    Customer : Jindal ITF Ltd Page : Annex-II 2 of 13

    Project : 1x12MW Power Plant Date: 10.07.14

    Offer Ref : TL/SPP/JITF/2408/R0

    S.NO Section Page NoClause

    NoRequirement as per Tender

    C/D

    TL Reply

    5002

    9.

    P.006294 G06

    50029 of 53 7.1

    The power cycle shall be finalised witha deaerator & HP heater to give a finalboiler inlet feed water temperature of200C.

    CWe are not considering HP heater inthe circuit

    10.

    P.006294 G06

    5002

    11 of53

    7.1 10 Start up vent capacity 70% MCR DStart up vent capacity will be 30%MCR minimum

    11.

    P.0062

    94 G065002

    11 of53 7.1.1 Fuel analysis C

    As the proximate analysis, elementalash analysis of the fuel are notavailable, we have assumed fuelanalysis as per our offer.

    12.

    P.006294 G06

    5002

    12 of53

    7.1.2Codes & Standards Centrifugalpumps API610 / DIN 1944

    CCentrifugal pumps shall be designedas per ANSI standards

    13.P.006294 G06

    5002

    12 of53

    7.1.3 MOC Superheater tubes (

  • 8/12/2019 Annexure-II C D on Tender

    3/13

    Customer : Jindal ITF Ltd Page : Annex-II 3 of 13

    Project : 1x12MW Power Plant Date: 10.07.14

    Offer Ref : TL/SPP/JITF/2408/R0

    S.NO Section Page NoClause

    NoRequirement as per Tender

    C/D

    TL Reply

    17.

    P.006294 G06

    5002

    13 of53

    7.1.3 MOC Flue gas ducting CFlue gas ducting material shall beIS2062

    18.

    P.006294 G06

    5002

    13 of53

    7.1.3 MOC Structurals CAll structural support material will beof IS2062

    19.

    P.006294 G06

    5002

    13 of53

    7.1.3 MOC DM water tank C DM water tank will be of MSEP

    20.

    P.0062

    94 G065002

    13 of53 7.1.3 Overflow storage tank C The same is not applicable

    21.

    P.006294 G06

    5002

    15 of53

    7.1.4 Fans Margin on head CFor all fans, margin will beconsidered on variable heads

    22.

    P.006294 G06

    5002

    16 of53

    7.1.11Deaerator dished end thickness 10mm min

    CDeaerator dished end thickness shallbe as per design requirements

    23.

    P.006294 G06

    5002

    17 of53

    7.1.14 Flue Gas De-sulphurisation system DThe same is not envisaged in ourdesign

    24.P.006294 G06

    5002

    17 of53

    7.2.1 Steam turbine CThe turbine offered is bleed cumcondensing turbine

    25.

    P.006294 G06

    5002

    18 of

    537.2.1

    The turbine shall be designed with103% VWO and shall be capable ofoperating continuously.

    CWe have not considered any VWO

    condition for our design

  • 8/12/2019 Annexure-II C D on Tender

    4/13

    Customer : Jindal ITF Ltd Page : Annex-II 4 of 13

    Project : 1x12MW Power Plant Date: 10.07.14

    Offer Ref : TL/SPP/JITF/2408/R0

    S.NO Section Page NoClause

    NoRequirement as per Tender

    C/D

    TL Reply

    26.

    P.006294 G06

    5002

    19 of53

    7.2.6The pump capacity and dischargepressure shall be a minimum of 115%of the MCR rating.

    CWe have considered 5% margin onpump capacity and dischargepressure

    27.

    P.006294 G06

    5002

    19 of53

    7.2.7 HP heater CWe have envisaged only LP heater inour design. HP heater is notconsidered.

    28.

    P.006294 G06

    5002

    20 of53

    7.3.1 Fuel handling system CFuel handling system shall be asmentioned in our offer

    29.

    P.0062

    94 G065002

    21 of53 7.3.2 Bottom ash handling system C We have envisaged submerged ashconveying system for bottom ash

    30.

    P.006294 G06

    5002

    22 of53

    7.3.3 Plant water system CKindly furnish raw water analysis tosuggest a suitable water treatmentscheme

    31.

    P.006294 G06

    5002

    23 of53

    7.3.5 Compressed air system CWe have envisaged (2x100%)lubricated screw compressor for theproposed power plant

    32.

    P.006294 G06

    5002

    23 of53

    7.3.7 Fuel Oil System CFuel Oil system is not applicable aswe are offering Pusher Grate boiler

    33.P.006294 G06

    5002

    24 of53

    7.3.9 Fire Protection System CWe are considering only fireextinguishers in our scope. Firehydrant system are envisaged

    34.

    P.006294 G06

    5002

    25 of

    537.3.10 Cranes and Hoist C

    We have considered EOT crane of

    capacity 15/5TON.

  • 8/12/2019 Annexure-II C D on Tender

    5/13

    Customer : Jindal ITF Ltd Page : Annex-II 5 of 13

    Project : 1x12MW Power Plant Date: 10.07.14

    Offer Ref : TL/SPP/JITF/2408/R0

    S.NO Section Page NoClause

    NoRequirement as per Tender

    C/D

    TL Reply

    35.

    P.006294 G06

    5002

    25 of53

    7.3.10 One passenger cum goods elevator CWe have considered passenger cumgoods elevator in our scope of supply

    36.

    P.006294 G06

    5002

    25 of53

    7.3.11 Chemical Laboratory CWe have not considered chemicallaboratory in our scope

    37.

    P.006294 G06

    5002

    26 of53

    7.4.111 kV for large auxiliaries (200 kWabove), 415 Volts for small auxiliaries(200 kW and less than 200kW)

    DKindly note, motor rating up to250kW shall be LT driven. We are notoffering HT motor.

    38.

    P.006294 G06

    5002

    Fault levels: Fault levels for the

    various voltage systems for design ofbreakers are as under:11 kV - 40 kA (rms) for 1 Sec

    D

    Fault level for HT system shall be

    26.1kA for 1 sec and LT system shallbe 50KA for 1Sec. Kindly accept.

    39.

    P.006294 G06

    5002

    26 of53

    7.4.2Scope of 66kV switchyard

    CKindly clarify scope of 66kVswitchyard in EPC scope or customerscope.

    40.

    P.006294 G065002

    27 of53

    7.4.3

    The Generator proposed for the plantare of reputed make three phase, twopole, cylindrical rotor, wye connectedmachine directly driven by steam

    turbine with phase and neutralterminals brought out for connectionto isolated segregate phase bus duct

    with rated output of 12MW, powerfactor of 0.85 lagging, terminal voltageof 11kV, frequency of 50Hz and speedof 3000 rpm. The Stator winding is of

    C

    Please note, we are offering Generatoras 12MW, 50Hz, 11kV, 4 Pole.

    The type of Cooling offered is CACWwith Air to Water cooler mounted on

    the top side.Hydorogen cooling is not offere for thegenerator.

  • 8/12/2019 Annexure-II C D on Tender

    6/13

    Customer : Jindal ITF Ltd Page : Annex-II 6 of 13

    Project : 1x12MW Power Plant Date: 10.07.14

    Offer Ref : TL/SPP/JITF/2408/R0

    S.NO Section Page NoClause

    NoRequirement as per Tender

    C/D

    TL Reply

    water cooling while the rotor windingand iron core is of hydrogen coolingtype.

    41.

    P.006294 G06

    5002

    27 of53

    7.4.3The Excitation system proposed shallbe Brushless excitation system. C

    Pls note, we are offering BrushelessStatic excitation system withoutPMG.

    42.

    P.006294 G06

    5002

    27 of53

    7.4.4

    One (1) No. Bi-directional GeneratorTransformer for 12 MW unit is 3phase, 50 Hz, YNd11, 16/20 MVA,ONAF/ONAN cooled oil immersed

    outdoor transformers with class 'A'insulation, 12.5% impedance. LV starconnected and HV star connected. LVwinding neutral is grounded through

    NGR and HV winding neutral is solidlygrounded

    C

    Please confirm the Vector groupof theGenerator Transformer. For YNd11,LV Star connection will not beapplicable.

    43.

    P.006294 G06

    5002

    27 of53

    7.4.4

    Voltage ratio for GT will be 66/11 KV.Each transformer is provided with offcircuit tap-changer (OCTC) for (-) 5%to (+) 5 % voltage variation in steps of

    2.5% on HV side.

    C

    Please note, generator transformershall be OLTC type. Hence OCTC isnot application

    44.

    P.006294 G06

    5002

    27 of53

    7.4.6

    Isolated Phase Bus duct & SegregatedPhase Bus Duct. 12 kV classsegregated phase bus duct (SPBD)and accessories shall be provided forconnection between Generator and 11kV HT switchgear

    D

    For Interconnection betweengenerator and 11kV switchgear weare considering HT cable.

  • 8/12/2019 Annexure-II C D on Tender

    7/13

    Customer : Jindal ITF Ltd Page : Annex-II 7 of 13

    Project : 1x12MW Power Plant Date: 10.07.14

    Offer Ref : TL/SPP/JITF/2408/R0

    S.NO Section Page NoClause

    NoRequirement as per Tender

    C/D

    TL Reply

    45.

    P.006294 G06

    5002

    28 of53

    7.4.7.1

    The rating of Auxiliary Transformersshall be selected on 2 x 100 % basisbased on the power plant load

    requirement.

    D

    Kindly note, we are considering 1 x100% Auxilary transformer for thepower plant auxilaries.

    46.

    P.006294 G06

    5002

    28 of53

    7.4.7.11

    All switchgears shall have two bussections with separate incomers andbus coupler with necessary interlockand auto closing facility for Buscoupler in case of under voltage at any

    one of the incoming supply.

    D

    Kindly note, the offered PMCC andMCC shall be with single bus systemwithout interlock and auto closing.

    47.

    P.0062

    94 G065002

    29 of53

    7.4.7.12

    The MCCs are of modular metalenclosed indoor draw out type. Eachoutgoing motor feeder has a directonline (DOL) starter unit. Motors rated

    110 KW and above shall be Numerical,comprehensive motor protectionrelays. Motors less than 110 KW shallbe provided with contactor, thermaloverload relays, HRC fuses or MCCB.

    D

    We are considering all MCCs withdouble front and non-draw outtype, with single incomers.

    48.P.006294 G06

    5002

    30 of53

    7.4.7.16

    Two (2) sets of numerical protection

    Unit Protection relays providing 100%redundancy self-monitoring andevent/fault recording &communication facilities

    D

    We are considering one (1) of

    generator protection relay withoutredundancy. Relay shall be withprovision of RS485 interfacecommunication ports and MODBUSprotocol.

    49.

    P.006294 G06

    5002

    Rotor earth fault (64R)Voltage balance (60) VT fuse Failmonitoring

    CRotor earth fault shall be separatestatic or electro mechanical relayVoltage balance relay shall be

  • 8/12/2019 Annexure-II C D on Tender

    8/13

    Customer : Jindal ITF Ltd Page : Annex-II 8 of 13

    Project : 1x12MW Power Plant Date: 10.07.14

    Offer Ref : TL/SPP/JITF/2408/R0

    S.NO Section Page NoClause

    NoRequirement as per Tender

    C/D

    TL Reply

    Excitation system faultsStator winding temp highRotor winding temp high (only for

    machine with static excitation)

    separate electro mechanical relayExcitation system faults shall bepart of AVR panel.

    Stator winding temp high Sameshall be hooked up from temperaturescannerRotor winding temp -Same shall be

    hooked up from temperature scanner

    50.

    P.006294 G06

    5002

    30, 31of 53

    7.4.7.16

    Overall differential (87GT)

    Distance protection (21) Xii. BackupDirectional over current & E/F (67 &67N)

    D

    Pls furnish the SLD for the

    Switchyard for our study and clarityon scope

    51.P.006294 G06

    5002

    31 of53

    7.4.7.16

    11 kV Switchgear:

    Under voltage (27)D

    Kindly note, under voltage relay shall

    be considered in only bus PT paneland incomer panel. For Outgoing thesame will not be applicable.

    52.

    P.006294 G06

    5002

    31 of53

    7.4.7.16Motor Differential protection for1000KW and above C

    HT motors not applicable in theproject

    53.

    P.006294 G06

    5002

    32 of53

    7.4.17

    Neutral Grounding Resistor (NGR)

    cubicle complete with Dry type,natural cooled, outdoor cast grid typeresistor to provide Non effectivegrounding of 611KV voltage systemi.e. for Generator transformerssecondary side limiting Phase toground fault current.

    C

    Request to clarify the Transformer

    vector group.However the Generator star point willbe grounded with NGR

  • 8/12/2019 Annexure-II C D on Tender

    9/13

    Customer : Jindal ITF Ltd Page : Annex-II 9 of 13

    Project : 1x12MW Power Plant Date: 10.07.14

    Offer Ref : TL/SPP/JITF/2408/R0

    S.NO Section Page NoClause

    NoRequirement as per Tender

    C/D

    TL Reply

    54.

    P.0062

    94 G065002

    33 of

    537.4.19

    11 KV cables are 11KV voltage grade,fire retardant low smoke (FRLS) PVCsheathed, wire/strip with XLPE

    insulated stranded aluminumconductor. The cables are suitable for11 KV unearthed system.

    D

    Kindly note, we are considering11kV,Al, XLPE insulated , PVC NON-FRLS Sheathed cables.

    55.

    P.006294 G06

    5002

    33 , 34of 53

    7.4.19

    Control cables PVC insulated, innerPVC sheathed / galvanized steel wirearmoured and outer sheath made of

    FRLS PVC compound

    D

    Please note, we are considering NONFRLS Sheath for control cables

    56.

    P.006294 G06

    5002

    34 of53

    7.4.19

    The plant lighting (illumination level)is varying at different locations of theplant depending on the utility andnature of work expected to be carried

    out at that area.

    C

    Plant illumination system shall be forEquipments with in TL battery limit.

    57.

    P.006294 G06

    5002

    35 of53

    7.4.23

    Control panels shall be provided for

    control of miscellaneous systems inthe power plant and outdoor controlcabinets for 245 KV circuit breakers,Isolators, transformers etc. meeting

    technical requirements of the tender.

    C

    Kindly note, 245kV system is not

    applicable.

    58.

    P.006294 G06

    5002

    35 of53

    7.4.23

    The push button station shall behoused in totally enclosed. Dust andvermin proof enclosure conforming toIP55 degree of enclosure protection forindoor and IP 65 for outdoorapplications.

    D

    Kindly note, the push button stationshall Dust and vermin proofenclosure conforming to IP55 degreeof enclosure protection for indoor andIP 56 for outdoor applications.

  • 8/12/2019 Annexure-II C D on Tender

    10/13

    Customer : Jindal ITF Ltd Page : Annex-II 10 of 13

    Project : 1x12MW Power Plant Date: 10.07.14

    Offer Ref : TL/SPP/JITF/2408/R0

    S.NO Section Page NoClause

    NoRequirement as per Tender

    C/D

    TL Reply

    59.

    P.006294 G06

    5002

    36 of53

    7.5

    System configuration for compositeC&I Package Scheme is enclosed inthe Drawing No: TE-1102-910-CI-3-

    0001 Rev 00 D

    DCS with Single Redundant

    controller shall be provided forcomplete plant operation excluding

    WTP and Compressor.WTP and Compressor shall have localcontrol panel with Unit control panel.

    60.P.006294 G06

    5002

    37 of53

    7.5.2.4

    Balance of plant systems shall be

    controlled from Programmable LogicController (PLC) based SCADA system

    and local control system with facilityto interface with main DCS formonitoring. Balance of plant(BOP) system shall include thefollowing.i) Fuel handling systemii) Ash handling system

    iii) Water Treatment Plant

    D

    Fuel Handling and Ash Handling

    system shall be controlled from

    Central DCS control itself.WTP shall have local control panelwith Unit Control Panel

    61.

    P.006294 G06

    5002

    38 of53

    7.5.2.6

    Signal & Control cables, special

    cables, cable accessories like lugs,glands. etc, Fibre optic convertors atboth DCS & PLC ends, light interfaceunit with all power supplies shall beprovided.

    C

    Fibre optic and accessories shall be

    provided if applicable.

    62.

    P.006294 G06

    38 of53

    7.5.2.11 Plant Communication system shall be D Plant communication is not

  • 8/12/2019 Annexure-II C D on Tender

    11/13

    Customer : Jindal ITF Ltd Page : Annex-II 11 of 13

    Project : 1x12MW Power Plant Date: 10.07.14

    Offer Ref : TL/SPP/JITF/2408/R0

    S.NO Section Page NoClause

    NoRequirement as per Tender

    C/D

    TL Reply

    5002 provided for quick and reliablecommunication between plantpersonnel.

    envisaged

    63.

    P.006294 G06

    5002

    38 of53

    7.5.2.12Instrument lab equipment with allnecessary furnitures shall be provided

    DInstrument Lab equipments are notenvisaged.

    64.

    P.0062

    94 G065002

    42 of53

    7.5.2.1

    Utility Plants

    Utilities such as Ash handling system,

    Fuel handling system, Watertreatment plant and Instrument /service air compressors shall beoperated automatically from PLCbased local control systems with seriallink to DCS for monitoring.

    C

    Fuel Handling and Ash Handlingsystem shall be controlled from

    Central DCS control itself.

    WTP shall have local control panelwith Unit Control Panel

    65. P.006294 G065002

    43 of53

    7.5.2.2

    Distributed Control System

    D

    IO Redundancy for critical signals isnot envisaged. However for criticalClosed loops like Drum level andFurnace draft the Level transmitter

    and pressure transmitter shall have1oo2 voting.

    10% Installed Spares and 10%Future spare space shall beconsidered.

  • 8/12/2019 Annexure-II C D on Tender

    12/13

    Customer : Jindal ITF Ltd Page : Annex-II 12 of 13

    Project : 1x12MW Power Plant Date: 10.07.14

    Offer Ref : TL/SPP/JITF/2408/R0

    S.NO Section Page NoClause

    NoRequirement as per Tender

    C/D

    TL Reply

    66.

    P.006294 G06

    5002

    45 of53

    7.5.2.4Operator Interface and Control Panel

    C

    3D monitors are not envisaged.However the Graphics for theequipments shall be denoted with 3D

    shapes

    67.P.006294 G06

    5002

    45 of53

    7.5.2.5

    Programmable Logic Controller (PLC)

    D

    DCS with Single Redundantcontroller shall be provided forcomplete plant operation excluding

    WTP and Compressor.WTP and Compressor shall have local

    control panel with Unit control panel.

    68.

    P.006294 G06

    5002

    46 of53

    7.5.2.6

    Two out of three logics is implementedfor critical loops; and for partialcritical loops one out of two logics isapplied. For non-critical loops, no

    redundancy has been envisaged.D

    For critical Closed loops like Drumlevel and Furnace draft the Leveltransmitter and pressure transmittershall have 1oo2 voting. For other allloops, instruments shall be only onefor the control and monitoring.

    69.

    P.006294 G065002

    47 of53

    7.5.2.7

    Instrumentation Pipes/Tubes andFittings

    Open type transmitter racks would beprovided to group and mount all

    pressure, Flow and level transmitters.Temperature transmitters would bemounted in enclosed boxes

    C

    All transmitters shall be suppliedwith enclosure protection of IP65.

    Racks and Enclosed boxes shall notbe considered.

    70.P.006294 G06

    47 of53

    7.5.2.8 Steam & Water Analysis System D SWAS Is not envisaged.

  • 8/12/2019 Annexure-II C D on Tender

    13/13

    Customer : Jindal ITF Ltd Page : Annex-II 13 of 13

    Project : 1x12MW Power Plant Date: 10.07.14

    Offer Ref : TL/SPP/JITF/2408/R0

    S.NO Section Page NoClause

    NoRequirement as per Tender

    C/D

    TL Reply

    5002 (SWAS)

    71.P.006294 G06

    5002

    48 of53

    7.5.2.10 Gas AnalysersD

    SPM and opacity monitors are notenvisaged.

    72.

    P.006294 G06

    5002

    48 of53

    7.5.2.11 Fire Detection System CFire Detection system is notenvisaged.

    73.

    P.006294 G06

    5002

    48 of53

    7.5.2.13 Instrumentation Cables D

    Insulation of extruded PVC insulationconforming to IS 5831/84 Type A.Cables shall be provided withextruded PVC inner sheath as per IS5831/84 type ST1. The cable shall besheathed with extruded NON-FRLS

    PVC. Thickness of the sheath shall beas per IS 1554 Part. 1.

    74.

    P.006294 G06

    5002

    49 of53

    7.5.2.14 Plant Communication System DPlant communication System is notenvisaged.

    75.

    P.006294 G06

    5002

    49 of53

    7.5.2.16 Spares DOperational Spares for 2 years arenot envisaged.

    76.

    P.006294 G06

    5002

    49 of53

    7.6 Civil Works CWe have excluded all civil works fromour scope.