annual general meeting 2019 & symposium on … · amber project – h2020 – grant agreement...
TRANSCRIPT
ANNUAL GENERAL MEETING 2019 & SYMPOSIUM ON CONNECTIVITY IN MEDITERRANEAN
RIVERS
Málaga, Spain, 3 to 6 September 2019
AMBER Project – H2020 – Grant Agreement #689682 Annual General Meeting 3rd to 6th September 2019
1
Programme Agenda
The meeting will be held across four days:
Day 1 – 3rd September Morning Field Visit to Guadalhorce case
study site and Ardales Cave
Afternoon
Symposium on Connectivity in
Mediterranean Rivers
Day 2 – 4th September Morning
WP Meetings and Talks by EAB
Afternoon WP Meetings Feedback and
Breakout Sessions
Day 3 – 5th September
Morning
CLOSED SESSION
AMBER Annual General Meeting
and EAB Feedback
Afternoon
Evening
International Experience on
Adaptive Barrier Management
Viewing of Carlos Rodriguez
Documentary Durienses,
followed by Dinner at El Pimpi
Restaurant
Day 4 – 6th September Morning
Afternoon
WP LEADS ONLY
EC Project Review Meeting
Free
Meeting Venue
All meetings will take place at the University of Málaga, Calle, Arquitecto Francisco Peñalosa, 18, 29010
Málaga in Meeting Room 1 (Ground Floor, Room B.0.6) of the Ada Byron Building.
AMBER Project – H2020 – Grant Agreement #689682 Annual General Meeting 3rd to 6th September 2019
2
Accommodation
We recommend accommodation close to the El Perchel underground train station, as the train will be
the most convenient way to travel to the meeting venue. The following hotels are in close proximity to El
Perchel Station and within a 30 minute walk to Málaga city center:
Barceló Málaga
https://www.barcelo.com/es/barcelo-hotels/hoteles/espana/andalucia/malaga
Hotel Guadalmedina
http://www.hotelguadalmedina.es/
TRYP Málaga Alameda Hotel
https://www.melia.com/es/hoteles/espana/malaga
Hotel Las Américas
https://hotel-lasamericas.es/
Hotel Don Paco
https://www.hotel-donpaco.com/
Sercotel Málaga
https://www.sercotelhoteles.com/hoteles/espana/Malaga/sercotel-malaga/
More hotels are available nearby El Perchel underground station.
How to get to the Ada Byron Building
We recommend travel by L1 train from El Perchel underground station to avoid traffic congestion. The
Andaluciá Tech underground station is approximately a seven-minute walk from the Ada Byron Building.
Location:
AMBER Project – H2020 – Grant Agreement #689682 Annual General Meeting 3rd to 6th September 2019
3
Travel by train:
AMBER Project – H2020 – Grant Agreement #689682 Annual General Meeting 3rd to 6th September 2019
4
Day 1 – T
Local Taxi Telephone Numbers
UNITAXI Malága
952 333 333
TAXI UNIÓN Malága 952 04 04 04 / 682 04 04 04
AMBER Project – H2020 – Grant Agreement #689682 Annual General Meeting 3rd to 6th September 2019
5
Day 1 – Tuesday, 3rd September 2019 08:00 Field Visit to Guadalhorce case study site Travel by private bus to the Guadalhorce Reservoir and the Conde de Guadalhorce
Reservoir with representatives from AMA, Territorial Delegation of Malaga and New Culture of Water The bus will meet field-visit participants at the long bus stop at Calle, Héroes de Sostoa (close to the María Zambrano Train Station and the Barcélo Hotel). The bus company is Autocares Vázquez Olmedo and the buses for the field visit will have this name displayed.
9:15
Reception in the Offices of the Guadalhorce-Guadalteba Dams Explanation of the system of reservoirs by the Head of Exploitation, Ignacio Calderón
10:45 11:30
Travel by private bus to Ardeles Cave Visit to Ardales Cave
http://www.andalucia.com/province/malaga/ardales/cave
13:45 Picnic Lunch at Ardales. Accompanied by Salvador Sánchez, of the Platform in Defense of the river Grande and the Jara Environmental Association (Coín, Málaga).
15:00 Guided visit at the mouth of the River Guadalhorce A guided tour will be provided by Christoph Schröder of Proyecto SWOS ETC-UMA,
https://www.swos-service.eu/, and José Manuel Nieto López of Centro de Hidrogeología de la Universidad de Málaga (CEHIUMA), http://cehiuma.uma.es/
16:00 Symposium on Connectivity in Mediterranean Rivers La Térmica building, next to the Guadalhorce estuary. Diputación de Málaga, Avenida De los Guindos, 48, 29004 Málaga, https://www.latermicamalaga.com/
AMBER Project – H2020 – Grant Agreement #689682 Annual General Meeting 3rd to 6th September 2019
6
16:00 Welcome coffee 16:30 Institutional opening from Diputacion Malága, Agriculture Counselling and AMA Junta
Andalucía 16:40 Hydrological Planning Technician from Environment and Water Agency, Andalucía 17:05 Anguilla Recovery Plan in Andalusia. Carlos Fernández Delgado (University of Cordoba) 17:30 SWOS Project Results (UMA). Surface waters and wetlands.- Christoph Schröder 17:50 CEHIUMA projects. Groundwater in the Guadalhorce basin.- José Manuel Nieto Lopez 18:10 Guadalhorce Case Study
- UNIOVI - AEMS-Ríos con Vida - IRS
19:00 Conclusions 19:20 Close
AMBER Project – H2020 – Grant Agreement #689682 Annual General Meeting 3rd to 6th September 2019
7
Day 2 – Wednesday, 4th September 2019 09:00 Arrival
Meeting Room 1 (Ground Floor, Room B.0.6), Ada Byron Building, University of Málaga,
Calle, Arquitecto Francisco Peñalosa, 18, 29010 Málaga
09:15 09:25
Welcome (Fire regulations, catering) Introduction to Jack Foxall from the Arcadia Fund
09:30 WP Progress Updates (each maximum of 15 minutes with 5 minutes for questions) 09:30 WP1 Atlas – Wouter van de Bund & Barbara Belletti 09:50 WP2 Impacts – Piotr Parasiewicz 10:10 WP3 Tools - Paul Kemp & Jim Kerr 10:30 WP4 Case Studies – Niels Jepsen 10:50 WP5 Dissemination – Arjan Berkhuysen 11:20 Coffee Break 11.40 Talks by the AMBER EAB 11:40 Laura Wildman 12:00 Martina Bussettini 12:20 Josh Royte 12:40 Guillermo Gianicco 13:00 Lunch 14:00 WP Breakout Sessions - planning, progress & discussion for WP1,2,3,4,5 (non-AMBER
attendees free to circulate) 16:00 Coffee Break 16:30 Breakout Feedback 16:30 WP1 Wouter van de Bund & Barbara Belletti 16:45 WP2 Piotr Parasiewicz 17:00 WP3 Paul Kemp & Jim Kerr 17:15 WP4 Niels Jepsen 17:30 WP5 Arjan Berkhuysen
18:00 Close
AMBER Project – H2020 – Grant Agreement #689682 Annual General Meeting 3rd to 6th September 2019
8
Day 3 – Thursday, 5th September 2019 09:15 AMBER General Assembly Closed session - AMBER members and EAB only
Meeting Room 1 (Ground Floor, Room B.0.6), Ada Byron Building, University of Málaga, Calle, Arquitecto Francisco Peñalosa, 18, 29010 Málaga
09:30 Welcome and Opening Comments – Carlos Garcia de Leaniz Legacy and final event – Arjan Berkhuysen MS13 Policy Meeting Brussels – Carlos Garcia de Leaniz
No cost extension and final reporting implications – Victoria Hurst
Any Other Business 11:00 Coffee Break 11:30 EAB Feedback 12:30 End of Closed Session 13:00 Lunch 14:00 International Experience on Adaptive Barrier Management 14:00 Jens Carlsson – Reconnect Ireland 14:20 Karl Matthias Wantzen – Unesco Chair "Fleuve et Patrimoine - River Culture" &
Université François Rabelais at Tours 14:40 Lourdes Lazaro - IUCN 15:00 Rosa Olivio del Amo – Dam Removal Europe 16:00
15:20 16:20
Hany Abo El Wafa - FIThydro Coffee Break Citizen Science and Data Collection Apps
16:40
Dave Kilbey – Natural Apptitude Networking Opportunity
17:30 Close 19:00 Carlos Rodriguez Documentary Durienses Auditorium of the María Victoria Atencia Cultural Center, Calle Ollerías, 34. Málaga,
http://www.centroculturalmva.es/6868/com1_ct-0/com1_fb-0/agenda
20:00 Close 21:00 Dinner at El Pimpi Restaurant Calle, Granada, 62, 29015 Málaga, https://www.elpimpi.com/
AMBER Project – H2020 – Grant Agreement #689682 Annual General Meeting 3rd to 6th September 2019
9
Day 4 – Friday, 6th September 2019 Meeting Room 1 (Ground Floor, Room B.0.6), Ada Byron Building, University of Málaga, Calle,
Arquitecto Francisco Peñalosa, 18, 29010 Málaga Lead 09:00 Closed session EASME - Reviewers 09:30 Introduction to the review meeting Victoria Beaz-Hidalgo
EASME 09:40
AMBER Overview of progress (20 min presentation followed by 10 min Q&A after each presentation)
09:40
10:00
10:20
WP1 summary & update (20 min) WP2 summary & update (20 min) WP3 summary & update (20 mins)
Wouter van de Bund/Barbara Belletti Maciej Zalewski/Piotr Parasiewicz Paul Kemp/James Kerr
11:10 11:30
Coffee break AMBER Overview of progress (cont.)
11:30
11:50
12:10
WP4 summary & update (20 min) WP5 summary & update (20 min) WP6 & 7 summary & update (20 min)
Niels Jepsen Herman Wanningen/Arjan Berkhuysen Carlos Garcia de Leaniz/Victoria Hurst
13:00 General feedback and conclusions
13:45 Buffer time
14:00 Close
AMBER Project – H2020 – Grant Agreement #689682 Annual General Meeting 3rd to 6th September 2019
10