2015 An

MUSWELL

nnual Environ

LBROOK COAL

nmental Man

This 

L COMPANY L

nagement Re

page has b

IMITED

eport

een left blaank intentionnally. 

2015 An

Name o  Name o

Titles/M

  MOP CoMOP Co AEMR CAEMR E  Reporti Title:    Signatu

Date:   

MUSWELL

nnual Environ

of Leasehold

of Mine:    Mining Leas

ommencemompletion D

CommencemEnd Date:  

ng Officer: 

   

re:            

LBROOK COAL

nmental Man

der: 

es: 

ment Date: Date:  

ment Date: 

 

L COMPANY L

nagement Re

 

 

 

  

  

 

 

 

 

IMITED

eport

Muswe

Muswe

ConsoliMiningMining

31 Mar31 Dece

1 Janua31 Dece

Julie Th

Environ

ellbrook Coa

ellbrook Coa

idated Coalg Lease 1304g Lease 1562

rch 2015 ember 2020

ary 2015 ember 2015

homas 

nmental Co

 

 

al Company

al 

l Lease 713 4 2 

ordinator 

y Limited 

    

   

2015 An

MUSWELL

nnual Environ

LBROOK COAL

nmental Man

This 

L COMPANY L

nagement Re

page has b

IMITED

eport

een left blaank intentionnally. 

2015 An

1.0  I

1.1 

1.2 

1.2

1.3 

1.4 

1.5 

1.5

1.5

2.0  A

2.1 

2.2 

2.2

2.3 

2.4 

2.5 

2.6 

2.7 

2.8 

2.9 

2.9

2.9

2.9

2.10 

2.1

2.1

2.1

2.11 

3.0  E

3.1 

3.2 

3.2

3.2

MUSWELL

nnual Environ

NTRODUCTI

STRUCTUR

CONSENTS

.1  Chang

MINE CON

ACTIONS R

COMPLIAN

.1  Repo

.2  Comp

ACTIVITIES D

EXPLORAT

LAND PREP

.1  Topso

CONSTRUC

MINING ...

MINERAL P

WASTE MA

PRODUCT 

PRODUCTI

HAZARDO

.1  Fuel S

.2  Chem

.3  Explo

WATER MA

0.1  Wate

0.2  Groun

0.3  Wate

OTHER INF

ENVIRONME

ENVIRONM

METEORO

.1  Wind

.2  Rainf

LBROOK COAL

nmental Man

ON ..............

RE OF THIS R

S, LEASES AN

ges to Appro

NTACTS ........

REQUIRED FR

NCE STATUS 

rtable Incide

pliance Audit

DURING THE 

TION ............

PARATION ..

oil Managem

CTION .........

....................

PROCESSING

ANAGEMENT

COAL AND T

ION SUMMA

US MATERIA

Storage .......

mAlert System

osives ...........

ANAGEMENT

er Storage ....

nd Water Ex

er Balance ....

FRASTRUCTU

NTAL MANA

MENTAL MA

OLOGICAL .....

 Speed and D

all ...............

L COMPANY L

nagement Re

TABLE

....................

EPORT .........

ND LICENCES

ovals ............

....................

ROM PREVIO

....................

ents ..............

ts .................

REPORTING 

....................

....................

ment .............

....................

....................

G ...................

T ..................

TRANSPORT .

ARY ...............

ALS MANAGE

....................

m ..................

....................

T ..................

....................

traction .......

....................

URE MANAG

AGEMENT AN

NAGEMENT .

....................

Direction .....

....................

IMITED

eport

E OF CONT

....................

....................

...................

....................

....................

OUS AEMR RE

....................

....................

....................

PERIOD .......

....................

....................

....................

....................

....................

....................

....................

....................

....................

EMENT .........

....................

....................

....................

....................

....................

....................

....................

EMENT .......

ND PERFORM

....................

....................

....................

....................

TENTS 

....................

....................

....................

....................

....................

EVIEW .........

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

MANCE .........

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

............ 1 

............ 1 

............ 1 

............ 3 

............ 3 

............ 4 

............ 6 

............ 6 

............ 6 

............ 8 

............ 8 

............ 8 

............ 8 

............ 8 

............ 8 

.......... 11 

.......... 11 

.......... 12 

.......... 12 

.......... 12 

.......... 12 

.......... 12 

.......... 12 

.......... 13 

.......... 13 

.......... 14 

.......... 14 

.......... 14 

.......... 15 

.......... 15 

.......... 15 

.......... 17 

.......... 18 

2015 An

3.2

3.2

3.3 

3.3

3.3

3.3

3.4 

3.5 

3.5

3.5

3.5

3.6 

3.6

3.6

3.6

3.7 

3.7

3.7

3.7

3.8 

3.9 

3.9

3.9

3.9

3.10 

3.1

3.1

3.11 

3.1

3.1

3.1

3.12 

3.1

3.1

MUSWELL

nnual Environ

.3  Temp

.4  Inver

AIR QUALI

.1  Activi

.2  Air Q

.3  Activi

GREENHO

EROSION A

.1  Activi

.2  Erosio

.3  Activi

SURFACE W

6.1  Activi

6.2  Surfa

6.3  Activi

GROUNDW

.1  Activi

.2  Groun

.1  Activi

CONTAMIN

FLORA AN

.1  Activi

.2  Flora 

.3  Activi

WEEDS AN

0.1  Activi

0.2  Activi

BLASTING 

1.1  Activi

1.2  Blast 

1.1  Activi

NOISE MA

2.1  Activi

2.2  Noise

LBROOK COAL

nmental Man

perature ......

sion Monito

TY MANAGE

ities this Rep

uality Monit

ities Next Re

USE GAS .....

AND SEDIME

ities this Rep

on and Sedim

ities next Re

WATER MAN

ities this Rep

ce Water Mo

ities next Re

WATER MAN

ities this Rep

ndwater Mo

ities next Re

NATED LAND

D FAUNA MA

ities this Rep

and Fauna M

ities next Re

ND FERAL AN

ities this Rep

ities next Re

...................

ities this Rep

Monitoring 

ities next Re

ANAGEMENT 

ities this Rep

e Monitoring

L COMPANY L

nagement Re

....................

ring .............

EMENT .........

porting Perio

oring ...........

eporting Peri

....................

ENT CONTRO

porting Perio

ment Contro

porting Perio

NAGEMENT ..

porting Perio

onitoring .....

porting Perio

AGEMENT ...

porting Perio

nitoring .......

porting Perio

D ..................

ANAGEMENT

porting Perio

Monitoring...

porting Perio

NIMALS .........

porting Perio

porting Perio

....................

porting Perio

....................

porting Perio

....................

porting Perio

g ...................

IMITED

eport

....................

....................

....................

od .................

....................

od ...............

....................

OL .................

od .................

l Monitoring

od ...............

....................

od .................

....................

od ...............

....................

od .................

....................

od ...............

....................

T .................

od .................

....................

od ...............

....................

od .................

od ...............

....................

od .................

....................

od ...............

....................

od .................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

g ...................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

ii 

.......... 19 

.......... 22 

.......... 24 

.......... 24 

.......... 25 

.......... 39 

.......... 39 

.......... 39 

.......... 39 

.......... 40 

.......... 40 

.......... 40 

.......... 40 

.......... 41 

.......... 51 

.......... 51 

.......... 51 

.......... 52 

.......... 63 

.......... 63 

.......... 66 

.......... 66 

.......... 66 

.......... 66 

.......... 66 

.......... 66 

.......... 71 

.......... 71 

.......... 71 

.......... 72 

.......... 73 

.......... 78 

.......... 78 

.......... 78 

2015 An

3.1

3.13 

3.14 

3.1

3.1

3.15 

3.1

3.1

3.16 

3.1

3.1

3.17 

3.1

3.1

3.18 

3.19 

3.20 

3.21 

4.0  C

4.1 

4.2 

4.3 

5.0  R

5.1 

5.2 

5.2

5.2

5.2

5.2

5.3 

5.3

5.4 

5.4

5.4

MUSWELL

nnual Environ

2.1  Activi

VISUAL, ST

ABORIGIN

4.1  Activi

4.2  Activi

EUROPEAN

5.1  Activi

5.1  Activi

SPONTANE

6.1  Activi

6.2  Activi

BUSHFIRE.

7.1  Activi

7.2  Activi

HYDROCA

METHANE

PUBLIC SA

OTHER ISS

COMMUNITY

ENVIRONM

COMMUN

COMMUN

REHABILITAT

BUILDINGS

REHABILIT

.1  Reha

.2  Speci

.3  Reha

.4  Reha

REHABILIT

.1  Site S

FLORA MO

4.1  Perm

4.2  Full F

LBROOK COAL

nmental Man

ities next Re

TRAY LIGHT .

AL HERITAG

ities this Rep

ities next Re

N HERITAGE 

ities this Rep

ities next Re

EOUS COMB

ities this Rep

ities next Re

....................

ities this Rep

ities this Rep

RBON CONT

 DRAINAGE/

AFETY ...........

SUES AND RIS

Y RELATIONS

MENTAL COM

ITY LIAISON,

ITY CONSUL

TION ............

S ..................

TATION OF D

bilitation Pro

es Selection 

bilitation Act

bilitation Act

TATION MON

Selection ......

ONITORING M

anent Monit

loristic and S

L COMPANY L

nagement Re

porting Perio

....................

E ..................

porting Perio

porting Perio

....................

porting Perio

porting Perio

USTION .......

porting Perio

porting Perio

....................

porting Perio

porting Perio

AMINATION

/VENTILATIO

....................

SKS ..............

S ...................

MPLAINTS ....

, SPONSORSH

TATIVE COM

....................

....................

ISTURBED LA

ocess ............

....................

tivities this R

tivities next 

NITORING .....

....................

METHODOLO

toring Transe

Structure .....

IMITED

eport

od ...............

....................

....................

od .................

od ...............

....................

od .................

od ...............

....................

od .................

od ...............

....................

od .................

od .................

 ...................

ON ................

....................

....................

....................

....................

HIPS AND DO

MMITTEE ......

....................

....................

ANDS ...........

....................

....................

Reporting Pe

Reporting Pe

....................

....................

OGY .............

ects/Plots ...

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

ONATIONS ...

....................

....................

....................

....................

....................

....................

riod .............

eriod ............

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

iii 

.......... 79 

.......... 85 

.......... 85 

.......... 85 

.......... 86 

.......... 86 

.......... 86 

.......... 86 

.......... 86 

.......... 86 

.......... 88 

.......... 88 

.......... 88 

.......... 89 

.......... 89 

.......... 89 

.......... 90 

.......... 90 

.......... 91 

.......... 91 

.......... 94 

.......... 94 

.......... 95 

.......... 95 

.......... 95 

.......... 95 

.......... 95 

.......... 97 

.......... 99 

........ 101 

........ 101 

........ 104 

........ 104 

........ 104 

2015 An

5.4

5.5 

5.5

5.5

5.5

5.6 

5.6

5.6

5.6

5.7 

5.7

5.7

5.7

5.8 

5.9 

5.9

5.9

5.10 

5.11 

5.12 

5.13 

6.0  A

 

Table 1: 

Table 2: 

Table 3: 

Table 4: 

Table 5: 

Table 6: 

Table 7: 

Table 8: 

Table 9: 

Table 10

Table 11

Table 12

Table 13

MUSWELL

nnual Environ

4.3  Biom

FLORA MO

.1  Speci

.2  Biom

.3  Comp

FAUNA MO

6.1  Remo

6.2  Bird C

6.3  Micro

FAUNA MO

.1  Remo

.2  Bird C

.3  Micro

SOIL MON

SOIL MON

.1  Wood

.2  Pastu

EROSION A

CARRYING

REHABILIT

FURTHER D

ACTIVITIES P

Consents, A

Mine Conta

Actions from

Mining Flee

Waste Strea

Production 

Stored Wat

Groundwate

Site Water B

0: Rainfall Da

1: Temperatu

2: Control Pr

3: Control Pr

LBROOK COAL

nmental Man

etric Survey 

ONITORING R

es Richness.

etric Data ...

parison to Co

ONITORING 

ote Camera S

Census .........

ochiropteran

ONITORING 

ote Camera S

Census .........

ochiropteran

ITORING ME

ITORING RES

dland Sites ..

ure Sites .......

AND LANDFO

G CAPACITY A

TATION TRIAL

DEVELOPME

ROPOSED IN

Authorisation

cts ..............

m AEMR Insp

et Utilised at 

am Generatio

and Waste S

er ................

er Extraction

Balance .......

ata ...............

ure Data ......

ocedures for

ocedures for

L COMPANY L

nagement Re

....................

RESULTS .......

....................

....................

ompletion Cr

METHODOLO

Survey ..........

....................

n Bats ...........

RESULTS ......

Survey ..........

....................

n Bats ...........

ETHODOLOG

SULTS ..........

....................

....................

ORM STABILI

AND PASTUR

LS AND RESE

ENT OF THE F

N THE NEXT A

LISns and Licenc

....................

pections .......

MCC ............

on ................

Summary .....

....................

n ...................

....................

....................

....................

r Wind Blow

r Mining Gen

IMITED

eport

....................

....................

....................

....................

riteria ..........

OGY ............

....................

....................

....................

....................

....................

....................

....................

GY .................

....................

....................

....................

ITY ...............

RE CONDITIO

EARCH .........

FINAL REHAB

AEMR PERIO

ST OF TABces ...............

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

n Dust .........

nerated Dust

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

N .................

....................

BILITATION P

D .................

LES ....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

t Sources......

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

PLAN ............

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

iv 

........ 105 

........ 105 

........ 105 

........ 107 

........ 108 

........ 108 

........ 108 

........ 108 

........ 109 

........ 109 

........ 109 

........ 111 

........ 111 

........ 112 

........ 113 

........ 113 

........ 116 

........ 119 

........ 122 

........ 122 

........ 123 

........ 124 

............ 2 

............ 3 

............ 4 

............ 9 

.......... 11 

.......... 12 

.......... 13 

.......... 14 

.......... 14 

.......... 19 

.......... 19 

.......... 24 

.......... 24 

2015 An

Table 14

Table 15

Table 16

Table 17

Table 18

Table 19

Table 20

Table 21

Table 22

Table 23

Table 24

Table 25

Table 26

Table 27

Table 28

Table 29

Table 30

Table 31

Table 32

Table 33

Table 34

Table 35

Table 36

Table 37

Table 38

Table 39

Table 40

Table 41

Table 42

Table 43

Table 44

Table 45

Table 46

Table 47

Table 48

Table 49

Table 50

Table 51

 

Figure 1

Figure 2

Figure 3

Figure 4

MUSWELL

nnual Environ

4: Current St

5: Compariso

6: TSP Averag

7: Compariso

8: Real‐Time 

9: Compariso

0: PM10 HVAS

1: Compariso

2: Surface W

3: Compariso

4: Compariso

5: Compariso

6: Groundwa

7: Compariso

8: Compariso

9: Compariso

0: Compariso

1: Sandy Cree

2: Priority We

3: Blast Crite

4: Blast Mon

5: Predicted 

6: Noise Mon

7: Spontaneo

8: Historical S

9: Summary o

0: Recommen

1: Recommen

2: Compariso

3: Rehabilitat

4: Maintenan

5: Compariso

6: Data Gathe

7: Rehabilitat

8: Remote Ca

9: Bat Calls Id

0: Evidence o

1: Estimated 

: Mining Act

: Environme

: Quarterly W

4: Rainfall Gra

LBROOK COAL

nmental Man

atus of Dust 

on of Deposit

ges ..............

on of TSP Res

PM10 Averag

on of Real‐Tim

S Average ....

on of PM10 Re

ater Monito

on of pH Res

on of EC Resu

on of TSS Res

ater Monitor

on of Underg

on of Depth t

on of pH Res

on of EC Resu

ek Groundw

eed Control 

ria ...............

itoring Netw

Noise Levels

nitoring Resu

ous Combust

Summary of 

of Complaint

nded Specie

nded Specie

on of 2015 Re

tion Summa

nce Activities

on of Propos

ered for Flor

tion Site Com

amera Result

dentified at R

of Erosion at 

Carrying Cap

tivities This R

ntal Monito

Windroses ...

aph..............

L COMPANY L

nagement Re

Gauges .......

tional Dust R

....................

sults .............

ges ...............

me PM10 Res

....................

esults ...........

ring Program

ults to Histor

ults to Histor

sults to Histo

ing Program

ground Work

to Historical 

ults to Histor

ults to Histor

ater Monito

Actions for R

....................

work ..............

s ...................

ults ...............

tion Report S

Areas Affect

ts .................

s List for Nat

s List for Pas

ehabilitation

ry .................

s on Rehabili

ed 2016 Reh

ristic Assessm

mpletion Crit

ts .................

Remnant and

Rehabilitatio

pacity for Re

LISTReporting Pe

ring Location

....................

....................

IMITED

eport

....................

Results .........

....................

....................

....................

sults ............

....................

....................

m ..................

rical Results

rical Results .

orical Results

 ...................

king Results .

Results .......

rical Results

rical Results .

ring Trigger 

Rehabilitatio

....................

....................

....................

....................

Summary .....

ted by Spont

....................

tive Vegetati

sture ............

n Against MO

....................

itated Land .

habilitation A

ment of the W

teria Target .

....................

d Rehabilitat

on Woodlan

emnant and R

T OF FIGUriod .............

ns ................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

s ...................

....................

....................

....................

....................

....................

Levels ..........

on Blocks ......

....................

....................

....................

....................

....................

taneous Com

....................

ion ...............

....................

OP Targets ....

....................

....................

Against MOP 

Woodland Si

....................

....................

tion Woodla

d and Pastur

Regrowth Pa

URES ....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

mbustion ......

....................

....................

....................

....................

....................

....................

Targets ......

ites ..............

....................

....................

nd Sites .......

re Sites ........

asture Sites ..

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

.......... 25 

.......... 26 

.......... 29 

.......... 29 

.......... 33 

.......... 33 

.......... 34 

.......... 34 

.......... 40 

.......... 41 

.......... 42 

.......... 44 

.......... 51 

.......... 52 

.......... 57 

.......... 57 

.......... 57 

.......... 62 

.......... 68 

.......... 72 

.......... 72 

.......... 79 

.......... 80 

.......... 87 

.......... 88 

.......... 91 

.......... 95 

.......... 96 

.......... 97 

.......... 98 

.......... 99 

.......... 99 

........ 105 

........ 108 

........ 110 

........ 112 

........ 120 

........ 122 

.......... 10 

.......... 16 

.......... 18 

.......... 20 

2015 An

Figure 5

Figure 6

Figure 7

Figure 8

Figure 9

Figure 1

Figure 1

Figure 1

Figure 1

Figure 1

Figure 1

Figure 1

Figure 1

Figure 1

Figure 1

Figure 2

Figure 2

Figure 2

Figure 2

Figure 2

Figure 2

Figure 2

Figure 2

Figure 2

Figure 2

Figure 3

Figure 3

Figure 3

Figure 3

Figure 3

Figure 3

Figure 3

Figure 3

Figure 3

Figure 3

Figure 4

Figure 4

Figure 4

Figure 4

Figure 4

Figure 4

Figure 4

Figure 4

Figure 4

Figure 4

MUSWELL

nnual Environ

: Temperatu

: Temperatu

: Average De

: Deposition

: Site 1 TSP M

0: Site 2 TSP

1: Site 3 TSP

2: Site 1 PM

3: Site 2 PM

4: Site 3 PM

5: PM10 HVA

6: Monthly S

7: Monthly S

8: Monthly S

9: Quarterly

0: Quarterly

1: Quarterly

2: Location o

3: Water Lev

4: Water Qu

5: Water Lev

6: Sandy Cre

7: Sandy Cre

8: Sandy Cre

9: Sandy Cre

0: Sandy Cre

1: Weed Ma

2: Queen Str

3: School Bla

4: 99 Queen

5: Nisbet Bla

6: Complain

7: Complain

8: Proposed

9: Rehabilita

40: Rehabilita

41: Floristic P

42: Comparis

43: Comparis

44: Biometric

45: Comparis

46: Bird Speci

47: Number o

48: Comparis

49: Comparis

LBROOK COAL

nmental Man

ure Graph ....

ure Inversion

epositional D

al Dust Cont

Monitoring R

P Monitoring

P Monitoring

10 Results ....

10 Results ....

10 Results ....

AS Results ....

Surface Wate

Surface Wate

Surface Wate

y Surface Wa

y Surface Wa

y Surface Wa

of Alluvial La

vel for Unde

uality Data in

vel for Groun

eek Groundw

eek Water Q

eek Water Q

eek Groundw

eek Groundw

anagement P

reet Blast M

ast Monitori

n Street Blast

ast Monitorin

t Summary .

t History .....

 Activities Ne

ation Monito

ation Monito

Plot Diagram 

on of Averag

on of Averag

c Data Averag

on of Averag

ies Identified

of Common a

on of Soil pH

on of Soil Ele

L COMPANY L

nagement Re

....................

 Graph ........

Dust Results .

tour Plot ......

Results .........

Results .......

Results .......

....................

....................

....................

....................

er Monitorin

er Results – 

er Results – T

ter Results –

ter Monitori

ter Monitori

and Compare

rground Wo

 Undergroun

ndwater Mon

water Depth .

uality – pH...

uality – Elect

water Monito

water Level C

Priority Actio

onitoring Re

ng Results ...

t Monitoring

ng Results ....

....................

....................

ext Reportin

oring Program

oring Program

....................

ge Native Spe

ge Number o

ges ...............

ge Fauna Spe

d at Remnan

and Threaten

H ...................

ectrical Cond

IMITED

eport

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

ng Results – p

Electrical Co

Total Suspen

– pH .............

ing Results –

ing Results –

ed to Mine W

rkings ..........

nd Workings

nitoring on S

....................

....................

trical Conduc

oring Netwo

Catenary Tra

ns ...............

esults ...........

....................

g Results ......

....................

....................

....................

g Period ......

m – Flora Sit

m – Fauna Si

....................

ecies Richne

of Weed Spe

....................

ecies Richnes

t and Rehab

ned Bat Spec

....................

ductivity ......

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

pH ................

nductivity ...

nded Solids ..

....................

– Electrical Co

– Total Suspe

Workings ......

....................

s ...................

Site ...............

....................

....................

ctivity ..........

rk, Sectional

nsect ...........

....................

....................

....................

....................

....................

....................

....................

....................

es ................

tes ...............

....................

ess ................

cies ..............

....................

ss .................

bilitation Site

cies Recorde

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

onductivity ..

ended Solids 

....................

....................

....................

....................

....................

....................

....................

Plan ...........

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

s .................

d at Woodla

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

...................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

and Sites .....

....................

....................

vi 

.......... 21 

.......... 23 

.......... 27 

.......... 28 

.......... 30 

.......... 31 

.......... 32 

.......... 35 

.......... 36 

.......... 37 

.......... 38 

.......... 45 

.......... 46 

.......... 47 

.......... 48 

.......... 49 

.......... 50 

.......... 53 

.......... 54 

.......... 55 

.......... 56 

.......... 59 

.......... 60 

.......... 61 

.......... 64 

.......... 65 

.......... 70 

.......... 74 

.......... 75 

.......... 76 

.......... 77 

.......... 92 

.......... 93 

........ 100 

........ 102 

........ 103 

........ 104 

........ 106 

........ 107 

........ 107 

........ 110 

........ 111 

........ 112 

........ 113 

........ 113 

2015 An

Figure 5

Figure 5

Figure 5

Figure 5

Figure 5

Figure 5

Figure 5

Figure 5

Figure 5

Figure 5

Figure 6

Figure 6

 

Append

Append

Append

Append

Append

 

 

MUSWELL

nnual Environ

0: Comparis

1: Comparis

2: Comparis

3: Comparis

4: Comparis

5: Comparis

6: Comparis

7: Comparis

8: Comparis

9: Comparis

0: Comparis

1: Comparis

ix 1: Summa

ix 2: Air Qua

ix 3: Water M

ix 4: Blast M

ix 5: Compla

LBROOK COAL

nmental Man

on of Soil Po

on of Soil Su

on of Soil Nit

on of Soil Nit

on of Soil Or

on of Soil pH

on of Soil Ele

on of Soil Po

on of Soil Su

on of Soil Nit

on of Soil Nit

on of Soil Or

ry of Indepe

lity Monitor

Monitoring R

onitoring Da

ints Summar

L COMPANY L

nagement Re

otassium ......

lphur ...........

trite + Nitrat

trogen .........

rganic Matte

H – Pasture ..

ectrical Cond

otassium – Pa

lphur – Past

trite + Nitrat

trogen – Pas

rganic Matte

LIST Ondent Comp

ing Results 

Results 

ata 

ry 

 

IMITED

eport

....................

....................

te.................

....................

er – Woodlan

....................

ductivity – Pa

asture .........

ture ..............

te (mg/kg) –

sture ............

er – Pasture .

OF APPENpliance Audit

....................

....................

....................

....................

nd .................

....................

asture ..........

....................

....................

Pasture .......

....................

....................

DICES t 

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

vii 

........ 114 

........ 114 

........ 115 

........ 115 

........ 116 

........ 116 

........ 117 

........ 117 

........ 118 

........ 118 

........ 119 

........ 119 

2015 An

DEFINIT 

ACHMP

AEMR  

APS 

BAM 

BL 

BMP 

BVMP 

BOM 

CCC 

CCL 

CHPP 

CPP 

CSIRO 

DA 

DMP 

DPI 

DRE 

EC 

EEA 

EIS 

EL 

EMP 

EMS 

EP&A 

EPA 

EPL 

ESCP 

FFMP 

HVAS 

INP 

LFA 

LGA 

LiMP 

LMP 

MCC 

MIA 

ML 

MMS 

MOP 

MTPA 

NATA 

NMP 

OC 

OEH 

MUSWELL

nnual Environ

TIONS 

P  Arc

An

Au

Bet

Bo

Bu

Bla

Bu

Co

Co

Co

Co

Co

De

Du

De

NS

Ele

Eas

Env

Exp

Env

Env

Env

NS

Env

Ero

Flo

Hig

Ind

Lan

Loc

Lig

Lan

Mu

Mi

Mi

Me

Mi

Mi

Na

No

Op

Off

LBROOK COAL

nmental Man

chaeology a

nual Enviro

tomatic Pos

ta Attenuat

re Licence 

shfire Mana

ast‐Vibratio

reau of Me

mmunity Co

nsolidated 

al Handling

al Preparat

mmonweal

velopment 

st Managem

partment o

W Trade & 

ectrical Cond

stern Empla

vironmenta

ploration Le

vironmenta

vironmenta

vironmenta

W Environm

vironment 

osion and Se

ora and Fau

gh Volume A

dustrial Nois

ndscape Fun

cal Governm

ghting Mana

nd Manage

uswellbrook

ne Infrastru

ning Lease 

eteorologica

ning Opera

llion Tonne

tional Asso

oise Manage

pen Cut 

fice of Envir

L COMPANY L

nagement Re

and Cultura

onmental M

sitioning Sy

tion Mass M

agement Pl

n Managem

teorology 

onsultative 

Coal Lease

 and Prepar

ion Plant 

th Scientific

Application

ment Plan 

of Primary In

Investment

ductivity 

acement Ar

al Impact St

ease 

al Managem

al Managem

al Planning a

ment Protec

Protection L

ediment Co

na Manage

Air Sampler

se Policy 

nction Anal

ment Area

agement Pla

ment Plan

k Coal Comp

ucture Area

or Megalitr

al Monitorin

tions Plan

s per Annum

ciation of T

ement Plan

ronment an

IMITED

eport

l Heritage M

Management

ystem 

Monitor 

an 

ment Plan 

Committee

ration Plant

c and Indus

ndustries 

t ‐ Division 

rea 

atement 

ment Plan 

ment Strateg

and Assessm

ction Autho

Licence 

ontrol Plan

ment Plan

ysis 

an 

pany 

re 

ng Stations

Testing Auth

nd Heritage

Managemen

t Report 

strial Resear

of Resource

gy 

ment Act 19

ority 

horities 

nt Plan 

rch Organisa

es and Ener

979 

ation 

rgy 

viii 

2015 An

OGM 

PM 

POEO 

PRP 

RL 

RLPB 

ROM 

RTEMS 

SGMP 

SWMP 

TEOM 

TPH 

TSP 

TSS 

VAMP 

WMP 

  

 

MUSWELL

nnual Environ

Org

Par

Pro

Po

Re

Ru

Ru

Re

Sur

Site

Tap

To

Tot

Tot

Vis

Wa

LBROOK COAL

nmental Man

ganic Grow

rticulate Ma

otection of 

llution Redu

lative Level

ral Lands Pr

n of Mine 

al Time Env

rface and G

e Water Ma

pered Elem

nnes per Ho

tal Suspend

tal Suspend

sual Amenit

aste Manag

L COMPANY L

nagement Re

th Medium

atter 

the Environ

uction Prog

 

rotection Bo

vironmental

Groundwate

anagement 

ent Oscillat

our 

ded Particul

ded Solids 

ty Managem

gement Plan

IMITED

eport

nment Oper

gram 

oard 

l Monitorin

er Monitorin

Plan 

ting Microb

ates 

ment Plan 

rations Act 

g System 

ng Plan 

alance 

1997 

ix 

2015 An

1.0   IMusweCompanunderglocatedMuswe On  1 MusweOpen Cto 2,000the relo 

1.1 STThe  strPreparaResourcthe  repConditiolicences This Anenviron2015 (h In accoto: 

Mus

Divi

Env

Offi

Nat

Dep

MCC A copy https://reports 

1.2 CMCC  oconsenton seve 

MUSWELL

nnual Environ

NTRODUCllbrook  Coany Ltd. Groround coal   on  Muscllbrook. 

Septemberllbrook  Shiut Extensio0,000 tonneocation of th

TRUCTUREructure  of ation  of  Aces, Documporting  reqon  9.2.    Ths and minin

nnual Environmental maherein refer

rdance wit

swellbrook 

sion of Res

ironment P

ce of Enviro

ional Parks 

partment of

C Communi

of the repo/idemitsu.co/environme

ONSENTS,perates  unt  is DA 205eral occasio

LBROOK COAL

nmental Man

CTION al  Companyoup. MCC hmining comcle  Creek 

r  2003,  Dre  Council on commences coal per he Mine Inf

E OF THIS Rthis  repor

Annual  Envment No. EDquirements his  report  ag leases. 

onmental Mnagement ared to as th

h the Deve

Shire Coun

ources and 

Protection A

onment and

and Wildlif

f Primary In

ity Consulta

ort is also avom.au/opeental‐report

, LEASES Ader  a  num/2002, whins with the

L COMPANY L

nagement Re

y  (MCC)  is as a  long a

mmencing inRoad,  app

Developmen(MSC)  to  eced operatiannum. Thifrastructure

REPORT rt  is  basedironmentalDG03 MREMstipulated

also  incorpo

Managemenand performhe ‘reporting

lopment Co

cil (MSC); 

Energy (DR

Authority (E

d Heritage (

fe Service (N

dustries – W

ative Comm

vailable on Mrations/muting/  

ND LICENCmber  of  devch was applatest mod

IMITED

eport

a wholly  oassociation n 1907 and proximately

nt  Consentextend  the ons in Marcis approval e Area (MIA

d  on  the  d  ManagemMP Guide Vd  in  the  Morates  the 

nt Report  (Amance at Mg period’). 

onsent, cop

RE); 

PA); 

(OEH); 

NPWS); 

Water (DPI‐

mittee (CCC)

MCC’s websswellbrook

CES velopment proved by Mdification be

owned  subswith coal mopen cut oy  3  kilom

t  for  DA former MCch 2005 andhas subseq

A) and to ext

document ment  RepoV3 dated  JaMCC  Develoreporting  r

AEMR) provMCC from 1 

pies of this 

Water); and

site  ‐coal/appro

consents  isMSC  in 2003eing approv

sidiary  of  thmining at Mperations inetres  to  t

205/2002 CC No.1 Opd has a capauently beentend the mi

“Guidelinesrt”,  Departanuary 2006opment  Corequiremen

vides a sumJanuary 201

AEMR will 

ovals‐plans‐

ssued  by M3.   This DA ed in 2013. 

he  IdemitsMuswellbroon 1944. Thethe  north‐

was  granpen  Cut.  Tacity to pron modified ine life to 2

s  and  Fortment  of 6 and  incoronsent,  spents  in MCC’

mmary of ac15 to 31 De

be made a

‐and‐

MSC.    The has been m  

u  Kosan ok, with e mine is ‐east  of 

nted  by he No.1 oduce up to allow 020. 

mat  for Mineral rporates ecifically ’s water 

ctivities, ecember 

available 

primary modified 

2015 An

Mining Lease 1 In addit

EnvEnv

WatPart

 Relevan 

Approva

DA 205/(MSC) 

DA 205/(MSC) – AmendmConditio

DA 205/(MSC) Amendm1.1 and 

DA 205/(MSC) Amendm11.1 

DA 205/(MSC) Amendm1.1(a), 345 and 5

DA 205/(MSC) Amendm1.1, 1.2 &and addconditio60. 

ConsolidLease 71

MUSWELL

nnual Environ

activities a1562 and M

tion to the a

ironmentalironment O

ter  Licencet 5 of the W

nt consents,

al 

/2002 

/2002 

ment to on 1.1 

/2002 

ment to 11.3 

/2002 

ment to 

/2002 

ment to 31, 33, 39, 58. 

/2002 

ment to & 6.3.2 itional ons 59 & 

dated Coal 13 

LBROOK COAL

nmental Man

t MCC are ining Lease 

above appro

  ProtectioOperations A

s  20BL1690Water Act 19

, authorisat

Table 1Description

Approval foNo.1 Open C

Power line radditions to

Relocate offworkshop a

Extension o

Revision to InfrastructuRequiremenRehabilitatipermit the cmining operadditional 5

ModificatioContinuatioOperations Coal Mine f(5) Years‐ MCoal Road M

Mining Leas

L COMPANY L

nagement Re

carried out1304. 

ovals MCC o

n  Licence Act 1997. 

014,  20BL16912. 

tions and lic

1: Consents 

r Extension oCut 

relocation ano Workshop

fice buildingsnd bath‐hou

f mining into

Mining ure Building nts and on Plan Revicontinuationrations for an5 years. 

n to Permit ton of Mining at Muswellbor an Additio

Multiple AllotMuswellbroo

se 

IMITED

eport

t wholly wit

operates un

(EPL)  656

69037,  20B

cences are s

s, AuthorisaCA

of MCC  MS

nd  MS

s, use 

MS

o Area C  MS

ision to n of n 

MS

the 

brook onal Five tments‐ ok. 

MS

DRE

thin Consoli

nder the fol

6  issued  u

BL169038  a

summarised

ations and LConsent Authority 

MuswellbrooShire Council

MuswellbrooShire Council

MuswellbrooShire Council

MuswellbrooShire Council

MuswellbrooShire Council

MuswellbrooShire Council

Division of Resources anEnergy 

idated Coal

lowing licen

nder  the 

nd  20BL17

d in Table 1

Licences Date Grante

ok  1 Sep 

ok  19 Dec

ok  13 July

ok  23 Dec

ok  29 Oct

ok  12 Dec

d 5 May

 Lease 713,

nces: 

Protection 

0473  issue

1. 

ed ExReDa

2003  1 S

c 2005  1 S

y 2009  1 S

c 2010  1 S

t 2013  1 S

c 2013  1 S

y 1990  24

, Mining 

of  the 

d  under 

xpiry/ enewal ate 

Sep 2020 

Sep 2020 

Sep 2020 

Sep 2020 

Sep 2020 

Sep 2020 

4 Nov 2024 

2015 An

Approva

Mining L1304 

Mining L1562 

Mining L1513 

EnvironmProtectiLicence 

Water L20BL169

Water L20BL169

Water L20BL169

Water L20BL170

 

1.2.1 During period 2approvereportinmonito There w 

1.3 MThe  naenviron 

Gra

Leo

Ro

War

Ju

 

MUSWELL

nnual Environ

al 

Lease 

Lease 

Lease 

mental on 656 

icence 9014 

icence 9037 

icence 9038 

icence 0473 

Changes tothe reporti2015‐2020.ed by DRE ong  year.    Tring progra

were no oth

MINE CONTames  and nmental ma

Name 

ant Clouten

on Claassens

d Gallagher

rren Edward

lie Thomas 

LBROOK COAL

nmental Man

Description

Mining Leas

Mining Leas

Mining Leas

Environmen

Water Licen

Water Licen

Water Licen

Water Licen

o Approvalsing period M  This MOP on 31 MarchThis  amendmm.  These c

her changes

TACTS contacts  onagement, 

n  Se

s  Tech

r  P

ds Hea

E(appo

L COMPANY L

nagement Re

 

se 

se 

se 

ntal Licence

nce 

nce 

nce 

nce 

s MCC applieaddresses h 2015.  Anment was  tchanges wer

to approva

f  site  persplanning an

Table 

Po

enior Opera

nical Servic

Production S

alth, Safety, Training Su

nvironmentointed Envi

IMITED

eport

CA

DRE

DRE

DRE

EPA

D

D

D

D

ed  for a newmining and amendmento  allow  chre approved

als during th

sonnel  respnd support 

2: Mine Co

sition 

ations Man

ces Superint

Superintend

Environmeuperintende

tal Coordinronmental 

Consent Authority 

Division of Resources anEnergy 

Division of Resources anEnergy 

Division of Resources anEnergy 

EnvironmentProtection Authority 

DPI‐Water 

DPI‐Water 

DPI‐Water 

DPI‐Water 

w Mining O closure actnt to this Mhanges  to bd by DRE on

he reporting

ponsible  fofunctions a

ontacts 

ager 

tendent 

dent 

ent and ent 

ator Officer) 

Date Grante

d 12 Jan

d 16 Feb

d 20 Ma

al  6 Dec 

16 Jan

5 Apr 

5 Apr 

24 Aug

Operations Ptivities at M

MOP was appbe made  ton 3 Novemb

g period. 

or  mining, are shown in

Cont

(02) 

(02) 

(02) 

(02) 

(02) 

ed ExReDa

n 1993  24

b 2005  16

ar 2002  20

2000  Noap

n 2014  15

2014  5 A

2014  5 A

g 2015  24

Plan  (MOP)MCC.  This Mplied for duo  the  rehabber 2015. 

rehabilitatn Table 2. 

tact Numbe

 6542 2300

 6542 2300

 6542 2300

 6542 2300

 6542 2300

xpiry/ enewal ate 

4 Nov 2024 

6 Feb 2026 

0 Mar 2023 

ot pplicable 

5 Jan 2019 

Apr 2019 

Apr 2019 

4 Aug 2016 

)  for the MOP was uring the bilitation 

ion  and 

er 

2015 An

1.4 AAn envi2014 Ainspectconducsite per14 July by MCC 

No  Iss

1.   HyMdeprhy

2.   M(Mre

3.   RhM

4.   W

5.   Acm

6.   To

 

MUSWELL

nnual Environ

ACTIONS REironmental EMR and  toion  was  reted by DRErformance. 2015.  The C are shown

sue/Observa

ydrocarbon anagement emonstrate trocess for maydrocarbon s

ine InfrastruMIA) – contameport 

hodes Grass anagement 

Weed Manage

cacia salignaanagement 

opsoil manag

LBROOK COAL

nmental Man

EQUIRED Finspection o  review sieceived  on  on 28 Apri Corresponactions fro

n in Table 3.

Tabation 

Plan – the internal anaging spills 

ucture Area minated soil 

ement 

gement 

L COMPANY L

nagement Re

FROM PREVwas condute perform14  July  20il 2015 to rendence regam these ins. 

ble 3: ActionDRE Actio

2013‐20

Provide DBioremedManagemthat incor

Legisl

Manarespo

Desig

Operainspec

Provide Dcontaminthe reloca

Provide dproposed Rhodes grpasture ar

Provide a managemundertake

Provide dmanagemthat it doeland use

Provide dmanagem

 

IMITED

eport

VIOUS AEMucted by DRance.   Corr015.    An  aeview the Jarding actiospections a

ns from AEMon 

014 AEMR In

DRE with a diation Area ment Plan forrporates: 

ative review

agement protonsibilities 

n and criteri

ating standarction regime

DRE with the ated soil repation of the M

etails of mea for the manrass in rehabreas 

summary ofment that is ben 

etails of proment of Acacies not impac

etails of topsment and mo

MR REVIEWRE on 8 Janurespondencdditional  euly‐Decembons from thlong with h

MR Inspect

spection 

r approval 

tocol and 

rds and e 

port from MIA 

asures nagement of bilitation 

f weed being 

posed ia saligna so ct on final 

soil nitoring 

W uary 2015 tce  regardingnvironmentber 2014 AEis  inspectioow they ha

ions Due Date

30 October 2015 

30 October 2015 

2015 AEMR 

2015 AEMR 

2015 AEMR 

2015 AEMR 

o review thg actions  frtal  inspectEMR and toon was receave been ad

e  MCC Com

BioremedManagemPlan was submittedon 30 Oct2015.  Modetail canfound in S3.18. 

The contaminreport wasubmittedon 30 Oct2015. 

More detbe found Section 3

More detbe found Section 3

More detbe found Section 3

More detbe found Section 2

he 2013‐rom  this ion  was o review eived on ddressed 

mment 

diation ment 

d to DRE tober ore n be Section 

nated soil as d to DRE tober 

tails can in 

3.10. 

tails can in 

3.10 

tails can in 

3.10. 

tails can in 

2.2.1. 

2015 An

No  Iss

1  ReMinsrilreNo

2a  HyMhymdebio

2b  HyMinsmththhy

MUSWELL

nnual Environ

sue/Observa

ehabilitationaintenance: spection eroling of the 20ehabilitation o.1 Dam 3 w

ydrocarbon anagement:ydrocarbon anagement ecommissionoremediatio

ydrocarbon anagement:spection hydaterial was oe bioremediat may haveydrocarbon c

LBROOK COAL

nmental Man

ation 

 during the 

osion and 015 near North 

was observed

 

plan for the ning the on area 

 during the drocarbon observed in iation area e high content 

L COMPANY L

nagement Re

DRE Actio

2014 

MCC to prdetailed rrehabilitaat Muswereport mufor the prreview theindustry bDRE encoremediatepracticablthe area tgrowth mWeed conoccur as acompletioflowering

DRE PreviBioremedPlan (BAMOctober 2The BAM 

Legisl

Manarespo

Desig

Operainspec

MCC haveplan to deBioremedshould inc

A dec

Decom

Provide Danalysis, rwith the Bmanagemdepicted i

IMITED

eport

on 

 AEMR Inspe

rovide DRE wreport on thetion methodellbrook Coalust include juactices usedese practicebest practiceurages MCC e this area asle, including to ensure furmedia does nontrol of the aa priority to eon prior to ga. 

iously requesdiation ManaMP) for appro2015. should incor

ative review

agement protonsibilities 

n and criteri

ating standarction regimee indicated thecommissiondiation Area. corporate: 

ommissionin

mmissioning

DRE with the reporting in aBAMP.  Detament for the min Photo 10.

ection 

with a e dology used l.  This ustification  and should s against e. to s soon as seeding of rther loss of ot occur. area should ensure alenia 

sted a agement oval due 30 

rporate: 

tocol and 

rds and e hat they n the  The BAMP 

ng plan 

g criteria 

laboratory accordance il the on‐sitematerial 

Due Date

30 October 2015 

30 October 2015 

30 October 2015 

e  MCC Com

The revisRehabilitaProcedurprovided on 30 Oct2015.  Modetail on rehabilitapractices found in S5.2.1. 

BioremedManagemPlan was submittedon 30 Oct2015.  Modetail canfound in S3.18. 

The laboranalysis wprovided on 30 Oct2015.  Thmaterial din Photo managedaccordanthe BioremedManagemPlan. 

mment 

ed ation e was to DRE tober ore 

ation can be Section 

diation ment 

d to DRE tober ore n be Section 

ratory was to DRE tober e depicted 10 was  in ce with 

diation ment 

2015 An

No  Iss

3  MSuMSeM

4  Co

5  RhM

6  W

7  Acm

8  To

 

1.5 C

1.5.1 During t 

1.5.2 As per Caudit wconformprotectwith the Conditioindepenprocess The audother dcommitconformin this aconsent 

MUSWELL

nnual Environ

sue/Observa

anagement urface Wateranagement ediment and anagement 

ompletion Cr

hodes Grass anagement 

Weed Manage

cacia salignaanagement 

opsoil manag

OMPLIANC

Reportablethe reportin

ComplianceCondition 8

was conductmance  wittion  licencee last audit 

on 9  in watndent audits assessed c

dit reviewedocuments tments  wemances. 27 audit relate t document

LBROOK COAL

nmental Man

ation 

Plans: r Plan and Erosion Plan 

riteria 

ement 

gement 

CE STATUS

e Incidents ng period th

e Audits 8.1 of Develted at MCC h  the  con  and waterbeing cond

ter  licencest also assesconformanc

d 27 approin a more gere  assesseof the  issuto the samts and mana

L COMPANY L

nagement Re

DRE Actio

Provide DSurface Wand SedimManagem

Report moperformacompletio

Provide dproposed Rhodes grpasture ar

Provide a managemundertake

Provide dmanagemthat it doedominate

Provide dmanagem

here were n

lopment Apduring the nsent  condr  licence  coducted in 20

s 20BL1690ses conformce against th

vals and engeneral maned  as  part es were ade issue whiagement pla

IMITED

eport

on 

DRE with copWater Managment and Eroment Plan 

onitoring dance indicatoon criteria in 

etails of mea for the manrass in rehabreas 

summary ofment that is ben 

etails of proment of Acacies not impace rehabilitatio

etails of topsment and mo

no reportab

pproval DA2reporting pditions  aloonditions.  012.   

037, 20BL16mance withhese requir

nvironmentnner, wherof  the  a

dministrativch, due to tans, raise th

ies of the gement Plan osion 

ta against rs and the MOP 

asures nagement of bilitation 

f weed being 

posed ia saligna so ct or on areas 

soil nitoring 

ble incidents

205/2002 aperiod.  Theng  with  mThe  audit 

69038 and 2h the water ements. 

al manageme relevant. udit.    42 e. Some of the duplicathe same no

Due Date

30 October 2015 

2015 AEMR 

2015 AEMR 

2015 AEMR 

2015 AEMR 

2015 AEMR 

s at MCC. 

n independe audit wasmining  leasis  required 

20BL170473licence con

ment documA total of 6issues  resthe non‐cotion of comon‐conforma

e  MCC Com

These managemplans werprovided on 25 Aug2015. 

More infocan be foSection 5

More detbe found Section 3

More detbe found Section 3

More detbe found Section 3

More detbe found Section 2

dent environs required tse,  enviro  every  thre

3 requires tnditions.  Th

ments  in de654 conditisulted  in  5onformancemitments bance severa

mment 

ment re to DRE gust 

ormation und in 5.5.3. 

tails can in 

3.10. 

tails can in 

3.10. 

tails can in 

3.10. 

tails can in 

2.2.1. 

nmental o assess nmental ee  years 

that the he audit 

etail and ons and 53  non‐es noted between al times.  

2015 An

A basic Extremewere 27High or  The audaimed  aaspects A full cohttps://reports A summ 

MUSWELL

nnual Environ

 risk assesse risk levels7 administrExtreme ris

dit report dat  improvins of the sites

opy of the a/idemitsu.co/environme

mary of the 

LBROOK COAL

nmental Man

sment was s identified.rative non‐csks were id

etails the ang  environms operation

audit reportom.au/opeental‐report

findings of 

L COMPANY L

nagement Re

conducted  For the noconformancentified in t

reas found mental perf and enviro

t can be fourations/muting/ 

the audit is 

IMITED

eport

for all nonn‐conformaces), there wthe audit. 

not compliformance  ionmental m

und on the Iswellbrook

s shown in A

n‐conformanances that wwere 11 Low

ant and mancluding  a 

management

demitsu we‐coal/appro

Appendix 1

nces with Lwere not adw, and 15 M

akes furtherreview of t. 

ebsite at: ovals‐plans‐

Low/MediumdministrativMedium res

r recommenkey  enviro

‐and‐

m/High/ ve (there sults. No 

ndations nmental 

2015 An

2.0   A

2.1 EXDuring Jholes wOpen Crehabilicommeapprove 

2.2 LALand prvegetattopsoil  

2.2.1 Previouin  futuroperatiperiod stockpil 

2.3 CDuring t 

2.4 MAll minito occureportin The Oparea, unwas  precontinuthroughCut 1. Tprevent Recent Anticlinroad anstrata isextracti 

MUSWELL

nnual Environ

ACTIVITIES

XPLORATIOJune and Juwas used toCut 1 that hitated  areaencing  a  Sued on 25 M

AND PREPreparation ition clearingstripping oc

Topsoil Mausly strippedre  rehabilitons  and  aridentified  tles.  Weed c

ONSTRUCTthe reportin

MINING ing activitier 24 hours ng period is

pen Cut 1 mnderneath eviously  exue  north  doh to the LodThis sequent oxygen ing

geological ne goes  thrond coal prods ongoing aion of low r

LBROOK COAL

nmental Man

S DURING

ON uly 2015, M confirm thhad been di  between urface  Distay 2015. 

ARATION is the proceg, topsoil stccurred. 

anagement d topsoil is tation  activre  inspectethat  the wcontrol will 

TION ng period n

es this repoa day, seves shown in F

mining schethe old Infrxcluded  froown  throuder seam, wnce of miningress and m

mapping anough previoduct stockpnd will contratio coal w

L COMPANY L

nagement Re

G THE REP

CC drilled the coal quaisturbed  forOpen  Cut turbance  N

ess of prepatripping and

stockpiled ities.    The ed  on  a  regweed  controbe underta

o construct

rting periodn days a weFigure 1. 

dule will corastructure m  the mingh  the  seawith the finang allows fominimising a

nd interpretously backfile. To ensutinue on thehich otherw

IMITED

eport

PORTING P

three explorlity  in the ar mining.   T1  and  OpeNotice  (SDN

aring the land topsoil sto

in locationsstockpile  lgular  basis.ol  activities aken during

tion activitie

d have occueek. The sta

ontinue witarea and w

ning  area.  Tam  sequenal void locaor sealing oany chance o

tation has sfilled and dure highwale eastern hwise would 

PERIOD 

ration holesarea.   One oThe other ten  Cut  2.   N)  was  sub

nd for openockpiling. D

s around thocations  ar.    Inspectioneed  to  b

g the next re

es occurred

urred in Opatus of min

thin  the easwithin the MThe  pit  hasces  as  theated in the nof the northof spontane

shown thatisturbed arl stability, righwall of Obe left behi

s.  The inforof the holeswo holes wPrior  to  thbmitted  to

n cut miningDuring the r

e site for usre  away  froons  throughbe  undertakeporting pe

d. 

en Cut 1 wing activitie

stern sectioMuswellbroos  reached  fey  present north westehern undergeous combu

the axis ofreas of  the removal of tOpen Cut 1. nd.  

rmation fros was  in anwere  locateis  drilling  po  DRE,  wh

g. Activitiesreporting pe

se and will om  currenthout  the  reken  on  theriod. 

with operatioes at the en

on of  the apok Anticlinefull width  afrom  the ern corner ground worustion.  

f the Muswold mine ethe steeply This will al

m these n area  in d  in the program ich  was 

s include eriod no 

be used t mining eporting e  topsoil 

ons able nd of the 

pproved e, which and will Fleming of Open rkings to 

ellbrook entrance  dipping so allow 

2015 An

Open CHeliers the  remoperatiundertaLamber Mining and rele Mining dump t 

Equipme

Excavato

Dump T

Front En

Blast Ho

Grader 

Water C

Dozer 

  

MUSWELL

nnual Environ

Cut 1 will coCollieries. maining  unng  experieaken  followrt Geotech P

operationsevant appro

is achievedrucks. The c

ent 

or 

ruck 

nd Loader 

ole Drill 

Cart 

LBROOK COAL

nmental Man

ontinue to e Site basedderground ence  gainewing  recomP/L. 

s at MCC arovals, lease

d through ocurrent flee

TaMode

HitachHydra

HitachHydra

Hitach

CAT 77

CAT 99

I.R. DM

CAT 16

Water70,000

CAT D

L COMPANY L

nagement Re

expose unded procedurepillar  coald  during  mmendation

re undertaks and licenc

open cut meet used for m

able 4: Minil 

hi EX3600 ulic Excavato

hi EX2600 ulic Excavato

hi 3500 (170 T

77C (85 Ton)

90H 

ML45 

6H Grader 

r Cart  (CAT 70 litre 

10T  

IMITED

eport

erground wes have beel.    These  pmining  pros  of  a  geo

ken  in accoces.   

ethods usinmining at M

ing Fleet UtNo 

or 2 

or  1 

Ton)  8 

)  3 

777) 2 

workings of ten developeprocedures ogress.    Ootechnical  s

rdance wit

ng excavatoMCC is provi

tilised at MWork A

Overburemova

Overburemova

Overburemova

Overbu

Coal st

Drillinginterbu

Surface

Dust su

Dumpsarea pr

the No. 2 Ued  to alloware  review

Open  cut  wstudy  comp

h  the Minin

rs, front‐ended in Table

CC Area 

urden, interbal 

urden, interbal 

urden, interbal 

urden, coal a

ockpile man

g for blastingurden and co

e preparatio

uppression, r

s, roads, coalreparation 

Undergrounw safe extrawed  to  refwall  designpleted  for 

ng Operatio

nd loaders ae 4.  

burden and c

burden and c

burden and c

and rejects 

nagement 

g in overburdoal 

n, road main

road mainte

l and overbu

d and St action of lect  the ns  were MCC  by 

ons Plan 

and rear 

coal 

coal 

coal 

den, 

ntenance 

nance 

urden 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

FFigure 1: Miningg Activities This Reporting Periood 

1

 

10 

2015 An

2.5 MMCC prcrushedby‐pass Coal  fromining and  harequire The CPPcoarse materiaDue  toSpontan 

2.6 WMCC opobjectivmanageIntegratincludesteel.   reducinreportinThere w Table 5 

January 

February

March 2

April 201

May 201

June 201

July 201

August 2

Septemb

October

Novemb

Decemb

 

MUSWELL

nnual Environ

MINERAL Produces thed and washeses the CPP 

om Open Cof the undes  a  capacitd’ basis. 

P uses a beland  fine  real  is quite do  the  amoneous Com

WASTE MAperate  in acve of  the We all wastested Waste s general wMCC  continng the amoung period wwere no sign

5 shows the 

Month 

2015 

y 2015 

2015 

15 

15 

15 

2015 

ber 2015 

r 2015 

ber 2015 

ber 2015 

LBROOK COAL

nmental Man

ROCESSINermal coal fed through directly to 

Cut 1  requirerground roty  of  appro

lt press filteeject materdry and ablount  of  cabustion Ma

ANAGEMENccordance wWMP  is  to ms on site. DManagemewaste, cardbnue  to  sepaunt of wastwith the upnificant cha

amount of 

TTota

L COMPANY L

nagement Re

G for both exCoal Prepathe product

res washingoadways.  Toximately  2

er to treat thrial will  be e  to be hanarbonaceouanagement 

NT with an appminimise  thuring the rent Service tboard and parate  and  rte going to dated WMnges to the

waste that 

Table 5: Waal Waste Rem

(tonnes)

106.42 

88.90 

94.29 

128.45 

113.64 

98.62 

111.73 

96.91 

97.93 

113.87 

95.79 

98.38 

IMITED

eport

port and doaration Plant stockpile.

g by  the CPThe CPP use240  tonnes

he fines or ttrucked  bandled  in  thus  materialPlan (SCMP

proved Washe amount eporting peto manage paper recycrecycle wasthe local laP being  impe WMP. 

 was remov

aste Streammoved 

omestic mant (CPP) whi

PP as a  resues a jig as ths  per  hour.

tailings comack  to  the e same ma,  disposal P). 

ste Manageof waste geriod MCC call waste stcling, co‐minste materiaandfill.  Theplemented 

ved from sit

m GeneratioTotal WastLandfill (ton

2.6 

2.6 

2.9 

2.6 

2.3 

2.5 

2.6 

2.0 

2.4 

2.4 

6.6 

3.0 

arkets. Highile low ash c

ult of dilutiohe main me.  The  CPP 

mponent of open  cuts nner as ovis  in  acco

ement Plan generated, continued ttreams genengled recycals when poWMP was on site on 

te during th

n te to nnes) 

P

h ash coal  iscoal is crus

on associatethod of sepis  used  on

the coal feefor  disposa

verburden mordance  w

(WMP).   Tand  to  respto maintainerated on scling, waste ossible,  to revised du1 Decembe

he reporting

Percentage RRecycle

97.5%

97.1%

96.9%

98.0%

98.0%

97.5%

97.7%

97.9%

97.5%

97.9%

93.1%

96.9%

11 

s mined, hed and 

ted with paration n  an  ‘as 

ed. Both al.    This material. with  the 

he main ponsibly n a Total site. This oil, and assist  in ring the er 2015.  

g period.   

Reused/ ed 

2015 An

2.7 PProductstockpilCreek Rloading 

2.8 PThe amo 

 

Topsoil 

Topsoil 

Topsoil 

Waste R

Open C

Underg

Total Co

Process

Open C

Underg

Total Pr

 

2.9 H

2.9.1 Diesel  f105,000listed  uWorkco 

2.9.2 MCC usand  syssystem transpooperatiintranetHealth a 

2.9.3 MCC hawith all

MUSWELL

nnual Environ

RODUCT Ct  coal  is  hles have a tRoad and thg. This coal i

RODUCTIOount of prod

Stripped (m

used/sprea

stockpiled 

Rock (BCM)

ut ROM Co

ground ROM

oal (t) 

sing Waste (

ut Product 

ground Prod

roduct Coal

HAZARDOU

Fuel Storagfuel  is store0L  each.  Thunder  MCCover NSW.  

ChemAlertse a web bastem  usersis  a  chemi

ortation,  usng procedut server. Auand Safety 

Explosives as a  licencel relevant  le

LBROOK COAL

nmental Man

COAL AND hauled  fromotal capacithe New Engs then trans

ON SUMMuction and a

Tab

m3) 

ad (m3) 

(m3) 

al (t) 

M Coal (t) 

(t) 

Coal (t) 

duct Coal (t)

 (t) 

US MATERI

ge ed  in three he  tanks  arC’s  License 

 System ased ChemA  can  accesical  hazard se  and  dispure for chemudits are unCommittee

e  to  supplyegislation u

L COMPANY L

nagement Re

TRANSPOm  the  prodty of 250,00land Highwsported to t

ARY associated w

le 6: Produc

At E

ALS MANA

Class C1 are  located  5for  Keepi

Alert systemss  the  datamanagemeposal  of  chmical selectndertaken w representa

and  store under Licenc

IMITED

eport

RT duct  bin  by00 tonnes. Pway to the Rthe port of 

waste generat

ction and W

nd of This RPeriod

7,765

34,057

7,004,9

1,705,93

1,705,93

277,76

1,428,17

1,428,17

AGEMENT

bove groun50m  from ing  Danger

m to managabase  from ent  tool  thhemicals.  Ation and uswith a focusatives. 

explosives ce Number

y  truck  to Product coaRavensworthNewcastle.

ted by MCC i

Waste Summ

PRODU

Reporting d 

 

16 

30 

30 

60 

70 

70 

nd, self bunany major rous  Goods

ge chemicathe MCC at  containsA  Dangeroue can be res on safe ch

and explosr XSPL10000

the  stockpal is truckedh Coal Term 

is detailed in

mary 

UCTION 

EstimateRepor

1

2

7,7

1,6

1,6

1

1,4

1,4

nded tanks, buildings.  Ts  No.  35/0

l use at theintranet  sits  informatious  Goods  meadily accesemical use 

sive precur02.   This sto

piles.  Five d off site viaminal (RCT) f

n Table 6. 

e, End of Nerting Period

14,000 

20,057 

743,924 

642,821 

642,821 

143,444 

499,377 

499,377 

 with a capThey  are  c021999,  iss

e mining opte.  The  Chon  on  the manifest  assed from tand storag

rsors  in accorage cons

12 

product a Muscle for train 

ext d 

pacity of currently sued  by 

peration emAlert storage, nd  safe the MCC e by the 

ordance ists of 2 

2015 An

externaexplosivbut  it  idangeroChemictotal loa 

2.10 WThe primmanageground during tNo chan The obj

Mee

Seplade

Use

Whesup

Allosuprequ

Wheund

Havmin

Monben

 

2.10.1 Volume 

Volum

Blues C

Brickw

Brickw

East Em

East Em

East Ha

Final Se

Dam 3 

MUSWELL

nnual Environ

al magazineve product is  not  comous  goods cals,  Licenceading servic

WATER MAmary objectement of owater resothe reportinnges were m

jectives of t

et the wate

arate cleanen) and con

e appropriat

ere  possibpression an

ow clean waplies  (fire  fuired and a

ere  possibderground m

ve nil dischanimising the

nitor surfacneficial use a

Water Stores of stored

es (m3) 

Crusher Dam

orks Dam 1  

orks Dam 2 

mplacement 

mplacement 

aul Road Dam

ettling Pond 

LBROOK COAL

nmental Man

s and an abcan also be

mmon  practon  the  p

e Number ce on site. 

ANAGEMENtive of the Sn‐site wateources, bothng period wmade to the

the SWMP a

er supply ne

n water runotaminated 

te sediment

le,  recycle nd wash dow

ater to flowfighting  sysllowed by h

ble,  and  wmines as mi

arge of saline risk of acci

ce and grouand underta

rage  water avai

m  

Dam South  

Dam North  

m  

L COMPANY L

nagement Re

bove grounde stored on ice  to  do  sremises  arNDG021999

NT Site Water Mr to minimh on and adwith no signe water man

are to: 

eds of the p

off producerunoff from

tation contr

and  reusiwn activitie

w through thstem  uses harvestable 

where  minne water st

ne mine wadental off s

undwater  toaking remed

lable at MC

TableStart Rep

2

7

5

2

2

2

SAL

IMITED

eport

d tank for rthe mobile so  as  this re  listed  u9.   A  blasti

Managemeise the  impdjacent to tificant channagement s

project; 

ed by undistm disturbed 

rols for dirty

ng  dirty  as; 

he catchmeraw mine rights; 

e  safety torages;  

ater by consite discharg

o determindial action w

CC are provi

e 7: Stored Wporting Perio

DIRTY WA

2,100 

7,500 

5,000 

2,500 

2,500 

2,200 

LINE OR MIN

raw materiaprocessingis  only  usender  MCC’ing  contrac

nt Plan (SWpact of minithe mine singes made tsystem duri

turbed catccatchment

y water; 

nd  contam

ent and usinwater)  and

permits,  u

taining all sge; and 

e significanwhere requ

ded in Tabl

Water od  End Re

ATER 

NE WATER 

als with 30,0 unit with aed  on  an  a’s  Notificatctor  is  emp

WMP) is to eing operatiote.   The SWto water mang the repo

chments fros; 

minated  min

ng clean wad  sensitive 

se  disused

saline mine

nt  impacts  tuired. 

e 7. 

eporting Per

6,472 

7,480 

5,935 

945 

1,296 

327 

3,330 

7,920 

000L capaca capacity oas  needs  btion  of  Haployed  to  ca

enable the eons on surfWMP was reanagementorting perio

om dirty (se

ne  water  f

ater for fire equipment

d  open  cu

e water on 

to water qu

riod  Stora

13 

ity. Bulk of 8,000L basis.  All azardous arry  out 

effective face and eviewed t on site.  d.   

ediment‐

for  dust 

fighting t  where 

uts  and 

site and 

uality or 

age Capacity

8,500 

30,000 

20,000 

10,000 

10,000 

5,400 

10,100 

8,000 

2015 An

Volum

Dam1 

Dam 2 

No.2 O

 

2.10.2 MCC hovolumewere co 

20BL

20BL

20BL

20BL

 

2.10.3 The  calbalancethe  extSiemen 

INPUTS

Ground

Surface

Entrain

Potable

Underg

TOTAL 

OUTPU

Entrain

Dischar

Dust Su

Dust Su

Evapora

Pumped

Septic P

TOTAL 

2015 Ba

 

2.11 ONo othe

MUSWELL

nnual Environ

es (m3) 

O/C Void 

Ground Waolds four  lices of groundonstructed d

Licen

L169014 (bo

L169037 (No

L169038 (No

L170473 (bo

Water Balalculated wae indicates atraction  of s MAG 800

d Water See

e Water Run

ment in Coa

e Water 

ground Wor

TS 

ment in Coa

rge Off Site 

uppression –

uppression –

ation from D

d to Counci

Pump Out 

alance 

OTHER INFRer managem

LBROOK COAL

nmental Man

ater Extractcences to edwater extraduring the r

ce No. 

orehole RDH

o.1 O/C Voi

o.2 O/C Voi

orehole RDH

ance ater  balanca water surwater  and0 battery p

epage 

noff and Da

al 

kings – Dew

al 

– water infu

– water cart

Dams 

l Void 

RASTRUCTment of infr

L COMPANY L

nagement Re

Start Rep

2

2

6

tion xtract grouacted in thireporting pe

Table 8: Gr

Ex

H529) 

d) 

d) 

H607) 

e  for  the  rplus for thewater moowered ma

Table 9: 

m Capture

watering Bo

usion and sp

ts 

TURE MANArastructure 

IMITED

eport

porting Perio

24,000 

20,000 

60,000 

nd water, us reporting eriod. 

roundwater

Reportingxtraction Vo

4.5

0

591

2,03

reporting  pee year.  MCCovements  aagflow mete

 Site Water

ores  

prays  

AGEMENToccurred du

od  End Re

under Part period are 

r Extraction

g Period olume (ML)

1.3 

6.5 

eriod  is  proC have instaround  site.ers. 

r Balance 

T uring this re

eporting Per

24,000 

20,000 

60,000 

5 of the Wshown Tab

) Extract(ML pe

2,00

ovided  in  Talled water     These m

ML/ye

0.0

178.

127.

2.7

2,041

2,350

ML/ye

138.

0.0

1,150

351.

126.

0.0

1.0

1,767

582.

eporting pe

riod  Stora

Water Act 19ble 8. No ne

tion Entitleer Annum L

1,000 

00 (combine

3,000 

Table  9.  Thmeters to m

meter  types 

ear  M

.8 

.5 

1.0 

0.0 

ear  M

.6 

0.3 

.5 

.2 

7.6 

.4 

riod.

14 

age Capacity

30,000 

20,000 

100,000 

912. The ew bores 

mentLimit) 

ed) 

e water measure include 

ML/day 

0.0 

0.5 

0.3 

0.0 

5.6 

6.4 

ML/day 

0.4 

0.0 

2.0 

1.0 

0.3 

0.0 

0.0 

4.8 

1.6 

2015 An

3.0   E

3.1 EIn ordevarious MCC mdetails o 

3.2 MDuring MonitoThis staMMS’s,providedata to  The  pritempertempertemperwere  seinversiosupplemthe  pumagnet 

Meteordata,  rmonito  

MUSWELL

nnual Environ

ENVIRONM

NVIRONMr to measurlicences, Mining areas.on the indiv

METEOROLthe  reporring Stationation is part,  located are  supplemea password

incipal MMrature,  rairature  inverature  fromelected dueon  to  be mentary MMrpose  of  itic north. 

rological darainfall  andring period 

LBROOK COAL

nmental Man

MENTAL M

MENTAL MAre complianMCC underta. The locatiovidual moni

LOGICAL rting  periodn (MMS) ont of the Rearound  the pental  informd protected

MS  providesnfall,  humersion.  Them  the princie  to  the 88extrapolat

MS’s providnterpreting

ata providedd  temperatwas 99.1%

L COMPANY L

nagement Re

MANAGEM

ANAGEMEnce with theakes a compons of the citoring prog

d,  MCC  con rehabilitatl Time Enviperimeter omation.  All  website th

s  10m  elevmidity,  bar  inversion pal MMS  am RL differted  and  rde 2m elevag  TEOM  an

d  in  this  reure  results. 

IMITED

eport

MENT AN

NT e managemprehensive current mongrams are p

ontinued  tted  land toronmental of  the minefour weath

hat is access

vation  windrometric  pcalculatio

and  the  suprence betwreported  oation wind snd  BAM  re

eport was  ss  are  summ

D PERFOR

ment plans, tmonitoringnitoring siterovided in t

o  maintaino the  immedMonitoringe property her  stationssible by MCC

  speed  andpressure  an  is  basedpplementarween  the sitover  a  10speed, direcesults.  Win

sourced  fromarised  be

RMANCE 

the developg program ines are showthe followin

n  a  principdiate west g System (RTat  the TEOs  continuouC personne

d  directionand  calculad  on  the y MMS  at tes, allowin0m  elevatction, and ad  direction

om  the prinelow.  Data 

pment consn the vicinit

wn in Figure ng sections.

pal  Meteorof the OpeTEMS). ThreOM and BAusly  relay wel.  

,  2m  elevaated  atmo2m  elevaSite 2.  The

ng  the  temption  intervair temperan  is  refere

ncipal MMS  recovery 

15 

sent and ty of the 2. More  

rological n Cut 1. ee other M  sites, weather 

ation  air ospheric tion  air ese  sites perature val.  The ature for nced  to 

S.   Wind for  the 

2015 An

MUSWELL

nnual Environ

LBROOK COAL

nmental Man

Figure 

L COMPANY L

nagement Re

2: Environm

IMITED

eport

mental Monitoring Locations 

16 

 

2015 An

3.2.1 Quarterthe pre 

MUSWELL

nnual Environ

Wind Speerly wind  rodominant w

LBROOK COAL

nmental Man

d and Direcses are prowind patter

L COMPANY L

nagement Re

ction  ovided  in Fins in the Hu

January

April 

IMITED

eport

igure 3. Theunter Valley

y – March W

l – June Wind

ese  results y. 

Windrose 

drose 

are generaally consiste

17 

ent with 

2015 An

 

3.2.2 Total rathe  lonMeteor

MUSWELL

nnual Environ

Rainfall ainfall recorng‐term  avrology (BOM

LBROOK COAL

nmental Man

rded duringverage  of M) site at Lo

L COMPANY L

nagement Re

July – Se

October –

Figure 3: 

g the repor620.8mm,ower Hill St

IMITED

eport

eptember W

– December 

Quarterly W

rting periodrecorded 

treet in Mu

Windrose 

Windrose 

Windroses

d was 627.8at  the  neswellbrook

8mm, whichearest  Aus. A summar

h  is consistestralian  Bury of rainfa

18 

ent with reau  of ll during 

2015 An

the repin Musw 

J

F

Se

O

No

De

 

3.2.3 MaximurecordeAustralimaximuTable 1 

J

F

Se

O

No

De

Su

MUSWELL

nnual Environ

orting periowellbrook, i

Month 

January 

February 

March 

April 

May 

June 

July 

August 

eptember 

October 

ovember 

ecember 

Total 

Temperatuum tempered was 0.0°ian Bureau um  and  ave11 and Figur

Month 

January 

February 

March 

April 

May 

June 

July 

August 

eptember 

October 

ovember 

ecember 

ummary 

LBROOK COAL

nmental Man

od, comparis provided 

MuswA

ure ature recor°C. This  is wof Meteoroerage montre 5. 

Tem

L COMPANY L

nagement Re

ed to the hin Table 10

Table 

wellbrook CActual (mm)

87.4 

13.6 

29.2 

125.1 

75.9 

24.2 

25.0 

52.6 

23.2 

35.6 

63.4 

72.6 

627.8 

rded duringwithin the  loology site atthly  tempe

Table 11

Minimum mperature (o

11.4 

12.6 

8.7 

6.3 

2.4 

0.0 

0.4 

0.2 

3.1 

9.0 

10.2 

11.2 

0.0 

IMITED

eport

istorical rai0 and Figure

 10: Rainfal

Coal ) 

MuA

g the reportong term mt Scone, ‐5.eratures  du

1: Temperat

oC)  Te

nfall at MCe 4.  

ll Data 

uswellbrookAverage (m

63.9 

87.0 

50.2 

29.6 

23.6 

69.7 

34.7 

32.9 

30.1 

39.2 

85.9 

58.5 

605.3 

ting period minimum an1°C and 44ring  the  re

ture Data 

Average emperature

23.9 

22.9 

22.0 

17.4 

14.3 

10.7 

10.0 

11.9 

14.1 

20.0 

21.7 

22.8 

17.6 

C and the c

k Coal m) 

M

was 39.0°Cnd maximu.2°C. A sumporting  per

e (oC)  T

closest BOM

MuswellbrooAverage (

69.6 

66.9 

52.8 

43.5 

41.5 

51.3 

44.2 

38.6 

40.7 

48.6 

56.1 

67.0 

620.8

C and the mm recorded

mmary of mriod  is  prov

MaximuTemperatu

36.1 

36.1 

39.0 

31.1 

25.7 

21.7 

19.4 

25.4 

28.2 

35.5 

38.9 

37.1 

39.0 

19 

M station 

ok BOM mm) 

minimum d by the inimum, vided  in 

um re (oC) 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figuure 4: Rainfall Graph 

2

 

20 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 5: Temperaturee Graph

2

 

21 

2015 An

3.2.4 Inversiothe Sanand  recmetres the groconditiofocusingconsidecooler m Over thdays  in are dispperiod w 

MUSWELL

nnual Environ

Inversion Mon strengthndy Creek Rcorded  tem(inversion sund.  A temons,  such g sound‐waered  to  be months. 

he reportingeach montplayed in Fiwith August

LBROOK COAL

nmental Man

Monitoring h  is measureRoad stationmperatures strength).  Tmperature inas  temperave propagastrong  and

g period, invth recordingure 6. A stt 2015 havi

L COMPANY L

nagement Re

ed betweenn (Site 2). Tare  used  tTemperatunversion is arature  inveation paths d  occur  prim

versions weg an  inverstrong inversng the high

IMITED

eport

n  the OpenThe sites hato  calculatres normalla temperatersion,  mayat a single marily  duri

ere monitorsion  level osion was rehest number

n Cut meteoave an eleve  the  temply decreaseure increasy  significanpoint.  Inveng  the  eve

ed and the f 3°C/100mecorded on r of days wi

orological sation differperature  dwith increae with heigtly  increasersions ovening  to  ea

daily maximm or greater168 days dth 22 days 

station  (Siterence of 88ifferential ase in heighght.  Meteorse  noise  ler 3°C per 10rly morning

mum recordr (strong  inuring the reabove 3°C/

22 

e 4) and 8 metres per  100 ht above rological evels  by 00m are g  in  the 

ded. The version) eporting 100m. 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 6: Teemperature Inveersion Graph 

223 

 

2015 An

3.3 A

3.3.1 During updatedimprovenetworsignifica The priimpact mitigatimining  Dust  caareas, ooutlined 

Areas dmining 

Coal HaStockpi

 

Haul ro

Minor r

Topsoil 

MUSWELL

nnual Environ

AIR QUALIT

Activities tthe  reportd DMP beiements to tk being ratiant changes

mary objecof  dust  frion measurgenerated 

an  be  geneor dust gend in Table 1

Source 

disturbed by

andling and le Areas 

Table

Source 

ad dust 

roads 

stockpiling

LBROOK COAL

nmental Man

TY MANAG

his Reportiting  periodng  implemthe Air Quaionalised.  Ts were mad

ctive of air om  the  opres have bedust source

erated  fromerated by m12 and Table

Table 12

Coal 

e 13: Contro

L COMPANY L

nagement Re

GEMENT 

ng Periodthe  Dust ented  in Dality MonitoThese change to the DM

quality maperations  oeen dividedes. 

m  two  primmining active 13. 

: Control Pr

Disturb onl

Reshape, toemplacemetipping. 

Maintain cowater cartsdust. 

Clean‐up af

Water cartssuppress du

ol Procedur

All roads ancarts to min

Long term material. 

Developmerequired by

Minor road

All topsoil sminimise th

Long term twill be reve

IMITED

eport

Managemeecember  2oring prograges are discMP. 

anagement n  the  envid  into  contr

ary  sourcesvities. The c

rocedures f

Cont

ly the minim

opsoil and rent areas af

oal handlings to minimis

fter any spi

s to operateust on road

res for Mini

Cont

nd traffic arnimise the g

haul roads 

ent of minoy mining. 

ds used regu

stockpiles whe area exp

topsoil stocegetated. 

ent  Plan  (D015.    The  ram with thecussed furth

at MCC  is ronment  arol procedu

s,  either wcontrol pro

for Wind Blo

trol Procedu

mum area n

rehabilitatefter the com

g areas in ase windblow

llage event

e around thdways and t

ing Generat

trol Procedu

reas will be generation 

will be shee

r roads will 

ularly for ac

will be locatposed to pre

ckpiles, not 

DMP)  was  rreview of  te depositionher in Sectio

to managend  nearby ures  for win

windblown  dcedures for

own Dust 

ures 

ecessary fo

completedmpletion of 

moist condwn and traff

he coal stockhe coal stoc

ted Dust So

ures 

watered usof dust. 

eted with ha

be limited 

ccess will be

ed and shapevailing win

used for ov

reviewed  wthe DMP  idnal dust moon 3.3.2.  N

e and minimresidences

nd‐blown d

dust  from  er these sou

or mining.  

d overburdeoverburden

dition usingfic generate

kpile area tckpiles. 

ources 

sing water 

ard wearing

to be only a

e watered. 

ped to nds. 

ver 6 month

24 

with  the dentified onitoring No other 

mise  the s.    Dust dust  and 

exposed rces are 

en n 

 ed 

as 

hs 

2015 An

Drilling 

Blasting

Raw Co

Coal HaPrepara 

Equipmcoal stoextracti Furthershort te As per the  repthe EnvThe  findthe asse 

3.3.2 The  revnetwor(HVAS),(BAM),  Deposit

Monitothe majmonitodust gaof the r 

MUSWELL

nnual Environ

Source 

oal Receival 

andling and ation Plant 

ment used  tockpiles), spion cyclone

r control prerm episodi

Condition Uporting perivironmentadings of thiessment sti

Air Qualityvised  Air  Qk consists o, Tapered EPM10 HVA

tional Dust G

ring deposijority of thered. Duringuge monitoreporting pe

Du

D2

D7

D1

D1

LBROOK COAL

nmental Man

Bin 

o control dprays at thes or water i

ocedures ac events. 

U1.1 of MCod.   This asl Assessmeis assessmell to be fina

y MonitoringQuality  Moof a combinlement OscS, and mete

Gauge Resu

itional duste reporting g the reportoring locatioeriod is show

Tab

ust Gauge 

10 

14 

L COMPANY L

nagement Re

Dust apron

Drills will bwater injec

Water injecwhen high 

Stemming w

Blasting wiManageme

Sprays are receival bin

Sprays are 

dust generaRaw Coal Rnjection sys

re  impleme

CC’s EPL anssessment nt to the aent were sualised by the

g nitoring  Nenation of dcillating Miceorological 

ults 

has occurrperiod 17 dting period ons were rawn in Table

ble 14: Curre

Curren

Decom

Still in 

Decom

Decom

IMITED

eport

Cont

ns will be low

e equippedction system

ction or duslevels of du

will be used

ll occur in aent Plan rela

to be used n during hig

fitted at tra

ation  includReceival Binstems on d

ented durin

n Exposed Lreviewed  tctual exposupplied to te EPA. 

etwork  is  depositionalcrobalancesmonitoring

red in the adust gaugesthe Dust M

ationalised. e 14. 

ent Status o

nt Status 

mmissioned

monitoring

mmissioned

mmissioned

trol Procedu

wered durin

d with dust ems. 

st suppressiust are bein

d at all time

accordance ating to me

when tippingh wind eve

ansfer point

e: water can, sprays at rill rigs. 

ng periods o

Land Assesshe predictesed surfacethe EPA  in t

displayed  in dust gauge (TEOM), Beg station. 

area surrouns positionedManagemen The status

of Dust Gau

 1 Decembe

g program 

 1 Decembe

 1 Decembe

ures 

ng drilling. 

extraction c

on sprays wg generated

es. 

with the Blateorologica

ng raw coalnts. 

ts. 

art  (sprays conveyor tr

of high dust

sment was ed exposed  area on 30the require

n  Figure  2es, High Voeta Attenua

nding MCC d around thnt Plan was of the dust

uges 

er 2015 

er 2015 

er 2015 

cyclones or 

will be usedd. 

ast‐Vibratioal condition

l into the 

on haul  roransfer poin

t emissions

undertaken surface ar0 Septembeed timefram

2.    The  moolume Air Sation Mass 

since 1983he operatios reviewed t gauges at 

25 

 

on s.  

ads and nts, dust 

and for 

n during ea  from er 2015.  mes with 

onitoring amplers Monitor 

. During ons were and the the end 

2015 An

 All  gaumaximudust ga All dustfor  anavegetatbasis of All gaugmonth‐2015  fofor 201Environresults  

Y

2

2

2013

2012

2011

2010* ‐ averag

 12‐monof  the Appendthe ava

MUSWELL

nnual Environ

Du

D1

D1

D1

D1

D1

D2

D2

D2

D2

D2

D2

D2

D3

ges  are  anum  for  depuge locatio

t gauges wealysis.  Samption,  are  exf field obser

ges complie‐rolling averor all monit5, historicanmental Assand backgr

Year 

2015 

2014 

3‐2014 

2‐2013 

1‐2012 

0‐2011 ge of all gaug

nth rolling adepositiondix 2. A conilable moni

LBROOK COAL

nmental Man

ust Gauge 

15 

16 

17 

18 

19 

20 

22 

23 

24 

26 

28 

29 

30 

nalysed  forpositional  dns are displ

ere sampledples with  exxcluded  frorvation and 

ed with therage dust dtoring sites l monitorinsessment.   ound levels

Table 15

AverageRe

(g/m2

es 

average andal  dust montour plot storing sites

L COMPANY L

nagement Re

Curren

Decom

Decom

Still in 

Still in 

Still in 

Decom

Still in 

Decom

Still in 

Still in 

Decom

Still in 

Decom

insoluble ust  on  nonlayed in Figu

d on a 30±2xcessive  coom  the  annlaboratory 

 maximum deposition  rwas 1.8g/mg results, bThe  resultss and are be

: Compariso

e Monitorinesults 2/month) 

1.8 

2.2 

2.1 

1.9 

1.7 

1.6 

d historical aonitoring  prhowing thes is shown in

IMITED

eport

nt Status 

mmissioned

mmissioned

monitoring

monitoring

monitoring

mmissioned

monitoring

mmissioned

monitoring

monitoring

mmissioned

monitoring

mmissioned

solids  andn‐mine  ownure 2. 

2 day cycle aontaminationual  averag analysis. 

annual dusrate  for  insm2/month. ackground s  in 2015 aelow the pre

on of Depo

ng Backg(g/

average valrogram  fore annual aven Figure 8.  

 1 Decembe

 1 Decembe

g program 

g program 

g program 

 1 Decembe

g program 

 1 Decembe

g program 

g program 

 1 June 201

g program 

 1 Decembe

  ash  residuned  land  is 

and sent to on,  includinge.  Contami

st criteria osoluble solid Table 15 results andare  consisteedicted resu

sitional Dus

ground Res/m2/month

1.8 

1.8 

1.8 

1.8 

1.8 

1.8 

ues are disp  the  reporerage dust  

er 2015 

er 2015 

er 2015 

er 2015 

er 2015 

ue.  The  an4.0g/m2/m

a NATA accg  bird  dropination  is  d

of 4g/m2/mods  from  Jancompares  t predictionsent with hisults from th

st Results 

sults )* 

EA

played in Figting  perioddeposition 

nnual  averamonth.  The 

credited labppings,  insedetermined

onth. The mnuary  to Dethe averages made in tstorical mohe EA. 

A Predicted (g/m2/mon

2.3 

2.3 

2.3 

2.3 

2.3 

2.3 

gure 7.  Thed  are  preseisopleths b

26 

age  EPA current 

boratory ects  and   on  the 

mean 12 ecember e  results he 2010 onitoring 

Results nth)* 

e results ented  in based on 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 7: Averrage Depositional Dust Results

2

 

27 

2015 An

The  conlevels d

MUSWELL

nnual Environ

ntour plot dropping the

LBROOK COAL

nmental Man

Figuindicates he further th

L COMPANY L

nagement Re

ure 8: Depoigher dust e location i

IMITED

eport

ositional Dudepositions from the 

st Contour   rates nearmining ope

Plot r  the mininrations. 

ng operatio

28 

 

ns, with 

2015 An

Total Su

Three Thave bethe EPAaccredit Annual 90µg/maverage11 dispresults  

Sit

1

2

3

All s 

Table 1results are beloEA.  

Y

2

2

2013

2012

2011

2010* ‐ averag

  

MUSWELL

nnual Environ

uspended P

TSP HVAS uneen operatiA nominateted laborat

Average  Tm3 at all sitee TSP value lay the 24‐his provided 

te AC

sites 

17 compareand predicow historic

Year 

2015 

2014 

3‐2014 

2‐2013 

1‐2012 

0‐2011 ge of all sites 

LBROOK COAL

nmental Man

articulates 

nits are locaional since ed six‐day  rory for ana

TSP  results s. The ratioat each mohour TSP rein Append

Annual Avoncentrat

29

29

32

30

es the averactions madecal monitori

Ta

AverageResult

4

4

L COMPANY L

nagement Re

(TSP) High 

ated at eachMarch 200un cycle. Flysis. The lo

for  the  reo of PM10 toonitoring locsults over tix 2. 

Table 

erage TSP ion (µg/m3

.8 

.7 

.9 

.8 

age results e  in  the 201ing results, 

able 17: Co

e Monitorins (µg/m3)*

30.8 

45.5 

39.4 

40.3 

31.9 

30.9 

IMITED

eport

Volume Air 

h of the thre05. Samplesilter papersocations of t

eporting  peo TSP on HVcation durinhe monitor

16: TSP Av

3) AnCr

for 2015, h10 Environmbackgroun

mparison o

ng  Backg

Samplers (H

ee real times are collecs are  then the HVAS ar

riod  were VAS run daysng the reporing period. 

erages 

nnual Averriteria (µg/

90 

90 

90 

90 

historical mmental Assed  levels an

of TSP Resu

ground Res(µg/m3)* 

41.4 

41.4 

41.4 

41.4 

41.4 

41.4 

HVAS) 

e dust monited over a collected are detailed 

below  the s is 47%. Taorting periodA compreh

age m3) 

monitoring ressment.   Td the predi

lts 

sults  EA

itoring stati24‐hour pend sent  to in Figure 2.

annual  criable 16 dispd. Figure 9 –hensive tabl

2015 DaRecover

100 

100 

100 

100 

results, bacThe  results icted result

A Predicted (µg/m3)

46.4 

46.4 

46.4 

46.4 

46.4 

46.4 

29 

ions and eriod on a NATA . 

iteria  of plays the – Figure e of TSP 

ata y % 

kground in 2015 ts  in the 

Results )* 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 9: Sitte 1 TSP Monitooring Results 

3

 

30 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 10: Siite 2 TSP Monitooring Results 

3

 

31 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 11: Siite 3 TSP Monitooring Results 

3

 

32 

2015 An

 Particul

Three runits coMCC pe The PMfaults, recoverperiod w There wthe 24‐storm tattributexceed averagepresentAppend 

Site 

A

 Table 1results are genand the 

Y

2

2

2013

2012

2011

2010* ‐ averag

 A PM10 unit opday  du

MUSWELL

nnual Environ

late Matter

real‐time PMontinuouslyersonnel. Th

M10 units arecommunicary  is  considwere 98% a

was one dayhour criterihat originattable to MCthe  30µg/

e  PM10  valuted  in Figurdix 2.  

Number 

ll sites 

19 compareand predicnerally conse predicted 

Year 

2015 

2014 

3‐2014 

2‐2013 

1‐2012 

0‐2011 ge of all sites 

HVAS unit erates on aring  the  re

LBROOK COAL

nmental Man

r <10µg (PM

M10 monitoy relay weathe locations

e continuouation  lossedered  essenacross the th

y during theia of 50µg/ted in southCC  it  is not /m3  annual ue  at  each re 12 – Fig

T

AnnuaConcen

es the averactions madeistent with results in th

Table 19

AverageResult

has been ea 6 day cycleeporting  pe

L COMPANY L

nagement Re

M10) 

oring units hther data tos of these u

us electronices,  power ntial  and  dhree units. 

e reporting m3.  This och‐west NSWa breach ocriteria  dusite  duringure 14. A  t

Table 18: Re

l Average Pntration (µg

14.9 

14.9 

13.7 

14.5 

age results e  in  the 201historical mhe EA. 

9: Comparis

e Monitorins (µg/m3)*

14.5 

16.9 

17.4 

18.3 

14.0 

14.1 

stablished we and is notriod where

IMITED

eport

have been o a passwornits are sho

c monitorinoutages  aata  recove 

period wheccurred on W and northf any condiuring  the  rg  the  reportable of  com

eal‐Time PM

PM10 g/m3) 

A

for 2015, h10 Environmmonitoring 

son of Real

ng  Backg

with the loct real‐time e  the  24  ho

operationard protectedown in Figur

ng systems tnd  maintery  levels  o

ere the 24 6 May 2015hern Victoriitions.   Thereporting  prting  periodmprehensiv

M10 Average

Annual Aver(µg/

3

3

3

3

historical mmental Asseresults, and

‐Time PM10

ground Res(µg/m3)* 

17.6 

17.6 

17.6 

17.6 

17.6 

17.6 

cation of thlike the othour  PM10  r

l since Mard website tre 2. 

that are subnance  dowbtained  du

hour PM10 5 and was ta.  As this r annual aveperiod.  Tabd with  the ve PM10  res

es 

rage Criteri/m3) 

monitoring ressment.   Td below the

0 Results 

sults  EA

his site shower PM10 unesult was  a

rch 2005.   Ahat is acces

bject to equwntime.  Higuring  the  re

results werthe result oresult is noterage PM10

le  18  dispresults  grasults  is prov

ia  DaRecov

10

9

9

9

results, bacThe  results e backgroun

A Predicted (µg/m3)

20.6 

20.6 

20.6 

20.6 

20.6 

20.6 

wn in Figurenits.  There wabove  the 

33 

All three ssible by 

uipment gh  data eporting 

re above of a dust  directly  did not lays  the aphically vided  in 

ata very % 

00 

kground in 2015 nd levels 

Results )* 

e 2. This was one 24‐hour 

2015 An

criteria westerldirectlyPM10 diaveragebeing d 

Site 

N

 Table 2results are  sliglevels b 

Y

2

2

2013

2012

2011

2010* ‐ averag

 

MUSWELL

nnual Environ

of 50µg/my winds.  Ay attributabid not excee  PM10  HVAisplayed in 

Number 

Nisbet 

21 compareand predicghtly  elevatbut are belo

Year 

2015 

2014 

3‐2014 

2‐2013 

1‐2012 

0‐2011 ge of all sites 

LBROOK COAL

nmental Man

m3.  This occAs the unit ible  to MCC eed the 30µAS  recordeFigure 15 a

AnnualConcen

es the averactions madeted  when  cw the level

Ta

AverageResult

L COMPANY L

nagement Re

curred on 20s on the noand  it  is noµg/m3 annud  over  theand Table 20

Table 20:

l Average Ptration (µg/

19.1 

age results e  in  the 201compared  ws predicted

ble 21: Com

e Monitorins (µg/m3)*

19.1 

19.1 

16.7 

16.2 

11.2 

10.6 

IMITED

eport

0 October 2orth‐westerot a breachal criteria de  reporting 0.  

: PM10 HVAS

PM10 /m3) 

A

for 2015, h10 Environmwith  histor in the EA.

mparison of

ng  Backg

2015 and wn side of thh of any conduring the period wa

S Average

Annual Aver(µg/

3

historical mmental Asserical monito

f PM10 Resu

ground Res(µg/m3)* 

17.6 

17.6 

17.6 

17.6 

17.6 

17.6 

was the resuhe operationnditions.   Treporting ps  19.1µg/m

rage Criteri/m3) 

monitoring ressment.   Toring  result

ults 

sults  EA

ult of stronns this resuThe annual period.   Them3 with  the

a  DaRecov

10

results, bacThe  results ts  and  bac

A Predicted (µg/m3)

20.6 

20.6 

20.6 

20.6 

20.6 

20.6 

34 

g north‐ult is not average e annual e  results 

ata very % 

00 

kground in 2015 kground 

Results )* 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 12: Site 1 PM10 Results  

3

 

35 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 13: Site 2 PM10 Results  

3

 

36 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 14: Site 3 PM10 Results  

3

 

37 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 15: PM10 HVAS Results 

3

 

38 

2015 An

3.3.3 During impacts 

3.4 GNo metthis repused  fomonito MCC  suGreenhreports 

3.5 E

3.5.1 During with thmade to The masoil fromThis is a

Sepcon

Red

Con

Conreha

Imp Two maCreeks.Howevedivertedwaterco Drainagfor  dus(major contain All distuwater ftypes o

MUSWELL

nnual Environ

Activities Nthe  next  rs in accorda

GREENHOUthane drainporting perior  gas  and ring purpos

upply  data house  and . 

ROSION A

Activities tthe  reporte updated o the ESCP.

ain objectivem the site aachieved th

arating  cletaminated 

ducing wate

ntrolling flow

nstructing seabilitated d

plementing 

ain natural   The  area er, some ofd  around ourses.  

ge from thest  suppressand minor n dirty runof

urbed or nerom catchmf banks con

LBROOK COAL

nmental Man

Next Reportreporting  pance with th

USE GAS age or ventiod. A numwater  mo

ses. 

to  IdemitEnergy  Re

ND SEDIM

his Reportiing period ESCP being  

e of the eroand its transrough the i

an  water  rrunoff from

r runoff vel

w volume a

ediment coisturbed ar

control stru

catchmentscontains  u

f the runoffmining  op

e coal crushion.  All  disgraded banff on the mi

ewly rehabiment areas anstructed: 

L COMPANY L

nagement Re

ting Perioderiod MCC he DMP. 

tilation issuber of boreonitoring.  T

tsu  for  theporting  (NG

MENT CONT

ng Periodthe  Erosionimplement

osion and sesport downmplementa

runoff  prodm disturbed 

ocity; 

nd path; 

ntrol dams eas to impr

uctures that

s exist in thundisturbedf  is captureerations  by

hing plant asturbed  or nks) to contine site.  

litated areaand to cont

IMITED

eport

 will  contin

es were asseholes  interThese  boreh

eir  corporatGER’s)  and

TROL 

n  and  Sedited in Dece

ediment constream, resation of the 

duced  by  ucatchment

at the baserove quality

t promote s

e area of md  land  surfed by damsy  diversion

and stockpilnewly  rehatrol the flow

as will contatain dirty ru

nue  to man

sociated wirsect the unholes  are  c

te  reportind  Energy  Ef

ment Contmber 2015

ntrol at MCsulting in sefollowing s

undisturbeds; 

e of rehabiliy of discharg

stable landf

mining, assofaces  that . Water  fron  banks,  a

e area  is coabilitated  aw of water 

ain diversiounoff on the

nage  and m

th the Openndergroundcapped  and

g  requiremfficiency  O

rol Plan  (ES.  No signifi

CC is to prevedimentatiotrategies: 

d  catchmen

tated emplged water; a

orms. 

ciated withdrain  towa

om undisturnd  channe

ollected  in aareas  contafrom catch

n banks to e mine site. 

monitor  air

n Cut operad workings d  opened  o

ments  for  Npportunitie

SCP) was  reicant chang

vent the eron of water

nts  from  d

acement arand 

h Muscle anards  Sandyrbed catchmelled  into  a

a dam and ain  diversiohment areas

control the There shal

39 

r  quality 

ations in that are only  for 

National es  (EEO) 

eviewed ges were 

osion of courses. 

irty  and 

reas and 

nd Sandy y  Creek. ments  is adjacent 

re‐used n  banks s and to 

e flow of l be two 

2015 An

Majpotevelomaimin

Minsite requvegeon prinaccu

 

3.5.2 Erosionmonito 

3.5.3 During sedime 

3.6 S

3.6.1 During GroundSGWMPimprovemonitoSWMP  The  revshown  

Site 

No 1 Vo

No 2 Vo

Dam 1/

MCC7 –Upstrea

MCC8 –Downst

MUSWELL

nnual Environ

jor graded bential for eocity and dintained  forning and reh

nor graded managem

uired in theetated slopthe  actua

nciples. Adeumulated se

Erosion andn  and  sedimring progra

Activities nthe next  rent impacts 

URFACE W

Activities tthe  report

dwater MonP  being  imements  to ring  netwoor SGWMP

vised monitin Figure 2.

oid 

oid 

/2 

– Muscle Cram 

– Muscle Crtream 

LBROOK COAL

nmental Man

banks – Therosion or srect water r  an  extendhabilitation 

banks – Thment  duringe long term pe which wil  requiremequate storaediment. 

d Sedimentment  contm.  Surface

next Reporteporting pein accordan

WATER MA

his Reportiting  period nitoring Promplemented

the  wateork  being  ra. 

toring  prog 

Table 

M

M

A

M

A

M

A

eek  M

A

eek  M

A

L COMPANY L

nagement Re

ey will be cocouring wilflow in a mded period ceases. 

ese are temg  the  first because a sill not requ

ments  of  thage will be 

t Control Mrol  monitoe water mon

ting Perioderiod MCC nce with the

NAGEMEN

ng Periodthe  Site W

ogram  (SGW  in  Decemer  monitoriationalised.

gram  is  sho

22: Surface

Monitoring 

Monthly 

Annually 

Monthly 

Annually 

Monthly 

Annually 

Monthly 

Annually 

Monthly 

Annually 

IMITED

eport

onstructed tll be rock‐li

more controand  are  in

mporary passtage  of  rsuccessful rire them. The  rehabiliprovided fo

Monitoringoring  is  connitoring is d

will  contine ESCP. 

NT 

Water ManaWMP) werember  2015. ing  progra.   No  other

own  in  Tab

e Water Mo

Frequency

to fall by upned or stablled mannentended  to 

sture furrowrehabilitatiorehabilitatioThe spacing itation  proor minor flo

nducted  asiscussed in 

ue  to mana

agement  Ple  reviewed   The  reviem  with  thr  significant

le  22.    The

onitoring Pr

y  Anal

pH, E

Com

pH, E

Com

pH, E

Com

pH, E

Com

pH, E

Com

p to 1.0%. Bbilised to rer.  Major grbe perman

ws which aon.  Pastureon strategy of minor b

ogram  and ows and tw

s  part  of  tSection 3.6

age  and mo

lan  (SWMPwith  the upew  of  the he  surface t  changes w

e  locations 

rogram 

ysis 

EC, TSS 

prehensive 

EC, TSS 

prehensive 

EC, TSS 

prehensive 

EC, TSS 

prehensive 

EC, TSS 

prehensive 

Banks that heduce wateraded banknent  featur

re used to e  furrows will result i

banks will bsoil  conse

wo to three 

the  surface6.2. 

onitor eros

P)  and  Surfpdated SWSGWMP  idand  grounwere made

of  these  s

 

 

 

 

 

40 

have the er runoff s will be res  after 

assist  in are  not in a well be based ervation years of 

e  water 

sion  and 

ace  and WMP and dentified ndwater e  to  the 

sites  are 

2015 An

Site 

MCC9 –

MCC12 Dam 

MCC23 Dam So

MCC24 Dam 

MCC25 Dam No

MCC26 Dam 

MCC27 

ComprepH, EC, BicarboCd, Cr, C

Annual Quarter

 During MCC11,collecte 

3.6.2 The surare  shosurface pH The pHecosystresults periodscompar 

Loca

Dam

MCC1Settlin

No.2 OVo

MUSWELL

nnual Environ

– Brickwork

– Final Sett

– E. Emplacouth 

– East Hau

– E. Emplacorth 

– Blues Cru

– Dam 3 

ehensive anTSS, Hardn

onate, NitraCu, Ni, Pb, Z

analysis is urly analysis 

the  report, MCC17 aned until then

Surface Warface waterown  graphic water mon

  levels  at  stem pH levefrom  this  rs.    There  are these res

T

ation 2

m 1/2 

12 Final ng Pond 

Open Cut oid 

LBROOK COAL

nmental Man

M

s Dam  Q

A

tling  M

A

cement  Q

A

l Road  Q

A

cement  Q

A

usher  Q

A

Q

A

nalysis moniness, Ca, Mgte, Oil and gZn, Hg, Se, T

undertakenis undertak

ting  periodnd MCC18.  n presented

ater Monitor pH, Electrically  in  Figunitoring resu

surface watels of 6.5 – 9reporting pre  no  backsults to. 

Table 23: Co

2010‐2011  

7.6 

8.1 

7.6 

L COMPANY L

nagement Re

Monitoring 

Quarterly 

Annually 

Monthly 

Annually 

Quarterly 

Annually 

Quarterly 

Annually 

Quarterly 

Annually 

Quarterly 

Annually 

Quarterly 

Annually 

itors for theg, Na, K, Sulfgrease, AmTPH, PAH 

n in March eken in June, 

d  monthly These sitesd in this AEM

oring ical Conducure  16  –  Fiults are pro

ter monitor9.5 througheriod are  ckground  re

omparison 

2011‐2012

7.6 

8.1 

7.6 

IMITED

eport

Frequency

e following:fate, Chlorimonia, Diss

each year  September

monitorings were decoMR. 

ctivity (EC) igure  21.  Tovided in Ap

ring  sites whout the repconsistent wsults  or  En

of pH ResupH Ann

2012‐201

7.8 

8.1 

7.9 

y  Anal

pH, E

Com

pH, E

Com

pH, E

Com

pH, E

Com

pH, E

Com

pH, E

Com

pH, E

Com

 de, Flouridesolved Fe, T

r and Decem

g  was  also ommissione

and Total SThe data  anppendix 3. 

were  generaporting periwith  the  renvironment

lts to Histonual Averag

13  2013‐2

7.8

8.3

8.0

ysis 

EC, TSS 

prehensive 

EC, TSS 

prehensive 

EC, TSS 

prehensive 

EC, TSS 

prehensive 

EC, TSS 

prehensive 

EC, TSS 

prehensive 

EC, TSS 

prehensive 

e, CarbonatTotal Fe, Mn

mber each y

conductedd in Decem

Suspended nd  the  annu

ally within iod.  As shosults  from al  Assessm

rical Resulte 

014  20

7

8

8

 

 

 

 

 

 

 

te, n, As, Ba, B, 

year 

d  at  sites mber 2015 w

Solids (TSSual  compre

the  recomown in Tableprevious  re

ment  predic

ts 

014  

7.7 

8.3 

8.1 

41 

MCC10, with data 

) results ehensive 

mended e 23 the eporting tions  to 

2015  

7.7 

8.3 

7.9 

2015 An

Loca

No.1 OVo

MC

MCC07Creupst

MCC08Cre

down

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

 ElectricTypicallsurrounthe  envwatercolevels d As showfrom  pAssessm 

Loca

Dam

MCC1Settlin

MUSWELL

nnual Environ

ation 2

Open Cut oid 

CC06 

7 Muscle eek – tream 

8 Muscle eek ‐ stream 

CC10 

CC11 

CC17 

CC18 

CC9 

CC13 

CC23 

CC24 

CC25 

CC26 

CC27 

al Conductily, EC levelsnding watervironment ourses  are during wet p

wn  in Tableprevious  rement predic

T

ation 2

m 1/2 

12 Final ng Pond 

LBROOK COAL

nmental Man

2010‐2011  

7.7 

not sampled 

not sampled 

not sampled 

not sampled 

not sampled 

not sampled 

not sampled 

8.0 

not sampled 

8.9 

8.6 

8.0 

8.4 

8.5 

ivity (EC) s for mine wrcourses.   Afrom  EC  linfluenced

periods. 

e 24 the resporting  pections to co

Table 24: Co

2010‐2011 

5,818 

6,760 

L COMPANY L

nagement Re

2011‐2012

7.7 

not sampled 

not sampled 

not sampled 

not sampled 

not sampled 

not sampled 

not sampled 

8.1 

7.9 

8.2 

8.4 

7.9 

8.3 

8.3 

water are gAs mine waevels  in  m  by  rainfal

sults from triods.    Thempare thes

omparison Electrica

2011‐2012

5,818 

6,760 

IMITED

eport

pH Ann

2012‐201

7.8 

7.9 

7.8 

7.9 

7.8 

7.1 

8.0 

no result

8.3 

8.0 

8.8 

8.3 

no result

8.4 

8.3 

greater thanater  is not dmine  waterl with  high

this reportinere  are  nose results to

of EC Resul Conductivi

2012‐201

5,886

8,836

nual Averag

13  2013‐2

7.7

7.7

7.8

7.8

7.9

7.4

7.9

ts  no resu

8.6

8.0

8.6

8.2

ts  7.5

8.7

8.2

n 4,000μS/cdischarged   dams.    Ther  levels  d

ng period ao  backgrouo. 

lts to Histoty Annual Av

13  2013‐2

5,97

8,35

014  20

no re

7

7

7

7

no re

7

ults  no re

8

8

9

8

no re

8

8

cm, with lowoff site theThe  EC  leveduring  dry 

are consistend  results 

rical Resultverage (µS/c

014  20

5  6,1

9  8,5

014  

esults  no

7.6 

7.8 

7.9 

7.9 

esults  no

7.9 

esults  no

8.7 

8.1 

.3 

8.0 

esults 

8.9 

8.4 

wer levels fere  is no  imels  in  surrperiods  an

ent with theor  Environ

ts cm) 

014  

133  6

530  7

42 

2015  

 results 

7.8 

7.9 

7.9 

7.9 

 results 

8.0 

 results 

8.7 

7.8 

9.2 

7.7 

7.6 

8.3 

8.0 

found in mpact on ounding d  lower 

e results nmental 

2015 

6,337 

7,523 

2015 An

Loca

No.2 OVo

No.1 OVo

MC

MCC07Creupst

MCC08Cre

down

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

 Total SuTSS  ressedimefrom  Tinfluencdry whe As showfrom  pAssessm 

MUSWELL

nnual Environ

ation 2

Open Cut oid 

Open Cut oid 

CC06 

7 Muscle eek – tream 

8 Muscle eek ‐ stream 

CC10 

CC11 

CC17 

CC18 

CC9 

CC13 

CC23 

CC24 

CC25 

CC26 

CC27 

uspended Sosults  in  sitent.   As  thisSS  levels  inced by rainen water lev

wn  in Tableprevious  rement predic

LBROOK COAL

nmental Man

2010‐2011 

5,285 

4,365 

not sampled 

not sampled 

not sampled 

not sampled 

not sampled 

not sampled 

not sampled 

8,186 

not sampled 

8,192 

6,710 

3,703 

5,524 

8,950 

olids (TSS) e  dams  cans water  is nn  mine  wafall with higvels are low

e 25 the resporting  pections to co

L COMPANY L

nagement Re

Electrica

2011‐2012

5,285 

4,365 

not sampled 

not sampled 

not sampled 

not sampled 

not sampled 

not sampled 

not sampled 

4,833 

2,820 

2,760 

3,475 

1,837 

5,643 

7,763 

n  be  influenot dischargater  dams. gher  levels w.  Lower lev

sults from triods.    Thempare thes 

IMITED

eport

l Conductivi

2012‐201

5,941

5,030

4,449

2,064

2,800

9,380

1,000

6,865

no result

4,718

4,173

3,110

5,278

no result

6,300

10,175

nced  by wged off site  The  TSSduring wetvels are fou

this reportinere  are  nose results to

ty Annual Av

13  2013‐2

6,26

5,53

5,46

2,84

3,67

9,34

725

7,81

ts  no resu

4,04

3,73

1,95

3,93

ts  1,74

4,86

9,58

water move  there  is nolevels  in  st periods wund during “

ng period ao  backgrouo. 

verage (µS/c

014  20

7  6,4

3  no re

9  5,3

3  4,7

2  5,2

0  10,

  no re

7  9,2

ults  no re

3  3,9

0  3,9

3  2,0

3  3,8

0  no re

8  6,6

8  9,4

ments  and o  impact onurrounding here there “normal” co

are consistend  results 

cm) 

014  

465  6

esults  no

347  3

780  2

207  3

208  1

esults  no

260  4

esults  no

900  4

970  1

080  1

840  3

esults  1

615  4

405  8

  runoff  stirn  the envirg  watercouris runoff oonditions. 

ent with theor  Environ

43 

2015 

6,526 

 results 

3,731 

2,887 

3,185 

10,467 

 results 

4,860 

 results 

4,985 

1,020 

1,950 

3,940 

1,533 

4,133 

8,273 

rring  up ronment rses  are r during 

e results nmental 

2015 An

 

Loca

Dam

MCC1Settlin

No.2 OVo

No.1 OVo

MC

MCC07Creupst

MCC08Cre

down

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

MC

  

MUSWELL

nnual Environ

T

ation 2

m 1/2 

12 Final ng Pond 

Open Cut oid 

Open Cut oid 

CC06 

7 Muscle eek – tream 

8 Muscle eek ‐ stream 

CC10 

CC11 

CC17 

CC18 

CC9 

CC13 

CC23 

CC24 

CC25 

CC26 

CC27 

LBROOK COAL

nmental Man

Table 25: Co

2010‐2011 

16 

19 

21 

86 

not sampled 

not sampled 

not sampled 

not sampled 

not sampled 

not sampled 

not sampled 

14 

not sampled 

34 

14 

41 

26 

L COMPANY L

nagement Re

omparison oTotal Sus

2011‐2012

16 

19 

21 

86 

not sampled 

not sampled 

not sampled 

not sampled 

not sampled 

not sampled 

not sampled 

21 

13 

31 

IMITED

eport

of TSS Resuspended Sol

2012‐201

13 

18 

18 

16 

11 

14 

12 

<5 

158 

no result

10 

19 

15 

21 

no result

16 

13 

ults to Histolids Annual A

13  2013‐2

14

22

20

13

20

16

13

95

28

43

ts  no resu

11

10

20

13

ts  13

15

14

orical ResultAverage (mg

014  20

7

1

1

no re

2

1

1

3

no re

2

ults  no re

4

7

1

1

no re

4

3

ts g/L) 

014 

16 

12 

esults  no

22 

11 

10 

32 

esults  no

23 

esults  no

71 

18 

14 

esults 

42 

31 

44 

2015 

11 

18 

12 

 results 

13 

 results 

18 

 results 

33 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figuree 16: Monthly Suurface Water Monitoring Resultts – pH 

4

 

45 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 17:: Monthly Surfacce Water Resultts – Electrical Coonductivity 

4

 

46 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 18: Monthly Surfacce Water Results – Total Suspennded Solids 

4

 

47 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

FFigure 19: Quartterly Surface Waater Results – pH

4

 

48 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

F

OMPANY LIMITED

gement Report

Figure 20: Quartterly Surface Waater Monitoringg Results – Electrrical Conductivitty

4

 

49 

 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

F

OMPANY LIMITED

gement Report

igure 21: Quarteerly Surface Waater Monitoring Results – Total Suspended Solids 

5

 

50 

2015 An

3.6.3 During impacts 

3.7 G

3.7.1 During GroundSGWMPimprovemonitoSWMP  The  revshown  

Site 

RDH607

RDH616

RDH617

RDH624

RDH650

MCC10

MCC10

MCC10

MCC10

MCC10

MCC10

ComprepH, EC, BicarboCd, Cr, C

Annual 

 During MCC10Decemb 

MUSWELL

nnual Environ

Activities nthe next res in accorda

GROUNDW

Activities tthe  report

dwater MonP  being  imements  to ring netwoor SGWMP

vised monitin Figure 2.

7/RDH529 

03 

05 

06 

15 

17 

18 

ehensive anTSS, Hardn

onate, NitraCu, Ni, Pb, Z

analysis is u

the  report08A,  MCC1ber 2015 w

LBROOK COAL

nmental Man

next Reporteporting peance with th

WATER MAN

his Reportiting  period nitoring Promplemented

the  wateorks being  r. 

toring  prog 

Table

M

M

A

M

M

M

M

M

A

M

A

M

A

M

A

M

M

nalysis moniness, Ca, Mgte, Oil and gZn, Hg, Se, T

undertaken

ing period 1009,  MC1ith data col

L COMPANY L

nagement Re

ting Periodriod MCC whe SWMP an

NAGEMEN

ng Periodthe  Site W

ogram  (SGW  in  Decemer  monitorirationalised

gram  is  sho

26: Ground

Monitoring 

Monthly 

Annually 

Monthly 

Monthly 

Monthly 

Monthly 

Monthly 

Annually 

Monthly 

Annually 

Monthly 

Annually 

Monthly 

Annually 

Monthly 

Monthly 

itors for theg, Na, K, Sulfgrease, AmTPH, PAH 

n in March e

monitoring010  and  Mlected until

IMITED

eport

will continund SGWMP

NT 

Water ManaWMP) werember  2015. ing  prograd.   No othe

own  in  Tab

dwater Mo

Frequency

e following:fate, Chlorimonia, Diss

each year 

g was also  cMCC1012. l then prese

e to managP. 

agement  Ple  reviewed   The  reviem  with  ther  significan

le  26.    The

nitoring Pro

y  Anal

Dept

Com

Dept

Dept

Dept

Dept

Dept

Com

Dept

Com

Dept

Com

Dept

Com

Dept

Dept

 de, Flouridesolved Fe, T

conducted   These  sitented in this

ge and mon

lan  (SWMPwith  the upew  of  the he  surface nt  changes 

e  locations 

ogram 

ysis 

th, pH, EC 

prehensive 

th 

th 

th 

th 

th, pH, EC 

prehensive 

th, pH, EC 

prehensive 

th, pH, EC 

prehensive 

th, pH, EC 

prehensive 

th 

th 

e, CarbonatTotal Fe, Mn

at  sites MCes  were  ds AEMR. 

nitor surfac

P)  and  Surfpdated SWSGWMP  idand  grounwere made

of  these  s

 

 

 

 

 

te, n, As, Ba, B, 

CC1001, Mdecommissio

51 

ce water 

ace  and WMP and dentified ndwater e  to  the 

sites  are 

CC1004, oned  in 

2015 An

Water groundwdistanceSectionMCC’s implem 

3.7.2 Ground

The waFigure 2are  sholevels  ogroundw As  showresults previouare  no results t 

    

MUSWELL

nnual Environ

Licence 20Bwater frome between n 3.7.2 demmining  ope

ment measur

Groundwatd Water Mo

ater  level, p23 and Figuown  in Figuor  quality  dwater mon

wn  in  Tablefrom  prev

us results anbackgrounto. 

T

Year 

2012‐201

2013‐201

2014 

2015 

LBROOK COAL

nmental Man

BL169014 hm entering talluvial  lan

monstrates  terations.    Bres to preve

ter Monitonitoring Res

pH and Elecure 24.  Theure 25.   Theduring  the itoring resu

e  27  the  pvious  repornd the watend  results  o

Table 27: C

A

13 

14 

L COMPANY L

nagement Re

has a  requihe mine wonds and  thethat  there Based  on  thent alluvial 

ring sults – Mini

ctrical Conde water leveese  results reporting 

ults are prov

pH  results  frting  perioder  levels aror  Environm

omparison 

Average pH

7.6 

7.1 

7.3 

7.3 

IMITED

eport

rement  to orkings.  Ase mining ophas been nhis  informagroundwat

ing Operatio

ductivity of els in grounshow  thereperiod.    Thvided in App

from  this  reds.    Electrire generallymental  Ass

 of Undergr

H Ave(μ

implements shown in Fperations.   no  impact otion  there er from ent

ons 

the undergndwater moe has beenhe  data  anpendix 3. 

eporting  pecal  Conducy consistentsessment  p

round Work

erage EC μS/cm) 

5,711 

5,078 

5,525 

6,196 

measures Figure 22 thMonitoringon  alluvial has  been  ntering the m

ground woronitoring wminimal  fld  the  annu

eriod  are  cctivity  is  slt with previredictions 

king Results

Relative(AHD

12

11

to preventhere is a sigg data presegroundwatno  requiremmine workin

rking are  shwells locateductuation  iual  compre

consistent wlightly  highious resultsto  compar

ve Level (RL)D metres) 

23‐146 

15‐117 

116 

114 

52 

t alluvial gnificant ented  in ter  from ment  to ngs. 

hown  in d on site n water ehensive 

with  the her  than s.   There re  these 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 222: Location of Allluvial Land Commpared to Mine Workings 

5

 

53 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Fiigure 23: Water Level for Underrground Workinngs

5

  

54 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figurre 24: Water Quuality Data in Unnderground Worrkings

5

  

55 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 25: Water Leveel for Groundwaater Monitoring on Site 

5

 

56 

2015 An

Ground

The allufrom thand  qucompre As showthe  resEnviron 

Loca

MCC

MCC

MCC

MCC

MCC

MCC

MCC

MCC

MCC

MCC

MCC

MCC

 

Loca

MCC

MCC

MCC

MCC

MCC

MCC

MCC

MCC

MCC

MCC

 

Loca

MCC

MCC

MCC

MCC

MCC

MUSWELL

nnual Environ

d Water Mo

uvial and hahe open cutuality  resultehensive gro

wn  in Tablesults  from nmental Ass

ation 2

C1001 

C1003 

C1004 

C1005 

C1006 

1008A 

C1009 

C1010 

C1012 

C1015 

C1017 

C1018 

T

ation 2

C1001 

C1003 

C1004 

C1005 

C1006 

1008A 

C1009 

C1010 

C1012 

C1015 

T

ation 2

C1001 

C1003 

C1004 

C1005 

C1006 

LBROOK COAL

nmental Man

nitoring Res

ard rock aqt  footprint ts  are  presoundwater 

e 28 – Tableprevious 

sessment pr

Table 28:

2010‐2011  

7.4 

3.2 

8.2 

7.2 

5.6 

4.4 

5.2 

1.7 

6.0 

3.6 

17.3 

17.5 

Table 29: Co

2010‐2011  

7.4 

7.4 

6.6 

7.4 

7.3 

7.5 

7.7 

7.6 

7.4 

7.3 

Table 30: Co

2010‐2011 

1,108 

1,434 

2,668 

2,635 

1,095 

L COMPANY L

nagement Re

sults – Sand

uifers in thand no  impsented  in  Fmonitoring

e 30 the rereporting redictions to

Compariso

2011‐2012 

6.6 

2.5 

7.3 

6.7 

4.4 

3.8 

4.6 

1.2 

5.4 

3.6 

17.0 

17.0 

omparison 

2011‐2012 

7.2 

7.3 

6.8 

7.4 

7.3 

7.3 

7.6 

7.6 

7.6 

7.1 

omparison Electrica

2011‐2012

777 

1,410 

2,670 

1,579 

933 

IMITED

eport

dy Creek Are

e Sandy Crepacts have Figure  26  –g results are

sults from periods.   o compare 

on of DepthDepth Annu

2012‐201

7.9 

3.8 

8.2 

7.3 

5.7 

5.4 

5.7 

1.4 

6.2 

3.8 

17.0 

16.6 

of pH ResupH Ann

2012‐201

7.1 

7.2 

6.7 

7.1 

7.1 

7.4 

7.7 

7.6 

7.4 

7.1 

of EC Resul Conductivi

2012‐201

1,086

1,359

2,200

1,947

1,087

ea 

eek area arbeen deter–  Figure  28e provided i

this reportiThere  arethese resul

h to Historicual Average (

13  2013‐2

8.1

4.5

8.8

7.8

6.5

5.5

6.3

1.5

6.3

3.6

17.1

16.7

lts to Histonual Averag

13  2013‐2

7.2

7.3

6.7

7.2

7.2

7.4

7.7

7.6

7.5

7.1

lts to Histoty Annual Av

13  2013‐2

1,12

1,48

2,20

2,54

1,11

e a significarmined. Gro8.    The  datn Appendix

ng period ae  no  backgts to. 

cal Results (mbgl) 

014  20

9

5

9

8

no re

6

7

1

6

3

1  16

7  16

rical Resulte 

014  20

7

7

6

7

no re

7

7

7

7

7

rical Resultverage (µS/c

014  20

2  1,1

0  1,7

8  2,1

4  2,6

7  no re

ant lateral dound waterta  and  thex 3. 

are consisteground  res

014  

.3 

.8 

.6 

8.3 

esult  no

6.8 

7.1 

.7 

6.8 

.7 

6.8 

6.8 

ts 

014  

7.3 

7.2 

6.9 

7.2 

esult  no

7.5 

7.9 

7.9 

7.5 

7.1 

ts cm) 

014  

123  1

701  1

105  2

697  2

esult  no

57 

distance r depths e  annual 

ent with sults  or 

2015  

7.9 

3.6 

8.4 

7.9 

o result 

5.0 

6.1 

1.7 

6.3 

3.7 

17.1 

17.3 

2015  

7.0 

7.2 

6.6 

7.1 

o result 

7.3 

7.6 

7.7 

7.3 

7.2 

2015 

1,114 

1,345 

2,731 

2,768 

o result 

2015 An

Loca

MCC

MCC

MCC

MCC

MCC

   

MUSWELL

nnual Environ

ation 2

1008A 

C1009 

C1010 

C1012 

C1015 

LBROOK COAL

nmental Man

2010‐2011 

934 

1,233 

6,298 

1,574 

2,417 

L COMPANY L

nagement Re

Electrica

2011‐2012

1,059 

1,126 

5,725 

1,272 

2,531 

IMITED

eport

l Conductivi

2012‐201

1,174

1,332

5,805

1,355

2,169

ty Annual Av

13  2013‐2

1,01

1,40

5,98

1,49

2,45

verage (µS/c

014  20

2  1,3

9  1,4

0  6,5

5  1,9

2  2,4

cm) 

014  

323  1

472  1

520  5

908  1

402  2

58 

2015 

1,076 

1,264 

5,860 

1,990 

2,659 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 26: Sanndy Creek Grounndwater Depth

5

 

59 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 27: Sanndy Creek Wateer Quality – pH

6

 

60 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 228: Sandy Creek Water Quality –– Electrical Condductivity 

6

 

61 

2015 An

Trigger 31.   A gfluctuatlevel ovwill alsomonitoregularlevels  a±0.5pH if monimonthlythe rep 

Bore/

MCC

MCC

MCC

MCC

MCC

MCC

Bore/

MCC

MCC

MCC

MCC

Bore/

MCC

MCC

MCC

MCC

 A sectioin  Figurconsequbeen de

MUSWELL

nnual Environ

levels havegroundwatetes by greaver a 3 mono need to bring bores fly analysed are  set  at  aunits fromitored  condy results. Torting perio

Tab

/Well 

1003 

1005 

1006 

1015 

1017  H

1018  H

/Well 

1003 

1005 

1006 

1015 

/Well 

1003 

1005 

1006 

1015 

onal plan dere  29.  To  auences to developed an

LBROOK COAL

nmental Man

e been estaer  level  trigater  than 5%nth period. be at a levelfor each aqat the groua  variation  the baselinditions  are Table 31 shood. 

le 31: Sand

Aquifer 

Alluvial 

Alluvial 

Alluvial 

Alluvial 

Hardrock 

Hardrock 

Aquifer 

Alluvial 

Alluvial 

Alluvial 

Alluvial 

Aquifer 

Alluvial 

Alluvial 

Alluvial 

Alluvial 

epicting theassist  in  dede‐pressurisnd is presen

L COMPANY L

nagement Re

blished for gger will be%  from  theIn additionl that is deeuifer.  Electundwater mof  >15%  frne minimumoutside  thows that th

y Creek Gro

WA

Lower TriggerLevel (m)TOC

2.17 

6.27 

4.00 

3.27 

14.71

14.10

Lower Trigger p

6.3 

5.9 

6.2 

6.3 

ELECTRICA

Lower Trigger E

876 

1,513

765 

1,494

e location oetermining sation in thented in Figu

IMITED

eport

selected site  initiated  ife historical n, to initiateeper than thtrical Condu

monitoring srom  the  bam and maxihe  upper  ohere was no

oundwater

ATER LEVELS

LowTrig

Exce

N

N

No Re

N

N

N

pH 

pH 

LowTrig

Exce

N

N

No Re

N

AL CONDUC

EC 

LowTrig

Exce

N

N

No Re

N

of the monitif  any  revee ground wure 30. The t

tes with thef  the grounminimum ae the triggerhe natural vuctivity (ECsites to monaseline minimum pH.  Tor  lower  trio exceedan

Monitoring

wer gger eeded 

NO 

NO 

esults 

NO 

NO 

NO 

wer gger eeded 

T

NO 

NO 

esults 

NO 

CTIVITY 

wer gger eeded 

T

NO 

NO 

esults 

NO 

toring sitesersal  in  growater is occutransect gra

e trigger levndwater  levand maximur, the reducvariability m) and pH arnitor water nimum  and The trigger igger  levelsce of the tr

g Trigger Le

Upper Trigger Level (m)TOC 

8.34 

11.46 

10.14 

13.97 

18.53 

19.69 

Upper rigger pH 

8.8 

8.3 

8.1 

8.1 

Upper Trigger EC 

2,461 

7,533 

1,610 

3,726 

in Sandy Cound water urring, a cataph clearly i

vels shown vel  in a piezum standinction in watmeasured are the mainquality. Themaximum levels are s  for  3  conrigger  level

evels 

UpperTrigger

Exceede

NO 

NO 

No Resu

NO 

NO 

NO 

UpperTrigger

Exceede

NO 

NO 

No Resu

NO 

UpperTrigger

Exceede

NO 

NO 

No Resu

NO 

Creek area ir  gradient  otenary tranindicates no

62 

in Table zometer ng water ter level cross all n species e trigger EC  and initiated ntinuous s during 

 r ed 

lts 

 r ed 

lts 

 r ed 

lts 

s shown or  other sect has o sign of 

2015 An

a  drawmonitoaquifers 

3.7.1 During impacts 

3.8 CDuring Old Pit of  signreportin  

MUSWELL

nnual Environ

‐down  effering  data  ts. 

Activities nthe next  res in accorda

ONTAMINthe  reportiTop area loificant  conng period. 

LBROOK COAL

nmental Man

ect  in  the  Sthere  appea

next Reporteporting peance with th

NATED LANing period ocated in Mtamination

L COMPANY L

nagement Re

Sandy  Creekars  to  be  n

ting Perioderiod MCC whe SWMP an

ND MCC under

Muswellbroo.    MCC  wi

IMITED

eport

k  area  durino  connect

will continund SGWMP

rtook a Phaok.  This assill  continue

ing  the  repion  betwee

ue  to manaP. 

ase 2 Contasessment foe  to  manag

porting  perien  the  alluv

age and mo

amination Aound that thge  this  lan

iod.    Basedvial  and  ha

onitor groun

Assessmenthere were nd  during  t

63 

d  on  the ard  rock 

ndwater 

t on  the no areas he  next 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 29: Sanndy Creek Groundwater Monitooring Network, Sectional Plan

6

 

64 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 330: Sandy Creekk Groundwater LLevel Catenary TTransect 

6

 

65 

2015 An

3.9 F

3.9.1 During with thchanges The obj

Iden

Out

Esta

Detare 

Det

Def

Det

Def No treeto remn 

3.9.2 Inspectcomple

Sug

Bat 

Bru 

3.9.3 During accorda 

3.10 W

3.10.1 During updatedwere m The LannoxiousServices Weed c

Prom

MUSWELL

nnual Environ

LORA AND

Activities tthe  reportie updated Fs were mad

jectives of t

ntify any str

tline the stra

ablish meth

ail the procencountere

ail how mic

ine the post

ail how the

ine the mea

e clearing wnant vegeta

Flora and Fions  of  nested during 

ar Glider (2

(4) – not oc

shtail Possu

Activities nthe next reance with th

WEEDS AND

Activities tthe  reportd LMP to b

made to the 

nd Managems  weeds  ws and the U

control and 

motion of v

LBROOK COAL

nmental Man

D FAUNA M

his Reportiing period FFMP to bede to the FF

the approve

rategic habi

ategic mitig

ods to man

cess to be aed; 

cro habitats

t‐mining lan

 post‐minin

asures to pr

was undertaation. 

Fauna Monisting  boxesthe reportin

2) – not occ

ccupied and

um (2) – no

next Reportporting perhe FFMP.  

D FERAL AN

his Reportiting  periodbe  implemeLMP. 

ment Plan (ill  be manapper Hunte

eradication

vigorous pas

L COMPANY L

nagement Re

MANAGEM

ng Periodthe Flora ae implementMP. 

ed Fauna an

itat areas on

gation meas

nage remna

dopted if an

 will be recr

ndscape; 

ng flora will 

rotect, mon

ken during 

itoring s  are  perfong period a

upied and n

d no signs o

ot occupied 

ting Periodriod MCC w

NIMALS 

ng Period  the  Land nted during

(LMP) contaaged  and  cer Weeds Au

n technique

sture growt

IMITED

eport

MENT 

and Fauna Mted during 

nd Flora Ma

n site; 

sures to be 

nt vegetatio

ny threaten

reated; 

be establis

nitor and ma

 the report

ormed  everre shown b

no signs of s

of activity w

and no sign

ill continue

Managemeg the next r

ains a sectiocontrolled uthority, us

es used at M

th to out‐co

Managemethe next re

nagement P

adopted in 

on; 

ned flora or 

hed; and 

aintain reha

ing period 

ry  6 monthbelow.  

sugar glider

were observe

ns of possum

 to manage

ent  Plan  (Lreporting p

on on weedas  per  thesing a comb

MCC include

ompete wee

nt Plan  (FFporting per

Plan (FFMP)

the FFMP; 

fauna not i

abilitation a

and there w

hs.  Results 

r activity we

ed. 

m activity w

e impacts on

LMP)  was  reriod.   No 

d control, an  requiremeination of c

eds; 

FMP) was  reriod.  No sig

) are to:  

identified in

areas; 

was no dist

of  the  insp

ere observe

were observ

n flora and 

reviewed  wsignificant 

nd specifiesents  of  Loccontrol strat

66 

eviewed gnificant 

n the EIS 

urbance 

pections 

ed.  

ved.  

fauna in 

with  the changes 

s that all cal  Land tegies.  

2015 An

Minbare

Spra

Phy During strategyareas.  actions rehabili32 and  Rhodes 

During Grass  (Chas beeRhodes

Spracom

Redthe 

 The suicurrent Acacia S

During WreathSalignaoptions

Usinpain

Out

Usin The suicurrent   

MUSWELL

nnual Environ

nimisation  oe areas; 

aying with s

ysical remov

the  reportiy focused oThe develofor  weed

itation areaFigure 31. 

 Grass 

the reportiChloris gayen removeds Grass inclu

aying  Rhodmpete the R

ducing the vunderstore

tability of et land use of

Saligna 

the reportih Wattle (Ac has been s for Acacia 

ng  the  “cutnted with h

t competing

ng grazing p

tability of et land use of

LBROOK COAL

nmental Man

of  area  ava

selective he

val by chipp

ing period on the preseopment of td  control  ias and for in

ng period aana)  that  isd from the sude: 

des  Grass  ahodes Gras

volume of Rey species to

each of  thef each of th

ng period acacia Salignremoved  frSaligna inc

t  stump” merbicide an

g the Acacia

pressures to

each of  thef each of th

L COMPANY L

nagement Re

ailable  for w

erbicides; an

ing/slashing

a Weed Maence of noxhis strategyin  the  rehncidental we

a review was present  ineed mix cu

and  then  ress; or 

Rhodes Graso out comp

e manageme rehabilita

a review wana) that is prom  the seelude: 

method  whd the stump

a Saligna wi

o reduce the

e manageme rehabilita

IMITED

eport

weed  infes

nd 

g. 

anagementxious and ey involved ahabilitation eeds identif

as undertakn  the rehabrrently bein

eseeding  w

ss through gete the Rho

ment optionsation areas.

as undertakpresent in thed mix curr

hereby  the ps are left i

th taller ov

e growth of

ment optionsation areas 

station,  thro

t Strategy wnvironmenta site surveyareas.    T

fied during 

en to identbilitation arng used on s

with  desired

grazing or sodes Grass.

s  is depend 

ken to identhe rehabilitrently being

stumps  of n situ to ass

erstorey sp

f young sap

s  is dependas well as th

ough  prom

was developtal weeds iny and develThe  prioritythe survey 

ify control reas.   Note site.  Manag

d  understor

slashing and

dent on  the

tify control ation areasg used on s

the  wattlesist in soil co

ecies; or  

lings. 

dent on  thehe density o

mpt  reveget

ped  for MCn the rehablopment ofy  actions are shown 

options forthat Rhodegement opt

rey  species

d then enco

e  location, s

options fors.  Note thasite.   Mana

es  are  cut onservation

e  location, sof Acacia Sa

67 

ation  of 

CC.   This bilitation f priority for  the in Table 

r Rhodes es Grass tions for 

s  to  out 

ouraging 

size and 

r Golden t Acacia agement 

off  and n; 

size and aligna. 

2

R

B

B

B

MUSWE

2015 Annual Envir

Rehabilitation Block Sites 

Block A 

Block B 

Block C 

ELLBROOK COAL CO

ronmental Manag

EnvironmentalWoNS 

Hyparrhenia hi

Galenia pubesc

Rubus fruticosuNoxious weed)

Opuntia strictaPrickly Pear) (C(WoNS) 

Senecio madag(Class 4 Noxiou

Senecio madag(Class 4 Noxiou

Lycium ferociss(Class 3 Noxiou

OMPANY LIMITED

gement Report

Table 32:

l, Noxious Weed

irta (Coolatai Gr

cens (Galenia) (E

us (Blackberry) () (WoNS) 

a var. stricta (CoClass 4 Noxious w

gascariensis (Fireus weed) (WoNS

gascariensis (Fireus weed) (WoNS

simum (African bus weed) (WoNS

: Priority Weed 

ds and O

ass) (Env) 

Tagw

Env) 

Gwrs

Class 4 Rttp

mmon weed) 

OrIft

eweed) S) 

Sast

eweed) S) 

Sast

boxthorn) S) 

OAc

Control Actions

Observations 

Targeted controland thus limit spgrass species in owoodland condit

G. pubescens prewithin the localitrecommended tospread. 

R. fruticosus wastwo small dams. targeted in ordeplant to spread.

O. stricta speciesrehabilitated wof targeted contrthe rehab woodl

S. madagascarieacross the majorsites.  This specietime and cost pe

S. madagascarieacross the majorsites.  This specietime and cost pe

One L. ferocissimAs this is a Class continuously sup

 for Rehabilitati

l is recommendepread of this highorder to maintaition throughout 

esent in low‐moty. Targeted cono reduce infesta

s observed along As this is a Clasr to inhibit the a

s is present withoodland areas at ol can occur eraand is achievab

nsis is present arity of all rehabiles should be maermit. 

nsis is present arity of all rehabiles should be maermit. 

mum is present a3 weed it must pressed and dest

ion Blocks 

ed to eradicate hly invasive in pasture and  this area.   

derate densitiesntrol is ation and limit 

g the edges of ss 4 it should be ability of the 

hin the low abundance

adication from le.   

at low densities litation block anaged where 

at low densities litation block anaged where 

at the locality.  be fully and troyed. 

Pri

H

H

Mod

e.  Mod

Low‐M

Low‐M

H

6

ority 

High 

High 

derate 

derate 

Moderate 

Moderate 

High 

68 

2

R

A(Ab

RRc

PP

 

MUSWE

2015 Annual Envir

Rehabilitation Block Sites 

AB  African boxthorn) 

RC Ricinus communis 

PT Pepper tree 

ELLBROOK COAL CO

ronmental Manag

EnvironmentalWoNS 

Galenia pubesc

Opuntia auranNoxious weed)

Senecio madag(Class 4 Noxiou

Lycium ferociss(Class 3 Noxiou

R. communis (C

Schinus areira 

 

OMPANY LIMITED

gement Report

l, Noxious Weed

cens (Galenia) (E

tiaca (Tiger Pear) (WoNS) 

gascariensis (Fireus weed) (WoNS

simum (African bus weed) (WoNS

Castor oil plant)

(Pepper tree) (E

ds and O

Env) Gtt

r) (Class 4 Owcw

eweed) S) 

Sast

boxthorn) S) 

OtRs

(Env) AaR

Env) ATs

Observations 

G. pubescens prethe locality.  Targto reduce infesta

O. aurantiaca is woodland areas control can occuwoodland is achi

S. madagascarieacross the majorsites.  This specietime and cost pe

One individual pthe hill to the telRemoval and trespread of this sp

A few individualsalong Blue’s RoaRWoodNew2 an

Approximately fiTargeted removaspecies within th

esent in high dengeted control is ation and limit s

present within tat low abundanr eradication froievable.   

nsis is present arity of all rehabiles should be maermit. 

lant was observlecommunicatioatment will prevecies.  

s 10‐20 were ided between the td the West Crib 

ive trees were pal will limit the she MCC site.   

nsities across recommended pread. 

the rehabilitatedce.  If targeted om the rehab 

at low densities litation block anaged where 

ed at the top of ons tower.  vent further 

entified growingturnoff to Hut.  

resent.  spread of this 

Pri

H

Mod

Low‐M

H

g L

L

6

ority 

High 

derate 

Moderate 

High 

Low 

Low 

69 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 31: Weed Management Priority Actionss 

7

 

70 

2015 An

3.10.2 During Land M A weedon the a Appropimplem 

3.11 B

3.11.1 During with  thwere m MembeInformaNotices The  intfragmeair blast Best pra

A hiburd

Manissu

Regthe 

Loa

Prop

Effe

Redthe 

Taktime

Videfrom

Regthe 

 During seam b

MUSWELL

nnual Environ

Activities nthe next reanagement

d control prareas ident

priate manamentation of

BLASTING 

Activities tthe  report

he  updated made to the 

ers  of  the ation Servics” page of th

tent  of  bentation reqt overpress

actice in dri

igh degree den; 

nagement oues); 

gular  inspecuncontrolle

ding of the 

per placem

ective place

duce the sleexplosive m

e  into accoe of the bla

eo  recordinm the predi

gular reviewactual blast

the  reportlasting prac

LBROOK COAL

nmental Man

next Reporteporting pet Plan (LMP

ogram will ified in the 

gement optf these opti

his Reportiing  period BVMP  beiBVMP. 

public  are ce Line whehe Muswell

est  practicequirements ure, ground

ill and blast

of accuracy

of surface a

ctions to  ideed release o

explosive m

ent of deck

ment of goo

eep time of material; 

ount any adst and, defe

ng of blastscted outcom

ws of actual t results var

ting  period,ctices. This 

L COMPANY L

nagement Re

ting Periodriod MCC w).   

be undertaWeed Man

tions for Rhons will com

ng Periodthe  Blast‐Vng  implem

notified  ofre they heabrook Shire

e  goals  in for each bld vibration, 

 activities a

y in the pla

and ground

entify any gof gaseous p

material so t

king charges

od quality s

the blast pa

verse meteer or modify

s  to  identifymes; and 

blast resultried from th

, MCC  comwas introdu

IMITED

eport

will continu

aken duringnagement St

hodes Grassmmence du

Vibration Mmented  in  D

f  proposedar a recordee Council W

drill  and ast. The usfumes and 

at MCC inclu

cement of 

dwater  in th

geological aproducts fro

that holes a

s if required

stemming m

attern to m

eorological y the blast t

y any  causa

ts to identihe predicte

mmenced  thuced to mit

e to  implem

g the next retrategy. 

s and Acaciauring the ne

ManagemenDecember  2

  blasting  ted message

Website. 

blast  active of best podours fro

ude: 

drill holes t

he drill hole

abnormalitiom explosiv

are not load

d; 

material to c

minimise the

conditions to accommo

al  factors  c

fy any pattd outcomes

he  trial  andtigate the r

ment the re

eporting pe

a Saligna wxt reporting

nt  Plan  (BVM2015.   No  s

imes  by  co or by looki

vities  is  to ractice techm blasting a

to achieve d

es (to reduc

es that mayve material;

ded in exces

contain the 

e potential f

that may bodate those

ontributing

erns in thoss. 

d  implemenisks associa

equirement

eriod and w

ill be reviewg period. 

MP) was  resignificant 

ontacting  thing at the “

comply  whniques wilactivities. 

design spac

ce fume an

y create a ; 

ss of the de

blast; 

for deterior

be prevailine conditions

g  to any ab

se instance

ntation  of ated with op

71 

ts of the 

will focus 

wed and 

eviewed changes 

he  Blast “Blasting 

with  the l reduce 

cing and 

d odour 

path for 

sign; 

ration of 

g at the s; 

erration 

s where 

through perating 

2015 An

in the ablastingcoal  sethroughgreatersuccessrecover 

3.11.2 All blasmaintaireportinits life.  The bla 

V

Ov

 The bla 

Blast Mo

B1 (Que

B2 (Scho

B3 (99 Q

B4 (Nisb

 During monitoequipmperiod capture There w A summall mon During levels  f

MUSWELL

nnual Environ

anticline areg  involves dams  in  theh seam pror  control  osful  at  MCCry in steeply

Blast Monists are monined  in accong period M

sting criteri

Vibration (m

10 

verpressure

115 

120 

st monitori

onitor 

een St) 

ool) 

Queen St) 

bet) 

the  reportrs were op

ment malfunfrom all me rate has b

was no exce

mary of blasitors is show

the preparafrom  the m

LBROOK COAL

nmental Man

ea of the mdrilling thro  blast  proc

ocess due  tof  timing  deC  with  crey dipping se

toring nitored by  fordance wiMCC upgrad

ia that appl

mm/s) 

e (dB(L)) 

ng network

T

Location

In the vi

At the M

At the n

Sandy Cr

ting  period,perational  tnction  or  conitoring ueen 98.5%. 

eedance of c

st monitoriwn in Appe

ation of envining opera

L COMPANY L

nagement Re

mine whereugh one orcess with  sto  the  firing esign  and ating  flat eams and re

four automth  the releed the blas

y to MCC ar

Table 

5% of t

5% of t

k is provided

able 34: Bla

cinity of the

Muswellbroo

orthern end

reek Road, 

,  136  blast hroughout communicatnits was 96

criteria duri

ng results  iendix 4.   

vironmentaation were 

IMITED

eport

 the coal ser more coaltemming.  E of multipleblast  vibrabenches  foeducing the 

matically  trigevant standst monitors

re shown in

 33: Blast C

All

total numbe

All

total numbe

d in Table 3

ast Monitor

e nearest no

ok Public Sc

d of Queen 

approximat

events  occthe  reporttion  issues6.3%.   Follo

ing the repo

s displayed

al assessmecalculated.

eams are st seams to aElectronic  be decks of ation.  Throuor  the  openumber of

ggered blasards and caas the old s

n Table 33.

Criteria 

owable Exc

er of blasts 

0%

owable Exc

er of blasts 

0%

34 and locat

ring Netwo

on‐compan

chool, Roge

Street, Nor

tely 1.2km t

curred  at Ming period,.    The  datowing  the u

orting perio

  in Figure 3

nts predicte.   The max

teeply dippa flat  level blasting  systexplosives ugh  seam rations,  acblast event

t monitors.alibrated ansystem was 

ceedance 

over a 12 m

ceedance 

over a 12 m

tions are dis

rk 

y owned re

r Street, No

rth Muswell

to the north

MCC.    Althosome dataa  recovery upgrade of 

od. 

32 to Figure

ed overpresimum pred

ping. Througand protectem  is  usedand  this alblasting  hachieving  gots. 

. The moninnually. Du nearing th

month perio

month perio

splayed in F

esidence 

orth Muswe

lbrook 

h of MCC 

ough  all  foa were  losty  for  the  rethe units  t

e 35. Blast 

ssure and vdicted overp

72 

gh seam cting the d  in  the lows  for as  been ood  coal 

tors are ring  the e end of 

od 

od 

Figure 2. 

ellbrook 

our  blast t due  to eporting the data 

data for 

vibration pressure 

2015 An

level waThe blawith pre 

3.11.1 During in accor  

MUSWELL

nnual Environ

as 114dB(Lst results devious resu

Activities nthe next rerdance with

LBROOK COAL

nmental Man

) and the muring this reults.  

next Reportporting perh the BVMP

L COMPANY L

nagement Re

maximum vieporting pe

ting Periodriod MCC w. 

IMITED

eport

ibration  leveriod were b

ill continue

vel was 2.2mbelow pred

 to manage

mm/s  in Noicted levels 

e and monit

orth Muswes and are co

tor blasting 

73 

ellbrook. onsistent 

impacts 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

FFigure 32: Queenn Street Blast MMonitoring Results

7

  

74 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 33: Schhool Blast Monitoring Results  

7

 

75 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figgure 34: 99 Queeen Street Blast MMonitoring Resuults

7

  

76 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 35: Nissbet Blast Monitoring Results

7

 

77 

2015 An

3.12 N

3.12.1 During updatedfrequendue  to effect  ioccurre The maoperatiunderta

Out

Mai

Idencom

Def

Det

Detdem

DetNois

Spe 

3.12.2 The  locnetwor6 monteach ofeach reand  twnoise suguidelin“AcoustTwo six Measurcharacthad  a confirmThe LAe The act

The

The

MUSWELL

nnual Environ

NOISE MAN

Activities tthe  reportd  NMP  bency were raexternal  inin  Decembed prior to t

ain objectiveons  on  theaken to ach

tline the me

intain a nois

ntify  the  rismpliance; 

ine the mec

ail the Com

ail  the  mamonstrated 

ail  the  spese Investiga

cify the reg

Noise Moncations of  tk of six attethly basis.  Ef  the Day, Eesidence waice  during urveys are pnes,  the  Ptics, Descripx‐monthly at

rements  weteristics as dcurrent  ca

med prior toeq (15‐minu

ual noise le

 location of

 elevation o

LBROOK COAL

nmental Man

NAGEMENT

his Reportiting  period eing  implemationalised nfluences  imer  2015.   this date so 

e of the NMe  environmieve this ob

easures to b

se monitori

sk  levels at 

chanisms fo

mplaint Hand

anagement to exceed t

cifications ations; and 

gulatory rep

nitoring he  revised ended noiseEach  attendEvening andas surveyedthe Night  pperformed iPeriodic  Noption and Mttended no

ere  taken defined in Aalibration  ao and at theute) noise e

evel receive

f mining equ

of mining eq

L COMPANY L

nagement Re

ng Periodthe  Noise

mented  in as part of tmpacting  oThe  two  rothe data pr

MP is to mament  and  nbjective: 

be undertak

ing program

which min

or communi

dling Proced

measures the criterion

and  proced

porting requ

noise mone survey locded noise  sd Night‐timd twice duriperiod  for in accordanoise  MonitoMeasuremenise surveys 

in  third‐ocAS1259‐199s  per  mane completiomission lev

d at individ

uipment; 

quipment;

IMITED

eport

ManagemDecember this review.on  results  aounds  of  mresented in 

nage and mnearby  resi

ken on site t

m; 

ne operatio

ity consulta

dure; 

  to  be  unn;  

dures  to  be

uirements.

nitoring  sitecations.  Mosurvey  is  come periods ang the Daya  total  of  fnce with theoring  prognt of Envirowere unde

ctave  bands0 “Acousticnufacturer’son of measvels, at each

ual residen

ent  Plan  (N2015.    Th

.   One monat  this  locatmonitoring this report 

minimise thedences.    T

to mitigate 

ns may nee

ation; 

ndertaken 

e  used  for 

es are displaonitoring is onducted oare monitoy period, onfive measue EPA “ NSWramme  anonmental Nrtaken duri

s  with  an cs – Sound Ls  instructiourements wh monitoring

ces may va

NMP) was he  monitornitoring  location.    This during  thisincludes re

e impact ofThe  followin

noise emiss

ed  to be m

where  the

the  purpos

ayed  in Figconducted 

over  a 24‐hred. For  thce during trements  at

W Industrial d  Australiaoise” as speng the repo

instrumentLevel Meterons  and  cawith a Soung site, were

ry as a resu

reviewed wring  locatioation was rchange  cas  reportingesults from 

f noise fromng  actions 

sions; 

modified  to 

e  noise  lev

se  of  Indep

gure 2.   MC at these siour period is  reportingthe Eveningt  each  loca Noise Polican  Standarecified in thorting perio

t  that  has rs”. The instalibration  wnd Level Cae determine

ult of: 

78 

with  the ons  and emoved me  into g  period all sites. 

m mining will  be 

manage 

vels  are 

pendent 

CC has a tes on a so  that g period g period, tion. All cy” (INP) rd  1055 he NMP. od. 

Type  1 trument was  also librator. ed. 

2015 An

Imp

Prev

Prev Attendeoverall proport Noise  lLAeq(15mi

monitoDuring mining  

 The  noconsiste 

3.12.1 During impacts  

MUSWELL

nnual Environ

pacts from o

vailing wind

vailing mete

ed noise monoise  leve

tion contrib

levels  duri

inute) and alring periodthe  prepaoperation w

oise  resultsent with pre

Activities nthe next  res in accorda

LBROOK COAL

nmental Man

other noise 

d conditions

eorological 

onitoring wels  at  the buted by MC

ng  the  repso  the nigh. Noise meration  of  ewere calcula

S

R

R

R

R

R

s  during  thevious resu

next Reporteporting peance with th

L COMPANY L

nagement Re

sources; 

s; and 

conditions.

was conductnominated

CC mining o

porting  peht LA1(1minute

easurement environmenated.  These

Table 35: P

Site 

R7 

R13 

R15 

R16 

R17 

R20 

his  reportinlts. 

ting Perioderiod MCC whe NMP. 

IMITED

eport

ed during Md  noise  mooperations.

riod  comp

e) noise  limi results of ntal  assesse noise leve

Predicted N

Predict

ng  period 

will continu

May and Noonitoring  l 

lied  with its at all mothis surveyments  predels are show

Noise Levels

ted Noise L

32 

38 

35 

35 

33 

34 

were  belo

ue  to mana

ovember 20ocations  a

the  day,  eonitoring  loare summdicted  noiswn in Table 

evels (dB) 

ow  predicte

ge and mo

015, to quannd  determ

evening  anocations duarised  in Tase  levels  fr35. 

ed  levels  a

onitor noise

79 

ntify the mine  the 

nd  night ring  the able 36.  rom  the 

and  are 

e  related 

2

L

MUSWE

2015 Annual Envir

Location Sta

DateTim

R7 19/014:

R7 19/017:

R7 19/018:

R7 20/000:

R7 26/000:

R13 19/015:

R13 19/017:

R13 19/018:

R13 20/000:

R13 26/000:

R15 19/014:

R15 19/016:

R15 19/018:

ELLBROOK COAL CO

ronmental Manag

art e and me 

Wind Speed (m/s) 

5/15 :44 

2.9 

5/15 :29 

0.4 

5/15 :51 

0.0 

5/15 :32 

1.4 

5/15 :34 

0.8 

5/15 :04 

2.3 

5/15 :10 

0.7 

5/15 :32 

0.1 

5/15 :10 

0.3 

5/15 :10 

0.0 

5/15 :15 

2.4 

5/15 :35 

0.1 

5/15 :01 

1.2 

OMPANY LIMITED

gement Report

VTC 0C/ 100m 

Cri

‐2.0 

‐2.0 

4.1 

3.0 

4.1 

‐2.0 

‐2.0 

3.0 

3.0 

4.1 

‐2.0 

‐2.0 

4.1 

Table 36: 

LAeq 15 Minu

iterion (dB) 

CriteriApplie

36  Yes

36  Yes

36  No

36  No

36  No

40  Yes

40  Yes

40  No

40  No

40  No

35  Yes

35  Yes

35  No

Noise Monitori

ute 

ion es?1 

MCC LAeq (dB)2 

IA 

IA 

IA 

<25 

29 

IA 

IA 

IA 

<25 

<25 

IA 

IA 

IA 

ng Results 

Exceedance3 

Nil 

Nil 

NA 

NA 

NA 

Nil 

Nil 

NA 

NA 

NA 

Nil 

Nil 

NA 

Criterion (dB) 

CritApp

‐‐‐ 

‐‐‐ 

‐‐‐ 

44 

44 

‐‐‐ 

‐‐‐ 

‐‐‐ 

51 

51 

‐‐‐ 

‐‐‐ 

‐‐‐ 

LA1 1 Minute

terion plies?1 

MCC LAeq (dB)2

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

No  <25 

No  33 

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

No  <25 

No  <25 

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

8

Exceedance

‐‐‐ 

‐‐‐ 

‐‐‐ 

NA 

NA 

‐‐‐ 

‐‐‐ 

‐‐‐ 

NA 

NA 

‐‐‐ 

‐‐‐ 

‐‐‐ 

80 

e3 

2

L

MUSWE

2015 Annual Envir

Location Sta

DateTim

R15 19/023:

R15 25/023:

R16 19/013:

R16 19/016:

R16 19/021:

R16 19/023:

R16 25/023:

R17 19/013:

R17 19/015:

R17 19/020:

R17 19/022:

R17 25/022:

R20 19/013:

R20 19/015:

ELLBROOK COAL CO

ronmental Manag

art e and me 

Wind Speed (m/s) 

5/15 :42 

0.6 

2/15 :40 

0.0 

5/15 :58 

1.1 

5/15 :17 

2.1 

5/15 :02 

0.0 

5/15 :23 

0.0 

5/15 :20 

3.8 

5/15 :40 

2.1 

5/15 :59 

1.6 

5/15 :37 

0.0 

5/15 :54 

0.0 

5/15 :57 

3.7 

5/15 :12 

3.8 

5/15 :34 

2.7 

OMPANY LIMITED

gement Report

VTC 0C/ 100m 

Cri

3.0 

4.1 

‐2.0 

3.0 

4.1 

4.1 

‐1.0 

‐2.0 

‐1.0 

4.1 

4.1 

‐2.0 

‐2.0 

‐2.0 

LAeq 15 Minu

iterion (dB) 

CriteriApplie

35  No

35  No

35  Yes

35  No

35  No

35  No

35  No

35  Yes

35  Yes

35  No

35  No

35  No

38  No

38  Yes

ute 

ion es?1 

MCC LAeq (dB)2 

<25 

<25 

IA 

IA 

IA 

IA 

IA 

IA 

IA 

<25 

<30 

32 

IA 

IA 

Exceedance3 

NA 

NA 

Nil 

NA 

NA 

NA 

NA 

Nil 

Nil 

NA 

NA 

NA 

NA 

Nil 

Criterion (dB) 

CritApp

46 

46 

‐‐‐ 

‐‐‐ 

‐‐‐ 

46 

46 

‐‐‐ 

‐‐‐ 

‐‐‐ 

46 

46 

‐‐‐ 

‐‐‐ 

LA1 1 Minute

terion plies?1 

MCC LAeq (dB)2

No  <25 

No  32 

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

No  IA 

No  IA 

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

No  40 

No  37 

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

8

Exceedance

NA 

NA 

‐‐‐ 

‐‐‐ 

‐‐‐ 

NA 

NA 

‐‐‐ 

‐‐‐ 

‐‐‐ 

NA 

NA 

‐‐‐ 

‐‐‐ 

81 

e3 

2

L

MUSWE

2015 Annual Envir

Location Sta

DateTim

R20 19/021:

R20 19/022:

R20 25/022:

R7 09/111:

R7 09/114:

R7 09/119:

R7 09/123:

R7 10/102:

R13 09/111:

R13 09/114:

R13 09/119:

R13 09/123:

R13 10/101:

R15 09/110:

ELLBROOK COAL CO

ronmental Manag

art e and me 

Wind Speed (m/s) 

5/15 :29 

0.0 

5/15 :21 

0.0 

5/15 :29 

1.1 

1/15 :29 

1.0 

1/15 :49 

2.4 

1/15 :32 

1.6 

1/15 :35 

0.0 

1/15 :28 

0.0 

1/15 :05 

2.0 

1/15 :27 

2.9 

1/15 :10 

2.8 

1/15 :11 

0.6 

1/15 :59 

0.0 

1/15 :37 

0.9 

OMPANY LIMITED

gement Report

VTC 0C/ 100m 

Cri

0.5 

4.1 

4.1 

‐1.8 

‐2.0 

‐1.0 

‐1.0 

4.1 

‐1.6 

‐1.6 

‐1.0 

0.5 

4.1 

‐1.6 

LAeq 15 Minu

iterion (dB) 

CriteriApplie

38  Yes

38  No

38  No

36  Yes

36  Yes

36  Yes

36  Yes

36  No

40  Yes

40  Yes

40  Yes

40  Yes

40  No

35  Yes

ute 

ion es?1 

MCC LAeq (dB)2 

IA 

<30 

IA 

IA 

NM 

NM 

28 

27 

NM 

IA 

34 

31 

33 

NM 

Exceedance3 

Nil 

NA 

NA 

Nil 

Nil 

Nil 

Nil 

NA 

Nil 

Nil 

Nil 

Nil 

NA 

Nil 

Criterion (dB) 

CritApp

‐‐‐ 

48 

48 

‐‐‐ 

‐‐‐ 

‐‐‐ 

44 

44 

‐‐‐ 

‐‐‐ 

‐‐‐ 

51 

51 

‐‐‐ 

LA1 1 Minute

terion plies?1 

MCC LAeq (dB)2

‐‐‐  ‐‐‐ 

No  38 

No  IA 

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

Yes  38 

No  36 

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

Yes  37 

No  41 

‐‐‐  ‐‐‐ 

8

Exceedance

‐‐‐ 

NA 

NA 

‐‐‐ 

‐‐‐ 

‐‐‐ 

Nil 

NA 

‐‐‐ 

‐‐‐ 

‐‐‐ 

Nil 

NA 

‐‐‐ 

82 

e3 

2

L

MUSWE

2015 Annual Envir

Location Sta

DateTim

R15 09/113:

R15 09/118:

R15 09/122:

R15 10/101:

R16 09/110:

R16 09/113:

R16 09/118:

R16 09/122:

R16 10/101:

R17 09/109:

R17 09/113:

R17 09/118:

R17 09/122:

R17 10/100:

ELLBROOK COAL CO

ronmental Manag

art e and me 

Wind Speed (m/s) 

1/15 :54 

3.3 

1/15 :39 

2.0 

1/15 :43 

1.1 

1/15 :25 

0.0 

1/15 :09 

2.7 

1/15 :33 

2.6 

1/15 :19 

2.2 

1/15 :23 

1.4 

1/15 :05 

0.0 

1/15 :46 

2.3 

1/15 :13 

2.5 

1/15 :00 

2.2 

1/15 :00 

1.8 

1/15 :44 

0.0 

OMPANY LIMITED

gement Report

VTC 0C/ 100m 

Cri

‐1.8 

‐1.0 

0.5 

3.0 

‐1.8 

‐1.6 

‐1.6 

0.5 

3.0 

‐2.0 

‐1.6 

‐1.6 

‐1.0 

‐1.0 

LAeq 15 Minu

iterion (dB) 

CriteriApplie

35  No

35  Yes

35  Yes

35  No

35  Yes

35  Yes

35  Yes

35  Yes

35  No

35  Yes

35  Yes

35  Yes

35  Yes

35  Yes

ute 

ion es?1 

MCC LAeq (dB)2 

NM 

28 

35 

26 

NM 

IA 

IA 

33 

IA 

NM 

IA 

IA 

34 

27 

Exceedance3 

Nil 

Nil 

Nil 

NA 

Nil 

Nil 

Nil 

Nil 

NA 

Nil 

Nil 

Nil 

Nil 

Nil 

Criterion (dB) 

CritApp

‐‐‐ 

‐‐‐ 

46 

46 

‐‐‐ 

‐‐‐ 

‐‐‐ 

46 

46 

‐‐‐ 

‐‐‐ 

‐‐‐ 

46 

46 

LA1 1 Minute

terion plies?1 

MCC LAeq (dB)2

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

Yes  41 

No  26 

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

Yes  37 

No  IA 

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

Yes  43 

Yes  27 

8

Exceedance

‐‐‐ 

‐‐‐ 

Nil 

NA 

‐‐‐ 

‐‐‐ 

‐‐‐ 

Nil 

NA 

‐‐‐ 

‐‐‐ 

‐‐‐ 

Nil 

Nil 

83 

e3 

2

L

N   

MUSWE

2015 Annual Envir

Location Sta

DateTim

R20 09/109:

R20 09/112:

R20 09/120:

R20 10/100:

R20 10/103:

Notes: 1. Limits a2. These a3. NA me

ELLBROOK COAL CO

ronmental Manag

art e and me 

Wind Speed (m/s) 

1/15 :15 

3.2 

1/15 :29 

1.7 

1/15 :11 

1.9 

1/15 :11 

0.0 

1/15 :06 

0.0 

apply for winds are results for Means atmospheri

OMPANY LIMITED

gement Report

VTC 0C/ 100m 

Cri

‐1.0 

‐2.0 

‐1.0 

‐1.0 

4.1 

up to 3m/s (at aMCC in the absenc conditions out

LAeq 15 Minu

iterion (dB) 

CriteriApplie

38  No

38  Yes

38  Yes

38  Yes

38  No

a height of 10m nce of all other mtside conditions 

ute 

ion es?1 

MCC LAeq (dB)2 

IA 

IA 

IA 

IA 

IA 

above ground lemine sources; anspecified in dev

Exceedance3 

NA 

Nil 

Nil 

Nil 

Nil 

evel); or tempernd velopment conse

Criterion (dB) 

CritApp

‐‐‐ 

‐‐‐ 

‐‐‐ 

48 

48 

ature inversions

ent, criterion is n

LA1 1 Minute

terion plies?1 

MCC LAeq (dB)2

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

‐‐‐  ‐‐‐ 

Yes  IA 

No  IA 

s of up to 30C/10

not applicable.

8

Exceedance

‐‐‐ 

‐‐‐ 

‐‐‐ 

Nil 

NA 

00m; 

84 

e3 

2015 An

3.13 VDuring updatedthe LiM The obj

To ope

To p

To m

To o MCC’s existingarea.  

3.14 A

3.14.1 During (ACHMreportin The obj

Idenof th

Mitand

Conobje

Maiimp

Dev MCC hathe Abo During Aborigion the M As  partannuallarchaeo 

MUSWELL

nnual Environ

VISUAL, STRthe  reportid LiMP bein

MP. 

jectives of t

provide  suerations; 

provide ligh

minimise th

outline a pr

operations g  overburde

ABORIGINA

Activities tthe  reportP)  was  revng period.  

jectives for 

ntifying anyhe MCC ope

igating any  equipment

nsulting  witectives, pro

intaining  thpacts on cos

veloping env

as successfuoriginal cult

the reportinal groups.MCC Comm

t  of  the  ony updating ological site

LBROOK COAL

nmental Man

RAY LIGHTing period ng impleme

the LiMP are

ufficient  lig

hting that is 

he impact of

ocess to ad

are  screenen  emplace

AL HERITAG

his Reportiting  periodviewed  withNo significa

managing a

y cultural heerations; 

cultural het so that im

th  all  releocesses and 

he mine’s osts; and 

vironmenta

ully completural site loc

ing period,  A member

munity Cons

ngoing  consthem on th

es. 

L COMPANY L

nagement Re

T the Lightingented in Dec

e: 

ghting  on‐s

of an appro

f on‐site ligh

dress light s

ned  from  dement  area

GE 

ng Periodd  the  Archh  the  updaant changes

archaeology

eritage issue

ritage risk dmpacts to cu

evant  Abormanageme

operational 

al procedure

eted salvagecated within

no ground r of the Waultative Com

sultation  prhe status of

IMITED

eport

g Managemcember 201

site  to  fac

opriate stan

hting source

spillage issu

direct  view as,  and  the 

aeology  anated  ACHMs were made

y and cultur

es that aris

due to the dltural resou

riginal  coment actions;

status,  thu

es for the m

e operationn the mine 

 disturbancnaruah Locmmittee (C

rocess withf the curren

ment Plan  (15.  No sign

cilitate  saf

ndard and a

es on reside

ues. 

of  residennatural  to

nd  Cultural MP  to  be  ime to the AC

ral heritage 

e because o

design and urces are m

mmunity  re 

us  reducing 

managemen

s and contilease bound

ce operatiocal AboriginCC). 

h  Aboriginant mining op

LiMP) was nificant chan

ety  and  s

ppropriate

ents or road

ts  or  the  tpography  o

Heritage mplementeHMP. 

at MCC inc

of the desig

installationinimised; 

presentativ

any  likely  t

t of heritag

inues to madary.  

ns requiredal Lands Co

al  groups  a perations a

reviewed wnges were m

security  to 

ly directed;

d users; and

travelling  pof  the  surr

Managemeed  during  t

clude: 

gn and cons

n of new mi

ves  on  the

time delay 

ge sites at M

aintain and

d consultatiouncil prese

  letter  is  snd manage

85 

with  the made to 

mining 

 

ublic  by ounding 

ent  Plan he  next 

struction 

ne plant 

e  plans, 

risks or 

MCC. 

 protect 

ion with ently sits 

sent  out ement of 

2015 An

3.14.2 During ACHMP 

3.15 E

3.15.1 During (ACHMreportin The obj

Idenof th

Mitand

Conobje

Maiimp

Dev No activ 

3.15.1 During ACHMP 

3.16 S

3.16.1 During reviewesignifica The maspontan

Exis

Dril

Min

Min

Emp

Emp

Coa 

MUSWELL

nnual Environ

Activities nthe next reP. 

UROPEAN

Activities tthe  reportP)  was  revng period.  

jectives for 

ntifying anyhe MCC ope

igating any  equipment

nsulting  witectives, pro

intaining  thpacts on cos

veloping env

ve activities

Activities nthe next reP. 

PONTANEO

Activities tthe  reported with theant changes

ain objectiveneous comb

sting open c

ling and bla

ning of over

ning of coal;

placement o

placement o

al stockpiles

LBROOK COAL

nmental Man

next Reporteporting pe

 HERITAGE

his Reportiting  periodviewed  withNo significa

managing a

y cultural heerations; 

cultural het so that im

th  all  releocesses and 

he mine’s osts; and 

vironmenta

s were unde

next Reportporting per

OUS COMB

his Reportiing period  updated Ss were mad

e of the SCbustion in: 

cut and und

asting; 

burden; 

of overburd

of washery 

s. 

L COMPANY L

nagement Re

ting Periodriod cultura

ng Periodd  the  Archh  the  updaant changes

archaeology

eritage issue

ritage risk dmpacts to cu

evant  Abormanageme

operational 

al procedure

ertaken in r

ting Periodriod Europe

BUSTION

ng Periodthe  SpontaCMP to be e to the SC

MP is to m

erground w

den; 

reject; and

IMITED

eport

al heritage 

aeology  anated  ACHMs were made

y and cultur

es that aris

due to the dltural resou

riginal  coment actions;

status,  thu

es for the m

relation to E

ean heritage

aneous ComimplementMP. 

inimise the

workings; 

will be ma

nd  Cultural MP  to  be  ime to the AC

ral heritage

e because o

design and urces are m

mmunity  re 

us  reducing 

managemen

European H

e will be ma

mbustion Mted during t

 occurrence

naged  in ac

Heritage mplementeHMP. 

at MCC inc

of the desig

installationinimised; 

presentativ

any  likely  t

t of heritag

eritage this

anaged in ac

Managementhe next rep

e and mana

ccordance w

Managemeed  during  t

clude: 

gn and cons

n of new mi

ves  on  the

time delay 

ge sites at M

s reporting p

ccordance w

t Plan  (SCMporting per

age the effe

86 

with the 

ent  Plan he  next 

struction 

ne plant 

e  plans, 

risks or 

MCC. 

period. 

with the 

MP) was riod.  No 

ect from 

2015 An

As part areas a

Exaoccu

Exabrow

Usintem

Mea

Mea MCC  hacombusinclude

Coo

Rem

Min

Reteimm

Seaprev

 Regularidentifyimproveareas uthe exte Four spperiod. emplacsubmitt 

MUSWELL

nnual Environ

of preparare identified

mining  preurrences of

mining  thewn or dying

ng  infra‐remperature;  

asuring bor

asuring surf

as  successfstion.   Met: 

oling the hea

moval of the

nimisation o

ention of 5 mediately re

ling  of  remvent the ing

r  spontaney existing anements  to nder waterent and loca

pontaneous The  majo

ement  areted during t

ReM

J

F

M

A

M

J

J

A

LBROOK COAL

nmental Man

ation for mid by: 

evious  infof spontaneo

e  surface  fog vegetation

ed  photogr

ehole temp

face tempe

ful  experienhods used 

ated area w

e fuel by mi

of areas of c

metres of equired for 

maining  unmgress of oxy

ous  combund new  incthese  proc infusion anation of pro

combustioority  of  afas.  A  histothe reportin

Table 37: S

eporting Month 

S

A

Jan‐15 

Feb‐15 

Mar‐15 

Apr‐15 

May‐15 

Jun‐15 

Jul‐15 

Aug‐15 

L COMPANY L

nagement Re

ning of are

rmation  reous combust

or  any  phyn and increa

raphy,  wh

peratures fo

ratures. 

nce  in manto manage 

with water b

ning the co

coal expose

overburdenmining ope

mined  undygen. 

ustion  repoidents of spcedures,  effnd complainoblem areas

n reports wffected  areorical  compng period, is

Spontaneou

SpontaneouCombustioAreas Cappe

(m2) 

9,178 

6,200 

7,000 

IMITED

eport

as affected

ecords,  acction; 

ysical  effectased surfac

ere  appro

or temperat

aging  and mining  in a

before mini

al; 

d to the air 

n above woerations; an

erground  w

orts  are  prpontaneousfectiveness nts receiveds.  

were submiteas  were  wparison,  alos provided i

us Combus

us on ed

SpontCombAreas

(m

1

1

 by spontan

umulated  o

ts  of  sponte temperat

opriate,  to 

ture increas

controlling areas prone

ng (water in

prior to mi

orkings to ed 

workings  w

ovided  to s combustioof  actions

d. The repor

tted to DREwithin  theong  with  a n Table 37

tion Report

aneous bustion  Minedm2) 

12 

14 

neous comb

over  the  la

taneous  coure; 

show  ar

ses; and  

areas  prone to sponta

nfusion); 

ning; 

xclude oxyg

with  clay  or

both  DRE on, mitigatio,  areas  caprt also inclu

 and EPA dopen  cutsummary and Table 3

t Summary 

Area UndeWater Infusion (m2) 

24,774 

9,517 

9,517 

9,517 

13,600 

8,500 

9,000 

9,000 

bustion, hig

ast  ten  ye

ombustion 

reas  of  in

ne  to  sponaneous com

gen from a

r  inert  mat

and  EPA. on procedupped,  areasudes a plan s

uring the ret  and  oveof  all  the 38. 

er 

87 

gher risk 

ears,  for 

such  as 

ncreased 

taneous mbustion 

reas not 

terial  to 

Reports ures and s mined, showing 

eporting rburden reports 

2015 An

 

  

Jan‐Mar 

Apr‐Jun 

Jul‐Sep 

Oct‐Dec 

Yearly Average 

 During continuaccess t 

3.16.2 During accorda 

3.17 B

3.17.1 During updatedwere m The obj

To m

Con

To poccu

To sho

 On 14 Dstarted spark.  

MUSWELL

nnual Environ

ReM

S

O

N

D

Table 38: H

2007 

6694 

25546 

3721 

3918 

9970 

the  reportued on an othese areas

Activities nthe next reance with th

BUSHFIRE 

Activities tthe reportid BFMP to 

made to the 

jectives of t

manage act

ntain fuel lo

put  in placeur; and 

put  in  placuld an outb

December 2when  a  bThe fire wa

LBROOK COAL

nmental Man

eporting Month 

S

A

Sep‐15 

Oct‐15 

Nov‐15 

Dec‐15 

Historical Su

Total Area

2008 

1726 

661 

1076 

646.5 

1027 

ing period ongoing bass.  A review 

next Reporteporting pehe SCMP. 

his Reporting period tbe implemeBFMP. 

the Bushfire

ivities on si

ads to acce

e hazard m

ce  arrangembreak of fire

2015 there wird  interactas controlle

L COMPANY L

nagement Re

SpontaneouCombustioAreas Cappe

(m2) 

31,000 

ummary of A

 Affected b

2009 

641.5 

187 

34 

70 

233 

mining of  ssis accordinof these co

ting Periodriod manag

ng Periodthe Bushfireented durin

e Managem

te are to m

ptable leve

mitigation m

ments  to  liae occur at M

was a fire oted with  poed by the Ru

IMITED

eport

us on ed

SpontCombAreas

(m

1

2

Areas Affec

by Spontane

2010  2

40 

85 

135 

45 

76 

spontaneoung to the seontrols cons

gement of s

e Managemng the next 

ent Plan are

inimise the

els to moder

measures  to

aise with  aMCC or threa

outbreak onower  lines ural Fire Se

aneous bustion  Minedm2) 

12 

24 

cted by Spo

eous Comb

2011  20

215  7

95  5

85  4

64  5

115  5

us  combusteverity of thidered the 

spontaneou

ment Plan (Breporting p

e: 

 risk of outb

rate fire int

o contain an

and  supportaten MCC’s

n site near Vand  caused

ervice and s

Area UndeWater Infusion (m2) 

25,560 

31,150 

31,150 

31,150 

ontaneous C

ustion (m2)

012  201

71  65

53  57

45  14

57  45

57  79

tion  areas  ahe problemcontrols to 

us combusti

BFMP) was period.  No 

break of fire

ensity; 

n outbreak 

t  the  Ruraloperations

Void 3.  It apd  the  poweite personn

er 

Combustion

13  2014

5 156 

49  177 

5  119 

9  151 

and water m and the abe successf

ion will con

reviewed wsignificant 

e; 

of  fire  sho

l  Fire  Servics. 

ppears that er  lines  to nel.  Approx

88 

4  2015

145 

232 

190 

242 

203 

infusion ability to ful. 

ntinue  in 

with the changes 

ould one 

ce  (RFS) 

this fire arc  and ximately 

2015 An

5ha of operati 

3.17.2 During accorda 

3.18 HHydrocafacilitiehandlinrisk of h

Abooccu

Wasrequ

Oilyfully

Runan o

 A Bioreguidanchydrocathat  is the  NSmateriacontam The Biolocatedarea anlimits inmateriamaterialeast 15 

3.19 MAs  no drainag 

MUSWELL

nnual Environ

rehabilitateons. 

Activities tthe  next 

ance with th

HYDROCARarbon storas. These stong of flammhydrocarbo

ove  ground ur; 

ste oil  fromuired; 

y water  runy bunded; a

noff from thoil/water se

emediation ce  on  howarbons and potentially W  EPA  Waal  is  classifiminated it is 

oremediatio  in an areand tested fon the NSW al met  the al was dispo5m of inert 

METHANE Dundergrounge or ventila

LBROOK COAL

nmental Man

ed  land was

his Reportireporting he BFMP.  

RBON CONTage facilitiesorage facilitmable and cn contamin

fuel  stora

m  the work

noff  from  thand 

he hardstaneparator.  Th

Managemew  to  manahow to deccontaminaaste  Classifed  as  solideither treat

on Area  req that was sr levels of hEPA Waste solid  wastosed  in  thematerial in 

DRAINAGEnd  mining ation was re

L COMPANY L

nagement Re

s burnt with

ng Periodperiod  bu

TAMINATIs were consties comply ombustible ation includ

ge  tanks  a

shop  is  sto

he  re‐fuellin

nd wash‐dohe collected

ent Plan waage  future commissionted  is  testefication  Gud waste  it  ited on site 

quired decoscheduled fhydrocarboClassificatite  classificae carbonacethe final lan

E/VENTILAToccurred  aequired 

IMITED

eport

h no damag

shfire  imp

ON structed as with the re  liquids. Acde: 

re  self‐bun

ored  in a bu

ng bay drai

wn bay pasd silt is rout

as developematerial 

n the establed with  theuidelines  Pas  disposed prior to dis

ommissioninfor rehabilitn contaminion Guidelination  and  weous materndform. 

TION at  MCC  du

ge to  infras

acts  will  c

part of the equirementstivities und

nded  to  con

unded wast

ins  into an 

sses througtinely cleane

d during ththat  is  poished Bioree results beart  1:  Classon  site.    Iposal or it i

ng during  ttation.   Samnation.  The nes Part 1: Cwas  able  torial dump, w

uring  the  re

structure or

continue  to

workshop, s of AS1940ertaken on

ntain  any  s

te oil  tank 

above grou

gh a three‐sed out. 

he reportingotentially  cmediation Aing comparsifying  Wasf  the mates taken off 

he  reportinmples were results werClassifying o  be  dispowhich will b

eporting  pe

r  impact on

o  be  man

stores and 0 – The storn site to red

spillage wh

and  is  rem

und  sump w

staged silt t

g period to contaminateArea.  Any mred  to  the ste  (2014). erial  is  classsite for disp

ng period acollected fre compareWaste (201osed  on  sitbe covered

eriod  no  m

89 

n mining 

aged  in 

blasting rage and duce the 

ich may 

moved as 

which  is 

trap and 

provide ed  with material limits  in   If  the 

sified  as posal. 

s  it was rom the ed to the 14).  The e.    This with at 

methane 

2015 An

3.20 PDuring proceduinspect A securperiods 

3.21 ONo  inciperiod.  

MUSWELL

nnual Environ

UBLIC SAFthe  reportures. Fenceed and mai

rity patrol iss (Christmas

OTHER ISSUidents  of  d

LBROOK COAL

nmental Man

FETY ing period, es surroundntained. 

s conducteds, shutdown

UES AND Rdamage  to 

L COMPANY L

nagement Re

public  safeing the ope

d by a localns, etc.) whe

ISKS surface  in

 

IMITED

eport

ety was maerational ar

l security fien the site 

nfrastructur

anaged  in aeas and alo

rm over weis not mann

re  were  re

accordance ong propert

eekends andned.  

corded  dur

with  currety boundari

d other nom

ring  this  re

90 

ent MCC ies were 

minated 

eporting 

2015 An

4.0   CMCC undiscussiContact 

4.1 EMCC opcan  cominvestigcomplaoperatiEnviron 50 comare proreceive 

 In compreportinshown 

MUSWELL

nnual Environ

COMMUNndertakes cions  with  ct Line (1800

NVIRONMperates a tommunicate gates the coinant  withon  of  the nmental Pro

mplaints werovided  in Apd during th

parison, theng period  cin Figure 37

LBROOK COAL

nmental Man

NITY RELATcommunity community 0 600 205). 

MENTAL COoll  free 24‐their  conc

omplaint, tah  the  findiEnvironmeotection Lice

re receivedppendix 5.   e reporting

T

Type of Co

Odo

Bla

Du

Haul

Ligh

Noi

Visu

Oth

Tot

ere has beecompared  t7.   

L COMPANY L

nagement Re

TIONS consultatiomembers

OMPLAINTShour Enviroerns  to  siteake action tngs.  The ntal  Contacence and De

 during theTable 39 a period. 

Table 39: Su

omplaint 

our 

st 

st 

age 

ht 

se 

ual 

her 

tal 

n an increato previous

IMITED

eport

on through tand  opera

S onmental Ce personneto reduce imrecording ct  Line  is  cevelopmen

e reporting and Figure 3

ummary of

Numb

37

3

2

4

1

1

2

0

50

ase in the nus  reporting 

the Commuating  a  toll

Contact Linel.     On  recempact as reof  environconducted t Consent C

period.   M36 provide 

f Complaint

ber  P

umber of coperiods.   T

unity Consufree  24‐ho

e where comeiving a  comquired and nmental  coin  accordanConditions.  

ore details a summary

Percentage 

74% 

6% 

4% 

8% 

2% 

2% 

4% 

0% 

100% 

omplaints rThe  compla

ultative Comour  Environ

mmunity mmplaint, M report bacomplaints  ance with  t

on the comy of the com

received duint history 

91 

mmittee, nmental 

members CC  staff ck to the and  the he MCC 

mplaints mplaints 

ring this chart  is 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 336: Complaint Summary

9

 

92 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figuree 37: Complaint History 

9

 

93 

2015 An

4.2 CMCC pefosterin Commuorganis

Wyb

Wes

201

Mus

Mus

Mus

Spe

St. J

Mus

Rota

Hun

Heb

Hun In additmoney  

4.3 CMCC’s operaticommuand  2 commuinformaquarterenvironpresent2015, 2

MUSWELL

nnual Environ

OMMUNITersonnel mng and deve

unity  suppoations: 

bong Wild D

stpac Rescu

4‐2015 Frie

swellbrook 

swellbrook 

swellbrook 

cial Childre

James Prima

swellbrook 

ary Club of 

nter Researc

bden Wild D

nter Coal Fe

tion to direthis year fo

OMMUNITCommunityons  to  the unity represMCC  repr

unication  mation  on  mrly at the Mnmental motations and June 2015,

LBROOK COAL

nmental Man

TY LIAISONaintain  coneloping stro

ort  through

Dog Annual 

ue Helicopte

end of Foun

High Schoo

Public Scho

South Publ

n’s Christm

ary School 

Christian Sc

Muswellbro

ch Foundat

Dog Support

estival 

ect donationor the Endea

TY CONSUy  Consultatlocal  comm

sentatives (iresentativesmechanism mining  andMCC office aonitoring  d site visits. , 8 Septemb

L COMPANY L

nagement Re

N, SPONSOntact with nng links wit

out  the  rep

Support 

er 

dation 

ol 

ool 

ic School 

as 

chool 

ook 

ion 

ns  from theavour Found

LTATIVE COtive  Commmunity.  Theincluding 1 s.  The  aimso  that  m  environmand commitata  and  ar During theber 2015 an

IMITED

eport

ORSHIPS ANnearby  resith the comm

porting per

e company,dation. 

OMMITTEmittee  (CCCe CCC  is  cofrom the W

m  of  the members  ofental  mattttee membere  kept  up e reportingnd 1 Decem

ND DONATdents and munity. 

riod  include

, MCC emp

E C)  providesomprised ofWanaruah Lcommittee f  the  localters.  CCC ers are actito  date  o

g period meber 2015. 

TIONS are  commi

ed donation

loyees and 

informatiof  3  council ocal Aborigis  to  pro

l  communimeetings  avely  involven mining  oeetings wer

tted  to  con

ns  to  the  fo

 contractor

on  regardinrepresenta

ginal Lands ovide  an  eity  have  adare  generaed  in the reoperations re held on 3

94 

ntinually 

ollowing 

rs raised 

ng  mine atives,  3 Council) effective dequate lly  held eview of through 3 March 

2015 An

5.0   RDuring updatedwere m The objflora  aconnect Rehabil 

5.1 BNo build 

5.2 R

5.2.1 The reh

Sha

In  tapp

ConPlan

In  tapp

Prio MCC’s and Skevegetatfor MCThere hperiod.  

5.2.2 A reviewthe recomix  is bCentral depend 

MUSWELL

nnual Environ

REHABILITthe  reportd LMP to b

made to the 

jectives of tnd  fauna tivity within

litation is co

BUILDINGS dings were 

REHABILITA

Rehabilitathabilitation 

ping is cond

the  areas  wproximately 

ntour  banksn. 

the  areas proximately 

or to seedin

rehabilitatioelletar Ridgtion across CC  includes has been no

Species Selw of the naommendedbased on spHunter Gr

dent on avai

TaBotanic

Eucalyp

Eucalyp

Acacia 

LBROOK COAL

nmental Man

TATION ting  periodbe  implemeLMP. 

the LMP arespecies,  imn the site an

onducted in

demolished

ATION OF D

tion Processprocess at M

ducted in ac

where  tree10cm. 

s  are  const

where  pas80‐100 ton

g, topsoil a

on  programe areas northe  lease athe  incorp

o change to 

lection tive vegetad native vegpecies that ey Box‐Ironilability of s

able 40: Reccal Name 

ptus crebra  

ptus teretico

decora  

L COMPANY L

nagement Re

  the  Land nted during

e to reducemplement nd surround

n accordanc

d or rehabil

DISTURBED

s MCC is: 

ccordance w

es  are  the 

ructed  in  a

sture  is  thnnes/ha. 

nd/or OGM

m  aims  to  lrth and souarea creatinporation  of the agricul

tion seed metation seewere presenbark Woodseed. 

commended

ornis 

IMITED

eport

Managemeg the next r

e the impacsustainableding areas. 

ce with the M

litated durin

D LANDS 

with the des

final  vege

accordance 

he  final  ve

M are incorp

link  existinguth of the  leng a viable native  vegltural land s

mix was unded mix listedent  in the adland.   Use

d Species LC

N

F

W

ent  Plan  (Lreporting p

ct of mininge  land  pra

MOP.  

ng the repo

sign require

tation  tops

with  the  E

getation  O

orated into

g  remnant ease area bwildlife corgetation  aresuitability o

dertaken dud in Table 4area prior t of these sp

ist for NativCommon Nam

Narrow‐leave

orest Red Gu

Western Silve

LMP)  was  reriod.   No 

g operationsactices  and

rting period

ements outl

soil  is  spre

Erosion  and

OGM  is  spr

o the underl

vegetation by planting rridor. Rehaeas  to  contf the site d

ring the rep0.  The natio mining apecies  in th

ve Vegetatime 

ed Ironbark 

um 

er Wattle 

reviewed  wsignificant 

s on existind  enhance 

d. 

lined in the

ead  to  a  d

d  Sediment 

read  at  a 

lying soil.  

in Bells Mcorridors oabilitation ptinue  the  curing the re

porting perive vegetatind  is basedhe final  land

ion 

95 

with  the changes 

g native habitat 

 MOP. 

depth  of 

Control 

rate  of 

Mountain of native planning corridor.  eporting 

iod with ion seed d on the dform  is 

2015 An

 PastureWimmesummecolder wGranulomix. Ththe Hun(Hannaand moperiod these sp 

MUSWELL

nnual Environ

Botanic

Acacia 

Acacia 

Acacia 

Cassini

Brachy

Bursari

Indigof

Austrod

Austrod

Chloris 

Desmo

Calotis 

Eremop

Veronc

Cyperu

Cheilan

Glycine

Eucalyp

Enchyla

Harden

Gooden

Myopo

Geijera

Loman

Loman

Loman

e  mixtures ena  Rye,  Per months  Jwinter monock 15 has he  species mnter Valley n, J.C., 199onitoring rewith  the  repecies in th

Botan

Pennis

Cynod

Lolium

Lolium

Setaria

Medic

LBROOK COAL

nmental Man

cal Name 

falcata 

implexa 

paradoxa 

ia aculeata  

ychiton popul

ia spinosa 

fera australis

danthia bipa

danthia race

ventricosa 

odium brachy

lappulacea 

phlia debilis 

cia calycina 

us gracilis 

nthes sieberi 

e tabacina 

ptus molucca

aena toment

nbergia viola

nia hederace

orum montan

a parviflora 

dra confertif

dra filiformis

dra multiflor

used  in Perennial  RyJapanese Mnths. The legbeen incorpmix has beein the book5).   This seesults.   A reevised  recoe final land

Table 41

ical Name 

setum cland

don dactylon

m rigidum 

m perenne 

a sphacelat

ago sativa 

L COMPANY L

nagement Re

lneus  

artite 

emose 

ypodum 

ana 

tosa 

acea 

ea 

num 

folia 

ra 

rehabilitatioye  LucerneMillet  is  addgumes are porated at aen based ok Mine Rehaed mix haseview of theommended form is dep

1: Recomm

destinum 

n  

ta 

IMITED

eport

C

S

H

K

D

K

B

A

W

W

P

T

Y

W

H

S

P

G

R

F

F

W

W

M

M

M

on  generae,  Haifa  Wded  to  the inoculated a rate of apon  the pastabilitation:  been mode pasture mspecies  listpendent on 

mended Spec

Comm

Kikuyu

Couch

Annua

Peren

Setari

Lucern

Common Nam

ally Wattle

Hickory Watt

Kangaroo Tho

Dolly Bush 

Kurrajong 

Blackthorn 

Australian Ind

Wallaby Gras

Wallaby Gras

Plump Windm

Tick‐trefoil 

Yellow Burr‐d

Winter Apple

Hairy Speedw

lender Flat‐s

Poison Rock F

Gum Topped 

Ruby Saltbush

alse Sarsapa

orest Goode

Western Boo

Wilga 

Mat‐Rush 

Mat‐Rush 

Mat‐Rush 

lly  consist hite  Clovermix, whilsand lime copproximateure establisA Handbooified over tmix was undt  for pasturavailability 

cies List for

mon Name

u grass 

al Rye grass

nial Rye gra

ne  

me 

le 

orn 

digo 

mill Grass 

daisy 

 

well 

sedge 

Fern 

Box 

rilla 

enia 

bialla 

of  Couch,r  and  sub‐cst Oats  are oated. Fertily 200 kg/Hshment  reck for the Cotime based dertaken dure  shown  inof seed. 

r Pasture 

 

ass 

,  Pioneer clover.  Dur  added  duilizer in the Ha with the commendatoal Mining on site expuring the ren Table 41

96 

Falcata, ring  the ring  the form of pasture tions  for Industry perience eporting . Use of 

2015 An

 

5.2.3 During site.  Thincludin

DamOrgpastactiexis

Wesand

No. This is aan areaoffset t Table 4activitie5.2.4  thtotal re 

 In additbrickwooutside During affectedfire  haserosionany eroactions 

MUSWELL

nnual Environ

Botan

Trifoliu

Trifoliu

Phalar

Festuc

Bromu

Rehabilitatthe  reporthree main ang: 

m Wall Dumanic  Growtture  and  tvities were sting and ne

st Crib Hut  seeding tre

2 Open Cut

a slight varia close to this area see

42  shows  thes were behhe  rehabilithabilitation

Table 

A

S

S

tion to the orks.  OGM e of the MO

the reportid approxims  assisted n occurring osion or signwill be und

LBROOK COAL

nmental Man

ical Name 

um repens 

um subterra

ris aquatic 

ca arundina

us wildenow

tion Activitiing  period areas were 

mp –  constrth Mediumree  speciescompleted

ew rehabilit

– final bulkee species. 

t – final bulk

iation from he workshoeding works

he  complethind targettation plannn area. 

42: Compa

Activity 

Shaping 

Seeding 

Total 

areas listedwas spreadP boundary

ng period amately 5ha orecovery  wfollowing tnificant weedertaken to 

L COMPANY L

nagement Re

aneum  

cea 

wie 

ies this RepMCC  contitargeted th

ruction of am  (OGM),  ins.    In  conju along Blueation. 

k shaping, co

k shaping ac

what was op this areas at the Wes

ted work  co with seedined  for  the

arison of 20

Pro

d MCC unded in this arey but on lan

 small fire oof  land (seewith  the  arhe rain.   Thed outbreakassist in the

IMITED

eport

Comm

White

Subte

Phalar

Tall Fe

Prairieonly)

porting Periinued  to  unhis reporting

a drop,  financorporatiounction  wites Road to t

onstruction

ctivities. 

identified ina couldn’t bst Crib Hut 

ompared  toing activitiee next  repo

015 Rehabili

oposed (MO

15.7ha 

10.0ha 

25.7ha 

ertook seeda prior to pd owned an

occurred one Section 3.rea  germinahis area wilks occur due managem

mon Name

e Clover  

rranean Clo

ris 

escue 

e Grass (sow

od ndertake  reg period wit

alisation ofon  of  topsoth  this  woidy up this a

n of a conto

n the MOP.be  final shawere exped

o  the  targees ahead ofrting period

itation Aga

OP) 

ding works pasture specnd controlle

n an area of.17 for morating  againl continue ring regene

ment of this 

over  

wn in Autum

ehabilitationth the activ

contour doil  and  OGMrk  final  shaarea and to

our drain, sp

.  Due to acaped and sedited. 

ts  in  the Mf  target.   Asd will addre

inst MOP T

Actual

6.0ha 

16.1ha

22.1ha

on 1.5ha ocies being seed by MCC. 

f older rehare details).     with  no  sto be monieration.  If rearea while 

mn 

n  activities vities in the

rains,  spreaM,  and  seeaping  and o incorporat

preading of

ccess restriceeded.    In o

MOP.   Bulk s shown  in ess any  sho

Targets 

of land neareeded.  Thi

abilitation.  Rain followsigns  of  sigitored to  idequired, mit regenera

97 

around se areas 

ading of eding  of seeding te it into 

f topsoil, 

ctions in order to 

shaping Section ortfall  in 

r the old s area is 

This fire wing the gnificant dentify  if itigation tes. 

2015 An

 The reh43 and  

  

MUSWELL

nnual Environ

habilitation Table 44. 

MINE LEA

A1 M1

DISTURBE

B1  In

B2 A(e

B3 W(a

B4 T(a

B5 S(a

ALL DISTU

REHABILIT

C1 T(e

REHABILIT

D1  1

D2  G

SURFACE 

E1  P

E2  N

E3  P

E4 Oo

DE‐HAB ‐ 

F1  P

F2  N

SURFACE to trees, h

G1 Pto

LBROOK COAL

nmental Man

and mainte

T

AREA A

ASE AREA 

Mine Lease 304 and M

ED AREAS 

nfrastructu

Active Mininexcluding it

Waste Emplactive/unsh

Tailing Emplactive/unsh

haped Wasawaits final 

URBED AREA

TATION PRO

Total Rehabexcept for m

TATION ON

0 to 18 deg

Greater than

OF REHABI

Pasture and

Native fores

Plantation a

Other (includoutcomes) 

disturbed a

Pasture and

Native fores

CONVERSIOhectares refl

Pasture/Covo Trees 

L COMPANY L

nagement Re

enance sum

Table 43: Re

AFFECTED /

Area: CCL 7L1562 

re Area 

ng Area ems B3‐B5 

acementshaped/in or 

lacementshaped/unca

ste Emplacevegetation

AS 

OGRESS 

ilitation Aremaintenanc

N SLOPES 

grees 

n 18 degree

LITATED LA

grasses 

st/ecosyste

and crops 

de non‐veg

areas previo

grasses 

st/ecosyste

ON ‐ previouflected in Se

ver Crop are

 

IMITED

eport

mmary for th

ehabilitatio

/ REHABILIT

713, ML 

below) 

out‐of‐pit)

pped) 

ement n) 

ea ce) 

es 

AND 

ms 

etative 

ously rehabi

ms 

usly reporteection E) 

eas planted

he reporting

on Summar

TATED (hec

To Dat

1788

48.3

88.3

111.3

0.0

6.0

253.9

363.5

45.7

0.0

238.7

124.8

0.0

0.0

ilitated, figu

0.0

0.0

ed pasture (

d 0.0

g period can

tares) 

te Las

Repo

  178

49.

111

3  92.

0.0

9.6

9  263

5  347

45.

0.0

7  233

8  114

0.0

0.0

ures reflecte

4.4

3.1

(cover crop)

0.0

n be found 

st ort 

NRe(E

88  17

.1  49

1.8  70

.9  11

0  0

6  0

3.9  23

7.4  38

.7  45

0  0

3.1  24

4.3  13

0  0

0  0

ed in Section

45  0

11  0

) areas plan

0  0

98 

in Table 

ext port Est.) 

788 

9.1 

0.3 

14.6 

0.0 

0.0 

34.0 

84.7 

5.7 

0.0 

45.9 

38.8 

0.0 

0.0 

n E 

0.0 

0.0 

nted 

0.0 

2015 An

 

NAT

Additiworks(drainsprotec

Re‐cov(detailsubsoi

Soil Tr(detailetc.) 

Treatm(detailslashin

Re‐see(detailseason

Advers(detail

Feral A(detailtrappietc.) 

 

5.2.4 The proThis is vproposeshown the minthat  cashown area tar 

 

MUSWELL

nnual Environ

T

TURE OF TR

onal erosio  s, re‐contouction)  

vering  l ‐ further toil sealing etc

reatment  l ‐ fertiliser,

ment / Manl ‐ grazing, cng) 

eding / Repl ‐ species dn etc.) 

sely Affectel – type and

Animal Conl – additionang, shootin

Rehabilitatoposed areavariation toed  changesin the MOPne plan.    Inn be  rehabin Table 45rgets identi

Table 45: C

A

S

S

LBROOK COAL

nmental Man

Table 44: M

REATMENT 

on control 

uring, rock 

opsoil, c.) 

 lime gypsu

nagement cropping, 

planting density, 

ed by Weedd treatment

ntrol  al fencing, g, baiting 

tion Activitia for rehabio what is shs  to  the  apP to be rehastead of rebilitated.    T5  these altefied in the M

Comparison

Activity 

Shaping 

Seeding 

Total 

L COMPANY L

nagement Re

Maintenance

ARE

ReporPeriod

um  0 

ds ) 

ies next Replitation durhown in thepproval  andabilitated wehabilitatingThese  areasernative areMOP. 

n of Propose

Pro

IMITED

eport

e Activities

EA TREATED(Ha) 

rt d 

NextPerio

porting Perring the nexe MOP.  Thid  the mine will require g these areas won’t be eas will  stil

ed 2016 Re

oposed (MO

22.0ha 

15.7ha 

37.7ha 

s on Rehabi

D Com

t d 

NA 

NA 

NA 

NA 

NA 

NA 

NA 

riod xt reporting s variation plan  identdisturbanceas MCC havaffected byll allow MC

habilitation

OP) 

litated Land

ment / ConTreatme

period is shis requiredtified  that  se as a resultve  identifiey  changes  tCC  to almos

n Against M

Actual (AE

15.1ha

21.2ha

36.3ha

ntrol Strateent Detail 

hown on Fig as a reviewsome  of  tht of the chad alternativto mine plast meet  the

MOP Targets

EMR) 

99 

egies / 

gure 38.  w of the he  areas anges to ve areas ans.   As e overall 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figgure 38: Proposeed Activities Nexxt Reporting Perriod 

10

 

00 

2015 An

 During rehabili 

5.3 RDuring programin  the accorda 

5.3.1 A total and  surFigure 4rehabiliguided sites  cAlthougrepresesite locaGPS  locrepresereferen Within the Endin  the Threateestablis The passix were Permantransecdocumeweed in(landscaend  of during s 

MUSWELL

nnual Environ

the  next itation area

REHABILITAthe  report

m.  This revupdated Mance with th

Site Selectiof 18 permrveyed  this40.  This incitation areaby indicativhosen  rangh  sites  weentative of ations werecation,  thesentative  oce/analogu

the woodladangered EcNew  Sout

ened  Specieshed within 

sture sites me establishe

nent photo ct  to  document changenvasion or eape and pothe  transesubsequent

LBROOK COAL

nmental Man

reporting  pas are on the

ATION MOting  periodiew was to MOP.    This he revised m

ion manent sites  reporting corporated as as per theve locationsdomly  witere  selectethe wider e pre‐existinse  three  sitof  remnanue sites.   

and sites, thcological Coth  Wales  Nes  Conservaeach of the

monitored ied within ea

reference pment  broads over  timeerosion). Fivortrait centrect.    Photo t yearly surv

L COMPANY L

nagement Re

period  furte desired tr

NITORINGd  MCC  undalign the mreporting 

monitoring 

s, nine wooperiod.    Thsites in bote requiremes provided bhin  designed  randomlrehabilitationg as part otes were nent  pasture

hree analoguommunity (North  Coasation  Act  1e three Reh

ncluded thrach of the th

points wered  vegetatioe and provive photos wre, facing  lereference 

veys. 

IMITED

eport

her  studiesrajectory to

G dertook  a  rmonitoring pperiod  reprequiremen

dland sites he  locationth remnant ents as set by MCC envnated  woodly,  care  waon areas.   of historic flewly estable  and  w

ue sites weEEC) Centrast  and  Syd1995  (TSC  Aabilitations

ree within rhree Rehab

e establishedon  changes ide early wwere taken eft, facing rpoints will

s  will  be  u comply wit

review  of  tprogram witpresents  thents. 

and nine p  of  the  site(for purposout in the Mvironmentadland  or  pas  given  toInitially,  twora monitolished  in  looodland  a

re establishal Hunter Gdney  BasinAct).    The s Blocks (A, 

remnant pabilitations B

d at the stawithin  ea

warning of aat each refright) and ol  be  reasse

undertaken th completi

the  rehabilth the closue  first  year

pasture siteses  is  shownse of refereMOP.  The ll staff with pasture  reo  ensure  two pasture aoring, howevcations  thaand  suitab

hed within rGrey Box – I

Bioregion remaining B and C).   

sture areaslocks (A, B a

rt and end ch  woodlanany emerginerence poinone  landscaessed  and  h

to  identifyon criteria.

litation  moure criteria or  of monit

s, were estan  in  Figure ence/analoglocality of s specific onhabilitationthey  were and one wver, due to at were  conble  for 

remnant paIronbark W  listed  unsix  location

s and the reand C).    

of each pernd/pastureng  threats  (nt, four at tpe photo fhave  image

101 

y  if  the 

onitoring outlined oring  in 

ablished 39  and 

gue) and ites was n ground n  areas.  suitably oodland error in nsidered use  as 

tches of oodland der  the ns were 

maining 

rmanent   site  to (such as the start rom the es  taken 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figuree 39: Rehabilitattion Monitoringg Program – Florra Sites

10

  

02 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

Figure 40: Rehabilitation Monitoring Program – Faunna Sites 

10

 

03 

2015 An

5.4 F

5.4.1 At eachplot weend of (and site45 degrlines an 

 

5.4.2 Floristic41). Th46).   Wwith the 

MUSWELL

nnual Environ

LORA MON

Permanenth of the ninere establis(Figure 41).e details werees) to avond/or plante

Full Floristic assessmenis was a m

Within each e BioBankin

LBROOK COAL

nmental Man

NITORING 

t Monitorine woodlandhed centred.  GPS coordere recordeoid collectined rows.  

ic and Strucnts for speceasure of bplot the attng Assessme

50

L COMPANY L

nagement Re

METHODO

ng Transectsd sites, 20md over a 50dinates wered.   All plotng data bias

Figure 41: 

cture cies richnessboth  specietribute for ent Method 

 

 

IMITED

eport

OLOGY 

s/Plots m x 50m plo0m transectre taken at ts were estased towards

Floristic Plo

s were condes presencenative and dology 2014

20

10

ots with a nt marked usthe start anablished acs vegetation

ot Diagram

ducted withe,  including exotic spec4. 

0

10

nested 20msing star picnd finish poross the slon and soil c

 

hin the 20mcover and 

cies  is recor

20

m x 20m fullckets the soints of the ope (approxharacteristi

 

m x 20m plot abundancerded  in acc

104 

floristic tart and transect ximately ics in rip 

t (Figure e  (Table ordance 

2015 An

Attribu

Stratum

Growth

Species

Cover 

Abundarating 

 All  vascpossibleNomenany  subother sp In  addirecorde 

5.4.3 Within Assessmcover  eforbs, snumberoccurrin 

5.5 FTo demsites,  mmonitomonitoyears frthe respyears  acompar 

5.5.1 The speand  is 

MUSWELL

nnual Environ

Table 46

te 

m  

h form 

s name 

ance 

cular  plantse,  with  sclature follobsequent  repecific bota

ition  to  thed from acro

Biometric Sthe  20 m 

ment Methoevery  five msedges) covr of hollowng were all 

LORA MONmonstrate comonitoring ring  of  anring prograrom plantinpective anaafter  seedinrable to ana

Species Ricecies richnebased  on  t

LBROOK COAL

nmental Man

6: Data Gath

Survey Req

Stratum an

Growth for

Scientific n

A measure recorded scover of a sthen the es

A relative mwithin the estimates o1,2,3,4,5,6,1000 if req

s  species  wsamples  ofowed the Fecent  taxonanical sourc

is,  the  totoss the ent

Survey x  50 m  ploodology  (Dmetres  aloner, exotic s bearing trrecorded. 

NITORING ompliance wsurvey  realogue  siteam,  states  tng, >80% ofalogue sitesng  weeds alogue sites

chness ss measurethe  average

L COMPANY L

nagement Re

hered for Fl

quirement

nd layer in w

rm for each 

ame and co

or estimatepecies; recospecies is lestimated co

measure of plot. Use thonly: ,7,8,9,10,20uired 

were  recordf  unknownlora of Newnomic  chanes. 

al  number ire vegetati

ot,  biometrECC 2008). ng  the  50mspecies coveees and wh

RESULTSwith the comesults  wases.      Key  cthat  ‘rehabf the species’ and ‘reharepresent ’. 

ed at each we  number  o

IMITED

eport

loristic Asse

which each s

 recorded s

ommon nam

e of the apporded from ess than 1% over should 

the numbehe following

0,50,100,50

ded  and  idn  species w South Wanges  as  pre

of  each  sion zone.  

ric  attribut   Attribute

m  transect. er were rechether rege

mpletion crcomparedcompletionbilitation moes establishbilitation mless  than 

woodland mof  native  sp

essment of 

species occ

species 

me 

propriate co1–5% and tand the spbe entered

r of individug intervals; 

00,1000 or s

dentified  tocollected 

les (Hardenesented  on 

species  reg

es were  res  included Shrub  covecorded evereneration  (t

riteria indica  to  bench  criteria  inonitoring  reed are com

monitoring r20%  of  pr

monitoring species  and 

the Woodl

urs 

over measuthen to the ecies is con (e.g. 0.4) 

uals or shoonumbers ab

pecify a nu

o  the  lowesfor  furth

n 1992; 1993PlantNET 

generating 

ecorded  usicanopy  cover,  grass  cory one mettrees  less th

ated in the hmarks  dern  the  MOPeports  confmparative toreports conojected  fol

ite is represweed  spec

and Sites 

re for each nearest 5%

nsidered imp

ots of a spebove about 

mber great

st  taxonomher  identi3; 2000; 20(RBGDT  20

was  assess

ing  the  Biover and midover,  otherre.   Lengthhan 5cm D

MOP for wrived  throuP,  relevant firm  that afo the seed firm that afliage  cover

sented in Fcies  presen

105 

%. If the portant, 

cies 20 are 

ter than 

mic  level fication.  02), and 012)  and 

sed  and 

obanking d‐storey r  (herbs, of  logs, BH) was 

oodland ugh  the to  this 

fter  two mix and fter two r  or  are 

igure 42 t within 

2015 An

remnanTable  4Central  The  aveover  fivwoodlarichnes 

 The comsite  is  rweed spjust abo 

MUSWELL

nnual Environ

nt and reha40  as well  Hunter Gre

erage numbve  times  gnd  sites.  Ts between 

Fi

mparison orepresentedpecies whicove an aver

LBROOK COAL

nmental Man

bilitation was  those  spey Box – Iro

ber of nativgreater  thahe  standarremnant an

gure 42: Co

f average wd  in Figure ch is slightlyage of 10 w

L COMPANY L

nagement Re

woodland sitpecies  consonbark Woo

ve  species an  that  of d  deviationnd rehabilita

omparison o

weed specie43.   The  rey higher thaweed specie

IMITED

eport

tes.  This residered  desodland comm

present winative  spe

n  bars  showation wood

of Average 

es richness ehabilitatioan that for tes.  

elates to thesired  nativemunity in th

thin  the  reecies  presew  that  the land sites is

Native Spe

measured n woodlandthe remnan

e recommee  species  che remnant

emnant wooent  across variability s relatively l

ecies Richne

at each wod sites havent woodland

nded speciconsistent wt sites.   

odland  sitethe  rehabof  average limited.  

ess  

oodland moe an averagd sites whic

106 

es list in with  the 

es  is  just bilitation species 

onitoring ge of 14 ch sits at 

2015 An

5.5.2 Averagenative oExotic  pbetwee The  remwith a cover wground 

MUSWELL

nnual Environ

Fig

Biometric De percentagother coverplant  coveren remnant 

mnant woohigher propwas conside.  

LBROOK COAL

nmental Man

gure 43: Com

Data ge of nativer was measur,  litter  andand rehabi

odland  sitesportion  in orably highe

F

L COMPANY L

nagement Re

mparison o

e over‐storeured for remd  bare  groulitation woo

s  containedover‐storey,r in rehabili

Figure 44: B

IMITED

eport

of Average N 

ey and mid‐mnant and und were  aodland sites

d  a  greater , grass coveitation sites

iometric Da

Number of 

storey coverehabilitatelso  recordes.   

proportioner, shrub ans and mode

ata Average

Weed Spec

er and natived woodlaned  and  pro

n  of  native nd native orately highe

es 

cies  

ve grass, shrnd sites (Figovide  a  com

species  in other coverer in litter a

107 

rub, and gure 44).  mparison 

general .   Exotic and bare 

 

2015 An

 

5.5.3 In relatestablisin Tableremnanfoliage  

Site 

RW1 

RW2 

RW3 

RW4 

RW5 

RW6 

 

5.6 FAFauna mobile indicatoconjuncnoted ifoperatimore  rsubsequ 

5.6.1 Remoteplastic bon a treof 3 nigweek  oidentify 

5.6.2 A  new involvedsites foare thaat  the across a

MUSWELL

nnual Environ

Comparisotion  to seleshed nativee 47.   In cont woodlandcover of we

T

Comcrite(natiesta

AUNA MOmonitoring fauna  specor  fauna spction  with f observed ons.    At  thrigorous  dauent monito

Remote Cae  cameras bait stationee trunk facghts, howevof  monitorying the typ

Bird Censumethodolod the use or four nightt recordingsame  tempall sites.  

LBROOK COAL

nmental Man

n to Complcted compl species comparison, td sites (anaeeds in rem

Table 47: R

mpletion eria target ve species ablished) 

>80% 

>80% 

>80% 

>80% 

>80% 

>80% 

ONITORINGdesign  an

cies  (i.e. birpecies as opthe  fauna which mayhis  stage,  faata  analysisoring years 

amera Survewere  place filled with cing the baitver, an addiring  and  ee of animal

s ogy  was  unof songmetets and usedgs of bird acperature  ac

L COMPANY L

nagement Re

etion Criteletion criteromposition the averagelogue sites)nant wood

ehabilitatio

2015 result

21% 

17% 

39% 

50% 

31% 

39% 

G METHODd  location rd and bat pposed  to amonitoring

y assist withauna monits  and  testhas been c

ey ed  at  seventuna and pt station fortional nightquipment  observed a

ndertaken ers. The sond to record ctivity werecross  each 

IMITED

eport

ria ria,  the resand projecte percentag) has been cland sites w

on Site Com

Target reached

No 

No 

No 

No 

No 

No 

DOLOGY was  guidespecies).   Tattempting g,  evidenceh habitat retoring  is  foing  to  be collected. 

n  of  the  niplaced at gror a total of ft was recorcollection. at each site

for  collectingmeters wbird call ac

e captured aof  the wo

ults of  the ted foliage e of native calculated aweeds is 12%

mpletion Cri

Complcriteria 

(weed prfoliage c

<20

<20

<20

<20

<20

<20

d  by  the MThe monitoto monitore  of  appropecreation toocused  on  cundertake

ne woodlanound level. four nights/ded as this   Analysis . 

ing  bird  dawere placed ctivity. The at exactly todland  site

rehabilitaticover for wspecies estaat 76%.  The%.   

teria Targe

etion target ojected cover) 

0% 

0% 

0% 

0% 

0% 

0% 

MOP  and  horing prograr all speciespriate  fauno areas adjacollecting  bn  once  ad

nd  sites,  an A remote c/days.  The coincided wof  camera

ata  across at each of benefits ofhe same times  thus  pro

ion woodlaweeds  is prablished wie average pr

et 

2015 result 

Tex

72.5% 

84.0% 

44.5% 

42.5% 

90.5% 

86.0% 

has  targetedam  focuseds  found on na  structureacent to thebaseline  dadequate  da

nd  compriscamera waMOP statedwith the ena  images  i

the  MCC  sthe nine wf using this me of mornoviding  con

108 

nd sites resented ithin the rojected 

Target xceeded

Yes 

Yes 

Yes 

Yes 

Yes 

Yes 

d  highly d on key site.    In es  were e mining ta, with ata  over 

sed  of  a s placed d a total d of the ncluded 

site  and oodland method ning and sistency 

2015 An

 An  ecocollecteconducMCC sit 

5.6.3 Songmerecord where songmefour  hoanalysis Call  idemicrobaeast Ne200 call Bat callcharactobtain rwere fo

Seabuz

Recwer

Fouo o o o

Nycmad

Seqcalls

Datathouand

 

5.7 FA

5.7.1 The resan  indic

MUSWELL

nnual Environ

ologist  expeed  and  hating rehabilte.  

Microchiroeters were high  frequpossible,  ineters recordours  of  recs expert.  

entificationsats in New ew South Wls from nort

s are analysteristic  freqreliable andollowed:  

rch phase czes (McKen

ordings  conre labelled a

r categoriesdefinite – idprobable – possible – munidentifiaeven a spec

ctophilus spde to identi

uences nots and don’t 

a  on  the  nugh only de presence a

AUNA MO

Remote Casults of the cation of  fa

LBROOK COAL

nmental Man

erienced  ins  used  thilitation mon

opteran Batinstalled atency  bat  cn  the  wooded calls foordings  for

s  were maSouth Wale

Wales (Reinhth‐eastern N

sed using spquency,  initd accurate r

calls were unzie et al. 20

ntaining  lesas short (Law

s of confidedentity not low probabmedium to ble, poor ocies group. 

pp. are difficfy this genu

 attributed represent m

number  of efinite and pat each site.

ONITORING

amera Surveremote camauna  specie

L COMPANY L

nagement Re

n  identifyinis,  in  conjunitoring, to 

s t each of  thalls.    All  sodland  sitesr a four hor  each  nigh

de  using  res (Pennay old et al. 20NSW.   

pecies‐special  slope  aresults the f

used  in  the002)  

ss  than  threw et al. 199

ence in specin doubt  bility of conhigh probabr low qualit

cult to idenus to specie

to microbamicrobat ac

passes  of  eprobable ca. 

G RESULTS

ey mera data ies  richness 

IMITED

eport

ng  bird  calunction  wicompile a b

he nine woongmeters s.    A  time our period fht were  ana

egional  baset al. 2004001) and th

cific paramend  time  befollowing pr

e analysis,  r

ee pulses w99)  

cies identific

fusion withbility of conty– calls ma

tify confides level (Pen

at echolocatctivity at the

each  bat  spall passes w

s presentedat each w

lls  from  reth  incidenbird list for 

oodland sitewere  direcdelay  was

from prior talysed  by  R

sed  guides ); and soute accompa

eters of the etween  callrotocols (ad

rather  than

were not  a

cation were

h species of nfusion withade by bats 

ently from tnnay et al. 2

tion calls wee site. and

pecies  per ere used to

d in Figure oodland  sit

ecordings  rtal  bird  idthe woodla

es  for  four ted  along  as  programmto dusk untRodney  Arm

to  the  echh‐east Queenying refere

call profile ls  (Rineholddapted from

 cruise pha

nalysed  and

e used (Mill

similar callsh species wiwhich cann

their calls a2004)  

ere labelled

monitoringo represent 

45 and Tabte  surveyed

reviewed  thdentificationand sites ac

nights and a  potentialmed  such  ttil midnightmistead,  a 

holocation ensland anence library

 such as cad  et  al.  200m Lloyd et. a

ase calls or 

d  these  seq

s et al. 1996

s  ith similar cnot be iden

nd no attem

d as junk or 

g  site was  cspecies cal

ble 48 and pd.   Results 

109 

he  data n  whilst cross the 

used  to   flyway, that  the t.   These bat  call 

calls  of d north‐y of over 

ll shape, 01).    To al. 2006) 

feeding 

quences 

6):  

calls  tified to 

mpt was 

non‐bat 

collated, l activity 

provides indicate 

2015 An

that  mpresencwere sl 

 

Macro(Red

Macr(Easter

Tachyg

Lepus e

Tricho(Bru

Rattus 

Vulp

Varan

Corv(Aus

Gym(Aust

MUSWELL

nnual Environ

ammal  prece  of  birdsightly more

Fi

Species 

opus rufogr‐neck Walla

ropus giganrn grey kang

glossus acul(Echidna) 

europaeus (

osurus vulpeshtail possu

rattus (Blac

pes vulpes (F

nus varius (Monitor) 

vus coronoidstralian Rav

norhina tibtralian Mag

LBROOK COAL

nmental Man

esence  bet.  Reptiles we common a

igure 45: Co

T

R

riseus aby) 

nteus garoo) 

leatus 

(Hare) 

ecula um) 

ck rat) 

Fox) 

Lace 

des ven) 

icen gpie) 

L COMPANY L

nagement Re

ween  remwere  only  iat the remn

omparison 

Table 48: R

Remnan

RWoodNew1 

 

 

 

 

 

 

IMITED

eport

nant  and identified  aant sites be

of Average

Remote Cam

nt Woodlan

RWoodNew2 

 

 

 

 

 

 

rehabilitatioat  remnant eing double 

 Fauna Spe

mera Result

nd Sites 

RWoodNew3 

 

 

 

 

on  sites  iswoodlandsthat of reh

cies Richne

s  

Rehabi

NRW1  R

 

 

 

 

s  similar  ass  and  pest habilitation s

ess 

ilitation WoSites 

RW3  RW

x  x 

x  

x  

   

   

   

x  

110 

s  is  the species sites.  

 

oodland 

5  RW6 

 

 

 

 

 

 

2015 An

melanow

 

5.7.2 Bird  spwoodlawoodla One  thWarble 

 

5.7.3 The resand  TawoodlaRW1, R 

MUSWELL

nnual Environ

Species 

Corcorax orhamphos (wing Chough

Bird Censupecies  werend sites shnd as oppo

hreatened  sr). This spec

Figure 4

Microchirosults of the ble  49  indnd  site  surW2, RW3, R

LBROOK COAL

nmental Man

R

(White h) 

s e  identifiedown  in Figuosed to appr

species  wacies is listed

46: Bird Spe

opteran BatMicro‐bat cicating  the rveyed.   NoRW5 or RW

L COMPANY L

nagement Re

Remnan

RWoodNew1 

 

d  with  a  cure 46.   An roximately 7

as  identified as Vulnera

ecies Identif

s census usinpresence 

o  bat  activi6.   

IMITED

eport

nt Woodlan

RWoodNew2 

comparisonaverage of7 in rehabil

d  at  RW5 able under t

fied at Rem

ng songmete(and  numbity was  det

nd Sites 

RWoodNew3 

 

n  between f 11 bird spitation woo

being  Chtthe TSC Act

mnant and R

er data capber  of  callstected  for 

Rehabi

NRW1  R

 

remnant ecies was podland sites

thonicola  st.  

Rehabilitati

ture is press)  of  bat  sprehabilitati

ilitation WoSites 

RW3  RW

x  

and  rehabpresent  in rs.  

sagittata  (S

ion Sites 

sented in Fipecies  utilison woodla

111 

oodland 

5  RW6 

 

bilitation remnant 

Speckled 

 

igure 47 sing  the nd  sites 

2015 An

Figure 

Gould

Choco

Eastern

South‐e

Long

Yellow‐

East

Inland 

Eastern

White‐st

South

*ThreateNote: M(Corben’s

 

5.8 SOAt eachfor  eacalong e 

MUSWELL

nnual Environ

e 47: Numbe

Table 49: B

Species 

d's Wattled B

late Wattled

 False Pipistr

astern Free‐Bat 

g‐eared Bats

bellied SheaBat* 

ern Forest B

Broad‐nosed

 broad‐nose

triped freeta

hern Forest B

ened species ay potentiallys long eared B

OIL MONITh of the moh of  the  18ach of the 5

LBROOK COAL

nmental Man

er of Comm

Bat Calls Ide

Def

Bat 

d Bat 

relle* 

tailed 

s* 

thtail 

at 

d Bat 

d Bat 

ail Bat 

Bat 

y be  commonBat) and Nycto

TORING Mnitoring site8  transects50m transec

L COMPANY L

nagement Re

mon and Th

entified at RRWoodNew

finite  Pro

 

 

n  species or oophilus bifax (

METHODOLes, 10 soil s using  the cts.   

IMITED

eport

reatened B

Remnant anw1  RW

obable 

 

one of  two  t(Eastern long‐

LOGY samples westandard  s

Bat Species 

nd RehabilitWoodNew2

Definite 

 

hreatened  sp‐eared bat). 

re collectedsoils  sampli

Recorded a

tation WooRWood

Definite 

 

ecies  includin

d using a song  techniq

at Woodlan

odland SitesdNew3 

Probable 

 

 

ng Nyctophilu

oil corer andue of  5m  i

112 

 d Sites 

s RW4 

Probable 

 

 

us  corbeni 

d bulked ntervals 

2015 An

5.9 SO

5.9.1 The  pHrehabili48).   

 The  av43µS/cm83µS/cmrespect 

MUSWELL

nnual Environ

OIL MONIT

Woodland H  in  remnaitation sites

verage  meam (Figure 4m.    Sites  Rtively which

LBROOK COAL

nmental Man

TORING RE

Sites ant  woodlas were gene

asured  elec49).  Within RW5  and  Rh is shown b

Figure 49

L COMPANY L

nagement Re

ESULTS 

nd  sites  werally within

Figure 48: C

ctrical  condthe rehabi

RW6  were by the large 

: Compariso

IMITED

eport

was  typicallyn this range

Compariso

ductivity  oflitation sitewell  abovestandard d

on of Soil E

y  between e with the h

n of Soil pH

f  soils  in es the averae  the  higheeviation ba

lectrical Co

5.5  and  6highest scor

remnant  wage electricaest  score  br.  

nductivity 

6.0.    All  wre being 6.7

woodland  sal conductibeing  160  a

113 

oodland 7 (Figure 

 

site  was vity was and  127 

 

2015 An

 The  av0.52merange w 

 The  avRehabilabove tbar.  

 

MUSWELL

nnual Environ

verage  exceq/100g  (Figwith an aver

verage  sulplitation woothis at 374 m

LBROOK COAL

nmental Man

changeablegure  50).   rage of 0.6m

Figu

phur  measuodland sitesmg/kg.  Thi

Fig

L COMPANY L

nagement Re

potassium  All woodlmeq/100g.

ure 50: Com

ured  in  rems generally fs outlying r

gure 51: Co

IMITED

eport

m  measureand  rehabi

mparison of

mnant  woofell within tresult is rep

 

mparison o

ed  at  remilitation  site

f Soil Potass

odland  sitethis range epresented b

of Soil Sulph

mnant  wooes were  ge

sium 

s  was  20mxcept for RWy the large 

hur 

odland  sitenerally wit

mg/kg  (FiguW2 which wstandard d

114 

es  was thin  this 

 

ure  51).  was well eviation 

 

2015 An

The  ave(Figure RW5 wstandar 

 The  aveThe ave 

 The meOrganic 

MUSWELL

nnual Environ

erage mea52).   All reas considerrd deviation

erage  soil Nerage Nitrog

easured  soic Matter acr

LBROOK COAL

nmental Man

sured  soil ehabilitationrably highern bar. 

Figure 

Nitrogen  ingen at reha

Fig

il Organic Mross the reh

L COMPANY L

nagement Re

Nitrite  +  Nn sites fell  jr at 4.9mg/

52: Compa

n  remnant wbilitation sit

gure 53: Com

Matter  in  rhabilitation 

IMITED

eport

Nitrate  in  rjust below /kg.   This ou

arison of So

woodland  ste fell below

mparison o

remnant wosites was a

emnant wothis with autlying resu

oil Nitrite + 

sites was  aw this at 2,0

f Soil Nitrog

oodland  sitpproximate

oodland  sitn average oult  is repres

Nitrate  

at  approxim000mg/kg (F

gen 

e  is  approxely 3.2% (Fig

tes  was  1.2of 1.30mg/sented by t

mately  2,60Figure 53). 

ximately  6.gure 54).    

115 

20mg/kg kg.   Site he  large 

 

0mg/kg.    

 

5%.  Soil 

2015 An

 

5.9.2 The  avepasture 

 The ave(Figure  

MUSWELL

nnual Environ

Fi

Pasture Siterage  pH  ine sites was s

erage meas56). Within

LBROOK COAL

nmental Man

igure 54: Co

es n  remnant slightly high

Figur

sured electrn the rehabi

L COMPANY L

nagement Re

omparison o

pasture  sither at 6.5% 

re 55: Comp

rical conducilitation site

IMITED

eport

of Soil Orga

tes was  5.7(Figure 55)

parison of S

ctivity of soes the avera

anic Matter

7%  and  the.  

Soil pH – Pa

oils in remnage electrica

r – Woodlan

  average  p

asture 

ant pastureal conductiv

nd 

pH  in  rehab

e site was 5vity was 119

116 

 

bilitation 

 

58µS/cm 9µS/cm.   

2015 An

 The aveRehabil 

 The avesites geand 84score of 

MUSWELL

nnual Environ

Figu

erage exchalitation past

erage sulphenerally fell mg/kg  respf 38mg/kg a

LBROOK COAL

nmental Man

ure 56: Com

angeable Poture sites ha

Figure 57

ur measurewithin this 

pectively.   Tand large st

L COMPANY L

nagement Re

mparison of 

otassium mead an avera

7: Comparis

ed in remnarange exceThese outlytandard dev

IMITED

eport

Soil Electri

easured at age of 0.62m

son of Soil P

nt pasture ept for RP1 ying  resultsviation bar (

cal Conduc

remnant pameq/100g (

Potassium –

sites was 9and RP6 w  are  repres(Figure 58).

tivity – Pas

asture sites Figure 57). 

– Pasture 

mg/kg.  Rehhich was wsented by  t  

sture  

 was 0.9me

habilitation ell above ththe higher 

117 

 

eq/100g. 

 

pasture his at 79 average 

2015 An

 The  averehabili 

 The aveaverageconside6,540m 

MUSWELL

nnual Environ

erage measitation sites

Figur

erage soil Ne  Nitrogenerable  variamg/kg.  This 

LBROOK COAL

nmental Man

Figure 5

sured  soil Ns were cons

re 59: Comp

Nitrogen  in   at  rehabation  in  rehvariation is 

L COMPANY L

nagement Re

58: Compar

Nitrite  + Niiderably low

parison of S

remnant pailitation  sithabilitation indicated b

IMITED

eport

rison of Soi

itrate  in  rewer with an

Soil Nitrite +

asture siteste  fell  beresults wi

by the large

l Sulphur –

mnant  pasn average of

+ Nitrate (m

s was at applow  this  ath  RP2  bei standard d

Pasture 

ture  sites wf 0.65mg/kg

mg/kg) – Pa

proximatelyat  2,515mgng  630mg/deviation ba

was  1.8mg/g (Figure 59

asture 

y 3,140mg/g/kg.    The/kg  and  RPar (Figure 60

118 

 

/kg.   All 9).  

 

/kg.   The ere  was P6  being 0). 

2015 An

 The meOrganic 

 

5.10 EIn  conjareas suobviousbe reco

Rills

MUSWELL

nnual Environ

easured  soic Matter acr

ROSION Aunction  witurrounding s  landform orded if foun

s, gullies an

LBROOK COAL

nmental Man

Figure 6

il  Organic ross the reh

Figure 61: C

ND LANDFth  the  201each of theinstability. nd present 

d tunnel inl

L COMPANY L

nagement Re

60: Compari

Matter  in  rhabilitation 

Comparison

FORM STAB15  rehabilite rehabilita The followwithin and 

et and outl

IMITED

eport

ison of Soil 

remnant  pasites was a

n of Soil Org

BILITY ation moniation monitowing  list prosurroundin

ets. 

Nitrogen –

asture  sitespproximate

ganic Matte

itoring,  obsoring sites fovides someg each reha

– Pasture 

s  is  approxely 4.3% (Fig

er – Pasture

servations  wfor any signe of the feaabilitation m

ximately  6.gure 61).    

were madens of soil eratures that monitoring s

119 

 

3%.  Soil 

 

e  in  the osion or were to site:  

2015 An

Finedep

Hole

Loss

Loss

Hum

Roo

Bare In ordesevere recomm The resmonitooccurrinflow lea 

RehabiliSite 

RW1 

RW2 

RW3 

MUSWELL

nnual Environ

e  soil  accumpressions. 

es through 

s in depth o

s of topsoil 

mmocking a

ot exposure

e patches w

r to determerosion  a

mended dep

sults from thring sites ang at all 12ading to rill 

Table 50: E

itation EroOccTyp

Lim

Lim

Lim

LBROOK COAL

nmental Man

mulation  or

drainage st

of topsoil/gr

due to wind

and pedesta

where groun

mine the sevand  1  beipending on 

he erosion sre presente2 sites, howerosion occ

Evidence ofosion currence/ pe 

mited 

mited 

mited 

L COMPANY L

nagement Re

r  the  prese

tructures. 

rowth medi

d and sheet

alling. 

ndcover veg

verity of eroing  minimthe level of

survey undeed  in Tablewever there curring in th

f Erosion at 

Comment

No evidenvicinity ofthis is liketopsoil inidue to winnatural decover preserosive fe

No evidenvicinity ofthis is liketopsoil inidue to winnatural decover preserosive fe

No evidenvicinity ofthis is liketopsoil inidue to winnatural dewhich groof the sitepresent wfeatures f

IMITED

eport

ence  of  lag 

ium  

t flow  

getation has

osion, a scoal)  has  bf erosion id

ertaken at ee 50. The su  is moderahe sloped la

 Rehabilitat

ts 

nce of erosiof the site.  Thely due to a nitially being and and/or shegeneration.sent which iseatures from

nce of erosiof the site.  Thely due to a nitially being and and/or shegeneration.sent which iseatures from

nce of erosiof the site.  Thely due to a nitially being and and/or shegeneration.ound layer coe has both grwhich is likelyfrom occurrin

material  a

s been denu

oring systemeen  used entified.   

each of theurvey  foundte  loss of  tand leading 

tion Woodl

on was obserhere is limitenumber of faapplied, poteheet flow du.  There is a fs likely to ass occurring.  

on was obserhere is limitenumber of faapplied, poteheet flow du.  There is a fs likely to ass occurring.  

on was obserhere is limitenumber of faapplied, poteheet flow du.  There are pover is not prround and cay to assist in ng.   

at  the  botto

uded. 

m from 1 towith  man

 six rehabild that thereopsoil due to site RW6

land and Pa

rved at this sd topsoil prectors includientially somering establisfair amount osist in the pr

rved at this sd topsoil prectors includientially somering establisfair amount osist in the pr

rved at this sd topsoil prectors includientially somering establispatches of baresent, howeanopy vegetathe preventi

om  of  slop

o 10 (with 1nagement 

itation and e  is  limited to wind an6.  

asture Sites

site, or withinesent, howeving limited e loss of tophment and of vegetativerevention of 

site, or withinesent, howeving limited e loss of tophment and of vegetativerevention of 

site, or withinesent, howeving limited e loss of tophment and are ground iever the majative cover ion of erosiv

120 

es  or  in 

10 being options 

pasture erosion 

nd sheet 

s  

n the ver, 

soil 

n the ver, 

soil 

n the ver, 

soil 

n ority 

ve 

2015 An

RehabiliSite 

RW4 

RW5 

RW6 

RP1 

RP2 

RP3 

RP4 

RP5 

RP6 

 

MUSWELL

nnual Environ

itation EroOccTyp

Lim

Lim

Lim    Losdueandleaero 

Lim

Lim

Lim

Lim

Lim

Lim

LBROOK COAL

nmental Man

osion currence/ pe 

mited 

mited 

mited at site 

ss of topsoil e to wind d sheet flow ding to Rill osion (5) 

mited 

mited 

mited 

mited 

mited 

mited 

L COMPANY L

nagement Re

Comment

No evidenvicinity ofsignificantthis is likeuse of rocloss of topestablishmareas of bpresent, hmoderatepreventio

No evidenlow‐modecanopy co

No evidenlimited toof factors potentiallduring estThe areasearth andare signs oinitial stag2015 withwas seede

No evidenlow‐modeis fairly hi

No evidenlow‐modesignificantcover is lo

No evidenlow‐modeis fairly hi

No evidenlimited toGround la

No evidenlimited toGround la

No evidenlow‐modeis fairly hi

IMITED

eport

ts 

nce of erosiof the site.  Tht amount of ely due to limck during lanpsoil due to wment and nabare ground however thee canopy covon of erosive 

nce of erosioerate level ofover is fairly 

nce of erosioopsoil presen including limy some loss tablishment s of sloped lad due to the sof topsoil losges of rill eroh signs of gooed. 

nce of erosioerate level ofgh.  

nce of erosioerate level oft patches of ow‐moderate

nce of erosioerate level ofgh. 

nce of erosioopsoil presenayer cover is 

nce of erosioopsoil presenayer cover is 

nce of erosioerate level ofgh. 

on was obserhere is limitebare ground

mited topsoil dform estabwind and/ortural degenein which grosite has a sp

ver present wfeatures fro

on was obserf topsoil preshigh.  

on was obsernt, however, mited topsoiof topsoil duand natural and in the vicslope and lacss and sheet osion. This arod vegetativ

on was obserf topsoil pres

on was obserf topsoil presbare grounde.  

on was obserf topsoil pres

on was obsernt and moderlow‐modera

on was obsernt and modermoderate. 

on was obserf topsoil pres

rved at this sd topsoil pred and rock prinitially beinlishment, por sheet flow deration.  Theund layer coparse groundwhich is likelym occurring

rved at this ssent and gro

rved at this sthis is likely l initially beinue to wind andegeneratiocinity of site ck of vegetatflow which irea was seede cover gene

rved at this ssent and gro

rved at this ssent, howeved present.  G

rved at this ssent and gro

rved at this srate patchesate.  

rved at this srate patches

rved at this ssent and gro

site, or withinesent and a resent, howeng applied, thotentially somduring ere are large over is not d cover and y to assist in g.   

site.  There isound layer an

site.  There isdue to a numng applied, nd/or sheet on.   RW6 is baretive cover this leading to ded in Octoberating since

site.  There isound layer co

site.  There iser there are round layer 

site.  There isound layer co

site.  There iss of bare grou

site.  There iss of bare grou

site.  There isound layer co

121 

n the 

ever, he me 

the 

s a nd 

s mber 

flow 

ere 

er e it 

s a over 

s a 

s a over 

s und.  

s und.  

s a over 

2015 An

5.11 CA

Carryingpasturewill  inflareas.  Carryingcalculatresults per 1.5only sto 

Ta

Sites 

RPastNe

RPastNe

RPast03

RP1 

RP2 

RP3 

RP4 

RP5 

RP6 

 

5.12 RMCC ar 

MUSWELL

nnual Environ

ARRYING C

g  capacity e rehabilitatuence the 

g  capacity ted using thfrom Tableha.  Sites Rock one cow

able 51: Est

Pastu

ew1 Nativfertiladde

ew2 Nativfertiladde

 Nativfertiladde

Nativ(dom

Nativ(dom

Nativfertiladde

Nativfertiladde

Nativ(dom

Nativfertiladde

REHABILITAre not curre

LBROOK COAL

nmental Man

CAPACITY 

and  pasturtion sites.  Tappropriate

for  each he example 51 show thP3 and RP4w per 4ha an

timated Ca

ure Type 

ve unimproveity (no seed d) 

ve unimproveity (no seed d) 

ve unimproveity (no seed d) 

ve unimproveminated by Ch

ve unimproveminated by Ch

ve unimproveity (no seed d) 

ve unimproveity (no seed d) 

ve unimproveminated by Ga

ve unimproveity (no seed d) 

ATION TRIAntly undert

L COMPANY L

nagement Re

AND PAST

re  conditioThe data gae future sto

of  the  reme of a 450kghat the rem4 have the cnd RP5 is on

rrying Capa

ed – moderaor fertiliser 

ed – moderaor fertiliser 

ed – moderaor fertiliser 

ed – low ferthloris gayana

ed – low ferthloris gayana

ed – moderaor fertiliser 

ed – moderaor fertiliser 

ed – low fertalenia pubes

ed – moderaor fertiliser 

ALS AND Rtaking any t

IMITED

eport

TURE COND

on were  coathered will ocking rates

mnant  andg dry stock mnant pastucapacity to ne cow per 

acity for Rem

R(DS

ate 1.

ate 1.

ate 1.

tility a) 

1.

tility a) 

1.

ate 1.

ate 1.

tility scens) 

1.

ate 1.

RESEARCHrials within 

DITION 

nducted  atbe used tos (carrying 

d  rehabilita(non‐lactatre sites havstock 1 cow6ha.  

mnant and 

Range SE/ha) 

E

(

.5‐4.0 

.5‐4.0 

.5‐4.0 

.0‐2.5 

.0‐2.5 

.5‐4.0 

.5‐4.0 

.0‐2.5 

.5‐4.0 

the rehabil

t  pasture  re inform pascapacity) of

tion  pastuting, non‐prve the abilitw per 2ha, 

Regrowth stimated Value DSE/ha) 

1.5 

1.5 

litation area

eference  sisture conditf the rehab

re  sites  haregnant cowty to stock oRP1 and RP

Pasture SitEstimated ccapacity (4

dry sto

1 cow per 

1 cow per 

1 cow per 

1 cow pe

1 cow pe

1 cow pe

1 cow pe

1 cow pe

1 cow pe

as. 

122 

ites  and tion and bilitation 

as  been w).   The one cow P2 could 

es carrying 450kg ck) 

1.5ha 

1.5ha 

1.5ha 

r 4ha 

r 4ha 

r 2ha 

r 2ha 

r 6ha 

r 2ha 

2015 An

5.13 FDuring additionreviewe 

MUSWELL

nnual Environ

URTHER Dthe next renal coal resed and will 

LBROOK COAL

nmental Man

DEVELOPMporting perserves at Mbe included

L COMPANY L

nagement Re

ENT OF THriod MCC wMCC.   As pad in future m 

IMITED

eport

HE FINAL Rwill be seekinrt of  this mmining appr

EHABILITAng approvamining procrovals. 

ATION PLANl from MSCess  the  fina

N C to allow mal  landform

123 

mining of m will be 

2015 An

6.0   ADuring t

An dev

Manchaof a

Rehmin

  

MUSWELL

nnual Environ

ACTIVITIESthe next re

environmeelopment c

nagement pnges to thedditional re

habilitation ning activitie

LBROOK COAL

nmental Man

S PROPOSporting per

ental  assesconsent to a

plans and the developmesources. 

will contines. 

L COMPANY L

nagement Re

SED IN THiod, the fol

sment  willallow mining

he Mining Oent consen

ue  to be un

IMITED

eport

E NEXT Alowing activ

l  be  undeg of additio

Operations t due to th

ndertaken 

EMR PERIvities are pl

rtaken  to onal coal res

Plan will be proposed

in areas  th

IOD anned: 

support  aserves. 

e updated td modificati

at are no  l

a  variation 

to comply wion to allow

onger  requ

124 

to  the 

with the w mining 

uired  for 

2015 An

MUSWELL

nnual Environ

Appe

LBROOK COAL

nmental Man

ndix 1C

L COMPANY L

nagement Re

1: SumCompl

IMITED

eport

mmaryliance

y of Ine Audi

ndepent

ndent

 

2

NC

3

MUSWE

2015 Annual Envir

Non‐ConformaCondition  Requ

3.1 (a)  The Ais avaMuswEnviri) be plan (ii) be condiiii) beaccoriv) facpersov) takimpaissue envir

ELLBROOK COAL CO

ronmental Manag

ance Findingsuirement 

Applicant shall ensailable throughouwellbrook Shire Coonmental Officer responsible for th(refer to conditioresponsible for citions of this conse responsible for rrdance with Condcilitate an environon involved with mke reasonable stects. The Environminstructions to stonment is likely t

OMPANY LIMITED

gement Report

sure that a suitabt the life of the mouncil prior to thefor the Project. T

he preparation of n no. 32) onsidering and adsent and complianreceiving and respition 10.2; nmental inductionmining and remedps to avoid or minmental Officer shatop work if a signio occur. 

Developm

bly qualified Enviromine and shall cone appointment ofThe Environmentathe environment

dvising on matternce with such matponding to compl

n and training prodial activities; andnimise adverse enall advise the Mineificant adverse im

ment Consent DA2

onmental Officer sult with f the al Officer shall: tal management 

rs specified in the tters; aints in 

ogram for all d nvironmental e Manager to 

mpact on the 

Audit Finding

205/2002 

All of these reqthe approval ofthe approval ofresponse had bthe audit. 

quirements were f EO by MSC. MCCf the EO by MSC bbeen received at t

R

met except C requested but no the time of 

NA

Risk Level 

Non‐Compliant – Administrative 

 

2

C

3

3

MUSWE

2015 Annual Envir

Condition  Requ

3.2 (b)  The Elimitei) statdurinrequiand pii) defreporincludiii) ovoutcothe krequiiv) ovstrateMininhabitthosev) idefor devi) steare bvii) prmanaviii) ddevel

3.2 (e)  The AStrategoverpubli

ELLBROOK COAL CO

ronmental Manag

uirement 

Environmental Maed to: tutory and other ong mining, includinired from authoritpolicies; finition of the rolerting of personneding the Environmverall environmenomes, during, miney environmentaired under this coverall ecological aegy for the restorng Operations, inctat areas, creek line objectives; entification of cumealing with these eps to be taken toeing complied witrocesses for conflagement of the prdocumentation oflopment of the En

Applicant shall maegy components irnment agencies cly available with

OMPANY LIMITED

gement Report

anagement Strate

obligations whichng all approvals aties and other sta

e, responsibility, al relevant to envirmental Officer; ntal management ning and decomml elements for whonsent; nd community obation and managecluding elements nes and drainage 

mulative environmat each stage of to ensure that all ath; lict resolution in rroject; f the results of connvironmental Man

ake copies of the in subclause (d) aand CCC, and ensin 14 days of com

egy shall include, b

h the Applicant is nd consultations akeholders, and ke

authority, accounronmental manag

objectives and peissioning of the mhich management

bjectives for the pement of the areasuch as wetlandschannels, within t

mental impacts anthe development;approvals, plans, a

relation to the env

nsultations undernagement Strateg

Environmental Mbove available tosure that the planmmencement of o

but not be 

required to fulfil and agreements ey legislation 

ntability and gement, 

erformance mine, for each of t plans are 

project, and a as affected by s and other the context of 

nd procedures ; and procedures 

vironmental 

rtaken in the gy. 

anagement o the relevant s are made perations. 

Audit Finding

There was no edocumentationin the EMS as rEvidence that cprovided. 

The SWMP, whprovided to the

evidence of the n of the results ofrequired. consultation occu

hen updated in 20e CCC. 

R

f consultation 

rred was 

NA

013, was not  NA

Risk Level 

Non‐Compliant – Administrative 

Non‐Compliant – Administrative 

 

2

C

3

4

4

MUSWE

2015 Annual Envir

Condition  Requ

3.2 (f)  The mor at goverenvirpractthe saThe Mweek

4.2 (h)  The Arespethe qconsimeteThe acondibe kewhenappliaautho

4.3 (c)  “i) Thdetaigroun* the* site* freq* the* the

ELLBROOK COAL CO

ronmental Manag

uirement 

management planother times as dirnment agencies. onmental requiretices. Any changesame manner as thManagement Straks of approval by M

Applicant shall insect of location, typuantity of water est of either a meaer or mean of meaappliance(s) is to bition. Detailed recept and supplied tn requested must ance(s) furnishedority duly qualifie

he Applicant shall ls of the monitorindwater. The Site duration of the mes to be sampled; quency of samplin parameters to be depth of bore co

OMPANY LIMITED

gement Report

ns are to be reviewrected by MSC, inThe review shou

ements or changes which are madehe initial Environmtegies shall be maMSC. 

stall to the satisfacpe and constructiextracted from thasuring weir or weasurement as maybe maintained in cords of all water to the departmenprovide a test ce either by the mad; 

incorporate into ing program for be Water Managemmonitoring progra

ng; e measured; onstruction (if req

wed, and updatedn consultation witld consider changes in technology/oe shall be made anmental Managemade publicly avail

ction of the depaon an appliance (he works. The appeirs with automaty be approved by good working ordextracted from tht upon request. Trtificate as to theanufacturer or by 

the Site Water Mboth surface watement Plan shall incam (pre, during an

uired); 

d every five years th the relevant ging operational nd approved in ent Strategy. able within two 

rtment in (s) to measure pliance (s) to tic recorder, or the department. der and he works shall The applicant  accuracy of the some person or 

anagement Plan r and clude: nd post mining);

Audit Finding

The SWMP on to the 2013 ver

Calibration Cerprovided. 

The duration omechanism to (now NoW) datthe SWMP. 

the website was nrsion. 

rtificates were not

f monitoring and transfer data to ttabase was not ad

R

not updated  NA

t able to be  NL

a the DIPNR ddressed in 

NA

Risk Level 

Non‐Compliant – Administrative 

Non‐Compliant – ow 

Non‐Compliant – Administrative 

 

2

C

6

6

8

9

MUSWE

2015 Annual Envir

Condition  Requ

* the* themechbase * detdeterThe rThe pyear 

6.1.2 (a)  For e(by sapollutThe asamp• TSP• PM• Dep

6.5 (a)  The Aresideopera

8 (b)  All samoniplan aplan. 

9.2 (a)  “The after AnnuMSC againMinin

ELLBROOK COAL CO

ronmental Manag

uirement 

 need for any con analysis of data ahanisms to transfeand to produce aermination of apprmined in consultresults of the monpost‐mining monitprior to the cessa

ach monitoring pampling and obtatant specified. applicant must useple at the frequenP‐ μg/m³, continuo10 ‐ μg/m³, everyposited Dust‐ g/m

Applicant shall scrences and roadwaations. 

ampling strategiestoring program shand shall be incluOnly accredited l

Applicant shall, ththe completion o

ual Environmentaland DMR. The AEnst the Environmeng Operations Pla

OMPANY LIMITED

gement Report

ntingency plans; and the reportinger monitoring datnnual reports witpropriate criteria ation with DIPNRnitoring program storing program shation of Mining Op

oint specified belining results by a

e the sampling mcy shown: ous, AS 3580.9.8‐y 6 days, 24 hour cm²/month, continu

reen or direct all oays to the satisfac

s and protocols unhall include a quaded in the relevalaboratories shall 

hroughout the lifeof mining in the DA Management ReEMR shall review tental Managemenns, the condition

g procedure, inclua from the mine tth interpreted resfor monitoring pu. shall be reported hall be prepared nperations. “ 

ow the applicant nalysis) the conce

ethod, unit of me

2001 composite sampleuous, AM‐19 

on‐site lighting awction of MSC duri

ndertaken as partality assurance/ qunt environmentalbe used for labor

e of the mine andA area, prepare aeport (AEMR) to ththe performance nt Strategy and ths of this consent, 

ding a to DIPNR data sults; and urposes 

in the AEMR. no later than one 

must monitor entration of each 

easure and 

way from ng mining 

t of any uality control l management ratory analysis. 

d for five years and submit an he satisfaction of of the mine e relevant and other 

Audit Finding

Due to equipmsome environmwere not collecyear of the aud

Lighting reviewlighting compla

None of the reassurance/qua

There was no aassessment of the AEMRs. 

ment failure and mmental monitoringcted. This occurredit period. 

ws were not conduaint in the audit p

levant MPs includlity control plan.

annual complianceagricultural land s

R

misadventure, g samples ed in each 

NM

ucted. One period. 

NL

ded a quality  NA

e audit or suitability in 

NA

Risk Level 

Non‐Compliant – Medium 

Non‐Compliant – ow 

Non‐Compliant – Administrative 

Non‐Compliant – Administrative 

 

2

C

9

1

MUSWE

2015 Annual Envir

Condition  Requ

licencwith tshall (i) an condi…. (vi) afrom 

9.3 (c)  “The to be(i) the(ii) th(iii) th(iv) th

11.3  • Priolegallcontraddrerequiand/oMSC Appli• FurCounand aarea wis proCoun

ELLBROOK COAL CO

ronmental Manag

uirement 

ces and approvalsthe predictions minclude, but not b annual complianitions of this cons

n assessment of athe Mining Opera

following recordse collected: e date(s) on whichhe time(s) at whichhe point at which he name of the pe

or to mining of thly binding agreemribution to MSC foess the social, amirements arising for in kind contribuCommunity Enhacant and MSC. ther, the Applicancil to provide an aa suitable access rwhich are appropovided to Council cil and any releva

OMPANY LIMITED

gement Report

s relating to the mmade in the EIS, dibe limited to, the ce audit of the pesent and statutory

any changes to agations, including c

s must be kept in 

h the sample wash the sample wasthe sample was uerson who collect

e extension area,ment with MSC foror the purpose of enity and associarom the operatioution shall be genncement Plan an

nt shall enter intoagreed area of lanroad to the void frpriately fenced anin a condition suiant regulatory aut

mine. To enable reagrams and tablefollowing matterserformance of they approvals; 

gricultural land sucumulative chang

respect of any sa

s taken; s collected; undertaken; andted the sample. “

 the Applicant shar financial and/or community enhated community inn of the extensionerally in accordand as agreed betw

o a legally binding nd to incorporaterom the exiting wd landscaped andtable to the requthorities. " 

eady comparison es, the report s: e project against 

itability resulting ges; “ 

mples required 

all enter into a in kind ancement to nfrastructure n. The financial nce with the een the 

 agreement with  void number 3, 

waste disposal d that such void irements of 

Audit Finding

The name of thalways recordeGenerally comp

A legally bindinentered into w

he person samplined. pliant apart from 

ng agreement haswith MSC. 

R

ng was not 

this. 

NA

s not been  NM

Risk Level 

Non‐Compliant – Administrative 

Non‐Compliant – Medium 

 

2

C

4

4

M

MUSWE

2015 Annual Envir

Condition  Requ

40  Uponto act(a) thfrom (b) th(c) a c

48  A restthe p'Propfile: 0authoThe ta) Reb) Remaintc) Resd) Obe) ObA cavregistat no

M1.3  "The to bea) theb) thec) thed) the

ELLBROOK COAL CO

ronmental Manag

uirement 

n completion of wt on this consent he total tonnage othe site; 

he disposal pointscopy of all disposa

triction as to userpurpose of creatinposed Offset Area06836A.dwg. Musority empowered erms of the restristriction against cstriction against utenance of the EEstrictions on livesbligation to fence bligation to controveat acceptable totered on the title  cost to Council. 

following recordse collected for thee date(s) on whiche time(s) at whiche point at which te name of the per

OMPANY LIMITED

gement Report

works and prior to shall provide to Cof all waste and ex

 and methods useal receipts are to 

r shall be registereg a Vegetation Of' prepared by Hanswellbrook Councto vary or modifyiction shall includclearing. use of land in anyEC on the land. stock grazing on ththe land. ol noxious weeds o Muswellbrook Cof affected land, 

s must be kept in  purposes of this h the sample wash the sample was he sample was tarson who collecte

occupation, the pCouncil the followxcavated materia

ed; and be provided. 

ed on the title of ffset Area as indicnsen Bailey datedil shall be nominay the restriction.e the following m

y way inconsistent

he land. 

and pests on the Council, shall be pby Muswellbrook

Environme

respect of any salicence:  taken; collected; ken; and ed the sample." 

person entitled wing information;l disposed of 

affected land for cated on Figure 1  12/10/10 Cad ated as the sole 

matters: 

t with the 

land. repared and k Coal Company 

ent Protection Lic

mples required 

Audit Finding

The report to Mproduced as ev

No inspectionscannot ensure accordance wit

cence 656 

The name of thalways recordeGenerally comp

MSC was not able vidence. 

s are conducted sothat the land is mth a), b), c), d) and

he person samplined. pliant apart from 

R

to be  NA

o MCC managed in d e). 

NM

ng was not 

this. 

NA

Risk Level 

Non‐Compliant – Administrative 

Non‐Compliant – Medium 

Non‐Compliant – Administrative 

 

2

C

M

M

6

4

4

MUSWE

2015 Annual Envir

Condition  Requ

M2.1  For e(by a obtaispeciof mecolum

M7.1  To dea) Airelectrparamb) ThsampAirblaGrou

6.0  Table

4.0  a) Thof thec) Theon th

4  The ligrounappro

ELLBROOK COAL CO

ronmental Manag

uirement 

ach monitoring/dpoint number), tning results by anfied in Column 1. easure, and sampmns: 

etermine compliarblast overpressurronically recordedmeters specified ie licensee must uple at the frequenast Overpressure nd Vibration Peak

e 21 – Biodiversity

e Leaseholder mue Minister. e Compliance Rephe grant anniversa

icence holder mundwater flows frooved by the Office

OMPANY LIMITED

gement Report

discharge point orhe licensee must nalysis) the conceThe licensee musle at the frequenc

nce with conditiore and ground vibd for monitoring pn column 1 of theuse the units of mcy specified oppoRecord All blastsk Particle Velocity

y Offset Areas will

ust submit a Comp

port must be lodgary date for the lif

st implement meom entering the me of Water. 

r utilisation area smonitor (by sampntration of each pst use the samplincy, specified oppo

ons L3.1, L3.2, L3.3bration must be mpoints 3, 4, 5 and e table below; andeasure, sampling osite in the other 

y Record All blasts

Min

l be monitored an

M

pliance Report to 

ged with the Depafe of this mining le

Wate

asures to preventmine work by 14 A

specified below pling and pollutant ng method, units osite in the other 

3 and L3.4: measured and 6 for the d method, and columns. 

ning Operations P

nnually. 

Mining Lease 1304

the satisfaction 

artment annually ease. 

r Licence 20BL169

t alluvial August 2014, as 

Audit Finding

2011‐12, 4 day(TEOM) 2012‐13, 48 darecorded (TEOM2012‐13, 3 dusnot recorded 2013‐14, 36 darecorded (TEOM2013‐14, 3 dusnot recorded.

2011‐12, 20 me2012 ‐ 13, 21 m2013 ‐ 14, 6 me

lan 

The BOAs were

Compliance repthis licence. Fir2015. 

9014 

These measurewithout the ap

y measurements n

ay measurements M) st deposition mea

ay measurements M) st deposition mea

easurements not measurements noeasurements not 

e not monitored.

ports were not derst report was due

es have been implpproval of the Offi

R

not recorded 

not 

surements 

not 

surements 

NM

recorded. t recorded. recorded. 

NM

NM

eveloped for e in June 

NL

lemented but ice of Water. 

NL

Risk Level 

Non‐Compliant – Medium 

Non‐Compliant – Medium 

Non‐Compliant – Medium 

Non‐Compliant – ow 

Non‐Compliant – ow 

 

2

C

8

9

7

8

7

8

7

MUSWE

2015 Annual Envir

Condition  Requ

8  The liComp

9  An exeach licencmaint

7  As paconsei) Ass

8  An exeach licencmaint

7  As paconsei) Ass

8  An exeach licencmaint

7  As paconsei) Ass

ELLBROOK COAL CO

ronmental Manag

uirement 

icence holder mupliance Report. 

xtraction measureextraction devicece, and such devictained in a manne

art of the Annual Rent, the licence hosess compliance w

xtraction measureextraction devicece, and such devictained in a manne

art of the Annual Rent, the licence hosess compliance w

xtraction measureextraction devicece, and such devictained in a manne

art of the Annual Rent, the licence hosess compliance w

OMPANY LIMITED

gement Report

st supply the Offi

ement device muse (pump)used for ces must be of a ter, which is accep

Reporting requireolder must: with the terms and

ement device muse (pump)used for ces must be of a ter, which is accep

Reporting requireolder must: with the terms and

ement device muse (pump)used for ces must be of a ter, which is accep

Reporting requireolder must: with the terms and

ce of Water with 

st be installed andextraction of wattype and standardptable to the Offic

Wate

ed under the deve

d conditions of th

st be installed andextraction of wattype and standardptable to the Offic

Wate

ed under the deve

d conditions of th

st be installed andextraction of wattype and standardptable to the Offic

Wate

ed under the deve

d conditions of th

an Annual 

d maintained on ter under this d, and must be ce of Water. 

r Licence 20BL169

elopment 

is licence. 

d maintained on ter under this d, and must be ce of Water. 

r Licence 20BL169

elopment 

is licence. 

d maintained on ter under this d, and must be ce of Water. 

r Licence 20BL170

elopment 

is licence. 

Audit Finding

An Annual Comsubmitted, therequired detail

Water meters hconsultation wwhether they wmeters were no

9037 

There was no athis licence in t

Water meters hconsultation wwhether they wmeters were no

9038 

There was no athis licence in t

Water meters hconsultation wwhether they wmeters were no

0473 

There was no athis licence in t

mpliance Report h AEMR covers soms but not all. 

have been installewith the Office of Wwere acceptable oot calibrated. 

assessment of comthe AEMR. 

have been installewith the Office of Wwere acceptable oot calibrated. 

assessment of comthe AEMR. 

have been installewith the Office of Wwere acceptable oot calibrated. 

assessment of comthe AEMR. 

R

as not been me of the 

NA

ed without Water as to or not. Water 

NM

mpliance with  NA

ed without Water as to or not. Water 

NM

mpliance with  NA

ed without Water as to or not. Water 

NM

mpliance with  NA

Risk Level 

Non‐Compliant – Administrative 

Non‐Compliant – Medium 

Non‐Compliant – Administrative 

Non‐Compliant – Medium 

Non‐Compliant – Administrative 

Non‐Compliant – Medium 

Non‐Compliant – Administrative 

 

2

C

8

4

8

8

6

MUSWE

2015 Annual Envir

Condition  Requ

8  An exeach licencmaint

4.1  In addOfficemaintcombThis o

8.2  ThroucondactiviConseThe r

8.3  An Ansubmcomp9.2 ofof theDeveAEMR

6.4.2  6.4.1 Archa“The intern

ELLBROOK COAL CO

ronmental Manag

uirement 

xtraction measureextraction devicece, and such devictained in a manne

dition, a bimonther to determine thtenance and areabustion. occurs for produc

ughout the operauct an internal auities are in complient. results will be dist

nnual Environmenmitted throughoutpletion of mining if the Developmene performance of lopment ConsentR. 

referred to belowaeological sites reabove performannal audits and mo

OMPANY LIMITED

gement Report

ement device muse (pump)used for ces must be of a ter, which is accep

ly audit will be cahe location of hotas that are of high

tion areas of the 

tion of the mine, udit annually on oiance with the con

tributed internally

ntal Managementt the mine life andin the Project arent Consent Conditf the project againt and statutory ap

Ar

w sets out managemaining (not salvnce objectives shoonitoring” 

st be installed andextraction of wattype and standardptable to the Offic

Spontaneous C

arried out by the Et spots that requih risk for spontane

pit and waste em

Environme

the Environmentperations to ensunditions of the De

y within MCC. 

t Report (AEMR) id for five years afta in accordance wtions. An annual cnst the conditionspprovals is to be in

rchaeology and C

ement objectivesvaged) at MCC. ould be measured

Flora and 

d maintained on ter under this d, and must be ce of Water. 

Combustion Mana

Environmental re ongoing eous 

mplacements. 

ntal Managemen

tal Officer will ure that all evelopment 

s to be ter the with Condition compliance audit s of the ncluded in the 

ultural Heritage M

s for 

d using regular 

Fauna Managem

Audit Finding

Water meters hconsultation wwhether they wmeters were no

agement Plan 

The Environmeconduct a bimo

nt Strategy 

Annual internaby the Environ

The AEMR did compliance audproject. 

Management Pla

Regular internaby the Environ

ment Plan 

have been installewith the Office of Wwere acceptable oot calibrated. 

ental Coordinator onthly audit. 

al audits were notmental Coordinat

not include an andit of the perform

al audits were notmental Coordinat

R

ed without Water as to or not. Water 

NM

did not  NA

 conducted tor. 

NL

nnual mance of the 

NA

t conducted tor. 

NM

Risk Level 

Non‐Compliant – Medium 

Non‐Compliant – Administrative 

Non‐Compliant – ow 

Non‐Compliant – Administrative 

Non‐Compliant – Medium 

 

2

C

5

TS

TS

TS

5

5

6

6

MUSWE

2015 Annual Envir

Condition  Requ

5.6  A boosupplof theinduc

Topsoil Spreading 

Prior overbthan 

Topsoil Spreading 

Selecthe pThe Ahoriz

Topsoil Spreading 

The uslopin

5.5  For thbathhwill bthis rfinish

5.5  New infras

6.1  The rcars s

6.2  AccesmaintAccesExam

ELLBROOK COAL CO

ronmental Manag

uirement 

oklet identifying plied to mine worke significance of tction and training

to the re‐spreadiburden spoil will b200mm in diamet

ctive placement ofproperties of the sA‐2 horizon will foon topsoil formin

use of the A‐2 horng or high erosion

he relocation of thhouse, the colour be chosen to ensuegard, neutral nohes 

native species plastructure compon

risk of accidental bshall be incorpora

ss tracks will be intained if necessarss to dams and wa

miner and maintain

OMPANY LIMITED

gement Report

possible threatenekers and contractohreatened specie. 

ng of topsoil matbe rock raked to rter. 

f topsoil material soil. orm the underlying the surface soil 

rizon subsoil will bn potential areas.

he administrationand texture of exre they blend in ton reflective mate

anting will be madnents into the nat

bushfire ignition sated in site induct

nspected by the Ory. ater supply will bened if necessary.

ed species on theors. The booklet aes will be provided

Soil Strip

erial, the prepareremove all rocks t

will be done in ac

g capping materiastructure, where

be avoided, where

Visual and La

n building, workshxternal materials to the natural surerial shall be used 

de to integrate thural surroundings

Bushf

such as lit cigaretttions. 

Open Cut Examine

e inspected by th

 site will be and a discussion d during site 

pping Manageme

ed surface of the hat are greater 

ccordance with 

al, with the A‐1 e practicable. 

e practicable, on 

andscape Manag

hop and of the buildings roundings. In in all external 

e new s. 

fire Management 

tes thrown from 

er and 

e Open Cut 

Audit Finding

A booklet identnot provided to

ent Plan 

The Rehabilitatrock raking. 

The Rehabilitatselective empla

The Rehabilitatselective emplarehabilitation a

ement Plan 

The relocated Mmaterials that blend with the 

No native plantrelocated MIA.

Plan 

Bushfire risks athrown from caInduction Prog

There was no einspections occ

tifying threatenedo inductees durin

tion Procedure di

tion Procedure diacement of horizo

tion Procedure diacement of horizoarea gradient. 

MIA did not have have a colour andnatural surround

tings had occurre. 

associated with cigars was not includram. 

evidence that thescur. 

R

d species was g training. 

NL

d not include  NA

d not include ons. 

NA

d not include ons based of 

NA

external d texture that dings. 

NM

ed around the  NM

garettes ded in the 

NM

se OCE  NL

Risk Level 

Non‐Compliant – ow 

Non‐Compliant – Administrative 

Non‐Compliant – Administrative 

Non‐Compliant – Administrative 

Non‐Compliant – Medium 

Non‐Compliant – Medium 

Non‐Compliant – Medium 

Non‐Compliant – ow 

 

2

C

6

7

AA

5

5

5

7

5

MUSWE

2015 Annual Envir

Condition  Requ

6.2  The Rasseshazar

7.1  Repo….. • Thethe Rdurin

Appendix A 

Emer

5.1.1  Gentlbe suminimcapab

5.6  "A Ve(3) mthe se• Def• Sele• Dev• Mo

5.7  A Wemont

7.1  WeedreporMana

5.7  Neighprovi

ELLBROOK COAL CO

ronmental Manag

uirement 

RFS and MCC shalssment, preferablyrds. 

rting will consist o

e annual inspectioRFS and will addreng the preceding y

rgency Contact Nu

ly sloping areas ouitable for the estamum of 10cm of tbility. 

ermin Eradicationmonths from the coelected control stfine the managemect the managemvelop managemennitor the success 

eed Eradication Plths from commen

d inspections shalrting of weed conagement Report. 

hbours will be conded with informa

OMPANY LIMITED

gement Report

l conduct an annuy during winter, t

of: 

on and risk assessess detailed issuesyear. 

umbers 

f the rehabilitatedablishment of pastopdressing and a

 Plan will be deveommencement oftrategies for feral ment objectives; ent options; nt strategies; andof the program a

an will be develoncement of operat

ll be conducted attrol will be includ

ntacted on an annation on MCC’s we

ual inspection andto assess fuel load

ment report, whics identified and / o

Land

d overburden emstoral grassland. Tre considered to 

eloped for the sitef operations. The animal managem

 against the stated 

ped for the site, wtions. 

t 6 monthly intervded in the Annual 

nual basis and theeed management

Site Wa

d bushfire risk ds and fire 

ch will be sent to or enacted 

d Management P

placement will These will have a have a Class IV 

e, within three principles for 

ment will be: 

objectives. " 

within three (3) 

vals, and Environmental 

ey will be t strategy. 

ater Managemen

Audit Finding

Bushfire inspecin conjunction 

The Annual Inswas not sent to

These have notnumbers were 

lan 

Areas of rehablike they will rewhich includes

There was no V

There was no W

Weed inspectionot six monthly

Neighbours weweed managem

nt Plan 

ctions were conduwith the RFS. 

spection and Risk o the RFS. 

t been kept up to incorrect. 

ilitation observedeach Class IV land  the potential for

Vermin Eradicatio

Weed Eradication

ons were conducty. 

ere not contactedment at MCC. 

R

ucted but not  NA

Assessment  NA

 date, 5  NA

d don't look capability 

r cropping. 

NA

on Plan.  NA

 Plan.  NA

ted annually,  NL

 regarding  NL

Risk Level 

Non‐Compliant – Administrative 

Non‐Compliant – Administrative 

Non‐Compliant – Administrative 

Non‐Compliant – Administrative 

Non‐Compliant – Administrative 

Non‐Compliant – Administrative 

Non‐Compliant – ow 

Non‐Compliant – ow 

 

2

C

7

7

3

5

5

Sd 

MUSWE

2015 Annual Envir

Condition  Requ

7.1  Flow • Pipe• PipeUnde• Pipe• PipeEach 

7.2  The gthe Nwork

3.2  A numoperafollow• ……• Monoise• …..

5.3  The dconfothe O

5.3  MCC ensur

Shaded cells indduring the next r

ELLBROOK COAL CO

ronmental Manag

uirement 

meters have beeeline from No. 2 Oeline from Borehoerground) to Dam eline that supplieeline from Final Sflow meter shall 

groundwater monNo.2 Undergroundings (Bore RDH61

mber of mitigatioational noise impawing measures:  bile equipment ae to suit the ambie

design, placementorm with the mosObtrusive Effects o

will conduct lightre compliance wit

icate the actionreporting period

 

OMPANY LIMITED

gement Report

n installed on theOpen Cut to Dam ole Pump 1 and BNo. 2; 

es water for dust sSettling Pond to Nbe read and recor

nitoring program id workings (Bore R14). 

n measures have acts on surroundi

re fitted with smaent noise conditio

t and directional ct current Australiof Outdoor Lightin

ting assessments oth this standard.

s that had beend. 

e following pipelinNo. 1; 

Borehole Pump 2 (

suppression; ando.1 Open Cut Voirded at least on a

is based on two bRDH522) and St H

Nois

been developed ing landholders. T

art alarms, which ons; and 

Lighti

control of all lightan Standard AS 4ng. 

on at least an ann

n addressed at t

nes: 

(No. 2 

d. a monthly basis. 

ores located in Heliers Colliery 

se Management P

to reduce the These include the 

adjust tonal 

ng Management 

ting on site will 282 –Control of 

nual basis to 

the end of the r

Audit Finding

Meters were re

RDH614 was noand monitoring

Plan 

“Smart alarms”

Plan 

Lighting was no

No audits were

eporting period

ead quarterly not 

ot monitored (as g spreadsheet). 

” were not fitted.

ot audited at MCC

e conducted –not 

.  All other actio

R

monthly.  NA

per AEMR  NA

NM

C.  NL

annually.  NL

ons are planned

Risk Level 

Non‐Compliant – Administrative 

Non‐Compliant – Administrative 

Non‐Compliant – Medium 

Non‐Compliant – ow 

Non‐Compliant – ow 

d to be addresse

 

ed 

2

OA

Tmw

Ra

T

W

Tc

Tn

Tr

Ten

A

Ae

T

S

D

C

M

Tp

R

TO

R

MUSWE

2015 Annual Envir

Observations Audit Finding 

The site induction more environmenwere no environm

Refresher trainingand reinforcemen

The flora and faun

With the site appr

The 2015 site manclosure work is lef

The native vegetatnot found locally.

There was a generegarding the envi

There had been a equipment is requnetwork but a rev

Agricultural monit

AEMR reporting shensure it is comple

The biodiversity of

Seek approval from

Develop and subm

Calibrate water flo

More auditing and

The Visual Amenitpoor quality contr

Review groundwa

The 2015 review oObtrusive Effects o

Remove weeds fro

ELLBROOK COAL CO

ronmental Manag

for Improvem

had a strong OHStal content and th

mental questions. 

g on environmentat with the workfo

na threatened spe

roaching closure, t

nagement plan revft till after the site

tion seed mix use

ral lack of proceduironmental aspec

consistent loss ofuired with the objiew of real time a

toring in the form

hould be carefullyete. 

ffset area require

m NoW for works

mit annual complia

ow meters in acco

d compliance revi

ty and Landscape rol with lots of typ

ter monitoring an

of the Lighting Maof Outdoor Lightin

om topsoil stockp

OMPANY LIMITED

gement Report

ment 

S focus and the enhe addition of a n

al matters had beorce. 

ecies booklet shou

the protection of 

view should conse is closed. It shou

ed at the site shou

ures to support thts of operations b

f monitoring data ective of improvinair quality data ca

 of pasture produ

y compared with t

es monitoring. 

s conducted to pre

ance reports for w

ordance with the 

ews are required 

Management Plapographic errors a

nd the issue of RD

anagement Plan sng. 

iles. 

nvironmental sectnumber of environ

een minimal throu

uld be handed out

the offset area sh

ider the Completiuld also carefully r

uld be in accordan

he management pbut the lack of doc

across the audit ng data collectionpture should also

uctivity should be 

the requirements

event alluvial inflo

water licenses. 

manufacturers re

and should be re

an should reflect tand unfinished se

DH 614 not being m

hould consider th

tion is attached onment related qu

ugh the audit peri

t at the induction

hould be finalised

ion criteria in thereview the actual 

nce with local nat

plans. Site personcumentation mus

period with no imn and retention. Wo be considered. 

conducted annua

s for reporting the

ows into the open

ecommendations.

eported in the AEM

the actual site conntences. 

monitored. Adjus

he best way to add

on the end. The iniz questions to en

od. Like all other 

d with MSC as a pr

MOP and other csite operation wi

ive vegetation (as

nel were able to pst be remedied to

mproving trend. A Work has commen

ally to help suppo

e in the managem

n cuts. 

MR. 

nditions and opera

t documentation 

dress compliance

duction could be nsure the inductee

training, environm

riority. 

closure consideratth that noted in t

s identified in the 

provide appropria help ensure com

review of the manced on this issue

ort relinquishment

ment plans, MOP, l

ations. The versio

as appropriate. 

 with Australian S

strengthened by e understands the

mental training re

tions to ensure ththe management 

EIS) and not inclu

ate responses to qmpliance across th

anagement of moe with the blast m

t of the pasture a

licenses and othe

on reviewed for th

Standard AS 4282 

the inclusion of e material. There 

equires updating 

hat not all of the plan. 

ude any species 

questions e operation. 

nitoring onitoring 

reas. 

r approvals to 

he audit had 

– Control of the 

 

2

A

C

Rp

 

Sd 

MUSWE

2015 Annual Envir

Audit Finding 

Carefully monitor 

Review equipmenprioritised. 

Shaded cells indduring the next r

ELLBROOK COAL CO

ronmental Manag

the extent and do

t onsite and comm

icate the actionreporting period

OMPANY LIMITED

gement Report

ominance of gold

mence removing 

s that had beend. 

en wreath wattle

redundant equipm

n addressed at t

 (Acacia saligna) 

ment to reduce th

the end of the r

and control if req

he cost post closu

eporting period

uired to reduce r

ure. Any equipme

.  All other actio

elinquishment ris

nt not owned by 

ons are planned

sk. 

MCC should be 

d to be addresse

 

ed 

2015 An

Ap

MUSWELL

nnual Environ

ppend

LBROOK COAL

nmental Man

ix 2: A

L COMPANY L

nagement Re

Air Qu

IMITED

eport

uality Monittoringg Resu

 

ults 

2

D

 

1

B

c

N

B

MUSWE

2015 Annual Envir

DEPOSITIONAL DATE

Jan‐15

Feb‐15

Mar‐15

Apr‐15

May‐15

Jun‐15

Jul‐15

Aug‐15

Sep‐15

Oct‐15

Nov‐15

Dec‐15

12‐month Rolling Av

Background Average

2009)

c = Contaminated result d

NR = No result. Includes  b

Blank cells  indicate that t

ELLBROOK COAL CO

ronmental Manag

DUST RESULTS 

 

DM2 D

c3.4 1

1.1 0

c5.2 1

0.8 1

6.4 1

0.2 0

0.7 0

0.4 0

1.3 2

1.6 1

3.8 2

1

verage 1.8 1

e (2000‐2.5 1

ue to the presence of bird

roken or missing bottles.

he gauge had been decom

OMPANY LIMITED

gement Report

 M7 DM10 DM1

1.0 3.2 c7.5

0.8 1.3 c3.1

1.4 c10.7 c5.8

1.1 c13.2 0.7

1.5 c8.1 5.3

0.4 c11.4 1.2

0.6 c9.2 1.1

0.6 c11.6 1.1

2.1 4.5 2.7

1.7 3.5 1.1

2.1 4.7 2.7

1.3

1.2 3.4 2.0

1.1 2.6 1.4

d droppings, insects, or ve

mmissioned and no result

14 DM15 DM16

5 0.6 0.7

1 0.4 1.8

8 0.9 4.3

7 1.2 0.8

3 1.0 2.3

2 3.6 0.9

1 0.6 0.8

1 0.7 0.5

7 13.5c 1.3

1 c4 c4.1

7 1.0 1.0

0 1.1 1.4

4 1.9 1.9

egetation in sample. Cont

ts  were available.

DM17 DM18

2.3 0.9

2.1 1.0

4.7 4.4

1.6 0.8

1.1 0.7

2.4 0.7

c3.4 1.1

0.8 0.6

2.9 1.6

3.0 4.0

2.7 1.5

3.8 2.4

2.5 1.6

1.7 1.1

taminated results  are exc

*DM19 DM20

0.7 1.7

0.8 0.7

0.9 1.3

1.2 1.2

1.5 0.9

3.3 0.6

1.9 0.6

0.5 1.6

4.8c 1.4

2.8 1.8

1.2 1.4

c7.2

1.5 1.2

2.5 2.3

luded from averages.

DM22 *DM23 *D

3.7 1.3 0

c6.3 1.6

1.6 1.6

2.7 0.9

c4.9 0.5

1.6 2.0 0

1.4 0.7

2.9 c3.2

2.3 14.9c

2.0 3.0 4

2.3 2.8

c5.1 c

2.3 1.6

1.9 1.6

DM24 DM26 DM

0.9 1.0 1.0

1.8 1.0 0.8

3.0 c6.6 1.4

1.7 0.9 3.0

1.4 2.3 2.9

0.8 1.5

1.2 2.1

2.1 2.0

2.7 2.1

4.3 2.3

2.6 2.6

c3.6 1.2

2.0 1.7 1.8

1.8 1.8 1.9

* = no

28 *DM29 DM30

0 1.3 0.9

8 0.9 0.7

4 1.5 1.6

0 0.9 2.0

9 0.6 0.6

0.5 0.6

1.0 0.6

0.6 0.7

1.8 1.7

1.9 2.0

4.2 1.9

3.2

8 1.5 1.2

9 1.5 1.4

n mine owned land

 

 

0

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

 

 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

 

 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

 

 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

 

 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

 

 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

 

 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

 

 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

 

 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

 

 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

 

 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

 

 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

 

 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

 

 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

 

 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

 

 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report

 

 

2

MUSWE

2015 Annual Envir

ELLBROOK COAL CO

ronmental Manag

OMPANY LIMITED

gement Report  

2015 An

HVAS M

MUSWELL

nnual Environ

MONITORIN

D

05‐J

11‐J

17‐J

23‐J

29‐J

04‐F

10‐F

16‐F

22‐F

28‐F

06‐M

12‐M

18‐M

24‐M

30‐M

05‐A

11‐A

17‐A

23‐A

29‐A

05‐M

11‐M

17‐M

23‐M

29‐M

04‐J

10‐J

16‐J

22‐J

28‐J

04‐J

10‐J

16‐J

22‐J

28‐J

03‐A

09‐A

15‐A

21‐A

27‐A

02‐S

08‐S

14‐S

LBROOK COAL

nmental Man

NG RESULT

ate  N

an‐15 

an‐15 

an‐15 

an‐15 

an‐15 

Feb‐15 

Feb‐15 

Feb‐15 

Feb‐15 

Feb‐15 

Mar‐15 

Mar‐15 

Mar‐15 

Mar‐15 

Mar‐15 

Apr‐15 

Apr‐15 

Apr‐15 

Apr‐15 

Apr‐15 

May‐15 

May‐15 

May‐15 

May‐15 

May‐15 

un‐15 

un‐15 

un‐15 

un‐15 

un‐15 

Jul‐15 

Jul‐15 

Jul‐15 

Jul‐15 

Jul‐15 

Aug‐15 

Aug‐15 

Aug‐15 

Aug‐15 

Aug‐15 

Sep‐15 

Sep‐15 

Sep‐15 

L COMPANY L

nagement Re

TS  

isbet PM10

24 

15 

17 

12 

10 

29 

24 

30 

35 

37 

17 

30 

15 

18 

17 

12 

13 

14 

19 

23 

10 

10 

10 

16 

11 

16 

33 

20 

24 

29 

IMITED

eport

Site 1 TS

39 

10 

30 

32 

35 

25 

26 

60 

12 

37 

66 

53 

52 

19 

51 

15 

24 

37 

10 

24 

18 

18 

20 

23 

10 

17 

15 

18 

21 

16 

15 

55 

17 

21 

23 

29 

13 

15 

33 

P  Site 2 T

39

11

30

23

35

23

26

55

10

37

57

58

60

23

52

16

20

29

13

21

19

30

17

23

9

10

17

19

20

16

10

15

15

47

15

11

25

20

27

5

20

16

29

TSP  Site 

4

1

2

1

4

2

3

7

1

4

5

7

7

2

5

1

2

4

2

1

1

2

2

1

1

2

1

1

1

1

5

1

2

2

2

2

1

3

3 TSP 

45 

14 

24 

19 

43 

25 

37 

71 

12 

48 

55 

75 

74 

25 

59 

15 

29 

47 

28 

18 

18 

21 

26 

13 

19 

23 

15 

18 

14 

19 

56 

15 

27 

20 

26 

21 

19 

31 

 

2015 An

MUSWELL

nnual Environ

D

20‐S

26‐S

02‐O

08‐O

14‐O

20‐O

26‐O

01‐N

07‐N

13‐N

19‐N

25‐N

01‐D

07‐D

13‐D

19‐D

25‐D

31‐D

LBROOK COAL

nmental Man

ate  N

Sep‐15 

Sep‐15 

Oct‐15 

Oct‐15 

Oct‐15 

Oct‐15 

Oct‐15 

Nov‐15 

Nov‐15 

Nov‐15 

Nov‐15 

Nov‐15 

Dec‐15 

Dec‐15 

Dec‐15 

Dec‐15 

Dec‐15 

Dec‐15 

L COMPANY L

nagement Re

isbet PM10

12 

15 

35 

23 

28 

55 

16 

36 

21 

19 

34 

35 

33 

41 

35 

23 

24 

IMITED

eport

Site 1 TS

23 

36 

65 

55 

51 

55 

31 

33 

34 

13 

30 

53 

64 

51 

52 

53 

13 

22 

 

P  Site 2 T

17

35

63

72

74

60

32

35

33

11

30

51

44

49

54

45

14

21

TSP  Site 

2

4

7

6

6

5

4

1

3

1

3

5

4

6

7

4

1

3

3 TSP 

25 

45 

71 

60 

65 

56 

44 

18 

34 

14 

36 

58 

46 

65 

73 

45 

19 

31 

 

2

R

 

MUSWE

2015 Annual Envir

REAL‐TIME PM1

SAMPLE 

DATESITE 1

01‐Jan‐15 20.7

02‐Jan‐15 8.4

03‐Jan‐15 14.4

04‐Jan‐15 15.7

05‐Jan‐15 19.6

06‐Jan‐15 15.4

07‐Jan‐15 15.0

08‐Jan‐15 18.8

09‐Jan‐15 22.6

10‐Jan‐15 19.0

11‐Jan‐15 7.4

12‐Jan‐15 6.8

13‐Jan‐15 11.6

14‐Jan‐15 10.4

15‐Jan‐15 8.5

16‐Jan‐15 17.3

17‐Jan‐15 12.4

18‐Jan‐15 21.3

19‐Jan‐15 19.5

20‐Jan‐15 10.7

21‐Jan‐15 14.7

22‐Jan‐15 16.4

23‐Jan‐15 31.8

24‐Jan‐15 15.7

25‐Jan‐15 10.4

26‐Jan‐15 18.3

27‐Jan‐15 9.2

28‐Jan‐15 10.1

29‐Jan‐15 11.5

30‐Jan‐15 14.7

31‐Jan‐15 21.3

Janua

ELLBROOK COAL CO

ronmental Manag

10 MONITORING

 

SITE 2 SITE 3

23.3 24.3

9.4 7.0

17.4 11.3

18.1 14.8

20.7 20.4

17.2 15.3

14.3 13.3

20.4 16.8

23.3 19.5

21.0 19.0

8.5 7.9

7.5 7.6

13.2 11.7

12.5 8.3

10.4 9.8

18.5 10.8

13.4 9.7

23.2 17.7

21.1 17.5

12.0 8.6

15.7 14.2

16.9 15.1

11.9 7.1

16.0 10.3

11.3 8.5

19.0 15.3

9.5 7.7

10.8 10.7

13.3 10.6

15.1 12.5

21.7 13.5

ary 2015

OMPANY LIMITED

gement Report

G RESULTS 

3SAMPLE 

DATES

01‐Feb‐15

02‐Feb‐15

03‐Feb‐15

04‐Feb‐15

05‐Feb‐15

06‐Feb‐15

07‐Feb‐15

08‐Feb‐15

09‐Feb‐15

10‐Feb‐15

11‐Feb‐15

12‐Feb‐15

13‐Feb‐15

14‐Feb‐15

15‐Feb‐15

16‐Feb‐15

17‐Feb‐15

18‐Feb‐15

19‐Feb‐15

20‐Feb‐15

21‐Feb‐15

22‐Feb‐15

23‐Feb‐15

24‐Feb‐15

25‐Feb‐15

26‐Feb‐15

27‐Feb‐15

28‐Feb‐15

F

ITE 1 SITE 2

19.0 19.5

17.5 14.3

16.9 17.5

15.9 14.7

17.6 16.5

15.4 15.2

18.3 18.5

19.5 20.7

34.0 33.6

13.8 14.4

12.7 12.9

22.5 23.7

15.1 16.5

18.7 19.5

21.0 21.2

23.5 22.7

20.3 20.8

23.8 24.0

19.7 20.9

21.4 21.8

8.5 10.5

9.8 9.9

10.0 9.5

15.5 16.5

15.1 12.7

18.1 15.9

17.9 18.9

17.0 17.4

February 2015

SITE 3SAMPLE

DATE

15.3 01‐Mar‐1

13.3 02‐Mar‐1

15.3 03‐Mar‐1

12.4 04‐Mar‐1

14.8 05‐Mar‐1

15.1 06‐Mar‐1

16.3 07‐Mar‐1

19.9 08‐Mar‐1

31.1 09‐Mar‐1

14.1 10‐Mar‐1

12.9 11‐Mar‐1

20.7 12‐Mar‐1

16.1 13‐Mar‐1

16.4 14‐Mar‐1

17.5 15‐Mar‐1

18.1 16‐Mar‐1

21.3 17‐Mar‐1

24.2 18‐Mar‐1

21.1 19‐Mar‐1

25.7 20‐Mar‐1

8.2 21‐Mar‐1

7.6 22‐Mar‐1

9.1 23‐Mar‐1

13.5 24‐Mar‐1

11.7 25‐Mar‐1

15.5 26‐Mar‐1

20.2 27‐Mar‐1

15.9 28‐Mar‐1

29‐Mar‐1

30‐Mar‐1

31‐Mar‐1

E SITE 1 SITE

15 18.4 19.

15 21.4 21.4

15 22.6 23.

15 32.0 32.

15 26.3 26.

15 24.0 24.

15 35.3 35.

15 26.6 28.

15 30.7 34.

15 46.6 48.

15 32.8 43.

15 29.1 30.9

15 19.7 19.8

15 17.9 18.9

15 23.7 24.

15 21.8 21.

15 31.2 34.4

15 27.7 30.

15 29.7 30.

15 28.8 27.

15 16.7 17.

15 14.1 13.

15 8.8 16.4

15 14.7 16.

15 18.7 21.

15 9.4 11.9

15 12.2 12.8

15 20.2 22.

15 26.6 25.

15 23.7 24.

15 12.0 11.

March 2015

E 2 SITE 3S

3 15.5 0

4 30.2 0

6 24.5 03

3 31.5 04

1 24.1 05

5 19.5 06

6 25.5 07

2 28.4 08

3 34.6 09

1 47.2 10

2 41.2 1

9 31.4 1

8 15.7 13

9 12.0 14

5 20.1 15

7 27.0 16

4 33.8 17

1 24.1 18

2 21.3 19

6 26.4 20

6 19.1 2

7 11.0 2

4 7.2 23

3 26.2 24

1 14.5 25

9 11.9 26

8 8.2 27

2 17.0 28

7 23.0 29

3 23.2 30

5 9.4

5SAMPLE 

DATESITE 1

1‐Apr‐15 13.1

2‐Apr‐15 21.3

3‐Apr‐15 22.8

4‐Apr‐15 5.0

5‐Apr‐15 7.6

6‐Apr‐15 8.0

7‐Apr‐15 9.7

8‐Apr‐15 7.6

9‐Apr‐15 12.7

0‐Apr‐15 18.3

1‐Apr‐15 13.0

2‐Apr‐15 13.4

3‐Apr‐15 18.3

4‐Apr‐15 22.9

5‐Apr‐15 24.6

6‐Apr‐15 16.3

7‐Apr‐15 28.4

8‐Apr‐15 16.5

9‐Apr‐15 7.8

0‐Apr‐15 5.1

1‐Apr‐15 3.7

2‐Apr‐15 4.7

3‐Apr‐15 8.0

4‐Apr‐15 8.1

5‐Apr‐15 9.2

6‐Apr‐15 8.0

7‐Apr‐15 8.9

8‐Apr‐15 11.8

9‐Apr‐15 12.4

0‐Apr‐15 8.3

April 

SITE 2 SITE 3

14.2 9.2

21.0 12.8

21.9 23.2

4.9 5.4

7.5 5.6

8.2 6.5

9.5 8.4

8.3 6.1

12.7 11.9

16.0 18.6

12.4 11.6

14.2 13.5

17.6 17.3

23.0 28.7

24.1 19.5

16.2 11.7

27.3 32.2

14.3 8.6

7.9 4.8

4.5 7.0

3.1 2.4

4.3 4.4

8.5 3.2

7.6 5.0

8.5 6.0

7.2 5.5

6.7 7.8

13.1 12.5

12.2 16.4

8.3 11.0

2015

 

 

2

 

MUSWE

2015 Annual Envir

SAMPLE 

DATESITE 1

01‐May‐15 8.4

02‐May‐15 9.5

03‐May‐15 6.4

04‐May‐15 12.8

05‐May‐15 10.8

06‐May‐15 65.3

07‐May‐15 18.5

08‐May‐15 12.9

09‐May‐15 11.1

10‐May‐15 12.0

11‐May‐15 12.9

12‐May‐15 8.4

13‐May‐15 12.1

14‐May‐15 10.6

15‐May‐15 15.6

16‐May‐15 14.2

17‐May‐15 11.1

18‐May‐15 13.7

19‐May‐15 8.5

20‐May‐15 7.9

21‐May‐15 6.3

22‐May‐15 7.2

23‐May‐15 11.1

24‐May‐15 12.0

25‐May‐15 11.7

26‐May‐15 13.3

27‐May‐15 12.9

28‐May‐15 10.8

29‐May‐15 7.6

30‐May‐15 7.8

31‐May‐15 5.4

May

ELLBROOK COAL CO

ronmental Manag

SITE 2 SITE 3

7.8 8.3

9.0 12.5

6.9 4.1

12.9 8.3

10.1 5.0

61.7 59.9

18.0 16.4

11.9 12.9

10.3 no dat

12.8 no dat

16.2 no dat

10.5 no dat

12.3 no dat

9.7 no dat

15.0 no dat

14.3 12.2

9.5 8.6

14.0 12.9

8.1 5.0

9.1 5.5

6.5 4.3

6.7 8.0

10.4 14.9

11.9 15.0

10.4 19.0

10.8 10.3

12.0 10.9

10.5 7.4

8.4 6.2

8.0 5.6

6.0 4.3

y 2015

OMPANY LIMITED

gement Report

3SAMPLE 

DATES

01‐Jun‐15

02‐Jun‐15

03‐Jun‐15

04‐Jun‐15

05‐Jun‐15

06‐Jun‐15

07‐Jun‐15

08‐Jun‐15

ta 09‐Jun‐15

ta 10‐Jun‐15

ta 11‐Jun‐15

ta 12‐Jun‐15

ta 13‐Jun‐15

ta 14‐Jun‐15

ta 15‐Jun‐15

16‐Jun‐15

17‐Jun‐15

18‐Jun‐15

19‐Jun‐15

20‐Jun‐15

21‐Jun‐15

22‐Jun‐15

23‐Jun‐15

24‐Jun‐15

25‐Jun‐15

26‐Jun‐15

27‐Jun‐15

28‐Jun‐15

29‐Jun‐15

30‐Jun‐15

ITE 1 SITE 2

8.7 7.4

10.0 9.4

12.2 11.1

8.7 8.7

9.2 8.8

14.5 14.5

9.1 8.6

8.3 8.5

10.2 10.1

11.2 10.1

13.9 12.4

8.5 8.4

10.1 9.6

13.5 11.5

14.2 13.7

9.7 13.9

5.8 6.1

4.1 4.8

7.9 6.9

7.8 8.2

9.5 8.9

10.7 11.5

8.2 8.3

17.0 13.7

10.6 8.8

11.9 11.3

10.0 8.7

11.6 9.9

13.1 12.1

14.9 13.4

June 2015

SITE 3SAMPLE

DATE

4.3 01‐Jul‐15

7.2 02‐Jul‐15

8.4 03‐Jul‐15

11.2 04‐Jul‐15

7.3 05‐Jul‐15

18.9 06‐Jul‐15

16.7 07‐Jul‐15

8.4 08‐Jul‐15

6.4 09‐Jul‐15

8.2 10‐Jul‐15

9.3 11‐Jul‐15

13.1 12‐Jul‐15

13.0 13‐Jul‐15

10.1 14‐Jul‐15

13.1 15‐Jul‐15

15.7 16‐Jul‐15

13.0 17‐Jul‐15

4.7 18‐Jul‐15

3.9 19‐Jul‐15

6.9 20‐Jul‐15

7.8 21‐Jul‐15

9.2 22‐Jul‐15

10.6 23‐Jul‐15

6.9 24‐Jul‐15

11.3 25‐Jul‐15

7.6 26‐Jul‐15

15.3 27‐Jul‐15

7.9 28‐Jul‐15

10.5 29‐Jul‐15

14.7 30‐Jul‐15

31‐Jul‐15

E SITE 1 SITE

5 8.9 8.7

5 8.8 8.1

5 18.9 16.

5 9.8 8.2

5 10.8 9.7

5 8.4 8.4

5 11.2 11.

5 12.5 9.6

5 11.7 12.4

5 8.9 8.5

5 6.1 5.7

5 4.5 4.7

5 4.9 4.8

5 4.9 5.9

5 8.3 7.4

5 6.8 7.2

5 4.6 4.7

5 10.4 9.7

5 13.5 12.

5 13.1 18.

5 16.9 14.

5 29.6 23.

5 14.6 13.

5 6.4 5.2

5 5.3 5.4

5 6.2 6.5

5 7.2 7.4

5 9.0 7.9

5 11.4 12.8

5 9.5 9.5

5 12.0 11.

July 2015

E 2 SITE 3S

7 9.2 01

1 8.2 02

7 16.6 03

2 5.5 04

7 6.3 05

4 8.1 06

3 9.5 07

6 12.4 08

4 11.3 09

5 7.7 10

7 4.2 11

7 4.2 12

8 3.2 13

9 3.5 14

4 4.6 15

2 7.3 16

7 6.1 17

7 7.2 18

5 14.0 19

2 18.2 20

2 13.4 21

6 28.2 22

6 11.2 23

2 4.2 24

4 4.2 25

5 5.5 26

4 7.8 27

9 7.6 28

8 11.8 29

5 7.6 30

3 7.7 31

SAMPLE 

DATESITE 1

1‐Aug‐15 10.5

2‐Aug‐15 13.1

3‐Aug‐15 8.7

4‐Aug‐15 6.9

5‐Aug‐15 7.1

6‐Aug‐15 5.8

7‐Aug‐15 6.1

8‐Aug‐15 10.8

9‐Aug‐15 14.8

0‐Aug‐15 9.6

1‐Aug‐15 10.4

2‐Aug‐15 11.0

3‐Aug‐15 6.2

4‐Aug‐15 7.6

5‐Aug‐15 13.0

6‐Aug‐15 12.9

7‐Aug‐15 9.4

8‐Aug‐15 9.9

9‐Aug‐15 14.8

0‐Aug‐15 21.2

1‐Aug‐15 19.2

2‐Aug‐15 16.7

3‐Aug‐15 11.9

4‐Aug‐15 9.3

5‐Aug‐15 5.0

6‐Aug‐15 4.4

7‐Aug‐15 5.0

8‐Aug‐15 5.2

9‐Aug‐15 5.7

0‐Aug‐15 9.7

1‐Aug‐15 8.9

August

SITE 2 SITE 3

10.1 10.5

12.9 7.6

9.3 13.7

6.9 6.3

9.2 4.5

6.6 5.8

7.0 6.2

12.0 6.3

15.8 11.0

9.9 14.0

9.5 8.2

11.8 10.5

7.1 9.3

7.4 4.9

12.8 8.5

12.9 10.5

9.9 10.1

9.6 7.7

15.1 7.5

20.8 16.6

18.1 20.1

15.3 15.4

11.1 11.8

8.1 9.2

5.1 8.7

4.4 5.6

5.6 3.6

5.6 3.5

5.6 4.1

5.6 4.1

no data 7.2

t 2015

 

2

MUSWE

2015 Annual Envir

SAMPLE 

DATESITE 1

01‐Sep‐15 7.2

02‐Sep‐15 9.7

03‐Sep‐15 8.0

04‐Sep‐15 12.5

05‐Sep‐15 9.8

06‐Sep‐15 13.7

07‐Sep‐15 8.3

08‐Sep‐15 8.1

09‐Sep‐15 7.0

10‐Sep‐15 15.3

11‐Sep‐15 13.5

12‐Sep‐15 12.5

13‐Sep‐15 14.5

14‐Sep‐15 15.9

15‐Sep‐15 16.7

16‐Sep‐15 18.2

17‐Sep‐15 20.0

18‐Sep‐15 13.4

19‐Sep‐15 13.3

20‐Sep‐15 8.6

21‐Sep‐15 8.6

22‐Sep‐15 10.5

23‐Sep‐15 15.7

24‐Sep‐15 15.3

25‐Sep‐15 12.3

26‐Sep‐15 11.1

27‐Sep‐15 12.4

28‐Sep‐15 11.7

29‐Sep‐15 12.4

30‐Sep‐15 21.2

Septem

ELLBROOK COAL CO

ronmental Manag

SITE 2 SITE 3

no data 5.2

no data 9.2

no data 5.8

8.5 9.2

8.8 8.8

11.0 15.4

7.8 6.2

7.2 7.8

7.3 7.1

14.7 17.7

11.7 11.2

10.4 9.5

14.7 12.7

13.3 12.6

15.4 13.9

16.8 17.4

16.4 18.2

12.3 18.6

10.4 11.4

6.2 6.2

7.0 6.1

9.6 10.7

13.4 15.2

12.7 13.3

11.6 11.9

9.4 13.0

11.0 15.9

9.1 8.8

11.1 9.9

19.7 19.7

mber 2015

OMPANY LIMITED

gement Report

3SAMPLE 

DATES

01‐Oct‐15

02‐Oct‐15

03‐Oct‐15

04‐Oct‐15

05‐Oct‐15

06‐Oct‐15

07‐Oct‐15

08‐Oct‐15

09‐Oct‐15

10‐Oct‐15

11‐Oct‐15

12‐Oct‐15

13‐Oct‐15

14‐Oct‐15

15‐Oct‐15

16‐Oct‐15

17‐Oct‐15

18‐Oct‐15

19‐Oct‐15

20‐Oct‐15

21‐Oct‐15

22‐Oct‐15

23‐Oct‐15

24‐Oct‐15

25‐Oct‐15

26‐Oct‐15

27‐Oct‐15

28‐Oct‐15

29‐Oct‐15

30‐Oct‐15

31‐Oct‐15

O

ITE 1 SITE 2

20.8 18.6

24.3 21.3

17.3 14.7

19.7 15.6

23.8 15.9

18.9 18.3

34.0 31.6

20.7 19.2

22.1 18.9

24.9 21.5

18.4 16.9

17.9 13.4

25.3 23.9

18.5 17.8

21.7 17.5

14.6 15.2

26.5 24.0

21.3 19.6

21.5 19.5

21.1 19.3

16.1 20.7

6.9 7.0

13.8 14.7

16.7 17.8

15.9 16.0

15.9 18.2

13.1 11.3

15.2 16.2

20.1 17.4

18.1 19.1

18.9 19.7

October 2015

SITE 3SAMPLE

DATE

22.3 01‐Nov‐1

12.7 02‐Nov‐1

13.5 03‐Nov‐1

13.5 04‐Nov‐1

13.0 05‐Nov‐1

17.5 06‐Nov‐1

37.8 07‐Nov‐1

19.3 08‐Nov‐1

23.9 09‐Nov‐1

16.3 10‐Nov‐1

13.7 11‐Nov‐1

16.3 12‐Nov‐1

24.4 13‐Nov‐1

22.8 14‐Nov‐1

18.1 15‐Nov‐1

12.4 16‐Nov‐1

21.7 17‐Nov‐1

20.6 18‐Nov‐1

22.0 19‐Nov‐1

19.3 20‐Nov‐1

19.6 21‐Nov‐1

5.7 22‐Nov‐1

16.6 23‐Nov‐1

20.2 24‐Nov‐1

14.9 25‐Nov‐1

17.0 26‐Nov‐1

15.5 27‐Nov‐1

19.6 28‐Nov‐1

17.2 29‐Nov‐1

23.8 30‐Nov‐1

16.9

E SITE 1 SITE

15 16.3 17.

15 11.3 14.0

15 11.7 13.8

15 6.7 6.3

15 8.2 9.2

15 13.3 14.4

15 14.8 18.

15 9.9 9.4

15 14.2 12.4

15 16.8 16.

15 12.0 10.9

15 14.4 17.

15 7.9 8.6

15 9.2 10.0

15 10.8 10.

15 11.2 10.

15 12.7 12.8

15 12.7 13.9

15 17.8 17.

15 26.1 21.

15 27.2 30.

15 17.8 18.4

15 21.6 22.0

15 27.1 30.8

15 21.2 20.

15 39.6 49.9

15 19.1 20.

15 24.5 24.

15 18.6 20.

15 27.1 24.

November 20

E 2 SITE 3S

2 13.2 01

0 10.3 02

8 13.9 03

3 8.1 04

2 13.7 05

4 10.5 06

1 12.2 07

4 12.3 08

4 19.5 09

7 26.9 10

9 15.2 11

5 14.4 12

6 7.1 13

0 8.0 14

6 8.9 15

3 10.5 16

8 16.7 17

9 10.5 18

7 13.7 19

7 19.7 20

7 27.2 21

4 15.5 22

0 18.1 23

8 30.8 24

2 20.0 25

9 no data 26

5 no data 27

7 no data 28

5 no data 29

3 no data 30

31

015SAMPLE 

DATESITE 1

1‐Dec‐15 24.4

2‐Dec‐15 21.9

3‐Dec‐15 18.6

4‐Dec‐15 16.7

5‐Dec‐15 18.0

6‐Dec‐15 17.9

7‐Dec‐15 19.5

8‐Dec‐15 22.1

9‐Dec‐15 13.5

0‐Dec‐15 15.5

1‐Dec‐15 22.9

2‐Dec‐15 36.0

3‐Dec‐15 21.6

4‐Dec‐15 25.8

5‐Dec‐15 35.4

6‐Dec‐15 15.1

7‐Dec‐15 12.0

8‐Dec‐15 17.0

9‐Dec‐15 19.5

0‐Dec‐15 19.4

1‐Dec‐15 19.0

2‐Dec‐15 3.0

3‐Dec‐15 8.7

4‐Dec‐15 12.4

5‐Dec‐15 10.8

6‐Dec‐15 11.8

7‐Dec‐15 10.1

8‐Dec‐15 14.0

9‐Dec‐15 13.1

0‐Dec‐15 12.3

1‐Dec‐15 13.7

Decemb

SITE 2 SITE 3

22.4 no data

24.5 no data

21.9 no data

16.9 25.6

23.7 19.5

21.4 19.9

21.7 25.1

27.0 12.6

12.9 14.7

18.4 18.2

22.5 30.4

39.2 25.4

24.2 22.7

29.5 31.3

38.2 21.4

16.2 17.4

12.8 7.1

18.6 16.8

19.2 15.8

19.4 14.8

22.6 17.9

2.4 3.2

9.9 7.0

14.7 13.0

11.5 7.9

14.8 12.1

9.6 13.0

14.6 13.0

13.2 13.9

12.7 11.8

15.7 9.7

ber 2015

 

2015 An

A

MUSWELL

nnual Environ

Appen

LBROOK COAL

nmental Man

ndix 3

L COMPANY L

nagement Re

3: Wat

IMITED

eport

ter Moonitorring RResults

 

2

M

2

1

2

2

1

2

1

1

1

8

1

2

M

2

1

2

2

1

2

MUSWE

2015 Annual Envir

MONTHLY SURF

DATE  Dam

27‐Jan‐15  7.

19‐Feb‐15  7.

24‐Mar‐15  7.

28‐Apr‐15  7.

4‐May‐15  7.

22‐Jun‐15  7.

17‐Jul‐15  7.

13‐Aug‐15  7.

10‐Sep‐15  7.

8‐Oct‐15  7.

13‐Nov‐15  7.

29‐Dec‐15  7.

Blank cells indicate

MONTHLY SURF

DATE  Dam

27‐Jan‐15  6,1

19‐Feb‐15  6,3

24‐Mar‐15  6,2

28‐Apr‐15  6,3

4‐May‐15  6,4

22‐Jun‐15  6,2

ELLBROOK COAL CO

ronmental Manag

FACE WATER M

m 1/2 

MCC12Final 

SettlingPond 

.68  8.30 

.72  8.26 

.59  8.01 

.66  8.19 

.99  8.36 

.74  8.37 

.39  8.28 

.40  8.30 

.72  8.33 

.96  8.13 

.35  8.37 

.71  8.31 

e that no sample 

FACE WATER M

m 1/2 

MCC12Final 

SettlingPond 

140  6,520 

380  7,870 

280  8,970 

300  4,960 

460  7,550 

240  6,880 

OMPANY LIMITED

gement Report

MONITORING RE

No.2 Open Cut 

Void 

8.10 

8.13 

7.14 

7.77 

7.93 

7.82 

7.84 

7.87 

8.05 

8.20 

7.89 

was collected 

MONITORING RE

No.2 Open Cut 

Void 

6,570 

6,750 

6,500 

6,390 

6,480 

6,380 

ESULTS ‐ pH 

No.1 Open Cut 

Void M

ESULTS – ELECT

No.1 Open Cut 

Void M

  4

 

 

  1

  2

  1

MCC06 

MCC0MuscCreek

upstre

7.71  8.01

7.95

8.01

7.57  7.70

7.74  7.86

7.94  7.87

7.84  7.88

7.67  7.85

7.98  8.04

8.09  8.12

7.30  7.58

7.65

TRICAL CONDUC

MCC06 

MCC0MuscCreek

upstre

4,410  5,32

  9,13

  6,79

1,650  1,21

2,860  1,34

1,940  827

07 cle k ‐ eam 

MCC08 Muscle Creek ‐ 

downstream 

1  7.86 

5  7.98 

1  7.93 

0  7.74 

6  7.88 

7  7.85 

8  7.90 

5  7.84 

4  8.04 

2  8.01 

8  7.61 

5  7.73 

CTIVITY 

07 cle k ‐ eam 

MCC08 Muscle Creek ‐ 

downstream 

0  5,480 

0  9,120 

0  6,140 

0  1,410 

0  1,770 

7  995 

MCC10 

7.85 

7.83 

7.83 

7.94 

8.13 

7.84 

MCC10 

 

 

 

 

 

10,600 

MCC11  MCC

8.0

8.0

7.9

7.6

7.7

8.1

7.9

7.7

8.2

8.1

8.0

MCC11  MCC

  9,5

  10,2

  9,8

  69

  1,6

  69

C17  MCC18 

04 

02 

95 

64 

75 

16 

93 

76 

23 

12 

00 

C17  MCC18 

540   

200   

820   

91   

680   

92   

 

2

1

1

1

8

1

2

M

2

1

2

2

1

2

1

1

1

8

1

2

B

MUSWE

2015 Annual Envir

DATE  Dam

17‐Jul‐15  6,3

13‐Aug‐15  6,4

10‐Sep‐15  6,2

8‐Oct‐15  6,5

13‐Nov‐15  6,3

29‐Dec‐15  6,3

Blank cells indicate

MONTHLY SURF

DATE  Dam

27‐Jan‐15  1

19‐Feb‐15 

24‐Mar‐15  <

28‐Apr‐15  <

4‐May‐15  1

22‐Jun‐15  1

17‐Jul‐15 

13‐Aug‐15  1

10‐Sep‐15  1

8‐Oct‐15 

13‐Nov‐15  <

29‐Dec‐15  <

Blank cells indicate

ELLBROOK COAL CO

ronmental Manag

m 1/2 

MCC12Final 

SettlingPond 

370  7,830 

480  8,760 

200  7,430 

520  10,600

320  8,640 

350  4,260 

e that no sample 

FACE WATER M

m 1/2 

MCC12Final 

SettlingPond 

12  16 

6  14 

<5  <5 

<5  <5 

15  13 

14  22 

6  7 

12  <5 

16  25 

9  <5 

<5  28 

<5  <5 

e that no sample 

OMPANY LIMITED

gement Report

No.2 Open Cut 

Void 

6,510 

6,570 

6,330 

0  6,640 

6,670 

was collected 

MONITORING RE

No.2 Open Cut 

Void 

12 

<5 

<5 

<5 

18 

15 

12 

12 

10 

 

<5 

was collected

No.1 Open Cut 

Void M

  4

  5

  3

  5

  4

 

ESULTS – TOTAL

No.1 Open Cut 

Void M

 

 

 

 

 

 

 

 

 

 

 

 

MCC06 

MCC0MuscCreek

upstre

4,280  1,27

5,050  1,84

3,260  1,01

5,280  1,81

4,850  2,06

2,04

L SUSPENDED S

MCC06 

MCC0MuscCreek

upstre

10  5

  <5

  <5

31  <5

7  <5

8  6

16  <5

20  <5

<5  <5

6  <5

7  <5

  14

 

07 cle k ‐ eam 

MCC08 Muscle Creek ‐ 

downstream 

0  1,470 

0  2,350 

0  1,320 

0  2,340 

0  2,960 

0  2,870 

SOLIDS 

07 cle k ‐ eam 

MCC08 Muscle Creek ‐ 

downstream 

10 

<5 

<5 

<5 

<5 

<5 

<5 

<5 

10 

MCC10 

10,800 

10,000 

10,400 

10,800 

10,200 

MCC10 

 

 

 

 

 

<5 

<5 

<5 

<5 

<5 

 

MCC11  MCC

  56

  4,1

  1,0

  6,8

  8,2

 

MCC11  MCC

  1

  2

  3

  1

  <

  6

  1

  1

  1

  2

  2

 

C17  MCC18 

62   

190   

050   

830   

210   

 

C17  MCC18 

2   

5   

6   

0   

5   

6   

4   

5   

2   

7   

1   

   

 

2

Q

2

2

1

2

Q

2

2

1

2

Q

2

2

1

2

MUSWE

2015 Annual Envir

QUARTERLY SUR

DATE  MC

24‐Mar‐15  8.

22‐Jun‐15  9.

10‐Sep‐15  8.

23‐Dec‐15  7.

Blank cells indicate

QUARTERLY SUR

DATE  MC

24‐Mar‐15  5,4

22‐Jun‐15  4,5

10‐Sep‐15  4,6

23‐Dec‐15  5,2

Blank cells indicate

QUARTERLY SUR

DATE  MC

24‐Mar‐15 

22‐Jun‐15  1

10‐Sep‐15  4

23‐Dec‐15  6

Blank cells indicate

ELLBROOK COAL CO

ronmental Manag

RFACE WATER 

CC9  MCC13

.70 

.24  7.83 

.98  7.78 

.97 

e that no sample 

RFACE WATER 

CC9  MCC13

480 

560  1,040 

660  1,000 

240 

e that no sample 

RFACE WATER 

CC9  MCC13

14  6 

48  <5 

64 

e that no sample  

OMPANY LIMITED

gement Report

MONITORING R

3  MCC23 

9.40 

9.30 

8.25 

9.80 

was collected 

MONITORING R

3  MCC23 

2,810 

2,110 

1,160 

1,720 

was collected 

MONITORING R

3  MCC23 

<5 

<5 

was collected 

RESULTS – pH

MCC24  M

 

7.87 

7.83 

7.54 

RESULTS – ELEC

MCC24  M

 

2,960  1

2,660  1

6,200  2

RESULTS – TOT

MCC24  M

 

<5 

25 

MCC25  MCC2

  9.00

7.67  8.19

7.92  8.21

7.32  7.84

CTRICAL CONDU

MCC25  MCC2

  8,72

1,100  2,53

1,100  3,22

2,400  2,06

AL SUSPENDED

MCC25  MCC2

  <5

<5  6

<5  5

6  29

26  MCC27 

0  8.01 

9  7.91 

1  8.24 

4  7.99 

UCTIVITY 

26  MCC27 

0  10,800 

0  8,500 

0  7,440 

0  6,350 

D SOLIDS 

26  MCC27 

<5 

15 

 

2

AS

H(ca

C

B

S

C

C

Ma

Ma

S

Po

I

A

B

MUSWE

2015 Annual Envir

ANNUAL SURFASampled 24 March

ANALYTE 

pH 

EC (µS/cm) 

TDS (mg/L) 

TSS (mg/L) 

Hardness ‐ total lculation ‐ mg/L) 

Alkalinity ‐Carbonate (mg 

CaCO3/L) 

Alkalinity ‐icarbonate (mg CaCO3/L) 

Sulfates (mg/L) 

Chloride (mg/L) 

Calcium ‐ total (mg/L) 

agnesium (ppm) 

agnesium ‐ total (mg/L) 

Sodium ‐ total (mg/L) 

otassium ‐ total (mg/L) 

Iron‐ filterable (mg/L) 

Arsenic (mg/L) 

Barium (mg/L) 

ELLBROOK COAL CO

ronmental Manag

ACE WATER MOh 2015 

Dam 1/2 

MCC12Final 

SettlingPond 

7.59  8.01 

6,280  8,970 

5,970  9,480 

<5  <5 

3,150  5,250 

<1  <1 

357  303 

3,070  5,330 

566  730 

565  493 

422  975 

422  975 

509  839 

42  42 

<0.05  <0.05 

<0.001  <0.001

0.046  0.044 

OMPANY LIMITED

gement Report

ONITORING RES

No.1 Open Cut Void 

No.OpeCutVoi

7.1

6,50

6,34

<5

 3,42

 <1

 257

3,38

550

 568

485

 485

 534

 42

 <0.0

1  <0.0

0.02

ULTS 

.2 en t d 

MCC6  MC

4  8.

00  6,7

40  4,7

5  <

20  

1,7

1  

<

7  

4

80  1,1

0  1,3

8  

3

5  2

5  

2

4  

9

2  

05  

<0

01  0.0

24  0.0

CC7  MCC8  M

.01  7.93 

790  6,140  5

780  4,560  4

<5  7 

710  1,660  2

<1  <1 

28  417 

110  1,440  2

340  1,030 

53  320 

02  208 

02  208 

54  828 

7  3 

0.05  <0.05  <

004  0.001  0

052  0.052  0

MCC9  MCC13 

8.70 

5,480 

4,260 

2,750  

33  

99  

2,880 

463 

188  

554 

554  

557  

29  

<0.05  

0.003 

0.066 

MCC17  MCC23

7.95  9.40 

9,820  2,810 

8,510  2,040 

36  6 

3,760  1,220 

<1  28 

422  27 

4,170  1,400 

1,190  184 

554  135 

576  215 

576  215 

1,460  258 

19  23 

0.14  <0.05 

0.002  0.002 

0.075  0.24 

MCC24  MCC25

   

   

   

   

   

   

   

   

5  MCC26  MCC2

9.00  8.01

8,720  10,80

9,440  10,50

<5  <5 

5,280  4,53

98  <1 

83  159

5,500  5,61

511  962

234  359

1,140  882

1,140  882

813  1,35

28  30 

<0.05  <0.0

0.005  0.00

0.04  0.03

 

27 

00 

00 

2

Ca

Ch

C

fi

Se

Iro

M

F

Nit

Ni

Oil 

T

B

 

MUSWE

2015 Annual Envir

ANALYTE 

admium (mg/L) 

hromium (mg/L) 

Copper  (mg/L) 

Lead (mg/L) 

Manganese ‐lterable (mg/L) 

Nickel (mg/L) 

elenium (mg/L) 

Zinc (mg/L) 

Boron (mg/L) 

on ‐ total (mg/L) 

Mercury (mg/L) 

Fluoride ‐ total (mg/L) 

trogen Ammonia (mg N/L) 

itrates (mg N/L) 

& Grease (mg/L) 

PAH (mg/L) 

otal Petroleum Hydrocarbons 

(mg/L) 

Blank cells indicate

ELLBROOK COAL CO

ronmental Manag

Dam 1/2 

MCC12Final 

SettlingPond 

<0.0001 

<0.0001

<0.001  <0.001

<0.001  0.001 

<0.001  <0.001

0.681  0.022 

0.022  0.007 

<0.01  <0.01 

<0.005  <0.005

0.76  0.51 

0.86  0.08 

<0.0001 

<0.0001

0.7  1.1 

6.2  0.22 

1.44  <0.01 

<5  <5 

<0.5  <0.5 

<70  <70 

e that no sample 

OMPANY LIMITED

gement Report

No.1 Open Cut Void 

No.OpeCutVoi

1  

<0.01

1  <0.0

<0.0

1  <0.0

 0.47

0.05

<0.0

5  0.01

0.7

0.1

1  

<0.01

 0.6

 1.0

2.8

<5

<0.

 <70

was collected 

.2 en t d 

MCC6  MC

00 

<0.

01  <0.

01  0.0

01  <0.

73  

0.0

53  <0.

01  <0

12  <0.

7  0.

6  0.

00 

<0.

6  

0

1  

0.

1  <0

5  <

5  <0

0  

<

CC7  MCC8  M

.0001 

<0.0001 

<

.001  <0.001  <

004  0.009  <

.001  <0.001  <

032  0.067  0

.001  <0.001  0

0.01  <0.01  <

.005  <0.005  <

.11  0.12 

.06  0.1 

.0001 

<0.0001 

<

0.3  0.5 

.02  0.05 

0.01  <0.01 

<5  <5 

0.5  <0.5 

70  <70 

MCC9  MCC13 

0.0001   

0.001 

0.001 

0.001 

0.089  

0.003 

<0.01 

0.005 

0.16 

0.12 

0.0001   

0.5  

0.09  

0.01 

<5 

<0.5 

<70  

MCC17  MCC23

<0.0001 

<0.0001 

<0.001  <0.001 

0.015  0.001 

0.001  <0.001 

0.274  0.003 

0.002  0.004 

<0.01  <0.01 

0.011  0.006 

0.2  <0.05 

0.89  0.06 

<0.0001 

<0.0001 

0.4  0.7 

0.06  0.05 

<0.01  <0.01 

<5  <5 

<0.5  <0.5 

<70  <70 

MCC24  MCC25

   

   

   

   

   

   

5  MCC26  MCC2

<0.0001 

<0.001 

<0.001  <0.00

<0.001  <0.00

<0.001  <0.00

0.061  0.31

0.004  0.00

<0.01  <0.0

<0.005  <0.00

0.09  0.12

0.24  0.11

<0.0001 

<0.001 

0.7  0.6 

0.09  0.08

<0.01  <0.0

<5  <5 

<0.5  <0.5

<70  <70

 

27 

00

01 

01 

01 

05 

00

2

G

MUSWE

2015 Annual Envir

GROUND WATE

DATE 

Jan‐15 

Feb‐15 

Mar‐15 

Apr‐15 

May‐15 

Jun‐15 

Jul‐15 

Aug‐15 

Sep‐15 

Oct‐15 

Nov‐15 

Dec‐15 

AVERAGE 

ELLBROOK COAL CO

ronmental Manag

ER MONITORING

Relative Lev(mAHD) 

BORE 

114.09 

113.68 

113.64 

113.65 

113.65 

113.65 

114.18 

113.72 

114.68 

113.73 

113.71 

113.72 

113.84 

OMPANY LIMITED

gement Report

G RESULTS – M

vel pH 

RDH650 

7.2 

7.5 

7.2 

7.0 

no resul

no resul

6.9 

7.0 

7.5 

7.8 

no resul

7.8 

7.3 

MINING AREAS

ElectricalConductivit(µS/cm)

5,250 

6,320 

6,130 

5,940 

lt  no result

lt  no result

6,390 

6,470 

6,340 

6,460 

lt  no result

6,460 

6,196 

 ty 

RDH61

55.69

56.23

57.16

54.34

55.17

54.18

55.20

55.74

54.80

55.69

56.11

54.62

55.41 

Depth(m

16  RD

9  4

3  5

6  5

4  4

7  4

8  4

0  4

4  4

0  4

9  4

1  4

2  4

1  4

h to Water mbgl) 

DH617 

49.60 

50.16 

50.71 

48.51 

49.14 

48.45 

49.19 

49.51 

48.75 

49.33 

49.43 

49.46 

49.35 

RDH624 

33.54 

33.60 

33.68 

33.81 

33.77 

33.80 

33.77 

33.78 

33.80 

33.81 

33.82 

33.86 

33.75 

 

2015 An

ANNUASampled

MUSWELL

nnual Environ

AL GROUNDd 24 March 2

Hardness ‐

Alkalinity ‐

Alkalinity ‐ 

Cal

Magn

Sod

Pota

Iron

C

C

Mangan

S

Ir

Fluo

Nitroge

N

Oi

Total Petro

LBROOK COAL

nmental Man

DWATER M2015 

ANALYT

pH 

EC (µS/cm

TDS (mg/

TSS (mg/

‐ total (calcu

‐ Carbonate

Bicarbonat

Sulfates (m

Chloride (m

cium ‐ total

nesium ‐ tot

dium ‐ total

assium ‐ tota

n‐ filterable

Arsenic (m

Barium (m

Cadmium (m

Chromium (m

Copper  (m

Nickel (mg

Lead (mg/

Zinc (mg/

nese ‐ filter

Selenium (m

Boron (mg

ron ‐ total (m

Mercury (m

oride ‐ tota

en Ammoni

Nitrates (mg

l & Grease 

PAH (mg/

leum Hydro

L COMPANY L

nagement Re

MONITORIN

TE 

m) 

/L) 

/L) 

ulation ‐ mg

e (mg CaCO3

e (mg CaCO

mg/L) 

mg/L) 

l (mg/L) 

tal (mg/L) 

 (mg/L) 

al (mg/L) 

e (mg/L) 

g/L) 

g/L) 

mg/L) 

mg/L) 

mg/L) 

g/L) 

/L) 

/L) 

rable (mg/L)

mg/L) 

g/L) 

mg/L) 

mg/L) 

l (mg/L) 

ia (mg N/L)

g N/L) 

(mg/L) 

/L) 

ocarbons (m

IMITED

eport

NG RESULTS

g/L) 

3/L) 

O3/L) 

mg/L) 

S – MINING

RDH

7.2

61

55

7

29

<

42

29

58

55

39

51

4

2.6

<0.0

0.0

<0.0

<0.0

<0.0

<0.0

0.9

0.0

<0.

0.1

0.7

2.9

<0.0

0.

10

2.7

<

<0

<7

G AREAS 

H607 

24 

30 

60 

80 

22 

20 

80 

51 

91 

11 

64 

001 

051 

0001 

001 

001 

001 

998 

006 

.01 

151 

72 

94 

0001 

.7 

0.1 

74 

0.5 

70 

 

2

G

S

2

1

24

2

14

2

2

20

2

2

20

2

S

2

1

24

2

14

2

MUSWE

2015 Annual Envir

GROUND WATE

Date Sampled  De

(m

27‐Jan‐15 

9‐Feb‐15 

4‐Mar‐15  9

8‐Apr‐15 

4‐May‐15 

9‐Jun‐15  7

29‐Jul‐15 

0‐Aug‐15 

2‐Sep‐15  6

3‐Oct‐15 

0‐Nov‐15 

1‐Dec‐15 Re

Shaded cell indicat

Date Sampled  De

(m

27‐Jan‐15 

9‐Feb‐15 

4‐Mar‐15  7

8‐Apr‐15 

4‐May‐15 

9‐Jun‐15  3

ELLBROOK COAL CO

ronmental Manag

ER MONITORING

MCC 1001 

epth mbgl) 

pH 

9.5  7.0 

   

7.4  7.0 

   

6.7  7.1 

moved from monprogram 

tes that the site w

MCC 1008A 

epth mbgl) 

pH 

   

   

7.4  7.3 

   

   

3.7  7.4 

OMPANY LIMITED

gement Report

G RESULTS – SA

EC (µS/cm)

Depth(mbgl

6.29

6.50

1,099  6.70

 2.81

2.90

1,194  2.35

 2.37

2.61

1,050  2.42

2.97

2.44

nitoring 3.38

was not due for sa

EC (µS/cm)

Depth(mbgl

   

   

1,266  8.3

   

   

968  5.6

ANDY CREEK 

MCC 1003 

h l)

pH EC

(µS/

  7.1  1,5

  7.1  1,6

  7.1  1,6

  7.4  1,0

  7.4  96

  7.2  1,3

  7.2  1,2

  7.2  1,2

  7.3  1,4

  7.1  1,3

  7.2  1,3

  7.1  1,3

ampling 

MCC 1009 

h l)

pH EC

(µS/

 

 

7.9  1,4

 

 

7.4  1,1

M

C /cm)

Depth (mbgl) 

544 

640 

604  9.9 

020  

69 

325  7.8 

270  

272 

480  7.7 

340 

321 

350 Removed 

p

M

C /cm)

Depth (mbgl) 

 

 

465  2.2 

 

 

186  1.7 

MCC 1004 

pH EC 

(µS/cm)

6.7  2,002

   

6.6  2,860

   

6.6  3,330

from monitoring program 

MCC 1010 

pH EC 

(µS/cm)

   

   

7.9  6,360

   

   

7.7  5,800

MCC 10

)Depth (mbgl)

pH

8.71  7.0

8.73  7.0

8.87  7.0

No access – chigh

10.94  6.9

No access – chigh

No access – chigh

4.31  7.1

7.10  7.1

7.36  7.1

7.20  7.2

7.43  7.2

MCC 10

)Depth (mbgl)

pH

   

   

8.0  7.2

   

   

5.6  7.4

005 

EC (µS/cm)

Dep(mb

2,710 

Bono

2,760 

2,980 

creek too h 

3,750 

creek too h 

creek too h 

3,200 

2,810 

2,550 

2,130 

2,020 

012 

EC (µS/cm)

Dep(mb

  4.0

  3.8

1,931  3.9

  3.5

  3.7

2,120  3.3

MCC 1006 

pth bgl)

pH EC

(µS/c

re has collapsed so sample could be

collected 

MCC 1015 

pth bgl)

pH EC

(µS/c

06  7.2  3,75

84  7.6  3,23

97  7.7  2,14

52  6.9  1,93

70  7.2  1,91

35  7.2  2,00

 

C cm) 

so e 

C cm) 

50 

30 

40 

30 

12 

06 

2

S

2

20

2

2

20

2

2

1

2

 

MUSWE

2015 Annual Envir

Date Sampled  De

(m

29‐Jul‐15 

0‐Aug‐15 

2‐Sep‐15  3

3‐Oct‐15 

0‐Nov‐15 

1‐Dec‐15 Re

Shaded cell indicat

Date Sampled  D

27‐Jan‐15 

19‐Feb‐15 

24‐Mar‐15 

28‐Apr‐15 

14‐May‐15 

29‐Jun‐15 

29‐Jul‐15 

20‐Aug‐15 

22‐Sep‐15 

23‐Oct‐15 

20‐Nov‐15 

21‐Dec‐15 

ELLBROOK COAL CO

ronmental Manag

MCC 1008A 

epth mbgl) 

pH 

   

   

3.8  7.3 

   

   

moved from monprogram 

tes that the site w

MCC 1017 

Depth (mbgl) 

No Access 

17.18 

17.16 

17.15 

17.16 

17.60 

16.99 

17.00 

16.98 

17.01 

17.00 

17.05 

OMPANY LIMITED

gement Report

EC (µS/cm)

Depth(mbgl

   

   

993  4.6

   

   

nitoring mo

was not due for sa

MCC 1018 

Depth (mbgl) 

17.07 

17.22 

17.21 

17.32 

17.39 

17.45 

17.46 

17.39 

17.32 

17.34 

17.31 

17.36 

MCC 1009 

h l)

pH EC

(µS/

 

 

7.6  1,1

 

 

Removed from onitoring program

ampling 

M

C /cm)

Depth (mbgl) 

 

 

140  1.3 

 

 

m Removed 

p

MCC 1010 

pH EC 

(µS/cm)

   

   

7.6  5,420

   

   

from monitoring program 

MCC 10

)Depth (mbgl)

pH

   

   

5.4  7.4

   

   

Removedmonitoring p

012 

EC (µS/cm)

Dep(mb

  3.8

  3.2

1,920  3.6

  3.6

  3.6

 from program 

3.8

MCC 1015 

pth bgl)

pH EC

(µS/c

82  7.2  2,45

25  7.2  2,67

66  7.1  3,07

68  7.0  3,06

65  7.1  2,93

80  7.0  2,76

 

C cm) 

50 

70 

70 

60 

30 

60 

2

AS

MUSWE

2015 Annual Envir

ANNUAL GROUNSampled 22 Septe

Analyte 

pH 

EC (µS/cm) 

TDS (mg/L) 

TSS (mg/L) 

Hardness ‐ total mg/L) 

Alkalinity ‐ CarboCaCO3/L) 

Alkalinity ‐ BicarbCaCO3/L) 

Sulfates (mg/L)

Chloride (mg/L)

Calcium ‐ total (m

Magnesium ‐ tot

Sodium ‐ total (m

Potassium ‐ tota

Iron‐ filterable (m

Arsenic (mg/L) 

Barium (mg/L) 

Cadmium (mg/L)

Chromium (mg/L

Copper  (mg/L) 

Lead (mg/L) 

Manganese ‐ filte(mg/L) 

Nickel (mg/L) 

Selenium (mg/L)

Zinc (mg/L) 

Boron (mg/L) 

ELLBROOK COAL CO

ronmental Manag

NDWATER MONmber 2015 

M

(calculation ‐ 

onate (mg 

bonate (mg 

mg/L) 

tal (mg/L) 

mg/L) 

l (mg/L) 

mg/L) 

)  <

L) 

erable 

 

OMPANY LIMITED

gement Report

NITORING RESU

MCC1001 MCC10

7.06  7.28

1050  148

488  835

<5  <5

289  405

<1  <1

184  226

81  124

169  260

68  93

29  42

110  165

2  2

<0.05  <0.0

<0.001  <0.00

0.026  0.03

<0.0001  <0.00

<0.001  <0.00

<0.001  <0.00

<0.001  <0.00

<0.001  <0.00

<0.001  <0.00

<0.01  <0.0

0.007  0.01

0.08  0.1

ULTS – SANDY C

003 MCC1004

8  6.59 

0  3330 

5  2530 

  <5 

5  861 

  <1 

6  157 

4  218 

0  803 

  180 

  100 

5  309 

05  <0.05 

01  <0.001 

34  0.046 

001  <0.0001 

01  <0.001 

01  <0.001 

01  <0.001 

01  0.008 

01  0.002 

01  <0.01 

13  <0.005 

1  0.05 

CREEK 

MCC1005 MCC

7.08  D

2810 

1880 

656 

<1 

261 

212 

611 

131 

80 

315 

0.07 

<0.001 

0.04 

<0.0001 

<0.001 

0.002 

<0.001 

0.018 

0.001 

<0.01 

0.05 

0.09 

C1006  MCC100

Dry  7.33

993

502

<5 

 263

 <1 

 213

70 

155

59 

28 

103

<0.05

<0.001

0.026

<0.000

<0.001

<0.001

<0.001

 <0.001

<0.001

<0.01

0.006

0.08

8A MCC1009

7.58 

1140 

604 

<5 

299 

<1 

203 

82 

187 

72 

29 

110 

<0.05 

1  <0.001 

0.036 

1  <0.0001 

1  <0.001 

1  <0.001 

1  <0.001 

1  0.089 

1  <0.001 

<0.01 

<0.005 

0.08 

MCC1010 MCC

7.64  7.

5420  19

3200  11

<5  <

820  52

<1  <

534  27

358  19

1140  32

104  11

136  6

812  21

3  2

<0.05  <0

<0.001  <0.

0.132  0.0

<0.0001  <0.0

<0.001  <0.

<0.001  <0.

<0.001  <0.

0.043  0.0

<0.001  <0.

<0.01  <0

<0.005  0.0

0.07  0.

C1012 MCC1015

44  7.14 

920  3070 

120  2130 

<5  <5 

24  936 

<1  <1 

78  275 

99  416 

25  583 

11  200 

60  106 

13  317 

2  4 

.05  0.07 

001  0.003 

032  0.105 

0001  <0.0001 

001  <0.001 

001  0.003 

001  0.005 

007  0.393 

001  <0.001 

.01  <0.01 

015  0.039 

13  0.14 

 

2

 

MUSWE

2015 Annual Envir

Analyte 

Iron ‐ total (mg/L

Mercury (mg/L)

Fluoride ‐ total (m

Ammonia (mg/L)

Nitrite (mg N/L)

Nitrate (mg N/L)

Oil & Grease (mg

PAH (mg/L) 

Total Petroleum Hydrocarbons (m

ELLBROOK COAL CO

ronmental Manag

M

L) 

<

mg/L) 

 

g/L) 

mg/L) 

OMPANY LIMITED

gement Report

MCC1001 MCC10

<0.05  0.06

<0.0001  <0.00

0.2  0.3

0.02  0.07

<0.01  <0.0

1.59  0.6

<5  <5

<0.5  <0.5

<70  <70

003 MCC1004

6  <0.05 

001  <0.0001 

3  <0.1 

7  0.01 

01  <0.01 

6  0.31 

  <5 

5  <0.5 

0  <70 

MCC1005 MCC

0.4 

<0.0001 

0.2 

0.1 

<0.01 

1.97 

<5 

<0.5 

<70 

C1006  MCC100

<0.05

<0.000

0.3 

0.02

<0.01

0.23

<5 

<0.5

  <70

8A MCC1009

0.06 

1  <0.0001 

0.2 

0.08 

<0.01 

0.15 

<5 

<0.5 

<70 

MCC1010 MCC

<0.05  0.

<0.0001  <0.0

0.6  0

0.03  0.

<0.01  <0

0.12  0.

<5  <

<0.5  <0

<70  <7

C1012 MCC1015

36  2.24 

0001  <0.0001 

.3  0.2 

04  0.23 

.01  <0.01 

66  0.41 

<5  <5 

0.5  <0.5 

70  <70 

 

2015 An

MUSWELL

nnual Environ

App

LBROOK COAL

nmental Man

pendix

L COMPANY L

nagement Re

x 4: Bl

IMITED

eport

ast MMonitooring DData 

 

2

B

MUSWE

2015 Annual Envir

BLAST MONITO

Blast ID

OR1058OR1059OR1060OR1061OR1062OR1063OR1064OR1065OR1066OR1067OR1068OR1069OR1070OR1071OR1072OR1073OR1074OR1075OR1076OR1077OR1078OR1079OR1080OR1081OR1082OR1083OR1084OR1085OR1086OR1087OR1088OR1089OR1091OR1090OR1092OR1093

ELLBROOK COAL CO

ronmental Manag

RING RESULTS 

Date

2-Jan-159-Jan-15

14-Jan-1515-Jan-1516-Jan-1520-Jan-1522-Jan-1523-Jan-1529-Jan-1530-Jan-153-Feb-155-Feb-156-Feb-159-Feb-15

11-Feb-1512-Feb-1513-Feb-1516-Feb-1517-Feb-1519-Feb-1520-Feb-1523-Feb-1524-Feb-1526-Feb-1527-Feb-154-Mar-156-Mar-15

13-Mar-1516-Mar-1517-Mar-1520-Mar-1523-Mar-1527-Mar-1527-Mar-1530-Mar-1531-Mar-15

OMPANY LIMITED

gement Report

Time Type

12:51 I12:47 I9:20 I

10:00 O14:10 I12:59 I13:05 I12:46 I12:52 O12:24 O12:56 O12:52 I12:55 I14:47 I13:28 I12:54 I12:53 I12:57 I13:33 O12:51 O12:19 I12:55 O12:51 I12:49 O12:50 I12:49 Other15:06 I14:36 I12:43 I12:47 Other12:57 I14:10 I14:38 I14:52 O12:50 I13:27 O

Overpressure dB(L)

NR94.791.089.391.598.594.094.795.096.0101.295.0100.099.593.394.491.591.097.8100.492.0NT

96.2103.0

NT88.795.096.292.988.097.391.592.996.280.4103.7

School

Ground Vibration mm/s

O

NR0.120.180.040.140.160.040.050.050.040.090.050.070.040.040.10.040.040.050.130.04

<0.330.040.04

<0.330.040.040.070.050.030.090.070.040.050.420.05

(B2)

Overpressure dB(L)

GrouVibrat

mm/

101.2 0.08103.2 0.3195.7 0.4195.2 0.12

104.2 0.36110.3 0.2496.4 0.10

105.9 0.1493.6 0.15NR NR

109.0 0.17104.9 0.17107.3 0.25110.8 0.10106.8 0.11104.4 0.22104.0 0.1095.4 0.11

101.4 0.14109.4 0.19102.6 0.09110.0 0.24105.7 0.12113.5 0.14

NT <0.195.6 0.0899.9 0.14

103.8 0.1199.1 0.0697.0 0.0

107.3 0.18101.0 0.2096.4 0.0

101.8 0.18106.7 0.22108.7 0.12

Nisbet (B4)

und tion /s

Overpressure dB(L)

83 96.811 94.319 94.321 92.862 95.741 101.102 95.74 88.359 98.8R 100.478 103.472 96.854 103.408 102.314 95.729 96.808 96.814 92.846 97.991 101.795 97.941 NT21 97.94 104.116 NT83 94.346 101.714 98.864 90.87 90.884 96.803 94.37 92.884 95.722 99.627 106.4

99 Queen

Ground Vibration

mm/s

Over

0.060.180.240.080.210.230.080.090.10.060.140.10.090.090.080.180.090.080.110.130.09

<0.300.060.11

<0.300.080.080.10.060.060.130.10.10.140.20.08

Street (B3)

rpressure dB(L)

Ground Vibration

mm/s

99.5 0.199.5 0.2196.3 0.589.2 0.0694.1 0.37

102.3 0.1897.2 0.0698 0.08

96.3 0.0898.8 0.06

103.6 0.09101.8 0.1103.6 0.08112 0.196.3 0.0896.3 0.1897.2 0.0892.7 0.0599.5 0.08

103.2 0.1295.2 0.06NT <0.31

98.8 0.05106 0.05NT <0.31

90.4 0.197.1 0.0898.4 0.1295.7 0.0888.8 0.05

100.9 0.2193.9 0.1392.9 0.1100 0.1

100.9 0.34107.5 0.08

Queen Street (B1)

 

 

2

MUSWE

2015 Annual Envir

Blast ID

OR1094OR1095OR1096OR1097OR1098OR1099OR1100OR1101OR1102OR1103OR1104OR1105OR1106OR1107OR1108OR1109OR1110OR1111OR1112OR1113OR1114

OR1115/OR1116OR1117OR1118OR1119OR1120OR1121OR1122OR1123OR1124

OR1125/OR1126OR1127OR1128OR1129OR1130OR1131OR1132

ELLBROOK COAL CO

ronmental Manag

Date

1-Apr-152-Apr-157-Apr-159-Apr-159-Apr-15

10-Apr-1513-Apr-1514-Apr-1515-Apr-1517-Apr-1524-Apr-1527-Apr-1528-Apr-1529-Apr-1530-Apr-151-May-154-May-155-May-157-May-158-May-1512-May-1515-May-1519-May-1521-May-1526-May-1527-May-1529-May-152-Jun-153-Jun-155-Jun-15

11-Jun-0512-Jun-1515-Jun-1515-Jun-1522-Jun-1525-Jun-1529-Jun-15

OMPANY LIMITED

gement Report

Time Type

13:27 O12:48 I14:05 I12:48 I13:02 O12:51 I12:47 I12:47 O12:49 I14:05 I14:09 I13:22 I12:53 I12:51 O13:51 I11:46 O12:57 I13:34 I14:15 I12:52 I14:15 I12:58 I14:03 I14:46 I13:01 I12:51 I12:35 I12:48 I13:08 I12:46 I12:48 I11:39 I12:59 I13:14 I13:58 I12:42 O12:50 I

Overpressure dB(L)

99.389.3101.785.596.091.088.7103.497.094.0102.9NR

108.2108.993.092.4110.989.7107.088.9105.691.497.289.692.588.289.692.5NR

88.296.693.489.693.897.289.695.7

School

Ground Vibration mm/s

O

0.070.070.050.040.040.040.030.040.090.080.120.070.040.050.10.050.070.030.050.050.040.070.080.040.040.030.080.05NR0.090.090.040.050.070.040.030.11

(B2)

Overpressure dB(L)

GrouVibrat

mm/

108.9 0.1391.0 0.19

108.0 0.1791.4 0.0898.2 0.14

100.8 0.1799.0 0.07

110.2 0.2101.3 0.2795.7 0.1892.7 0.3398.6 0.2490.8 0.05

107.8 0.14103.1 0.0698.9 0.10

107.5 0.23103.4 0.0103.5 0.1493.0 0.23

102.3 0.11102.7 0.1794.8 0.0896.1 0.098.9 0.1289.2 0.0789.2 0.1995.0 0.19NR NR94.6 0.30

104.9 0.2997.0 0.1690.8 0.17

101.4 0.0697.0 0.1094.6 0.16

100.5 0.26

Nisbet (B4)

und tion /s

Overpressure dB(L)

33 104.897 95.772 101.183 90.846 98.878 94.376 92.81 104.873 98.884 98.832 92.742 NR51 89.847 100.464 93.802 95.83 95.87 95.847 95.83 89.815 97.479 92.789 91.37 87.821 94.977 87.891 87.891 93.8R NR06 91.393 95.86 91.372 87.864 94.908 97.46 91.362 98.1

99 Queen

Ground Vibration

mm/s

Over

0.180.130.10.080.180.080.060.110.190.180.290.130.050.110.060.090.130.050.130.150.080.110.090.060.080.060.20.13NR0.190.230.080.130.050.080.080.18

Street (B3)

rpressure dB(L)

Ground Vibration

mm/s

105.5 0.193.9 0.1698.4 0.188.8 0.08100 0.193.9 0.08

107.3 0.08107.7 0.1399.5 0.3198.9 0.3795.1 0.42

100.2 0.14104.9 0.0599.5 0.14

100.2 0.0894.2 0.08

102.4 0.19100.2 0.0895.3 0.0991.2 0.21

101.3 0.0892.8 0.15

102.8 0.1289.3 0.0891.2 0.0586.8 0.0591.2 0.2692.8 0.18NR NR89.3 0.3995.3 0.2792.8 0.0592.8 0.1997.3 0.0597.3 0.0691.2 0.0597.3 0.26

Queen Street (B1)

 

 

2

MUSWE

2015 Annual Envir

Blast ID

OR1133/ OR1134 *OR1135/OR1136 *

OR1137OR1138OR1139OR1140OR1141OR1142OR1143OR1144OR1145OR1146OR1147OR1148OR1149OR1150OR1151OR1152OR1153OR1154

OR1155/OR1156OR1157OR1158OR1159OR1160OR1161OR1162OR1163OR1164OR1165

OR1166/OR1167OR1168OR1169OR1170

OR1171/OR1172

ELLBROOK COAL CO

ronmental Manag

Date

1-Jul-152-Jul-156-Jul-158-Jul-158-Jul-15

10-Jul-1513-Jul-1514-Jul-1516-Jul-1516-Jul-1517-Jul-1522-Jul-1524-Jul-1524-Jul-1528-Jul-1531-Jul-1531-Jul-155-Aug-157-Aug-1511-Aug-1514-Aug-1518-Aug-1520-Aug-1521-Aug-1525-Aug-1528-Aug-1528-Aug-152-Sep-154-Sep-157-Sep-1510-Sep-1517-Sep-1525-Sep-1528-Sep-1530-Sep-15

OMPANY LIMITED

gement Report

Time Type

13:25 I13:28 I11:58 I16:41 I16:24 I12:57 O12:56 I13:07 I12:08 O11:57 I11:59 I12:53 I13:16 O12:51 Other12:44 I12:53 I13:12 I13:10 I12:57 O12:54 I12:45 I12:48 I12:46 O12:49 I11:06 Other13:19 O13:04 I12:56 I12:47 I12:50 I13:13 I12:46 I10:16 O12:46 I12:56 O

Overpressure dB(L)

99.491.497.191.192.495.5101.5104.494.698.3100.199.698.487.593.693.6104.4100.695.598.496.399.698.497.889.597.195.592.493.6104.895.593.692.499.097.1

School

Ground Vibration mm/s

O

0.050.050.070.130.070.090.110.080.070.10.110.090.080.070.110.080.090.120.080.110.110.130.080.110.080.080.090.10.110.090.190.110.080.10.1

(B2)

Overpressure dB(L)

GrouVibrat

mm/

102.1 0.2098.8 0.19

106.0 0.1098.3 0.197.7 0.3

103.1 0.24109.6 0.24104.3 0.1103.1 0.22106.2 0.395.8 0.1298.8 0.1

100.6 0.192.2 0.198.8 0.299.8 0.197.1 0.199.8 0.3

106.0 0.1100.6 0.198.3 0.294.2 0.1

104.3 0.1101.8 0.4100.2 0.14106.0 0.199.3 0.197.7 0.2299.3 0.297.1 0.1

101.4 0.1102.1 0.2299.8 0.2

105.1 0.32101.4 0.2

Nisbet (B4)

und tion /s

Overpressure dB(L)

04 94.998 92.709 98.13 NR1 NR4 97.54 94.38 99.92 94.35 99.92 897 98.53 102.55 89.62 99.77 NR5 NR9 104.37 101.75 93.19 91.95 899 1015 99.64 94.13 101.87 97.32 95.81 97.33 90.67 93.12 97.91 101.82 1011 100.1

99 Queen

Ground Vibration

mm/s

Over

0.110.130.08NRNR0.250.20.150.150.20.150.20.090.090.11NRNR0.160.110.130.110.070.090.140.070.080.080.150.140.070.090.160.120.160.21

Street (B3)

rpressure dB(L)

Ground Vibration

mm/s

96.4 0.14101.3 0.1398.1 0.0596.2 0.1494.3 0.299.1 0.24

105.4 0.25103 0.1296.2 0.14

101.8 0.1588.2 0.199.1 0.15

101.3 0.1390.2 0.1297.8 0.1597 0.12

91.8 0.1194.3 0.2599.1 0.13

102.2 0.18108 0.1790.2 0.12

101.8 0.14100.3 0.2794.3 0.11

101.3 0.15102.6 0.1594.3 0.2897 0.22

103.8 0.1295.3 0.1597 0.21

97.8 0.19102.2 0.1799.7 0.17

Queen Street (B1)

 

 

2

MUSWE

2015 Annual Envir

Blast ID

OR1173OR1174OR1175OR1176OR1177OR1178OR1179OR1181OR1180OR1182

OR1183/ OR1184OR1185OR1186OR1187OR1188OR1189OR1190

OR1191/ OR11920R1193OR1194OR1195OR1196OR1197OR1198OR1199OR1200OR1201OR1202

ELLBROOK COAL CO

ronmental Manag

Date

2-Oct-156-Oct-156-Oct-158-Oct-159-Oct-1513-Oct-1516-Oct-1520-Oct-1521-Oct-1523-Oct-1530-Oct-152-Nov-153-Nov-155-Nov-1513-Nov-1518-Nov-1518-Nov-1520-Nov-1525-Nov-1525-Nov-151-Dec-154-Dec-154-Dec-159-Dec-1514-Dec-1515-Dec-1518-Dec-1523-Dec-15

OMPANY LIMITED

gement Report

Time Type

12:49 Other12:51 I13:12 O12:27 O12:10 O13:07 I12:53 I15:07 I12:58 O13:32 I14:20 I14:51 I12:05 I13:12 Other12:55 I13:29 I11:16 I14:56 I13:46 O13:30 I15:03 I14:26 I14:31 I13:03 I12:45 O12:49 O12:54 O12:24 O

Overpressure dB(L)

92.4NRNR

105.697.193.691.195.5103.587.596.395.599.091.187.591.194.697.894.695.591.193.6100.1103.596.395.5104.494.6

School

Ground Vibration mm/s

O

0.08<0.5<0.50.090.090.120.10.130.10.080.130.090.080.090.10.110.10.150.090.080.110.110.090.090.120.10.140.07

(B2)

Overpressure dB(L)

GrouVibrat

mm/

95.8 0.1100.2 0.3107.1 0.2110.7 0.1100.2 0.24101.8 0.195.8 0.398.3 0.3

108.5 0.3100.6 0.1103.4 0.2101.0 0.299.8 0.196.5 0.194.2 0.2

109.9 0.299.8 0.14

103.7 0.4101.0 0.194.2 0.197.7 0.3

102.5 0.2103.1 0.198.8 0.2499.8 0.4295.0 0.1

109.3 0.4295.8 0.14

Nisbet (B4)

und tion /s

Overpressure dB(L)

5 95.88 96.62 105.19 1124 101.45 97.33 895 97.37 107.93 93.16 1017 96.67 102.67 93.11 91.97 93.14 94.16 959 95.85 95.83 91.93 957 99.64 93.12 98.58 94.12 107.24 96.6

99 Queen

Ground Vibration

mm/s

Over

0.090.170.130.190.140.120.160.170.180.080.160.10.080.090.220.160.080.250.10.090.140.140.090.110.20.110.310.07

Street (B3)

rpressure dB(L)

Ground Vibration

mm/s

96.2 0.1591.8 0.22

105.4 0.18111.2 0.17101.3 0.19102.2 0.1691.8 0.2498.5 0.2

107.1 0.1797 0.13

100.3 0.2296.2 0.15

102.6 0.1394.3 0.1391.8 0.26

101.3 0.28102.2 0.14106.6 0.26104.8 0.15

97 0.1498.5 0.2499.1 0.299.7 0.14

101.8 0.15100.3 0.2294.3 0.17

107.6 0.2898.5 0.12

Queen Street (B1)

 

 

2015 An

MUSWELL

nnual Environ

App

LBROOK COAL

nmental Man

pendix

L COMPANY L

nagement Re

x 5: Co

IMITED

eport

omplaaints SSummmary 

 

2

S

C

1

1

0

1

MUSWE

2015 Annual Envir

SUMMARY OF C

Date of Complaint 

Time Compl

14‐Jan‐15  9:25 A

16‐Jan‐15  2:12 P

3‐Mar‐15  12:50 

1‐Mar‐15  3:57 P

ELLBROOK COAL CO

ronmental Manag

COMPLAINTS 

 of aint 

Date of Incident 

AM 14‐Jan‐15 

PM 16‐Jan‐15 

PM 03‐Mar‐15 

PM   

OMPANY LIMITED

gement Report

Time of Incident 

L

9:20 AMMu

2:09 PMMu

12:50 PM 

Mu

Mu

Location TypCom

North swellbrook 

BL

North swellbrook 

BL

uscle Creek HAU

Southswellbrook 

DU

pe of mplaint 

Mode of 

LAST Direct calOffice

switchborespon

LAST Direct calOffice

switchborespon

ULAGE EnvironHotlinerespon

UST Direct calOfficerespon

Contact  Natur

l to MCC e via oard, EC nded. 

Blascomplathey wabout

l to MCC e via oard, EC nded. 

Compltod

commtime wadv

mental e ‐ OCE nded. 

Coal spicoal roMusclNew E

l to MCC e ‐ EC nded. 

Coconcecoverirecentarea 

re of Complaint

st today shook inant's house and were concerned t damage to the house. 

ainant could feel ay's blast and 

mented that blast was different to vertised time. 

illed on road from oad turnoff along le Creek Road to England Highway 

omplainant is erned about dust ng their roof and tly covered back (3 weeks ago). 

Actio

Discussed concresults with comresults within cComplainant is

damage t

Complainant cotime was diffe

tReview resultsEngineer ‐ al

conditions andvariance wi

Lumps of coal scathe road all th

highway from hMuscle C

Daracon weretrucks pulled up

problem w

EC visited comtheir concerns w

neighbour. Rconditions and

were also discussweather conditio

dust originaComplainant is go

mines i

on Taken

cerns and reviewed mplainant. All blastconsent conditions.s concerned about to the house. 

mmented that blasrent to advertised time. s with Drill & Blast ll within consent d notification time thin allowance. 

attered along side ohe way back to the his parents place onCreek Road.  contacted and all p for inspection. Nowas identified. 

plainant to discuss with them and theirRecent weather d location of house sed. Based on recenons, it is unlikely thated from MCC. oing to contact othn the area. 

 

 t  

st 

of 

nt e 

er 

2

C

1

1

1

2

MUSWE

2015 Annual Envir

Date of Complaint 

Time Compl

4‐Mar‐15  8:40 P

4‐Mar‐15  8:48 A

7‐Mar‐15  4:49 P

4‐Mar‐15  6:30 P

ELLBROOK COAL CO

ronmental Manag

 of aint 

Date of Incident 

PM 14‐Mar‐15 

AM 14‐Mar‐15 

PM 17‐Mar‐15 

PM 24‐Mar‐15 

OMPANY LIMITED

gement Report

Time of Incident 

L

8:40 PMMu

8:45 AMMu

4:49 PMMu

6:30 PMMu

Location TypCom

North swellbrook 

OD

North swellbrook 

OD

North swellbrook 

OD

Southswellbrook 

OD

pe of mplaint 

Mode of 

DOUR EnvironHotline ‐ next worbut no cdetailsprovidefollow

DOUR EnvironHotliProdu

Superintrespon

DOUR EnvironHotlinerespon

DOUR Direct cal‐ OCE res

Contact  Natur

mental call back king day contact  were ed for w‐up. 

Compl

mental ne ‐ ction tendent nded. 

Stronghad to

mental e ‐ EC nded. 

StrongM

ll to OCE ponded. 

Callestroncombodou

wa

re of Complaint

lainant can smell odour. 

g sulphur smell ‐o close the house 

up. 

g odour smell in uswellbrook. 

er could smell a ng spontaneous bustion related r and thought it as from MCC.  

Actio

No contact detacall the com

Hot working arepractices in p

observed the nestrong. Productrang complain

Current operatiand explained wwould be compComplainant cissue is going to

EC rang comcommented thodour in varioutown. They needhouse to keep th

operations w

Large fire in the S13). Arranged forrelocated to dr

area. Dozers alsosnuff spontane

base of 

on Taken

ils were provided tmplainant back 

a with managemenplace. Conditions ext night and not asion Superintendentant next morning. ons were discussedwork in the hot areapleted in 7‐10 days.oncerned that this o occur over winter

mplainant who hey could smell an us locations aroundded to shut up theihe smell out. Currenwere discussed. 

St. Heliers coal (Strr infusion spray to brench fire and coal o pushing access in teous combustion at Pit 1 dump. 

 

nt 

s t 

d a  

 r nt 

ip be 

to 

2

C

2

2

3

MUSWE

2015 Annual Envir

Date of Complaint 

Time Compl

4‐Mar‐15  6:31 P

8‐Mar‐15  9:04 A

0‐Mar‐15  12:52 

ELLBROOK COAL CO

ronmental Manag

 of aint 

Date of Incident 

PM 24‐Mar‐15 

AM 28‐Mar‐15 

PM 30‐Mar‐15 

OMPANY LIMITED

gement Report

Time of Incident 

L

6:31 PMMu

9:04 AM Mu

12:50 PM  Mu

Location TypCom

Central swellbrook 

OD

uscle Creek OD

North swellbrook 

BL

pe of mplaint 

Mode of 

DOUR Direct cal‐ OCE res

DOUR EnvironHotlinerespon

LAST Direct calOfficerespon

Contact  Natur

ll to OCE ponded. 

Callersp

com(st

mental e ‐ OCE nded. 

SulpstronMC

anythin

l to MCC e ‐ EC nded. 

Bcomp

re of Complaint

r complained of pontaneous mbustion smell trong odour).  

phur smell very g. Wondering if CC were doing ng different in the operation. 

Blast shook plainants’ house. 

Actio

Pit and boundidentify possibburning in Strip Moved infusion s

drench fire anpushing accescombustion o

snuf

OCE spoke to explained fire wStrip 13. Fire haand water car

infusing area.Thcomplainant whohealth impacts 

nose and stinunderstood it's athat MCC was wo

were stil

EC reviewed bresults. Locatioblasts that the cResults were 0

Street and withiEC left message 

call back

on Taken

dary inspection to le cause. Large fire 13 (St Heliers coal)spray into location td coal area. Dozer ss to spontaneous on Pit 1 dump and fing fire. 

complainant and was in St Heliers coaad been smotheredrts were currently e EC spoke with theo is concerned abouon family ‐ burningnging eyes. They an ongoing issue anorking on it but thel concerned. 

blast location and n is similar to otheromplainant has felt.34mm/s at Queen n compliance levelswith complainant tk if required. 

 

). to 

al d 

e ut g 

nd ey 

r t. 

s. to 

2

C

0

2

2

2

04

MUSWE

2015 Annual Envir

Date of Complaint 

Time Compl

05‐Apr‐15  5:15 P

23‐Apr‐15  8:18 P

24‐Apr‐15  1:23 P

24‐Apr‐15  6:24 P

4‐May‐15  8:27 P

ELLBROOK COAL CO

ronmental Manag

 of aint 

Date of Incident 

PM 05‐Apr‐15 

PM 23‐Apr‐15 

PM 22‐Apr‐15 

PM 24‐Apr‐15 

PM 04‐May‐15 

OMPANY LIMITED

gement Report

Time of Incident 

L

5:17 PM W

8:18 PMMu

10:02 PM 

U

6:24 PM W

8:27 PMMu

Location TypCom

Woodlands Ridge 

OD

North swellbrook 

OD

Unknown OD

Woodlands Ridge 

OD

North swellbrook 

OD

pe of mplaint 

Mode of 

DOUR EnvironHotlinerespon

DOUR Environhotline ‐ cnext wor

DOUR Email fro

DOUR EnvironHotline ‐ next wor

DOUR EnvironHotline ‐ next wor

Contact  Natur

mental e ‐ OCE nded. 

Lots oi

mental call back king day 

Very western

se

om EPA  Stronotice

mental call back king day 

Sulphstron

op

mental call back king day 

Odour 

re of Complaint

of smoke coming into house. 

bad smell from n side of mine last everal nights 

ng odour smell ed when putting bins out. 

hur smell is very g and unable to pen windows 

coming from the mine 

Actio

OCE explained tthere was an arthat had coal th

spent 2 hours oncoal to cover hofires. Complaina

have to lock the hup with smoke. 

down the val

EC spoke with Pbeen working wiin pit.  Recent raiarea.  EC rang th

left a messa

Advised EPA woperating at the

due to wet weathwith this responinformation req

Infusion spray wcart put out smsoaking coal pri

coal.  OngoinThere were twoMCC that nigh12:16am. Com

enough

Infusion was runfire on the ROM The EC spoke wwho feels that Mproblem.  Theneighbours are

pro

on Taken

to the complainantea on the ROM padhat was on fire. OCEn loader carrying coot coal and snuff ouant said they wouldhouse up as it will fIt has been blowingley for 1.5 hours. 

PS and infusion hasith no specific issuen helps cool/wet thhe complainant andage to call back. 

we only had a drill e time of complainther.  EPA were happnse with no furtherquired at this stage.

was started.  Waterall fire on ROM andor to loader diggingg pit inspections. o follow up calls to ht at 12:00am and mplainant has had h of odour. 

nning in the pit and was being managedith the complainanMCC are ignoring thy commented the e having the same oblem. 

 

t d E ol t d fill g 

s es he d 

t py r . 

r d g 

a d. t e 

2

C

15

24

26

27

27

29

MUSWE

2015 Annual Envir

Date of Complaint 

Time Compl

5‐May‐15  9:40 A

4‐May‐15  9:39 A

6‐May‐15  10:46 

7‐May‐15  10:09 

7‐May‐15  10:09 

9‐May‐15  10:02 

ELLBROOK COAL CO

ronmental Manag

 of aint 

Date of Incident 

AM 15‐May‐15 

AM 24‐May‐15 

AM 26‐May‐15 

AM 26‐May‐15 

AM 15‐May‐15 

AM 27‐May‐15 

OMPANY LIMITED

gement Report

Time of Incident 

L

9:40 AM Mu

Morning Mu

4:30am‐10:00am 

Mu

11:41 AM 

W

11:30 AM 

Mu

7:08 PMMu

Location TypCom

uscle Creek OD

uscle Creek OD

uscle Creek OD

Woodlands Ridge 

OD

uscle Creek OD

North swellbrook 

OD

pe of mplaint 

Mode of 

DOUR EnvironHotlinerespon

DOUR EnvironHotline ‐back req

DOUR EnvironHotline ‐back req

DOUR Email fro

DOUR Email fro

DOUR Email fro

Contact  Natur

mental e ‐ OCE nded. 

Strong haze 

mental ‐ no call quired. 

Su

mental ‐ no call quired. 

Sulp4:30

om EPA  Smoke 

om EPA  OdourConcer

om EPA  Smell oaro

re of Complaint

sulphur smell and covering valley 

ulphur smell

hur smell from 0am‐10:00am 

from burning coal piles 

r smell at house.  rned about health impacts 

of sulphur started und sundown 

Actio

Operations wepreviously unspontaneous

identified.  Mitigaput in place. Thecomplainant who

the health im

No specific area oconditions were a

Wait for weatcomplainant did

No specific area oconditions were a

Wait for weatcomplainant did

Advised EPA of rcombustion maand impact we

spontaneomanagement

cooled and ROMro

Advised EPA of rcombustion maand impact we

spontaneomanagement

cooled and ROMro

Advised EPA of rcombustion manAreas are being c

is being 

on Taken

re inspected and a identified area of  combustion was ation measures wee EC spoke with theo is concerned aboumpacts of sulphur.   

of concern.  Weathaffecting odour drifther to clear. The dn't want a call back

of concern.  Weathaffecting odour drifther to clear. The dn't want a call back

recent spontaneounagement activitieseather is having on us combustion .  Areas are being M coal is being trackolled. 

recent spontaneounagement activitieseather is having on us combustion .  Areas are being M coal is being trackolled. 

recent spontaneounagement activitiescooled and ROM cotrack rolled. 

 

re e ut 

er ft.  

k. 

er ft.  

k. 

s s 

s s 

s s.  oal 

2

C

0

0

1

1

2

2

MUSWE

2015 Annual Envir

Date of Complaint 

Time Compl

04‐Jun‐15  1:24 P

07‐Jun‐15  4:37 P

13‐Jun‐15  7:09 A

19‐Jul‐15  8:30 A

22‐Jul‐15  1:55 P

23‐Jul‐15  12:30 

ELLBROOK COAL CO

ronmental Manag

 of aint 

Date of Incident 

PM 04‐Jun‐15 

PM 07‐Jun‐15 

AM 13‐Jun‐15 

AM 19‐Jul‐15 

PM 22‐Jul‐15 

PM 23‐Jul‐15 

OMPANY LIMITED

gement Report

Time of Incident 

L

1:24 PM Mu

4:37 PM W

7:09 AM Mu

8:30 AM Mu

1:55 PM Mu

12:30 PM 

W

Location TypCom

uscle Creek OD

Woodlands Ridge 

OD

uscle Creek OD

uscle Creek OD

uscle Creek OD

Woodlands Ridge 

HAU

pe of mplaint 

Mode of 

DOUR EnvironHotline ‐back req

DOUR EnvironHotlinerespon

DOUR EnvironHotlinerespon

DOUR EnvironHotlinerespon

DOUR EnvironHotlinerespon

ULAGE EnvironHotline ‐ next wor

Contact  Natur

mental ‐ no call quired. 

Sulphur

mental e ‐ OCE nded. 

Gas afromWo

mental e ‐ OCE nded. 

Odour 

mental e ‐ OCE nded. 

Strong smokdire

mental e ‐ OCE nded. 

Strong 

mental call back king day 

Coal finon Muwith th

re of Complaint

r smell from mine

and dust coming m MCC towards oodland Ridge 

was coming from the mine 

sulphur smell and y haze from the ection of MCC 

sulphur smell and thick haze 

nes accumulating uscle Creek Road he rain turning it to sludge 

Actio

Extra sprays hadsystem this mo

operations followsmoky/steamy

complainant did

The OCE spoke wat the time of roads were d

conditions.  Therin the area at th

The OCE spoke wat the time o

At the time of twas being undecap a spontaneo

in

The OCE spoke wat the time o

Water carts anoperation.  ROM 

trac

The OCE spoke wat the time o

undertook a pit the complaint t

any new

The road was inscart was arrangesurface with t

collected from tremoved. A mescomplainant to 

call wa

on Taken

d been added to theorning.  A review of wing call indicated ny areas in pit. The dn't want a call back

with the complainanthe complaint. All amp and in good e was a general haze time of complaint

with the complainanof the complaint. the complaint workertaken with clay toous combustion aren OC2. 

with the complainanof the complaint. nd water sprays in coal was spread an

ck rolled 

with the complainanof inspection and inspection followinto see if there werew outbreaks 

spected and a wateed to wash the roadthe material to be the road edges andsage was left for thcall back. No returns received. 

 

no 

k. 

nt 

ze t. 

nt 

k o ea 

nt 

nd 

nt 

g e 

er d 

d he n 

2

C

2

3

1

1

MUSWE

2015 Annual Envir

Date of Complaint 

Time Compl

23‐Jul‐15  3:41 P

31‐Jul‐15  6:36 P

13‐Aug‐15  7:45 A

13‐Aug‐15  12:22 

ELLBROOK COAL CO

ronmental Manag

 of aint 

Date of Incident 

PM   

PM 31‐Jul‐15 

AM 13‐Aug‐15 

PM 13‐Aug‐15 

OMPANY LIMITED

gement Report

Time of Incident 

L

U

6:36 PM W

7:45 AMMu

7:59 AM U

Location TypCom

Unknown HAU

Woodlands Ridge 

OD

Southswellbrook 

VIS

Unknown VIS

pe of mplaint 

Mode of 

ULAGE Email fro

DOUR EnvironHotline ‐ next wor

SUAL EnvironHotlinerespo

SUAL Email fro

Contact  Natur

om EPA  Truckscreating

the rtrafficissue a

ca

mental call back king day 

Chemifrom th

mental e ‐ OCE nded 

Duobse

om EPA  Smokeare visbeen on

we

re of Complaint

s leaving site are g a lot of mess on road creating a c safety, hazard and mess on the ars and road 

ical mine coming he mine ‐ sulphur 

smell 

st and smoke rved above the 

mine 

e, ash and steam sible and this has ngoing for several eeks/months 

Actio

Advised EPA of aup t

The complainanthealth impacts oabout how long 

is

Mining activitieand 13 with inpinfusion sprays wpit and the waterThe EC spoke wiThere was a gene

spontaneomanagement, imvisibility and the

An offer wacomplainant

Discussed compadvised the com

are discussincombustion man

on Taken

ctions taken to cleathe road 

t is concerned aboun family.  Concerneit is taking to fix thssue. 

es were in Strips 12pit dumping.  Waterwere operational inr carts were runninith the complainanteral discussion abouus combustion 

mpacts of weather oe general operationsas made for the t to visit the site. 

plaint with EPA.  EPAmplainant that theyng spontaneous nagement with MCC

 

an 

ut ed e 

 r n g. t. ut 

on s.  

A y 

C. 

2

C

2

0

MUSWE

2015 Annual Envir

Date of Complaint 

Time Compl

20‐Aug‐15  6:24 A

04‐Sep‐15  8:32 A

ELLBROOK COAL CO

ronmental Manag

 of aint 

Date of Incident 

AM 20‐Aug‐15 

AM 04‐Sep‐15 

OMPANY LIMITED

gement Report

Time of Incident 

L

6:24 AM Mu

8:32 AM Mu

Location TypCom

uscle Creek OD

uscle Creek OD

pe of mplaint 

Mode of 

DOUR EnvironHotline ‐ next wor

DOUR EnvironHotlinerespon

Contact  Natur

mental call back king day 

Su

mental e ‐ EC nded. 

Sulphulast weeabout

re of Complaint

ulphur smell

ur smell over the ek and concerned t health impacts 

Actio

Ongoing spontamanagement wa

observed odolocation of the c7:30am and 8:00

spontaneous observed on Be

Muscle Creek Roor c

A message wcomplainant to c

call wa

Ongoing spontamanagement w

observed environCreek Road, MuWoodlands Ri

observed.  Thereand rain haze.  Svisible from W

Feedback on thwas provided to general discus

impacts was hadby MCC to provhealth professinvestigation in

Complainant comare other pe

concerned aboutMCC asked th

encourage thesthe

on Taken

aneous combustionas occurring.  The Eour in the general complaint between0am.  No odour fromcombustions was eggary Creek Road,ad, mine access roaar park. 

was left asking the call back.  No returs received. 

aneous combustionwas occurring.  EC nment along Beggascle Creek Road andge.  No odour as e was low level clouSome smoke/steamWoodlands Ridge. e EC's observationsthe complainant.  Assion about health d with an offer madvide information tosionals to support nto health impacts. mmented that thereople in the area t health impacts anhe complainant to e people to contacte mine. 

 

n C 

n m 

 ad 

ry d 

ud m 

s A 

e  

 re 

nd 

2

C

0

1

1

2

MUSWE

2015 Annual Envir

Date of Complaint 

Time Compl

02‐Oct‐15  5:40 A

12‐Oct‐15  12:05 

15‐Oct‐15  4:45 P

25‐Oct‐15  8:24 P

ELLBROOK COAL CO

ronmental Manag

 of aint 

Date of Incident 

AM 02‐Oct‐15 

PM Ongoing 

PM Unknown 

PM 25‐Oct‐15 

OMPANY LIMITED

gement Report

Time of Incident 

L

5:40 AM W

OngoingMu

Unknown 

U

8:24 PMMu

Location TypCom

Woodlands Ridge 

OD

Southswellbrook 

NO

Unknown OD

North swellbrook 

OD

pe of mplaint 

Mode of 

DOUR EnvironHotline ‐back req

OISE EnvironHotline ‐ next wor

DOUR EnvironHotli

attemppatch thrOCE budroppe

DOUR EnvironHotline ‐ next wor

Contact  Natur

mental ‐ no call quired. 

Pollutios

mental call back king day 

High pnoisegoing

been onlast co

mental ne ‐ pted to rough to ut call ed out 

Fou

mental call back king day 

Smell ind

re of Complaint

on, can't breathe, sore throat 

pitched shrilling e that has been g all day and has n and off over the ouple of months. 

l sulphur smell

n house even with oors closed 

Actio

Production Supemade observatioThey identifiedsome fog with athe south (blowcomplainant).advised that a

req

The OCE andpotential sourcesthe descriptionthing was a pumconversations w

and investigconcluded that itnoise source is frthat the noise description of t

noise sou

Four attempts wthe complainandetails but non

ret

Ongoing spontamanagement.  inspection arouof the mine sitodour. A messacomplainant to 

back wa

on Taken

erintendent and OCons of the local aread some smoke and a slight breeze fromwing away from the. The complainant a call back was not quired. 

d EC investigated s of noise that matc.  The only possible

mp alarm.  Follow upwith the complainanations by the EC  is highly unlikely throm MCC.  The timeis audible and the the noise rules out urces at MCC. 

were made to contacnt to find out more ne of the calls were turned. 

aneous combustionOCE conducted an nd the western sidete and detected no age was left for thecall back but no calas received. 

 

CE a.  

m e 

ch e p nt 

he es 

ct 

 ll 

2

C

2

2

2

MUSWE

2015 Annual Envir

Date of Complaint 

Time Compl

25‐Oct‐15  8:50 P

29‐Oct‐15  1:16 P

29‐Oct‐15  1:16 P

ELLBROOK COAL CO

ronmental Manag

 of aint 

Date of Incident 

PM 25‐Oct‐15 

PM 24‐Oct‐15 

PM 25‐Oct‐15 

OMPANY LIMITED

gement Report

Time of Incident 

L

8:50 PMMu

8:52 AMMu

9:09 PMMu

Location TypCom

North swellbrook 

OD

Southswellbrook 

OD

North swellbrook 

OD

pe of mplaint 

Mode of 

DOUR Direct tland

DOUR Email fro

DOUR Email fro

Contact  Natur

to OCE line 

When othe csmell a

om EPA  Smog, dMountto see acoverin

s

om EPA  Extremesme

causinshort

re of Complaint

outside the house omplainant can a strong smell of sulphur. 

dust and sulphur.  ain profile is hard and appears to be ng all the eastern ide of town 

ely strong sulphur ell.  Stifling and ng headache and tness of breath 

Actio

Ongoing spontamanagement.  inspection arouof the mine sit

odour. No call bacontact details

The followingsupplied

There havespontaneous comRecent rain hasteam from thlevels have b20ug/m3.  I

observations frhave been unnoticeable od

Musw

The followingsupplied

There havespontaneous comRecent rain hasteam from thlevels have b20ug/m3.  I

observations frhave been unnoticeable od

Musw

on Taken

aneous combustionOCE conducted an nd the western sidete and detected no ack could be made as weren't supplied. 

g information was d to the EPA. e been no new mbustion outbreakas generated more he hot areas.  Dust een between 16‐nspections and rom site personnel dertaken with no dour detected in wellbrook. 

g information was d to the EPA. e been no new mbustion outbreakas generated more he hot areas.  Dust een between 16‐nspections and rom site personnel dertaken with no dour detected in wellbrook. 

 

as 

s.  

s.  

2

C

0

1

MUSWE

2015 Annual Envir

Date of Complaint 

Time Compl

5‐Nov‐15  12:24 

3‐Nov‐15  10:05 

ELLBROOK COAL CO

ronmental Manag

 of aint 

Date of Incident 

PM 01‐Nov‐15 

AM 05‐Nov‐15 

OMPANY LIMITED

gement Report

Time of Incident 

L

10:30 PM 

W

Various U

Location TypCom

Woodlands Ridge 

OD

Unknown OD

pe of mplaint 

Mode of 

DOUR Email fro

DOUR Email fro

Contact  Natur

om EPA  Unpl

om EPA  Dsp

comem

MuswOdour 

in

re of Complaint

easant smell in house 

Dust and/or pontaneous mbustion being mitted from wellbrook Coal.  could be smelled n Aberdeen. 

Actio

The followingsupplied to the E

2 November spontaneo

management woperating.  Co

occurring as weaffected by rain

prod

A site inspectionthe Production Sthe Environment

November 20current status of

taken and proOther informat

EPA includedactivities betw

especially thspontaneo

management.UHAQM statiowere classified a

Nov

on Taken

g information was PA. Operations on included ongoing us combustion with infusion spraysoal processing was ll.  Operations weren and weren't in fulduction. 

n was undertaken bSuperintendent andtal Coordinator on 115.  Photos of the f the operation werovided to the EPA.  ion provided to thed the operational een 3‐5 November hose relating to us combustion .  SO2 levels at the n in Muswellbrook as "very good" on 5vember. 

 

1‐

e l 

by d 13 

re 

2

C

2

0

0

0

MUSWE

2015 Annual Envir

Date of Complaint 

Time Compl

6‐Nov‐15  9:55 A

04‐Dec‐15  8:07 P

05‐Dec‐15  8:36 A

09‐Dec‐15  2:20 P

ELLBROOK COAL CO

ronmental Manag

 of aint 

Date of Incident 

AM 26‐Nov‐15 

PM 04‐Dec‐15 

AM 05‐Dec‐15 

PM 09‐Dec‐15 

OMPANY LIMITED

gement Report

Time of Incident 

L

9:55 AM W

8:07 PM U

8:36 AMMu

2:00 PM U

Location TypCom

Woodlands Ridge 

DU

Unknown LIG

North swellbrook 

OD

Unknown HAU

pe of mplaint 

Mode of 

UST EnvironHotlinerespo

GHT Direct cOffice respo

DOUR EnvironHotline

urge

ULAGE Direct cOffic

ProduSuperintrespo

Contact  Natur

mental e ‐ OCE nded 

Dust bandcom

call to ‐ OCE nded 

Lightingcomp

mental e ‐ non ent 

Strong

call to ce ‐ ction tendent nded 

Traffic 

re of Complaint

being generated d spontaneous mbustion smell 

g plant was facing plainant's house 

g smell from coal

incident involving road truck 

Actio

Mining operatidown since 7

ancillary activiticarts were operthroughout thecould see dozercoal stockpileleaving site.  Tdown and the r

operating at suspended betwePhotos of the opthroughout the

dust leaving site.by observatio

Lighting plant wfurther follow

Normal activitiescoal was being 

ROM operatboundary inspecand Muswellbroowas detected.  conducted and Caller did not

Interaction witevasive action

collision.  InformDaracon for th

d

on Taken

ons had been shut :40am with some es occurring. Waterating continuouslye day.  Complainantr operating on cleanes and road trucks he dozer was shut oad trucks stopped1pm after being een 7:30am‐9:00amperation were taken day with no visible  This was supporteons from the EPA. 

was relocated.  No w up was required. 

s were occurring.  Nmoved apart from tions.  OCE did a ction between MCCok.  Nothing unusuPit inspection was everything was OKt want a call back. 

th road truck with  required to avoid mation passed ontoheir follow up with river. 

 

r y t n 

m.  n e ed 

No 

C al 

.  

2

C

1

1

2

MUSWE

2015 Annual Envir

Date of Complaint 

Time Compl

13‐Dec‐15  7:00 A

18‐Dec‐15  9:31 P

26‐Dec‐15  9:20 A

ELLBROOK COAL CO

ronmental Manag

 of aint 

Date of Incident 

AM Various 

PM 18‐Dec‐15 

AM Various 

OMPANY LIMITED

gement Report

Time of Incident 

L

Various A

9:31 PMMu

Various W

Location TypCom

Aberdeen OD

North swellbrook 

OD

Woodlands Ridge 

OD

pe of mplaint 

Mode of 

DOUR EnvironHotlinerespo

DOUR EnvironHotline

urge

DOUR EnvironHotline

urge

 

Contact  Natur

mental e ‐ OCE nded 

Strongpres

monthsover

mental e ‐ non ent 

Smell ‐

mental e ‐ non ent 

Spcombuhas beeand wa

re of Complaint

g sulphur smell ‐sent for last 12 s, particularly bad r the last week 

no further details provided 

pontaneous ustion smell that en bad in the past as particularly bad yesterday 

Actio

At the time of thactivities were oand Strip 14.  Crof coal with no mAn inspection oundertaken withbeing altered.  Tthe complainancomplaint wit

message for theback if they wis

compla

Mining activities were in free dig no hot material was a split in the was being repaircomplaint.  The 

want a

There were no opof the comp

Christmas shutdoff between 1:026/12/15.  Fogg

of complainSuperintendecomplainant acomplaint.  C

accepting that wmade the s

on Taken

he complaint, mininoccurring in Strip 13rushing and washingmining of hot areasf the operation wash the infusion sprayThe OCE spoke withnt at the time of theh the EC leaving a e complainant to cashed to discuss the int further. 

at time of complainarea of Strip 19 witbeing mined.  Therinfusion lines, whiced at the time of thcomplainant did noa call back. 

perations at the timplaint due to the down.  Infusion was0am and 6:30am oy conditions at timent.  Production nt spoke with the and discussed the Complainant was weather conditionsituation worse. 

 

ng 3 g s.  s ys h e 

ll 

nt th e ch he ot 

me 

s n e