\

Prepared by: Certified )I: '

e.0", L".<·t'c .M-( .,,,-,,-< ~ .

'--'_-, "t' .' . . ' . ~ :, r; !-.: L{.~.·,'·

60n WiIliams'PEng ~ -at Manager

Rev 0 ALLNORTH CONSULTANTS LIMITED

Page 3: APPENDIX B TAB E - library.assembly.gov.nt.ca

rJ :i rJcf'."

IcJI.-<.

I' 'fl;i'{'ft ~ 1 '-9.0_~~.T~~~~~?~ . !:T~: I

DEH CHO BRIDGE - LOWER PIER BUTTRESS - CERTIFICATION

Certification for Lower Pier Buttress - Pier #1 South Date: February 26, 2010

Item Description Y,N QC Comments No. or NfA Manager 1.0 Lower Pier Buttress

'" 1.1 Lower Pier Buttress Inspection Test Plan filled out Y " I'f-d, - ' . ::f"'~/! ,; ,,'" ' ' , -' ~1 and siqned off Cec<#f-<e/ /",. J"h:, w o I-rlot )jvJ

;1.2 Material Audit inspection test Pla?~I~ed out and Y ~~g;r~rCing modifications verbally siqned off - ~f~.i JI~Ju- JJ, 1. ,,{. ... ;.b 'l i) W 1' 1( roved by owner representatives

VI ·3 Pre pour inspection test plans filled out and Y >1< ['- -/'U> ~ ~ tN""'7l:...>

siqned off - ~fd fit: -.Jto/ko oJ';"" Yo"" V1.4 Cast In place concrete inspection test plans filled out Y Plastic concrete testing provided by

and signed off 'i> \) "" EBA Directed by AlCON 1-"1.5 Post pour inspection test plans filled out and

odo/a! y ITP signed off without concrete break

signed off - M.<-.,pI-<4 6'f J,,,.,.u> nv' Information as it was not made /; r W L- :5> d -II.~(" I ... ", Available by ATCON

1.6 Concrete mix design I1'1lvdI"AI~/~ /17 L6A NIA Concrete mix design and supply by b~L..- ATCON

1.7 As-built location of lower pier buttress N .\\b w Formwork As-built location completed

I certify that Pier #1 South Lower Buttress has been constructed in accordance with the applicable CSA Standards, Plans and Specifications. Certification doesn't include concrete quality or strength, as concrete supply was the responsibility of ATCON. Supporting documentation originally provided to ATCON is available upon request.

Certified by:

ALLNORTH CONSULTANTS LIMITED

Page 4: APPENDIX B TAB E - library.assembly.gov.nt.ca

v

V

J

v

v I

V

DEK CHO BRIDGE - UPPER PIER BUTTRESS - CERTIFICATION

Certification for Upper Pier Buttress - Pier #1 South Date: February 26, 2010

Item Description Y,N QC Comments No. or N/A Manager 1.0 Upper Pier Buttress

fA· 1 Upper Pier Buttress Inspection Test Plan filled out Y » ~w and sioned off

1.2 Material Audit inspection test plans filled out and Y Reinforcing modifications verbally' s igned off ~ ~ ..J Approved Qy .owner representative!d;I

j.-AtconJ;upplied materials not certified, 1.3 Pre pour inspection test plans filled out and Y

9~ sioned off 1.4 Cast in place concrete inspection test plans filled out Y Plastic concrete testing provided by

and signed off bP"" EBA Directed by .l\I-CON

7 5 Post pour Inspection test plans filled out and Y I'fP=signed off--Yiilhoulconcretejiriiak

J- signed off \0'- Information as it was not made Available by ATCON

1.6 Concrete mix design CoNI/V Concrete mix design and supply by ) \>"~ ATCON

1.7 As-built location of Upper pier buttress C" lip v Construction surveying complel~~ 1>19 FeeefflS a.ailable ,.1 ,:,..,

I certify that Pier #1 South Upper Buttress has been constructed in accordance with the applicable CSA Standards, Plans and Specifications. Certification doesn't include concrete quality, strength, and or any ATCON supplied materials. Certification supporting documentation originally provided to ATCON is available upon request.

Certified by:

ALLNORTH CONSULTANTS LIMITED

Page 5: APPENDIX B TAB E - library.assembly.gov.nt.ca

\ '\. ..

- .... ~'1'1 \1 \ i"~' ~ ' - \~

t rfiitTI L I C ONSTRUCTION l T U I' ---- . _ . . _- .. _.- . __ . __ . .

DEH CHO BRIDGE - PIER FOOTING - CERTIFICATION Certification for Pier Footing - ,1; •• _ A>

Item Description Y, N QC Comments No. ar N/A Manager 1.0 Drilling 1.1 Drillinq Inspection Test Plan filled out/siqned off '\ »'!>VJ ~b.d' ,. .. • ~ tL~;I.\,·" ,\ " >" 0 . ., f., 1.2 As-built location and elevation of holes "'. vbw - '( /'.LD~ \ (~-'rIi(Q..(.~ ,: ( (' (

2.0 Sheet Pile Installation 2.1 Sheet Pile Inspection Test Plan filled out/signed off '< O.>w 2.2 As-built location and elevation of sheet piles \ b;'''''' 3.0 Cofferdam Excavation 3 .1 Cofferdam Excavation Inspection Test Plan filled out

'( '~~v -}<.< frC..v.L J... \!). t,;,).A ).Jlii c.r· and signed off

3 .2 Excavation survey drawing showing surface v Topoaraohy \ lI,>\w

3 .3 Record of excavation surface "soft thickness" 'j Measurements .).,1>"'"

4.0 Pier Footing Rebar Cage Intallation 4.1 Pier Footing Rebar Cage Assembly Inspeclion Test U

Plan - Oolion 1 or 2 filled out and sianed off \ »»\-1 4.2 Pier Footing Rebar Cage Installation Inspection Test

~ \J :Y o."u Plan - Ootion 1 or 2 filled out and siqned off 4.3 Reinforcing Mill Certificates '{ .~ 'J>V-I 4.4 Caae inspection notes C/W proof of measurements 1>f ·J(j 11.1 s>>-VJ C .,JJ .... t!".. J. I'~" Ad. ' ", '. ", ' ' .Ii» . 4.5 As-built location and elevation of reinforcing cage '!- .ll )."",

5.0 Tremie Pour 5.1 Pier Footing Tremie Pour Inspection Test Plan filled

~ j.> l<; out and siqned off 5.2 Approved concrete mix design '\ »>V 5.3 Record of upper elevation of concrete surface "\ H,w ' 5.4 Require concrete strength prior to dewatering

i }',).W document 6.0 Waler Installation and Dewatering 6.1 Waler Installation and Dewatering Inspection Test 'I )'> » V Plan filledout and sianed off 7.0 Footing Concrete 7.1 Require design concrete strength document :v ~~w \ '" -'I ~ """ ~\."" t · ( , . .. 1.,

I certify that Pier Footing p:, (,. J.. '> has been constructed in accordance with the applicable CSA Standards and with the Plans. and Specifications~lease see the attached supporting documentation (as listed above) that supports thiS certificatIon. lP.: L"':' (',c-r-' --f,,- fl'u~.{ ,.{ t',~ .'\' 3.. do ')v" ,. '" I >"(,{ , .

Prepared by: Certified by:._ .. f J.,V-( A,,.,,,,- . \",-h,,-, '''''

;. ~~",'~ /. ( 'V A1 " , ' .

,'. (, I Pi ~ \ <; •• '

"Doh Williams PEng ... "QC Manager Darby Kreitz P , n9 - Certfiying Engineer

Rev 0 ALLN ORT H CONSULTANTS LIMITED

Page 6: APPENDIX B TAB E - library.assembly.gov.nt.ca

I . ; ~ /' '''\T\ , ' j "I J [ 11J.5 ~n l I L <::<?_NSTn.u5~110~_ L~D·I

DEH CHO BRIDGE - LOWER PIER BUTTRESS - CERTifiCATION

Certification for Lower Pier Buttress - Pier #2 South Date: February 26, 2010

Item Description Y,N QC Comments No. or N/A Manager 1.0 Lower Pier Buttress 1.1 Lower Pier Buttress Inspection Test Plan filled out Y

P)W and signed off 1.2 Material Audit inspection test plans filled out and Y

\j) LV Reinforcing modifications verbally

signed off Approved by owner represenlatives 1.3 Pre pour inspection test plans filled out and Y

signed off ) )\0 1.4 Cast in place concrete inspection test plans filled out Y

).?'" Plastic concrete testing provided by

and signed off EBA Directed by ATCON 1.5 Post pour inspection test plans filled out and Y ITP signed off without concrete break

signed off ) )lIV Information as it was not made Available by ATCON

1.6 Concrete mix design NIA "~ iN-'

Concrete mix design and supply by ATCON

c-1.7 As-built location of lower pier buttress N ~)"r/ Formwork As-built location completed

I certify that Pier #2 South Lower Buttress has been constructed in accordance with the applicable CSA Standards, Plans and Specifications. Certification doesn't include concrete quality or strength, as concrete supply was the responsibility of ATCON. Supporting documentation originally provided to ATCON is available upon request.

ALLNORTH CONSULTANTS LIMITED

Page 7: APPENDIX B TAB E - library.assembly.gov.nt.ca

In~!:ilf] ,;,,11

DEH CHO BRIDGE - UPPER PIER BUTTRESS - CERTIFICATION

Certification for Upper Pier Buttress - Pier #2 South Date: February 26. 2010

Item Description Y. N QC Comments No. or N/A Manager 1.0 Upper Pier Buttress 1.1 Upper Pier Buttress Inspection Test Plan filled out Y

and siq ned off JI):J'''';

1.2 Material Audit inspection test plans filled out and Y Reinforcing modifications verbally signed off ~, V-' Approved by owner representatives .

Atcon supplied materials not certified. 1.3 Pre pour inspection test plans filled out and Y

p~vI siqned off 1.4 Cast in place concrete inspection test plans filled out Y

) \)uI Plastic concrete testing provided by

and signed off EBA Directed by ATCON 1.5 Post pour inspection test plans filled out and Y ITP Signed off without concrete break

signed off ppW Information as it was not made Available by ATCON

1.6 Concrete mix design N/A D .1>""

Concrete mix design and supply by ATCON

1.7 As-built location of Upper pier buttress N bpw Construction surveying completed No records available

I certify that Pier #2 South Upper Buttress has been constructed in accordance with the applicable CSA Standards, Plans and Specifications. Certification doesn't include concrete quality, strength, and or any ATCON supplied materials. Certification supporting documentation originally provided to ATCON is available upon request.

ALLNORTH CONSULTANTS LIMITED

Page 8: APPENDIX B TAB E - library.assembly.gov.nt.ca

DEH CHO BRIDGE - PIER FOOTING - CERTIFICATION Certification for Pier Footing - 3 X -·----- ----·-------""'O:-a-t-e-: -0-,. "'")-;2.-1-·,.- ,""""08'

Item Oescription Y,N QC Comments No. or N/A Manager '.Jl.. Drilling

'" .]) DrillinQ Inspection Test Plan filled ouVsiQned off "< )') \) v' bo,jld~<:

v' .2) As-built location and elevation of holes y lrt> '-" Sheet Pile Installation

~ 2. 1/ Sheet Pile Inspection Test Plan filled out/signed off '< ~pw

.~ As-built location and elevation of sheetRiles -"I. , 1>,,", Cofferdam Excavation

v ~- Cofferdam Excavation Inspection Test Plan filled out '( 9.£) liJ

~~ _ ".... .. q;L vt.AAt:'I-4 1';""""

&.--- and signed off 1~ ~<,..k t'i.u.

V ~ Excavalion survey drawing showing surface '1' :\)::> w Topography 'l? re> Record of excavation surface "soft thickness" '( ~pw Measurements

4.JY Pier Footing Rebar Cage Intallation

t lA·l Pier Footing Rebar Cage Assembly Inspection Tesl y M >l).I -/ Plan - Option 1 or 2 filled out and signed off

-./ / 4.2 Pier Footing Rebar Cage Installation Inspeclion Test

l »»w ~ Plan - Option 1 or 2 filled out and signed off 4.3 ) Reinforcing Mill Certificates i l> II \AI

",4..4" Cage inspection notes clw proof of measurements AU ) $>w 1.,.fP <& i ,.t(. y, c",", • . · '" f ~I).

\, 4.5 As-built location and elevation of reinforcina caae '( 1J~~

5.0 Tremle Pour

~ ~ Pier Footing Tremie Pour Inspection Test Plan filled ~ \)~vv

//'''''/'' / ,,,-/ p"'Dhfe''''''' oul and signed off

52, ADD roved concrele mix des ian 1 .~ 1>",

" ' 5"':>-") Record of upper elevation of concrele surface i ;'~'"

v ~ Require concrele strenglh prior 10 dewatering 'I \>1' "" g.pr..e~/c,;;)

documenl 6.0 Waler Installation and Dewatering

t.- f"6.1 Waler Installation and Dewatering Inspection Test '\' .\l !, W Plan filledout and siqned off 7.0 Footing Concrete

, ' 7.1) Require desien concrete stre"llth document '1'J .Y / /J~~~/~ '''' ..fth" ; """ ",;.,,,,f'{ l>~"I · '--""

I certify that Pier Footing ;3 5 has been conslructed in accordance with the applicable CSA Standards and with the Plans and ~pecificationsry Please see the attached SllPporting docum~ntation (a~ _ .. , listed above) that supports thiS certification . L.. e. ;'C-c p-\ -{,... P·",.( ".( -t:'"," \ $.,11" '.'> '" ,,;<, ., d

~ fecit. 5--""v' ("'\ .. /K "H,, " \v\~l·\·i .... , >\">""U-{-< r, ... l1

Prep,are~: .~t ... (lff),.JL ~~ Certifie by: ~ "'7J;i - ~

. ,

Don Williams PEng - ac Manager Darby Kreitz PEng -\certfiying Engineer

Rev 1 ALLNORTH CONSULTANTS LIMITED

Page 9: APPENDIX B TAB E - library.assembly.gov.nt.ca

v

v

~

V

'-

V

I . ;,~\/,,\ I-;:.:~i Y I I [ \ lJ) ~l I' i I CO~~_"'."R~_~~ ~~~_ ,:!":,. :

DEl'{ CHO BR[[):GE - Lo\r\~R PIER. SUT'rRESS - CERTIFICATION

Certification for Lower Pier Buttress - Pier #3 South Date: February 26,2010

Item Description y, N QC Comments No. or N/A Manager 1.0 Lower Pier Buttress

.-1.1 Lower Pier Buttress Inspection Test Plan filled out Y ~ '!l \IJ

/'IG"- .~ ct<_ .'_ "d'Prot ''''' - 0 / <.. v I

and signed off " .. «dUY<-' ~d A'IJu,t,o /1 .2 Material Auru~spection tesj,lans filled' out and Y

b\Jw Reinforcing modifications verbally

signed off - 4~<eI "'" I o//L.c ~d~/;"~ ApPrDved by owner representatives - ~

0.3 Pre pour inspec~ i:!~t plans filled out and r~ Y .q [Jw

{>7 /J.. Lo(:T"rV<- I AI '::;t<-4

sianed off ,Al«- ........ ,ru.r'>/~ 1."1 J .- I , 1.4 Casl In place concrete inspection tes).;:lans filled out Y

Dl>w Plastic concrete testing provided by

and sianed off 4>"- - ~e-u.,p{-.,1 JwJ<:c> EBA Directed by ATCON

~ Post pour Inspection test plans filled out and 0 Y ITP signed off without concrete break signed off ~ti?d ~ .J v 1<.<> o.h-'6 VIl b );, .... Information as it was not made

Available by ATCON 1_6 Concrete mix deSign

~ f,y"""kA dI~~ N/A D1, \v'

Concrete mix design and supply by

"'" ATCON 1.7 As-built location of lower pier buttress N ~" "" Formwork As-buill location completed

I certify that Pier #3 South Lower Buttress has been constructed in accordance with the applicable CSA Standards, Plans and Specifications . Certification doesn't include concr~te · quality or strength; as ' concrete '5up-pl',!WaS'the responsil5ility of A'fCON Supporting documentation originally provided to ATCONis available upon request.

Certified by:

ALLNORTH CONSULTANTS LIMITED

Page 10: APPENDIX B TAB E - library.assembly.gov.nt.ca

/

u~l

V

N J

J

\...

J ·· ;'-i\/ V \/I.'~ ''( I

i r ffJ -, r'{1 I I I I IJl ilt L

[' COI-lSTRUC"rIO N Ll D. I , - -- . __ ._----------_!

OEI~ CHO BR.IOGE - UPPER P!ER. BUTTRESS - CERTIFICAT[ON

Certification for Upper Pier Buttress - Pier #3 South Date: February 26, 2010

Item Description Y,N QC Comments No. or N/A Manager 1.0 Upper Pier Buttress

~~ Upper Pier Buttress Inspection Test Plan filled out Y and signed off 1> »"-'

/ .2 Material Audit inspection test plans filled out and Y Reinforcing modifications verbally signed off \> b "V' Approved by owner representatives.

/ Atcon suoolied materials not certified . 1.3 Pre pour inspection test plans filled out and Y 1Jp"".

/ siQned off 1.4 Cast in place concrete inspection test plans filled out Y }o) v Plastic concrete testing provided by

and slQned off EBA Directed by ATCON 1.5 Post pour inspection test plans filled out and Y ITP signed off without concrete break

signed off P,ll"" Information as it was not made Available by ATCON

1.6 Concrete mix design , br~ td/t0A.,

N/A Concrete mix design and ~PIY. by lll) v ATCON 9 1),..~1<.i a ull.U(

,)'.7 As-built 10~J~on of Upper pier buttress N Construction surveying completed ~ U#-d alf,..rL,~ ))'J) "'" No records available

I certify that Pier #3 South Upper Buttress has been constructed in accordance with the applicable CSA Standards, Plans and Specifications. Certification doesn't include concrete quality, strength, and or any ATCON supplied materials. Certification supporting documentation originally provided to ATCON is available upon request.

ALLNORTH CONSULTANTS LIMITED

Page 11: APPENDIX B TAB E - library.assembly.gov.nt.ca

f4S

P4~ I ~ ____ ( P, s 6, N&!e>r ~s-

DEH CHO BRIDGE - PIER FOOTING - CERTIFICATION Certification for Pier Footing - _"1'-'> _ __ _ Date: ____ _

Item Description Y, N QC Comments No. or N/A Manager 1.0 Drilling

«.-, 1.1 Drillino Inspection Test Plan filled out/signed off \ }>~"" Oo",l&Ns , 1.2 As-built location and elevation of holes '( l>~W

2.0 Sheet Pile Installation v 2.1 Sheet Pile Inspection Test Plan fi lled out/signed off i ])j)v,. ,

'-,

~

~

'-

v'

V

'V

v

,

--2.2 As-built location and elevation of sheet piles 'I ~>lv 3.0 Cofferdam Excavation

/ 3.1 Cofferdam Excavation Inspection Test Plan filled out 'f 1> }l \IV and signed off

/;1.2 Excavation survey drawing showing surface ~ l>nW

'1- hcoltf..pV t"t ~CV~( -1:'

Topographv h<>~ 10 k .... ~~ . ho"W",,,, ~e ~,,<&{ Iv:~l-" c4.-;.Jt"-'-

1--8.3 Record of excavation surface "soft thickness" 'I ~!llfI .. ~ o,/#u. ~/'" Measurements

4.0 Pier Footing Rebar Cage Intallation

1--". 1 Pier Footing Rebar Cage Assembly Inspection Test l( H lN v v. I, J.. (Jr'VT/ t-l Ihr J w k..£, Plan - Option 1 or 2 filled out and signed off

V4 2 Pier Footing Rebar Cage Installation Inspection Test J ~ j) "Ii

V"- O,<£ 'Y'/J~ '''/Jl v f<-c,

Plan - Option 1 or 2 filled out and sioned off \ he d~(u,..,-, ... -.frt-l{Dv\.

4.3 Reinforcing Mill Certificates '< .\l~\v

4.4 Cage inspection notes c/w proof of measurements ti l p,pW 0",..,,,- f!..cP ,v.IA",-rc.l,. c<~' 4.5 As-built location and elevation of reinforcing cage '\ ).'). V' 5.0 Tremie Pour

rs· 1 Pier Footing Tremie Pour Inspection Test Plan filled \ ):)w ~ out and silmed off

5.2 Approved concrete mix design '\ j) »w' 5.3 Record of upper elevation of concrete surface '\ b OlAJ

f5.4 Require concrete strength prior to dewatering '\ }i>v 'r¥ ./,/ document -tU-"a/....e - ?) ';'!I,:! ,.

6.0 Waler Installation and Dewatering 6.1 Waler Inslallation and Dewatering Inspection Test '1 » » '<.l

I\...t.-?r- L.o\A.. 0- (. ft~ "l.7· ... t .#

Plan filledout and signed off -r. 7.0 Footing Concrete

- 7.1 Require design concrete strength document ffJ'''I ])S)IA/ l",t~ I""" 5; 1, ,-\ cn'i ~ ",h ~'QVI" ,,,,,,f,,.. <-h ..... - IW /N..J(.. "fr .. ~/~VV ..,... '-'2bJ-'<D-U ., . r-~ I '.t I "'1

I certify that Pier Footing '-\ ':> has been constructed in accordance with the applicable CSA Standards and with the Plans and Specifications.,Please sE;le th)3 attached s~ppo.rting dlocumentation (as listed above) that supports this certification. L" 'i- (,p ., '1'. ".. ({'o' " ( . ' -t;"'C!-\ "f',>'" <·o"cV'C -te

> .tY'c"'.:) '\·~_ \V\-\-c .... ,~ '\'\.'''Io·t "n ly_

P:e.{Ja~~~ .~~:. ::: certifiedG b. ' \ \ / ,. "' ·~f[~!..Jq . . : .:",.; ;, ;./{!;~', ;;. ";"

:&: .' ";<"Yf.' . ~ . \ ~ '. ;~. : ~ .- - . ;:; , .

' . I •

4. "" v '. ,. . . ! '-- " .'

'. ~ ~.!··(;IIJl~\. •• ,' '" ,.'

Don Williams PEng • ac Manager

Rev 1

Darby Kreitz PEng - Certfiying Engineer

ALLNORTH CONSULTANTS LIMITED

Page 12: APPENDIX B TAB E - library.assembly.gov.nt.ca

tift ~

\,

v

:-~L

DEH CHO BRIDGE - LOWER PIER BUTTRESS - CERTIFICATION

Certification for Lower Pier Buttress - Pier #4 South Date: February 26, 2010

Item Description Y,N QG Comments No. or N/A Manager 1.0 Lower Pier Buttress \: 1.1 Lower Pier Butlress Inspection Test Plan filled out Y DVw and sioned off

1"2 Material Audit inSpectionI1tt~anJ:illed out and Y 'j) ]Jv/

I, Heinforcing-modifications verbj'lIy sJanea 011 -""IS".,,,",,,} I \. ,oj /ep • AEEfI'lVed-bl' owner re~resentatives

1'\.3 Pre pour inspection test plans fill~ out and Y )7\7"" signed off f., • ./ ..... .d4f "'" .. 1<.0 ,

1.4 Cast in place concrete i~spection test plans filled out Y Plastic concrete teSting provided by and signed off ~'5t.~ ,rt .... , J,~ 1>\JV -EB~ Directed by ATCON

l)<5 Post pour inspection test plans filled out and -

Y ITP-signed off without concrete break signed off q bru<_h- .,Altu~ T)!lW Information as it was not mace -1..-

Available by ATCON r 1.6 Concrete mix design N/A

\7 )7"" ~~crete mix design and supply by~ A'fCON

{7 . As-built location of lower pier buttress ~-, ~ \',v Farmwork As-biJiltlocation completed ,

I certify that Pier #4 South Lower Buttress has been constructed in accordance with the applicable CSA Standards, Plans and Specifications. Certification doesn't include concrete quality or strength, as concrete supply was the responsibility of ATCON. Supporting documentation originally provided to ATGON is available upon request.

Gerlified by: __

f "'n:": '':'-';':~:.'\ ,,:' !)~I' I. f J ,_,-, I : ' ." 'fi' J:,,,., " " 1 \\ <. ·.:'A,::~; '. I .y-tv I I

"'-- ~ .' ....... -.~- .. '

" .... ', . 1:\, \~, .' '- .

Don Williams PEng - QC Manager

ALLNORTH CONSULTANTS LIMITED

Page 13: APPENDIX B TAB E - library.assembly.gov.nt.ca

'v

v

\/

prJ \../

L.

L.

'~- ... [, J\ J V \ -, \.. ;~ 'fl

~ 10 I cLr~1~m L~J DEH CHO BRIDGE - UPPER PIER BUTTRESS - CERTIFICATION

Certification for Upper Pier Buttress - Pier #4 South Date: February 26, 2010

Item Description Y,N QC Comments No, or N/A Manager 1.0 Upper Pier Buttress 1.1 Upper Pier Buttress Inspection Test Plan filled out Y

1>'pw and sioned off 0 .2 Material Audit inspection test plans filled out and Y Reinforcing modifications verbally

signed off .4.f..uP~ ye, I'~~'''~ r> ~r ~\)lo<I Approved by owner representat ives . Atcon supplied materials not certified.

1.3 Pre pour inspection lest plans filled out and Y ;> 17'" sioned off ""'"'''' h'l a..U'~t'/"

1.4 Cast in place concrete inspection lest plans filled oul Y \j>V

Plastic concrete testing provided by and signed off ~/v,"7f' ,,,f- p..."",b,,- N GtL EBA [i)irected by ATCON

).5 Post pour inspection lesl plans filled out and Y ITP signed-off'without 'cancrete bfJm}< signed off !>Dv' Information as it wa.S not made {6~ ~ Y"c- r({)<.t::u lE. Available by ATeON

/f.6 Concrete mix design ~ ti ~ I~J P/?v Concrete-mix-desigN and supply oy

c;:, b" C;; IJ< . • ATCON I /'1 .7 As-built location of Upper pier buttress I..!. NJ i\~w

Construction surveying compleled INa-records avallablij

I certify that Pier #4 South Upper Buttress has been constructed in accordance with the applicable CSA Standards, Plans and Specifications. Certification doesn't include concrete quality, strength, and or any ATCON supplied materials. Certification supporting documentation originally provided to ATCON is available upon request.

ALLNORTH CONSULTANTS LIMITED