anderson project walton's new land opportunity

10
WALTON’S NEW LAND OPPORTUNITY ANDERSON HAYS & CALDWELL COUNTY | AUSTIN MSA

Upload: werner-vermeulen-cisi-cii-mba-candidate

Post on 14-Jan-2017

29 views

Category:

Real Estate


0 download

TRANSCRIPT

WALTON’S NEW LAND OPPORTUNITY

ANDERSONHAYS & CALDWELL COUNTY | AUSTIN MSA

© 2016 Walton International Group Inc.

TEXAS AT A GLANCE

AUSTIN MSA

TEXAS

Source: U.S. Census Bureau, http://www.census.gov/newsroom/press-releases/2014/cb14-

232.html; Office of the Governor, Texas http://gov.texas.gov/files/ecodev/texas-economic-

overview.pdf, retrieved September 30, 2015

WHAT EXPERTS ARE SAYING ABOUT

TEXAS, U.S.

© 2016 Walton International Group Inc.

POPULATION GROWTH ALONG HIGH GROWTH CORRIDOR I-35

Source: United States Census Bureau American Fact Finder, 2000 census and 2015 population estimates, as retrieved May 19, 2016 from http://factfinder.census.gov/faces/nav/jsf/pages/index.xhtml

PropertyKyle

Buda

HIGH GROWTH CORRIDOR

572%

↑42%

↑28%

470%

93%

75%Area 2000 Population 2015 Population % Growth

Kyle 5,314 35,733 572%

Buda 2,404 13,705 470%

New Braunfels 36,494 70,543 93%

San Marcos 34,733 60,684 75%

Austin 656,562 931,830 42%

Texas Average 20,851,820 27,469,114 32%

San Antonio 1,150,535 1,469,845 28%

USA Average 281,421,906 321,418,820 14%

8 LanesHighway Servicing More

than 100,000 Cars a Day

I-35The Busiest Inter-Metro

Highway in Texas

© 2016 Walton International Group Inc.

STABLE LABOR FORCE & TOP EMPLOYERS

“Austin Metro will grow at an above-average

pace over the coming year, driven by IT,

professional services, travel and hospitality

sectors.”

“In-migration of well-paid professionals

will power above-average gains in the

housing market. Longer term, an especially

well-educated labor force, high concentration of

technology businesses, and fast population

growth will yield above-average performance.”

Moody’s Analytics, March 2016

TOP EMPLOYERS

IN THE REGION

© 2016 Walton International Group Inc.

AUSTIN METRO NEW HOME ACTIVITY

LOCAL PRESENCE OF ACTIVE

HOMEBUILDERS IN THE REGION

13,423(YOY +17%)

ANNUAL STARTS

12,117(YOY +14%)

ANNUAL CLOSINGS

Rank 9th Top Housing Market in terms of Annual Starts

in the nation in 2Q16

HOUSING SPOTLIGHT

Source: Metrostudy 2Q16 Executive Client Briefing – Denver Metro Area, July 28, 2016

16,126(YOY +12%)

ANNUAL LOT DELIVERIES

Community of McConachie | Edmonton, Alberta

THE PROPERTY

© 2016 Walton International Group Inc.

STRATEGIC LOCATION ALONG KEY GROWTH CORRIDOR

Located along I-35 between Austin and San Antonio

The region is in close to proximity to:

• Two international airports

• Numerous seaports

• East and west connectors Interstate 10 and 20

• Intermodal rail service

• Situated within the Texas Triangle

» Area outlined by the metro areas of Houston, DFW, and San Antonio-Austin

7

Source: Greater San Marcos Partnership, as retrieved September 13, 2016 from http://www.greatersanmarcostx.com/map-

room/san-marcos-area-map-1

PropertyKyle

© 2016 Walton International Group Inc.

ANDERSON: HAYS COUNTY, TEXAS

• Location: Hays County, TX

• Zoning: Agricultural land intended for single family residential development

• Servicing:

• County Line Water Service Company holds the water Certificate of Convenience and Necessity (CCN)

© 2016 Walton International Group Inc.

CLOSE PROXIMITY TO KEY INFRASTRUCTURE

SAN MARCOS

KYLE

BUDA

AUSTIN

INTERSTATE 35 (I-35)The busiest inter-metro interstate in Texas

- Over 100,000 vehicles per day

TOLLWAY 130A new and final stretch opened to drivers

in Lockhart, Texas – 85 miles-per-hour

HIGHWAY 21Runs from the east of San Augustine to

San Marcos in east and central Texas

THE

PROPERTY

© 2016 Walton International Group Inc.

SizeApproximately 82.236 acres

1 Land Unit1/210th undivided interest in the land

1 Acre

USD 25,536.26

Anticipated Hold Period4 – 6 years*

PROJECT DETAILS

* Walton cannot predict or guarantee when a project will exit, as the market will ultimately determine that timing. The Estimated Hold Period is only an estimate and shall not be construed

as an undertaking or representation by Walton that the project will exit within this period. The actual hold period may be shorter or longer than estimated.