anoop resume-instr engr
TRANSCRIPT
PROJECT ENGINEER - INSTRUMENTATIONCAREER OBJECTIVE:
Looking for reputable company seeking a career minded Instrumentation Engineer to fill open position within company
EDUCATIONAL QUALIFICATION:
Bachelor in Technology (B.Tech) in ELECTRONICS AND INSTRUMENTATION from Federal Institute of Science and Technology (Affiliated to MG University, Kerala, India) during 2004 – 2008
PROFESSIONAL SKILLS:
Proficient in Smart Plant Instrumentation(Intools) Experience in handling multiple projects at a time. Experience in Project Engineering, design and site maintenance Experience in liaising with vendors and clients Familiar with international standards Good at written and oral communication. Possess strong technical aptitude including applicable engineering tools and
systems
SOFTWARE EXPOSURE:
Design tools : Smart Plant Instrumentation (Intools),Auto Cad 2007,Instru Calc, various sizing softwares
Office Automation: Microsoft Word, PowerPoint & Excel. Computer language :C & C++
LANGUAGE SKILLS:
English: Read, write and speak Hindi: Read, write and speak Malayalam: Mother tongue
PROFESSIONAL EXPERIENCE:
Total : 5 years 2 months (Oil and gas sector)
Project engineering: 1 year 7 months (Yokogawa Engineering, Dubai)
Instrumentation design: 1 year 10 months (AICE, India)
Technical sales: 7 months (SPPE, Dubai)
Refinery maintenance: 1 year 2 months (Kochi refinery)
ANOOP GEORGEANOOP GEORGE
Email:Email:
[email protected]@gmail.com
Contact:
+974 33045052(Qatar)+974 33045052(Qatar)
Permanent Address:Permanent Address:
Alooparambil House
Kallissery P.O, Chengannur
Kerala,India-689124
Personal Data:Personal Data:
Date of Birth : 07-08-1985
Gender : Male
Marital Status: Married
Nationality : Indian
Passport No : M0477869
Driving License: India, UAE
Interests:
Listening to music Sports Travelling
PROJECT ENGINEER - INSTRUMENTATIONORGANISATION: SPECIALIZED POWER PRODUCTS EST (SPPE), Dubai DESIGNATION: Technical Sales engineerPERIOD: Nov 2013 to June 2014RESPONSIBILITIES:
Preparation of technical bid for hazardous area junction boxes and cables based on customer requirements and data sheets
Follow Up with customers for the submitted quotations Checking the drawings and datasheets from the factory for approval Follow up with the factory for timely delivery of the products
ORGANIZATION: ACCURATE INSTRUMENTATION AND CONTROL ENGINEERS(AICE), Kerala, IndiaDESIGNATION: Instrumentation Design EngineerPERIOD: May 2010 to Sep 2013
RESPONSIBILITIES IN AICE
Preparation of Instrument data sheets for valves/flow/ temperature /level/ pressure instruments etc. Preparation of specification for PLC/ SCADA Preparation of Piping and instrumentation diagrams Preparation of Functional logic diagrams, Electrical/Pneumatic/Process hookup diagrams, Cable termination
diagrams, Loop diagrams, Cable schedule, Cable block diagrams, Cause and effect diagrams etc Checking of FAT documents Preparation of monthly progress reports and resolving of delays in projects
PROJECTS HANDLED:
a) Sterlite industries Sulphuric acid plant: Preparation of functional logic diagram for entire sulphuric acid plant from control narrative. Coordinating with electrical departments for motor start up circuits and making corresponding changes in
the logicsb) Instrumentation Documents for cross country ATF pipe line (Kochi refineries to Airport fuel station).
Preparation of Instrument data sheets for valves/flow/ temperature /level/ pressure instruments etc Preparation of specification for PLC/ SCADA Preparation of Functional logic diagrams, Electrical/Pneumatic/Process hookup diagrams, Cable termination
diagrams, Loop diagrams, Cable schedule, Cable block diagrams, Cause and effect diagrams etc Checking of FAT documents
c) P & ID for BPCL storage facility at Irimpanam, Kochi Preparation of P & ID for the entire petroleum storage plant (existing facility) through several visits to the
plant. Coordinating with the draftsman for drawings in AutoCAD.
d) Leak Detection System for cross country ATF pipeline Prepared specification for Leak Detection System for ATF pipeline (for tendering purpose)
e) Terminal Automation system for BPCL storage facility at Kochi. Prepared specification for truck loading and tank farm area for tendering purpose
PROJECT ENGINEER - INSTRUMENTATIONDEPUTATION: YOKOGAWA ENGINEERING MIDDLE EAST, Jebel Ali,Dubai (Deputed from AICE)DESIGNATION: Engineer-Process control InstrumentsPERIOD: May 2011 to Nov 2012
RESPONSIBILITIES IN YOKOGAWA:
Responsible for the management of project from the sales handover until it reaches the client ,which includes Submission of preliminary documents for customer approval Selection of third party vendors based on the project requirements and project budget. Preparation of monthly progress reports and resolving of delays. Ensuring Engineering and Procurement will be done within the estimated time schedule. To coordinate with Yokogawa factory and third party vendors for timely delivery of instruments Ensuring the quality of instruments supplied by third party vendors. Estimation of change order items, price and releasing of change order quotation. Guide, supervise and allocate technicians for integration of Yokogawa instruments with third party instruments Conduct calibration and material tests on received instruments. Conduct inspections and coordinate with the inspectors for getting inspection release note Support procurement team for the shipment of instruments. Preparation of Final Documents
PROJECTS HANDLED:
Ruwais RefineryExpansion Project – Package 1 , Client – SK Engineering Ruwais Refinery Expansion Project – Package 2 & 7, Client – GS Engineering Ruwais Refinery Expansion Project – Package 4, Client – Daewoo Engineering KOC/KNPC Project, Client – Client - Petrofac Sharjah South pars field instruments Job, Client – Petrokish Esfahan oil gas prod vortex flow meters, Client- Namavaran Engineering Esfahan oil gas prod pressure transmitters, Client- Namavaran Engineering
ORGANISATION:: S S ASSOCIATES, O.M VARGHEESE (Instrumentation contractors for BPCL Kochi Refineries)DESIGNATION: Instrumentation EngineerPERIOD: Jan 2009 to Mar 2010
RESPONSIBILITIES:
Calibration, Erection and Loop checking of electronic and pneumatic instruments Installation of process measuring instruments and final control element Supervising a team of technicians Identifying the maintenance works in the refinery
DECLARATION:I hereby declare that the above furnished information is true to the best of my knowledge and belief.
ANOOP GEORGEDATE & PLACE: