annual envir onmen ta l management report · mental man this company l ... .3 reha.4 reha...
TRANSCRIPT
A
M
ANNMA
MUSWE
NUALANA
ELLBRO
2L ENAGEM
OOK CO
2015NVIRMEN
OAL CO
5 RONMNT R
MPAN
MENEPO
Y
NTAORT
AL
2015 An
MUSWELL
nnual Environ
LBROOK COAL
nmental Man
This
L COMPANY L
nagement Re
page has b
IMITED
eport
een left blaank intentionnally.
i
2015 An
Name o Name o
Titles/M
MOP CoMOP Co AEMR CAEMR E Reporti Title: Signatu
Date:
MUSWELL
nnual Environ
of Leasehold
of Mine: Mining Leas
ommencemompletion D
CommencemEnd Date:
ng Officer:
re:
LBROOK COAL
nmental Man
der:
es:
ment Date: Date:
ment Date:
L COMPANY L
nagement Re
IMITED
eport
Muswe
Muswe
ConsoliMiningMining
31 Mar31 Dece
1 Janua31 Dece
Julie Th
Environ
ellbrook Coa
ellbrook Coa
idated Coalg Lease 1304g Lease 1562
rch 2015 ember 2020
ary 2015 ember 2015
homas
nmental Co
al Company
al
l Lease 713 4 2
0
5
ordinator
y Limited
i
2015 An
MUSWELL
nnual Environ
LBROOK COAL
nmental Man
This
L COMPANY L
nagement Re
page has b
IMITED
eport
een left blaank intentionnally.
i
2015 An
1.0 I
1.1
1.2
1.2
1.3
1.4
1.5
1.5
1.5
2.0 A
2.1
2.2
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.9
2.9
2.9
2.10
2.1
2.1
2.1
2.11
3.0 E
3.1
3.2
3.2
3.2
MUSWELL
nnual Environ
NTRODUCTI
STRUCTUR
CONSENTS
.1 Chang
MINE CON
ACTIONS R
COMPLIAN
.1 Repo
.2 Comp
ACTIVITIES D
EXPLORAT
LAND PREP
.1 Topso
CONSTRUC
MINING ...
MINERAL P
WASTE MA
PRODUCT
PRODUCTI
HAZARDO
.1 Fuel S
.2 Chem
.3 Explo
WATER MA
0.1 Wate
0.2 Groun
0.3 Wate
OTHER INF
ENVIRONME
ENVIRONM
METEORO
.1 Wind
.2 Rainf
LBROOK COAL
nmental Man
ON ..............
RE OF THIS R
S, LEASES AN
ges to Appro
NTACTS ........
REQUIRED FR
NCE STATUS
rtable Incide
pliance Audit
DURING THE
TION ............
PARATION ..
oil Managem
CTION .........
....................
PROCESSING
ANAGEMENT
COAL AND T
ION SUMMA
US MATERIA
Storage .......
mAlert System
osives ...........
ANAGEMENT
er Storage ....
nd Water Ex
er Balance ....
FRASTRUCTU
NTAL MANA
MENTAL MA
OLOGICAL .....
Speed and D
all ...............
L COMPANY L
nagement Re
TABLE
....................
EPORT .........
ND LICENCES
ovals ............
....................
ROM PREVIO
....................
ents ..............
ts .................
REPORTING
....................
....................
ment .............
....................
....................
G ...................
T ..................
TRANSPORT .
ARY ...............
ALS MANAGE
....................
m ..................
....................
T ..................
....................
traction .......
....................
URE MANAG
AGEMENT AN
NAGEMENT .
....................
Direction .....
....................
IMITED
eport
E OF CONT
....................
....................
...................
....................
....................
OUS AEMR RE
....................
....................
....................
PERIOD .......
....................
....................
....................
....................
....................
....................
....................
....................
....................
EMENT .........
....................
....................
....................
....................
....................
....................
....................
EMENT .......
ND PERFORM
....................
....................
....................
....................
TENTS
....................
....................
....................
....................
....................
EVIEW .........
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
MANCE .........
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
i
............ 1
............ 1
............ 1
............ 3
............ 3
............ 4
............ 6
............ 6
............ 6
............ 8
............ 8
............ 8
............ 8
............ 8
............ 8
.......... 11
.......... 11
.......... 12
.......... 12
.......... 12
.......... 12
.......... 12
.......... 12
.......... 13
.......... 13
.......... 14
.......... 14
.......... 14
.......... 15
.......... 15
.......... 15
.......... 17
.......... 18
2015 An
3.2
3.2
3.3
3.3
3.3
3.3
3.4
3.5
3.5
3.5
3.5
3.6
3.6
3.6
3.6
3.7
3.7
3.7
3.7
3.8
3.9
3.9
3.9
3.9
3.10
3.1
3.1
3.11
3.1
3.1
3.1
3.12
3.1
3.1
MUSWELL
nnual Environ
.3 Temp
.4 Inver
AIR QUALI
.1 Activi
.2 Air Q
.3 Activi
GREENHO
EROSION A
.1 Activi
.2 Erosio
.3 Activi
SURFACE W
6.1 Activi
6.2 Surfa
6.3 Activi
GROUNDW
.1 Activi
.2 Groun
.1 Activi
CONTAMIN
FLORA AN
.1 Activi
.2 Flora
.3 Activi
WEEDS AN
0.1 Activi
0.2 Activi
BLASTING
1.1 Activi
1.2 Blast
1.1 Activi
NOISE MA
2.1 Activi
2.2 Noise
LBROOK COAL
nmental Man
perature ......
sion Monito
TY MANAGE
ities this Rep
uality Monit
ities Next Re
USE GAS .....
AND SEDIME
ities this Rep
on and Sedim
ities next Re
WATER MAN
ities this Rep
ce Water Mo
ities next Re
WATER MAN
ities this Rep
ndwater Mo
ities next Re
NATED LAND
D FAUNA MA
ities this Rep
and Fauna M
ities next Re
ND FERAL AN
ities this Rep
ities next Re
...................
ities this Rep
Monitoring
ities next Re
ANAGEMENT
ities this Rep
e Monitoring
L COMPANY L
nagement Re
....................
ring .............
EMENT .........
porting Perio
oring ...........
eporting Peri
....................
ENT CONTRO
porting Perio
ment Contro
porting Perio
NAGEMENT ..
porting Perio
onitoring .....
porting Perio
AGEMENT ...
porting Perio
nitoring .......
porting Perio
D ..................
ANAGEMENT
porting Perio
Monitoring...
porting Perio
NIMALS .........
porting Perio
porting Perio
....................
porting Perio
....................
porting Perio
....................
porting Perio
g ...................
IMITED
eport
....................
....................
....................
od .................
....................
od ...............
....................
OL .................
od .................
l Monitoring
od ...............
....................
od .................
....................
od ...............
....................
od .................
....................
od ...............
....................
T .................
od .................
....................
od ...............
....................
od .................
od ...............
....................
od .................
....................
od ...............
....................
od .................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
g ...................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
ii
.......... 19
.......... 22
.......... 24
.......... 24
.......... 25
.......... 39
.......... 39
.......... 39
.......... 39
.......... 40
.......... 40
.......... 40
.......... 40
.......... 41
.......... 51
.......... 51
.......... 51
.......... 52
.......... 63
.......... 63
.......... 66
.......... 66
.......... 66
.......... 66
.......... 66
.......... 66
.......... 71
.......... 71
.......... 71
.......... 72
.......... 73
.......... 78
.......... 78
.......... 78
2015 An
3.1
3.13
3.14
3.1
3.1
3.15
3.1
3.1
3.16
3.1
3.1
3.17
3.1
3.1
3.18
3.19
3.20
3.21
4.0 C
4.1
4.2
4.3
5.0 R
5.1
5.2
5.2
5.2
5.2
5.2
5.3
5.3
5.4
5.4
5.4
MUSWELL
nnual Environ
2.1 Activi
VISUAL, ST
ABORIGIN
4.1 Activi
4.2 Activi
EUROPEAN
5.1 Activi
5.1 Activi
SPONTANE
6.1 Activi
6.2 Activi
BUSHFIRE.
7.1 Activi
7.2 Activi
HYDROCA
METHANE
PUBLIC SA
OTHER ISS
COMMUNITY
ENVIRONM
COMMUN
COMMUN
REHABILITAT
BUILDINGS
REHABILIT
.1 Reha
.2 Speci
.3 Reha
.4 Reha
REHABILIT
.1 Site S
FLORA MO
4.1 Perm
4.2 Full F
LBROOK COAL
nmental Man
ities next Re
TRAY LIGHT .
AL HERITAG
ities this Rep
ities next Re
N HERITAGE
ities this Rep
ities next Re
EOUS COMB
ities this Rep
ities next Re
....................
ities this Rep
ities this Rep
RBON CONT
DRAINAGE/
AFETY ...........
SUES AND RIS
Y RELATIONS
MENTAL COM
ITY LIAISON,
ITY CONSUL
TION ............
S ..................
TATION OF D
bilitation Pro
es Selection
bilitation Act
bilitation Act
TATION MON
Selection ......
ONITORING M
anent Monit
loristic and S
L COMPANY L
nagement Re
porting Perio
....................
E ..................
porting Perio
porting Perio
....................
porting Perio
porting Perio
USTION .......
porting Perio
porting Perio
....................
porting Perio
porting Perio
AMINATION
/VENTILATIO
....................
SKS ..............
S ...................
MPLAINTS ....
, SPONSORSH
TATIVE COM
....................
....................
ISTURBED LA
ocess ............
....................
tivities this R
tivities next
NITORING .....
....................
METHODOLO
toring Transe
Structure .....
IMITED
eport
od ...............
....................
....................
od .................
od ...............
....................
od .................
od ...............
....................
od .................
od ...............
....................
od .................
od .................
...................
ON ................
....................
....................
....................
....................
HIPS AND DO
MMITTEE ......
....................
....................
ANDS ...........
....................
....................
Reporting Pe
Reporting Pe
....................
....................
OGY .............
ects/Plots ...
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
ONATIONS ...
....................
....................
....................
....................
....................
....................
riod .............
eriod ............
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
iii
.......... 79
.......... 85
.......... 85
.......... 85
.......... 86
.......... 86
.......... 86
.......... 86
.......... 86
.......... 86
.......... 88
.......... 88
.......... 88
.......... 89
.......... 89
.......... 89
.......... 90
.......... 90
.......... 91
.......... 91
.......... 94
.......... 94
.......... 95
.......... 95
.......... 95
.......... 95
.......... 95
.......... 97
.......... 99
........ 101
........ 101
........ 104
........ 104
........ 104
2015 An
5.4
5.5
5.5
5.5
5.5
5.6
5.6
5.6
5.6
5.7
5.7
5.7
5.7
5.8
5.9
5.9
5.9
5.10
5.11
5.12
5.13
6.0 A
Table 1:
Table 2:
Table 3:
Table 4:
Table 5:
Table 6:
Table 7:
Table 8:
Table 9:
Table 10
Table 11
Table 12
Table 13
MUSWELL
nnual Environ
4.3 Biom
FLORA MO
.1 Speci
.2 Biom
.3 Comp
FAUNA MO
6.1 Remo
6.2 Bird C
6.3 Micro
FAUNA MO
.1 Remo
.2 Bird C
.3 Micro
SOIL MON
SOIL MON
.1 Wood
.2 Pastu
EROSION A
CARRYING
REHABILIT
FURTHER D
ACTIVITIES P
Consents, A
Mine Conta
Actions from
Mining Flee
Waste Strea
Production
Stored Wat
Groundwate
Site Water B
0: Rainfall Da
1: Temperatu
2: Control Pr
3: Control Pr
LBROOK COAL
nmental Man
etric Survey
ONITORING R
es Richness.
etric Data ...
parison to Co
ONITORING
ote Camera S
Census .........
ochiropteran
ONITORING
ote Camera S
Census .........
ochiropteran
ITORING ME
ITORING RES
dland Sites ..
ure Sites .......
AND LANDFO
G CAPACITY A
TATION TRIAL
DEVELOPME
ROPOSED IN
Authorisation
cts ..............
m AEMR Insp
et Utilised at
am Generatio
and Waste S
er ................
er Extraction
Balance .......
ata ...............
ure Data ......
ocedures for
ocedures for
L COMPANY L
nagement Re
....................
RESULTS .......
....................
....................
ompletion Cr
METHODOLO
Survey ..........
....................
n Bats ...........
RESULTS ......
Survey ..........
....................
n Bats ...........
ETHODOLOG
SULTS ..........
....................
....................
ORM STABILI
AND PASTUR
LS AND RESE
ENT OF THE F
N THE NEXT A
LISns and Licenc
....................
pections .......
MCC ............
on ................
Summary .....
....................
n ...................
....................
....................
....................
r Wind Blow
r Mining Gen
IMITED
eport
....................
....................
....................
....................
riteria ..........
OGY ............
....................
....................
....................
....................
....................
....................
....................
GY .................
....................
....................
....................
ITY ...............
RE CONDITIO
EARCH .........
FINAL REHAB
AEMR PERIO
ST OF TABces ...............
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
n Dust .........
nerated Dust
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
N .................
....................
BILITATION P
D .................
LES ....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
t Sources......
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
PLAN ............
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
iv
........ 105
........ 105
........ 105
........ 107
........ 108
........ 108
........ 108
........ 108
........ 109
........ 109
........ 109
........ 111
........ 111
........ 112
........ 113
........ 113
........ 116
........ 119
........ 122
........ 122
........ 123
........ 124
............ 2
............ 3
............ 4
............ 9
.......... 11
.......... 12
.......... 13
.......... 14
.......... 14
.......... 19
.......... 19
.......... 24
.......... 24
2015 An
Table 14
Table 15
Table 16
Table 17
Table 18
Table 19
Table 20
Table 21
Table 22
Table 23
Table 24
Table 25
Table 26
Table 27
Table 28
Table 29
Table 30
Table 31
Table 32
Table 33
Table 34
Table 35
Table 36
Table 37
Table 38
Table 39
Table 40
Table 41
Table 42
Table 43
Table 44
Table 45
Table 46
Table 47
Table 48
Table 49
Table 50
Table 51
Figure 1
Figure 2
Figure 3
Figure 4
MUSWELL
nnual Environ
4: Current St
5: Compariso
6: TSP Averag
7: Compariso
8: Real‐Time
9: Compariso
0: PM10 HVAS
1: Compariso
2: Surface W
3: Compariso
4: Compariso
5: Compariso
6: Groundwa
7: Compariso
8: Compariso
9: Compariso
0: Compariso
1: Sandy Cree
2: Priority We
3: Blast Crite
4: Blast Mon
5: Predicted
6: Noise Mon
7: Spontaneo
8: Historical S
9: Summary o
0: Recommen
1: Recommen
2: Compariso
3: Rehabilitat
4: Maintenan
5: Compariso
6: Data Gathe
7: Rehabilitat
8: Remote Ca
9: Bat Calls Id
0: Evidence o
1: Estimated
: Mining Act
: Environme
: Quarterly W
4: Rainfall Gra
LBROOK COAL
nmental Man
atus of Dust
on of Deposit
ges ..............
on of TSP Res
PM10 Averag
on of Real‐Tim
S Average ....
on of PM10 Re
ater Monito
on of pH Res
on of EC Resu
on of TSS Res
ater Monitor
on of Underg
on of Depth t
on of pH Res
on of EC Resu
ek Groundw
eed Control
ria ...............
itoring Netw
Noise Levels
nitoring Resu
ous Combust
Summary of
of Complaint
nded Specie
nded Specie
on of 2015 Re
tion Summa
nce Activities
on of Propos
ered for Flor
tion Site Com
amera Result
dentified at R
of Erosion at
Carrying Cap
tivities This R
ntal Monito
Windroses ...
aph..............
L COMPANY L
nagement Re
Gauges .......
tional Dust R
....................
sults .............
ges ...............
me PM10 Res
....................
esults ...........
ring Program
ults to Histor
ults to Histor
sults to Histo
ing Program
ground Work
to Historical
ults to Histor
ults to Histor
ater Monito
Actions for R
....................
work ..............
s ...................
ults ...............
tion Report S
Areas Affect
ts .................
s List for Nat
s List for Pas
ehabilitation
ry .................
s on Rehabili
ed 2016 Reh
ristic Assessm
mpletion Crit
ts .................
Remnant and
Rehabilitatio
pacity for Re
LISTReporting Pe
ring Location
....................
....................
IMITED
eport
....................
Results .........
....................
....................
....................
sults ............
....................
....................
m ..................
rical Results
rical Results .
orical Results
...................
king Results .
Results .......
rical Results
rical Results .
ring Trigger
Rehabilitatio
....................
....................
....................
....................
Summary .....
ted by Spont
....................
tive Vegetati
sture ............
n Against MO
....................
itated Land .
habilitation A
ment of the W
teria Target .
....................
d Rehabilitat
on Woodlan
emnant and R
T OF FIGUriod .............
ns ................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
s ...................
....................
....................
....................
....................
....................
Levels ..........
on Blocks ......
....................
....................
....................
....................
....................
taneous Com
....................
ion ...............
....................
OP Targets ....
....................
....................
Against MOP
Woodland Si
....................
....................
tion Woodla
d and Pastur
Regrowth Pa
URES ....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
mbustion ......
....................
....................
....................
....................
....................
....................
Targets ......
ites ..............
....................
....................
nd Sites .......
re Sites ........
asture Sites ..
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
v
.......... 25
.......... 26
.......... 29
.......... 29
.......... 33
.......... 33
.......... 34
.......... 34
.......... 40
.......... 41
.......... 42
.......... 44
.......... 51
.......... 52
.......... 57
.......... 57
.......... 57
.......... 62
.......... 68
.......... 72
.......... 72
.......... 79
.......... 80
.......... 87
.......... 88
.......... 91
.......... 95
.......... 96
.......... 97
.......... 98
.......... 99
.......... 99
........ 105
........ 108
........ 110
........ 112
........ 120
........ 122
.......... 10
.......... 16
.......... 18
.......... 20
2015 An
Figure 5
Figure 6
Figure 7
Figure 8
Figure 9
Figure 1
Figure 1
Figure 1
Figure 1
Figure 1
Figure 1
Figure 1
Figure 1
Figure 1
Figure 1
Figure 2
Figure 2
Figure 2
Figure 2
Figure 2
Figure 2
Figure 2
Figure 2
Figure 2
Figure 2
Figure 3
Figure 3
Figure 3
Figure 3
Figure 3
Figure 3
Figure 3
Figure 3
Figure 3
Figure 3
Figure 4
Figure 4
Figure 4
Figure 4
Figure 4
Figure 4
Figure 4
Figure 4
Figure 4
Figure 4
MUSWELL
nnual Environ
: Temperatu
: Temperatu
: Average De
: Deposition
: Site 1 TSP M
0: Site 2 TSP
1: Site 3 TSP
2: Site 1 PM
3: Site 2 PM
4: Site 3 PM
5: PM10 HVA
6: Monthly S
7: Monthly S
8: Monthly S
9: Quarterly
0: Quarterly
1: Quarterly
2: Location o
3: Water Lev
4: Water Qu
5: Water Lev
6: Sandy Cre
7: Sandy Cre
8: Sandy Cre
9: Sandy Cre
0: Sandy Cre
1: Weed Ma
2: Queen Str
3: School Bla
4: 99 Queen
5: Nisbet Bla
6: Complain
7: Complain
8: Proposed
9: Rehabilita
40: Rehabilita
41: Floristic P
42: Comparis
43: Comparis
44: Biometric
45: Comparis
46: Bird Speci
47: Number o
48: Comparis
49: Comparis
LBROOK COAL
nmental Man
ure Graph ....
ure Inversion
epositional D
al Dust Cont
Monitoring R
P Monitoring
P Monitoring
10 Results ....
10 Results ....
10 Results ....
AS Results ....
Surface Wate
Surface Wate
Surface Wate
y Surface Wa
y Surface Wa
y Surface Wa
of Alluvial La
vel for Unde
uality Data in
vel for Groun
eek Groundw
eek Water Q
eek Water Q
eek Groundw
eek Groundw
anagement P
reet Blast M
ast Monitori
n Street Blast
ast Monitorin
t Summary .
t History .....
Activities Ne
ation Monito
ation Monito
Plot Diagram
on of Averag
on of Averag
c Data Averag
on of Averag
ies Identified
of Common a
on of Soil pH
on of Soil Ele
L COMPANY L
nagement Re
....................
Graph ........
Dust Results .
tour Plot ......
Results .........
Results .......
Results .......
....................
....................
....................
....................
er Monitorin
er Results –
er Results – T
ter Results –
ter Monitori
ter Monitori
and Compare
rground Wo
Undergroun
ndwater Mon
water Depth .
uality – pH...
uality – Elect
water Monito
water Level C
Priority Actio
onitoring Re
ng Results ...
t Monitoring
ng Results ....
....................
....................
ext Reportin
oring Program
oring Program
....................
ge Native Spe
ge Number o
ges ...............
ge Fauna Spe
d at Remnan
and Threaten
H ...................
ectrical Cond
IMITED
eport
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
ng Results – p
Electrical Co
Total Suspen
– pH .............
ing Results –
ing Results –
ed to Mine W
rkings ..........
nd Workings
nitoring on S
....................
....................
trical Conduc
oring Netwo
Catenary Tra
ns ...............
esults ...........
....................
g Results ......
....................
....................
....................
g Period ......
m – Flora Sit
m – Fauna Si
....................
ecies Richne
of Weed Spe
....................
ecies Richnes
t and Rehab
ned Bat Spec
....................
ductivity ......
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
pH ................
nductivity ...
nded Solids ..
....................
– Electrical Co
– Total Suspe
Workings ......
....................
s ...................
Site ...............
....................
....................
ctivity ..........
rk, Sectional
nsect ...........
....................
....................
....................
....................
....................
....................
....................
....................
es ................
tes ...............
....................
ess ................
cies ..............
....................
ss .................
bilitation Site
cies Recorde
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
onductivity ..
ended Solids
....................
....................
....................
....................
....................
....................
....................
Plan ...........
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
s .................
d at Woodla
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
...................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
and Sites .....
....................
....................
vi
.......... 21
.......... 23
.......... 27
.......... 28
.......... 30
.......... 31
.......... 32
.......... 35
.......... 36
.......... 37
.......... 38
.......... 45
.......... 46
.......... 47
.......... 48
.......... 49
.......... 50
.......... 53
.......... 54
.......... 55
.......... 56
.......... 59
.......... 60
.......... 61
.......... 64
.......... 65
.......... 70
.......... 74
.......... 75
.......... 76
.......... 77
.......... 92
.......... 93
........ 100
........ 102
........ 103
........ 104
........ 106
........ 107
........ 107
........ 110
........ 111
........ 112
........ 113
........ 113
2015 An
Figure 5
Figure 5
Figure 5
Figure 5
Figure 5
Figure 5
Figure 5
Figure 5
Figure 5
Figure 5
Figure 6
Figure 6
Append
Append
Append
Append
Append
MUSWELL
nnual Environ
0: Comparis
1: Comparis
2: Comparis
3: Comparis
4: Comparis
5: Comparis
6: Comparis
7: Comparis
8: Comparis
9: Comparis
0: Comparis
1: Comparis
ix 1: Summa
ix 2: Air Qua
ix 3: Water M
ix 4: Blast M
ix 5: Compla
LBROOK COAL
nmental Man
on of Soil Po
on of Soil Su
on of Soil Nit
on of Soil Nit
on of Soil Or
on of Soil pH
on of Soil Ele
on of Soil Po
on of Soil Su
on of Soil Nit
on of Soil Nit
on of Soil Or
ry of Indepe
lity Monitor
Monitoring R
onitoring Da
ints Summar
L COMPANY L
nagement Re
otassium ......
lphur ...........
trite + Nitrat
trogen .........
rganic Matte
H – Pasture ..
ectrical Cond
otassium – Pa
lphur – Past
trite + Nitrat
trogen – Pas
rganic Matte
LIST Ondent Comp
ing Results
Results
ata
ry
IMITED
eport
....................
....................
te.................
....................
er – Woodlan
....................
ductivity – Pa
asture .........
ture ..............
te (mg/kg) –
sture ............
er – Pasture .
OF APPENpliance Audit
....................
....................
....................
....................
nd .................
....................
asture ..........
....................
....................
Pasture .......
....................
....................
DICES t
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
vii
........ 114
........ 114
........ 115
........ 115
........ 116
........ 116
........ 117
........ 117
........ 118
........ 118
........ 119
........ 119
2015 An
DEFINIT
ACHMP
AEMR
APS
BAM
BL
BMP
BVMP
BOM
CCC
CCL
CHPP
CPP
CSIRO
DA
DMP
DPI
DRE
EC
EEA
EIS
EL
EMP
EMS
EP&A
EPA
EPL
ESCP
FFMP
HVAS
INP
LFA
LGA
LiMP
LMP
MCC
MIA
ML
MMS
MOP
MTPA
NATA
NMP
OC
OEH
MUSWELL
nnual Environ
TIONS
P Arc
An
Au
Bet
Bo
Bu
Bla
Bu
Co
Co
Co
Co
Co
De
Du
De
NS
Ele
Eas
Env
Exp
Env
Env
Env
NS
Env
Ero
Flo
Hig
Ind
Lan
Loc
Lig
Lan
Mu
Mi
Mi
Me
Mi
Mi
Na
No
Op
Off
LBROOK COAL
nmental Man
chaeology a
nual Enviro
tomatic Pos
ta Attenuat
re Licence
shfire Mana
ast‐Vibratio
reau of Me
mmunity Co
nsolidated
al Handling
al Preparat
mmonweal
velopment
st Managem
partment o
W Trade &
ectrical Cond
stern Empla
vironmenta
ploration Le
vironmenta
vironmenta
vironmenta
W Environm
vironment
osion and Se
ora and Fau
gh Volume A
dustrial Nois
ndscape Fun
cal Governm
ghting Mana
nd Manage
uswellbrook
ne Infrastru
ning Lease
eteorologica
ning Opera
llion Tonne
tional Asso
oise Manage
pen Cut
fice of Envir
L COMPANY L
nagement Re
and Cultura
onmental M
sitioning Sy
tion Mass M
agement Pl
n Managem
teorology
onsultative
Coal Lease
and Prepar
ion Plant
th Scientific
Application
ment Plan
of Primary In
Investment
ductivity
acement Ar
al Impact St
ease
al Managem
al Managem
al Planning a
ment Protec
Protection L
ediment Co
na Manage
Air Sampler
se Policy
nction Anal
ment Area
agement Pla
ment Plan
k Coal Comp
ucture Area
or Megalitr
al Monitorin
tions Plan
s per Annum
ciation of T
ement Plan
ronment an
IMITED
eport
l Heritage M
Management
ystem
Monitor
an
ment Plan
Committee
ration Plant
c and Indus
n
ndustries
t ‐ Division
rea
atement
ment Plan
ment Strateg
and Assessm
ction Autho
Licence
ontrol Plan
ment Plan
r
ysis
an
pany
a
re
ng Stations
m
Testing Auth
nd Heritage
Managemen
t Report
e
t
strial Resear
of Resource
gy
ment Act 19
ority
horities
nt Plan
rch Organisa
es and Ener
979
ation
rgy
viii
2015 An
OGM
PM
POEO
PRP
RL
RLPB
ROM
RTEMS
SGMP
SWMP
TEOM
TPH
TSP
TSS
VAMP
WMP
MUSWELL
nnual Environ
Org
Par
Pro
Po
Re
Ru
Ru
Re
Sur
Site
Tap
To
Tot
Tot
Vis
Wa
LBROOK COAL
nmental Man
ganic Grow
rticulate Ma
otection of
llution Redu
lative Level
ral Lands Pr
n of Mine
al Time Env
rface and G
e Water Ma
pered Elem
nnes per Ho
tal Suspend
tal Suspend
sual Amenit
aste Manag
L COMPANY L
nagement Re
th Medium
atter
the Environ
uction Prog
rotection Bo
vironmental
Groundwate
anagement
ent Oscillat
our
ded Particul
ded Solids
ty Managem
gement Plan
IMITED
eport
m
nment Oper
gram
oard
l Monitorin
er Monitorin
Plan
ting Microb
ates
ment Plan
n
rations Act
g System
ng Plan
alance
1997
ix
2015 An
1.0 IMusweCompanunderglocatedMuswe On 1 MusweOpen Cto 2,000the relo
1.1 STThe strPreparaResourcthe repConditiolicences This Anenviron2015 (h In accoto:
Mus
Divi
Env
Offi
Nat
Dep
MCC A copy https://reports
1.2 CMCC oconsenton seve
MUSWELL
nnual Environ
NTRODUCllbrook Coany Ltd. Groround coal on Muscllbrook.
Septemberllbrook Shiut Extensio0,000 tonneocation of th
TRUCTUREructure of ation of Aces, Documporting reqon 9.2. Ths and minin
nnual Environmental maherein refer
rdance wit
swellbrook
sion of Res
ironment P
ce of Enviro
ional Parks
partment of
C Communi
of the repo/idemitsu.co/environme
ONSENTS,perates unt is DA 205eral occasio
LBROOK COAL
nmental Man
CTION al Companyoup. MCC hmining comcle Creek
r 2003, Dre Council on commences coal per he Mine Inf
E OF THIS Rthis repor
Annual Envment No. EDquirements his report ag leases.
onmental Mnagement ared to as th
h the Deve
Shire Coun
ources and
Protection A
onment and
and Wildlif
f Primary In
ity Consulta
ort is also avom.au/opeental‐report
, LEASES Ader a num/2002, whins with the
L COMPANY L
nagement Re
y (MCC) is as a long a
mmencing inRoad, app
Developmen(MSC) to eced operatiannum. Thifrastructure
REPORT rt is basedironmentalDG03 MREMstipulated
also incorpo
Managemenand performhe ‘reporting
lopment Co
cil (MSC);
Energy (DR
Authority (E
d Heritage (
fe Service (N
dustries – W
ative Comm
vailable on Mrations/muting/
ND LICENCmber of devch was applatest mod
IMITED
eport
a wholly oassociation n 1907 and proximately
nt Consentextend the ons in Marcis approval e Area (MIA
d on the d ManagemMP Guide Vd in the Morates the
nt Report (Amance at Mg period’).
onsent, cop
RE);
PA);
(OEH);
NPWS);
Water (DPI‐
mittee (CCC)
MCC’s websswellbrook
CES velopment proved by Mdification be
owned subswith coal mopen cut oy 3 kilom
t for DA former MCch 2005 andhas subseq
A) and to ext
document ment RepoV3 dated JaMCC Develoreporting r
AEMR) provMCC from 1
pies of this
Water); and
.
site ‐coal/appro
consents isMSC in 2003eing approv
sidiary of thmining at Mperations inetres to t
205/2002 CC No.1 Opd has a capauently beentend the mi
“Guidelinesrt”, Departanuary 2006opment Corequiremen
vides a sumJanuary 201
AEMR will
d
ovals‐plans‐
ssued by M3. This DA ed in 2013.
he IdemitsMuswellbroon 1944. Thethe north‐
was granpen Cut. Tacity to pron modified ine life to 2
s and Fortment of 6 and incoronsent, spents in MCC’
mmary of ac15 to 31 De
be made a
‐and‐
MSC. The has been m
1
u Kosan ok, with e mine is ‐east of
nted by he No.1 oduce up to allow 020.
mat for Mineral rporates ecifically ’s water
ctivities, ecember
available
primary modified
2015 An
Mining Lease 1 In addit
EnvEnv
WatPart
Relevan
Approva
DA 205/(MSC)
DA 205/(MSC) – AmendmConditio
DA 205/(MSC) Amendm1.1 and
DA 205/(MSC) Amendm11.1
DA 205/(MSC) Amendm1.1(a), 345 and 5
DA 205/(MSC) Amendm1.1, 1.2 &and addconditio60.
ConsolidLease 71
MUSWELL
nnual Environ
activities a1562 and M
tion to the a
ironmentalironment O
ter Licencet 5 of the W
nt consents,
al
/2002
/2002
ment to on 1.1
/2002
ment to 11.3
/2002
ment to
/2002
ment to 31, 33, 39, 58.
/2002
ment to & 6.3.2 itional ons 59 &
dated Coal 13
LBROOK COAL
nmental Man
t MCC are ining Lease
above appro
ProtectioOperations A
s 20BL1690Water Act 19
, authorisat
Table 1Description
Approval foNo.1 Open C
Power line radditions to
Relocate offworkshop a
Extension o
Revision to InfrastructuRequiremenRehabilitatipermit the cmining operadditional 5
ModificatioContinuatioOperations Coal Mine f(5) Years‐ MCoal Road M
Mining Leas
L COMPANY L
nagement Re
carried out1304.
ovals MCC o
n Licence Act 1997.
014, 20BL16912.
tions and lic
1: Consents
r Extension oCut
relocation ano Workshop
fice buildingsnd bath‐hou
f mining into
Mining ure Building nts and on Plan Revicontinuationrations for an5 years.
n to Permit ton of Mining at Muswellbor an Additio
Multiple AllotMuswellbroo
se
IMITED
eport
t wholly wit
operates un
(EPL) 656
69037, 20B
cences are s
s, AuthorisaCA
of MCC MS
nd MS
s, use
MS
o Area C MS
ision to n of n
MS
the
brook onal Five tments‐ ok.
MS
DRE
thin Consoli
nder the fol
6 issued u
BL169038 a
summarised
ations and LConsent Authority
MuswellbrooShire Council
MuswellbrooShire Council
MuswellbrooShire Council
MuswellbrooShire Council
MuswellbrooShire Council
MuswellbrooShire Council
Division of Resources anEnergy
idated Coal
lowing licen
nder the
nd 20BL17
d in Table 1
Licences Date Grante
ok 1 Sep
ok 19 Dec
ok 13 July
ok 23 Dec
ok 29 Oct
ok 12 Dec
d 5 May
Lease 713,
nces:
Protection
0473 issue
1.
ed ExReDa
2003 1 S
c 2005 1 S
y 2009 1 S
c 2010 1 S
t 2013 1 S
c 2013 1 S
y 1990 24
2
, Mining
of the
d under
xpiry/ enewal ate
Sep 2020
Sep 2020
Sep 2020
Sep 2020
Sep 2020
Sep 2020
4 Nov 2024
2015 An
Approva
Mining L1304
Mining L1562
Mining L1513
EnvironmProtectiLicence
Water L20BL169
Water L20BL169
Water L20BL169
Water L20BL170
1.2.1 During period 2approvereportinmonito There w
1.3 MThe naenviron
Gra
Leo
Ro
War
Ju
MUSWELL
nnual Environ
al
Lease
Lease
Lease
mental on 656
icence 9014
icence 9037
icence 9038
icence 0473
Changes tothe reporti2015‐2020.ed by DRE ong year. Tring progra
were no oth
MINE CONTames and nmental ma
Name
ant Clouten
on Claassens
d Gallagher
rren Edward
lie Thomas
LBROOK COAL
nmental Man
Description
Mining Leas
Mining Leas
Mining Leas
Environmen
Water Licen
Water Licen
Water Licen
Water Licen
o Approvalsing period M This MOP on 31 MarchThis amendmm. These c
her changes
TACTS contacts onagement,
n Se
s Tech
r P
ds Hea
E(appo
L COMPANY L
nagement Re
se
se
se
ntal Licence
nce
nce
nce
nce
s MCC applieaddresses h 2015. Anment was tchanges wer
to approva
f site persplanning an
Table
Po
enior Opera
nical Servic
Production S
alth, Safety, Training Su
nvironmentointed Envi
IMITED
eport
CA
DRE
DRE
DRE
EPA
D
D
D
D
ed for a newmining and amendmento allow chre approved
als during th
sonnel respnd support
2: Mine Co
sition
ations Man
ces Superint
Superintend
Environmeuperintende
tal Coordinronmental
Consent Authority
Division of Resources anEnergy
Division of Resources anEnergy
Division of Resources anEnergy
EnvironmentProtection Authority
DPI‐Water
DPI‐Water
DPI‐Water
DPI‐Water
w Mining O closure actnt to this Mhanges to bd by DRE on
he reporting
ponsible fofunctions a
ontacts
ager
tendent
dent
ent and ent
ator Officer)
Date Grante
d 12 Jan
d 16 Feb
d 20 Ma
al 6 Dec
16 Jan
5 Apr
5 Apr
24 Aug
Operations Ptivities at M
MOP was appbe made ton 3 Novemb
g period.
or mining, are shown in
Cont
(02)
(02)
(02)
(02)
(02)
ed ExReDa
n 1993 24
b 2005 16
ar 2002 20
2000 Noap
n 2014 15
2014 5 A
2014 5 A
g 2015 24
Plan (MOP)MCC. This Mplied for duo the rehabber 2015.
rehabilitatn Table 2.
tact Numbe
6542 2300
6542 2300
6542 2300
6542 2300
6542 2300
3
xpiry/ enewal ate
4 Nov 2024
6 Feb 2026
0 Mar 2023
ot pplicable
5 Jan 2019
Apr 2019
Apr 2019
4 Aug 2016
) for the MOP was uring the bilitation
ion and
er
0
0
0
0
0
2015 An
1.4 AAn envi2014 Ainspectconducsite per14 July by MCC
No Iss
1. HyMdeprhy
2. M(Mre
3. RhM
4. W
5. Acm
6. To
MUSWELL
nnual Environ
ACTIONS REironmental EMR and toion was reted by DRErformance. 2015. The C are shown
sue/Observa
ydrocarbon anagement emonstrate trocess for maydrocarbon s
ine InfrastruMIA) – contameport
hodes Grass anagement
Weed Manage
cacia salignaanagement
opsoil manag
LBROOK COAL
nmental Man
EQUIRED Finspection o review sieceived on on 28 Apri Corresponactions fro
n in Table 3.
Tabation
Plan – the internal anaging spills
ucture Area minated soil
ement
a
gement
L COMPANY L
nagement Re
FROM PREVwas condute perform14 July 20il 2015 to rendence regam these ins.
ble 3: ActionDRE Actio
2013‐20
Provide DBioremedManagemthat incor
Legisl
Manarespo
Desig
Operainspec
Provide Dcontaminthe reloca
Provide dproposed Rhodes grpasture ar
Provide a managemundertake
Provide dmanagemthat it doeland use
Provide dmanagem
IMITED
eport
VIOUS AEMucted by DRance. Corr015. An aeview the Jarding actiospections a
ns from AEMon
014 AEMR In
DRE with a diation Area ment Plan forrporates:
ative review
agement protonsibilities
n and criteri
ating standarction regime
DRE with the ated soil repation of the M
etails of mea for the manrass in rehabreas
summary ofment that is ben
etails of proment of Acacies not impac
etails of topsment and mo
MR REVIEWRE on 8 Janurespondencdditional euly‐Decembons from thlong with h
MR Inspect
spection
r approval
w
tocol and
a
rds and e
port from MIA
asures nagement of bilitation
f weed being
posed ia saligna so ct on final
soil nitoring
W uary 2015 tce regardingnvironmentber 2014 AEis inspectioow they ha
ions Due Date
30 October 2015
30 October 2015
2015 AEMR
2015 AEMR
2015 AEMR
2015 AEMR
o review thg actions frtal inspectEMR and toon was receave been ad
e MCC Com
BioremedManagemPlan was submittedon 30 Oct2015. Modetail canfound in S3.18.
The contaminreport wasubmittedon 30 Oct2015.
More detbe found Section 3
More detbe found Section 3
More detbe found Section 3
More detbe found Section 2
4
he 2013‐rom this ion was o review eived on ddressed
mment
diation ment
d to DRE tober ore n be Section
nated soil as d to DRE tober
tails can in
3.10.
tails can in
3.10
tails can in
3.10.
tails can in
2.2.1.
2015 An
No Iss
1 ReMinsrilreNo
2a HyMhymdebio
2b HyMinsmththhy
MUSWELL
nnual Environ
sue/Observa
ehabilitationaintenance: spection eroling of the 20ehabilitation o.1 Dam 3 w
ydrocarbon anagement:ydrocarbon anagement ecommissionoremediatio
ydrocarbon anagement:spection hydaterial was oe bioremediat may haveydrocarbon c
LBROOK COAL
nmental Man
ation
during the
osion and 015 near North
was observed
plan for the ning the on area
during the drocarbon observed in iation area e high content
L COMPANY L
nagement Re
DRE Actio
2014
MCC to prdetailed rrehabilitaat Muswereport mufor the prreview theindustry bDRE encoremediatepracticablthe area tgrowth mWeed conoccur as acompletioflowering
DRE PreviBioremedPlan (BAMOctober 2The BAM
Legisl
Manarespo
Desig
Operainspec
MCC haveplan to deBioremedshould inc
A dec
Decom
Provide Danalysis, rwith the Bmanagemdepicted i
IMITED
eport
on
AEMR Inspe
rovide DRE wreport on thetion methodellbrook Coalust include juactices usedese practicebest practiceurages MCC e this area asle, including to ensure furmedia does nontrol of the aa priority to eon prior to ga.
iously requesdiation ManaMP) for appro2015. should incor
ative review
agement protonsibilities
n and criteri
ating standarction regimee indicated thecommissiondiation Area. corporate:
ommissionin
mmissioning
DRE with the reporting in aBAMP. Detament for the min Photo 10.
ection
with a e dology used l. This ustification and should s against e. to s soon as seeding of rther loss of ot occur. area should ensure alenia
sted a agement oval due 30
rporate:
w
tocol and
a
rds and e hat they n the The BAMP
ng plan
g criteria
laboratory accordance il the on‐sitematerial
Due Date
30 October 2015
30 October 2015
e
30 October 2015
e MCC Com
The revisRehabilitaProcedurprovided on 30 Oct2015. Modetail on rehabilitapractices found in S5.2.1.
BioremedManagemPlan was submittedon 30 Oct2015. Modetail canfound in S3.18.
The laboranalysis wprovided on 30 Oct2015. Thmaterial din Photo managedaccordanthe BioremedManagemPlan.
5
mment
ed ation e was to DRE tober ore
ation can be Section
diation ment
d to DRE tober ore n be Section
ratory was to DRE tober e depicted 10 was in ce with
diation ment
2015 An
No Iss
3 MSuMSeM
4 Co
5 RhM
6 W
7 Acm
8 To
1.5 C
1.5.1 During t
1.5.2 As per Caudit wconformprotectwith the Conditioindepenprocess The audother dcommitconformin this aconsent
MUSWELL
nnual Environ
sue/Observa
anagement urface Wateranagement ediment and anagement
ompletion Cr
hodes Grass anagement
Weed Manage
cacia salignaanagement
opsoil manag
OMPLIANC
Reportablethe reportin
ComplianceCondition 8
was conductmance wittion licencee last audit
on 9 in watndent audits assessed c
dit reviewedocuments tments wemances. 27 audit relate t document
LBROOK COAL
nmental Man
ation
Plans: r Plan and Erosion Plan
riteria
ement
a
gement
CE STATUS
e Incidents ng period th
e Audits 8.1 of Develted at MCC h the con and waterbeing cond
ter licencest also assesconformanc
d 27 approin a more gere assesseof the issuto the samts and mana
L COMPANY L
nagement Re
DRE Actio
Provide DSurface Wand SedimManagem
Report moperformacompletio
Provide dproposed Rhodes grpasture ar
Provide a managemundertake
Provide dmanagemthat it doedominate
Provide dmanagem
S
here were n
lopment Apduring the nsent condr licence coducted in 20
s 20BL1690ses conformce against th
vals and engeneral maned as part es were ade issue whiagement pla
IMITED
eport
on
DRE with copWater Managment and Eroment Plan
onitoring dance indicatoon criteria in
etails of mea for the manrass in rehabreas
summary ofment that is ben
etails of proment of Acacies not impace rehabilitatio
etails of topsment and mo
no reportab
pproval DA2reporting pditions aloonditions. 012.
037, 20BL16mance withhese requir
nvironmentnner, wherof the a
dministrativch, due to tans, raise th
ies of the gement Plan osion
ta against rs and the MOP
asures nagement of bilitation
f weed being
posed ia saligna so ct or on areas
soil nitoring
ble incidents
205/2002 aperiod. Theng with mThe audit
69038 and 2h the water ements.
al manageme relevant. udit. 42 e. Some of the duplicathe same no
Due Date
30 October 2015
2015 AEMR
2015 AEMR
2015 AEMR
2015 AEMR
2015 AEMR
s at MCC.
n independe audit wasmining leasis required
20BL170473licence con
ment documA total of 6issues resthe non‐cotion of comon‐conforma
e MCC Com
These managemplans werprovided on 25 Aug2015.
More infocan be foSection 5
More detbe found Section 3
More detbe found Section 3
More detbe found Section 3
More detbe found Section 2
dent environs required tse, enviro every thre
3 requires tnditions. Th
ments in de654 conditisulted in 5onformancemitments bance severa
6
mment
ment re to DRE gust
ormation und in 5.5.3.
tails can in
3.10.
tails can in
3.10.
tails can in
3.10.
tails can in
2.2.1.
nmental o assess nmental ee years
that the he audit
etail and ons and 53 non‐es noted between al times.
2015 An
A basic Extremewere 27High or The audaimed aaspects A full cohttps://reports A summ
MUSWELL
nnual Environ
risk assesse risk levels7 administrExtreme ris
dit report dat improvins of the sites
opy of the a/idemitsu.co/environme
mary of the
LBROOK COAL
nmental Man
sment was s identified.rative non‐csks were id
etails the ang environms operation
audit reportom.au/opeental‐report
findings of
L COMPANY L
nagement Re
conducted For the noconformancentified in t
reas found mental perf and enviro
t can be fourations/muting/
the audit is
IMITED
eport
for all nonn‐conformaces), there wthe audit.
not compliformance ionmental m
und on the Iswellbrook
s shown in A
n‐conformanances that wwere 11 Low
ant and mancluding a
management
demitsu we‐coal/appro
Appendix 1
nces with Lwere not adw, and 15 M
akes furtherreview of t.
ebsite at: ovals‐plans‐
.
Low/MediumdministrativMedium res
r recommenkey enviro
‐and‐
7
m/High/ ve (there sults. No
ndations nmental
2015 An
2.0 A
2.1 EXDuring Jholes wOpen Crehabilicommeapprove
2.2 LALand prvegetattopsoil
2.2.1 Previouin futuroperatiperiod stockpil
2.3 CDuring t
2.4 MAll minito occureportin The Oparea, unwas precontinuthroughCut 1. Tprevent Recent Anticlinroad anstrata isextracti
MUSWELL
nnual Environ
ACTIVITIES
XPLORATIOJune and Juwas used toCut 1 that hitated areaencing a Sued on 25 M
AND PREPreparation ition clearingstripping oc
Topsoil Mausly strippedre rehabilitons and aridentified tles. Weed c
ONSTRUCTthe reportin
MINING ing activitier 24 hours ng period is
pen Cut 1 mnderneath eviously exue north doh to the LodThis sequent oxygen ing
geological ne goes thrond coal prods ongoing aion of low r
LBROOK COAL
nmental Man
S DURING
ON uly 2015, M confirm thhad been di between urface Distay 2015.
ARATION is the proceg, topsoil stccurred.
anagement d topsoil is tation activre inspectethat the wcontrol will
TION ng period n
es this repoa day, seves shown in F
mining schethe old Infrxcluded froown throuder seam, wnce of miningress and m
mapping anough previoduct stockpnd will contratio coal w
L COMPANY L
nagement Re
G THE REP
CC drilled the coal quaisturbed forOpen Cut turbance N
ess of prepatripping and
stockpiled ities. The ed on a regweed controbe underta
o construct
rting periodn days a weFigure 1.
dule will corastructure m the mingh the seawith the finang allows fominimising a
nd interpretously backfile. To ensutinue on thehich otherw
IMITED
eport
PORTING P
three explorlity in the ar mining. T1 and OpeNotice (SDN
aring the land topsoil sto
in locationsstockpile lgular basis.ol activities aken during
tion activitie
d have occueek. The sta
ontinue witarea and w
ning area. Tam sequenal void locaor sealing oany chance o
tation has sfilled and dure highwale eastern hwise would
PERIOD
ration holesarea. One oThe other ten Cut 2. N) was sub
nd for openockpiling. D
s around thocations ar. Inspectioneed to b
g the next re
es occurred
urred in Opatus of min
thin the easwithin the MThe pit hasces as theated in the nof the northof spontane
shown thatisturbed arl stability, righwall of Obe left behi
s. The inforof the holeswo holes wPrior to thbmitted to
n cut miningDuring the r
e site for usre away froons throughbe undertakeporting pe
d.
en Cut 1 wing activitie
stern sectioMuswellbroos reached fey present north westehern undergeous combu
the axis ofreas of the removal of tOpen Cut 1. nd.
rmation fros was in anwere locateis drilling po DRE, wh
g. Activitiesreporting pe
se and will om currenthout the reken on theriod.
with operatioes at the en
on of the apok Anticlinefull width afrom the ern corner ground worustion.
f the Muswold mine ethe steeply This will al
8
m these n area in d in the program ich was
s include eriod no
be used t mining eporting e topsoil
ons able nd of the
pproved e, which and will Fleming of Open rkings to
ellbrook entrance dipping so allow
2015 An
Open CHeliers the remoperatiundertaLamber Mining and rele Mining dump t
Equipme
Excavato
Dump T
Front En
Blast Ho
Grader
Water C
Dozer
MUSWELL
nnual Environ
Cut 1 will coCollieries. maining unng experieaken followrt Geotech P
operationsevant appro
is achievedrucks. The c
ent
or
ruck
nd Loader
ole Drill
Cart
LBROOK COAL
nmental Man
ontinue to e Site basedderground ence gainewing recomP/L.
s at MCC arovals, lease
d through ocurrent flee
TaMode
HitachHydra
HitachHydra
Hitach
CAT 77
CAT 99
I.R. DM
CAT 16
Water70,000
CAT D
L COMPANY L
nagement Re
expose unded procedurepillar coald during mmendation
re undertaks and licenc
open cut meet used for m
able 4: Minil
hi EX3600 ulic Excavato
hi EX2600 ulic Excavato
hi 3500 (170 T
77C (85 Ton)
90H
ML45
6H Grader
r Cart (CAT 70 litre
10T
IMITED
eport
erground wes have beel. These pmining pros of a geo
ken in accoces.
ethods usinmining at M
ing Fleet UtNo
or 2
or 1
Ton) 8
) 3
1
1
2
777) 2
3
workings of ten developeprocedures ogress. Ootechnical s
rdance wit
ng excavatoMCC is provi
tilised at MWork A
Overburemova
Overburemova
Overburemova
Overbu
Coal st
Drillinginterbu
Surface
Dust su
Dumpsarea pr
the No. 2 Ued to alloware review
Open cut wstudy comp
h the Minin
rs, front‐ended in Table
CC Area
urden, interbal
urden, interbal
urden, interbal
urden, coal a
ockpile man
g for blastingurden and co
e preparatio
uppression, r
s, roads, coalreparation
Undergrounw safe extrawed to refwall designpleted for
ng Operatio
nd loaders ae 4.
burden and c
burden and c
burden and c
and rejects
nagement
g in overburdoal
n, road main
road mainte
l and overbu
9
d and St action of lect the ns were MCC by
ons Plan
and rear
coal
coal
coal
den,
ntenance
nance
urden
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
FFigure 1: Miningg Activities This Reporting Periood
1
10
2015 An
2.5 MMCC prcrushedby‐pass Coal fromining and harequire The CPPcoarse materiaDue toSpontan
2.6 WMCC opobjectivmanageIntegratincludesteel. reducinreportinThere w Table 5
January
February
March 2
April 201
May 201
June 201
July 201
August 2
Septemb
October
Novemb
Decemb
MUSWELL
nnual Environ
MINERAL Produces thed and washeses the CPP
om Open Cof the undes a capacitd’ basis.
P uses a beland fine real is quite do the amoneous Com
WASTE MAperate in acve of the We all wastested Waste s general wMCC continng the amoung period wwere no sign
5 shows the
Month
2015
y 2015
2015
15
15
15
5
2015
ber 2015
r 2015
ber 2015
ber 2015
LBROOK COAL
nmental Man
ROCESSINermal coal fed through directly to
Cut 1 requirerground roty of appro
lt press filteeject materdry and ablount of cabustion Ma
ANAGEMENccordance wWMP is to ms on site. DManagemewaste, cardbnue to sepaunt of wastwith the upnificant cha
amount of
TTota
L COMPANY L
nagement Re
G for both exCoal Prepathe product
res washingoadways. Toximately 2
er to treat thrial will be e to be hanarbonaceouanagement
NT with an appminimise thuring the rent Service tboard and parate and rte going to dated WMnges to the
waste that
Table 5: Waal Waste Rem
(tonnes)
106.42
88.90
94.29
128.45
113.64
98.62
111.73
96.91
97.93
113.87
95.79
98.38
IMITED
eport
port and doaration Plant stockpile.
g by the CPThe CPP use240 tonnes
he fines or ttrucked bandled in thus materialPlan (SCMP
proved Washe amount eporting peto manage paper recycrecycle wasthe local laP being impe WMP.
was remov
aste Streammoved
omestic mant (CPP) whi
PP as a resues a jig as ths per hour.
tailings comack to the e same ma, disposal P).
ste Manageof waste geriod MCC call waste stcling, co‐minste materiaandfill. Theplemented
ved from sit
m GeneratioTotal WastLandfill (ton
2.6
2.6
2.9
2.6
2.3
2.5
2.6
2.0
2.4
2.4
6.6
3.0
arkets. Highile low ash c
ult of dilutiohe main me. The CPP
mponent of open cuts nner as ovis in acco
ement Plan generated, continued ttreams genengled recycals when poWMP was on site on
te during th
n te to nnes)
P
h ash coal iscoal is crus
on associatethod of sepis used on
the coal feefor disposa
verburden mordance w
(WMP). Tand to respto maintainerated on scling, waste ossible, to revised du1 Decembe
he reporting
Percentage RRecycle
97.5%
97.1%
96.9%
98.0%
98.0%
97.5%
97.7%
97.9%
97.5%
97.9%
93.1%
96.9%
11
s mined, hed and
ted with paration n an ‘as
ed. Both al. This material. with the
he main ponsibly n a Total site. This oil, and assist in ring the er 2015.
g period.
Reused/ ed
%
%
%
%
%
%
%
%
%
%
%
%
2015 An
2.7 PProductstockpilCreek Rloading
2.8 PThe amo
Topsoil
Topsoil
Topsoil
Waste R
Open C
Underg
Total Co
Process
Open C
Underg
Total Pr
2.9 H
2.9.1 Diesel f105,000listed uWorkco
2.9.2 MCC usand syssystem transpooperatiintranetHealth a
2.9.3 MCC hawith all
MUSWELL
nnual Environ
RODUCT Ct coal is hles have a tRoad and thg. This coal i
RODUCTIOount of prod
Stripped (m
used/sprea
stockpiled
Rock (BCM)
ut ROM Co
ground ROM
oal (t)
sing Waste (
ut Product
ground Prod
roduct Coal
HAZARDOU
Fuel Storagfuel is store0L each. Thunder MCCover NSW.
ChemAlertse a web bastem usersis a chemi
ortation, usng procedut server. Auand Safety
Explosives as a licencel relevant le
LBROOK COAL
nmental Man
COAL AND hauled fromotal capacithe New Engs then trans
ON SUMMuction and a
Tab
m3)
ad (m3)
(m3)
)
al (t)
M Coal (t)
(t)
Coal (t)
duct Coal (t)
(t)
US MATERI
ge ed in three he tanks arC’s License
System ased ChemA can accesical hazard se and dispure for chemudits are unCommittee
e to supplyegislation u
L COMPANY L
nagement Re
TRANSPOm the prodty of 250,00land Highwsported to t
ARY associated w
le 6: Produc
At E
)
ALS MANA
Class C1 are located 5for Keepi
Alert systemss the datamanagemeposal of chmical selectndertaken w representa
and store under Licenc
IMITED
eport
RT duct bin by00 tonnes. Pway to the Rthe port of
waste generat
ction and W
nd of This RPeriod
0
7,765
34,057
7,004,9
1,705,93
0
1,705,93
277,76
1,428,17
0
1,428,17
AGEMENT
bove groun50m from ing Danger
m to managabase from ent tool thhemicals. Ation and uswith a focusatives.
explosives ce Number
y truck to Product coaRavensworthNewcastle.
ted by MCC i
Waste Summ
PRODU
Reporting d
7
16
30
30
60
70
70
nd, self bunany major rous Goods
ge chemicathe MCC at containsA Dangeroue can be res on safe ch
and explosr XSPL10000
the stockpal is truckedh Coal Term
is detailed in
mary
UCTION
EstimateRepor
1
2
7,7
1,6
1,6
1
1,4
1,4
nded tanks, buildings. Ts No. 35/0
l use at theintranet sits informatious Goods meadily accesemical use
sive precur02. This sto
piles. Five d off site viaminal (RCT) f
n Table 6.
e, End of Nerting Period
0
14,000
20,057
743,924
642,821
0
642,821
143,444
499,377
0
499,377
with a capThey are c021999, iss
e mining opte. The Chon on the manifest assed from tand storag
rsors in accorage cons
12
product a Muscle for train
ext d
pacity of currently sued by
peration emAlert storage, nd safe the MCC e by the
ordance ists of 2
2015 An
externaexplosivbut it idangeroChemictotal loa
2.10 WThe primmanageground during tNo chan The obj
Mee
Seplade
Use
Whesup
Allosuprequ
Wheund
Havmin
Monben
2.10.1 Volume
Volum
Blues C
Brickw
Brickw
East Em
East Em
East Ha
Final Se
Dam 3
MUSWELL
nnual Environ
al magazineve product is not comous goods cals, Licenceading servic
WATER MAmary objectement of owater resothe reportinnges were m
jectives of t
et the wate
arate cleanen) and con
e appropriat
ere possibpression an
ow clean waplies (fire fuired and a
ere possibderground m
ve nil dischanimising the
nitor surfacneficial use a
Water Stores of stored
es (m3)
Crusher Dam
orks Dam 1
orks Dam 2
mplacement
mplacement
aul Road Dam
ettling Pond
LBROOK COAL
nmental Man
s and an abcan also be
mmon practon the p
e Number ce on site.
ANAGEMENtive of the Sn‐site wateources, bothng period wmade to the
the SWMP a
er supply ne
n water runotaminated
te sediment
le, recycle nd wash dow
ater to flowfighting sysllowed by h
ble, and wmines as mi
arge of saline risk of acci
ce and grouand underta
rage water avai
m
Dam South
Dam North
m
L COMPANY L
nagement Re
bove grounde stored on ice to do sremises arNDG021999
NT Site Water Mr to minimh on and adwith no signe water man
are to:
eds of the p
off producerunoff from
tation contr
and reusiwn activitie
w through thstem uses harvestable
where minne water st
ne mine wadental off s
undwater toaking remed
lable at MC
TableStart Rep
2
7
5
2
2
2
SAL
IMITED
eport
d tank for rthe mobile so as this re listed u9. A blasti
Managemeise the impdjacent to tificant channagement s
project;
ed by undistm disturbed
rols for dirty
ng dirty as;
he catchmeraw mine rights;
e safety torages;
ater by consite discharg
o determindial action w
CC are provi
e 7: Stored Wporting Perio
DIRTY WA
2,100
7,500
5,000
2,500
0
0
2,500
2,200
LINE OR MIN
raw materiaprocessingis only usender MCC’ing contrac
nt Plan (SWpact of minithe mine singes made tsystem duri
turbed catccatchment
y water;
nd contam
ent and usinwater) and
permits, u
taining all sge; and
e significanwhere requ
ded in Tabl
Water od End Re
ATER
NE WATER
als with 30,0 unit with aed on an a’s Notificatctor is emp
WMP) is to eing operatiote. The SWto water mang the repo
chments fros;
minated min
ng clean wad sensitive
se disused
saline mine
nt impacts tuired.
e 7.
eporting Per
6,472
7,480
5,935
945
1,296
327
3,330
7,920
000L capaca capacity oas needs btion of Haployed to ca
enable the eons on surfWMP was reanagementorting perio
om dirty (se
ne water f
ater for fire equipment
d open cu
e water on
to water qu
riod Stora
13
ity. Bulk of 8,000L basis. All azardous arry out
effective face and eviewed t on site. d.
ediment‐
for dust
fighting t where
uts and
site and
uality or
age Capacity
8,500
30,000
20,000
10,000
10,000
5,400
10,100
8,000
y
2015 An
Volum
Dam1
Dam 2
No.2 O
2.10.2 MCC hovolumewere co
20BL
20BL
20BL
20BL
2.10.3 The calbalancethe extSiemen
INPUTS
Ground
Surface
Entrain
Potable
Underg
TOTAL
OUTPU
Entrain
Dischar
Dust Su
Dust Su
Evapora
Pumped
Septic P
TOTAL
2015 Ba
2.11 ONo othe
MUSWELL
nnual Environ
es (m3)
O/C Void
Ground Waolds four lices of groundonstructed d
Licen
L169014 (bo
L169037 (No
L169038 (No
L170473 (bo
Water Balalculated wae indicates atraction of s MAG 800
S
d Water See
e Water Run
ment in Coa
e Water
ground Wor
TS
ment in Coa
rge Off Site
uppression –
uppression –
ation from D
d to Counci
Pump Out
alance
OTHER INFRer managem
LBROOK COAL
nmental Man
ater Extractcences to edwater extraduring the r
ce No.
orehole RDH
o.1 O/C Voi
o.2 O/C Voi
orehole RDH
ance ater balanca water surwater and0 battery p
epage
noff and Da
al
kings – Dew
al
– water infu
– water cart
Dams
l Void
RASTRUCTment of infr
L COMPANY L
nagement Re
Start Rep
2
2
6
tion xtract grouacted in thireporting pe
Table 8: Gr
Ex
H529)
d)
d)
H607)
e for the rplus for thewater moowered ma
Table 9:
m Capture
watering Bo
usion and sp
ts
TURE MANArastructure
IMITED
eport
porting Perio
24,000
20,000
60,000
nd water, us reporting eriod.
roundwater
Reportingxtraction Vo
4.5
0
591
2,03
reporting pee year. MCCovements aagflow mete
Site Water
ores
prays
AGEMENToccurred du
od End Re
under Part period are
r Extraction
g Period olume (ML)
5
0
1.3
6.5
eriod is proC have instaround site.ers.
r Balance
T uring this re
eporting Per
24,000
20,000
60,000
5 of the Wshown Tab
n
) Extract(ML pe
2,00
ovided in Talled water These m
ML/ye
0.0
178.
127.
2.7
2,041
2,350
ML/ye
138.
0.0
1,150
351.
126.
0.0
1.0
1,767
582.
eporting pe
riod Stora
Water Act 19ble 8. No ne
tion Entitleer Annum L
1,000
00 (combine
3,000
Table 9. Thmeters to m
meter types
ear M
0
.8
.5
7
1.0
0.0
ear M
.6
0
0.3
.5
.2
0
0
7.6
.4
riod.
14
age Capacity
30,000
20,000
100,000
912. The ew bores
mentLimit)
ed)
e water measure include
ML/day
0.0
0.5
0.3
0.0
5.6
6.4
ML/day
0.4
0.0
2.0
1.0
0.3
0.0
0.0
4.8
1.6
y
2015 An
3.0 E
3.1 EIn ordevarious MCC mdetails o
3.2 MDuring MonitoThis staMMS’s,providedata to The pritempertempertemperwere seinversiosupplemthe pumagnet
Meteordata, rmonito
MUSWELL
nnual Environ
ENVIRONM
NVIRONMr to measurlicences, Mining areas.on the indiv
METEOROLthe reporring Stationation is part, located are supplemea password
incipal MMrature, rairature inverature fromelected dueon to be mentary MMrpose of itic north.
rological darainfall andring period
LBROOK COAL
nmental Man
MENTAL M
MENTAL MAre complianMCC underta. The locatiovidual moni
LOGICAL rting periodn (MMS) ont of the Rearound the pental informd protected
MS providesnfall, humersion. Them the princie to the 88extrapolat
MS’s providnterpreting
ata providedd temperatwas 99.1%
L COMPANY L
nagement Re
MANAGEM
ANAGEMEnce with theakes a compons of the citoring prog
d, MCC con rehabilitatl Time Enviperimeter omation. All website th
s 10m elevmidity, bar inversion pal MMS am RL differted and rde 2m elevag TEOM an
d in this reure results.
IMITED
eport
MENT AN
NT e managemprehensive current mongrams are p
ontinued tted land toronmental of the minefour weath
hat is access
vation windrometric pcalculatio
and the suprence betwreported oation wind snd BAM re
eport was ss are summ
D PERFOR
ment plans, tmonitoringnitoring siterovided in t
o maintaino the immedMonitoringe property her stationssible by MCC
speed andpressure an is basedpplementarween the sitover a 10speed, direcesults. Win
sourced fromarised be
RMANCE
the developg program ines are showthe followin
n a principdiate west g System (RTat the TEOs continuouC personne
d directionand calculad on the y MMS at tes, allowin0m elevatction, and ad direction
om the prinelow. Data
pment consn the vicinit
wn in Figure ng sections.
pal Meteorof the OpeTEMS). ThreOM and BAusly relay wel.
, 2m elevaated atmo2m elevaSite 2. The
ng the temption intervair temperan is refere
ncipal MMS recovery
15
sent and ty of the 2. More
rological n Cut 1. ee other M sites, weather
ation air ospheric tion air ese sites perature val. The ature for nced to
S. Wind for the
2015 An
MUSWELL
nnual Environ
LBROOK COAL
nmental Man
Figure
L COMPANY L
nagement Re
2: Environm
IMITED
eport
mental Monitoring Locations
16
2015 An
3.2.1 Quarterthe pre
MUSWELL
nnual Environ
Wind Speerly wind rodominant w
LBROOK COAL
nmental Man
d and Direcses are prowind patter
L COMPANY L
nagement Re
ction ovided in Fins in the Hu
January
April
IMITED
eport
igure 3. Theunter Valley
y – March W
l – June Wind
ese results y.
Windrose
drose
are generaally consiste
17
ent with
2015 An
3.2.2 Total rathe lonMeteor
MUSWELL
nnual Environ
Rainfall ainfall recorng‐term avrology (BOM
LBROOK COAL
nmental Man
rded duringverage of M) site at Lo
L COMPANY L
nagement Re
July – Se
October –
Figure 3:
g the repor620.8mm,ower Hill St
IMITED
eport
eptember W
– December
Quarterly W
rting periodrecorded
treet in Mu
Windrose
Windrose
Windroses
d was 627.8at the neswellbrook
8mm, whichearest Aus. A summar
h is consistestralian Bury of rainfa
18
ent with reau of ll during
2015 An
the repin Musw
J
F
Se
O
No
De
3.2.3 MaximurecordeAustralimaximuTable 1
J
F
Se
O
No
De
Su
MUSWELL
nnual Environ
orting periowellbrook, i
Month
January
February
March
April
May
June
July
August
eptember
October
ovember
ecember
Total
Temperatuum tempered was 0.0°ian Bureau um and ave11 and Figur
Month
January
February
March
April
May
June
July
August
eptember
October
ovember
ecember
ummary
LBROOK COAL
nmental Man
od, comparis provided
MuswA
ure ature recor°C. This is wof Meteoroerage montre 5.
Tem
L COMPANY L
nagement Re
ed to the hin Table 10
Table
wellbrook CActual (mm)
87.4
13.6
29.2
125.1
75.9
24.2
25.0
52.6
23.2
35.6
63.4
72.6
627.8
rded duringwithin the loology site atthly tempe
Table 11
Minimum mperature (o
11.4
12.6
8.7
6.3
2.4
0.0
0.4
0.2
3.1
9.0
10.2
11.2
0.0
IMITED
eport
istorical rai0 and Figure
10: Rainfal
Coal )
MuA
g the reportong term mt Scone, ‐5.eratures du
1: Temperat
oC) Te
nfall at MCe 4.
ll Data
uswellbrookAverage (m
63.9
87.0
50.2
29.6
23.6
69.7
34.7
32.9
30.1
39.2
85.9
58.5
605.3
ting period minimum an1°C and 44ring the re
ture Data
Average emperature
23.9
22.9
22.0
17.4
14.3
10.7
10.0
11.9
14.1
20.0
21.7
22.8
17.6
C and the c
k Coal m)
M
was 39.0°Cnd maximu.2°C. A sumporting per
e (oC) T
closest BOM
MuswellbrooAverage (
69.6
66.9
52.8
43.5
41.5
51.3
44.2
38.6
40.7
48.6
56.1
67.0
620.8
C and the mm recorded
mmary of mriod is prov
MaximuTemperatu
36.1
36.1
39.0
31.1
25.7
21.7
19.4
25.4
28.2
35.5
38.9
37.1
39.0
19
M station
ok BOM mm)
8
minimum d by the inimum, vided in
um re (oC)
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figuure 4: Rainfall Graph
2
20
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 5: Temperaturee Graph
2
21
2015 An
3.2.4 Inversiothe Sanand recmetres the groconditiofocusingconsidecooler m Over thdays in are dispperiod w
MUSWELL
nnual Environ
Inversion Mon strengthndy Creek Rcorded tem(inversion sund. A temons, such g sound‐waered to be months.
he reportingeach montplayed in Fiwith August
LBROOK COAL
nmental Man
Monitoring h is measureRoad stationmperatures strength). Tmperature inas temperave propagastrong and
g period, invth recordingure 6. A stt 2015 havi
L COMPANY L
nagement Re
ed betweenn (Site 2). Tare used tTemperatunversion is arature inveation paths d occur prim
versions weg an inverstrong inversng the high
IMITED
eport
n the OpenThe sites hato calculatres normalla temperatersion, mayat a single marily duri
ere monitorsion level osion was rehest number
n Cut meteoave an eleve the temply decreaseure increasy significanpoint. Inveng the eve
ed and the f 3°C/100mecorded on r of days wi
orological sation differperature dwith increae with heigtly increasersions ovening to ea
daily maximm or greater168 days dth 22 days
station (Siterence of 88ifferential ase in heighght. Meteorse noise ler 3°C per 10rly morning
mum recordr (strong inuring the reabove 3°C/
22
e 4) and 8 metres per 100 ht above rological evels by 00m are g in the
ded. The version) eporting 100m.
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 6: Teemperature Inveersion Graph
223
2015 An
3.3 A
3.3.1 During updatedimprovenetworsignifica The priimpact mitigatimining Dust caareas, ooutlined
Areas dmining
Coal HaStockpi
Haul ro
Minor r
Topsoil
MUSWELL
nnual Environ
AIR QUALIT
Activities tthe reportd DMP beiements to tk being ratiant changes
mary objecof dust frion measurgenerated
an be geneor dust gend in Table 1
Source
disturbed by
andling and le Areas
Table
Source
ad dust
roads
stockpiling
LBROOK COAL
nmental Man
TY MANAG
his Reportiting periodng implemthe Air Quaionalised. Ts were mad
ctive of air om the opres have bedust source
erated fromerated by m12 and Table
Table 12
y
Coal
e 13: Contro
g
L COMPANY L
nagement Re
GEMENT
ng Periodthe Dust ented in Dality MonitoThese change to the DM
quality maperations oeen dividedes.
m two primmining active 13.
: Control Pr
Disturb onl
Reshape, toemplacemetipping.
Maintain cowater cartsdust.
Clean‐up af
Water cartssuppress du
ol Procedur
All roads ancarts to min
Long term material.
Developmerequired by
Minor road
All topsoil sminimise th
Long term twill be reve
IMITED
eport
Managemeecember 2oring prograges are discMP.
anagement n the envid into contr
ary sourcesvities. The c
rocedures f
Cont
ly the minim
opsoil and rent areas af
oal handlings to minimis
fter any spi
s to operateust on road
res for Mini
Cont
nd traffic arnimise the g
haul roads
ent of minoy mining.
ds used regu
stockpiles whe area exp
topsoil stocegetated.
ent Plan (D015. The ram with thecussed furth
at MCC is ronment arol procedu
s, either wcontrol pro
for Wind Blo
trol Procedu
mum area n
rehabilitatefter the com
g areas in ase windblow
llage event
e around thdways and t
ing Generat
trol Procedu
reas will be generation
will be shee
r roads will
ularly for ac
will be locatposed to pre
ckpiles, not
DMP) was rreview of te depositionher in Sectio
to managend nearby ures for win
windblown dcedures for
own Dust
ures
ecessary fo
completedmpletion of
moist condwn and traff
.
he coal stockhe coal stoc
ted Dust So
ures
watered usof dust.
eted with ha
be limited
ccess will be
ed and shapevailing win
used for ov
reviewed wthe DMP idnal dust moon 3.3.2. N
e and minimresidences
nd‐blown d
dust from er these sou
or mining.
d overburdeoverburden
dition usingfic generate
kpile area tckpiles.
ources
sing water
ard wearing
to be only a
e watered.
ped to nds.
ver 6 month
24
with the dentified onitoring No other
mise the s. Dust dust and
exposed rces are
en n
ed
o
g
as
hs
2015 An
Drilling
Blasting
Raw Co
Coal HaPrepara
Equipmcoal stoextracti Furthershort te As per the repthe EnvThe findthe asse
3.3.2 The revnetwor(HVAS),(BAM), Deposit
Monitothe majmonitodust gaof the r
MUSWELL
nnual Environ
Source
g
oal Receival
andling and ation Plant
ment used tockpiles), spion cyclone
r control prerm episodi
Condition Uporting perivironmentadings of thiessment sti
Air Qualityvised Air Qk consists o, Tapered EPM10 HVA
tional Dust G
ring deposijority of thered. Duringuge monitoreporting pe
Du
D2
D7
D1
D1
LBROOK COAL
nmental Man
Bin
o control dprays at thes or water i
ocedures ac events.
U1.1 of MCod. This asl Assessmeis assessmell to be fina
y MonitoringQuality Moof a combinlement OscS, and mete
Gauge Resu
itional duste reporting g the reportoring locatioeriod is show
Tab
ust Gauge
2
7
10
14
L COMPANY L
nagement Re
Dust apron
Drills will bwater injec
Water injecwhen high
Stemming w
Blasting wiManageme
Sprays are receival bin
Sprays are
dust generaRaw Coal Rnjection sys
re impleme
CC’s EPL anssessment nt to the aent were sualised by the
g nitoring Nenation of dcillating Miceorological
ults
has occurrperiod 17 dting period ons were rawn in Table
ble 14: Curre
Curren
Decom
Still in
Decom
Decom
IMITED
eport
Cont
ns will be low
e equippedction system
ction or duslevels of du
will be used
ll occur in aent Plan rela
to be used n during hig
fitted at tra
ation includReceival Binstems on d
ented durin
n Exposed Lreviewed tctual exposupplied to te EPA.
etwork is depositionalcrobalancesmonitoring
red in the adust gaugesthe Dust M
ationalised. e 14.
ent Status o
nt Status
mmissioned
monitoring
mmissioned
mmissioned
trol Procedu
wered durin
d with dust ems.
st suppressiust are bein
d at all time
accordance ating to me
when tippingh wind eve
ansfer point
e: water can, sprays at rill rigs.
ng periods o
Land Assesshe predictesed surfacethe EPA in t
displayed in dust gauge (TEOM), Beg station.
area surrouns positionedManagemen The status
of Dust Gau
1 Decembe
g program
1 Decembe
1 Decembe
ures
ng drilling.
extraction c
on sprays wg generated
es.
with the Blateorologica
ng raw coalnts.
ts.
art (sprays conveyor tr
of high dust
sment was ed exposed area on 30the require
n Figure 2es, High Voeta Attenua
nding MCC d around thnt Plan was of the dust
uges
er 2015
er 2015
er 2015
cyclones or
will be usedd.
ast‐Vibratioal condition
l into the
on haul roransfer poin
t emissions
undertaken surface ar0 Septembeed timefram
2. The moolume Air Sation Mass
since 1983he operatios reviewed t gauges at
25
on s.
ads and nts, dust
and for
n during ea from er 2015. mes with
onitoring amplers Monitor
. During ons were and the the end
2015 An
All gaumaximudust ga All dustfor anavegetatbasis of All gaugmonth‐2015 fofor 201Environresults
Y
2
2
2013
2012
2011
2010* ‐ averag
12‐monof the Appendthe ava
MUSWELL
nnual Environ
Du
D1
D1
D1
D1
D1
D2
D2
D2
D2
D2
D2
D2
D3
ges are anum for depuge locatio
t gauges wealysis. Samption, are exf field obser
ges complie‐rolling averor all monit5, historicanmental Assand backgr
Year
2015
2014
3‐2014
2‐2013
1‐2012
0‐2011 ge of all gaug
nth rolling adepositiondix 2. A conilable moni
LBROOK COAL
nmental Man
ust Gauge
15
16
17
18
19
20
22
23
24
26
28
29
30
nalysed forpositional dns are displ
ere sampledples with exxcluded frorvation and
ed with therage dust dtoring sites l monitorinsessment. ound levels
Table 15
AverageRe
(g/m2
es
average andal dust montour plot storing sites
L COMPANY L
nagement Re
Curren
Decom
Decom
Still in
Still in
Still in
Decom
Still in
Decom
Still in
Still in
Decom
Still in
Decom
insoluble ust on nonlayed in Figu
d on a 30±2xcessive coom the annlaboratory
maximum deposition rwas 1.8g/mg results, bThe resultss and are be
: Compariso
e Monitorinesults 2/month)
1.8
2.2
2.1
1.9
1.7
1.6
d historical aonitoring prhowing thes is shown in
IMITED
eport
nt Status
mmissioned
mmissioned
monitoring
monitoring
monitoring
mmissioned
monitoring
mmissioned
monitoring
monitoring
mmissioned
monitoring
mmissioned
solids andn‐mine ownure 2.
2 day cycle aontaminationual averag analysis.
annual dusrate for insm2/month. ackground s in 2015 aelow the pre
on of Depo
ng Backg(g/
average valrogram fore annual aven Figure 8.
1 Decembe
1 Decembe
g program
g program
g program
1 Decembe
g program
1 Decembe
g program
g program
1 June 201
g program
1 Decembe
ash residuned land is
and sent to on, includinge. Contami
st criteria osoluble solid Table 15 results andare consisteedicted resu
sitional Dus
ground Res/m2/month
1.8
1.8
1.8
1.8
1.8
1.8
ues are disp the reporerage dust
er 2015
er 2015
er 2015
er 2015
5
er 2015
ue. The an4.0g/m2/m
a NATA accg bird dropination is d
of 4g/m2/mods from Jancompares t predictionsent with hisults from th
st Results
sults )*
EA
played in Figting perioddeposition
nnual averamonth. The
credited labppings, insedetermined
onth. The mnuary to Dethe averages made in tstorical mohe EA.
A Predicted (g/m2/mon
2.3
2.3
2.3
2.3
2.3
2.3
gure 7. Thed are preseisopleths b
26
age EPA current
boratory ects and on the
mean 12 ecember e results he 2010 onitoring
Results nth)*
e results ented in based on
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 7: Averrage Depositional Dust Results
2
27
2015 An
The conlevels d
MUSWELL
nnual Environ
ntour plot dropping the
LBROOK COAL
nmental Man
Figuindicates he further th
L COMPANY L
nagement Re
ure 8: Depoigher dust e location i
IMITED
eport
ositional Dudepositions from the
st Contour rates nearmining ope
Plot r the mininrations.
ng operatio
28
ns, with
2015 An
Total Su
Three Thave bethe EPAaccredit Annual 90µg/maverage11 dispresults
Sit
1
2
3
All s
Table 1results are beloEA.
Y
2
2
2013
2012
2011
2010* ‐ averag
MUSWELL
nnual Environ
uspended P
TSP HVAS uneen operatiA nominateted laborat
Average Tm3 at all sitee TSP value lay the 24‐his provided
te AC
1
2
3
sites
17 compareand predicow historic
Year
2015
2014
3‐2014
2‐2013
1‐2012
0‐2011 ge of all sites
LBROOK COAL
nmental Man
articulates
nits are locaional since ed six‐day rory for ana
TSP results s. The ratioat each mohour TSP rein Append
Annual Avoncentrat
29
29
32
30
es the averactions madecal monitori
Ta
AverageResult
4
4
L COMPANY L
nagement Re
(TSP) High
ated at eachMarch 200un cycle. Flysis. The lo
for the reo of PM10 toonitoring locsults over tix 2.
Table
erage TSP ion (µg/m3
.8
.7
.9
.8
age results e in the 201ing results,
able 17: Co
e Monitorins (µg/m3)*
30.8
45.5
39.4
40.3
31.9
30.9
IMITED
eport
Volume Air
h of the thre05. Samplesilter papersocations of t
eporting peo TSP on HVcation durinhe monitor
16: TSP Av
3) AnCr
for 2015, h10 Environmbackgroun
mparison o
ng Backg
Samplers (H
ee real times are collecs are then the HVAS ar
riod were VAS run daysng the reporing period.
erages
nnual Averriteria (µg/
90
90
90
90
historical mmental Assed levels an
of TSP Resu
ground Res(µg/m3)*
41.4
41.4
41.4
41.4
41.4
41.4
HVAS)
e dust monited over a collected are detailed
below the s is 47%. Taorting periodA compreh
age m3)
monitoring ressment. Td the predi
lts
sults EA
itoring stati24‐hour pend sent to in Figure 2.
annual criable 16 dispd. Figure 9 –hensive tabl
2015 DaRecover
100
100
100
100
results, bacThe results icted result
A Predicted (µg/m3)
46.4
46.4
46.4
46.4
46.4
46.4
29
ions and eriod on a NATA .
iteria of plays the – Figure e of TSP
ata y %
kground in 2015 ts in the
Results )*
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 9: Sitte 1 TSP Monitooring Results
3
30
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 10: Siite 2 TSP Monitooring Results
3
31
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 11: Siite 3 TSP Monitooring Results
3
32
2015 An
Particul
Three runits coMCC pe The PMfaults, recoverperiod w There wthe 24‐storm tattributexceed averagepresentAppend
Site
A
Table 1results are genand the
Y
2
2
2013
2012
2011
2010* ‐ averag
A PM10 unit opday du
MUSWELL
nnual Environ
late Matter
real‐time PMontinuouslyersonnel. Th
M10 units arecommunicary is considwere 98% a
was one dayhour criterihat originattable to MCthe 30µg/
e PM10 valuted in Figurdix 2.
Number
1
2
3
ll sites
19 compareand predicnerally conse predicted
Year
2015
2014
3‐2014
2‐2013
1‐2012
0‐2011 ge of all sites
HVAS unit erates on aring the re
LBROOK COAL
nmental Man
r <10µg (PM
M10 monitoy relay weathe locations
e continuouation lossedered essenacross the th
y during theia of 50µg/ted in southCC it is not /m3 annual ue at each re 12 – Fig
T
AnnuaConcen
es the averactions madeistent with results in th
Table 19
AverageResult
has been ea 6 day cycleeporting pe
L COMPANY L
nagement Re
M10)
oring units hther data tos of these u
us electronices, power ntial and dhree units.
e reporting m3. This och‐west NSWa breach ocriteria dusite duringure 14. A t
Table 18: Re
l Average Pntration (µg
14.9
14.9
13.7
14.5
age results e in the 201historical mhe EA.
9: Comparis
e Monitorins (µg/m3)*
14.5
16.9
17.4
18.3
14.0
14.1
stablished we and is notriod where
IMITED
eport
have been o a passwornits are sho
c monitorinoutages aata recove
period wheccurred on W and northf any condiuring the rg the reportable of com
eal‐Time PM
PM10 g/m3)
A
for 2015, h10 Environmmonitoring
son of Real
ng Backg
with the loct real‐time e the 24 ho
operationard protectedown in Figur
ng systems tnd maintery levels o
ere the 24 6 May 2015hern Victoriitions. Thereporting prting periodmprehensiv
M10 Average
Annual Aver(µg/
3
3
3
3
historical mmental Asseresults, and
‐Time PM10
ground Res(µg/m3)*
17.6
17.6
17.6
17.6
17.6
17.6
cation of thlike the othour PM10 r
l since Mard website tre 2.
that are subnance dowbtained du
hour PM10 5 and was ta. As this r annual aveperiod. Tabd with the ve PM10 res
es
rage Criteri/m3)
0
0
0
0
monitoring ressment. Td below the
0 Results
sults EA
his site shower PM10 unesult was a
rch 2005. Ahat is acces
bject to equwntime. Higuring the re
results werthe result oresult is noterage PM10
le 18 dispresults grasults is prov
ia DaRecov
10
9
9
9
results, bacThe results e backgroun
A Predicted (µg/m3)
20.6
20.6
20.6
20.6
20.6
20.6
wn in Figurenits. There wabove the
33
All three ssible by
uipment gh data eporting
re above of a dust directly did not lays the aphically vided in
ata very %
00
9
6
8
kground in 2015 nd levels
Results )*
e 2. This was one 24‐hour
2015 An
criteria westerldirectlyPM10 diaveragebeing d
Site
N
Table 2results are sliglevels b
Y
2
2
2013
2012
2011
2010* ‐ averag
MUSWELL
nnual Environ
of 50µg/my winds. Ay attributabid not excee PM10 HVAisplayed in
Number
Nisbet
21 compareand predicghtly elevatbut are belo
Year
2015
2014
3‐2014
2‐2013
1‐2012
0‐2011 ge of all sites
LBROOK COAL
nmental Man
m3. This occAs the unit ible to MCC eed the 30µAS recordeFigure 15 a
AnnualConcen
es the averactions madeted when cw the level
Ta
AverageResult
L COMPANY L
nagement Re
curred on 20s on the noand it is noµg/m3 annud over theand Table 20
Table 20:
l Average Ptration (µg/
19.1
age results e in the 201compared ws predicted
ble 21: Com
e Monitorins (µg/m3)*
19.1
19.1
16.7
16.2
11.2
10.6
IMITED
eport
0 October 2orth‐westerot a breachal criteria de reporting 0.
: PM10 HVAS
PM10 /m3)
A
for 2015, h10 Environmwith histor in the EA.
mparison of
ng Backg
2015 and wn side of thh of any conduring the period wa
S Average
Annual Aver(µg/
3
historical mmental Asserical monito
f PM10 Resu
ground Res(µg/m3)*
17.6
17.6
17.6
17.6
17.6
17.6
was the resuhe operationnditions. Treporting ps 19.1µg/m
rage Criteri/m3)
0
monitoring ressment. Toring result
ults
sults EA
ult of stronns this resuThe annual period. Them3 with the
a DaRecov
10
results, bacThe results ts and bac
A Predicted (µg/m3)
20.6
20.6
20.6
20.6
20.6
20.6
34
g north‐ult is not average e annual e results
ata very %
00
kground in 2015 kground
Results )*
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 12: Site 1 PM10 Results
3
35
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 13: Site 2 PM10 Results
3
36
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 14: Site 3 PM10 Results
3
37
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 15: PM10 HVAS Results
3
38
2015 An
3.3.3 During impacts
3.4 GNo metthis repused fomonito MCC suGreenhreports
3.5 E
3.5.1 During with thmade to The masoil fromThis is a
Sepcon
Red
Con
Conreha
Imp Two maCreeks.Howevedivertedwaterco Drainagfor dus(major contain All distuwater ftypes o
MUSWELL
nnual Environ
Activities Nthe next rs in accorda
GREENHOUthane drainporting perior gas and ring purpos
upply data house and .
ROSION A
Activities tthe reporte updated o the ESCP.
ain objectivem the site aachieved th
arating cletaminated
ducing wate
ntrolling flow
nstructing seabilitated d
plementing
ain natural The area er, some ofd around ourses.
ge from thest suppressand minor n dirty runof
urbed or nerom catchmf banks con
LBROOK COAL
nmental Man
Next Reportreporting pance with th
USE GAS age or ventiod. A numwater mo
ses.
to IdemitEnergy Re
ND SEDIM
his Reportiing period ESCP being
e of the eroand its transrough the i
an water rrunoff from
r runoff vel
w volume a
ediment coisturbed ar
control stru
catchmentscontains u
f the runoffmining op
e coal crushion. All disgraded banff on the mi
ewly rehabiment areas anstructed:
L COMPANY L
nagement Re
ting Perioderiod MCC he DMP.
tilation issuber of boreonitoring. T
tsu for theporting (NG
MENT CONT
ng Periodthe Erosionimplement
osion and sesport downmplementa
runoff prodm disturbed
ocity;
nd path;
ntrol dams eas to impr
uctures that
s exist in thundisturbedf is captureerations by
hing plant asturbed or nks) to contine site.
litated areaand to cont
IMITED
eport
will contin
es were asseholes interThese boreh
eir corporatGER’s) and
TROL
n and Sedited in Dece
ediment constream, resation of the
duced by ucatchment
at the baserove quality
t promote s
e area of md land surfed by damsy diversion
and stockpilnewly rehatrol the flow
as will contatain dirty ru
nue to man
sociated wirsect the unholes are c
te reportind Energy Ef
ment Contmber 2015
ntrol at MCsulting in sefollowing s
undisturbeds;
e of rehabiliy of discharg
stable landf
mining, assofaces that . Water fron banks, a
e area is coabilitated aw of water
ain diversiounoff on the
nage and m
th the Openndergroundcapped and
g requiremfficiency O
rol Plan (ES. No signifi
CC is to prevedimentatiotrategies:
d catchmen
tated emplged water; a
orms.
ciated withdrain towa
om undisturnd channe
ollected in aareas contafrom catch
n banks to e mine site.
monitor air
n Cut operad workings d opened o
ments for Npportunitie
SCP) was reicant chang
vent the eron of water
nts from d
acement arand
h Muscle anards Sandyrbed catchmelled into a
a dam and ain diversiohment areas
control the There shal
39
r quality
ations in that are only for
National es (EEO)
eviewed ges were
osion of courses.
irty and
reas and
nd Sandy y Creek. ments is adjacent
re‐used n banks s and to
e flow of l be two
2015 An
Majpotevelomaimin
Minsite requvegeon prinaccu
3.5.2 Erosionmonito
3.5.3 During sedime
3.6 S
3.6.1 During GroundSGWMPimprovemonitoSWMP The revshown
Site
No 1 Vo
No 2 Vo
Dam 1/
MCC7 –Upstrea
MCC8 –Downst
MUSWELL
nnual Environ
jor graded bential for eocity and dintained forning and reh
nor graded managem
uired in theetated slopthe actua
nciples. Adeumulated se
Erosion andn and sedimring progra
Activities nthe next rent impacts
URFACE W
Activities tthe report
dwater MonP being imements to ring netwoor SGWMP
vised monitin Figure 2.
oid
oid
/2
– Muscle Cram
– Muscle Crtream
LBROOK COAL
nmental Man
banks – Therosion or srect water r an extendhabilitation
banks – Thment duringe long term pe which wil requiremequate storaediment.
d Sedimentment contm. Surface
next Reporteporting pein accordan
WATER MA
his Reportiting period nitoring Promplemented
the wateork being ra.
toring prog
Table
M
M
A
M
A
M
A
eek M
A
eek M
A
L COMPANY L
nagement Re
ey will be cocouring wilflow in a mded period ceases.
ese are temg the first because a sill not requ
ments of thage will be
t Control Mrol monitoe water mon
ting Perioderiod MCC nce with the
NAGEMEN
ng Periodthe Site W
ogram (SGW in Decemer monitoriationalised.
gram is sho
22: Surface
Monitoring
Monthly
Annually
Monthly
Annually
Monthly
Annually
Monthly
Annually
Monthly
Annually
IMITED
eport
onstructed tll be rock‐li
more controand are in
mporary passtage of rsuccessful rire them. The rehabiliprovided fo
Monitoringoring is connitoring is d
will contine ESCP.
NT
Water ManaWMP) werember 2015. ing progra. No other
own in Tab
e Water Mo
Frequency
to fall by upned or stablled mannentended to
sture furrowrehabilitatiorehabilitatioThe spacing itation proor minor flo
nducted asiscussed in
ue to mana
agement Ple reviewed The reviem with thr significant
le 22. The
onitoring Pr
y Anal
pH, E
Com
pH, E
Com
pH, E
Com
pH, E
Com
pH, E
Com
p to 1.0%. Bbilised to rer. Major grbe perman
ws which aon. Pastureon strategy of minor b
ogram and ows and tw
s part of tSection 3.6
age and mo
lan (SWMPwith the upew of the he surface t changes w
e locations
rogram
ysis
EC, TSS
prehensive
EC, TSS
prehensive
EC, TSS
prehensive
EC, TSS
prehensive
EC, TSS
prehensive
Banks that heduce wateraded banknent featur
re used to e furrows will result i
banks will bsoil conse
wo to three
the surface6.2.
onitor eros
P) and Surfpdated SWSGWMP idand grounwere made
of these s
40
have the er runoff s will be res after
assist in are not in a well be based ervation years of
e water
sion and
ace and WMP and dentified ndwater e to the
sites are
2015 An
Site
MCC9 –
MCC12 Dam
MCC23 Dam So
MCC24 Dam
MCC25 Dam No
MCC26 Dam
MCC27
ComprepH, EC, BicarboCd, Cr, C
Annual Quarter
During MCC11,collecte
3.6.2 The surare shosurface pH The pHecosystresults periodscompar
Loca
Dam
MCC1Settlin
No.2 OVo
MUSWELL
nnual Environ
– Brickwork
– Final Sett
– E. Emplacouth
– East Hau
– E. Emplacorth
– Blues Cru
– Dam 3
ehensive anTSS, Hardn
onate, NitraCu, Ni, Pb, Z
analysis is urly analysis
the report, MCC17 aned until then
Surface Warface waterown graphic water mon
levels at stem pH levefrom this rs. There are these res
T
ation 2
m 1/2
12 Final ng Pond
Open Cut oid
LBROOK COAL
nmental Man
M
s Dam Q
A
tling M
A
cement Q
A
l Road Q
A
cement Q
A
usher Q
A
Q
A
nalysis moniness, Ca, Mgte, Oil and gZn, Hg, Se, T
undertakenis undertak
ting periodnd MCC18. n presented
ater Monitor pH, Electrically in Figunitoring resu
surface watels of 6.5 – 9reporting pre no backsults to.
Table 23: Co
2010‐2011
7.6
8.1
7.6
L COMPANY L
nagement Re
Monitoring
Quarterly
Annually
Monthly
Annually
Quarterly
Annually
Quarterly
Annually
Quarterly
Annually
Quarterly
Annually
Quarterly
Annually
itors for theg, Na, K, Sulfgrease, AmTPH, PAH
n in March eken in June,
d monthly These sitesd in this AEM
oring ical Conducure 16 – Fiults are pro
ter monitor9.5 througheriod are ckground re
omparison
2011‐2012
7.6
8.1
7.6
IMITED
eport
Frequency
e following:fate, Chlorimonia, Diss
each year September
monitorings were decoMR.
ctivity (EC) igure 21. Tovided in Ap
ring sites whout the repconsistent wsults or En
of pH ResupH Ann
2012‐201
7.8
8.1
7.9
y Anal
pH, E
Com
pH, E
Com
pH, E
Com
pH, E
Com
pH, E
Com
pH, E
Com
pH, E
Com
de, Flouridesolved Fe, T
r and Decem
g was also ommissione
and Total SThe data anppendix 3.
were generaporting periwith the renvironment
lts to Histonual Averag
13 2013‐2
7.8
8.3
8.0
ysis
EC, TSS
prehensive
EC, TSS
prehensive
EC, TSS
prehensive
EC, TSS
prehensive
EC, TSS
prehensive
EC, TSS
prehensive
EC, TSS
prehensive
e, CarbonatTotal Fe, Mn
mber each y
conductedd in Decem
Suspended nd the annu
ally within iod. As shosults from al Assessm
rical Resulte
014 20
7
8
8
te, n, As, Ba, B,
year
d at sites mber 2015 w
Solids (TSSual compre
the recomown in Tableprevious re
ment predic
ts
014
7.7
8.3
8.1
41
MCC10, with data
) results ehensive
mended e 23 the eporting tions to
2015
7.7
8.3
7.9
2015 An
Loca
No.1 OVo
MC
MCC07Creupst
MCC08Cre
down
MC
MC
MC
MC
MC
MC
MC
MC
MC
MC
MC
ElectricTypicallsurrounthe envwatercolevels d As showfrom pAssessm
Loca
Dam
MCC1Settlin
MUSWELL
nnual Environ
ation 2
Open Cut oid
CC06
7 Muscle eek – tream
8 Muscle eek ‐ stream
CC10
CC11
CC17
CC18
CC9
CC13
CC23
CC24
CC25
CC26
CC27
al Conductily, EC levelsnding watervironment ourses are during wet p
wn in Tableprevious rement predic
T
ation 2
m 1/2
12 Final ng Pond
LBROOK COAL
nmental Man
2010‐2011
7.7
not sampled
not sampled
not sampled
not sampled
not sampled
not sampled
not sampled
8.0
not sampled
8.9
8.6
8.0
8.4
8.5
ivity (EC) s for mine wrcourses. Afrom EC linfluenced
periods.
e 24 the resporting pections to co
Table 24: Co
2010‐2011
5,818
6,760
L COMPANY L
nagement Re
2011‐2012
7.7
not sampled
not sampled
not sampled
not sampled
not sampled
not sampled
not sampled
8.1
7.9
8.2
8.4
7.9
8.3
8.3
water are gAs mine waevels in m by rainfal
sults from triods. Thempare thes
omparison Electrica
2011‐2012
5,818
6,760
IMITED
eport
pH Ann
2012‐201
7.8
7.9
7.8
7.9
7.8
7.1
8.0
no result
8.3
8.0
8.8
8.3
no result
8.4
8.3
greater thanater is not dmine waterl with high
this reportinere are nose results to
of EC Resul Conductivi
2012‐201
5,886
8,836
nual Averag
13 2013‐2
7.7
7.7
7.8
7.8
7.9
7.4
7.9
ts no resu
8.6
8.0
8.6
8.2
ts 7.5
8.7
8.2
n 4,000μS/cdischarged dams. Ther levels d
ng period ao backgrouo.
lts to Histoty Annual Av
13 2013‐2
5,97
8,35
e
014 20
no re
7
7
7
7
no re
7
ults no re
8
8
9
8
no re
8
8
cm, with lowoff site theThe EC leveduring dry
are consistend results
rical Resultverage (µS/c
014 20
5 6,1
9 8,5
014
esults no
7.6
7.8
7.9
7.9
esults no
7.9
esults no
8.7
8.1
.3
8.0
esults
8.9
8.4
wer levels fere is no imels in surrperiods an
ent with theor Environ
ts cm)
014
133 6
530 7
42
2015
results
7.8
7.9
7.9
7.9
results
8.0
results
8.7
7.8
9.2
7.7
7.6
8.3
8.0
found in mpact on ounding d lower
e results nmental
2015
6,337
7,523
2015 An
Loca
No.2 OVo
No.1 OVo
MC
MCC07Creupst
MCC08Cre
down
MC
MC
MC
MC
MC
MC
MC
MC
MC
MC
MC
Total SuTSS ressedimefrom Tinfluencdry whe As showfrom pAssessm
MUSWELL
nnual Environ
ation 2
Open Cut oid
Open Cut oid
CC06
7 Muscle eek – tream
8 Muscle eek ‐ stream
CC10
CC11
CC17
CC18
CC9
CC13
CC23
CC24
CC25
CC26
CC27
uspended Sosults in sitent. As thisSS levels inced by rainen water lev
wn in Tableprevious rement predic
LBROOK COAL
nmental Man
2010‐2011
5,285
4,365
not sampled
not sampled
not sampled
not sampled
not sampled
not sampled
not sampled
8,186
not sampled
8,192
6,710
3,703
5,524
8,950
olids (TSS) e dams cans water is nn mine wafall with higvels are low
e 25 the resporting pections to co
L COMPANY L
nagement Re
Electrica
2011‐2012
5,285
4,365
not sampled
not sampled
not sampled
not sampled
not sampled
not sampled
not sampled
4,833
2,820
2,760
3,475
1,837
5,643
7,763
n be influenot dischargater dams. gher levels w. Lower lev
sults from triods. Thempare thes
IMITED
eport
l Conductivi
2012‐201
5,941
5,030
4,449
2,064
2,800
9,380
1,000
6,865
no result
4,718
4,173
3,110
5,278
no result
6,300
10,175
nced by wged off site The TSSduring wetvels are fou
this reportinere are nose results to
ty Annual Av
13 2013‐2
6,26
5,53
5,46
2,84
3,67
9,34
725
7,81
ts no resu
4,04
3,73
1,95
3,93
ts 1,74
4,86
9,58
water move there is nolevels in st periods wund during “
ng period ao backgrouo.
verage (µS/c
014 20
7 6,4
3 no re
9 5,3
3 4,7
2 5,2
0 10,
no re
7 9,2
ults no re
3 3,9
0 3,9
3 2,0
3 3,8
0 no re
8 6,6
8 9,4
ments and o impact onurrounding here there “normal” co
are consistend results
cm)
014
465 6
esults no
347 3
780 2
207 3
208 1
esults no
260 4
esults no
900 4
970 1
080 1
840 3
esults 1
615 4
405 8
runoff stirn the envirg watercouris runoff oonditions.
ent with theor Environ
43
2015
6,526
results
3,731
2,887
3,185
10,467
results
4,860
results
4,985
1,020
1,950
3,940
1,533
4,133
8,273
rring up ronment rses are r during
e results nmental
2015 An
Loca
Dam
MCC1Settlin
No.2 OVo
No.1 OVo
MC
MCC07Creupst
MCC08Cre
down
MC
MC
MC
MC
MC
MC
MC
MC
MC
MC
MC
MUSWELL
nnual Environ
T
ation 2
m 1/2
12 Final ng Pond
Open Cut oid
Open Cut oid
CC06
7 Muscle eek – tream
8 Muscle eek ‐ stream
CC10
CC11
CC17
CC18
CC9
CC13
CC23
CC24
CC25
CC26
CC27
LBROOK COAL
nmental Man
Table 25: Co
2010‐2011
16
19
21
86
not sampled
not sampled
not sampled
not sampled
not sampled
not sampled
not sampled
14
not sampled
34
14
8
41
26
L COMPANY L
nagement Re
omparison oTotal Sus
2011‐2012
16
19
21
86
not sampled
not sampled
not sampled
not sampled
not sampled
not sampled
not sampled
21
5
7
9
7
13
31
IMITED
eport
of TSS Resuspended Sol
2012‐201
13
18
18
16
11
14
12
9
<5
158
no result
10
19
15
21
no result
16
13
ults to Histolids Annual A
13 2013‐2
14
22
20
13
20
16
13
95
28
43
ts no resu
11
10
20
13
ts 13
15
14
orical ResultAverage (mg
014 20
7
1
1
no re
2
1
1
3
no re
2
ults no re
4
7
1
1
no re
4
3
ts g/L)
014
7
16
12
esults no
22
11
10
32
esults no
23
esults no
4
71
18
14
esults
42
31
44
2015
11
18
12
results
13
8
8
5
results
18
results
33
6
7
7
5
5
9
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figuree 16: Monthly Suurface Water Monitoring Resultts – pH
4
45
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 17:: Monthly Surfacce Water Resultts – Electrical Coonductivity
4
46
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 18: Monthly Surfacce Water Results – Total Suspennded Solids
4
47
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
FFigure 19: Quartterly Surface Waater Results – pH
4
48
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
F
OMPANY LIMITED
gement Report
Figure 20: Quartterly Surface Waater Monitoringg Results – Electrrical Conductivitty
4
49
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
F
OMPANY LIMITED
gement Report
igure 21: Quarteerly Surface Waater Monitoring Results – Total Suspended Solids
5
50
2015 An
3.6.3 During impacts
3.7 G
3.7.1 During GroundSGWMPimprovemonitoSWMP The revshown
Site
RDH607
RDH616
RDH617
RDH624
RDH650
MCC10
MCC10
MCC10
MCC10
MCC10
MCC10
ComprepH, EC, BicarboCd, Cr, C
Annual
During MCC10Decemb
MUSWELL
nnual Environ
Activities nthe next res in accorda
GROUNDW
Activities tthe report
dwater MonP being imements to ring netwoor SGWMP
vised monitin Figure 2.
7/RDH529
6
7
4
0
03
05
06
15
17
18
ehensive anTSS, Hardn
onate, NitraCu, Ni, Pb, Z
analysis is u
the report08A, MCC1ber 2015 w
LBROOK COAL
nmental Man
next Reporteporting peance with th
WATER MAN
his Reportiting period nitoring Promplemented
the wateorks being r.
toring prog
Table
M
M
A
M
M
M
M
M
A
M
A
M
A
M
A
M
M
nalysis moniness, Ca, Mgte, Oil and gZn, Hg, Se, T
undertaken
ing period 1009, MC1ith data col
L COMPANY L
nagement Re
ting Periodriod MCC whe SWMP an
NAGEMEN
ng Periodthe Site W
ogram (SGW in Decemer monitorirationalised
gram is sho
26: Ground
Monitoring
Monthly
Annually
Monthly
Monthly
Monthly
Monthly
Monthly
Annually
Monthly
Annually
Monthly
Annually
Monthly
Annually
Monthly
Monthly
itors for theg, Na, K, Sulfgrease, AmTPH, PAH
n in March e
monitoring010 and Mlected until
IMITED
eport
will continund SGWMP
NT
Water ManaWMP) werember 2015. ing prograd. No othe
own in Tab
dwater Mo
Frequency
e following:fate, Chlorimonia, Diss
each year
g was also cMCC1012. l then prese
e to managP.
agement Ple reviewed The reviem with ther significan
le 26. The
nitoring Pro
y Anal
Dept
Com
Dept
Dept
Dept
Dept
Dept
Com
Dept
Com
Dept
Com
Dept
Com
Dept
Dept
de, Flouridesolved Fe, T
conducted These sitented in this
ge and mon
lan (SWMPwith the upew of the he surface nt changes
e locations
ogram
ysis
th, pH, EC
prehensive
th
th
th
th
th, pH, EC
prehensive
th, pH, EC
prehensive
th, pH, EC
prehensive
th, pH, EC
prehensive
th
th
e, CarbonatTotal Fe, Mn
at sites MCes were ds AEMR.
nitor surfac
P) and Surfpdated SWSGWMP idand grounwere made
of these s
te, n, As, Ba, B,
CC1001, Mdecommissio
51
ce water
ace and WMP and dentified ndwater e to the
sites are
CC1004, oned in
2015 An
Water groundwdistanceSectionMCC’s implem
3.7.2 Ground
The waFigure 2are sholevels ogroundw As showresults previouare no results t
MUSWELL
nnual Environ
Licence 20Bwater frome between n 3.7.2 demmining ope
ment measur
Groundwatd Water Mo
ater level, p23 and Figuown in Figuor quality dwater mon
wn in Tablefrom prev
us results anbackgrounto.
T
Year
2012‐201
2013‐201
2014
2015
LBROOK COAL
nmental Man
BL169014 hm entering talluvial lan
monstrates terations. Bres to preve
ter Monitonitoring Res
pH and Elecure 24. Theure 25. Theduring the itoring resu
e 27 the pvious repornd the watend results o
Table 27: C
A
13
14
L COMPANY L
nagement Re
has a requihe mine wonds and thethat there Based on thent alluvial
ring sults – Mini
ctrical Conde water leveese results reporting
ults are prov
pH results frting perioder levels aror Environm
omparison
Average pH
7.6
7.1
7.3
7.3
IMITED
eport
rement to orkings. Ase mining ophas been nhis informagroundwat
ing Operatio
ductivity of els in grounshow thereperiod. Thvided in App
from this reds. Electrire generallymental Ass
of Undergr
H Ave(μ
implements shown in Fperations. no impact otion there er from ent
ons
the undergndwater moe has beenhe data anpendix 3.
eporting pecal Conducy consistentsessment p
round Work
erage EC μS/cm)
5,711
5,078
5,525
6,196
measures Figure 22 thMonitoringon alluvial has been ntering the m
ground woronitoring wminimal fld the annu
eriod are cctivity is slt with previredictions
king Results
Relative(AHD
12
11
to preventhere is a sigg data presegroundwatno requiremmine workin
rking are shwells locateductuation iual compre
consistent wlightly highious resultsto compar
s
ve Level (RL)D metres)
23‐146
15‐117
116
114
52
t alluvial gnificant ented in ter from ment to ngs.
hown in d on site n water ehensive
with the her than s. There re these
)
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 222: Location of Allluvial Land Commpared to Mine Workings
5
53
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Fiigure 23: Water Level for Underrground Workinngs
5
54
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figurre 24: Water Quuality Data in Unnderground Worrkings
5
55
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 25: Water Leveel for Groundwaater Monitoring on Site
5
56
2015 An
Ground
The allufrom thand qucompre As showthe resEnviron
Loca
MCC
MCC
MCC
MCC
MCC
MCC
MCC
MCC
MCC
MCC
MCC
MCC
Loca
MCC
MCC
MCC
MCC
MCC
MCC
MCC
MCC
MCC
MCC
Loca
MCC
MCC
MCC
MCC
MCC
MUSWELL
nnual Environ
d Water Mo
uvial and hahe open cutuality resultehensive gro
wn in Tablesults from nmental Ass
ation 2
C1001
C1003
C1004
C1005
C1006
1008A
C1009
C1010
C1012
C1015
C1017
C1018
T
ation 2
C1001
C1003
C1004
C1005
C1006
1008A
C1009
C1010
C1012
C1015
T
ation 2
C1001
C1003
C1004
C1005
C1006
LBROOK COAL
nmental Man
nitoring Res
ard rock aqt footprint ts are presoundwater
e 28 – Tableprevious
sessment pr
Table 28:
2010‐2011
7.4
3.2
8.2
7.2
5.6
4.4
5.2
1.7
6.0
3.6
17.3
17.5
Table 29: Co
2010‐2011
7.4
7.4
6.6
7.4
7.3
7.5
7.7
7.6
7.4
7.3
Table 30: Co
2010‐2011
1,108
1,434
2,668
2,635
1,095
L COMPANY L
nagement Re
sults – Sand
uifers in thand no impsented in Fmonitoring
e 30 the rereporting redictions to
Compariso
2011‐2012
6.6
2.5
7.3
6.7
4.4
3.8
4.6
1.2
5.4
3.6
17.0
17.0
omparison
2011‐2012
7.2
7.3
6.8
7.4
7.3
7.3
7.6
7.6
7.6
7.1
omparison Electrica
2011‐2012
777
1,410
2,670
1,579
933
IMITED
eport
dy Creek Are
e Sandy Crepacts have Figure 26 –g results are
sults from periods. o compare
on of DepthDepth Annu
2012‐201
7.9
3.8
8.2
7.3
5.7
5.4
5.7
1.4
6.2
3.8
17.0
16.6
of pH ResupH Ann
2012‐201
7.1
7.2
6.7
7.1
7.1
7.4
7.7
7.6
7.4
7.1
of EC Resul Conductivi
2012‐201
1,086
1,359
2,200
1,947
1,087
ea
eek area arbeen deter– Figure 28e provided i
this reportiThere arethese resul
h to Historicual Average (
13 2013‐2
8.1
4.5
8.8
7.8
6.5
5.5
6.3
1.5
6.3
3.6
17.1
16.7
lts to Histonual Averag
13 2013‐2
7.2
7.3
6.7
7.2
7.2
7.4
7.7
7.6
7.5
7.1
lts to Histoty Annual Av
13 2013‐2
1,12
1,48
2,20
2,54
1,11
e a significarmined. Gro8. The datn Appendix
ng period ae no backgts to.
cal Results (mbgl)
014 20
9
5
9
8
no re
6
7
1
6
3
1 16
7 16
rical Resulte
014 20
7
7
6
7
no re
7
7
7
7
7
rical Resultverage (µS/c
014 20
2 1,1
0 1,7
8 2,1
4 2,6
7 no re
ant lateral dound waterta and thex 3.
are consisteground res
014
.3
.8
.6
8.3
esult no
6.8
7.1
.7
6.8
.7
6.8
6.8
ts
014
7.3
7.2
6.9
7.2
esult no
7.5
7.9
7.9
7.5
7.1
ts cm)
014
123 1
701 1
105 2
697 2
esult no
57
distance r depths e annual
ent with sults or
2015
7.9
3.6
8.4
7.9
o result
5.0
6.1
1.7
6.3
3.7
17.1
17.3
2015
7.0
7.2
6.6
7.1
o result
7.3
7.6
7.7
7.3
7.2
2015
1,114
1,345
2,731
2,768
o result
2015 An
Loca
MCC
MCC
MCC
MCC
MCC
MUSWELL
nnual Environ
ation 2
1008A
C1009
C1010
C1012
C1015
LBROOK COAL
nmental Man
2010‐2011
934
1,233
6,298
1,574
2,417
L COMPANY L
nagement Re
Electrica
2011‐2012
1,059
1,126
5,725
1,272
2,531
IMITED
eport
l Conductivi
2012‐201
1,174
1,332
5,805
1,355
2,169
ty Annual Av
13 2013‐2
1,01
1,40
5,98
1,49
2,45
verage (µS/c
014 20
2 1,3
9 1,4
0 6,5
5 1,9
2 2,4
cm)
014
323 1
472 1
520 5
908 1
402 2
58
2015
1,076
1,264
5,860
1,990
2,659
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 26: Sanndy Creek Grounndwater Depth
5
59
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 27: Sanndy Creek Wateer Quality – pH
6
60
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 228: Sandy Creek Water Quality –– Electrical Condductivity
6
61
2015 An
Trigger 31. A gfluctuatlevel ovwill alsomonitoregularlevels a±0.5pH if monimonthlythe rep
Bore/
MCC
MCC
MCC
MCC
MCC
MCC
Bore/
MCC
MCC
MCC
MCC
Bore/
MCC
MCC
MCC
MCC
A sectioin Figurconsequbeen de
MUSWELL
nnual Environ
levels havegroundwatetes by greaver a 3 mono need to bring bores fly analysed are set at aunits fromitored condy results. Torting perio
Tab
/Well
1003
1005
1006
1015
1017 H
1018 H
/Well
1003
1005
1006
1015
/Well
1003
1005
1006
1015
onal plan dere 29. To auences to developed an
LBROOK COAL
nmental Man
e been estaer level trigater than 5%nth period. be at a levelfor each aqat the groua variation the baselinditions are Table 31 shood.
le 31: Sand
Aquifer
Alluvial
Alluvial
Alluvial
Alluvial
Hardrock
Hardrock
Aquifer
Alluvial
Alluvial
Alluvial
Alluvial
Aquifer
Alluvial
Alluvial
Alluvial
Alluvial
epicting theassist in dede‐pressurisnd is presen
L COMPANY L
nagement Re
blished for gger will be% from theIn additionl that is deeuifer. Electundwater mof >15% frne minimumoutside thows that th
y Creek Gro
WA
Lower TriggerLevel (m)TOC
2.17
6.27
4.00
3.27
14.71
14.10
Lower Trigger p
6.3
5.9
6.2
6.3
ELECTRICA
Lower Trigger E
876
1,513
765
1,494
e location oetermining sation in thented in Figu
IMITED
eport
selected site initiated ife historical n, to initiateeper than thtrical Condu
monitoring srom the bam and maxihe upper ohere was no
oundwater
ATER LEVELS
r
C
LowTrig
Exce
N
N
No Re
N
N
N
pH
pH
LowTrig
Exce
N
N
No Re
N
AL CONDUC
EC
LowTrig
Exce
N
N
No Re
N
of the monitif any revee ground wure 30. The t
tes with thef the grounminimum ae the triggerhe natural vuctivity (ECsites to monaseline minimum pH. Tor lower trio exceedan
Monitoring
S
wer gger eeded
NO
NO
esults
NO
NO
NO
wer gger eeded
T
NO
NO
esults
NO
CTIVITY
wer gger eeded
T
NO
NO
esults
NO
toring sitesersal in growater is occutransect gra
e trigger levndwater levand maximur, the reducvariability m) and pH arnitor water nimum and The trigger igger levelsce of the tr
g Trigger Le
Upper Trigger Level (m)TOC
8.34
11.46
10.14
13.97
18.53
19.69
Upper rigger pH
8.8
8.3
8.1
8.1
Upper Trigger EC
2,461
7,533
1,610
3,726
in Sandy Cound water urring, a cataph clearly i
vels shown vel in a piezum standinction in watmeasured are the mainquality. Themaximum levels are s for 3 conrigger level
evels
UpperTrigger
Exceede
NO
NO
No Resu
NO
NO
NO
UpperTrigger
Exceede
NO
NO
No Resu
NO
UpperTrigger
Exceede
NO
NO
No Resu
NO
Creek area ir gradient otenary tranindicates no
62
in Table zometer ng water ter level cross all n species e trigger EC and initiated ntinuous s during
r ed
lts
r ed
lts
r ed
lts
s shown or other sect has o sign of
2015 An
a drawmonitoaquifers
3.7.1 During impacts
3.8 CDuring Old Pit of signreportin
MUSWELL
nnual Environ
‐down effering data ts.
Activities nthe next res in accorda
ONTAMINthe reportiTop area loificant conng period.
LBROOK COAL
nmental Man
ect in the Sthere appea
next Reporteporting peance with th
NATED LANing period ocated in Mtamination
L COMPANY L
nagement Re
Sandy Creekars to be n
ting Perioderiod MCC whe SWMP an
ND MCC under
Muswellbroo. MCC wi
IMITED
eport
k area durino connect
will continund SGWMP
rtook a Phaok. This assill continue
ing the repion betwee
ue to manaP.
ase 2 Contasessment foe to manag
porting perien the alluv
age and mo
amination Aound that thge this lan
iod. Basedvial and ha
onitor groun
Assessmenthere were nd during t
63
d on the ard rock
ndwater
t on the no areas he next
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 29: Sanndy Creek Groundwater Monitooring Network, Sectional Plan
6
64
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 330: Sandy Creekk Groundwater LLevel Catenary TTransect
6
65
2015 An
3.9 F
3.9.1 During with thchanges The obj
Iden
Out
Esta
Detare
Det
Def
Det
Def No treeto remn
3.9.2 Inspectcomple
Sug
Bat
Bru
3.9.3 During accorda
3.10 W
3.10.1 During updatedwere m The LannoxiousServices Weed c
Prom
MUSWELL
nnual Environ
LORA AND
Activities tthe reportie updated Fs were mad
jectives of t
ntify any str
tline the stra
ablish meth
ail the procencountere
ail how mic
ine the post
ail how the
ine the mea
e clearing wnant vegeta
Flora and Fions of nested during
ar Glider (2
(4) – not oc
shtail Possu
Activities nthe next reance with th
WEEDS AND
Activities tthe reportd LMP to b
made to the
nd Managems weeds ws and the U
control and
motion of v
LBROOK COAL
nmental Man
D FAUNA M
his Reportiing period FFMP to bede to the FF
the approve
rategic habi
ategic mitig
ods to man
cess to be aed;
cro habitats
t‐mining lan
post‐minin
asures to pr
was undertaation.
Fauna Monisting boxesthe reportin
2) – not occ
ccupied and
um (2) – no
next Reportporting perhe FFMP.
D FERAL AN
his Reportiting periodbe implemeLMP.
ment Plan (ill be manapper Hunte
eradication
vigorous pas
L COMPANY L
nagement Re
MANAGEM
ng Periodthe Flora ae implementMP.
ed Fauna an
itat areas on
gation meas
nage remna
dopted if an
will be recr
ndscape;
ng flora will
rotect, mon
ken during
itoring s are perfong period a
upied and n
d no signs o
ot occupied
ting Periodriod MCC w
NIMALS
ng Period the Land nted during
(LMP) contaaged and cer Weeds Au
n technique
sture growt
IMITED
eport
MENT
and Fauna Mted during
nd Flora Ma
n site;
sures to be
nt vegetatio
ny threaten
reated;
be establis
nitor and ma
the report
ormed everre shown b
no signs of s
of activity w
and no sign
ill continue
Managemeg the next r
ains a sectiocontrolled uthority, us
es used at M
th to out‐co
Managemethe next re
nagement P
adopted in
on;
ned flora or
hed; and
aintain reha
ing period
ry 6 monthbelow.
sugar glider
were observe
ns of possum
to manage
ent Plan (Lreporting p
on on weedas per thesing a comb
MCC include
ompete wee
nt Plan (FFporting per
Plan (FFMP)
the FFMP;
fauna not i
abilitation a
and there w
hs. Results
r activity we
ed.
m activity w
e impacts on
LMP) was reriod. No
d control, an requiremeination of c
:
eds;
FMP) was reriod. No sig
) are to:
identified in
areas;
was no dist
of the insp
ere observe
were observ
n flora and
reviewed wsignificant
nd specifiesents of Loccontrol strat
66
eviewed gnificant
n the EIS
urbance
pections
ed.
ved.
fauna in
with the changes
s that all cal Land tegies.
2015 An
Minbare
Spra
Phy During strategyareas. actions rehabili32 and Rhodes
During Grass (Chas beeRhodes
Spracom
Redthe
The suicurrent Acacia S
During WreathSalignaoptions
Usinpain
Out
Usin The suicurrent
MUSWELL
nnual Environ
nimisation oe areas;
aying with s
ysical remov
the reportiy focused oThe develofor weed
itation areaFigure 31.
Grass
the reportiChloris gayen removeds Grass inclu
aying Rhodmpete the R
ducing the vunderstore
tability of et land use of
Saligna
the reportih Wattle (Ac has been s for Acacia
ng the “cutnted with h
t competing
ng grazing p
tability of et land use of
LBROOK COAL
nmental Man
of area ava
selective he
val by chipp
ing period on the preseopment of td control ias and for in
ng period aana) that isd from the sude:
des Grass ahodes Gras
volume of Rey species to
each of thef each of th
ng period acacia Salignremoved frSaligna inc
t stump” merbicide an
g the Acacia
pressures to
each of thef each of th
L COMPANY L
nagement Re
ailable for w
erbicides; an
ing/slashing
a Weed Maence of noxhis strategyin the rehncidental we
a review was present ineed mix cu
and then ress; or
Rhodes Graso out comp
e manageme rehabilita
a review wana) that is prom the seelude:
method whd the stump
a Saligna wi
o reduce the
e manageme rehabilita
IMITED
eport
weed infes
nd
g.
anagementxious and ey involved ahabilitation eeds identif
as undertakn the rehabrrently bein
eseeding w
ss through gete the Rho
ment optionsation areas.
as undertakpresent in thed mix curr
hereby the ps are left i
th taller ov
e growth of
ment optionsation areas
station, thro
t Strategy wnvironmenta site surveyareas. T
fied during
en to identbilitation arng used on s
with desired
grazing or sodes Grass.
s is depend
ken to identhe rehabilitrently being
stumps of n situ to ass
erstorey sp
f young sap
s is dependas well as th
ough prom
was developtal weeds iny and develThe prioritythe survey
ify control reas. Note site. Manag
d understor
slashing and
dent on the
tify control ation areasg used on s
the wattlesist in soil co
ecies; or
lings.
dent on thehe density o
mpt reveget
ped for MCn the rehablopment ofy actions are shown
options forthat Rhodegement opt
rey species
d then enco
e location, s
options fors. Note thasite. Mana
es are cut onservation
e location, sof Acacia Sa
67
ation of
CC. This bilitation f priority for the in Table
r Rhodes es Grass tions for
s to out
ouraging
size and
r Golden t Acacia agement
off and n;
size and aligna.
2
R
B
B
B
MUSWE
2015 Annual Envir
Rehabilitation Block Sites
Block A
Block B
Block C
ELLBROOK COAL CO
ronmental Manag
EnvironmentalWoNS
Hyparrhenia hi
Galenia pubesc
Rubus fruticosuNoxious weed)
Opuntia strictaPrickly Pear) (C(WoNS)
Senecio madag(Class 4 Noxiou
Senecio madag(Class 4 Noxiou
Lycium ferociss(Class 3 Noxiou
OMPANY LIMITED
gement Report
Table 32:
l, Noxious Weed
irta (Coolatai Gr
cens (Galenia) (E
us (Blackberry) () (WoNS)
a var. stricta (CoClass 4 Noxious w
gascariensis (Fireus weed) (WoNS
gascariensis (Fireus weed) (WoNS
simum (African bus weed) (WoNS
: Priority Weed
ds and O
ass) (Env)
Tagw
Env)
Gwrs
Class 4 Rttp
mmon weed)
OrIft
eweed) S)
Sast
eweed) S)
Sast
boxthorn) S)
OAc
Control Actions
Observations
Targeted controland thus limit spgrass species in owoodland condit
G. pubescens prewithin the localitrecommended tospread.
R. fruticosus wastwo small dams. targeted in ordeplant to spread.
O. stricta speciesrehabilitated wof targeted contrthe rehab woodl
S. madagascarieacross the majorsites. This specietime and cost pe
S. madagascarieacross the majorsites. This specietime and cost pe
One L. ferocissimAs this is a Class continuously sup
for Rehabilitati
l is recommendepread of this highorder to maintaition throughout
esent in low‐moty. Targeted cono reduce infesta
s observed along As this is a Clasr to inhibit the a
s is present withoodland areas at ol can occur eraand is achievab
nsis is present arity of all rehabiles should be maermit.
nsis is present arity of all rehabiles should be maermit.
mum is present a3 weed it must pressed and dest
ion Blocks
ed to eradicate hly invasive in pasture and this area.
derate densitiesntrol is ation and limit
g the edges of ss 4 it should be ability of the
hin the low abundance
adication from le.
at low densities litation block anaged where
at low densities litation block anaged where
at the locality. be fully and troyed.
Pri
H
s
H
Mod
e. Mod
Low‐M
Low‐M
H
6
ority
High
High
derate
derate
Moderate
Moderate
High
68
2
R
A(Ab
RRc
PP
MUSWE
2015 Annual Envir
Rehabilitation Block Sites
AB African boxthorn)
RC Ricinus communis
PT Pepper tree
ELLBROOK COAL CO
ronmental Manag
EnvironmentalWoNS
Galenia pubesc
Opuntia auranNoxious weed)
Senecio madag(Class 4 Noxiou
Lycium ferociss(Class 3 Noxiou
R. communis (C
Schinus areira
OMPANY LIMITED
gement Report
l, Noxious Weed
cens (Galenia) (E
tiaca (Tiger Pear) (WoNS)
gascariensis (Fireus weed) (WoNS
simum (African bus weed) (WoNS
Castor oil plant)
(Pepper tree) (E
ds and O
Env) Gtt
r) (Class 4 Owcw
eweed) S)
Sast
boxthorn) S)
OtRs
(Env) AaR
Env) ATs
Observations
G. pubescens prethe locality. Targto reduce infesta
O. aurantiaca is woodland areas control can occuwoodland is achi
S. madagascarieacross the majorsites. This specietime and cost pe
One individual pthe hill to the telRemoval and trespread of this sp
A few individualsalong Blue’s RoaRWoodNew2 an
Approximately fiTargeted removaspecies within th
esent in high dengeted control is ation and limit s
present within tat low abundanr eradication froievable.
nsis is present arity of all rehabiles should be maermit.
lant was observlecommunicatioatment will prevecies.
s 10‐20 were ided between the td the West Crib
ive trees were pal will limit the she MCC site.
nsities across recommended pread.
the rehabilitatedce. If targeted om the rehab
at low densities litation block anaged where
ed at the top of ons tower. vent further
entified growingturnoff to Hut.
resent. spread of this
Pri
H
d
Mod
Low‐M
H
g L
L
6
ority
High
derate
Moderate
High
Low
Low
69
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 31: Weed Management Priority Actionss
7
70
2015 An
3.10.2 During Land M A weedon the a Appropimplem
3.11 B
3.11.1 During with thwere m MembeInformaNotices The intfragmeair blast Best pra
A hiburd
Manissu
Regthe
Loa
Prop
Effe
Redthe
Taktime
Videfrom
Regthe
During seam b
MUSWELL
nnual Environ
Activities nthe next reanagement
d control prareas ident
priate manamentation of
BLASTING
Activities tthe report
he updated made to the
ers of the ation Servics” page of th
tent of bentation reqt overpress
actice in dri
igh degree den;
nagement oues);
gular inspecuncontrolle
ding of the
per placem
ective place
duce the sleexplosive m
e into accoe of the bla
eo recordinm the predi
gular reviewactual blast
the reportlasting prac
LBROOK COAL
nmental Man
next Reporteporting pet Plan (LMP
ogram will ified in the
gement optf these opti
his Reportiing period BVMP beiBVMP.
public are ce Line whehe Muswell
est practicequirements ure, ground
ill and blast
of accuracy
of surface a
ctions to ideed release o
explosive m
ent of deck
ment of goo
eep time of material;
ount any adst and, defe
ng of blastscted outcom
ws of actual t results var
ting period,ctices. This
L COMPANY L
nagement Re
ting Periodriod MCC w).
be undertaWeed Man
tions for Rhons will com
ng Periodthe Blast‐Vng implem
notified ofre they heabrook Shire
e goals in for each bld vibration,
activities a
y in the pla
and ground
entify any gof gaseous p
material so t
king charges
od quality s
the blast pa
verse meteer or modify
s to identifymes; and
blast resultried from th
, MCC comwas introdu
IMITED
eport
will continu
aken duringnagement St
hodes Grassmmence du
Vibration Mmented in D
f proposedar a recordee Council W
drill and ast. The usfumes and
at MCC inclu
cement of
dwater in th
geological aproducts fro
that holes a
s if required
stemming m
attern to m
eorological y the blast t
y any causa
ts to identihe predicte
mmenced thuced to mit
e to implem
g the next retrategy.
s and Acaciauring the ne
ManagemenDecember 2
blasting ted message
Website.
blast active of best podours fro
ude:
drill holes t
he drill hole
abnormalitiom explosiv
are not load
d;
material to c
minimise the
conditions to accommo
al factors c
fy any pattd outcomes
he trial andtigate the r
ment the re
eporting pe
a Saligna wxt reporting
nt Plan (BVM2015. No s
imes by co or by looki
vities is to ractice techm blasting a
to achieve d
es (to reduc
es that mayve material;
ded in exces
contain the
e potential f
that may bodate those
ontributing
erns in thoss.
d implemenisks associa
equirement
eriod and w
ill be reviewg period.
MP) was resignificant
ontacting thing at the “
comply whniques wilactivities.
design spac
ce fume an
y create a ;
ss of the de
blast;
for deterior
be prevailine conditions
g to any ab
se instance
ntation of ated with op
71
ts of the
will focus
wed and
eviewed changes
he Blast “Blasting
with the l reduce
cing and
d odour
path for
sign;
ration of
g at the s;
erration
s where
through perating
2015 An
in the ablastingcoal sethroughgreatersuccessrecover
3.11.2 All blasmaintaireportinits life. The bla
V
Ov
The bla
Blast Mo
B1 (Que
B2 (Scho
B3 (99 Q
B4 (Nisb
During monitoequipmperiod capture There w A summall mon During levels f
MUSWELL
nnual Environ
anticline areg involves dams in theh seam pror control osful at MCCry in steeply
Blast Monists are monined in accong period M
sting criteri
Vibration (m
5
10
verpressure
115
120
st monitori
onitor
een St)
ool)
Queen St)
bet)
the reportrs were op
ment malfunfrom all me rate has b
was no exce
mary of blasitors is show
the preparafrom the m
LBROOK COAL
nmental Man
ea of the mdrilling thro blast proc
ocess due tof timing deC with crey dipping se
toring nitored by fordance wiMCC upgrad
ia that appl
mm/s)
e (dB(L))
ng network
T
Location
In the vi
At the M
At the n
Sandy Cr
ting period,perational tnction or conitoring ueen 98.5%.
eedance of c
st monitoriwn in Appe
ation of envining opera
L COMPANY L
nagement Re
mine whereugh one orcess with sto the firing esign and ating flat eams and re
four automth the releed the blas
y to MCC ar
Table
5% of t
5% of t
k is provided
able 34: Bla
n
cinity of the
Muswellbroo
orthern end
reek Road,
, 136 blast hroughout communicatnits was 96
criteria duri
ng results iendix 4.
vironmentaation were
IMITED
eport
the coal ser more coaltemming. E of multipleblast vibrabenches foeducing the
matically trigevant standst monitors
re shown in
33: Blast C
All
total numbe
All
total numbe
d in Table 3
ast Monitor
e nearest no
ok Public Sc
d of Queen
approximat
events occthe reporttion issues6.3%. Follo
ing the repo
s displayed
al assessmecalculated.
eams are st seams to aElectronic be decks of ation. Throuor the openumber of
ggered blasards and caas the old s
n Table 33.
Criteria
owable Exc
er of blasts
0%
owable Exc
er of blasts
0%
34 and locat
ring Netwo
on‐compan
chool, Roge
Street, Nor
tely 1.2km t
curred at Ming period,. The datowing the u
orting perio
in Figure 3
nts predicte. The max
teeply dippa flat level blasting systexplosives ugh seam rations, acblast event
t monitors.alibrated ansystem was
ceedance
over a 12 m
ceedance
over a 12 m
tions are dis
rk
y owned re
r Street, No
rth Muswell
to the north
MCC. Althosome dataa recovery upgrade of
od.
32 to Figure
ed overpresimum pred
ping. Througand protectem is usedand this alblasting hachieving gots.
. The moninnually. Du nearing th
month perio
month perio
splayed in F
esidence
orth Muswe
lbrook
h of MCC
ough all foa were losty for the rethe units t
e 35. Blast
ssure and vdicted overp
72
gh seam cting the d in the lows for as been ood coal
tors are ring the e end of
od
od
Figure 2.
ellbrook
our blast t due to eporting the data
data for
vibration pressure
2015 An
level waThe blawith pre
3.11.1 During in accor
MUSWELL
nnual Environ
as 114dB(Lst results devious resu
Activities nthe next rerdance with
LBROOK COAL
nmental Man
) and the muring this reults.
next Reportporting perh the BVMP
L COMPANY L
nagement Re
maximum vieporting pe
ting Periodriod MCC w.
IMITED
eport
ibration leveriod were b
ill continue
vel was 2.2mbelow pred
to manage
mm/s in Noicted levels
e and monit
orth Muswes and are co
tor blasting
73
ellbrook. onsistent
impacts
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
FFigure 32: Queenn Street Blast MMonitoring Results
7
74
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 33: Schhool Blast Monitoring Results
7
75
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figgure 34: 99 Queeen Street Blast MMonitoring Resuults
7
76
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 35: Nissbet Blast Monitoring Results
7
77
2015 An
3.12 N
3.12.1 During updatedfrequendue to effect ioccurre The maoperatiunderta
Out
Mai
Idencom
Def
Det
Detdem
DetNois
Spe
3.12.2 The locnetwor6 monteach ofeach reand twnoise suguidelin“AcoustTwo six Measurcharacthad a confirmThe LAe The act
The
The
MUSWELL
nnual Environ
NOISE MAN
Activities tthe reportd NMP bency were raexternal inin Decembed prior to t
ain objectiveons on theaken to ach
tline the me
intain a nois
ntify the rismpliance;
ine the mec
ail the Com
ail the mamonstrated
ail the spese Investiga
cify the reg
Noise Moncations of tk of six attethly basis. Ef the Day, Eesidence waice during urveys are pnes, the Ptics, Descripx‐monthly at
rements weteristics as dcurrent ca
med prior toeq (15‐minu
ual noise le
location of
elevation o
LBROOK COAL
nmental Man
NAGEMENT
his Reportiting period eing implemationalised nfluences imer 2015. this date so
e of the NMe environmieve this ob
easures to b
se monitori
sk levels at
chanisms fo
mplaint Hand
anagement to exceed t
cifications ations; and
gulatory rep
nitoring he revised ended noiseEach attendEvening andas surveyedthe Night pperformed iPeriodic Noption and Mttended no
ere taken defined in Aalibration ao and at theute) noise e
evel receive
f mining equ
of mining eq
L COMPANY L
nagement Re
T
ng Periodthe Noise
mented in as part of tmpacting oThe two rothe data pr
MP is to mament and nbjective:
be undertak
ing program
which min
or communi
dling Proced
measures the criterion
and proced
porting requ
noise mone survey locded noise sd Night‐timd twice duriperiod for in accordanoise MonitoMeasuremenise surveys
in third‐ocAS1259‐199s per mane completiomission lev
d at individ
uipment;
quipment;
IMITED
eport
ManagemDecember this review.on results aounds of mresented in
nage and mnearby resi
ken on site t
m;
ne operatio
ity consulta
dure;
to be unn;
dures to be
uirements.
nitoring sitecations. Mosurvey is come periods ang the Daya total of fnce with theoring prognt of Envirowere unde
ctave bands0 “Acousticnufacturer’son of measvels, at each
ual residen
ent Plan (N2015. Th
. One monat this locatmonitoring this report
minimise thedences. T
to mitigate
ns may nee
ation;
ndertaken
e used for
es are displaonitoring is onducted oare monitoy period, onfive measue EPA “ NSWramme anonmental Nrtaken duri
s with an cs – Sound Ls instructiourements wh monitoring
ces may va
NMP) was he monitornitoring location. This during thisincludes re
e impact ofThe followin
noise emiss
ed to be m
where the
the purpos
ayed in Figconducted
over a 24‐hred. For thce during trements at
W Industrial d Australiaoise” as speng the repo
instrumentLevel Meterons and cawith a Soung site, were
ry as a resu
reviewed wring locatioation was rchange cas reportingesults from
f noise fromng actions
sions;
modified to
e noise lev
se of Indep
gure 2. MC at these siour period is reportingthe Eveningt each loca Noise Polican Standarecified in thorting perio
t that has rs”. The instalibration wnd Level Cae determine
ult of:
78
with the ons and emoved me into g period all sites.
m mining will be
manage
vels are
pendent
CC has a tes on a so that g period g period, tion. All cy” (INP) rd 1055 he NMP. od.
Type 1 trument was also librator. ed.
2015 An
Imp
Prev
Prev Attendeoverall proport Noise lLAeq(15mi
monitoDuring mining
The noconsiste
3.12.1 During impacts
MUSWELL
nnual Environ
pacts from o
vailing wind
vailing mete
ed noise monoise leve
tion contrib
levels duri
inute) and alring periodthe prepaoperation w
oise resultsent with pre
Activities nthe next res in accorda
LBROOK COAL
nmental Man
other noise
d conditions
eorological
onitoring wels at the buted by MC
ng the repso the nigh. Noise meration of ewere calcula
S
R
R
R
R
R
s during thevious resu
next Reporteporting peance with th
L COMPANY L
nagement Re
sources;
s; and
conditions.
was conductnominated
CC mining o
porting peht LA1(1minute
easurement environmenated. These
Table 35: P
Site
R7
R13
R15
R16
R17
R20
his reportinlts.
ting Perioderiod MCC whe NMP.
IMITED
eport
.
ed during Md noise mooperations.
riod comp
e) noise limi results of ntal assesse noise leve
Predicted N
Predict
ng period
will continu
May and Noonitoring l
lied with its at all mothis surveyments predels are show
Noise Levels
ted Noise L
32
38
35
35
33
34
were belo
ue to mana
ovember 20ocations a
the day, eonitoring loare summdicted noiswn in Table
s
evels (dB)
ow predicte
ge and mo
015, to quannd determ
evening anocations duarised in Tase levels fr35.
ed levels a
onitor noise
79
ntify the mine the
nd night ring the able 36. rom the
and are
e related
2
L
MUSWE
2015 Annual Envir
Location Sta
DateTim
R7 19/014:
R7 19/017:
R7 19/018:
R7 20/000:
R7 26/000:
R13 19/015:
R13 19/017:
R13 19/018:
R13 20/000:
R13 26/000:
R15 19/014:
R15 19/016:
R15 19/018:
ELLBROOK COAL CO
ronmental Manag
art e and me
Wind Speed (m/s)
5/15 :44
2.9
5/15 :29
0.4
5/15 :51
0.0
5/15 :32
1.4
5/15 :34
0.8
5/15 :04
2.3
5/15 :10
0.7
5/15 :32
0.1
5/15 :10
0.3
5/15 :10
0.0
5/15 :15
2.4
5/15 :35
0.1
5/15 :01
1.2
OMPANY LIMITED
gement Report
VTC 0C/ 100m
Cri
‐2.0
‐2.0
4.1
3.0
4.1
‐2.0
‐2.0
3.0
3.0
4.1
‐2.0
‐2.0
4.1
Table 36:
LAeq 15 Minu
iterion (dB)
CriteriApplie
36 Yes
36 Yes
36 No
36 No
36 No
40 Yes
40 Yes
40 No
40 No
40 No
35 Yes
35 Yes
35 No
Noise Monitori
ute
ion es?1
MCC LAeq (dB)2
IA
IA
IA
<25
29
IA
IA
IA
<25
<25
IA
IA
IA
ng Results
Exceedance3
Nil
Nil
NA
NA
NA
Nil
Nil
NA
NA
NA
Nil
Nil
NA
Criterion (dB)
CritApp
‐‐‐
‐‐‐
‐‐‐
44
44
‐‐‐
‐‐‐
‐‐‐
51
51
‐‐‐
‐‐‐
‐‐‐
LA1 1 Minute
terion plies?1
MCC LAeq (dB)2
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
No <25
No 33
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
No <25
No <25
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
8
Exceedance
‐‐‐
‐‐‐
‐‐‐
NA
NA
‐‐‐
‐‐‐
‐‐‐
NA
NA
‐‐‐
‐‐‐
‐‐‐
80
e3
2
L
MUSWE
2015 Annual Envir
Location Sta
DateTim
R15 19/023:
R15 25/023:
R16 19/013:
R16 19/016:
R16 19/021:
R16 19/023:
R16 25/023:
R17 19/013:
R17 19/015:
R17 19/020:
R17 19/022:
R17 25/022:
R20 19/013:
R20 19/015:
ELLBROOK COAL CO
ronmental Manag
art e and me
Wind Speed (m/s)
5/15 :42
0.6
2/15 :40
0.0
5/15 :58
1.1
5/15 :17
2.1
5/15 :02
0.0
5/15 :23
0.0
5/15 :20
3.8
5/15 :40
2.1
5/15 :59
1.6
5/15 :37
0.0
5/15 :54
0.0
5/15 :57
3.7
5/15 :12
3.8
5/15 :34
2.7
OMPANY LIMITED
gement Report
VTC 0C/ 100m
Cri
3.0
4.1
‐2.0
3.0
4.1
4.1
‐1.0
‐2.0
‐1.0
4.1
4.1
‐2.0
‐2.0
‐2.0
LAeq 15 Minu
iterion (dB)
CriteriApplie
35 No
35 No
35 Yes
35 No
35 No
35 No
35 No
35 Yes
35 Yes
35 No
35 No
35 No
38 No
38 Yes
ute
ion es?1
MCC LAeq (dB)2
<25
<25
IA
IA
IA
IA
IA
IA
IA
<25
<30
32
IA
IA
Exceedance3
NA
NA
Nil
NA
NA
NA
NA
Nil
Nil
NA
NA
NA
NA
Nil
Criterion (dB)
CritApp
46
46
‐‐‐
‐‐‐
‐‐‐
46
46
‐‐‐
‐‐‐
‐‐‐
46
46
‐‐‐
‐‐‐
LA1 1 Minute
terion plies?1
MCC LAeq (dB)2
No <25
No 32
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
No IA
No IA
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
No 40
No 37
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
8
Exceedance
NA
NA
‐‐‐
‐‐‐
‐‐‐
NA
NA
‐‐‐
‐‐‐
‐‐‐
NA
NA
‐‐‐
‐‐‐
81
e3
2
L
MUSWE
2015 Annual Envir
Location Sta
DateTim
R20 19/021:
R20 19/022:
R20 25/022:
R7 09/111:
R7 09/114:
R7 09/119:
R7 09/123:
R7 10/102:
R13 09/111:
R13 09/114:
R13 09/119:
R13 09/123:
R13 10/101:
R15 09/110:
ELLBROOK COAL CO
ronmental Manag
art e and me
Wind Speed (m/s)
5/15 :29
0.0
5/15 :21
0.0
5/15 :29
1.1
1/15 :29
1.0
1/15 :49
2.4
1/15 :32
1.6
1/15 :35
0.0
1/15 :28
0.0
1/15 :05
2.0
1/15 :27
2.9
1/15 :10
2.8
1/15 :11
0.6
1/15 :59
0.0
1/15 :37
0.9
OMPANY LIMITED
gement Report
VTC 0C/ 100m
Cri
0.5
4.1
4.1
‐1.8
‐2.0
‐1.0
‐1.0
4.1
‐1.6
‐1.6
‐1.0
0.5
4.1
‐1.6
LAeq 15 Minu
iterion (dB)
CriteriApplie
38 Yes
38 No
38 No
36 Yes
36 Yes
36 Yes
36 Yes
36 No
40 Yes
40 Yes
40 Yes
40 Yes
40 No
35 Yes
ute
ion es?1
MCC LAeq (dB)2
IA
<30
IA
IA
NM
NM
28
27
NM
IA
34
31
33
NM
Exceedance3
Nil
NA
NA
Nil
Nil
Nil
Nil
NA
Nil
Nil
Nil
Nil
NA
Nil
Criterion (dB)
CritApp
‐‐‐
48
48
‐‐‐
‐‐‐
‐‐‐
44
44
‐‐‐
‐‐‐
‐‐‐
51
51
‐‐‐
LA1 1 Minute
terion plies?1
MCC LAeq (dB)2
‐‐‐ ‐‐‐
No 38
No IA
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
Yes 38
No 36
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
Yes 37
No 41
‐‐‐ ‐‐‐
8
Exceedance
‐‐‐
NA
NA
‐‐‐
‐‐‐
‐‐‐
Nil
NA
‐‐‐
‐‐‐
‐‐‐
Nil
NA
‐‐‐
82
e3
2
L
MUSWE
2015 Annual Envir
Location Sta
DateTim
R15 09/113:
R15 09/118:
R15 09/122:
R15 10/101:
R16 09/110:
R16 09/113:
R16 09/118:
R16 09/122:
R16 10/101:
R17 09/109:
R17 09/113:
R17 09/118:
R17 09/122:
R17 10/100:
ELLBROOK COAL CO
ronmental Manag
art e and me
Wind Speed (m/s)
1/15 :54
3.3
1/15 :39
2.0
1/15 :43
1.1
1/15 :25
0.0
1/15 :09
2.7
1/15 :33
2.6
1/15 :19
2.2
1/15 :23
1.4
1/15 :05
0.0
1/15 :46
2.3
1/15 :13
2.5
1/15 :00
2.2
1/15 :00
1.8
1/15 :44
0.0
OMPANY LIMITED
gement Report
VTC 0C/ 100m
Cri
‐1.8
‐1.0
0.5
3.0
‐1.8
‐1.6
‐1.6
0.5
3.0
‐2.0
‐1.6
‐1.6
‐1.0
‐1.0
LAeq 15 Minu
iterion (dB)
CriteriApplie
35 No
35 Yes
35 Yes
35 No
35 Yes
35 Yes
35 Yes
35 Yes
35 No
35 Yes
35 Yes
35 Yes
35 Yes
35 Yes
ute
ion es?1
MCC LAeq (dB)2
NM
28
35
26
NM
IA
IA
33
IA
NM
IA
IA
34
27
Exceedance3
Nil
Nil
Nil
NA
Nil
Nil
Nil
Nil
NA
Nil
Nil
Nil
Nil
Nil
Criterion (dB)
CritApp
‐‐‐
‐‐‐
46
46
‐‐‐
‐‐‐
‐‐‐
46
46
‐‐‐
‐‐‐
‐‐‐
46
46
LA1 1 Minute
terion plies?1
MCC LAeq (dB)2
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
Yes 41
No 26
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
Yes 37
No IA
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
Yes 43
Yes 27
8
Exceedance
‐‐‐
‐‐‐
Nil
NA
‐‐‐
‐‐‐
‐‐‐
Nil
NA
‐‐‐
‐‐‐
‐‐‐
Nil
Nil
83
e3
2
L
N
MUSWE
2015 Annual Envir
Location Sta
DateTim
R20 09/109:
R20 09/112:
R20 09/120:
R20 10/100:
R20 10/103:
Notes: 1. Limits a2. These a3. NA me
ELLBROOK COAL CO
ronmental Manag
art e and me
Wind Speed (m/s)
1/15 :15
3.2
1/15 :29
1.7
1/15 :11
1.9
1/15 :11
0.0
1/15 :06
0.0
apply for winds are results for Means atmospheri
OMPANY LIMITED
gement Report
VTC 0C/ 100m
Cri
‐1.0
‐2.0
‐1.0
‐1.0
4.1
up to 3m/s (at aMCC in the absenc conditions out
LAeq 15 Minu
iterion (dB)
CriteriApplie
38 No
38 Yes
38 Yes
38 Yes
38 No
a height of 10m nce of all other mtside conditions
ute
ion es?1
MCC LAeq (dB)2
IA
IA
IA
IA
IA
above ground lemine sources; anspecified in dev
Exceedance3
NA
Nil
Nil
Nil
Nil
evel); or tempernd velopment conse
Criterion (dB)
CritApp
‐‐‐
‐‐‐
‐‐‐
48
48
ature inversions
ent, criterion is n
LA1 1 Minute
terion plies?1
MCC LAeq (dB)2
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
‐‐‐ ‐‐‐
Yes IA
No IA
s of up to 30C/10
not applicable.
8
Exceedance
‐‐‐
‐‐‐
‐‐‐
Nil
NA
00m;
84
e3
2015 An
3.13 VDuring updatedthe LiM The obj
To ope
To p
To m
To o MCC’s existingarea.
3.14 A
3.14.1 During (ACHMreportin The obj
Idenof th
Mitand
Conobje
Maiimp
Dev MCC hathe Abo During Aborigion the M As partannuallarchaeo
MUSWELL
nnual Environ
VISUAL, STRthe reportid LiMP bein
MP.
jectives of t
provide suerations;
provide ligh
minimise th
outline a pr
operations g overburde
ABORIGINA
Activities tthe reportP) was revng period.
jectives for
ntifying anyhe MCC ope
igating any equipment
nsulting witectives, pro
intaining thpacts on cos
veloping env
as successfuoriginal cult
the reportinal groups.MCC Comm
t of the ony updating ological site
LBROOK COAL
nmental Man
RAY LIGHTing period ng impleme
the LiMP are
ufficient lig
hting that is
he impact of
ocess to ad
are screenen emplace
AL HERITAG
his Reportiting periodviewed withNo significa
managing a
y cultural heerations;
cultural het so that im
th all releocesses and
he mine’s osts; and
vironmenta
ully completural site loc
ing period, A member
munity Cons
ngoing consthem on th
es.
L COMPANY L
nagement Re
T the Lightingented in Dec
e:
ghting on‐s
of an appro
f on‐site ligh
dress light s
ned from dement area
GE
ng Periodd the Archh the updaant changes
archaeology
eritage issue
ritage risk dmpacts to cu
evant Abormanageme
operational
al procedure
eted salvagecated within
no ground r of the Waultative Com
sultation prhe status of
IMITED
eport
g Managemcember 201
site to fac
opriate stan
hting source
spillage issu
direct view as, and the
aeology anated ACHMs were made
y and cultur
es that aris
due to the dltural resou
riginal coment actions;
status, thu
es for the m
e operationn the mine
disturbancnaruah Locmmittee (C
rocess withf the curren
ment Plan (15. No sign
cilitate saf
ndard and a
es on reside
ues.
of residennatural to
nd Cultural MP to be ime to the AC
ral heritage
e because o
design and urces are m
mmunity re
us reducing
managemen
s and contilease bound
ce operatiocal AboriginCC).
h Aboriginant mining op
LiMP) was nificant chan
ety and s
ppropriate
ents or road
ts or the tpography o
Heritage mplementeHMP.
at MCC inc
of the desig
installationinimised;
presentativ
any likely t
t of heritag
inues to madary.
ns requiredal Lands Co
al groups a perations a
reviewed wnges were m
security to
ly directed;
d users; and
travelling pof the surr
Managemeed during t
clude:
gn and cons
n of new mi
ves on the
time delay
ge sites at M
aintain and
d consultatiouncil prese
letter is snd manage
85
with the made to
mining
d
ublic by ounding
ent Plan he next
struction
ne plant
e plans,
risks or
MCC.
protect
ion with ently sits
sent out ement of
2015 An
3.14.2 During ACHMP
3.15 E
3.15.1 During (ACHMreportin The obj
Idenof th
Mitand
Conobje
Maiimp
Dev No activ
3.15.1 During ACHMP
3.16 S
3.16.1 During reviewesignifica The maspontan
Exis
Dril
Min
Min
Emp
Emp
Coa
MUSWELL
nnual Environ
Activities nthe next reP.
UROPEAN
Activities tthe reportP) was revng period.
jectives for
ntifying anyhe MCC ope
igating any equipment
nsulting witectives, pro
intaining thpacts on cos
veloping env
ve activities
Activities nthe next reP.
PONTANEO
Activities tthe reported with theant changes
ain objectiveneous comb
sting open c
ling and bla
ning of over
ning of coal;
placement o
placement o
al stockpiles
LBROOK COAL
nmental Man
next Reporteporting pe
HERITAGE
his Reportiting periodviewed withNo significa
managing a
y cultural heerations;
cultural het so that im
th all releocesses and
he mine’s osts; and
vironmenta
s were unde
next Reportporting per
OUS COMB
his Reportiing period updated Ss were mad
e of the SCbustion in:
cut and und
asting;
burden;
;
of overburd
of washery
s.
L COMPANY L
nagement Re
ting Periodriod cultura
E
ng Periodd the Archh the updaant changes
archaeology
eritage issue
ritage risk dmpacts to cu
evant Abormanageme
operational
al procedure
ertaken in r
ting Periodriod Europe
BUSTION
ng Periodthe SpontaCMP to be e to the SC
MP is to m
erground w
den;
reject; and
IMITED
eport
al heritage
aeology anated ACHMs were made
y and cultur
es that aris
due to the dltural resou
riginal coment actions;
status, thu
es for the m
relation to E
ean heritage
aneous ComimplementMP.
inimise the
workings;
will be ma
nd Cultural MP to be ime to the AC
ral heritage
e because o
design and urces are m
mmunity re
us reducing
managemen
European H
e will be ma
mbustion Mted during t
occurrence
naged in ac
Heritage mplementeHMP.
at MCC inc
of the desig
installationinimised;
presentativ
any likely t
t of heritag
eritage this
anaged in ac
Managementhe next rep
e and mana
ccordance w
Managemeed during t
clude:
gn and cons
n of new mi
ves on the
time delay
ge sites at M
s reporting p
ccordance w
t Plan (SCMporting per
age the effe
86
with the
ent Plan he next
struction
ne plant
e plans,
risks or
MCC.
period.
with the
MP) was riod. No
ect from
2015 An
As part areas a
Exaoccu
Exabrow
Usintem
Mea
Mea MCC hacombusinclude
Coo
Rem
Min
Reteimm
Seaprev
Regularidentifyimproveareas uthe exte Four spperiod. emplacsubmitt
MUSWELL
nnual Environ
of preparare identified
mining preurrences of
mining thewn or dying
ng infra‐remperature;
asuring bor
asuring surf
as successfstion. Met:
oling the hea
moval of the
nimisation o
ention of 5 mediately re
ling of remvent the ing
r spontaney existing anements to nder waterent and loca
pontaneous The majo
ement areted during t
ReM
J
F
M
A
M
J
J
A
LBROOK COAL
nmental Man
ation for mid by:
evious infof spontaneo
e surface fog vegetation
ed photogr
ehole temp
face tempe
ful experienhods used
ated area w
e fuel by mi
of areas of c
metres of equired for
maining unmgress of oxy
ous combund new incthese proc infusion anation of pro
combustioority of afas. A histothe reportin
Table 37: S
eporting Month
S
A
Jan‐15
Feb‐15
Mar‐15
Apr‐15
May‐15
Jun‐15
Jul‐15
Aug‐15
L COMPANY L
nagement Re
ning of are
rmation reous combust
or any phyn and increa
raphy, wh
peratures fo
ratures.
nce in manto manage
with water b
ning the co
coal expose
overburdenmining ope
mined undygen.
ustion repoidents of spcedures, effnd complainoblem areas
n reports wffected areorical compng period, is
Spontaneou
SpontaneouCombustioAreas Cappe
(m2)
0
9,178
6,200
0
4
0
0
7,000
IMITED
eport
as affected
ecords, acction;
ysical effectased surfac
ere appro
or temperat
aging and mining in a
before mini
al;
d to the air
n above woerations; an
erground w
orts are prpontaneousfectiveness nts receiveds.
were submiteas were wparison, alos provided i
us Combus
us on ed
SpontCombAreas
(m
1
1
by spontan
umulated o
ts of sponte temperat
opriate, to
ture increas
controlling areas prone
ng (water in
prior to mi
orkings to ed
workings w
ovided to s combustioof actions
d. The repor
tted to DREwithin theong with a n Table 37
tion Report
aneous bustion Minedm2)
4
0
0
0
0
12
14
0
neous comb
over the la
taneous coure;
show ar
ses; and
areas prone to sponta
nfusion);
ning;
xclude oxyg
with clay or
both DRE on, mitigatio, areas caprt also inclu
and EPA dopen cutsummary and Table 3
t Summary
Area UndeWater Infusion (m2)
24,774
9,517
9,517
9,517
13,600
8,500
9,000
9,000
bustion, hig
ast ten ye
ombustion
reas of in
ne to sponaneous com
gen from a
r inert mat
and EPA. on procedupped, areasudes a plan s
uring the ret and oveof all the 38.
er
87
gher risk
ears, for
such as
ncreased
taneous mbustion
reas not
terial to
Reports ures and s mined, showing
eporting rburden reports
2015 An
Jan‐Mar
Apr‐Jun
Jul‐Sep
Oct‐Dec
Yearly Average
During continuaccess t
3.16.2 During accorda
3.17 B
3.17.1 During updatedwere m The obj
To m
Con
To poccu
To sho
On 14 Dstarted spark.
MUSWELL
nnual Environ
ReM
S
O
N
D
Table 38: H
2007
6694
25546
3721
3918
9970
the reportued on an othese areas
Activities nthe next reance with th
BUSHFIRE
Activities tthe reportid BFMP to
made to the
jectives of t
manage act
ntain fuel lo
put in placeur; and
put in placuld an outb
December 2when a bThe fire wa
LBROOK COAL
nmental Man
eporting Month
S
A
Sep‐15
Oct‐15
Nov‐15
Dec‐15
Historical Su
Total Area
2008
1726
661
1076
646.5
1027
ing period ongoing bass. A review
next Reporteporting pehe SCMP.
his Reporting period tbe implemeBFMP.
the Bushfire
ivities on si
ads to acce
e hazard m
ce arrangembreak of fire
2015 there wird interactas controlle
L COMPANY L
nagement Re
SpontaneouCombustioAreas Cappe
(m2)
31,000
0
0
0
ummary of A
Affected b
2009
641.5
187
34
70
233
mining of ssis accordinof these co
ting Periodriod manag
ng Periodthe Bushfireented durin
e Managem
te are to m
ptable leve
mitigation m
ments to liae occur at M
was a fire oted with poed by the Ru
IMITED
eport
us on ed
SpontCombAreas
(m
1
2
Areas Affec
by Spontane
2010 2
40
85
135
45
76
spontaneoung to the seontrols cons
gement of s
e Managemng the next
ent Plan are
inimise the
els to moder
measures to
aise with aMCC or threa
outbreak onower lines ural Fire Se
aneous bustion Minedm2)
12
24
8
0
cted by Spo
eous Comb
2011 20
215 7
95 5
85 4
64 5
115 5
us combusteverity of thidered the
spontaneou
ment Plan (Breporting p
e:
risk of outb
rate fire int
o contain an
and supportaten MCC’s
n site near Vand caused
ervice and s
Area UndeWater Infusion (m2)
25,560
31,150
31,150
31,150
ontaneous C
ustion (m2)
012 201
71 65
53 57
45 14
57 45
57 79
tion areas ahe problemcontrols to
us combusti
BFMP) was period. No
break of fire
ensity;
n outbreak
t the Ruraloperations
Void 3. It apd the poweite personn
er
Combustion
)
13 2014
5 156
7
49 177
5 119
9 151
and water m and the abe successf
ion will con
reviewed wsignificant
e;
of fire sho
l Fire Servics.
ppears that er lines to nel. Approx
88
n
4 2015
145
232
190
242
203
infusion ability to ful.
ntinue in
with the changes
ould one
ce (RFS)
this fire arc and ximately
2015 An
5ha of operati
3.17.2 During accorda
3.18 HHydrocafacilitiehandlinrisk of h
Abooccu
Wasrequ
Oilyfully
Runan o
A Bioreguidanchydrocathat is the NSmateriacontam The Biolocatedarea anlimits inmateriamaterialeast 15
3.19 MAs no drainag
MUSWELL
nnual Environ
rehabilitateons.
Activities tthe next
ance with th
HYDROCARarbon storas. These stong of flammhydrocarbo
ove ground ur;
ste oil fromuired;
y water runy bunded; a
noff from thoil/water se
emediation ce on howarbons and potentially W EPA Waal is classifiminated it is
oremediatio in an areand tested fon the NSW al met the al was dispo5m of inert
METHANE Dundergrounge or ventila
LBROOK COAL
nmental Man
ed land was
his Reportireporting he BFMP.
RBON CONTage facilitiesorage facilitmable and cn contamin
fuel stora
m the work
noff from thand
he hardstaneparator. Th
Managemew to manahow to deccontaminaaste Classifed as solideither treat
on Area req that was sr levels of hEPA Waste solid wastosed in thematerial in
DRAINAGEnd mining ation was re
L COMPANY L
nagement Re
s burnt with
ng Periodperiod bu
TAMINATIs were consties comply ombustible ation includ
ge tanks a
shop is sto
he re‐fuellin
nd wash‐dohe collected
ent Plan waage future commissionted is testefication Gud waste it ited on site
quired decoscheduled fhydrocarboClassificatite classificae carbonacethe final lan
E/VENTILAToccurred aequired
IMITED
eport
h no damag
shfire imp
ON structed as with the re liquids. Acde:
re self‐bun
ored in a bu
ng bay drai
wn bay pasd silt is rout
as developematerial
n the establed with theuidelines Pas disposed prior to dis
ommissioninfor rehabilitn contaminion Guidelination and weous materndform.
TION at MCC du
ge to infras
acts will c
part of the equirementstivities und
nded to con
unded wast
ins into an
sses througtinely cleane
d during ththat is poished Bioree results beart 1: Classon site. Iposal or it i
ng during ttation. Samnation. The nes Part 1: Cwas able torial dump, w
uring the re
structure or
continue to
workshop, s of AS1940ertaken on
ntain any s
te oil tank
above grou
gh a three‐sed out.
he reportingotentially cmediation Aing comparsifying Wasf the mates taken off
he reportinmples were results werClassifying o be dispowhich will b
eporting pe
r impact on
o be man
stores and 0 – The storn site to red
spillage wh
and is rem
und sump w
staged silt t
g period to contaminateArea. Any mred to the ste (2014). erial is classsite for disp
ng period acollected fre compareWaste (201osed on sitbe covered
eriod no m
89
n mining
aged in
blasting rage and duce the
ich may
moved as
which is
trap and
provide ed with material limits in If the
sified as posal.
s it was rom the ed to the 14). The e. This with at
methane
2015 An
3.20 PDuring proceduinspect A securperiods
3.21 ONo inciperiod.
MUSWELL
nnual Environ
UBLIC SAFthe reportures. Fenceed and mai
rity patrol iss (Christmas
OTHER ISSUidents of d
LBROOK COAL
nmental Man
FETY ing period, es surroundntained.
s conducteds, shutdown
UES AND Rdamage to
L COMPANY L
nagement Re
public safeing the ope
d by a localns, etc.) whe
ISKS surface in
IMITED
eport
ety was maerational ar
l security fien the site
nfrastructur
anaged in aeas and alo
rm over weis not mann
re were re
accordance ong propert
eekends andned.
corded dur
with currety boundari
d other nom
ring this re
90
ent MCC ies were
minated
eporting
2015 An
4.0 CMCC undiscussiContact
4.1 EMCC opcan cominvestigcomplaoperatiEnviron 50 comare proreceive
In compreportinshown
MUSWELL
nnual Environ
COMMUNndertakes cions with ct Line (1800
NVIRONMperates a tommunicate gates the coinant withon of the nmental Pro
mplaints werovided in Apd during th
parison, theng period cin Figure 37
LBROOK COAL
nmental Man
NITY RELATcommunity community 0 600 205).
MENTAL COoll free 24‐their conc
omplaint, tah the findiEnvironmeotection Lice
re receivedppendix 5. e reporting
T
Type of Co
Odo
Bla
Du
Haul
Ligh
Noi
Visu
Oth
Tot
ere has beecompared t7.
L COMPANY L
nagement Re
TIONS consultatiomembers
OMPLAINTShour Enviroerns to siteake action tngs. The ntal Contacence and De
during theTable 39 a period.
Table 39: Su
omplaint
our
st
st
age
ht
se
ual
her
tal
n an increato previous
IMITED
eport
on through tand opera
S onmental Ce personneto reduce imrecording ct Line is cevelopmen
e reporting and Figure 3
ummary of
Numb
37
3
2
4
1
1
2
0
50
ase in the nus reporting
the Commuating a toll
Contact Linel. On recempact as reof environconducted t Consent C
period. M36 provide
f Complaint
ber P
umber of coperiods. T
unity Consufree 24‐ho
e where comeiving a comquired and nmental coin accordanConditions.
ore details a summary
s
Percentage
74%
6%
4%
8%
2%
2%
4%
0%
100%
omplaints rThe compla
ultative Comour Environ
mmunity mmplaint, M report bacomplaints ance with t
on the comy of the com
received duint history
91
mmittee, nmental
members CC staff ck to the and the he MCC
mplaints mplaints
ring this chart is
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 336: Complaint Summary
9
92
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figuree 37: Complaint History
9
93
2015 An
4.2 CMCC pefosterin Commuorganis
Wyb
Wes
201
Mus
Mus
Mus
Spe
St. J
Mus
Rota
Hun
Heb
Hun In additmoney
4.3 CMCC’s operaticommuand 2 commuinformaquarterenvironpresent2015, 2
MUSWELL
nnual Environ
OMMUNITersonnel mng and deve
unity suppoations:
bong Wild D
stpac Rescu
4‐2015 Frie
swellbrook
swellbrook
swellbrook
cial Childre
James Prima
swellbrook
ary Club of
nter Researc
bden Wild D
nter Coal Fe
tion to direthis year fo
OMMUNITCommunityons to the unity represMCC repr
unication mation on mrly at the Mnmental motations and June 2015,
LBROOK COAL
nmental Man
TY LIAISONaintain coneloping stro
ort through
Dog Annual
ue Helicopte
end of Foun
High Schoo
Public Scho
South Publ
n’s Christm
ary School
Christian Sc
Muswellbro
ch Foundat
Dog Support
estival
ect donationor the Endea
TY CONSUy Consultatlocal comm
sentatives (iresentativesmechanism mining andMCC office aonitoring d site visits. , 8 Septemb
L COMPANY L
nagement Re
N, SPONSOntact with nng links wit
out the rep
Support
er
dation
ol
ool
ic School
as
chool
ook
ion
t
ns from theavour Found
LTATIVE COtive Commmunity. Theincluding 1 s. The aimso that m environmand commitata and ar During theber 2015 an
IMITED
eport
ORSHIPS ANnearby resith the comm
porting per
e company,dation.
OMMITTEmittee (CCCe CCC is cofrom the W
m of the members ofental mattttee membere kept up e reportingnd 1 Decem
ND DONATdents and munity.
riod include
, MCC emp
E C) providesomprised ofWanaruah Lcommittee f the localters. CCC ers are actito date o
g period meber 2015.
TIONS are commi
ed donation
loyees and
informatiof 3 council ocal Aborigis to pro
l communimeetings avely involven mining oeetings wer
tted to con
ns to the fo
contractor
on regardinrepresenta
ginal Lands ovide an eity have adare generaed in the reoperations re held on 3
94
ntinually
ollowing
rs raised
ng mine atives, 3 Council) effective dequate lly held eview of through 3 March
2015 An
5.0 RDuring updatedwere m The objflora aconnect Rehabil
5.1 BNo build
5.2 R
5.2.1 The reh
Sha
In tapp
ConPlan
In tapp
Prio MCC’s and Skevegetatfor MCThere hperiod.
5.2.2 A reviewthe recomix is bCentral depend
MUSWELL
nnual Environ
REHABILITthe reportd LMP to b
made to the
jectives of tnd fauna tivity within
litation is co
BUILDINGS dings were
REHABILITA
Rehabilitathabilitation
ping is cond
the areas wproximately
ntour banksn.
the areas proximately
or to seedin
rehabilitatioelletar Ridgtion across CC includes has been no
Species Selw of the naommendedbased on spHunter Gr
dent on avai
TaBotanic
Eucalyp
Eucalyp
Acacia
LBROOK COAL
nmental Man
TATION ting periodbe implemeLMP.
the LMP arespecies, imn the site an
onducted in
demolished
ATION OF D
tion Processprocess at M
ducted in ac
where tree10cm.
s are const
where pas80‐100 ton
g, topsoil a
on programe areas northe lease athe incorp
o change to
lection tive vegetad native vegpecies that ey Box‐Ironilability of s
able 40: Reccal Name
ptus crebra
ptus teretico
decora
L COMPANY L
nagement Re
the Land nted during
e to reducemplement nd surround
n accordanc
d or rehabil
DISTURBED
s MCC is:
ccordance w
es are the
ructed in a
sture is thnnes/ha.
nd/or OGM
m aims to lrth and souarea creatinporation of the agricul
tion seed metation seewere presenbark Woodseed.
commended
ornis
IMITED
eport
Managemeg the next r
e the impacsustainableding areas.
ce with the M
litated durin
D LANDS
with the des
final vege
accordance
he final ve
M are incorp
link existinguth of the leng a viable native vegltural land s
mix was unded mix listedent in the adland. Use
d Species LC
N
F
W
ent Plan (Lreporting p
ct of mininge land pra
MOP.
ng the repo
sign require
tation tops
with the E
getation O
orated into
g remnant ease area bwildlife corgetation aresuitability o
dertaken dud in Table 4area prior t of these sp
ist for NativCommon Nam
Narrow‐leave
orest Red Gu
Western Silve
LMP) was reriod. No
g operationsactices and
rting period
ements outl
soil is spre
Erosion and
OGM is spr
o the underl
vegetation by planting rridor. Rehaeas to contf the site d
ring the rep0. The natio mining apecies in th
ve Vegetatime
ed Ironbark
um
er Wattle
reviewed wsignificant
s on existind enhance
d.
lined in the
ead to a d
d Sediment
read at a
lying soil.
in Bells Mcorridors oabilitation ptinue the curing the re
porting perive vegetatind is basedhe final land
ion
95
with the changes
g native habitat
MOP.
depth of
Control
rate of
Mountain of native planning corridor. eporting
iod with ion seed d on the dform is
2015 An
PastureWimmesummecolder wGranulomix. Ththe Hun(Hannaand moperiod these sp
MUSWELL
nnual Environ
Botanic
Acacia
Acacia
Acacia
Cassini
Brachy
Bursari
Indigof
Austrod
Austrod
Chloris
Desmo
Calotis
Eremop
Veronc
Cyperu
Cheilan
Glycine
Eucalyp
Enchyla
Harden
Gooden
Myopo
Geijera
Loman
Loman
Loman
e mixtures ena Rye, Per months Jwinter monock 15 has he species mnter Valley n, J.C., 199onitoring rewith the repecies in th
Botan
Pennis
Cynod
Lolium
Lolium
Setaria
Medic
LBROOK COAL
nmental Man
cal Name
falcata
implexa
paradoxa
ia aculeata
ychiton popul
ia spinosa
fera australis
danthia bipa
danthia race
ventricosa
odium brachy
lappulacea
phlia debilis
cia calycina
us gracilis
nthes sieberi
e tabacina
ptus molucca
aena toment
nbergia viola
nia hederace
orum montan
a parviflora
dra confertif
dra filiformis
dra multiflor
used in Perennial RyJapanese Mnths. The legbeen incorpmix has beein the book5). This seesults. A reevised recoe final land
Table 41
ical Name
setum cland
don dactylon
m rigidum
m perenne
a sphacelat
ago sativa
L COMPANY L
nagement Re
lneus
s
artite
emose
ypodum
ana
tosa
acea
ea
num
folia
s
ra
rehabilitatioye LucerneMillet is addgumes are porated at aen based ok Mine Rehaed mix haseview of theommended form is dep
1: Recomm
destinum
n
ta
IMITED
eport
C
S
H
K
D
K
B
A
W
W
P
T
Y
W
H
S
P
‐
G
R
F
F
W
W
M
M
M
on generae, Haifa Wded to the inoculated a rate of apon the pastabilitation: been mode pasture mspecies listpendent on
mended Spec
Comm
Kikuyu
Couch
Annua
Peren
Setari
Lucern
Common Nam
ally Wattle
Hickory Watt
Kangaroo Tho
Dolly Bush
Kurrajong
Blackthorn
Australian Ind
Wallaby Gras
Wallaby Gras
Plump Windm
Tick‐trefoil
Yellow Burr‐d
Winter Apple
Hairy Speedw
lender Flat‐s
Poison Rock F
Gum Topped
Ruby Saltbush
alse Sarsapa
orest Goode
Western Boo
Wilga
Mat‐Rush
Mat‐Rush
Mat‐Rush
lly consist hite Clovermix, whilsand lime copproximateure establisA Handbooified over tmix was undt for pasturavailability
cies List for
mon Name
u grass
h
al Rye grass
nial Rye gra
a
ne
me
le
orn
digo
s
s
mill Grass
daisy
well
sedge
Fern
Box
h
rilla
enia
bialla
of Couch,r and sub‐cst Oats are oated. Fertily 200 kg/Hshment reck for the Cotime based dertaken dure shown inof seed.
r Pasture
ass
, Pioneer clover. Dur added duilizer in the Ha with the commendatoal Mining on site expuring the ren Table 41
96
Falcata, ring the ring the form of pasture tions for Industry perience eporting . Use of
2015 An
5.2.3 During site. Thincludin
DamOrgpastactiexis
Wesand
No. This is aan areaoffset t Table 4activitie5.2.4 thtotal re
In additbrickwooutside During affectedfire haserosionany eroactions
MUSWELL
nnual Environ
Botan
Trifoliu
Trifoliu
Phalar
Festuc
Bromu
Rehabilitatthe reporthree main ang:
m Wall Dumanic Growtture and tvities were sting and ne
st Crib Hut seeding tre
2 Open Cut
a slight varia close to this area see
42 shows thes were behhe rehabilithabilitation
Table
A
S
S
tion to the orks. OGM e of the MO
the reportid approxims assisted n occurring osion or signwill be und
LBROOK COAL
nmental Man
ical Name
um repens
um subterra
ris aquatic
ca arundina
us wildenow
tion Activitiing period areas were
mp – constrth Mediumree speciescompleted
ew rehabilit
– final bulkee species.
t – final bulk
iation from he workshoeding works
he complethind targettation plannn area.
42: Compa
Activity
Shaping
Seeding
Total
areas listedwas spreadP boundary
ng period amately 5ha orecovery wfollowing tnificant weedertaken to
L COMPANY L
nagement Re
aneum
cea
wie
ies this RepMCC contitargeted th
ruction of am (OGM), ins. In conju along Blueation.
k shaping, co
k shaping ac
what was op this areas at the Wes
ted work co with seedined for the
arison of 20
Pro
d MCC unded in this arey but on lan
small fire oof land (seewith the arhe rain. Thed outbreakassist in the
IMITED
eport
Comm
White
Subte
Phalar
Tall Fe
Prairieonly)
porting Periinued to unhis reporting
a drop, financorporatiounction wites Road to t
onstruction
ctivities.
identified ina couldn’t bst Crib Hut
ompared toing activitiee next repo
015 Rehabili
oposed (MO
15.7ha
10.0ha
25.7ha
ertook seeda prior to pd owned an
occurred one Section 3.rea germinahis area wilks occur due managem
mon Name
e Clover
rranean Clo
ris
escue
e Grass (sow
od ndertake reg period wit
alisation ofon of topsoth this woidy up this a
n of a conto
n the MOP.be final shawere exped
o the targees ahead ofrting period
itation Aga
OP)
ding works pasture specnd controlle
n an area of.17 for morating againl continue ring regene
ment of this
over
wn in Autum
ehabilitationth the activ
contour doil and OGMrk final shaarea and to
our drain, sp
. Due to acaped and sedited.
ts in the Mf target. Asd will addre
inst MOP T
Actual
6.0ha
16.1ha
22.1ha
on 1.5ha ocies being seed by MCC.
f older rehare details). with no sto be monieration. If rearea while
mn
n activities vities in the
rains, spreaM, and seeaping and o incorporat
preading of
ccess restriceeded. In o
MOP. Bulk s shown in ess any sho
Targets
l
a
a
of land neareeded. Thi
abilitation. Rain followsigns of sigitored to idequired, mit regenera
97
around se areas
ading of eding of seeding te it into
f topsoil,
ctions in order to
shaping Section ortfall in
r the old s area is
This fire wing the gnificant dentify if itigation tes.
2015 An
The reh43 and
A
B
C
D
E
F
G
MUSWELL
nnual Environ
habilitation Table 44.
MINE LEA
A1 M1
DISTURBE
B1 In
B2 A(e
B3 W(a
B4 T(a
B5 S(a
ALL DISTU
REHABILIT
C1 T(e
REHABILIT
D1 1
D2 G
SURFACE
E1 P
E2 N
E3 P
E4 Oo
DE‐HAB ‐
F1 P
F2 N
SURFACE to trees, h
G1 Pto
LBROOK COAL
nmental Man
and mainte
T
AREA A
ASE AREA
Mine Lease 304 and M
ED AREAS
nfrastructu
Active Mininexcluding it
Waste Emplactive/unsh
Tailing Emplactive/unsh
haped Wasawaits final
URBED AREA
TATION PRO
Total Rehabexcept for m
TATION ON
0 to 18 deg
Greater than
OF REHABI
Pasture and
Native fores
Plantation a
Other (includoutcomes)
disturbed a
Pasture and
Native fores
CONVERSIOhectares refl
Pasture/Covo Trees
L COMPANY L
nagement Re
enance sum
Table 43: Re
AFFECTED /
Area: CCL 7L1562
re Area
ng Area ems B3‐B5
acementshaped/in or
lacementshaped/unca
ste Emplacevegetation
AS
OGRESS
ilitation Aremaintenanc
N SLOPES
grees
n 18 degree
LITATED LA
grasses
st/ecosyste
and crops
de non‐veg
areas previo
grasses
st/ecosyste
ON ‐ previouflected in Se
ver Crop are
IMITED
eport
mmary for th
ehabilitatio
/ REHABILIT
713, ML
below)
out‐of‐pit)
pped)
ement n)
ea ce)
es
AND
ms
etative
ously rehabi
ms
usly reporteection E)
eas planted
he reporting
on Summar
TATED (hec
To Dat
1788
48.3
88.3
111.3
0.0
6.0
253.9
363.5
45.7
0.0
238.7
124.8
0.0
0.0
ilitated, figu
0.0
0.0
ed pasture (
d 0.0
g period can
y
tares)
te Las
Repo
178
49.
111
3 92.
0.0
9.6
9 263
5 347
45.
0.0
7 233
8 114
0.0
0.0
ures reflecte
4.4
3.1
(cover crop)
0.0
n be found
st ort
NRe(E
88 17
.1 49
1.8 70
.9 11
0 0
6 0
3.9 23
7.4 38
.7 45
0 0
3.1 24
4.3 13
0 0
0 0
ed in Section
45 0
11 0
) areas plan
0 0
98
in Table
ext port Est.)
788
9.1
0.3
14.6
0.0
0.0
34.0
84.7
5.7
0.0
45.9
38.8
0.0
0.0
n E
0.0
0.0
nted
0.0
2015 An
NAT
Additiworks(drainsprotec
Re‐cov(detailsubsoi
Soil Tr(detailetc.)
Treatm(detailslashin
Re‐see(detailseason
Advers(detail
Feral A(detailtrappietc.)
5.2.4 The proThis is vproposeshown the minthat cashown area tar
MUSWELL
nnual Environ
T
TURE OF TR
onal erosio s, re‐contouction)
vering l ‐ further toil sealing etc
reatment l ‐ fertiliser,
ment / Manl ‐ grazing, cng)
eding / Repl ‐ species dn etc.)
sely Affectel – type and
Animal Conl – additionang, shootin
Rehabilitatoposed areavariation toed changesin the MOPne plan. Inn be rehabin Table 45rgets identi
Table 45: C
A
S
S
LBROOK COAL
nmental Man
Table 44: M
REATMENT
on control
uring, rock
opsoil, c.)
lime gypsu
nagement cropping,
planting density,
ed by Weedd treatment
ntrol al fencing, g, baiting
tion Activitia for rehabio what is shs to the apP to be rehastead of rebilitated. T5 these altefied in the M
Comparison
Activity
Shaping
Seeding
Total
L COMPANY L
nagement Re
Maintenance
ARE
ReporPeriod
0
0
um 0
0
0
ds )
0
0
ies next Replitation durhown in thepproval andabilitated wehabilitatingThese areasernative areMOP.
n of Propose
Pro
IMITED
eport
e Activities
EA TREATED(Ha)
rt d
NextPerio
0
0
0
0
0
0
0
porting Perring the nexe MOP. Thid the mine will require g these areas won’t be eas will stil
ed 2016 Re
oposed (MO
22.0ha
15.7ha
37.7ha
s on Rehabi
D Com
t d
NA
NA
NA
NA
NA
NA
NA
riod xt reporting s variation plan identdisturbanceas MCC havaffected byll allow MC
habilitation
OP)
litated Land
ment / ConTreatme
period is shis requiredtified that se as a resultve identifiey changes tCC to almos
n Against M
Actual (AE
15.1ha
21.2ha
36.3ha
d
ntrol Strateent Detail
hown on Fig as a reviewsome of tht of the chad alternativto mine plast meet the
MOP Targets
EMR)
a
a
a
99
egies /
gure 38. w of the he areas anges to ve areas ans. As e overall
s
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figgure 38: Proposeed Activities Nexxt Reporting Perriod
10
00
2015 An
During rehabili
5.3 RDuring programin the accorda
5.3.1 A total and surFigure 4rehabiliguided sites cAlthougrepresesite locaGPS locrepresereferen Within the Endin the Threateestablis The passix were Permantransecdocumeweed in(landscaend of during s
MUSWELL
nnual Environ
the next itation area
REHABILITAthe report
m. This revupdated Mance with th
Site Selectiof 18 permrveyed this40. This incitation areaby indicativhosen rangh sites weentative of ations werecation, thesentative oce/analogu
the woodladangered EcNew Sout
ened Specieshed within
sture sites me establishe
nent photo ct to document changenvasion or eape and pothe transesubsequent
LBROOK COAL
nmental Man
reporting pas are on the
ATION MOting periodiew was to MOP. This he revised m
ion manent sites reporting corporated as as per theve locationsdomly witere selectethe wider e pre‐existinse three sitof remnanue sites.
and sites, thcological Coth Wales Nes Conservaeach of the
monitored ied within ea
reference pment broads over timeerosion). Fivortrait centrect. Photo t yearly surv
L COMPANY L
nagement Re
period furte desired tr
NITORINGd MCC undalign the mreporting
monitoring
s, nine wooperiod. Thsites in bote requiremes provided bhin designed randomlrehabilitationg as part otes were nent pasture
hree analoguommunity (North Coasation Act 1e three Reh
ncluded thrach of the th
points wered vegetatioe and provive photos wre, facing lereference
veys.
IMITED
eport
her studiesrajectory to
G dertook a rmonitoring pperiod reprequiremen
dland sites he locationth remnant ents as set by MCC envnated woodly, care waon areas. of historic flewly estable and w
ue sites weEEC) Centrast and Syd1995 (TSC Aabilitations
ree within rhree Rehab
e establishedon changes ide early wwere taken eft, facing rpoints will
s will be u comply wit
review of tprogram witpresents thents.
and nine p of the site(for purposout in the Mvironmentadland or pas given toInitially, twora monitolished in looodland a
re establishal Hunter Gdney BasinAct). The s Blocks (A,
remnant pabilitations B
d at the stawithin ea
warning of aat each refright) and ol be reasse
undertaken th completi
the rehabilth the closue first year
pasture siteses is shownse of refereMOP. The ll staff with pasture reo ensure two pasture aoring, howevcations thaand suitab
hed within rGrey Box – I
Bioregion remaining B and C).
sture areaslocks (A, B a
rt and end ch woodlanany emerginerence poinone landscaessed and h
to identifyon criteria.
litation moure criteria or of monit
s, were estan in Figure ence/analoglocality of s specific onhabilitationthey were and one wver, due to at were conble for
remnant paIronbark W listed unsix location
s and the reand C).
of each pernd/pastureng threats (nt, four at tpe photo fhave image
101
y if the
onitoring outlined oring in
ablished 39 and
gue) and ites was n ground n areas. suitably oodland error in nsidered use as
tches of oodland der the ns were
maining
rmanent site to (such as the start rom the es taken
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figuree 39: Rehabilitattion Monitoringg Program – Florra Sites
10
02
2
MUSWE
2015 Annual Envir
ELLBROOK COAL CO
ronmental Manag
OMPANY LIMITED
gement Report
Figure 40: Rehabilitation Monitoring Program – Faunna Sites
10
03
2015 An
5.4 F
5.4.1 At eachplot weend of (and site45 degrlines an
5.4.2 Floristic41). Th46). Wwith the
MUSWELL
nnual Environ
LORA MON
Permanenth of the ninere establis(Figure 41).e details werees) to avond/or plante
Full Floristic assessmenis was a m
Within each e BioBankin
LBROOK COAL
nmental Man
NITORING
t Monitorine woodlandhed centred. GPS coordere recordeoid collectined rows.
ic and Strucnts for speceasure of bplot the attng Assessme
50
L COMPANY L
nagement Re
METHODO
ng Transectsd sites, 20md over a 50dinates wered. All plotng data bias
Figure 41:
cture cies richnessboth specietribute for ent Method
IMITED
eport
OLOGY
s/Plots m x 50m plo0m transectre taken at ts were estased towards
Floristic Plo
s were condes presencenative and dology 2014
20
10
ots with a nt marked usthe start anablished acs vegetation
ot Diagram
ducted withe, including exotic spec4.
0
10
nested 20msing star picnd finish poross the slon and soil c
hin the 20mcover and
cies is recor
20
m x 20m fullckets the soints of the ope (approxharacteristi
m x 20m plot abundancerded in acc
104
floristic tart and transect ximately ics in rip
t (Figure e (Table ordance
2015 An
Attribu
Stratum
Growth
Species
Cover
Abundarating
All vascpossibleNomenany subother sp In addirecorde
5.4.3 Within Assessmcover eforbs, snumberoccurrin
5.5 FTo demsites, mmonitomonitoyears frthe respyears acompar
5.5.1 The speand is
MUSWELL
nnual Environ
Table 46
te
m
h form
s name
ance
cular plantse, with sclature follobsequent repecific bota
ition to thed from acro
Biometric Sthe 20 m
ment Methoevery five msedges) covr of hollowng were all
LORA MONmonstrate comonitoring ring of anring prograrom plantinpective anaafter seedinrable to ana
Species Ricecies richnebased on t
LBROOK COAL
nmental Man
6: Data Gath
Survey Req
Stratum an
Growth for
Scientific n
A measure recorded scover of a sthen the es
A relative mwithin the estimates o1,2,3,4,5,6,1000 if req
s species wsamples ofowed the Fecent taxonanical sourc
is, the totoss the ent
Survey x 50 m ploodology (Dmetres aloner, exotic s bearing trrecorded.
NITORING ompliance wsurvey realogue siteam, states tng, >80% ofalogue sitesng weeds alogue sites
chness ss measurethe average
L COMPANY L
nagement Re
hered for Fl
quirement
nd layer in w
rm for each
ame and co
or estimatepecies; recospecies is lestimated co
measure of plot. Use thonly: ,7,8,9,10,20uired
were recordf unknownlora of Newnomic chanes.
al number ire vegetati
ot, biometrECC 2008). ng the 50mspecies coveees and wh
RESULTSwith the comesults wases. Key cthat ‘rehabf the species’ and ‘reharepresent ’.
ed at each we number o
IMITED
eport
loristic Asse
which each s
recorded s
ommon nam
e of the apporded from ess than 1% over should
the numbehe following
0,50,100,50
ded and idn species w South Wanges as pre
of each sion zone.
ric attribut Attribute
m transect. er were rechether rege
mpletion crcomparedcompletionbilitation moes establishbilitation mless than
woodland mof native sp
essment of
species occ
species
me
propriate co1–5% and tand the spbe entered
r of individug intervals;
00,1000 or s
dentified tocollected
les (Hardenesented on
species reg
es were res included Shrub covecorded evereneration (t
riteria indica to bench criteria inonitoring reed are com
monitoring r20% of pr
monitoring species and
the Woodl
urs
over measuthen to the ecies is con (e.g. 0.4)
uals or shoonumbers ab
pecify a nu
o the lowesfor furth
n 1992; 1993PlantNET
generating
ecorded usicanopy cover, grass cory one mettrees less th
ated in the hmarks dern the MOPeports confmparative toreports conojected fol
ite is represweed spec
and Sites
re for each nearest 5%
nsidered imp
ots of a spebove about
mber great
st taxonomher identi3; 2000; 20(RBGDT 20
was assess
ing the Biover and midover, otherre. Lengthhan 5cm D
MOP for wrived throuP, relevant firm that afo the seed firm that afliage cover
sented in Fcies presen
105
%. If the portant,
cies 20 are
ter than
mic level fication. 02), and 012) and
sed and
obanking d‐storey r (herbs, of logs, BH) was
oodland ugh the to this
fter two mix and fter two r or are
igure 42 t within
2015 An
remnanTable 4Central The aveover fivwoodlarichnes
The comsite is rweed spjust abo
MUSWELL
nnual Environ
nt and reha40 as well Hunter Gre
erage numbve times gnd sites. Ts between
Fi
mparison orepresentedpecies whicove an aver
LBROOK COAL
nmental Man
bilitation was those spey Box – Iro
ber of nativgreater thahe standarremnant an
gure 42: Co
f average wd in Figure ch is slightlyage of 10 w
L COMPANY L
nagement Re
woodland sitpecies consonbark Woo
ve species an that of d deviationnd rehabilita
omparison o
weed specie43. The rey higher thaweed specie
IMITED
eport
tes. This residered desodland comm
present winative spe
n bars showation wood
of Average
es richness ehabilitatioan that for tes.
elates to thesired nativemunity in th
thin the reecies presew that the land sites is
Native Spe
measured n woodlandthe remnan
e recommee species che remnant
emnant wooent across variability s relatively l
ecies Richne
at each wod sites havent woodland
nded speciconsistent wt sites.
odland sitethe rehabof average limited.
ess
oodland moe an averagd sites whic
106
es list in with the
es is just bilitation species
onitoring ge of 14 ch sits at
2015 An
5.5.2 Averagenative oExotic pbetwee The remwith a cover wground
MUSWELL
nnual Environ
Fig
Biometric De percentagother coverplant coveren remnant
mnant woohigher propwas conside.
LBROOK COAL
nmental Man
gure 43: Com
Data ge of nativer was measur, litter andand rehabi
odland sitesportion in orably highe
F
L COMPANY L
nagement Re
mparison o
e over‐storeured for remd bare groulitation woo
s containedover‐storey,r in rehabili
Figure 44: B
IMITED
eport
of Average N
ey and mid‐mnant and und were aodland sites
d a greater , grass coveitation sites
iometric Da
Number of
storey coverehabilitatelso recordes.
proportioner, shrub ans and mode
ata Average
Weed Spec
er and natived woodlaned and pro
n of native nd native orately highe
es
cies
ve grass, shrnd sites (Figovide a com
species in other coverer in litter a
107
rub, and gure 44). mparison
general . Exotic and bare
2015 An
5.5.3 In relatestablisin Tableremnanfoliage
Site
RW1
RW2
RW3
RW4
RW5
RW6
5.6 FAFauna mobile indicatoconjuncnoted ifoperatimore rsubsequ
5.6.1 Remoteplastic bon a treof 3 nigweek oidentify
5.6.2 A new involvedsites foare thaat the across a
MUSWELL
nnual Environ
Comparisotion to seleshed nativee 47. In cont woodlandcover of we
T
Comcrite(natiesta
AUNA MOmonitoring fauna specor fauna spction with f observed ons. At thrigorous dauent monito
Remote Cae cameras bait stationee trunk facghts, howevof monitorying the typ
Bird Censumethodolod the use or four nightt recordingsame tempall sites.
LBROOK COAL
nmental Man
n to Complcted compl species comparison, td sites (anaeeds in rem
Table 47: R
mpletion eria target ve species ablished)
>80%
>80%
>80%
>80%
>80%
>80%
ONITORINGdesign an
cies (i.e. birpecies as opthe fauna which mayhis stage, faata analysisoring years
amera Survewere place filled with cing the baitver, an addiring and ee of animal
s ogy was unof songmetets and usedgs of bird acperature ac
L COMPANY L
nagement Re
etion Criteletion criteromposition the averagelogue sites)nant wood
ehabilitatio
2015 result
21%
17%
39%
50%
31%
39%
G METHODd location rd and bat pposed to amonitoring
y assist withauna monits and testhas been c
ey ed at seventuna and pt station fortional nightquipment observed a
ndertaken ers. The sond to record ctivity werecross each
IMITED
eport
ria ria, the resand projecte percentag) has been cland sites w
on Site Com
Target reached
No
No
No
No
No
No
DOLOGY was guidespecies). Tattempting g, evidenceh habitat retoring is foing to be collected.
n of the niplaced at gror a total of ft was recorcollection. at each site
for collectingmeters wbird call ac
e captured aof the wo
ults of the ted foliage e of native calculated aweeds is 12%
mpletion Cri
Complcriteria
(weed prfoliage c
<20
<20
<20
<20
<20
<20
d by the MThe monitoto monitore of appropecreation toocused on cundertake
ne woodlanound level. four nights/ded as this Analysis .
ing bird dawere placed ctivity. The at exactly todland site
rehabilitaticover for wspecies estaat 76%. The%.
teria Targe
etion target ojected cover)
0%
0%
0%
0%
0%
0%
MOP and horing prograr all speciespriate fauno areas adjacollecting bn once ad
nd sites, an A remote c/days. The coincided wof camera
ata across at each of benefits ofhe same times thus pro
ion woodlaweeds is prablished wie average pr
et
2015 result
Tex
72.5%
84.0%
44.5%
42.5%
90.5%
86.0%
has targetedam focuseds found on na structureacent to thebaseline dadequate da
nd compriscamera waMOP statedwith the ena images i
the MCC sthe nine wf using this me of mornoviding con
108
nd sites resented ithin the rojected
Target xceeded
Yes
Yes
Yes
Yes
Yes
Yes
d highly d on key site. In es were e mining ta, with ata over
sed of a s placed d a total d of the ncluded
site and oodland method ning and sistency
2015 An
An ecocollecteconducMCC sit
5.6.3 Songmerecord where songmefour hoanalysis Call idemicrobaeast Ne200 call Bat callcharactobtain rwere fo
Seabuz
Recwer
Fouo o o o
Nycmad
Seqcalls
Datathouand
5.7 FA
5.7.1 The resan indic
MUSWELL
nnual Environ
ologist expeed and hating rehabilte.
Microchiroeters were high frequpossible, ineters recordours of recs expert.
entificationsats in New ew South Wls from nort
s are analysteristic freqreliable andollowed:
rch phase czes (McKen
ordings conre labelled a
r categoriesdefinite – idprobable – possible – munidentifiaeven a spec
ctophilus spde to identi
uences nots and don’t
a on the nugh only de presence a
AUNA MO
Remote Casults of the cation of fa
LBROOK COAL
nmental Man
erienced ins used thilitation mon
opteran Batinstalled atency bat cn the wooded calls foordings for
s were maSouth Wale
Wales (Reinhth‐eastern N
sed using spquency, initd accurate r
calls were unzie et al. 20
ntaining lesas short (Law
s of confidedentity not low probabmedium to ble, poor ocies group.
pp. are difficfy this genu
attributed represent m
number of efinite and pat each site.
ONITORING
amera Surveremote camauna specie
L COMPANY L
nagement Re
n identifyinis, in conjunitoring, to
s t each of thalls. All sodland sitesr a four hor each nigh
de using res (Pennay old et al. 20NSW.
pecies‐special slope aresults the f
used in the002)
ss than threw et al. 199
ence in specin doubt bility of conhigh probabr low qualit
cult to idenus to specie
to microbamicrobat ac
passes of eprobable ca.
G RESULTS
ey mera data ies richness
IMITED
eport
ng bird calunction wicompile a b
he nine woongmeters s. A time our period fht were ana
egional baset al. 2004001) and th
cific paramend time befollowing pr
e analysis, r
ee pulses w99)
cies identific
fusion withbility of conty– calls ma
tify confides level (Pen
at echolocatctivity at the
each bat spall passes w
s presentedat each w
lls from reth incidenbird list for
oodland sitewere direcdelay was
from prior talysed by R
sed guides ); and soute accompa
eters of the etween callrotocols (ad
rather than
were not a
cation were
h species of nfusion withade by bats
ently from tnnay et al. 2
tion calls wee site. and
pecies per ere used to
d in Figure oodland sit
ecordings rtal bird idthe woodla
es for four ted along as programmto dusk untRodney Arm
to the echh‐east Queenying refere
call profile ls (Rineholddapted from
cruise pha
nalysed and
e used (Mill
similar callsh species wiwhich cann
their calls a2004)
ere labelled
monitoringo represent
45 and Tabte surveyed
reviewed thdentificationand sites ac
nights and a potentialmed such ttil midnightmistead, a
holocation ensland anence library
such as cad et al. 200m Lloyd et. a
ase calls or
d these seq
s et al. 1996
s ith similar cnot be iden
nd no attem
d as junk or
g site was cspecies cal
ble 48 and pd. Results
109
he data n whilst cross the
used to flyway, that the t. These bat call
calls of d north‐y of over
ll shape, 01). To al. 2006)
feeding
quences
6):
calls tified to
mpt was
non‐bat
collated, l activity
provides indicate
2015 An
that mpresencwere sl
Macro(Red
Macr(Easter
Tachyg
Lepus e
Tricho(Bru
Rattus
Vulp
Varan
Corv(Aus
Gym(Aust
MUSWELL
nnual Environ
ammal prece of birdsightly more
Fi
Species
opus rufogr‐neck Walla
ropus giganrn grey kang
glossus acul(Echidna)
europaeus (
osurus vulpeshtail possu
rattus (Blac
pes vulpes (F
nus varius (Monitor)
vus coronoidstralian Rav
norhina tibtralian Mag
LBROOK COAL
nmental Man
esence bet. Reptiles we common a
igure 45: Co
T
R
riseus aby)
nteus garoo)
leatus
(Hare)
ecula um)
ck rat)
Fox)
Lace
des ven)
icen gpie)
L COMPANY L
nagement Re
ween remwere only iat the remn
omparison
Table 48: R
Remnan
RWoodNew1
x
x
IMITED
eport
nant and identified aant sites be
of Average
Remote Cam
nt Woodlan
RWoodNew2
x
rehabilitatioat remnant eing double
Fauna Spe
mera Result
nd Sites
RWoodNew3
x
x
x
x
x
on sites iswoodlandsthat of reh
cies Richne
s
Rehabi
NRW1 R
x
x
x
s similar ass and pest habilitation s
ess
ilitation WoSites
RW3 RW
x x
x
x
x
x
110
s is the species sites.
oodland
5 RW6
x
x
2015 An
melanow
5.7.2 Bird spwoodlawoodla One thWarble
5.7.3 The resand TawoodlaRW1, R
MUSWELL
nnual Environ
Species
Corcorax orhamphos (wing Chough
Bird Censupecies werend sites shnd as oppo
hreatened sr). This spec
Figure 4
Microchirosults of the ble 49 indnd site surW2, RW3, R
LBROOK COAL
nmental Man
R
(White h)
s e identifiedown in Figuosed to appr
species wacies is listed
46: Bird Spe
opteran BatMicro‐bat cicating the rveyed. NoRW5 or RW
L COMPANY L
nagement Re
Remnan
RWoodNew1
d with a cure 46. An roximately 7
as identified as Vulnera
ecies Identif
s census usinpresence
o bat activi6.
IMITED
eport
nt Woodlan
RWoodNew2
x
comparisonaverage of7 in rehabil
d at RW5 able under t
fied at Rem
ng songmete(and numbity was det
nd Sites
RWoodNew3
n between f 11 bird spitation woo
being Chtthe TSC Act
mnant and R
er data capber of callstected for
Rehabi
NRW1 R
remnant ecies was podland sites
thonicola st.
Rehabilitati
ture is press) of bat sprehabilitati
ilitation WoSites
RW3 RW
x
and rehabpresent in rs.
sagittata (S
ion Sites
sented in Fipecies utilison woodla
111
oodland
5 RW6
bilitation remnant
Speckled
igure 47 sing the nd sites
2015 An
Figure
Gould
Choco
Eastern
South‐e
Long
Yellow‐
East
Inland
Eastern
White‐st
South
*ThreateNote: M(Corben’s
5.8 SOAt eachfor eacalong e
MUSWELL
nnual Environ
e 47: Numbe
Table 49: B
Species
d's Wattled B
late Wattled
False Pipistr
astern Free‐Bat
g‐eared Bats
bellied SheaBat*
ern Forest B
Broad‐nosed
broad‐nose
triped freeta
hern Forest B
ened species ay potentiallys long eared B
OIL MONITh of the moh of the 18ach of the 5
LBROOK COAL
nmental Man
er of Comm
Bat Calls Ide
Def
Bat
d Bat
relle*
tailed
s*
thtail
at
d Bat
d Bat
ail Bat
Bat
y be commonBat) and Nycto
TORING Mnitoring site8 transects50m transec
L COMPANY L
nagement Re
mon and Th
entified at RRWoodNew
finite Pro
3
7
1
1
n species or oophilus bifax (
METHODOLes, 10 soil s using the cts.
IMITED
eport
reatened B
Remnant anw1 RW
obable
1
4
1
1
2
one of two t(Eastern long‐
LOGY samples westandard s
Bat Species
nd RehabilitWoodNew2
Definite
1
hreatened sp‐eared bat).
re collectedsoils sampli
Recorded a
tation WooRWood
Definite
5
1
2
1
4
ecies includin
d using a song techniq
at Woodlan
odland SitesdNew3
Probable
1
1
ng Nyctophilu
oil corer andue of 5m i
112
d Sites
s RW4
Probable
1
us corbeni
d bulked ntervals
2015 An
5.9 SO
5.9.1 The pHrehabili48).
The av43µS/cm83µS/cmrespect
MUSWELL
nnual Environ
OIL MONIT
Woodland H in remnaitation sites
verage meam (Figure 4m. Sites Rtively which
LBROOK COAL
nmental Man
TORING RE
Sites ant woodlas were gene
asured elec49). Within RW5 and Rh is shown b
Figure 49
L COMPANY L
nagement Re
ESULTS
nd sites werally within
Figure 48: C
ctrical condthe rehabi
RW6 were by the large
: Compariso
IMITED
eport
was typicallyn this range
Compariso
ductivity oflitation sitewell abovestandard d
on of Soil E
y between e with the h
n of Soil pH
f soils in es the averae the higheeviation ba
lectrical Co
5.5 and 6highest scor
H
remnant wage electricaest score br.
nductivity
6.0. All wre being 6.7
woodland sal conductibeing 160 a
113
oodland 7 (Figure
site was vity was and 127
2015 An
The av0.52merange w
The avRehabilabove tbar.
MUSWELL
nnual Environ
verage exceq/100g (Figwith an aver
verage sulplitation woothis at 374 m
LBROOK COAL
nmental Man
changeablegure 50). rage of 0.6m
Figu
phur measuodland sitesmg/kg. Thi
Fig
L COMPANY L
nagement Re
potassium All woodlmeq/100g.
ure 50: Com
ured in rems generally fs outlying r
gure 51: Co
IMITED
eport
m measureand rehabi
mparison of
mnant woofell within tresult is rep
mparison o
ed at remilitation site
f Soil Potass
odland sitethis range epresented b
of Soil Sulph
mnant wooes were ge
sium
s was 20mxcept for RWy the large
hur
odland sitenerally wit
mg/kg (FiguW2 which wstandard d
114
es was thin this
ure 51). was well eviation
2015 An
The ave(Figure RW5 wstandar
The aveThe ave
The meOrganic
MUSWELL
nnual Environ
erage mea52). All reas considerrd deviation
erage soil Nerage Nitrog
easured soic Matter acr
LBROOK COAL
nmental Man
sured soil ehabilitationrably highern bar.
Figure
Nitrogen ingen at reha
Fig
il Organic Mross the reh
L COMPANY L
nagement Re
Nitrite + Nn sites fell jr at 4.9mg/
52: Compa
n remnant wbilitation sit
gure 53: Com
Matter in rhabilitation
IMITED
eport
Nitrate in rjust below /kg. This ou
arison of So
woodland ste fell below
mparison o
remnant wosites was a
emnant wothis with autlying resu
oil Nitrite +
sites was aw this at 2,0
f Soil Nitrog
oodland sitpproximate
oodland sitn average oult is repres
Nitrate
at approxim000mg/kg (F
gen
e is approxely 3.2% (Fig
tes was 1.2of 1.30mg/sented by t
mately 2,60Figure 53).
ximately 6.gure 54).
115
20mg/kg kg. Site he large
0mg/kg.
5%. Soil
2015 An
5.9.2 The avepasture
The ave(Figure
MUSWELL
nnual Environ
Fi
Pasture Siterage pH ine sites was s
erage meas56). Within
LBROOK COAL
nmental Man
igure 54: Co
es n remnant slightly high
Figur
sured electrn the rehabi
L COMPANY L
nagement Re
omparison o
pasture sither at 6.5%
re 55: Comp
rical conducilitation site
IMITED
eport
of Soil Orga
tes was 5.7(Figure 55)
parison of S
ctivity of soes the avera
anic Matter
7% and the.
Soil pH – Pa
oils in remnage electrica
r – Woodlan
average p
asture
ant pastureal conductiv
nd
pH in rehab
e site was 5vity was 119
116
bilitation
58µS/cm 9µS/cm.
2015 An
The aveRehabil
The avesites geand 84score of
MUSWELL
nnual Environ
Figu
erage exchalitation past
erage sulphenerally fell mg/kg respf 38mg/kg a
LBROOK COAL
nmental Man
ure 56: Com
angeable Poture sites ha
Figure 57
ur measurewithin this
pectively. Tand large st
L COMPANY L
nagement Re
mparison of
otassium mead an avera
7: Comparis
ed in remnarange exceThese outlytandard dev
IMITED
eport
Soil Electri
easured at age of 0.62m
son of Soil P
nt pasture ept for RP1 ying resultsviation bar (
cal Conduc
remnant pameq/100g (
Potassium –
sites was 9and RP6 w are repres(Figure 58).
tivity – Pas
asture sites Figure 57).
– Pasture
mg/kg. Rehhich was wsented by t
sture
was 0.9me
habilitation ell above ththe higher
117
eq/100g.
pasture his at 79 average
2015 An
The averehabili
The aveaverageconside6,540m
MUSWELL
nnual Environ
erage measitation sites
Figur
erage soil Ne Nitrogenerable variamg/kg. This
LBROOK COAL
nmental Man
Figure 5
sured soil Ns were cons
re 59: Comp
Nitrogen in at rehabation in rehvariation is
L COMPANY L
nagement Re
58: Compar
Nitrite + Niiderably low
parison of S
remnant pailitation sithabilitation indicated b
IMITED
eport
rison of Soi
itrate in rewer with an
Soil Nitrite +
asture siteste fell beresults wi
by the large
l Sulphur –
mnant pasn average of
+ Nitrate (m
s was at applow this ath RP2 bei standard d
Pasture
ture sites wf 0.65mg/kg
mg/kg) – Pa
proximatelyat 2,515mgng 630mg/deviation ba
was 1.8mg/g (Figure 59
asture
y 3,140mg/g/kg. The/kg and RPar (Figure 60
118
/kg. All 9).
/kg. The ere was P6 being 0).
2015 An
The meOrganic
5.10 EIn conjareas suobviousbe reco
Rills
MUSWELL
nnual Environ
easured soic Matter acr
ROSION Aunction witurrounding s landform orded if foun
s, gullies an
LBROOK COAL
nmental Man
Figure 6
il Organic ross the reh
Figure 61: C
ND LANDFth the 201each of theinstability. nd present
d tunnel inl
L COMPANY L
nagement Re
60: Compari
Matter in rhabilitation
Comparison
FORM STAB15 rehabilite rehabilita The followwithin and
et and outl
IMITED
eport
ison of Soil
remnant pasites was a
n of Soil Org
BILITY ation moniation monitowing list prosurroundin
ets.
Nitrogen –
asture sitespproximate
ganic Matte
itoring, obsoring sites fovides someg each reha
– Pasture
s is approxely 4.3% (Fig
er – Pasture
servations wfor any signe of the feaabilitation m
ximately 6.gure 61).
e
were madens of soil eratures that monitoring s
119
3%. Soil
e in the osion or were to site:
2015 An
Finedep
Hole
Loss
Loss
Hum
Roo
Bare In ordesevere recomm The resmonitooccurrinflow lea
RehabiliSite
RW1
RW2
RW3
MUSWELL
nnual Environ
e soil accumpressions.
es through
s in depth o
s of topsoil
mmocking a
ot exposure
e patches w
r to determerosion a
mended dep
sults from thring sites ang at all 12ading to rill
Table 50: E
itation EroOccTyp
Lim
Lim
Lim
LBROOK COAL
nmental Man
mulation or
drainage st
of topsoil/gr
due to wind
and pedesta
.
where groun
mine the sevand 1 beipending on
he erosion sre presente2 sites, howerosion occ
Evidence ofosion currence/ pe
mited
mited
mited
L COMPANY L
nagement Re
r the prese
tructures.
rowth medi
d and sheet
alling.
ndcover veg
verity of eroing minimthe level of
survey undeed in Tablewever there curring in th
f Erosion at
Comment
No evidenvicinity ofthis is liketopsoil inidue to winnatural decover preserosive fe
No evidenvicinity ofthis is liketopsoil inidue to winnatural decover preserosive fe
No evidenvicinity ofthis is liketopsoil inidue to winnatural dewhich groof the sitepresent wfeatures f
IMITED
eport
ence of lag
ium
t flow
getation has
osion, a scoal) has bf erosion id
ertaken at ee 50. The su is moderahe sloped la
Rehabilitat
ts
nce of erosiof the site. Thely due to a nitially being and and/or shegeneration.sent which iseatures from
nce of erosiof the site. Thely due to a nitially being and and/or shegeneration.sent which iseatures from
nce of erosiof the site. Thely due to a nitially being and and/or shegeneration.ound layer coe has both grwhich is likelyfrom occurrin
material a
s been denu
oring systemeen used entified.
each of theurvey foundte loss of tand leading
tion Woodl
on was obserhere is limitenumber of faapplied, poteheet flow du. There is a fs likely to ass occurring.
on was obserhere is limitenumber of faapplied, poteheet flow du. There is a fs likely to ass occurring.
on was obserhere is limitenumber of faapplied, poteheet flow du. There are pover is not prround and cay to assist in ng.
at the botto
uded.
m from 1 towith man
six rehabild that thereopsoil due to site RW6
land and Pa
rved at this sd topsoil prectors includientially somering establisfair amount osist in the pr
rved at this sd topsoil prectors includientially somering establisfair amount osist in the pr
rved at this sd topsoil prectors includientially somering establispatches of baresent, howeanopy vegetathe preventi
om of slop
o 10 (with 1nagement
itation and e is limited to wind an6.
asture Sites
site, or withinesent, howeving limited e loss of tophment and of vegetativerevention of
site, or withinesent, howeving limited e loss of tophment and of vegetativerevention of
site, or withinesent, howeving limited e loss of tophment and are ground iever the majative cover ion of erosiv
120
es or in
10 being options
pasture erosion
nd sheet
s
n the ver,
soil
e
n the ver,
soil
e
n the ver,
soil
n ority
ve
2015 An
RehabiliSite
RW4
RW5
RW6
RP1
RP2
RP3
RP4
RP5
RP6
MUSWELL
nnual Environ
itation EroOccTyp
Lim
Lim
Lim Losdueandleaero
Lim
Lim
Lim
Lim
Lim
Lim
LBROOK COAL
nmental Man
osion currence/ pe
mited
mited
mited at site
ss of topsoil e to wind d sheet flow ding to Rill osion (5)
mited
mited
mited
mited
mited
mited
L COMPANY L
nagement Re
Comment
No evidenvicinity ofsignificantthis is likeuse of rocloss of topestablishmareas of bpresent, hmoderatepreventio
No evidenlow‐modecanopy co
No evidenlimited toof factors potentiallduring estThe areasearth andare signs oinitial stag2015 withwas seede
No evidenlow‐modeis fairly hi
No evidenlow‐modesignificantcover is lo
No evidenlow‐modeis fairly hi
No evidenlimited toGround la
No evidenlimited toGround la
No evidenlow‐modeis fairly hi
IMITED
eport
ts
nce of erosiof the site. Tht amount of ely due to limck during lanpsoil due to wment and nabare ground however thee canopy covon of erosive
nce of erosioerate level ofover is fairly
nce of erosioopsoil presen including limy some loss tablishment s of sloped lad due to the sof topsoil losges of rill eroh signs of gooed.
nce of erosioerate level ofgh.
nce of erosioerate level oft patches of ow‐moderate
nce of erosioerate level ofgh.
nce of erosioopsoil presenayer cover is
nce of erosioopsoil presenayer cover is
nce of erosioerate level ofgh.
on was obserhere is limitebare ground
mited topsoil dform estabwind and/ortural degenein which grosite has a sp
ver present wfeatures fro
on was obserf topsoil preshigh.
on was obsernt, however, mited topsoiof topsoil duand natural and in the vicslope and lacss and sheet osion. This arod vegetativ
on was obserf topsoil pres
on was obserf topsoil presbare grounde.
on was obserf topsoil pres
on was obsernt and moderlow‐modera
on was obsernt and modermoderate.
on was obserf topsoil pres
rved at this sd topsoil pred and rock prinitially beinlishment, por sheet flow deration. Theund layer coparse groundwhich is likelym occurring
rved at this ssent and gro
rved at this sthis is likely l initially beinue to wind andegeneratiocinity of site ck of vegetatflow which irea was seede cover gene
rved at this ssent and gro
rved at this ssent, howeved present. G
rved at this ssent and gro
rved at this srate patchesate.
rved at this srate patches
rved at this ssent and gro
site, or withinesent and a resent, howeng applied, thotentially somduring ere are large over is not d cover and y to assist in g.
site. There isound layer an
site. There isdue to a numng applied, nd/or sheet on. RW6 is baretive cover this leading to ded in Octoberating since
site. There isound layer co
site. There iser there are round layer
site. There isound layer co
site. There iss of bare grou
site. There iss of bare grou
site. There isound layer co
121
n the
ever, he me
the
s a nd
s mber
flow
ere
er e it
s a over
s a
s a over
s und.
s und.
s a over
2015 An
5.11 CA
Carryingpasturewill inflareas. Carryingcalculatresults per 1.5only sto
Ta
Sites
RPastNe
RPastNe
RPast03
RP1
RP2
RP3
RP4
RP5
RP6
5.12 RMCC ar
MUSWELL
nnual Environ
ARRYING C
g capacity e rehabilitatuence the
g capacity ted using thfrom Tableha. Sites Rock one cow
able 51: Est
Pastu
ew1 Nativfertiladde
ew2 Nativfertiladde
Nativfertiladde
Nativ(dom
Nativ(dom
Nativfertiladde
Nativfertiladde
Nativ(dom
Nativfertiladde
REHABILITAre not curre
LBROOK COAL
nmental Man
CAPACITY
and pasturtion sites. Tappropriate
for each he example 51 show thP3 and RP4w per 4ha an
timated Ca
ure Type
ve unimproveity (no seed d)
ve unimproveity (no seed d)
ve unimproveity (no seed d)
ve unimproveminated by Ch
ve unimproveminated by Ch
ve unimproveity (no seed d)
ve unimproveity (no seed d)
ve unimproveminated by Ga
ve unimproveity (no seed d)
ATION TRIAntly undert
L COMPANY L
nagement Re
AND PAST
re conditioThe data gae future sto
of the reme of a 450kghat the rem4 have the cnd RP5 is on
rrying Capa
ed – moderaor fertiliser
ed – moderaor fertiliser
ed – moderaor fertiliser
ed – low ferthloris gayana
ed – low ferthloris gayana
ed – moderaor fertiliser
ed – moderaor fertiliser
ed – low fertalenia pubes
ed – moderaor fertiliser
ALS AND Rtaking any t
IMITED
eport
TURE COND
on were coathered will ocking rates
mnant andg dry stock mnant pastucapacity to ne cow per
acity for Rem
R(DS
ate 1.
ate 1.
ate 1.
tility a)
1.
tility a)
1.
ate 1.
ate 1.
tility scens)
1.
ate 1.
RESEARCHrials within
DITION
nducted atbe used tos (carrying
d rehabilita(non‐lactatre sites havstock 1 cow6ha.
mnant and
Range SE/ha)
E
(
.5‐4.0
.5‐4.0
.5‐4.0
.0‐2.5
.0‐2.5
.5‐4.0
.5‐4.0
.0‐2.5
.5‐4.0
the rehabil
t pasture re inform pascapacity) of
tion pastuting, non‐prve the abilitw per 2ha,
Regrowth stimated Value DSE/ha)
4
4
4
1.5
1.5
2
2
1
2
litation area
eference sisture conditf the rehab
re sites haregnant cowty to stock oRP1 and RP
Pasture SitEstimated ccapacity (4
dry sto
1 cow per
1 cow per
1 cow per
1 cow pe
1 cow pe
1 cow pe
1 cow pe
1 cow pe
1 cow pe
as.
122
ites and tion and bilitation
as been w). The one cow P2 could
es carrying 450kg ck)
1.5ha
1.5ha
1.5ha
r 4ha
r 4ha
r 2ha
r 2ha
r 6ha
r 2ha
2015 An
5.13 FDuring additionreviewe
MUSWELL
nnual Environ
URTHER Dthe next renal coal resed and will
LBROOK COAL
nmental Man
DEVELOPMporting perserves at Mbe included
L COMPANY L
nagement Re
ENT OF THriod MCC wMCC. As pad in future m
IMITED
eport
HE FINAL Rwill be seekinrt of this mmining appr
EHABILITAng approvamining procrovals.
ATION PLANl from MSCess the fina
N C to allow mal landform
123
mining of m will be
2015 An
6.0 ADuring t
An dev
Manchaof a
Rehmin
MUSWELL
nnual Environ
ACTIVITIESthe next re
environmeelopment c
nagement pnges to thedditional re
habilitation ning activitie
LBROOK COAL
nmental Man
S PROPOSporting per
ental assesconsent to a
plans and the developmesources.
will contines.
L COMPANY L
nagement Re
SED IN THiod, the fol
sment willallow mining
he Mining Oent consen
ue to be un
IMITED
eport
E NEXT Alowing activ
l be undeg of additio
Operations t due to th
ndertaken
EMR PERIvities are pl
rtaken to onal coal res
Plan will be proposed
in areas th
IOD anned:
support aserves.
e updated td modificati
at are no l
a variation
to comply wion to allow
onger requ
124
to the
with the w mining
uired for
2015 An
MUSWELL
nnual Environ
Appe
LBROOK COAL
nmental Man
ndix 1C
L COMPANY L
nagement Re
1: SumCompl
IMITED
eport
mmaryliance
y of Ine Audi
ndepent
ndent
t
2
NC
3
MUSWE
2015 Annual Envir
Non‐ConformaCondition Requ
3.1 (a) The Ais avaMuswEnviri) be plan (ii) be condiiii) beaccoriv) facpersov) takimpaissue envir
ELLBROOK COAL CO
ronmental Manag
ance Findingsuirement
Applicant shall ensailable throughouwellbrook Shire Coonmental Officer responsible for th(refer to conditioresponsible for citions of this conse responsible for rrdance with Condcilitate an environon involved with mke reasonable stects. The Environminstructions to stonment is likely t
OMPANY LIMITED
gement Report
s
sure that a suitabt the life of the mouncil prior to thefor the Project. T
he preparation of n no. 32) onsidering and adsent and complianreceiving and respition 10.2; nmental inductionmining and remedps to avoid or minmental Officer shatop work if a signio occur.
Developm
bly qualified Enviromine and shall cone appointment ofThe Environmentathe environment
dvising on matternce with such matponding to compl
n and training prodial activities; andnimise adverse enall advise the Mineificant adverse im
ment Consent DA2
onmental Officer sult with f the al Officer shall: tal management
rs specified in the tters; aints in
ogram for all d nvironmental e Manager to
mpact on the
Audit Finding
205/2002
All of these reqthe approval ofthe approval ofresponse had bthe audit.
quirements were f EO by MSC. MCCf the EO by MSC bbeen received at t
R
met except C requested but no the time of
NA
Risk Level
Non‐Compliant – Administrative
2
C
3
3
MUSWE
2015 Annual Envir
Condition Requ
3.2 (b) The Elimitei) statdurinrequiand pii) defreporincludiii) ovoutcothe krequiiv) ovstrateMininhabitthosev) idefor devi) steare bvii) prmanaviii) ddevel
3.2 (e) The AStrategoverpubli
ELLBROOK COAL CO
ronmental Manag
uirement
Environmental Maed to: tutory and other ong mining, includinired from authoritpolicies; finition of the rolerting of personneding the Environmverall environmenomes, during, miney environmentaired under this coverall ecological aegy for the restorng Operations, inctat areas, creek line objectives; entification of cumealing with these eps to be taken toeing complied witrocesses for conflagement of the prdocumentation oflopment of the En
Applicant shall maegy components irnment agencies cly available with
OMPANY LIMITED
gement Report
anagement Strate
obligations whichng all approvals aties and other sta
e, responsibility, al relevant to envirmental Officer; ntal management ning and decomml elements for whonsent; nd community obation and managecluding elements nes and drainage
mulative environmat each stage of to ensure that all ath; lict resolution in rroject; f the results of connvironmental Man
ake copies of the in subclause (d) aand CCC, and ensin 14 days of com
egy shall include, b
h the Applicant is nd consultations akeholders, and ke
authority, accounronmental manag
objectives and peissioning of the mhich management
bjectives for the pement of the areasuch as wetlandschannels, within t
mental impacts anthe development;approvals, plans, a
relation to the env
nsultations undernagement Strateg
Environmental Mbove available tosure that the planmmencement of o
but not be
required to fulfil and agreements ey legislation
ntability and gement,
erformance mine, for each of t plans are
project, and a as affected by s and other the context of
nd procedures ; and procedures
vironmental
rtaken in the gy.
anagement o the relevant s are made perations.
Audit Finding
There was no edocumentationin the EMS as rEvidence that cprovided.
The SWMP, whprovided to the
evidence of the n of the results ofrequired. consultation occu
hen updated in 20e CCC.
R
f consultation
rred was
NA
013, was not NA
Risk Level
Non‐Compliant – Administrative
Non‐Compliant – Administrative
2
C
3
4
4
MUSWE
2015 Annual Envir
Condition Requ
3.2 (f) The mor at goverenvirpractthe saThe Mweek
4.2 (h) The Arespethe qconsimeteThe acondibe kewhenappliaautho
4.3 (c) “i) Thdetaigroun* the* site* freq* the* the
ELLBROOK COAL CO
ronmental Manag
uirement
management planother times as dirnment agencies. onmental requiretices. Any changesame manner as thManagement Straks of approval by M
Applicant shall insect of location, typuantity of water est of either a meaer or mean of meaappliance(s) is to bition. Detailed recept and supplied tn requested must ance(s) furnishedority duly qualifie
he Applicant shall ls of the monitorindwater. The Site duration of the mes to be sampled; quency of samplin parameters to be depth of bore co
OMPANY LIMITED
gement Report
ns are to be reviewrected by MSC, inThe review shou
ements or changes which are madehe initial Environmtegies shall be maMSC.
stall to the satisfacpe and constructiextracted from thasuring weir or weasurement as maybe maintained in cords of all water to the departmenprovide a test ce either by the mad;
incorporate into ing program for be Water Managemmonitoring progra
ng; e measured; onstruction (if req
wed, and updatedn consultation witld consider changes in technology/oe shall be made anmental Managemade publicly avail
ction of the depaon an appliance (he works. The appeirs with automaty be approved by good working ordextracted from tht upon request. Trtificate as to theanufacturer or by
the Site Water Mboth surface watement Plan shall incam (pre, during an
uired);
d every five years th the relevant ging operational nd approved in ent Strategy. able within two
rtment in (s) to measure pliance (s) to tic recorder, or the department. der and he works shall The applicant accuracy of the some person or
anagement Plan r and clude: nd post mining);
Audit Finding
The SWMP on to the 2013 ver
Calibration Cerprovided.
The duration omechanism to (now NoW) datthe SWMP.
the website was nrsion.
rtificates were not
f monitoring and transfer data to ttabase was not ad
R
not updated NA
t able to be NL
a the DIPNR ddressed in
NA
Risk Level
Non‐Compliant – Administrative
Non‐Compliant – ow
Non‐Compliant – Administrative
2
C
6
6
8
9
MUSWE
2015 Annual Envir
Condition Requ
* the* themechbase * detdeterThe rThe pyear
6.1.2 (a) For e(by sapollutThe asamp• TSP• PM• Dep
6.5 (a) The Aresideopera
8 (b) All samoniplan aplan.
9.2 (a) “The after AnnuMSC againMinin
ELLBROOK COAL CO
ronmental Manag
uirement
need for any con analysis of data ahanisms to transfeand to produce aermination of apprmined in consultresults of the monpost‐mining monitprior to the cessa
ach monitoring pampling and obtatant specified. applicant must useple at the frequenP‐ μg/m³, continuo10 ‐ μg/m³, everyposited Dust‐ g/m
Applicant shall scrences and roadwaations.
ampling strategiestoring program shand shall be incluOnly accredited l
Applicant shall, ththe completion o
ual Environmentaland DMR. The AEnst the Environmeng Operations Pla
OMPANY LIMITED
gement Report
ntingency plans; and the reportinger monitoring datnnual reports witpropriate criteria ation with DIPNRnitoring program storing program shation of Mining Op
oint specified belining results by a
e the sampling mcy shown: ous, AS 3580.9.8‐y 6 days, 24 hour cm²/month, continu
reen or direct all oays to the satisfac
s and protocols unhall include a quaded in the relevalaboratories shall
hroughout the lifeof mining in the DA Management ReEMR shall review tental Managemenns, the condition
g procedure, inclua from the mine tth interpreted resfor monitoring pu. shall be reported hall be prepared nperations. “
ow the applicant nalysis) the conce
ethod, unit of me
2001 composite sampleuous, AM‐19
on‐site lighting awction of MSC duri
ndertaken as partality assurance/ qunt environmentalbe used for labor
e of the mine andA area, prepare aeport (AEMR) to ththe performance nt Strategy and ths of this consent,
ding a to DIPNR data sults; and urposes
in the AEMR. no later than one
must monitor entration of each
easure and
e
way from ng mining
t of any uality control l management ratory analysis.
d for five years and submit an he satisfaction of of the mine e relevant and other
Audit Finding
Due to equipmsome environmwere not collecyear of the aud
Lighting reviewlighting compla
None of the reassurance/qua
There was no aassessment of the AEMRs.
ment failure and mmental monitoringcted. This occurredit period.
ws were not conduaint in the audit p
levant MPs includlity control plan.
annual complianceagricultural land s
R
misadventure, g samples ed in each
NM
ucted. One period.
NL
ded a quality NA
e audit or suitability in
NA
Risk Level
Non‐Compliant – Medium
Non‐Compliant – ow
Non‐Compliant – Administrative
Non‐Compliant – Administrative
2
C
9
1
MUSWE
2015 Annual Envir
Condition Requ
licencwith tshall (i) an condi…. (vi) afrom
9.3 (c) “The to be(i) the(ii) th(iii) th(iv) th
11.3 • Priolegallcontraddrerequiand/oMSC Appli• FurCounand aarea wis proCoun
ELLBROOK COAL CO
ronmental Manag
uirement
ces and approvalsthe predictions minclude, but not b annual complianitions of this cons
n assessment of athe Mining Opera
following recordse collected: e date(s) on whichhe time(s) at whichhe point at which he name of the pe
or to mining of thly binding agreemribution to MSC foess the social, amirements arising for in kind contribuCommunity Enhacant and MSC. ther, the Applicancil to provide an aa suitable access rwhich are appropovided to Council cil and any releva
OMPANY LIMITED
gement Report
s relating to the mmade in the EIS, dibe limited to, the ce audit of the pesent and statutory
any changes to agations, including c
s must be kept in
h the sample wash the sample wasthe sample was uerson who collect
e extension area,ment with MSC foror the purpose of enity and associarom the operatioution shall be genncement Plan an
nt shall enter intoagreed area of lanroad to the void frpriately fenced anin a condition suiant regulatory aut
mine. To enable reagrams and tablefollowing matterserformance of they approvals;
gricultural land sucumulative chang
respect of any sa
s taken; s collected; undertaken; andted the sample. “
the Applicant shar financial and/or community enhated community inn of the extensionerally in accordand as agreed betw
o a legally binding nd to incorporaterom the exiting wd landscaped andtable to the requthorities. "
eady comparison es, the report s: e project against
itability resulting ges; “
mples required
all enter into a in kind ancement to nfrastructure n. The financial nce with the een the
agreement with void number 3,
waste disposal d that such void irements of
Audit Finding
The name of thalways recordeGenerally comp
A legally bindinentered into w
he person samplined. pliant apart from
ng agreement haswith MSC.
R
ng was not
this.
NA
s not been NM
Risk Level
Non‐Compliant – Administrative
Non‐Compliant – Medium
2
C
4
4
M
MUSWE
2015 Annual Envir
Condition Requ
40 Uponto act(a) thfrom (b) th(c) a c
48 A restthe p'Propfile: 0authoThe ta) Reb) Remaintc) Resd) Obe) ObA cavregistat no
M1.3 "The to bea) theb) thec) thed) the
ELLBROOK COAL CO
ronmental Manag
uirement
n completion of wt on this consent he total tonnage othe site;
he disposal pointscopy of all disposa
triction as to userpurpose of creatinposed Offset Area06836A.dwg. Musority empowered erms of the restristriction against cstriction against utenance of the EEstrictions on livesbligation to fence bligation to controveat acceptable totered on the title cost to Council.
following recordse collected for thee date(s) on whiche time(s) at whiche point at which te name of the per
OMPANY LIMITED
gement Report
works and prior to shall provide to Cof all waste and ex
and methods useal receipts are to
r shall be registereg a Vegetation Of' prepared by Hanswellbrook Councto vary or modifyiction shall includclearing. use of land in anyEC on the land. stock grazing on ththe land. ol noxious weeds o Muswellbrook Cof affected land,
s must be kept in purposes of this h the sample wash the sample was he sample was tarson who collecte
occupation, the pCouncil the followxcavated materia
ed; and be provided.
ed on the title of ffset Area as indicnsen Bailey datedil shall be nominay the restriction.e the following m
y way inconsistent
he land.
and pests on the Council, shall be pby Muswellbrook
Environme
respect of any salicence: taken; collected; ken; and ed the sample."
person entitled wing information;l disposed of
affected land for cated on Figure 1 12/10/10 Cad ated as the sole
matters:
t with the
land. repared and k Coal Company
ent Protection Lic
mples required
Audit Finding
The report to Mproduced as ev
No inspectionscannot ensure accordance wit
cence 656
The name of thalways recordeGenerally comp
MSC was not able vidence.
s are conducted sothat the land is mth a), b), c), d) and
he person samplined. pliant apart from
R
to be NA
o MCC managed in d e).
NM
ng was not
this.
NA
Risk Level
Non‐Compliant – Administrative
Non‐Compliant – Medium
Non‐Compliant – Administrative
2
C
M
M
6
4
4
MUSWE
2015 Annual Envir
Condition Requ
M2.1 For e(by a obtaispeciof mecolum
M7.1 To dea) Airelectrparamb) ThsampAirblaGrou
6.0 Table
4.0 a) Thof thec) Theon th
4 The ligrounappro
ELLBROOK COAL CO
ronmental Manag
uirement
ach monitoring/dpoint number), tning results by anfied in Column 1. easure, and sampmns:
etermine compliarblast overpressurronically recordedmeters specified ie licensee must uple at the frequenast Overpressure nd Vibration Peak
e 21 – Biodiversity
e Leaseholder mue Minister. e Compliance Rephe grant anniversa
icence holder mundwater flows frooved by the Office
OMPANY LIMITED
gement Report
discharge point orhe licensee must nalysis) the conceThe licensee musle at the frequenc
nce with conditiore and ground vibd for monitoring pn column 1 of theuse the units of mcy specified oppoRecord All blastsk Particle Velocity
y Offset Areas will
ust submit a Comp
port must be lodgary date for the lif
st implement meom entering the me of Water.
r utilisation area smonitor (by sampntration of each pst use the samplincy, specified oppo
ons L3.1, L3.2, L3.3bration must be mpoints 3, 4, 5 and e table below; andeasure, sampling osite in the other
y Record All blasts
Min
l be monitored an
M
pliance Report to
ged with the Depafe of this mining le
Wate
asures to preventmine work by 14 A
specified below pling and pollutant ng method, units osite in the other
3 and L3.4: measured and 6 for the d method, and columns.
s
ning Operations P
nnually.
Mining Lease 1304
the satisfaction
artment annually ease.
r Licence 20BL169
t alluvial August 2014, as
Audit Finding
2011‐12, 4 day(TEOM) 2012‐13, 48 darecorded (TEOM2012‐13, 3 dusnot recorded 2013‐14, 36 darecorded (TEOM2013‐14, 3 dusnot recorded.
2011‐12, 20 me2012 ‐ 13, 21 m2013 ‐ 14, 6 me
lan
The BOAs were
4
Compliance repthis licence. Fir2015.
9014
These measurewithout the ap
y measurements n
ay measurements M) st deposition mea
ay measurements M) st deposition mea
easurements not measurements noeasurements not
e not monitored.
ports were not derst report was due
es have been implpproval of the Offi
R
not recorded
not
surements
not
surements
NM
recorded. t recorded. recorded.
NM
NM
eveloped for e in June
NL
lemented but ice of Water.
NL
Risk Level
Non‐Compliant – Medium
Non‐Compliant – Medium
Non‐Compliant – Medium
Non‐Compliant – ow
Non‐Compliant – ow
2
C
8
9
7
8
7
8
7
MUSWE
2015 Annual Envir
Condition Requ
8 The liComp
9 An exeach licencmaint
7 As paconsei) Ass
8 An exeach licencmaint
7 As paconsei) Ass
8 An exeach licencmaint
7 As paconsei) Ass
ELLBROOK COAL CO
ronmental Manag
uirement
icence holder mupliance Report.
xtraction measureextraction devicece, and such devictained in a manne
art of the Annual Rent, the licence hosess compliance w
xtraction measureextraction devicece, and such devictained in a manne
art of the Annual Rent, the licence hosess compliance w
xtraction measureextraction devicece, and such devictained in a manne
art of the Annual Rent, the licence hosess compliance w
OMPANY LIMITED
gement Report
st supply the Offi
ement device muse (pump)used for ces must be of a ter, which is accep
Reporting requireolder must: with the terms and
ement device muse (pump)used for ces must be of a ter, which is accep
Reporting requireolder must: with the terms and
ement device muse (pump)used for ces must be of a ter, which is accep
Reporting requireolder must: with the terms and
ce of Water with
st be installed andextraction of wattype and standardptable to the Offic
Wate
ed under the deve
d conditions of th
st be installed andextraction of wattype and standardptable to the Offic
Wate
ed under the deve
d conditions of th
st be installed andextraction of wattype and standardptable to the Offic
Wate
ed under the deve
d conditions of th
an Annual
d maintained on ter under this d, and must be ce of Water.
r Licence 20BL169
elopment
is licence.
d maintained on ter under this d, and must be ce of Water.
r Licence 20BL169
elopment
is licence.
d maintained on ter under this d, and must be ce of Water.
r Licence 20BL170
elopment
is licence.
Audit Finding
An Annual Comsubmitted, therequired detail
Water meters hconsultation wwhether they wmeters were no
9037
There was no athis licence in t
Water meters hconsultation wwhether they wmeters were no
9038
There was no athis licence in t
Water meters hconsultation wwhether they wmeters were no
0473
There was no athis licence in t
mpliance Report h AEMR covers soms but not all.
have been installewith the Office of Wwere acceptable oot calibrated.
assessment of comthe AEMR.
have been installewith the Office of Wwere acceptable oot calibrated.
assessment of comthe AEMR.
have been installewith the Office of Wwere acceptable oot calibrated.
assessment of comthe AEMR.
R
as not been me of the
NA
ed without Water as to or not. Water
NM
mpliance with NA
ed without Water as to or not. Water
NM
mpliance with NA
ed without Water as to or not. Water
NM
mpliance with NA
Risk Level
Non‐Compliant – Administrative
Non‐Compliant – Medium
Non‐Compliant – Administrative
Non‐Compliant – Medium
Non‐Compliant – Administrative
Non‐Compliant – Medium
Non‐Compliant – Administrative
2
C
8
4
8
8
6
MUSWE
2015 Annual Envir
Condition Requ
8 An exeach licencmaint
4.1 In addOfficemaintcombThis o
8.2 ThroucondactiviConseThe r
8.3 An Ansubmcomp9.2 ofof theDeveAEMR
6.4.2 6.4.1 Archa“The intern
ELLBROOK COAL CO
ronmental Manag
uirement
xtraction measureextraction devicece, and such devictained in a manne
dition, a bimonther to determine thtenance and areabustion. occurs for produc
ughout the operauct an internal auities are in complient. results will be dist
nnual Environmenmitted throughoutpletion of mining if the Developmene performance of lopment ConsentR.
referred to belowaeological sites reabove performannal audits and mo
OMPANY LIMITED
gement Report
ement device muse (pump)used for ces must be of a ter, which is accep
ly audit will be cahe location of hotas that are of high
tion areas of the
tion of the mine, udit annually on oiance with the con
tributed internally
ntal Managementt the mine life andin the Project arent Consent Conditf the project againt and statutory ap
Ar
w sets out managemaining (not salvnce objectives shoonitoring”
st be installed andextraction of wattype and standardptable to the Offic
Spontaneous C
arried out by the Et spots that requih risk for spontane
pit and waste em
Environme
the Environmentperations to ensunditions of the De
y within MCC.
t Report (AEMR) id for five years afta in accordance wtions. An annual cnst the conditionspprovals is to be in
rchaeology and C
ement objectivesvaged) at MCC. ould be measured
Flora and
d maintained on ter under this d, and must be ce of Water.
Combustion Mana
Environmental re ongoing eous
mplacements.
ntal Managemen
tal Officer will ure that all evelopment
s to be ter the with Condition compliance audit s of the ncluded in the
ultural Heritage M
s for
d using regular
Fauna Managem
Audit Finding
Water meters hconsultation wwhether they wmeters were no
agement Plan
The Environmeconduct a bimo
nt Strategy
Annual internaby the Environ
The AEMR did compliance audproject.
Management Pla
Regular internaby the Environ
ment Plan
have been installewith the Office of Wwere acceptable oot calibrated.
ental Coordinator onthly audit.
al audits were notmental Coordinat
not include an andit of the perform
n
al audits were notmental Coordinat
R
ed without Water as to or not. Water
NM
did not NA
conducted tor.
NL
nnual mance of the
NA
t conducted tor.
NM
Risk Level
Non‐Compliant – Medium
Non‐Compliant – Administrative
Non‐Compliant – ow
Non‐Compliant – Administrative
Non‐Compliant – Medium
2
C
5
TS
TS
TS
5
5
6
6
MUSWE
2015 Annual Envir
Condition Requ
5.6 A boosupplof theinduc
Topsoil Spreading
Prior overbthan
Topsoil Spreading
Selecthe pThe Ahoriz
Topsoil Spreading
The uslopin
5.5 For thbathhwill bthis rfinish
5.5 New infras
6.1 The rcars s
6.2 AccesmaintAccesExam
ELLBROOK COAL CO
ronmental Manag
uirement
oklet identifying plied to mine worke significance of tction and training
to the re‐spreadiburden spoil will b200mm in diamet
ctive placement ofproperties of the sA‐2 horizon will foon topsoil formin
use of the A‐2 horng or high erosion
he relocation of thhouse, the colour be chosen to ensuegard, neutral nohes
native species plastructure compon
risk of accidental bshall be incorpora
ss tracks will be intained if necessarss to dams and wa
miner and maintain
OMPANY LIMITED
gement Report
possible threatenekers and contractohreatened specie.
ng of topsoil matbe rock raked to rter.
f topsoil material soil. orm the underlying the surface soil
rizon subsoil will bn potential areas.
he administrationand texture of exre they blend in ton reflective mate
anting will be madnents into the nat
bushfire ignition sated in site induct
nspected by the Ory. ater supply will bened if necessary.
ed species on theors. The booklet aes will be provided
Soil Strip
erial, the prepareremove all rocks t
will be done in ac
g capping materiastructure, where
be avoided, where
Visual and La
n building, workshxternal materials to the natural surerial shall be used
de to integrate thural surroundings
Bushf
such as lit cigaretttions.
Open Cut Examine
e inspected by th
site will be and a discussion d during site
pping Manageme
ed surface of the hat are greater
ccordance with
al, with the A‐1 e practicable.
e practicable, on
andscape Manag
hop and of the buildings roundings. In in all external
e new s.
fire Management
tes thrown from
er and
e Open Cut
Audit Finding
A booklet identnot provided to
ent Plan
The Rehabilitatrock raking.
The Rehabilitatselective empla
The Rehabilitatselective emplarehabilitation a
ement Plan
The relocated Mmaterials that blend with the
No native plantrelocated MIA.
Plan
Bushfire risks athrown from caInduction Prog
There was no einspections occ
tifying threatenedo inductees durin
tion Procedure di
tion Procedure diacement of horizo
tion Procedure diacement of horizoarea gradient.
MIA did not have have a colour andnatural surround
tings had occurre.
associated with cigars was not includram.
evidence that thescur.
R
d species was g training.
NL
d not include NA
d not include ons.
NA
d not include ons based of
NA
external d texture that dings.
NM
ed around the NM
garettes ded in the
NM
se OCE NL
Risk Level
Non‐Compliant – ow
Non‐Compliant – Administrative
Non‐Compliant – Administrative
Non‐Compliant – Administrative
Non‐Compliant – Medium
Non‐Compliant – Medium
Non‐Compliant – Medium
Non‐Compliant – ow
2
C
6
7
AA
5
5
5
7
5
MUSWE
2015 Annual Envir
Condition Requ
6.2 The Rasseshazar
7.1 Repo….. • Thethe Rdurin
Appendix A
Emer
5.1.1 Gentlbe suminimcapab
5.6 "A Ve(3) mthe se• Def• Sele• Dev• Mo
5.7 A Wemont
7.1 WeedreporMana
5.7 Neighprovi
ELLBROOK COAL CO
ronmental Manag
uirement
RFS and MCC shalssment, preferablyrds.
rting will consist o
e annual inspectioRFS and will addreng the preceding y
rgency Contact Nu
ly sloping areas ouitable for the estamum of 10cm of tbility.
ermin Eradicationmonths from the coelected control stfine the managemect the managemvelop managemennitor the success
eed Eradication Plths from commen
d inspections shalrting of weed conagement Report.
hbours will be conded with informa
OMPANY LIMITED
gement Report
l conduct an annuy during winter, t
of:
on and risk assessess detailed issuesyear.
umbers
f the rehabilitatedablishment of pastopdressing and a
Plan will be deveommencement oftrategies for feral ment objectives; ent options; nt strategies; andof the program a
an will be develoncement of operat
ll be conducted attrol will be includ
ntacted on an annation on MCC’s we
ual inspection andto assess fuel load
ment report, whics identified and / o
Land
d overburden emstoral grassland. Tre considered to
eloped for the sitef operations. The animal managem
against the stated
ped for the site, wtions.
t 6 monthly intervded in the Annual
nual basis and theeed management
Site Wa
d bushfire risk ds and fire
ch will be sent to or enacted
d Management P
placement will These will have a have a Class IV
e, within three principles for
ment will be:
objectives. "
within three (3)
vals, and Environmental
ey will be t strategy.
ater Managemen
Audit Finding
Bushfire inspecin conjunction
The Annual Inswas not sent to
These have notnumbers were
lan
Areas of rehablike they will rewhich includes
There was no V
There was no W
Weed inspectionot six monthly
Neighbours weweed managem
nt Plan
ctions were conduwith the RFS.
spection and Risk o the RFS.
t been kept up to incorrect.
ilitation observedeach Class IV land the potential for
Vermin Eradicatio
Weed Eradication
ons were conducty.
ere not contactedment at MCC.
R
ucted but not NA
Assessment NA
date, 5 NA
d don't look capability
r cropping.
NA
on Plan. NA
Plan. NA
ted annually, NL
regarding NL
Risk Level
Non‐Compliant – Administrative
Non‐Compliant – Administrative
Non‐Compliant – Administrative
Non‐Compliant – Administrative
Non‐Compliant – Administrative
Non‐Compliant – Administrative
Non‐Compliant – ow
Non‐Compliant – ow
2
C
7
7
3
5
5
Sd
MUSWE
2015 Annual Envir
Condition Requ
7.1 Flow • Pipe• PipeUnde• Pipe• PipeEach
7.2 The gthe Nwork
3.2 A numoperafollow• ……• Monoise• …..
5.3 The dconfothe O
5.3 MCC ensur
Shaded cells indduring the next r
ELLBROOK COAL CO
ronmental Manag
uirement
meters have beeeline from No. 2 Oeline from Borehoerground) to Dam eline that supplieeline from Final Sflow meter shall
groundwater monNo.2 Undergroundings (Bore RDH61
mber of mitigatioational noise impawing measures: bile equipment ae to suit the ambie
design, placementorm with the mosObtrusive Effects o
will conduct lightre compliance wit
icate the actionreporting period
OMPANY LIMITED
gement Report
n installed on theOpen Cut to Dam ole Pump 1 and BNo. 2;
es water for dust sSettling Pond to Nbe read and recor
nitoring program id workings (Bore R14).
n measures have acts on surroundi
re fitted with smaent noise conditio
t and directional ct current Australiof Outdoor Lightin
ting assessments oth this standard.
s that had beend.
e following pipelinNo. 1;
Borehole Pump 2 (
suppression; ando.1 Open Cut Voirded at least on a
is based on two bRDH522) and St H
Nois
been developed ing landholders. T
art alarms, which ons; and
Lighti
control of all lightan Standard AS 4ng.
on at least an ann
n addressed at t
nes:
(No. 2
d. a monthly basis.
ores located in Heliers Colliery
se Management P
to reduce the These include the
adjust tonal
ng Management
ting on site will 282 –Control of
nual basis to
the end of the r
Audit Finding
Meters were re
RDH614 was noand monitoring
Plan
“Smart alarms”
Plan
Lighting was no
No audits were
eporting period
ead quarterly not
ot monitored (as g spreadsheet).
” were not fitted.
ot audited at MCC
e conducted –not
. All other actio
R
monthly. NA
per AEMR NA
NM
C. NL
annually. NL
ons are planned
Risk Level
Non‐Compliant – Administrative
Non‐Compliant – Administrative
Non‐Compliant – Medium
Non‐Compliant – ow
Non‐Compliant – ow
d to be addresse
ed
2
OA
Tmw
Ra
T
W
Tc
Tn
Tr
Ten
A
Ae
T
S
D
C
M
Tp
R
TO
R
MUSWE
2015 Annual Envir
Observations Audit Finding
The site induction more environmenwere no environm
Refresher trainingand reinforcemen
The flora and faun
With the site appr
The 2015 site manclosure work is lef
The native vegetatnot found locally.
There was a generegarding the envi
There had been a equipment is requnetwork but a rev
Agricultural monit
AEMR reporting shensure it is comple
The biodiversity of
Seek approval from
Develop and subm
Calibrate water flo
More auditing and
The Visual Amenitpoor quality contr
Review groundwa
The 2015 review oObtrusive Effects o
Remove weeds fro
ELLBROOK COAL CO
ronmental Manag
for Improvem
had a strong OHStal content and th
mental questions.
g on environmentat with the workfo
na threatened spe
roaching closure, t
nagement plan revft till after the site
tion seed mix use
ral lack of proceduironmental aspec
consistent loss ofuired with the objiew of real time a
toring in the form
hould be carefullyete.
ffset area require
m NoW for works
mit annual complia
ow meters in acco
d compliance revi
ty and Landscape rol with lots of typ
ter monitoring an
of the Lighting Maof Outdoor Lightin
om topsoil stockp
OMPANY LIMITED
gement Report
ment
S focus and the enhe addition of a n
al matters had beorce.
ecies booklet shou
the protection of
view should conse is closed. It shou
ed at the site shou
ures to support thts of operations b
f monitoring data ective of improvinair quality data ca
of pasture produ
y compared with t
es monitoring.
s conducted to pre
ance reports for w
ordance with the
ews are required
Management Plapographic errors a
nd the issue of RD
anagement Plan sng.
iles.
nvironmental sectnumber of environ
een minimal throu
uld be handed out
the offset area sh
ider the Completiuld also carefully r
uld be in accordan
he management pbut the lack of doc
across the audit ng data collectionpture should also
uctivity should be
the requirements
event alluvial inflo
water licenses.
manufacturers re
and should be re
an should reflect tand unfinished se
DH 614 not being m
hould consider th
tion is attached onment related qu
ugh the audit peri
t at the induction
hould be finalised
ion criteria in thereview the actual
nce with local nat
plans. Site personcumentation mus
period with no imn and retention. Wo be considered.
conducted annua
s for reporting the
ows into the open
ecommendations.
eported in the AEM
the actual site conntences.
monitored. Adjus
he best way to add
on the end. The iniz questions to en
od. Like all other
.
d with MSC as a pr
MOP and other csite operation wi
ive vegetation (as
nel were able to pst be remedied to
mproving trend. A Work has commen
ally to help suppo
e in the managem
n cuts.
MR.
nditions and opera
t documentation
dress compliance
duction could be nsure the inductee
training, environm
riority.
closure consideratth that noted in t
s identified in the
provide appropria help ensure com
review of the manced on this issue
ort relinquishment
ment plans, MOP, l
ations. The versio
as appropriate.
with Australian S
strengthened by e understands the
mental training re
tions to ensure ththe management
EIS) and not inclu
ate responses to qmpliance across th
anagement of moe with the blast m
t of the pasture a
licenses and othe
on reviewed for th
Standard AS 4282
the inclusion of e material. There
equires updating
hat not all of the plan.
ude any species
questions e operation.
nitoring onitoring
reas.
r approvals to
he audit had
– Control of the
2
A
C
Rp
Sd
MUSWE
2015 Annual Envir
Audit Finding
Carefully monitor
Review equipmenprioritised.
Shaded cells indduring the next r
ELLBROOK COAL CO
ronmental Manag
the extent and do
t onsite and comm
icate the actionreporting period
OMPANY LIMITED
gement Report
ominance of gold
mence removing
s that had beend.
en wreath wattle
redundant equipm
n addressed at t
(Acacia saligna)
ment to reduce th
the end of the r
and control if req
he cost post closu
eporting period
uired to reduce r
ure. Any equipme
. All other actio
elinquishment ris
nt not owned by
ons are planned
sk.
MCC should be
d to be addresse
ed
2015 An
Ap
MUSWELL
nnual Environ
ppend
LBROOK COAL
nmental Man
ix 2: A
L COMPANY L
nagement Re
Air Qu
IMITED
eport
uality Monittoringg Resu
ults
2
D
1
B
c
N
B
MUSWE
2015 Annual Envir
DEPOSITIONAL DATE
Jan‐15
Feb‐15
Mar‐15
Apr‐15
May‐15
Jun‐15
Jul‐15
Aug‐15
Sep‐15
Oct‐15
Nov‐15
Dec‐15
12‐month Rolling Av
Background Average
2009)
c = Contaminated result d
NR = No result. Includes b
Blank cells indicate that t
ELLBROOK COAL CO
ronmental Manag
DUST RESULTS
DM2 D
c3.4 1
1.1 0
c5.2 1
0.8 1
6.4 1
0.2 0
0.7 0
0.4 0
1.3 2
1.6 1
3.8 2
1
verage 1.8 1
e (2000‐2.5 1
ue to the presence of bird
roken or missing bottles.
he gauge had been decom
OMPANY LIMITED
gement Report
M7 DM10 DM1
1.0 3.2 c7.5
0.8 1.3 c3.1
1.4 c10.7 c5.8
1.1 c13.2 0.7
1.5 c8.1 5.3
0.4 c11.4 1.2
0.6 c9.2 1.1
0.6 c11.6 1.1
2.1 4.5 2.7
1.7 3.5 1.1
2.1 4.7 2.7
1.3
1.2 3.4 2.0
1.1 2.6 1.4
d droppings, insects, or ve
mmissioned and no result
14 DM15 DM16
5 0.6 0.7
1 0.4 1.8
8 0.9 4.3
7 1.2 0.8
3 1.0 2.3
2 3.6 0.9
1 0.6 0.8
1 0.7 0.5
7 13.5c 1.3
1 c4 c4.1
7 1.0 1.0
0 1.1 1.4
4 1.9 1.9
egetation in sample. Cont
ts were available.
DM17 DM18
2.3 0.9
2.1 1.0
4.7 4.4
1.6 0.8
1.1 0.7
2.4 0.7
c3.4 1.1
0.8 0.6
2.9 1.6
3.0 4.0
2.7 1.5
3.8 2.4
2.5 1.6
1.7 1.1
taminated results are exc
*DM19 DM20
0.7 1.7
0.8 0.7
0.9 1.3
1.2 1.2
1.5 0.9
3.3 0.6
1.9 0.6
0.5 1.6
4.8c 1.4
2.8 1.8
1.2 1.4
c7.2
1.5 1.2
2.5 2.3
luded from averages.
DM22 *DM23 *D
3.7 1.3 0
c6.3 1.6
1.6 1.6
2.7 0.9
c4.9 0.5
1.6 2.0 0
1.4 0.7
2.9 c3.2
2.3 14.9c
2.0 3.0 4
2.3 2.8
c5.1 c
2.3 1.6
1.9 1.6
DM24 DM26 DM
0.9 1.0 1.0
1.8 1.0 0.8
3.0 c6.6 1.4
1.7 0.9 3.0
1.4 2.3 2.9
0.8 1.5
1.2 2.1
2.1 2.0
2.7 2.1
4.3 2.3
2.6 2.6
c3.6 1.2
2.0 1.7 1.8
1.8 1.8 1.9
* = no
28 *DM29 DM30
0 1.3 0.9
8 0.9 0.7
4 1.5 1.6
0 0.9 2.0
9 0.6 0.6
0.5 0.6
1.0 0.6
0.6 0.7
1.8 1.7
1.9 2.0
4.2 1.9
3.2
8 1.5 1.2
9 1.5 1.4
n mine owned land
0
2015 An
HVAS M
MUSWELL
nnual Environ
MONITORIN
D
05‐J
11‐J
17‐J
23‐J
29‐J
04‐F
10‐F
16‐F
22‐F
28‐F
06‐M
12‐M
18‐M
24‐M
30‐M
05‐A
11‐A
17‐A
23‐A
29‐A
05‐M
11‐M
17‐M
23‐M
29‐M
04‐J
10‐J
16‐J
22‐J
28‐J
04‐J
10‐J
16‐J
22‐J
28‐J
03‐A
09‐A
15‐A
21‐A
27‐A
02‐S
08‐S
14‐S
LBROOK COAL
nmental Man
NG RESULT
ate N
an‐15
an‐15
an‐15
an‐15
an‐15
Feb‐15
Feb‐15
Feb‐15
Feb‐15
Feb‐15
Mar‐15
Mar‐15
Mar‐15
Mar‐15
Mar‐15
Apr‐15
Apr‐15
Apr‐15
Apr‐15
Apr‐15
May‐15
May‐15
May‐15
May‐15
May‐15
un‐15
un‐15
un‐15
un‐15
un‐15
Jul‐15
Jul‐15
Jul‐15
Jul‐15
Jul‐15
Aug‐15
Aug‐15
Aug‐15
Aug‐15
Aug‐15
Sep‐15
Sep‐15
Sep‐15
L COMPANY L
nagement Re
TS
isbet PM10
24
8
15
9
17
12
10
29
5
24
30
35
37
17
30
9
15
18
6
17
12
13
14
19
4
7
23
10
10
10
6
8
16
11
16
4
33
20
24
1
8
7
29
IMITED
eport
Site 1 TS
39
10
30
32
35
25
26
60
12
37
66
53
52
19
51
15
24
37
10
24
18
18
20
23
6
10
17
15
18
21
16
15
8
55
17
9
21
23
29
5
13
15
33
P Site 2 T
39
11
30
23
35
23
26
55
10
37
57
58
60
23
52
16
20
29
13
21
19
30
17
23
9
10
17
19
20
16
10
15
15
47
15
11
25
20
27
5
20
16
29
TSP Site
4
1
2
1
4
2
3
7
1
4
5
7
7
2
5
1
2
4
2
1
1
2
2
1
1
2
1
1
1
1
5
1
2
2
2
2
1
3
3 TSP
45
14
24
19
43
25
37
71
12
48
55
75
74
25
59
15
29
47
8
28
18
18
21
26
7
13
19
23
15
18
8
14
19
56
15
9
27
20
26
5
21
19
31
2015 An
MUSWELL
nnual Environ
D
20‐S
26‐S
02‐O
08‐O
14‐O
20‐O
26‐O
01‐N
07‐N
13‐N
19‐N
25‐N
01‐D
07‐D
13‐D
19‐D
25‐D
31‐D
LBROOK COAL
nmental Man
ate N
Sep‐15
Sep‐15
Oct‐15
Oct‐15
Oct‐15
Oct‐15
Oct‐15
Nov‐15
Nov‐15
Nov‐15
Nov‐15
Nov‐15
Dec‐15
Dec‐15
Dec‐15
Dec‐15
Dec‐15
Dec‐15
L COMPANY L
nagement Re
isbet PM10
12
15
35
23
28
55
16
36
21
7
19
34
35
33
41
35
23
24
IMITED
eport
Site 1 TS
23
36
65
55
51
55
31
33
34
13
30
53
64
51
52
53
13
22
P Site 2 T
17
35
63
72
74
60
32
35
33
11
30
51
44
49
54
45
14
21
TSP Site
2
4
7
6
6
5
4
1
3
1
3
5
4
6
7
4
1
3
3 TSP
25
45
71
60
65
56
44
18
34
14
36
58
46
65
73
45
19
31
2
R
MUSWE
2015 Annual Envir
REAL‐TIME PM1
SAMPLE
DATESITE 1
01‐Jan‐15 20.7
02‐Jan‐15 8.4
03‐Jan‐15 14.4
04‐Jan‐15 15.7
05‐Jan‐15 19.6
06‐Jan‐15 15.4
07‐Jan‐15 15.0
08‐Jan‐15 18.8
09‐Jan‐15 22.6
10‐Jan‐15 19.0
11‐Jan‐15 7.4
12‐Jan‐15 6.8
13‐Jan‐15 11.6
14‐Jan‐15 10.4
15‐Jan‐15 8.5
16‐Jan‐15 17.3
17‐Jan‐15 12.4
18‐Jan‐15 21.3
19‐Jan‐15 19.5
20‐Jan‐15 10.7
21‐Jan‐15 14.7
22‐Jan‐15 16.4
23‐Jan‐15 31.8
24‐Jan‐15 15.7
25‐Jan‐15 10.4
26‐Jan‐15 18.3
27‐Jan‐15 9.2
28‐Jan‐15 10.1
29‐Jan‐15 11.5
30‐Jan‐15 14.7
31‐Jan‐15 21.3
Janua
ELLBROOK COAL CO
ronmental Manag
10 MONITORING
SITE 2 SITE 3
23.3 24.3
9.4 7.0
17.4 11.3
18.1 14.8
20.7 20.4
17.2 15.3
14.3 13.3
20.4 16.8
23.3 19.5
21.0 19.0
8.5 7.9
7.5 7.6
13.2 11.7
12.5 8.3
10.4 9.8
18.5 10.8
13.4 9.7
23.2 17.7
21.1 17.5
12.0 8.6
15.7 14.2
16.9 15.1
11.9 7.1
16.0 10.3
11.3 8.5
19.0 15.3
9.5 7.7
10.8 10.7
13.3 10.6
15.1 12.5
21.7 13.5
ary 2015
OMPANY LIMITED
gement Report
G RESULTS
3SAMPLE
DATES
01‐Feb‐15
02‐Feb‐15
03‐Feb‐15
04‐Feb‐15
05‐Feb‐15
06‐Feb‐15
07‐Feb‐15
08‐Feb‐15
09‐Feb‐15
10‐Feb‐15
11‐Feb‐15
12‐Feb‐15
13‐Feb‐15
14‐Feb‐15
15‐Feb‐15
16‐Feb‐15
17‐Feb‐15
18‐Feb‐15
19‐Feb‐15
20‐Feb‐15
21‐Feb‐15
22‐Feb‐15
23‐Feb‐15
24‐Feb‐15
25‐Feb‐15
26‐Feb‐15
27‐Feb‐15
28‐Feb‐15
F
ITE 1 SITE 2
19.0 19.5
17.5 14.3
16.9 17.5
15.9 14.7
17.6 16.5
15.4 15.2
18.3 18.5
19.5 20.7
34.0 33.6
13.8 14.4
12.7 12.9
22.5 23.7
15.1 16.5
18.7 19.5
21.0 21.2
23.5 22.7
20.3 20.8
23.8 24.0
19.7 20.9
21.4 21.8
8.5 10.5
9.8 9.9
10.0 9.5
15.5 16.5
15.1 12.7
18.1 15.9
17.9 18.9
17.0 17.4
February 2015
SITE 3SAMPLE
DATE
15.3 01‐Mar‐1
13.3 02‐Mar‐1
15.3 03‐Mar‐1
12.4 04‐Mar‐1
14.8 05‐Mar‐1
15.1 06‐Mar‐1
16.3 07‐Mar‐1
19.9 08‐Mar‐1
31.1 09‐Mar‐1
14.1 10‐Mar‐1
12.9 11‐Mar‐1
20.7 12‐Mar‐1
16.1 13‐Mar‐1
16.4 14‐Mar‐1
17.5 15‐Mar‐1
18.1 16‐Mar‐1
21.3 17‐Mar‐1
24.2 18‐Mar‐1
21.1 19‐Mar‐1
25.7 20‐Mar‐1
8.2 21‐Mar‐1
7.6 22‐Mar‐1
9.1 23‐Mar‐1
13.5 24‐Mar‐1
11.7 25‐Mar‐1
15.5 26‐Mar‐1
20.2 27‐Mar‐1
15.9 28‐Mar‐1
29‐Mar‐1
30‐Mar‐1
31‐Mar‐1
E SITE 1 SITE
15 18.4 19.
15 21.4 21.4
15 22.6 23.
15 32.0 32.
15 26.3 26.
15 24.0 24.
15 35.3 35.
15 26.6 28.
15 30.7 34.
15 46.6 48.
15 32.8 43.
15 29.1 30.9
15 19.7 19.8
15 17.9 18.9
15 23.7 24.
15 21.8 21.
15 31.2 34.4
15 27.7 30.
15 29.7 30.
15 28.8 27.
15 16.7 17.
15 14.1 13.
15 8.8 16.4
15 14.7 16.
15 18.7 21.
15 9.4 11.9
15 12.2 12.8
15 20.2 22.
15 26.6 25.
15 23.7 24.
15 12.0 11.
March 2015
E 2 SITE 3S
3 15.5 0
4 30.2 0
6 24.5 03
3 31.5 04
1 24.1 05
5 19.5 06
6 25.5 07
2 28.4 08
3 34.6 09
1 47.2 10
2 41.2 1
9 31.4 1
8 15.7 13
9 12.0 14
5 20.1 15
7 27.0 16
4 33.8 17
1 24.1 18
2 21.3 19
6 26.4 20
6 19.1 2
7 11.0 2
4 7.2 23
3 26.2 24
1 14.5 25
9 11.9 26
8 8.2 27
2 17.0 28
7 23.0 29
3 23.2 30
5 9.4
5SAMPLE
DATESITE 1
1‐Apr‐15 13.1
2‐Apr‐15 21.3
3‐Apr‐15 22.8
4‐Apr‐15 5.0
5‐Apr‐15 7.6
6‐Apr‐15 8.0
7‐Apr‐15 9.7
8‐Apr‐15 7.6
9‐Apr‐15 12.7
0‐Apr‐15 18.3
1‐Apr‐15 13.0
2‐Apr‐15 13.4
3‐Apr‐15 18.3
4‐Apr‐15 22.9
5‐Apr‐15 24.6
6‐Apr‐15 16.3
7‐Apr‐15 28.4
8‐Apr‐15 16.5
9‐Apr‐15 7.8
0‐Apr‐15 5.1
1‐Apr‐15 3.7
2‐Apr‐15 4.7
3‐Apr‐15 8.0
4‐Apr‐15 8.1
5‐Apr‐15 9.2
6‐Apr‐15 8.0
7‐Apr‐15 8.9
8‐Apr‐15 11.8
9‐Apr‐15 12.4
0‐Apr‐15 8.3
April
SITE 2 SITE 3
14.2 9.2
21.0 12.8
21.9 23.2
4.9 5.4
7.5 5.6
8.2 6.5
9.5 8.4
8.3 6.1
12.7 11.9
16.0 18.6
12.4 11.6
14.2 13.5
17.6 17.3
23.0 28.7
24.1 19.5
16.2 11.7
27.3 32.2
14.3 8.6
7.9 4.8
4.5 7.0
3.1 2.4
4.3 4.4
8.5 3.2
7.6 5.0
8.5 6.0
7.2 5.5
6.7 7.8
13.1 12.5
12.2 16.4
8.3 11.0
2015
2
MUSWE
2015 Annual Envir
SAMPLE
DATESITE 1
01‐May‐15 8.4
02‐May‐15 9.5
03‐May‐15 6.4
04‐May‐15 12.8
05‐May‐15 10.8
06‐May‐15 65.3
07‐May‐15 18.5
08‐May‐15 12.9
09‐May‐15 11.1
10‐May‐15 12.0
11‐May‐15 12.9
12‐May‐15 8.4
13‐May‐15 12.1
14‐May‐15 10.6
15‐May‐15 15.6
16‐May‐15 14.2
17‐May‐15 11.1
18‐May‐15 13.7
19‐May‐15 8.5
20‐May‐15 7.9
21‐May‐15 6.3
22‐May‐15 7.2
23‐May‐15 11.1
24‐May‐15 12.0
25‐May‐15 11.7
26‐May‐15 13.3
27‐May‐15 12.9
28‐May‐15 10.8
29‐May‐15 7.6
30‐May‐15 7.8
31‐May‐15 5.4
May
ELLBROOK COAL CO
ronmental Manag
SITE 2 SITE 3
7.8 8.3
9.0 12.5
6.9 4.1
12.9 8.3
10.1 5.0
61.7 59.9
18.0 16.4
11.9 12.9
10.3 no dat
12.8 no dat
16.2 no dat
10.5 no dat
12.3 no dat
9.7 no dat
15.0 no dat
14.3 12.2
9.5 8.6
14.0 12.9
8.1 5.0
9.1 5.5
6.5 4.3
6.7 8.0
10.4 14.9
11.9 15.0
10.4 19.0
10.8 10.3
12.0 10.9
10.5 7.4
8.4 6.2
8.0 5.6
6.0 4.3
y 2015
OMPANY LIMITED
gement Report
3SAMPLE
DATES
01‐Jun‐15
02‐Jun‐15
03‐Jun‐15
04‐Jun‐15
05‐Jun‐15
06‐Jun‐15
07‐Jun‐15
08‐Jun‐15
ta 09‐Jun‐15
ta 10‐Jun‐15
ta 11‐Jun‐15
ta 12‐Jun‐15
ta 13‐Jun‐15
ta 14‐Jun‐15
ta 15‐Jun‐15
16‐Jun‐15
17‐Jun‐15
18‐Jun‐15
19‐Jun‐15
20‐Jun‐15
21‐Jun‐15
22‐Jun‐15
23‐Jun‐15
24‐Jun‐15
25‐Jun‐15
26‐Jun‐15
27‐Jun‐15
28‐Jun‐15
29‐Jun‐15
30‐Jun‐15
ITE 1 SITE 2
8.7 7.4
10.0 9.4
12.2 11.1
8.7 8.7
9.2 8.8
14.5 14.5
9.1 8.6
8.3 8.5
10.2 10.1
11.2 10.1
13.9 12.4
8.5 8.4
10.1 9.6
13.5 11.5
14.2 13.7
9.7 13.9
5.8 6.1
4.1 4.8
7.9 6.9
7.8 8.2
9.5 8.9
10.7 11.5
8.2 8.3
17.0 13.7
10.6 8.8
11.9 11.3
10.0 8.7
11.6 9.9
13.1 12.1
14.9 13.4
June 2015
SITE 3SAMPLE
DATE
4.3 01‐Jul‐15
7.2 02‐Jul‐15
8.4 03‐Jul‐15
11.2 04‐Jul‐15
7.3 05‐Jul‐15
18.9 06‐Jul‐15
16.7 07‐Jul‐15
8.4 08‐Jul‐15
6.4 09‐Jul‐15
8.2 10‐Jul‐15
9.3 11‐Jul‐15
13.1 12‐Jul‐15
13.0 13‐Jul‐15
10.1 14‐Jul‐15
13.1 15‐Jul‐15
15.7 16‐Jul‐15
13.0 17‐Jul‐15
4.7 18‐Jul‐15
3.9 19‐Jul‐15
6.9 20‐Jul‐15
7.8 21‐Jul‐15
9.2 22‐Jul‐15
10.6 23‐Jul‐15
6.9 24‐Jul‐15
11.3 25‐Jul‐15
7.6 26‐Jul‐15
15.3 27‐Jul‐15
7.9 28‐Jul‐15
10.5 29‐Jul‐15
14.7 30‐Jul‐15
31‐Jul‐15
E SITE 1 SITE
5 8.9 8.7
5 8.8 8.1
5 18.9 16.
5 9.8 8.2
5 10.8 9.7
5 8.4 8.4
5 11.2 11.
5 12.5 9.6
5 11.7 12.4
5 8.9 8.5
5 6.1 5.7
5 4.5 4.7
5 4.9 4.8
5 4.9 5.9
5 8.3 7.4
5 6.8 7.2
5 4.6 4.7
5 10.4 9.7
5 13.5 12.
5 13.1 18.
5 16.9 14.
5 29.6 23.
5 14.6 13.
5 6.4 5.2
5 5.3 5.4
5 6.2 6.5
5 7.2 7.4
5 9.0 7.9
5 11.4 12.8
5 9.5 9.5
5 12.0 11.
July 2015
E 2 SITE 3S
7 9.2 01
1 8.2 02
7 16.6 03
2 5.5 04
7 6.3 05
4 8.1 06
3 9.5 07
6 12.4 08
4 11.3 09
5 7.7 10
7 4.2 11
7 4.2 12
8 3.2 13
9 3.5 14
4 4.6 15
2 7.3 16
7 6.1 17
7 7.2 18
5 14.0 19
2 18.2 20
2 13.4 21
6 28.2 22
6 11.2 23
2 4.2 24
4 4.2 25
5 5.5 26
4 7.8 27
9 7.6 28
8 11.8 29
5 7.6 30
3 7.7 31
SAMPLE
DATESITE 1
1‐Aug‐15 10.5
2‐Aug‐15 13.1
3‐Aug‐15 8.7
4‐Aug‐15 6.9
5‐Aug‐15 7.1
6‐Aug‐15 5.8
7‐Aug‐15 6.1
8‐Aug‐15 10.8
9‐Aug‐15 14.8
0‐Aug‐15 9.6
1‐Aug‐15 10.4
2‐Aug‐15 11.0
3‐Aug‐15 6.2
4‐Aug‐15 7.6
5‐Aug‐15 13.0
6‐Aug‐15 12.9
7‐Aug‐15 9.4
8‐Aug‐15 9.9
9‐Aug‐15 14.8
0‐Aug‐15 21.2
1‐Aug‐15 19.2
2‐Aug‐15 16.7
3‐Aug‐15 11.9
4‐Aug‐15 9.3
5‐Aug‐15 5.0
6‐Aug‐15 4.4
7‐Aug‐15 5.0
8‐Aug‐15 5.2
9‐Aug‐15 5.7
0‐Aug‐15 9.7
1‐Aug‐15 8.9
August
SITE 2 SITE 3
10.1 10.5
12.9 7.6
9.3 13.7
6.9 6.3
9.2 4.5
6.6 5.8
7.0 6.2
12.0 6.3
15.8 11.0
9.9 14.0
9.5 8.2
11.8 10.5
7.1 9.3
7.4 4.9
12.8 8.5
12.9 10.5
9.9 10.1
9.6 7.7
15.1 7.5
20.8 16.6
18.1 20.1
15.3 15.4
11.1 11.8
8.1 9.2
5.1 8.7
4.4 5.6
5.6 3.6
5.6 3.5
5.6 4.1
5.6 4.1
no data 7.2
t 2015
2
MUSWE
2015 Annual Envir
SAMPLE
DATESITE 1
01‐Sep‐15 7.2
02‐Sep‐15 9.7
03‐Sep‐15 8.0
04‐Sep‐15 12.5
05‐Sep‐15 9.8
06‐Sep‐15 13.7
07‐Sep‐15 8.3
08‐Sep‐15 8.1
09‐Sep‐15 7.0
10‐Sep‐15 15.3
11‐Sep‐15 13.5
12‐Sep‐15 12.5
13‐Sep‐15 14.5
14‐Sep‐15 15.9
15‐Sep‐15 16.7
16‐Sep‐15 18.2
17‐Sep‐15 20.0
18‐Sep‐15 13.4
19‐Sep‐15 13.3
20‐Sep‐15 8.6
21‐Sep‐15 8.6
22‐Sep‐15 10.5
23‐Sep‐15 15.7
24‐Sep‐15 15.3
25‐Sep‐15 12.3
26‐Sep‐15 11.1
27‐Sep‐15 12.4
28‐Sep‐15 11.7
29‐Sep‐15 12.4
30‐Sep‐15 21.2
Septem
ELLBROOK COAL CO
ronmental Manag
SITE 2 SITE 3
no data 5.2
no data 9.2
no data 5.8
8.5 9.2
8.8 8.8
11.0 15.4
7.8 6.2
7.2 7.8
7.3 7.1
14.7 17.7
11.7 11.2
10.4 9.5
14.7 12.7
13.3 12.6
15.4 13.9
16.8 17.4
16.4 18.2
12.3 18.6
10.4 11.4
6.2 6.2
7.0 6.1
9.6 10.7
13.4 15.2
12.7 13.3
11.6 11.9
9.4 13.0
11.0 15.9
9.1 8.8
11.1 9.9
19.7 19.7
mber 2015
OMPANY LIMITED
gement Report
3SAMPLE
DATES
01‐Oct‐15
02‐Oct‐15
03‐Oct‐15
04‐Oct‐15
05‐Oct‐15
06‐Oct‐15
07‐Oct‐15
08‐Oct‐15
09‐Oct‐15
10‐Oct‐15
11‐Oct‐15
12‐Oct‐15
13‐Oct‐15
14‐Oct‐15
15‐Oct‐15
16‐Oct‐15
17‐Oct‐15
18‐Oct‐15
19‐Oct‐15
20‐Oct‐15
21‐Oct‐15
22‐Oct‐15
23‐Oct‐15
24‐Oct‐15
25‐Oct‐15
26‐Oct‐15
27‐Oct‐15
28‐Oct‐15
29‐Oct‐15
30‐Oct‐15
31‐Oct‐15
O
ITE 1 SITE 2
20.8 18.6
24.3 21.3
17.3 14.7
19.7 15.6
23.8 15.9
18.9 18.3
34.0 31.6
20.7 19.2
22.1 18.9
24.9 21.5
18.4 16.9
17.9 13.4
25.3 23.9
18.5 17.8
21.7 17.5
14.6 15.2
26.5 24.0
21.3 19.6
21.5 19.5
21.1 19.3
16.1 20.7
6.9 7.0
13.8 14.7
16.7 17.8
15.9 16.0
15.9 18.2
13.1 11.3
15.2 16.2
20.1 17.4
18.1 19.1
18.9 19.7
October 2015
SITE 3SAMPLE
DATE
22.3 01‐Nov‐1
12.7 02‐Nov‐1
13.5 03‐Nov‐1
13.5 04‐Nov‐1
13.0 05‐Nov‐1
17.5 06‐Nov‐1
37.8 07‐Nov‐1
19.3 08‐Nov‐1
23.9 09‐Nov‐1
16.3 10‐Nov‐1
13.7 11‐Nov‐1
16.3 12‐Nov‐1
24.4 13‐Nov‐1
22.8 14‐Nov‐1
18.1 15‐Nov‐1
12.4 16‐Nov‐1
21.7 17‐Nov‐1
20.6 18‐Nov‐1
22.0 19‐Nov‐1
19.3 20‐Nov‐1
19.6 21‐Nov‐1
5.7 22‐Nov‐1
16.6 23‐Nov‐1
20.2 24‐Nov‐1
14.9 25‐Nov‐1
17.0 26‐Nov‐1
15.5 27‐Nov‐1
19.6 28‐Nov‐1
17.2 29‐Nov‐1
23.8 30‐Nov‐1
16.9
E SITE 1 SITE
15 16.3 17.
15 11.3 14.0
15 11.7 13.8
15 6.7 6.3
15 8.2 9.2
15 13.3 14.4
15 14.8 18.
15 9.9 9.4
15 14.2 12.4
15 16.8 16.
15 12.0 10.9
15 14.4 17.
15 7.9 8.6
15 9.2 10.0
15 10.8 10.
15 11.2 10.
15 12.7 12.8
15 12.7 13.9
15 17.8 17.
15 26.1 21.
15 27.2 30.
15 17.8 18.4
15 21.6 22.0
15 27.1 30.8
15 21.2 20.
15 39.6 49.9
15 19.1 20.
15 24.5 24.
15 18.6 20.
15 27.1 24.
November 20
E 2 SITE 3S
2 13.2 01
0 10.3 02
8 13.9 03
3 8.1 04
2 13.7 05
4 10.5 06
1 12.2 07
4 12.3 08
4 19.5 09
7 26.9 10
9 15.2 11
5 14.4 12
6 7.1 13
0 8.0 14
6 8.9 15
3 10.5 16
8 16.7 17
9 10.5 18
7 13.7 19
7 19.7 20
7 27.2 21
4 15.5 22
0 18.1 23
8 30.8 24
2 20.0 25
9 no data 26
5 no data 27
7 no data 28
5 no data 29
3 no data 30
31
015SAMPLE
DATESITE 1
1‐Dec‐15 24.4
2‐Dec‐15 21.9
3‐Dec‐15 18.6
4‐Dec‐15 16.7
5‐Dec‐15 18.0
6‐Dec‐15 17.9
7‐Dec‐15 19.5
8‐Dec‐15 22.1
9‐Dec‐15 13.5
0‐Dec‐15 15.5
1‐Dec‐15 22.9
2‐Dec‐15 36.0
3‐Dec‐15 21.6
4‐Dec‐15 25.8
5‐Dec‐15 35.4
6‐Dec‐15 15.1
7‐Dec‐15 12.0
8‐Dec‐15 17.0
9‐Dec‐15 19.5
0‐Dec‐15 19.4
1‐Dec‐15 19.0
2‐Dec‐15 3.0
3‐Dec‐15 8.7
4‐Dec‐15 12.4
5‐Dec‐15 10.8
6‐Dec‐15 11.8
7‐Dec‐15 10.1
8‐Dec‐15 14.0
9‐Dec‐15 13.1
0‐Dec‐15 12.3
1‐Dec‐15 13.7
Decemb
SITE 2 SITE 3
22.4 no data
24.5 no data
21.9 no data
16.9 25.6
23.7 19.5
21.4 19.9
21.7 25.1
27.0 12.6
12.9 14.7
18.4 18.2
22.5 30.4
39.2 25.4
24.2 22.7
29.5 31.3
38.2 21.4
16.2 17.4
12.8 7.1
18.6 16.8
19.2 15.8
19.4 14.8
22.6 17.9
2.4 3.2
9.9 7.0
14.7 13.0
11.5 7.9
14.8 12.1
9.6 13.0
14.6 13.0
13.2 13.9
12.7 11.8
15.7 9.7
ber 2015
2015 An
A
MUSWELL
nnual Environ
Appen
LBROOK COAL
nmental Man
ndix 3
L COMPANY L
nagement Re
3: Wat
IMITED
eport
ter Moonitorring RResults
s
2
M
2
1
2
2
1
2
1
1
1
8
1
2
B
M
2
1
2
2
1
2
MUSWE
2015 Annual Envir
MONTHLY SURF
DATE Dam
27‐Jan‐15 7.
19‐Feb‐15 7.
24‐Mar‐15 7.
28‐Apr‐15 7.
4‐May‐15 7.
22‐Jun‐15 7.
17‐Jul‐15 7.
13‐Aug‐15 7.
10‐Sep‐15 7.
8‐Oct‐15 7.
13‐Nov‐15 7.
29‐Dec‐15 7.
Blank cells indicate
MONTHLY SURF
DATE Dam
27‐Jan‐15 6,1
19‐Feb‐15 6,3
24‐Mar‐15 6,2
28‐Apr‐15 6,3
4‐May‐15 6,4
22‐Jun‐15 6,2
ELLBROOK COAL CO
ronmental Manag
FACE WATER M
m 1/2
MCC12Final
SettlingPond
.68 8.30
.72 8.26
.59 8.01
.66 8.19
.99 8.36
.74 8.37
.39 8.28
.40 8.30
.72 8.33
.96 8.13
.35 8.37
.71 8.31
e that no sample
FACE WATER M
m 1/2
MCC12Final
SettlingPond
140 6,520
380 7,870
280 8,970
300 4,960
460 7,550
240 6,880
OMPANY LIMITED
gement Report
MONITORING RE
2
g
No.2 Open Cut
Void
8.10
8.13
7.14
7.77
7.93
7.82
7.84
7.87
8.05
8.20
7.89
was collected
MONITORING RE
2
g
No.2 Open Cut
Void
6,570
6,750
6,500
6,390
6,480
6,380
ESULTS ‐ pH
No.1 Open Cut
Void M
ESULTS – ELECT
No.1 Open Cut
Void M
4
1
2
1
MCC06
MCC0MuscCreek
upstre
7.71 8.01
7.95
8.01
7.57 7.70
7.74 7.86
7.94 7.87
7.84 7.88
7.67 7.85
7.98 8.04
8.09 8.12
7.30 7.58
7.65
TRICAL CONDUC
MCC06
MCC0MuscCreek
upstre
4,410 5,32
9,13
6,79
1,650 1,21
2,860 1,34
1,940 827
07 cle k ‐ eam
MCC08 Muscle Creek ‐
downstream
1 7.86
5 7.98
1 7.93
0 7.74
6 7.88
7 7.85
8 7.90
5 7.84
4 8.04
2 8.01
8 7.61
5 7.73
CTIVITY
07 cle k ‐ eam
MCC08 Muscle Creek ‐
downstream
0 5,480
0 9,120
0 6,140
0 1,410
0 1,770
7 995
MCC10
7.85
7.83
7.83
7.94
8.13
7.84
MCC10
10,600
MCC11 MCC
8.0
8.0
7.9
7.6
7.7
8.1
7.9
7.7
8.2
8.1
8.0
MCC11 MCC
9,5
10,2
9,8
69
1,6
69
C17 MCC18
04
02
95
64
75
16
93
76
23
12
00
C17 MCC18
540
200
820
91
680
92
2
1
1
1
8
1
2
B
M
2
1
2
2
1
2
1
1
1
8
1
2
B
MUSWE
2015 Annual Envir
DATE Dam
17‐Jul‐15 6,3
13‐Aug‐15 6,4
10‐Sep‐15 6,2
8‐Oct‐15 6,5
13‐Nov‐15 6,3
29‐Dec‐15 6,3
Blank cells indicate
MONTHLY SURF
DATE Dam
27‐Jan‐15 1
19‐Feb‐15
24‐Mar‐15 <
28‐Apr‐15 <
4‐May‐15 1
22‐Jun‐15 1
17‐Jul‐15
13‐Aug‐15 1
10‐Sep‐15 1
8‐Oct‐15
13‐Nov‐15 <
29‐Dec‐15 <
Blank cells indicate
ELLBROOK COAL CO
ronmental Manag
m 1/2
MCC12Final
SettlingPond
370 7,830
480 8,760
200 7,430
520 10,600
320 8,640
350 4,260
e that no sample
FACE WATER M
m 1/2
MCC12Final
SettlingPond
12 16
6 14
<5 <5
<5 <5
15 13
14 22
6 7
12 <5
16 25
9 <5
<5 28
<5 <5
e that no sample
OMPANY LIMITED
gement Report
2
g
No.2 Open Cut
Void
6,510
6,570
6,330
0 6,640
6,670
was collected
MONITORING RE
2
g
No.2 Open Cut
Void
12
<5
<5
<5
18
15
6
12
12
10
<5
was collected
No.1 Open Cut
Void M
4
5
3
5
4
ESULTS – TOTAL
No.1 Open Cut
Void M
MCC06
MCC0MuscCreek
upstre
4,280 1,27
5,050 1,84
3,260 1,01
5,280 1,81
4,850 2,06
2,04
L SUSPENDED S
MCC06
MCC0MuscCreek
upstre
10 5
<5
<5
31 <5
7 <5
8 6
16 <5
20 <5
<5 <5
6 <5
7 <5
14
07 cle k ‐ eam
MCC08 Muscle Creek ‐
downstream
0 1,470
0 2,350
0 1,320
0 2,340
0 2,960
0 2,870
SOLIDS
07 cle k ‐ eam
MCC08 Muscle Creek ‐
downstream
10
<5
7
<5
<5
6
<5
6
<5
<5
<5
10
MCC10
10,800
10,000
10,400
10,800
10,200
MCC10
<5
5
<5
<5
<5
<5
MCC11 MCC
56
4,1
1,0
6,8
8,2
MCC11 MCC
1
2
3
1
<
6
1
1
1
2
2
C17 MCC18
62
190
050
830
210
C17 MCC18
2
5
6
0
5
6
4
5
2
7
1
2
Q
2
2
1
2
B
Q
2
2
1
2
B
Q
2
2
1
2
B
MUSWE
2015 Annual Envir
QUARTERLY SUR
DATE MC
24‐Mar‐15 8.
22‐Jun‐15 9.
10‐Sep‐15 8.
23‐Dec‐15 7.
Blank cells indicate
QUARTERLY SUR
DATE MC
24‐Mar‐15 5,4
22‐Jun‐15 4,5
10‐Sep‐15 4,6
23‐Dec‐15 5,2
Blank cells indicate
QUARTERLY SUR
DATE MC
24‐Mar‐15
22‐Jun‐15 1
10‐Sep‐15 4
23‐Dec‐15 6
Blank cells indicate
ELLBROOK COAL CO
ronmental Manag
RFACE WATER
CC9 MCC13
.70
.24 7.83
.98 7.78
.97
e that no sample
RFACE WATER
CC9 MCC13
480
560 1,040
660 1,000
240
e that no sample
RFACE WATER
CC9 MCC13
6
14 6
48 <5
64
e that no sample
OMPANY LIMITED
gement Report
MONITORING R
3 MCC23
9.40
9.30
8.25
9.80
was collected
MONITORING R
3 MCC23
2,810
2,110
1,160
1,720
was collected
MONITORING R
3 MCC23
6
9
<5
<5
was collected
RESULTS – pH
MCC24 M
7.87
7.83
7.54
RESULTS – ELEC
MCC24 M
2,960 1
2,660 1
6,200 2
RESULTS – TOT
MCC24 M
8
<5
25
MCC25 MCC2
9.00
7.67 8.19
7.92 8.21
7.32 7.84
CTRICAL CONDU
MCC25 MCC2
8,72
1,100 2,53
1,100 3,22
2,400 2,06
AL SUSPENDED
MCC25 MCC2
<5
<5 6
<5 5
6 29
26 MCC27
0 8.01
9 7.91
1 8.24
4 7.99
UCTIVITY
26 MCC27
0 10,800
0 8,500
0 7,440
0 6,350
D SOLIDS
26 MCC27
<5
6
15
8
2
AS
H(ca
C
B
S
C
C
Ma
Ma
S
Po
I
A
B
MUSWE
2015 Annual Envir
ANNUAL SURFASampled 24 March
ANALYTE
pH
EC (µS/cm)
TDS (mg/L)
TSS (mg/L)
Hardness ‐ total lculation ‐ mg/L)
Alkalinity ‐Carbonate (mg
CaCO3/L)
Alkalinity ‐icarbonate (mg CaCO3/L)
Sulfates (mg/L)
Chloride (mg/L)
Calcium ‐ total (mg/L)
agnesium (ppm)
agnesium ‐ total (mg/L)
Sodium ‐ total (mg/L)
otassium ‐ total (mg/L)
Iron‐ filterable (mg/L)
Arsenic (mg/L)
Barium (mg/L)
ELLBROOK COAL CO
ronmental Manag
ACE WATER MOh 2015
Dam 1/2
MCC12Final
SettlingPond
7.59 8.01
6,280 8,970
5,970 9,480
<5 <5
3,150 5,250
<1 <1
357 303
3,070 5,330
566 730
565 493
422 975
422 975
509 839
42 42
<0.05 <0.05
<0.001 <0.001
0.046 0.044
OMPANY LIMITED
gement Report
ONITORING RES
2
g
No.1 Open Cut Void
No.OpeCutVoi
7.1
6,50
6,34
<5
3,42
<1
257
3,38
550
568
485
485
534
42
<0.0
1 <0.0
0.02
ULTS
.2 en t d
MCC6 MC
4 8.
00 6,7
40 4,7
5 <
20
1,7
1
<
7
4
80 1,1
0 1,3
8
3
5 2
5
2
4
9
2
05
<0
01 0.0
24 0.0
CC7 MCC8 M
.01 7.93
790 6,140 5
780 4,560 4
<5 7
710 1,660 2
<1 <1
28 417
110 1,440 2
340 1,030
53 320
02 208
02 208
54 828
7 3
0.05 <0.05 <
004 0.001 0
052 0.052 0
MCC9 MCC13
8.70
5,480
4,260
6
2,750
33
99
2,880
463
188
554
554
557
29
<0.05
0.003
0.066
MCC17 MCC23
7.95 9.40
9,820 2,810
8,510 2,040
36 6
3,760 1,220
<1 28
422 27
4,170 1,400
1,190 184
554 135
576 215
576 215
1,460 258
19 23
0.14 <0.05
0.002 0.002
0.075 0.24
MCC24 MCC25
5 MCC26 MCC2
9.00 8.01
8,720 10,80
9,440 10,50
<5 <5
5,280 4,53
98 <1
83 159
5,500 5,61
511 962
234 359
1,140 882
1,140 882
813 1,35
28 30
<0.05 <0.0
0.005 0.00
0.04 0.03
27
1
00
00
0
9
0
2
9
2
2
0
5
1
3
2
Ca
Ch
C
fi
Se
Iro
M
F
Nit
Ni
Oil
T
B
MUSWE
2015 Annual Envir
ANALYTE
admium (mg/L)
hromium (mg/L)
Copper (mg/L)
Lead (mg/L)
Manganese ‐lterable (mg/L)
Nickel (mg/L)
elenium (mg/L)
Zinc (mg/L)
Boron (mg/L)
on ‐ total (mg/L)
Mercury (mg/L)
Fluoride ‐ total (mg/L)
trogen Ammonia (mg N/L)
itrates (mg N/L)
& Grease (mg/L)
PAH (mg/L)
otal Petroleum Hydrocarbons
(mg/L)
Blank cells indicate
ELLBROOK COAL CO
ronmental Manag
Dam 1/2
MCC12Final
SettlingPond
<0.0001
<0.0001
<0.001 <0.001
<0.001 0.001
<0.001 <0.001
0.681 0.022
0.022 0.007
<0.01 <0.01
<0.005 <0.005
0.76 0.51
0.86 0.08
<0.0001
<0.0001
0.7 1.1
6.2 0.22
1.44 <0.01
<5 <5
<0.5 <0.5
<70 <70
e that no sample
OMPANY LIMITED
gement Report
2
g
No.1 Open Cut Void
No.OpeCutVoi
1
<0.01
1 <0.0
<0.0
1 <0.0
0.47
0.05
<0.0
5 0.01
0.7
0.1
1
<0.01
0.6
1.0
2.8
<5
<0.
<70
was collected
.2 en t d
MCC6 MC
00
<0.
01 <0.
01 0.0
01 <0.
73
0.0
53 <0.
01 <0
12 <0.
7 0.
6 0.
00
<0.
6
0
1
0.
1 <0
5 <
5 <0
0
<
CC7 MCC8 M
.0001
<0.0001
<
.001 <0.001 <
004 0.009 <
.001 <0.001 <
032 0.067 0
.001 <0.001 0
0.01 <0.01 <
.005 <0.005 <
.11 0.12
.06 0.1
.0001
<0.0001
<
0.3 0.5
.02 0.05
0.01 <0.01
<5 <5
0.5 <0.5
70 <70
MCC9 MCC13
0.0001
0.001
0.001
0.001
0.089
0.003
<0.01
0.005
0.16
0.12
0.0001
0.5
0.09
0.01
<5
<0.5
<70
MCC17 MCC23
<0.0001
<0.0001
<0.001 <0.001
0.015 0.001
0.001 <0.001
0.274 0.003
0.002 0.004
<0.01 <0.01
0.011 0.006
0.2 <0.05
0.89 0.06
<0.0001
<0.0001
0.4 0.7
0.06 0.05
<0.01 <0.01
<5 <5
<0.5 <0.5
<70 <70
MCC24 MCC25
5 MCC26 MCC2
<0.0001
<0.001
<0.001 <0.00
<0.001 <0.00
<0.001 <0.00
0.061 0.31
0.004 0.00
<0.01 <0.0
<0.005 <0.00
0.09 0.12
0.24 0.11
<0.0001
<0.001
0.7 0.6
0.09 0.08
<0.01 <0.0
<5 <5
<0.5 <0.5
<70 <70
27
00
01
01
01
4
2
1
05
2
1
00
8
1
5
0
2
G
MUSWE
2015 Annual Envir
GROUND WATE
DATE
Jan‐15
Feb‐15
Mar‐15
Apr‐15
May‐15
Jun‐15
Jul‐15
Aug‐15
Sep‐15
Oct‐15
Nov‐15
Dec‐15
AVERAGE
ELLBROOK COAL CO
ronmental Manag
ER MONITORING
Relative Lev(mAHD)
BORE
114.09
113.68
113.64
113.65
113.65
113.65
114.18
113.72
114.68
113.73
113.71
113.72
113.84
OMPANY LIMITED
gement Report
G RESULTS – M
vel pH
RDH650
7.2
7.5
7.2
7.0
no resul
no resul
6.9
7.0
7.5
7.8
no resul
7.8
7.3
MINING AREAS
ElectricalConductivit(µS/cm)
5,250
6,320
6,130
5,940
lt no result
lt no result
6,390
6,470
6,340
6,460
lt no result
6,460
6,196
ty
RDH61
55.69
56.23
57.16
54.34
55.17
54.18
55.20
55.74
54.80
55.69
56.11
54.62
55.41
Depth(m
16 RD
9 4
3 5
6 5
4 4
7 4
8 4
0 4
4 4
0 4
9 4
1 4
2 4
1 4
h to Water mbgl)
DH617
49.60
50.16
50.71
48.51
49.14
48.45
49.19
49.51
48.75
49.33
49.43
49.46
49.35
RDH624
33.54
33.60
33.68
33.81
33.77
33.80
33.77
33.78
33.80
33.81
33.82
33.86
33.75
2015 An
ANNUASampled
T
MUSWELL
nnual Environ
AL GROUNDd 24 March 2
Hardness ‐
Alkalinity ‐
Alkalinity ‐
Cal
Magn
Sod
Pota
Iron
C
C
Mangan
S
Ir
Fluo
Nitroge
N
Oi
Total Petro
LBROOK COAL
nmental Man
DWATER M2015
ANALYT
pH
EC (µS/cm
TDS (mg/
TSS (mg/
‐ total (calcu
‐ Carbonate
Bicarbonat
Sulfates (m
Chloride (m
cium ‐ total
nesium ‐ tot
dium ‐ total
assium ‐ tota
n‐ filterable
Arsenic (m
Barium (m
Cadmium (m
Chromium (m
Copper (m
Nickel (mg
Lead (mg/
Zinc (mg/
nese ‐ filter
Selenium (m
Boron (mg
ron ‐ total (m
Mercury (m
oride ‐ tota
en Ammoni
Nitrates (mg
l & Grease
PAH (mg/
leum Hydro
L COMPANY L
nagement Re
MONITORIN
TE
m)
/L)
/L)
ulation ‐ mg
e (mg CaCO3
e (mg CaCO
mg/L)
mg/L)
l (mg/L)
tal (mg/L)
(mg/L)
al (mg/L)
e (mg/L)
g/L)
g/L)
mg/L)
mg/L)
mg/L)
g/L)
/L)
/L)
rable (mg/L)
mg/L)
g/L)
mg/L)
mg/L)
l (mg/L)
ia (mg N/L)
g N/L)
(mg/L)
/L)
ocarbons (m
IMITED
eport
NG RESULTS
g/L)
3/L)
O3/L)
)
mg/L)
S – MINING
RDH
7.2
61
55
7
29
<
42
29
58
55
39
51
4
2.6
<0.0
0.0
<0.0
<0.0
<0.0
<0.0
0.9
0.0
<0.
0.1
0.7
2.9
<0.0
0.
10
2.7
<
<0
<7
G AREAS
H607
24
30
60
7
80
1
22
20
80
51
91
11
0
64
001
051
0001
001
001
001
998
006
.01
151
72
94
0001
.7
0.1
74
5
0.5
70
2
G
S
2
1
24
2
14
2
2
20
2
2
20
2
S
S
2
1
24
2
14
2
MUSWE
2015 Annual Envir
GROUND WATE
Date Sampled De
(m
27‐Jan‐15
9‐Feb‐15
4‐Mar‐15 9
8‐Apr‐15
4‐May‐15
9‐Jun‐15 7
29‐Jul‐15
0‐Aug‐15
2‐Sep‐15 6
3‐Oct‐15
0‐Nov‐15
1‐Dec‐15 Re
Shaded cell indicat
Date Sampled De
(m
27‐Jan‐15
9‐Feb‐15
4‐Mar‐15 7
8‐Apr‐15
4‐May‐15
9‐Jun‐15 3
ELLBROOK COAL CO
ronmental Manag
ER MONITORING
MCC 1001
epth mbgl)
pH
9.5 7.0
7.4 7.0
6.7 7.1
moved from monprogram
tes that the site w
MCC 1008A
epth mbgl)
pH
7.4 7.3
3.7 7.4
OMPANY LIMITED
gement Report
G RESULTS – SA
EC (µS/cm)
Depth(mbgl
6.29
6.50
1,099 6.70
2.81
2.90
1,194 2.35
2.37
2.61
1,050 2.42
2.97
2.44
nitoring 3.38
was not due for sa
EC (µS/cm)
Depth(mbgl
1,266 8.3
968 5.6
ANDY CREEK
MCC 1003
h l)
pH EC
(µS/
7.1 1,5
7.1 1,6
7.1 1,6
7.4 1,0
7.4 96
7.2 1,3
7.2 1,2
7.2 1,2
7.3 1,4
7.1 1,3
7.2 1,3
7.1 1,3
ampling
MCC 1009
h l)
pH EC
(µS/
7.9 1,4
7.4 1,1
M
C /cm)
Depth (mbgl)
544
640
604 9.9
020
69
325 7.8
270
272
480 7.7
340
321
350 Removed
p
M
C /cm)
Depth (mbgl)
465 2.2
186 1.7
MCC 1004
pH EC
(µS/cm)
6.7 2,002
6.6 2,860
6.6 3,330
from monitoring program
MCC 1010
pH EC
(µS/cm)
7.9 6,360
7.7 5,800
MCC 10
)Depth (mbgl)
pH
8.71 7.0
8.73 7.0
8.87 7.0
No access – chigh
10.94 6.9
No access – chigh
No access – chigh
4.31 7.1
7.10 7.1
7.36 7.1
7.20 7.2
7.43 7.2
MCC 10
)Depth (mbgl)
pH
8.0 7.2
5.6 7.4
005
EC (µS/cm)
Dep(mb
2,710
Bono
2,760
2,980
creek too h
3,750
creek too h
creek too h
3,200
2,810
2,550
2,130
2,020
012
EC (µS/cm)
Dep(mb
4.0
3.8
1,931 3.9
3.5
3.7
2,120 3.3
MCC 1006
pth bgl)
pH EC
(µS/c
re has collapsed so sample could be
collected
MCC 1015
pth bgl)
pH EC
(µS/c
06 7.2 3,75
84 7.6 3,23
97 7.7 2,14
52 6.9 1,93
70 7.2 1,91
35 7.2 2,00
C cm)
so e
C cm)
50
30
40
30
12
06
2
S
2
20
2
2
20
2
S
2
1
2
MUSWE
2015 Annual Envir
Date Sampled De
(m
29‐Jul‐15
0‐Aug‐15
2‐Sep‐15 3
3‐Oct‐15
0‐Nov‐15
1‐Dec‐15 Re
Shaded cell indicat
Date Sampled D
27‐Jan‐15
19‐Feb‐15
24‐Mar‐15
28‐Apr‐15
14‐May‐15
29‐Jun‐15
29‐Jul‐15
20‐Aug‐15
22‐Sep‐15
23‐Oct‐15
20‐Nov‐15
21‐Dec‐15
ELLBROOK COAL CO
ronmental Manag
MCC 1008A
epth mbgl)
pH
3.8 7.3
moved from monprogram
tes that the site w
MCC 1017
Depth (mbgl)
No Access
17.18
17.16
17.15
17.16
17.60
16.99
17.00
16.98
17.01
17.00
17.05
OMPANY LIMITED
gement Report
EC (µS/cm)
Depth(mbgl
993 4.6
nitoring mo
was not due for sa
MCC 1018
Depth (mbgl)
17.07
17.22
17.21
17.32
17.39
17.45
17.46
17.39
17.32
17.34
17.31
17.36
MCC 1009
h l)
pH EC
(µS/
7.6 1,1
Removed from onitoring program
ampling
M
C /cm)
Depth (mbgl)
140 1.3
m Removed
p
MCC 1010
pH EC
(µS/cm)
7.6 5,420
from monitoring program
MCC 10
)Depth (mbgl)
pH
5.4 7.4
Removedmonitoring p
012
EC (µS/cm)
Dep(mb
3.8
3.2
1,920 3.6
3.6
3.6
from program
3.8
MCC 1015
pth bgl)
pH EC
(µS/c
82 7.2 2,45
25 7.2 2,67
66 7.1 3,07
68 7.0 3,06
65 7.1 2,93
80 7.0 2,76
C cm)
50
70
70
60
30
60
2
AS
MUSWE
2015 Annual Envir
ANNUAL GROUNSampled 22 Septe
Analyte
pH
EC (µS/cm)
TDS (mg/L)
TSS (mg/L)
Hardness ‐ total mg/L)
Alkalinity ‐ CarboCaCO3/L)
Alkalinity ‐ BicarbCaCO3/L)
Sulfates (mg/L)
Chloride (mg/L)
Calcium ‐ total (m
Magnesium ‐ tot
Sodium ‐ total (m
Potassium ‐ tota
Iron‐ filterable (m
Arsenic (mg/L)
Barium (mg/L)
Cadmium (mg/L)
Chromium (mg/L
Copper (mg/L)
Lead (mg/L)
Manganese ‐ filte(mg/L)
Nickel (mg/L)
Selenium (mg/L)
Zinc (mg/L)
Boron (mg/L)
ELLBROOK COAL CO
ronmental Manag
NDWATER MONmber 2015
M
(calculation ‐
onate (mg
bonate (mg
mg/L)
tal (mg/L)
mg/L)
l (mg/L)
mg/L)
) <
L)
erable
OMPANY LIMITED
gement Report
NITORING RESU
MCC1001 MCC10
7.06 7.28
1050 148
488 835
<5 <5
289 405
<1 <1
184 226
81 124
169 260
68 93
29 42
110 165
2 2
<0.05 <0.0
<0.001 <0.00
0.026 0.03
<0.0001 <0.00
<0.001 <0.00
<0.001 <0.00
<0.001 <0.00
<0.001 <0.00
<0.001 <0.00
<0.01 <0.0
0.007 0.01
0.08 0.1
ULTS – SANDY C
003 MCC1004
8 6.59
0 3330
5 2530
<5
5 861
<1
6 157
4 218
0 803
180
100
5 309
3
05 <0.05
01 <0.001
34 0.046
001 <0.0001
01 <0.001
01 <0.001
01 <0.001
01 0.008
01 0.002
01 <0.01
13 <0.005
1 0.05
CREEK
MCC1005 MCC
7.08 D
2810
1880
7
656
<1
261
212
611
131
80
315
3
0.07
<0.001
0.04
<0.0001
<0.001
0.002
<0.001
0.018
0.001
<0.01
0.05
0.09
C1006 MCC100
Dry 7.33
993
502
<5
263
<1
213
70
155
59
28
103
2
<0.05
<0.001
0.026
<0.000
<0.001
<0.001
<0.001
<0.001
<0.001
<0.01
0.006
0.08
8A MCC1009
7.58
1140
604
<5
299
<1
203
82
187
72
29
110
3
<0.05
1 <0.001
0.036
1 <0.0001
1 <0.001
1 <0.001
1 <0.001
1 0.089
1 <0.001
<0.01
<0.005
0.08
MCC1010 MCC
7.64 7.
5420 19
3200 11
<5 <
820 52
<1 <
534 27
358 19
1140 32
104 11
136 6
812 21
3 2
<0.05 <0
<0.001 <0.
0.132 0.0
<0.0001 <0.0
<0.001 <0.
<0.001 <0.
<0.001 <0.
0.043 0.0
<0.001 <0.
<0.01 <0
<0.005 0.0
0.07 0.
C1012 MCC1015
44 7.14
920 3070
120 2130
<5 <5
24 936
<1 <1
78 275
99 416
25 583
11 200
60 106
13 317
2 4
.05 0.07
001 0.003
032 0.105
0001 <0.0001
001 <0.001
001 0.003
001 0.005
007 0.393
001 <0.001
.01 <0.01
015 0.039
13 0.14
5
2
MUSWE
2015 Annual Envir
Analyte
Iron ‐ total (mg/L
Mercury (mg/L)
Fluoride ‐ total (m
Ammonia (mg/L)
Nitrite (mg N/L)
Nitrate (mg N/L)
Oil & Grease (mg
PAH (mg/L)
Total Petroleum Hydrocarbons (m
ELLBROOK COAL CO
ronmental Manag
M
L)
<
mg/L)
)
g/L)
mg/L)
OMPANY LIMITED
gement Report
MCC1001 MCC10
<0.05 0.06
<0.0001 <0.00
0.2 0.3
0.02 0.07
<0.01 <0.0
1.59 0.6
<5 <5
<0.5 <0.5
<70 <70
003 MCC1004
6 <0.05
001 <0.0001
3 <0.1
7 0.01
01 <0.01
6 0.31
<5
5 <0.5
0 <70
MCC1005 MCC
0.4
<0.0001
0.2
0.1
<0.01
1.97
<5
<0.5
<70
C1006 MCC100
<0.05
<0.000
0.3
0.02
<0.01
0.23
<5
<0.5
<70
8A MCC1009
0.06
1 <0.0001
0.2
0.08
<0.01
0.15
<5
<0.5
<70
MCC1010 MCC
<0.05 0.
<0.0001 <0.0
0.6 0
0.03 0.
<0.01 <0
0.12 0.
<5 <
<0.5 <0
<70 <7
C1012 MCC1015
36 2.24
0001 <0.0001
.3 0.2
04 0.23
.01 <0.01
66 0.41
<5 <5
0.5 <0.5
70 <70
5
2015 An
MUSWELL
nnual Environ
App
LBROOK COAL
nmental Man
pendix
L COMPANY L
nagement Re
x 4: Bl
IMITED
eport
ast MMonitooring DData
2
B
MUSWE
2015 Annual Envir
BLAST MONITO
Blast ID
OR1058OR1059OR1060OR1061OR1062OR1063OR1064OR1065OR1066OR1067OR1068OR1069OR1070OR1071OR1072OR1073OR1074OR1075OR1076OR1077OR1078OR1079OR1080OR1081OR1082OR1083OR1084OR1085OR1086OR1087OR1088OR1089OR1091OR1090OR1092OR1093
ELLBROOK COAL CO
ronmental Manag
RING RESULTS
Date
2-Jan-159-Jan-15
14-Jan-1515-Jan-1516-Jan-1520-Jan-1522-Jan-1523-Jan-1529-Jan-1530-Jan-153-Feb-155-Feb-156-Feb-159-Feb-15
11-Feb-1512-Feb-1513-Feb-1516-Feb-1517-Feb-1519-Feb-1520-Feb-1523-Feb-1524-Feb-1526-Feb-1527-Feb-154-Mar-156-Mar-15
13-Mar-1516-Mar-1517-Mar-1520-Mar-1523-Mar-1527-Mar-1527-Mar-1530-Mar-1531-Mar-15
OMPANY LIMITED
gement Report
Time Type
12:51 I12:47 I9:20 I
10:00 O14:10 I12:59 I13:05 I12:46 I12:52 O12:24 O12:56 O12:52 I12:55 I14:47 I13:28 I12:54 I12:53 I12:57 I13:33 O12:51 O12:19 I12:55 O12:51 I12:49 O12:50 I12:49 Other15:06 I14:36 I12:43 I12:47 Other12:57 I14:10 I14:38 I14:52 O12:50 I13:27 O
Overpressure dB(L)
NR94.791.089.391.598.594.094.795.096.0101.295.0100.099.593.394.491.591.097.8100.492.0NT
96.2103.0
NT88.795.096.292.988.097.391.592.996.280.4103.7
School
Ground Vibration mm/s
O
NR0.120.180.040.140.160.040.050.050.040.090.050.070.040.040.10.040.040.050.130.04
<0.330.040.04
<0.330.040.040.070.050.030.090.070.040.050.420.05
(B2)
Overpressure dB(L)
GrouVibrat
mm/
101.2 0.08103.2 0.3195.7 0.4195.2 0.12
104.2 0.36110.3 0.2496.4 0.10
105.9 0.1493.6 0.15NR NR
109.0 0.17104.9 0.17107.3 0.25110.8 0.10106.8 0.11104.4 0.22104.0 0.1095.4 0.11
101.4 0.14109.4 0.19102.6 0.09110.0 0.24105.7 0.12113.5 0.14
NT <0.195.6 0.0899.9 0.14
103.8 0.1199.1 0.0697.0 0.0
107.3 0.18101.0 0.2096.4 0.0
101.8 0.18106.7 0.22108.7 0.12
Nisbet (B4)
und tion /s
Overpressure dB(L)
83 96.811 94.319 94.321 92.862 95.741 101.102 95.74 88.359 98.8R 100.478 103.472 96.854 103.408 102.314 95.729 96.808 96.814 92.846 97.991 101.795 97.941 NT21 97.94 104.116 NT83 94.346 101.714 98.864 90.87 90.884 96.803 94.37 92.884 95.722 99.627 106.4
99 Queen
Ground Vibration
mm/s
Over
0.060.180.240.080.210.230.080.090.10.060.140.10.090.090.080.180.090.080.110.130.09
<0.300.060.11
<0.300.080.080.10.060.060.130.10.10.140.20.08
Street (B3)
rpressure dB(L)
Ground Vibration
mm/s
99.5 0.199.5 0.2196.3 0.589.2 0.0694.1 0.37
102.3 0.1897.2 0.0698 0.08
96.3 0.0898.8 0.06
103.6 0.09101.8 0.1103.6 0.08112 0.196.3 0.0896.3 0.1897.2 0.0892.7 0.0599.5 0.08
103.2 0.1295.2 0.06NT <0.31
98.8 0.05106 0.05NT <0.31
90.4 0.197.1 0.0898.4 0.1295.7 0.0888.8 0.05
100.9 0.2193.9 0.1392.9 0.1100 0.1
100.9 0.34107.5 0.08
Queen Street (B1)
2
MUSWE
2015 Annual Envir
Blast ID
OR1094OR1095OR1096OR1097OR1098OR1099OR1100OR1101OR1102OR1103OR1104OR1105OR1106OR1107OR1108OR1109OR1110OR1111OR1112OR1113OR1114
OR1115/OR1116OR1117OR1118OR1119OR1120OR1121OR1122OR1123OR1124
OR1125/OR1126OR1127OR1128OR1129OR1130OR1131OR1132
ELLBROOK COAL CO
ronmental Manag
Date
1-Apr-152-Apr-157-Apr-159-Apr-159-Apr-15
10-Apr-1513-Apr-1514-Apr-1515-Apr-1517-Apr-1524-Apr-1527-Apr-1528-Apr-1529-Apr-1530-Apr-151-May-154-May-155-May-157-May-158-May-1512-May-1515-May-1519-May-1521-May-1526-May-1527-May-1529-May-152-Jun-153-Jun-155-Jun-15
11-Jun-0512-Jun-1515-Jun-1515-Jun-1522-Jun-1525-Jun-1529-Jun-15
OMPANY LIMITED
gement Report
Time Type
13:27 O12:48 I14:05 I12:48 I13:02 O12:51 I12:47 I12:47 O12:49 I14:05 I14:09 I13:22 I12:53 I12:51 O13:51 I11:46 O12:57 I13:34 I14:15 I12:52 I14:15 I12:58 I14:03 I14:46 I13:01 I12:51 I12:35 I12:48 I13:08 I12:46 I12:48 I11:39 I12:59 I13:14 I13:58 I12:42 O12:50 I
Overpressure dB(L)
99.389.3101.785.596.091.088.7103.497.094.0102.9NR
108.2108.993.092.4110.989.7107.088.9105.691.497.289.692.588.289.692.5NR
88.296.693.489.693.897.289.695.7
School
Ground Vibration mm/s
O
0.070.070.050.040.040.040.030.040.090.080.120.070.040.050.10.050.070.030.050.050.040.070.080.040.040.030.080.05NR0.090.090.040.050.070.040.030.11
(B2)
Overpressure dB(L)
GrouVibrat
mm/
108.9 0.1391.0 0.19
108.0 0.1791.4 0.0898.2 0.14
100.8 0.1799.0 0.07
110.2 0.2101.3 0.2795.7 0.1892.7 0.3398.6 0.2490.8 0.05
107.8 0.14103.1 0.0698.9 0.10
107.5 0.23103.4 0.0103.5 0.1493.0 0.23
102.3 0.11102.7 0.1794.8 0.0896.1 0.098.9 0.1289.2 0.0789.2 0.1995.0 0.19NR NR94.6 0.30
104.9 0.2997.0 0.1690.8 0.17
101.4 0.0697.0 0.1094.6 0.16
100.5 0.26
Nisbet (B4)
und tion /s
Overpressure dB(L)
33 104.897 95.772 101.183 90.846 98.878 94.376 92.81 104.873 98.884 98.832 92.742 NR51 89.847 100.464 93.802 95.83 95.87 95.847 95.83 89.815 97.479 92.789 91.37 87.821 94.977 87.891 87.891 93.8R NR06 91.393 95.86 91.372 87.864 94.908 97.46 91.362 98.1
99 Queen
Ground Vibration
mm/s
Over
0.180.130.10.080.180.080.060.110.190.180.290.130.050.110.060.090.130.050.130.150.080.110.090.060.080.060.20.13NR0.190.230.080.130.050.080.080.18
Street (B3)
rpressure dB(L)
Ground Vibration
mm/s
105.5 0.193.9 0.1698.4 0.188.8 0.08100 0.193.9 0.08
107.3 0.08107.7 0.1399.5 0.3198.9 0.3795.1 0.42
100.2 0.14104.9 0.0599.5 0.14
100.2 0.0894.2 0.08
102.4 0.19100.2 0.0895.3 0.0991.2 0.21
101.3 0.0892.8 0.15
102.8 0.1289.3 0.0891.2 0.0586.8 0.0591.2 0.2692.8 0.18NR NR89.3 0.3995.3 0.2792.8 0.0592.8 0.1997.3 0.0597.3 0.0691.2 0.0597.3 0.26
Queen Street (B1)
2
MUSWE
2015 Annual Envir
Blast ID
OR1133/ OR1134 *OR1135/OR1136 *
OR1137OR1138OR1139OR1140OR1141OR1142OR1143OR1144OR1145OR1146OR1147OR1148OR1149OR1150OR1151OR1152OR1153OR1154
OR1155/OR1156OR1157OR1158OR1159OR1160OR1161OR1162OR1163OR1164OR1165
OR1166/OR1167OR1168OR1169OR1170
OR1171/OR1172
ELLBROOK COAL CO
ronmental Manag
Date
1-Jul-152-Jul-156-Jul-158-Jul-158-Jul-15
10-Jul-1513-Jul-1514-Jul-1516-Jul-1516-Jul-1517-Jul-1522-Jul-1524-Jul-1524-Jul-1528-Jul-1531-Jul-1531-Jul-155-Aug-157-Aug-1511-Aug-1514-Aug-1518-Aug-1520-Aug-1521-Aug-1525-Aug-1528-Aug-1528-Aug-152-Sep-154-Sep-157-Sep-1510-Sep-1517-Sep-1525-Sep-1528-Sep-1530-Sep-15
OMPANY LIMITED
gement Report
Time Type
13:25 I13:28 I11:58 I16:41 I16:24 I12:57 O12:56 I13:07 I12:08 O11:57 I11:59 I12:53 I13:16 O12:51 Other12:44 I12:53 I13:12 I13:10 I12:57 O12:54 I12:45 I12:48 I12:46 O12:49 I11:06 Other13:19 O13:04 I12:56 I12:47 I12:50 I13:13 I12:46 I10:16 O12:46 I12:56 O
Overpressure dB(L)
99.491.497.191.192.495.5101.5104.494.698.3100.199.698.487.593.693.6104.4100.695.598.496.399.698.497.889.597.195.592.493.6104.895.593.692.499.097.1
School
Ground Vibration mm/s
O
0.050.050.070.130.070.090.110.080.070.10.110.090.080.070.110.080.090.120.080.110.110.130.080.110.080.080.090.10.110.090.190.110.080.10.1
(B2)
Overpressure dB(L)
GrouVibrat
mm/
102.1 0.2098.8 0.19
106.0 0.1098.3 0.197.7 0.3
103.1 0.24109.6 0.24104.3 0.1103.1 0.22106.2 0.395.8 0.1298.8 0.1
100.6 0.192.2 0.198.8 0.299.8 0.197.1 0.199.8 0.3
106.0 0.1100.6 0.198.3 0.294.2 0.1
104.3 0.1101.8 0.4100.2 0.14106.0 0.199.3 0.197.7 0.2299.3 0.297.1 0.1
101.4 0.1102.1 0.2299.8 0.2
105.1 0.32101.4 0.2
Nisbet (B4)
und tion /s
Overpressure dB(L)
04 94.998 92.709 98.13 NR1 NR4 97.54 94.38 99.92 94.35 99.92 897 98.53 102.55 89.62 99.77 NR5 NR9 104.37 101.75 93.19 91.95 899 1015 99.64 94.13 101.87 97.32 95.81 97.33 90.67 93.12 97.91 101.82 1011 100.1
99 Queen
Ground Vibration
mm/s
Over
0.110.130.08NRNR0.250.20.150.150.20.150.20.090.090.11NRNR0.160.110.130.110.070.090.140.070.080.080.150.140.070.090.160.120.160.21
Street (B3)
rpressure dB(L)
Ground Vibration
mm/s
96.4 0.14101.3 0.1398.1 0.0596.2 0.1494.3 0.299.1 0.24
105.4 0.25103 0.1296.2 0.14
101.8 0.1588.2 0.199.1 0.15
101.3 0.1390.2 0.1297.8 0.1597 0.12
91.8 0.1194.3 0.2599.1 0.13
102.2 0.18108 0.1790.2 0.12
101.8 0.14100.3 0.2794.3 0.11
101.3 0.15102.6 0.1594.3 0.2897 0.22
103.8 0.1295.3 0.1597 0.21
97.8 0.19102.2 0.1799.7 0.17
Queen Street (B1)
2
MUSWE
2015 Annual Envir
Blast ID
OR1173OR1174OR1175OR1176OR1177OR1178OR1179OR1181OR1180OR1182
OR1183/ OR1184OR1185OR1186OR1187OR1188OR1189OR1190
OR1191/ OR11920R1193OR1194OR1195OR1196OR1197OR1198OR1199OR1200OR1201OR1202
ELLBROOK COAL CO
ronmental Manag
Date
2-Oct-156-Oct-156-Oct-158-Oct-159-Oct-1513-Oct-1516-Oct-1520-Oct-1521-Oct-1523-Oct-1530-Oct-152-Nov-153-Nov-155-Nov-1513-Nov-1518-Nov-1518-Nov-1520-Nov-1525-Nov-1525-Nov-151-Dec-154-Dec-154-Dec-159-Dec-1514-Dec-1515-Dec-1518-Dec-1523-Dec-15
OMPANY LIMITED
gement Report
Time Type
12:49 Other12:51 I13:12 O12:27 O12:10 O13:07 I12:53 I15:07 I12:58 O13:32 I14:20 I14:51 I12:05 I13:12 Other12:55 I13:29 I11:16 I14:56 I13:46 O13:30 I15:03 I14:26 I14:31 I13:03 I12:45 O12:49 O12:54 O12:24 O
Overpressure dB(L)
92.4NRNR
105.697.193.691.195.5103.587.596.395.599.091.187.591.194.697.894.695.591.193.6100.1103.596.395.5104.494.6
School
Ground Vibration mm/s
O
0.08<0.5<0.50.090.090.120.10.130.10.080.130.090.080.090.10.110.10.150.090.080.110.110.090.090.120.10.140.07
(B2)
Overpressure dB(L)
GrouVibrat
mm/
95.8 0.1100.2 0.3107.1 0.2110.7 0.1100.2 0.24101.8 0.195.8 0.398.3 0.3
108.5 0.3100.6 0.1103.4 0.2101.0 0.299.8 0.196.5 0.194.2 0.2
109.9 0.299.8 0.14
103.7 0.4101.0 0.194.2 0.197.7 0.3
102.5 0.2103.1 0.198.8 0.2499.8 0.4295.0 0.1
109.3 0.4295.8 0.14
Nisbet (B4)
und tion /s
Overpressure dB(L)
5 95.88 96.62 105.19 1124 101.45 97.33 895 97.37 107.93 93.16 1017 96.67 102.67 93.11 91.97 93.14 94.16 959 95.85 95.83 91.93 957 99.64 93.12 98.58 94.12 107.24 96.6
99 Queen
Ground Vibration
mm/s
Over
0.090.170.130.190.140.120.160.170.180.080.160.10.080.090.220.160.080.250.10.090.140.140.090.110.20.110.310.07
Street (B3)
rpressure dB(L)
Ground Vibration
mm/s
96.2 0.1591.8 0.22
105.4 0.18111.2 0.17101.3 0.19102.2 0.1691.8 0.2498.5 0.2
107.1 0.1797 0.13
100.3 0.2296.2 0.15
102.6 0.1394.3 0.1391.8 0.26
101.3 0.28102.2 0.14106.6 0.26104.8 0.15
97 0.1498.5 0.2499.1 0.299.7 0.14
101.8 0.15100.3 0.2294.3 0.17
107.6 0.2898.5 0.12
Queen Street (B1)
2015 An
MUSWELL
nnual Environ
App
LBROOK COAL
nmental Man
pendix
L COMPANY L
nagement Re
x 5: Co
IMITED
eport
omplaaints SSummmary
2
S
C
1
1
0
1
MUSWE
2015 Annual Envir
SUMMARY OF C
Date of Complaint
Time Compl
14‐Jan‐15 9:25 A
16‐Jan‐15 2:12 P
3‐Mar‐15 12:50
1‐Mar‐15 3:57 P
ELLBROOK COAL CO
ronmental Manag
COMPLAINTS
of aint
Date of Incident
AM 14‐Jan‐15
PM 16‐Jan‐15
PM 03‐Mar‐15
PM
OMPANY LIMITED
gement Report
Time of Incident
L
9:20 AMMu
2:09 PMMu
12:50 PM
Mu
Mu
Location TypCom
North swellbrook
BL
North swellbrook
BL
uscle Creek HAU
Southswellbrook
DU
pe of mplaint
Mode of
LAST Direct calOffice
switchborespon
LAST Direct calOffice
switchborespon
ULAGE EnvironHotlinerespon
UST Direct calOfficerespon
Contact Natur
l to MCC e via oard, EC nded.
Blascomplathey wabout
l to MCC e via oard, EC nded.
Compltod
commtime wadv
mental e ‐ OCE nded.
Coal spicoal roMusclNew E
l to MCC e ‐ EC nded.
Coconcecoverirecentarea
re of Complaint
st today shook inant's house and were concerned t damage to the house.
ainant could feel ay's blast and
mented that blast was different to vertised time.
illed on road from oad turnoff along le Creek Road to England Highway
omplainant is erned about dust ng their roof and tly covered back (3 weeks ago).
Actio
Discussed concresults with comresults within cComplainant is
damage t
Complainant cotime was diffe
tReview resultsEngineer ‐ al
conditions andvariance wi
Lumps of coal scathe road all th
highway from hMuscle C
Daracon weretrucks pulled up
problem w
EC visited comtheir concerns w
neighbour. Rconditions and
were also discussweather conditio
dust originaComplainant is go
mines i
on Taken
cerns and reviewed mplainant. All blastconsent conditions.s concerned about to the house.
mmented that blasrent to advertised time. s with Drill & Blast ll within consent d notification time thin allowance.
attered along side ohe way back to the his parents place onCreek Road. contacted and all p for inspection. Nowas identified.
plainant to discuss with them and theirRecent weather d location of house sed. Based on recenons, it is unlikely thated from MCC. oing to contact othn the area.
t
st
of
n
o
r
nt e
er
2
C
1
1
1
2
MUSWE
2015 Annual Envir
Date of Complaint
Time Compl
4‐Mar‐15 8:40 P
4‐Mar‐15 8:48 A
7‐Mar‐15 4:49 P
4‐Mar‐15 6:30 P
ELLBROOK COAL CO
ronmental Manag
of aint
Date of Incident
PM 14‐Mar‐15
AM 14‐Mar‐15
PM 17‐Mar‐15
PM 24‐Mar‐15
OMPANY LIMITED
gement Report
Time of Incident
L
8:40 PMMu
8:45 AMMu
4:49 PMMu
6:30 PMMu
Location TypCom
North swellbrook
OD
North swellbrook
OD
North swellbrook
OD
Southswellbrook
OD
pe of mplaint
Mode of
DOUR EnvironHotline ‐ next worbut no cdetailsprovidefollow
DOUR EnvironHotliProdu
Superintrespon
DOUR EnvironHotlinerespon
DOUR Direct cal‐ OCE res
Contact Natur
mental call back king day contact were ed for w‐up.
Compl
mental ne ‐ ction tendent nded.
Stronghad to
mental e ‐ EC nded.
StrongM
ll to OCE ponded.
Callestroncombodou
wa
re of Complaint
lainant can smell odour.
g sulphur smell ‐o close the house
up.
g odour smell in uswellbrook.
er could smell a ng spontaneous bustion related r and thought it as from MCC.
Actio
No contact detacall the com
Hot working arepractices in p
observed the nestrong. Productrang complain
Current operatiand explained wwould be compComplainant cissue is going to
EC rang comcommented thodour in varioutown. They needhouse to keep th
operations w
Large fire in the S13). Arranged forrelocated to dr
area. Dozers alsosnuff spontane
base of
on Taken
ils were provided tmplainant back
a with managemenplace. Conditions ext night and not asion Superintendentant next morning. ons were discussedwork in the hot areapleted in 7‐10 days.oncerned that this o occur over winter
mplainant who hey could smell an us locations aroundded to shut up theihe smell out. Currenwere discussed.
St. Heliers coal (Strr infusion spray to brench fire and coal o pushing access in teous combustion at Pit 1 dump.
o
nt
s t
d a
.
r nt
ip be
to
2
C
2
2
3
MUSWE
2015 Annual Envir
Date of Complaint
Time Compl
4‐Mar‐15 6:31 P
8‐Mar‐15 9:04 A
0‐Mar‐15 12:52
ELLBROOK COAL CO
ronmental Manag
of aint
Date of Incident
PM 24‐Mar‐15
AM 28‐Mar‐15
PM 30‐Mar‐15
OMPANY LIMITED
gement Report
Time of Incident
L
6:31 PMMu
9:04 AM Mu
12:50 PM Mu
Location TypCom
Central swellbrook
OD
uscle Creek OD
North swellbrook
BL
pe of mplaint
Mode of
DOUR Direct cal‐ OCE res
DOUR EnvironHotlinerespon
LAST Direct calOfficerespon
Contact Natur
ll to OCE ponded.
Callersp
com(st
mental e ‐ OCE nded.
SulpstronMC
anythin
l to MCC e ‐ EC nded.
Bcomp
re of Complaint
r complained of pontaneous mbustion smell trong odour).
phur smell very g. Wondering if CC were doing ng different in the operation.
Blast shook plainants’ house.
Actio
Pit and boundidentify possibburning in Strip Moved infusion s
drench fire anpushing accescombustion o
snuf
OCE spoke to explained fire wStrip 13. Fire haand water car
infusing area.Thcomplainant whohealth impacts
nose and stinunderstood it's athat MCC was wo
were stil
EC reviewed bresults. Locatioblasts that the cResults were 0
Street and withiEC left message
call back
on Taken
dary inspection to le cause. Large fire 13 (St Heliers coal)spray into location td coal area. Dozer ss to spontaneous on Pit 1 dump and fing fire.
complainant and was in St Heliers coaad been smotheredrts were currently e EC spoke with theo is concerned abouon family ‐ burningnging eyes. They an ongoing issue anorking on it but thel concerned.
blast location and n is similar to otheromplainant has felt.34mm/s at Queen n compliance levelswith complainant tk if required.
). to
al d
e ut g
nd ey
r t.
s. to
2
C
0
2
2
2
04
MUSWE
2015 Annual Envir
Date of Complaint
Time Compl
05‐Apr‐15 5:15 P
23‐Apr‐15 8:18 P
24‐Apr‐15 1:23 P
24‐Apr‐15 6:24 P
4‐May‐15 8:27 P
ELLBROOK COAL CO
ronmental Manag
of aint
Date of Incident
PM 05‐Apr‐15
PM 23‐Apr‐15
PM 22‐Apr‐15
PM 24‐Apr‐15
PM 04‐May‐15
OMPANY LIMITED
gement Report
Time of Incident
L
5:17 PM W
8:18 PMMu
10:02 PM
U
6:24 PM W
8:27 PMMu
Location TypCom
Woodlands Ridge
OD
North swellbrook
OD
Unknown OD
Woodlands Ridge
OD
North swellbrook
OD
pe of mplaint
Mode of
DOUR EnvironHotlinerespon
DOUR Environhotline ‐ cnext wor
DOUR Email fro
DOUR EnvironHotline ‐ next wor
DOUR EnvironHotline ‐ next wor
Contact Natur
mental e ‐ OCE nded.
Lots oi
mental call back king day
Very western
se
om EPA Stronotice
mental call back king day
Sulphstron
op
mental call back king day
Odour
re of Complaint
of smoke coming into house.
bad smell from n side of mine last everal nights
ng odour smell ed when putting bins out.
hur smell is very g and unable to pen windows
coming from the mine
Actio
OCE explained tthere was an arthat had coal th
spent 2 hours oncoal to cover hofires. Complaina
have to lock the hup with smoke.
down the val
EC spoke with Pbeen working wiin pit. Recent raiarea. EC rang th
left a messa
Advised EPA woperating at the
due to wet weathwith this responinformation req
Infusion spray wcart put out smsoaking coal pri
coal. OngoinThere were twoMCC that nigh12:16am. Com
enough
Infusion was runfire on the ROM The EC spoke wwho feels that Mproblem. Theneighbours are
pro
on Taken
to the complainantea on the ROM padhat was on fire. OCEn loader carrying coot coal and snuff ouant said they wouldhouse up as it will fIt has been blowingley for 1.5 hours.
PS and infusion hasith no specific issuen helps cool/wet thhe complainant andage to call back.
we only had a drill e time of complainther. EPA were happnse with no furtherquired at this stage.
was started. Waterall fire on ROM andor to loader diggingg pit inspections. o follow up calls to ht at 12:00am and mplainant has had h of odour.
nning in the pit and was being managedith the complainanMCC are ignoring thy commented the e having the same oblem.
t d E ol t d fill g
s es he d
t py r .
r d g
a d. t e
2
C
15
24
26
27
27
29
MUSWE
2015 Annual Envir
Date of Complaint
Time Compl
5‐May‐15 9:40 A
4‐May‐15 9:39 A
6‐May‐15 10:46
7‐May‐15 10:09
7‐May‐15 10:09
9‐May‐15 10:02
ELLBROOK COAL CO
ronmental Manag
of aint
Date of Incident
AM 15‐May‐15
AM 24‐May‐15
AM 26‐May‐15
AM 26‐May‐15
AM 15‐May‐15
AM 27‐May‐15
OMPANY LIMITED
gement Report
Time of Incident
L
9:40 AM Mu
Morning Mu
4:30am‐10:00am
Mu
11:41 AM
W
11:30 AM
Mu
7:08 PMMu
Location TypCom
uscle Creek OD
uscle Creek OD
uscle Creek OD
Woodlands Ridge
OD
uscle Creek OD
North swellbrook
OD
pe of mplaint
Mode of
DOUR EnvironHotlinerespon
DOUR EnvironHotline ‐back req
DOUR EnvironHotline ‐back req
DOUR Email fro
DOUR Email fro
DOUR Email fro
Contact Natur
mental e ‐ OCE nded.
Strong haze
mental ‐ no call quired.
Su
mental ‐ no call quired.
Sulp4:30
om EPA Smoke
om EPA OdourConcer
om EPA Smell oaro
re of Complaint
sulphur smell and covering valley
ulphur smell
hur smell from 0am‐10:00am
from burning coal piles
r smell at house. rned about health impacts
of sulphur started und sundown
Actio
Operations wepreviously unspontaneous
identified. Mitigaput in place. Thecomplainant who
the health im
No specific area oconditions were a
Wait for weatcomplainant did
No specific area oconditions were a
Wait for weatcomplainant did
Advised EPA of rcombustion maand impact we
spontaneomanagement
cooled and ROMro
Advised EPA of rcombustion maand impact we
spontaneomanagement
cooled and ROMro
Advised EPA of rcombustion manAreas are being c
is being
on Taken
re inspected and a identified area of combustion was ation measures wee EC spoke with theo is concerned aboumpacts of sulphur.
of concern. Weathaffecting odour drifther to clear. The dn't want a call back
of concern. Weathaffecting odour drifther to clear. The dn't want a call back
recent spontaneounagement activitieseather is having on us combustion . Areas are being M coal is being trackolled.
recent spontaneounagement activitieseather is having on us combustion . Areas are being M coal is being trackolled.
recent spontaneounagement activitiescooled and ROM cotrack rolled.
re e ut
er ft.
k.
er ft.
k.
s s
k
s s
k
s s. oal
2
C
0
0
1
1
2
2
MUSWE
2015 Annual Envir
Date of Complaint
Time Compl
04‐Jun‐15 1:24 P
07‐Jun‐15 4:37 P
13‐Jun‐15 7:09 A
19‐Jul‐15 8:30 A
22‐Jul‐15 1:55 P
23‐Jul‐15 12:30
ELLBROOK COAL CO
ronmental Manag
of aint
Date of Incident
PM 04‐Jun‐15
PM 07‐Jun‐15
AM 13‐Jun‐15
AM 19‐Jul‐15
PM 22‐Jul‐15
PM 23‐Jul‐15
OMPANY LIMITED
gement Report
Time of Incident
L
1:24 PM Mu
4:37 PM W
7:09 AM Mu
8:30 AM Mu
1:55 PM Mu
12:30 PM
W
Location TypCom
uscle Creek OD
Woodlands Ridge
OD
uscle Creek OD
uscle Creek OD
uscle Creek OD
Woodlands Ridge
HAU
pe of mplaint
Mode of
DOUR EnvironHotline ‐back req
DOUR EnvironHotlinerespon
DOUR EnvironHotlinerespon
DOUR EnvironHotlinerespon
DOUR EnvironHotlinerespon
ULAGE EnvironHotline ‐ next wor
Contact Natur
mental ‐ no call quired.
Sulphur
mental e ‐ OCE nded.
Gas afromWo
mental e ‐ OCE nded.
Odour
mental e ‐ OCE nded.
Strong smokdire
mental e ‐ OCE nded.
Strong
mental call back king day
Coal finon Muwith th
re of Complaint
r smell from mine
and dust coming m MCC towards oodland Ridge
was coming from the mine
sulphur smell and y haze from the ection of MCC
sulphur smell and thick haze
nes accumulating uscle Creek Road he rain turning it to sludge
Actio
Extra sprays hadsystem this mo
operations followsmoky/steamy
complainant did
The OCE spoke wat the time of roads were d
conditions. Therin the area at th
The OCE spoke wat the time o
At the time of twas being undecap a spontaneo
in
The OCE spoke wat the time o
Water carts anoperation. ROM
trac
The OCE spoke wat the time o
undertook a pit the complaint t
any new
The road was inscart was arrangesurface with t
collected from tremoved. A mescomplainant to
call wa
on Taken
d been added to theorning. A review of wing call indicated ny areas in pit. The dn't want a call back
with the complainanthe complaint. All amp and in good e was a general haze time of complaint
with the complainanof the complaint. the complaint workertaken with clay toous combustion aren OC2.
with the complainanof the complaint. nd water sprays in coal was spread an
ck rolled
with the complainanof inspection and inspection followinto see if there werew outbreaks
spected and a wateed to wash the roadthe material to be the road edges andsage was left for thcall back. No returns received.
e
no
k.
nt
ze t.
nt
k o ea
nt
nd
nt
g e
er d
d he n
2
C
2
3
1
1
MUSWE
2015 Annual Envir
Date of Complaint
Time Compl
23‐Jul‐15 3:41 P
31‐Jul‐15 6:36 P
13‐Aug‐15 7:45 A
13‐Aug‐15 12:22
ELLBROOK COAL CO
ronmental Manag
of aint
Date of Incident
PM
PM 31‐Jul‐15
AM 13‐Aug‐15
PM 13‐Aug‐15
OMPANY LIMITED
gement Report
Time of Incident
L
U
6:36 PM W
7:45 AMMu
7:59 AM U
Location TypCom
Unknown HAU
Woodlands Ridge
OD
Southswellbrook
VIS
Unknown VIS
pe of mplaint
Mode of
ULAGE Email fro
DOUR EnvironHotline ‐ next wor
SUAL EnvironHotlinerespo
SUAL Email fro
Contact Natur
om EPA Truckscreating
the rtrafficissue a
ca
mental call back king day
Chemifrom th
mental e ‐ OCE nded
Duobse
om EPA Smokeare visbeen on
we
re of Complaint
s leaving site are g a lot of mess on road creating a c safety, hazard and mess on the ars and road
ical mine coming he mine ‐ sulphur
smell
st and smoke rved above the
mine
e, ash and steam sible and this has ngoing for several eeks/months
Actio
Advised EPA of aup t
The complainanthealth impacts oabout how long
is
Mining activitieand 13 with inpinfusion sprays wpit and the waterThe EC spoke wiThere was a gene
spontaneomanagement, imvisibility and the
An offer wacomplainant
Discussed compadvised the com
are discussincombustion man
on Taken
ctions taken to cleathe road
t is concerned aboun family. Concerneit is taking to fix thssue.
es were in Strips 12pit dumping. Waterwere operational inr carts were runninith the complainanteral discussion abouus combustion
mpacts of weather oe general operationsas made for the t to visit the site.
plaint with EPA. EPAmplainant that theyng spontaneous nagement with MCC
an
ut ed e
r n g. t. ut
on s.
A y
C.
2
C
2
0
MUSWE
2015 Annual Envir
Date of Complaint
Time Compl
20‐Aug‐15 6:24 A
04‐Sep‐15 8:32 A
ELLBROOK COAL CO
ronmental Manag
of aint
Date of Incident
AM 20‐Aug‐15
AM 04‐Sep‐15
OMPANY LIMITED
gement Report
Time of Incident
L
6:24 AM Mu
8:32 AM Mu
Location TypCom
uscle Creek OD
uscle Creek OD
pe of mplaint
Mode of
DOUR EnvironHotline ‐ next wor
DOUR EnvironHotlinerespon
Contact Natur
mental call back king day
Su
mental e ‐ EC nded.
Sulphulast weeabout
re of Complaint
ulphur smell
ur smell over the ek and concerned t health impacts
Actio
Ongoing spontamanagement wa
observed odolocation of the c7:30am and 8:00
spontaneous observed on Be
Muscle Creek Roor c
A message wcomplainant to c
call wa
Ongoing spontamanagement w
observed environCreek Road, MuWoodlands Ri
observed. Thereand rain haze. Svisible from W
Feedback on thwas provided to general discus
impacts was hadby MCC to provhealth professinvestigation in
Complainant comare other pe
concerned aboutMCC asked th
encourage thesthe
on Taken
aneous combustionas occurring. The Eour in the general complaint between0am. No odour fromcombustions was eggary Creek Road,ad, mine access roaar park.
was left asking the call back. No returs received.
aneous combustionwas occurring. EC nment along Beggascle Creek Road andge. No odour as e was low level clouSome smoke/steamWoodlands Ridge. e EC's observationsthe complainant. Assion about health d with an offer madvide information tosionals to support nto health impacts. mmented that thereople in the area t health impacts anhe complainant to e people to contacte mine.
n C
n m
ad
n
n
ry d
ud m
s A
e
re
nd
t
2
C
0
1
1
2
MUSWE
2015 Annual Envir
Date of Complaint
Time Compl
02‐Oct‐15 5:40 A
12‐Oct‐15 12:05
15‐Oct‐15 4:45 P
25‐Oct‐15 8:24 P
ELLBROOK COAL CO
ronmental Manag
of aint
Date of Incident
AM 02‐Oct‐15
PM Ongoing
PM Unknown
PM 25‐Oct‐15
OMPANY LIMITED
gement Report
Time of Incident
L
5:40 AM W
OngoingMu
Unknown
U
8:24 PMMu
Location TypCom
Woodlands Ridge
OD
Southswellbrook
NO
Unknown OD
North swellbrook
OD
pe of mplaint
Mode of
DOUR EnvironHotline ‐back req
OISE EnvironHotline ‐ next wor
DOUR EnvironHotli
attemppatch thrOCE budroppe
DOUR EnvironHotline ‐ next wor
Contact Natur
mental ‐ no call quired.
Pollutios
mental call back king day
High pnoisegoing
been onlast co
mental ne ‐ pted to rough to ut call ed out
Fou
mental call back king day
Smell ind
re of Complaint
on, can't breathe, sore throat
pitched shrilling e that has been g all day and has n and off over the ouple of months.
l sulphur smell
n house even with oors closed
Actio
Production Supemade observatioThey identifiedsome fog with athe south (blowcomplainant).advised that a
req
The OCE andpotential sourcesthe descriptionthing was a pumconversations w
and investigconcluded that itnoise source is frthat the noise description of t
noise sou
Four attempts wthe complainandetails but non
ret
Ongoing spontamanagement. inspection arouof the mine sitodour. A messacomplainant to
back wa
on Taken
erintendent and OCons of the local aread some smoke and a slight breeze fromwing away from the. The complainant a call back was not quired.
d EC investigated s of noise that matc. The only possible
mp alarm. Follow upwith the complainanations by the EC is highly unlikely throm MCC. The timeis audible and the the noise rules out urces at MCC.
were made to contacnt to find out more ne of the calls were turned.
aneous combustionOCE conducted an nd the western sidete and detected no age was left for thecall back but no calas received.
CE a.
m e
ch e p nt
he es
ct
n
e
ll
2
C
2
2
2
MUSWE
2015 Annual Envir
Date of Complaint
Time Compl
25‐Oct‐15 8:50 P
29‐Oct‐15 1:16 P
29‐Oct‐15 1:16 P
ELLBROOK COAL CO
ronmental Manag
of aint
Date of Incident
PM 25‐Oct‐15
PM 24‐Oct‐15
PM 25‐Oct‐15
OMPANY LIMITED
gement Report
Time of Incident
L
8:50 PMMu
8:52 AMMu
9:09 PMMu
Location TypCom
North swellbrook
OD
Southswellbrook
OD
North swellbrook
OD
pe of mplaint
Mode of
DOUR Direct tland
DOUR Email fro
DOUR Email fro
Contact Natur
to OCE line
When othe csmell a
om EPA Smog, dMountto see acoverin
s
om EPA Extremesme
causinshort
re of Complaint
outside the house omplainant can a strong smell of sulphur.
dust and sulphur. ain profile is hard and appears to be ng all the eastern ide of town
ely strong sulphur ell. Stifling and ng headache and tness of breath
Actio
Ongoing spontamanagement. inspection arouof the mine sit
odour. No call bacontact details
The followingsupplied
There havespontaneous comRecent rain hasteam from thlevels have b20ug/m3. I
observations frhave been unnoticeable od
Musw
The followingsupplied
There havespontaneous comRecent rain hasteam from thlevels have b20ug/m3. I
observations frhave been unnoticeable od
Musw
on Taken
aneous combustionOCE conducted an nd the western sidete and detected no ack could be made as weren't supplied.
g information was d to the EPA. e been no new mbustion outbreakas generated more he hot areas. Dust een between 16‐nspections and rom site personnel dertaken with no dour detected in wellbrook.
g information was d to the EPA. e been no new mbustion outbreakas generated more he hot areas. Dust een between 16‐nspections and rom site personnel dertaken with no dour detected in wellbrook.
n
e
as
s.
s.
2
C
0
1
MUSWE
2015 Annual Envir
Date of Complaint
Time Compl
5‐Nov‐15 12:24
3‐Nov‐15 10:05
ELLBROOK COAL CO
ronmental Manag
of aint
Date of Incident
PM 01‐Nov‐15
AM 05‐Nov‐15
OMPANY LIMITED
gement Report
Time of Incident
L
10:30 PM
W
Various U
Location TypCom
Woodlands Ridge
OD
Unknown OD
pe of mplaint
Mode of
DOUR Email fro
DOUR Email fro
Contact Natur
om EPA Unpl
om EPA Dsp
comem
MuswOdour
in
re of Complaint
easant smell in house
Dust and/or pontaneous mbustion being mitted from wellbrook Coal. could be smelled n Aberdeen.
Actio
The followingsupplied to the E
2 November spontaneo
management woperating. Co
occurring as weaffected by rain
prod
A site inspectionthe Production Sthe Environment
November 20current status of
taken and proOther informat
EPA includedactivities betw
especially thspontaneo
management.UHAQM statiowere classified a
Nov
on Taken
g information was PA. Operations on included ongoing us combustion with infusion spraysoal processing was ll. Operations weren and weren't in fulduction.
n was undertaken bSuperintendent andtal Coordinator on 115. Photos of the f the operation werovided to the EPA. ion provided to thed the operational een 3‐5 November hose relating to us combustion . SO2 levels at the n in Muswellbrook as "very good" on 5vember.
1‐
s
e l
by d 13
re
e
5
2
C
2
0
0
0
MUSWE
2015 Annual Envir
Date of Complaint
Time Compl
6‐Nov‐15 9:55 A
04‐Dec‐15 8:07 P
05‐Dec‐15 8:36 A
09‐Dec‐15 2:20 P
ELLBROOK COAL CO
ronmental Manag
of aint
Date of Incident
AM 26‐Nov‐15
PM 04‐Dec‐15
AM 05‐Dec‐15
PM 09‐Dec‐15
OMPANY LIMITED
gement Report
Time of Incident
L
9:55 AM W
8:07 PM U
8:36 AMMu
2:00 PM U
Location TypCom
Woodlands Ridge
DU
Unknown LIG
North swellbrook
OD
Unknown HAU
pe of mplaint
Mode of
UST EnvironHotlinerespo
GHT Direct cOffice respo
DOUR EnvironHotline
urge
ULAGE Direct cOffic
ProduSuperintrespo
Contact Natur
mental e ‐ OCE nded
Dust bandcom
call to ‐ OCE nded
Lightingcomp
mental e ‐ non ent
Strong
call to ce ‐ ction tendent nded
Traffic
re of Complaint
being generated d spontaneous mbustion smell
g plant was facing plainant's house
g smell from coal
incident involving road truck
Actio
Mining operatidown since 7
ancillary activiticarts were operthroughout thecould see dozercoal stockpileleaving site. Tdown and the r
operating at suspended betwePhotos of the opthroughout the
dust leaving site.by observatio
Lighting plant wfurther follow
Normal activitiescoal was being
ROM operatboundary inspecand Muswellbroowas detected. conducted and Caller did not
Interaction witevasive action
collision. InformDaracon for th
d
on Taken
ons had been shut :40am with some es occurring. Waterating continuouslye day. Complainantr operating on cleanes and road trucks he dozer was shut oad trucks stopped1pm after being een 7:30am‐9:00amperation were taken day with no visible This was supporteons from the EPA.
was relocated. No w up was required.
s were occurring. Nmoved apart from tions. OCE did a ction between MCCok. Nothing unusuPit inspection was everything was OKt want a call back.
th road truck with required to avoid mation passed ontoheir follow up with river.
r y t n
d
m. n e ed
No
C al
.
o
2
C
1
1
2
MUSWE
2015 Annual Envir
Date of Complaint
Time Compl
13‐Dec‐15 7:00 A
18‐Dec‐15 9:31 P
26‐Dec‐15 9:20 A
ELLBROOK COAL CO
ronmental Manag
of aint
Date of Incident
AM Various
PM 18‐Dec‐15
AM Various
OMPANY LIMITED
gement Report
Time of Incident
L
Various A
9:31 PMMu
Various W
Location TypCom
Aberdeen OD
North swellbrook
OD
Woodlands Ridge
OD
pe of mplaint
Mode of
DOUR EnvironHotlinerespo
DOUR EnvironHotline
urge
DOUR EnvironHotline
urge
Contact Natur
mental e ‐ OCE nded
Strongpres
monthsover
mental e ‐ non ent
Smell ‐
mental e ‐ non ent
Spcombuhas beeand wa
re of Complaint
g sulphur smell ‐sent for last 12 s, particularly bad r the last week
no further details provided
pontaneous ustion smell that en bad in the past as particularly bad yesterday
Actio
At the time of thactivities were oand Strip 14. Crof coal with no mAn inspection oundertaken withbeing altered. Tthe complainancomplaint wit
message for theback if they wis
compla
Mining activities were in free dig no hot material was a split in the was being repaircomplaint. The
want a
There were no opof the comp
Christmas shutdoff between 1:026/12/15. Fogg
of complainSuperintendecomplainant acomplaint. C
accepting that wmade the s
on Taken
he complaint, mininoccurring in Strip 13rushing and washingmining of hot areasf the operation wash the infusion sprayThe OCE spoke withnt at the time of theh the EC leaving a e complainant to cashed to discuss the int further.
at time of complainarea of Strip 19 witbeing mined. Therinfusion lines, whiced at the time of thcomplainant did noa call back.
perations at the timplaint due to the down. Infusion was0am and 6:30am oy conditions at timent. Production nt spoke with the and discussed the Complainant was weather conditionsituation worse.
ng 3 g s. s ys h e
ll
nt th e ch he ot
me
s n e
s