Page 1: ANTECEDENT Meeting 1 Study Program: S0673 / Building Construction II Period: 2007
Page 2: ANTECEDENT Meeting 1 Study Program: S0673 / Building Construction II Period: 2007

ANTECEDENTMeeting 1

Study Program : S0673 / Building Construction IIPeriod : 2007

Page 3: ANTECEDENT Meeting 1 Study Program: S0673 / Building Construction II Period: 2007

Bina Nusantara

• An building consist of some structure component which is one and another related/relevant, so that the building can stand up, hence from that each component of meant structure have to be up to standard.

Building Construction

3

Page 4: ANTECEDENT Meeting 1 Study Program: S0673 / Building Construction II Period: 2007

Bina Nusantara

Some condition which are must be fulfill to structure component :

1. Can hold all burden which must be shouldered, including earthquake.

2. Fulfilling standard and regulation going into effect.3. Function during minimum 20 year.4. Hold up to decay, other pest and corotion among

others by insect.

4

Page 5: ANTECEDENT Meeting 1 Study Program: S0673 / Building Construction II Period: 2007

Bina Nusantara

Besides structure component have to fulfill conditions, the materials also have to fulfill some conditions for the sake of taking care of durable the building, and also for the efficiency usage of its materials.

Such conditions are :1. Usage of materials have to according to its function2. Durable to non minimum structure hold up during 5

year, and to minimum structure hold up during 20 year.

3. Have to earn to hold all style and burden that happened including earthquake.

5

Page 6: ANTECEDENT Meeting 1 Study Program: S0673 / Building Construction II Period: 2007

Bina Nusantara

Some condition and factor which must be paid attention in making a house building remain shall be as follows :

1. Strength : a building must have strong construction, to protect dweller of avalanche danger as well so that dweller can feel peaceful stay in it.

2. Durable : a building have to be planned to have longevity, because durable and strong building will give calmness and easiness to its dweller

Building House Remain

6

Page 7: ANTECEDENT Meeting 1 Study Program: S0673 / Building Construction II Period: 2007

Bina Nusantara

3. Beauty : a building have to be planned to have longevity, cause can give pride to its dweller as well as adding building value.

4. Health : a building also have to be planned by paying attention hygiene and health of its environment.

7

Page 8: ANTECEDENT Meeting 1 Study Program: S0673 / Building Construction II Period: 2007

Bina Nusantara

I. Ichnographic.Ichnographic depict the division of room, door situation and window, size measure and form dance room, can give drawn roof line with dot line.

II. Visible.The visible picture made is seeing face, back view, from other side right and left.

III. Cutting.Cutting picture depict interior of room, it is drawn in two direction, that is face direction behind and direction from other side right and left of building. To the number of hinging from division and to the number of existing room.

Picture Plan

8

Page 9: ANTECEDENT Meeting 1 Study Program: S0673 / Building Construction II Period: 2007

Bina Nusantara

IV. Plan Foundation.Depicting foundation size measure and type weared. All existing shares of its foundation have to be drawn is complete. The drawn is wide than foundation weared with given by its wall line.

V. Roof PlanDepicting roof form weared, roof line drawn with dots. At this picture, explained by easel situation, roof details and materials cover of its roof.

9

Page 10: ANTECEDENT Meeting 1 Study Program: S0673 / Building Construction II Period: 2007

Bina Nusantara

VI.Plafond Plan Drawing the division of check than its plafond in each room. Plafond frame depicted complete with mains log, divisor log and wood size measure weared.

VII. Sanitation PlanPlan of Sanitation depict discard hole situation at bathroom, kitchen, basin clean and other discard place. Stream dismissal channel direction given by dart showing its current direction. Basin control situation, tank septic, clean water well and its drawn and its distance in clear report.

10

Page 11: ANTECEDENT Meeting 1 Study Program: S0673 / Building Construction II Period: 2007

Bina Nusantara

VIII.Detail PlanDetail plan which must be drawn :

1. Foundation : depicting cross section form and its size measure and also deepness situation of foundation weared.

2. Truss : drawing truss weared and clarification of its extension.

3. Plafond : explaining form and height of plafond, joining and size measure is written complete and given clarification sufficiently.

4. Cushion / Frame : all door and window form, if there is extension which must be made special also have to be drawn.

11

Page 12: ANTECEDENT Meeting 1 Study Program: S0673 / Building Construction II Period: 2007

Bina Nusantara

5. Sanitation : drawing cross section and see the control basin, tank septic, well of diffusion as well as clarification of dismissal from all receiver appliance irrigate discard, all size measure and materials.

IX. SituationSituation picture depict to form of its land as well as its size measure, situation to an existing street is near written by the name of street, building layout above land of the given black color, at situation picture given wind eye direction.

12