  • 7/28/2019 Appendix 9A - Monthly Site Photos March 2013

    1/5

    Activity : Trial Trench for 500mm dia PUB Asbestos Pipe Activity : Clearing of Tree Roots from the proposed New Road

    Location : Upper Changi Road South Bound near Sunbird

    RoadLocation : ACCESS ROAD TO CHANGI NORTH INDUSTRIAL PARK

    Date: 07/03/2013 Date: 07/03/2013

    Activity :Noise Meter- Chainage 130 MCO2 East Bound:

    Noise Monitoring Meter Installed Near Lamp Post 50,

    relocated nearer to Residential Houses

    Activity : Trial Trench-Chainage MCO2 60 : New trial Hole to Locate

    alignment of 500mm Diameter Asbestos Pipe, Found approximately

    1metre below footpath level.

    Location :Upper Changi Road East Bound Location : Upper Changi Road West Bound

    Date : 08/03/2013 Date : 08/03/2013

    Activity : LTA Logo: Installed three (3 ) LTA Logo along

    Hoarding facing Upper Changi Road, One (1 ) BCA SignBoard

    and One (1) LTA Logo Facing Upper Changi Road East

    Activity : BCA Sign Board: Installed One (1 ) BCA SignBoard Near

    Main Entrance Gate at Upper Changi Road East

    Location : Upper Changi Road West Bound Location :Near Main Entrance Gate- Upper Changi Road East

    Date : 8/03/2013 Date : 9/03/2013

    Activity : Boundary Fencing Activity : Clearing of Existing U- Drains

    Location : Along the Slope of the proposed New Link RoadLocation : Near 900mm wide Drain of the proposed New Road North

    Bound Side

    Date : 9/03/2013 Date : 12/03/2013

    5 6

    APPENDIX 9A - PROGRESS PHOTOGRAPHS MARCH 2013 FOR PROJECT - ER420QP

    1 2

    3 4

    7 8

  • 7/28/2019 Appendix 9A - Monthly Site Photos March 2013

    2/5

    APPENDIX 9A - PROGRESS PHOTOGRAPHS MARCH 2013 FOR PROJECT - ER420QP

    Activity : Tree Cutting : 2 Trees cut near the existing Bus StopActivity : Warning Signs in Place and Workers signalling the Traffic

    during Tree Cutting Works

    Warning Signs in Place and Workers signalling the Traffic Warning Signs in Place and Workers signalling the Traffic

    Date: 13/03/2013 Date: 13/03/2013

    Activity : Formwork Fabrication for 900mm RC Drain Activity : Fixing of damaged Silt Fence near ECM Area

    Location : Near Site office Location : Near ECM Machine

    Date :14/03/2013 Date :14/03/2013

    Activity : Excavation works. Preparation for 900mm RC Drain Activity : Wire Installation for Internet Connection

    Location : Upper Changi Road East West Bound Location : Along the Perimeter Fencing

    Date: 15/03/2013 Date : 15/03/2013

    Activity : Soil Sample taken for Laboraory testing Activity : Soil Samples taken for Laboratory testing

    Location : New Road CH 90 West Bound Location : Upper Changi Road -CH 35 New Road North Bound

    Date: 19/03/2013 Date: 19/03/2013

    1211

    9

    15

    10

    13 14

    16

  • 7/28/2019 Appendix 9A - Monthly Site Photos March 2013

    3/5

    APPENDIX 9A - PROGRESS PHOTOGRAPHS MARCH 2013 FOR PROJECT - ER420QP

    Activity : Working on 900mm RC Drain Activity : Precast 900mm RC Drain installed

    Location : Upper Changi Road CH 185 West Bound Location : Upper Changi Road-West Bound CH 190~170

    Date: 19/03/2013 Date : 2103/2013

    17 18

  • 7/28/2019 Appendix 9A - Monthly Site Photos March 2013

    4/5

    APPENDIX 9A - PROGRESS PHOTOGRAPHS MARCH 2013 FOR PROJECT - ER420QP

    Activity : Welded Wire Mesh and soil Samples sent to AL

    Technologies (Laboratory for Material Testing)Activity : On- going 900mm RC Drain works

    Location : AL Technologies (Testing laboratory) Location : Upper Changi Road -West Bound CH 160~190

    Date: 21/03/2013 Date : 22/03/2013

    Activity : 900mm RC Drain excavation works Activity : Pegging of Under Ground Water Pipe

    Location : West Bound Upper Changi Road Location : Upper Changi Road -West Bound

    Date: 25/03/2013 Date : 25/03/2013

    Activity : Checking and identification of Excavator operator

    Registration Cert.

    Activity : Meeting on site with N-Parks Officer and PUB Officers:

    discusssed about PUB Pipe Diversion and protection of the tree

    near proposed RCBC

    Location : Proposed New Road Location : Upper Changi Road

    Date: 25/03/2013 Date : 25/03/2013

    Activity : Tree Cutting at Upper Changi Road East Activity : C5 in place Prior to Benching Works

    Location : Upper Changi Road East, Near Proposed Road

    Junction Location : New Road: CH 20-30

    Date: 26/03/2013 Date : 27/03/2013

    19 20

    18

    21 22

    17

    23 24

  • 7/28/2019 Appendix 9A - Monthly Site Photos March 2013

    5/5

    APPENDIX 9A - PROGRESS PHOTOGRAPHS MARCH 2013 FOR PROJECT - ER420QP

    Activity : On -going Benching works at 900mm RC Drain Activity : C5 in place - Benching Works

    Location : CH 150- 190 West Bound Upper Changi Road Location : CH 150- 190 West Bound Upper Changi Road

    Date: 27/03/2013 Date : 27/03/2013

    Activity : Geo Textile in Place at 900mm RC Drain Prior to

    Back filling worksSilt Fence properly installed near ECM Area

    c v y : ee ng w ower r r. an eng oe an

    Singtel Mr. Ronald Tan: regarding Diversion of underground

    Location : CH150- 160 West Bound Upper Changi Road Location : Upper Changi Road

    Date: 27 March 2013 Date: 27 March 2013

    Activity : C5 in place Prior to Benching Works Activity : Silt Fence properly installed near ECM Area

    Location : CH150- 160 West Bound Upper Changi RoadworksLocation : ECM AREA beside ULT Site officeCH150- 160 West Bound

    U er Chan i Road

    Date: 30 March 2013 Date:

    27 28

    29 30

    25 26