annual environmental report 2011annual environmental report 2011 fsw coatings ltd published march...

22
Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012 1 Annual Environmental Report 2011 Published March 2012 FSW Coatings Ltd, Virginia, Co. Cavan. Register No. P0-244-01

Upload: others

Post on 24-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Annual Environmental Report 2011Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012 4 1.1 FSW Coatings Environmental Policy FSW Coatings Ltd trading as ‘Fleetwood

Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012

1

Annual

Environmental

Report 2011

Published March 2012

FSW Coatings Ltd,

Virginia,

Co. Cavan.

Register No. P0-244-01

Page 2: Annual Environmental Report 2011Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012 4 1.1 FSW Coatings Environmental Policy FSW Coatings Ltd trading as ‘Fleetwood

Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012

2

Index

1 Introduction .................................................................................................................... 3

1.1 FSW Coatings Environmental Policy .......................................................................4 1.2 Site description ..........................................................................................................5 1.3 Product Summary ......................................................................................................5 1.4 Operations .................................................................................................................5 1.5 Environmental Management .....................................................................................6

1.5.1 Organisational Chart. ........................................................................................ 6 2 Operating Conditions ..................................................................................................... 7

2.1 Economic Contribution .............................................................................................7 3 Data Summary ................................................................................................................ 7

3.1 Emissions to Surface Water ......................................................................................7 Summary of FSW Surface Water (EW1) monitoring data 2010 ..........................................8

3.1.1 Details of Non-Compliances 2011– Surface Water .......................................... 8 3.1.2 Details of Equipment Failure 2011– Water....................................................... 8 3.1.3 Emissions to Groundwater 2011 ....................................................................... 8 3.1.4 GW1 Annual Emissions 2010- .......................................................................... 9 3.1.5 GW2 Annual Emissions 2010- .......................................................................... 9 3.1.6 GW3 Annual Emissions 2010- .......................................................................... 9

3.2 Waste Management: ..................................................................................................9 3.2.1 Non Hazardous Waste 2010 ............................................................................ 10 3.2.2 Hazardous Waste 2010 .................................................................................... 10 3.2.3 Non Hazardous waste (landfill) 2010.............................................................. 10

3.3 National Waste Database Report Sheet ...................................................................11 3.4 Noise Monitoring ....................................................................................................11 3.5 Energy Monitoring: .................................................................................................11

3.5.1 Electricity Usage 2010: ................................................................................... 11 3.5.2 Graph of electricity usage 2008 versus 2010 .................................................. 12 3.5.3 Natural Gas Usage 2010:................................................................................. 12 3.5.4 Fuel Comparison (kWh) Graph: ...................................................................... 13 3.5.5 Trend Analysis for electricity/100 litres of paint produced 2004 to 2010: ..... 13

3.6 Water Usage: 2007 ..................................................................................................14 3.7 Funding of Environmental Projects: .......................................................................14 3.8 Environmental Training: .........................................................................................14 3.9 Environmental Incidents .........................................................................................14 3.10 Environmental Complaints ......................................................................................14 3.11 PER Register ........................................................... Error! Bookmark not defined.

3.11.1 PER Register .................................................... Error! Bookmark not defined. 4. Environmental Management Programme for 2010 .................................................15

4.1 Objectives & Targets 2010 - Environmental....................................................... 16 4.2 Objectives & Targets 2010 - Environmental....................................................... 16

Page 3: Annual Environmental Report 2011Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012 4 1.1 FSW Coatings Environmental Policy FSW Coatings Ltd trading as ‘Fleetwood

Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012

3

1 Introduction

Licence Register No. 244

Name FSW Coatings

Location Ballaghanea,

Virginia,

Co. Cavan.

Site Manager For further information on the contents of this report

please contact:

Mr. John Hetherton,

Environmental Officer,

FSW Coatings Ltd,

Virginia,

Co. Cavan.

Ph: 049-8547209.

Mobile: 086-1740381

E-Mail: [email protected]

Page 4: Annual Environmental Report 2011Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012 4 1.1 FSW Coatings Environmental Policy FSW Coatings Ltd trading as ‘Fleetwood

Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012

4

1.1 FSW Coatings Environmental Policy

FSW Coatings Ltd trading as ‘Fleetwood Paint’ is a household name for quality paint in

Ireland. The company manufactures paint in it’s facility in Virginia, Co Cavan. The group

recognises it’s environmental and occupational health & safety responsibilities to its staff,

shareholders, customers and the general public and is committed to the continual

improvement of the operating environment of its manufacturing facilities.

FSW have received accreditation to Quality, and Environmental Management System

Standards ISO 9001: 2008, ISO 14001:2004 and takes into account all regulatory and

legislative requirements pertinent to its industry, local operating environment and customer

requirements.

The organisation’s objectives include the following:

• communicating it's policies both internally and externally

• ensuring that all employees are aware of their obligations

• commitment to continual improvement in quality, occupational health & safety and

environmental performance

• using the input of staff, customers, shareholders, government, local authorities, interested

third parties and the general public

• awareness and training on quality, occupational health & safety and environmental issues

• creating a better environment for all, through the reduction, recycling and reuse of waste,

the optimum usage of resources and the elimination of polluting releases to the

environment

• compliance with all pertinent applicable regulations and legislation

• prevention of pollution

• provision of a competitive, cost effective and on time service

• manufacture and supply of product in a safe environment to customer specifications and

requirements

The above policy is supported by the management of the organisation who shall commit the

necessary resources in ensuring that the Group objectives and targets can be achieved.

Page 5: Annual Environmental Report 2011Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012 4 1.1 FSW Coatings Environmental Policy FSW Coatings Ltd trading as ‘Fleetwood

Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012

5

1.2 Site description

FSW Coatings Ltd. is a company registered in Ireland. The company is Irish owned with

35% of the company’s shares owned by an American paint manufacturer, Sherwin Williams.

FSW Coatings Ltd. is Irelands largest indigenous Paint Company that manufactures paint

products at Virginia, Co. Cavan.

FSW Coatings Ltd. is located southeast of Virginia, Co. Cavan. The plant is approximately

300m east of the Virginia to Kells road, N3.

There is a residential farmhouse that is on the opposite side of the road from the main

entrance gate, within 100m of the site. Glanbia is located approximately 1 km away on the

N3 towards Kells. Virginia town is located approximately 11/2 km away in the opposite

direction.

1.3 Product Summary

• Decorative coatings

• Industrial coatings

• Applicators (brushes, rollers)

• Ancillary decorating products (Step ladders, fillers, masking tape, dust sheets, etc)

1.4 Operations

The principal unit operations in the manufacturing process are:

• Water based paint manufacturing.

• Solvent based paint manufacturing.

• Solvent based industrial paint manufacturing

• Water based industrial paint manufacturing.

All of the manufacturing operations are batch operations. The scheduling and duration of

each operation is controlled by production programmes and “Production Batch Sheets”.

At all stages of the manufacturing process, quality checks are carried out to ensure that the final products meet required specifications.

Page 6: Annual Environmental Report 2011Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012 4 1.1 FSW Coatings Environmental Policy FSW Coatings Ltd trading as ‘Fleetwood

Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012

6

1.5 Environmental Management

1.5.1 Organisational Chart.

Managing Director Conor M Doyle

Factory Manager Liam Hughes

Production Manager Terry O’Brien Environmental Manager

John Hetherton

Environmental Technician John Skelton

Supervisors

Yard Personnel

General Manager Technical & Industrial

Division Mick Clowes

Page 7: Annual Environmental Report 2011Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012 4 1.1 FSW Coatings Environmental Policy FSW Coatings Ltd trading as ‘Fleetwood

Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012

7

2 Operating Conditions The plant operates from 8.30am to 17.00 from Monday to Thursday inclusive and

8.30am to 4.00pm on Friday. However, during the busier summer period depending on

product demand it may operate overtime from 17:00 to 20:00 in the evenings and on a

Saturday from 8:30am to 13:00.

2.1 Economic Contribution

Fleetwood and Sherwin Williams established FSW Coatings Ltd. in 1978 as a joint

venture, with Sherwin Williams holding a minority shareholding of 35%. FSW Coatings

ltd. currently employs 115 people at its headquarters in Virginia, Co. Cavan on a 13-acre

site.

3 Data Summary

3.1 Emissions to Surface Water

This section provides information pertaining to the annual emissions to Surface Water. This

data is based on the monitoring data available for the operation. As detailed in condition 9 –

Non-Process Water, of the IPC licence there are a number of requirements to provide

protection for the environment by way of control, limitation, treatment and monitoring of

emissions.

The frequency of monitoring is monthly for the emissions from the effluent treatment plant.

This is as specified in Schedule 3(i) Surface Water Discharge Monitoring of the licence.

Monthly results have been submitted to the Agency as required. The tables below include

yearly figures that are based on the results obtained. All figures are based on average data

and do not represent either the best or worst case scenario.

Page 8: Annual Environmental Report 2011Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012 4 1.1 FSW Coatings Environmental Policy FSW Coatings Ltd trading as ‘Fleetwood

Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012

8

Summary of FSW Surface Water (EW1) monitoring data 2011

Volume of effluent m3 432.00

Date BOD

mg/l

COD

mg/l

Conductivity

(uS/cm @20oC) pH TOC (mg/l) VOC (ug/l)

January 11 22 708 7.0 6.02 <5 February <2 52 136 6.6 15.0 3.503 March 17 43.0 169 7.5 37.4 <5 April 159 216 170 6.7 46 <1 May 183 309 129 6.5 67 <1 June 7.6 182 180 6.8 34 4 July 27 48 109 7.3 10 15 August 89 125 151 6.7 26 1.4 September 39 82 90 6.7 17 <1 October 12 28 89 7.2 7.5 <1 November 6.0 8 83 7.2 3.9 <1 December 5 21 212 7.2 2.5 <1

3.1.1 Details of Non-Compliances 2011– Surface Water

None to report

3.1.2 Details of Equipment Failure 2011– Water

Date Equipment Failure Details / Cause Corrective Action

None to report

3.1.3 Emissions to Groundwater 2011

This section provides information pertaining to the annual emissions to Groundwater. This

data is based on the monitoring data available for the operation. As detailed in condition 9 –

Non-process Water, of the IPC licence there are a number of requirements to provide

protection for the surface waters.

The frequency of monitoring is Bi-Annually for the emissions to groundwater. This is as

specified in Schedule 3(ii) Groundwater monitoring of the licence. Bi-Annually results have

Page 9: Annual Environmental Report 2011Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012 4 1.1 FSW Coatings Environmental Policy FSW Coatings Ltd trading as ‘Fleetwood

Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012

9

been submitted to the Agency as required. The tables below include yearly figures that are

based on the results obtained.

3.1.4 GW1 Annual Emissions 2011-

This borehole is no longer in service

3.1.5 GW2 Annual Emissions 201-

3.1.6 GW3 Annual Emissions 2011-

3.2 Waste Management:

FSW has continued to improve the waste management on site the company has introduced a

closed loop system with our raw material suppliers, supplying IBCs from two of the

companies Mamor and Eastman. These IBCs are collected and returned at regular intervals.

Other IBCs are sent for reuse if suitable or destruction if unusable to Rialta Environmental

Ltd.

Date BOD (mg/l)

Chromium (µg/l)

COD (mg/l)

Conductivity (µS/cm @ 25C)

pH Total Organic Carbon (mg/l)

VOCs (µg/l)

05/04/11 <5 <0.05 28 263 6.4 2.6 <1 14/10/2011 <2 <0.05 6 298 6.8 2.89 <1

Date BOD (mg/l)

Chromium (µg/l)

COD (mg/l)

Conductivity (µS/cm @ 25C)

pH Total Organic Carbon (mg/l)

VOCs (µg/l)

05/04/11 <5 <0.05 28 342 7.6 2.0 <1.0 14/10/2011 <2 <0.05 <4 339 7.7 1.9 <1.0

Page 10: Annual Environmental Report 2011Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012 4 1.1 FSW Coatings Environmental Policy FSW Coatings Ltd trading as ‘Fleetwood

Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012

10

3.2.1 Non Hazardous Waste 2011

EWC Code Type Of Waste Waste Tonnage Waste Status

15 01 01 paper and cardboard packaging 11.89 Non Hazardous

15 01 02 plastic packaging 9.29 Non Hazardous

17 04 07 mixed metals 24.28 Non Hazardous 15 01 05 Composite packaging 5.6 Non Hazardous Total 50.62

3.2.2 Hazardous Waste 2011

EWC Code Type Of Waste Waste Tonnage Waste Status

08 01 11* waste paint and varnish containing organic solvents or other dangerous substances paint slops and solvent washings

10.775 Hazardous

13 08 99* Rags and clean up material from paint spills on factory floor. 0.193 Hazardous

15 01 10* Packaging containing waste paint material 3.686 Hazardous

15 02 02* Packaging containing waste paint material 0.284 Hazardous

20 01 21 Fluorescent tubes 0.40 Hazardous

Total 15.34

3.2.3 Non Hazardous waste (landfill) 2011

EWC Code Type Of Waste Waste Tonnage Waste Status 20 03 01 mixed municipal waste 91.60 Non Hazardous

Total 91.606

Page 11: Annual Environmental Report 2011Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012 4 1.1 FSW Coatings Environmental Policy FSW Coatings Ltd trading as ‘Fleetwood

Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012

11

3.3 National Waste Database Report Sheet

3.4 Noise Monitoring

As per agreement reached with the Agency and subsequent to receipt of letter dated 5th July

ref no. P0244-01/ap14em FSW Coatings were informed that noise monitoring need only be

carried out every two years. There was therefore no noise monitoring carried out in 2011. A

survey will be undertaken in 2012.

3.5 Energy Monitoring:

There are four types of fuel used on site, electricity, natural gas, gas oil and kerosene.

3.5.1 Electricity Usage 2011:

Industry Sector NACE Code D 1

Reporting Period 2006 2006 2008 2009 2010 2011

Number of Employees 91 90 83 115 93 90

Total Tonnage of Waste Produced 337.49 468.744 327.364 143.758 166.997 157.56

Hazardous 74.51 109.925 52.8 1.36 44.077 15.34

Non-Hazardous 262.98 358.81 274.564 142.398 122.92 142.22

Total Tonnage of waste Recovered 230.92 142.715 165.012 54.138 88.137 53.875

Hazardous 74.51 102.425 29.1 1.36 44.077 15.34

Non Hazardous 156.41 40.29 135.912 52.778 44.06 38.535

Period Electricity kWh Jan 66028 Feb 64319 Mar 58761 Apr 49405 May 48664 Jun 47611 Jul 45949 Aug 46451 Sep 44858 Oct 41408 Nov 53299 Dec 43224 Total 609977

Page 12: Annual Environmental Report 2011Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012 4 1.1 FSW Coatings Environmental Policy FSW Coatings Ltd trading as ‘Fleetwood

Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012

12

3.5.2 Graph of electricity usage 2008 versus 2011

0

1 0 0 0 0

2 0 0 0 0

3 0 0 0 0

4 0 0 0 0

5 0 0 0 0

6 0 0 0 0

7 0 0 0 0

k W h

J a n F e b M a r A p r M a y J u n J u l A u g S e p O c t N o v D e c

M o n t h

E l e c t r i c i t y 2 0 0 8 - 2 0 1 12 0 0 82 0 0 92 0 1 02 0 1 12 0 0 82 0 0 92 0 1 02 0 1 1

3.5.3 Natural Gas Usage 2011:

Period Natural Gas (kWh)

Jan 248002 Feb 109174 Mar 97909 Apr 29383 May 18046 Jun 9845 July 10877 Aug 13153 Sept 15121 Oct 22705 Nov 49518 Dec 136778 Total 760511

Page 13: Annual Environmental Report 2011Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012 4 1.1 FSW Coatings Environmental Policy FSW Coatings Ltd trading as ‘Fleetwood

Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012

13

3.5.4 Fuel Comparison (kWh) Graph:

Trend Analysis for electricity/100 litres of paint produced 2005 to 2010:

Year 2005 2006 2007 2008 2009 2010 2011

kWh/100l 17.27 15.37 16.17 17.71 15.22 15.36 19.57

0

3 5 0 0 0 0

7 0 0 0 0 0

1 0 5 0 0 0 0

1 4 0 0 0 0 0

1 7 5 0 0 0 0

kWh

2 0 0 6 2 0 0 7 2 0 0 8 2 0 0 9 2 0 1 0 2 0 1 1

Y e a r

E n e r g y U s a g eG a s / o i lN a t u r a l G a sE l e c t r i c i t yT o t a l k W h

Page 14: Annual Environmental Report 2011Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012 4 1.1 FSW Coatings Environmental Policy FSW Coatings Ltd trading as ‘Fleetwood

Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012

14

3.6 Water Usage: 2006 - 2012

Date Consumption (m3)

2006 7210

2007 9209

2008 11375

2009 9796

2010 9271

2011 7863

3.7 Funding of Environmental Projects:

FSW operates a structured accounting system. This tracks environmental expense spending.

Environmental projects of significance require capital provision, are planned into the capital

budget and must be approved by senior management and the board of directors.

Environmental Expenditure 2011

Analysis €2778.55 Consultants €1788.0 Service €22165.75 Training €1550 Total €28282.30

3.8 Environmental Training:

It is the company’s responsibility that each member of staff has been trained to the correct

level of Environmental Awareness so as to be able to carry out their normal day to day tasks

safely and with no risk to themselves or the surrounding environment.

3.9 Environmental Incidents

There were was no environmental incident to report in the period January 2011 to December

2011

3.10 Environmental Complaints

No complaints received by FSW during the period January 2011 to December 2011

Page 15: Annual Environmental Report 2011Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012 4 1.1 FSW Coatings Environmental Policy FSW Coatings Ltd trading as ‘Fleetwood

Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012

15

4. Environmental Management Programme for 2012

In accordance with schedule 4 (i) of IPC Licence 244, & FSW’s Environmental

Management system, the Environmental Management Team at FSW Coatings has developed

an EMP for 2012. The purpose of the EMP is to ensure that the objectives and targets are

supported by a realistic programme that is implemented throughout the company. This

programme reviews the objectives and targets set for 2011 and identifies and sets objectives

and targets for 2012.

Page 16: Annual Environmental Report 2011Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012 4 1.1 FSW Coatings Environmental Policy FSW Coatings Ltd trading as ‘Fleetwood

Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012

16

4.1 Objectives & Targets 2011 – Environmental

2011 Objective & Target Time Frame &

Responsibility End or Year Progress Report

1. Re-testing of Bunds No.3 Feb 2011 John Hetherton & Liam Hughes

Completed. Mulroy Environmental Ltd carried out test in April and it passed the test. Report available on file.

2. Housekeeping inspections December 2011 John Hetherton

1st Inspection completed April 2011. 2nd Inspection carried out September 2011 In general housekeeping has improved around the factory.

3. Training - Spill Control End 2011 John Hetherton

Outstanding, training completed a number of years back and to date FSW have no issues with spillages.

4.2 Objectives & Targets 2012 - Environmental

2012 Objective & Target Time Frame &

Responsibility Environmental Impact Resources

1. Carry out Noise Monitoring on Site

May 2012 John Hetherton

Comply with conditions of our IPC Licence

Hire Environmental Service & Consultants to perform Noise tests

2. Test Bund No. 1 & Bund No. 2 September 2012 John Hetherton

Comply with conditions of our IPC Licence

Hire Environmental Service & Consultants to perform Bund tests

3. Housekeeping inspections 3 audits by End of 2012 John Hetherton

Comply with conditions of our IPC Licence and ISO 14001:2004 4.4.6 "Operational Control"

John Hetherton & Rita Gilsenan schedule inspections into their program of work for 2012

Page 17: Annual Environmental Report 2011Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012 4 1.1 FSW Coatings Environmental Policy FSW Coatings Ltd trading as ‘Fleetwood

| PRTR# : P0244 | Facility Name : FSW Coatings Limited | Filename :

P0244_2011.xls | Return Year : 2011 | 2915 28/05/2012 16:32

Guidance to completing the PRTR workbook

Version 1.1.13

REFERENCE YEAR 2011

1. FACILITY IDENTIFICATION

Parent Company Name FSW Coatings Limited

Facility Name FSW Coatings Limited

PRTR Identification Number P0244

Licence Number P0244-01

Waste or IPPC Classes of Activity

No. class_name

5.7

The manufacture of paints, varnishes, resins, inks, dyes, pigments

or elastomers where the production capacity exceeds 1,000 litres

per week, not included in paragraphs 5.12 to 5.17.

5.7

The manufacture of paints, varnishes, resins, inks, dyes, pigments

or elastomers where the production capacity exceeds 1,000 litres

per week, not included in paragraphs 5.12 to 5.17.

Address 1 Ballaghanae

Address 2 Virginia

Address 3 Co Cavan

Address 4

Cavan

Country Ireland

Coordinates of Location -7.04765 53.8223

River Basin District IEEA

NACE Code 2030

Main Economic Activity

Manufacture of paints, varnishes and similar coatings, printing ink

and mastics

AER Returns Contact Name John Hetherton

AER Returns Contact Email Address [email protected]

AER Returns Contact Position Quality Manager

AER Returns Contact Telephone Number 049-8547209

AER Returns Contact Mobile Phone Number 086-1740381

AER Returns Contact Fax Number 049- 8547470

Production Volume 8342503.0

Production Volume Units litres

Number of Installations 1

Number of Operating Hours in Year 1950

Number of Employees 90

User Feedback/Comments

Web Address www.fleetwood.ie

2. PRTR CLASS ACTIVITIES

Activity Number Activity Name

50.1 General

4(a)

Simple hydrocarbons (linear or cyclic, saturated or unsaturated,

aliphatic or aromatic),Oxygen-containing hydrocarbons such as

alcohols, aldehydes, ketones, carboxylic acids, esters, acetates,

ethers, peroxides, epoxy resins,Nitrogenous hydrocarbons such as

amines, amides, nitrous compounds, nitro compounds or nitrate

compounds, nitriles, cyanates, isocyanates,Synthetic

rubbers,Phosphorus-containing hydrocarbons,Halogenic

hydrocarbons,Organometallic compounds,Basic plastic materials

(polymers, s

3. SOLVENTS REGULATIONS (S.I. No. 543 of 2002)

Is it applicable? No

Have you been granted an exemption ?

If applicable which activity class applies (as per

Schedule 2 of the regulations) ?

Is the reduction scheme compliance route being

used ?

AER Returns Workbook

Page 18: Annual Environmental Report 2011Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012 4 1.1 FSW Coatings Environmental Policy FSW Coatings Ltd trading as ‘Fleetwood

4.1 RELEASES TO AIR Link to previous years emissions data | PRTR# : P0244 | Facility Name : FSW Coatings Limited | Filename : P0244_2011.xls | Return Year : 2011 | 28/05/2012 16:32

8 8 16 16 24 24 6 6 6 6 6 6 28

SECTION A : SECTOR SPECIFIC PRTR POLLUTANTS

Please enter all quantities in this section in KGs

QUANTITY

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year

0.0 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION B : REMAINING PRTR POLLUTANTS

Please enter all quantities in this section in KGs

QUANTITY

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year

0.0 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION C : REMAINING POLLUTANT EMISSIONS (As required in your Licence)

Please enter all quantities in this section in KGs

QUANTITY

Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year

0.0 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

Additional Data Requested from Landfill operators

Landfill: FSW Coatings Limited

Please enter summary data on the

quantities of methane flared and / or utilised

additional_pollutant_no T (Total) kg/Year M/C/E Method Code

Designation or

Description

Facility Total Capacity m3

per hour

Total estimated methane generation (as per

site model) 0.0 N/A

Methane flared 0.0 0.0 (Total Flaring Capacity)

Methane utilised in engine/s 0.0 0.0 (Total Utilising Capacity)

Net methane emission (as reported in Section

A above) 0.0 N/A

METHOD

POLLUTANT METHOD

Method Used

For the purposes of the National Inventory on Greenhouse Gases, landfill operators are requested to provide

summary data on landfill gas (Methane) flared or utilised on their facilities to accompany the figures for total

methane generated.  Operators should only report their Net methane (CH4) emission to the environment under

T(total) KG/yr for Section A: Sector specific PRTR pollutants above.  Please complete the table below:

Method Used

Method Used

POLLUTANT

RELEASES TO AIR

POLLUTANT METHOD

Method Used

RELEASES TO AIR

RELEASES TO AIR

Page 19: Annual Environmental Report 2011Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012 4 1.1 FSW Coatings Environmental Policy FSW Coatings Ltd trading as ‘Fleetwood

4.2 RELEASES TO WATERS Link to previous years emissions data | PRTR# : P0244 | Facility Name : FSW Coatings Limited | Filename : P0244_2011.xls | Return Year : 2011 | 28/05/2012 16:32

8 8 16 16 24 28 6 6 6 6 6 6 28

SECTION A : SECTOR SPECIFIC PRTR POLLUTANTS Data on ambient monitoring of storm/surface water or groundwater, conducted as part of your licence requirements, should NOT be submitted under AER / PRTR Reporting as this only concerns Releases from your facility

Please enter all quantities in this section in KGs

QUANTITY

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year

0.0 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION B : REMAINING PRTR POLLUTANTS

Please enter all quantities in this section in KGs

QUANTITY

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year

0.0 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION C : REMAINING POLLUTANT EMISSIONS (as required in your Licence)

Please enter all quantities in this section in KGs

QUANTITY

Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year

303 BOD E OTH

Calculated by reference to

monthly grab samples

averaged and extroplated

for total effluent emmited

for the year 56.9 56.9 0.0 0.0

306 COD E OTH

Calculated by reference to

monthly grab samples

averaged and extroplated

for total effluent emmited

for the year 103.52 103.52 0.0 0.0

351 Total Organic Carbon (as C) E OTH

Calculated by reference to

monthly grab samples

averaged and extroplated

for total effluent emmited

for the year 202.77 202.77 0.0 0.0

237 Volatile organic compounds (as TOC) E OTH

Calculated by reference to

monthly grab samples

averaged and extroplated

for total effluent emmited

for the year 3.08 3.08 0.0 0.0

206 Benzene & toluene & xylene (combined) E OTH

Calculated by reference to

monthly grab samples

averaged and extroplated

for total effluent emmited

for the year 2.17 2.17 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

RELEASES TO WATERS

Method Used

RELEASES TO WATERS

RELEASES TO WATERS

Method Used

POLLUTANT

Method Used

POLLUTANT

POLLUTANT

Page 20: Annual Environmental Report 2011Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012 4 1.1 FSW Coatings Environmental Policy FSW Coatings Ltd trading as ‘Fleetwood

4.3 RELEASES TO WASTEWATER OR SEWER Link to previous years emissions data | PRTR# : P0244 | Facility Name : FSW Coatings Limited | Filename : P0244_2011.xls | Return Year : 2011 | 28/05/2012 16:32

8 8 16 16 6 6 6 6

SECTION A : PRTR POLLUTANTS

Please enter all quantities in this section in KGs

QUANTITY

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year

0.0 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION B : REMAINING POLLUTANT EMISSIONS (as required in your Licence)

Please enter all quantities in this section in KGs

QUANTITY

Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year

0.0 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

OFFSITE TRANSFER OF POLLUTANTS DESTINED FOR WASTE-WATER TREATMENT OR SEWER

OFFSITE TRANSFER OF POLLUTANTS DESTINED FOR WASTE-WATER TREATMENT OR SEWER

Method Used

Method Used

POLLUTANT METHOD

POLLUTANT METHOD

Page 21: Annual Environmental Report 2011Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012 4 1.1 FSW Coatings Environmental Policy FSW Coatings Ltd trading as ‘Fleetwood

4.4 RELEASES TO LAND Link to previous years emissions data | PRTR# : P0244 | Facility Name : FSW Coatings Limited | Filename : P0244_2011.xls | Return Year : 2011 | 28/05/2012 16:32

8 8 16 16 6 6 6 6

SECTION A : PRTR POLLUTANTS

Please enter all quantities in this section in KGs

QUANTITY

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year

0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION B : REMAINING POLLUTANT EMISSIONS (as required in your Licence)

Please enter all quantities in this section in KGs

QUANTITY

Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year

0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

POLLUTANT METHOD

Method Used

RELEASES TO LAND

RELEASES TO LAND

POLLUTANT METHOD

Method Used

Page 22: Annual Environmental Report 2011Annual Environmental Report 2011 FSW Coatings Ltd Published March 2012 4 1.1 FSW Coatings Environmental Policy FSW Coatings Ltd trading as ‘Fleetwood

5. ONSITE TREATMENT & OFFSITE TRANSFERS OF WASTE | PRTR# : P0244 | Facility Name : FSW Coatings Limited | Filename : P0244_2011.xls | Return Year : 2011 | 28/05/2012 16:32

5 14 Please enter all quantities on this sheet in Tonnes 0

Quantity

(Tonnes per

Year)

Haz Waste : Name and

Licence/Permit No of Next

Destination Facility Non

Haz Waste: Name and

Licence/Permit No of

Recover/Disposer

Haz Waste : Address of Next

Destination Facility

Non Haz Waste: Address of

Recover/Disposer

Name and License / Permit No. and

Address of Final Recoverer /

Disposer (HAZARDOUS WASTE

ONLY)

Actual Address of Final Destination

i.e. Final Recovery / Disposal Site

(HAZARDOUS WASTE ONLY)

Transfer Destination

European Waste

Code Hazardous Quantity T/Year Description of Waste

Waste

Treatment

Operation M/C/E Method Used

Location of

Treatment Name and Licence / Permit No. of Recoverer / Disposer / Broker Address of Recoverer / Disposer / Broker Name and Address of Final Destination i.e. Final Recovery / Disposal Site (HAZARDOUS WASTE ONLY) Licence / Permit No. of Final Destination i.e. Final Recovery / Disposal Site (HAZARDOUS WASTE ONLY)

To Other Countries 08 01 11 Yes 10.775

waste paint and varnish containing organic

solvents or other dangerous substances R1 M Weighed Abroad Indaver Ireland Ltd.,WP 36/2

4 Haddington Terrace,Dun

Laoghaire,Co. Dublin,

,Ireland

Afvalstoffen Terminal

Moerdijk

BV,821780,Vlasweg 12,

,Moerdijk,4782

PW,Netherlands

Afvalstoffen Terminal

Moerdijk BV, ,Moerdijk,4782

PW,Netherlands

To Other Countries 13 08 99 Yes 0.193 wastes not otherwise specified D10 M Weighed Abroad Indaver Ireland Ltd.,WP 36/2

4 Haddington Terrace,Dun

Laoghaire,Co. Dublin,

,Ireland

AVG Abfall-Verwertungs-

Gesellschaft mbH,IB

2234/AVG-GENB-

2,Borsigstraße

2,22113,Hamburg,22113,Ge

rmany

Borsigstraße

2,22113,Hamburg,22113,Ge

rmany

To Other Countries 15 02 02 Yes 0.284

absorbents, filter materials (including oil

filters not otherwise specified), wiping

cloths, protective clothing contaminated by

dangerous substances R1 M Weighed Abroad Indaver Ireland Ltd.,WP 36/2

4 Haddington Terrace,Dun

Laoghaire,Co. Dublin,

,Ireland

Afvalstoffen Terminal

Moerdijk

BV,821780,Vlasweg 12,

,Moerdijk,4782

PW,Netherlands

Afvalstoffen Terminal

Moerdijk BV, ,Moerdijk,4782

PW,Netherlands

To Other Countries 15 01 10 Yes 3.686

packaging containing residues of or

contaminated by dangerous substances R1 M Weighed Abroad Indaver Ireland Ltd.,WP 36/2

4 Haddington Terrace,Dun

Laoghaire,Co. Dublin,

,Ireland

Afvalstoffen Terminal

Moerdijk

BV,821780,Vlasweg 12,

,Moerdijk,4782

PW,Netherlands

Afvalstoffen Terminal

Moerdijk BV, ,Moerdijk,4782

PW,Netherlands

Within the Country 20 01 21 Yes 0.4

fluorescent tubes and other mercury-

containing waste R13 M Weighed Offsite in Ireland Eco Safe systems,54-2

Unit 1A,Allied Industrial

Estate,Kylemore

Road,Dublin 10,Ireland

Irish Lamp Recycling,WFP-

KE-08-0348-01,Woodstock

Industrial Estate,Kilkenny

Road,Athy,Co.

Kildare,Ireland

Woodstock Industrial

Estate,Kilkenny

Road,Athy,Co.

Kildare,Ireland

Within the Country 20 03 01 No 91.6 mixed municipal waste D1 M Weighed Onsite of generation

Cavan Waste Disposal,W/L

207/1

Killygarry Industrial Park,

,Cavan Town, ,Ireland

Within the Country 15 01 02 No 9.29 plastic packaging R3 M Weighed Offsite in Ireland

Cavan Waste Disposal,W/L

207/1

Killygarry Industrial Park,

,Cavan Town, ,Ireland

Within the Country 15 01 05 No 5.16 composite packaging R4 M Weighed Offsite in Ireland

Rialta Environmental Ireland

Limited,W0192-03

Block402 ,Grant's Drive

,Greenogue Business

Park,Rathcoole

Dublin,Ireland

Within the Country 17 04 07 No 24.28 mixed metals R11 M Weighed Offsite in Ireland

Felix Gormley

,WCP/MH/2001/76c

WP/07/15

Monery,Crossdoney,Co.

Cavan,.,Ireland

Within the Country 20 01 39 No 2.0 plastics R3 M Weighed Offsite in Ireland

The Shabra Group,WCP

MH/2001/68C

Killycard Industrial

Estate,Bree,Castleblaney,C

o Monaghan,Ireland

* Select a row by double-clicking the Description of Waste then click the delete button

Link to previous years waste data

Link to previous years waste summary data & percentage change

Method Used