aplication cv certificate

25
Date: August 16, 2011 To The Cluster Coordination Unit - Hetauda Subject: For the Vacant Position of MF and DF Dear Sir; I wish to apply for the Vacant Position of MF and DF in various Local Bodies, which was published in “The Kantipur, Nepali national daily” on 2068/04/17. As for my educational qualification, I have passed BE in civil engineering from Nepal Engineering College in “A” Grade in 2008. I had complete ECHO project at rural villages of Humla and Mugu District by KIRDARC Nepal and Mission East; I had working on the DF for the Manang District. Now I am in search of more challenging job for the proper utilization of my knowledge. During my job, I had participated in different Projects, with the help of my qualification and experience; I assure you that if I am selected. I have attached my Cv and Certificate with this application, which inform you more about me. I have for the positive response from you soon. Yours Truly , Hem Raj Shahi Contact No: 9851016051

Upload: hem-shahi

Post on 02-Oct-2014

134 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Aplication CV Certificate

Date: August 16, 2011

To The Cluster Coordination Unit - Hetauda

Subject: For the Vacant Position of MF and DF Dear Sir;

I wish to apply for the Vacant Position of MF and DF in various Local Bodies, which was published in “The Kantipur, Nepali national daily” on 2068/04/17.

As for my educational qualification, I have passed BE in civil engineering from Nepal Engineering College in “A” Grade in 2008. I had complete ECHO project at rural villages of Humla and Mugu District by KIRDARC Nepal and Mission East; I had working on the DF for the Manang District. Now I am in search of more challenging job for the proper utilization of my knowledge. During my job, I had participated in different Projects, with the help of my qualification and experience; I assure you that if I am selected. I have attached my Cv and Certificate with this application, which inform you more about me. I have for the positive response from you soon. Yours Truly, Hem Raj Shahi Contact No: 9851016051

Page 2: Aplication CV Certificate

CV: H. R. Shahi

RIDARC Nepal Pvt Ltd.

Curriculum vitae Name : Hem Raj Shahi Sex : Male Date of Birth : 1st August, 1983 Permanent Address : Shree kot –2, Mugu, Karanali Citizenship No : 5277 Passport NO : 3442431, Valid Until 2018/11/19 Contact No : cell +977-9851016051

+977-9741137840 Resi. +977-01-4780378

Personal E-mail : [email protected] , [email protected] Marital Status : Married Nationality : Nepali Award and Medals:

FCAN Gold Medal for securing Highest Marks in Bachelor in Civil Engineering Given by Federation of Contractors Associations of Nepal (FCAN)

Structure Award for Securing Highest Marks in Structure Analysis I and II

Water Award for Securing Highest Marks in Fluid Mechanics and Hydraulics

Geo-tech Award for Securing Highest Marks in Engineering Geology, Engineering properties

of Soil and Foundation

Mathematics Award for Securing Highest Marks in Engineering Math I, II and III Academic Qualification:

Degree in Civil Engineering from Nepal Engineering College, Bhaktapur, Pokhara University, Nepal in 2008

Diploma in Civil Engineering from Baijnath Engineering College, Mahendranagar, CTEVT, Nepal in 2003 S.L.C from Lokpriya Ma Vi Gamtha, Mugu, HMG Board, Nepal in 2000

Nepal Engineering Council Reg. No: 5648 “Civil” ‘A’ Nepal Engineers Association Membership No: 10647 (Civil) Language Efficiency:

Speaking Reading Writing Nepali - Mother Tongue English- Good Good Good Hindi - Good Good Good

Computer skills: - Windows Applications, MS-Word, Excel and Power Point Professional Experiences: 1. From : 27 July 2009

To : Till Date Employer : RIDARC Nepal Pvt. Ltd. (Rural Infrastructure Development and Research Consultant

Nepal) Designation : Executive Director / Bridge Designer

Page 3: Aplication CV Certificate

CV: H. R. Shahi

RIDARC Nepal Pvt Ltd.

Project Name: 1. Detail Engineering Survey, Soil investigation, Hydrological Study and Design, Estimation of

Marsyngdi River Bridge at Bhraka VDC, Chame Khansar Road, Manang 2. Detailed Engineering Survey, Design and Cost Estimate of RCC Bridge at Satasi Khola, Jhapa 3. Detail Engineering Survey, Soil investigation, Hydrological Study, Datailed Design and Cost Estimatie

of Saradi Khola Motorable Bridge at Phulbari Syangja 4. Detail Engineering Survey and Design of following Suspension/Suspended Bridge:

Chipchipe-Devghat (Risti Khola), Tanahu Chipchipe-Dharmpani (Nablung), Seti Nadi, Tanahu

5. Detail Engineering Survey and Design of Gairi Jangar Suspended Bridge, 145 m. Span

Major Responsibilities: - Assisting Field Survey team to conduct well Survey - Prepare Preliminary Design Reports and Discussion with Clint - Prepare Detail Design, Drawing, BOQ and Assisting to Report preparation - Final Defense and Correct the over al

2. From : 1st May 2009 To : Till Date (As a part Time) Employer : BDA Nepal Pvt. Ltd. / GIDA Pvt Ltd. / GOEC Nepal Pvt Ltd Position : Bridge Designer / Structural Engineer Clint : Department of Roads, Bridge Project, Babarmahal, Kathmandu, Nepal Project Name:

Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study & Detailed Design of Bridge (s) of Consultant

GIDA Nepal P. Ltd. Contact No: BU-DSD-26/065/66 1. Badighad Bridge at Kharbang Paudineta Hawangi Arkhabad Motor Road , Gulmi 2. Bhalubahi Nadi Bridge at Roopanni Rajbiraj Kunauli Sadak , Saptari 3. Mainawati Khola Rural Road Bridge Mainawati Khola, Oshapur-Balkahawa, Siraha 4. Marlaiya Bridge Parsa 5. Bangari Bridge Bara 6. Gangajali Nadi Bridge, Kamalpur VDC, Saptari 7. Phusre Khola Bridge at Kaski 8. Sapa Khola Bridge at Sarlahi 9. Sursar Khola Bridge at Kakdhuwa chhapaki Jodne Sadak at Saptari

BDA Nepal Pvt Ltd and GOEC Nepal Pvt. Ltd. Jv Contact No: BU-DSD-22/065/66 1. Bhingri Bridge over Jari Khola at Chakhake – Bhingri – Rolpa Road at Bhingri, Pyuthan 2. Churagad Bridge over Churagad Khola at Ghartighau on Sahid Marga, Rolpa 3. Jimrukh Khola Bridge at SirungKholagau, Rajwara VDC-3, Pyuthan 4. Katuwa Khola Bridge at Ghorahi-Bhalubang Road at Chaughera, Dang 5. Chhape Khola Bridge over Chhape Khola ( Rapti Bridge) at Khalanga – Dharampani –

Arghakhachi Road at Rahakholagau, Pyuthan 6. Sisne (Katuwa) Khola Bridge over Sisne Khola at Ghorahi-pyuthan Road at Asare, Dang 7. Sulichaur Phagam (Gajur) Khola Bridge at Chakchake – Gumchal - Gam Road at Runibang,

Rolpa 8. Uwa Khola at Kamphu -Besi at Rolpa

Major Responsibilities:

- Assisting Field Survey team to conduct well Survey - Prepare Preliminary Design Reports and Discussion with Clint - Prepare Detail Design, Drawing, BOQ and Assisting to Report preparation - Final Defense and Correct the over all

3. From : 1st May 2009

To : Till Date (As a part Time) Employer : Everest Engineering Consultant, ktm Position : Bridge Designer / Structural Engineer Clint : Department of Roads, Bridge Project, Babarmahal, Kathmandu, Nepal Project Name:

Page 4: Aplication CV Certificate

CV: H. R. Shahi

RIDARC Nepal Pvt Ltd.

Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study & Detailed Design of Bridge (s)

1. Dokar Biruwaguthi Bridge at Janata Road Parsa 2. Gade Nadi Bridge at Near Ragpur Tandi, Parsa 3. Dhudai (Dhongahi) Nadi Bridge at Birgung Aura Thori Sadak, Parsa 4. Kholsi Nadi Bridge at Birgung Aura Thori Sadak, Parsa 5. Naurangiya Nadi Bridge at Birgung Aura Thori Sadak, Parsa 6. Sikta (Bhaluwahi) Nadi Bridge at Birgung Aura Thori Sadak, Parsa 7. Hamahi Nadi Bridge at Birgung Aura Thori Sadak, Parsa

Major Responsibilities:

- Assisting Field Survey team to conduct well Survey - Prepare Preliminary Design Reports and Discussion with Clint - Prepare Detail Design, Drawing, BOQ and Assisting to Report preparation - Final Defense and Correct the over all

4. From : 15 December 2010

To : Till Date (As a part Time) Employer : Gaurav Integrated Development Associate Nepal (P) Ltd. (GIDA Nepal P. Ltd.) : Position : Bridge Designer / Structural Engineer Clint : Department of Roads, Bridge Project, Babarmahal, Kathmandu, Nepal Project Name:

Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study & Detailed Design of Bridge (s)

1. Bangari Khola Bridge at Bara 2. Marlaiya Khola Bridge at Parsa

Major Responsibilities:

- Assisting Field Survey team to conduct well Survey - Prepare Preliminary Design Reports and Discussion with Clint - Prepare Detail Design, Drawing, BOQ and Assisting to Report preparation - Final Defense and Correct the over all

5. From : 23 December 2009

To : 1st May 2010 Employer : District Development Office Manang, (LGCDP) Duty station : District Facilitator Project Name : Local Governance ad community Development Programme(LGCDP) Major Responsibilities:

- Assisting office of District Development Committee to carry out participatory planning process in consultation concerned programme officers, Sections and Line Agencies

- Provide technical support to DDC board in prioritization of project proposal at different level of plan approval and prioritization process.

- Under the overall guideline of Local Development Officer and Planning Monitoring and Administrative officer, and District technical office, DF will support to organize meeting and workshop involving users committees, Line agencies community Organizations, and local NGOs directly involved in DDCs supported activities

- Assisting DDC to prepare Annual Work Plan, prepare project funding matrix, for the funded through LGCDP and Implemented by DDCs

- Assisting DDCs and VDCs to prepare monitoring and evaluation plan timely inform concerned authorities to correct the misappropriations, Mistakes and weaknesses if found.

- Provide technical Support wherever possible for Designing, costing of infrastructure projects funded through LGCDP

- Support DDCs to conduct IEE, EIA and Other environment and safeguard required under LGCDP

- Assisting DDCs in Managing the Local Governance and Accountability Facility

Page 5: Aplication CV Certificate

CV: H. R. Shahi

RIDARC Nepal Pvt Ltd.

6. From : 1 August 2009

To : 20 December 2009 Employer : Everest Engineering Consultants, Baneshwor, Kathmandu and Inclusive consultant (P)

Ltd. Kalimati, Kathmandu J/V Designation : Deputy Team Leader, Civil Engineer Duty station : District Implementation Support Team (DIST), Jhapa Project Name :

Rural Reconstruction and Rehabilitation Sector Development Program (RRRSDP), District Project Office (DPO), Jhapa

Funded By :

Government of Nepal (GON), Asian Development Bank (ADB) and OPEC Fund for International Development (OFID)

Major Responsibilities:

To provide technical input and guidance in engineering survey, design, construction supervision, monitoring and reporting; and will work closely with the social, resettlement, and environment team members in overall implementation of the project in the district. Deputy Team Leader will works work under the guidance of the DIST Team Leader and undertake the following tasks, among others;

- Assist DPO in planning, identification, short-listing, prioritization and selection of sub-project and supplementary investment projects;

- Train DTO staff in the use of laboratory equipments for material testing and quality control of civil works;

- Assist in arranging on- site monitoring of project works by local stakeholders - Support DTO to establish and manage the quality control labs. - Ensure implementation of standard specifications, norms, design guidelines etc.

complying with the DOLIDAR'S Approach Manual, work norms, specifications, guidelines etc.

- Provide technical input and guidance for engineering design, construction supervision, monitoring and reporting of all sub-projects.

- Organize and conduct orientation and awareness trainings to different stakeholders including VIUG, VICCC, BGs; Savings and credit groups about the process and procedures of the project implementation.

- Assist DPO for procurement and contract management. - Assist team leader in the coordination of the team members. - Undertake additional tasks as required by the DIST Team Leader and DPO

7. From : 31 May 2009

To : Till date as part time Employer : Group of Engineers for Appropriate Technology Nepal

(GREAT - Nepal) Designation : Civil Engineer / Team Leader Project Name :

Chame – Khangsar Rural Road Inventory ( Ch- 0+000 to 32+ 240 ), Manag, DDC / DTO Manag ( 10 June 2009 to 1 July 2009)

Detail survey, Design and Soil Investigation of Motarable Bridge over Marshyangdi River at Tal, Manag, DDC / DTO Manag(1July- Till Date)

Preparation of Master Plan of Timang Airport, Manang, DDC / DTO Manag(1July- Till Date) Major Responsibilities:

- Carry out survey and design - Report Preparation - Project Presentation

8. From : 10 November 2008 To : 31 May 2009 Employer : Karnali Integrated Rural Development and Research Center

(KIRDARC - Nepal) Designation : Project Manager/Engineer Duty station : Humla and Mugu

Page 6: Aplication CV Certificate

CV: H. R. Shahi

RIDARC Nepal Pvt Ltd.

Job Purpose : To manage the overall WATSAN programme. Project Name :

Clean water, Improved Sanitation and Hygiene knowledge in rural villages of Humla and Mugu, Mid West Nepal

Supported INGO : Mission East Funded By : European Union Humanitarian Aid department (ECHO) Major Responsibilities:

- Carry out survey, design and implementation of the infrastructure development activities in the field like irrigation, water, health and sanitation etc. including social mobilization and social development activities as necessary.

- Based on the community needs and rights, prepare plan, budget and action plan on annual, quarterly and half yearly basis in consultation with the project team, community and local government agencies.

- Coordinate, collaborate and network between local, district and regional levels. - Prepare proposals, project reports of infrastructure development works including

social mobilization and social development activities where necessary. - Develop the skill of technical supervisors for feasibility survey and design;

prepare estimate of quantity and cost, detailed drawings and other necessary documents of irrigation, safe drinking water, sanitation schemes and other social parts.

- Ensure timely procurement process with quality materials and quality work standard.

- Furnish technical and social information regarding projects to the supervisor, Regional Coordinator, Programme Manager and Executive Director as and when required.

- Ensure that project implementation guidelines and agreement are fully followed - Follow the organisational guidelines, code of conduct, staff administration policy,

financial procedures and others rule and regulations. - Carry out work as instructed by Project Coordinator, Regional Coordinator,

Programme Manager and Executive Director. - Prepare water, health and sanitation guideline and modify them as per the

organisational development and play key role for the implementation of such guideline/policies in the field.

- Ensure that project is being planned and implemented from caste and gender perspectives.

9. From : April 2007

To : October 2008 (As part time) Employer : Inclusive consultent, ktm Designation : Sub Engineer Project Name:

Detail survey, Design and Soil Investigation of RCC Bridge, Mohana River, Kailali, DDC / DTO Kailali (April - May 2007)

Detail Survey, Design and Planning of Far Western Medical Collage, Mehendranagar, Kanchanpur (24 Jan 2008 - 2 Feb 2008)

Tribeni Shankhamul suspension Bridge, Daman and Palung V. D. C., Makawanpur, DDC / DTO Makawanpur, (2 Jun 2008 - 8 Jun 2008)

Rapti Khola suspended Bridge,Bhaise,Makawanpur, DDC / DTO Makawanpur, (8 Jun 2008 - 12 Jun 2008)

Major Responsibilities: - Detail Survey, Design and Report Preparation - Project Presentation

10. From : June 2007

To : July 2008 (As part time) Employer : Nepal Consult Jv Everest Enginering consultent, lalitpur Designation : Sub-Engineer / Surveyor Project Name:

Page 7: Aplication CV Certificate

CV: H. R. Shahi

RIDARC Nepal Pvt Ltd.

Daltar Irrigation Subproject Galchi, Dhadhing, CMIASP, Bhanimandal, lalitpur ( 8 Jun 2008 – 17 Jun 2008)

Jaipuri Jogimara Irrigation Subproject, Jaypuri-Jogimara, Dhadhing, CMIASP, Bhanimandal, lalitpur ( 8 Jun 2008 – 17 Jun 2008)

Detail Engineering Survey of 33kV Dipyal-Jumla Transmission Line (157 kM) Nepal Electricity Authority, SHP and Rural Electrification Department, Jamal, KTM. ( 22 Jun 2007 - 25 July 2007)

Major Responsibilities: - Detail Survey, Design and Report Preparation - Project Presentation

11. From : 1 April 2005 To : 20 November 2008 (As a part Time) Employer : Everest Engineering Consultant, ktm Position : Sub-Engineer / Surveyor Project Name:

Feasibility Study of Bagmati River Bridge at kavrepalanchowk, kavrepalanchowk & Makawanpur District Border, DoLIDAR, Jawalakhel, Lalitpur (20 March 2007- 25 March 2007)

Feasibility Study of Darchula - Tinkar Road, Darchula, 90 km. Dipartment of Roads, Babarmahal, Kathmandu (28 May 2007 - 29 Oct. 2007)

Preparation of Master Plan of Manang Airport, Manang, CAAN, Babarmahal, Kathmandu (Jan. 21, 2007 to Jun 20, 2007)

Lamsal Ghat Suspension Bridge, Bhojpur, DoLIDAR, Jawalakhel, Lalitpur (May 2007-July 2007) Sakela Siran Suspension Bridge, Udayapur, DoLIDAR, Jawalakhel, Lalitpur (May 2007-July 2007)

Feasibility Study of Kiran Nala Bridge, Banke, DoLIDAR, Jawalakhel, Lalitpur (July 2007-Nov.

2007) Okharpauwa Kumari kolpu Road, Detail Survey, Design and Eastimate (Ch 3+000 to 33+000 Km),

Nuwakot, District Development Committee Nuwakot ( 27 Nov – 23 Dec, 2007) Field Verification of GIS Based Desk Identified Mini-Grid Schemes - Dolakha District, AEPC/ESAP,

Khumaltar, Lalitpur (14 January 2008 - 15 February 2008). Field Verification of GIS Based Desk Identified Mini-Grid Schemes - Salyan District, AEPC/ESAP,

Khumaltar, Lalitpur (15 May 2008 - 22 Jun 2008). Detail Feasibility Study of KORASI KHOLA MHP (7 kW) Chaulakhark VDC, Rangda,Solukhumbu,

AEPC/ESAP, Khumaltar, Lalitpur ( 22 April 2008 - 28 th April 2008)

Major Responsibilities: - Feasibility Study, Detail Survey, Design and Estimate, Report preparation - Project briefing and Presentation

12. From : 5 April 2007 To : 10 November 2008 (As a part time) Employer : Eastren Engineering Consultant, ktm Designation : Sub-Engineer / Surveyor Project Name:

Detail survey, Design and Soil Investigation of RCC Bridge, Chhyasal, Koteshower, Ktm (April - May 2007)

Panauti- Khopasi Road, Detail Survey, Design and Eastimate (Ch 0+000 to 13+000 Km), Kavre, District Development Committee Kavre ( 20 June – 15 July, 2007)

Major Responsibilities:

- Detail Survey, Design and Report Preparation - Project Presentation

13. From : 02 January 2004

To : 31 December 2004 Employer : DFID-CSP Nepal (Department for international development, British Embassy,

Kathmandu, Nepal) Designation : Consultants Duty Station : Mugu District Project Name:

Chimat Micro-Hydropower, Shree Nagar, Mugu (Jan. 2004 - Apr. 2004)

Page 8: Aplication CV Certificate

CV: H. R. Shahi

RIDARC Nepal Pvt Ltd.

Hapikharka Drinking Water Supply Project, Shree Nagar - 5, Mugu (Jan. 2004 - May 2004)

Health Post Office Building Construction Work, Sheri VDC, Mugu (Feb. 2004 - may 2004)

Major responsibilities: - Technical feasibility study, design, estimate and implementation of projects

(Drinking water supply system , irrigation canal , rural roads , pletic set(small hydro power system), Building)

- Reporting and Support to CSO to make planning - Super vision of Construction work

14. From : 20 June 2004

To : 30 November 2004 Employer : Mahila Uapakar Munch, Kohalpur, Banke Designation : Site Supervisor Duty station : kohalpur, Banke Major responsibilities:

- To Design, Estimate and Implementation of office Building - Site Supervision of Building - Final Evaluation and Report Prepared

15. From : 1 January 2005

To : 30 February 2006 Employer : Rural Community Development Center (RCDC, Mugu) Designation : Sub Engineer / Surveyor Duty station : Mugu District Project Name:

Talcha Drinking Water Supply Project, Talcha Airport, Mugu,Fund Board(Jan. 2005 - Mar. 2005)

Ghoira Drinking Water Supply Project, Pina, Mugu, Fund Board (Feb. 2005 - Mar. 2005)

Mathi Tuma Water Supply Project, Shree Nagar, Mugu, Fund Board (May 2005 - Aug. 2005)

Major Responsibilities: - Technical Feasibility and Detail Survey, Design, Estimate and Implementation of

projects (Water Supply Schemes, Irrigation Canal, Rural Roads) - Reporting and Supporting to programme Coordinator

Trainings S.N. Description Duration Date Organized by Venue 1 SW_ ROAD / SW_DTM (

Road Design / Digital Terrain Modeling Software)

15 day’s 1- 15 July, 2005 Softwel (P) Ltd. Kathmandu, Nepal

Softwel (P) Ltd. Kathmandu, Nepal

2 Computer Aided Design (CAD 2D & 3D)

1 month 1- 30 Dec, 2005 Nepal Engineering College , Changunarayan, Bhaktapur

Nepal Engineering College , Changunarayan, Bhaktapur

3 Land Development (LD)/ Civil Design

3 month’s 15 Dec, 2006 to 15 Mar, 2007

Eureka Global Academy, Bagbazar, Kathmandu

Bagbazar, Kathmandu

Conference/Seminar Attended

S.N. Description Duration Date Organized by Venue 1 “Soil Liquefaction”

Mr Mitsu Okamura Graduate school of science and engineering, Ehime university

1 day’s 23 Nov, 2006 Center for Disaster Risk Service (CDRS), nec

Nec, Bhaktapur

2 Prefeasibility of w/s orientation 3 day’s 16-18 Fund Board/Udaya Nepalgunj

Page 9: Aplication CV Certificate

CV: H. R. Shahi

RIDARC Nepal Pvt Ltd.

S.N. Description Duration Date Organized by Venue Training Aprial,2004 consultancy

3 International conference on: “Disaster Management:Achievements and Challenges”

3 day’s 18-20 Nov, 2005

Nepal Engineering Collage (nec) with Ehime University,Japan,NSET,UNDP,Nepal

Hyatt Regency Hotel, Bouddha

4 Hydrological Extremes of 2006 in Nepalgunj Area

1 day’s 17 Nov 2006 Department of Hydrology & Meteriology, Babarmahal, Kathmandu

DHM, Babarmahal, Ktm

5 Rain water Harvesting

1 day’s 18 May 2007 Nepal Engineering Association, lalitpur

NEA, Building pulchok, lalitpur

6 Earthquake vulnerability of Kathmandu valley

1 day’s 5 June 2007 Center for Disaster Risk Service (CDRS), nec

Nepal Engineering Collage, Changunarayan, Bhaktapur

7

Hydra Nepal 1 day’s 25th Dec, 2007 Nepal Engineering Collage, Changunarayan, Bhaktapur

Nepal Engineering Collage, Changunarayan, Bhaktapur

8 National seminar on: “Hydropower for National Development in Nepal: Prospects, Challenges and Strategies

1 day’s 5th Jan, 2007 Nepal Engineering Association (NEA) & AIT Alumni Association Nepal (AITAAN)

Shankhar Hotal Ktm

9 Second National Seminar on Rural Bridges " Connecting Rural Nepal"

1 day's 2nd Nov 2007 Nepal Engineering College and Ehime University,Japan ,UNDP

Yak Place Pulchowk, Lalitpur

10 National Structural Engineering Seminar on “ Towards Quality Structures”

1 day’s 12th Sep 2008 Structural Engineer’s Association Nepal (SEANep) & Panchkanya Group

Shankhar Hotal Ktm

CERTIFICATION:

I, the undersigned, certify to the best of my knowledge and belief that (i) this CV correctly describes my qualifications and my experience; (ii) I am not employed by the Executing/Implementing Agency; (iii) In the absence of medical incapacity, I will undertake this assignment for the duration and in terms of

the inputs specified for me in the Personnel Schedule in Form provided team mobilization takes place within the validity of this proposal or any agreed extension thereof;

(iv) I am committed to undertake the assignment within the validity of Proposal; (v) I am not part of the team who wrote the terms of reference for this consulting services assignment;

I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged.

______________________________________________________ [Signature of expert]

Date: 31/04/2068 Day/Month /Year

Full Name of authorised representative: Hem Raj Shahi

Page 10: Aplication CV Certificate
Page 11: Aplication CV Certificate
Page 12: Aplication CV Certificate
Page 13: Aplication CV Certificate
Page 14: Aplication CV Certificate
Page 15: Aplication CV Certificate
Page 16: Aplication CV Certificate
Page 17: Aplication CV Certificate
Page 18: Aplication CV Certificate
Page 19: Aplication CV Certificate
Page 20: Aplication CV Certificate
Page 21: Aplication CV Certificate
Page 22: Aplication CV Certificate

January 15, 2005

To Whom It May Concern

This is to certify that Mr. Hem Raj Shahi residence of Shree Kot VDC- 2, Rol, Mugu District, Karnaki Zone, was Working as a Consultants in this Organization for the Services of Technical Feasibility, technical backstopping of hardware projects of Mugu District from January 2004 to December 2004. Mr Shahi contributes handsomely in the fruitful outcomes of the many of the issues related with Technical Feasibility Study, technical backstopping of hardware different Projects like Hill Irrigation, Rural Road, Micro Hydropower, Water Supply, Hospital and School Building project, Agriculture Program in Most of location of the Mugu District. He had support CSO Mugu to over all planning of the project as well as screening and implementing. He always did his assignment in time with sound academic and practical knowledge while working in this Organization. We are confident that if he gets further opportunity in any field (Work for Infrastructure Development) related to him, he would credibly accomplish his assignment in time. We strongly recommend him for further opportunity to work or study and wish bright future with successful career.

________________ Keshav Prasad Shrestha (Contract Officer) DFID-CSP Nepal

Page 23: Aplication CV Certificate
Page 24: Aplication CV Certificate
Page 25: Aplication CV Certificate

ldltM– @)^&÷)#÷)$

laifo M– hf] h;;Fu ;+alGwt 5 .

pk/f]Qm ;+aGwdf >Lsf]6–@, d'u' a:g] O{= >L x]d/fh zfxL n] :yfgLo zf;g tyf ;fd'bflos ljsf; sfo{qmd cGtu{t o; lhNnfdf ;Grflnt sfo{qmdx?df ;xlhs/0f ug]{ pb]Zosf nflu lhNnf ;xhstf{ kbdf ldlt @)^^÷)(÷* b]vL @)^& ÷)@÷#) ut] ;Dd sfd u/L o; lhNnfsf] lasf;

lgdf0f{sf sfo{df ct'nlgo of]ubfg bLg'ePsf]n] pxf¤sf] pQ/f]Q/ k|ultsf] sfdgf ub{5f}+ .

========================== = -s[i0fk|;fb lwtfn_

:yfgLo ljsf; clwsf/L lhNnf ljsf; ;ldltsf] sfof{no, dgfª