(andrea) ppt de proyectos ingles_pptx [sólo lectura]

38
ENDLESS INVESTMENT OPPORTUNITIES IN PUBLIC INFRASTRUCTURE AND SERVICES 2014 -2015 April 30 th,2014

Upload: lekien

Post on 01-Jan-2017

231 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

ENDLESS INVESTMENT OPPORTUNITIES IN PUBLIC INFRASTRUCTURE AND SERVICES

2014 -2015

April 30 th,2014

Page 2: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]
Page 3: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

PACIFIC OCEAN

THE AMAZON WATERWAY

The project comprises the implementation of works and

actions to improve the navigability and transit of pasenger and

cargo on the Amazonas, Marañón, Huallaga and Ucayali rivers.

� Dredging on critical areas (Malos Pasos) and on the access

to the Port of Iquitos.

� GPS information system on the route of the navigation

channel.

� Installation of level measuring stations with transmission

of information.

� System of monitoring of navigability conditions.

� Cleaning system.

� Estimated investment (VAT not included): US$ 69.4

million

� Type of concession : Co-financed

� Concession period: 20 years.

� Estimated date of award: II Quarter 2014.

CALLED

Loreto

Ucayali

Page 4: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

LINES 3 AND 4 OF THE BASIC NETWORK OF THE METRO OF LIMA AND CALLAO

The project comprises the concession to design,

finance, build, provision of electromechanical

equipment, purchase of rolling stock, operation and

maintenance of Line 3 and Line 4.

� Estimated investment: Under evaluation

� Type of concession : Co-financed

� Concession Period: 35 years

Line 3 Line 4

32 Km 30 Km

2015 2015Estimated award date

Approximate length

TO BE CALLED

Lima and Callao

Page 5: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

Project oriented to the transportation of passengers and cargo,

which comprises the execution of the following works along the

128 Km of the existing railway:

� Railway upgrade

� Changes to the tracks in critical sectors

� Purchase of rolling stock

� Reinforcement of 15 railway bridges

� Extension of 38 tunnels for standard gauge rolling stock

(1,435 mm)

� Upgrades to the signaling and telecommunication systems

� Draining works

The project includes the interoperability with Ferrocarril Central

(railway service with standard gauge of 25 ton per axle) for the

connection of high Andes regions with the port of Callao and the

Santa Anita market.

�Estimated investment: Under evaluation

�Type of concession: Co-financed

�Concession period: 30 years

�Estimated award date: I Quarter 2015

HUANCAYO - HUANCAVELICA RAILWAY

Junín

Central railway

Huancayo – Huancavelica railway

South railway

Huancavelica

TO BE CALLED

Page 6: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

FAST MONORAIL MASS TRANSPORTATION SYSTEM - AREQUIPA

A private initiative for the design,

construction, electromagnetic equipment,

systems, rolling stock, financing, operation

and maintenance of a 14 Km fast mass

transportation system on an elevated track.

� Estimated investment: Studies in progress

� Type of concession : Co-financed

� Estimated award date: 2015

UNDER EVALUATION

Arequipa

Page 7: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

The project comprises the execution of upgrade and

rehabilitation works (117 km), initial periodic

maintenance (160 km); and subsequent maintenance

and operation of 651 Km, in order to reach and

maintain the level of services established on the

railway route.

� Estimated investment: The sector is conducting the

final engineering studies.

� Type of concession : Co-financed

� Concession period: 25 years

� Estimated date of award: I Quarter 2015.

LONGITUDINAL DE LA SIERRA HIGHWAY, SECTION 4

TO BE CALLED

APURÍMAC

Page 8: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

The project comprises the regular initial

maintenance, and operation and maintenance of all

the Section (422 km), in order to obtain the required

level of service.

� Estimated investment: The sector is updating the

upgrading and improvement costs

� Type of concession: Co-financed

� Concession period: 25 years.

� Estimated award date : II Quarter 2015.

LONGITUDINAL DE LA SIERRA HIGHWAY, SECTION 5

Cusco

TO BE CALLED

Page 9: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

Private initiative for the concession to build, operate

and maintain the following infrastructure: Vía de

Evitamiento de Ica, Second road Ev. Ica - Ov. Ocucaje,

Vía de Evitamiento de Palpa, Vía de Evitamiento de

Nazca and section Nazca - DV. Quilca.

� Estimated investment: Under evaluation.

� Type of concession: Self sustaining

� Estimated award date: 2015

PANAMERICANA SUR HIGHWAY: SECTION ICA- DV. QUILCA

UNDER EVALUATION

Ica

Arequipa

Page 10: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

CONCESSIONS IN URBAN AREAS PERIPHERAL RING ROAD

Private initiative for the construction, financing,

operation and maintenance of a highway from

Av. Elmer Faucett to Av. Circunvalación (approx.

33 Km), according to the technical parameters

and service levels established.

� Estimated investment: Studies in progress

� Type of concession : Co-financed

� Estimated award date: I Quarter 2015

Ring road

UNDER EVALUATION

Lima and Callao

Page 11: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]
Page 12: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

220 kV MOYOBAMBA -IQUITOS TRANSMISSION LINE AND ASSOCIATED SUB STATIONS

The project comprises the concession to design,

finance, build, operate, and maintain a transmission

line with an approximated length of 600 km and

capacity of 145 MVA, in order to incorporate the

city of Iquitos to the National Interconnected

System.

� Estimated investment (VAT not included): US$

434 million

� Type of concession: Self-sustaining

� Concession period: 30 years plus the

construction period (52 months)

� Estimated award date: II Quarter 2014.

CALLED

Moyobamba

Iquitos600 Km

PACIFIC OCEAN

BRAZILSan Martin

Loreto

Page 13: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

220 KV LA PLANICIE INDUSTRIALES TRANSMISSION LINE AND ASSOCIATED SUBSTATIONS

The project comprises the concession to design,

finance, build, operate, and maintain the transmission

line with a length of 16.6 km and two circuits with 400

MVA capacity each. The last 5 km of the line will be

underground.

� Estimated investment (VAT not included): US$ 56.6

million

� Type of concession : Self-sustaining

� Concession period: 30 years plus the construction

period (22 months approximately).

� Estimated award date: II Quarter 2014

CALLED

Lima

Page 14: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

220 KV FRIASPATA - MOLLEPATA TRANSMISSION LINE AND 220/60 KV ORCOTUNA SUBSTATION

CALLED

The project comprises the concession to design, finance,

build, operate and maintain the following projects:

a) Mollepata – Friaspata transmission line of 90.5 k.m.

and 192 MVA capacity and associated sub stations.

b) 220/60 kV new Orcotuna substation with 50 MVA

capacity.

Both projects will allow to meet the energy demand in

the regions involved.

� Estimated investment (VAT not included): US$ 43.5

million

� Type of concession : Self-sustained.

� Concession period: 30 years plus the construction

period (25 months approximately)

� Estimated award date: III Quarter 2014

Mollepata

Friaspata

SE Orcotuna

Junín

Ayacucho

Huancavelica

Page 15: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

Supply of power and energy to the National Interconnected

Power System (SEIN) through new hydroelectric power

stations to meet the demand of 400/400/300 MW from

2018 on. The energy sale will be guarantee by contracts.

� Estimated investment: Under evaluation

� Type of concession : Self-sustained

� Estimated date of award: IV Quarter 2014

1100 Mw FROM HYDROELECTRIC POWER STATIONS

TO BE CALLED

nationwide

Page 16: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

220 kV AZANGARO – JULIACA – PUNO TRANSMISSION LINE

The project comprises the concession to design,

finance, build, operate, and maintain the

transmission line with a length of 110 km with 120

MVA aim to eliminated the overcrowding in 138 kV in

the project area and reinforce the South

Interconnected System with a trusted network of 220

kV.

�Estimated investment( VAT not included): US$

81.3 million

�Type of concession: Self-sustained

�Concession period: 30 years plus the

construction time (24 months )

�Estimated award date: IV QT 2014

TO BE CALLED

Page 17: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

The project comprises the concession to design,

finance, build, operate, and maintain the first stage

of the new Carapongo sub station (located in the

eastern part of metropolitan Lima).

In this new substation Protection, Control,

Measurement and Communications Systems related

to transmission lines and substations that provide

energy to Lima will be installed.

� Estimated investment (VAT not included):US$ 31.3 million

� Type of concession: Self-sustained

� Estimated award date: IV QT 2014

CARAPONGO SUB STATION AND CONNECTION TO ASSOCIATE LINES

TO BE CALLED

Lima

Lima Metropolitana

Page 18: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]
Page 19: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

ENERGY SECURITY AND SOUTHERN GAS PIPELINE

CALLED

Malvinas

Chiquintirca

Camisea

CUSCO

AREQUIPA

Mollendo MOQUEGUA

Quillabamba

PC

Ilo

Concession for the design, financing, construction, operation,

maintenance and transfer of a transportation system of natural

gas. The project shall comprise two transportation systems :

a) Pipeline and polyduct of the Separación Malvinas Plant

to the Point of Connection (PC) located in the existing

system of transportation ; and from this point to the

Chiquintirca Compression Plant. In this last section, the

concessionaire is obliged to perform only the FEED

study (by its acronym in English ) and the

Environmental Impact Study (EIA).

b) Pipeline from the Point of Connection (PC) to the South

Coast of the country . It shall include the following

sections :

� Section 1: Pipeline from the PC to Urcos (Cusco)

� Section 2: Urcos Pipeline (Cusco) - Mollendo

(Arequipa) - Ilo (Moquegua).

� Estimated investment (VAT not included): US$ 2,800*

Million

� Modality: Self-sustainable

� Estimated award date: II QUARTER 2014

* Estimated amount base on engineering studies

Page 20: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

SUPPLY SYSTEM OF LNG FOR DOMESTIC MARKET

Description: The project comprises the concession to

design, finance, build, operate and maintain a supply

system of liquid natural gas with a capacity of 130,000

M3 in emergency situations for up to 7 days.

� Estimated investment (VAT not included): US$ 250

million.

� Type of concession: Self-sustained.

� Concession period: 20 years plus the build period

(30 months).

� Estimated award date: IV Quarter 2014

CALLED

Lima

Page 21: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]
Page 22: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

The project comprises the concession to design, finance, build,

operate and maintain of the following infrastructure works:

� Extension capacity of Pomacocha and Huallacocha Bajo dams

(approx. 100 MM cubic meters ).

� Diversion works of Pomacocha – River Blanco (approx. 10 km

of trans Andean tunnel).

� Water purification plant (5 m3/s), and

� Southern conduction line Ramal Sur (approx. 25,6 km) from

Huachipa to Villa del Triunfo districts, three tunnels of 4.2

k.m., 4.5 k.m., and 2.5 k.m.; and 6 support reservoirs of

24,000 cubic meters.

�Estimated investment (VAT not included): US$ 400 million

�Type of concession: Self -sustained

�Concession period: 20 to 30 years

�Estimated award date: IV Quarter 2014.

POR CONVOCAR

P

H

Water Purificatio

n Plant

Southern conduction line

Blanco RiverRimac

River

Trans Andean tunnel

MAIN WORKS AND CONDUCTION OF DRINKABLE WATER SUPPLY FOR LIMA

CALLED

LimaJunín

Page 23: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

CHILLÓN RIVER WATER SUPPLY WORKS

The project comprises the concession to design, finance,

build, operate and maintain of dam works (approximately 40

MM cubic meters) of Chillón river basin.

� Estimated investment (VAT not included):US$ 45 million

� Type of concession: Self- sustained

� Concession period: 20 to 30 years

� Estimated award date: IV Quarter 2014.

POR CONVOCAR

Canta

Matucana

Ancón

Lima

TO BE CALLED

Page 24: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

MANAGEMENT OF THE INSTITUTO NACIONAL DE

SALUD DEL NIÑO – SAN BORJA

The project comprises in the provision, by a private operator, of

the following services:

� Maintenance of buildings, facilities and electromechanical

equipment associated with infrastructure, landscaping and

parking

� Maintenance of the clinical and not-clinical equipment

� Operation and maintenance of general services (laundry,

kitchen, cleaning service and security and hospital waste

management)

� Operation and maintenance of the diagnose support

(clinical pathology and sterilization center)

� Technical assistance services for acquisition

� Type of concession: Co-financed

� Concession period: 10 years.

� Estimated award date: II Quarter 2014.

CALLED

Lima

Page 25: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

The project comprises the concession to design, build,

equip, operate, maintain complementary services in the

following hospitals:

1. Sergio Bernales MINSA - Lima

2. Dos de Mayo MINSA - Lima

3. Hospital Piura Essalud – Piura

4. Hospital Chiclayo Essalud - Chiclayo

5. Hospital Arequipa Essalud – Arequipa

6. Hospital Chimbote Essalud - Huaraz

� Estimated investment: Studies in progess

� Estimated award date: 2015

BUILD, EQUIP AND COMPLEMENTARY SERVICES IN ESSALUD AND MINSA HOSPITALS

TO BE CALLED

Page 26: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

INTEGRAL MANAGEMENT OF SOLID WASTE FROMHOSPITALS IN METROPOLITAN LIMA AND CALLAO

A private initiative involving the construction, operation and

maintenance of a modern hospital waste treatment plant

for the appropriate management of this type of waste

(hazardous-biocontaminated/special-hazardous/regular)

from MINSA hospitals and institutes.

The project will be executed on the basis of other existing

infrastructure public works owned by the Peruvian

Government.

� Estimated investment: Studies in progress

� Type of concession: Co-financed

� Estimated award date: 2015

Lima and Callao

TO BE CALLED

Page 27: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]
Page 28: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

KUELAP CABLEWAY

The project comprises the concession to design, finance,

build, operate and maintain a cableway system for a fast,

safe and easy access to Kuelap Fortress.

The cable cars route will be 4,400 meters aimed to

overcome the distance of 965 meters between Tingo

Nuevo town and Kuelap fortress.

� Estimated investment (VAT not included): US$ 17.6

million

� Type of concession: Co- financed

� Concession period: 20 – 25 years

� Estimated award date: II Quarter 2014.

CALLED

Amazonas

Page 29: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

CHOQUEQUIRAO CABLE RAILWAY

Concession of the design, financing, construction,

equipment, operation and maintenance of a cable

railway system to access the Choquequirao

Archaeological Park in a fast and comfortable way.

The railway system will cross the Apurimac Canyon and

will have 5.4 Km long, divided in 2 sections (3.4 Km and

1.99 Km), and have a capacity for 400 passengers/hour.

� Estimated investment (VAT not included): US$ 54.3

million

� Type of concession : Co-financed

� Concession period: 20-25 years

� Estimated date of award: IV Quarter 2014

CALLED

Apurímac

Cusco

Page 30: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]
Page 31: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

PROVISION OF TECHNOLOGICAL SECURITY SERVICES IN PRISONS

A private initiative declared to be of interest, created to

upgrade the security in correctional facilities through the

application of the following technologies:

� Blocking of mobile phone signals and WiFi networks.

� Public use of telephones under established security

conditions.

� Estimated investment (VAT not included): US $ 4.1 million

� Type of concession : Self-sustained

� Concession period: 25 years

� Estimated award date: II Quarter 2014

CALLED

Page 32: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

A private initiative for the provision of Electronic

Personal Monitoring services aiming at decongesting

the Peruvian correctional facilities through the use of

electronic tagging devices on prosecuted or sentenced

inmates that may have access to this benefit, in their

places of residence or under restricted transit

conditions.

� Estimated investment: Under evaluation

� Type of concession : Self-sustained

� Estimated award date: IV Quarter 2014

ELECTRONIC PERSONAL MONITORING

UNDER EVALUATION

Lima y Callao

Page 33: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

Relocation of 4 penal facilities located in urban areas of

Metropolitan Lima and Cusco, fulfilling the necessary

conditions for the treatment process of the inmates.

The penal facilities considered are:

• Mujeres Chorrillos (Common) and Annex.

• Lurigancho

• Miguel Castro Castro.

• Cusco and EP Cusco Women

� Estimated investment: Under evaluation

� Estimated award date: I Quarter 2015

RELOCATION OF PENAL FACILITIES

TO BE CALLED

Lima and Cusco

Page 34: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

The project proposes the construction of a commercial center,

housing, warehouses and parking lots in the historical center

of Lima (current land of San Jorge penal facilities) It also

includes the construction of a new penal facility in a state

owned property – to be defined.

� Estimated investment : Under evaluation

� Concession type: Self sustained

� Estimated award date: 2015

PENAL INFRASTRUCTURE AND URBAN RENEWAL “TINKUY PLAZA PROJECT”

UNDER EVALUATION

Lima

Page 35: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]
Page 36: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

HUAYDAY AMBARA MINING PROSPECT

The project involves a mining concession with a total

area of 2992 ha . There are coal stratums identified as

“clean anthracite” with probable estimated reserves of

1.8 million MT that offers a high potential for

exploration.

� Estimated investment (VAT not included): US$ 8

million

� Estimated award date: III Quarter 2014

Project

location

LA LIBERTAD

CALLED

Page 37: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]

COMPREHENSIVE AGRICULTURAL, WATER AND MINING PROJECT IN PIURA

This project will be performed in two stages :

� First stage: Design, financing, construction,

operation and maintenance of an ore benefit Plant

which shall process the gold ore extracted by formal

miners and miners under formalization process who

operate within the Piura region.

� Second stage: Promotion of a portfolio of agriculture

and livestock development projects and others that

are intended to solve problems related to water for

domestic and agriculture purposes in the influence

area of the formal mining operations.

� Estimated investment (VAT not included): US$ 12

million

� Estimated award date : III Quarter 2014

TO BE CALLED

Location of the ore benefit plant

Operations area of

informal mining

PACIFIC OCEAN

P i u r a

Page 38: (Andrea) ppt de proyectos ingles_pptx [Sólo lectura]