HCPT – HUAWEI
RTN 600 MICROWAVES
INSTALLATION STANDARD
PT. Hutchitson PT
………………………………………
Name:
Date:
PT Huawei Technologies
………………………………………
Name:
Date:
HCPT 2G & 3G TURNKEY PROJECT
2009
RTN 600 MW Installation Standard 1 HCPT - HUAWEI
8/13/2019 Antenna Installation -MW RTN 900
http://slidepdf.com/reader/full/antenna-installation-mw-rtn-900 2/14
1. Antenna Fastness
Key Points Details DescriptionThe antenna must be
installed in the rightheight and position and
polarization
The fixation of antenna
and pole are reliable
Each screw should be fastness very well
RTN 600 MW Installation Standard 2 HCPT - HUAWEI
8/13/2019 Antenna Installation -MW RTN 900
http://slidepdf.com/reader/full/antenna-installation-mw-rtn-900 3/14
For the more than 1.2m antenna the side strut must be installed and fixed position is correct.
Antenna identifier
!standard labeling"
#abeling Format$
#abel template $
Font $ %lac&
%ac&ground $ 'hite
(aterial $ )rint #abel
RTN 600 MW Installation Standard * HCPT - HUAWEI
ANTENNA TO !"E ID#
"AR END NAME
8/13/2019 Antenna Installation -MW RTN 900
http://slidepdf.com/reader/full/antenna-installation-mw-rtn-900 4/14
2. +,- Fastness
Key Points Details DescriptionThe +,-s and hybrid
couplers appearance are properly Tighten all screw / bolt from +,- to hybrid
0F connector from +,- should be waterproofed properly
The 0F connector of +,-
should be waterproofed
and face downward
RTN 600 MW Installation Standard HCPT - HUAWEI
OD$ "i%in&
Waterproo'in&
Waterproo'in&
8/13/2019 Antenna Installation -MW RTN 900
http://slidepdf.com/reader/full/antenna-installation-mw-rtn-900 5/14
The +,- grounding
cable should be shortest
length as possible and
attached to bus bar
RTN 600 MW Installation Standard HCPT - HUAWEI
(ro)n*in& connection
to +)s +ar
OD$ (ro)n*in&
8/13/2019 Antenna Installation -MW RTN 900
http://slidepdf.com/reader/full/antenna-installation-mw-rtn-900 6/14
+,- 0dentifier !+,-
labeling"
#abeling Format$
#abel template $
For 131 mar& +,-1 for main +,- and +,-2 for stand by +,-
Font $ %lac&
%ac&ground $ 'hite
(aterial $ )rint #abel
*. 0F ,istribution
Key Points Details Description0n general the 0F cable
should be grounded to a
minimum of one point
0F grounding &it installed between concurrence 45T and 65T
Tower
RTN 600 MW Installation Standard 7 HCPT - HUAWEI
Reco,,en*e* point to
install I" ro)n*in -it
OD$. TO !"E ID#"AR END NAME
8/13/2019 Antenna Installation -MW RTN 900
http://slidepdf.com/reader/full/antenna-installation-mw-rtn-900 7/14
2 end are tidy with cable tie
0F grounding &it should connect to lower 65T bus bar.
#eave enough slac& when
connecting cables to the
+,- to facilitate future
maintenance
0F redundant no more than 2 meters
RTN 600 MW Installation Standard 8 HCPT - HUAWEI
I" re*)n*ant no ,ore
t/an ,
Ti*y )p 1it/ ca+le tie
(ro)n*in& -it
connect to +)s +ar
8/13/2019 Antenna Installation -MW RTN 900
http://slidepdf.com/reader/full/antenna-installation-mw-rtn-900 8/14
0F cable must be up tilted
or have 'aterproof curve
in the entrance of
porthole
5able 0nstallation and endto end labeling
RTN 600 MW Installation Standard 9 HCPT - HUAWEI
Port/ole connection s/o)l* +e 1aterproo'e*
Ri&/t position 'or /ole I" ca+le ro)te
Proper installation 'or I"
ca+le an* separation 1it/
(ND ca+le
8/13/2019 Antenna Installation -MW RTN 900
http://slidepdf.com/reader/full/antenna-installation-mw-rtn-900 9/14
0F cable labeling /
identifier
0F cable should have identifier / labeling on top near connector of
+,- and 0,-
+utdoor 0F #abeling 0ndoor 0F #abeling
O)t*oor la+elin&2 In*oor la+elin&2
#abeling Format$
#abel template $
For 131 use mar& 0F1 for main 0F and 0F2 for stand by 0F
Font $ %lac&
%ac&ground $ 'hite
RTN 600 MW Installation Standard : HCPT - HUAWEI
I" . TO !"E ID#
"AR END NAME
8/13/2019 Antenna Installation -MW RTN 900
http://slidepdf.com/reader/full/antenna-installation-mw-rtn-900 10/14
(aterial $ )rint #abel #abel flag cable ties 0F cable label
. 0ndoor E;uipment Fastness
Key Points Details Description
The installation
position of 0,-
accords to the
engineering design
document.
+utdoor 0nstallation and 0,- placement !on %T< *=12AE"
+utdoor 0nstallation and 0,- placement !on %T< *:==A"
0ndoor 0nstallation and 0,- placement on 1:> rac&
RTN 600 MW Installation Standard 1= HCPT - HUAWEI
8/13/2019 Antenna Installation -MW RTN 900
http://slidepdf.com/reader/full/antenna-installation-mw-rtn-900 11/14
0,- and ,5),%
labeling standard
<tandard labeling and labeling format
0F %oard #abeling#abeling Format$
#abel template $
For 131 use mar& 0F1 for main 0F and 0F2 for stand by 0F
Font $ %lac&
%ac&ground $ 'hite
(aterial $ )rint #abel
)ower 5able #abeling#abeling Format$
#abel template $
Font $ %lac&
%ac&ground $ 'hite
(aterial $ )rint #abel Flag label tie
Tributary 5able #abeling#abeling Format$
#abel template $
RTN 600 MW Installation Standard 11 HCPT - HUAWEI
TO : FE ID , FE NAMETX. xxxx MH, RX. xxxx
MH
TO : POWER
CA!"E
8/13/2019 Antenna Installation -MW RTN 900
http://slidepdf.com/reader/full/antenna-installation-mw-rtn-900 12/14
Font $ %lac&
%ac&ground $ 'hite
(aterial $ )rint #abel Flag label tie
#abeling on rectifier power cable#abeling Format$
#abel template $
Font $ %lac&
%ac&ground $ 'hite
(aterial $ )rint #abel Flag label tie
#abeling on ,5),%#abeling Format$
#abel template $
Font $ %lac&
%ac&ground $ 'hite
(aterial $ )rint #abel
,,F #abeling
<tandard
<tandard labeling for outdoor ,,F !sample"
<tandard labeling for 0ndoor ,,F !sample"
RTN 600 MW Installation Standard 12 HCPT - HUAWEI
TO : DDF
TO : FAR END ID
TO : FAR END ID
8/13/2019 Antenna Installation -MW RTN 900
http://slidepdf.com/reader/full/antenna-installation-mw-rtn-900 13/14
. 5able distribution and routing
Key Points Details Description
5able distribution and
cable routing5able routing standard for outdoor %T<.
5able routing standard for indoor %T< !1".