Analyst Visit 17 October 2006 PLATINUM WE DO IT BETTER WE DO IT BETTER WE DO IT BETTER Slide 2 of 18 Analyst Visit – 17 October 2006 PLATINUM Agenda INTRODUCTION Gerhard Potgieter (ARM Executive : Operations) (ARM Executive : Operations) PROJECT REVIEW Mark Brasler (Project Leader) (Project Leader) OPERATIONS REVIEW Nico Muller (Business Leader) (Business Leader) SITE VISIT Underground Anthony Durrant (Mining Leader) (Mining Leader) Concentrator Francois Vermeulen (Process Leader) (Process Leader)

Upload: others

Post on 07-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Analyst Visit - Implats · 10/17/2006  · 1 Analyst Visit 17 October 200617 October 2006 PLATINUM WE DO IT BETTER Slide 2 of 18 Analyst Visit – 17 October 2006 PLATINUM Agenda

1

Analyst Visit

17 October 200617 October 2006

PLATINUM

WE DO IT BETTERWE DO IT BETTERWE DO IT BETTER

Slide 2 of 18 Analyst Visit – 17 October 2006 PLATINUM

Agenda

• INTRODUCTION Gerhard Potgieter (ARM Executive : Operations)(ARM Executive : Operations)

• PROJECT REVIEW Mark Brasler (Project Leader)(Project Leader)

• OPERATIONS REVIEW Nico Muller (Business Leader)(Business Leader)

• SITE VISIT

• Underground Anthony Durrant (Mining Leader)(Mining Leader)

• Concentrator Francois Vermeulen (Process Leader)(Process Leader)

Page 2: Analyst Visit - Implats · 10/17/2006  · 1 Analyst Visit 17 October 200617 October 2006 PLATINUM WE DO IT BETTER Slide 2 of 18 Analyst Visit – 17 October 2006 PLATINUM Agenda

2

Slide 3 of 18 Analyst Visit – 17 October 2006 PLATINUM

Gerhard PotgieterARM Executive : Operations

13 October 2006

IntroductionIntroduction“Doing it Better . . . . . ”

Slide 4 of 18 Analyst Visit – 17 October 2006 PLATINUM

Introduction

• Joint Venture • Shareholder Agreement• Management Agreement• Active Participation

• Learning from previous projects

• Project in execution / construction site

Page 3: Analyst Visit - Implats · 10/17/2006  · 1 Analyst Visit 17 October 200617 October 2006 PLATINUM WE DO IT BETTER Slide 2 of 18 Analyst Visit – 17 October 2006 PLATINUM Agenda

3

Slide 5 of 18 Analyst Visit – 17 October 2006 PLATINUM

Fundamentals

• Owner Mining • Trial mining validated feasibility assumptions• Trackless room & pillar mining

• Outsource Concentrator & Tailings Operations• Specialist / non core services

• Undertaking to employ local labour

Slide 6 of 18 Analyst Visit – 17 October 2006 PLATINUM

Mark BraslerProject Leader Two Rivers Platinum

13 October 2006

Project ReviewProject Review“Doing it Better . . . . . ”

Page 4: Analyst Visit - Implats · 10/17/2006  · 1 Analyst Visit 17 October 200617 October 2006 PLATINUM WE DO IT BETTER Slide 2 of 18 Analyst Visit – 17 October 2006 PLATINUM Agenda

4

Slide 7 of 18 Analyst Visit – 17 October 2006 PLATINUM

Burgersf

AngloPt / ARM(Modikwa)

Thorncliff / AngloPt(Mototolo Joint venture)

AngloPt(Atock Mine)

AngloPt(Twickenham)

ARM / Implats Two Rivers

Eastern Plats Rhodium Reefs

Slide 8 of 18 Analyst Visit – 17 October 2006 PLATINUM

Mine, plant & infrastructure• Mining

• Surface Stockpile 1 200 000 tons (October 2006)• Underground 185 000 tpm (LOM)• Open pit (north) 40 000 tpm (Years 2 - 5)• Adit 25 000 tpm (Years 5 - 13)• North Adit 40 000 tpm (LOM)

• Concentrator 2.5 M tpa MF2

• 82.5 % recovery @ 4E 3.49 g/t• Design 50% waste / No DMS / optical sorting• Toll smelt & refine @ IRS & Springs

• Infrastructure• Water supply of 2.9 million m3/a secured

Delayed

Page 5: Analyst Visit - Implats · 10/17/2006  · 1 Analyst Visit 17 October 200617 October 2006 PLATINUM WE DO IT BETTER Slide 2 of 18 Analyst Visit – 17 October 2006 PLATINUM Agenda

5

Slide 9 of 18 Analyst Visit – 17 October 2006 PLATINUM

North Decline

Slide 10 of 18 Analyst Visit – 17 October 2006 PLATINUM

Project Focus

• To implement the capital works program within the approved budget

• To advance the concentrator ramp up schedule

• To establish a platform to sustain and improve feasibility parameters

Page 6: Analyst Visit - Implats · 10/17/2006  · 1 Analyst Visit 17 October 200617 October 2006 PLATINUM WE DO IT BETTER Slide 2 of 18 Analyst Visit – 17 October 2006 PLATINUM Agenda

6

Slide 11 of 18 Analyst Visit – 17 October 2006 PLATINUM

Milestone Dates• Purchase land & mineral rights Dec 01• EMPR & mining license approved Mar 03• WULA approved Dec 03• Trial Mining & access development Jan 04• Project submission to ARM & Implats Dec 04• Project release, commence construction Jun 05• Conclude Bank Funding Agreement Sep 05• Commence concentrator commissioning Aug 06• Concentrator at full capacity 4th Qtr 06• North Decline Construction Mar 07• Commercial operations Apr 07• Underground Mining at 185 000 tpm Dec 07

Slide 12 of 18 Analyst Visit – 17 October 2006 PLATINUM

Project Finance

• Project Funding R 1.3 billion• 50% bank funded

• 50% ABSA / 50% Nedcor• 50% shareholder / equity funded

• 55% ARM / 45% Implats

• Asset Finance R 0.3 billion• Mining Fleet (ABSA)• Lydenburg Housing Development (Nedcor)

Page 7: Analyst Visit - Implats · 10/17/2006  · 1 Analyst Visit 17 October 200617 October 2006 PLATINUM WE DO IT BETTER Slide 2 of 18 Analyst Visit – 17 October 2006 PLATINUM Agenda

7

Slide 13 of 18 Analyst Visit – 17 October 2006 PLATINUM

Resourcing

• EPCM Services• Concentrator & Infrastructure (DRA)

• Major contracts awarded• Mining access development (GLTA- Mining)• FFE – Mills• GLTA Civils – Civil construction• Cosira – Structural steelwork & Mechanical erection • Outokumpu – Thickeners & Float Cells• ECMP - Tailings Dam• Rooimech – Conveyors• Larox – Concentrate filter• Wade Walker – Portal electrical & instrumentation scope

• Lydenburg Housing development• Mvela Phanda Construction / Sunset Bay Partnership

Slide 14 of 18 Analyst Visit – 17 October 2006 PLATINUM

Capital Implementation Progress (October 2006)

• + 95% complete (mine & concentrator)• Commitments R 1.2 billion

• Weighted BEE / HDSA commitment 32 %• Expenditure R 1.1 billion

• Site labour peak• Mine & Concentrator 2 200 • Lydenburg Housing 700

• Project budget saving of ±10%

Page 8: Analyst Visit - Implats · 10/17/2006  · 1 Analyst Visit 17 October 200617 October 2006 PLATINUM WE DO IT BETTER Slide 2 of 18 Analyst Visit – 17 October 2006 PLATINUM Agenda

8

Capital Implementation : Achievements

Team successExecutive / Shareholders / Project / Operations / Contractors / ….Trust in an empowered project team (C1 / satellite office)

Realistic implementation parametersMining

BenchmarkingTrial Mining established the foundation to succeed

Proved mining fundamentalsAdvanced primary access development Stockpile Accumulation (250 000 to 1 200 000 tons)

Optimized designs

Concentrator Schedule15 months (not necessarily repeatable with current market up-tick)

Operational flexibilityFace redundancy (30% - 100%)Mill capacity (225 000 – 260 000 tpm)

Exceeded most project objectivesSafety / Capital / Schedule / Commissioning

PLATINUM

Slide 16 of 18 Analyst Visit – 17 October 2006 PLATINUM

Lydenburg HousingDevelopment

PLATINUM

Page 9: Analyst Visit - Implats · 10/17/2006  · 1 Analyst Visit 17 October 200617 October 2006 PLATINUM WE DO IT BETTER Slide 2 of 18 Analyst Visit – 17 October 2006 PLATINUM Agenda

9

Slide 17 of 18 Analyst Visit – 17 October 2006 PLATINUM

Slide 18 of 18 Analyst Visit – 17 October 2006 PLATINUM

Capital Implementation ChallengesExpedite the concentrator ramp-up

Girth gear / Mill silos / Mill gearbox lubrication / Primary mill discharge grate / …Crusher hold down bolts / Tailings barge power supply / Tailings flexible hoses / …Delivery of Strategic Spares …

Ongoing capital implementation scope (Focus on opening the revenue pipeline)Mining service extensions below 4 levelDeluge systemENGEN Diesel fuelling facilities (surface & underground)Surface compressor plantRichmond / Plant / Portal roadsLydenburg housing (10/90/180 – 9 months behind planned schedule)

Manage handover to new operations teamManage capital growth

Manage attrition within the project team (industry skills shortage)

Project close out reporting

Page 10: Analyst Visit - Implats · 10/17/2006  · 1 Analyst Visit 17 October 200617 October 2006 PLATINUM WE DO IT BETTER Slide 2 of 18 Analyst Visit – 17 October 2006 PLATINUM Agenda

10

Slide 19 of 18 Analyst Visit – 17 October 2006 PLATINUM

Nico MullerBusiness Leader Two Rivers Platinum

17 October 2006

Operations ReviewOperations Review“Doing it Better . . . . . ”

Slide 20 of 18 Analyst Visit – 17 October 2006 PLATINUM

GeologyGeology

Page 11: Analyst Visit - Implats · 10/17/2006  · 1 Analyst Visit 17 October 200617 October 2006 PLATINUM WE DO IT BETTER Slide 2 of 18 Analyst Visit – 17 October 2006 PLATINUM Agenda

11

Slide 21 of 18 Analyst Visit – 17 October 2006 PLATINUM

Burgersf

AngloPt / ARM(Modikwa)

AngloPt(Der Brochen)

AngloPt(Atock Mine)

AngloPt(Twickenham)

Aquarius (Everest South)

Impala (Marula)

106 cm572 cmg/tPt:Pd=1:1

Steelpoort Fault

185 cm781 cmg/tPt:Pd=5:3

ARM/ImplatsTwo Rivers

Salene Mining(Rhodium Reefs)

Slide 22 of 18 Analyst Visit – 17 October 2006 PLATINUM

UG2 Reef Section : North - South

Page 12: Analyst Visit - Implats · 10/17/2006  · 1 Analyst Visit 17 October 200617 October 2006 PLATINUM WE DO IT BETTER Slide 2 of 18 Analyst Visit – 17 October 2006 PLATINUM Agenda

12

Slide 23 of 18 Analyst Visit – 17 October 2006 PLATINUM

4 128 16 (6E g/t)

Typical 6E Grade Profile

Slide 24 of 18 Analyst Visit – 17 October 2006 PLATINUM

Geology Base Parameters

• Average Dip : 10° West

• Channel Width : ≥ 1.5m

• Mining Cut : 1.85m – 2.60m

• Grade : 3.49 g/t (4E)

• Geological Losses : 30% (14%)• Potholes : 15% (8%)• Faults & Dykes : 14% (6%)• Repl. pegm. : 1%

Mining Method :

Mechanized Bord & Pillar

Page 13: Analyst Visit - Implats · 10/17/2006  · 1 Analyst Visit 17 October 200617 October 2006 PLATINUM WE DO IT BETTER Slide 2 of 18 Analyst Visit – 17 October 2006 PLATINUM Agenda

13

Slide 25 of 18 Analyst Visit – 17 October 2006 PLATINUM

Resource & Reserve StatementAs at May 2006

Moz MozPt Pd Rh Au (3E+Au) (5E+Au) Pt 6E

UG2 ResourceMeasured 13.05 2.90 1.70 0.50 0.04 5.17 6.27 1.18 2.54

Indicated 46.23 2.01 1.30 0.35 0.04 3.70 4.43 2.89 6.37

Inferred - - - - - - - - -

Total 59.28 2.21 1.39 0.38 0.04 4.02 4.83 4.07 8.91

UG2 ReservesStockpile 1.00 2.04 1.15 0.38 0.03 3.60 4.35 0.06 0.14

Proven 9.50 2.04 1.15 0.38 0.03 3.60 4.35 0.60 1.29

Probable 29.80 1.86 1.20 0.35 0.03 3.44 4.11 1.72 3.81

Total 40.30 1.91 1.19 0.36 0.03 3.49 4.19 2.39 5.23

Merensky ResourcesMeasured - - - - - - - - -

Indicated 18.7 2.06 - - - 3.34 3.55 1.20 2.06

Inferred 3.9 1.95 - - - 3.16 3.36 0.24 0.41

Total 22.6 2.04 - - - 3.31 3.52 1.43 2.47

Mt Grade (g/t)Category

Slide 26 of 18 Analyst Visit – 17 October 2006 PLATINUM

MiningMining

Page 14: Analyst Visit - Implats · 10/17/2006  · 1 Analyst Visit 17 October 200617 October 2006 PLATINUM WE DO IT BETTER Slide 2 of 18 Analyst Visit – 17 October 2006 PLATINUM Agenda

14

Slide 27 of 18 Analyst Visit – 17 October 2006 PLATINUM

N

Bulk Sample Shaft

MINE LAYOUT

100m

PLATINUM

Slide 28 of 18 Analyst Visit – 17 October 2006 PLATINUM

Production

• Mining Reserve 40 Mt• Life of Mine +16 Years

• Main Decline 185 ktpm• North Decline 40 ktpm

• Other Resources• Open Pit• Merensky• Toll Feed• Adjacent resources

• Average Annual Sales 220,000 Oz PGEs

Page 15: Analyst Visit - Implats · 10/17/2006  · 1 Analyst Visit 17 October 200617 October 2006 PLATINUM WE DO IT BETTER Slide 2 of 18 Analyst Visit – 17 October 2006 PLATINUM Agenda

15

Slide 29 of 18 Analyst Visit – 17 October 2006 PLATINUM

Mining Fleet

Activity Machinery TotalsFace Drilling 1X AXERA LP D/BOOMER

8 X ATLAS S1L DRILL RIG 9

Loading 1 X TORO 007 LHD (4659)1 X WAGNER ST 600 LHD1 X TORRO 400 LHD15 X LHD 115 LP1 X WAGNER ST400 LHD1 X GHH LHD 20

Rock Bolting 8 X ROBOLT LP BOLTER1 X DBT Bolter 9

Logistics and charging 1 X Fermel UV17 X SECO UV 42 18

Personnel Transport 1 X Fermel Jeep5 X Toyota 4X4 LDVs 6

Slide 30 of 18 Analyst Visit – 17 October 2006 PLATINUM

Production Crews

• Mining Crews : 11• 1xMiner• 1xTeam leader• 1xDrill rig operator• 1xRoofbolter operator• 1xUV operator• 2xLHD operators• 2xPTV• 2xtip attendants

• Work Arrangement• Shift – 9 hrs• 2 x Shifts per day• 2 x 12m panels per shift• 3m advance per blast• 500 t / crew / shift• 45 t / man / shift• 20,500 t/ section / month• 11 day fortnight• Conops options

Page 16: Analyst Visit - Implats · 10/17/2006  · 1 Analyst Visit 17 October 200617 October 2006 PLATINUM WE DO IT BETTER Slide 2 of 18 Analyst Visit – 17 October 2006 PLATINUM Agenda

16

Slide 31 of 18 Analyst Visit – 17 October 2006 PLATINUM

Mining LayoutEnd of September 06

Level 1Level 2Level 3Level 4

Level 5Level 6

Level 7Level 8

Conveyor Decline : Complete

Ledging : 758m out of 930m (81%)

Reef Declines : 907m out of 1038m (87%)

GLTA 2

GLTA 1

GLTA 3GLTA 4

TRP 1&2

Slide 32 of 18 Analyst Visit – 17 October 2006 PLATINUM

Decline Cross Section

560m

430m

Page 17: Analyst Visit - Implats · 10/17/2006  · 1 Analyst Visit 17 October 200617 October 2006 PLATINUM WE DO IT BETTER Slide 2 of 18 Analyst Visit – 17 October 2006 PLATINUM Agenda

17

Analyst Visit – 17 October 2006

ROM TONSROM TONS

0

20,000

40,000

60,000

80,000

100,000

120,000

140,000

160,000

180,000

200,000

2004

2005

Jul 0

5

Aug

05

Sep

05

Oct

05

Nov

05

Dec

05

Jan

06

Feb

06

Mar

06

Apr 0

6

May

06

Jun

06

Jul 0

6

Aug

06

Sep

06

Oct

06

Nov

06

Dec

06

Jan

07

Feb

07

Mar

07

Apr 0

7

May

07

Jun

07

2008

2009

2010

Tons

History Actual 5Y Plan Plan Forecast

Analyst Visit – 17 October 2006

Reef StockpileReef Stockpile

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1,400,000

2004

2005

Jul 0

5

Aug

05

Sep

05

Oct

05

Nov

05

Dec

05

Jan

06

Feb

06

Mar

06

Apr 0

6

May

06

Jun

06

Jul 0

6

Aug

06

Sep

06

Oct

06

Nov

06

Dec

06

Jan

07

Feb

07

Mar

07

Apr 0

7

May

07

Jun

07

2008

2009

2010

Tons

History Actual 5Y Plan Plan Forecast

Page 18: Analyst Visit - Implats · 10/17/2006  · 1 Analyst Visit 17 October 200617 October 2006 PLATINUM WE DO IT BETTER Slide 2 of 18 Analyst Visit – 17 October 2006 PLATINUM Agenda

18

Slide 35 of 18 Analyst Visit – 17 October 2006 PLATINUM

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1,400,000

Tons

Planned 193,829 256,806 658,978 1,026,388 1,065,860

Actual 179,598 280,114 702,503 1,064,881 1,170,342

Development Ledging Stoping ROM Stockpile

Overall Production PerformanceOverall Production PerformanceJul 05 Jul 05 –– Sep 06Sep 06

Slide 36 of 18 Analyst Visit – 17 October 2006 PLATINUM

Concentrator PlantConcentrator Plant

Page 19: Analyst Visit - Implats · 10/17/2006  · 1 Analyst Visit 17 October 200617 October 2006 PLATINUM WE DO IT BETTER Slide 2 of 18 Analyst Visit – 17 October 2006 PLATINUM Agenda

19

Slide 37 of 18 Analyst Visit – 17 October 2006 PLATINUM

Concentrator Plant

• Plant Commission• Commissioning started ahead of schedule• Critical commissioning challenges resolved• Awaiting final strategic spares• Full throughput by end of year• Early recoveries higher than planned

• General• Contractor operations (EPC)• 82 staff (contractor & mine)• Conops• 2 x 12hr shifts per day• 4 on 4 off cycle

Slide 38 of 18 Analyst Visit – 17 October 2006 PLATINUM

Commissioning Challenges

Mill Silo Damage

Mill Discharge Screen

Page 20: Analyst Visit - Implats · 10/17/2006  · 1 Analyst Visit 17 October 200617 October 2006 PLATINUM WE DO IT BETTER Slide 2 of 18 Analyst Visit – 17 October 2006 PLATINUM Agenda

20

Slide 39 of 18 Analyst Visit – 17 October 2006 PLATINUM

Plant Commissioning

Mill Gearbox Bearing

Girth Gear

Slide 40 of 18 Analyst Visit – 17 October 2006 PLATINUM

Plant Performance

CONCENTRATOR PLANT

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

22 J

ul

29 J

ul

05 A

ug

12 A

ug

19 A

ug

26 A

ug

02 S

ep

09 S

ep

16 S

ep

23 S

ep

30 S

ep

07 O

ct

14 O

ct

Mill

ed T

ons

Page 21: Analyst Visit - Implats · 10/17/2006  · 1 Analyst Visit 17 October 200617 October 2006 PLATINUM WE DO IT BETTER Slide 2 of 18 Analyst Visit – 17 October 2006 PLATINUM Agenda

21

Slide 41 of 18 Analyst Visit – 17 October 2006 PLATINUM

GeneralGeneral

Slide 42 of 18 Analyst Visit – 17 October 2006 PLATINUM

Safety Performance

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

0

200

400

600

800

1000

1200

1400

1600

1800

2000

2200

2400

Number of employees 193 887 1196 1633 1768 1833 2070 2270 2077 1976 1218 1177

Minor Injuries 1 3 5 3 9 8 12 5 12 8 7 3

Serious Injuries 0 1 1 0 2 0 2 0 0 0 2 0

Fatals 0 0 0 0 0 0 0 0 0 0 0 0

LTIFR 0 3.47 2.67 1.02 1.27 1.10 1.25 1.39 1.22 2.6 2.78 2.27

LTIFR Plan 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 4.5 4 3.5

2003 2004 2005 Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 2007 2008 2009

Project To DateFatalities = 0

Fatality Free Shifts = 621,002

LTIFR = 1.22

Page 22: Analyst Visit - Implats · 10/17/2006  · 1 Analyst Visit 17 October 200617 October 2006 PLATINUM WE DO IT BETTER Slide 2 of 18 Analyst Visit – 17 October 2006 PLATINUM Agenda

22

Slide 43 of 18 Analyst Visit – 17 October 2006 PLATINUM

Operating CostJul 06 – Sep 06

2007 Financial Year : 1st Quarter

Description UnitYTD

Actual Plan Var

Operating Cost R mil 72.0 94.2 22.2

Mining R mil 35.7 37.8 2.1

Process R mil 19.0 31.1 12.1

Other On Mine Costs R mil 17.3 25.3 8.0

ROM Tons kt 253 338 -86

Cash Operating Cost R/t 285 278 -7

Notes - Other On Mine Costs excludes change in value of unsold stock - Increase in unit costs due to lower production (strike) - Unit operating costs reflect current costs during ramp up - not steady state costs

Slide 44 of 18 Analyst Visit – 17 October 2006 PLATINUM

Industry Cost Curve

0

100

200

300

400

500

600

700

WLT

R (A

MS)

CTRP

(AQP

)

Ever

est(A

QP)

KPM

(AM

S)

Mim

osa

(AQP

)

Aqua

rius

Tota

l (AQ

P)

Mim

osa

(IMP)

*

KPM

(AQP

)

Mar

ikana

(LON

)

Impa

la Le

ase

(IMP)

Impla

ts T

otal

(IMP)

Two

Rive

rs P

latinu

m

Lonm

in (L

ON)

Zim

plats

(IM

P)*

PPRu

st (A

MS)

Zim

plats

(ZIM

)

Anglo

Plat

Tot

al (A

MS)

Limpo

po (L

ON)

Union

(AM

S)

Aman

delbu

lt (A

MS)

Mar

ula (I

MP)

Mar

ikana

(AQP

)

BRPM

(AM

S)

Rust

enbu

rg (A

MS)

Mod

ikwa

(AM

S)

Mar

ikana

(AM

S)

Lebo

wa (A

MS)

North

am (N

HM)

ZAR/

ton

ZAR/ton IRS ZAR/ton ZAR/tonMerrill Ly nch, September 2006

Page 23: Analyst Visit - Implats · 10/17/2006  · 1 Analyst Visit 17 October 200617 October 2006 PLATINUM WE DO IT BETTER Slide 2 of 18 Analyst Visit – 17 October 2006 PLATINUM Agenda

23

Slide 45 of 18 Analyst Visit – 17 October 2006 PLATINUM

• Total labour plan = 1000 people• 650 Mine employees• 350 Contracted out services

• Employment of local labour• To the extent possible• Initial skills through contracting

IMIU - 30 March 2006

Operational Labour

Slide 46 of 18 Analyst Visit – 17 October 2006 PLATINUM

Licensing & Permits

• North Open Pit• Application submitted in 2003• Rejected in May 2006• Appeal process

• North Decline• Full application required & well advanced• Scoping document• Authorities & I&A Parties consultation concluded• Submission date : 27 October

• New Order Mining Rights• Expected submission date : Feb 07• Technical skills (artisans, foreman)

Page 24: Analyst Visit - Implats · 10/17/2006  · 1 Analyst Visit 17 October 200617 October 2006 PLATINUM WE DO IT BETTER Slide 2 of 18 Analyst Visit – 17 October 2006 PLATINUM Agenda

24

Slide 47 of 18 Analyst Visit – 17 October 2006 PLATINUM

The Way Forward

• Production• Recruitment & Training• Decline Extension• Additional Fleet• North Decline• Full Calendar Operations• Continuous Improvement (LTIFR, R/t, t/man, . . . )

• Skills Development• UG Training Section• Training Fleet• Simulators• Learnership Programs• Regional Training Infrastructure

• Concentrator Plant• Tailings dam return water• Critical Spares Delivery• Process Optimisation (recovery, availability, throughput, . . . .)

Slide 48 of 18 Analyst Visit – 17 October 2006 PLATINUM

The Way Forward

• Licensing & Permits• North Decline Environmental Authorisation (Nov 06)

• New Order Mining Rights (Feb 07)• Local Communities

• Skills Development Programs• Local Economic Development (SMME’s)

• Management Systems• ERP• Production monitoring• SHEQ

Page 25: Analyst Visit - Implats · 10/17/2006  · 1 Analyst Visit 17 October 200617 October 2006 PLATINUM WE DO IT BETTER Slide 2 of 18 Analyst Visit – 17 October 2006 PLATINUM Agenda

25

Slide 49 of 18 Analyst Visit – 17 October 2006 PLATINUM

Thank YouThank YouQuestions ?Questions ?