appendices - jicaopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · appendices a.1 member list of...

31
Appendices

Upload: others

Post on 24-Jan-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

[ Appendices ]

Page 2: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-1

Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007)

Name Job Title Occupation

Mr. IWAMA Toshiyuki Team Leader

Team Director ICT and Governance Team, Grant Aid Management Dept, JICA

Mr. NAKAMURA Takeshi

Technical Adviser (Port Security)

Port Security Inspector, Port and Airport Department, Kanto Regional Development Bureau, MLIT

Mr. YATABE Masafumi

Project Coordinator

Snr. Project Administration Officer, ICT & Governance Team, Grant Aid Management Dept, JICA

Mr. SUZUKI Yuzo

Chief Consultant / O&M Planning Japan Port Consultants, Ltd.

Mr. HIURA Akihito

Equipment 1 / Port Security Planning

General Manager, Engineering Dept, Nishiki Consultant Co., Ltd.

Mr. HIROSE Hiromu

Equipment 2 / Cost Estimate 1 OS Consultants & Associates, Ltd.

Mr. IMAMURA Mitsutaka

Procurement / Cost Estimate 2 Japan Port Consultants, Ltd.

(2) Draft Basic Design Report Explanation (From 12th March to 20th March, 2008)

Name Job Title Occupation Mr. TOMIYA Kichi Team Leader Deputy Resident Representative

Indonesian Office, JICA

Mr. YATABE Masafumi

Project Coordinator

Snr. Project Administration Officer, ICT & Governance Team, Grant Aid Management Dept, JICA

Mr. SUZUKI Yuzo

Chief Consultant / O&M Planning Japan Port Consultants, Ltd.

Mr. HIURA Akihito

Equipment 1 / Port Security Planning

General Manager, Engineering Dept, Nishiki Consultant Co., Ltd.

Page 3: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-2

A.2 Study Schedule (1) Site Survey

Date Day Leader TechnicalAdviser

ProjectCoordinator

Chief Consultant/O & M Planning

Equipment 1 /Port Security

Equipment 2 / CostEstimate 1

Procurement /Cost Estimate 2

28-Oct Sun.29-Oct Mon.30-Oct Tue31-Oct Wed1-Nov Thu2-Nov Fri3-Nov Sat4-Nov Sun5-Nov Mon6-Nov Tue7-Nov Wed8-Nov Thu9-Nov Fri

10-Nov Sat11-Nov Sun12-Nov Mon13-Nov Tue14-Nov Wed

15-Nov Thu16-Nov Fri17-Nov Sat18-Nov Sun

19-Nov Mon Site Survey ofTanjung Perak Port

Site Survey ofTanjung Perak Port

20-Nov Tue Site Survey ofBenoa Port

Site Survey ofBenoa Port

21-Nov Wed Site Survey ofMakassar Port

Site Survey ofBatam Port

Site Survey ofMakassar Port

Site Survey ofBatam Port

22-Nov ThuSite Survey of

Tanjung PinangPort

Site Survey ofTanjung Pinang

Port23-Nov Fri Data Analysis Data Analysis24-Nov Sat25-Nov Sun26-Nov Mon27-Nov Tue28-Nov Wed29-Nov Thu30-Nov Fri

1-Dec Sat2-Dec Sun3-Dec Mon4-Dec Tue

Explanation of IR and Discussions with DGSTDisussions with DGST

Site Survey of Benoa Port

Data Analysis Depart from Japan

Site Survey ofBitung Port

Site Survey ofBitung Port

Site Survey of Tanjung Priok PortSigning on M/M

Arrive in Japan Internal Meeting

Depart from Japan

Discussion with DGSTSite Survey of Tanjung Priok Port

Site Survey of Belawan PortSite Survey of Belawan Port

Internal MeetingInternal Meeting

Data AnalysisSite Survey of Dumai PortSite Survey of Dumai Port

Site Survey ofPalembang Port

Site Survey ofTeluk Bayur Port

Site Survey ofPalembang Port

Site Survey ofTeluk Bayur

PortInternal MeetingInternal Meeting

Data Analysis

Site Survey ofPontianak Port

Site Survey ofPontianak Port

Internal MeetingData Analysis

Internal Meeting & Data AnalysisInternal Meeting & Data AnalysisInternal Meeting & Data AnalysisInternal Meeting & Data Analysis

Discussion with DGST Arrive in JapanInternal Meeting & Data Analysis

Data AnalysisDiscussion with DGST

Arrive in Japan (2) Draft Basic Design Report Explanation

Date Day Job Contents 12-Mar Wed Depart from Japan 13-Mar Thu Discussion with DGST 14-Mar Fri Discussion with DGST 15-Mar Sat Internal Meeting 16-Mar Sun Data Analysis 17-Mar Mon Discussion with DGST & PELINDO 18-Mar Tue Discussion with DGST 19-Mar Wed Signing on M/M 20-Mar Thu Arrive in Japan

Page 4: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-3

A.3 List of Parties Concerned in the Recipient Country

Name Position, Name of Division or Institute

Directrate General of Sea Transportation

Ir. EFFENDI BATUBARA Director General

Capt. DJONY Director of Sea and Coast Guard

UNTUNG Directorate of Sea and Coast Guard

MUKHLIS TOHEPALY Directorate of Sea and Coast Guard

LATIF WAHYUDI Directorate of Sea and Coast Guard

P. ARITONANG Directorate of Sea and Coast Guard

KEMAL HERYANDRI Director of Planning Division

EKO HADI Planning Division

VIVA I. A, ST Planning Division

YUDHONUR S.P Planning Division

BAMBANG SUTRISNA Legal Affairs Division

DJOKOPUJIANTO Legal Affairs Division

Port Administrator Office, DGST (ADPEL)

A. PULUNGAN ADPEL Belawan, KPLP

M. AMIN BAKRI, SE ADPEL Belawan, KPLP

AGUS ARIFIANTO ADPEL Dumai

FIRMAN HAREFA ADPEL Tanjung Pinang

DARMALIS SYAM ADPEL Teluk Bayur

Capt. EZAU D.K ADPEL Teluk Bayur

HARIYONO, SH ADPEL Pontianak

S. LATIF ADPEL Palembang

Drs. EFENDI AJARIF ADPEL Palembang, Administrator

HERU MARYANTO ADPEL Benoa

RAHMADI DJADJA ADPEL Benoa, PSO

SATO ADPEL Makassar, Administrator

USMAN E. ADPEL Makassar

Capt. JONGGUNG SITORUS ADPEL Makassar, PSO

PT. Pelabuhan Indonesia(PELINDO)

BUNJAMINE SUKUR PELINDO I, Tanjung Priok, PFSO

SYAHPUTERA S PELINDO I, Unit Container Terminal Belawan,

GM

HIDAYAT OLCAFF PELINDO I, Unit Container Terminal Belawan,

Page 5: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-4

PFSO

SYAHRI R. PELINDO I, Belawan

HERY AMS PELINDO I, Belawan

RAMIL SITOMPUL PELINDO I, Dumai

DWI HARINTO PELINDO I, Tanjung Pinang, GM

EDY AGUSTRI PELINDO I, Tanjung Pinang, PFSO

SUDARMAN PELINDO II, Pontianak, PFSO

DALSAF USMAN PELINDO II, Teluk Bayur, PFSO

GAYATRI GANI PELINDO II, Teluk Bayur, PFSO

ZULKIFLI Js. PELINDO II, Teluk Bayur, PFSO

Ir. H. GUNAWAN TRISULO PELINDO II, Palembang, GM

FARID EDDY PELINDO II, Palembang, PFSO

TAUFIK EFFENDI PELINDO II, Palembang

EDY PRIYONO PELINDO III, Tanjung Perak, PFSO

WIRAWIBAWA PELINDO III, Benoa, PFSO

HESKIEL SASIANG PELINDO III, Benoa

SUNARTO PELINDO IV, Makassar

BUSTAMI PELINDO IV, Makassar, PFSO

Batam Port Authority

AGUSMAN PSO

Japanese Embassy

Takashi IKEMITSU First Security

Japan International Cooperation Agency (JICA)

Hiroyuki Katayama Ex-Deputy Resident Representative

Naoki KAKIOKA Assistant Resident Representative

Taiji KAWAKAMI JICA Expert

Page 6: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-5

A.4 Minutes of Discussions

Page 7: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-6

Page 8: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-7

Page 9: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-8

Page 10: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-9

Page 11: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-10

Page 12: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-11

Page 13: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-12

Page 14: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-13

Page 15: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-14

Page 16: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-15

Page 17: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-16

Page 18: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-17

Page 19: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-18

Page 20: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-19

Page 21: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-20

Page 22: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-21

Page 23: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-22

Page 24: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-23

Page 25: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-24

Page 26: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-25

Page 27: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-26

Page 28: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-27

Page 29: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-28

Page 30: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-29

Page 31: Appendices - JICAopen_jicareport.jica.go.jp/pdf/11882909_02.pdf · Appendices A.1 Member List of the Study Team (1) Site Survey (From 28th October to 4th December, 2007) Name Job

A-30