app chk by no. revisions and record of use...2.vertical control: elevations are based on ngvd 29....
TRANSCRIPT
D1
00
00
PROJECT NO.
SHEET
OF
0 11/2
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
DESIGNED:
APPROVED:
CHECKED:
DETAILED:
RE
VIS
IO
NS
A
ND
R
EC
OR
D O
F U
SE
NO
.B
YC
HK
AP
PD
AT
E
CIT
Y O
F L
AK
E O
SW
EG
O
RIV
ER
IN
TA
KE
P
UM
P S
TA
TIO
N U
PG
RA
DE
S
VICINITY MAP
RIVER INTAKE PUMP STATION UPGRADES
WORK ORDER NO. 290
DRAWINGS
OCTOBER 2019
NO SCALE
W
D
a
r
t
m
o
u
t
h
S
t
W
C
la
r
e
n
d
o
n
S
t
P
o
r
t
la
n
d
A
v
e
B
a
r
t
o
n
A
v
e
205p
205p
~
W
i
l
l
a
m
e
t
t
e
R
i
v
e
r
~
R
i
v
e
r
~
~
C
l
a
c
k
a
m
a
s
R
iv
e
r~
~Clackamas
213
C
a
s
c
a
d
e
H
w
y
E Clackamas Blvd
W
C
l
a
c
k
a
m
a
s
B
l
v
d
W
A
r
lin
g
t
o
n
S
t
E
A
r
lin
g
t
o
n
S
t
C
l
a
c
k
a
m
a
s
R
i
v
e
r
D
r
W
a
s
h
in
g
t
o
n
S
t
S
A
g
n
e
s
A
v
e
McLoughlin B
lvd
S
E
R
i
v
e
r
R
d
99E
W
G
lo
u
c
e
s
t
e
r
S
t
8
2
n
d
D
r
B
e
lle
v
u
e
A
v
e
C
o
r
n
e
l
l
A
v
e
Front A
ve
A
pperson B
lvd
S H
unter A
ve
RIPS
Gladstone
Portland
Springfield
Eugene
Roseburg
Bend
Medford
Grants Pass
Salem
Tigard
LOCATION MAP
NO SCALE
PROJECT
LOCATION
WASHINGTON
IDAHO
NEVADA
CALIFORNIA
5p
5p
OREGON
Pacific O
cean
Lake Oswego
Gladstone
VOLUME 2 OF 2
DEFERRED SUBMITTALS
THE FOLLOWING DEFERRED SUBMITTALS SHALL BE SUBMITTED IN THEIR ENTIRETY TO THE
OWNER AND ENGINEER OF RECORD FOR REVIEW AND BUILDING DEPARTMENT APPROVAL A
MINIMUM OF 21 DAYS PRIOR TO FABRICATION. ALL DEFERRED SUBMITTALS SHALL BE STAMPED
AND SIGNED BY A DESIGN PROFESSIONAL PRIOR TO SUBMITTAL.
1. SEISMIC ANCHORAGES OF MECHANICAL AND ELECTRICAL EQUIPMENT.
PL
OT
TE
D: 9
/3
0/2
019 1
2:39 P
M F
ILE
: C
:\pw
_w
orkin
g\b
vw
_a
me
rica
s\d
08
71
82
5\G
-0
1.d
wg
FD
90
00
A
ISSUED FOR BID
GE
NE
RA
L
CO
VE
R S
HE
ET
A
ND
L
OC
AT
IO
N M
AP
G-01
1 24
402864
CRT
RLF
JAM
NEB
OCTOBER 2019
Digi
tally
Sig
ned
RIVER INTAKE PUMP STATION UPGRADE PROJECT
SHEET
NO.
DRAWING
NO.
SHEET TITLE
GENERAL DRAWINGS
1 G-01 COVER SHEET AND LOCATION MAP
2 G-02 LIST OF DRAWINGS
3 G-03 GENERAL NOTES AND AGENCY APPROVALS
4 G-04 STANDARD LEGENDS
5 G-05 ABBREVIATIONS
CIVIL DRAWINGS
6 C-01 OVERALL SITE PLAN
MECHANICAL DRAWINGS
7 M-01MECHANICAL LEGEND, ABBREVIATIONS, GENERAL NOTES
8 M-02 OPERATIONS LEVEL PIPING PLAN
9 M-03 PUMP LEVEL ENLARGED PLAN AND SECTION
10 MD-1 MECHANICAL DETAILS
ELECTRICAL DRAWINGS
11 E-01 ELECTRICAL LEGEND AND ABBREVIATIONS
12 E-02 POWER DISTRIBUTION FUNCTIONAL DIAGRAM
13 E-03 OPERATIONS LEVEL POWER PLAN
14 E-04 PUMP LEVEL POWER PLAN
15 E-05 SWITCHBOARD SINGLE LINE DIAGRAM AND ELEVATIONS
16 E-06 MISCELLANEOUS SINGLE LINE DIAGRAMS
17 E-07 PLC SINGLE LINE DIAGRAMS
18 E-08 ELECTRICAL SCHEMATICS
INSTRUMENTATION DRAWINGS
19 I-01 P&ID - LEGENDS & ABBREVIATIONS SHEET 1 OF 3
20 I-02 P&ID - LEGENDS & ABBREVIATIONS SHEET 2 OF 3
21 I-03 P&ID - LEGENDS & ABBREVIATIONS SHEET 3 OF 3
22 I-04 P&ID - RIVER INTAKE PUMP STATION
23 I-05 CONTROL SYSTEM BLOCK DIAGRAM
24 I-06 INSTALLATION DETAILS
D1
00
00
PROJECT NO.
SHEET
OF
0 11/2
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
DESIGNED:
APPROVED:
CHECKED:
DETAILED:
RE
VIS
IO
NS
A
ND
R
EC
OR
D O
F U
SE
NO
.B
YC
HK
AP
PD
AT
E
CIT
Y O
F L
AK
E O
SW
EG
O
RIV
ER
IN
TA
KE
P
UM
P S
TA
TIO
N U
PG
RA
DE
S
PL
OT
TE
D: 9
/3
0/2
019 1
2:40 P
M F
ILE
: C
:\pw
_w
orkin
g\b
vw
_a
me
rica
s\d
08
71
82
5\G
-0
2.d
wg
FD
90
00
A
ISSUED FOR BID
GE
NE
RA
L
LIS
T O
F D
RA
WIN
GS
G-02
2 24
402864
CRT
RLF
JAM
NEB
OCTOBER 2019
Digi
tally
Sig
ned
D1
00
00
PROJECT NO.
SHEET
OF
0 11/2
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
DESIGNED:
APPROVED:
CHECKED:
DETAILED:
RE
VIS
IO
NS
A
ND
R
EC
OR
D O
F U
SE
NO
.B
YC
HK
AP
PD
AT
E
CIT
Y O
F L
AK
E O
SW
EG
O
RIV
ER
IN
TA
KE
P
UM
P S
TA
TIO
N U
PG
RA
DE
S
1. HORIZONTAL CONTROL: COORDINATES ARE BASED ON NAD83.
COORDINATES ON STRUCTURES DEPICT THE EXTERIOR FACE OF THE
CONCRETE SUBSTRUCTURE FOUNDATION WALL OR FOOTING WALL.
2. VERTICAL CONTROL: ELEVATIONS ARE BASED ON NGVD 29.
BENCHMARKS AND/OR STRUCTURE ELEVATIONS FROM EXISTING
SURVEYS OR REFERENCE DRAWINGS MAY RESULT IN VARIANCES
WITH ELEVATIONS INDICATED ON THE DRAWINGS FOR EXISTING
FACILITIES.
3. THE PROJECTED 100 YEAR FLOOD ELEVATION IS 44.5 NGVD 29 AND
THE PROJECTED 500 YEAR FLOOD ELEVATION IS 52.5 NGVD 29.
4. "SCREENED" (LIGHT) DELINEATION INDICATED ON THE DRAWINGS
DENOTES EXISTING FACILITIES. "SCREENED" INFORMATION WAS
TAKEN FROM EXISTING CONSTRUCTION DRAWINGS AND DATA, IS FOR
REFERENCE ONLY, AND SHALL BE FIELD VERIFIED BY THE
CONTRACTOR PRIOR TO THE ORDERING OF MATERIALS AND
BEGINNING OF CONSTRUCTION. "BOLD" DELINEATION IS NEW WORK
TO BE CONSTRUCTED UNDER THIS CONTRACT.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF
ALL PROPERTY CORNER MARKERS. PROPERTY CORNER MARKERS
DAMAGED BY CONSTRUCTION ACTIVITIES SHALL BE REESTABLISHED
BY A PROFESSIONAL SURVEYOR LICENSED IN THE STATE OF OREGON.
6. CONTRACTOR SHALL PROTECT AND MAINTAIN ALL EXISTING TREES,
SHRUBS, AND PLANTS UNLESS OTHERWISE NOTED.
7. THE DRAWINGS INDICATE TYPES OF PIPE SUPPORT SYSTEMS AT
VARIOUS LOCATIONS. HOWEVER, All PIPE SUPPORTS, HANGERS,
BRACKETS, INSERTS OR BRACES ARE NOT SHOWN. CONTRACTOR
SHALL REFER TO THE SPECIFICATIONS AND PROVIDE A COMPLETE
SUPPORT SYSTEM AS REQUIRED.
8. CONTRACTOR SHALL FIELD VERIFY PRECISE LOCATION, ELEVATION,
AND ARRANGEMENT OF CONNECTIONS OF NEW PIPELINES WITH
EXISTING PIPELINES BASED ON FIELD CONDITIONS, INCLUDING
EXPOSING EXISTING PIPING PRIOR TO FABRICATING NEW PIPING.
CONTRACTOR SHALL PROVIDE FITTINGS, ADAPTERS, SOLID SLEEVE
CLOSURES, AND HARNESSED MECHANICAL COUPLING; ROTATE
FITTINGS; DEFLECT JOINTS; AND MODIFY EXISTING PIPING AS
APPLICABLE AND AS REQUIRED TO MAKE CONNECTIONS, INCLUDING
ADJUSTMENTS FOR ANY OFFSETS IN CENTERLINE ELEVATIONS
BETWEEN PIPELINES. CONTRACTOR SHALL PROVIDE TEMPORARY
PLUG WITH FACTORY OUTLET SIZED AS REQUIRED FOR
CONTRACTOR'S TESTING AND DISINFECTION WORK BEFORE MAKING
CONNECTION, WHEN APPLICABLE. CONTRACTOR SHALL COORDINATE
MAKING EACH CONNECTION WITH THE OWNER.
GENERAL NOTES
PL
OT
TE
D: 9
/3
0/2
019 1
2:41 P
M F
ILE
: C
:\pw
_w
orkin
g\b
vw
_a
me
rica
s\d
08
71
82
5\G
-0
3.d
wg
FD
90
00
A
ISSUED FOR BID
GE
NE
RA
L
GE
NE
RA
L N
OT
ES
A
ND
A
GE
NC
Y A
PP
RO
VA
LS
G-03
3 24
402864
CRT
RLF
JAM
NEB
OCTOBER 2019
Digi
tally
Sig
ned
D1
00
00
PROJECT NO.
SHEET
OF
0 11/2
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
DESIGNED:
APPROVED:
CHECKED:
DETAILED:
RE
VIS
IO
NS
A
ND
R
EC
OR
D O
F U
SE
NO
.B
YC
HK
AP
PD
AT
E
CIT
Y O
F L
AK
E O
SW
EG
O
RIV
ER
IN
TA
KE
P
UM
P S
TA
TIO
N U
PG
RA
DE
S
GENERAL LEGEND
PIPING SYSTEMS
MATERIALS LEGEND
PIPING ACCESSORIES LEGEND
VALVE LEGEND
ACTUATOR LEGEND
CB
326
326
#3 OR T.H.#3
SMALLER THAN 24"
24" AND LARGER
SMALLER THAN 24"
24" AND LARGER
CE
L
E
L
R
W
P
L
PE
L
TE
L
T
E
P T
(G)
(W)
(WM)
(GM)
Y
T
S
10"
4"
1
AC45
1
A045
D
4
F102
PV
10
PV-10
EQUIP
CALLOUT
A
AR
CRW
CRV
TW
C
LIME
ACET
CWR
CWS
CL(G)
CL(L)
CL(S)
CDWR
CDWS
Co2(G)
Co2(S)
CW
DW
FeCl
FeS
F
FOR
FOS
FOV
G
H
HE
PA
HWR
HWS
HW
HWC
IA
PERM
PG
N
SA
NaOH
SP
AMM(G)
AMM(S)
NO
NPW
NPHW
OX
OF
POLY
RF
ST
SG
SI
PD
SAN
V
VAC
W
CO
SIZE
Q
S
S
AT
DT
S
S
F
S
S
T
E
P
O
ALUM
B3
L
S
L
UE
G
W
FL
HP
NaOCL
OZ
S
A
V
MISCELLANEOUS EQUIPMENT
P
M
FM
SURFACED STREET, ROAD OR DRIVE
SURFACED STREET, ROAD OR DRIVE WITH CURBS
NON-SURFACED STREET, ROAD OR DRIVE
CONCRETE WALK
CATCH BASIN
MANHOLE
DRAINAGE COURSE OR FLOW LINE
EXISTING GROUND CONTOUR
FINISH GRADE CONTOUR
BANK OR SLOPE LINES
TEST HOLE AND NUMBER
SURVEY LINE WITH PI, PT, OR POT
CONCRETE ENCASEMENT-PLAN
CONCRETE REACTION BLOCKING AT BEND,
PLUG OR TEE
DRAINS OR CULVERTS
TUNNEL CASING - PLAN
EXISTING
GENERAL LAYOUT YARD PIPING
NEW
NEW WATER LINE OR SEWER IN PROFILE
NON-CONNECTING PIPING
CONSTRUCTION EASEMENT LINE
EASEMENT LINE
RIGHT-OF-WAY LINE
PROPERTY LINE
PERMANENT EASEMENT LINE
TEMPORARY EASEMENT LINE
UTILITY EASEMENT LINE
SURVEY LINE
SECTION LINE
WATER LINE
GAS LINE
TELEPHONE (UNDERGROUND)
ELECTRICAL (UNDERGROUND)
POWER OR TELEPHONE LINES (OVERHEAD)
WATER OR GAS VALVE
WATER OR GAS METER
TELEPHONE OR POWER POLE WITH GUY ANCHOR
FIRE HYDRANT
YARD HYDRANT
STREET LIGHT POLE
TRAFFIC SIGNAL
TRAFFIC SIGN
STOPSIGN
HEDGE, BRUSH, SHRUBS, WOODS
DECIDUOUS TREE AND TRUNK DIAMETER
CONIFEROUS TREE AND TRUNK DIAMETER
SWAMP INSULATION (RIGID)
INSULATION (BATT)
ALUMINUM
BAR GRATING (LINES IN DIRECTION OF SPAN)
STEEL OR ALUMINUM (FOR 3/4" SCALE & SMALLER)
STEEL (FOR 1"SCALE & LARGER)
CHECKERED PLATE
RIPRAP
WOOD, STUDS, BEAMS, JOISTS, ETC.
WOOD, SHEATHING, PANELING, DECKING, ETC.
CUT STONE OR SAND FILL, GROUT,
MORTAR, AND PLASTER
CONCRETE MASONRY UNITS (CMU)
BRICK, COMMON
BRICK, FACE
EXISTING CONCRETE, PRECAST
OR PRESTRESSED CONCRETE
NEW CONCRETE
ROCK
GRANULAR FILL (CRUSHED ROCK OR GRAVEL)
EARTH OR GRADE
EXISTING FACILITY TO BE
DEMOLISHED OR REMOVED
EQUIPMENT REPRESENTATION
WITH CALLOUT
EQUIPMENT OR VALVE
IDENTIFICATION CODE
EQUIPMENT NUMBER
AREA DESIGNATION
ROOM NUMBER
SCHEDULE NUMBER
ABBREVIATION
WALL ELEVATION
DOOR, WINDOW AND LOUVER SCHEDULE REFERENCE
DRAWING NUMBER ON WHICH SECTION
OR DETAIL APPEARS; OR WHERE
SECTION IS CUT OR DETAIL IS NOTED
SECTION NUMBER OR DETAIL LETTER
CENTERLINE
RAILROAD, EACH TRACK
FENCE, WOOD
FENCE
SWING SET
CLOTHES LINE
FUTURE BUILDINGS, STRUCTURES
STRUCTURES UNDERGROUND
BUILDINGS, STRUCTURES
NEW PIPING
UNDERGROUND PIPING
EXISTING PIPING
FUTURE PIPING
AIR (COMPRESSED)
ALUMINUM SULFATE - (ALUM)
ARGON
CHEMICAL RESISTANT
ACID WASTE
CHEMICAL RESISTANT ACID
WASTE VENT
TEMPERED OR BLENDED WATER
CARBON SLURRY
ACETYLENE
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CHLORINE GAS
CHLORINE LIQUID
CHLORINE SOLUTION
BLIND FLANGE
CAP OR PLUG
CLEANOUT
CROSS
DIAPHRAGM SEAL
ELBOW
ELBOW DOWN
ELBOW TURNING UP
HOSE CONNECTION
QUICK COUPLING
REDUCER
RUPTURE DISK
TEE
TEE LINE DOWN
TEE LINE UP
WYE
WYE STRAINER
WYE STRAINER WITH BLOWOFF
DRAIN OR BELL-UP
PINCH VALVE
PLUG VALVE, ECCENTRIC
PLUG VALVE, NON-ECCENTRIC
BUTTERFLY VALVE
GATE VALVE
BALL VALVE
GLOBE VALVE
CHECK VALVE
3 WAY VALVE
4 WAY VALVE
ANGLE VALVE
CHLORINE INSTITUTE VALVE
DIAPHRAGM VALVE
THROTTLING VALVE
FLAME ARRESTER OR CHECK
BACKWATER VALVE
INLINE PRESSURE RELIEF VALVE
PRESSURE REGULATING VALVE
PRESSURE SUSTAINING OR
MAINTAINING VALVE
VACUUM BREAKER
CALIBRATING COLUMN
TRAP
UNION
WALL SLEEVE
AUTOMATIC DRAIN TRAP
DRIP TRAP
DUPLEX STRAINER
EXPANSION COMPENSATOR
INLINE FILTER
FLEXIBLE HOSE OR TUBING
FLEXIBLE CONNECTOR
HOSE REEL
INJECTOR, EDUCTOR, BLENDER
PIPE GUIDE
ORIFICE PLATE
SEDIMENT TRAP
STRAINER
SUCTION DIFFUSER
PIPE DIFFUSER
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
CARBON DIOXIDE GAS
CARBON DIOXIDE SOLUTION
WATER, COLD
DISTILLED WATER
FERRIC CHLORIDE
FERRIC SULFATE
FIRE PROTECTION
WATER SYSTEM
FLUORIDE
FUEL OIL RETURN
FUEL OIL SUPPLY
FUEL OIL VENT
GAS, NATURAL
HYDROGEN
HELIUM
HYDROGEN PEROXIDE
PHOSPHORIC ACID
HEATING SYSTEM WATER RETURN
HEATING SYSTEM WATER SUPPLY
WATER, POTABLE HOT
HOT WATER CIRCULATING
INSTRUMENT AIR
POTASSIUM PERMANGANATE
LIME
LP GAS (PROPANE)
NITROGEN
SODA ASH
SODIUM HYDROXIDE
SODIUM HEXAMETAPHOSPHATE
(PHOSPHATE)
SODIUM HYPOCHLORITE
AMMONIA GAS
AMMONIA SOLUTION
NITROUS OXIDE
WATER, NON-POTABLE
WATER, NON-POTABLE HOT
OXYGEN
OZONE
OVERFLOW
POLYMER SOLUTION
REFRIGERANT
STORM DRAIN
SLUDGE GAS
SILICA
SUMP PUMP DISCHARGE
SANITARY SEWER
VENT
VACUUM
WATER
SURGE CHAMBER
VENT - SCREENED
VENT
PRESSURE GAUGE W/SNUBBER
SIGHT FLOW INDICATOR
TEMPERATURE INDICATOR
THERMOMETER
ELECTROMAGNETIC/ULTRASONIC FLOWMETER
PITOT TUBE
ROTAMETER
TURBINE OR PROPELLOR FLOWMETER
SET STOP METER
VENTURI
FLOW METER
STATIC MIXER
VERTICAL MIXER
SIGHT GLASS
CENTRIFUGE
CHANNEL DIFFUSER
COMPRESSOR OR BLOWER
PIPE ANCHOR
PUMP
SLUICE GATE
SLIDE GATE
STOP PLATE
BAR SCREEN
EXPANSION TANK
SCREW (LIFT) PUMP
FLUME
WEIR
THERMAL SHUTOFF VALVE
EXPLOSION RELIEF VALVE
HOSE FAUCET
HOSE FAUCET W/VACUUM BREAKER
HOSE VALVE W/HOSE NIPPLE
BACKFLOW PREVENTER
SAFETY RELIEF VALVE
VACUUM RELIEF CHECK VALVE
PRESSURE VACUUM RELIEF VALVE
ELECTRIC
FLOAT
DIAPHRAGM
AIR/OIL TANDEM
SOLENOID
AIR
NOTE :
SYMBOLS ON THIS SHEET WHICH ARE TO BE SHOWN AS EXISTING SHALL BE DELINEATED AS SCREENED
THOSE SYMBOLS WHICH ARE TO BE SHOWN AS NEW SHALL BE DELINEATED AS SOLID (HEAVY)
EQUIPMENT NUMBER
EQUIPMENT OR VALVE
IDENTIFICATION CODE
PL
OT
TE
D: 9
/3
0/2
01
9 1
2:4
2 P
M F
IL
E: C
:\p
w_
wo
rkin
g\b
vw
_a
me
rica
s\d
08
71
82
5\G
-0
4.d
wg
FD
90
00
A
ISSUED FOR BID
GE
NE
RA
L
ST
AN
DA
RD
L
EG
EN
DS
G-04
4 24
402864
CRT
RLF
JAM
NEB
OCTOBER 2019
Digi
tally
Sig
ned
D1
00
00
PROJECT NO.
SHEET
OF
0 11/2
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
DESIGNED:
APPROVED:
CHECKED:
DETAILED:
RE
VIS
IO
NS
A
ND
R
EC
OR
D O
F U
SE
NO
.B
YC
HK
AP
PD
AT
E
CIT
Y O
F L
AK
E O
SW
EG
O
RIV
ER
IN
TA
KE
P
UM
P S
TA
TIO
N U
PG
RA
DE
S
PL
OT
TE
D: 9
/3
0/2
019 1
2:43 P
M F
ILE
: C
:\pw
_w
orkin
g\b
vw
_a
me
rica
s\d
08
71
82
5\G
-0
5.d
wg
FD
90
00
A
ISSUED FOR BID
GE
NE
RA
L
AB
BR
EV
IA
TIO
NS
G-05
5 24
402864
CRT
RLF
JAM
NEB
OCTOBER 2019
A ACID, AMBER INDICATING LIGHT,AMP
AB ANCHOR BOLT
ABS ACID BATH SINK
AC ALTERNATING CURRENT
A/C AIR CONDITIONER, (ING)
ACP ASBESTOS CEMENT PIPE
ACST ACOUSTIC, (AL
AD ACCESS DOOR, AREA DRAIN, AIR DAMPER, ANODE
ADD ADDITIONAL
ADH ADHESIVE
ADJ ADJUSTABLE, ADJACENT
ADMIN ADMINISTRATION
AF AIR FLOW
AFF ABOVE FINISH FLOOR
AH AHEAD
AHU AIR HANDLING UNIT
AL ACTIVE LEAF
ALT ALTERNATE, (IVE)
ALUM ALUMINUM
AM AMMETER
AMP AMPERE
ANOD ANODIZED
AP ACCESS PANEL
APPR APPROACH
APPROX APPROXIMATE, (LY)
AR ALARM RELAY
ARCH ARCHITECTURAL
AS AMMETER SWITCH
ASSY ASSEMBLY
AUTO AUTOMATIC
AUX AUXILIARY
AVS AUTOMATIC VALVE STATION
AWG AMERICAN WIRE GAGE
B BEAM
B TO B BACK TO BACK
BA BEARING AREA
BAL BALANCE
BAT BATTERY
BC BEGIN CURVE
BD BOARD
BEJ BRICK EXPANSION JOINT
BF BLIND FLANGE
BHP BRAKE HORSEPOWER
BITUM BITUMINOUS
BKR BREAKER
BLDG BUILDING
BLK BLOCK
BM BENCHMARK
BOF BOTTOM OF FOOTING
BOT BOTTOM
BP BACK PRESSURE
BPMK NO BASEPLATE MARK NUMBER
BRG BEARING
BRK BRICK
BS BOTH SIDES
B&S BELL AND SPIGOT
BSMT BASEMENT
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT-HOUR
BU BELL-UP
BUR BUILT UP ROOFING
BVC BEGIN VERTICAL CURVE
C COUNTER
C TO C CENTER TO CENTER
CB CATCH BASIN
CD CEILING DIFFUSER
C/EJ CONTRACTION/EXPANSION JOINT
CFM CUBIC FEET PER MINUTE
C&G CURB AND GUTTER
CHKD CHECKERED
CI CAST IRON
CIMH CAST IRON MANHOLE
CIMHS CAST IRON MANHOLE STEPS
CIP CAST IRON PIPE
CISP CAST IRON SOIL PIPE
CJT CONTROL JOINT
CKT CIRCUIT
CL CLASS
C/L CENTERLINE
CLG CEILING
CLO CLOSET
CLR CLEAR, (ANCE)
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT, COMPANY
COD CHEMICAL OXYGEN DEMAND
COL COLUMN
COMB COMBINATION
COMB SWR COMBINED SEWER
COMP COMPRESSOR, (ED)
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS, CONTINUATION, CONTROL
CONTR CONTRACTOR
COR CORNER
CORR CORRIDOR, CORRUGATED
CP CONTROL PANEL
CPLG COUPLING
CPT CONTROL POWER TRANSFORMER
CRS COURSES, (ING)
CS CONTROL SWITCH, CONTROL STATION, CUP SINK
CSK COUNTERSUNK, (INK)
CT CERAMIC TILE, CYCLE TIMER, CURRENT TRANSFORMER
CTR(S) CENTER(S)
CU CUBIC
CU YD CUBIC YARD
CW COLD WATER
D DOOR
DBL DOUBLE
DC DIRECT CURRENT
DEG DEGREE
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DH DOOR HEIGHT
DI DROP INLET, DUCTILE IRON
DIA DIAMETER
DIFF DIFFUSER
DIM DIMENSION
DIP DUCTILE IRON PIPE
DISCH DISCHARGE
DISP DISPENSER
DIST DISTRIBUTION
DIV DIVISION
DL DEAD LOAD
DM DAMPER MOTOR
DMJ DISMANTLING JOINT
DN DOWN
DO DOOR OPENING, DISSOLVED OXYGEN
DPDT DOUBLE POLE DOUBLE THROW
DR DRAIN
DS DOWNSPOUT
DT DISTRIBUTION TRANSFORMER
DV DRAIN VALVE
DWG(S) DRAWING(S)
DWL(S) DOWEL(S)
E EAST, ELECTRICAL
EA EACH
EAT ENTERING AIR TEMPERATURE
EC END CURVE
ECC ECCENTRIC
ECC RED ECCENTRIC REDUCER
EEW EMERGENCY EYEWASH
EF EACH FACE
EFF EFFLUENT
EJ EXPANSION JOINT
EL ELEVATION
ELB ELBOW
ELEC ELECTRIC, (AL)
ELEV ELEVATOR
EMER EMERGENCY
ENC ENCASEMENT
ENCL ENCLOSURE
ENT ENTRANCE
EOL END OF LINE
EQ EQUAL
EQUIP EQUIPMENT
EW EACH WAY, EMERGENCY EYEWASH
EWEF EACH WAY EACH FACE
EXCH EXCHANGER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION, EXPOSED
EXP JT EXPANSION JOINT
EXT EXTENSION, EXTERIOR, EXTERNAL
F FAN
F TO F FACE TO FACE
FB FACE BRICK
FC FLEXIBLE CONNECTION, FLOW CONTROL
FCA FLANGED COUPLING ADAPTER
FD FLOOR DRAIN
FDN FOUNDATION
FDPR FIRE DAMPER
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FH FLAT HEAD, FIRE HYDRANT
FHMS FLAT HEAD MACHINE SCREW
FIG FIGURE
FIN FINISH
FIN GR FINISH GRADE
FL FLOOR, FLOW LINE
FLEX FLEXIBLE
FLG FLANGE, FLASHING
FM FORCE MAIN
FO FUEL OIL
FOB FLAT ON BOTTOM
FOM FACE OF MASONRY
FOS FACE OF STUDS
FOT FLAT ON TOP
FRP FIBERGLASS REINFORCED PLASTIC
FS FAR SIDE, FLOOR SLEEVE, FLOAT SWITCH
FT FOOT
FTG FOOTING
FURN FURNISH, FURNISHED
FV FLAP VALVE
FWD FORWARD
G GAS
GA GAUGE
GAL GALLON
GALV GALVANIZED
GC/MS GAS CHROMATOGRAPH/MASS SPECTROMETER
GEN GENERAL, GENERATOR
GM GAS METER
GPM GALLONS PER MINUTE
GR GRADE
GWB GYPSUM WALLBOARD
GYP GYPSUM
H HIGH, HOUR, HYDROGEN
HB HOSE BIBB
HC HOLLOW CORE
HDR HEADER
HE HEAT EXCHANGER
HEX HEXAGONAL
HF HOSE FAUCET
HGT HEIGHT
HH HANDHOLE
HLS HIGH LEVEL SWITCH
HMC HARNESSED MECHANICAL COUPLING
HMD HOLLOW METAL DOOR
HMJ HARNESSED MECHANICAL JOINT
HORIZ HORIZONTAL
HP HIGH POINT, HORSEPOWER
HR HOUR, HANDRAIL
HS HIGH STRENGTH
HV HOSE VALVE
HW HOT WATER
HVAC HEATING,VENTILATING AND AIR CONDITIONING
HWY HIGHWAY
HYDRO HYDROPNEUMATIC
I INDICATOR
ID INSIDE DIAMETER
IF INSIDE FACE
I/I CURRENT TO CURRENT BOOSTER
IN INCHES
INC INCORPORATED
INCL INCLUDING
INCR INCREASE
INST INSTRUMENT, (ATION)
INSUL INSULATE, (ED), (ING)
INT INTERIOR, INTERNAL
INV INVERT
IPS IRON PIPE SIZE
IWWP IN-WATER WORK PERIOD
JAN JANITOR
JB JUNCTION BOX
JF JOINT FILLER
JT JOINT
K KIPS
KIT KITCHEN
KO KNOCK OUT
KS KITCHEN SINK
KV KILOVOLT
KVA KILOVOLT AMPERE
KW KILOWATT
KWH KILOWATT HOUR
L LOUVER
LAB LABORATORY
LAM LAMINATE(D)
LAT LEAVING AIR TEMPERATURE
LAT LATERAL
LAV LAVATORY
LB(S) POUNDS
LG LENGTH, LONG
LH LEFT HAND
LIN LINEAL, LINEAR
LL LIVE LOAD
LO LOUVER OPENING
LS LEVEL SWITCH
LT LEFT, LAB TABLE
MA MILLIAMPERE
MACH MACHINE
MAINT MAINTENANCE
MAN MANUAL
MAS MASONRY
MAX MAXIMUM
MB MACHINE BOLT
MC MECHANICAL COUPLING
MCC MOTOR CONTROL CENTER
MECH MECHANICAL
MED MEDIUM
MET METAL
MEZ MEZZANINE
MFM MAGNETIC FLOWMETER
MFR(S) MANUFACTURER(S)
MG MILLION GALLONS
MGD MILLION GALLONS PER DAY
MH MANHOLE
MIN MINIMUM, MINUTE
MISC MISCELLANEOUS
MJ MECHANICAL JOINT
MJRG MECHANICAL JOINT RETAINER GLAND
MJTR MECHANICAL JOINT WITH TIE ROD
MO MASONRY OPENING, MOTOR OPERATED
MP METERING PUMP
MRD METAL ROOF DECK
MS MACHINE SCREW
MSL MEAN SEA LEVEL
MTD MOUNTED
MTL MATERIAL
MTR MOTOR
N NORTH
N/A NOT APPLICABLE
NBC NAIL IN BOTTLE CAP
NC NORMALLY CLOSED
NEUT NEUTRAL
NF NEAR FACE
N.O. NORMALLY OPEN
NO.(S) NUMBER(S)
NOM NOMINAL
NORM NORMAL
NPT NATIONAL PIPE THREAD
NPW NONPOTABLE WATER
NS NEAR SIDE
NTS NOT TO SCALE
OC ON CENTER, ODOR CONTROL
OD OUTSIDE DIAMETER
OF OUTSIDE FACE, OVERFLOW
OH OVERHEAD OR OFF-HAND
OHWL ORDINARY HIGH WATER LEVEL
OL OVERLOAD
OPER OPERATING
OPNG OPENING
OPP OPPOSITE
OSL OUTSTANDING LEG
OZ OUNCE
PC POINT OF CURVE
PCC POINT OF COMPOUND CURVATURE
PCCP PRESTRESSED CONCRETE CYLINDER PIPE
PCP PIER CUTOFF POINT
PD PUMPED DRAIN
PE PLAIN END
PG PRESSURE GAUGE
PH PIPE HANGER, PENTHOUSE
PI POINT OF INTERSECTION
PIVC POINT OF INTERSECTION ON VERTICAL CURVE
PL PLATE
PLYWD PLYWOOD
PNL(S) PANEL(S)
POLY POLYMER
POT POINT ON TANGENT
PP POWER POLE
PR PAIR
PROJ PROJECTION
PRS PRESSURE REDUCING STATION
PRV POWER ROOF VENTILATOR
PS PIPE SUPPORT
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT, POINT OF TANGENCY
PVC POLYVINYL CHLORIDE, POINT ON VERTICAL CURVE
PVCP POLYVINYL CHLORIDE PIPE
PVMT PAVEMENT
PW POTABLE WATER
R RADIUS, RISER
RAS RETURN ACTIVATED SLUDGE
RCP REINFORCED CONCRETE PIPE
RCCP REINFORCED CONCRETE CYLINDER PIPE
RCHEP REINFORCED CONCRETE HORIZONTAL ELLIPTICAL PIPE
RD ROOF DRAIN, ROAD
RDL ROOF DRAIN LEADER
RECEP RECEPTION
RECIRC RECIRCULATING
RECP RECEPTACLE
RED REDUCER, REDUCING
REG REGULATOR, REGULATING
REF REFERENCE
REFR REFRIGERATION, REFRIGERATOR
REINF REINFORCING
REM REMOVABLE
REQD REQUIRED
RET RETURN
REV REVISION, REVISED, REVERSED
RFG ROOFING
RG RETAINER GLAND
RH ROOF HOOD, RIGHT HAND, ROUND HEAD, RED HEAD
RHMS ROUND HEAD MACHINE SCREW
RHWS ROUND HEAD WOOD SCREW
RM ROOM
RO ROUGH OPENING
RPM REVOLUTIONS PER MINUTE
RR RAILROAD
RS RAW SLUDGE, RAW SEWAGE, ROLLED STEEL
RT RIGHT
R/W RIGHT OF WAY
S SOUTH, SPEAKER
SAN SWR SANITARY SEWER
SCHED SCHEDULE
SD STORM DRAIN, SOAP DISH
SEC SECOND
SECT SECTION
SER SK SERVICE SINK
SG SLUICE GATE, SUPPLY GRILLE
SH SHEET
SHR SHOWER
SHD SHOWER DOOR
SIM SIMILAR
SKL SKYLIGHT
SM SHEET METAL
SP SUMP PUMP
SPA SPACING, SPACES
SPEC(S) SPECIFICATION(S)
SPLY SUPPLY
SQ SQUARE
SR SUPPLY REGISTER
SS STAINLESS STEEL, SANITARY SEWER
SSK SERVICE SINK
ST SELF TAPPING
ST SWR STORM SEWER
STA STATION
STD STANDARD
STL STEEL
STOR STORAGE
STR STRUCTURAL
SUP SUPPLY
SUSP SUSPENDED
SV SHUTOFF VALVE
SW SWITCH
SWBD SWITCHBOARD
SWGR SWITCHGEAR
SWS SEAL WATER SOLENOID
SYM SYMMETRICAL
SYS SYSTEM
T THERMOSTAT, TREAD, TOTALIZER, TRANSFORMER,
TELEPHONE, TOP
TAN TANGENT
TB TERMINAL BOX
T&B TOP AND BOTTOM
TBE THREAD BOTH ENDS
TBM TEMPORARY BENCHMARK
TC TOWEL CABINET, TOP OF CURB, TERMINAL CABINET
TEL TELESCOPING
TEMP TEMPERATURE, TEMPORARY
TERM TERMINAL
T&G TONGUE & GROOVE
TH TEST HOLE
THK THICK, THICKNESS
THR THRESHOLD
TI TOTALIZING INDICATOR, TEMPERATURE INDICATOR
TIR TOTALIZING INDICATING RECORDER
TOF TOP OF FOOTING
TOM TOP OF MASONRY
TOS TOP OF STEEL
TP TWISTED PAIR COUPLE, TOWEL PIN
TRANS TRANSFORMER, TRANSMITTER, TRANSFER
TS TEMPERATURE SWITCH
TV TELEVISION
TYP TYPICAL
UDM ULTRASONIC DENSITY METER
UGND UNDERGROUND
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
UR URINAL
USGS UNITED STATES GEOLOGICAL SURVEY
V VALVE, VOLT, VENT
VAC VACUUM
VAT VINYL ASBESTOS TILE
VBF VALVE, AWWA BUTTERFLY
VBI VALVE, INDUSTRIAL BUTTERFLY
VBL VALVE, BALL
VBM VALVE, BALL MISCELLANEOUS
VC VERTICAL CURVE, VICTAULIC COUPLING
VCD VERTICAL CONTROL DAMPER
VCK VALVE, CHECK
VCN VALVE, CONE
VCP VITRIFIED CLAY PIPE
VG VALVE, GATE
VGD VALVE, DOUBLE DISC GATE
VGL VALVE, GLOBE
VERT VERTICAL
VF VACUUM FILTER
VIB VIBRATION
VKG VALVE, KNIFE GATE
VM VOLT METER
VNR VENEER
VPC VALVE, PRESSURE REGULATING
VPG VALVE, PLUG
VPL VALVE, ECCENTRIC PLUG
VPR VALVE, PRESSURE REDUCING
VSP VALVE, PRESSURE RELIEF
VSPV VALVE, PRESSURE/VACUUM RELIEF
VSV VALVE, VACUUM RELIEF
VV VENT VALVE
VVB VACUUM BREAKER
W WEST, WIDE, WINDOW, WATT, WATER
W/ WITH
WAS WASTE ACTIVATED SLUDGE
WB WALLBOARD
WC WATER CLOSET
WD WOOD, WIDTH
WF WALL FITTING
WH WALL HYDRANT
WL WATER LEVEL
WM WATER METER, WATTMETER
WO WINDOW OPENING
W/O WITHOUT
WOM WOMEN
WP WATERPROOF, WORKING POINT
WR WASTE RECEPTACLE
WS WATERSTOP
WT WEIGHT
WW WETWELL
WWF WELDED WIRE FABRIC
x BY,TIMES
YH YARD HYDRANT
& AND
@ AT
< DEFLECTION ANGLE
# NUMBER
% PER CENT
Digi
tally
Sig
ned
CLACKAMAS RIVER
RESERVE ONE PARKING
SPACE FOR CITY STAFF
AT ALL TIMES (NOTE 2)
PROPERTY BOUNDARY
(APPROX)
CONTRACTOR
ACCESS AND STAGING
AREA (NOTE 1)
2
8
'±
P
O
R
T
L
A
N
D
A
V
E
N
U
E
E
. C
L
A
C
K
A
M
A
S
B
L
V
D
.
14'±
16'±
E
.
A
R
L
I
N
G
T
O
N
S
T
R
E
E
T
W
.
C
L
A
C
K
A
M
A
S
B
L
V
D
.
LEGEND
PROPERTY BOUNDARY
CONTRACTOR ACCESS AND
STAGING AREA
D10000
PROJECT NO.
SHEET
OF
0 11/2
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
DESIGNED:
APPROVED:
CHECKED:
DETAILED:
RE
VIS
IO
NS
A
ND
R
EC
OR
D O
F U
SE
NO
.B
YC
HK
AP
PD
AT
E
CIT
Y O
F LA
KE
O
SW
EG
O
RIV
ER
IN
TA
KE
P
UM
P S
TA
TIO
N U
PG
RA
DE
S
OVERALL SITE PLAN
NO SCALE
PL
OT
TE
D: 9
/3
0/2
01
9 1
2:4
6 P
M F
IL
E: C
:\p
w_
wo
rkin
g\b
vw
_a
me
rica
s\d
08
71
84
0\C
-0
1.d
wg
FD
90
00
A
ISSUED FOR BID
CIV
IL
OV
ER
AL
L S
IT
E P
LA
N
C-01
6 24
402864
CRT
RLF
JAM
NEB
OCTOBER 2019
NOTES:
1. CONTRACTOR’S STAGING, PARKING AND MATERIAL
STORAGE SHALL BE LIMITED TO THE SPACE(S)
DESIGNATED ON THE DRAWINGS. CONSTRUCTION LABOR
PARKING, SHORT TERM STAGING, JUST IN TIME
DELIVERIES MAY PARK ADJACENT TO CHARLES AMES
PARK, PORTLAND BLVD., AND ARLINGTON STREET. NO
PARKING IS ALLOWED ON WEST CLACKAMAS BLVD.,
IMMEDIATELY WEST OF THE SITE. PROVIDING ADDITIONAL
STORAGE OR PARKING SHALL BE THE RESPONSIBILITY OF
THE CONTRACTOR.
2. CITY STAFF PARKING SPOT SHALL BE ACCESSIBLE AT ALL
TIMES THROUGHOUT CONSTRUCTION.
Digi
tally
Sig
ned
D1
00
00
PROJECT NO.
SHEET
OF
0 11/2
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
DESIGNED:
APPROVED:
CHECKED:
DETAILED:
RE
VIS
IO
NS
A
ND
R
EC
OR
D O
F U
SE
NO
.B
YC
HK
AP
PD
AT
E
CIT
Y O
F L
AK
E O
SW
EG
O
RIV
ER
IN
TA
KE
P
UM
P S
TA
TIO
N U
PG
RA
DE
S
SERVICE WATER
DEIONIZED WATER
PLANT EFFLUENT WATER
FIRE PROTECTION WATER
HOT WATER (NONPOTABLE)
COLD WATER (NONPOTABLE)
DISTILLED WATER
SOFTENED WATER
TEMPERED OR BLENDED WATER
HOT WATER CIRCULATING (POTABLE)
HOT WATER (POTABLE)
COLD WATER (POTABLE)
TEMPERED NONPOTABLE WATER
FOUL AIR
STORM DRAIN
SANITARY DRAIN
INDIRECT DRAIN
CHEMICAL RESISTANT VENT
CHEMICAL RESISTANT WASTE
SUMP PUMP DISCHARGE
VACUUM
VENT
LOW PRESSURE STEAM (<15 PSIG)
LOW PRESSURE CONDENSATE
ACETYLENE
HELIUM
HYDROGEN
METHANE
COMPRESSED AIR
REFRIGERANT
HEATING WATER SUPPLY
NITROUS OXIDE
OXYGEN
NITROGEN
ARGON
WYE STRAINER W/ BLOWOFF
VACUUM BREAKER
FIRE DEPARTMENT CONNECTION
DRY PIPE VALVE
ALARM CHECK VALVE - WET SYSTEM
SUPERVISORY (TAMPER) SWITCHTS
S
S
WYE STRAINER
THERMOSTAT WITH NUMBER
TEMPERATURE SENSOR
STEM TYPE THERMOMETER
SOLENOID OPERATOR
V
T
1
TS
S
1
SMD
SIGHT FLOW INDICATOR
PRESSURE/TEMPERATURE RELIEF
QUICK COUPLING
SUCTION DIFFUSER (SCHEMATIC)
PRESSURE RELIEF VALVE
M METER
WALL HYDRANT W/ VACUUM BREAKER
Q
ROTAMETER
COMBINATION PUMP DISCHARGE
HOSE VALVE W/ HOSE NIPPLE
HOSE FAUCET W/ VACUUM BREAKER
FLOW SENSOR METER
FLEXIBLE CONNECTION
FLOW CONTROL VALVE
PRESSURE REDUCING STATION
HOSE FAUCET
HF
PRS
HF
AIR VENT
INSTRUMENT TEST OPENING
HUMIDISTAT W/ NUMBER
GAUGE ACTIVATOR/ISOLATOR
LS LEVEL SWITCH
PRESSURE SWITCH
P
PS
PDS
1
FLOW SWITCH
1
H
I
FS
ELECTRIC OPERATOR (EXPLOSION
DIAL TYPE THERMOMETER
PRESSURE REDUCING VALVE
ELECTRIC OPERATOR (2 POSITION)
ELECTRIC OPERATOR (MODULATING)
DRAFT GAUGE
E
E
DG
PLUG VALVE
THREE WAY VALVE
CONDENSATE DRAIN
PIPE TURNING DOWN
PIPE TURNING UP
PIPING BELOW FLOOR OR GRADE
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
HEATING WATER RETURN
GENERAL
PIPING ABOVE FLOOR OR GRADE
BLIND FLANGE
BASKET STRAINER
AUTOMATIC VALVE STATION
S
TP
TEST PLUG
UNION
SLEEVE
REDUCER
CAP
ANGLE VALVE
BACKFLOW PREVENTER
CHECK VALVE
BUTTERFLY VALVE
GLOBE VALVE
GATE VALVE
BACKWATER VALVE
BALL VALVE
LEGEND
ABBREVIATIONS
DEVICE TYPE:
(INCHES, IF USED)
DEVICE GROUP:
DEVICE DESIGNATION
CFM THRU DEVICE
TURNING VANES
24"x10"-10"
SR-1-760
POSITIVE PRESSURE DUCT
NEGATIVE PRESSURE DUCT
FLEXIBLE DUCTWORK
FLEXIBLE CONNECTION
XX
VENT THROUGH ROOF (VTR)
BELL-UP DRAIN OR FUNNEL
AIR-GAP FITTING
FLOOR DRAIN W/ FUNNEL
FLOOR CLEANOUT
P-TRAP
FLOOR DRAIN
A
SPLASHBLOCK
ROOF DRAIN
HOSE REEL
P-TRAP
GENERAL MECHANICAL NOTES
DIFFUSER FOR FLEXIBLE DUCT
30"x20"(L)
BELL-UP DRAIN OR FUNNEL
CLEANOUT (PIPE)
CLEANOUT (FLOOR)
DOWNSPOUT NOZZLE OR SHOWER
EMERGENCY SHOWER/EYEWASH
BLENDING VALVE
FLOOR DRAIN
CO
CW
HW
FCO
EVS
1
EMERGENCY VENTILATION SWITCH
WATER HAMMER ARRESTOR W/
PDI SIZE DESIGNATION
DUCTWORK DIMENSIONS, THE FIRST
DIMENSION IS THE SIDE SEEN OR
SIDE THE LEADER LINE TOUCHES.
INCLINED RISE (UP) OR DROP
(DN) IN RESPECT TO DIRECTION
REGISTER, GRILLE OR DIFFUSER
ROUND TO SQUARE TRANSITION
ROUND OR FLEXIBLE DUCT TAKEOFF
BACKFLOW PREVENTER W/STRAINER
(2" & SMALLER)
VACUUM GAUGE W/ SHUTOFF VALVE
SMOKE DETECTOR W/ NUMBER
S-SUPPLY, E-EXHAUST,
R-RETURN, T-TRANSFER
R-REGISTER, G-GRILLE,
D-DIFFUSER
FLEXIBLE DUCT DIAMETER
SIZE-LENGTH BY WIDTH (INCHES)
VALVE
VALVE
W/ NUMBER
PRESSURE DIFFERENTIAL SWITCH
W/ NUMBER
PRESSURE GAUGE W/ SHUTOFF
VALVE
M
E
E
HOSE RACK
PROOF)
WH
RECEPTOR W/ TRAP
RECEPTOR
PROPANE GAS
NATURAL GAS
SCRUBBER RECIRCULATION
OF AIRFLOW
WATER
WASTE
HVAC/ODOR CONTROL
FUEL GAS
SPECIAL
PIPE FITTINGS
VALVES
PLUMBING
FIRE PROTECTION
PLUMBING (SCHEMATIC)
HVAC
CONTROLS AND INSTRUMENTATION
AIR INLET AND OUTLET IDENTIFICATION
VAC
ACET
NPW
HWC
PEW
SVW
CW
DE
DW
HW
SW
TW
NPHW
TNPW
F
D
V
ST
PD
CRW
CRV
SAN
C
R
G
FA
SR
PG
CWR
CWS
HWR
HWS
LPC
LPS
CDWR
CDWS
A
H
N
AR
HE
ME
NO
OX
PIPING SPECIALTIES
1. ALL EQUIPMENT, PIPING, AND DUCTWORK SHALL BE ROUTED TO AVOID INTERFERENCES WITH
STRUCTURE, OTHER PIPING, EQUIPMENT, DUCTWORK, AND CONDUIT. UNLESS SPECIFICALLY
DIMENSIONED, THE PIPE AND DUCTWORK ROUTING SHOWN IS INTENDED TO INDICATE GENERAL
LOCATION ONLY. INSTALL DUCTWORK TO ALLOW FOR PIPING TO BE ROUTED NEAR WALLS.
2. ALL PIPING AND DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE WITH A MINIMUM HEIGHT
OF 8'-0" ABOVE THE WALKING SURFACE UNLESS OTHERWISE INDICATED BY A CENTERLINE,
INVERT, OR BOTTOM OF DUCT ELEVATION.
3. ALL RELIEF VALVES SHALL BE PIPED TO FLOOR OR FUNNEL RECEPTOR.
4. SEISMIC RESTRAINTS/BRACING SHALL BE PROVIDED FOR ALL EQUIPMENT, DUCTWORK, PIPING
AND ACCESSORIES IN ACCORDANCE WITH THE LATEST SMACNA SEISMIC RESTRAINT MANUAL
AND LOCAL BUILDING CODES. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SEISMIC
SUPPORTS AND ADDITIONAL/MISCELLANEOUS STEEL REQUIRED FOR PROPER INSTALLATION OF
SUPPORTS. SUPPORTS AND SEISMIC RESTRAINTS DESIGN SUBMITTALS SHALL BEAR THE STAMP
AND SIGNATURE OF AN ENGINEER LICENSED IN THE STATE OF OREGON.
A ALARM, COMPRESSED AIR OUTLET
AC AIR COMPRESSOR
AD ACCESS DOOR, AIR DRYER
AF AIR FLOW, AIRFOIL
AFD ADJUSTABLE FREQUENCY DRIVE
AFF ABOVE FINISH FLOOR
AFM AIR FLOW MONITOR
AHU AIR HANDLING UNIT
ALUM ALUMINUM
AP ACCESS PANEL
APPROX APPROXIMATE
AR AIR VALVE
AS AIR SEPARATOR
ATU AIR TERMINAL UNIT
AUTO AUTOMATIC
AVAR AIR VACUUM AIR RELEASE
AVG AVERAGE
AVS AUTOMATIC VALVE STATION
B BELT DRIVE, BLOW THROUGH
BDD BACKDRAFT DAMPER
BF BLIND FLANGE
BFF BELOW FINISH FLOOR
BFP BACKFLOW PREVENTER
BFV BUTTERFLY VALVE
BH BASEBOARD HEATER
BI BACKWARD INCLINED, BUILT-IN
THERMOSTAT
BL BOTTOM LEVEL
BLDG BUILDING
BLR BLOWER
BOD BOTTOM OF DUCT ELEVATION
BOT BOTTOM
BTF BIOTRICKLING FILTER
BTUH BRITISH THERMAL UNITS PER HOUR
BU BELL-UP
BV BALL VALVE
C CHANNEL, CONVECTOR, COOLING,
COOLING (MAKE ON RISE)
CAU CARBON ADSORPTION UNIT
CAV COMBINATION AIR VALVE
CB CENTRIFUGAL BLOWER
CBD COUNTERBALANCE BACKDRAFT
DAMPER
CC COOLING COIL
CCU CARBON CANISTER UNIT
CD CONTROL DAMPER
CDWP CONDENSER WATER PUMP
CENTR CENTRIFUGAL
CF CABINET FAN
CFM CUBIC FEET PER MINUTE
SEE GENERAL MECHANICAL NOTES.
CH CONVECTION HEATER
C/L CENTERLINE
CO CLEANOUT
CONC CONCRETE
CONN CONNECTION
CONT CONTINUATION
CP CIRCULATING PUMP
CS CUP SINK
CT COOLING TOWER
CU CONDENSING UNIT
CV CHECK VALVE, CONTROL VALVE
CWP CHILLED WATER PUMP
CWW CLEAR WATER WASTE
D DIRECT DRIVE, DRAW-THRU
DB DRY BULB
DDC DIRECT DIGITAL CONTROL
DEH DEHUMIDIFIER
DF DRINKING FOUNTAIN, DUCT FAN
DIA DIAMETER
DM DUCT MOUNTED
DMJ DISMANTLING JOINT
DN DOWN
DSN DOWNSPOUT NOZZLE
DX DIRECT EXPANSION
E ELECTRIC, ELECTRIC OPERATOR,
EXHAUST
EA EACH, EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC ECONOMIZER, EVAPORATIVE COOLER
ECH ELECTRIC CABINET HEATER
ECP EQUIPMENT CONTROL PANEL
EDH ELECTRIC DUCT HEATER
EEW EMERGENCY EYE WASH
EF EXHAUST FAN
EFF EFFICIENCY
EGS EMERGENCY GAS SCRUBBER
EIH ELECTRIC INFRARED HEATER
EL ELEVATION
EP EXPLOSION PROOF
EQUIP EQUIPMENT
ES EMERGENCY SHOWER, EMERGENCY
SWITCH
ES/EEW EMERGENCY SHOWER AND EYEWASH
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EUH ELECTRIC UNIT HEATER
EV EXHAUST VALVE
EVS EMERGENCY VENTILATION SWITCH
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWT ENTERING WATER TEMPERATURE
EXIST EXISTING
F DEGREES FAHRENHEIT
FA FOUL AIR
FBD FACE AND BYPASS DAMPER
FC FORWARD CURVE, FAN COIL
FC FLOOR CLEANOUT
FD FIRE DAMPER, FLOOR DRAIN
FDB DEGREES FAHRENHEIT DRY BULB
FEF FUME EXHAUST FAN
FLEX FLEXIBLE
FM FLOW METER
FPM FEET PER MINUTE
FR FUNNEL RECEPTOR
FRP FIBERGLASS REINFORCED PLASTIC
PIPE
FS FLOOR SINK, FLOW SWITCH
FSD COMBINATION FIRE/SMOKE DAMPER
FSW FILTER SURFACE WASH
FT FEET, FIN TUBE HEATER, FLOW
TUBE
FUR FURNACE
FWB DEGREES FAHRENHEIT WET BULB
G GAS OUTLET
GA GAUGE
GALV GALVANIZED
GCO GRADE CLEANOUT
GD GARBAGE DISPOSER
GIH GAS INFRARED HEATER
GPM GALLONS PER MINUTE
GUH GAS UNIT HEATER
GV GATE VALVE
GW GLASS WASHER
GWH GAS WATER HEATER
H HAND OPERATOR, HEATING,
HEATING (MAKE ON FALL), HEIGHT,
HORIZONTAL, HUMIDISTAT
HC HEATING COIL
HCH HEATING WATER CABINET HEATER
HE HEAT EXCHANGER, HELIUM
HF HOSE FAUCET
HO HAND-OFF
HOA HAND-OFF-AUTO
HP HEAT PUMP, HORSEPOWER
HR HEAT RECOVERY UNIT, HOUR,
HOSE REEL
HUH HEATING WATER UNIT HEATER
HUM HUMIDIFIER
HV HOSE VALVE
HWB HEATING WATER BOILER
HWP HEATING WATER PUMP
HZ HERTZ
I INTAKE
ID INSIDE DIAMETER
IN INCHES
INV INVERT
JS JANITOR'S SINK
KS KITCHEN SINK
KW KILOWATT
L LINED DUCT, LOUVER
LAT LEAVING AIR TEMPERATURE
LAV LAVATORY
LBS POUNDS
LD COMBINATION LOUVER/DAMPER
LI LEVEL INDICATOR
LS LABORATORY SINK, LEVEL SWITCH
LWT LEAVING WATER TEMPERATURE
MAU MAKEUP AIR UNIT
MAX MAXIMUM
MCA MINIMUM CIRCUIT AMPS
ME MIST ELIMINATOR
MFR MANUFACTURER
MOCP MAXIMUM OVERCURRENT PROTECTION
MIN MINIMUM
MOD MODULATING
MS MOP SINK
NC NORMALLY CLOSED
NO NORMALLY OPEN, NUMBER
NPSHR NET POSITIVE SUCTION HEAD
REQUIRED
NT NEUTRALIZATION TANK
OA OUTSIDE AIR
OC ODOR CONTROL
OCBD ODOR CONTROL BALANCE DAMPER
OCF ODOR CONTROL FAN
OCFS ODOR CONTROL FLOW SWITCH
OCLS ODOR CONTROL LEVEL SWITCH
OCP ODOR CONTROL PANEL
OCPS ODOR CONTROL PRESSURE SWITCH
OCS ODOR CONTROL SCRUBBER
OCSD ODOR CONTROL SHUTOFF DAMPER
OD OUTSIDE DIAMETER
ORD OVERFLOW ROOF DRAIN
ORP OXIDATION REDUCTION POTENTIAL
P PNEUMATIC
PAC PACKAGED AIR CONDITIONING UNIT
PAH PACKAGED AIR HANDLING UNIT
PD PRESSURE DROP (INCHES OF
WATER FOR AIR, FEET OF WATER FOR
FLUIDS), PUMP DRAIN
PDI PLUMBING AND DRAINAGE INSTITUTE
PDS PRESSURE DIFFERENTIAL SWITCH
PF PROPELLER FAN
PHP PACKAGED HEAT PUMP
PL PLATE
POS POSITION
PPM PARTS PER MILLION
PROP PROPELLER
PRS PRESSURE REDUCING STATION
PRV POWER ROOF VENTILATOR,
PRESSURE REDUCING VALVE
PS PRESSURE SWITCH
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAUGE
PTAC PACKAGED TERMINAL AIR
CONDITIONER
RA REACTIVATION AIR, RETURN AIR
RAC ROOM AIR CONDITIONER
RCS REMOTE CONTROL STATION
RD ROOF DRAIN
REQD REQUIRED
RH RELATIVE HUMIDITY, ROOF HOOD
RSF ROOF SUPPLY FAN
SA SUPPLY AIR
SCD SMOKE CONTROL DAMPER
SCFM STANDARD CUBIC FEET PER
MINUTE
SCP SCRUBBER CONTROL PANEL
SF SQUARE FEET, SUPPLY FAN
SH SHEET, SHOWER
SIM SIMILAR
SMD SMOKE DETECTOR
SP STATIC PRESSURE (INCHES OF WATER)
SPS STATIC PRESSURE SENSOR
SRP SCRUBBER RECIRCULATION PUMP
SS STAINLESS STEEL
SSK SERVICE SINK
SSP SUBMERSIBLE SUMP PUMP
STD STANDARD
SV SERVICE VALVE, SHUTOFF VALVE,
SUPPLY VALVE, SOLENOID VALVE
T THERMOSTAT
TCP TEMPERATURE CONTROL PANEL
TCV TEMPERATURE CONTROL VALVE
TD TRENCH DRAIN
TE TEMPERATURE ELEMENT
TL TOP LEVEL
TP TRAP PRIMER
TS TIP SPEED, TAMPER SWITCH
TYP TYPICAL
UR URINAL
V VERTICAL
VAC VACUUM OUTLET
VANE VANEAXIAL
VAV VARIABLE AIR VOLUME
VB VACUUM BREAKER
VCD VOLUME CONTROL DAMPER
VF VANEAXIAL FAN
VP VACUUM PUMP
VSP VERTICAL COLUMN SUMP PUMP
VTR VENT THRU ROOF
W WIDE FLANGE, WIDTH
WB WET BULB
WBP WATER BOOSTER PUMP
WC WATER CHILLER, WATER CLOSET
WATER COLUMN
WCO WALL CLEANOUT
WF WALL FAN
WG WATER GAUGE
WH WALL HEATER, WALL HYDRANT
WHA WATER HAMMER ARRESTOR
WM WALL MOUNTED
WST WATER STORAGE TANK
WT WEIGHT
WV WATER CONTROL VALVE
ZD ZONE DAMPER
CLEAR WATER WASTECWW
TRAP PRIMERTP
PL
OT
TE
D: 9
/3
0/2
01
9 1
2:4
7 P
M F
IL
E: C
:\p
w_
wo
rkin
g\b
vw
_a
me
rica
s\d
08
71
82
7\M
-0
1.d
wg
FD
90
00
A
ISSUED FOR BID
ME
CH
AN
IC
AL
ME
CH
AN
IC
AL
L
EG
EN
D,
AB
BR
EV
IA
TIO
NS
, G
EN
ER
AL
N
OT
ES
M-01
7 24
402864
CRT
RLF
JAM
NEB
OCTOBER 2019
Digi
tally
Sig
ned
OPERATIONS ROOM LEVEL - EL 57.50
1/4" = 1'-0"
FD (TYP)
ARV (TYP)
PUMP PUMP
PUMP
PUMP
MOTOR ROOM
*
*
02-VTP-501
02-ARV-401
02-VTP-401
02-ARV-301
02-VTP-301
02-ARV-201
02-VTP-201
02-ARV-101
02-VTP-101
REMOVE EXISTING
METAL PLATES PRIOR
TO INSTALLING NEW
PUMP BASE
02-ARV-501
NEW PUMP
GROUT PAD (TYP)
FS
02-ARV-501
02-VTP-501
1/4"=1'-0"
2'4' 0 8'4'
NOTES:
1. FOR BEARING LUBRICATION VALVING STATIONS SEE
SPECIFICATIONS SECTION 15499.
2. FOR ARV SEE SPECIFICATION SECTION 15108.
3. FOR PUMP SPECIFICATIONS SEE SECTION 11140.
4. 1" AIR RELEASE VALVE, PUMP SUPPLIER TO PROVIDE AND
COORDINATE MOUNTING LOCATION.
5. INSTALL PUMP SO THAT THE OIL SITE GLASS IS FACING
THE WALKWAY WITHIN THE PUMP STATION.
D1
00
00
PROJECT NO.
SHEET
OF
0 11/2
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
DESIGNED:
APPROVED:
CHECKED:
DETAILED:
RE
VIS
IO
NS
A
ND
R
EC
OR
D O
F U
SE
NO
.B
YC
HK
AP
PD
AT
E
CIT
Y O
F L
AK
E O
SW
EG
O
RIV
ER
IN
TA
KE
P
UM
P S
TA
TIO
N U
PG
RA
DE
S
NOTE:
DIMENSIONS ARE FOR REFERENCE ONLY. CONTRACTOR TO
VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION OF FLOOR
AND PUMP BASE.
*
PUMP SECTION 1
-NO SCALE
18
"
1/2" NPW 2" D
*
21
"
79
"
*
*
FD **
42
"
*
24.5"
27"
*
*
D
MD-1
VERTICAL DIFFUSION
PUMP BASE
PUMP SCHEDULE
TAG NO. TYPE SERVICE
FLOW
RATE (GPM)
TDH (FT)
MOTOR
SIZE (HP)
VALVE SCHEDULE
TAG NO. TYPE
SIZE (IN)
PRESSURE
(PSI)
SERVICE
FLANGE
AWWA C207
FLANGE
RATING
OPERATOR
1" ARV
(SEE NOTE 4)
1-
PL
OT
TE
D: 9
/3
0/2
01
9 1
2:4
8 P
M F
IL
E: C
:\p
w_
wo
rkin
g\b
vw
_a
me
rica
s\d
08
71
82
7\M
-0
2.d
wg
FD
9000A
ISSUED FOR BID
ME
CH
AN
IC
AL
OP
ER
AT
IO
NS
L
EV
EL
P
IP
IN
G P
LA
N
M-02
8 24
402864
CRT
RLF
JAM
NEB
OCTOBER 2019
PRIMARY
SECONDARY
02-VTP-501
VERTICAL
TURBINE
RAW
WATER
6,600185
9,200120
400
02-BFV-501 BUTTERFLY 18" 150
PUMP
CONTROL
D 150 ELECT
MANUAL150DISOLATION15018"BUTTERFLY
02-BFV-502
(EXISTING)
NOTE 5
Digi
tally
Sig
ned
E
DETAIL - ENLARGED PUMP PIPING PLAN
3/8" = 1'-0"
A
-
8"± 16"8"12"± 12"
15
1
4
"
18"
18" BFV
18" DISMANTLING
JOINT
PRESSURE TRANSMITTER
SEE I-06 FOR DETAILS
18" PIPE
SEE SECTION 1, NOTE 8
E
2'-0
"±
3'-0"±
C
MD-1
B
MD-1
A
MD-1
02-VTP-501
02-BFV-501
02-BFV-502
05-MNH-102
02-ARV-501
CL/EL 47.50
MIN
4" AVAR
PIPE SUPPORT
PUMP COLUMN
SLEEVE
LIMITS OF
BRIDGE
500-YR FLOOD
ELEV 52.5
42" ID HEADER
CL/EL 51.40 ±
100-YR FLOOD
ELEV 44.5
42" ID HARNESS
RESTRAINT
COUPLING
18" BFV
ISOLATION
18" 90°
ELBOW
TAP FOR
PRESSURE
TRANSMITTER
18" BFV PUMP
CONTROL
PUMP FL
EL 45.50 ±
PIPE SPOOL
SEE NOTE 10
MONORAIL CHAIN
HOIST NOT SHOWN
FOR CLARITY
OPERATING FL
EL 57.50 ±
1" ARV
PUMP MOTOR
E
MD-1
TAP FOR HIGH
PRESSURE
DIFFERENTIAL
SWITCH (TYP)
3'-0
"±
PUMP ROOM
100
DISCHARGE HEADER ROOM
110
8'-0"±8'-0"±8'-0"±
PUMP ROOM PIPING PLAN
1/4" = 1'-0"
E E E E
2'-6"±8'-0"±2'-6"±
14'-0"±
3'-1
1
/2
"±
20'-0"±
7'-0"±
B
MD1
02-BFV-502
02-BFV-402
02-BFV-401
02-BFV-301
02-BFV-302
02-CAV-602
02-CAV-601
02-BFV-201
02-AVAR-401
02-BFV-101
02-BFV-102
02-BFV-202
02-AVAR-301
02-AVAR-201
02-AVAR-101
04-PCV-101
05-MNH-101
3'-0"±
4'-0"±
1'-6
"±
02-VTP-401
02-VTP-301
02-VTP-201
02-VTP-101
1'-8
"±
04-LE/LIT-002
04-SMP-101
04-LE/LIT-003
04-LE/LIT-001
REMOVE EXISTING
BLIND FLANGE PRIOR TO
INSTALLING THE NEW PIPE
AND APPURTENANCES.
MONORAIL CHAIN HOIST
ABOVE
02-BFV-501
02-AVAR-501
WATER QUALITY
ANALYZER
A
-
1
-
1
M-03
LADDER AND HATCH
TO CATWALK LEVEL
BELOW (TYP)
PUMP WATER BEARING
LUBRICATION SYSTEM
SKID MOUNT
18" BFV
(TYP)
WET WELL
CLEANING
SYSTEM HEADER
PIPE SUPPORTS
1/2" CU SAMPLE
3/8" CU
1/2" SS
SINK
1/2" CU
INSULATING
FITTING
BEARING
LUBRICATION
VALVE STATION
(TYP)
E
PUMP COL
EDGE OF
OPENING
18" BFV
18" BFV
18" DISMANTLING
JOINT
MONORAIL ELEC
HOIST ABOVE
BACKFLOW PREVENTER
FLOOR DRAIN
SLIDE GATE ACTUATOR
FLOOR STAND
SEE NOTE 7
SECTION 1
-3/8" = 1'-0"
FL EL -1.0 ±
REFER TO SPECIFICATIONS
FOR FLOWSERVE'S
FABRICATED VORTEX
SUPPRESSION BASKET TO BE
PROVIDED ON THE PUMP BELL
D1
00
00
PROJECT NO.
SHEET
OF
0 11/2
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
DESIGNED:
APPROVED:
CHECKED:
DETAILED:
RE
VIS
IO
NS
A
ND
R
EC
OR
D O
F U
SE
NO
.B
YC
HK
AP
PD
AT
E
CIT
Y O
F L
AK
E O
SW
EG
O
RIV
ER
IN
TA
KE
P
UM
P S
TA
TIO
N U
PG
RA
DE
S
NOTES:
1. FOR PUMP SPECIFICATION, SEE SECTION 11140.
2. FOR BUTTERFLY VALVES SPECIFICATION, SEE SECTION 15101.
3. FOR ACTUATORS SPECIFICATION, SEE SECTION 15180.
4. FOR AIR VALVES SPECIFICATION, SEE SECTION 15108.
5. FOR PIPE SUPPORTS SPECIFICATION, SEE SECTION 15140.
6. FOR STEEL PIPE SPECIFICATIONS, SEE SECTION 15062.
7. FOR BEARING LUBRICATION VALVING STATIONING
SPECIFICATION, SEE SECTION 15499. NEW VALVING STATION
SHALL MATCH EXISTING VALVING STATION LAYOUT.
8. CONTRACTOR SHALL INSTALL SPOOL PIECE FOR CUSTOM FIT
TO ENSURE NO LOADS OR STRESSES ARE TRANSMITTED TO
THE PUMP FLANGES. SEE SPEC 11140, PARAGRAPH 3-1.
9. PROCESS CODE HAS BEEN LEFT OFF THE TAG NUMBER;
PROCESS CODE IS "RAW".
10. SUPPORT PIPE AS SPECIFIED IN SECTION 15140.
1/4"=1'-0"
2'4' 0 8'4'
E E E
E
NOTES:
1. CONTRACTOR TO FIELD POSITION PUMP CONTROL
ACTUATOR TO PROMOTE ACCESS BETWEEN PUMPS.
2. CONTRACTOR TO FIELD LOCATE INSTRUMENT
STANDS TO AVOID PIPING AND VALVE CONFLICTS.
PL
OT
TE
D: 9
/3
0/2
01
9 1
2:4
9 P
M F
IL
E: C
:\p
w_
wo
rkin
g\b
vw
_a
me
rica
s\d
08
71
82
7\M
-0
3.d
wg
FD
9000A
ISSUED FOR BID
ME
CH
AN
IC
AL
PU
MP
L
EV
EL
E
NL
AR
GE
D P
LA
N A
ND
S
EC
TIO
N
M-03
9 24
402864
CRT
RLF
JAM
NEB
OCTOBER 2019
Digi
tally
Sig
ned
4" AIR VACUUM
VALVE
SEE SPEC 15108
4" SURGE
CHECK VALVE
SEE SPEC 15108
4" FLANGED OUTLET
18" PUMP DISCHARGE
C
M-03NO SCALE
NOTE:
1. USED ON PUMP DISCHARGE LINE.
02-AVAR-501
*DIMENSIONS VARY BASED ON SUBMITTED PRODUCT.
CUSTOM COMBINATION AIR VALVE - AVAR
AIR VACUUM / AIR RELEASE
1'-2"
ROUTE DRAIN PIPE
TO EXISTING
FUNNEL RECEPTOR
DOUBLE NUT &
WASHER
SUBBASE PL
ANCHOR BOLT SIZE TO BE
DETERMINED BY EQUIPMENT MFR
ANCHOR BOLT SLEEVE WITH AN INSIDE
DIA APPROX 4 TIMES BOLT DIA
PUMP SLEEVE
6" M
IN
WELD SQUARE PL WASHER
TO SLEEVE & NUT
OPER
FLOOR
WELD NUT
TO BOLT
BASE PLATE
1 1/2" GROUT OR AS
RECOMMENDED BY PUMP
MANUFACTURER
ROUGHEN SURFACE TO
1/4" AMPLITUDE
#5@12" EF
#5@12"
ANCHOR RODS, QUANTITY,
DIAMETER, AND EMBEDMENT
DEPTH DETERMINED BY PUMP
MANUFACTURER. USE RIGID
TEMPLATE FOR PLACEMENT
OF ANCHOR RODS
BASE PLATE OPENING,
DIAMETER DETERMINED
BY PUMP MANUFACTURER
CONCRETE OPENING,
DIAMETER DETERMINED
BY PUMP MANUFACTURER
BASE PLATE, SIZE
DETERMINED BY PUMP
MANUFACTURER
CONCRETE CURB
LG
T
O B
E M
IN
O
F
8 T
IM
ES
B
OL
T D
IA
1
1 1/2" GROUT MIN
PLAN SECTION 1-1 SECTION 2-2
NOTES:
1. THE ANCHOR BOLTS SHALL BE COVERED WITH A NON-BINDING MATERIAL, SUCH AS
GREASE, PUTTY, OR TAPE, BEFORE GROUTING THE SLEEVE, TO FACILITATE STRETCH.
2. SLEEVE NUT SHALL BE TAPERED AND SHALL HAVE ULTIMATE STRENGTH EQUAL TO
OR GREATER THAN THE ANCHOR ROD STRENGTH.
3. AFTER FINAL ASSEMBLY OF THE PUMP, ALL ANCHOR BOLTS SHALL BE PRETENSIONED
(TIGHTENED) AS RECOMMENDED BY THE PUMP MANUFACTURER.
MIN 6" OR 8 BOLT DIAMETERS TYP
2 2
1
GROUT
1" MIN
1/2
" M
IN
3/4" CHAMFER
2" MIN 2 1/2" MIN
SLEEVE NUT
AS REQD FOR PUMP FURN
8" MIN
NOTES:
1. UNLESS OTHERWISE INDICATED, TIE BOLTS SHALL BE SPACED UNIFORMLY
AROUND THE PIPE, BEGINNING WITH THE FIRST TWO AT THE HORIZONTAL
CENTERLINE OF THE PIPE, SUBJECT TO THE APPROVAL OF THE ENGINEER.
2. SIZE AND NUMBER OF TIE BOLTS IS BASED ON THE HYDRAULIC INSTITUTE
STANDARDS FOR ALLOWABLE MAXIMUM STRENGTH. ALTERNATING DESIGN OR
APPEARANCE SHALL BE ALLOWED ONLY UPON APPROVAL BY THE ENGINEER.
3. SPHERICAL WASHERS SHALL BE INSTALLED FOR ANGULARITY ADJUSTMENT.
PUMP TAG
NUMBER
SUCTION/DISCHARGE DIAMETER OF
HARNESS RODS
NUMBER OF
HARNESS RODS
DOUBLE NUTHARNESS ROD
TABLE 1 - HARNESS RODS
CONNECTION
SIZE
SPHERICAL WASHER
02-VTP-501 DISCHARGE 18 INCH 6 RODS 5/8 INCH
D1
00
00
PROJECT NO.
SHEET
OF
0 11/2
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
DESIGNED:
APPROVED:
CHECKED:
DETAILED:
RE
VIS
IO
NS
A
ND
R
EC
OR
D O
F U
SE
NO
.B
YC
HK
AP
PD
AT
E
CIT
Y O
F L
AK
E O
SW
EG
O
RIV
ER
IN
TA
KE
P
UM
P S
TA
TIO
N U
PG
RA
DE
S
WELD TOP PLATE
TO SPLIT COVER
PLATE
1/2" BOLTS (5 EA HALF)
LOCATION TO MATCH EXIST
SPLIT COVER PLATE - PLAN
SECTION 2
NO SCALENO SCALE
1SECTION
NO SCALE
APUMP COLUMN SLEEVE DETAIL
1/2" BOLTS, 10 EA
SEE SPLIT COVER PL
PLAN FOR LOCATION
NEOPRENE GASKET
2"
2"
OD OF PUMP
1/8
COLUMN + 4"
3"
1
-
-
2
4"±
12"±
SLEEVE ID = PUMP
COLUMN OD + 4"
1/4" PL
2"
1/4" SPLIT COVER
PLATE (SEE PLAN)
PUMP COLUMN
1/4" PL SPLIT SLEEVE
RING SLEEVE
PUMP
COLUMN
1/4" PL SPLIT
2"
1/4" PL
GASKET
NEOPRENE
2'-6"
3/8" MAX
NOTE:
1. COAT INSIDE OF SLEEVE W/
EPOXY ENAMEL
NOTES:
1. HOT DIP GALV PIPE SUPPORT AFTER FABRICATION.
2. ALL HARDWARE SHALL BE GALVANIZED.
3. USE 6" PIPE COLUMN FOR PIPE SIZE > 16" OR
SMALLER PIPES HIGHER THAN 10'-0".
4. PIPE SUPPORT MAY BE COUPLED DIRECTLY TO
PIPE COLUMN.
PIPE SUPPORT
NO SCALE
SCH 40 PIPE (NOTE 3)
1/2"X6" SQ PL
1 1/2" (TYP)
4-3/4" ANCHOR BOLTS
OR ADHESIVE ANCHORS
CONC SLAB
COL OD+6"
SQ
1/2" PL
GROUT
1/4
PIPE, COLUMN,
AND BASE PL C/L
12" M
AX
TYPE 37 PS
SEE PLAN FOR PIPE
SIZE & C/L EL
STEEL PIPE COUPLING
FOR ADJUSTMENT (NOTE 4)
MIN
5"
1" M
AX
SLAB THICKNESS
MINUS 2"
(8" MAX)
B
M-03
BOLTS THREAD INTO
SPLIT COVER PLATES
3/8" BOLTS SPACED
3.75 INCHES ON CENTER
NO SCALE
D
NO SCALE
E
M-02 M-02
-
PLO
TT
ED
: 9/30/2019 12:50 P
M F
ILE
: C
:\pw
_w
orking\bvw
_am
ericas\d0871827
\M
D-1.dw
g
FD
90
00
A
ISSUED FOR BID
ME
CH
AN
IC
AL
ME
CH
AN
IC
AL
D
ET
AIL
S
MD-1
10 24
402864
CRT
RLF
JAM
NEB
OCTOBER 2019
PUMP DISCHARGE JOINT HARNESSVERTICAL DIFFUSION PUMP BASE DETAIL
Digi
tally
Sig
ned
INCREASING DIFF.)(NORMALLY CLOSED, OPENING ON DIFFERENTIAL PRESSURE SWITCH
INCREASING DIFF.)(NORMALLY OPEN, CLOSING ON DIFFERENTIAL PRESSURE SWITCH
(NORMALLY OPEN)LIMIT SWITCH
(NORMALLY CLOSED, HELD OPEN)LIMIT SWITCH
(NORMALLY CLOSED)LIMIT SWITCH
(NORMALLY OPEN, HELD CLOSED)LIMIT SWITCH
(NORMALLY CLOSED)TORQUE SWITCH
(NORMALLY OPEN)TORQUE SWITCH
THE CONTACT WILL CLOSE AFTER A TIME DELAY)(NORMALLY CLOSED, WHEN THE COIL IS DE-ENERGIZEDOFF TIME DELAY CONTACT
THE CONTACT WILL OPEN AFTER A TIME DELAY)(NORMALLY CLOSED, WHEN THE COIL IS ENGERGIZED ON TIME DELAY CONTACT
THE CONTACT WILL OPEN AFTER A TIME DELAY)(NORMALLY OPEN, WHEN THE COIL IS DE-ENERGIZEDOFF TIME DELAY CONTACT
THE CONTACT WILL CLOSE AFTER A TIME DELAY)(NORMALLY OPEN, WHEN THE COIL IS ENERGIZEDON TIME DELAY CONTACT
(OPENING ON INCREASE IN FLOW)FLOW ACTUATED SWITCH
(CLOSING ON INCREASE IN FLOW)FLOW ACTUATED SWITCH
(OPENING ON RISING TEMPERATURE)TEMPERATURE SWITCH
(CLOSING ON RISING TEMPERATURE)TEMPERATURE SWITCH
OPENING ON INCREASING VACUUM)VACUUM SWITCH
V
(CLOSING ON INCREASING VACUUM)VACUUM SWITCH
(OPENING ON RISING PRESSURE)PRESSURE SWITCH
V
P
NORMALLY OPEN GEARED LIMIT SWITCH
(OPENING ON RISING LEVEL)FLOAT SWITCH
(CLOSING ON RISING PRESSURE)PRESSURE SWITCH
P
(CLOSING ON RISING LEVEL)FLOAT SWITCH
MANUAL STARTER
ELECTRODE
OVERLOADOL
MS
TRANSFORMERCONTROL POWER
SWITCH
RESISTOR
DIODE
CAPACITOR
POTENTIOMETER
INDICATING LIGHT
FUSE
NORMALLY CLOSED GEARED LIMIT SWITCH
NORMALLY CLOSED PUSH BUTTON
STARTER, CONTACTOR OR RELAY COIL
MAINTAINED PUSH BUTTON
NORMALLY OPEN PUSH BUTTON
NORMALLY CLOSED CONTACT
NORMALLY OPEN CONTACT
EXTERNAL CONNECTION POINT
WIRE CONNECTION POINT
SCHEMATIC SYMBOLS
CONDUIT PLUGGED FLUSH. CONDUIT CAPPED.
BANK ROUTED BENEATH SLAB-ON-GRADEUNDERGROUND CONCRETE ENCASED ELECTRICAL
ELECTRICAL DUCT BANKUNDERGROUND CONCRETE ENCASED
IN FIXTURE SCHEDULE.FLUORESCENT FIXTURE. REFER TO NUMBER OR LETTER
IN FIXTURE SCHEDULELIGHTING FIXTURE. REFER TO NUMBER OR LETTER
(MINIMUM NO. 12 AWG CONDUCTORS AND 3/4" CONDUIT)PANEL L2 & CONNECTED TO CIRCUIT #5TYPICAL FOR HOME RUN TO BE ROUTED TO LIGHTING
GROUND CONDUCTOR
DIRECT BURIED CONDUIT
L2-5
CONDUIT TURNING UP. CONDUIT TURNING DOWN.
CONDUIT CONCEALED
CONDUIT EXPOSED
LIGHTING PANEL LP1, CIRCUIT 3RECEPTACLE POWERED FROMLP1-3
(NON-SWITCHED)LIGHTING PANEL LP2, CIRCUIT 2LIGHTING FIXTURE POWERED FROM
A
A
11
LP2-2
VIA SWITCH ALIGHTING PANEL LPA, CIRCUIT 4,LIGHTING FIXTURE POWERED FROM
11LPA-4 A
CONDUIT & WIRING INSTALLATION LEGEND
E
EE
RECEPTACLE (UPS)120 VOLT DUPLEX
CX
TYPICAL AMPERE RATING NOTED WELDING RECEPTACLE,Ø480V, 3
AMPERE RATING NOTED RECEPTACLE, TYPICALØ240V, 1
TWISTLOCK RECEPTACLE
RANGE RECEPTACLE
SIMPLEX RECEPTACLE
DUPLEX RECEPTACLE 120 VOLT
60
30
WEATHERPROOF SWITCHWP
FOUR-WAY SWITCH
THREE-WAY SWITCH
TWO POLE SWITCH
SINGLE POLE SWITCH
3
M
4
2
C1
C1CONTROLLING CONTACTORMOMENTARY SWITCH
DIMMER SWITCH
EXPLOSION PROOF SWITCH
SWITCHKEY OPERATED
PILOT LIGHTSWITCH WITH
DM
XP
KO
PL
WITH "A" DESIGNATIONCONTROLLING LIGHTSTHREE-WAY SWITCH
3A
SWITCH & OUTLET SYMBOLS
COAXIAL CABLE OUTLET
TELEPHONE FLOOR OUTLET
TELEPHONE OUTLET
DUPLEX FLOOR OUTLET
CEILING MOUNTED CONE SPEAKER
LINE BALANCE ASSEMBLYLB
TG
SPEAKER AMPLIFIER
REMOTE HANDSET
SA
WPRH
DESK TOP STATION
WALL STATION
DS
WPWS
SK
WALL MOUNTED CONE SPEAKER
DUAL HORN SPEAKER
HORN SPEAKER
COMMUNICATION SYMBOLS
INTERFACE AMPLIFIER
TELEPHONE INTERFACE
TONE GENERATOR
TI
IA
H=HAZARDOUS AREAWP=WEATHERPROOF
INTERCOM JUNCTION BOXIJB
NOTE:
SIZES, AND ROUTING, IS ON THE FOLLOWING DRAWING TYPES.6. INFORMATION RELATED TO CIRCUIT IDENTIFICATION, WIRE & CONDUIT
OF CIRCUITS, AND IDENTIFY CIRCUITS ROUTED UNDERGROUND. ONE-LINE DIAGRAMS ALSO INDICATE ORIGIN AND DESTINATION QUANTITY AND SIZES, AND CONDUIT SIZE WITHIN STRUCTURES. A. ONE-LINE DIAGRAMS SHOW CIRCUIT IDENTIFICATION, WIRE
AND OTHER MISCELLANEOUS EQUIPMENT CIRCUITS. PLANS MAY ALSO SHOW HOME RUNS FOR LIGHTING, RECEPTACLE, OF THE IN-STRUCTURE PORTIONS OF CIRCUITS. BUILDING FLOOR ARE SHOWN ON STRUCTURE PLANS FOR DETERMINING THE LENGTH PORTIONS, ANTICIPATED PENETRATION OF UNDERGROUND CONDUITS LENGTH WITHIN THE STRUCTURE. FOR CIRCUITS WITH UNDERGROUND PLANS SHOW LOCATION OF EQUIPMENT FOR DETERMINING CIRCUIT B. FOR CIRCUITS WITHOUT UNDERGROUND PORTIONS, BUILDING FLOOR
REFERENCED ON THE SITE PLAN. CONDUITS OR DUCT BANKS ARE INDICATED IN DUCT BANK SECTIONS CONDUITS AND DUCT BANKS. CIRCUITS ROUTED IN UNDERGROUND C. SITE PLANS INDICATE THE GENERAL ROUTING OF UNDERGROUND
CONDUIT. CONDUITS, AND CIRCUITS ROUTED IN EACH UNDERGROUND SIZE CONDUIT MATERIAL, ARRANGEMENT OF THE UNDERGROUND D. DUCT BANK SECTIONS AND SCHEDULES IDENTIFY CONDUIT
3. DASHED LINES ( ) INDICATE FUTURE WORK OR EQUIPMENT.
2. SCREENED LINES ( ) INDICATE EXISTING WORK OR EQUIPMENT.
1. SOLID LINES ( ) INDICATE NEW WORK OR EQUIPMENT.
ABBREVIATIONS MAY NOT BE UTILIZED ON THIS SPECIFIC PROJECT.5. THIS IS A GENERAL LEGEND SHEET. SOME SYMBOLS AND
GENERAL NOTES
AREA TYPE 12
AREA TYPE 1A
AREA TYPE 4
NEMA TYPE 1 ENCLOSURES.INDOOR AREAS NOT INDICATED OTHERWISE ARE AREA TYPE 1 AND MINIMUMDESIGNATION BOXES ARE LOCATED WITHIN ROOM OR BELOW ROOM NUMBER. ALLTHE PLAN DRAWINGS TO DEFINE ELECTRICAL INSTALLATION REQUIREMENTS.THE SPECIAL AREA DESIGNATION BOXES, AS DEFINED BELOW, ARE LOCATED ON
FITTINGS IN CONDUIT SYSTEMS.12 GASKETED ENCLOSURES FOR ALL EQUIPMENT AND GASKETEDINDOOR, DRY, DIRTY AREA. REQUIRES MINIMUM NEMA TYPE
CONDUIT WITH PVC FITTINGS, BOXES, AND ACCESSORIES.CONDUIT SYSTEM SHALL BE EXPOSED PVC COATED RIGID STEELCORROSIVE CHEMICAL FEED AND STORAGE ROOMS.
STEEL ENCLOSURE FOR EQUIPMENT AND GASKETED FITTINGSBASEMENTS, ETC. MINIMUM NEMA TYPE 4X WITH STAINLESSINDOOR WET LOCATIONS SUCH AS VAULTS, HOSEDOWN AREAS,
AREA DESIGNATIONS
EQUIPMENT. THAT WILL INTERFERE WITH THE OPERATION OF THE HOISTS, ETC., NO CONDUITS SHALL BE RUN OVERHEAD6. IN AREAS WHERE THERE ARE OVERHEAD BRIDGE CRANES,
MINIMUM 3/4". RECEPTACLES, AND MISCELLANEOUS 120VAC CIRCUITS SHALL BE SHALL BE MINIMUM NO. 12 AWG. CONDUIT FOR LIGHTING, LIGHTING, RECEPTACLES, AND MISCELLANEOUS 120VAC CIRCUITS PLANS ARE NOT SHOWN ON THE ONE-LINES. CONDUCTORS FOR5. LIGHTING AND RECEPTACLE CIRCUITS DESIGNATED ON THE FLOOR
FURNISHED. PROPERLY SIZED STARTER OVERLOADS FOR EQUIPMENT4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING
THE HIGHER VALUE. EQUIPMENT SHALL BE ENLARGED, AS REQUIRED, TO ACCOMMODATE LOAD THAN VALUE SHOWN, THE CABLE CONDUIT AND ELECTRICAL3. IF EQUIPMENT SUPPLIED BY MANUFACTURER HAS A LARGER
2. SPARE WIRES SHALL BE TAPED AND COILED.
DEFINED IN THE SPECIFICATIONS. ON THE PLAN DRAWINGS. CONDUITS SHALL BE ROUTED AS CONDUITS SHOWN ON THE ONE-LINES AND HOME-RUNS SHOWN CONDUITS NOT SHOWN ON THE PLANS. THIS SHALL INCLUDE ALL1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ROUTING ALL
GENERAL REQUIREMENTS
LIGHTING CONTACTOR
MISCELLANEOUS PANEL
LIGHTING PANEL
POWER PANEL
COMBINATION STARTER
DISCONNECT SWITCH
GROUND CONNECTION
GROUND ROD
JUNCTION BOX
THERMOSTATT
J
HORN
BELL
MISCELLANEOUS SYMBOLS
GROUND ROD WITH TEST WELL
TM
ZSZ
XP
X
Y
XFMR
WP
WHW
VSVPI
VLS
UPSUV
TSL
WM
VM
VARVAV
UG
TQ
TDTCTB
T
SVSUPV
SSSPSTSPDT
SOSNSH
SCADA
RTU
TEMP
TACH
SWB
SP
RTDRT
R
PTPSPRS
PHPFPB
OCB
RESRECP
2P
P
OL
O
NONC
MVA
MSHMS
MOVMHMFRMFM
MDMCLUMCC
M
N
MV
MA
TIMER MOTOR
POSITION SWITCHAUXILIARY RELAY
EXPLOSION PROOF
AUXILIARY RELAY
YELLOW
TRANSFORMER
WEATHERPROOF
WATTHOUR METERWHITE OR WATTS
VOLTMETER SWITCHVALVE POSITION INDICATOR
VALVE LIMIT SWITCH
UNINTERRUPTIBLE POWER SUPPLYUNDER VOLTAGE
TEMPERATURE SWITCH LOW
WATT METER
VOLTMETER
VARMETERVOLT AMPEREVOLTS
UNDERGROUND
TORQUE
TIME DELAY RELAYTIMER CLUTCHTERMINAL BLOCK
THERMOSTAT, TIMER, OR TOTALIZER
SOLENOID VALVESUPERVISORY CONTROL
SELECTOR SWITCHSINGLE POLE SINGLE THROWSINGLE POLE DOUBLE THROW
SOLENOID OILERSOLID NEUTRALSPACE HEATERDATA ACQUISITIONSUPERVISORY CONTROL AND
REMOTE TERMINAL UNIT
TEMPERATURE
TACHOMETER
SWITCHBOARD
SINGLE POLE OR SPARE
RESISTANCE TYPE TEMP DETECTORREPEATING TIMER
RED, RAISE, RELAY OR REVERSE
PROGRAM TIMERPOTENTIAL TRANSFORMER, PRESSURE SWITCHPROXIMITY SWITCH
PHASE, CHEMICAL TERMPOWER FACTOR METERPUSH BUTTON OR PULL BOX
OIL CIRCUIT BREAKER
RESISTORRECEPTACLE
2 POLE
PRIMARY
OVERLOAD
OPEN
NORMALLY OPEN, NUMBERNORMALLY CLOSED
MEGA VOLT AMPERE
MOTOR SPACE HEATERMOTION SENSOR
MOTOR OPERATED VALVEMANHOLE OR MOUNTING HEIGHTMANUFACTURERMAGNETIC FLOW METER
MOISTURE DETECTORMOTOR CONTROL LINEUPMOTOR CONTROL CENTER
MAGNETIC MOTOR STARTER
NEUTRAL
MILLIVOLT
MILLIAMPERE
MPR MOTOR PROTECTION RELAY
MCB MAIN CIRCUIT BREAKER
OOA ON-OFF-AUTOOOR ON-OFF-REMOTE
PCS PLANT CONTROL SYSTEM
PP POWER PANEL
PLC PROGRAMMABLE LOGIC CONTROLLER
RVSS
SA SURGE ARRESTER
SSS SOLID STATE STARTER
SWGR SWITCHGEAR
TS TEMPERATURE SWITCH
ZSS ZERO SPEED SWITCH
GD
SHIELDED #16 CABLEONE, SINGLE PAIR, TWISTED,
MULTICONDUCTOR CONTROL CABLESTHREE, SINGLE, SEVEN CONDUCTOR #14
LWCO
LPLOR
LC
LAL
KWHKWKVARKVAKV
K
INST
JBJ
I/O
HZHWCO
HPHORHOAHMTHHHCH
#8GGLSGFIGEN
CB"A"
EX
G
FSF
ETMESER
EMHEL
EC
DVLSDSDPSDPRDPSTDPDTDMDI
DC
4"C2/CCTMCTCCTCS
CRCPTCPCOSCL2CKT
CB"B"
CBCAPC
BTBRBC
AT
ASARANNAM
AFD
ACBACA
GROUND DETECTOR
LOW WATER CUTOFF
LIGHTING PANELLOCAL-OFF-REMOTE
LIGHTING CONTACTOR
LIGHTNING ARRESTERLOW, LEVEL
KILOWATT HOURKILOWATTKILOVARKILOVOLT AMPEREKILOVOLT
KEY INTERLOCK
INSTANTANEOUS
JUNCTION BOXJUNCTION BOX
INPUT/OUTPUT
HERTZ (CYCLE)HIGH WATER CUTOFF
HORSEPOWERHAND-OFF-REMOTEHAND-OFF-AUTOHIGH MOTOR TEMPERATUREHANDHOLEHOT CIRCUITHIGH OR HUMIDISTAT
#8 GROUND WIREGEARED LIMIT SWITCHGROUND FAULT INTERRUPTERGENERATOR
CIRCUIT BREAKER AUXILIARY CONTACT
(CLOSED WHEN BREAKER IS OPEN OR TRIPPED
EXISTING
GREEN OR GROUND
FLOW SWITCHFORWARD
ELAPSED TIME METEREND SWITCHELECTRODE RELAY
ELECTRICAL MANHOLEELEVATION OR EMERGENCY LIGHT
EMPTY CONDUIT
DISCHARGE VALVE LIMIT SWITCHDISCONNECT SWITCHDIFFERENTIAL PRESSURE SWITCHDIFFERENTIAL PRESSURE REGULATORDOUBLE POLE SINGLE THROWDOUBLE POLE DOUBLE THROWDAMPER MOTOR OR DEMAND METERDOOR INTERLOCK
DIRECT CURRENT
4" CONDUIT2 CONDUCTORCYCLE TIMER MOTORCYCLE TIMER CLUTCHCYCLE TIMER OR CURRENT TRANSFORMERCONTROL STATION
CURRENT OR CONTROL RELAYCONTROL POWER TRANSFORMERCONTROL PANELCABLE OPERATED SWITCHCHLORINECIRCUITCELL INTERLOCK
OPEN WHEN BREAKER IS CLOSED)
CIRCUIT BREAKER AUXILIARY CONTACTCLOSED WHEN BREAKER IS CLOSED)(OPEN WHEN BREAKER IS OPEN OR TRIPPED
CIRCUIT BREAKERCAPACITORCLOSE, COUNTER OR CONTACTOR
BEARING TEMPERATUREBRAKEBATTERY CHARGER
AMPERE TRIP
AMMETER SWITCHALARM RELAYANNUNCIATORAMMETER
ADJUSTABLE FREQUENCY DRIVE
AIR CIRCUIT BREAKERALTERNATING CURRENTAMBER, AMPERE, ALARM
1-1PR#16S
3-7/C#14
LAN LOCAL AREA NETWORK
LOA LOCAL-OFF-AUTO
LS LIMIT OR LEVEL SWITCH
ECONTROL DAMPER OR VALVEELECTRIC OPERATOR FOR
CICONTROL DAMPERCD
AWG AMERICAN WIRE GAGE
AF AMPERE FRAME
KCMIL THOUSAND CIRCULAR MIL
ABBREVIATIONS
REDUCED VOLTAGE SOLID STATE STARTER
WPI WEATHERPROOF IN-USELCP LOCAL CONTROL PANEL
REVERSING OR 2 SPEEDSIZE 2 COMBINATION MAGNETIC MOTOR STARTER,
FUSE AND DISCONNECT SWITCH
HIGH VOLTAGE DRAWOUT CONTACTOR
LOW VOLTAGE DRAWOUT AIR CIRCUIT BREAKER
SIZE 4 COMBINATION MAGNETIC MOTOR STARTER
3 POLE, 20 AMPERELOW VOLTAGE AIR CIRCUIT BREAKER,
VACUUM CIRCUIT BREAKERHIGH VOLTAGE DRAWOUT AIR OR
SIZE OF UNDERGROUND PORTION OF CIRCUIT.DUCT BANK SCHEDULE AND SECTIONS FOR CONDUITGROUND AND/OR INSIDE OF STRUCTURE. SEECONDUIT SIZE SHOWN ON ONE-LINE IS ABOVEBE ROUTED IN DUCT BANK OR UNDERGROUND.INDICATES THAT ALL OR PART OF CIRCUIT MAY
REQUIRED BY THE EQUIPMENT FURNISHED. MENT SHALL ALSO BE INSTALLED AND WIRED ASIMPLY THAT ANY AND ALL ASSOCIATED EQUIP-GENERATOR OR AN AIR HANDLING UNIT, SHALLPACKAGE UNIT, AS FOR EXAMPLE A STEAMONE-LINE SHOWING POWER AND CONTROL TO A
20 HP MOTOR1#10 BARE GROUND WIRE ALL IN 2" CONDUIT TOCIRCUIT NO.22 WITH #8 INSULATED CONDUCTORS,
VOLTAGE, AND KVA RATING AS NOTEDTRANSFORMER WITH PRIMARY AND SECONDARY
CURRENT TRANSFORMER
POTENTIAL TRANSFORMER
REDUCED VOLTAGE STARTERSIZE 1 COMBINATIONS1
S4
3P-20
S2
COMPLETELYSHOWN MAY NOT BEAUXILIARY ITEMS
22: 3#8,#10G,2"
-480Y/2772.4KV, 60HZ3
1500KVA
20
15
ONE-LINE DIAGRAM LEGEND
4. CROSS-HATCHED ( ) INDICATE DEMOLITION WORK OR EQUIPMENT.
TSH TEMPERATURE SWITCH HIGHTTB TELEPHONE TERMINAL BOX
CR CARD READER
DC DOOR CONTACT
MD MOTION DETECTOR
PTZ PAN TILT ZOOM CAMERA
IN A CONDUIT SYSTEM.
LW LINNWOOD
E ELECTRICAL
ATS AUTOMATIC TRANSFER SWITCH
AIR AIR CONDITIONING EQUIPMENT
BAT BATTERY EQUIPMENT
EGN ELECTRICAL GENERATOR
LHT LIGHTING
LT LIGHTING XFMR
MAB MAIN BREAKER
POP POWER PANEL
HTC HEAT TRACE CONTROLLER
SWG SWITCHGEAR
TRF TRANSFORMERS
UH UNIT HEATERS
ENCL ENCLOSURE
S2 SIZE 2 STARTER
Ø
EXPOSED CONDUIT SUSPENDED BENEATH SLAB
ASTC AUTOMATIC SOURCE TRANSFER CONTROLLER
IS INTRUSION SWITCH
MTS MANUAL TRANSFER SWITCH
ETHERNET DATA OUTLET
LCP-101 ETHERNET DATA OUTLET FROM LCP-101,ETHERNET CABLE IN 3/4" CONDUIT
NS INTRUSION SWITCH
SPD SURGE PROTECTION DEVICE
D1
00
00
PROJECT NO.
SHEET
OF
0 11/2
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
DESIGNED:
APPROVED:
CHECKED:
DETAILED:
RE
VIS
IO
NS
A
ND
R
EC
OR
D O
F U
SE
NO
.B
YC
HK
AP
PD
AT
E
CIT
Y O
F L
AK
E O
SW
EG
O
RIV
ER
IN
TA
KE
P
UM
P S
TA
TIO
N U
PG
RA
DE
S
PL
OT
TE
D: 9
/3
0/2
019 1
2:53 P
M F
ILE
: C
:\pw
_w
orkin
g\b
vw
_a
me
rica
s\d
08
71
85
2\E
01
.d
wg
FD
10
00
0
ISSUED FOR BID
EL
EC
TR
IC
AL
LE
GE
ND
A
ND
A
BB
RE
VIA
TIO
NS
E-01
11 24
402684
RRB
KH
AJT
AJT
OCTOBER 2019
Digi
tally
Sig
ned
RIVER INTAKEPUMP NO.1
RAW-02-VTP-101
400
RAW-02-VFD-101
SWITCHBOARD RAW-03-SWB-001RIVER INTAKEPUMP STATION
EXISTING 12.47KV JENNINGS LODGEUTILITY SERVICE(FULL CAPACITY)
NEW 12.47KVABERNETHY-CLACKAMASUTILITY SERVICE
(1MVA PARTIAL CAPACITY)
MM
UTILITYMETERINGENCLOSURE
UTILITYMETERINGENCLOSURE
15KV PAD-MOUNTEDSWITCHGEARRAW-03-SWG-001
POWER DISTRIBUTIONFUNCTIONAL DIAGRAMNO SCALE
ASTCNC NO
480V,3000A BUS,3W,3PH,60HZ,65KAIC
SWG01-3A:
SWG01-2A:
SWG01-4A:
SWG01-4:
3P-2500
RAW-03-XFM-0011500/1680KVA12.47KV-480Y/277V3PH,60HZ,55 /65 C
SWG01-1A:
SWG01-1:
3P-2500
RIVER INTAKEPUMP NO.2
RAW-02-VTP-201
400
RAW-02-VFD-201
RIVER INTAKEPUMP NO.3
RAW-02-VTP-301
400
RAW-02-VFD-301
RIVER INTAKEPUMP NO.4
RAW-02-VTP-401
400
RAW-02-VFD-401
RIVER INTAKEPUMP NO.5
RAW-02-VTP-501
400
RAW-02-VFD-501
SWG01-2: SWG01-3:
480V,3000A BUS,3W,3PH,60HZ,65KAIC
3P-700
3P-700
3P-2500
3P-700
3P-700
3P-700
RAW-03-XFM-0021500/1680KVA12.47KV-480Y/277V3PH,60HZ,55 /65 C
K
NC NC
NC NC
NO
D1
00
00
PROJECT NO.
SHEET
OF
0 11/2
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
DESIGNED:
APPROVED:
CHECKED:
DETAILED:
RE
VIS
IO
NS
A
ND
R
EC
OR
D O
F U
SE
NO
.B
YC
HK
AP
PD
AT
E
CIT
Y O
F L
AK
E O
SW
EG
O
RIV
ER
IN
TA
KE
P
UM
P S
TA
TIO
N U
PG
RA
DE
S
NOTES:1. SEE DRAWING E1 FOR ELECTRICAL LEGEND, ABBREVIATIONS AND GENERAL REQUIREMENTS.
2. FUNCTIONAL DIAGRAM SHOWS OVERALL POWER DISTRIBUTION LAYOUT. NOT ALL EQUIPMENT AND DETAILS ARE SHOWN. SEE ONE-LINE DIAGRAMS FOR FULL DETAIL.
PL
OT
TE
D: 9
/3
0/2
01
9 12:54 P
M F
ILE
: C
:\pw
_w
orkin
g\b
vw
_a
me
rica
s\d
08
71
85
2\E
02
.d
wg
FD
10
00
0
ISSUED FOR BID
EL
EC
TR
IC
AL
PO
WE
R D
IS
TR
IB
UT
IO
N F
UN
CT
IO
NA
L D
IA
GR
AM
E-02
12 24
402684
RRB
KH
AJT
AJT
OCTOBER 2019
Digi
tally
Sig
ned
RAW-03-SWB-001
RAW-02-VFD-101
LIGHTINGTRANSFORMERRAW-03-LT-001
LIGHTINGPANELRAW-03-LP-001
FISH SCREENMASTER CONTROL PANELRAW-01-MCP-001
RAW-04-RTU-101
UPS LIGHTINGTRANSFORMERRAW-03-LT-002
FISH SCREENLOCAL CONTROL PANELRAW-01-LCP-001
RIVER INTAKEPUMP NO.1RAW-02-VTP-101
RAW-02-LCP-101
RAW-02-LCP-201RAW-02-LCP-301RAW-02-LCP-401
RAW-03-PP-001
RAW-02-VFD-201
RAW-02-VFD-301
(CEILING MTD)
CD-205
CD-204
RAW-03-UPS-101
UPS PANELRAW-03-LP-002
RAW-02-VFD-401
CCTV CAMERARAW-04-CCTV-101(MOUNTED ON CEILING)
MOTOR ROOMINTRUSION SWITCHRAW-04-NS-112
CCTV CAMERARAW-04-CCTV-102
RAW-05-TPP-102
CONTROL ROOMINTRUSION SWITCHRAW-04-NS-102
CCTV CAMERARAW-04-CCTV-104
MOTOR ROOMINTRUSION SWITCHRAW-04-NS-113
NETWORK RACKRAW-04-LCP-001
PB
CONTROL ROOMSPARE CONDUITS
RIVER INTAKEPUMP NO.2RAW-02-VTP-201
RIVER INTAKEPUMP NO.3RAW-02-VTP-301
RIVER INTAKEPUMP NO.4RAW-02-VTP-401
ACCESS CONTROLPANEL
FACPRAW-05-FCP-201
30A EATON MTHXFDMANUAL TRANSFER SWITCH (TOP)150A EATON MTHXFD MANUALTRANSFER SWITCH (BOTTOM)
TCP-201
DFC-201
EUH-201
EUH-202
E
RR
C
T203
T202
E
EM
T201
T
T
E E
51
A
F
3
C
E
B
2 4
RAW-02-VFD-501
RIVER INTAKEPUMP NO.5RAW-02-VTP-501
NOTE 2
NOTE 2
RAW-02-GTV-511
RAW-02-FSH-511
RAW-02-TE-501-506RAW-02-VSH-501RAW-02-MSH-501
SWB01-15A:(NOTE 4)
18"x6" CABLE TRAY
30"x6" CABLE TRAY
SWBO1-15:
UPS POWER PANELRAW-03-PP-002
200MOTOR ROOM 210
CONTROL ROOM
230DECK
220ELECTRICAL ROOM
240BALCONY
RAW-02-LCP-501
OPERATIONS LEVEL - POWER PLAN1/4" = 1'-0"
1/4"=1'-0"
2'4' 0 8'4'
NOTES:1. SEE DRAWING E1 FOR ELECTRICAL LEGEND, ABBREVIATIONS AND GENERAL REQUIREMENTS.
2. GROUND CONDUCTOR STUB OUTS SHALL BE CONNECTED TO MOTORAND VFD VIA EXISTING GROUND CONNECTIONS. EXTEND #4/0BARE GROUND CABLE AS REQUIRED FOR FINAL TERMINATION ATEQUIPMENT.
3. NOT ALL CABLE/CONDUIT ROUTING IS SHOWN. CONTRACTORSHALL FIELD ROUTE ALL CONDUIT IN ACCORDANCE WITHSPECIFICATIONS.
4. ROUTE CABLE IN CABLE TRAY.
D1
00
00
PROJECT NO.
SHEET
OF
0 11/2
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
DESIGNED:
APPROVED:
CHECKED:
DETAILED:
RE
VIS
IO
NS
A
ND
R
EC
OR
D O
F U
SE
NO
.B
YC
HK
AP
PD
AT
E
CIT
Y O
F L
AK
E O
SW
EG
O
RIV
ER
IN
TA
KE
P
UM
P S
TA
TIO
N U
PG
RA
DE
S
PL
OT
TE
D: 9
/3
0/2
019 1
2:55 P
M F
ILE
: C
:\pw
_w
orkin
g\b
vw
_a
me
rica
s\d
08
71
85
2\E
03
.d
wg
FD
10
00
0
ISSUED FOR BID
EL
EC
TR
IC
AL
OP
ER
AT
IO
NS
L
EV
EL
PO
WE
R P
LA
N
E-03
13 24
402684
RRB
KH
AJT
AJT
OCTOBER 2019
Digi
tally
Sig
ned
E
E
E E
TT
101
T
EUH-101
EUH-102
PF-102
PF-101
RAW-01-SLG-301
RAW-01-SLG-401
RIVER INTAKETEE SCREEN NO.3RAW-01-SCR-301
RAW-01-SLG-201
RIVER INTAKETEE SCREEN NO.2RAW-01-SCR-201
RAW-01-SLG-101
RIVER INTAKETEE SCREEN NO.1RAW-01-SCR-101
PB
PB
RAW-04-LIT-001RAW-04-LIT-003
SLG-301 DS SLG-201 DSSLG-401 DS
SLG-101 DS
RAW-04-LIT-002RAW-05-SMP-101 JB
RAW-05-SUP-102RAW-05-SUP-101
RAW-05-LS-101
BEARING LUBE SKIDRAW-02-LCP-701
RAW-02-BFV-101RAW-02-BFV-201
RAW-02-BFV-301
RAW-02-BFV-401RAW-02-BFV-501
SAMPLE PUMPRAW-04-LCP-101
CD-103
CD-101
CD-102
CD-104
PF-102STARTER
PF-101STARTER
RAW-04-PIT-101
RAW-05-TPP-101
SUMP PUMP LCPCONTROL PANELRAW-05-LCP-101
SLIDE GATE HOISTRAW-05-MNH-101
RAW-04-AIT/AE-104RAW-04-AIT/AE-103RAW-04-AIT/AE-102RAW-04-AIT/AE-101
RAW-02-PIT-101RAW-02-PSH-101
RAW-02-PIT-201RAW-02-PSH-201
RAW-02-PIT-301RAW-02-PSH-301
RAW-02-PIT-401RAW-02-PSH-401
SAMPLE LINEHEAT TRACE CONTROLLERRAW-03-HTC-003
COLD WATERHEAT TRACECONTROLLERRAW-03-HTC-002
BFV-101 DSBFV-201 DSBFV-301 DSBFV-401 DS
PUMPED DISCHARGEHEAT TRACECONTROLLERRAW-03-HTC-001
RAW-04-FSH-101
RAW-02-PDSH-101
RAW-02-PDSH-201RAW-02-PDSH-301RAW-02-PDSH-401
ANALYZER SUBPANELSPARE JB
RAW-05-EWH-101
SLIDE GATE HOISTRAW-05-MNH-101 DS
RAW-05-EWH-101 DS
LOCATION FOR J-BOXES FORFEEDS FROM :SB1 & HVACPANELS 120V LP-1 & LP-2
LOCATION OF ANALOG & DISCREETJ-BOXES FED FROM RTU-101
RAW-02-PSH-501
RAW-02-PIT-501
BFV-501 DS
RAW-02-PDIT-501
100PUMP ROOM
110DISCHARGE HEADER ROOM
AREA TYPE 4
AREA TYPE 4
D1
00
00
PROJECT NO.
SHEET
OF
0 11/2
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
DESIGNED:
APPROVED:
CHECKED:
DETAILED:
RE
VIS
IO
NS
A
ND
R
EC
OR
D O
F U
SE
NO
.B
YC
HK
AP
PD
AT
E
CIT
Y O
F L
AK
E O
SW
EG
O
RIV
ER
IN
TA
KE
P
UM
P S
TA
TIO
N U
PG
RA
DE
S
PUMP LEVEL - POWER PLAN1/4" = 1'-0"
NOTES:1. SEE DRAWING E1 FOR ELECTRICAL LEGEND, ABBREVIATIONS
AND GENERAL REQUIREMENTS.
2. NOT ALL CABLE/CONDUIT ROUTING IS SHOWN. CONTRACTORSHALL FIELD ROUTE ALL CONDUIT IN ACCORDANCE WITH THESPECIFICATIONS.
1/4"=1'-0"
2'4' 0 8'4'
PL
OT
TE
D: 9
/3
0/2
019 1
2:56 P
M F
ILE
: C
:\pw
_w
orkin
g\b
vw
_a
me
rica
s\d
08
71
85
2\E
04
.d
wg
FD
10
00
0
ISSUED FOR BID
EL
EC
TR
IC
AL
PU
MP
L
EV
EL
PO
WE
R P
LA
N
E-04
14 24
402684
RRB
KH
AJT
AJT
OCTOBER 2019
Digi
tally
Sig
ned
RAW-03-SWB-001 SWITCHBOARD FRONT ELEVATIONNO SCALE
RAW-03-SWB-001 ONE-LINE
RAW-03-XFM-001
SWG01-1A:
NOTES:1. SEE DRAWING E1 FOR ELECTRICAL LEGEND, ABBREVIATIONS
AND GENERAL REQUIREMENTS.
2. CONDUIT SHOWN AS EXISTING (EXT) SHALL BE EXTENDEDWITH NEW CONDUIT AS REQUIRED FOR FINAL EQUIPMENTTERMINATIONS.
3. KIRK KEY INTERLOCK SHALL ONLY ALLOW 2 OF 3 CIRCUITBREAKERS TO BE CLOSED AT ANY TIME.
4. AFD CABLE, SEE 16050-FIGURE 15.
5. ROUTE CABLE THROUGH EXISTING CABLE TRAY.
6. CONTRACTOR SHALL REPLACE THE EXISTING GENERAL ELECTRIC ETUTRIP UNITS ON THE TWO EXISTING 2500A GENERAL ELECTRIC SSD25SWITCHBOARD MAIN CIRCUIT BREAKERS AND REPLACE THEM WITH NEWLSIG ABB/GE ETU TRIP UNITS EQUIPPED WITH ABB/GE RELT ARCFLASH REDUCTION MAINTENANCE MODE SWITCHES. PROVIDE ALLMODIFICATIONS NECESSARY TO INCORPORATE THE SWITCH INCLUDING3-POSITION ON-OFF-TEST SWITCH, LOCAL INDICATION LED LIGHT,RELT UNIT, CONTROL POWER, DISTRIBUTION CABLE TERMINAL BLOCK,AND OTHER ACCESSORIES AS REQUIRED.
RAW-02-VTP-101
SWB01-1:6-500KCMIL,2#1/0G,(2)3-1/2"
RAW-02-VFD-101
400
SWB01-1A:2-3/C#500 W/G,(2)5" (NOTE 4)
SVRAW-02-GTV-111
VFD101-1:20#14,#14G,1-1/4"
FSH
RAW-02-FSH-111
2#14,3/4"
TE
RAW-02-TE-101,
-102,-103,-104,-105,-106
VFD101-2:6-TR#16S,1-1/2"
PSH
RAW-02-PSH-101
RAW-04-RTU-101
RTU101-4:
#4/0G
BOND TO GROUND RING
3P-2500
#4/0G
RAW-03-XFM-002
SWG01-4A:
BOND TO GROUND RING
RAW-02-BFV-101
VFD101-3:8#14,3/4"
CS
RAW-02-LCP-101
SPD
SURGE PROTECTIVE DEVICES
SPD
SURGE PROTECTIVE DEVICES
CONTINUED BELOW
CONTINUED FROM ABOVE
RAW-03-SWB-001 ONE-LINE
480V, 3PH, 3W, 60HZ, 3000A BUS, 65KAIC, SERVICE ENTRANCE RATED
3P-700
3P-2500
3P-2500
1/2 1/2 MOV
3P-30
METERINGPACKAGE
RAW-03-PM-101
NETWORK RACK
RAW-04-LCP-001
LCP001-7:
SWB01-2:6-500KCMIL,2#1/0G,(2)3-1/2"
3P-700
RAW-05-SUP-101
SWB01-3:3#12,#12G,3/4"
SUMP PUMP LCPRAW-05-LCP-101
SWB01-3A:3#12,#12G,3/4"
3P-20
RAW-05-SUP-102
SWB01-3B:3#12,#12G,3/4"
MTS-001
SPARE
RAW-03-SWB-001
3P-25
UPS
RAW-03-UPS-101
3P-25
SWB01-6:3#10,#10G,3/4"
SWB01-7:3#12,#12G,3/4"
3P-15
INTAKE GATE
RAW-01-SLG-101
MOV
SWB01-8:3#12,#12G,3/4"
3P-15
INTAKE GATE
RAW-01-SLG-201
MOV
SWB01-9:3#12,#12G,3/4"
3P-15
INTAKE GATE
RAW-01-SLG-301
MOV
SWB01-10:3#12,#12G,3/4"
3P-15
INTAKE GATE
RAW-01-SLG-401
SWB01-11:6-500KCMIL,2#1/0G,(2)3-1/2"
3P-700
480V, 3PH, 3W, 60HZ, 3000A BUS, 65KAIC
SWB01-12:6-500KCMIL,2#1/0G,(2)3-1/2"
3P-700
SWB01-15:6-500KCMIL,2-1/0G,(2 EXISTING)3-1/2"
3P-700
METERINGPACKAGE
RAW-03-PM-201
NETWORK RACK
RAW-04-LCP-001
LCP001-7:
HVAC POWER PANEL
3P-150
SWB01-13:3#2/0,#6G,2"
FISH SCREEN MASTER CP
RAW-01-MCP-001
3P-25
SWB01-14:3#10,#10G,3/4"
3P-20
SPARE
3P-25
SWB01-16:3#12,#12G,3/4"
SLIDE GATE HOIST
RAW-05-MNH-101
RTU101-59:
VSH
RAW-02-VSH-101
24VDC FROM RTU-101
MSH
RAW-02-MSH-101
2#14,3/4"
2#14,3/4"
SWB01-1:6-500KCMIL,2#1/0G,(2)3-1/2"
RTU101-63:
RAW-04-RTU-101
RTU101-64:
RAW-04-RTU-101
RTU101-65:
RAW-04-RTU-101
RTU101-66:
RAW-04-RTU-101
RAW-04-RTU-101
RTU101-74:
LS
RAW-05-LS-101
SWBD-3C:8#14,3/4"
JB JB
K
3PT
CPT
3PT
CPT
MPR
2#14,#14G,3/4"
2#14,3/4"
8#14,3/4"
(6)
PDS
2#14,3/4"
RAW-02-PDSH-101
RAW-02-VTP-201
RAW-02-VFD-201
400
SWB01-2A:2-3/C#500 W/G,(2)5" (NOTE 4)
SV
RAW-02-GTV-211
VFD201-1:20#14,#14G,1-1/4"
FSH
RAW-02-FSH-211
2#14,3/4"
TE
RAW-02-TE-201,
-202,-203,-204,-205,-206
VFD201-2:6-TR#16S,1-1/2"
PSH
RAW-02-PSH-201
RAW-04-RTU-101
RTU101-12:
RAW-02-BFV-201
VFD201-3:8#14,3/4"
CS
RAW-02-LCP-201
RTU101-59:
VSH
RAW-02-VSH-201
24VDC FROM RTU-101
MSH
RAW-02-MSH-201
2#14,3/4"
2#14,3/4"
MPR
2#14,#14G,3/4"
2#14,3/4"
8#14,3/4"
(6)
PDS
2#14,3/4"
RAW-02-PDSH-201
RAW-02-VTP-301
RAW-02-VFD-301
400
SWB01-11A:2-3/C#500 W/G,(2)5" (NOTE 4)
SV
RAW-02-GTV-311
VFD301-1:20#14,#14G,1-1/4"
FSH
RAW-02-FSH-311
2#14,3/4"
TE
RAW-02-TE-301,
-302,-303,-304,-305,-306
VFD301-2:6-TR#16S,1-1/2"
PSH
RAW-02-PSH-301
RAW-04-RTU-101
RTU101-18:
RAW-02-BFV-301
VFD301-3:8#14,3/4"
CS
RAW-02-LCP-301
RTU101-59:
VSH
RAW-02-VSH-301
24VDC FROM RTU-101
MSH
RAW-02-MSH-301
2#14,3/4"
2#14,3/4"
MPR
2#14,#14G,3/4"
2#14,3/4"
8#14,3/4"
(6)
PDS
2#14,3/4"
RAW-02-PDSH-301
RAW-02-VTP-501
RAW-02-VFD-501
400
SWB01-15A:2-3/C#500 W/G,(2-EXT)5"
SV
RAW-02-GTV-511
VFD501-1:20#14,14G,(EXT)1-1/4"
FSH
RAW-02-FSH-511
2#14,3/4"
TE
RAW-02-TE-501,
-502,-503,-504,-505,-506
VFD501-2:6-TR#16S,1-1/2"(NOTE 5)
PSH
RAW-02-PSH-501
RAW-04-RTU-101
RTU101-51:
RAW-02-BFV-501
VFD501-3:8#14,(EXT)3/4"
CS
RAW-02-LCP-501
RTU101-70:
VSH
RAW-02-VSH-501
MOV
24VDC FROM RTU-101
MSH
RAW-02-MSH-501
MOV
2#14,3/4"
MPR
2#14,#14G,3/4"
(6)
PDS
RAW-02-PDSH-501
RAW-02-VTP-401
RAW-02-VFD-401
400
SWB01-12A:2-3/C#500 W/G,(2)5" (NOTE 4)
SV
RAW-02-GTV-411
VFD401-1:20#14,#14G,1-1/4"
FSH
RAW-02-FSH-411
2#14,3/4"
TE
RAW-02-TE-401,
-402,-403,-404,-405,-406
VFD401-2:6-TR#16S,1-1/2"
PSH
RAW-02-PSH-401
RAW-04-RTU-101
RTU101-26:
3P-30
3P-30
RAW-02-BFV-401
3P-30
VFD401-3:8#14,3/4"
CS
RAW-02-LCP-401
RTU101-59:
VSH
RAW-02-VSH-401
24VDC FROM RTU-101
MSH
RAW-02-MSH-401
2#14,3/4"
2#14,3/4"
MPR
2#14,#14G,3/4"
2#14,3/4"
8#14,3/4"
(6)
PDS
2#14,3/4"
RAW-02-PDSH-401
SWB01-17:3#12,#12G,3/4"
3P-15
RAW-02-BFV-611
RTU101-75:
RAW-04-RTU-101
SWB01-18:3#12,#12G,3/4"
3P-15
RAW-02-BFV-621
RTU101-76:
RAW-04-RTU-101
3P-25
MTS-002
2#14,3/4"
2#14,3/4"
2#14,3/4"
8#14,3/4"
3P-30
3P-30
3P-30
NOTE 3
3P-150
3#10,#10G,3/4"
3#10,#10G,3/4"
MTS-002
(30A)
3#210,#6G,2"
MTS-001
(150A)
RAW-03-SWB-001
(NOTE 4 & 5)
40
90
40 35 35 35
SPD
SPACE15A15A
15A15A
700A
700A
SPACE
25A15A
20A15A
METER
CPT
MAIN A2500A
CABLESECTION
TIE2500A
METER
CPT
MAIN B2500A
CABLESECTION
SPD
SPACE15A25A
SPACE25A
700A
700A
700A150A20A
25A15A
SPACE
LSIGRELT
NOTE 6
LSIGRELT
NOTE 6
D1
00
00
PROJECT NO.
SHEET
OF
0 11/2
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
DESIGNED:
APPROVED:
CHECKED:
DETAILED:
RE
VIS
IO
NS
A
ND
R
EC
OR
D O
F U
SE
NO
.B
YC
HK
AP
PD
AT
E
CIT
Y O
F L
AK
E O
SW
EG
O
RIV
ER
IN
TA
KE
P
UM
P S
TA
TIO
N U
PG
RA
DE
S
PL
OT
TE
D: 9
/3
0/2
019 1
2:57 P
M F
ILE
: C
:\pw
_w
orkin
g\b
vw
_a
me
rica
s\d
08
71
85
2\E
05
.d
wg
FD
10
00
0
ISSUED FOR BID
EL
EC
TR
IC
AL
SW
IT
CH
BO
AR
D
SIN
GL
E L
IN
E D
IA
GR
AM
A
ND
E
LE
VA
TIO
NS
E-05
15 24
402684
RRB
KH
AJT
AJT
OCTOBER 2019
Digi
tally
Sig
ned
NOTES:1. SEE DRAWING E1 FOR ELECTRICAL LEGEND, ABBREVIATIONS AND GENERAL REQUIREMENTS.
2. CONDUIT SHOWN AS EXISTING (EXT) SHALL BE EXTENDEDWITH NEW CONDUIT AS REQUIRED FOR FINAL EQUIPMENTTERMINATIONS.
3. FUSE SIZE AND TYPE FOR ACTUATOR DISCONNECT SHALL BERECOMMENDED BY THE ACTUATOR MANUFACTURER.
HVAC POWER PANEL RAW-03-PP-001
3P-150
SWITCHBOARD
RAW-03-SWB-001
SWB01-13:
3P-20
T
AIR HANDLING UNIT
RAW-05-AHU-301
7.5
PP01-1B:MFR SUPPLIED,3/4"
7KVA T
THERMOSTAT RAW-05-T-201
42KVA T 1/2
S-1
3P-20
RAW-05-DHP-301
PP01-2:3#12,#12G,3/4"
MFR SUPPLIED,3/4"
THERMOSTAT RAW-05-T-202
3P-70
RAW-05-CU-301
PP01-3:3#2,#8G,1-1/4"
MFR SUPPLIED,3/4"
THERMOSTAT RAW-05-T-201
3P-15
RAW-05-PF-101
PP01-4A:3#12,#12G,3/4"
RAW-05-TCP-201
TCP201-1:
3P-15
RAW-05-PF-102
1/2
PP01-5A:3#12,#12G,3/4"
S-1
RAW-05-TCP-201
TCP201-2:
3P-15
RAW-05-PF-301
1/2
PP01-6A:3#12,#12G,3/4"
S-1
RAW-05-TCP-201
TCP201-3:
3P-15
RAW-05-PF-302
1
PP01-7A:3#12,#12G,3/4"
S-1
RAW-05-TCP-201
TCP201-4:
3P-20
RAW-05-UF-301
7.5
PP01-8A:6#10,#12G,1"
S-1
RAW-05-TCP-201
TCP201-5:
3P-20
RAW-05-EUH-101
5KW
PP01-9:3#12,#12G,3/4"
T
MFR SUPPLIED,3/4"
THERMOSTAT
3P-20
RAW-05-EUH-102
5KW
PP01-10:3#12,#12G,3/4"
T
MFR SUPPLIED,3/4"
THERMOSTAT
3P-20
RAW-05-EUH-201
5KW
PP01-11:3#12,#12G,3/4"
T
MFR SUPPLIED,3/4"
THERMOSTAT
3P-20
RAW-05-EUH-202
5KW
PP01-12:3#12,#12G,3/4"
T
MFR SUPPLIED,3/4"
THERMOSTAT
RAW-05-TCP-201
120VAC FROM RAW-03-LP-001
LP1-14:2#12,#12G,3/4"
RAW-05-PF-101 STARTER
TCP201-1:2#14,3/4"
RAW-05-PF-102 STARTER
TCP201-2:2#14,3/4"
RAW-05-PF-201 STARTER
TCP201-3:2#14,3/4"
RAW-05-PF-202 STARTER
TCP201-4:2#14,3/4"
RAW-05-UF-301 STARTER
TCP201-5:2#14,3/4"
RAW-03-UPS-101
SWTICHBOARD
RAW-03-SWB-001
SWB01-6:
RAW-03-UPS-101
BATTERY ENCLOSURE
BAT
MFR SUPPLIED
RAW-04-RTU-101
RTU101-77:
UPS LIGHTING PANEL
RAW-03-LP-002
UPS10-2:4#4,#10G,1-1/4"
POWER PANEL RAW-03-PP-002
3P-25
208V UPS FROM RAW-03-LP-002
3P-15
RAW-02-BFV-101
MOV
PP02-3:3#12,#12G,3/4"
VFD101-3:
RAW-02-VFD-101
RTU101-6:
RAW-04-RTU-101
3P-15
RAW-02-BFV-201
MOV
PP02-4:3#12,#12G,3/4"
VFD201-3:
RAW-02-VFD-201
RTU101-14:
RAW-04-RTU-101
3P-15
RAW-02-BFV-301
MOV
PP02-5:3#12,#12G,3/4"
VFD301-3:
RAW-02-VFD-301
RTU101-20:
RAW-04-RTU-101
3P-15
RAW-02-BFV-401
MOV
3P-30PP02-6:3#12,#12G,3/4"
VFD401-3:
RAW-02-VFD-401
RTU101-27:
RAW-04-RTU-101
3P-15
RAW-02-BFV-501
MOV
PP02-7:3#12,#12G,
(EXT)3/4"
VFD501-3:
RAW-02-VFD-501
RTU101-53:
SPARE
3P-20
RAW-04-RTU-101
RTU101-68:
RAW-03-UPS-10115KVA,
480V INPUT,208V OUTPUT,
INTEGRAL MAINTENANCEBYPASS SWITCH
480V, 60HZ, 3W, 3PH, 100A, 18 POLE, 14KAIC
STEP-UP TRANSFORMER
RAW-03-LT-002
208V-480/277V
15KVA
#6G
LP02-5:
3#4,#10G,1-1/4"
PP02-1:3#10,#10G,3/4"
480V, 60HZ, 3W, 3PH, 250A, 42 POLE, 65KAIC
TEMPERATURE CONTROL PANELRAW-05-TCP-201
CONTROL DAMPERS, THERMOSTAT, ETC.
3P-30
3P-30
3P-30
3P-100
3P-30
PP01-4:3#12,#12G,3/4"
PP01-5:3#12,#12G,3/4"
PP01-6:3#12,#12G,3/4"
PP01-7:3#12,#12G,3/4"
PP01-1A:3#12,#12G,3/4"
S-1
PP01-1:3#12,#12G,3/4"
PP01-8:3#10,#12G,3/4"
BOND TO GROUND RING
BOND TO GROUND RING
#4/0G
#4/0G
3P-25
10HP
SWB01-19:3#10,#10G,3/4"
RTU101-78A:
VFD
RTU101-78B:
RAW-03-LT-001
480-208/120V
45KVA
SWB01-4:3#2,#8G,1-1/4"
#4G
3P-70
SPD
SWB01-4A:4#210,#6G,2"
BEARING LUBE SKID
RAW-02-LCP-701
BOND TO GROUND RING
LIGHTING TRANSFORMER
RAW-03-LP-001
LIGHTING PANEL
RAW-03-LP-001
RAW-04-RTU-101
3P-30
RAW-04-RTU-101
NOTE 3
PP02-7A:3#12,#12G,3/4"
D1
00
00
PROJECT NO.
SHEET
OF
0 11/2
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
DESIGNED:
APPROVED:
CHECKED:
DETAILED:
RE
VIS
IO
NS
A
ND
R
EC
OR
D O
F U
SE
NO
.B
YC
HK
AP
PD
AT
E
CIT
Y O
F L
AK
E O
SW
EG
O
RIV
ER
IN
TA
KE
P
UM
P S
TA
TIO
N U
PG
RA
DE
S
PL
OT
TE
D: 9
/3
0/2
019 1
2:57 P
M F
ILE
: C
:\pw
_w
orkin
g\b
vw
_a
me
rica
s\d
08
71
85
2\E
06
.d
wg
FD
10
00
0
ISSUED FOR BID
EL
EC
TR
IC
AL
OP
ER
AT
IO
NS
L
EV
EL
PO
WE
R P
LA
N
E-06
16 24
402684
RRB
KH
AJT
AJT
OCTOBER 2019
Digi
tally
Sig
ned
120VAC UPS FROM
RAW-03-LP-002
RAW-04-RTU-101 ONE-LINE
LP02-1:2#12,#12G,3/4"
LIT
RAW-04-LIT-001
RTU101-1:1-1PR#16S,2#12,#12G,1"
RAW-02-VFD-101
RTU101-4:ETHERNET,2-1PR#16S,6#14,1-1/4"
PITRAW-02-PIT-101
RTU101-5:1-1PR#16S,3/4"
RAW-02-BFV-101
RTU101-6:8#14,3/4"
PIT
RAW-02-PIT-201
RTU101-13:1-1PR#16S,3/4"
PIT
RAW-02-PIT-301
RTU101-19:1-1PR#16S,3/4"
RAW-04-RTU-101 ONE-LINE
CONTINUED BELOW
CONTINUED FROM ABOVE
PIT
RAW-02-PIT-401
RTU101-28:1-1PR#16S,3/4"
PIT
RAW-04-PIT-101
RTU101-41:1-1PR#16S,3/4"
SAMPLE PUMP LCP
RAW-04-LCP-101
RTU101-42:10#14,1"
AIT
PUMP STATION SAMPLE
PH/TEMP
RAW-04-AIT-101
RTU101-43:2-1PR#16S,2#12,#12G,1"
AIT
PUMP STATION SAMPLE
COND
RAW-04-AIT-102
RTU101-44:1-1PR#16S,2#12,#12G,1"
AIT
PUMP STATION SAMPLE
UV 254
RAW-04-AIT-103
RTU101-45:1-1PR#16S,2#12,#12G,1"
AIT
PUMP STATION SAMPLE
TURB
RAW-04-AIT-104
RTU101-46:1-1PR#16S,3/4"
NOTES:1. SEE DRAWING E1 FOR ELECTRICAL LEGEND, ABBREVIATIONS
AND GENERAL REQUIREMENTS.
2. CONDUIT SHOWN AS EXISTING (EXT) SHALL BE EXTENDEDWITH NEW CONDUIT AS REQUIRED FOR FINAL EQUIPMENTTERMINATIONS.
3. ETHERNET CABLE FROM VFD SHALL BE ROUTED TO RTUCABINET AND CONTINUE ON TO NETWORK RACKRAW-04-LCP-001 FOR TERMINATION THROUGH CIRCUITRTU101-51A.
120VAC UPS FROM
RAW-03-LP-002
LP02-2:2#12,#12G,3/4"
RAW-02-VFD-501
PIT
RAW-02-PIT-501
RTU101-52:1-1PR#16S,(EXT)3/4"
RAW-02-BFV-501
RAW-02-VFD-201
RTU101-12:ETHERNET,2-1PR#16S,6#14,1-1/4"
RAW-02-BFV-201
RTU101-14:8#14,3/4"
RAW-02-VFD-301
RTU101-18:ETHERNET,2-1PR#16S,6#14,1-1/4"
RAW-02-BFV-301
RTU101-20:8#14,3/4"
RAW-02-VFD-401
RTU101-26:ETHERNET,2-1PR#16S,6#14,1-1/4"
RAW-02-BFV-401
RTU101-27:8#14,3/4"
RTU101-51:ETHERNET,2-1PR#16S,6#14,(EXT)1-1/4"
RTU101-53:8#14,3/4"
SWITCHGEAR ASTC
RAW-03-SWG-001
SWG01-5:
NS
CONTROL ROOM INTRUSION SWITCH
RAW-04-NS-101
RTU101-55:2#14,3/4"
NS
ELECTRICAL ROOM INTRUSION SWITCH
RAW-04-NS-121
RTU101-57:2#14,3/4"
AE
RAW-04-AE-101
MFR SUPLLIED,3/4"
LE
RAW-04-LE-001
MFR SUPLLIED,3/4"
LIT
RAW-04-LIT-002
RTU101-2:1-1PR#16S,2#12,#12G,1"
LE
RAW-04-LE-002
MFR SUPLLIED,3/4"
LIT
RAW-04-LIT-003
RTU101-16:1-1PR#16S,2#12,#12G,1"
LE
RAW-04-LE-003
MFR SUPLLIED,3/4"
AE
RAW-04-AE-102
MFR SUPLLIED,3/4"
AE
RAW-04-AE-103
MFR SUPLLIED,3/4"
AE
RAW-04-AE-104
MFR SUPLLIED,3/4"
NS
CONTROL ROOM INTRUSION SWITCH
RAW-04-NS-102
2#14,3/4"
NS
MOTOR ROOM INTRUSION SWITCH
RAW-04-NS-111
RTU101-56:2#14,3/4"
NS
MOTOR ROOM INTRUSION SWITCH
RAW-04-NS-112
2#14,3/4"
NS
MOTOR ROOM INTRUSION SWITCH
RAW-04-NS-113
2#14,3/4"
NS
ATTIC ROOM INTRUSION SWITCH
RAW-04-NS-131
RTU101-58:2#14,3/4"
NS
ATTIC ROOM INTRUSION SWITCH
RAW-04-NS-141
RTU101-58A:2#14,3/4"
RAW-02-FSH-111 AND
RAW-02-VSH-101
RTU101-59:4#12,#12G,3/4"
RAW-02-FSH-211 AND
RAW-02-VSH-201
RTU101-60:4#12,#12G,3/4"
RAW-02-FSH-311 AND
RAW-02-VSH-301
RTU101-61:4#12,#12G,3/4"
RAW-02-FSH-411 AND
RAW-02-VSH-401
RTU101-62:4#12,#12G,3/4"
SCREEN 1 ISO GATE
RAW-01-SLG-101
RTU101-63:12#14,1"
SCREEN 2 ISO GATE
RAW-01-SLG-201
RTU101-64:12#14,1"
SCREEN 3 ISO GATE
RAW-01-SLG-301
RTU101-65:12#14,1"
INTAKE STRUCTURE ISO GATE
RAW-01-SLG-401
RTU101-66:12#14,1"
FIRE ALARM CP
RAW-05-FCP-201
RTU101-67:8#14,3/4"
TEMPERATURE CONTROL PANEL
RAW-05-TCP-201
RTU101-68:4#14,3/4"
RAW-02-FSH-511 AND
RAW-02-VSH-501
RTU101-70:4#12,#12G,(EXT)3/4"
NETWORK RACK
RAW-04-LCP-001
RTU101-72:6-ETHERNET,2"
FSH
SAMPLE SUPPLY FLOW
RAW-04-FSH-101
RTU101-73:2#14,2#12,#12G,3/4"
SUMP PUMP LCP
RAW-05-LCP-101
RTU101-74:4#14,3/4"
JB
ANALYZER SUBPANEL SPARES JB
RTU101-41:1-1PR#16S,3/4"
RAW-02-BFV-611
RTU101-75:12#14,1"
RAW-02-BFV-621
RTU101-76:12#14,1"
RAW-03-UPS-101
RTU101-77:4#14,1"
BEARING LUBE SKID
RAW-02-LCP-701
RTU101-78A:4-1PR#16S,1-1/4"
RTU101-78B:20#14,1-1/4"
FIT
BEARING LUBE SKID
RAW-02-FIT-701
RTU101-80:1-1PR#16S,2#12,#12G,1"
FE
BEARING LUBE SKID
RAW-02-FE-701
MFR SUPLLIED,3/4"
PIT
BEARING LUBE SKID
RAW-02-PIT-701
RTU101-79:1-1PR#16S,3/4"
5-1PR#16S,6#12,3#12G,1-1/2"
4#14,3/4" 48#14,2" 12#14,1" 24#14,1-1/4" 6-1PR#16S,2#12,#12G,1-1/2"
RAW-04-LCP-001
RTU101-51A:ETHERNET,3/4"
NOTE 3
D1
00
00
PROJECT NO.
SHEET
OF
0 11/2
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
DESIGNED:
APPROVED:
CHECKED:
DETAILED:
RE
VIS
IO
NS
A
ND
R
EC
OR
D O
F U
SE
NO
.B
YC
HK
AP
PD
AT
E
CIT
Y O
F L
AK
E O
SW
EG
O
RIV
ER
IN
TA
KE
P
UM
P S
TA
TIO
N U
PG
RA
DE
S
PL
OT
TE
D: 9
/3
0/2
019 1
2:58 P
M F
ILE
: C
:\pw
_w
orkin
g\b
vw
_a
me
rica
s\d
08
71
85
2\E
07
.d
wg
FD
10
00
0
ISSUED FOR BID
EL
EC
TR
IC
AL
PL
C S
IN
GL
E L
IN
E D
IA
GR
AM
S
E-07
17 24
402684
RRB
KH
AJT
AJT
OCTOBER 2019
Digi
tally
Sig
ned
NOTES:1. SEE DRAWING E1 FOR ELECTRICAL LEGEND, ABBREVIATIONS AND GENERAL REQUIREMENTS.
SWITCH DEVELOPMENTS
POSITIONCONTACTS1-23-45-6
SS1
LOCAL OFF REMOTE
DISCHARGE VALVE RAW-02-BFV-501
SYMBOL LEGENDAT TCP
480V,3Ø
1 2
SS1LOCAL OPEN
3 4
SS1REMOTE CR3
CR6
OPEN
CR6
CLOSE
FULLY CLOSEDTO RTU
FULLY OPENTO RTU
TO CRAIN AFD
CLOSES @ VALVE5%-100% OPEN
FROM AFD
REMOTE FROM PANEL
FROM RTU
RAW-02-VFD-501
480V,3Ø
AFD
1 2
SS1LOCAL
120V POWER FROM AFD
MOTOR
TO RTU
SPEEDSETPOINT4-20mA
TO RTU
SPEED4-20mA
RUN CR1
CR3TO DISCHARGEVALVE
START
START
CR5
STOP STOP CR2E-STOP
CR6
CR5
3 4
SS1REMOTE CRC
CLOSE
CR6
CRA
TD3
60 SEC
CR1CLOSE
5 6
SS1REMOTE
7 8
SS1REMOTE
TD1
TD3
CR1G MOTOR STOPPED
TD1SV
G60 SEC
(DISCHARGEVALVEOPEN)
MSH
SWITCHVIBRATION
TO DISCHARGEVALVE
7-8
TO RTU5 6
SS1REMOTE
24VDC
0VDC
TO RTU
TO CRBIN AFD
INITIATE RUNSEQUENCE
START PUSH BUTTONSEAL-IN
CRB
(DISCHARGEVALVEIN REMOTEPERMISSIVE)
(RTU RUN CMD)
E-STOP
CRB
(DISCHARGEVALVE IN REMOTEPERMISSIVE)
RUN RELAY
SV TIME DELAY ONSTOP
SV TIME DELAY ONSTART
R MOTOR RUNNING RUNSEQUENCE INITIATED
RTDTRIP
MPRTO MOTOR
RTD(TYP 6)
MOTOR PROTECTIONRELAY
PRESSURECR7
SWITCHFLOW
CR1
24VDC FROMRTU
CR2
TD2
60 SEC
RESETCR2
A
ALARM RELAY
ALARM LIGHT
RESET
TD
TIME DELAY45-90SEC
24VDC FROMRTU
SWITCH
CR3
CR3
OPEN DISCHARGEVALVE
DIFFERENTIALPRESSURE
SPEEDINDICATION
RUN CMD
TO RTU ETHERNETI/P DATALINK
CLOSE VALVECR6
OPEN VALVE
CRA24VDC FROMDISCHARGE VALVE
ENERGIZES WHEN VALVEIS 5-100% OPEN
CRB24VDC FROMDISCHARGE VALVEENERGIZES WHEN
IN REMOTE
CRC24VDC FROMRTU ENERGIZES
ON RUN CMD
HIGH DISCHARGE
24VDC
LUBE SOLENOID
FAILTO RTU
AT THERMOSTAT
LUBE SOLENOIDVALVE OPEN
CR1
CR10
TD4CR8
CR11
TD4
60 SEC
CR11 VIBRATION
CRD24VDC FROMRTU ENERGIZES
ON ALARM RESET
CR8
CR9
CR7TD2
CR9
CRD(PLC RESET)
TD2 CR7
CR8
CR9
CR11
CR2
87SS1
REMOTE IN REMOTE
HIGH DISCHARGEPRESSURE
LUBRICATION FAIL
HIGH MOTOR TEMP
HIGH VIBRATION
FAIL
ESTOP
TD4
ESTOP
D1
00
00
PROJECT NO.
SHEET
OF
0 11/2
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
DESIGNED:
APPROVED:
CHECKED:
DETAILED:
RE
VIS
IO
NS
A
ND
R
EC
OR
D O
F U
SE
NO
.B
YC
HK
AP
PD
AT
E
CIT
Y O
F L
AK
E O
SW
EG
O
RIV
ER
IN
TA
KE
P
UM
P S
TA
TIO
N U
PG
RA
DE
S
PL
OT
TE
D: 9
/3
0/2
019 1
2:59 P
M F
ILE
: C
:\pw
_w
orkin
g\b
vw
_a
me
rica
s\d
08
71
85
2\E
08
.d
wg
FD
10
00
0
ISSUED FOR BID
EL
EC
TR
IC
AL
EL
EC
TR
IC
AL
S
CH
EM
AT
IC
S
E-08
18 24
402684
RRB
KH
AJT
AJT
OCTOBER 2019
Digi
tally
Sig
ned
1. IN GENERAL, THE P&ID SYMBOLS AND DEVICE IDENTIFICATIONS ARE BASED ON
INTERNATIONAL SOCIETY OF AUTOMATION, STANDARD PRACTICE ANSI/ISA-S5.1 (2009).
SOME MODIFICATIONS, ADDITIONS, AND ALTERATIONS HAVE BEEN MADE AS NEEDED TO
ACCOMMODATE THE PROJECT REQUIREMENTS.
2. SOME CONTROL AND INTERLOCK REQUIREMENTS WHICH CAN BE MORE CLEARLY
ILLUSTRATED ON SCHEMATIC DRAWINGS HAVE BEEN OMITTED FROM THE P&ID
DRAWINGS.
3. THIS IS A GENERAL LEGEND SHEET. SOME SYMBOLS AND ABBREVIATIONS MAY NOT BE
UTILIZED ON THIS SPECIFIC PROJECT.
4. PIPING AND EQUIPMENT LEGEND APPLIES TO P&ID SHEETS ONLY AND MAY DIFFER
FROM LEGENDS FOR OTHER SHEETS.
GENERAL NOTES
PUMP & BLOWER SYMBOLS
CENTRIFUGAL PUMP
OR OTHER TYPE
NOT SPECIFIED
SCREW (LIFT) PUMP
ROTARY PUMP
PROGRESSING
CAVITY PUMP
POSITIVE
DISPLACEMENT
PUMP
PLUNGER PUMP
VERTICAL PUMP
SUMP PUMP
CENTRIFUGAL FAN
CENTRIFUGAL BLOWER
POSITIVE
DISPLACEMENT BLOWER
COMPRESSOR:
RECIPROCATING
COMPRESSOR:
ROTARY SCREW
COMPRESSOR:
LIQUID RING
DIAPHRAGM METERING PUMP
PERISTALTIC PUMP
DRUM PUMP
DOUBLE DIAPHRAGM
METERING PUMP
S
SOLENOID PUMP
TURBINE COMPRESSOR
T
TURBINE
ST
M
STEAM COMPRESSOR
SUBMERGED
CENTRIIFUGAL
PUMP
SUMP PUMP
BELL MOUNTED PUMP
GAS TURBINE ENGINE
PRIMARY ELEMENT & FITTING SYMBOLS
TE
LE
FE
DIAPHRAGM SEAL
PRIMARY FLOW ELEMENT:
ORIFICE PLATE
PRIMARY FLOW ELEMENT:
FLUME
PRIMARY FLOW ELEMENT:
TURBINE OR PROPELLER-TYPE
PRIMARY FLOW ELEMENT:
ELECTROMAGNETIC
THERMAL DISPERSION
TYPE FLOW ELEMENT
PRIMARY FLOW ELEMENT:
TRANSIT-TIME ULTRASONIC
TEMPERATURE ELEMENT
WITH THERMOWELL
ANNULAR TYPE
DIAPHRAGM SEAL
PRIMARY FLOW ELEMENT:
POSITIVE DISPLACEMENT
PRIMARY FLOW ELEMENT:
VENTURI TUBE
PRIMARY FLOW ELEMENT:
WEIR
PRIMARY FLOW ELEMENT:
PITOT TUBE
PRIMARY FLOW ELEMENT:
CORIOLIS
PRIMARY FLOW ELEMENT:
DOPPLER TYPE ULTRASONIC
PRIMARY ELEMENT:
ROTAMETER
ULTRASONIC LEVEL
ELEMENT
SEDIMENT TRAP
FLAME ARRESTER
SURGE CHAMBER
FLAME CHECK
REDUCER - CONCENTRIC
REDUCER - ECCENTRIC
FLANGE
DRAIN - BELL-UP
DRAIN - FUNNEL
FLEXIBLE CONNECTION
CAP
PLUG
TRAP
UNION
HOSE CONNECTION
STRAINER - Y TYPE
STRAINER - BASKET
QUICK CONNECT
VENT
VENT - SCREENED
COUPLING
SIGHTGLASS
MOISTURE SEPARATOR
LE
ELECTRODE TYPE
LEVEL SWITCH
Q
D
D
END CAP
EXPANSION LOOP
THE FOLLOWING ADDITIONAL
DESIGNATIONS MAY BE
UTILIZED ADJACENT TO SOME
VALVE OR GATE SYMBOLS.
NC NORMALLY CLOSED
NO NORMALLY OPEN
FC FAILS CLOSED
FO FAILS OPEN
FIP FAILS IN LAST POSITION
HCW
HWN
HL
M
N
E/H
M
P
P/O
HHW
P
DA
P
SC
P
SO
HANDWHEEL
CHAINWHEEL
WRENCH NUT
LEVER
SMALL MOTOR
ACTUATOR
STANDARD
ELECTRIC
NETWORKED
ELECTRIC
ELECTRIC-
HYDRAULIC
PROGRAMMABLE
ELECTRIC
HYDRAULIC
SOLENOID
AIR-OIL
PNEUMATIC ACTUATOR
DOUBLE ACTING
PNEUMATIC ACTUATOR
SPRING CLOSE
PNEUMATIC ACTUATOR
SPRING OPEN
DIAPHRAGM VALVE
QUICK OPENING
VALVE
QUICK CLOSING
VALVE
WEIGHT LOADED
VALVE
FLOAT OPERATED
VALVE
SPRING LOADED
VALVE
LOADING/BACK
PRESSURE VALVE
PNEUMATIC
ACTUATOR
VALVE & GATE SYMBOLS
VALVE: AIR-VACUUM
VALVE: AIR RELEASE
VALVE: THERMAL SHUTOFF
VALVE: MUD
VALVE: SLEEVE
VALVE: KNIFE GATE
CHLORINE VACUUM
REGULATOR
BACKFLOW PREVENTER
GATE: FLAP
VACUUM BREAKER
VALVE: DIAPHRAGM
VALVE: PRESSURE/VACUUM
RELIEF
VALVE: PRESSURE RELIEF
VALVE: VACUUM RELIEF
VALVE: PRESSURE SUSTAINING
(SELF ACTUATING TYPE)
VALVE: PRESSURE REDUCING
(SELF ACTUATING TYPE)
VALVE: PRESSURE SUSTAINING
VALVE: PRESSURE REDUCING
VALVE: GATE OR OTHER IN-LINE
TYPE NOT OTHERWISE IDENTIFIED
VALVE: BALL, AWWA=AMERICAN WATER
WORKS ASSCIATION
VALVE: GLOBE
VALVE: BUTTERFLY, DAMPER OR
LOUVER: IND=INDUSTRIAL,
AWWA=AMERICAN WATER
WORKS ASSOCIATION,
SS=STAINLESS STEEL
VALVE: PLUG
VALVE: THREE WAY
VALVE: FOUR WAY
VALVE: CHECK
VALVE: ANGLE
VALVE: SET STOP
VALVE: PINCH
VALVE: CHLORINE
VALVE: CHLORINE WITH YOKE
VALVE: PILOT
EXPLOSION RELIEF
VALVE: FOUR FUNCTION
M
OVERFLOW WEIR
VALVE: NEEDLE
VALVE: TELESCOPING
VALVE: VPORT BALL
GATE: SLU=SLUICE
SLD= SLIDE
SLU
L L
// //
LINE SYMBOLS
AAA-XX-BBB-YYY
PI-45B
PI-45B
PI-45
B
PI-45
B
SSS PPP MTL-
PROCESS CODE - DENOTES ASSOCIATED SYSTEM STREAM
FUNCTION/EQUIPMENT CODE - DENOTES ASSOCIATED EQUIPMENT ABBREVIATION
AREA CODE - UNIQUE NUMERIC AREA IDENTIFIER
PIPE SIZE - INCHES UNLESS OTHERWISE NOTED
MATERIAL CODE - DENOTES ASSOCIATED MATERIAL ABBREVIATION
PROCESS CODE - DENOTES ASSOCIATED PROCESS STREAM
EQUIPMENT IDENTIFICATION DESCRIPTION
PIPELINE IDENTIFICATION DESCRIPTION
MAJOR PROCESS PIPING OR FLOW CHANNEL
SECONDARY PROCESS PIPING
MISCELLANEOUS PIPING
SCREENED LINE DENOTES EXISTING PIPE
OR EQUIPMENT
DASHED LINE DENOTES FUTURE PIPE
AND EQUIPMENT
ELECTRIC SIGNAL
HYDRAULIC SIGNAL
PNEUMATIC SIGNAL
SIGNAL CONNECTION POINT
INTERNAL SYSTEM SIGNAL LINK
(SOFTWARE OR DATA LINK)
SIGNAL LINE GOING
TO ANOTHER SHEET
SIGNAL LINE FROM ANOTHER
SHEET (MATCH LETTERS)
PROCESS LINE GOING TO
ANOTHER SHEET
FLOW ARROW FOR PROCESS
PIPING
MATCH SHEET NO. IDENTIFIER
MATCH LINE NO.
PROCESS LINE COMING FROM
ANOTHER SHEET
PROCESS LINES CROSSING
(NOT CONNECTED)
-
LE
RADAR LEVEL SENSOR
FLOW SWITCH
FS
EQUIPMENT NUMBER - UNIQUE NUMERIC IDENTIFIER
D1
00
00
PROJECT NO.
SHEET
OF
0 11/2
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
DESIGNED:
APPROVED:
CHECKED:
DETAILED:
RE
VIS
IO
NS
A
ND
R
EC
OR
D O
F U
SE
NO
.B
YC
HK
AP
PD
AT
E
CIT
Y O
F LA
KE
O
SW
EG
O
RIV
ER
IN
TA
KE
P
UM
P S
TA
TIO
N U
PG
RA
DE
S
PL
OT
TE
D: 9
/3
0/2
01
9 4
:4
6 P
M F
IL
E: C
:\U
se
rs\ra
m8
30
10
\A
pp
Da
ta
\L
oca
l\A
uto
de
sk\A
uto
CA
D P
la
nt 3
D\C
olla
bo
ra
tio
nC
ach
e\4
02
68
4\P
ID
D
WG
\I-0
1.d
wg
FD
10
00
0
ISSUED FOR BID
P&
ID
- L
EG
EN
D A
ND
A
BB
RE
VIA
TIO
NS
SH
EE
T 1
O
F 3
I-01
19 24
402684
TEB
DRS
JSM
JSM
OCTOBER 2019
EX
PIR
AT
IO
N D
AT
E: 1
2/3
1/2
0
Digi
tally
Sig
ned
PCCP
CBWS
LHCPP
RCP
PVC
DIP
SP
LWS-XX
SS-XX1
CSG-XX
CS-XX
FRPE-XX
FRP-XX
PVC-XX
CPVC-XX
PE-XX
PP-XX
PVDF-XX
RPT-XX
SS
CI-XX
CU-XX
BR-XX
HS-XX
TG-XX
CRP-XX
SECTION 02612, PRESTRESSED CONCRETE CYLINDER PIPE
SECTION 02614, CONCRETE BAR-WRAPPED, STEEL CYLINDER PIPE
SECTION 02616, LOW HEAD CONCRETE PRESSURE PIPE
SECTION 02618, CONCRETE PIPE
SECTION 15061, POLYVINYL CHLORIDE PIPE
SECTION 15061, DUCTILE IRON PIPE
SECTION 15062, STEEL PIPE
SECTION 15063, LIGHT WALL STEEL PIPE
SECTION 15064, STAINLESS STEEL PIPE, TUBING, AND ACCESSORIES
SECTION 15065, MISCELLANEOUS STEEL PIPE, TUBING, AND ACCESSORIES
SECTION 15065, MISCELLANEOUS STEEL PIPE, TUBING, AND ACCESSORIES
SECTION 15066, FIBERGLASS REINFORCED PLASTIC PIPE (EXHAUST AIR SERVICE)
SECTION 15067, MISCELLANEOUS PLASTIC PIPE, TUBING, AND ACCESSORIES
SECTION 15067, MISCELLANEOUS PLASTIC PIPE, TUBING, AND ACCESSORIES
SECTION 15067, MISCELLANEOUS PLASTIC PIPE, TUBING, AND ACCESSORIES
SECTION 15067, MISCELLANEOUS PLASTIC PIPE, TUBING, AND ACCESSORIES
SECTION 15067, MISCELLANEOUS PLASTIC PIPE, TUBING, AND ACCESSORIES
SECTION 15067, MISCELLANEOUS PLASTIC PIPE, TUBING, AND ACCESSORIES
SECTION 15067, MISCELLANEOUS PLASTIC PIPE, TUBING, AND ACCESSORIES
SECTION 15068, AWWA STAINLESS STEEL PIPE
SECTION 15069, CAST IRON SOIL PIPE AND ACCESSORIES
SECTION 15070, COPPER TUBING AND ACCESSORIES
SECTION 15060, MISCELLANEOUS PIPING AND PIPE ASSEMBLY
SECTION 15060, MISCELLANEOUS PIPING AND PIPE ASSEMBLY
SECTION 15060, MISCELLANEOUS PIPING AND PIPE ASSEMBLY
SECTION 15060, MISCELLANEOUS PIPING AND PIPE ASSEMBLY
FSR FORWARD-STOP-REVERSE
31
TRC
I
PIPELINE MATERIAL CODE ABBREVIATIONS
OSC OPEN-STOP-CLOSE
OOR ON-OFF-REMOTE
OOA ON-OFF-AUTO
AS
WS WATER SUPPLY
SS STEAM SUPPLY
NS NITROGEN SUPPLY
HS HYDRAULIC SUPPLY
GS GAS SUPPLY
ES ELECTRIC SUPPLY
AS AIR SUPPLY
LOA LOCAL-OFF-AUTO
OO ON-OFF
OC OPEN-CLOSE
LOR LOCAL-OFF-REMOTE
HOA HAND-OFF-AUTO
TURBIDITYTURB
pH CELL
OXYGEN (PURITY)
MLSS
MIXED LIQUOR SUSPENDED SOLIDS
MCCMOTOR CONTROL CENTER
LOWER EXPLOSIVE LIMIT
LEL
DO DISSOLVED OXYGEN
CONDUCTIVITY
CHLORINE RESIDUAL
METHANE
INTEGRATE (TIME INTEGRAL)
MULTIPLY
LOW-SELECT
HIGH-SELECT
F(X)CHARACTERIZE SIGNAL
DIVIDE
EXTRACT SQUARE
ROOT
SUBTRACT (DIFFERENCE)
-K
K
Y
MEANINGS OF IDENTIFICATION LETTERS
INSTRUMENT TAG NUMBERS
SUCCEEDING LETTERSFIRST LETTER
LE
TT
ER
Z
X
W
V
U
T
S
R
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
pH
1. IN GENERAL, THE P&ID SYMBOLS AND
DEVICE IDENTIFICATIONS ARE BASED
ON INTERNATIONAL SOCIETY OF AUTOMATION,
STANDARD PRACTICE ISA-S5.1 (1988).
SOME MODIFICATIONS, ADDITIONS, AND
ALTERATIONS HAVE BEEN MADE AS
NEEDED TO ACCOMMODATE THE
PROJECT REQUIREMENTS.
2. SOME CONTROL AND INTERLOCK REQUIREMENTS
WHICH CAN BE MORE CLEARLY ILLUSTRATED
ON SCHEMATIC DRAWINGS HAVE BEEN OMITTED
FROM P&ID DRAWINGS.
3. THIS IS A GENERAL LEGEND SHEET. SOME
SYMBOLS AND ABBREVIATIONS MAY NOT BE
UTILIZED ON THIS SPECIFIC PROJECT.
PIPING AND EQUIPMENT LEGEND APPLIES
TO P&ID SHEETS.
4. PIPING AND EQUIPMENT LEGEND APPLIES
TO P&ID SHEETS ONLY AND MAY DIFFER
FROM LEGENDS FOR OTHER SHEETS.
GENERAL NOTES
MEASURED OR
INITIATING
VARIABLE
ANALYSIS
BURNER,
COMBUSTION
CONDUCTIVITY
(ELECTRICAL)
DENSITY (MASS)
OR SPECIFIC
GRAVITY
VOLTAGE (EMF)
FLOW RATE
USER'S CHOICE
HAND (MANUALLY
INITIATED)
CURRENT
(ELECTRICAL)
POWER
TIME OR TIME-
SCHEDULE
LEVEL
MOISTURE OR
HUMIDITY
USER'S CHOICE
USER'S CHOICE
PRESSURE OR
VACUUM
QUANTITY
RADIATION
SPEED OR
FREQUENCY
TEMPERATURE
MULTIVARIABLE
VIBRATION
WEIGHT OR FORCE
UNCLASSIFIED
EVENT, STATE,
OR PRESENCE
POSITION,
DIMENSION
MODIFIER
DIFFERENTIAL
RATIO (FRACTION)
SCAN
TIME RATE
OF CHANGE
MOMENTARY
INTEGRATE OR
TOTALIZE
SAFETY
UNCLASSIFIED
WELL
MULTIFUNCTION
RECORD OR PRINT
INTEGRATE OR
TOTALIZE
POINT (TEST
CONNECTION)
ORIFICE
(RESTRICTION)
USER'S CHOICE
LIGHT (PILOT)
INDICATE
GLASS
PRIMARY ELEMENT
CONTROL STATION
USER'S CHOICE
SWITCH
TRANSMIT
MULTIFUNCTION
VALVE, DAMPER,
OR LOUVER
DRIVE, ACTUATOR
OR UNCLASSIFIED
FINAL CONTROL
ELEMENT
RELAY OR
COMPUTE
UNCLASSIFIED UNCLASSIFIED
MULTIFUNCTION
OPEN
USER'S CHOICE
MIDDLE OR INTER-
MEDIATE
LOW
HIGH
CLOSED
USER'S CHOICE
MODIFIER
OUTPUT
FUNCTION
USER'S CHOICE
CONTROL
READOUT OR
PASSIVE FUNCTION
ALARM
USER'S CHOICE
FIELD MOUNTED INSTRUMENT
INSTRUMENT MOUNTED ON
FACE OF PANEL
INSTRUMENT MOUNTED BEHIND
OR INSIDE OF PANEL
INSTRUMENT MOUNTED ON
FACE OF LOCAL PANEL
INSTRUMENT MOUNTED BEHIND
OR INSIDE OF LOCAL PANEL
SINGLE INSTRUMENT HOUSING CONTAINING TWO
(OR MORE) INSTRUMENTATION FUNCTIONS
CONTROL INTERLOCK FUNCTION, SEE SCHEMATICS AND
SYSTEM SPECIFICATIONS FOR SPECIFIC FUNCTION
FIRST LETTER
SUCCEEDING LETTERS
LOOP DESIGNATION NUMBER
SEE INSTRUMENT
FUNCTIONAL DESIGNATIONS
AND ABBREVIATIONS.
NOTE: REFER TO DETAILED SYSTEM SPECIFICATIONS FOR
FUNCTIONAL DESCRIPTION. ALSO SEE I/O SCHEDULES FOR
COMPLETE INPUT AND OUTPUT LISTINGS.
COMPUTER, DISTRIBUTED CONTROL
SYSTEM, OR DISPLAY FUNCTION BLOCK
LETTER, TAG NUMBERS, ABBREVIATIONS
AND OTHER ANNOTATIONS ARE SIMILAR TO
THE GENERAL INSTRUMENT LEGEND
GAIN OR ATTENUATE (INPUT:OUTPUT)
GAIN AND REVERSE
ADD OR SUM (ADD AND SUBTRACT)
POWER SUPPLY SOURCE LABEL.
USED ONLY WHERE NECESSARY
TO HELP CLARIFY AN INSTRUMENT
OR SYSTEM FUNCTION.
E VOLTAGE
FSK FREQUENCY SHIFT KEYING
H HYDRAULIC
I CURRENT
P PNEUMATIC PULSE
PD PULSE DURATION
PF PULSE FREQUENCY
R RESISTANCE (ELECTRICAL)
EXAMPLE: I/P = CURRENT TO PNEUMATIC
TRANSDUCER
HAND SWITCH DESIGNATIONS
POWER SUPPLY ABBREVIATIONS
TRANSDUCER & CONVERTER DESIGNATION
INSTRUMENT DESIGNATIONS
FUNCTION DESIGNATIONS AND ABBREVIATIONS
DIGITAL SYSTEMS INTERFACE SYMBOLS
TAG NUMBERS AND ADDITIONAL DESIGNATIONS
GENERAL INSTRUMENT SYMBOLS
UV INTENSITYUVI
UV TRANSMITTANCEUVT
ESP EMERGENCY STOP
LO LOCAL-OFF
LR LOCAL-REMOTE
RS RESET
TEMPERATURETEMP
COND
TAS TEST-AUTO-SILENCE
TOA TEST-OFF-AUTO
RSL RAISE-STOP-LOWER
101
TAH
24VDC 24 VOLTS DC
1. XX = numbers 01 - 20
D1
00
00
PROJECT NO.
SHEET
OF
0 11/2
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
DESIGNED:
APPROVED:
CHECKED:
DETAILED:
RE
VIS
IO
NS
A
ND
R
EC
OR
D O
F U
SE
NO
.B
YC
HK
AP
PD
AT
E
CIT
Y O
F LA
KE
O
SW
EG
O
RIV
ER
IN
TA
KE
P
UM
P S
TA
TIO
N U
PG
RA
DE
S
PL
OT
TE
D: 9
/3
0/2
01
9 4
:4
8 P
M F
IL
E: C
:\U
se
rs\ra
m8
30
10
\A
pp
Da
ta
\L
oca
l\A
uto
de
sk\A
uto
CA
D P
la
nt 3
D\C
olla
bo
ra
tio
nC
ach
e\4
02
68
4\P
ID
D
WG
\I-0
2.d
wg
FD
10
00
0
ISSUED FOR BID
P&
ID
- L
EG
EN
D A
ND
A
BB
RE
VIA
TIO
NS
SH
EE
T 2
O
F 3
I-02
20 24
402684
TEB
DRS
JSM
JSM
OCTOBER 2019
EX
PIR
AT
IO
N D
AT
E: 1
2/3
1/2
0
Digi
tally
Sig
ned
Compressed Air
Ballasted Floc Polymer
Ballasted Floc Solids
Carbon Dioxide Chemical
Chemical Drain
Secondary Coagulant
Caustic Soda Chemical
Calcium Thiosulfate Chemical
Cooling Water Return
Cooling Water Supply
Engine Exhaust
Filter Aid Polymer
Filter Air Scour
Filter Backwash Water
Ferric Chloride Chemical
Floor Drain
Filter Influent Water
Filtered Water
Fuel Oil Return
Fuel Oil Supply
Filter to Waste
Gasseous Oxygen
Aluminum Sulfate Chemical
Liquid Oxygen
Lagoon Water Recycle
Mechanically Dewatering Polymer
Mechanically Dewatered Solids
Off Gas
Overflow
Ozone Gas
Ozonated Water
Plant Drain
Pressate
Raw Water
Sample
Spare Chemical System
Settled Water
Sodium Hypochlorite Chemical
Seal Water
Sand Slurry
Sump Pump Discharge
Sanitary Sewer Drain
Storm Water
Structure Underdrain
Thicken Decant
Thickener Polymer
Thickened Sludge
Utility Water
Vent
Washwater Recycle
Washwater Sludge
Waste Washwater
AIR
BFP
BFS
CDC
CDR
COA
CSC
CTC
CWR
CWS
EEX
FAP
FAS
FBW
FCC
FDR
FIW
FLW
FOR
FOS
FTW
GOX
LAC
LOX
LWR
MDP
MDS
OFG
OFL
OZG
OZW
PDR
PRS
RAW
SAM
SCS
SEW
SHC
SLW
SND
SPD
SSD
STM
SUD
TKD
TKP
TKS
UWT
VNT
WWR
WWS
WWW
PROCESS CODE ABBREVIATIONS
Air Dryer
Air Filter
Air Receiver
Bridge Crane
Blind Flange
Storage Bin
Blower
Calibration Column
Centrifuge
Channel
Compressor
Dessicant Air Dryer
Dry Air Receiver
Ozone Destruct Unit
Pulsation Dampner
Fan
Flocculator
Filter
Flexible Connection
Injector
Jib Crane
Local Control Panel
Miscellaneous Equipment
Mixer
Monorail Hoist
Ozone Generator
Reducer/Expander
Screw Press
Screen
Slide Gate
Inlet Silencer
Sludge Thickener/Collector
Strainer
Tank
Vaporizer
Heat Exchanger
ADY
AFL
ARV
BCR
BFL
BIN
BLW
CAL
CEN
CHL
CMP
DAD
DAR
DES
DPM
FAN
FLC
FLT
FLX
INJ
JIB
LCP
MEQ
MIX
MNH
OZG
RED
SCP
SCR
SLG
SLN
SLT
STR
TNK
VAP
XCH
EQUIPMENT CODE ABBREVIATIONS
EQUIPMENT/PUMP/VALVE CODE ABBREVIATIONS
Veritcal Turbine Pump
Chemical Centrifugal Pump
Peristaltic Pump
Centrifugal Pump
Diaphragm Pump
Hose Pump
Progressive Cavity Pump
Positive Displacement Pump
Rotary Lobe Pump
Sample Pump
Submersible Pump
VTP
CCP
PTP
CTP
DPP
HSP
PCP
PDP
RLP
SMP
SUP
PUMP CODE ABBREVIATIONS
Air Release Valve
Air Vacuum Air Release Valve
Automatic Shutoff Safety Valve
Ball Valve
Backflow Preventer
Butterfly Valve
Combination Air Valve
Cryogenic Globe Valve
Swing Check Valve
Silent Check Valve
Cone Valve
Diaphragm Valve
Flap Valve
Globe Valve
Gate Valve
Knife Gate Valve
Needle Valve
Pressure Control Valve
Pinch Valve
Plug Valve
Pressure Relief Valve
Rupture Disc
Slide, or Sluice Gate
Solenoid Valve
Stop Gate
Telescoping Valve
Three Way Valve
Vacuum Relief Valve
ARV
AVAR
ASV
BAV
BFP
BFV
CAV
CGV
CKS
CKV
CNV
DHV
FLV
GOV
GTV
KGV
NDV
PCV
PIV
PLV
PRV
RPD
SLG
SNV
STG
TLV
TWV
VRV
VALVE CODE ABBREVIATIONS
River Intake Pump Station
Intake Screens
Pumps
Motor Controls and Electrical Gear
Instrumentation & SCADA
HVAC and Facilities
Raw Water Pipeline
Site Civil
Ballasted Flocculation
Ozone Contact
Filtration
Clear Well and Finished Water Pump Station
Electrical Building
Washwater Handling
Gravity Thickeners and Solids Storage Tank
Mechanical Dewatering
Overflow Basins
Chemical Building
Ozone Generation
LOX Storage and CO2 Storage
Operations Building
Administration Building
Spare for use at the WTP
Finished Water Pipeline
Waluga Reservoirs
Bonita Pump Station
Future
01-05
01
02
03
04
05
06
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25-29
30-39
40-49
50-59
60-99
AREA CODES
D1
00
00
PROJECT NO.
SHEET
OF
0 11/2
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
DESIGNED:
APPROVED:
CHECKED:
DETAILED:
RE
VIS
IO
NS
A
ND
R
EC
OR
D O
F U
SE
NO
.B
YC
HK
AP
PD
AT
E
CIT
Y O
F LA
KE
O
SW
EG
O
RIV
ER
IN
TA
KE
P
UM
P S
TA
TIO
N U
PG
RA
DE
S
PL
OT
TE
D: 9
/3
0/2
01
9 4
:5
0 P
M F
IL
E: C
:\U
se
rs\ra
m8
30
10
\A
pp
Da
ta
\L
oca
l\A
uto
de
sk\A
uto
CA
D P
la
nt 3
D\C
olla
bo
ra
tio
nC
ach
e\4
02
68
4\P
ID
D
WG
\I-0
3.d
wg
FD
10
00
0
ISSUED FOR BID
P&
ID
- L
EG
EN
D A
ND
A
BB
RE
VIA
TIO
NS
SH
EE
T 3
O
F 3
I-03
21 24
402684
TEB
DRS
JSM
JSM
OCTOBER 2019
EX
PIR
AT
IO
N D
AT
E: 1
2/3
1/2
0
Digi
tally
Sig
ned
RTU-101
RIV
ER
IN
TA
KE
P
UM
P N
O. 5
HIG
H V
IB
RA
TIO
N
RIV
ER
IN
TA
KE
P
UM
P N
O. 5
B
EA
RIN
G
LU
BR
IC
AT
IO
N F
AIL
RIV
ER
IN
TA
KE
P
UM
P N
O. 5
FA
IL
RIV
ER
IN
TA
KE
P
UM
P N
O. 5
RU
NN
IN
G
RIV
ER
IN
TA
KE
P
UM
P N
O. 5
EM
ER
GE
NC
Y S
TO
P
RIV
ER
IN
TA
KE
P
UM
P N
O. 5
VF
D F
AIL
RIV
ER
IN
TA
KE
P
UM
P N
O. 5
HIG
H M
OT
OR
T
EM
PE
RA
TU
RE
RIV
ER
IN
TA
KE
P
UM
P N
O. 5
HIG
H D
IS
CH
AR
GE
P
RE
SS
UR
E
RIV
ER
IN
TA
KE
P
UM
P N
O. 5
RU
N C
MD
RIV
ER
IN
TA
KE
P
UM
P N
O. 5
IN
-R
EM
OT
E
RIV
ER
IN
TA
KE
P
UM
P N
O. 5
SP
EE
D S
ET
PO
IN
T
RIV
ER
IN
TA
KE
P
UM
P N
O. 5
SP
EE
D
RE
IV
ER
IN
TA
KE
P
UM
P N
O. 5
DIS
CH
AR
GE
P
RE
SS
UR
E
RIP
S P
UM
P N
O. 5
D
IS
CH
V
AL
VE
FA
IL
RIP
S P
UM
P N
O. 5
D
IS
CH
V
AL
VE
IN
-R
EM
OT
E
RIP
S P
UM
P N
O. 5
D
IS
CH
V
AL
VE
FU
LL
Y C
LO
SE
D
RIP
S P
UM
P N
O. 5
D
IS
CH
V
AL
VE
FU
LL
Y O
PE
N
HS
02-501
LOR
SI
02-501
HMS
02-501
START
HMS
02-501
STOP
YL
02-501
RUN
SC
02-501
YA
02-501
FAIL
ZSC
02-501
ZSM
02-501
ZSO
02-501
HS
02-501
OSC
ZLC
02-501
ZLO
02-501
HS
02-501
LOR
VALVE ACTUATOR
RAW-02-VFD-501
TAH
02-501
VAH
02-501
UI
02-501
MOTOR
PROTECTION
RELAY
TO
TRANSMISSION
MAIN
42"-RAW
RIVER INTAKE
PUMP NO. 5 WETWELL
INTAKE STRUCTURE
FROM RIVER INTAKE
PUMPS NO. 3 & NO. 4
FROM BEARING
LUBRICATION SYSTEM
PIT
02-501
PSH
02-501
PDSH
02-501
TE
02-501
TE
02-502
TE
02-503
VSH
02-501
2
4
V
D
C
PI
02-511
PI
02-512
FSH
02-511
HMS
02-503
START
HMS
02-504
STOP
HMS
02-505
ESP
LOCAL CONTROL
PANEL AT PUMP
RAW-02-LCP-501
02-ARV-501
18"-RAW
2
4
V
D
C
ON 480VAC
UPS
POWER
ETHERNET I/P
02-AVAR-501
02-B
FV
-501
02-B
FV
-502
02-GTV-511
RIVER INTAKE
PUMP NO. 5
02-VTP-501
1. SEE LEGEND ON DRAWINGS I-01, I-02, AND I-03.
2. PROCESS CODE HAS BEEN LEFT OFF THE TAG NUMBER. PROCESS CODE IS "RAW"
UNLESS OTHERWISE NOTED.
3. LOCAL CONTROL DEVICES SUCH AS INDICATING LIGHTS, SWITCHES LOCATED ON VFD'S
OR ON EQUIPMENT MAY NOT BE SHOWN ON THIS P&ID.
NOTES:
FAH
02-501
PI
02-513
1/2"
1/2"
1/2"
RIV
ER
IN
TA
KE
P
UM
P N
O. 5
RE
MO
TE
R
ES
ET
C
MD
D1
00
00
PROJECT NO.
SHEET
OF
0 11/2
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
DESIGNED:
APPROVED:
CHECKED:
DETAILED:
RE
VIS
IO
NS
A
ND
R
EC
OR
D O
F U
SE
NO
.B
YC
HK
AP
PD
AT
E
CIT
Y O
F LA
KE
O
SW
EG
O
RIV
ER
IN
TA
KE
P
UM
P S
TA
TIO
N U
PG
RA
DE
S
PL
OT
TE
D: 9
/3
0/2
01
9 4
:5
1 P
M F
IL
E: C
:\U
se
rs\ra
m8
30
10
\A
pp
Da
ta
\L
oca
l\A
uto
de
sk\A
uto
CA
D P
la
nt 3
D\C
olla
bo
ra
tio
nC
ach
e\4
02
68
4\P
ID
D
WG
\I-0
4.d
wg
FD
10
00
0
ISSUED FOR BID
P&
ID
- R
IV
ER
IN
TA
KE
P
UM
P S
TA
TIO
N
I-04
22 24
402684
TEB
DRS
JSM
JSM
OCTOBER 2019
EX
PIR
AT
IO
N D
AT
E: 1
2/3
1/2
0
Digi
tally
Sig
ned
CLACKMAS RIVER INTAKE SITE
NEW RAW-04-RTU-101
REDUNDANT CONTROLLOGIX
RAW-04-RAD-101
NEW RADIO
ESTEEM 192C
FREQ 453.9375 MHz
4 WATTS
RAW-04-RTU-101 ENCLOSURE
(PROVIDED BY OWNER)
RIVER INTAKE PUMP
STATION UPS
RAW-03-UPS-101
WATER TREATMENT PLANT
MASTER MTU-102 RADIO
NOTES:
1. CONNECT PUMP 5 VFD VIA CAT6 ETHERNET CABLE TO THE
EXISTING I/O ETHERNET SWITCH INSIDE THE NETWORK RACK.
CCTV & ACCESS CONTROL
ETHERNET SWITCH
OIT
BRIDGE
CCTV CAMERA
RAW-04-CCTV-103
RAW-02-VFD-101
SCREENS
CCTV CAMERA
RAW-04-CCTV-102
RS
-232
RS-232
MODEM
FIREWALL
HIGH SPEED
INTERNET
CONNECTION
CONTROL ROOM
CCTV CAMERA
RAW-04-CCTV-101
CA
T6
RAW-02-VFD-201
RAW-02-VFD-301
RAW-02-VFD-401
RAW-03-PM-101
RAW-03-PM-201
HMI
ETHERNET
SWITCH
ETAP
MODULE
(TYP)
RAW-01-MCP-001
RJ-45
PATCH PANEL
I/O
ETHERNET SWITCH
19" WALL MOUNTED
NETWORK RACK
RAW-04-LCP-001
CA
T6
CA
T6
CAT6
CAT6
CA
T6
CA
T6
CAT6
RIVER
CCTV CAMERA
RAW-04-CCTV-104
CA
T6
CAT6
BUILDING ACCESS
CONTROL PANEL
CAT6
CA
T6
CONTROL ROOM
CITY NETWORK
DATA DROP
CONTROL ROOM
VOIP DROP
CAT6
REDUNDANT
POWER SUPPLIES
CAT6
UPS
RAW-02-VFD-501
CA
T6
CAT6 CAT6
CA
T6
CAT6
CA
T6
CAT6
D1
00
00
PROJECT NO.
SHEET
OF
0 11/2
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
DESIGNED:
APPROVED:
CHECKED:
DETAILED:
RE
VIS
IO
NS
A
ND
R
EC
OR
D O
F U
SE
NO
.B
YC
HK
AP
PD
AT
E
CIT
Y O
F LA
KE
O
SW
EG
O
RIV
ER
IN
TA
KE
P
UM
P S
TA
TIO
N U
PG
RA
DE
S
PL
OT
TE
D: 9
/3
0/2
01
9 4
:5
2 P
M F
IL
E: C
:\U
se
rs\ra
m8
30
10
\A
pp
Da
ta
\L
oca
l\A
uto
de
sk\A
uto
CA
D P
la
nt 3
D\C
olla
bo
ra
tio
nC
ach
e\4
02
68
4\P
ID
D
WG
\I-0
5.d
wg
FD
10
00
0
ISSUED FOR BID
CO
NT
RO
L S
YS
TE
M B
LO
CK
D
IA
GR
AM
I-05
23 24
402684
TEB
DRS
JSM
JSM
OCTOBER 2019
EX
PIR
AT
IO
N D
AT
E: 1
2/3
1/2
0
Digi
tally
Sig
ned
ABOVE OPERATING
C OF SWITCH 4'-6"
FLOOR
L
INSTALLATION DETAIL
TYPICAL FOR: RAW-02-PDSH-501
LENGTH OF LIQUIDTIGHT FLEXIBLE METAL
CONDUIT AS REQUIRED TO ALLOW EASY
REMOVAL OF SENSOR.
MANUFACTURER PROVIDED FLOW
THROUGH TEE ASSEMBLY.
CONTROL OUTPUT
24VDC POWER
THERMAL DISPERSION TYPE FLOW SWITCH
INSTALLATION DETAIL
TYPICAL FOR: RAW-02-FSH-511
PROCESS PIPING PROCESS PIPING
FIELD BOLT
TO SUPPORT PLATE
PRESSURE SWITCH, GAUGE & TRANSMITTER
PS
PROCESS PIPE
ABOVE OPERATING
C OF SWITCH 4'-6"
FLOOR
L
CONTACT OUTPUT
3/4" RGS. CONDUIT
DIAPHRAGM SEAL AS INDICATED ON
DRAWINGS AND IN SPECIFICATIONS
INSTALLATION DETAIL
TYPICAL FOR: RAW-02-PSH/PIT-501
RAW-02-PI-511
RAW-02-PI-512
RAW-04-PIT-501
PI/PIT
NO SCALE
NO SCALE
NO SCALE
PROCESS PIPE
DIAPHRAGM SEAL AS
INDICATED ON
DRAWINGS AND IN
SPECIFICATIONS (TYP)
FIELD BOLT
TO SUPPORT PLATE
PS
CONTACT OUTPUT
3/4" RGS. CONDUIT
DIFFERENTIAL PRESSURE SWITCH
D1
00
00
PROJECT NO.
SHEET
OF
0 11/2
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
DESIGNED:
APPROVED:
CHECKED:
DETAILED:
RE
VIS
IO
NS
A
ND
R
EC
OR
D O
F U
SE
NO
.B
YC
HK
AP
PD
AT
E
CIT
Y O
F LA
KE
O
SW
EG
O
RIV
ER
IN
TA
KE
P
UM
P S
TA
TIO
N U
PG
RA
DE
S
PL
OT
TE
D: 9
/3
0/2
01
9 4
:5
3 P
M F
IL
E: C
:\U
se
rs\ra
m8
30
10
\A
pp
Da
ta
\L
oca
l\A
uto
de
sk\A
uto
CA
D P
la
nt 3
D\C
olla
bo
ra
tio
nC
ach
e\4
02
68
4\P
ID
D
WG
\I-0
6.d
wg
FD
10
00
0
ISSUED FOR BID
IN
ST
AL
LA
TIO
N D
ET
AIL
S
I-06
24 24
402684
TEB
DRS
JSM
JSM
OCTOBER 2019
EX
PIR
AT
IO
N D
AT
E: 1
2/3
1/2
0
Digi
tally
Sig
ned