  • Feasibility Study – Wilshire/La Brea Light Rail Transit Extension

    Appendix A – Optional LRT Alignment Plan Set

    C R E N S H A W T R A N S I T C O R R I D O R P R O J E C T May 2009

    APPENDIX A

    Optional LRT Alignment Plan Set

  • Note: Alignment is based on a cut and cover construction approach in this segment. Use of a bored tunneling approachwill require curvature with radius of 800 feet or larger.

  • Note: Alignment may also proceed west along San Vicente Boulevard in lieu of turning onto La Brea Avenue.

  • Note: Track alignment and curvature to be defined in the future to minimize easement requirements.

  • Feasibility Study – Wilshire/La Brea Light Rail Transit Extension

    Appendix B – Optional LRT Alignment Profile

    C R E N S H A W T R A N S I T C O R R I D O R P R O J E C T May 2009

    APPENDIX B

    Optional LRT Alignment Profile

  • Feasibility Study – Wilshire/La Brea Light Rail Transit Extension

    Appendix B – Optional LRT Alignment Profile

    C R E N S H A W T R A N S I T C O R R I D O R P R O J E C T May 2009 Page B-1

  • THIS PAGE INTENTIONALLY LEFT BLANK