RESUMEN PRESUPUESTO ANALÍTICO - FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1 FTE.FTO 0 UNIDAD GEST. 0 PROYECTO FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1 COMPONENTE SUB COMPONENTE OBRA FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1 CÓDIGO ESPECÍFICA DE GASTOS COSTO DIRECTO GASTOS GENERALES GASTOS DE SUPERVISIÓN EXPEDIENTE TÉCNICO GASTOS DE LIQUIDACIÓN COSTO TOTAL 2.6.2.3.7.3 REMUNERACIONES 1,067,035.57 764,400.00 288,000.00 90,000.00 70,000.00 2,279,435.57 2.6.2.3.7.4 BIENES 4,420,856.57 36,170.70 9,875.00 12,725.00 8,525.00 4,488,152.27 2.6.2.3.7.5 SERVICIOS 2,307,478.32 16,907.85 513.00 0.00 513.00 2,325,412.17 2.6.2.3.7.6 OTROS 0.00 17,500.00 42,000.00 0.00 0.00 59,500.00 TOTALES S/. 7,795,370.45 834,978.55 340,388.00 102,725.00 79,038.00 9,152,500.00 10.71% 4.37% 1.32% 1.01%

Upload: snandopf

Post on 20-Oct-2015

158 views

Category:

Documents


29 download

TRANSCRIPT

RESUMEN PRESUPUESTO ANALÍTICO - FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1

FTE.FTO 0

UNIDAD GEST. 0

PROYECTO FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1

COMPONENTE

SUB COMPONENTE

OBRA FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1

CÓDIGO ESPECÍFICA DE GASTOS COSTO DIRECTO GASTOS GENERALES GASTOS DE SUPERVISIÓN EXPEDIENTE TÉCNICO GASTOS DE LIQUIDACIÓN COSTO TOTAL

2.6.2.3.7.3 REMUNERACIONES 1,067,035.57 764,400.00 288,000.00 90,000.00 70,000.00 2,279,435.57

2.6.2.3.7.4 BIENES 4,420,856.57 36,170.70 9,875.00 12,725.00 8,525.00 4,488,152.27

2.6.2.3.7.5 SERVICIOS 2,307,478.31 16,907.85 513.00 0.00 513.00 2,325,412.16

2.6.2.3.7.6 OTROS 0.00 17,500.00 42,000.00 0.00 0.00 59,500.00

TOTALES S/. 7,795,370.45 834,978.55 340,388.00 102,725.00 79,038.00 9,152,500.00

10.71% 4.37% 1.32% 1.01%

PRESUPUESTO ANALÍTICO - COSTO DIRECTO

FTE.FTO 0

UNIDAD GEST. 0

PROYECTO FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1

COMPONENTE 0

SUB COMPONENTE 0

OBRA FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1

CÓDIGO ESPECIFICA DE GASTOS COSTO DIRECTO

2.6.2.3.7.3 REMUNERACIONES 1,067,035.57

2.6.2.3.7.4 BIENES 4,420,856.57

2.6.2.3.7.5 SERVICIOS 2,307,478.31

2.6.2.3.7.6 OTROS

TOTAL COSTO DIRECTO S/. 7,795,370.45

DESAGREGADO DEL PRESUPUESTO ANALÍTICO

COSTO DIRECTO

2.6.2 3.7.3 REMUNERACIONES S/. 1,067,035.57

01 RETRIBUCIONES COMPLEMENTARIAS-CONTRATOS A PLAZO FIJO S/. 713,542.42DEL EMPLEADO EVENTUAL

CARGO UND. CANTIDAD COSTO SUB TOTAL TOTALPERSONAL DE OBRA

1 CAPATAZ Hh 122.19 12.50 1,527.41 1,020.162 CAPATAZ DE TRABAJOS ELECTRICOS Hh 30.00 12.34 370.20 247.263 MAESTRO DE OBRA Hh 114.70 12.50 1,433.75 957.604 OFICIAL Hh 19,025.69 10.68 203,194.32 135,713.495 OFICIAL DE TRABAJOS ELECTRICOS Hh 483.00 10.68 5,158.44 3,445.326 OPERADOR DE EQUIPO LIVIANO Hh 1,875.07 10.68 20,025.74 13,375.197 OPERADOR DE EQUIPO PESADO Hh 1,095.26 12.34 13,515.55 9,027.048 OPERARIO Hh 37,998.80 12.34 468,905.13 313,181.749 OPERARIO DE TRABAJOS ELECTRICOS Hh 1,230.00 12.34 15,178.20 10,137.52

10 PEON Hh 32,822.41 9.59 314,766.94 211,102.2011 PEON DE TRABAJOS ELECTRICOS Hh 1,956.00 9.59 18,758.04 12,528.4912 TOPOGRAFO Hh 305.59 13.75 4,201.85 2,806.42

713,542.42

02 OBLIGACIONES DEL EMPLEADOR S/. 111,384.97DEL EMPLEADO EVENTUAL

CARGO UND. CANTIDAD COSTO SUB TOTAL TOTALPERSONAL DE OBRA

1 CAPATAZ Hh 122.19 12.50 1,527.41 160.072 CAPATAZ DE TRABAJOS ELECTRICOS Hh 30.00 12.34 370.20 38.803 MAESTRO DE OBRA Hh 114.70 12.50 1,433.75 150.264 OFICIAL Hh 19,025.69 10.68 203,194.32 21,294.765 OFICIAL DE TRABAJOS ELECTRICOS Hh 483.00 10.68 5,158.44 540.606 OPERADOR DE EQUIPO LIVIANO Hh 1,875.07 10.68 20,025.74 2,098.707 OPERADOR DE EQUIPO PESADO Hh 1,095.26 12.34 13,515.55 1,416.438 OPERARIO Hh 37,998.80 12.34 468,905.13 49,141.269 OPERARIO DE TRABAJOS ELECTRICOS Hh 1,230.00 12.34 15,178.20 1,590.68

10 PEON Hh 32,822.41 9.59 314,766.94 32,987.5811 PEON DE TRABAJOS ELECTRICOS Hh 1,956.00 9.59 18,758.04 1,965.8412 TOPOGRAFO Hh 305.59 13.75 4,201.85 440.35

TOTAL 111,384.97

03 GASTOS VARIABLES Y OCASIONALES S/. 108,515.32DEL EMPLEADO EVENTUAL

CARGO UND. CANTIDAD COSTO SUB TOTAL TOTALPERSONAL DE OBRA

1 CAPATAZ Hh 122.19 12.50 1,527.41 155.952 CAPATAZ DE TRABAJOS ELECTRICOS Hh 30.00 12.34 370.20 37.803 MAESTRO DE OBRA Hh 114.70 12.50 1,433.75 146.394 OFICIAL Hh 19,025.69 10.68 203,194.32 20,746.145 OFICIAL DE TRABAJOS ELECTRICOS Hh 483.00 10.68 5,158.44 526.686 OPERADOR DE EQUIPO LIVIANO Hh 1,875.07 10.68 20,025.74 2,044.637 OPERADOR DE EQUIPO PESADO Hh 1,095.26 12.34 13,515.55 1,379.948 OPERARIO Hh 37,998.80 12.34 468,905.13 47,875.219 OPERARIO DE TRABAJOS ELECTRICOS Hh 1,230.00 12.34 15,178.20 1,549.69

10 PEON Hh 32,822.41 9.59 314,766.94 32,137.7011 PEON DE TRABAJOS ELECTRICOS Hh 1,956.00 9.59 18,758.04 1,915.2012 TOPOGRAFO Hh 305.59 13.75 4,201.85 429.01

TOTAL 108,515.32

04 ESCOLARIDAD, AGUINALDOS Y GRATIFICACIONES S/. 133,592.85DEL EMPLEADO EVENTUAL

CARGO UND. CANTIDAD COSTO SUB TOTAL TOTALPERSONAL DE OBRA

1 CAPATAZ Hh 122.19 12.50 1,527.41 191.232 CAPATAZ DE TRABAJOS ELECTRICOS Hh 30.00 12.34 370.20 46.353 MAESTRO DE OBRA Hh 114.70 12.50 1,433.75 179.514 OFICIAL Hh 19,025.69 10.68 203,194.32 25,439.935 OFICIAL DE TRABAJOS ELECTRICOS Hh 483.00 10.68 5,158.44 645.846 OPERADOR DE EQUIPO LIVIANO Hh 1,875.07 10.68 20,025.74 2,507.227 OPERADOR DE EQUIPO PESADO Hh 1,095.26 12.34 13,515.55 1,692.158 OPERARIO Hh 37,998.80 12.34 468,905.13 58,706.929 OPERARIO DE TRABAJOS ELECTRICOS Hh 1,230.00 12.34 15,178.20 1,900.31

10 PEON Hh 32,822.41 9.59 314,766.94 39,408.8211 PEON DE TRABAJOS ELECTRICOS Hh 1,956.00 9.59 18,758.04 2,348.5112 TOPOGRAFO Hh 305.59 13.75 4,201.85 526.07

TOTAL 133,592.85

02 S/. 4,420,856.57

01 COMBUSTIBLES , CARBURANTES Y LUBRICANTES S/. 357.52DESCRIPCIÓN UND. P.U. CANTIDAD SUB TOTAL

PETROLEO gln 32.44 11.02 357.52TOTAL 357.52

02 MATERIALES S/. 4,420,499.05DESCRIPCIÓN UND. P.U CANTIDAD SUB TOTAL

ABRAZADERA DE F°G° DE 1/2" Und 24.00 1.50 36.00ACCESORIOS COMPLETO BRONCE TANQUE BAJO Und 5.00 16.00 80.00ACCESORIOS DE FIJACION VARIOS %MT 1,822.95ACCESORIOS DIVERSOS GLB 580.90 4.00 2,323.60ACCESORIOS PARA CONEXION DE INTERRUPTOR A TABLERO DE S.E. GLB 1.00 250.00 250.00ACEITE PARA MOTOR SAE-30 gln 1.95 14.00 27.29ACERO CORRUGADO fy= 4200 Kg/cm² G-60 Kg 202,498.11 4.50 911,241.50ACERO LISO DE 1" Pza 8.05 72.00 579.34ACERO LISO DE 1/2" M 2.83 8.00 22.66AGUA M3 383.09 0.84 321.79

AGUA M3 475.29 0.84 399.24ALAMBRE # 18 Kg 127.75 5.00 638.76ALAMBRE NEGRO N°16 Kg 48.75 4.50 219.37ALAMBRE NEGRO N°8 Kg 188.34 4.50 847.54ALAMBRE NEGRO RECOCIDO # 16 Kg 10,802.79 4.50 48,612.56ALAMBRE NEGRO RECOCIDO # 8 Kg 1,423.32 2.60 3,700.62ALCOHOL gln 15.83 15.60 246.94ALMACEN CERCADO M2 32.00 60.00 1,920.00ANDAMIO DE MADERA p2 19.13 2.60 49.73ANDAMIO METALICO TABLAS ALQUILER est 280.11 26.00 7,282.81ANGULAR DE 1"X1" Pza 7.90 16.00 126.46ANGULAR DE ALUMINIO DE 3/4"X3/4" Pza 81.77 22.00 1,799.03ANGULO DE ALUMINIO 2"x2"x1/8"x6m Pza 8.00 120.00 960.00ARCHIVADORES Und 22.00 300.00 6,600.00ARENA FINA M3 315.15 50.42 15,889.79ARENA GRUESA M3 1,305.09 80.00 104,407.23ARMARIOS PARA LIBROS Und 24.00 300.00 7,200.00ARPILLERA H=3.00m M 2,500.00 3.36 8,400.00ARTEFACTO DE LUZ DE EMERGENCIA CON 02 FAROS DIRIGIBLES CON BATERIA Y RECARGA Pza 29.00 125.50 3,639.50ARTEFACTO PARA ADOSAR TIPO AH-236 MARCA PORTALAMPARAS CON 02 FLUORESCENTES Und 22.00 165.00 3,630.00ARTEFACTO TIPO PBE BRAQUET EMBELLECEDOR PORTALAMPARAS CON 01 FLUORESCENTES Und 104.00 40.50 4,212.00ARTEFACTO TIPO PBE BRAQUET EMBELLECEDOR PORTALAMPARAS CON 02 FLUORESCENTES Und 24.00 65.00 1,560.00ARTEFACTO TIPO PLD-A EMPOTRABLE PORTALAMPARAS CON 02 FLUORESCENTES 36 W/840 Und 236.00 236.00 55,696.00ARTEFACTO TIPO SDL LUCERNA ADOSABLE PORTALAMPARAS CON LAMP. AHORRADORA DE 1 Und 19.00 96.45 1,832.55ASFALTO RC-250 gln 33.52 9.24 309.76ASIENTO DE PLASTICO Und 5.00 8.00 40.00BANCAS Und 30.00 150.00 4,500.00BANCAS DE LABORATORIOS Und 160.00 50.00 8,000.00BARRA DE APOYO Pza 16.20 75.00 1,215.00BASUREROS Und 30.00 30.00 900.00BENTONITA bls 10.00 32.50 325.00BISAGRA CAPUCHINA 4" Und 171.00 6.40 1,094.40BISAGRAS DE FIERRO DE 1 1/2"" PAR 90.09 1.00 90.09BISAGRAS DE GRAVEDAD PAR 83.88 25.00 2,096.89BISAGRAS METALICAS Pza 146.87 6.00 881.25BLOQUE DE CONCRETO MURO 10x20x40 CM 8.8Kg Und 359.04 15.00 5,385.60BLOQUES DE VIDRIO Und 1,964.16 8.00 15,713.28BORNERAS, SWITCHES DE CONTROL CABLES Y ACCESORIOS DE CONEXION GLB 1.00 85.10 85.10BRAQUET METALICO PARA ADOSAR EN PARED COLOR NEGRO INC. ACCES. Und 17.00 75.00 1,275.00BUTACAS Und 150.00 120.00 18,000.00CABLE DE ENERGIA TIPO N2XH3-1 x 150 mm M 107.00 295.60 31,629.20CABLE DE FIBRA OPTICA PARA RED DE DATOS M 374.50 22.85 8,557.33CABLE MELLIZO POLARIZADO DE 2x2.5 mm2 M 80.00 1.88 150.40CABLE NLT EXTRAFLEXIBLE 3x2.5mm2 M 166.00 4.50 747.00CABLE TELEFONICO DE DOS PARES 22 AWG M 710.40 1.20 852.48CABLE TIPO N2XH 2-1x6 mm2 M 99.00 9.10 900.90CABLE TIPO N2XH 3-1x18 mm M 408.10 34.06 13,899.89CABLE TIPO N2XH 3-1x25 mm M 66.00 52.74 3,480.84CABLE TIPO N2XH 3-1x6 mm M 44.00 14.50 638.00CABLE TIPO NH70 DE 2.5 mm2 (ROJO, AZUL Y NEGRO) M 8,512.50 0.92 7,831.50CABLE TIPO NH70 DE 2.5 mm2 (VERDE) M 2,819.00 0.92 2,593.48CABLE TIPO NH70 DE 4 mm2 (VERDE) M 1,834.80 1.70 3,119.16CABLE TIPO NH70 de 4mm2 (ROJO, AZUL O NEGRO) M 3,366.00 1.70 5,722.20CABLE TIPO NH70 DE 6 mm2 (VERDE) M 47.30 3.12 147.58CABLE TIPO NH90 de 10mm2 (ROJO, AZUL O NEGRO) M 391.60 5.76 2,255.62CABLE TIPO NH90 de 16mm2 (ROJO, AZUL O NEGRO) M 33.00 9.17 302.61CABLE TIPO NH90 de 4mm2 (ROJO, AZUL O NEGRO) M 207.90 2.39 496.88CABLE TIPO NH90 de 6mm2 (ROJO, AZUL O NEGRO) M 123.20 3.56 438.59CABLE UTP CATEGORIA 6A M 4,090.00 3.21 13,128.90CAJA CUADRADA DE F°G° DE 100x100x50 mm CON TAPA CIEGA Und 12.00 8.50 102.00CAJA CUADRADA DE F°G° DE 150x150x50 mm CON TAPA CIEGA DE F°G° Und 43.00 10.50 451.50CAJA CUADRADA DE F°G° DE 200x200x100 mm CON TAPA CIEGA DE F°G° Und 5.00 15.80 79.00CAJA CUADRADA DE F°G° DE 400x400x200 mm CON TAPA CIEGA DE F°G° Und 10.00 38.00 380.00CAJA CUADRADA DE F°G° DE 500x500x200 mm CON TAPA CIEGA DE F°G° Und 5.00 52.50 262.50CAJA CUADRADA DE F°G° DE 600x600x250 mm CON TAPA CIEGA DE F°G° Und 3.00 65.00 195.00CAJA DE REGISTRO DE CONCRETO CON TAPA SEÑALIZADA Und 5.00 17.50 87.50CAJA METALICA OCTOGONAL TP Pza 472.85 3.00 1,418.55CAJA METALICA RECTANGULAR PARA ADOSAR SEGUN DETALLE Pza 2.00 45.00 90.00

CAJA METALICA RECTANGULAR TP Pza 586.95 3.00 1,760.85CAJA TIPO TICIBOX INCLUYE ACCESORIOS DE FIJACION Pza 75.60 4.70 355.32CAL bls 44.64 5.00 223.20CANAL DE ALUMINO DE 1/2"x6.0 m Pza 40.07 6.00 240.43CANALETA DE LATON SEGUN DISEÑO M 580.90 13.00 7,551.70CANASTILLA DE BRONCE DE 2" Und 2.00 60.00 120.00CANTONERAS DE ALUMINIO 3" M 287.28 7.00 2,010.96CARPETAS UNIPERSONALES Und 350.00 150.00 52,500.00CARTEL DE OBRA INC.INSTALACION Y TRANSP Und 1.00 450.00 450.00CEMENTO PORTLAND TIPO IP (42.5KG) BOL 26,460.04 24.50 648,270.90CENTRAl DE AlARMAS DIGITAL, 16 ZONAS, CENTRAL Y KEY PAD CON TECLADO AlFANUMERI Und 1.00 672.87 672.87CERAMICO 40 X 40 CM M2 931.30 21.00 19,557.25CERAMICO ANTIDESLIZANTE 40 X 40 CM M2 3,050.74 30.00 91,522.31CERRADURA DE MANIJA DE DOS GOLPES Pza 38.00 52.00 1,976.00CERRADURA EXTERIOR DE DOS GOLPES Und 4.00 70.00 280.00CHAMOTA Und 12.00 10.00 120.00CHAMPA (0.40x0.60m) Und 3,427.50 5.00 17,137.50CHAPAS FORTE PUERTA INT. PEST, MANIJA, LLAVE EXT. SEG. INTER. Pza 8.00 30.00 240.00CINTA AISLANTE 20mm 3M 1700 Rll 100.83 3.78 381.14CINTA P/JUNTA PAPEL 52mmx75m Rll 5.89 15.00 88.34CINTA SEÑALADORA AMARILLA PARA CABLE DE BAJA TENSION M 330.00 0.50 165.00CINTA TEFLON Pza 11.70 3.00 35.11CINTA TEFLON Pza 2.50 3.00 7.49CIZALLA PARA ACERO CONSTRUCCION HASTA 1" Und 74.63 26.00 1,940.32CLAVO DE FIIJACION 1" Kg 58.90 4.50 265.03CLAVOS C/C 3" Kg 82.40 4.50 370.79CLAVOS C/C 3/4" Kg 1,381.22 4.50 6,215.50CLAVOS C/C 4" Kg 125.56 4.50 565.02CLAVOS C/C 5" Kg 25.11 4.50 113.01CLAVOS CON CABEZA PROMEDIO Kg 0.46 4.50 2.08CLAVOS PARA MADERA C/C 3" Kg 346.45 4.50 1,559.01CLAVOS PARA MADERA C/C 4" Kg 34.33 4.50 154.47CODO DE F° G° UNION ROSCADA DE 3" Und 2.00 6.50 13.00CODO DE F° G° UNION ROSCADA DE 4" Und 1.00 16.15 16.15CODO F° G° ISO-I DE 2"x90° Und 18.00 5.00 90.00CODO PVC SAL 3" x 45° Pza 24.00 7.00 168.00CODO PVC SAL 4" x 45° Pza 26.00 4.50 117.00CODO PVC SAP 1/2" Pza 7.00 1.00 7.00CODO PVC SAP 2" * 45° Pza 1.00 14.20 14.20CODO PVC SAP 2" X 90° Pza 8.00 6.70 53.60CODO PVC SAP 3/4" x 90° C-10 CR Pza 297.00 1.00 297.00CODO PVC SAP Ø 1" CR C-10 Pza 6.00 1.20 7.20CODO PVC SAP 1/2" X 90° Und 1.00 1.50 1.50CODO PVC SAP Ø=3" CR C-10 Pza 4.00 25.00 100.00CODOS PVC SAL 6" X 90° Pza 3.00 2.00 6.00COLA SINTETICA gln 40.54 30.00 1,216.25CONDUCTOR DE COBRE DESNUDO BLANDO 10 MM2 M 408.10 4.80 1,958.88CONDUCTOR DE COBRE DESNUDO BLANDO 16 MM2 M 126.00 5.91 744.66CONDUCTOR DE COBRE DESNUDO BLANDO 50 MM2 M 10.00 16.05 160.50CONDUCTOR DE COBRE DESNUDO BLANDO 6 MM2 M 242.00 3.20 774.40CONECTOR ANDERSON Pza 5.00 10.08 50.40CONTACTO ELECTROMAGNETICO 10A, 220 v x 60 Hz Und 14.00 38.00 532.00CONTRAZOCALO DE CERAMICO h=10 cm M 1,480.60 6.00 8,883.60COSTO DE MATERIALES NECESARIOS GLB 1.00 73,223.73 73,223.73CRUZ PVC SAP RED AGUA POTABLE DE 2"x3/4" Und 5.00 5.60 28.00CUBIERTA DE POLICARBONATO DE 16MM M2 163.00 92.45 15,069.35CURVA P/TUBO DE 20 mm TP Pza 2,050.24 1.57 3,218.88CURVA P/TUBO DE 25 mm TP Pza 104.25 2.40 250.20CURVA P/TUBO DE 40 mm TP Pza 181.80 6.47 1,176.25CURVA P/TUBO DE 50 mm TP Pza 18.00 10.90 196.20

Und 13.00 153.20 1,991.60EMBONE P/TUBO DE 20 mm Und 2,042.47 0.74 1,511.43EMBONE P/TUBO DE 25 mm Und 104.26 0.84 87.58EMBONE P/TUBO DE 40 mm Und 181.80 1.20 218.16EMBONE P/TUBO DE 50 mm Und 18.00 1.33 23.94ESCALERA DE GATO DE F°G° 1" M 4.40 45.00 198.00ESCRITORIOS Und 16.00 400.00 6,400.00ESPECIES ARBOREAS Und 70.00 3.00 210.00ESPEJO CON BISEL p2 458.37 4.00 1,833.48ESTACA DE MADERA p2 461.49 2.20 1,015.28ESTACION MANUAL PARA ALARMAS CONTRA INCENDIOS CON PROTECTOR DE VIDRIO Und 4.00 45.30 181.20ESTOBOL DE 1/8"xLONG 1/2", HILO DE 1/32" INC. TUERCA Und 60.00 0.50 30.00FAROLA DE POLICARBONATO TIPO FAE PORTALAMPARAS CON LAMP. HALOGENURO METALICO Und 17.00 210.00 3,570.00Fierro corrugado F'y=4200 Kg/cm² Ø=3/8" Vll 1.00 25.00 25.00Fierro corrugado F'y=4200 Kg/cm² Ø=8mm Vll 16.55 25.00 413.66FLASHER LUMINOSOS 12 VDC Und 4.00 29.50 118.00FLETE TERRESTRE GLB 1.00 175,000.00 175,000.00FORMADOR DE EMPAQUETADURA ADEX Pza 2.23 6.50 14.52FRENO HIDRAULICO Und 57.00 210.00 11,970.00FULMINANTE MARRON CAL 22 Cto 2.94 40.00 117.79GASOLINA 84 OCTANOS gln 312.48 8.60 2,687.37GRASA lb 3.83 4.50 17.24GRAVA CANTO RODADO 10 - 100mm M3 15.27 80.00 1,221.36HOJA DE SIERRA Pza 6.70 8.00 53.60HOJA DE SIERRA Und 158.11 4.30 679.89HORMIGON M3 307.03 80.00 24,562.38HORMIGON (puesto en obra) M3 307.71 80.00 24,617.14IMPERMEABILIZANTE gln 18.39 18.64 342.84INODORO ADVANCE ONE PIECE O SIMILAR Und 5.00 285.00 1,425.00INODORO TQUE. BAJO NORMAL+ACCES, TAPA, BLANCO Und 18.00 225.00 4,050.00INSTALACION PROVICIONAL DE LETRINAS GLB 1.00 700.00 700.00INSTALACION PROVISIONAL DE AGUA GLB 1.00 250.00 250.00INSTALACION PROVISIONAL DE DESAGUE GLB 1.00 200.00 200.00INSTALACION PROVISIONAL DE ENERGIA ELECTRICA GLB 1.00 350.00 350.00INTERRUPTOR DIFERENCIAL DE 2x25Ax220vx30mA Und 37.00 118.04 4,367.48INTERRUPTOR DIFERENCIAL SUPERINMUNIZADO DE 2x25Ax220vx30mA Und 10.00 199.00 1,990.00

DETECTOR DE MOVIMIENTO INFRA ROJO MINI PIR ESTANDAR, 100· X 13.5 M .COLOR BLANCPORTALAMPARAS CON 02 FLUORESCENTES 36 W

INTERRUPTOR DOBLE Pza 47.25 14.50 685.13INTERRUPTOR SIMPLE Pza 22.05 9.95 219.40INTERRUPTOR TERMOMAGNETICO 2x15A-220V Und 36.00 38.07 1,370.52INTERRUPTOR TERMOMAGNETICO 2x20A-220V Und 47.00 38.07 1,789.29INTERRUPTOR TERMOMAGNETICO 2x30A-220V Und 5.00 49.50 247.50INTERRUPTOR TERMOMAGNETICO 3X300A, 220V 25KA Und 2.00 1,875.50 3,751.00INTERRUPTOR TERMOMAGNETICO DE 2x50A-220V Und 2.00 85.00 170.00INTERRUPTOR TERMOMAGNETICO DE 3x20A-220V Und 2.00 80.50 161.00INTERRUPTOR TERMOMAGNETICO DE 3x30A-220V Und 21.00 100.12 2,102.52INTERRUPTOR TERMOMAGNETICO DE 3x40A-220V Und 1.00 139.58 139.58INTERRUPTOR TERMOMAGNETICO DE 3x50A-220V Und 2.00 139.58 279.16INTERRUPTOR TRIPLE Pza 18.00 19.50 351.00JACK RJ45 CATEGORIA 6 PARA MONTAR EN PLACA Und 87.00 20.50 1,783.50JALADOR ALUMINIZADO Und 83.88 3.00 251.63LADRILLO DE PROTECCION Und 2,025.00 0.30 607.50LADRILLO KING KONG HECHO A MANO 10x14x24 cm Und 137,622.16 0.40 55,048.86LADRILLO KK DE ARCILLA DE 9 X 14 X 24 CM Und 342.00 0.50 171.00LAMPARA DE 20 W TIPO DECO GLOBO PHILIPS Und 29.00 20.10 582.90LAVADERO DE ACERO INOXIDABLE CIRCULAR Und 21.00 345.00 7,245.00LAVADERO DE ACERO INOXIDABLE DE 1 POZAS 1400x700x850mm Und 1.00 300.00 300.00LAVADERO DE ACERO INOXIDABLE DE 2 POZAS 1300x700x900mm Und 13.00 365.00 4,745.00LAVATORIO 23"x17" PARA GRIFERIA 4" BLANCO CON ACCESORIOS Und 5.00 180.00 900.00LAVATORIO OVALIN SOBRE MESA DE CONCRETO TIPO CERALUX O SIMILAR INC. ACCESORIOS Und 18.00 285.00 5,130.00LEÑA QQ 7.93 5.00 39.68LIJA Und 6.70 1.20 8.04LIJA DE AGUA #120 Pza 5.89 2.00 11.78LIJA DE FIERRO #60 Pza 292.96 2.00 585.91LIJA PARA MADERA Und 138.21 1.80 248.78MADERA AGUANO p2 1,474.24 4.50 6,634.08MADERA AGUANO 2"*3"*10' Pza 93.40 22.50 2,101.50MADERA CORRIENTE p2 2,500.00 3.00 7,500.00Madera corriente 1" * 8" * 10' Pza 2.00 20.00 40.00Madera corriente 1 1/2" * 8" * 10' Pza 614.88 30.00 18,446.40Madera corriente 2" *3" * 10' Pza 265.28 15.00 3,979.20MADERA CORRIENTE PARA ENCOFRADO p2 57,897.51 3.50 202,641.29MADERA PINO (REGLAS) p2 0.59 4.50 2.66MADERA PINO PARA ANDAMIOS p2 6.16 4.00 24.62MADERA PRENSADA e=18 mm Pln 81.77 46.00 3,761.60MADERA TORINLLO INCL. CORTE PARA ENCOFRADO p2 3,512.76 4.50 15,807.43Madera tornillo p2 293.72 4.50 1,321.75MASILLA Kg 0.05 3.00 0.15MELANINA DE 15mm Pza 31.25 156.00 4,874.69MELANINA DE 18mm Pza 22.98 180.00 4,135.68MESAS Und 50.00 300.00 15,000.00MODULO GALPONES PARA AVES Und 1.00 2,550.00 2,550.00MODULO GALPONES PARA OBSERVACION Und 1.00 4,500.00 4,500.00MODULO GALPONES PARA CAMELIDOS Und 3.00 5,250.00 15,750.00MODULO GALPONES PARA CONEJOS Und 1.00 10,500.00 10,500.00MODULO GALPONES PARA OVINOS Und 1.00 4,500.00 4,500.00MODULO GALPONES PARA PORCINOS Und 1.00 3,750.00 3,750.00MODULO GALPONES PARA POZAS DE LOMBRICULTURA Und 3.00 4,050.00 12,150.00MODULO GALPONES PARA VACUNOS Und 2.00 4,500.00 9,000.00MODULOS DE CÓMPUTO Und 50.00 400.00 20,000.00NIPLE PVC DE 2" x 6" Und 6.00 10.98 65.88OFICINAS EN OBRA GLB 24.00 45.00 1,080.00Palo Rollizo de Eucalipto 4" * 3m Pza 60.32 15.00 904.80PAPELERAS DE LOSA BLANCA INC. EJE Und 6.00 20.00 120.00PARANTE METALICO 89x38x0.45mmx3m Pza 117.79 25.00 2,944.80PASTA P/JUNTA WESTPAC (BALDE) 4.5 Gln. Und 8.83 10.00 88.34PEGAMENTO PARA PVC AGUA FORDUIT gln 5.98 100.00 597.86PEGAMENTO PARA TUBO gln 6.20 105.00 651.49PEGAMENTO PLASTICO P/PVC CCP gln 22.13 100.00 2,213.04Pegamento plástico PVC Oatey gln 0.10 90.00 9.36PERFIL "U" DE ALUMINIO DE 16.07mm x 16.07mm M 368.73 6.00 2,212.36PERGOLA METALICA SEGUN DISEÑO Und 64.00 400.00 25,600.00PERNO DE ANCLAJE PARA INODORO Pza 10.00 2.00 20.00PERNO DE ANCLAJE PARA SUJECION DE INODORO Pza 10.00 1.00 10.00

PICAPORTE DE ALUMINIO DE 3" Pza 43.49 10.00 434.91PIEDRA CHANCADA DE 1/2" M3 1,226.66 80.00 98,132.60PIEDRA CHANCADA DE 3/4" M3 762.91 80.00 61,032.74PIEDRA DE CANTO RODADO M3 100.79 80.00 8,062.80PIEDRA ESMERIL Pza 5.19 2.00 10.38PIEDRA GRANDE DE 8" M3 42.59 80.00 3,406.80PIEDRA MEDIANA M3 298.89 80.00 23,911.36PIEDRA MEDIANA DE 6" M3 42.04 80.00 3,362.86PINTURA AL DUCO gln 18.43 39.00 718.69PINTURA ANTICORROSIVA gln 1.92 35.29 67.76PINTURA ANTICORROSIVA EPOXICA ZINCROMATO gln 115.07 37.82 4,351.80PINTURA ESMALTE gln 99.76 35.29 3,520.45PINTURA ESMALTE ANTICORROSIVA M2 322.65 35.29 11,386.26PINTURA IMPRIMANTE gln 789.62 15.54 12,270.69PINTURA LATEX DE PRIMERA gln 292.43 16.80 4,912.75PIZARRA ACRILICA INC./TIZERO M2 238.31 26.00 6,196.13PLACA DOBLE PARA JACK RJ45 Und 16.00 12.50 200.00PLACA GYPLAC RH 2.44x1.22mx12mm Pln 54.48 35.00 1,906.76PLACA SIMPLE PARA JACK RJ45 Und 55.00 7.50 412.50PLANCHA DE ACERO 2mm x 1.22m x 2.4 Pln 498.66 114.00 56,847.24PLANCHA DE ACERO 3mm x 1.22m x 2.4 Pln 96.23 189.00 18,187.09PLANCHA DE ACERO 1/8" x 1.20m x 2.40m Pln 174.27 180.00 31,368.60PLANCHA DE ACERO LAC e=1/8" M2 133.60 215.00 28,724.00PLANCHA GALVANIZADA DE 3/16" Pza 7.90 35.00 276.64PLANCHA MDF 4.5mm Pza 138.21 70.00 9,674.70PLANCHA METALICA Pln 150.94 250.00 37,734.38PLATINA DE ACERO 1/4"x1 1/2"x6 m Pza 120.70 71.00 8,569.52PLATINA DE ACERO 1/4"x2 1/2"x6 m Pza 241.40 73.00 17,621.84

PLATINA DE ACERO 1/4"x5"x6 m Pza 7.90 35.00 276.64PORCELANA Kg 221.74 6.00 1,330.43REDUCCION PVC SAL P/DESAGUE DE 6" A 4" Und 3.00 15.00 45.00REDUCCION PVC SAP 2"-3/4" C-10 CR Pza 10.00 8.50 85.00REFLECTOR CON LAMPARA HALÓGENA DE 150 W Und 10.00 96.45 964.50REGISTRO DE BRONCE DE 3" Und 32.00 3.50 112.00REGISTRO DE BRONCE DE 4" Und 61.00 4.00 244.00REGLA DE MADERA p2 3.04 2.60 7.89Regla de madera 3/4"*3"*10' Pza 9.31 7.50 69.84RELE TERMICO BIMETALICO P-CONTACTO 7-10A Und 2.00 65.91 131.82RELOJ INTERRUPTOR HORARIO DIGITAL 16Ax220v Und 14.00 114.00 1,596.00RIEL METALICO 90x25x0.45mmx3m Pza 51.53 14.00 721.48RODOPLAST PARA BORDE DE MAYOLICAS M 1,480.60 1.00 1,480.60ROTURA DE BRIQUETA Und 30.00 25.00 750.00SAL INDUSTRIAL (BOLSA DE 50KG) bls 10.00 25.21 252.10SEÑAL INDICANDO PRESENCIA DE EXTINTOR Und 124.00 10.00 1,240.00SEÑAL INDICANDO SALIDA A LA DERECHA Und 124.00 10.00 1,240.00SEÑAL INDICANDO SALIDA A LA IZQUIERDA Und 124.00 10.00 1,240.00SEÑAL INDICANDO SALIDA SIN DIRECCION Und 124.00 10.00 1,240.00SEÑAL INDICANDO ZONA SEGURA EN CASO DE SISMO Und 124.00 10.00 1,240.00SILICONA Und 160.00 10.00 1,600.00SILICONA ESTRUCTURAL Und 56.64 9.00 509.76SILLAS Und 142.00 120.00 17,040.00SIRENA ELECTRONICA DE DOBLE TONO, 30W, 12 VDC COLORBLANCO MARFIL Und 2.00 37.16 74.32SISTEMA PFK GLB 1,978.21 300.00 593,463.00SOCKET DE BAKELITA Y 2 ESTOBOLES Und 29.00 4.50 130.50SOLDADURA CELLOCORD Kg 866.86 8.40 7,281.63SOLDADURA CELLOCORD 1/8" Kg 350.97 7.60 2,667.36SOLDADURA CELLOCORD P 3/16" Kg 143.98 9.50 1,367.79SOLDADURA CELLOCORD PUNTO AZUL 3/16 Kg 10.49 18.50 194.03SOLDADURA OVERCORD 1/8" Kg 42.88 15.70 673.23SOMBRERO DE VENTILACION PVC SAL 2" Pza 128.00 6.00 768.00SUMIDERO DE BRONCE DE 2" Und 57.00 4.00 228.00SUMIDERO DE BRONCE DE 4" Und 1.00 6.00 6.00TABLERO METALICO CON PUERTA Y CHAPA PARA EMPOTRAR DE 12 POLOS Und 4.00 85.00 340.00TABLERO METALICO CON PUERTA Y CHAPA PARA EMPOTRAR DE 18 POLOS Und 1.00 108.00 108.00TABLERO METALICO CON PUERTA Y CHAPA PARA EMPOTRAR DE 30 POLOS Und 13.00 220.00 2,860.00TABLERO METALICO CON PUERTA Y CHAPA PARA EMPOTRAR DE 54 POLOS Pza 1.00 365.00 365.00TAPA CIEGA PARA CAJA OCTOGONAL Pza 149.79 2.77 414.93TAPA CIEGA PARA CAJA RECTANGULAR Pza 76.65 2.50 191.63TAPA METALICA DE 1/8" M2 2.04 122.54 249.98TAPACANTO DE VINIL M 62.80 3.00 188.40TECNOPORT E=1" M2 332.35 4.00 1,329.40TECNOPORT E=15 x 30 x 300mm Und 2,195.55 12.60 27,663.93TEE DE F° G° DE 2" Und 1.00 8.00 8.00TEE DE F° G° DE 2" x 1" Und 1.00 8.96 8.96TEE DE F° G° DE 4" Und 1.00 35.00 35.00TEE PVC SAL 2" X 2" Pza 455.50 3.50 1,594.25TEE PVC SAL 3" X 2" Pza 48.00 3.20 153.60TEE PVC SAP 1"x1 1/2" Und 5.00 3.20 16.00TEE PVC SAP 1"x3/4" Und 1.00 5.20 5.20TEE PVC SAP 2"x1 1/2" Und 1.00 9.50 9.50TEE PVC SAP 2"x1" Und 1.00 8.20 8.20TEE PVC SAP ROSCADO 1/2" Pza 91.00 0.80 72.80TEE PVC SAP ROSCADO 3/4" Pza 91.00 1.00 91.00TEJA DE ARCILLA TIPO COLONIAL DE 37 CM Pza 787.46 22.20 17,481.50TERMINAL DE COBRE PARA CONDUCTOR DE 16mm2 Und 5.00 3.10 15.50TERRAZO EN MESAS M2 194.98 50.00 9,749.16THINER gln 11.71 14.40 168.61TIERRA COMUN CERNIDA M3 5.00 54.62 273.10TIERRA SARANDEADA M3 72.50 3.00 217.50TIRADORES DE NYLON Pza 23.55 3.00 70.65TIRAFON Und 98.80 0.08 7.90TIRAFON DE 3" Und 687.96 3.00 2,063.88TIRAFONES PARA TEJAS DE 1/2" X 5" Pza 2,362.37 2.59 6,118.53TOMACORRIENTE BIPOLAR E INTERRUPTOR SIMPLE Und 15.75 9.70 152.78TOMACORRIENTE DOBLE CON PUESTA A TIERRA 250 V, PESADO CON HORQUILLA UNIVERSAL Pza 329.55 8.76 2,886.86TORNILLO GYPLAC/SUPERBOARD P.FINA 6x25mm Mll 2.94 35.00 103.07TORNILLO WAFER P.FINA 8x13mm Mll 1.47 45.00 66.26TORNILLOS DE 2" Und 1,345.11 0.25 336.28TORNILLOS DE FIJACION DE 1 1/2" Pza 197.60 0.16 31.62TRAMPA "P" PVC SAL PARA DESAGUE DE 4" Pza 1.00 2.50 2.50TRANSPORTE DE EQUIPO Y MAQUINARIAS GLB 1.00 1,000.00 1,000.00TUB. PVC SAP CR P/AGUA C-10 1" M 3.68 4.00 14.70TUB. PVC SAP PRESION P/AGUA C-10 Ø=3" M 65.52 14.28 935.63TUBERIA CºSºNº 10 " M 21.00 5.00 105.00TUBERIA F°G° 2" M 13.86 11.20 155.23TUBERIA F°G° 3" M 2.00 15.12 30.24TUBERIA F°G° DE 4" M 3.94 20.00 78.75TUBERIA PVC SAL 2" M 511.68 5.00 2,558.42TUBERIA PVC SAL 3" M 563.45 5.50 3,098.95TUBERIA PVC SAL 4" M 447.43 4.00 1,789.70TUBERIA PVC SAL 6" M 252.47 3.00 757.41TUBERIA PVC SAP C-10 Ø 2" M 185.36 2.50 463.40TUBERIA PVC TP P/INST. ELECTRICAS DE 20 mm x 3 m Pza 2,115.46 5.54 11,719.63TUBERIA PVC TP P/INST. ELECTRICAS DE 25 mm x 3 m Pza 161.41 6.74 1,087.88TUBERIA PVC TP P/INST. ELECTRICAS DE 40 mm x 3 m Pza 273.56 12.94 3,539.84TUBERIA PVC TP P/INST. ELECTRICAS DE 50 mm x 3 m Pza 178.95 18.30 3,274.78TUBO ABASTO COBRE FLEXIBLE TERM/M-H 1/2"x5/8"x30cm Und 5.00 6.00 30.00TUBO CORRUGADO METALICO DE 15 mm M 30.00 22.50 675.00TUBO DE ACERO 1"x6.0 m Pza 8.13 26.00 211.33TUBO DE ACERO LAC 1 1/2" e=1/8" M2 148.14 13.60 2,014.75TUBO DE ACERO LAC 1" e=1/8" M2 45.89 8.60 394.61TUBO DE ACERO LAC 2"x2" e=2.5mm M 622.40 16.00 9,958.40TUBO DE ACERO LAC 2"x4" e=2.5mm M 566.60 22.00 12,465.20TUBO DE ALUMINIO DE 1 1/2" x 1 1/2" x0.8" Pza 217.46 38.00 8,263.29

TUBO DE FIERRO NEGRO DE 2"x2 mm Und 136.79 78.00 10,669.67TUBO DE FIERRO NEGRO DE 5/8"x6 m Und 539.12 16.00 8,625.84TUBO DE VENTILACION DE F°.G° Ø 2" Und 2.00 80.00 160.00TUBO PVC SAL 4" Pza 494.40 4.00 1,977.60TUBO PVC SAL 6" M 20.60 28.00 576.80TUBO PVC SAP Ø 1/2" CR C-10 M 201.67 2.50 504.18TUBO PVC SAP Ø 3/4" CR C-10 M 112.18 3.00 336.55TUBO PVC SAP 1 1/2" CR C-10 M 47.65 4.00 190.60TUBO RECTANGULAR DE 1 1/2"x2" e=3.0mm Pza 6.44 79.00 508.54TUBO RECTANGULAR DE 1"x2" e=2.0mm Pza 21.21 42.00 890.90TUBO RECTANGULAR DE 2"x4" e=2.5mm Pza 40.71 120.00 4,885.20UNION PVC SAP DE 1 1/2" Pza 11.35 1.20 13.61UNION PVC SAP Ø=2" CR C-10 Pza 28.53 2.00 57.07UNION PVC SAP Ø=3" CR C-10 Pza 15.60 21.00 327.60UNION UNIVERSAL F°G° DE 1 1/2" Und 2.00 7.00 14.00UNION UNIVERSAL F°G° DE 1" Und 2.00 8.00 16.00UNION UNIVERSAL F°G° DE 1/2" Und 20.00 7.00 140.00UNION UNIVERSAL F°G° DE 2" Und 14.00 9.00 126.00UNION UNIVERSAL F°G° DE 3/4" Und 24.00 8.00 192.00UNION UNIVERSAL F°G° DE 4" Und 2.00 33.05 66.10UPR DE F°G° DE 3" Pza 2.00 6.54 13.08URINARIO PICO BLANCO Und 6.00 259.00 1,554.00VALVULA CHECK DE BRONCE DE 2" Und 2.00 55.00 110.00VALVULA COMPUERTA DE BRONCE DE 1" Und 1.00 35.00 35.00VALVULA COMPUERTA DE BRONCE DE 1/2" Und 101.00 15.00 1,515.00VALVULA COMPUERTA DE BRONCE DE 2" Und 5.00 40.00 200.00VALVULA COMPUERTA DE BRONCE DE 3" Und 1.00 45.00 45.00VALVULA COMPUERTA DE BRONCE DE 3/4" Und 12.00 35.00 420.00VALVULA COMPUERTA DE BRONCE DE 4" Und 1.00 50.00 50.00VALVULA FLOTADORA DE 2" Und 1.00 50.00 50.00VÁLVULA REGULADORA DE PRESION Ø=2" Und 2.00 50.00 100.00VARILLA DE COBRE COPERWELD 3/4" X 2.40M Pza 5.00 189.07 945.35VIDRIO TEMPLADO GRIS DE E=10 MM. M2 241.69 180.00 43,504.02VIDRIO TEMPLADO GRIS DE E=6 MM. M2 125.76 120.00 15,090.70YEE PVC SAL 4" Und 24.00 6.00 144.00YEE PVC SAL 4"x4" Und 1.00 6.00 6.00YEE PVC SP RAMAL CON REDUCCION DE 4"x3" Pza 24.00 4.50 108.00YESO DE 28 Kg BOL 691.08 6.00 4,146.46

TOTAL 4,420,499.05

03 HERRAMIENTAS MANUALES S/. 28,856.31DESCRIPCIÓN UND. P.U. CANTIDAD SUB TOTAL

HERRAMIENTAS MANUALES %MO 28,856.31

TOTAL 28,856.31

.6.2 3.2 6 SERVICIOS S/. 2,307,478.31

01 SERVICIOS S/. 18,820.72DESCRIPCIÓN UND. P.U. CANTIDAD SUB TOTAL

SOLDADORA ELECTRICA DE 225 AMPERIOS Hm 1,698.11 9.00 15,282.99WINCHE DE DOS BALDES DE 350KG MOTOR ELECTRICO 3.6 HP Hm 172.81 16.00 2,764.96WINCHE ELECTRICO 3.6 HP DE DOS BALDES Hm 85.86 9.00 772.77

TOTAL 18,820.72

02 ALQUILERES S/. 2,288,657.59DESCRIPCIÓN UND. PU CANTIDAD SUB TOTAL

ANDAMIO METALICO Hm 738.47 12.00 8,861.69AVES Und 100.00 50.00 5,000.00BOVINOS Und 20.00 2,500.00 50,000.00CAMELIDOS SUDAMERICANOS Und 30.00 2,000.00 60,000.00CAMION VOLQUETE 4x2 140-210 HP 6 m3 Hm 7.36 67.22 494.65CAMION VOLQUETE DE 6x4330HP 10 m3 Hm 271.20 100.84 27,347.74CARGADOR RETROEXCAVADOR 62 HP Yd3 Hm 119.03 151.00 17,972.82CARGADOR S/LLANTAS 100 - 115 HP 2-2.25 Yd3 Hm 19.35 113.45 2,194.71CARGADOR S/LLANTAS 125 HP 2.5 YD3. Hm 1.84 100.84 185.16CENTRO DE COMPUTO GLB 1.00 154,000.00 154,000.00CIZALLA PARA CORTE DE FIERRO Hm 662.10 2.00 1,324.20COMPACTADOR VIBR. TIPO PLANCHA 4 HP Hm 1,611.08 9.00 14,499.73CUYES Und 100.00 50.00 5,000.00EQUINOS Und 5.00 2,500.00 12,500.00EQUIPO PARA ADMINISTRACIÓN GLB 1.00 49,000.00 49,000.00EQUIPO PARA AULAS Y LABORATORIOS GLB 1.00 96,000.00 96,000.00ESCALERA Hm 644.00 1.50 966.00LABORATORIO CLINICO VETERINARIO GLB 1.00 185,000.00 185,000.00LABORATORIO DE ANATOMIA Y FISIOLOGÍA ANIMAL GLB 1.00 220,700.00 220,700.00LABORATORIO DE BIOQUIMICA, NUTRICIÓN Y ALIMENTACIÓN ANIMAL GLB 1.00 206,700.00 206,700.00LABORATORIO DE FARMACOLOGIA Y TOXICOLOGIA VETERINARIA GLB 1.00 244,100.00 244,100.00LABORATORIO DE HISTOPATOLOGIA, EMBRIOLOGIA Y PATOLOGIA VETERINARIA GLB 1.00 280,300.00 280,300.00LABORATORIO DE MICROBIOLOGIA, INMUNOLOGIA Y LABORATORIO CLINICO GLB 1.00 121,900.00 121,900.00LABORATORIO DE PARASITOLOGIA VETERINARIA I Y II GLB 1.00 171,400.00 202,067.96LABORATORIO DE REPRODUCCION ANIMAL Y FIBRAS TEXTILES GLB 1.00 171,640.00 171,640.00MATERIAL BIBLIOGRAFICO GLB 1.00 37,500.00 37,500.00MEZCLADORA CONCRETO TAMBOR 11 P3-18 HP Hm 55.86 18.00 1,005.48MEZCLADORA CONCRETO TAMBOR 18HP 11P3 Hm 450.44 8.00 3,603.55MEZCLADORA CONCRETO TROMPO 8 HP 9 P3 Hm 99.92 8.80 879.30MEZCLADORA DE CONCRETO DE 9 -11P3 Hm 87.18 8.80 767.21MOTONIVELADORA DE 125 HP Hm 147.02 125.00 18,377.00MOTOSOLDADORA DE 250 A Hm 70.80 9.00 637.20NIVEL TOPOGRAFICO Hm 152.57 6.00 915.40OVINOS Und 30.00 1,250.00 37,500.00PORCINOS Und 20.00 1,250.00 25,000.00SOLDADORA Hm 0.53 7.56 4.03

TEODOLITO Hm 10.08 8.00 80.65TRACTOR DE ORUGAS DE 190-240 HP Hm 147.02 145.00 21,317.32VIBRADOR DE 3/4" - 2" CONCRETO Hm 142.51 6.00 855.05VIBRADOR DE 4 HP CAB.=2.40" Hm 235.05 6.00 1,410.27VIBRADOR DE CONCRETO 4 HP 2.40" Hm 175.08 6.00 1,050.48

TOTAL 2,288,657.59

.6.2 3.2 7 OTROS S/. 0.00

01 OTROS S/. 0.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

0.00TOTAL 0.00

S/. 7,795,370.45

FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1PRESUPUESTO ANALÍTICO - GASTOS GENERALES

FTE.FTO 0

UNIDAD GEST. 0

PROYECTO FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1

COMPONENTE 0

SUB COMPONENTE : 1.4 SERVICIO PARA TURISTAS EN EL CAMINO INCA

OBRA FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1

CÓDIGO ESPECIFICA DE GASTOS GASTOS GENERALES

2.6.2.3.7.3 REMUNERACIONES 764,400.00

2.6.2.3.7.4 BIENES 36,170.70

2.6.2.3.7.5 SERVICIOS 16,907.85

2.6.2.3.7.6 OTROS 17,500.00

TOTAL GASTOS GENERALES S/. 834,978.55

DESAGREGADO DEL PRESUPUESTO ANALÍTICO G G

GASTOS GENERALES

2.6.2 3.7.3 REMUNERACIONES S/. 764,400.00

01 RETRIBUCIONES COMPLEMENTARIAS-CONTRATOS A PLAZO FIJO S/. 510,542.76DEL EMPLEADO EVENTUAL

CARGO N° DE PERSONAS MESES COSTO SUB TOTAL TOTALPERSONAL DE OBRA

AREA DE PRODUCCIONRESIDENTE ESPECIALISTAS DE OBRA 8.00 12.00 6,000.00 576,000.00 384,710.40AREA ADMINISTRATIVA 0.00ALMACENERO * 1.00 12.00 1,800.00 21,600.00 14,426.64GUARDIAN 1.00 12.00 1,500.00 18,000.00 12,022.20AREA DE ASISTENCIA TECNICAASSITENTE TECNICO 4.00 12.00 2,500.00 120,000.00 80,148.00AREA TECNICAMAESTRO DE OBRA 1.00 12.00 2,400.00 28,800.00 19,235.52

510,542.76

02 OBLIGACIONES DEL EMPLEADOR S/. 80,109.12DEL EMPLEADO EVENTUAL

CARGO N° DE PERSONAS MESES COSTO SUB TOTAL TOTALAREA DE PRODUCCIONRESIDENTE ESPECIALISTAS DE OBRA 8.00 12.00 6,000.00 576,000.00 60,364.80AREA ADMINISTRATIVA 0.00 0.00 0.00 0.00 0.00ALMACENERO * 1.00 12.00 1,800.00 21,600.00 2,263.68GUARDIAN 1.00 12.00 1,500.00 18,000.00 1,886.40AREA DE ASISTENCIA TECNICA 0.00 0.00 0.00 0.00 0.00ASSITENTE TECNICO 4.00 12.00 2,500.00 120,000.00 12,576.00AREA TECNICA 0.00 0.00 0.00 0.00 0.00MAESTRO DE OBRA 1.00 12.00 2,400.00 28,800.00 3,018.24

TOTAL 80,109.12

03 GASTOS VARIABLES Y OCASIONALES S/. 78,045.24DEL EMPLEADO EVENTUAL

CARGO N° DE PERSONAS MESES COSTO SUB TOTAL TOTALAREA DE PRODUCCIONRESIDENTE ESPECIALISTAS DE OBRA 8.00 12.00 6,000.00 576,000.00 58,809.60AREA ADMINISTRATIVA 0.00 0.00 0.00 0.00 0.00ALMACENERO * 1.00 12.00 1,800.00 21,600.00 2,205.36GUARDIAN 1.00 12.00 1,500.00 18,000.00 1,837.80AREA DE ASISTENCIA TECNICA 0.00 0.00 0.00 0.00 0.00ASSITENTE TECNICO 4.00 12.00 2,500.00 120,000.00 12,252.00AREA TECNICA 0.00 0.00 0.00 0.00 0.00MAESTRO DE OBRA 1.00 12.00 2,400.00 28,800.00 2,940.48

TOTAL 78,045.24

04 ESCOLARIDAD, AGUINALDOS Y GRATIFICACIONES S/. 95,702.88DEL EMPLEADO EVENTUAL

CARGO N° DE PERSONAS MESES COSTO SUB TOTAL TOTALAREA DE PRODUCCIONRESIDENTE ESPECIALISTAS DE OBRA 8.00 12.00 6,000.00 576,000.00 72,115.20AREA ADMINISTRATIVA 0.00 0.00 0.00 0.00 0.00ALMACENERO * 1.00 12.00 1,800.00 21,600.00 2,704.32GUARDIAN 1.00 12.00 1,500.00 18,000.00 2,253.60AREA DE ASISTENCIA TECNICA 0.00 0.00 0.00 0.00 0.00

ASSITENTE TECNICO 4.00 12.00 2,500.00 120,000.00 15,024.00

AREA TECNICA 0.00 0.00 0.00 0.00 0.00MAESTRO DE OBRA 1.00 12.00 2,400.00 28,800.00 3,605.76

TOTAL 95,702.88

2.6.2 3.7.4 BIENES S/. 36,170.70

01 COMBUSTIBLES , CARBURANTES Y LUBRICANTES S/. 5,115.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

PETROLEO (CAMIONETA DE OBRA/INC.TRANS.) GLN 250 13.50 3,375.00GASOLINA GLN 120 14.50 1,740.00

TOTAL 5,115.00

02 MATERIALES DE LIMPIEZA S/. 200.00

DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTALMATERIALES DE LIMPIEZA EST. 1.00 200.00 200.00

TOTAL 200.00

03 IMPLEMENTOS DE SEGURIDAD S/. 3,600.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

CASCOS DE PROTECCION UND 40.00 40.00 1,600.00CORREAS DE SEGURIDAD UND 2.00 100.00 200.00GUANTES DE CUERO MANGA CORTA REFORZADO PAR 80.00 20.00 1,600.00PROTECTOR DE OJOS UND 10.00 10.00 100.00FILTRO PARA PROTECTOR BUCAL UND 10.00 10.00 100.00

TOTAL 3,600.00

04 VESTUARIO S/. 7,416.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

CHALECOS SEGÚN MODELO C/LOGOTIPO UND 6.00 40.00 240.00CHALECOS RETROREFLECTIVOS DE OBRA UND 68.00 20.00 1,360.00BOTAS DE JEBE PAR 68.00 32.00 2,176.00BOTAS DE CUERO PAR 4.00 60.00 240.00PONCHOS PARA LLUVIA UND 40.00 20.00 800.00BOTAS DE CUERO REFORZADO CATERPILLAR PAR 2.00 350.00 700.00MASCARILLAS CONTRA EL POLVO DE UN FILTRO UND 60.00 20.00 1,200.00CASACA UND 2.00 250.00 500.00PANTALON UND 2.00 100.00 200.00

TOTAL 7,416.00

05 MEDICAMENTOS S/. 808.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

AGUA OXIGENADA FRASCO 6.00 1.50 9.00ALCOHOL LTS 4.00 6.00 24.00ALGODÓN X 25 GR PQTE 6.00 2.00 12.00PANADOL UND 80.00 0.50 40.00PARACETAMOL UND 80.00 0.60 48.00AMPICILINA UND 20.00 0.50 10.00BACTRIN FORTE UND 20.00 1.50 30.00BUSCAPINA COMPUESTA UND 50.00 1.30 65.00ASPIRINA UND 80.00 0.20 16.00DOLOCORDRALAN UND 80.00 0.70 56.00DICLOFENACO CHISGUETE 10.00 6.00 60.00VITAPIRENA COMPUESTA CAP. 20.00 1.50 30.00ESPARADRAPO 2.5" X .5 CM ROLLO 10.00 5.30 53.00GASA ESTERILIZADA UND 20.00 4.80 96.00DONAFAN UND 30.00 1.00 30.00MERTHIOLATE LTS 1.00 37.00 37.00GOTAS OFTALMICA CHISGUETE 4.00 8.00 32.00ICE HOT UNGÜENTO CHISGUETE 4.00 12.00 48.00VENDAS ELÁSTICAS DE 6" X 5 YD UND 12.00 3.00 36.00YODO LTS 2.00 16.00 32.00BISMUCAR FRASCO 2.00 22.00 44.00

TOTAL 808.00

06 MATERIALES DE ESCRITORIO S/. 3,461.70DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

TINTA PARA IMPRESORA UND 1.00 80.00 80.00PAPEL PARA PLOTER RLLO 2.00 150.00 300.00TINTA PARA PLOTER JGO 2.00 350.00 700.00PAPEL BOND 80 GR A-4 MLL 6.00 26.00 156.00CUADERNO DE 200 HJAS ANILLADO ARCOIRIS PEQUEÑO UND 4.00 6.00 24.00CUADERNO 50 HJAS UND 6.00 0.70 4.20CUADERNO DE OBRA UND 2.00 70.00 140.00LAPIZ TECNICO 2B DOC 4.00 16.00 64.00LIBRETA TOPOGRÁFICA FIELD BOOK UND 4.00 3.50 14.00CD CONO 0.50 70.00 35.00DVD CONO 0.50 150.00 75.00FILES COLOR AMARILLO CTO 1.00 48.00 48.00ARCHIVADOR DE LOMO ANCHO PARA FORMATO A-4 UND 4.00 9.00 36.00SELLO DE OBRA UND 4.00 28.00 112.00PORTAMINAS PUNTA METALICA UND 4.00 5.00 20.00FORMATO NOTA SALIDA Y ENTRADA DE ALMACEN BLOCK 2.00 10.00 20.00GUIAS DE REMISION BLOCK 1.00 10.00 10.00MINAS DE LÁPIZ 0.5 CAJA 2.00 8.00 16.00POST IT DE DIFERENTES COLORES PQTE 2.00 20.00 40.00LAPICEROS FABER CASTELL CJA 1.00 30.00 30.00LAPICEROS PILOT (AZUL, NEGRO, ROJO) CJA 1.00 40.00 40.00LAPICEROS TINTA LIQUIDA CJA 1.00 40.00 40.00

CUTER UND 6.00 8.00 48.00BORRADOR DE LÁPIZ FABER CASTELL CAJA 1.00 25.00 25.00

CARTULINA CANSON PLGO 8.00 4.50 36.00CINTA MASKINTAPE 1" RLLO 8.00 3.50 28.00CINTA DE EMBALAJE RLLO 8.00 3.50 28.00CLIPS PEQUEÑOS CJA 2.00 1.00 2.00CHINCHES CJA 2.00 1.25 2.50ESCALIMETRO UND 2.00 25.00 50.00GRAPAS CJA 2.00 5.00 10.00RESALTADORES UND 4.00 2.00 8.00CORRECTORES UND 4.00 9.00 36.00MICAS CIENTO 1.00 30.00 30.00ANILLOS CIENTO 1.00 80.00 80.00PLUMONES DELGADOS ESTUCHE 2.00 2.00 4.00PLUMON PARA PIZARRA ACRILICA UND. 4.00 2.00 8.00PLUMON INDELEBLE PUNTA FINA UND. 4.00 4.00 16.00REGLAS DE PLASTICO UND 4.00 1.00 4.00BADILEJOS UND 4.00 5.00 20.00RECOGEDORES DE MANO UND 2.00 4.00 8.00NIVELES AEREOS UND 2.00 15.00 30.00CORDEL OVILLO 2.00 10.00 20.00PAPEL MILIMETRADO BLOCK 2.00 12.00 24.00BOLSA DE TELA TOCUYO UND 20.00 4.00 80.00PAPEL FOTOGRAFICO UND 40.00 0.50 20.00PEGAMENTO UHU UND 4.00 5.00 20.00TONER PARA IMPRESORA UND 2.00 280.00 560.00ENGRAPADOR UND 2.00 80.00 160.00PERFORADOR UNID 2.00 25.00 50.00PIZARRA ACRILICA UNID 2.00 25.00 50.00

TOTAL 3,461.70

07 ENSERES S/. 6,080.00DESCRIPCION CANT CANT MONTO SUB TOTAL

COLCHON DE RESORTES 1 1/2 PLAZA PZA 2.00 350.00 700.00COLCHON DE ESPONJA 1 PLAZA DE 9 " Promedio OPERARIOS/ PZA 12.00 90.00 1,080.00FRAZADA DE 1 1/2 PLAZA (ALPACA O SIMILAR) Promedio OPERARIOS/ UND 12.00 50.00 600.00TARIMA 1 1/2 PLAZA Inc personal tecnico UND 14.00 150.00 2,100.00ESCRITORIOS DE MELAMINA CON SILLAS (DE OBRA) UND 4.00 400.00 1,600.00

TOTAL 6,080.00

08 REPUESTOS S/. 800.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

REPUESTOS PARA CAMIONETA EST 1.00 800.00 800.00TOTAL 800.00

09 EQUIPO Y MATERIAL DURADERO S/. 8,400.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

CAMARA FOTOGRAFICA DIGITAL UND 1.00 600.00 600.00COMPUTADORA PERSONAL PORTATIL UND 2.00 3,500.00 7,000.00IMPRESORA LASER MULTIFUNCIONAL UND 1.00 800.00 800.00

TOTAL 8,400.00

10 OTROS S/. 290.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

WINCHA DE 50 MT. UND. 2.00 60.00 120.00WINCHA DE 5 MT. UND. 4.00 10.00 40.00LINTERNAS RECARGABLE UND. 2.00 25.00 50.00CANDADOS UND. 4.00 20.00 80.00

TOTAL 290.00

11 VARIOS S/. 0.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

TOTAL 0.00

2.6.2 3.7.5 SERVICIOS S/. 16,907.85

01 RACIONAMIENTO S/. 0.00CARGO PERSONAS DÍAS x MES MESES S/. X DIA SUB TOTAL

PERSONAL PROFESIONAL - TECNICO 0.00

TOTAL 0.00

02 GASTOS NOTARIALES Y OTROS S/. 1,650.00

DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

LEGALIZACION DE CUADERNO DE OBRA UND 3.00 50.00 150.00GASTOS NOTARIALES DE PROCESOS ADMINISTRATIVOS EST 3.00 500.00 1,500.00

TOTAL 1,650.00

03 SERVICIOS S/. 8,360.00DESCRIPCION CANT W MONTO SUB TOTAL

IMPLEMENTACIÓN DEL PLAN DE MANEJO AMBIENTAL 4.00 600.00 2,400.00PRUEBAS DE CALIDAD DE CONCRETO ROTURA 84.00 40.00 3,360.00PRUEBA DE CALIDAD EN AGREGADOS 2.00 250.00 500.00PRUEBA DISEÑO DE MEZCLAS 3.00 300.00 900.00PRUEBA DETERMINACION HUMEDAD DE LA MADERA 5.00 150.00 750.00PRUEBA CON OHMNIMETRO EN POZO A TIERRA 3.00 150.00 450.00

0.00

0.000.00 0.00 0.00 0.00

TOTAL 8,360.00

04 RACIONAMIENTO TALLERES DE CAPACITACION S/. 0.00DESCRIPCION UND CANTIDAD P.U SUB TOTAL

0.00TOTAL 0.00

05 INSUMOS PARA TALLERES DE CAPACITACION S/. 440.00DESCRIPCION TALLERES UND CANTIDAD P.U SUB TOTAL

PAPEL CUADRICULADO 08 OFICIOS 2.00 Und 5.00 1.50 15.00PAPEL CRAFF 2.00 Und 1.00 1.50 3.00PAPEL BOND 08 OFICIOS 2.00 Und 5.00 1.50 15.00CUADERNOS 2.00 Und 50.00 0.80 80.00FORLDER 2.00 Und 50.00 0.30 30.00PAPEL BOND A4 2.00 Cto 2.00 3.00 12.00LAPICEROS 2.00 Und 50.00 0.50 50.00CINTA MASKING 2.00 Und 1.00 5.00 10.00PLUMONES GRUESOS P/PAPEL 2.00 Und 7.00 2.50 35.00PILAS AA 2.00 Und 2.00 5.00 20.00FOTOCOPIAS 2.00 Und 50.00 0.10 10.00REFRIGERIOS 2.00 Und 50.00 1.00 100.00CARTULINA COLORES 2.00 plg 15.00 2.00 60.00

0.00TOTAL 440.00

06 IMPREVISTOS S/. 6,457.85DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

IMPREVISTOS / FONDOS PARA PAGOS EN EFECTIVO EST 1.00 6,457.85 6,457.85TOTAL 6,457.85

2.6.2 3.2 7 S/. 17,500.00

01 OTROS S/. 17,500.00DESCRIPCIÓN UND. MES P.U. SUB TOTAL

ALQUILER DE CAMIONETA EST 5.00 3,500.00 17,500.00TOTAL 17,500.00

TOTAL GASTOS GENERALES S/. 834,978.55

FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1PRESUPUESTO ANALÍTICO - GASTOS DE SUPERVISION

FTE.FTO 0

UNIDAD GEST. 0

PROYECTO FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1

COMPONENTE 0

SUB COMPONENTE 0

OBRA FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1

CÓDIGO ESPECIFICA DE GASTOS GASTOS DE SUPERVISION

2.6.2.3.7.3 REMUNERACIONES 288,000.00

2.6.2.3.7.4 BIENES 9,875.00

2.6.2.3.7.5 SERVICIOS 513.00

2.6.2.3.7.6 OTROS 42,000.00

TOTAL GASTOS DE SUPERVISION S/. 340,388.00

DESAGREGADO DEL PRESUPUESTO ANALÍTICO

GASTOS DE SUPERVISION

2.6.2 3.7.3 REMUNERACIONES S/. 288,000.00

01 RETRIBUCIONES COMPLEMENTARIAS-CONTRATOS A PLAZO FIJO S/. 192,355.20DEL EMPLEADO EVENTUAL

CARGO N° DE PERSONAS MESES COSTO SUB TOTAL TOTALAREA DE SUPERVISIONSUPERVISOR 4.00 12.00 6,000.00 288,000.00 192,355.20

192,355.20

02 OBLIGACIONES DEL EMPLEADOR S/. 30,182.40DEL EMPLEADO EVENTUAL

CARGO N° DE PERSONAS MESES COSTO SUB TOTAL TOTALAREA DE SUPERVISIONSUPERVISOR 4.0000 12.00 6,000.00 288,000.00 30,182.40

TOTAL 30,182.40

03 GASTOS VARIABLES Y OCASIONALES S/. 29,404.80DEL EMPLEADO EVENTUAL

CARGO N° DE PERSONAS MESES COSTO SUB TOTAL TOTALAREA DE SUPERVISIONSUPERVISOR 4.0000 12.00 6,000.00 288,000.00 29,404.80

TOTAL 29,404.80

04 ESCOLARIDAD, AGUINALDOS Y GRATIFICACIONES S/. 36,057.60DEL EMPLEADO EVENTUAL

CARGO N° DE PERSONAS MESES COSTO SUB TOTAL TOTALAREA DE SUPERVISIONSUPERVISOR 4.00 12.00 6,000.00 288,000.00 36,057.60

TOTAL 36,057.60

2.6.2 3.7.4 BIENES S/. 9,875.00

01 COMBUSTIBLES , CARBURANTES Y LUBRICANTES S/. 2,025.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

COMBUSTIBLE GLN 150.00 13.50 2,025.00

TOTAL 2,025.00

02 MATERIALES DE LIMPIEZA S/. 400.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

MATERIALES DE LIMPIEZA EST 1.00 400.00 400.00TOTAL 400.00

03 IMPLEMENTOS DE SEGURIDAD S/. 40.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

CASCOS DE PROTECCION UND 1.00 40.00 40.00TOTAL 40.00

04 VESTUARIO S/. 770.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

CHALECOS SEGÚN MODELO C/LOGOTIPO UND 1.00 40.00 40.00PONCHOS PARA LLUVIA UND 1.00 30.00 30.00BOTAS DE CUERO REFORZADO CATERPILLAR PAR 1.00 350.00 350.00CASACA UND 1.00 250.00 250.00PANTALON JEAN O SIMILAR UND 1.00 100.00 100.00

TOTAL 770.00

05 MEDICAMENTOS S/. 0.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

TOTAL 0.00

06 MATERIALES DE ESCRITORIO S/. 1,140.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

PAPEL BOND 80 GR A-4 MLL 2.00 26.00 52.00PAPEL PARA PLOTTER RLLO 1.00 150.00 150.00TINTA PARA PLOTER JGO 1.00 350.00 350.00CUADERNO DE 200 HJAS ANILLADO ARCOIRIS PEQUEÑO UND 2.00 6.00 12.00LIBRETA TOPOGRÁFICA FIELD BOOK UND 2.00 3.50 7.00CD UND 12.00 1.00 12.00DVD UND 12.00 2.00 24.00ARCHIVADOR DE LOMO ANCHO PARA FORMATO A-4 UND 2.00 9.00 18.00SELLO DE OBRA UND 1.00 28.00 28.00PORTAMINAS PUNTA METALICA UND 2.00 12.00 24.00MINAS DE LÁPIZ 0.5 CAJA 1.00 8.00 8.00POST IT DE DIFERENTES COLORES PQTE 2.00 20.00 40.00LAPICEROS PILOT (AZUL, NEGRO, ROJO) CJA 1.00 35.00 35.00CUTER UND 2.00 5.00 10.00CINTA MASKINTAPE 1" RLLO 2.00 3.50 7.00CINTA DE EMBALAJE RLLO 2.00 3.50 7.00CLIPS PEQUEÑOS CJA 2.00 1.00 2.00CORRECTORES UND 2.00 9.00 18.00MICAS CIENTO 0.50 30.00 15.00ANILLOS CIENTO 0.50 80.00 40.00PLUMONES DELGADOS ESTUCHE 0.50 2.00 1.00TONER PARA IMPRESORA UND 1.00 280.00 280.00

TOTAL 1,140.00

07 ENSERES S/. 600.00DESCRIPCION CANT CANT MONTO SUB TOTAL

COLCHON DE RESORTES 1 1/2 PLAZA PZA 1.00 350.00 350.00FRAZADA DE 1 1/2 PLAZA (ALPACA O SIMILAR) UND 2.00 50.00 100.00TARIMA 1 1/2 PLAZA UND 1.00 150.00 150.00

TOTAL 600.00

08 REPUESTOS S/. 0.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

TOTAL 0.00

09 EQUIPO Y MATERIAL DURADERO S/. 4,100.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

CAMARA FOTOGRAFICA DIGITAL UND 1.00 600.00 600.00COMPUTADORA PERSONAL PORTATIL UND 1.00 3,500.00 3,500.00

TOTAL 4,100.00

11 IMPREVISTOS S/. 800.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

IMPREVISTOS EST 1.00 800.00 800.00TOTAL 800.00

2.6.2 3.7.5 SERVICIOS S/. 513.00

01 RACIONAMIENTO S/. 513.00CARGO PERSONAS DÍAS x MES MES S/. X DIA SUB TOTAL

PERSONAL PROFESIONAL - TECNICO 1.00 1.50 3.00 114.00 513.00

TOTAL 513.00

2.6.2 3.2 7 OTROS S/. 42,000.00

01 OTROS S/. 42,000.00DESCRIPCIÓN UND. Meses P.U. SUB TOTAL

Alquiler camioneta 1.00 12.00 3,500.00 42,000.00TOTAL 42,000.00

TOTAL GASTOS DE SUPERVISION S/. 340,388.00

FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1PRESUPUESTO ANALÍTICO - EXPEDIENTE TÉCNICO

FTE.FTO 0

UNIDAD GEST. 0

PROYECTO FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1

COMPONENTE 0

SUB COMPONENTE 0

OBRA FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1

CÓDIGO ESPECIFICA DE GASTOS EXPEDIENTE TÉCNICO

2.6.2.3.7.3 REMUNERACIONES 90,000.00

2.6.2.3.7.4 BIENES 12,725.00

2.6.2.3.7.5 SERVICIOS 0.00

2.6.2.3.7.6 OTROS 0.00

TOTAL EXPEDIENTE TÉCNICO S/. 102,725.00

DESAGREGADO DEL PRESUPUESTO ANALÍTICO

EXPEDIENTE TÉCNICO

2.6.2 3.7.3 REMUNERACIONES S/. 90,000.00

01 RETRIBUCIONES COMPLEMENTARIAS-CONTRATOS A PLAZO FIJO S/. 60,111.00DEL EMPLEADO EVENTUAL

CARGO N° DE PERSONAS MESES COSTO SUB TOTAL TOTALAREA DE PROYECTOSINGENIERO PROYECTISTA 4.00 2.00 5,000.00 40,000.00 26,716.00ARQUITECTO PROYECTISTA 2.00 2.00 5,000.00 20,000.00 13,358.00INGENIERO ESTRUCTURALISTA 2.00 2.00 5,000.00 20,000.00 13,358.00INGENIERO ELECTRICISTA 1.00 2.00 5,000.00 10,000.00 6,679.00

60,111.00

02 OBLIGACIONES DEL EMPLEADOR S/. 9,432.00DEL EMPLEADO EVENTUAL

CARGO N° DE PERSONAS MESES COSTO SUB TOTAL TOTALAREA DE PROYECTOSINGENIERO PROYECTISTA 4.0000 2.00 5,000.00 40,000.00 4,192.00ARQUITECTO PROYECTISTA 2.0000 2.00 5,000.00 20,000.00 2,096.00INGENIERO ESTRUCTURALISTA 2.0000 2.00 5,000.00 20,000.00 2,096.00INGENIERO ELECTRICISTA 1.0000 2.00 5,000.00 10,000.00 1,048.00

TOTAL 9,432.00

03 GASTOS VARIABLES Y OCASIONALES S/. 9,189.00DEL EMPLEADO EVENTUAL

CARGO N° DE PERSONAS MESES COSTO SUB TOTAL TOTALAREA DE PROYECTOSINGENIERO PROYECTISTA 4.0000 2.00 5,000.00 40,000.00 4,084.00ARQUITECTO PROYECTISTA 2.0000 2.00 5,000.00 20,000.00 2,042.00INGENIERO ESTRUCTURALISTA 2.0000 2.00 5,000.00 20,000.00 2,042.00INGENIERO ELECTRICISTA 1.0000 2.00 5,000.00 10,000.00 1,021.00

TOTAL 9,189.00

04 ESCOLARIDAD, AGUINALDOS Y GRATIFICACIONES S/. 11,268.00DEL EMPLEADO EVENTUAL

CARGO N° DE PERSONAS MESES COSTO SUB TOTAL TOTALAREA DE PROYECTOSINGENIERO PROYECTISTA 4.00 2.00 5,000.00 40,000.00 5,008.00ARQUITECTO PROYECTISTA 2.00 2.00 5,000.00 20,000.00 2,504.00INGENIERO ESTRUCTURALISTA 2.00 2.00 5,000.00 20,000.00 2,504.00INGENIERO ELECTRICISTA 1.00 2.00 5,000.00 10,000.00 1,252.00

TOTAL 11,268.00

2.6.2 3.7.4 BIENES S/. 12,725.00

01 COMBUSTIBLES , CARBURANTES Y LUBRICANTES S/. 675.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

COMBUSTIBLE GLN 50.00 13.50 675.00

TOTAL 675.00

02 MATERIALES DE LIMPIEZA S/. 400.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

MATERIALES DE LIMPIEZA EST 1.00 400.00 400.00TOTAL 400.00

03 IMPLEMENTOS DE SEGURIDAD S/. 40.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

CASCOS DE PROTECCION UND 1.00 40.00 40.00TOTAL 40.00

04 VESTUARIO S/. 770.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

CHALECOS SEGÚN MODELO C/LOGOTIPO UND 1.00 40.00 40.00PONCHOS PARA LLUVIA UND 1.00 30.00 30.00BOTAS DE CUERO REFORZADO CATERPILLAR PAR 1.00 350.00 350.00CASACA UND 1.00 250.00 250.00PANTALON JEAN O SIMILAR UND 1.00 100.00 100.00

TOTAL 770.00

05 MEDICAMENTOS S/. 0.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

TOTAL 0.00

06 MATERIALES DE ESCRITORIO S/. 1,140.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

PAPEL BOND 80 GR A-4 MLL 2.00 26.00 52.00PAPEL PARA PLOTTER RLLO 1.00 150.00 150.00TINTA PARA PLOTER JGO 1.00 350.00 350.00CUADERNO DE 200 HJAS ANILLADO ARCOIRIS PEQUEÑO UND 2.00 6.00 12.00LIBRETA TOPOGRÁFICA FIELD BOOK UND 2.00 3.50 7.00CD UND 12.00 1.00 12.00DVD UND 12.00 2.00 24.00ARCHIVADOR DE LOMO ANCHO PARA FORMATO A-4 UND 2.00 9.00 18.00SELLO DE OBRA UND 1.00 28.00 28.00PORTAMINAS PUNTA METALICA UND 2.00 12.00 24.00MINAS DE LÁPIZ 0.5 CAJA 1.00 8.00 8.00POST IT DE DIFERENTES COLORES PQTE 2.00 20.00 40.00LAPICEROS PILOT (AZUL, NEGRO, ROJO) CJA 1.00 35.00 35.00CUTER UND 2.00 5.00 10.00CINTA MASKINTAPE 1" RLLO 2.00 3.50 7.00CINTA DE EMBALAJE RLLO 2.00 3.50 7.00CLIPS PEQUEÑOS CJA 2.00 1.00 2.00CORRECTORES UND 2.00 9.00 18.00MICAS CIENTO 0.50 30.00 15.00ANILLOS CIENTO 0.50 80.00 40.00PLUMONES DELGADOS ESTUCHE 0.50 2.00 1.00TONER PARA IMPRESORA UND 1.00 280.00 280.00

TOTAL 1,140.00

07 ENSERES S/. 600.00DESCRIPCION CANT CANT MONTO SUB TOTAL

COLCHON DE RESORTES 1 1/2 PLAZA PZA 1.00 350.00 350.00FRAZADA DE 1 1/2 PLAZA (ALPACA O SIMILAR) UND 2.00 50.00 100.00TARIMA 1 1/2 PLAZA UND 1.00 150.00 150.00

TOTAL 600.00

08 REPUESTOS S/. 0.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

TOTAL 0.00

09 EQUIPO Y MATERIAL DURADERO S/. 4,100.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

CAMARA FOTOGRAFICA DIGITAL UND 1.00 600.00 600.00COMPUTADORA PERSONAL PORTATIL UND 1.00 3,500.00 3,500.00

TOTAL 4,100.00

11 IMPREVISTOS S/. 5,000.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

ENSAYOS Y PRUEBAS EST 1.00 5,000.00 5,000.00TOTAL 5,000.00

2.6.2 3.7.5 SERVICIOS S/. 0.00

01 RACIONAMIENTO S/. 0.00CARGO PERSONAS DÍAS x MES MES S/. X DIA SUB TOTAL

PERSONAL PROFESIONAL - TECNICO 0.00

TOTAL 0.00

2.6.2 3.2 7 OTROS S/. 0.00

01 OTROS S/. 0.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

OTROSTOTAL 0.00

TOTAL EXPEDIENTE TÉCNICO S/. 102,725.00

FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1PRESUPUESTO ANALÍTICO - LIQUIDACIÓN

FTE.FTO 0

UNIDAD GEST. 0

PROYECTO FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1

COMPONENTE 0

SUB COMPONENTE 0

OBRA FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1

CÓDIGO ESPECIFICA DE GASTOS LIQUIDACIÓN

2.6.2.3.7.3 REMUNERACIONES 70,000.00

2.6.2.3.7.4 BIENES 8,525.00

2.6.2.3.7.5 SERVICIOS 513.00

2.6.2.3.7.6 OTROS 0.00

TOTAL LIQUIDACIÓN S/. 79,038.00

DESAGREGADO DEL PRESUPUESTO ANALÍTICO

LIQUIDACIÓN

2.6.2 3.7.3 REMUNERACIONES S/. 70,000.00

01 RETRIBUCIONES COMPLEMENTARIAS-CONTRATOS A PLAZO FIJO S/. 46,753.00DEL EMPLEADO EVENTUAL

CARGO N° DE PERSONAS MESES COSTO SUB TOTAL TOTALAREA DE LIQUIDACIONINGENIERO LIQUIDADOR - CONTADOR 7.00 2.00 5,000.00 70,000.00 46,753.00

46,753.00

02 OBLIGACIONES DEL EMPLEADOR S/. 7,336.00DEL EMPLEADO EVENTUAL

CARGO N° DE PERSONAS MESES COSTO SUB TOTAL TOTALAREA DE LIQUIDACIONINGENIERO LIQUIDADOR - CONTADOR 7.0000 2.00 5,000.00 70,000.00 7,336.00

TOTAL 7,336.00

03 GASTOS VARIABLES Y OCASIONALES S/. 7,147.00DEL EMPLEADO EVENTUAL

CARGO N° DE PERSONAS MESES COSTO SUB TOTAL TOTALAREA DE LIQUIDACIONINGENIERO LIQUIDADOR - CONTADOR 7.0000 2.00 5,000.00 70,000.00 7,147.00

TOTAL 7,147.00

04 ESCOLARIDAD, AGUINALDOS Y GRATIFICACIONES S/. 8,764.00DEL EMPLEADO EVENTUAL

CARGO N° DE PERSONAS MESES COSTO SUB TOTAL TOTALAREA DE LIQUIDACIONINGENIERO LIQUIDADOR - CONTADOR 7.00 2.00 5,000.00 70,000.00 8,764.00

TOTAL 8,764.00

2.6.2 3.7.4 BIENES S/. 8,525.00

01 COMBUSTIBLES , CARBURANTES Y LUBRICANTES S/. 675.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

COMBUSTIBLE GLN 50.00 13.50 675.00

TOTAL 675.00

02 MATERIALES DE LIMPIEZA S/. 400.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

MATERIALES DE LIMPIEZA EST 1.00 400.00 400.00TOTAL 400.00

03 IMPLEMENTOS DE SEGURIDAD S/. 40.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

CASCOS DE PROTECCION UND 1.00 40.00 40.00TOTAL 40.00

04 VESTUARIO S/. 770.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

CHALECOS SEGÚN MODELO C/LOGOTIPO UND 1.00 40.00 40.00PONCHOS PARA LLUVIA UND 1.00 30.00 30.00BOTAS DE CUERO REFORZADO CATERPILLAR PAR 1.00 350.00 350.00CASACA UND 1.00 250.00 250.00PANTALON JEAN O SIMILAR UND 1.00 100.00 100.00

TOTAL 770.00

05 MEDICAMENTOS S/. 0.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

TOTAL 0.00

06 MATERIALES DE ESCRITORIO S/. 1,140.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

PAPEL BOND 80 GR A-4 MLL 2.00 26.00 52.00PAPEL PARA PLOTTER RLLO 1.00 150.00 150.00TINTA PARA PLOTER JGO 1.00 350.00 350.00CUADERNO DE 200 HJAS ANILLADO ARCOIRIS PEQUEÑO UND 2.00 6.00 12.00LIBRETA TOPOGRÁFICA FIELD BOOK UND 2.00 3.50 7.00CD UND 12.00 1.00 12.00DVD UND 12.00 2.00 24.00ARCHIVADOR DE LOMO ANCHO PARA FORMATO A-4 UND 2.00 9.00 18.00SELLO DE OBRA UND 1.00 28.00 28.00PORTAMINAS PUNTA METALICA UND 2.00 12.00 24.00MINAS DE LÁPIZ 0.5 CAJA 1.00 8.00 8.00POST IT DE DIFERENTES COLORES PQTE 2.00 20.00 40.00LAPICEROS PILOT (AZUL, NEGRO, ROJO) CJA 1.00 35.00 35.00CUTER UND 2.00 5.00 10.00CINTA MASKINTAPE 1" RLLO 2.00 3.50 7.00CINTA DE EMBALAJE RLLO 2.00 3.50 7.00CLIPS PEQUEÑOS CJA 2.00 1.00 2.00CORRECTORES UND 2.00 9.00 18.00MICAS CIENTO 0.50 30.00 15.00ANILLOS CIENTO 0.50 80.00 40.00PLUMONES DELGADOS ESTUCHE 0.50 2.00 1.00TONER PARA IMPRESORA UND 1.00 280.00 280.00

TOTAL 1,140.00

07 ENSERES S/. 600.00DESCRIPCION CANT CANT MONTO SUB TOTAL

COLCHON DE RESORTES 1 1/2 PLAZA PZA 1.00 350.00 350.00FRAZADA DE 1 1/2 PLAZA (ALPACA O SIMILAR) UND 2.00 50.00 100.00TARIMA 1 1/2 PLAZA UND 1.00 150.00 150.00

TOTAL 600.00

08 REPUESTOS S/. 0.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

TOTAL 0.00

09 EQUIPO Y MATERIAL DURADERO S/. 4,100.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

CAMARA FOTOGRAFICA DIGITAL UND 1.00 600.00 600.00COMPUTADORA PERSONAL PORTATIL UND 1.00 3,500.00 3,500.00

TOTAL 4,100.00

11 IMPREVISTOS S/. 800.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

IMPREVISTOS EST 1.00 800.00 800.00TOTAL 800.00

2.6.2 3.7.5 SERVICIOS S/. 513.00

01 RACIONAMIENTO S/. 513.00CARGO PERSONAS DÍAS x MES MES S/. X DIA SUB TOTAL

PERSONAL PROFESIONAL - TECNICO 1.00 1.50 3.00 114.00 513.00

TOTAL 513.00

2.6.2 3.2 7 OTROS S/. 0.00

01 OTROS S/. 0.00DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

OTROSTOTAL 0.00

TOTAL LIQUIDACIÓN S/. 79,038.00

RESUMEN DESAGREGADO PRESUPUESTO ANALÍTICO

FTE.FTO 0

UNIDAD GEST. 0

PROYECTO FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1

COMPONENTE 0

SUB COMPONENTE 0

OBRA FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1

CODIGO ESPECIFICA DE GASTOS COSTO DIRECTO G. GRALES G. SUPERV. COSTO TOTAL

2.6.2.3.7.3 1.00 RETRIBUCIONES COMPLEMENTARIAS 713,542.42 510,542.76 192,355.20 1,416,440.38

REMUNERACIONES 2.00 OBLIGACIONES DEL EMPLEADOR 111,384.97 80,109.12 30,182.40 221,676.49

3.00 GASTOS VARIABLES Y OCASIONALES 108,515.32 78,045.24 29,404.80 215,965.36

4.00 ESCOLARIDAD Y GRATIFICACIONES 133,592.85 95,702.88 36,057.60 265,353.33

2.6.2.3.7.4 1.00 COMBUSTIBLES Y LUBRICANTES 357.52 5,115.00 2,025.00 7,497.52

BIENES 2.00 MATERIALES 4,420,499.05 200.00 400.00 4,421,099.05

3.00 IMPLEMENTOS DE SEGURIDAD 3,600.00 40.00 3,640.00

4.00 VESTUARIO 7,416.00 770.00 8,186.00

5.00 MEDICAMENTOS 808.00 0.00 808.00

6.00 MATERIALES DE ESCRITORIO 3,461.70 1,140.00 4,601.70

7.00 ENSERES 6,080.00 600.00 6,680.00

8.00 REPUESTOS 800.00 0.00 800.00

9.00 MATERIAL Y EQUIPO DURARERO 8,400.00 4,100.00 12,500.00

10.00 OTROS 290.00 0.00 290.00

11.00 VARIOS 0.00 800.00 800.00

12.00 HERRAMIENTAS MANUALES 28,856.31 0.00 0.00 28,856.31

2.6.2.3.7.5 1.00 RACIONAMIENTO 0.00 513.00 513.00

SERVICIOS 2.00 GASTOS NOTARIALES Y OTROS 1,650.00 0.00 1,650.00

3.00 RACIONAMEINTO TALLERES 8,360.00 0.00 8,360.00

4.00 SERVICIOS 18,820.72 0.00 0.00 18,820.72

5.00 INSUMOS PARA TALLERES 440.00 0.00 440.00

6.00 IMPREVISTOS 6,457.85 0.00 6,457.85

7.00 ALQUILERES 2,288,657.59 0.00 0.00 2,288,657.59

2.6.2.3.7.6

OTROS 17,500.00 17,500.00

TOTAL 7,824,226.76 834,978.55 298,388.00 8,957,593.31

2.2 PRESUPUESTO ANALÍTICO

FTE.FTO 0

UNIDAD GEST. 0

PROYECTO FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1

COMPONENTE 0

SUB COMPONENTE 0

OBRA FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1

Nº DESCRIPCIÓN TOTAL2.6.2.3.7.3 1 Retribuciones y complementos - Contratos a plazo fijo Programado 1,416,440.38REMUNERACIONES Ejecutado

2 Obligaciones del empleador Programado 221,676.49Ejecutado

3 Gastos Variables y ocasionales Programado 215,965.36Ejecutado

4 Escolaridad, aguinaldos y gratificaciones Programado 265,353.33Ejecutado

2.6.2.3.7.4 1 Combustible y lubricantes Programado 7,497.52BIENES Ejecutado

2 Materiales de limpieza Programado 4,421,099.05Ejecutado

3 Implementos de seguridad Programado 3,640.00Ejecutado

4 Vestuario Programado 8,186.00Ejecutado

5 Medicamentos Programado 808.00Ejecutado

6 Materiales de escritorio Programado 4,601.70Ejecutado

7 Enseres Programado 6,680.00Ejecutado

8 Repuestos Programado 800.00Ejecutado

9 Material y equipo durarero Programado 12,500.00Ejecutado

10 Otros Programado 290.00Ejecutado

11 Varios Programado 800.00Ejecutado

12 Herramientas manuales Programado 28,856.31Ejecutado

2.6.2.3.7.5 1 Racionamiento Programado 513.00SERVICIOS Ejecutado

2 Gastos notariales y otros Programado 1,650.00Ejecutado

3 Racionamiento y Talleres Programado 8,360.00Ejecutado

4 Servicios Programado 18,820.72Ejecutado

5 Insumos para Talleres Programado 440.00Ejecutado

6 Imprevistos Programado 6,457.85Ejecutado

7 Alquileres Programado 2,288,657.59Ejecutado

2.6.2.3.7.6 Programado 17,500.00

OTROS EjecutadoTOTAL Programado 8,957,593.31

FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1

FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1

2.4 CRONOGRAMA DE INVERSION

1,240,715.92

CODIGO ESPECIFICA DE GASTOS P.ANALITICO01 AÑO TOTAL

MES 1 MES 2 MES 3 MES 4 MES 5

2.6.2.3.7.3 1.00 RETRIBUCIONES COMPLEMENTARIAS 1,416,440.38 Programado 443,423.01 424,010.00 373,282.91 175,724.49 1,416,440.41

REMUNERACIONES 0.00 Ejecutado

2.00 OBLIGACIONES DEL EMPLEADOR 221,676.49 Programado 69,360.99 66,330.60 58,412.03 27,572.88 221,676.50

0.00 Ejecutado

3.00 GASTOS VARIABLES Y OCASIONALES 215,965.36 Programado 67,574.02 64,621.70 56,907.14 26,862.51 215,965.37

0.00 Ejecutado

4.00 ESCOLARIDAD Y GRATIFICACIONES 265,353.33 Programado 83,059.93 79,425.33 69,927.96 32,940.12 265,353.34

0.00 Ejecutado

2.6.2.3.7.4 1.00 COMBUSTIBLES Y LUBRICANTES 7,497.52 Programado 1,919.13 1,909.40 1,883.99 1,785.00 7,497.52

BIENES 0.00 Ejecutado

2.00 MATERIALES 4,421,099.05 Programado 1,658,581.25 1,538,314.87 1,224,053.13 150.00 4,421,099.25

0.00 Ejecutado

3.00 IMPLEMENTOS DE SEGURIDAD 3,640.00 Programado 910.00 910.00 910.00 910.00 3,640.00

0.00 Ejecutado

4.00 VESTUARIO 8,186.00 Programado 2,046.50 2,046.50 2,046.50 2,046.50 8,186.00

0.00 Ejecutado

5.00 MEDICAMENTOS 808.00 Programado 202.00 202.00 202.00 202.00 808.00

0.00 Ejecutado

6.00 MATERIALES DE ESCRITORIO 4,601.70 Programado 1,150.43 1,150.43 1,150.43 1,150.43 4,601.70

0.00 Ejecutado

7.00 ENSERES 6,680.00 Programado 1,670.00 1,670.00 1,670.00 1,670.00 6,680.00

0.00 Ejecutado

8.00 REPUESTOS 800.00 Programado 200.00 200.00 200.00 200.00 800.00

0.00 Ejecutado

9.00 MATERIAL Y EQUIPO DURARERO 12,500.00 Programado 3,125.00 3,125.00 3,125.00 3,125.00 12,500.00

0.00 Ejecutado

10.00 OTROS 290.00 Programado 72.50 72.50 72.50 72.50 290.00

0.00 Ejecutado

11.00 VARIOS 800.00 Programado 200.00 200.00 200.00 200.00 800.00

0.00 Ejecutado

12.00 HERRAMIENTAS MANUALES 28,856.31 Programado 10,825.97 10,040.89 7,989.44 0.00 28,856.31

0.00 Ejecutado

2.6.2.3.7.5 1.00 RACIONAMIENTO 513.00 Programado 128.25 128.25 128.25 128.25 513.00

SERVICIOS 0.00 Ejecutado

2.00 GASTOS NOTARIALES Y OTROS 1,650.00 Programado 412.50 412.50 412.50 412.50 1,650.00

0.00 Ejecutado

3.00 RACIONAMIENTO Y TALLERES 8,360.00 Programado 2,090.00 2,090.00 2,090.00 2,090.00 8,360.00

0.00 Ejecutado

4.00 SERVICIOS 18,820.72 Programado 7,060.94 6,548.89 5,210.89 0.00 18,820.72

0.00 Ejecutado

5.00 INSUMOS PARA TALLERES 440.00 Programado 110.00 110.00 110.00 110.00 440.00

0.00 Ejecutado

6.00 IMPREVISTOS 6,457.85 Programado 1,614.46 1,614.46 1,614.46 1,614.46 6,457.85

0.00 Ejecutado

7.00 ALQUILERES 2,288,657.59 Programado 858,631.85 796,365.45 633,660.40 0.00 2,288,657.70

2.6.2.3.7.6 0.00 Ejecutado

OTROS 17,500.00 Programado 4,375.00 4,375.00 4,375.00 4,375.00 17,500.00

TOTAL 8,957,593.31 3,218,743.73 3,005,873.78 2,449,634.52 283,341.64 8,957,593.66

35.93% 33.56% 27.35% 3.16% 100.00%

FTE.FTO: BIRF PRESTAMO Nº LA-7257-PE

UNIDAD GEST.: PER PLAN COPESCO

PROYECTO: PROYECTO DE REORDENAMIENTO Y REHABILITACIÓN DEL VALLE VILCANOTA

COMPONENTE: 1.0 FORTALECIMIENTO DE LA CAPACIDAD EN TURISMO Y DESARROLLO DE INFRAESTRUCTURA

SUB COMPONENTE: 1.4 SERVICIO PARA TURISTAS EN EL CAMINO INCA

OBRA: SERVICIOS HIGIENICOS EN CAMPAMENTO DEL CAMINO INCA: HATUNCHACA (WAYLLABAMBA)

-0.03

0.00

0.00

-0.01

0.00

-0.20

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

-0.10

-0.35

2.8 PROGRAMACION DE AVANCE FISICO MENSUAL

OBRA: SERVICIOS HIGIENICOS EN CAMPAMENTO DEL CAMINO INCA: HATUNCHACA (WAYLLABAMBA)

COD ACTIVIDAD Und Cant. P. Unit TotalMES 1

Metrado01 MEJORAMIENTO01 OBRAS PROVISIONALES 10,261.1201.01 CAMINO PEATO 01.01 OBRAS PROVISIONALES 10,261.1201.01.01 OBRAS PRELIMI01.01.01 CONSTRUCCIONES PROVISIONALES 4,434.78 100%01.01.01.01 TRAZO DE NIVE 01.01.01.01 CAMPAMENTO DE ADOBE TECHO CALAMINA m2 36.00 86.46 3,112.56 36.0001.01.01.02 CARTEL DE IDENT01.01.01.02 LETRINA PROVISIONAL und 1.00 1,322.22 1,322.22 1.0001.01.01.03 CONSTRUCCION CAMPAMENTO, OFICINA, ALMACEN01.01.02 MOVIMIENTO DE01.01.02 CARTELES 826.34 100%01.01.02.01 CORTE MANUAL 01.01.02.01 CARTEL DE IDENTIFICACION DE OBRA DE 5.60 X 4.80M. und 1.00 826.34 826.34 1.0001.01.02.02 CORTE MANUAL EN ROCA SUELTA01.01.02.03 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO01.01.02.04 ELIMINACION MANUAL DE MATERIAL EXCEDENTE DIST 50 m01.01.03 MEJORAMIENTO 01.01.03 INSTALACIONES PROVISIONALES 5,000.00 100%01.01.03.01 EXTRACCION Y 01.01.03.01 AGUA PARA LA CONSTRUCCION GLB 1.00 2,000.00 2,000.00 1.0001.01.03.02 TRASLADO DE MATERIAL DE CANTERA DIST 1200 m01.01.03.03 EXTENDIDO Y C 01.01.03.02 ENERGIA ELECTRICA PARA LA CONSTRUCCION GLB 1.00 3,000.00 3,000.00 1.0001.02 OBRAS DE ARTE02 SISTEMA DE AGUA POTABLE 30,355.7301.02.01 PUENTE DE CONCRETO ARMADO01.02.01.01 MOVIMIENTO DE02.01 CAPTACION DE RIO (01 UND.) 8,759.06 100%01.02.01.01.01 CORTE MANUAL 02.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 21.32 8.14 173.54 21.3201.02.01.01.02 CORTE MANUAL 02.01.02 EXCAVACION MASIVA MANUAL BAJO AGUA m3 17.11 47.74 816.83 17.1101.02.01.01.03 ELIMINACION MA02.01.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30M. m3 20.53 13.92 285.78 20.5301.02.01.01.04 CONFORMACION02.01.04 ENCOFRADO Y DESENCOFRADO m2 29.03 31.45 912.99 29.0301.02.01.02 ENCAUSAMIENT02.01.05 CONCRETO F'C= 175 KG/CM2. m3 4.62 352.14 1,626.89 4.6201.02.01.02.01 ENCAUSAMIENTO02.01.06 CONCRETO F'C= 140 KG/CM2. + 30% P.M. m3 10.95 272.84 2,987.60 10.9501.02.01.03 FALSO PUENTE 02.01.07 ACERO FY= 4200 KG/CM2. kg 38.84 5.57 216.34 38.8401.02.01.03.01 Concreto Ciclópe 02.01.08 TARRAJEO EN EXTERIORES, MORTERO 1:5 m2 6.72 27.53 185.00 6.7201.02.01.03.02 ENCOFRADO Y 02.01.09 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2 E= 1.5CM. m2 5.73 41.89 240.03 5.7301.02.01.03.03 CONSTRUCCION 02.01.10 ACCESORIOS CAPTACION D=2", COSTO GLOBAL GLB 1.00 406.50 406.50 1.0001.02.01.04 ESTRIBOS 02.01.11 COLOCACION DE ACCESORIOS PROMEDIO und 5.00 18.79 93.95 5.0001.02.01.04.01 Encofrado y dese02.01.12 COMPUERTA METALICA DE 0.40 X 0.40M. X 1/8" und 1.00 337.87 337.87 1.0001.02.01.04.02 MUROS DE PIED02.01.13 COMPUERTA CON MALLA METALICA DE 0.40 X 0.40M. und 1.00 187.87 187.87 1.0001.02.01.05 LOSAS ARMADA02.01.14 VERTEDERO METALICO DE 0.40 X 0.40M. X 1/8" und 1.00 287.87 287.87 1.0001.02.01.05.01 CONCRETO f`c=202.02 REFACCION SEDIMENTADOR (01 UND.) 3,219.24 100%01.02.01.05.02 ENCOFRADO Y 02.02.01 PICADO DE CONCRETO m2 25.68 83.47 2,143.51 25.6801.02.01.05.03 Acero Corrugado 02.02.02 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2 E= 1.5CM. m2 25.68 41.89 1,075.74 25.6801.02.01.06 BARANDAS DE R02.03 LINEA DE CONDUCCION 3,624.0001.02.01.06.01 BARANDA DE MA02.03.01 LINEA DE CONDUCCION (100 ML.) 3,624.00 100%01.02.02 ALCANTARILLAS02.03.01.01 ROCE Y DESHIERBE m 100.00 4.17 417.00 100.0001.02.02.01 MOVIMIENTO DE02.03.01.02 TRAZO, NIVELACION Y REPLANTEO m 100.00 2.00 200.00 100.0001.02.02.01.01 CORTE MANUAL 02.03.01.03 EXCAVACION MANUAL DE ZANJAS EN TIERRA COMPACTA m 100.00 9.70 970.00 100.0001.02.02.02 OBRAS DE CON 02.03.01.04 REFINE, NIVELACION Y FONDOS PARA TUBERIA HASTA 6" m 100.00 1.39 139.00 100.0001.02.02.02.01 Encofrado y dese02.03.01.05 CAMA DE APOYO PARA TUBERIAS MENORES DE 6" m 100.00 2.92 292.00 100.0001.02.02.02.02 CONCRETO f`c=202.03.01.06 RELLENO PRIMERA CAPA H=0.30M. ZARANDEADO m 100.00 3.47 347.00 100.0001.02.02.02.03 Acero Corrugado 02.03.01.07 RELLENO Y APISONADO DE ZANJAS m 100.00 6.26 626.00 100.0001.02.02.02.04 MUROS DE PIED02.03.01.08 TUBERIA PVC SAP D= 1 1/2", CLASE 10.0 m 100.00 5.39 539.00 100.0001.02.03 ALCANTARILLAS02.03.01.09 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA m 100.00 0.94 94.00 100.0001.02.03.01 CORTE MANUAL E02.04 REFACCION FILTRO (01 UND.) 2,700.30 100%01.02.03.02 ALCANTARILLAS02.04.01 PICADO DE CONCRETO m2 18.62 83.47 1,554.21 18.6201.02.03.03 Aliviaderos y poz 02.04.02 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2 E= 1.5CM. m2 18.62 41.89 779.99 18.6201.02.04 CUNETAS LATE 02.04.03 TARRAJEO EN EXTERIORES, MORTERO 1:5 m2 6.93 27.53 190.78 6.9301.02.04.01 CONST. CUNETAS 02.04.04 MATERIAL FILTRANTE m3 4.70 37.30 175.31 4.7001.02.04.02 CUNETAS EN ROCA02.05 RESERVORIO DE CONCRETO ARMADO 8,980.6101.02.05 CUNETAS DE C 02.05.01 RESERVORIO V= 5M3. (01 UND.) 7,661.35 100%01.02.05.01 CUNETAS EN TEIR02.05.01.01 PICADO DE CONCRETO m2 59.01 83.47 4,925.56 59.0101.02.06 SUB DRENAJE 02.05.01.02 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2 E= 1.5CM. m2 27.00 41.89 1,131.03 27.0001.02.06.01 CORTE MANUAL 02.05.01.03 TARRAJEO EN EXTERIORES, MORTERO 1:5 m2 34.65 27.53 953.91 34.6501.02.06.02 RELLENO Y COM02.05.01.04 TAPA SANITARIA METALICA 0.60 X 0.60M. X 1/8" und 1.00 187.57 187.57 1.0001.02.06.03 TUBERIA DE DRE02.05.01.05 PRUEBA HIDRAULICA Y DESINFECCION, RESERVORIO GLB 1.00 108.97 108.97 1.0001.02.06.04 SUMINISTRO Y 02.05.01.06 SUMINISTRO Y COLOCACION DE HIPOCLORADOR und 1.00 99.62 99.62 1.0001.02.06.05 MATERIAL FILT 02.05.01.07 PINTURA EN EXTERIORES AL LATEX m2 34.65 7.35 254.68 34.6501.02.06.06 TRASLADO DE M02.05.02 CASETA DE VALVULAS (01 UND.) 843.16 100%01.02.07 MUROS DE SOST02.05.02.01 TAPA SANITARIA METALICA 0.60 X 0.60M. X 1/8" und 1.00 187.57 187.57 1.0001.02.07.01 CORTE MANUAL 02.05.02.02 ACCESORIOS RESERVORIO D=1", COSTO GLOBAL GLB 1.00 261.00 261.00 1.0001.02.07.02 EXTRACCIÓN Y 02.05.02.03 COLOCACION DE ACCESORIOS, PROMEDIO und 21.00 18.79 394.59 21.0001.02.07.03 MUROS SECOS D02.05.03 TRABAJOS DE PROTECCION EN RESERVORIO 476.10 100%01.02.07.04 ELIMINACION MA02.05.03.01 EXCAVACION DE ZANJAS CUNETAS DE CORONACION m 10.00 11.89 118.90 10.0001.02.08 GRADAS DE PIE02.05.03.02 CERCO CON ALAMBRE DE PUAS m 20.00 17.86 357.20 20.0001.02.08.01 CORTE MANUAL 02.06 LINEA DE ADUCCION 3,072.5201.02.08.02 GRADAS DE PIE02.06.01 LINEA DE ADUCCION (65 ML.) 2,603.17 0%01.02.08.03 ELIMINACION MA02.06.01.01 ROCE Y DESHIERBE m 65.00 4.17 271.05 0.0001.03 PLAN DE MANEJ02.06.01.02 TRAZO, NIVELACION Y REPLANTEO m 65.00 2.00 130.00 0.0001.03.01 REPOSICIÓN DE02.06.01.03 EXCAVACION MANUAL DE ZANJAS EN TIERRA COMPACTA m 35.00 9.70 339.50 0.0002 REFUGIO 02.06.01.04 EXC. MANUAL ZANJAS ROCA SUELTA BOLONERIA MEDIANA m 30.00 27.82 834.60 0.0002.01 TRABAJOS PELI02.06.01.05 REFINE, NIVELACION Y FONDOS PARA TUBERIA HASTA 6" m 35.00 1.39 48.65 0.0002.01.01 DEMOLICION DE02.06.01.06 CAMA DE APOYO PARA TUBERIAS MENORES DE 6" m 35.00 2.92 102.20 0.0002.01.02 Limpieza de Terr 02.06.01.07 RELLENO PRIMERA CAPA H=0.30M. ZARANDEADO m 35.00 3.47 121.45 0.0002.01.03 Trazo, niveles y r 02.06.01.08 RELLENO Y APISONADO DE ZANJAS m 35.00 6.26 219.10 0.0002.02 MOVIMIENTO DE02.06.01.09 TUBERIA PVC SAP D= 1", CLASE 10 m 65.00 4.82 313.30 0.0002.02.01 EXCAVACION DE02.06.01.10 ACCESORIOS DISTRIBUCION D= 1", COSTO GLOBAL GLB 1.00 11.90 11.90 0.0002.02.02 EXCAVACION MA02.06.01.11 COLOCACION DE ACCESORIOS PROMEDIO und 8.00 18.79 150.32 0.0002.02.03 ELIMINACIÓN M 02.06.01.12 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA m 65.00 0.94 61.10 0.0002.02.04 PERFILADO DE 02.06.02 VALVULA DE CONTROL (01 UND.) 469.35 0%02.03 OBRAS DE CONC02.06.02.01 TRAZO Y REPLANTEO PRELIMINAR m2 0.64 8.14 5.21 0.00

FTE.FTO: BIRF PRESTAMO Nº LA-7257-PE

UNIDAD GEST.: PER PLAN COPESCO

PROYECTO: PROYECTO DE REORDENAMIENTO Y REHABILITACIÓN DEL VALLE VILCANOTA

COMPONENTE: 1.0 FORTALECIMIENTO DE LA CAPACIDAD EN TURISMO Y DESARROLLO DE INFRAESTRUCTURA

SUB COMPONENTE: 1.4 SERVICIO PARA TURISTAS EN EL CAMINO INCA

02.03.01 CIMIENTO CORRI02.06.02.02 EXCAVACION MASIVA MANUAL TIERRA COMPACTA m3 0.61 27.82 16.97 0.0002.03.02 ENCOFRADO Y 02.06.02.03 ENROCADO CON PIEDRA MEDIANA m3 0.32 37.30 11.94 0.0002.03.03 SOBRECIMIENTO02.06.02.04 CONCRETO F'C= 175 KG/CM2. m3 0.16 352.14 56.34 0.0002.03.04 DADO DE CONCRE02.06.02.05 ENCOFRADO Y DESENCOFRADO m2 1.20 31.45 37.74 0.0002.04 OBRAS DE CON 02.06.02.06 TARRAJEO EN EXTERIORES, MORTERO 1:5 m2 0.64 27.53 17.62 0.0002.04.01 ZAPATAS 02.06.02.07 TAPA SANITARIA METALICA 0.40 X 0.40M. X 1/8" und 1.00 137.57 137.57 0.0002.04.01.01 SOLADO PARA ZA02.06.02.08 SUMINISTRO Y COLOC. VALV. CONTROL D= 1" GLB 1.00 110.80 110.80 0.0002.04.01.02 CONCRETO f'c=202.06.02.09 COLOCACION DE ACCESORIOS PROMEDIO und 4.00 18.79 75.16 0.0002.04.01.03 Acero Corrugado 03 SISTEMA DE DESAGUE 21,536.9402.04.02 COLUMNAS 03.01 INSTALACIONES EXTERIORES DE DESAGUE 2,008.8002.04.02.01 CONCRETO f`c=203.01.01 REDES COLECTORAS 2,008.80 0%02.04.02.02 ENCOFRADO Y 03.01.01.01 TRAZO, NIVELACION Y REPLANTEO m 16.00 2.00 32.00 0.0002.04.02.03 Acero Corrugado 03.01.01.02 EXCAVACION MANUAL DE ZANJAS EN TIERRA COMPACTA m 16.00 9.70 155.20 0.0002.04.03 VIGAS 03.01.01.03 REFINE, NIVELACION Y FONDOS PARA TUBERIA HASTA 6" m 16.00 1.39 22.24 0.0002.04.03.01 CONCRETO f`c=203.01.01.04 CAMA DE APOYO PARA TUBERIAS MENORES DE 6" m 16.00 2.92 46.72 0.0002.04.03.02 ENCOFRADO Y 03.01.01.05 RELLENO Y APISONADO DE ZANJAS m 16.00 6.26 100.16 0.0002.04.03.03 Acero Corrugado 03.01.01.06 TUBERIA PVC SAL DE 4" m 6.00 11.62 69.72 0.0002.04.04 ALBAÑILERIA 03.01.01.07 TUBERIA PVC SAL DE 3" m 10.00 9.56 95.60 0.0002.04.04.01 MURO DE PIEDRA03.01.01.08 ACCESORIOS PVC SAL, COSTO GLOBAL GLB 1.00 1,412.00 1,412.00 0.0002.04.04.02 MURO DE PIEDRA03.01.01.09 COLOCACION DE ACCESORIOS PROMEDIO und 4.00 18.79 75.16 0.0002.04.04.03 ENCHAPADO CON03.02 BIODIGESTOR 13,081.8902.04.05 ESTRUCTURAS 03.02.01 TRABAJOS PRELIMINARES 73.26 0%02.04.05.01 TECHOS 03.02.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 9.00 8.14 73.26 0.0002.04.05.01.01 TIJERAL MADER03.02.02 MOVIMIENTO DE TIERRAS 1,812.47 0%02.04.05.01.02 COLOCACION DE03.02.02.01 EXCAVACION MASIVA MANUAL TIERRA COMPACTA m3 38.77 27.82 1,078.58 0.0002.04.05.01.03 MACHIHEMBRADO 03.02.02.02 RELLENO CON MATERIAL PROPIO m3 3.00 28.87 86.61 0.0002.04.05.01.04 PILARES DE MADE03.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30M. m3 46.50 13.92 647.28 0.0002.04.05.01.05 VIGA DE MADERA03.02.03 CAJA DE LODOS 499.06 0%02.04.05.02 ENTREPISO MEZ03.02.03.01 ENCOFRADO Y DESENCOFRADO m2 6.76 31.45 212.60 0.0002.04.05.02.01 PILARES DE MADE03.02.03.02 CONCRETO F'C= 140 KG/CM2. m3 0.43 342.31 147.19 0.0002.04.05.02.02 VIGA DE MADERA03.02.03.03 CONCRETO F'C= 175 KG/CM2. m3 0.19 352.14 66.91 0.0002.04.05.02.03 VIGA DE MADERA03.02.03.04 ACERO FY= 4200 KG/CM2. kg 12.99 5.57 72.35 0.0002.04.05.02.04 PISO MACHIHEM03.02.04 BIODIGESTOR 10,697.10 0%02.04.05.02.05 ESCALERA DE G03.02.04.01 BIODIGESTOR DE POLIETILENO DE 7,000 LITROS pza 1.00 10,697.10 10,697.10 0.0002.04.05.02.06 BARANDA DE M 03.03 POZO DE PERCOLACION (01 UND.) 6,446.2602.05 ARQUITECTURA03.03.01 TRABAJOS PRELIMINARES 32.56 0%02.05.01 PISOS Y PAVIM 03.03.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 4.00 8.14 32.56 0.0002.05.01.01 ENCOFRADO Y 03.03.02 MOVIMIENTO DE TIERRAS 800.65 0%02.05.01.02 FALSO PISO DE 03.03.02.01 EXCAVACION MASIVA MANUAL TIERRA COMPACTA m3 12.00 27.82 333.84 0.0002.05.01.03 PISO DE LAJA D 03.03.02.02 RELLENO CON MATERIAL PROPIO m3 2.40 28.87 69.29 0.0002.05.01.04 VEREDA DE LAJ03.03.02.03 FILTRO DE GRAVA m3 6.00 37.30 223.80 0.0002.05.02 CUBIERTAS 03.03.02.04 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30M. m3 12.48 13.92 173.72 0.0002.05.02.01 COBERTURA CO03.03.03 OBRAS DE CONCRETO ARMADO 2,662.25 0%02.05.03 CARPINTERIA D03.03.03.01 ENCOFRADO Y DESENCOFRADO m2 28.44 31.45 894.44 0.0002.05.03.01 Puertas tableros 03.03.03.02 CONCRETO F'C= 175 KG/CM2. m3 2.22 352.14 781.75 0.0002.05.03.02 VENTANA DE MA03.03.03.03 ACERO FY= 4200 KG/CM2. kg 177.03 5.57 986.06 0.0002.05.03.03 VENTANA DE MA03.03.04 MAMPOSTERIA 2,950.80 0%02.05.04 CERRAJERIA 03.03.04.01 MURO DE LADRILLO DE .24 X .13 X .09M. S/JUNTA VERTICAL m2 24.00 122.95 2,950.80 0.0002.05.04.01 Bisagras capuchin04 MODULO DE SERVICIOS TURISTICOS 92,745.8602.05.04.02 Cerradura para pu04.01 MODULO SERVICIOS HIGIENICOS 92,745.8602.05.04.03 CERRADURA PA04.01.01 TRABAJOS PRELIMINARES 5,871.66 100%02.05.05 VIDRIOS, CRIST 04.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 160.08 1.67 267.33 160.0802.05.05.01 VIDRIOS SEMID 04.01.01.02 ELIMINACION DE MALEZA Y ARBUSTOS m2 160.08 4.17 667.53 160.0802.05.06 PINTURA 04.01.01.03 NIVELACION DE TERRENO m2 160.08 1.04 166.48 160.0802.05.06.01 PINTURA BARNI 04.01.01.04 TRAZO, NIVELACION Y REPLANTEO m2 160.08 9.67 1,547.97 160.0802.06 ESTRUCTURAS E04.01.01.05 MURO SECO DE PIEDRA DE 16" m3 9.33 88.29 823.75 9.3302.06.01 MESAS 04.01.01.06 EXTRACCION DE TIERRA VEGETAL Y TRASLADO MANUAL m3 39.79 41.74 1,660.83 39.7902.06.01.01 MURO DE BLOQUE04.01.01.07 SEMBRADO DE GRASS m2 116.00 6.36 737.76 116.0002.06.01.02 REVESTIMIENTO04.01.02 MOVIMIENTO DE TIERRAS 1,047.63 100%02.06.01.03 ENCOFRADO Y 04.01.02.01 EXCAVACION DE ZANJAS HASTA 1M. m3 13.55 27.82 376.96 13.5502.06.01.04 ACERO DE REFU04.01.02.02 TERRAPLEN PARA F/PISO CON PISON A MANO 0.15M. m2 160.08 2.64 422.61 160.0802.06.01.05 Concreto f`c=210 04.01.02.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30M. m3 17.82 13.92 248.05 17.8202.06.02 BANCOS 04.01.03 OBRAS DE CONCRETO SIMPLE 3,100.84 100%02.06.02.01 BANCOS DE ROL04.01.03.01 CIMIENTOS CORRIDOS 1:10+30% DE P.G. m3 13.55 164.40 2,227.62 13.5502.06.02.02 BANCO EXTERIOR04.01.03.02 SOBRECIMIENTOS: ENCOFRADO Y DESENCOFRADO m2 17.58 30.33 533.20 17.5802.06.03 PARRILERO 04.01.03.03 SOBRECIMIENTOS: CONCRETO 1:8+25% P.M. m3 1.32 257.59 340.02 1.3202.06.03.01 MURO DE PIEDR04.01.04 OBRAS DE CONCRETO ARMADO 1,857.25 95%02.06.03.02 ENCOFRADO Y 04.01.04.01 COLUMNAS: CONCRETO F'C= 210 KG/CM2. m3 0.90 477.05 429.35 0.9002.06.03.03 ENCOFRADO Y 04.01.04.02 COLUMNAS: ENCOFRADO Y DESENCOFRADO m2 18.08 36.03 651.42 18.0802.06.03.04 ACERO DE REFU04.01.04.03 COLUMNAS: ACERO FY=4200 KG/CM2. kg 129.34 5.32 688.09 129.3402.06.03.05 Concreto f`c=210 04.01.04.04 DINTEL: CONCRETO F'C= 210 KG/CM2. m3 0.10 368.44 36.84 0.0002.06.03.06 REJILLA METALI04.01.04.05 DINTEL: ENCOFRADO Y DESENCOFRADO m2 0.70 42.64 29.85 0.0003 SSHH TIPO - 1 04.01.04.06 DINTEL: ACERO FY=4200 KG/CM2. kg 4.08 5.32 21.71 0.0003.01 ESTRUCTURAS 04.01.05 MUROS Y TABIQUES DE ALBAÑILERIA 6,516.05 0%03.01.01 TRABAJOS PELI04.01.05.01 MURO DE BLOQUETA DE 0.12 X 0.20 X 0.40M. m2 43.45 55.66 2,418.43 0.0003.01.01.01 Limpieza de Terr 04.01.05.02 MURO DE PIEDRA DE 0.50M. ASENTADA EN MORTERO 1:5. m2 52.50 78.05 4,097.63 0.0003.01.01.02 Trazo, niveles y r 04.01.06 PISOS Y PAVIMENTOS 14,222.32 0%03.01.02 MOVIMIENTO DE04.01.06.01 EMPEDRADO E= 0.10M. m2 112.37 21.76 2,445.17 0.0003.01.02.01 EXCAVACION DE04.01.06.02 BASE DE 4" CONCRETO F'C= 140 KG/CM2. m2 112.37 46.34 5,207.23 0.0003.01.02.02 ELIMINACIÓN M 04.01.06.03 ENCOFRADO Y DESENCOFRADO VEREDAS m2 11.96 10.74 128.45 0.0003.01.02.03 PERFILADO DE 04.01.06.04 FALSO PISO E=2" (MEZCLA 1:8 S/EMPEDRADO) m2 79.58 33.99 2,704.92 0.0003.01.03 OBRAS DE CONC04.01.06.05 CONTRAPISO CONCRETO 1:6 E= 48MM. m2 79.58 28.37 2,257.68 0.0003.01.03.01 CIMIENTO CORRI04.01.06.06 PISO DE CERAMICO DE 0.30 x 0.30M. m2 25.31 58.43 1,478.86 0.0003.01.03.02 SOBRECIMIENTO04.01.07 REVOQUES, ENLUCIDOS Y MOLDURAS 11,272.91 0%03.01.03.03 ENCOFRADO Y 04.01.07.01 TARRAJEO PRIMARIO O RAYADO (1:5) m2 86.90 19.53 1,697.16 0.0003.01.04 ESTRUCTURAS 04.01.07.02 TARRAJEO EN INTERIORES (MORTERO 1:5) m2 71.28 22.49 1,603.09 0.0003.01.04.01 TIJERAL MADER04.01.07.03 TARRAJEO EN EXTERIORES (MORTERO 1:5) m2 22.22 34.13 758.37 0.0003.01.04.02 COLOCACION DE04.01.07.04 EMBOQUILLADO EN MURO DE PIEDRA MEZCLA 1:5 m2 124.75 57.83 7,214.29 0.0003.01.04.03 VIGAS DINTEL 04.01.08 ZOCALOS 5,075.05 0%03.01.04.04 MACHIHEMBRADO 04.01.08.01 ZOCALO DE MAYOLICA DE COLOR DE .20 X .30M. m2 78.21 64.89 5,075.05 0.0003.01.04.05 PILARES DE MADE04.01.09 ESTRUCTURA DE MADERA Y COBERTURA 20,520.32 0%03.01.04.06 VIGA DE MADERA04.01.09.01 PARES DE MADERA COPAIBA 2" X 8" TIPO T-1 und 13.00 362.01 4,706.13 0.0003.01.05 ALBAÑILERIA 04.01.09.02 CORREAS DE MADERA COPAIBA DE 2" x 2" m 234.30 5.78 1,354.25 0.0003.01.05.01 MURO DE PIEDRA04.01.09.03 ENTABLADO MACHIHEMBRADO AGUANO DE 3/4" X 4" m2 95.85 96.20 9,220.77 0.0003.02 ARQUITECTURA04.01.09.04 COBERTURA CON PLANCHAS ONDULINE m2 95.85 54.66 5,239.16 0.0003.02.01 PISOS Y PAVIM 04.01.10 CARPINTERIA DE MADERA 3,225.53 0%03.02.01.01 VEREDA DE LAJ04.01.10.01 PUERTA DE MADERA COPAIBA E=1 1/4" m2 8.32 272.90 2,270.53 0.00

03.02.01.02 ENCOFRADO Y 04.01.10.02 TABIQUERIA DE MADERA E=0.05M. m2 4.51 131.08 591.17 0.0003.02.01.03 FALSO PISO DE 04.01.10.03 BANCAS DE MADERA COPAIBA m2 3.13 116.24 363.83 0.0003.02.01.04 PISO DE LAJA D 04.01.11 CARPINTERIA METALICA Y HERRERIA 2,600.58 0%03.02.02 CUBIERTAS 04.01.11.01 VIGAS METALICAS DE 2" X 8" X 1/4" m 31.95 49.59 1,584.40 0.0003.02.02.01 COBERTURA CO04.01.11.02 SUMIDERO METALICO TIPO REJILLA m2 4.02 252.78 1,016.18 0.0003.02.03 CARPINTERIA D04.01.12 CERRAJERIA 1,658.40 0%03.02.03.01 Puertas tableros 04.01.12.01 BISAGRA CAPUCHINA ALUMINIZADA DE 4" X 4" und 16.00 10.90 174.40 0.0003.02.03.02 VENTANA DE MA04.01.12.02 CERRADURA TIPO PASADOR DE 3" pza 8.00 61.10 488.80 0.0003.02.04 CERRAJERIA 04.01.12.03 ANGULAR DE FIERRO DE 2" X 4" X 1/4" pza 32.00 31.10 995.20 0.0003.02.04.01 Bisagras capuchin04.01.13 PINTURA 1,478.91 0%03.02.04.02 Cerradura para pu04.01.13.01 PINTURA SATINADA EN MUROS EXTERIORES m2 16.83 10.56 177.72 0.0003.02.05 PINTURA 04.01.13.02 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 16.64 11.09 184.54 0.0003.02.05.01 PINTURA BARNI 04.01.13.03 PINTURA PRESERVANTE EN CARPINTERIA DE MADERA m2 175.85 6.35 1,116.65 0.0003.03 INSTALACIONES04.01.14 APARATOS Y ACCESORIOS SANITARIOS 4,204.05 0%03.03.01 SISTEMA DE AG04.01.14.01 INODORO TIPO TURCO COLOR BLANCO pza 8.00 120.00 960.00 0.0003.03.01.01 EXCAVACION MA04.01.14.02 URINARIO CORRIDO REVESTIDO CON CERAMICO m 3.36 105.96 356.03 0.0003.03.01.02 RELLENO Y COMPACTA DE ZANJ LAVADERO CORRIDO REVESTIDO CON CERAMICO ml 3.36 143.95 483.67 0.0003.03.01.03 Instalación Tuber 04.01.14.03 MANGUERAS PARA LIMPIEZA pza 1.00 50.00 50.00 0.0003.03.01.04 Instalación Tuber 04.01.14.04 BARRAS METALICAS DE SEGURIDAD pza 16.00 25.00 400.00 0.0003.03.01.05 Salida de agua fr 04.01.14.05 BASUREROS METALICOS pza 8.00 150.00 1,200.00 0.0003.03.01.06 Reducción PVC SAP 3/4"*1/2" GANCHO DOBLE DE ALUMINIO pza 8.00 6.00 48.00 0.0003.03.01.07 TEE PVC SAP 3/4"04.01.14.06 COLOCACION DE APARATOS SANITARIOS und 8.00 49.47 395.76 0.0003.03.01.08 Codo PVC SAP 3/404.01.14.07 COLOCACION DE ACCESORIOS SANITARIOS pza 17.00 18.27 310.59 0.0003.03.01.09 Codo PVC SAP 1/04.01.15 INSTALACIONES SANITARIAS 5,874.26 0%03.03.01.10 VALVULA COMPU04.01.15.01 SALIDA PARA DESAGUE, PVC SAL DE 4" pto 8.00 69.72 557.76 0.0003.03.01.11 Grifería cromada d04.01.15.02 SALIDA PARA DESAGUE, PVC SAL DE 2" pto 14.00 66.18 926.52 0.0003.03.02 SISTEMA DE DE 04.01.15.03 SALIDA PARA VENTILACION pto 1.00 38.52 38.52 0.0003.03.02.01 Instalación Tuber 04.01.15.04 EXCAVACION DE ZANJAS PARA TUBERIAS m 71.00 16.70 1,185.70 0.0003.03.02.02 Instalación Tuber 04.01.15.05 RELLENO DE ZANJAS PARA TUBERIAS m 71.00 10.43 740.53 0.0003.03.02.03 Salida tubería de 04.01.15.06 INSTALACION TUBERIA PVC SAL DE 4" m 18.10 8.73 158.01 0.0003.03.02.04 Sumidero cromad04.01.15.07 INSTALACION TUBERIA PVC SAL DE 3" m 30.50 6.67 203.44 0.0003.03.02.05 Yee PVC SAL Ø=04.01.15.08 INSTALACION TUBERIA PVC SAL DE 2" m 22.40 5.33 119.39 0.0003.03.02.06 Yee PVC SAL Ø=04.01.15.09 ACCESORIOS PVC SAL, COSTO GLOBAL GLB 1.00 304.00 304.00 0.0003.03.02.07 Registro roscado 04.01.15.10 COLOCACION DE ACCESORIOS PVC SAL pza 43.00 13.38 575.34 0.0003.03.02.08 Salida tubería de 04.01.15.11 REGISTRO ROSCADO DE BRONCE DE 4" und 1.00 26.22 26.22 0.0003.03.02.09 Sombrero de vent04.01.15.12 REGISTRO ROSCADO DE BRONCE DE 2" und 2.00 18.22 36.44 0.0003.03.02.10 Caja de registro 04.01.15.13 SUMIDERO DE BRONCE DE 2" und 14.00 23.22 325.08 0.0003.03.03 APARATOS Y AC04.01.15.14 CAJA DE REGISTRO DE 12" x 24" C/TAPA DE C° und 3.00 225.77 677.31 0.0003.03.03.01 Inodoro tanque ba04.01.16 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 4,220.11 0%03.03.03.02 LAVATORIO DE M04.01.16.01 SALIDA DE AGUA FRIA DE 1/2" pto 16.00 38.55 616.80 0.0003.03.03.03 DUCHA CROMAD04.01.16.02 EXCAVACION DE ZANJAS PARA TUBERIAS m 50.00 16.70 835.00 0.0003.04 CAPTACION DE 04.01.16.03 RELLENO DE ZANJAS PARA TUBERIAS m 50.00 10.43 521.50 0.0003.04.01 MOVIMIENTO DE04.01.16.04 INSTALACION TUBERIA PVC SAP C/R DE 1" C-15 m 5.00 6.14 30.70 0.0003.04.01.01 EXCAVACION MA04.01.16.05 INSTALACION TUBERIA PVC SAP C/R DE 3/4" C-15 m 10.00 4.67 46.70 0.0003.04.01.02 ELIMINACION D 04.01.16.06 INSTALACION TUBERIA PVC SAP C/R DE 1/2" C-15 m 35.00 4.04 141.40 0.0003.04.02 OBRAS DE CONC04.01.16.07 ACCESORIOS PVC SAP, COSTO GLOBAL GLB 1.00 82.00 82.00 0.0003.04.02.01 Solado para zapat04.01.16.08 COLOCACION ACCESORIOS PVC SAP pza 71.00 16.04 1,138.84 0.0003.04.03 OBRAS DE CON 04.01.16.09 VALVULA DE COMPUERTA DE BRONCE DE 1" pza 1.00 112.85 112.85 0.0003.04.03.01 Encofrado y dese04.01.16.10 VALVULA DE COMPUERTA DE BRONCE DE 1/2" pza 5.00 81.85 409.25 0.0003.04.03.02 Acero Corrugado 04.01.16.11 NICHO DE MAYOLICA COLOR 0.15 X 0.25 X 0.20M. und 5.00 23.62 118.10 0.0003.04.03.03 Concreto f`c=210 04.01.16.12 CAJA PARA VALVULAS pza 1.00 95.47 95.47 0.0003.04.03.04 Tarrajeo con mort04.01.16.13 PRUEBA HIDRAULICA TUBERIA PVC SAP m 50.00 1.43 71.50 0.0003.04.03.05 Tarrajeo con mort05 FLETES 102,458.7403.04.04 ACCESORIOS 05.01 FLETES 102,458.7403.04.04.01 Tapa metálica 0. 05.01.01 FLETE TERRESTRE 10,093.77 50%03.04.04.02 SUMINISTRO AC05.01.01.01 FLETE TERRESTRE DE MATERIALES kg 50,468.84 0.20 10,093.77 25,234.4203.04.04.03 TUBERIA F°G° Ø=05.01.02 FLETE EN CAMINO RURAL 92,364.97 50%03.04.04.04 MATERIAL FILT 05.01.02.01 FLETE EN CAMINO RURAL DE MATERIALES kg 50,468.84 0.89 44,917.27 25,234.4203.05 BIODIGESTOR 05.01.02.02 FLETE EN CAMINO RURAL DE AGREGADOS m3 217.65 218.00 47,447.70 108.8303.05.01 RED DE CONDU 06 VARIOS 1,539.0003.05.01.01 Instalación Tuber 06.01 VARIOS 1,539.0003.05.02 OBRAS DE CONC06.01.01 MODULO DE HERRAMIENTAS 504.00 0%03.05.02.01 Solado para zapat06.01.01.01 MODULO PARA CAPACITACION EN AGUA POTABLE MOD 1.00 504.00 504.00 0.0003.05.03 ACCESORIOS 06.01.02 CONTROL DE CALIDAD DEL CONCRETO 835.00 4%03.05.03.01 Tapa de C° f'c=1 06.01.02.01 ENSAYOS A LA COMPRESION DEL CONCRETO GLB 1.00 35.00 35.00 1.0003.05.03.02 Caja de registro 06.01.02.02 DISEÑO DE MEZCLAS GLB 1.00 800.00 800.00 0.0003.05.03.03 SUMINSITRO E I 06.01.03 PLACA RECORDATORIA 200.00 0%04 SSHH TIPO - 2 06.01.03.01 PLACA RECORDATORIA und 1.00 200.00 200.00 0.0004.01 ESTRUCTURAS 07 ARQUEOLOGIA 10,141.0704.01.01 TRABAJOS PELI07.01 MONITOREO ARQUEOLOGICO 10,141.0704.01.01.01 Limpieza de Terr 07.01.01 MOVIMIENTO DE TIERRAS 674.04 50%04.01.01.02 Trazo, niveles y r 07.01.01.01 EXCAVACIONES DE INVESTIGACION ARQUEOLOGICA (TRINCHERA) m3 6.00 83.47 500.82 3.0004.01.02 MOVIMIENTO DE07.01.01.02 RELLENO CON MATERIAL PROPIO m3 6.00 28.87 173.22 3.0004.01.02.01 EXCAVACION DE07.01.02 MONITOREO ARQUEOLOGICO 9,407.03 0%04.01.02.02 ELIMINACIÓN M 07.01.02.01 MONITOREO ARQUEOLOGICO. m2 1,273.70 6.78 8,635.68 0.0004.01.02.03 PERFILADO DE 07.01.02.02 CLASIFICACION DE MATERIAL CULTURAL bls 5.00 63.57 317.85 0.0004.01.03 OBRAS DE CONC07.01.02.03 ANALISIS DE MATERIAL CULTURAL bls 5.00 77.14 385.70 0.0004.01.03.01 CIMIENTO CORRIDO C:H=1:10+30% PG04.01.03.02 SOBRECIMIENTO CORRIDO C:H=1:8+25% PG04.01.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO04.01.04 ESTRUCTURAS DE MADERA04.01.04.01 TIJERAL MADERA AGUANO ENCUADRADA 2" x 6"04.01.04.02 COLOCACION DE TIJERALES04.01.04.03 VIGAS DINTEL DE MADERA04.01.04.04 MACHIHEMBRADO MADERA AGUANO 3/4" x 4" x 10'04.01.04.05 PILARES DE MADERA AGUANO 6" x 6" x 2.85 m04.01.04.06 VIGA DE MADERA AGUANO 6" x 4"04.01.05 ALBAÑILERIA04.01.05.01 MURO DE PIEDRA e=0.50m04.02 ARQUITECTURA04.02.01 PISOS Y PAVIMENTOS04.02.01.01 VEREDA DE LAJA DE PIEDRA IRREGULAR04.02.01.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VEREDAS04.02.01.03 FALSO PISO DE CONCRETO1:10 INC/EMPEDRADO e=10cm04.02.01.04 PISO DE LAJA DE PIEDRA IRREGULAR04.02.02 CUBIERTAS04.02.02.01 COBERTURA CON PLANCHA ONDULINE

04.02.03 CARPINTERIA DE MADERA04.02.03.01 Puertas tableros rebajados águano 4.5 cm.04.02.03.02 VENTANA DE MADERA TIPO V304.02.04 CERRAJERIA04.02.04.01 Bisagras capuchinas de 4"04.02.04.02 Cerradura para puerta principal pesada04.02.05 PINTURA04.02.05.01 PINTURA BARNIZ EN PUERTAS04.03 INSTALACIONES SANITARIAS04.03.01 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO04.03.01.01 EXCAVACION MANUAL DE ZANJAS04.03.01.02 RELLENO Y COMPACTA DE ZANJAS04.03.01.03 Instalación Tubería PVC SAP C-10 Ø=3/4"04.03.01.04 Instalación Tubería PVC SAP C-10 Ø=1/2"04.03.01.05 Salida de agua fría Tubería PVC SAP 1/2"04.03.01.06 Reducción PVC SAP 3/4"*1/2"04.03.01.07 TEE PVC SAP 3/4" x 3/4"04.03.01.08 Codo PVC SAP 3/4" x 90°04.03.01.09 Codo PVC SAP 1/2"*90°04.03.01.10 VALVULA COMPUERTA BRONCE 3/4"04.03.01.11 Grifería cromada de lavatorio04.03.02 SISTEMA DE DESAGUE04.03.02.01 Instalación Tubería PVC SAL 2"04.03.02.02 Instalación Tubería PVC SAL 4"04.03.02.03 Salida tubería de desague de 4"04.03.02.04 Sumidero cromado Ø=2"04.03.02.05 Salida de ventilación PVC SAL 2"04.03.02.06 Yee PVC SAL Ø=2"04.03.02.07 Yee PVC SAL Ø=4"04.03.02.08 Registro roscado de bronce 2"04.03.02.09 Salida tubería de desague de 2"04.03.02.10 Sombrero de ventilación PVC Ø=2"04.03.02.11 Caja de registro de desague 12" * 24"04.03.03 APARATOS Y ACCESORIOS SANITARIOS04.03.03.01 Inodoro tanque bajo blanco04.03.03.02 LAVATORIO DE MAMPOSTERIA DE PIEDRA 1 llave04.04 CAPTACION DE AGUA04.04.01 MOVIMIENTO DE TIERRAS04.04.01.01 EXCAVACION MANUAL DE ESTRUCTURAS04.04.01.02 ELIMINACION DE MATERIAL EXCEDENTE MANUAL D=30m04.04.02 OBRAS DE CONCRETO SIMPLE04.04.02.01 Solado para zapatas y cimentaciones e=2" mezcla 1:12 C:H04.04.03 OBRAS DE CONCRETO ARMADO04.04.03.01 Encofrado y desencofrado04.04.03.02 Acero Corrugado Fy=4200 Kg/cm² Grado 6004.04.03.03 Concreto f`c=210 Kg/cm²04.04.03.04 Tarrajeo con mortero C:A 1:2 e=1.5cm con impermeabilizante04.04.03.05 Tarrajeo con mortero C:A 1:3 e=1cm obras de arte04.04.04 ACCESORIOS04.04.04.01 Tapa metálica 0.60m * 0.60m04.04.04.02 SUMINISTRO ACCESORIOS CAPTACIÓN04.04.04.03 TUBERIA F°G° Ø=3/4"04.04.04.04 MATERIAL FILTRANTE04.05 BIODIGESTOR04.05.01 RED DE CONDUCCIÓN04.05.01.01 Instalación Tubería PVC SAL 4"04.05.02 OBRAS DE CONCRETO SIMPLE04.05.02.01 Solado para zapatas y cimentaciones e=2" mezcla 1:12 C:H04.05.03 ACCESORIOS04.05.03.01 Tapa de C° f'c=175 kg/cm² e=0.15m 0.60*0.60m04.05.03.02 Caja de registro de desague 12" * 24"04.05.03.03 SUMINSITRO E INSTALACIÓN BIODIGESTOR 1300LTS05 MIRADORES TURÍSTICOS PLATAFORMA CAMPING05.01 TRABAJOS PELIMINARES05.01.01 Trazo, niveles y replanteo05.02 CORTE EN TERRENO NATURAL05.02.01 CORTE MANUAL EN MATERIAL SUELTO05.02.02 CORTE MANUAL EN ROCA FIJA05.02.03 Rellenos con material propio05.02.04 Compactación manual y mejoramiento de calzada05.02.05 MATERIAL DE AFIRMADO DE e=6"05.02.06 EXTRACCIÓN DE MATERIAL DE CANTERA05.02.07 TRASLADO DE MATERIAL DE CANTERA05.02.08 Eliminacion manual de material excedente d=50m05.03 PISOS Y VEREDAS05.03.01 PISO DE LAJA DE PIEDRA IRREGULAR05.04 MUROS DE ALBAÑILERIA05.04.01 Excavación en terreno natural manual05.04.02 Muro de mamposteria de piedra asentada con mortero C:A 1:806 PARADOR06.01 TRABAJOS PELIMINARES06.01.01 Trazo, niveles y replanteo06.02 CORTE EN TERRENO NATURAL06.02.01 CORTE MANUAL EN MATERIAL SUELTO06.02.02 CORTE MANUAL EN ROCA FIJA06.02.03 Eliminacion manual de material excedente d=50m06.03 CUBIERTAS06.03.01 Concreto Ciclópeo f'c=140 Kg/cm² +50 % PM.06.03.02 Estructura de soporte en madera06.03.03 COBERTURA CON PLANCHA ONDULINE06.04 PARRILERO06.04.01 MURO DE PIEDRA C/ENCOFRADO DE PIEDRAS06.04.02 ENCOFRADO Y DESENCOFRADO DE MUROS06.04.03 ENCOFRADO Y DESENCOFRADO NORMAL DE LOSAS06.04.04 ACERO DE REFUERZO - MALLA ELECTROSOLADA (a=0.80)06.04.05 Concreto f`c=210 Kg/cm²06.04.06 REJILLA METALICA CON ANGULAR 20mm x 20mm x 2mm (0.60 x 1.00 m)

07 SEÑALIZACION07.01 TRABAJOS PELIMINARES07.01.01 TRAZO NIVELES Y REPLANTEO07.01.02 EXCAVACION MANUAL NO CLASIFICADA DE ESTRUCTURAS07.01.03 Eliminacion manual de material excedente d=50m07.01.04 CIMENTACION DE SEÑAL07.01.05 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNETAS07.01.06 Acero Corrugado Fy=4200 Kg/cm² Ø=3/8"07.02 PANEL INFORMATIVO07.02.01 ESTRUCTURA DE MADERA DE PANEL INFORMATIVO07.02.02 COBERTURA CON PLANCHA ONDULINE07.02.03 PANEL INFORMATIVO RETROREFLEJANTE CUBIERTA CON POLICARBONATO MACIZO 1.00 x 1.2007.03 SEÑAL TIPO - 107.03.01 SEÑAL TIPO 1 (PLANCHA FIERRO GALV., PARANTES METALICOS - SEGÚN DISEÑO)07.04 SEÑAL TIPO - 207.04.01 SEÑAL TIPO 2 (PLANCHA FIERRO GALV., PARANTES METALICOS - SEGÚN DISEÑO)07.05 SEÑAL TIPO - 307.05.01 SEÑAL TIPO 3 (PLANCHA FIERRO GALV., PARANTES METALICOS - SEGÚN DISEÑO)07.06 SEÑAL TIPO - 407.06.01 SEÑAL TIPO 4 (PLANCHA FIERRO GALV., PARANTES METALICOS - SEGÚN DISEÑO)07.07 HITO INFORMATIVO07.07.01 HITO INFORMATIVO (SEGUN DISEÑO)07.08 HITO KILOMETRICO07.08.01 HITO KILOMETRICO (SEGUN DISEÑO)07.09 SEÑAL DE PISO07.09.01 SEÑAL DE PISO (SEGUN DISEÑO)08 FLETES08.01 FLETE TERRESTRE08.01.01 FLETE TERRESTRE DE MATERIALES08.02 FLETE EN CAMINO RURAL08.02.01 FLETE EN CAMINO RURAL DE AGREGADOS08.02.02 FLETE EN CAMINO RURAL DE MATERIALES

07.01.02.04 INVENTARIO Y CATALOGACION DE HALLAZGOS pza 10.00 6.78 67.80 0.0007.01.03 DIBUJOS 60.00 0%07.01.03.01 DIBUJO TECNICO hja 30.00 2.00 60.00 0.00

07.01.03.02 DIGITALIZACION DE REGISTRO GRAFICO hja 30.00 0.00 0.00 0.00COSTO DIRECTO TOTAL 269,038.45

PORCENTAJE DE AVANCE FISICO MENSUAL 100%(*) Irfomes Final Presupuestario - Informe Final de Investigacion Arqueologica

32747.10

2.8 PROGRAMACION DE AVANCE FISICO MENSUAL

MES 1 MES 2 MES 3 TOTAL

Monto Metrado Monto Metrado Monto

4,434.78 0% 0.00 0% 0.003,112.56 0.00 0.00 0.00 0.00 36.00 3,112.56 36.00 0.001,322.22 0.00 0.00 0.00 0.00 1.00 1,322.22 1.00 0.00

826.34 0% 0.00 0% 0.00826.34 0.00 0.00 0.00 0.00 1.00 826.34 1.00 0.00

5,000.00 0% 0.00 0% 0.00 0.002,000.00 0.00 0.00 0.00 0.00 1.00 2,000.00 1.00 0.00

3,000.00 0.00 0.00 0.00 0.00 1.00 3,000.00 1.00 0.00

8,759.06 0% 0.00 0% 0.00173.54 0.00 0.00 0.00 0.00 21.32 173.54 21.32 0.00816.83 0.00 0.00 0.00 0.00 17.11 816.83 17.11 0.00 0285.78 0.00 0.00 0.00 0.00 20.53 285.78 20.53 0.00 519.44912.99 0.00 0.00 0.00 0.00 29.03 912.99 29.03 0.00

1,626.89 0.00 0.00 0.00 0.00 4.62 1,626.89 4.62 0.00 02,987.60 0.00 0.00 0.00 0.00 10.95 2,987.60 10.95 0.00 0.497727272727

216.34 0.00 0.00 0.00 0.00 38.84 216.34 38.84 0.00185.00 0.00 0.00 0.00 0.00 6.72 185.00 6.72 0.00240.03 0.00 0.00 0.00 0.00 5.73 240.03 5.73 0.00406.50 0.00 0.00 0.00 0.00 1.00 406.50 1.00 0.00

93.95 0.00 0.00 0.00 0.00 5.00 93.95 5.00 0.00337.87 0.00 0.00 0.00 0.00 1.00 337.87 1.00 0.00187.87 0.00 0.00 0.00 0.00 1.00 187.87 1.00 0.00287.87 0.00 0.00 0.00 0.00 1.00 287.87 1.00 0.00

3,219.24 0% 0.00 0% 0.002,143.51 0.00 0.00 0.00 0.00 25.68 2,143.51 25.68 0.001,075.74 0.00 0.00 0.00 0.00 25.68 1,075.74 25.68 0.00

3,624.00 0% 0.00 0% 0.00417.00 0.00 0.00 0.00 0.00 100.00 417.00 100.00 0.00200.00 0.00 0.00 0.00 0.00 100.00 200.00 100.00 0.00970.00 0.00 0.00 0.00 0.00 100.00 970.00 100.00 0.00139.00 0.00 0.00 0.00 0.00 100.00 139.00 100.00 0.00292.00 0.00 0.00 0.00 0.00 100.00 292.00 100.00 0.00347.00 0.00 0.00 0.00 0.00 100.00 347.00 100.00 0.00626.00 0.00 0.00 0.00 0.00 100.00 626.00 100.00 0.00539.00 0.00 0.00 0.00 0.00 100.00 539.00 100.00 0.00

94.00 0.00 0.00 0.00 0.00 100.00 94.00 100.00 0.002,700.30 0% 0.00 0% 0.001,554.21 0.00 0.00 0.00 0.00 18.62 1,554.21 18.62 0.00

779.99 0.00 0.00 0.00 0.00 18.62 779.99 18.62 0.00190.78 0.00 0.00 0.00 0.00 6.93 190.78 6.93 0.00175.31 0.00 0.00 0.00 0.00 4.70 175.31 4.70 0.00

7,661.35 0% 0.00 0% 0.004,925.56 0.00 0.00 0.00 0.00 59.01 4,925.56 59.01 0.001,131.03 0.00 0.00 0.00 0.00 27.00 1,131.03 27.00 0.00

953.91 0.00 0.00 0.00 0.00 34.65 953.91 34.65 0.00187.57 0.00 0.00 0.00 0.00 1.00 187.57 1.00 0.00108.97 0.00 0.00 0.00 0.00 1.00 108.97 1.00 0.00

99.62 0.00 0.00 0.00 0.00 1.00 99.62 1.00 0.00254.68 0.00 0.00 0.00 0.00 34.65 254.68 34.65 0.00843.16 0% 0.00 0% 0.00187.57 0.00 0.00 0.00 0.00 1.00 187.57 1.00 0.00261.00 0.00 0.00 0.00 0.00 1.00 261.00 1.00 0.00394.59 0.00 0.00 0.00 0.00 21.00 394.59 21.00 0.00476.10 0% 0.00 0% 0.00118.90 0.00 0.00 0.00 0.00 10.00 118.90 10.00 0.00357.20 0.00 0.00 0.00 0.00 20.00 357.20 20.00 0.00

0.00 100% 2,603.17 0% 0.000.00 65.00 271.05 0.00 0.00 65.00 271.05 65.00 0.000.00 65.00 130.00 0.00 0.00 65.00 130.00 65.00 0.000.00 35.00 339.50 0.00 0.00 35.00 339.50 35.00 0.000.00 30.00 834.60 0.00 0.00 30.00 834.60 30.00 0.000.00 35.00 48.65 0.00 0.00 35.00 48.65 35.00 0.000.00 35.00 102.20 0.00 0.00 35.00 102.20 35.00 0.000.00 35.00 121.45 0.00 0.00 35.00 121.45 35.00 0.000.00 35.00 219.10 0.00 0.00 35.00 219.10 35.00 0.000.00 65.00 313.30 0.00 0.00 65.00 313.30 65.00 0.000.00 1.00 11.90 0.00 0.00 1.00 11.90 1.00 0.000.00 8.00 150.32 0.00 0.00 8.00 150.32 8.00 0.000.00 65.00 61.10 0.00 0.00 65.00 61.10 65.00 0.000.00 100% 469.35 0% 0.000.00 0.64 5.21 0.00 0.00 0.64 5.21 0.64 0.00

0.00 0.61 16.97 0.00 0.00 0.61 16.97 0.61 0.000.00 0.32 11.94 0.00 0.00 0.32 11.94 0.32 0.000.00 0.16 56.34 0.00 0.00 0.16 56.34 0.16 0.000.00 1.20 37.74 0.00 0.00 1.20 37.74 1.20 0.000.00 0.64 17.62 0.00 0.00 0.64 17.62 0.64 0.000.00 1.00 137.57 0.00 0.00 1.00 137.57 1.00 0.000.00 1.00 110.80 0.00 0.00 1.00 110.80 1.00 0.000.00 4.00 75.16 0.00 0.00 4.00 75.16 4.00 0.00

0.00 0% 0.00 100% 2,008.800.00 0.00 0.00 16.00 32.00 16.00 32.00 16.00 0.000.00 0.00 0.00 16.00 155.20 16.00 155.20 16.00 0.000.00 0.00 0.00 16.00 22.24 16.00 22.24 16.00 0.000.00 0.00 0.00 16.00 46.72 16.00 46.72 16.00 0.000.00 0.00 0.00 16.00 100.16 16.00 100.16 16.00 0.000.00 0.00 0.00 6.00 69.72 6.00 69.72 6.00 0.000.00 0.00 0.00 10.00 95.60 10.00 95.60 10.00 0.000.00 0.00 0.00 1.00 1,412.00 1.00 1,412.00 1.00 0.000.00 0.00 0.00 4.00 75.16 4.00 75.16 4.00 0.00

0.00 0% 0.00 100% 73.260.00 0.00 0.00 9.00 73.26 9.00 73.26 9.00 0.000.00 0% 0.00 100% 1,812.470.00 0.00 0.00 38.77 1,078.58 38.77 1,078.58 38.77 0.000.00 0.00 0.00 3.00 86.61 3.00 86.61 3.00 0.000.00 0.00 0.00 46.50 647.28 46.50 647.28 46.50 0.000.00 0% 0.00 100% 499.060.00 0.00 0.00 6.76 212.60 6.76 212.60 6.76 0.000.00 0.00 0.00 0.43 147.19 0.43 147.19 0.43 0.000.00 0.00 0.00 0.19 66.91 0.19 66.91 0.19 0.000.00 0.00 0.00 12.99 72.35 12.99 72.35 12.99 0.000.00 0% 0.00 100% 10,697.100.00 0.00 0.00 1.00 10,697.10 1.00 10,697.10 1.00 0.00

0.00 0% 0.00 100% 32.560.00 0.00 0.00 4.00 32.56 4.00 32.56 4.00 0.000.00 0% 0.00 100% 800.650.00 0.00 0.00 12.00 333.84 12.00 333.84 12.00 0.000.00 0.00 0.00 2.40 69.29 2.40 69.29 2.40 0.000.00 0.00 0.00 6.00 223.80 6.00 223.80 6.00 0.000.00 0.00 0.00 12.48 173.72 12.48 173.72 12.48 0.000.00 0% 0.00 100% 2,662.250.00 0.00 0.00 28.44 894.44 28.44 894.44 28.44 0.000.00 0.00 0.00 2.22 781.75 2.22 781.75 2.22 0.000.00 0.00 0.00 177.03 986.06 177.03 986.06 177.03 0.000.00 0% 0.00 100% 2,950.800.00 0.00 0.00 24.00 2,950.80 24.00 2,950.80 24.00 0.00

5,871.66 0% 0.00 0% 0.00267.33 0.00 0.00 0.00 0.00 160.08 267.33 160.08 0.00667.53 0.00 0.00 0.00 0.00 160.08 667.53 160.08 0.00166.48 0.00 0.00 0.00 0.00 160.08 166.48 160.08 0.00

1,547.97 0.00 0.00 0.00 0.00 160.08 1,547.97 160.08 0.00823.75 0.00 0.00 0.00 0.00 9.33 823.75 9.33 0.00

1,660.83 0.00 0.00 0.00 0.00 39.79 1,660.83 39.79 0.00737.76 0.00 0.00 0.00 0.00 116.00 737.76 116.00 0.00

1,047.63 0% 0.00 0% 0.00376.96 0.00 0.00 0.00 0.00 13.55 376.96 13.55 0.00422.61 0.00 0.00 0.00 0.00 160.08 422.61 160.08 0.00248.05 0.00 0.00 0.00 0.00 17.82 248.05 17.82 0.00

3,100.84 0% 0.00 0% 0.002,227.62 0.00 0.00 0.00 0.00 13.55 2,227.62 13.55 0.00

533.20 0.00 0.00 0.00 0.00 17.58 533.20 17.58 0.00340.02 0.00 0.00 0.00 0.00 1.32 340.02 1.32 0.00

1,768.86 5% 88.40 0% 0.00429.35 0.00 0.00 0.00 0.00 0.90 429.35 0.90 0.00651.42 0.00 0.00 0.00 0.00 18.08 651.42 18.08 0.00688.09 0.00 0.00 0.00 0.00 129.34 688.09 129.34 0.00

0.00 0.10 36.84 0.00 0.00 0.10 36.84 0.10 0.000.00 0.70 29.85 0.00 0.00 0.70 29.85 0.70 0.000.00 4.08 21.71 0.00 0.00 4.08 21.71 4.08 0.000.00 100% 6,516.05 0% 0.000.00 43.45 2,418.43 0.00 0.00 43.45 2,418.43 43.45 0.000.00 52.50 4,097.63 0.00 0.00 52.50 4,097.63 52.50 0.000.00 0% 0.00 100% 14,222.320.00 0.00 0.00 112.37 2,445.17 112.37 2,445.17 112.37 0.000.00 0.00 0.00 112.37 5,207.23 112.37 5,207.23 112.37 0.000.00 0.00 0.00 11.96 128.45 11.96 128.45 11.96 0.000.00 0.00 0.00 79.58 2,704.92 79.58 2,704.92 79.58 0.000.00 0.00 0.00 79.58 2,257.68 79.58 2,257.68 79.58 0.000.00 0.00 0.00 25.31 1,478.86 25.31 1,478.86 25.31 0.000.00 0% 0.00 100% 11,272.91 0.000.00 0.00 0.00 86.90 1,697.16 86.90 1,697.16 86.90 0.000.00 0.00 0.00 71.28 1,603.09 71.28 1,603.09 71.28 0.000.00 0.00 0.00 22.22 758.37 22.22 758.37 22.22 0.000.00 0.00 0.00 124.75 7,214.29 124.75 7,214.29 124.75 0.000.00 0% 0.00 100% 5,075.050.00 0.00 0.00 78.21 5,075.05 78.21 5,075.05 78.21 0.000.00 100% 20,520.32 0% 0.000.00 13.00 4,706.13 0.00 0.00 13.00 4,706.13 13.00 0.000.00 234.30 1,354.25 0.00 0.00 234.30 1,354.25 234.30 0.000.00 95.85 9,220.77 0.00 0.00 95.85 9,220.77 95.85 0.000.00 95.85 5,239.16 0.00 0.00 95.85 5,239.16 95.85 0.000.00 0% 0.00 100% 3,225.530.00 0.00 0.00 8.32 2,270.53 8.32 2,270.53 8.32 0.00

0.00 0.00 0.00 4.51 591.17 4.51 591.17 4.51 0.000.00 0.00 0.00 3.13 363.83 3.13 363.83 3.13 0.000.00 61% 1,584.40 39% 1,016.180.00 31.95 1,584.40 0.00 0.00 31.95 1,584.40 31.95 0.000.00 0.00 0.00 4.02 1,016.18 4.02 1,016.18 4.02 0.000.00 0% 0.00 100% 1,658.40 0.000.00 0.00 0.00 16.00 174.40 16.00 174.40 16.00 0.000.00 0.00 0.00 8.00 488.80 8.00 488.80 8.00 0.000.00 0.00 0.00 32.00 995.20 32.00 995.20 32.00 0.000.00 0% 0.00 100% 1,478.910.00 0.00 0.00 16.83 177.72 16.83 177.72 16.83 0.000.00 0.00 0.00 16.64 184.54 16.64 184.54 16.64 0.000.00 0.00 0.00 175.85 1,116.65 175.85 1,116.65 175.85 0.000.00 0% 0.00 100% 4,204.050.00 0.00 0.00 8.00 960.00 8.00 960.00 8.00 0.000.00 0.00 0.00 3.36 356.03 3.36 356.03 3.36 0.000.00 0.00 0.00 3.36 483.67 3.36 483.67 3.36 0.000.00 0.00 0.00 1.00 50.00 1.00 50.00 1.00 0.000.00 0.00 0.00 16.00 400.00 16.00 400.00 16.00 0.000.00 0.00 0.00 8.00 1,200.00 8.00 1,200.00 8.00 0.000.00 0.00 0.00 8.00 48.00 8.00 48.00 8.00 0.000.00 0.00 0.00 8.00 395.76 8.00 395.76 8.00 0.000.00 0.00 0.00 17.00 310.59 17.00 310.59 17.00 0.000.00 0% 0.00 100% 5,874.260.00 0.00 0.00 8.00 557.76 8.00 557.76 8.00 0.000.00 0.00 0.00 14.00 926.52 14.00 926.52 14.00 0.000.00 0.00 0.00 1.00 38.52 1.00 38.52 1.00 0.000.00 0.00 0.00 71.00 1,185.70 71.00 1,185.70 71.00 0.000.00 0.00 0.00 71.00 740.53 71.00 740.53 71.00 0.000.00 0.00 0.00 18.10 158.01 18.10 158.01 18.10 0.000.00 0.00 0.00 30.50 203.44 30.50 203.44 30.50 0.000.00 0.00 0.00 22.40 119.39 22.40 119.39 22.40 0.000.00 0.00 0.00 1.00 304.00 1.00 304.00 1.00 0.000.00 0.00 0.00 43.00 575.34 43.00 575.34 43.00 0.000.00 0.00 0.00 1.00 26.22 1.00 26.22 1.00 0.000.00 0.00 0.00 2.00 36.44 2.00 36.44 2.00 0.000.00 0.00 0.00 14.00 325.08 14.00 325.08 14.00 0.000.00 0.00 0.00 3.00 677.31 3.00 677.31 3.00 0.000.00 0% 0.00 100% 4,220.110.00 0.00 0.00 16.00 616.80 16.00 616.80 16.00 0.000.00 0.00 0.00 50.00 835.00 50.00 835.00 50.00 0.000.00 0.00 0.00 50.00 521.50 50.00 521.50 50.00 0.000.00 0.00 0.00 5.00 30.70 5.00 30.70 5.00 0.000.00 0.00 0.00 10.00 46.70 10.00 46.70 10.00 0.000.00 0.00 0.00 35.00 141.40 35.00 141.40 35.00 0.000.00 0.00 0.00 1.00 82.00 1.00 82.00 1.00 0.000.00 0.00 0.00 71.00 1,138.84 71.00 1,138.84 71.00 0.000.00 0.00 0.00 1.00 112.85 1.00 112.85 1.00 0.000.00 0.00 0.00 5.00 409.25 5.00 409.25 5.00 0.000.00 0.00 0.00 5.00 118.10 5.00 118.10 5.00 0.000.00 0.00 0.00 1.00 95.47 1.00 95.47 1.00 0.000.00 0.00 0.00 50.00 71.50 50.00 71.50 50.00 0.00

5,046.88 50% 5,046.88 0% 0.005,046.88 25,234.42 5,046.88 0.00 0.00 50,468.84 10,093.77 50468.84 0.00

46,182.48 50% 46,182.48 0% 0.0022,458.63 25,234.42 22,458.63 0.00 0.00 50,468.84 44,917.27 50468.84 0.0023,723.85 108.83 23,723.85 0.00 0.00 217.65 47,447.70 217.65 0.00

0.00 0% 0.00 100% 504.000.00 0.00 0.00 1.00 504.00 1.00 504.00 1.00 0.00

35.00 96% 800.00 0% 0.0035.00 0.00 0.00 0.00 0.00 1.00 35.00 1.00 0.00

0.00 1.00 800.00 0.00 0.00 1.00 800.00 1.00 0.000.00 0% 0.00 100% 200.000.00 0.00 0.00 1.00 200.00 1.00 200.00 1.00 0.00

337.02 50% 337.02 0% 0.00250.41 3.00 250.41 0.00 0.00 6.00 500.82 6.00 0.00

86.61 3.00 86.61 0.00 0.00 6.00 173.22 6.00 0.000.00 100% 9,407.04 0% 0.000.00 1,273.70 8,635.69 0.00 0.00 1,273.70 8,635.69 1273.70 0.000.00 5.00 317.85 0.00 0.00 5.00 317.85 5.00 0.000.00 5.00 385.70 0.00 0.00 5.00 385.70 5.00 0.00 0

0.00 10.00 67.80 0.00 0.00 10.00 67.80 10.00 0.000.00 100% 60.00 0% 0.000.00 30.00 60.00 0.00 0.00 30.00 60.00 30.00 0.000.00 30.00 0.00 0.00 0.00 30.00 0.00 30.00 0.00

100,934.70 93,615.11 74,488.65 269038.46

37.52% 34.80% 27.69%

2.9 CRONOGRAMA: METRADO (Oficial)

OBRA: SERVICIOS HIGIENICOS EN CAMPAMENTO DEL CAMINO INCA: HATUNCHACA (WAYLLABAMBA)

COD ACTIVIDAD Und Cant. P. Unit TotalMES 1 MES 2 MES 3

Metrado Metrado Metrado#VALUE! OBRAS PROVISIONALES 10,261.12

01.01 OBRAS PROVISIONALES 10,261.12

01.01.01 CONSTRUCCIONES PROVISIONALES 4,434.7801.01.01.01 CAMPAMENTO DE ADOBE TECHO CALAMINA m2 36.00 86.46 3,112.56 36.00 0.00 0.00 36.00 01.01.01.02 LETRINA PROVISIONAL und 1.00 1,322.22 1,322.22 1.00 0.00 0.00 1.00 01.01.02 CARTELES 826.3401.01.02.01 CARTEL DE IDENTIFICACION DE OBRA DE 5.60 X 4.80M. und 1.00 826.34 826.34 1.00 0.00 0.00 1.00 01.01.03 INSTALACIONES PROVISIONALES 5,000.0001.01.03.01 AGUA PARA LA CONSTRUCCION GLB 1.00 2,000.00 2,000.00 1.00 0.00 0.00 1.00 01.01.03.02 ENERGIA ELECTRICA PARA LA CONSTRUCCION GLB 1.00 3,000.00 3,000.00 1.00 0.00 0.00 1.00 02 SISTEMA DE AGUA POTABLE 30,355.7302.01 CAPTACION DE RIO (01 UND.) 8,759.0602.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 21.32 8.14 173.54 21.32 0.00 0.00 21.32 02.01.02 EXCAVACION MASIVA MANUAL BAJO AGUA m3 17.11 47.74 816.83 17.11 0.00 0.00 17.11 02.01.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30M. m3 20.53 13.92 285.78 20.53 0.00 0.00 20.53 02.01.04 ENCOFRADO Y DESENCOFRADO m2 29.03 31.45 912.99 29.03 0.00 0.00 29.03 02.01.05 CONCRETO F'C= 175 KG/CM2. m3 4.62 352.14 1,626.89 4.62 0.00 0.00 4.62 02.01.06 CONCRETO F'C= 140 KG/CM2. + 30% P.M. m3 10.95 272.84 2,987.60 10.95 0.00 0.00 10.95 02.01.07 ACERO FY= 4200 KG/CM2. kg 38.84 5.57 216.34 38.84 0.00 0.00 38.84 02.01.08 TARRAJEO EN EXTERIORES, MORTERO 1:5 m2 6.72 27.53 185.00 6.72 0.00 0.00 6.72 02.01.09 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2 E= 1.5CM. m2 5.73 41.89 240.03 5.73 0.00 0.00 5.73 02.01.10 ACCESORIOS CAPTACION D=2", COSTO GLOBAL GLB 1.00 406.50 406.50 1.00 0.00 0.00 1.00 02.01.11 COLOCACION DE ACCESORIOS PROMEDIO und 5.00 18.79 93.95 5.00 0.00 0.00 5.00 02.01.12 COMPUERTA METALICA DE 0.40 X 0.40M. X 1/8" und 1.00 337.87 337.87 1.00 0.00 0.00 1.00 02.01.13 COMPUERTA CON MALLA METALICA DE 0.40 X 0.40M. und 1.00 187.87 187.87 1.00 0.00 0.00 1.00 02.01.14 VERTEDERO METALICO DE 0.40 X 0.40M. X 1/8" und 1.00 287.87 287.87 1.00 0.00 0.00 1.00 02.02 REFACCION SEDIMENTADOR (01 UND.) 3,219.2402.02.01 PICADO DE CONCRETO m2 25.68 83.47 2,143.51 25.68 0.00 0.00 25.68 02.02.02 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2 E= 1.5CM. m2 25.68 41.89 1,075.74 25.68 0.00 0.00 25.68 02.03 LINEA DE CONDUCCION 3,624.0002.03.01 LINEA DE CONDUCCION (100 ML.) 3,624.0002.03.01.01 ROCE Y DESHIERBE m 100.00 4.17 417.00 100.00 0.00 0.00 100.00 02.03.01.02 TRAZO, NIVELACION Y REPLANTEO m 100.00 2.00 200.00 100.00 0.00 0.00 100.00 02.03.01.03 EXCAVACION MANUAL DE ZANJAS EN TIERRA COMPACTA m 100.00 9.70 970.00 100.00 0.00 0.00 100.00 02.03.01.04 REFINE, NIVELACION Y FONDOS PARA TUBERIA HASTA 6" m 100.00 1.39 139.00 100.00 0.00 0.00 100.00 02.03.01.05 CAMA DE APOYO PARA TUBERIAS MENORES DE 6" m 100.00 2.92 292.00 100.00 0.00 0.00 100.00 02.03.01.06 RELLENO PRIMERA CAPA H=0.30M. ZARANDEADO m 100.00 3.47 347.00 100.00 0.00 0.00 100.00 02.03.01.07 RELLENO Y APISONADO DE ZANJAS m 100.00 6.26 626.00 100.00 0.00 0.00 100.00 02.03.01.08 TUBERIA PVC SAP D= 1 1/2", CLASE 10.0 m 100.00 5.39 539.00 100.00 0.00 0.00 100.00 02.03.01.09 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA m 100.00 0.94 94.00 100.00 0.00 0.00 100.00 02.04 REFACCION FILTRO (01 UND.) 2,700.3002.04.01 PICADO DE CONCRETO m2 18.62 83.47 1,554.21 18.62 0.00 0.00 18.62 02.04.02 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2 E= 1.5CM. m2 18.62 41.89 779.99 18.62 0.00 0.00 18.62 02.04.03 TARRAJEO EN EXTERIORES, MORTERO 1:5 m2 6.93 27.53 190.78 6.93 0.00 0.00 6.93 02.04.04 MATERIAL FILTRANTE m3 4.70 37.30 175.31 4.70 0.00 0.00 4.70 02.05 RESERVORIO DE CONCRETO ARMADO 8,980.6102.05.01 RESERVORIO V= 5M3. (01 UND.) 7,661.3502.05.01.01 PICADO DE CONCRETO m2 59.01 83.47 4,925.56 59.01 0.00 0.00 59.01 02.05.01.02 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2 E= 1.5CM. m2 27.00 41.89 1,131.03 27.00 0.00 0.00 27.00 02.05.01.03 TARRAJEO EN EXTERIORES, MORTERO 1:5 m2 34.65 27.53 953.91 34.65 0.00 0.00 34.65 02.05.01.04 TAPA SANITARIA METALICA 0.60 X 0.60M. X 1/8" und 1.00 187.57 187.57 1.00 0.00 0.00 1.00 02.05.01.05 PRUEBA HIDRAULICA Y DESINFECCION, RESERVORIO GLB 1.00 108.97 108.97 1.00 0.00 0.00 1.00 02.05.01.06 SUMINISTRO Y COLOCACION DE HIPOCLORADOR und 1.00 99.62 99.62 1.00 0.00 0.00 1.00 02.05.01.07 PINTURA EN EXTERIORES AL LATEX m2 34.65 7.35 254.68 34.65 0.00 0.00 34.65 02.05.02 CASETA DE VALVULAS (01 UND.) 843.1602.05.02.01 TAPA SANITARIA METALICA 0.60 X 0.60M. X 1/8" und 1.00 187.57 187.57 1.00 0.00 0.00 1.00 02.05.02.02 ACCESORIOS RESERVORIO D=1", COSTO GLOBAL GLB 1.00 261.00 261.00 1.00 0.00 0.00 1.00 02.05.02.03 COLOCACION DE ACCESORIOS, PROMEDIO und 21.00 18.79 394.59 21.00 0.00 0.00 21.00 02.05.03 TRABAJOS DE PROTECCION EN RESERVORIO 476.1002.05.03.01 EXCAVACION DE ZANJAS CUNETAS DE CORONACION m 10.00 11.89 118.90 10.00 0.00 0.00 10.00 02.05.03.02 CERCO CON ALAMBRE DE PUAS m 20.00 17.86 357.20 20.00 0.00 0.00 20.00 02.06 LINEA DE ADUCCION 3,072.5202.06.01 LINEA DE ADUCCION (65 ML.) 2,603.1702.06.01.01 ROCE Y DESHIERBE m 65.00 4.17 271.05 0.00 65.00 0.00 65.00 02.06.01.02 TRAZO, NIVELACION Y REPLANTEO m 65.00 2.00 130.00 0.00 65.00 0.00 65.00 02.06.01.03 EXCAVACION MANUAL DE ZANJAS EN TIERRA COMPACTA m 35.00 9.70 339.50 0.00 35.00 0.00 35.00 02.06.01.04 EXC. MANUAL ZANJAS ROCA SUELTA BOLONERIA MEDIANA m 30.00 27.82 834.60 0.00 30.00 0.00 30.00 02.06.01.05 REFINE, NIVELACION Y FONDOS PARA TUBERIA HASTA 6" m 35.00 1.39 48.65 0.00 35.00 0.00 35.00 02.06.01.06 CAMA DE APOYO PARA TUBERIAS MENORES DE 6" m 35.00 2.92 102.20 0.00 35.00 0.00 35.00 02.06.01.07 RELLENO PRIMERA CAPA H=0.30M. ZARANDEADO m 35.00 3.47 121.45 0.00 35.00 0.00 35.00 02.06.01.08 RELLENO Y APISONADO DE ZANJAS m 35.00 6.26 219.10 0.00 35.00 0.00 35.00 02.06.01.09 TUBERIA PVC SAP D= 1", CLASE 10 m 65.00 4.82 313.30 0.00 65.00 0.00 65.00 02.06.01.10 ACCESORIOS DISTRIBUCION D= 1", COSTO GLOBAL GLB 1.00 11.90 11.90 0.00 1.00 0.00 1.00 02.06.01.11 COLOCACION DE ACCESORIOS PROMEDIO und 8.00 18.79 150.32 0.00 8.00 0.00 8.00 02.06.01.12 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA m 65.00 0.94 61.10 0.00 65.00 0.00 65.00 02.06.02 VALVULA DE CONTROL (01 UND.) 469.3502.06.02.01 TRAZO Y REPLANTEO PRELIMINAR m2 0.64 8.14 5.21 0.00 0.64 0.00 0.64 02.06.02.02 EXCAVACION MASIVA MANUAL TIERRA COMPACTA m3 0.61 27.82 16.97 0.00 0.61 0.00 0.61 02.06.02.03 ENROCADO CON PIEDRA MEDIANA m3 0.32 37.30 11.94 0.00 0.32 0.00 0.32 02.06.02.04 CONCRETO F'C= 175 KG/CM2. m3 0.16 352.14 56.34 0.00 0.16 0.00 0.16 02.06.02.05 ENCOFRADO Y DESENCOFRADO m2 1.20 31.45 37.74 0.00 1.20 0.00 1.20 02.06.02.06 TARRAJEO EN EXTERIORES, MORTERO 1:5 m2 0.64 27.53 17.62 0.00 0.64 0.00 0.64 02.06.02.07 TAPA SANITARIA METALICA 0.40 X 0.40M. X 1/8" und 1.00 137.57 137.57 0.00 1.00 0.00 1.00 02.06.02.08 SUMINISTRO Y COLOC. VALV. CONTROL D= 1" GLB 1.00 110.80 110.80 0.00 1.00 0.00 1.00 02.06.02.09 COLOCACION DE ACCESORIOS PROMEDIO und 4.00 18.79 75.16 0.00 4.00 0.00 4.00 03 SISTEMA DE DESAGUE 21,536.9403.01 INSTALACIONES EXTERIORES DE DESAGUE 2,008.8003.01.01 REDES COLECTORAS 2,008.80

FTE.FTO: BIRF PRESTAMO Nº LA-7257-PE

UNIDAD GEST.: PER PLAN COPESCO

PROYECTO: PROYECTO DE REORDENAMIENTO Y REHABILITACIÓN DEL VALLE VILCANOTA

COMPONENTE: 1.0 FORTALECIMIENTO DE LA CAPACIDAD EN TURISMO Y DESARROLLO DE INFRAESTRUCTURA

SUB COMPONENTE: 1.4 SERVICIO PARA TURISTAS EN EL CAMINO INCA

03.01.01.01 TRAZO, NIVELACION Y REPLANTEO m 16.00 2.00 32.00 0.00 0.00 16.00 16.00 03.01.01.02 EXCAVACION MANUAL DE ZANJAS EN TIERRA COMPACTA m 16.00 9.70 155.20 0.00 0.00 16.00 16.00 03.01.01.03 REFINE, NIVELACION Y FONDOS PARA TUBERIA HASTA 6" m 16.00 1.39 22.24 0.00 0.00 16.00 16.00 03.01.01.04 CAMA DE APOYO PARA TUBERIAS MENORES DE 6" m 16.00 2.92 46.72 0.00 0.00 16.00 16.00 03.01.01.05 RELLENO Y APISONADO DE ZANJAS m 16.00 6.26 100.16 0.00 0.00 16.00 16.00 03.01.01.06 TUBERIA PVC SAL DE 4" m 6.00 11.62 69.72 0.00 0.00 6.00 6.00 03.01.01.07 TUBERIA PVC SAL DE 3" m 10.00 9.56 95.60 0.00 0.00 10.00 10.00 03.01.01.08 ACCESORIOS PVC SAL, COSTO GLOBAL GLB 1.00 1,412.00 1,412.00 0.00 0.00 1.00 1.00 03.01.01.09 COLOCACION DE ACCESORIOS PROMEDIO und 4.00 18.79 75.16 0.00 0.00 4.00 4.00 03.02 BIODIGESTOR 13,081.8903.02.01 TRABAJOS PRELIMINARES 73.2603.02.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 9.00 8.14 73.26 0.00 0.00 9.00 9.00 03.02.02 MOVIMIENTO DE TIERRAS 0 0.00 0.00 1,812.4703.02.02.01 EXCAVACION MASIVA MANUAL TIERRA COMPACTA m3 38.77 27.82 1,078.58 0.00 0.00 38.77 38.77 03.02.02.02 RELLENO CON MATERIAL PROPIO m3 3.00 28.87 86.61 0.00 0.00 3.00 3.00 03.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30M. m3 46.50 13.92 647.28 0.00 0.00 46.50 46.50 03.02.03 CAJA DE LODOS 0 0.00 0.00 499.0603.02.03.01 ENCOFRADO Y DESENCOFRADO m2 6.76 31.45 212.60 0.00 0.00 6.76 6.76 03.02.03.02 CONCRETO F'C= 140 KG/CM2. m3 0.43 342.31 147.19 0.00 0.00 0.43 0.43 03.02.03.03 CONCRETO F'C= 175 KG/CM2. m3 0.19 352.14 66.91 0.00 0.00 0.19 0.19 03.02.03.04 ACERO FY= 4200 KG/CM2. kg 12.99 5.57 72.35 0.00 0.00 12.99 12.99 03.02.04 BIODIGESTOR 10,697.1003.02.04.01 BIODIGESTOR DE POLIETILENO DE 7,000 LITROS pza 1.00 10,697.10 10,697.10 0.00 0.00 1.00 1.00 03.03 POZO DE PERCOLACION (01 UND.) 0 0.00 0.00 6,446.2603.03.01 TRABAJOS PRELIMINARES 0 0.00 0.00 32.5603.03.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 4.00 8.14 32.56 0.00 0.00 4.00 4.00 03.03.02 MOVIMIENTO DE TIERRAS 0 0.00 0.00 800.6503.03.02.01 EXCAVACION MASIVA MANUAL TIERRA COMPACTA m3 12.00 27.82 333.84 0.00 0.00 12.00 12.00 03.03.02.02 RELLENO CON MATERIAL PROPIO m3 2.40 28.87 69.29 0.00 0.00 2.40 2.40 03.03.02.03 FILTRO DE GRAVA m3 6.00 37.30 223.80 0.00 0.00 6.00 6.00 03.03.02.04 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30M. m3 12.48 13.92 173.72 0.00 0.00 12.48 12.48 03.03.03 OBRAS DE CONCRETO ARMADO 2,662.2503.03.03.01 ENCOFRADO Y DESENCOFRADO m2 28.44 31.45 894.44 0.00 0.00 28.44 28.44 03.03.03.02 CONCRETO F'C= 175 KG/CM2. m3 2.22 352.14 781.75 0.00 0.00 2.22 2.22 03.03.03.03 ACERO FY= 4200 KG/CM2. kg 177.03 5.57 986.06 0.00 0.00 177.03 177.03 03.03.04 MAMPOSTERIA 0 0.00 0.00 2,950.8003.03.04.01 MURO DE LADRILLO DE .24 X .13 X .09M. S/JUNTA VERTICAL m2 24.00 122.95 2,950.80 0.00 0.00 24.00 24.00 04 MODULO DE SERVICIOS TURISTICOS 92,745.8604.01 MODULO SERVICIOS HIGIENICOS 92,745.8604.01.01 TRABAJOS PRELIMINARES 5,871.6604.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 160.08 1.67 267.33 160.08 0.00 0.00 160.08 04.01.01.02 ELIMINACION DE MALEZA Y ARBUSTOS m2 160.08 4.17 667.53 160.08 0.00 0.00 160.08 04.01.01.03 NIVELACION DE TERRENO m2 160.08 1.04 166.48 160.08 0.00 0.00 160.08 04.01.01.04 TRAZO, NIVELACION Y REPLANTEO m2 160.08 9.67 1,547.97 160.08 0.00 0.00 160.08 04.01.01.05 MURO SECO DE PIEDRA DE 16" m3 9.33 88.29 823.75 9.33 0.00 0.00 9.33 04.01.01.06 EXTRACCION DE TIERRA VEGETAL Y TRASLADO MANUAL m3 39.79 41.74 1,660.83 39.79 0.00 0.00 39.79 04.01.01.07 SEMBRADO DE GRASS m2 116.00 6.36 737.76 116.00 0.00 0.00 116.00 04.01.02 MOVIMIENTO DE TIERRAS 1,047.6304.01.02.01 EXCAVACION DE ZANJAS HASTA 1M. m3 13.55 27.82 376.96 13.55 0.00 0.00 13.55 04.01.02.02 TERRAPLEN PARA F/PISO CON PISON A MANO 0.15M. m2 160.08 2.64 422.61 160.08 0.00 0.00 160.08 04.01.02.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30M. m3 17.82 13.92 248.05 17.82 0.00 0.00 17.82 04.01.03 OBRAS DE CONCRETO SIMPLE 0 0.00 0.00 3,100.8404.01.03.01 CIMIENTOS CORRIDOS 1:10+30% DE P.G. m3 13.55 164.40 2,227.62 13.55 0.00 0.00 13.55 04.01.03.02 SOBRECIMIENTOS: ENCOFRADO Y DESENCOFRADO m2 17.58 30.33 533.20 17.58 0.00 0.00 17.58 04.01.03.03 SOBRECIMIENTOS: CONCRETO 1:8+25% P.M. m3 1.32 257.59 340.02 1.32 0.00 0.00 1.32 04.01.04 OBRAS DE CONCRETO ARMADO 1,857.2504.01.04.01 COLUMNAS: CONCRETO F'C= 210 KG/CM2. m3 0.90 477.05 429.35 0.90 0.00 0.00 0.90 04.01.04.02 COLUMNAS: ENCOFRADO Y DESENCOFRADO m2 18.08 36.03 651.42 18.08 0.00 0.00 18.08 04.01.04.03 COLUMNAS: ACERO FY=4200 KG/CM2. kg 129.34 5.32 688.09 129.34 0.00 0.00 129.34 04.01.04.04 DINTEL: CONCRETO F'C= 210 KG/CM2. m3 0.10 368.44 36.84 0.00 0.10 0.00 0.10 04.01.04.05 DINTEL: ENCOFRADO Y DESENCOFRADO m2 0.70 42.64 29.85 0.00 0.70 0.00 0.70 04.01.04.06 DINTEL: ACERO FY=4200 KG/CM2. kg 4.08 5.32 21.71 0.00 4.08 0.00 4.08 04.01.05 MUROS Y TABIQUES DE ALBAÑILERIA 6,516.0504.01.05.01 MURO DE BLOQUETA DE 0.12 X 0.20 X 0.40M. m2 43.45 55.66 2,418.43 0.00 43.45 0.00 43.45 04.01.05.02 MURO DE PIEDRA DE 0.50M. ASENTADA EN MORTERO 1:5. m2 52.50 78.05 4,097.63 0.00 52.50 0.00 52.50 04.01.06 PISOS Y PAVIMENTOS 14,222.3204.01.06.01 EMPEDRADO E= 0.10M. m2 112.37 21.76 2,445.17 0.00 0.00 112.37 112.37 04.01.06.02 BASE DE 4" CONCRETO F'C= 140 KG/CM2. m2 112.37 46.34 5,207.23 0.00 0.00 112.37 112.37 04.01.06.03 ENCOFRADO Y DESENCOFRADO VEREDAS m2 11.96 10.74 128.45 0.00 0.00 11.96 11.96 04.01.06.04 FALSO PISO E=2" (MEZCLA 1:8 S/EMPEDRADO) m2 79.58 33.99 2,704.92 0.00 0.00 79.58 79.58 04.01.06.05 CONTRAPISO CONCRETO 1:6 E= 48MM. m2 79.58 28.37 2,257.68 0.00 0.00 79.58 79.58 04.01.06.06 PISO DE CERAMICO DE 0.30 x 0.30M. m2 25.31 58.43 1,478.86 0.00 0.00 25.31 25.31 04.01.07 REVOQUES, ENLUCIDOS Y MOLDURAS 11,272.9104.01.07.01 TARRAJEO PRIMARIO O RAYADO (1:5) m2 86.90 19.53 1,697.16 0.00 0.00 86.90 86.90 04.01.07.02 TARRAJEO EN INTERIORES (MORTERO 1:5) m2 71.28 22.49 1,603.09 0.00 0.00 71.28 71.28 04.01.07.03 TARRAJEO EN EXTERIORES (MORTERO 1:5) m2 22.22 34.13 758.37 0.00 0.00 22.22 22.22 04.01.07.04 EMBOQUILLADO EN MURO DE PIEDRA MEZCLA 1:5 m2 124.75 57.83 7,214.29 0.00 0.00 124.75 124.75 04.01.08 ZOCALOS 5,075.0504.01.08.01 ZOCALO DE MAYOLICA DE COLOR DE .20 X .30M. m2 78.21 64.89 5,075.05 0.00 0.00 78.21 78.21 04.01.09 ESTRUCTURA DE MADERA Y COBERTURA 20,520.3204.01.09.01 PARES DE MADERA COPAIBA 2" X 8" TIPO T-1 und 13.00 362.01 4,706.13 0.00 13.00 0.00 13.00 04.01.09.02 CORREAS DE MADERA COPAIBA DE 2" x 2" m 234.30 5.78 1,354.25 0.00 234.30 0.00 234.30 04.01.09.03 ENTABLADO MACHIHEMBRADO AGUANO DE 3/4" X 4" m2 95.85 96.20 9,220.77 0.00 95.85 0.00 95.85 04.01.09.04 COBERTURA CON PLANCHAS ONDULINE m2 95.85 54.66 5,239.16 0.00 95.85 0.00 95.85 04.01.10 CARPINTERIA DE MADERA 3,225.5304.01.10.01 PUERTA DE MADERA COPAIBA E=1 1/4" m2 8.32 272.90 2,270.53 0.00 0.00 8.32 8.32 04.01.10.02 TABIQUERIA DE MADERA E=0.05M. m2 4.51 131.08 591.17 0.00 0.00 4.51 4.51 04.01.10.03 BANCAS DE MADERA COPAIBA m2 3.13 116.24 363.83 0.00 0.00 3.13 3.13 04.01.11 CARPINTERIA METALICA Y HERRERIA 2,600.5804.01.11.01 VIGAS METALICAS DE 2" X 8" X 1/4" m 31.95 49.59 1,584.40 0.00 31.95 0.00 31.95 04.01.11.02 SUMIDERO METALICO TIPO REJILLA m2 4.02 252.78 1,016.18 0.00 0.00 4.02 4.02 04.01.12 CERRAJERIA 1,658.4004.01.12.01 BISAGRA CAPUCHINA ALUMINIZADA DE 4" X 4" und 16.00 10.90 174.40 0.00 0.00 16.00 16.00 04.01.12.02 CERRADURA TIPO PASADOR DE 3" pza 8.00 61.10 488.80 0.00 0.00 8.00 8.00 04.01.12.03 ANGULAR DE FIERRO DE 2" X 4" X 1/4" pza 32.00 31.10 995.20 0.00 0.00 32.00 32.00 04.01.13 PINTURA 1,478.9104.01.13.01 PINTURA SATINADA EN MUROS EXTERIORES m2 16.83 10.56 177.72 0.00 0.00 16.83 16.83 04.01.13.02 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 16.64 11.09 184.54 0.00 0.00 16.64 16.64 04.01.13.03 PINTURA PRESERVANTE EN CARPINTERIA DE MADERA m2 175.85 6.35 1,116.65 0.00 0.00 175.85 175.85 04.01.14 APARATOS Y ACCESORIOS SANITARIOS 4,204.0504.01.14.01 INODORO TIPO TURCO COLOR BLANCO pza 8.00 120.00 960.00 0.00 0.00 8.00 8.00

04.01.14.02 URINARIO CORRIDO REVESTIDO CON CERAMICO m 3.36 105.96 356.03 0.00 0.00 3.36 3.36 LAVADERO CORRIDO REVESTIDO CON CERAMICO ml 3.36 143.95 483.67 0.00 0.00 3.36 3.36

04.01.14.03 MANGUERAS PARA LIMPIEZA pza 1.00 50.00 50.00 0.00 0.00 1.00 1.00 04.01.14.04 BARRAS METALICAS DE SEGURIDAD pza 16.00 25.00 400.00 0.00 0.00 16.00 16.00 04.01.14.05 BASUREROS METALICOS pza 8.00 150.00 1,200.00 0.00 0.00 8.00 8.00

GANCHO DOBLE DE ALUMINIO pza 8.00 6.00 48.00 0.00 0.00 8.00 8.00 04.01.14.06 COLOCACION DE APARATOS SANITARIOS und 8.00 49.47 395.76 0.00 0.00 8.00 8.00 04.01.14.07 COLOCACION DE ACCESORIOS SANITARIOS pza 17.00 18.27 310.59 0.00 0.00 17.00 17.00 04.01.15 INSTALACIONES SANITARIAS 5,874.2604.01.15.01 SALIDA PARA DESAGUE, PVC SAL DE 4" pto 8.00 69.72 557.76 0.00 0.00 8.00 8.00 04.01.15.02 SALIDA PARA DESAGUE, PVC SAL DE 2" pto 14.00 66.18 926.52 0.00 0.00 14.00 14.00 04.01.15.03 SALIDA PARA VENTILACION pto 1.00 38.52 38.52 0.00 0.00 1.00 1.00 04.01.15.04 EXCAVACION DE ZANJAS PARA TUBERIAS m 71.00 16.70 1,185.70 0.00 0.00 71.00 71.00 04.01.15.05 RELLENO DE ZANJAS PARA TUBERIAS m 71.00 10.43 740.53 0.00 0.00 71.00 71.00 04.01.15.06 INSTALACION TUBERIA PVC SAL DE 4" m 18.10 8.73 158.01 0.00 0.00 18.10 18.10 04.01.15.07 INSTALACION TUBERIA PVC SAL DE 3" m 30.50 6.67 203.44 0.00 0.00 30.50 30.50 04.01.15.08 INSTALACION TUBERIA PVC SAL DE 2" m 22.40 5.33 119.39 0.00 0.00 22.40 22.40 04.01.15.09 ACCESORIOS PVC SAL, COSTO GLOBAL GLB 1.00 304.00 304.00 0.00 0.00 1.00 1.00 04.01.15.10 COLOCACION DE ACCESORIOS PVC SAL pza 43.00 13.38 575.34 0.00 0.00 43.00 43.00 04.01.15.11 REGISTRO ROSCADO DE BRONCE DE 4" und 1.00 26.22 26.22 0.00 0.00 1.00 1.00 04.01.15.12 REGISTRO ROSCADO DE BRONCE DE 2" und 2.00 18.22 36.44 0.00 0.00 2.00 2.00 04.01.15.13 SUMIDERO DE BRONCE DE 2" und 14.00 23.22 325.08 0.00 0.00 14.00 14.00 04.01.15.14 CAJA DE REGISTRO DE 12" x 24" C/TAPA DE C° und 3.00 225.77 677.31 0.00 0.00 3.00 3.00 04.01.16 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 4,220.1104.01.16.01 SALIDA DE AGUA FRIA DE 1/2" pto 16.00 38.55 616.80 0.00 0.00 16.00 16.00 04.01.16.02 EXCAVACION DE ZANJAS PARA TUBERIAS m 50.00 16.70 835.00 0.00 0.00 50.00 50.00 04.01.16.03 RELLENO DE ZANJAS PARA TUBERIAS m 50.00 10.43 521.50 0.00 0.00 50.00 50.00 04.01.16.04 INSTALACION TUBERIA PVC SAP C/R DE 1" C-15 m 5.00 6.14 30.70 0.00 0.00 5.00 5.00 04.01.16.05 INSTALACION TUBERIA PVC SAP C/R DE 3/4" C-15 m 10.00 4.67 46.70 0.00 0.00 10.00 10.00 04.01.16.06 INSTALACION TUBERIA PVC SAP C/R DE 1/2" C-15 m 35.00 4.04 141.40 0.00 0.00 35.00 35.00 04.01.16.07 ACCESORIOS PVC SAP, COSTO GLOBAL GLB 1.00 82.00 82.00 0.00 0.00 1.00 1.00 04.01.16.08 COLOCACION ACCESORIOS PVC SAP pza 71.00 16.04 1,138.84 0.00 0.00 71.00 71.00 04.01.16.09 VALVULA DE COMPUERTA DE BRONCE DE 1" pza 1.00 112.85 112.85 0.00 0.00 1.00 1.00 04.01.16.10 VALVULA DE COMPUERTA DE BRONCE DE 1/2" pza 5.00 81.85 409.25 0.00 0.00 5.00 5.00 04.01.16.11 NICHO DE MAYOLICA COLOR 0.15 X 0.25 X 0.20M. und 5.00 23.62 118.10 0.00 0.00 5.00 5.00 04.01.16.12 CAJA PARA VALVULAS pza 1.00 95.47 95.47 0.00 0.00 1.00 1.00 04.01.16.13 PRUEBA HIDRAULICA TUBERIA PVC SAP m 50.00 1.43 71.50 0.00 0.00 50.00 50.00 05 FLETES 102,458.7405.01 FLETES 102,458.7405.01.01 FLETE TERRESTRE 10,093.7705.01.01.01 FLETE TERRESTRE DE MATERIALES kg 50,468.84 0.20 10,093.77 25,234.42 25,234.42 0.00 50,468.84 05.01.02 FLETE EN CAMINO RURAL 92,364.9705.01.02.01 FLETE EN CAMINO RURAL DE MATERIALES kg 50,468.84 0.89 44,917.27 25,234.42 25,234.42 0.00 50,468.84 05.01.02.02 FLETE EN CAMINO RURAL DE AGREGADOS m3 217.65 218.00 47,447.70 108.83 108.83 0.00 217.65 06 VARIOS 1,539.0006.01 VARIOS 1,539.0006.01.01 MODULO DE HERRAMIENTAS 504.0006.01.01.01 MODULO PARA CAPACITACION EN AGUA POTABLE MOD 1.00 504.00 504.00 0.00 0.00 1.00 1.00 06.01.02 CONTROL DE CALIDAD DEL CONCRETO 835.0006.01.02.01 ENSAYOS A LA COMPRESION DEL CONCRETO GLB 1.00 35.00 35.00 1.00 0.00 0.00 1.00 06.01.02.02 DISEÑO DE MEZCLAS GLB 1.00 800.00 800.00 0.00 1.00 0.00 1.00 06.01.03 PLACA RECORDATORIA 200.0006.01.03.01 PLACA RECORDATORIA und 1.00 200.00 200.00 0.00 0.00 1.00 1.00 07 ARQUEOLOGIA 10,141.0707.01 MONITOREO ARQUEOLOGICO 10,141.0707.01.01 MOVIMIENTO DE TIERRAS 674.0407.01.01.01 EXCAVACIONES DE INVESTIGACION ARQUEOLOGICA (TRINCHERA) m3 6.00 83.47 500.82 3.00 3.00 0.00 6.00 07.01.01.02 RELLENO CON MATERIAL PROPIO m3 6.00 28.87 173.22 3.00 3.00 0.00 6.00 07.01.02 MONITOREO ARQUEOLOGICO 9,407.0307.01.02.01 MONITOREO ARQUEOLOGICO. m2 1,273.70 6.78 8,635.68 0.00 1,273.70 0.00 1,273.70 07.01.02.02 CLASIFICACION DE MATERIAL CULTURAL bls 5.00 63.57 317.85 0.00 5.00 0.00 5.00 07.01.02.03 ANALISIS DE MATERIAL CULTURAL bls 5.00 77.14 385.70 0.00 5.00 0.00 5.00 07.01.02.04 INVENTARIO Y CATALOGACION DE HALLAZGOS pza 10.00 6.78 67.80 0.00 10.00 0.00 10.00 07.01.03 DIBUJOS 60.0007.01.03.01 DIBUJO TECNICO hja 30.00 2.00 60.00 0.00 30.00 0.00 30.00

07.01.03.02 DIGITALIZACION DE REGISTRO GRAFICO hja 30.00 0.00 0.00 0.00 30.00 0.00 30.00 COSTO DIRECTO TOTAL 269,038.45

36.00 0.001.00 0.00

1.00 0.00

1.00 0.001.00 0.00

21.32 0.0017.11 0.0020.53 0.0029.03 0.004.62 0.00

10.95 0.0038.84 0.006.72 0.005.73 0.001.00 0.005.00 0.001.00 0.001.00 0.001.00 0.00

25.68 0.0025.68 0.00

100.00 0.00100.00 0.00100.00 0.00100.00 0.00100.00 0.00100.00 0.00100.00 0.00100.00 0.00100.00 0.00

18.62 0.0018.62 0.00

6.934.70 0.00

59.01 0.0027.00 0.0034.65 0.001.00 0.001.00 0.001.00 0.00

34.65 0.00

1.00 0.001.00 0.00

21.00 0.00

10.00 0.0020.00 0.00

65.00 0.0065.00 0.0035.00 0.0030.00 0.0035.00 0.0035.00 0.0035.00 0.0035.00 0.0065.00 0.001.00 0.008.00 0.00

65.00 0.00

0.64 0.000.61 0.000.32 0.000.16 0.001.20 0.000.64 0.001.00 0.001.00 0.004.00 0.00

16.00 0.0016.00 0.0016.00 0.0016.00 0.0016.00 0.006.00 0.00

10.00 0.001.00 0.004.00 0.00

9.00 0.00

38.77 0.003.00 0.00

46.50 0.00

6.76 0.000.43 0.000.19 0.00

12.99 0.00

1.00 0.00

4.00 0.00

12.00 0.002.40 0.006.00 0.00

12.48 0.00

28.44 0.002.22 0.00

177.03 0.00

24.00 0.00

160.08 0.00160.08 0.00160.08 0.00160.08 0.00

9.33 0.0039.79 0.00

116.00 0.00

13.55 0.00160.08 0.0017.82 0.00

13.55 0.0017.58 0.001.32 0.00

0.90 0.0018.08 0.00

129.34 0.000.10 0.000.70 0.004.08 0.00

43.45 0.0052.50 0.00

112.37 0.00112.37 0.0011.96 0.0079.58 0.0079.58 0.0025.31 0.00

86.90 0.0071.28 0.0022.22 0.00

124.75 0.00

78.21 0.00

13.00 0.00234.30 0.0095.85 0.0095.85 0.00

8.32 0.004.51 0.003.13 0.00

31.95 0.004.02 0.00

16.00 0.008.00 0.00

32.00 0.00

16.83 0.0016.64 0.00

175.85 0.00

8.00 0.00

3.36 0.003.36 0.001.00 0.00

16.00 0.008.00 0.008.00 0.008.00 0.00

17.00 0.00

8.00 0.0014.00 0.001.00 0.00

71.00 0.0071.00 0.0018.10 0.0030.50 0.0022.40 0.001.00 0.00

43.00 0.001.00 0.002.00 0.00

14.00 0.003.00 0.00

16.00 0.0050.00 0.0050.00 0.005.00 0.00

10.00 0.0035.00 0.001.00 0.00

71.00 0.001.00 0.005.00 0.005.00 0.001.00 0.00

50.00 0.00

50468.84 0.00

50468.84 0.00217.65 0.00

1.00 0.00

1.00 0.001.00 0.00

1.00 0.00

6.00 0.006.00 0.00

1273.70 0.005.00 0.005.00 0.00

10.00 0.00

30.00 0.00

30.00 0.00

2.10 CRONOGRAMA % DE AVANCE DE OBRA

OBRA: SERVICIOS HIGIENICOS EN CAMPAMENTO DEL CAMINO INCA: HATUNCHACA (WAYLLABAMBA)

COD. ACTIVIDAD TotalMES 1 MES 2 MES 3

TOTAL

% % %01 OBRAS PROVISIONALES 10,261.12 01.01 OBRAS PROVISIONALES 10,261.12 01.01.01 CONSTRUCCIONES PROVISIONALES 4,434.78 100% 0% 0% 100%01.01.02 CARTELES 826.34 100% 0% 0% 100%01.01.03 INSTALACIONES PROVISIONALES 5,000.00 100% 0% 0% 100%02 SISTEMA DE AGUA POTABLE 30,355.73 02.01 CAPTACION DE RIO (01 UND.) 8,759.06 100% 0% 0% 100%02.02 REFACCION SEDIMENTADOR (01 UND.) 3,219.24 100% 0% 0% 100%02.03 LINEA DE CONDUCCION 3,624.00 02.03.01 LINEA DE CONDUCCION (100 ML.) 3,624.00 100% 0% 0% 100%02.04 REFACCION FILTRO (01 UND.) 2,700.30 100% 0% 0% 100%02.05 RESERVORIO DE CONCRETO ARMADO 8,980.61 02.05.01 RESERVORIO V= 5M3. (01 UND.) 7,661.35 100% 0% 0% 100%02.05.02 CASETA DE VALVULAS (01 UND.) 843.16 100% 0% 0% 100%02.05.03 TRABAJOS DE PROTECCION EN RESERVORIO 476.10 100% 0% 0% 100%02.06 LINEA DE ADUCCION 3,072.52 02.06.01 LINEA DE ADUCCION (65 ML.) 2,603.17 0% 100% 0% 100%02.06.02 VALVULA DE CONTROL (01 UND.) 469.35 0% 100% 0% 100%03 SISTEMA DE DESAGUE 21,536.94 03.01 INSTALACIONES EXTERIORES DE DESAGUE 2,008.80 03.01.01 REDES COLECTORAS 2,008.80 0% 0% 100% 100%03.02 BIODIGESTOR 13,081.89 03.02.01 TRABAJOS PRELIMINARES 73.26 0% 0% 100% 100%03.02.02 MOVIMIENTO DE TIERRAS 1,812.47 0% 0% 100% 100%03.02.03 CAJA DE LODOS 499.06 0% 0% 100% 100%03.02.04 BIODIGESTOR 10,697.10 0% 0% 100% 100%03.03 POZO DE PERCOLACION (01 UND.) 6,446.26 03.03.01 TRABAJOS PRELIMINARES 32.56 0% 0% 100% 100%03.03.02 MOVIMIENTO DE TIERRAS 800.65 0% 0% 100% 100%03.03.03 OBRAS DE CONCRETO ARMADO 2,662.25 0% 0% 100% 100%03.03.04 MAMPOSTERIA 2,950.80 0% 0% 100% 100%04 MODULO DE SERVICIOS TURISTICOS 92,745.86 04.01 MODULO SERVICIOS HIGIENICOS 92,745.86 04.01.01 TRABAJOS PRELIMINARES 5,871.66 100% 0% 0% 100%04.01.02 MOVIMIENTO DE TIERRAS 1,047.63 100% 0% 0% 100%04.01.03 OBRAS DE CONCRETO SIMPLE 3,100.84 100% 0% 0% 100%04.01.04 OBRAS DE CONCRETO ARMADO 1,857.25 95% 5% 0% 100%04.01.05 MUROS Y TABIQUES DE ALBAÑILERIA 6,516.05 0% 100% 0% 100%04.01.06 PISOS Y PAVIMENTOS 14,222.32 0% 70% 0% 70%04.01.07 REVOQUES, ENLUCIDOS Y MOLDURAS 11,272.91 0% 0% 100% 100%04.01.08 ZOCALOS 5,075.05 0% 0% 100% 100%04.01.09 ESTRUCTURA DE MADERA Y COBERTURA 20,520.32 0% 100% 0% 100%04.01.10 CARPINTERIA DE MADERA 3,225.53 0% 0% 100% 100%04.01.11 CARPINTERIA METALICA Y HERRERIA 2,600.58 0% 61% 39% 100%04.01.12 CERRAJERIA 1,658.40 0% 0% 100% 100%04.01.13 PINTURA 1,478.91 0% 0% 100% 100%04.01.14 APARATOS Y ACCESORIOS SANITARIOS 4,204.05 0% 0% 100% 100%04.01.15 INSTALACIONES SANITARIAS 5,874.26 0% 0% 100% 100%04.01.16 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 4,220.11 0% 0% 100% 100%05 FLETES 102,458.74 05.01 FLETES 102,458.74 05.01.01 FLETE TERRESTRE 10,093.77 50% 50% 0% 100%

FTE.FTO: BIRF PRESTAMO Nº LA-7257-PEUNIDAD GEST.: PER PLAN COPESCOPROYECTO: PROYECTO DE REORDENAMIENTO Y REHABILITACIÓN DEL VALLE VILCANOTA

COMPONENTE: 1.0 FORTALECIMIENTO DE LA CAPACIDAD EN TURISMO Y DESARROLLO DE INFRAESTRUCTURASUB COMPONENTE: 1.4 SERVICIO PARA TURISTAS EN EL CAMINO INCA

05.01.02 FLETE EN CAMINO RURAL 92,364.97 50% 50% 0% 100%06 VARIOS 1,539.00 06.01 VARIOS 1,539.00 06.01.01 MODULO DE HERRAMIENTAS 504.00 0% 0% 100% 100%06.01.02 CONTROL DE CALIDAD DEL CONCRETO 835.00 4% 96% 0% 100%06.01.03 PLACA RECORDATORIA 200.00 0% 0% 100% 100%07 ARQUEOLOGIA 10,141.07 07.01 MONITOREO ARQUEOLOGICO 10,141.07 07.01.01 MOVIMIENTO DE TIERRAS 674.04 50% 50% 0% 100%07.01.02 MONITOREO ARQUEOLOGICO 9,407.03 0% 100% 0% 100%

07.01.03 DIBUJOS 60.00 0% 100% 0% 100%

COSTO DIRECTO 269,038.45 37.52% 34.80% 27.69% 100.00%

(*) Infomes Final Presupuestario - Informe Final de Investigacion Arqueologica

2.12 PROGRAMACIÓN DE PERSONALAÑO - 2011

PERSONAL TÉCNICO Mes 1 2 3 4 5 TOTAL

Supervisor de Obra Programado 0.5 0.5 0.5 0.5 0 2Ejecutado 0

Residente de Obra Programado 1 1 1 1 0 4Ejecutado 0

Asistente de Obra Programado 0 0 0 0 0 0Ejecutado 0

Arqueólogo Programado 0.5 0.5 0.5 0.5 0 2Direc. Proyec. Investigación Ejecutado 0Asistente Arqueólogo Programado 0 0 0 0 0 0

Ejecutado 0Biologo Medio Ambientalista Programado 1 0 0 0 0 1

Ejecutado 0Maestro de Obra Programado 1 1 1 0 0 3

Ejecutado 0Ing Hidraulico Programado 1 0 0 0 0 1

Ejecutado 0

PERSONAL AUXILIAR Mes 1 2 3 4 5 TOTAL

Almacenero Programado 0.5 0.5 0.5 0 0 1.5Ejecutado 0

Guardian Programado 1 1 1 0 0 3Ejecutado 0

Chofer Programado 1 1 1 0 0 3

Ejecutado 0

OBRERO R. COMÚN Mes 1 2 3 4 5 TOTAL

Facilitador Programado 0Ejecutado 0

Facilitador Tecnicas de Riego Programado 0Ejecutado 0

Facilitador Aspectos Sociales Programado 0Ejecutado 0

Topografo Programado 0Ejecutado 0

Capataz Programado 0 0 0 0 0 0Ejecutado 0

Oficial (Dibujante) Programado 0Ejecutado 0

Operario Programado 3 4 4 0 0 11 ###Ejecutado 0

Oficial Programado 1 1 1 0 0 3 ###Ejecutado 0

Peon Programado 8 8 8 0 0 24 ###

Ejecutado 0TOTAL Programado 12 13 13 0 38

Ejecutado 0

38 841

38

2.13 AVANCE FÍSICO

META TOTAL%

M E S E S Total Observaciones

Mensual Acumulado AcumuladoMes 1 Programado 37.52% 37.52% 37.52%

Ejecutado

Mes 2 Programado 34.80% 72.31% 72.31%

Ejecutado

Mes 3 Programado 27.69% 100.00% 100.00%

Ejecutado

Mes 4 (*) Programado 0.00% 100.00% 100.00%

Ejecutado

* MES PARA INFORME ANUAL PRESUPUESTARIO ( PRELIQUIDACION)

Meta total : 100.00% Presupuesto total: S/. 8,957,593.31

Meta total: Presupuesto total:Meta del sector: Presupuesto del sector: S/. 1'278,034.24

Av. acumulado anterior: Fecha acumulado anterior:

(*) Para el cálculo de la meta total, se debe realizar el computo del avance físico actualizado en el Conjunto Arqueologico Choquequirao

Cusco, Abril del 2006

FTE.FTO: BIRF PRESTAMO Nº LA-7257-PEUNIDAD GEST.: PER PLAN COPESCOPROYECTO: PROYECTO DE REORDENAMIENTO Y REHABILITACIÓN DEL VALLE VILCANOTA

COMPONENTE: 1.0 FORTALECIMIENTO DE LA CAPACIDAD EN TURISMO Y DESARROLLO DE INFRAESTRUCTURASUB COMPONENTE: 1.4 SERVICIO PARA TURISTAS EN EL CAMINO INCA

OBRA: SERVICIOS HIGIENICOS EN CAMPAMENTO DEL CAMINO INCA: HATUNCHACA (WAYLLABAMBA)

* Los porcentajes otorgados para el mes 4, corresponde al avance de los informes finales y preliquidacion correspondiente al trabajo programado.

S10

snandopf

Precios y cantidades de recursos requeridosObra 0801016

Fecha 24/09/2011Lugar 080801 CUSCO - ESPINAR - ESPINAR

Código Recurso Unidad Cantidad Precio S/. Parcial S/.

MANO DE OBRA0147000022 OPERADOR DE EQUIPO LIVIANO Hh 1,875.0700 10.68 20,025.740147000023 OPERADOR DE EQUIPO PESADO Hh 1,095.2600 12.34 13,515.550147000041 OPERARIO Hh 37,998.8000 12.34 468,905.130147000042 TOPOGRAFO Hh 305.5900 13.75 4,201.850147000043 OPERARIO DE TRABAJOS ELECTRICOS Hh 1,230.0000 12.34 15,178.200147010001 CAPATAZ Hh 122.1900 12.50 1,527.410147010002 MAESTRO DE OBRA Hh 114.7000 12.50 1,433.750147010003 OFICIAL Hh 19,025.6900 10.68 203,194.320147010004 PEON Hh 32,822.4100 9.59 314,766.940147010039 CAPATAZ DE TRABAJOS ELECTRICOS Hh 30.0000 12.34 370.200147010040 PEON DE TRABAJOS ELECTRICOS Hh 1,956.0000 9.59 18,758.040147010041 OFICIAL DE TRABAJOS ELECTRICOS Hh 483.0000 10.68 5,158.44

1,067,035.57

MATERIALES0201000014 INSTALACION PROVICIONAL DE LETRINAS GLB 1.0000 700.00 700.00

0201000015 INSTALACION PROVISIONAL DE AGUA GLB 1.0000 250.00 250.000201000016 INSTALACION PROVISIONAL DE DESAGUE GLB 1.0000 200.00 200.00

0201000017 GLB 1.0000 350.00 350.00

0202000007 ALAMBRE NEGRO RECOCIDO # 16 Kg 10,802.7900 4.50 48,612.560202000008 ALAMBRE NEGRO RECOCIDO # 8 Kg 1,423.3200 2.60 3,700.620202000011 ESCALERA DE GATO DE F°G° 1" M 4.4000 45.00 198.000202000012 ALAMBRE # 18 Kg 127.7500 5.00 638.760202010005 CLAVOS PARA MADERA C/C 3" Kg 346.4500 4.50 1,559.010202010007 CLAVOS PARA MADERA C/C 4" Kg 34.3300 4.50 154.470202010061 CLAVOS C/C 3" Kg 82.4000 4.50 370.790202010062 CLAVOS C/C 5" Kg 25.1100 4.50 113.010202010063 CLAVOS C/C 4" Kg 125.5600 4.50 565.020202010064 CLAVOS C/C 3/4" Kg 1,381.2200 4.50 6,215.500202020054 CLAVOS CON CABEZA PROMEDIO Kg 0.4600 4.50 2.080202020056 ACERO LISO DE 1/2" M 2.8300 8.00 22.660202020057 ACERO LISO DE 1" Pza 8.0500 72.00 579.340202040009 ALAMBRE NEGRO N°16 Kg 48.7500 4.50 219.370202040010 ALAMBRE NEGRO N°8 Kg 188.3400 4.50 847.540202130043 TUBO DE ACERO LAC 1 1/2" e=1/8" M2 148.1400 13.60 2,014.750202130044 TUBO DE ACERO LAC 1" e=1/8" M2 45.8900 8.60 394.610202130045 TUBO DE ACERO 1"x6.0 m Pza 8.1300 26.00 211.330202130046 CLAVO DE FIIJACION 1" Kg 58.9000 4.50 265.030202460097 PERNO DE ANCLAJE PARA INODORO Pza 10.0000 2.00 20.000202460098 Pza 10.0000 1.00 10.00

0202460099 ASIENTO DE PLASTICO Und 5.0000 8.00 40.000202850010 TUBO DE FIERRO NEGRO DE 2"x2 mm Und 136.7900 78.00 10,669.670202850011 TUBO DE FIERRO NEGRO DE 5/8"x6 m Und 539.1200 16.00 8,625.840202850012 TUBO DE ALUMINIO DE 1 1/2" x 1 1/2" x0.8" Pza 217.4600 38.00 8,263.29

0203030012 Fierro corrugado F'y=4200 Kg/cm² Ø=3/8" Vll 1.0000 25.00 25.000203030083 Fierro corrugado F'y=4200 Kg/cm² Ø=8mm Vll 16.5500 25.00 413.660204000000 ARENA FINA M3 315.1500 50.42 15,889.790204010004 TIERRA SARANDEADA M3 72.5000 3.00 217.500204010007 TIERRA COMUN CERNIDA M3 5.0000 54.62 273.100204010008 BENTONITA bls 10.0000 32.50 325.000204010009 CHAMPA (0.40x0.60m) Und 3,427.5000 5.00 17,137.500204010010 ESPECIES ARBOREAS Und 70.0000 3.00 210.00

FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1

INSTALACION PROVISIONAL DE ENERGIA ELECTRICA

PERNO DE ANCLAJE PARA SUJECION DE INODORO

0204010011 CHAMOTA Und 12.0000 10.00 120.000205000003 PIEDRA CHANCADA DE 1/2" M3 1,226.6600 80.00 98,132.600205000004 PIEDRA CHANCADA DE 3/4" M3 762.9100 80.00 61,032.740205000007 PIEDRA DE CANTO RODADO M3 100.7900 80.00 8,062.800205000009 PIEDRA GRANDE DE 8" M3 42.5900 80.00 3,406.800205000011 PIEDRA MEDIANA DE 6" M3 42.0400 80.00 3,362.860205000034 GRAVA CANTO RODADO 10 - 100mm M3 15.2700 80.00 1,221.360205010004 ARENA GRUESA M3 1,305.0900 80.00 104,407.230205020020 PIEDRA MEDIANA M3 298.8900 80.00 23,911.360206030051 M 126.0000 5.91 744.66

0206030052 M 408.1000 4.80 1,958.88

0206030053 M 242.0000 3.20 774.40

0206030054 M 10.0000 16.05 160.50

0207010040 M 107.0000 295.60 31,629.20

0207010041 CABLE TIPO N2XH 3-1x25 mm M 66.0000 52.74 3,480.840207010042 CABLE TIPO N2XH 3-1x18 mm M 408.1000 34.06 13,899.890207010043 CABLE TIPO N2XH 3-1x6 mm M 44.0000 14.50 638.000207010044 CABLE TIPO N2XH 2-1x6 mm2 M 99.0000 9.10 900.900207010045 M 391.6000 5.76 2,255.62

0207010046 M 123.2000 3.56 438.59

0207010047 CABLE TIPO NH70 DE 4 mm2 (VERDE) M 1,834.8000 1.70 3,119.160207010048 M 33.0000 9.17 302.61

0207010049 CABLE TIPO NH70 DE 6 mm2 (VERDE) M 47.3000 3.12 147.580207010050 M 207.9000 2.39 496.88

0207010051 CABLE NLT EXTRAFLEXIBLE 3x2.5mm2 M 166.0000 4.50 747.000207010052 M 8,512.5000 0.92 7,831.50

0207010053 CABLE TIPO NH70 DE 2.5 mm2 (VERDE) M 2,819.0000 0.92 2,593.480207010054 M 3,366.0000 1.70 5,722.20

0207010055 M 710.4000 1.20 852.48

0207010056 M 80.0000 1.88 150.40

0207010057 CABLE UTP CATEGORIA 6A M 4,090.0000 3.21 13,128.900210020033 Und 18.0000 225.00 4,050.00

0210020035 INODORO ADVANCE ONE PIECE O SIMILAR Und 5.0000 285.00 1,425.00

0210040097 Und 18.0000 285.00 5,130.00

0210040098 Und 5.0000 180.00 900.00

0210040099 URINARIO PICO BLANCO Und 6.0000 259.00 1,554.000210040100 Und 21.0000 345.00 7,245.00

0210040101 Und 13.0000 365.00 4,745.00

0210040103 Und 1.0000 300.00 300.00

0210100052 PAPELERAS DE LOSA BLANCA INC. EJE Und 6.0000 20.00 120.000210150022 REGISTRO DE BRONCE DE 4" Und 61.0000 4.00 244.000210150062 SUMIDERO DE BRONCE DE 4" Und 1.0000 6.00 6.000210150063 REGISTRO DE BRONCE DE 3" Und 32.0000 3.50 112.000210150064 SUMIDERO DE BRONCE DE 2" Und 57.0000 4.00 228.000210240005 CANASTILLA DE BRONCE DE 2" Und 2.0000 60.00 120.000211040056 Und 124.0000 10.00 1,240.00

0211040057 Und 124.0000 10.00 1,240.00

CONDUCTOR DE COBRE DESNUDO BLANDO 16 MM2

CONDUCTOR DE COBRE DESNUDO BLANDO 10 MM2

CONDUCTOR DE COBRE DESNUDO BLANDO 6 MM2

CONDUCTOR DE COBRE DESNUDO BLANDO 50 MM2

CABLE DE ENERGIA TIPO N2XH3-1 x 150 mm

CABLE TIPO NH90 de 10mm2 (ROJO, AZUL O NEGRO)

CABLE TIPO NH90 de 6mm2 (ROJO, AZUL O NEGRO)

CABLE TIPO NH90 de 16mm2 (ROJO, AZUL O NEGRO)

CABLE TIPO NH90 de 4mm2 (ROJO, AZUL O NEGRO)

CABLE TIPO NH70 DE 2.5 mm2 (ROJO, AZUL Y NEGRO)

CABLE TIPO NH70 de 4mm2 (ROJO, AZUL O NEGRO)

CABLE TELEFONICO DE DOS PARES 22 AWG

CABLE MELLIZO POLARIZADO DE 2x2.5 mm2

INODORO TQUE. BAJO NORMAL+ACCES, TAPA, BLANCO

LAVATORIO OVALIN SOBRE MESA DE CONCRETO TIPO CERALUX O SIMILAR INC. ACCESORIOS

LAVATORIO 23"x17" PARA GRIFERIA 4" BLANCO CON ACCESORIOS

LAVADERO DE ACERO INOXIDABLE CIRCULAR

LAVADERO DE ACERO INOXIDABLE DE 2 POZAS 1300x700x900mm

LAVADERO DE ACERO INOXIDABLE DE 1 POZAS 1400x700x850mm

SEÑAL INDICANDO PRESENCIA DE EXTINTOR

SEÑAL INDICANDO ZONA SEGURA EN CASO DE SISMO

0211040058 Und 124.0000 10.00 1,240.00

0211040059 SEÑAL INDICANDO SALIDA A LA DERECHA Und 124.0000 10.00 1,240.00

0211040060 SEÑAL INDICANDO SALIDA SIN DIRECCION Und 124.0000 10.00 1,240.00

0211040063 SISTEMA PFK GLB 1,978.2100 300.00 593,463.000211600014 Und 29.0000 20.10 582.90

0211600015 SOCKET DE BAKELITA Y 2 ESTOBOLES Und 29.0000 4.50 130.500212000021 Pza 1.0000 365.00 365.00

0212000022 Und 1.0000 108.00 108.00

0212000023 Und 13.0000 220.00 2,860.00

0212000024 Und 4.0000 85.00 340.00

0212000025 Und 10.0000 96.45 964.50

0212000026 Und 22.0000 165.00 3,630.00

0212000027 Und 17.0000 210.00 3,570.00

0212000028 Und 17.0000 75.00 1,275.00

0212000029 Und 19.0000 96.45 1,832.55

0212000030 Und 236.0000 236.00 55,696.00

0212000031 Und 104.0000 40.50 4,212.00

0212000032 Und 24.0000 65.00 1,560.00

0212000033 Und 2.0000 37.16 74.32

0212000034 Und 13.0000 153.20 1,991.60

0212000035 Und 1.0000 672.87 672.87

0212000036 Und 87.0000 20.50 1,783.50

0212000037 PLACA DOBLE PARA JACK RJ45 Und 16.0000 12.50 200.000212000038 PLACA SIMPLE PARA JACK RJ45 Und 55.0000 7.50 412.500212020066 Und 21.0000 100.12 2,102.52

0212020067 Und 2.0000 80.50 161.00

0212020068 Und 1.0000 139.58 139.58

0212020069 Und 2.0000 139.58 279.16

0212020070 Und 2.0000 85.00 170.00

SEÑAL INDICANDO ZONA SEGURA EN CASO DE SISMO

SEÑAL INDICANDO SALIDA A LA IZQUIERDA

LAMPARA DE 20 W TIPO DECO GLOBO PHILIPS

TABLERO METALICO CON PUERTA Y CHAPA PARA EMPOTRAR DE 54 POLOS

TABLERO METALICO CON PUERTA Y CHAPA PARA EMPOTRAR DE 18 POLOS

TABLERO METALICO CON PUERTA Y CHAPA PARA EMPOTRAR DE 30 POLOS

TABLERO METALICO CON PUERTA Y CHAPA PARA EMPOTRAR DE 12 POLOS

REFLECTOR CON LAMPARA HALÓGENA DE 150 W

ARTEFACTO PARA ADOSAR TIPO AH-236 MARCA PORTALAMPARAS CON 02 FLUORESCENTES 36 W

FAROLA DE POLICARBONATO TIPO FAE PORTALAMPARAS CON LAMP. HALOGENURO METALICO 70 W INC. EQP. Y DEFLECTOR ALUMINIO

BRAQUET METALICO PARA ADOSAR EN PARED COLOR NEGRO INC. ACCES.

ARTEFACTO TIPO SDL LUCERNA ADOSABLE PORTALAMPARAS CON LAMP. AHORRADORA DE 18 W.PORTALAMPARAS CON 02 FLUORESCENTES 36 W

ARTEFACTO TIPO PLD-A EMPOTRABLE PORTALAMPARAS CON 02 FLUORESCENTES 36 W/840

ARTEFACTO TIPO PBE BRAQUET EMBELLECEDOR PORTALAMPARAS CON 01 FLUORESCENTES 36 W/840

ARTEFACTO TIPO PBE BRAQUET EMBELLECEDOR PORTALAMPARAS CON 02 FLUORESCENTES 36 W/840

SIRENA ELECTRONICA DE DOBLE TONO, 30W, 12 VDC COLORBLANCO MARFIL

DETECTOR DE MOVIMIENTO INFRA ROJO MINI PIR ESTANDAR, 100· X 13.5 M .COLOR BLANCPORTALAMPARAS CON 02 FLUORESCENTES 36 W

CENTRAl DE AlARMAS DIGITAL, 16 ZONAS, CENTRAL Y KEY PAD CON TECLADO AlFANUMERICO PARA OPERAR Y PROGRAMAR LA CENTRAL

JACK RJ45 CATEGORIA 6 PARA MONTAR EN PLACA

INTERRUPTOR TERMOMAGNETICO DE 3x30A-220V

INTERRUPTOR TERMOMAGNETICO DE 3x20A-220V

INTERRUPTOR TERMOMAGNETICO DE 3x40A-220V

INTERRUPTOR TERMOMAGNETICO DE 3x50A-220V

INTERRUPTOR TERMOMAGNETICO DE 2x50A-220V

0212030039 Und 10.0000 199.00 1,990.00

0212030040 Und 14.0000 38.00 532.00

0212030041 Und 37.0000 118.04 4,367.48

0212030042 INTERRUPTOR SIMPLE Pza 22.0500 9.95 219.400212030043 INTERRUPTOR DOBLE Pza 47.2500 14.50 685.130212030044 INTERRUPTOR TRIPLE Pza 18.0000 19.50 351.000212090052 CAJA METALICA OCTOGONAL TP Pza 472.8500 3.00 1,418.550212090053 CAJA METALICA RECTANGULAR TP Pza 586.9500 3.00 1,760.850212090054 Pza 2.0000 45.00 90.00

0212090055 Pza 75.6000 4.70 355.32

0212340013 Pza 329.5500 8.76 2,886.86

0212340014 Und 15.7500 9.70 152.78

0212550002 Pza 29.0000 125.50 3,639.50

0212550003 Und 60.0000 0.50 30.00

0213010003 ASFALTO RC-250 gln 33.5200 9.24 309.760217020000 Und 359.0400 15.00 5,385.60

0217020001 BLOQUES DE VIDRIO Und 1,964.1600 8.00 15,713.280217080007 TECNOPORT E=15 x 30 x 300mm Und 2,195.5500 12.60 27,663.930217080008 Und 137,622.1600 0.40 55,048.86

0217080009 TECNOPORT E=1" M2 332.3500 4.00 1,329.400217080010 Und 342.0000 0.50 171.00

0217080011 LADRILLO DE PROTECCION Und 2,025.0000 0.30 607.500217510001 Pza 787.4600 22.20 17,481.50

0221000000 CEMENTO PORTLAND TIPO IP (42.5KG) BOL 26,460.0400 24.50 648,270.900226000030 TORNILLOS DE FIJACION DE 1 1/2" Pza 197.6000 0.16 31.620226000031 TORNILLOS DE 2" Und 1,345.1100 0.25 336.280226010013 PICAPORTE DE ALUMINIO DE 3" Pza 43.4900 10.00 434.910226010014 PIZARRA ACRILICA INC./TIZERO M2 238.3100 26.00 6,196.130226020007 BISAGRAS METALICAS Pza 146.8700 6.00 881.250226020008 BISAGRAS DE FIERRO DE 1 1/2"" PAR 90.0900 1.00 90.090226020009 BISAGRAS DE GRAVEDAD PAR 83.8800 25.00 2,096.890226050023 BISAGRA CAPUCHINA 4" Und 171.0000 6.40 1,094.400226050025 JALADOR ALUMINIZADO Und 83.8800 3.00 251.630226050026 FRENO HIDRAULICO Und 57.0000 210.00 11,970.000226060001 Mll 2.9400 35.00 103.07

0226060002 TORNILLO WAFER P.FINA 8x13mm Mll 1.4700 45.00 66.260226070055 CERRADURA EXTERIOR DE DOS GOLPES Und 4.0000 70.00 280.00

0226070057 Pza 8.0000 30.00 240.00

0227010094 FULMINANTE MARRON CAL 22 Cto 2.9400 40.00 117.790227010095 CINTA P/JUNTA PAPEL 52mmx75m Rll 5.8900 15.00 88.340228000026 ALCOHOL gln 15.8300 15.60 246.940229030017 PLACA GYPLAC RH 2.44x1.22mx12mm Pln 54.4800 35.00 1,906.760229030018 Und 8.8300 10.00 88.34

0229040005 CINTA TEFLON Pza 11.7000 3.00 35.110229040008 M 330.0000 0.50 165.00

0229040009 CINTA AISLANTE 20mm 3M 1700 Rll 100.8300 3.78 381.140229050001 CINTA TEFLON Pza 2.5000 3.00 7.490229070037 CANAL DE ALUMINO DE 1/2"x6.0 m Pza 40.0700 6.00 240.43

INTERRUPTOR DIFERENCIAL SUPERINMUNIZADO DE 2x25Ax220vx30mA

CONTACTO ELECTROMAGNETICO 10A, 220 v x 60 Hz

INTERRUPTOR DIFERENCIAL DE 2x25Ax220vx30mA

CAJA METALICA RECTANGULAR PARA ADOSAR SEGUN DETALLE

CAJA TIPO TICIBOX INCLUYE ACCESORIOS DE FIJACION

TOMACORRIENTE DOBLE CON PUESTA A TIERRA 250 V, PESADO CON HORQUILLA UNIVERSAL

TOMACORRIENTE BIPOLAR E INTERRUPTOR SIMPLE

ARTEFACTO DE LUZ DE EMERGENCIA CON 02 FAROS DIRIGIBLES CON BATERIA Y RECARGA AUTOMATICA

ESTOBOL DE 1/8"xLONG 1/2", HILO DE 1/32" INC. TUERCA

BLOQUE DE CONCRETO MURO 10x20x40 CM 8.8Kg

LADRILLO KING KONG HECHO A MANO 10x14x24 cm

LADRILLO KK DE ARCILLA DE 9 X 14 X 24 CM

TEJA DE ARCILLA TIPO COLONIAL DE 37 CM

TORNILLO GYPLAC/SUPERBOARD P.FINA 6x25mm

CHAPAS FORTE PUERTA INT. PEST, MANIJA, LLAVE EXT. SEG. INTER.

PASTA P/JUNTA WESTPAC (BALDE) 4.5 Gln.

CINTA SEÑALADORA AMARILLA PARA CABLE DE BAJA TENSION

0229070038 CANALETA DE LATON SEGUN DISEÑO M 580.9000 13.00 7,551.700229080011 Pza 5.0000 189.07 945.35

0229080012 Und 5.0000 3.10 15.50

0229220002 Und 74.6300 26.00 1,940.32

0229550004 Kg 10.4900 18.50 194.03

0229550094 SOLDADURA CELLOCORD Kg 866.8600 8.40 7,281.630229550100 SOLDADURA CELLOCORD 1/8" Kg 350.9700 7.60 2,667.360229550101 SOLDADURA OVERCORD 1/8" Kg 42.8800 15.70 673.230229550102 EMBONE P/TUBO DE 50 mm Und 18.0000 1.33 23.940229550103 EMBONE P/TUBO DE 40 mm Und 181.8000 1.20 218.160229550104 EMBONE P/TUBO DE 25 mm Und 104.2600 0.84 87.580229550105 EMBONE P/TUBO DE 20 mm Und 2,042.4700 0.74 1,511.430229550106 CONECTOR ANDERSON Pza 5.0000 10.08 50.400229810058 CERRADURA DE MANIJA DE DOS GOLPES Pza 38.0000 52.00 1,976.00

0230010098 Pegamento plástico PVC Oatey gln 0.1000 90.00 9.360230020001 YESO DE 28 Kg BOL 691.0800 6.00 4,146.460230020098 M 374.5000 22.85 8,557.33

0230110015 IMPERMEABILIZANTE gln 18.3900 18.64 342.840230150016 PORCELANA Kg 221.7400 6.00 1,330.430230460011 PEGAMENTO PARA PVC AGUA FORDUIT gln 5.9800 100.00 597.860230460019 PEGAMENTO PLASTICO P/PVC CCP gln 22.1300 100.00 2,213.040230460032 SILICONA Und 160.0000 10.00 1,600.000230460033 SILICONA ESTRUCTURAL Und 56.6400 9.00 509.760230460034 PEGAMENTO PARA TUBO gln 6.2000 105.00 651.490230470003 SOLDADURA CELLOCORD P 3/16" Kg 143.9800 9.50 1,367.790230920045 UNION PVC SAP Ø=3" CR C-10 Pza 15.6000 21.00 327.600230920046 UNION PVC SAP Ø=2" CR C-10 Pza 28.5300 2.00 57.070230990001 LIJA PARA MADERA Und 138.2100 1.80 248.780230990019 LIJA Und 6.7000 1.20 8.040230990021 LIJA DE FIERRO #60 Pza 292.9600 2.00 585.910230990022 LIJA DE AGUA #120 Pza 5.8900 2.00 11.780231510002 Und 5.0000 17.50 87.50

0232000033 FLETE TERRESTRE GLB 1.0000 175,000.00 175,000.000232100002 TRANSPORTE DE EQUIPO Y MAQUINARIAS GLB 1.0000 1,000.00 1,000.00

0238000000 HORMIGON M3 307.0300 80.00 24,562.380238000001 HORMIGON (puesto en obra) M3 307.7100 80.00 24,617.140239010093 AGUA M3 383.0900 0.84 321.790239020020 HOJA DE SIERRA Pza 6.7000 8.00 53.600239020071 COLA SINTETICA gln 40.5400 30.00 1,216.250239020077 HOJA DE SIERRA Und 158.1100 4.30 679.890239020078 TIRAFON Und 98.8000 0.08 7.900239020079 TIRAFON DE 3" Und 687.9600 3.00 2,063.880239020080 PIEDRA ESMERIL Pza 5.1900 2.00 10.380239020081 TIRADORES DE NYLON Pza 23.5500 3.00 70.650239020083 TIRAFONES PARA TEJAS DE 1/2" X 5" Pza 2,362.3700 2.59 6,118.530239050000 AGUA M3 475.2900 0.84 399.240239060022 SAL INDUSTRIAL (BOLSA DE 50KG) bls 10.0000 25.21 252.100239060023 CAL bls 44.6400 5.00 223.200239900095 Und 1.0000 450.00 450.00

0239900101 MODULO GALPONES PARA VACUNOS Und 2.0000 4,500.00 9,000.000239900102 MODULO GALPONES PARA CAMELIDOS Und 3.0000 5,250.00 15,750.000239900103 MODULO GALPONES PARA OVINOS Und 1.0000 4,500.00 4,500.000239900104 MODULO GALPONES PARA PORCINOS Und 1.0000 3,750.00 3,750.000239900105 MODULO GALPONES PARA CONEJOS Und 1.0000 10,500.00 10,500.000239900106 MODULO GALPONES PARA AVES Und 1.0000 2,550.00 2,550.000239900107 MODULO GALPONES PARA OBSERVACION Und 1.0000 4,500.00 4,500.00

0239900108 Und 3.0000 4,050.00 12,150.00

0239900110 COSTO DE MATERIALES NECESARIOS GLB 1.0000 73,223.73 73,223.73

VARILLA DE COBRE COPERWELD 3/4" X 2.40M

TERMINAL DE COBRE PARA CONDUCTOR DE 16mm2

CIZALLA PARA ACERO CONSTRUCCION HASTA 1"

SOLDADURA CELLOCORD PUNTO AZUL 3/16

CABLE DE FIBRA OPTICA PARA RED DE DATOS

CAJA DE REGISTRO DE CONCRETO CON TAPA SEÑALIZADA

CARTEL DE OBRA INC.INSTALACION Y TRANSP

MODULO GALPONES PARA POZAS DE LOMBRICULTURA

0239980006 ACCESORIOS DE FIJACION VARIOS %MT 1,822.950239980007 ACCESORIOS DIVERSOS GLB 580.9000 4.00 2,323.600239980008 Und 5.0000 16.00 80.00

0239980009 GLB 1.0000 250.00 250.00

0239990032 TAPA METALICA DE 1/8" M2 2.0400 122.54 249.980240130004 ALMACEN CERCADO M2 32.0000 60.00 1,920.000240130005 OFICINAS EN OBRA GLB 24.0000 45.00 1,080.000240130006 CERAMICO ANTIDESLIZANTE 40 X 40 CM M2 3,050.7400 30.00 91,522.310240130007 CERAMICO 40 X 40 CM M2 931.3000 21.00 19,557.250242100021 MADERA PINO PARA ANDAMIOS p2 6.1600 4.00 24.620242100022 MADERA PINO (REGLAS) p2 0.5900 4.50 2.660243010097 BARRA DE APOYO Pza 16.2000 75.00 1,215.000243020010 RODOPLAST PARA BORDE DE MAYOLICAS M 1,480.6000 1.00 1,480.60

0243160002 Regla de madera 3/4"*3"*10' Pza 9.3100 7.50 69.840243160052 REGLA DE MADERA p2 3.0400 2.60 7.890243510061 ESTACA DE MADERA p2 461.4900 2.20 1,015.280243510063 LEÑA QQ 7.9300 5.00 39.680243550001 ANDAMIO DE MADERA p2 19.1300 2.60 49.730243550003 ANDAMIO METALICO TABLAS ALQUILER est 280.1100 26.00 7,282.810243570059 ARPILLERA H=3.00m M 2,500.0000 3.36 8,400.000243680001 Palo Rollizo de Eucalipto 4" * 3m Pza 60.3200 15.00 904.800243980045 MELANINA DE 15mm Pza 31.2500 156.00 4,874.690243980046 MELANINA DE 18mm Pza 22.9800 180.00 4,135.680243980047 ESCRITORIOS Und 16.0000 400.00 6,400.000243980048 SILLAS Und 142.0000 120.00 17,040.000243980050 BANCAS DE LABORATORIOS Und 160.0000 50.00 8,000.000243980051 MODULOS DE CÓMPUTO Und 50.0000 400.00 20,000.000243980053 CARPETAS UNIPERSONALES Und 350.0000 150.00 52,500.000243980054 ARMARIOS PARA LIBROS Und 24.0000 300.00 7,200.000243980055 ARCHIVADORES Und 22.0000 300.00 6,600.000243980056 BANCAS Und 30.0000 150.00 4,500.000243980057 MESAS Und 50.0000 300.00 15,000.000243980058 BUTACAS Und 150.0000 120.00 18,000.000243980059 BASUREROS Und 30.0000 30.00 900.000243990002 Madera corriente 1 1/2" * 8" * 10' Pza 614.8800 30.00 18,446.400243990003 Madera corriente 2" *3" * 10' Pza 265.2800 15.00 3,979.200243990008 Madera corriente 1" * 8" * 10' Pza 2.0000 20.00 40.000244000020 MADERA AGUANO 2"*3"*10' Pza 93.4000 22.50 2,101.500244000022 Madera tornillo p2 293.7200 4.50 1,321.750244000036 MADERA CORRIENTE p2 2,500.0000 3.00 7,500.000244000037 p2 3,512.7600 4.50 15,807.43

0244000038 MADERA CORRIENTE PARA ENCOFRADO p2 57,897.5100 3.50 202,641.290244000039 MADERA AGUANO p2 1,474.2400 4.50 6,634.080244000040 MADERA PRENSADA e=18 mm Pln 81.7700 46.00 3,761.600248080006 ROTURA DE BRIQUETA Und 30.0000 25.00 750.000250060011 TAPA CIEGA PARA CAJA OCTOGONAL Pza 149.7900 2.77 414.930250060012 TAPA CIEGA PARA CAJA RECTANGULAR Pza 76.6500 2.50 191.630251040076 PLATINA DE ACERO 1/4"x2 1/2"x6 m Pza 241.4000 73.00 17,621.840251040077 PLATINA DE ACERO 1/4"x1 1/2"x6 m Pza 120.7000 71.00 8,569.520251040078 PLATINA DE ACERO 1/4"x5"x6 m Pza 7.9000 35.00 276.640251200029 ANGULO DE ALUMINIO 2"x2"x1/8"x6m Pza 8.0000 120.00 960.000251200030 ANGULAR DE 1"X1" Pza 7.9000 16.00 126.460251200031 ANGULAR DE ALUMINIO DE 3/4"X3/4" Pza 81.7700 22.00 1,799.030252010002 UNION PVC SAP DE 1 1/2" Pza 11.3500 1.20 13.610252950009 CANTONERAS DE ALUMINIO 3" M 287.2800 7.00 2,010.960252950010 TAPACANTO DE VINIL M 62.8000 3.00 188.400253100003 PETROLEO gln 32.4400 11.02 357.520253100004 GRASA lb 3.8300 4.50 17.240253100006 THINER gln 11.7100 14.40 168.610254010051 PINTURA LATEX DE PRIMERA gln 292.4300 16.80 4,912.750254020043 PINTURA ESMALTE ANTICORROSIVA M2 322.6500 35.29 11,386.260254060000 PINTURA ANTICORROSIVA gln 1.9200 35.29 67.760254060024 gln 115.0700 37.82 4,351.80

0254110090 PINTURA ESMALTE gln 99.7600 35.29 3,520.45

ACCESORIOS COMPLETO BRONCE TANQUE BAJO

ACCESORIOS PARA CONEXION DE INTERRUPTOR A TABLERO DE S.E.

MADERA TORINLLO INCL. CORTE PARA ENCOFRADO

PINTURA ANTICORROSIVA EPOXICA ZINCROMATO

0254110092 PINTURA AL DUCO gln 18.4300 39.00 718.690254830001 PINTURA IMPRIMANTE gln 789.6200 15.54 12,270.690256990026 ACERO CORRUGADO fy= 4200 Kg/cm² G-60 Kg 202,498.1100 4.50 911,241.50

0260010002 CUBIERTA DE POLICARBONATO DE 16MM M2 163.0000 92.45 15,069.35

0261010028 PLANCHA GALVANIZADA DE 3/16" Pza 7.9000 35.00 276.640261010029 PLANCHA MDF 4.5mm Pza 138.2100 70.00 9,674.700261010030 PARANTE METALICO 89x38x0.45mmx3m Pza 117.7900 25.00 2,944.800261010031 RIEL METALICO 90x25x0.45mmx3m Pza 51.5300 14.00 721.480264010051 TERRAZO EN MESAS M2 194.9800 50.00 9,749.160264020006 CONTRAZOCALO DE CERAMICO h=10 cm M 1,480.6000 6.00 8,883.600265000058 TUBO DE VENTILACION DE F°.G° Ø 2" Und 2.0000 80.00 160.000265020090 CODO DE F° G° UNION ROSCADA DE 3" Und 2.0000 6.50 13.000265020091 TUBERIA F°G° 3" M 2.0000 15.12 30.240265020092 CODO DE F° G° UNION ROSCADA DE 4" Und 1.0000 16.15 16.150265020093 TUBERIA F°G° DE 4" M 3.9400 20.00 78.750265020094 TUBERIA F°G° 2" M 13.8600 11.20 155.230265050023 UNION UNIVERSAL F°G° DE 4" Und 2.0000 33.05 66.100265050024 UNION UNIVERSAL F°G° DE 1 1/2" Und 2.0000 7.00 14.000265050025 UNION UNIVERSAL F°G° DE 2" Und 14.0000 9.00 126.000265050026 UNION UNIVERSAL F°G° DE 1" Und 2.0000 8.00 16.000265050027 UNION UNIVERSAL F°G° DE 3/4" Und 24.0000 8.00 192.000265050028 UNION UNIVERSAL F°G° DE 1/2" Und 20.0000 7.00 140.000265160009 ABRAZADERA DE F°G° DE 1/2" Und 24.0000 1.50 36.000265310017 CODO F° G° ISO-I DE 2"x90° Und 18.0000 5.00 90.000265330093 TEE DE F° G° DE 4" Und 1.0000 35.00 35.000265330094 TEE DE F° G° DE 2" Und 1.0000 8.00 8.000265330095 TEE DE F° G° DE 2" x 1" Und 1.0000 8.96 8.960272010026 TUB. PVC SAP CR P/AGUA C-10 1" M 3.6800 4.00 14.700272020031 Und 5.0000 6.00 30.00

0272020032 TUBO PVC SAP 1 1/2" CR C-10 M 47.6500 4.00 190.600272020033 REDUCCION PVC SAP 2"-3/4" C-10 CR Pza 10.0000 8.50 85.000272030040 UPR DE F°G° DE 3" Pza 2.0000 6.54 13.080272060048 CODO PVC SAP Ø=3" CR C-10 Pza 4.0000 25.00 100.000272070057 TEE PVC SAP 2"x1" Und 1.0000 8.20 8.200272070058 TEE PVC SAP 2"x1 1/2" Und 1.0000 9.50 9.500272070059 TEE PVC SAP 1"x3/4" Und 1.0000 5.20 5.200272070060 TEE PVC SAP 1"x1 1/2" Und 5.0000 3.20 16.000272070061 Und 5.0000 5.60 28.00

0272080020 FORMADOR DE EMPAQUETADURA ADEX Pza 2.2300 6.50 14.520272130020 TEE PVC SAP ROSCADO 1/2" Pza 91.0000 0.80 72.800272130021 TEE PVC SAP ROSCADO 3/4" Pza 91.0000 1.00 91.000272130084 TUBERIA PVC SAL 3" M 563.4500 5.50 3,098.950272200005 Und 3.0000 15.00 45.00

0272300068 NIPLE PVC DE 2" x 6" Und 6.0000 10.98 65.880272320001 YEE PVC SAL 4" Und 24.0000 6.00 144.000272320003 YEE PVC SAL 4"x4" Und 1.0000 6.00 6.000272320004 Pza 24.0000 4.50 108.00

0272530034 CODO PVC SAP 2" X 90° Pza 8.0000 6.70 53.600272530066 CODO PVC SAP 1/2" X 90° Und 1.0000 1.50 1.500272530077 CODO PVC SAP 2" * 45° Pza 1.0000 14.20 14.200272530079 CODO PVC SAP Ø 1" CR C-10 Pza 6.0000 1.20 7.200272530080 CODO PVC SAP 3/4" x 90° C-10 CR Pza 297.0000 1.00 297.000272530081 CODO PVC SAP 1/2" Pza 7.0000 1.00 7.000272530082 CODO PVC SAL 3" x 45° Pza 24.0000 7.00 168.000272530083 CODO PVC SAL 4" x 45° Pza 26.0000 4.50 117.000272720002 TUBERIA PVC SAP C-10 Ø 2" M 185.3600 2.50 463.400272720020 TUB. PVC SAP PRESION P/AGUA C-10 Ø=3" M 65.5200 14.28 935.63

0272720021 TUBERIA CºSºNº 10 " M 21.0000 5.00 105.000273010009 TUBO PVC SAL 4" Pza 494.4000 4.00 1,977.600273010010 TUBO PVC SAL 6" M 20.6000 28.00 576.800273010026 TUBERIA PVC SAL 2" M 511.6800 5.00 2,558.420273010029 TUBERIA PVC SAL 4" M 447.4300 4.00 1,789.70

TUBO ABASTO COBRE FLEXIBLE TERM/M-H 1/2"x5/8"x30cm

CRUZ PVC SAP RED AGUA POTABLE DE 2"x3/4"

REDUCCION PVC SAL P/DESAGUE DE 6" A 4"

YEE PVC SP RAMAL CON REDUCCION DE 4"x3"

0273010034 TUBERIA PVC SAL 6" M 252.4700 3.00 757.410273010035 Pza 178.9500 18.30 3,274.78

0273010036 Pza 273.5600 12.94 3,539.84

0273010037 Pza 161.4100 6.74 1,087.88

0273010038 Pza 2,115.4600 5.54 11,719.63

0273110006 CODOS PVC SAL 6" X 90° Pza 3.0000 2.00 6.000273130009 TEE PVC SAL 2" X 2" Pza 455.5000 3.50 1,594.250273130010 TEE PVC SAL 3" X 2" Pza 48.0000 3.20 153.600273200004 Pza 1.0000 2.50 2.50

0273230001 SOMBRERO DE VENTILACION PVC SAL 2" Pza 128.0000 6.00 768.000274010011 TUBO PVC SAP Ø 3/4" CR C-10 M 112.1800 3.00 336.550274010012 TUBO PVC SAP Ø 1/2" CR C-10 M 201.6700 2.50 504.180275130006 CURVA P/TUBO DE 50 mm TP Pza 18.0000 10.90 196.200275130007 CURVA P/TUBO DE 40 mm TP Pza 181.8000 6.47 1,176.250275130008 CURVA P/TUBO DE 25 mm TP Pza 104.2500 2.40 250.200275130009 CURVA P/TUBO DE 20 mm TP Pza 2,050.2400 1.57 3,218.880277000002 VALVULA COMPUERTA DE BRONCE DE 1/2" Und 101.0000 15.00 1,515.00

0277000003 VALVULA COMPUERTA DE BRONCE DE 3/4" Und 12.0000 35.00 420.00

0277000004 VALVULA COMPUERTA DE BRONCE DE 1" Und 1.0000 35.00 35.00

0277000007 VALVULA COMPUERTA DE BRONCE DE 2" Und 5.0000 40.00 200.00

0277000009 VALVULA COMPUERTA DE BRONCE DE 3" Und 1.0000 45.00 45.00

0277000010 VALVULA COMPUERTA DE BRONCE DE 4" Und 1.0000 50.00 50.00

0277000033 VÁLVULA REGULADORA DE PRESION Ø=2" Und 2.0000 50.00 100.00

0277030005 VALVULA CHECK DE BRONCE DE 2" Und 2.0000 55.00 110.000277050025 VALVULA FLOTADORA DE 2" Und 1.0000 50.00 50.000279010001 ESPEJO CON BISEL p2 458.3700 4.00 1,833.480279110002 VIDRIO TEMPLADO GRIS DE E=6 MM. M2 125.7600 120.00 15,090.700279110009 VIDRIO TEMPLADO GRIS DE E=10 MM. M2 241.6900 180.00 43,504.020279110010 MASILLA Kg 0.0500 3.00 0.150281010008 Und 36.0000 38.07 1,370.52

0281010010 Und 2.0000 1,875.50 3,751.00

0281010011 Und 47.0000 38.07 1,789.29

0281010012 Und 5.0000 49.50 247.50

0281010013 Und 14.0000 114.00 1,596.00

0281010014 Und 2.0000 65.91 131.82

0281010015 GLB 1.0000 85.10 85.10

0281010016 Und 12.0000 8.50 102.00

0281010017 Und 43.0000 10.50 451.50

0281010018 Und 10.0000 38.00 380.00

0281010019 Und 4.0000 45.30 181.20

0281010020 FLASHER LUMINOSOS 12 VDC Und 4.0000 29.50 118.000281010021 Und 5.0000 15.80 79.00

TUBERIA PVC TP P/INST. ELECTRICAS DE 50 mm x 3 m

TUBERIA PVC TP P/INST. ELECTRICAS DE 40 mm x 3 m

TUBERIA PVC TP P/INST. ELECTRICAS DE 25 mm x 3 m

TUBERIA PVC TP P/INST. ELECTRICAS DE 20 mm x 3 m

TRAMPA "P" PVC SAL PARA DESAGUE DE 4"

INTERRUPTOR TERMOMAGNETICO 2x15A-220V

INTERRUPTOR TERMOMAGNETICO 3X300A, 220V 25KA

INTERRUPTOR TERMOMAGNETICO 2x20A-220V

INTERRUPTOR TERMOMAGNETICO 2x30A-220V

RELOJ INTERRUPTOR HORARIO DIGITAL 16Ax220v

RELE TERMICO BIMETALICO P-CONTACTO 7-10A

BORNERAS, SWITCHES DE CONTROL CABLES Y ACCESORIOS DE CONEXION

CAJA CUADRADA DE F°G° DE 100x100x50 mm CON TAPA CIEGA

CAJA CUADRADA DE F°G° DE 150x150x50 mm CON TAPA CIEGA DE F°G°

CAJA CUADRADA DE F°G° DE 400x400x200 mm CON TAPA CIEGA DE F°G°

ESTACION MANUAL PARA ALARMAS CONTRA INCENDIOS CON PROTECTOR DE VIDRIO

CAJA CUADRADA DE F°G° DE 200x200x100 mm CON TAPA CIEGA DE F°G°

0281010023 Und 5.0000 52.50 262.50

0281010024 Und 3.0000 65.00 195.00

0298010083 GASOLINA 84 OCTANOS gln 312.4800 8.60 2,687.370298010084 ACEITE PARA MOTOR SAE-30 gln 1.9500 14.00 27.290298010085 TUBO DE ACERO LAC 2"x4" e=2.5mm M 566.6000 22.00 12,465.200298010086 TUBO DE ACERO LAC 2"x2" e=2.5mm M 622.4000 16.00 9,958.400298010088 PLANCHA DE ACERO LAC e=1/8" M2 133.6000 215.00 28,724.000298010089 TUBO RECTANGULAR DE 2"x4" e=2.5mm Pza 40.7100 120.00 4,885.200298010090 TUBO RECTANGULAR DE 1"x2" e=2.0mm Pza 21.2100 42.00 890.900298010091 TUBO RECTANGULAR DE 1 1/2"x2" e=3.0mm Pza 6.4400 79.00 508.54

0298010092 PLANCHA DE ACERO 1/8" x 1.20m x 2.40m Pln 174.2700 180.00 31,368.600298010093 M 368.7300 6.00 2,212.36

0298010094 PLANCHA DE ACERO 3mm x 1.22m x 2.4 Pln 96.2300 189.00 18,187.090298010095 PLANCHA DE ACERO 2mm x 1.22m x 2.4 Pln 498.6600 114.00 56,847.240298010096 PLANCHA METALICA Pln 150.9400 250.00 37,734.380298010097 TUBO CORRUGADO METALICO DE 15 mm M 30.0000 22.50 675.000298010098 PERGOLA METALICA SEGUN DISEÑO Und 64.0000 400.00 25,600.00

4,420,856.57

EQUIPOS0337010001 HERRAMIENTAS MANUALES %MO 28,856.310348010008 Hm 55.8600 18.00 1,005.48

0348010011 MEZCLADORA DE CONCRETO DE 9 -11P3 Hm 87.1800 8.80 767.21

0348210001 Hm 1,698.1100 9.00 15,282.99

0348210066 SOLDADORA Hm 0.5300 7.56 4.030348210067 GLB 1.0000 220,700.00 220,700.00

0348210068 GLB 1.0000 206,700.00 206,700.00

0348210069 GLB 1.0000 244,100.00 244,100.00

0348210070 GLB 1.0000 280,300.00 280,300.00

0348210071 GLB 1.0000 121,900.00 121,900.00

0348210072 GLB 1.0000 171,400.00 171,400.00

0348210073 GLB 1.0000 171,640.00 171,640.00

0348210074 LABORATORIO CLINICO VETERINARIO GLB 1.0000 185,000.00 185,000.000348210075 CENTRO DE COMPUTO GLB 1.0000 154,000.00 154,000.000348210076 EQUIPO PARA AULAS Y LABORATORIOS GLB 1.0000 96,000.00 96,000.000348210077 EQUIPO PARA ADMINISTRACIÓN GLB 1.0000 49,000.00 49,000.000348210078 MATERIAL BIBLIOGRAFICO GLB 1.0000 37,500.00 37,500.000348810003 Hm 85.8600 9.00 772.77

0348810004 Hm 172.8100 16.00 2,764.96

0348960003 CIZALLA PARA CORTE DE FIERRO Hm 662.1000 2.00 1,324.200348960004 ESCALERA Hm 644.0000 1.50 966.000349030001 COMPACTADOR VIBR. TIPO PLANCHA 4 HP Hm 1,611.0800 9.00 14,499.73

0349040009 CARGADOR S/LLANTAS 125 HP 2.5 YD3. Hm 1.8400 100.84 185.160349040034 TRACTOR DE ORUGAS DE 190-240 HP Hm 147.0200 145.00 21,317.320349040097 CARGADOR RETROEXCAVADOR 62 HP Yd3 Hm 119.0300 151.00 17,972.82

0349040098 Hm 19.3500 113.45 2,194.71

0349070004 VIBRADOR DE CONCRETO 4 HP 2.40" Hm 175.0800 6.00 1,050.480349070006 VIBRADOR DE 3/4" - 2" CONCRETO Hm 142.5100 6.00 855.05

CAJA CUADRADA DE F°G° DE 500x500x200 mm CON TAPA CIEGA DE F°G°

CAJA CUADRADA DE F°G° DE 600x600x250 mm CON TAPA CIEGA DE F°G°

PERFIL "U" DE ALUMINIO DE 16.07mm x 16.07mm

MEZCLADORA CONCRETO TAMBOR 11 P3-18 HP

SOLDADORA ELECTRICA DE 225 AMPERIOS

LABORATORIO DE ANATOMIA Y FISIOLOGÍA ANIMAL

LABORATORIO DE BIOQUIMICA, NUTRICIÓN Y ALIMENTACIÓN ANIMAL

LABORATORIO DE FARMACOLOGIA Y TOXICOLOGIA VETERINARIA

LABORATORIO DE HISTOPATOLOGIA, EMBRIOLOGIA Y PATOLOGIA VETERINARIA

LABORATORIO DE MICROBIOLOGIA, INMUNOLOGIA Y LABORATORIO CLINICO

LABORATORIO DE PARASITOLOGIA VETERINARIA I Y II

LABORATORIO DE REPRODUCCION ANIMAL Y FIBRAS TEXTILES

WINCHE ELECTRICO 3.6 HP DE DOS BALDES

WINCHE DE DOS BALDES DE 350KG MOTOR ELECTRICO 3.6 HP

CARGADOR S/LLANTAS 100 - 115 HP 2-2.25 Yd3

0349100007 Hm 450.4400 8.00 3,603.55

0349100011 Hm 99.9200 8.80 879.30

0349100013 ANDAMIO METALICO Hm 738.4700 12.00 8,861.690349170007 CAMION VOLQUETE DE 6x4330HP 10 m3 Hm 271.2000 100.84 27,347.740349170008 CAMION VOLQUETE 4x2 140-210 HP 6 m3 Hm 7.3600 67.22 494.650349190001 TEODOLITO Hm 10.0800 8.00 80.650349520003 VIBRADOR DE 4 HP CAB.=2.40" Hm 235.0500 6.00 1,410.270349700004 MOTONIVELADORA DE 125 HP Hm 147.0200 125.00 18,377.000349700006 MOTOSOLDADORA DE 250 A Hm 70.8000 9.00 637.200349880002 NIVEL TOPOGRAFICO Hm 152.5700 6.00 915.400349880008 BOVINOS Und 20.0000 2,500.00 50,000.000349880009 CAMELIDOS SUDAMERICANOS Und 30.0000 2,000.00 60,000.000349880010 OVINOS Und 30.0000 1,250.00 37,500.000349880011 EQUINOS Und 5.0000 2,500.00 12,500.000349880012 PORCINOS Und 20.0000 1,250.00 25,000.000349880013 AVES Und 100.0000 50.00 5,000.000349880014 CUYES Und 100.0000 50.00 5,000.00

2,305,666.67

TOTAL S/. 7,793,558.81

Fecha : 18/11/2012 05:33:42 PM

MEZCLADORA CONCRETO TAMBOR 18HP 11P3

MEZCLADORA CONCRETO TROMPO 8 HP 9 P3

Página : 1

snandopf

Precios y cantidades de recursos requeridos

CUSCO - ESPINAR - ESPINAR

MANO DE OBRA

MATERIALES

EQUIPOS

18/11/2012 05:33:42 PM

S10

snandopf

Presupuesto

Presupuesto 0801016 FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1

Cliente UNIVERSIDAD NACIONAL DE SAN ANTONIO ABAD DEL CUSCOLugar CUSCO - ESPINAR - ESPINAR

Item Descripción Und. Metrado

01 ESTRUCTURAS

01.01 CONSTRUCCIONES PROVISIONALES

01.01.01 CONSTRUCCION DE ALMACENES M2 32.00

01.01.02 CONSTRUCCION DE OFICINAS GLB 24.00

01.01.03 INSTALACION ARPILLERAS PUNTALES M 500.00

01.01.04 CARTEL DE OBRA. Und 1.00

01.02 INSTALACIONES PROVISIONALES

01.02.01 INSTALACION PROVISIONAL DE LETRINAS GLB 1.00

01.02.02 INSTALACION PROVISIONAL DE AGUA GLB 1.00

01.02.03 INSTALACION PROVISIONAL DE DESAGUE GLB 1.00

01.02.04 INSTALACION PROVISIONAL DE ENERGIA ELECTRICA GLB 1.00

01.03 OBRAS PRELIMINARES

01.03.01 LIMPIEZA DE TERRENO MANUAL M2 1,174.00

01.03.02 ELIMINACION DE OBSTRUCCIONES M2 1,174.00

01.03.03 TRANSPORTE DE EQUIPOS Y MAQUINARIAS GLB 1.00

01.03.04 TRAZO, NIVELES Y REPLANTEO PRELIMINAR M2 1,174.00

01.04 MOVIMIENTO DE TIERRAS

01.04.01 CORTE TERRENO A NIVEL DE SUBRASANTE M3 1,852.50

01.04.02 NIVELACION DEL TERRENO M2 2,784.00

01.04.03 EXCAVACIÓN MANUAL DE ZANJAS M3 57.23

01.04.04 EXCAVACIÓN MASIVA A MAQUINA EN TERRENO NORMAL M3 1,898.33

01.04.05 RELLENO CON MATERIAL PROPIO M3 1,460.25

01.04.06 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO H M3 643.90

01.04.07 NIVELACION INTERIOR APISONADO MANUAL M2 1,174.00

01.05 OBRAS DE CONCRETO SIMPLE

01.05.01 SOLADOS

01.05.01.01 SOLADOS CONCRETO 1:12 CEM - HORM. h=10cm M2 1,955.56

01.05.02 CIMIENTOS Y SOBRECIMIENTOS

01.05.02.01 CONCRETO 1:10+50% P.G. PARA FALSA ZAPATA M3 15.12

01.05.02.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMI M3 62.49

01.05.02.03 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS M3 55.86

01.05.02.04 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBR M2 362.57

01.06 OBRAS DE CONCRETO ARMADO

01.06.01 ZAPATAS

01.06.01.01 CONCRETO F`C=210 KG/CM² EN ZAPATAS M3 93.59

01.06.01.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS Kg 2,567.56

01.06.02 VIGAS DE CIMENTACION

01.06.02.01 CONCRETO f`c=210 Kg/cm² EN VIGAS DE CIMENTACION M3 475.74

01.06.02.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CIME M2 192.88

01.06.02.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE C Kg 34,652.47

01.06.03 VIGAS DE CONEXION

01.06.03.01 CONCRETO EN VIGAS DE CONEXION f`c=210 Kg/cm² M3 19.38

01.06.03.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CONEM2 106.46

01.06.03.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE C Kg 2,377.20

01.06.04 SOBRECIMIENTOS ARMADOS

01.06.04.01 CONCRETO EN SOBRECIMIENTOS f'c=175 Kg/cm² M3 12.75

01.06.04.02 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENT M2 25.50

01.06.04.03 ACERO ESTRUCTURAL TRABAJADO PARA SOBRECIMIE Kg 440.63

01.06.05 COLUMNAS

01.06.05.01 CONCRETO f`c=210 Kg/cm² EN COLUMNAS M3 51.29

01.06.05.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS M2 205.65

01.06.05.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS Kg 36,229.88

01.06.06 COLUMNETAS DE AMARRE

01.06.06.01 CONCRETO EN COLUMNETAS f`c=175 Kg/cm² M3 33.17

01.06.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMN M2 66.3301.06.06.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNETA Kg 2,983.78

01.06.07 VIGAS

01.06.07.01 CONCRETO f`c=210 Kg/cm² EN VIGAS M3 287.30

01.06.07.02 ENCOFRADO Y DESENCOFRADO EN VIGAS M2 2,749.30

01.06.07.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS Kg 28,938.65

01.06.08 VIGAS DE AMARRE

01.06.08.01 CONCRETO EN VIGAS DE AMARRE f`c=175 Kg/cm² M3 369.47

01.06.08.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS D M2 352.88

01.06.08.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE A Kg 2,125.74

01.06.09 PLACAS

01.06.09.01 CONCRETO EN PLACAS f`c=210 Kg/cm² M3 116.55

01.06.09.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA PLACAM2 409.85

01.06.09.03 ACERO ESTRUCTURAL TRABAJADO PARA PLACAS Kg 26,545.03

01.06.10 LOSAS MACIZAS

01.06.10.01 CONCRETO EN LOSAS MACIZASN f`c=210 Kg/cm² M3 125.36

01.06.10.02 ENCOFRADO Y DESENCOFRADO NORMAL DE LOSAS M M2 828.92

01.06.10.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS MACI Kg 6,846.98

01.06.11 LOSAS ALIGERADAS

01.06.11.01 CONCRETO EN LOSAS ALIGERADAS f`c=210 Kg/cm² M3 167.71

01.06.11.02 ENCOFRADO Y DESENCOFRADO NORMAL DE LOSAS A M2 2,526.62

01.06.11.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIG Kg 14,375.75

01.06.11.04 PLASTOFORMO h=15 cm PARA TECHO ALIGERADO M 6,273.00

01.07 MUROS DE CONTENCION

01.07.01 CONCRETO f`c=210 Kg/cm² PARA MUROS DE CONTENCIO M3 41.35

01.07.02 ENCOFRADO Y DESENCOFRADO PARA MUROS DE CONT M2 275.66

01.07.03 ACERO ESTRUCTURAL TRABAJADO PARA MUROS DE CO Kg 2,888.04

01.08 ESTRUCTURA METALICAS

01.08.01 VIGAS EN RAMPAS

01.08.01.01 VIGAS METALICAS DE 100x150x3mm M 228.48

01.08.01.02 CORREAS METALICAS TUBO 100 x 50 x 2 mm M 692.50

01.08.01.03 PLANCHAS METALICA DE 12MM M2 143.75

01.08.02 ARMADURA PARA CUBIERTA DE TEJA ANDINA

01.08.02.01 VIGAS ARMADAS DE L=10.25M @ 1.5M Und 42.00

01.08.02.02 CORREAS METALICAS TUBO 50 x 50 x 2 mm @ 1.00M M 594.00

01.08.03 ARMADURA PARA CUBIERTA DE POLICARBONATO

01.08.03.01 VIGAS ARMADAS DE L=13.50M Und 5.00

01.08.03.02 CORREAS METALICAS TUBO 50 x 50 x 2 mm @ 2M M 88.20

01.08.04 ESTRUCTURA PARA TAPASOL EN VENTANAS

01.08.04.01 PANEL GIRATORIO DE METAL TUBO 80x40x2MM Und 662.10

01.08.04.02 PLANCHAS DE DRYWALL M2 147.24

02 ARQUITECTURA

02.01 MUROS Y TABIQUES DE ALBAÑILERÍA

02.01.01 MURO DE SOGA LADRILLO C/M 1:4 x 1.5 cm. KING-KON M2 418.32

02.01.02 MURO DE CABEZA LADRILLO CON CEMENTO - ARENA M2 1,166.42

02.02 REVOQUES ENLUCIDOS Y MOLDURAS

02.02.01 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARM2 1,886.41

02.02.02 TARRAJEO EN EXTERIORES M2 2,651.75

02.02.03 TARRAJEO DE COLUMNAS M2 762.93

02.02.04 TARRAJEO DE VIGAS M2 1,567.08

02.02.05 VESTIDURA DE ARISTAS EN COLUMNAS M 16.20

02.02.06 VESTIDURA DE DERRAMES EN PUERT AS, VENTANAS Y M 16.20

02.02.07 BRUÑAS M 1,329.40

02.03 CIELO RASO

02.03.01 CIELORRASOS CON YESO M2 2,009.56

02.04 PISOS Y PAVIMENTOS

02.04.01 FALSO PISO DE CONCRETO + EMPEDRADO e=0.15 M. M2 577.13

02.04.02 CONTRAPISO DE 28 mm M2 1,915.27

02.04.03 PISO DE DE CERAMICO ANTIDESLIZANTE DE 40X40 cm M2 2,905.47

02.05 VEREDAS

02.05.01 FALSO PISO DE CONCRETO + EMPEDRADO e=0.15 M. M2 917.33

02.05.02 ENCOFRADO Y DESENCOFRADO PARA VEREDAS M2 259.28

02.05.03 PISO DE CONCRETO E=2" f'c 140 kg/cm2 X 4 cm PULIDO 1: M2 917.33

02.05.04 SELLADO DE JUNTAS CON ASFALTO RC-250 Y ARENA M 305.78

02.06 SARDINELES

02.06.01 ENCOFRADO Y DESENCOFRADO DE SARDINELES M2 180.00

02.06.02 CONCRETO EN SARDINELES M3 48.00

02.07 ZOCALOS Y CONTRAZOCALOS

02.07.01 CONTRAZOCALO DE CERAMICO h= 10 cm BOLEADO DE MM 1,480.60

02.07.02 ZOCALO DE CERAMICO DE COLOR DE 40 X 40 cm M2 886.95

02.08 REVESTIDO DE GRADAS Y ESCALERAS

02.08.01 VESTIDURA EN FONDO DE ESCALERA m 72.96

02.08.02 REVESTIMIENTO CON CEMENTO PULIDO PASO Y CONTR M2 273.60

02.08.03 REVESTIMIENTO DE DESCANSOS CON MORTERO 1:4 x 2cM2 144.32

02.08.04 CANTONERA DE ALUMINIO EN ESCALERA M 273.60

02.09 COBERTURAS

02.09.01 PLANCHAS DE TEJA ANDINA M2 524.97

02.09.02 CUBIERTA DE POLICARBONATO TRANSLUCIDO E= 16mm. M2 163.00

02.10 CARPINTERIA METALICA

02.10.01 ARMADURA PARA COBERTURA DE POLICARBONATO und 8.00

02.10.02 ESCALERA METALICA TIPO "U" ACCESOS TERRAZA M 17.48

02.10.03 CERRAMIENTO DE ESCALERAS DE METAL M2 54.28

02.10.04 PUERTA DE ACCESO PRINCIPAL M2 24.00

02.10.05 BARANDA CON PLANCHA DESPLEGADA MEDIANA m 365.25

02.10.06 PASAMANOS M 218.60

02.10.07 MARCOS DE VENTANAS TUB. 2"x4"x2.00mm INCL. PINTUR M 541.20

02.10.08 TAPAJUNTAS METALICO CON PLANCHA METALICA M 49.40

02.10.09 TAPAJUNTA EN TECHO M 49.40

02.10.10 CANALETA METALICA CON PLANCHA MET. Y LATON SEG M 16.70

02.10.11 CANALETA METALICA EN TECHO DE POLICARBONATO M 23.00

02.11 CARPINTERIA DE MADERA

02.11.01 PUERTA DE TABLERO REBAJADO DE 4.5 cm DE AGUANO M2 184.28

02.11.02 SEPARADOR DE AMBIENTE DE AGUANO M 102.33

02.12 CARPINTERIA DE MELAMINA

02.12.01 SEPARADOR DE BAÑO CON MELAMINA DE 15 mm. CON PEM2 208.32

02.12.02 BARRA DE ATENCION CON MELAMINA DE 19 MM und 15.20

02.12.03 REPOSTERO ALTO Y BAJO CON MELAMINA DE 15 mm und 7.85

02.13 CARPINTERIA DE ALUMINIO

02.13.01 PUERTA TIPO MURO CORTINA M2 55.46

02.13.02 SISTEMA DE VENTANAS PFK (MURO CORTINA) M2 920.20

02.14 CERRAJERIA

02.14.01 BISAGRA CAPUCHINA ALUMINIZADA 4" PARA PUERTAS und 171.00

02.14.02 FRENO HIDRAULICO und 57.00

02.14.03 CERRADURA DE MANIJA DE 2 GOLPES und 38.00

02.14.04 CERRADURA PARA PUERTA PRINCIPAL PESADA und 4.00

02.14.05 CERRADURA PUERTAS INTERIOR PESTILLO, MANIJA, LL und 8.00

02.15 PINTURA

02.15.01 PINTURA LATEX EN CIELORRASO 2 MANOS M2 2,009.56

02.15.02 PINTURA LATEX EN MUROS EXTERIORES 2 MANOS M2 3,046.51

02.15.03 PINTURA LATEX EN MUROS INTERIORES 2 MANOS M2 2,254.58

02.15.04 PINTURA ANTICORROSIVA PARA PUERTAS METALICAS M2 24.0002.16 VIDRIOS, CRISTALES Y SIMILARES

02.16.01 SISTEMA DE VENTANAS PFK (MURO CORTINA) M2 1,002.55

02.16.02 VIDRIO DE 6 mm INC. ACCESORIOS M2 123.29

02.16.03 VIDRIO DE 10 mm INC. ACCESORIOS DE MANPARA M2 236.95

02.16.04 ESPEJO BISELADO DE SOBREPONER M2 41.67

02.16.05 MURO BLOCK DE VIDRIO 15x15 cm M2 44.64

02.17 VARIOS

02.17.01 PIZARRA ACRILICA M2 233.64

02.17.02 MESA DE CONCRETO f 'c=210 kg/cm2 M2 191.16

02.17.03 BANCAS DE MADERA SOBRE ESTRUCTURA DE METAL Und 20.00

02.18 APARATOS Y ACCESORIOS SANITARIOS

02.18.01 INODORO TANQUE BAJO BLANCO Pza 18.00

02.18.02 INODORO TIPO ADVANCE ONE PIECE O SIMILAR Pza 5.00

02.18.03 LAVATORIO TIPO OVALIN BLANCO Pza 18.00

02.18.04 LAVATORIO DE PARED BLANCO 1 LLAVE Pza 5.00

02.18.05 URINARIOS DE LOZA DE PICO BLANCO Pza 6.00

02.18.06 PAPELERA DE LOZA COLOR BLANCO Pza 6.00

02.18.07 LAVATORIO DE LOZA PARA LABORATORIOS Pza 20.00

02.18.08 LAVADERO DE ACERO INOXIDABLE 2 POZAS Pza 13.00

02.18.09 LAVADERO DE ACERO INOXIDABLE 1 POZA Pza 1.00

02.18.10 LAVADERO DE COCINA DE ACERO INOXIDABLE Pza 1.00

02.18.11 BARRA DE APOYO DE ACERO EN SS.HH. DISCAPACITADOPza 1.00

02.19 SEÑALIZACIÓN Y SEGURIDAD

02.19.01 SEÑALIZACION DE AMBIENTES SEGUN DEFENSA CIVIL GLB 1.00

03 INSTALACIONES SANITARIAS

03.01 TANQUE CISTERNA

03.01.01 ESTRUCTURAS

03.01.01.01 TRAZO Y REPLANTEO UNSAAC M2 37.93

03.01.01.02 EXCAVACION DE ESTRUCTURAS M3 106.20

03.01.01.03 PERFILADO E=0.15M M2 154.51

03.01.01.04 NIVELACION, APISONADO Y COMPACTADO M2 37.93

03.01.01.05 SOLADO C°S° MEZCLA 1:12 CEM - HORM. E=2" M2 37.93

03.01.01.06 ELIMINACION DE EXCESO DE CORTE C/VOLQ. CARGUI M3 138.06

03.01.01.07 DADOS DE CONCRETO SIMPLE f´c = 175 Kg/cm². M3 0.34

03.01.01.08 ENCOFRADO Y DESENCOFRADO DE DADOS M2 0.90

03.01.01.09 CONCRETO PARA CISTERNA f`c=210 Kg/cm² UNSAAC M3 56.26

03.01.01.10 ENCOFRADO Y DESENCOFRADO TANQUE CISTERNA M2 160.97

03.01.01.11 ACERO ESTRUCTURAL EN TANQUE CISTERNA Kg 5,049.61

03.01.01.12 CONFORMACION DE FONDOS DE CISTERNA M2 49.91

03.01.01.13 TARRAJEO CON IMPERMEABILIZANTE EN MUROS Y BA M2 95.15

03.01.01.14 TARRAJEO EN INTERIORES ACABADO CON CEMENTO- M2 95.59

03.01.01.15 VESTIDURA DE DERRAMES M 7.00

03.01.01.16 TAPA METALICA DE 1/8" (1.50MX1.45M) M2 2.00

03.01.01.17 ESCALERA DE GATO METALICA DE 2.20 ML Und 2.00

03.01.02 SISTEMA DE ALIMENTACION

03.01.02.01 TUBERIA PVC SAP DE 3" CR C-10 M 62.40

03.01.02.02 VALVULA COMPUERTA DE 3" Pza 1.00

03.01.02.03 CODO PVC SAP 3" Pza 4.00

03.01.02.04 CODO DE F° G° UNION ROSCADA DE 3" Pza 2.00

03.01.02.05 TUBERIA F°G° 3" INSTALACION INC. PRUEBA HIDR. M 2.00

03.01.02.06 UPR DE F°G° DE 3" Pza 2.00

03.01.03 SISTEMA DE LIMPIA Y REBOSE

03.01.03.01 TUBERIA PVC SAL DE 4" M 26.70

03.01.03.02 VALVULA COMPUERTA DE 4" Pza 1.00

03.01.03.03 UNION UNIVERSAL F°G° DE 4" Pza 2.0003.01.03.04 CODO DE F° G° UNION ROSCADA DE 4" Und 1.00

03.01.03.05 TEE DE F° G° DE 4" Und 1.00

03.01.03.06 YEE PVC SAL RED DESAGUE DE 4"X4" Pza 1.00

03.01.03.07 CODO PVC SAL Ø4"X45° Pza 2.00

03.01.03.08 TRAMPA "P" DE P.V.C. SAL PARA DESAGUE DE 4" Pza 1.00

03.01.03.09 SUMIDERO DE BRONCE DE 4" Pza 1.00

03.01.03.10 VALVULA FLOTADOR DE 2" Pza 1.00

03.01.03.11 TUBERIA DE F°G° DE 4" M 3.75

03.01.04 SISTEMA DE CONDUCCION AGUA POTABLE A T. ELEVADO Y CONTRAINCENDIO

03.01.04.01 TUBERIA DE AGUA PVC DE 2" (50MM) INSTAL. INC. PRU M 89.13

03.01.04.02 VALVULA DE COMPUERTA DE 2" Pza 4.00

03.01.04.03 VALVULA CHECK BB CON PILOTO DE 2" Pza 2.00

03.01.04.04 CODO PVC SAP 2" Pza 5.00

03.01.04.05 CODO DE F° G° UNION ROSCADA DE 2" Pza 7.00

03.01.04.06 TEE DE F° G° UNION ROSCADA DE 2" Pza 1.00

03.01.04.07 UNION UNIVERSAL F°G° DE 2" Pza 8.00

03.01.04.08 TUBERIA DE F°G° DE 2" INSTAL. INCL. PRUEBA M 8.20

03.01.04.09 CODO PVC SAP 2"*45° Pza 1.00

03.01.04.10 NIPLES DE 2" x 6" Pza 6.00

03.01.04.11 CANASTILLA DE BRONCE DE 2" Pza 1.00

03.01.05 SISTEMA DE CONDUCCION A EDIFICACION

03.01.05.01 TUBERIA DE F°G° DE 2" INSTAL. INCL. PRUEBA M 5.00

03.01.05.02 TUBERIA DE AGUA PVC DE 2" (50MM) INSTAL. INC. PRU M 25.00

03.01.05.03 TUBERIA PVC SAP C - 10 R 1 1/2" EN MONTANTE M 45.38

03.01.05.04 TUBERIA PVC SAP 1" CR C-10 M 3.50

03.01.05.05 TUBERIA PVC SAP 3/4" CR C-10 M 15.84

03.01.05.06 TUBERIA PVC SAP 1/2" CR C-10 M 4.00

03.01.05.07 VALVULA DE COMPUERTA DE 2" Pza 1.00

03.01.05.08 VALVULA DE COMPUERTA DE 1" Und 1.00

03.01.05.09 VALVULA DE COMPUERTA DE 3/4" Und 12.00

03.01.05.10 VALVULA DE COMPUERTA DE 1/2" Pza 10.00

03.01.05.11 REDUCCION PVC SAP Ø2" - 3/4" C10 CR Pza 10.00

03.01.05.12 CODO DE F° G° UNION ROSCADA DE 2" Pza 3.00

03.01.05.13 CODO PVC SAP 2" Pza 3.00

03.01.05.14 CODO PVC SAP Ø1 1/2"x90 C-10 CR Pza 1.00

03.01.05.15 CODO PVC SAP Ø 1"x90° C-10 CR Pza 6.00

03.01.05.16 CODO PVC SAP Ø 3/4" x 90° C-10 CR Pza 24.00

03.01.05.17 CODO PVC SAP 1/2"x90 Pza 7.00

03.01.05.18 TEE F°G° 2" x 1" Pza 1.00

03.01.05.19 TEE PVC-SAP 2" x 1" Pza 1.00

03.01.05.20 TEE PVC SAP 2" x 1 1/2" Pza 1.00

03.01.05.21 TEE PVC SAP 1" x 3/4" Pza 1.00

03.01.05.22 TEE PVC SAP 1" x 1/2" Pza 5.00

03.01.05.23 CRUZ DE PVC SAP RED DE AGUA POTABLE DE 2" x 3/4" Pza 5.00

03.01.05.24 CANASTILLA DE BRONCE DE 2" Pza 1.00

03.02 INSTALACION SANITARIA

03.02.01 SISTEMA DE AGUA FRIA

03.02.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 91.00

03.02.02 SISTEMA DE DESAGUE Y VENTILACION

03.02.02.01 SALIDA DE DESAGUE DE 2" pto 76.00

03.02.02.02 SALIDA DE DESAGUE DE 2" EN SUMIDEROS pto 63.00

03.02.02.03 SOMBRERO DE VENTILACION Ø=2" pto 110.00

03.02.02.04 SALIDA DE DESAGUE DE 4" pto 36.00

03.02.02.05 PROVISION E INSTAL. TUB. PVC SAL Ø=4" + PRUEB. HID M 166.40

03.02.02.06 PROVISION E INSTAL. TUB. PVC SAL Ø=3" + PRUEB. HID M 285.0003.02.02.07 PROVISION E INSTAL. TUB. PVC SAL Ø=2" + PRUEB. HID M 197.15

03.02.02.08 REGISTRO DE BRONCE DE 4" Pza 61.00

03.02.02.09 REGISTRO DE BRONCE DE 3" Pza 32.00

03.02.02.10 SUMIDERO DE BRONCE DE 2" Pza 49.00

03.02.02.11 YEE PVC SAL DE 4" Pza 24.00

03.02.02.12 YEE PVC SAL SP, RAMAL CON REDUCCION DE 4"X3" Pza 24.00

03.02.02.13 CODO PVC SAL 3"X45° Pza 24.00

03.02.02.14 CODO PVC SAL Ø4"X45° Pza 24.00

03.02.02.15 TEE PVC SAL 3" x 2" Pza 48.00

03.02.02.16 SOMBRERO DE VENTILACION Ø=2" pto 18.00

03.02.03 COLECTOR DE AGUAS SERVIDAS

03.02.03.01 PROVISION E INSTALACION TUBERIA CºSºNº 10 " M 20.00

03.02.03.02 PROVISION E INSTALACION TUBERIA PVC-SAL D=6" M 99.00

03.02.03.03 PROVISION E INSTALACION TUBERIA PVC-SAL D=4" M 86.00

03.02.03.04 PROVISION E INSTALACION TUBERIA PVC-SAL D=3" M 216.00

03.02.03.05 EXCAV.TERRENO P/TUB COLECTOR AGUAS SERVIDAS M3 189.24

03.02.03.06 ELIMINACION MATERIAL EXCEDENTE MENOR O IGUAL M3 141.93

03.02.03.07 RELLENO CON MATERIAL PROPIO M3 47.31

03.02.03.08 PERFILADO E=0.15M M2 205.00

03.02.03.09 CAJA DE REGISTRO DE DESAGUE 10" X 20" Und 12.00

03.02.03.10 CAJA DE REGISTRO DE DESAGUE 18" X 24" Und 2.00

03.02.03.11 BUZON DE REGISTRO DIFERENCIADO, D=1.2m, H=1.50mUnd 5.00

03.02.03.12 ACCESORIOS DE FIJACION DE RECUBRIMIENTO DE M Und 210.00

03.02.04 SISTEMA DE DESAGUE DE AGUAS PLUVIALES

03.02.04.01 PROVISION E INSTALACION TUBERIA PVC-SAL D=3" M 40.50

03.02.04.02 EXCAV.TERRENO P/TUB COLECTOR AGUAS PLUVIALEM3 48.60

03.02.04.03 MONTANTE TUBERIA DE FIERRO GALVANIZADO PINT M 30.00

03.02.04.04 ACCESORIOS DE FIJACION EN MONTANTES Und 240.00

03.02.04.05 SALIDA SUMIDERO REJILLA 3" Und 8.00

03.02.05 TANQUE SEPTICO

03.02.05.01 MOVIMIENTO DE TIERRAS

03.02.05.01.01 EXCAVACIÓN EN TERRENO NORMAL M3 12.71

03.02.05.02 OBRAS DE CONCRETO SIMPLE

03.02.05.02.01 Solado de e=3" de espesor M2 5.78

03.02.05.03 OBRAS DE CONCRETO ARMADO

03.02.05.03.01 ENCOFRADO Y DESENCOFRADO M2 24.12

03.02.05.03.02 ACERO CORRUGADO Fy=4200 Kg/cm² G-60 Kg 35.39

03.02.05.03.03 ACERO CORRUGADO Fy=4200 Kg/cm² G-60 Kg 195.60

03.02.05.03.04 CONCRETO f`c=210 Kg/cm² M3 4.86

03.02.05.03.05 TARRAJEO CON IMPERMEABILIZANTE M2 21.26

03.02.05.03.06 TARRAJEO CON MORTERO C:A 1:3 E=1CM OBRAS DE M2 4.32

03.02.05.04 ACCESORIOS

03.02.05.04.01 TAPA DE C° f'c=175 kg/cm² e=0.15M 0.60*0.60M Und 2.00

03.02.05.04.02 SUMINISTRO E INSTALACIÓN DE ACCESORIOS TANQ GLB 1.00

03.02.06 POZO DE ABSORSIÓN

03.02.06.01 RED DE CONDUCCIÓN

03.02.06.01.01 TUBERIA PVC PARA DESAGUE DE 6" M 20.00

03.02.06.02 OBRAS DE CONCRETO SIMPLE

03.02.06.02.01 Solado e=3" de espesor M2 1.96

03.02.06.03 OBRAS DE CONCRETO ARMADO

03.02.06.03.01 ENCOFRADO Y DESENCOFRADO M2 25.08

03.02.06.03.02 ACERO CORRUGADO Fy=4200 Kg/cm² G-60 Kg 39.82

03.02.06.03.03 ACERO CORRUGADO Fy=4200 Kg/cm² G-60 Kg 68.65

03.02.06.03.04 CONCRETO f´c = 175 Kg/cm². M3 2.27

03.02.06.03.05 TARRAJEO CON MORTERO C:A 1:3 E=1" OBRAS DE A M2 7.0703.02.06.04 ALBAÑILERIA

03.02.06.04.01 MURO DE LADRILLODE C° HUECO 0.10X0.20X0.4SOG M2 29.92

03.02.06.05 ACCESORIOS

03.02.06.05.01 SUMINISTRO E INSTALACIÓN DE ACCESORIOS POZ GLB 1.00

03.02.06.05.02 GRAVA GRADUADA FILTRO PERCOLACIÓN M3 14.54

04 INSTALACIONES ELECTRICAS

04.01 TRABAJOS PRELIMINARES Y ALIMENTADOR GENERAL

04.01.01 CAVADO, SEÑALIZACION, PROTECCION, RELLENO Y CO M 100.00

04.01.02 TENDIDO DE CABLE SUBTERRANEO N2 POR H3 - 1x150m M 100.00

04.01.03 CONEXION DE INTERRUPTOR TERMOMAGNETICO 3 x 300AGLB 1.00

04.02 TABLERO DE DISTRIBUCION

04.02.01 TABLERO DE DISTRIBUCION GENERAL TG EQU 1.00

04.02.02 TABLERO ESTABILIZADO TE-11 EQU 1.00

04.02.03 TABLERO DE DISTRIBUCION TD-21 EQU 11.00

04.02.04 TABLERO DE DISTRIBUCION TD-22 EQU 1.00

04.02.05 SUBTABLERO ESTABILIZADO STE-41 EQU 4.00

04.02.06 TABLERO DE TANQUE CISTERNA TC-EB EQU 1.00

04.03 ALIMENTADORES

04.03.01 TENDIDO DE CABLE N2 POR H3 - 1x25 + Cu 1x16/T EN P M 60.00

04.03.02 TENDIDO DE CABLE N2 POR H3 - 1x16 + Cu 1x10/T EN P M 371.00

04.03.03 TENDIDO DE CABLE N2 POR H3 - 1x6 + Cu 6/T EN PVC Ø M 40.00

04.03.04 TENDIDO DE CABLE N2 POR H2 - 1x6 + Cu 6/T EN PVC Ø M 90.00

04.03.05 TENDIDO DE CABLE NH90 POR 3x10 + Cu 1x6/T EN PVC M 90.00

04.03.06 TENDIDO DE CABLE NH90 POR 3x6 + NH70 1x4/T EN PVC M 14.00

04.03.07 TENDIDO DE CABLE NH90 2x16 EN PVC Ø=40mm M 15.00

04.03.08 TENDIDO DE CABLE NH90 2x10 + NH 70 1x6/T EN PVC Ø= M 43.00

04.03.09 TENDIDO DE CABLE NH90 2x6 + NH 70 1x4/T EN PVC Ø=2 M 35.00

04.03.10 TENDIDO DE CABLE NH90 2x4 + NH 70 1x4/T EN PVC Ø=2 M 78.00

04.03.11 TENDIDO DE CABLE NH90 3x4 + NH 70 1x4/T EN PVC Ø=2 M 11.00

04.03.12 CAVADO, SEÑALIZACION, PROTECCION, RELLENO Y CO M 65.00

04.04 ARTEFACTOS DE ILUMINACION

04.04.01 REFLECTOR CON LAMPARA HALOGENA DE 150W Und 10.00

04.04.02 ARTEFACTO PARA ADOSAR TIPO AH-236 MARCA PORT Und 22.00

04.04.03 LAMPARA AHORRADORA DE 20W TIPO DECO GLOBO PH Und 29.00

04.04.04 FAROLA DE POLICARBONATO TIPO FAE PORTALAMPARA Und 17.00

04.04.05 ARTEFACTO TIPO SDL LUCERNA ADOSABLE PORTALA Und 19.00

04.04.06 ARTEFACTO TIPO PLD - A EMPOTRABLE PORTALAMPAR Und 8.00

04.04.07 ARTEFACTO TIPO PLD - A ADOSABLE PARA PORTALAM Und 228.00

04.04.08 ARTEFACTO TIPO PBE - BRAQUETS EMBELLEZEDOR P Und 104.00

04.04.09 ARTEFACTO TIPO PBE - BRAQUETS EMBELLEZEDOR P Und 24.00

04.04.10 ARTEFACTO DE LUZ DE EMERGENCIA Und 29.00

04.05 SALIDA DE LUZ, INTERRUPTORES, TOMACORRIENTES Y CAJAS

04.05.01 SALIDA PARA CENTRO DE LUZ pto 381.00

04.05.02 SALIDA PARA INTERRUPTOR SIMPLE pto 21.00

04.05.03 SALIDA PARA INTERRUPTOR DOBLE pto 45.00

04.05.04 SALIDA PARA INTERRUPTOR TRIPLE pto 18.00

04.05.05 INTERRUPTOR SIMPLE PARA ILUMINACION DE CAMPAN pto 2.00

04.05.06 CAJA RECTANGULAR DE FIERRO GALVANIZADO pto 8.00

04.05.07 SALIDA PARA TOMACORRIENTE DOBLE CON PUESTA A T pto 239.0004.05.08 SALIDA PARA TOMACORRIENTE DOBLE CON PUESTA A T pto 52.00

04.05.09 TOMACORRIENTE E INTERRUPTOR SIMPLE pto 15.00

04.05.10 SALIDA PARA TOMACORRIENTE DE LUZ DE EMERGENCIApto 24.00

04.05.11 CAJA DE PASE OCTAGONAL DE F°G° PARA ALUMBRADO pto 8.00

04.05.12 CAJA OCTAGONAL DE F°G° PARA SALIDA DE FUERZA pto 5.00

04.05.13 CAJA DE PASE DE F°G° DE 100x100x50mm pto 8.00

04.05.14 CAJA DE PASE DE F°G° 150x150x75mm pto 22.00

04.05.15 CAJA DE PASE DE F°G° 400x400x200mm pto 8.00

04.06 SISTEMA DE PUESTA A TIERRA

04.06.01 PUESTA A TIERRA jgo 4.00

04.06.02 PUESTA A TIERRA GENERAL jgo 1.00

04.07 SISTEMAS ESPECIALES

04.07.01 SISTEMAS DE ALARMAS

04.07.01.01 SALIDA PARA DETECTOR DE HUMO pto 34.00

04.07.01.02 SALIDA PARA DETECTOR DE TEMPERATURA pto 4.00

04.07.01.03 SALIDA PARA ESTACION MANUAL pto 4.00

04.07.01.04 SALIDA PARA FLASHER LUMINOSO pto 4.00

04.07.01.05 SALIDA PARA SIRENA pto 2.00

04.07.01.06 SALIDA PARA DETECTOR DE MOVIMIIENTO MINI PIR pto 13.00

04.07.01.07 SALIDA PARA CENTRALITA DE ALARMAS Y KEYPAD pto 1.00

04.07.01.08 TUBO PVC TP Ø=40" M 100.00

04.07.01.09 CAJA DE PASE DE F°G° 150x150x75mm pto 9.00

04.07.02 SISTEMA DE RED DE DATOS

04.07.02.01 SALIDA DOBLE PARA RED DE DATOS pto 16.00

04.07.02.02 SALIDA SIMPLE PARA RED DE DATOS pto 35.00

04.07.02.03 SALIDA SIMPLE PARA RED DE DATOS EN PISO pto 20.00

04.07.02.04 CAVADO DE ZANJA, PROTECCION Y RELLENO DE ZANJ M 200.00

04.07.02.05 CABLE DE FIBRA OPTICA PARA RED DE DATOS M 350.00

04.07.02.06 CAJA RECTANGULAR DE FIERRO GALVANIZADO pto 4.00

04.07.02.07 SALIDA PARA VIDEO pto 33.00

04.07.02.08 CAJA DE PASE DE F°G° 150x150x75mm pto 12.00

04.07.02.09 CAJA DE PASE DE F°G° 200x200x100mm pto 5.00

04.07.02.10 CAJA DE PASE DE F°G° 400x400x200mm pto 2.00

04.07.02.11 CAJA DE PASE DE F°G° 500x500x200mm pto 5.00

04.07.02.12 CAJA DE PASE DE F°G° 600x600x250mm pto 3.00

04.07.02.13 TUBO PVC TP Ø=50" M 428.00

04.07.02.14 TUBO PVC TP Ø=40" M 40.00

04.07.03 SISTEMA DE SONIDO

04.07.03.01 SALIDA PARA PARLANTE pto 14.00

04.07.03.02 CAJA RECTANGULAR DE FIERRO GALVANIZADO pto 14.00

05 OBRAS EXTERIORES

05.01 TRABAJOS PRELIMINARES

05.01.01 LIMPIEZA DE TERRENO MANUAL M2 1,551.00

05.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR M2 1,551.00

05.02 MOVIMIENTO DE TIERRAS

05.02.01 CORTE TERRENO A NIVEL DE SUBRASANTE M3 841.50

05.02.02 APERTURA DE VIAS ANCHO 4.00m M3 541.00

05.02.03 RELLENO CON MATERIAL PROPIO M3 576.00

05.02.04 EXCAVACIÓN MANUAL DE ZANJAS M3 93.58

05.02.05 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO H M3 900.08

05.02.06 NIVELACION INTERIOR APISONADO MANUAL M2 384.00

05.03 MUROS DE CONTENCION

05.03.01 CONCRETO f`c=210 Kg/cm² PARA MUROS DE CONTENCIO M3 37.50

05.03.02 ENCOFRADO Y DESENCOFRADO PARA MUROS DE CONT M2 37.5005.03.03 ACERO ESTRUCTURAL TRABAJADO PARA MUROS DE CO Kg 3,870.00

05.04 CONCRETO SIMPLE

05.04.01 SARDINELES

05.04.01.01 ENCOFRADO Y DESENCOFRADO DE SARDINELES M2 288.00

05.04.01.02 CONCRETO EN SARDINELES M3 2.88

05.04.02 ESCALINATAS

05.04.02.01 EMPEDRADO DE e=6" M2 5.40

05.04.02.02 ENCOFRADO Y DESENCOFRADO DE COSTADOS M2 7.20

05.04.02.03 ENCOFRADO Y DESENCOFRADO DE CONTRAPASOS M2 9.00

05.04.02.04 CONCRETO f`c=175 Kg/cm² M3 1.20

05.04.03 CUNETAS

05.04.03.01 EMPEDRADO DE e=4" M2 26.44

05.04.03.02 ENCOFRADO Y DESENCOFRADO DE COSTADOS M2 116.00

05.04.03.03 ENCOFRADO Y DESENCOFRADO DE DICIPADORES Hint=0M2 3.60

05.04.03.04 CONCRETO f`c=175 Kg/cm² M3 24.64

05.04.04 VEREDAS

05.04.04.01 EMPEDRADO DE e=6" M2 11.20

05.04.04.02 ENCOFRADO Y DESENCOFRADO DE COSTADOS M2 56.00

05.04.04.03 CONCRETO f`c=175 Kg/cm² M3 5.60

05.04.04.04 SELLADO DE JUNTAS CON ASFALTO RC-250 Y ARENA M 35.35

05.04.05 PISOS

05.04.05.01 TIERRA COMPACTADA M2 375.00

05.04.05.02 PIEDRA CHANCADA 3/4" M2 320.00

05.04.06 CARPINTERIA METALICA

05.04.07 PUERTA DE ACCESO PRINCIPAL M2 24.00

05.04.08 BARANDA CON PLANCHA DESPLEGADA MEDIANA m 96.60

05.04.09 VARIOS

05.04.09.01 BANCAS DE CONCRETO

05.04.09.01.01 CONCRETO f`c=175 Kg/cm² M3 0.76

05.04.09.01.02 ACERO DE REFUERZO Kg 244.80

05.04.09.02 CURADO DE CONCRETO

05.04.09.02.01 CURADO DE CONCRETO M2 331.04

05.04.09.03 PRUEBAS DE CONTROL DE CALIDAD

05.04.09.03.01 PRUEBAS DE RESISTENCIA DE CONCRETO Und 15.00

05.04.10 TRATAMIENTO DE AREAS VERDES

05.04.10.01 COLOCADO DE CHAMPA Und 1,595.00

05.04.10.02 COLOCACION DE ESPECIES ARBOREAS Und 50.00

05.04.11 SEÑALIZACIÓN Y SEGURIDAD

05.04.11.01 SEÑALIZACION Y SEGURIDAD Und 20.00

05.04.12 LIMPIEZA

05.04.12.01 LIMPIEZA FINAL DE OBRA M2 1,551.00

06 GALPONES

06.01 TRABAJOS PRELIMINARES

06.01.01 LIMPIEZA DE TERRENO MANUAL M2 1,852.00

06.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR M2 1,852.00

06.02 MOVIMIENTO DE TIERRAS

06.02.01 CORTE TERRENO A NIVEL DE SUBRASANTE M3 1,224.00

06.02.02 RELLENO CON MATERIAL PROPIO M3 1,036.00

06.02.03 EXCAVACIÓN MANUAL DE ZANJAS M3 93.05

06.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO H M3 281.05

06.02.05 NIVELACION INTERIOR APISONADO MANUAL M2 1,036.00

06.03 MUROS DE CONTENCION

06.03.01 CONCRETO f`c=210 Kg/cm² PARA MUROS DE CONTENCIO M3 252.00

06.03.02 ENCOFRADO Y DESENCOFRADO PARA MUROS DE CONT M2 420.00

06.03.03 EMBOQUILLADO C:A 1:5 e=0.02m M2 420.0006.03.04 ACERO ESTRUCTURAL TRABAJADO PARA MUROS DE CO Kg 19,236.00

06.03.05 LAGRIMEADORES PVC 2" M2 168.00

06.04 CONCRETO SIMPLE

06.04.01 ESCALINATAS

06.04.01.01 EMPEDRADO DE e=6" M2 5.40

06.04.01.02 ENCOFRADO Y DESENCOFRADO DE COSTADOS M2 7.20

06.04.01.03 ENCOFRADO Y DESENCOFRADO DE CONTRAPASOS M2 9.00

06.04.01.04 CONCRETO f`c=175 Kg/cm² M3 1.20

06.04.02 CUNETAS

06.04.02.01 EMPEDRADO DE e=4" M2 69.96

06.04.02.02 ENCOFRADO Y DESENCOFRADO DE COSTADOS M2 312.00

06.04.02.03 ENCOFRADO Y DESENCOFRADO DE DICIPADORES Hint=0M2 8.40

06.04.02.04 CONCRETO f`c=175 Kg/cm² M3 65.76

06.04.03 VEREDAS

06.04.03.01 ENCOFRADO Y DESENCOFRADO DE COSTADOS M2 678.00

06.04.03.02 EMPEDRADO DE e=6" M2 553.50

06.04.03.03 EMBOQUILLADO C:A 1:5 e=0.02m M2 110.70

06.04.03.04 SELLADO DE JUNTAS CON ASFALTO RC-250 Y ARENA M 55.60

06.04.04 PISOS

06.04.04.01 CHAMOTA M2 100.00

06.04.04.02 TIERRA COMPACTADA M2 350.00

06.04.04.03 PIEDRA CHANCADA 3/4" M2 22.80

06.04.05 CARPINTERIA METALICA

06.04.06 PUERTA DE ACCESO PRINCIPAL M2 22.80

06.04.07 BARANDA CON PLANCHA DESPLEGADA MEDIANA m 124.20

06.04.08 VARIOS

06.04.08.01 BANCAS DE CONCRETO

06.04.08.01.01 CONCRETO f`c=175 Kg/cm² M3 0.76

06.04.08.01.02 ACERO DE REFUERZO Kg 244.80

06.04.08.02 CURADO DE CONCRETO

06.04.08.02.01 CURADO DE CONCRETO M2 75.36

06.04.08.03 PRUEBAS DE CONTROL DE CALIDAD

06.04.08.03.01 PRUEBAS DE RESISTENCIA DE CONCRETO Und 15.00

06.04.08.04 PERGOLA PARA ALIMENTO DE ANIMALES

06.04.08.04.01 PERGOLA PARA ALIMENTO DE ANIMALES und 64.00

06.04.09 MÓDULOS DE GALPONES

06.04.09.01 VACUNOS Und 2.00

06.04.09.02 CAMELIDOS Und 3.00

06.04.09.03 OVINOS Und 1.00

06.04.09.04 PORCINOS Und 1.00

06.04.09.05 CONEJOS Und 1.00

06.04.09.06 AVES Und 1.00

06.04.09.07 OBSERVACION Und 1.00

06.04.09.08 POZAS DE LOMBRICULTURA Und 3.00

06.04.10 TRATAMIENTO DE AREAS VERDES

06.04.10.01 COLOCADO DE CHAMPA Und 1,832.50

06.04.10.02 COLOCACION DE ESPECIES ARBOREAS Und 20.00

06.04.11 SEÑALIZACIÓN Y SEGURIDAD

06.04.11.01 SEÑALIZACION Y SEGURIDAD Und 10.00

06.04.12 LIMPIEZA

06.04.12.01 LIMPIEZA FINAL DE OBRA M2 1,852.00

07 FLETE TRANSPORTE

07.01 FLETE TRANSPORTE GLB 1.00

08 EQUIPAMIENTO Y MATERIALES

08.01 EQUIPAMIENTO

08.01.01 EQUIPOS DE LABORATORIO GLB 1.00

08.02 MATERIALES

08.02.01 MATERIALES DE LABORATORIO GLB 1.00

09 MOBILIARIO

09.01 MOBILIARIO GLB 1.00

10 SEMOVIENTES

10.01 SEMOVIENTES GLB 1.00

COSTO DIRECTO

MATERIALES

MANO DE OBRA

EQUIPO Y HERRAMIENTAS

SUB TOTAL

GASTOS GENERALES

GASTOS DE SUPERVISION

EXPEDIENTE TECNICO

LIQUIDACION

TOTAL PRESUPUESTO

Fecha :

Página 1

FORTALECIMIENTO DE LA CAPACIDAD PRESTADORA DE SERVICIOS EDUCATIVOS DE LA CARRERA PROFESIONAL DE MEDICINA VETERINARIA DE LA UNSAAC-SEDE ESPINAR ALTERNATIVA 1

Costo al 24/09/2011

Precio S/. Parcial S/.

###

19,350.00

60.00 1,920.00

45.00 1,080.00

31.80 15,900.00

450.00 450.00

1,500.00

700.00 700.00

250.00 250.00

200.00 200.00

350.00 350.00

6,236.04

2.28 2,676.72

1,000.00 1,000.00

2.18 2,559.32

88,252.37

9.35 17,320.88

4.04 11,247.36

19.76 1,130.86

11.31 21,470.11

15.49 22,619.27

18.47 11,892.83

2.19 2,571.06

78,123.93

28,316.51

14.48 28,316.51

49,807.42

209.75 3,171.42

234.82 14,673.90

301.78 16,857.43

41.66 15,104.67

###

50,987.48

407.90 38,175.36

4.99 12,812.12

373,626.30

409.12 194,634.75

31.50 6,075.72

4.99 172,915.83

23,159.39

409.89 7,943.67

31.50 3,353.49

4.99 11,862.23

8,075.22

377.58 4,814.15

41.66 1,062.33

4.99 2,198.74

215,456.64

431.62 22,137.79

43.32 8,908.76

5.09 184,410.09

30,013.37

367.62 12,193.96

39.68 2,631.975.09 15,187.44

408,483.81

441.83 126,937.76

48.83 134,248.32

5.09 147,297.73

160,675.09

367.62 135,824.56

39.76 14,030.51

5.09 10,820.02

199,752.02

442.44 51,566.38

38.37 15,725.94

4.99 132,459.70

122,613.06

404.35 50,689.32

45.55 37,757.31

4.99 34,166.43

304,037.15

426.41 71,513.22

52.12 131,687.43

5.09 73,172.57

4.41 27,663.93

39,965.31

395.48 16,353.10

32.33 8,912.09

5.09 14,700.12

202,038.72

106,905.99

71.82 16,409.43

70.80 49,029.00

288.47 41,467.56

20,827.26

93.24 3,916.08

28.47 16,911.18

5,747.80

144.61 723.05

56.97 5,024.75

68,557.67

94.01 62,244.02

42.88 6,313.65

###

124,281.30

48.85 20,434.93

89.03 103,846.37

130,244.07

18.63 35,143.82

19.47 51,629.57

18.89 14,411.75

17.29 27,094.81

14.17 229.55

24.19 391.88

1.01 1,342.69

43,587.36

21.69 43,587.36

185,083.66

36.81 21,244.16

8.92 17,084.21

50.51 146,755.29

81,263.43

36.81 33,766.92

46.49 12,053.93

37.80 34,675.07

2.51 767.51

10,182.60

46.49 8,368.20

37.80 1,814.40

46,827.98

7.54 11,163.72

40.21 35,664.26

18,240.26

5.92 431.92

37.80 10,342.08

37.80 5,455.30

7.35 2,010.96

41,798.34

44.96 23,602.65

111.63 18,195.69

182,957.57

9,251.88 74,015.04

111.27 1,945.00

239.10 12,978.35

176.36 4,232.64

93.80 34,260.45

59.56 13,019.82

71.73 38,820.28

7.76 383.34

9.21 454.97

71.73 1,197.89

71.73 1,649.79

62,533.43

197.20 36,340.02

255.97 26,193.41

30,864.68

126.14 26,277.48

87.34 1,327.57

415.24 3,259.63

325,470.42

333.59 18,500.90

333.59 306,969.52

19,870.41

19.11 3,267.81

235.42 13,418.94

64.71 2,458.98

95.75 383.00

42.71 341.68

36,454.20

1.97 3,958.83

8.65 26,352.31

2.69 6,064.82

3.26 78.24412,411.03

333.59 334,440.65

122.40 15,090.70

183.60 43,504.02

44.00 1,833.48

392.97 17,542.18

64,492.07

131.39 30,697.96

137.77 26,336.11

372.90 7,458.00

27,278.99

249.68 4,494.24

321.03 1,605.15

309.68 5,574.24

192.34 961.70

271.34 1,628.04

32.34 194.04

357.34 7,146.80

377.34 4,905.42

312.34 312.34

369.68 369.68

87.34 87.34

468.71

468.71 468.71

142,896.23

71,135.76

63,757.04

0.61 23.14

5.29 561.80

4.38 166.13

14.48 549.23

5.07 699.96

384.76 130.82

49.62 44.66

399.17 22,457.30

57.92 9,323.38

5.00 25,248.05

0.08 3.99

21.63 2,058.09

18.63 1,780.84

2.11 14.77

133.88 267.76

213.56 427.12

1,796.50

23.52 1,467.65

69.17 69.17

38.01 152.04

19.29 38.58

15.20 30.40

19.33 38.66

603.19

4.38 116.95

74.17 74.17

45.84 91.6828.94 28.94

35.08 35.08

19.01 19.01

17.81 35.62

15.51 15.51

19.01 19.01

88.17 88.17

21.08 79.05

1,698.53

3.78 336.91

82.17 328.68

147.17 294.34

19.71 98.55

17.79 124.53

20.79 20.79

17.79 142.32

11.84 97.09

27.21 27.21

23.99 143.94

84.17 84.17

3,280.50

11.84 59.20

3.78 94.50

5.15 233.71

4.85 16.98

3.80 60.19

3.28 13.12

82.17 82.17

75.17 75.17

75.17 902.04

53.17 531.70

21.51 215.10

17.79 53.37

19.71 59.13

14.51 14.51

14.21 85.26

14.01 336.24

14.01 98.07

29.84 29.84

21.21 21.21

22.51 22.51

18.21 18.21

16.21 81.05

18.61 93.05

84.17 84.17

71,760.47

6,748.56

74.16 6,748.56

23,063.20

41.21 3,131.96

41.21 2,596.23

19.01 2,091.10

65.55 2,359.80

4.38 728.83

16.02 4,565.7015.49 3,053.85

4.30 262.30

16.51 528.32

17.01 833.49

19.01 456.24

17.51 420.24

20.31 487.44

17.81 427.44

16.21 778.08

19.01 342.18

20,625.87

15.13 302.60

3.35 331.65

4.38 376.68

5.93 1,280.88

19.76 3,739.38

19.76 2,804.54

15.49 732.83

270.19 3,242.28

270.19 540.38

144.11 720.55

31.21 6,554.10

3,765.67

5.93 240.17

19.76 960.34

8.62 258.60

8.62 2,068.80

29.72 237.76

6,179.70

376.60

29.63 376.60

138.20

23.91 138.20

5,415.24

53.01 1,278.60

5.77 204.20

5.09 995.60

441.83 2,147.29

31.69 673.73

26.81 115.82

249.66

67.65 135.30

114.36 114.36

11,377.47

585.80

29.29 585.80

46.86

23.91 46.86

2,881.23

53.01 1,329.49

5.77 229.76

5.09 349.43

371.25 842.74

18.36 129.816,252.38

208.97 6,252.38

1,611.20

97.00 97.00

104.14 1,514.20

291,885.62

35,921.56

20.64 2,064.00

316.29 31,629.00

2,228.56 2,228.56

22,231.08

3,859.63 3,859.63

802.11 802.11

1,140.13 12,541.43

1,140.13 1,140.13

694.11 2,776.44

1,111.34 1,111.34

33,170.81

75.40 4,524.00

50.31 18,665.01

27.03 1,081.20

21.09 1,898.10

30.09 2,708.10

17.57 245.98

27.73 415.95

20.05 862.15

13.65 477.75

10.36 808.08

12.99 142.89

20.64 1,341.60

87,735.48

96.45 964.50

186.28 4,098.16

24.60 713.40

342.28 5,818.76

119.23 2,265.37

258.78 2,070.24

258.78 59,001.84

61.78 6,425.12

86.28 2,070.72

148.53 4,307.37

62,006.03

68.77 26,201.37

63.82 1,340.22

73.01 3,285.45

78.66 1,415.88

529.35 1,058.70

45.82 366.56

79.47 18,993.3384.22 4,379.44

80.46 1,206.90

59.66 1,431.84

87.90 703.20

29.00 145.00

31.53 252.24

33.53 737.66

61.03 488.24

3,718.25

729.28 2,917.12

801.13 801.13

47,102.41

8,177.81

69.11 2,349.74

68.81 275.24

88.05 352.20

87.22 348.88

231.16 462.32

220.53 2,866.89

745.77 745.77

4.75 475.00

33.53 301.77

37,501.36

396.76 6,348.16

239.23 8,373.05

228.00 4,560.00

16.91 3,382.00

24.45 8,557.50

45.82 183.28

44.52 1,469.16

33.53 402.36

38.83 194.15

61.03 122.06

75.53 377.65

111.05 333.15

7.03 3,008.84

4.75 190.00

1,423.24

55.84 781.76

45.82 641.48

155,581.30

6,917.46

2.28 3,536.28

2.18 3,381.18

42,434.55

9.35 7,868.03

11.70 6,329.70

15.49 8,922.24

19.76 1,849.14

18.47 16,624.48

2.19 840.96

35,741.18

395.48 14,830.50

32.33 1,212.385.09 19,698.30

70,488.11

13,497.98

46.49 13,389.12

37.80 108.86

1,370.70

32.81 177.17

42.54 306.29

42.54 382.86

420.32 504.38

16,311.96

32.81 867.50

42.54 4,934.64

42.54 153.14

420.32 10,356.68

5,192.23

32.81 367.47

42.54 2,382.24

420.32 2,353.79

2.51 88.73

5,427.00

6.28 2,355.00

9.60 3,072.00

176.36 4,232.64

93.80 9,061.08

1,925.92

1,540.99

420.32 319.44

4.99 1,221.55

9.93

0.03 9.93

375.00

25.00 375.00

8,125.00

5.00 7,975.00

3.00 150.00

5,343.60

267.18 5,343.60

490,747.16

8,259.92

2.28 4,222.56

2.18 4,037.36

36,790.54

9.35 11,444.40

15.49 16,047.64

19.76 1,838.67

18.47 5,190.99

2.19 2,268.84

223,767.60

395.48 99,660.96

32.33 13,578.60

27.84 11,692.805.09 97,911.24

5.50 924.00

221,929.10

1,370.70

32.81 177.17

42.54 306.29

42.54 382.86

420.32 504.38

43,565.45

32.81 2,295.39

42.54 13,272.48

42.54 357.34

420.32 27,640.24

50,223.91

42.54 28,842.12

32.81 18,160.34

27.84 3,081.89

2.51 139.56

2,536.88

1.20 120.00

6.28 2,198.00

9.60 218.88

176.36 4,021.01

93.80 11,649.96

33,966.89

1,540.99

420.32 319.44

4.99 1,221.55

2.26

0.03 2.26

375.00

25.00 375.00

32,048.64

500.76 32,048.64

62,700.00

4,500.00 9,000.00

5,250.00 15,750.00

4,500.00 4,500.00

3,750.00 3,750.00

10,500.00 10,500.00

2,550.00 2,550.00

4,500.00 4,500.00

4,050.00 12,150.00

9,222.50

5.00 9,162.50

3.00 60.00

2,671.80

267.18 2,671.80

175,000.00

175,000.00 175,000.00

###

###

### ###

73,223.73

73,223.73 73,223.73

156,140.00

156,140.00 156,140.00

195,000.00

195,000.00 195,000.00

7,795,370.45

4,420,856.57

1,067,035.57

2,110,666.67

7,598,558.81

759,855.88

379,927.94

1,139,783.82

227,956.76

10,106,083.21

###

S10

Tiempo para programación (Mano de Obra)

Presupuesto 0601066 MEJORAMIENTO INFRESTRUCTURA I.E. 50441 DE UMANA - PAUCARTAMBO

Subpresupuesto 001 MEJORAMIENTO DE CAMINOS

Item Descripción Partida

01 MEJORAMIENTO DE CAMINO

01.01 CAMINO PEATONAL

01.01.01 OBRAS PRELIMINARES

01.01.01.01 TRAZO DE NIVELES Y REPLANTEO M ### 1,200.00 ### 1.00

01.01.01.02 CARTEL DE IDENTIFICACION DE OBRA 4.80 x 2.40 m. Un### 2.00 ### 1.00

01.01.01.03 CONSTRUCCION CAMPAMENTO, OFICINA, ALMACEN M ### 12.00 ### 1.00

01.01.02 MOVIMIENTO DE TIERRAS

01.01.02.01 CORTE MANUAL EN MATERIAL SUELTO M ### 3.00 ### 1.00

01.01.02.02 CORTE MANUAL EN ROCA SUELTA CON BOLONERIA M ### 1.00 ### 1.00

01.01.02.03 CORTE MANUAL EN ROCA SUELTA M ### 2.50 ### 1.00

01.01.02.04 CORTE MANUAL EN ROCA FIJA M ### 1.00 ### 1.00

01.01.02.05 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO M ### 12.00 ### 1.00

01.01.02.06 ELIMINACION MANUAL DE MATERIAL EXCEDENTE DIST 50 m M ### 12.00 ### 1.00

01.01.03 MEJORAMIENTO DE CAMINO EN TRAMOS ARCILLOSOS

01.01.03.01 EXTRACCION Y SELECCION DE MATERIAL DE CANTERA M ### 3.00 ### 1.00

01.01.03.02 TRASLADO DE MATERIAL DE CANTERA DIST 1200 m M ### 3.00 ### 1.00

01.01.03.03 EXTENDIDO Y COMPACTADO MANUAL DE MATERIAL DE CANTERA M ### 90.00 ### 1.00

01.02 OBRAS DE ARTE

01.02.01 PUENTE DE CONCRETO ARMADO

01.02.01.01 MOVIMIENTO DE TIERRAS

01.02.01.01.01 CORTE MANUAL EN MATERIAL SUELTO M ### 3.00 ### 1.00

01.02.01.01.02 CORTE MANUAL EN ROCA FIJA M ### 1.80 ### 1.00

01.02.01.01.03 ELIMINACION MANUAL DE MATERIAL EXCEDENTE DIST 50 m M ### 12.00 ### 1.00

01.02.01.01.04 CONFORMACION MANUAL DE TERRAPLENES M ### 10.00 ### 1.00

01.02.01.02 ENCAUSAMIENTO Y REENCAUSAMIENTO

01.02.01.02.01 ENCAUSAMIENTO DE RIOS M ### 1.00 ### 1.00

01.02.01.03 FALSO PUENTE

01.02.01.03.01 CONCRETO CICLOPEO f'c=140 Kg/cm² +50 % PM. M ### 9.00 ### 1.00

01.02.01.03.02 ENCOFRADO Y DESENCOFRADO BAJO AGUA M ### 8.00 ### 1.00

01.02.01.03.03 M ### 12.00 ### 1.00

01.02.01.04 ESTRIBOS

01.02.01.04.01 ENCOFRADO Y DESENCOFRADO M ### 10.00 ### 1.00

01.02.01.04.02 MUROS DE PIEDRA ASENTADOS CON CONCRETO F'C=175 KG/CM² M ### 7.00 ### 1.00

01.02.01.05 LOSAS ARMADAS

01.02.01.05.01 CONCRETO f`c=210 Kg/cm² DE LOSAS M ### 12.00 ### 1.00

01.02.01.05.02 ENCOFRADO Y DESENCOFRADO NORMAL DE LOSAS M ### 10.00 ### 1.00

01.02.01.05.03 ACERO CORRUGADO Fy=4200 Kg/cm² Grado 60 Kg### 250.00 ### 1.00

01.02.01.06 BARANDAS DE ROLLIZO

01.02.01.06.01 BARANDA DE MADERA ROLLIZO DE EUCALIPTO Ml### 15.00 ### 1.00

Und.

Metrad

o

Rendimiento(Ru)

TiempoUnit

FactorMultiplicidad(f)

CONSTRUCCION Y DESMONTAJE FALSO PUENTE DE ROLLIZOS DE EUCALIPTO

01.02.02 ALCANTARILLAS DE C°

01.02.02.01 MOVIMIENTO DE TIERRAS

01.02.02.01.01 CORTE MANUAL EN MATERIAL SUELTO M ### 3.00 ### 1.00

01.02.02.02 OBRAS DE CONCRETO

01.02.02.02.01 ENCOFRADO Y DESENCOFRADO M ### 10.00 ### 1.00

01.02.02.02.02 CONCRETO f`c=210 Kg/cm² DE LOSAS M ### 12.00 ### 1.00

01.02.02.02.03 ACERO CORRUGADO Fy=4200 Kg/cm² Grado 60 Kg### 250.00 ### 1.00

01.02.02.02.04 MUROS DE PIEDRA ASENTADOS CON CONCRETO F'C=175 KG/CM² M ### 7.00 ### 1.00

01.02.03 ALCANTARILLAS TIPO TAJEA

01.02.03.01 CORTE MANUAL EN MATERIAL SUELTO M ### 3.00 ### 1.00

01.02.03.02 ALCANTARILLAS DE PIEDRA M ### 5.30 ### 1.00

01.02.03.03 ALIVIADERO Y POZA DE AMORTIGUAMIENTO Un### 2.00 ### 1.00

01.02.04 CUNETAS LATERALES

01.02.04.01 CONST. CUNETAS SIN REVESTIR SEC. TRIANG. H=0.20 , B=0.30 Ml### 30.00 ### 1.00

01.02.04.02 CUNETAS EN ROCA SUELTA Sección Triangular b=0.30, h=0.20m Ml### 20.00 ### 1.00

01.02.05 CUNETAS DE CORONACIÓN

01.02.05.01 CUNETAS EN TEIRRA Sección Triangular b=0.30, h=0.20m Ml### 30.00 ### 1.00

01.02.06 SUB DRENAJE

01.02.06.01 CORTE MANUAL EN MATERIAL SUELTO M ### 3.00 ### 1.00

01.02.06.02 RELLENO Y COMPACTADO DE ZANJAS M ### 12.00 ### 1.00

01.02.06.03 TUBERIA DE DRENAJE PVC SAP Ø=4" CRIBADO Ml### 60.00 ### 1.00

01.02.06.04 SUMINISTRO Y COLOCACIÓN DE GEOTEXTIL CLASE 2 M ### 60.00 ### 1.00

01.02.06.05 MATERIAL FILTRANTE M ### 4.50 ### 1.00

01.02.06.06 TRASLADO DE MATERIAL DE CANTERA M ### 3.00 ### 1.00

01.02.07 MUROS DE SOSTENIMIENTO

01.02.07.01 CORTE MANUAL EN MATERIAL SUELTO M ### 3.00 ### 1.00

01.02.07.02 EXTRACCIÓN Y TRANSPORTE DE PIEDRA DE CANTERA M.### 5.00 ### 1.00

01.02.07.03 MUROS SECOS DE PIEDRA M ### 7.50 ### 1.00

01.02.07.04 ELIMINACION MANUAL DE MATERIAL EXCEDENTE DIST 50 m M ### 12.00 ### 1.00

01.02.08 GRADAS DE PIEDRA

01.02.08.01 CORTE MANUAL EN MATERIAL SUELTO M ### 3.00 ### 1.00

01.02.08.02 GRADAS DE PIEDRA RÚSTICA M ### 2.00 ### 1.00

01.02.08.03 ELIMINACION MANUAL DE MATERIAL EXCEDENTE DIST 50 m M ### 12.00 ### 1.00

01.03 PLAN DE MANEJO AMBIENTAL

01.03.01 REPOSICIÓN DE CANTERAS M ### 10.00 ### 1.00

Subpresupuesto 003 SSHH TIPO - 1

Item Descripción Partida

02 SSHH TIPO - 1

02.01 ESTRUCTURAS

02.01.01 TRABAJOS PELIMINARES

02.01.01.01 LIMPIEZA DE TERRENO MANUAL M ### 50.00 ### 1.00

02.01.01.02 TRAZO NIVELES Y REPLANTEO M ### 500.00 ### 1.00

02.01.02 MOVIMIENTO DE TIERRAS

02.01.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS MAT. SUELTO H=1.2m M ### 3.00 ### 1.00

02.01.02.02 ELIMINACIÓN MANUAL DE MATERIAL DE CORTE d=50m M ### 12.00 ### 1.00

02.01.02.03 PERFILADO DE ZANJAS M ### 60.00 ### 1.00

02.01.03 OBRAS DE CONCRETO SIMPLE

02.01.03.01 CIMIENTO CORRIDO C:H=1:10+30% PG M ### 12.50 ### 1.00

02.01.03.02 SOBRECIMIENTO CORRIDO C:H=1:8+25% PG M ### 12.50 ### 1.00

02.01.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO M ### 10.00 ### 1.00

Und.

Metrad

o

Rendimiento(Ru)

TiempoUnit

FactorMultiplicidad(f)

02.01.04 ESTRUCTURAS DE MADERA

02.01.04.01 TIJERAL MADERA AGUANO ENCUADRADA 2" x 6" Un### 4.00 ### 1.00

02.01.04.02 COLOCACION DE TIJERALES Un### 3.00 ### 1.00

02.01.04.03 VIGAS DINTEL DE MADERA Un### 10.00 ### 1.00

02.01.04.04 MACHIHEMBRADO MADERA AGUANO 3/4" x 4" x 10' M ### 18.00 ### 1.00

02.01.04.05 PILARES DE MADERA AGUANO 6" x 6" x 2.85 m Pz### 15.00 ### 1.00

02.01.04.06 VIGA DE MADERA AGUANO 6" x 4" Pz### 15.00 ### 1.00

02.01.05 ALBAÑILERIA

02.01.05.01 MURO DE PIEDRA e=0.50m M ### 18.00 ### 1.00

02.02 ARQUITECTURA

02.02.01 PISOS Y PAVIMENTOS

02.02.01.01 VEREDA DE LAJA DE PIEDRA IRREGULAR M ### 20.00 ### 1.00

02.02.01.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VEREDAS M ### 15.00 ### 1.00

02.02.01.03 FALSO PISO DE CONCRETO1:10 INC/EMPEDRADO e=10cm M ### 35.00 ### 1.00

02.02.01.04 PISO DE LAJA DE PIEDRA IRREGULAR M ### 22.00 ### 1.00

02.02.02 CUBIERTAS

02.02.02.01 COBERTURA CON PLANCHA ONDULINE M ### 50.00 ### 1.00

02.02.03 CARPINTERIA DE MADERA

02.02.03.01 Puertas tableros rebajados águano 4.5 cm. M ### 6.00 ### 1.00

02.02.03.02 VENTANA DE MADERA TIPO V3 Un### 2.00 ### 1.00

02.02.04 CERRAJERIA

02.02.04.01 Bisagras capuchinas de 4" Un### 50.00 ### 1.00

02.02.04.02 Cerradura para puerta principal pesada Pz### 4.00 ### 1.00

02.02.05 PINTURA

02.02.05.01 PINTURA BARNIZ EN PUERTAS M ### 40.00 ### 1.00

02.03 INSTALACIONES SANITARIAS

02.03.01 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO

02.03.01.01 EXCAVACION MANUAL DE ZANJAS M ### 3.00 ### 1.00

02.03.01.02 RELLENO Y COMPACTA DE ZANJAS M ### 15.00 ### 1.00

02.03.01.03 Instalación Tubería PVC SAP C-10 Ø=3/4" Ml### 500.00 ### 1.00

02.03.01.04 Instalación Tubería PVC SAP C-10 Ø=1/2" Ml### 550.00 ### 1.00

02.03.01.05 Salida de agua fría Tubería PVC SAP 1/2" Pt ### 4.00 ### 1.00

02.03.01.06 Reducción PVC SAP 3/4"*1/2" Un### 40.00 ### 1.00

02.03.01.07 TEE PVC SAP 3/4" x 3/4" Un### 30.00 ### 1.00

02.03.01.08 Codo PVC SAP 3/4" x 90° Un### 40.00 ### 1.00

02.03.01.09 Codo PVC SAP 1/2"*90° Un### 40.00 ### 1.00

02.03.01.10 VALVULA COMPUERTA BRONCE 3/4" Un### 10.00 ### 1.00

02.03.01.11 Grifería cromada de lavatorio Un### 10.00 ### 1.00

02.03.02 SISTEMA DE DESAGUE

02.03.02.01 Instalación Tubería PVC SAL 2" Ml### 250.00 ### 1.00

02.03.02.02 Instalación Tubería PVC SAL 4" Ml### 200.00 ### 1.00

02.03.02.03 Salida tubería de desague de 4" Pt ### 5.00 ### 1.00

02.03.02.04 Sumidero cromado Ø=2" Un### 4.00 ### 1.00

02.03.02.05 Yee PVC SAL Ø=2" Un### 45.00 ### 1.00

02.03.02.06 Yee PVC SAL Ø=4" Un### 40.00 ### 1.00

02.03.02.07 Registro roscado de bronce 2" Un### 4.00 ### 1.00

02.03.02.08 Salida tubería de desague de 2" Pt ### 5.00 ### 1.00

02.03.02.09 Sombrero de ventilación PVC Ø=2" Pz### 25.00 ### 1.00

02.03.02.10 Caja de registro de desague 12" * 24" Un### 6.00 ### 1.00

02.03.03 APARATOS Y ACCESORIOS SANITARIOS

02.03.03.01 Inodoro tanque bajo blanco Pz### 4.00 ### 1.00

02.03.03.02 LAVATORIO DE MAMPOSTERIA DE PIEDRA 1 llave Pz### 1.00 ### 1.00

02.03.03.03 DUCHA CROMADA Un### 10.00 ### 1.00

02.04 CAPTACION DE AGUA

02.04.01 MOVIMIENTO DE TIERRAS

02.04.01.01 EXCAVACION MANUAL DE ESTRUCTURAS M ### 3.00 ### 1.00

02.04.01.02 ELIMINACION DE MATERIAL EXCEDENTE MANUAL D=30m M ### 25.00 ### 1.00

02.04.02 OBRAS DE CONCRETO SIMPLE

02.04.02.01 Solado para zapatas y cimentaciones e=2" mezcla 1:12 C:H M ### 80.00 ### 1.00

02.04.03 OBRAS DE CONCRETO ARMADO

02.04.03.01 Encofrado y desencofrado M ### 10.00 ### 1.00

02.04.03.02 ACERO CORRUGADO Fy=4200 Kg/cm² Grado 60 Kg### 250.00 ### 1.00

02.04.03.03 Concreto f`c=210 Kg/cm² M ### 12.00 ### 1.00

02.04.03.04 Tarrajeo con mortero C:A 1:2 e=1.5cm con impermeabilizante M ### 6.00 ### 1.00

02.04.03.05 Tarrajeo con mortero C:A 1:3 e=1cm obras de arte M ### 8.00 ### 1.00

02.04.04 ACCESORIOS

02.04.04.01 Tapa metálica 0.60m * 0.60m Un### 40.00 ### 1.00

02.04.04.02 SUMINISTRO ACCESORIOS CAPTACIÓN G ### 2.00 ### 1.00

02.04.04.03 TUBERIA F°G° Ø=3/4" Ml### 40.00 ### 1.00

02.04.04.04 MATERIAL FILTRANTE M ### 4.50 ### 1.00

02.05 BIODIGESTOR

02.05.01 RED DE CONDUCCIÓN

02.05.01.01 Instalación Tubería PVC SAL 4" Ml### 200.00 ### 1.00

02.05.02 OBRAS DE CONCRETO SIMPLE

02.05.02.01 Solado para zapatas y cimentaciones e=2" mezcla 1:12 C:H M ### 80.00 ### 1.00

02.05.03 ACCESORIOS

02.05.03.01 Tapa de C° f'c=175 kg/cm² e=0.15m 0.60*0.60m Un### 6.00 ### 1.00

02.05.03.02 Caja de registro de desague 12" * 24" Un### 6.00 ### 1.00

02.05.03.03 SUMINSITRO E INSTALACIÓN BIODIGESTOR 1300LTS G ### 2.00 ### 1.00

Subpresupuesto 005 MIRADOR PLATAFORMA CAMPING

Item Descripción Partida

03 MIRADORES TURÍSTICOS PLATAFORMA CAMPING

03.01 TRABAJOS PELIMINARES

03.01.01 TRAZO, NIVELES Y REPLANTEO M ### 500.00 ### 1.00

03.02 CORTE EN TERRENO NATURAL

03.02.01 CORTE MANUAL EN MATERIAL SUELTO M ### 3.00 ### 1.00

03.02.02 CORTE MANUAL EN ROCA FIJA M ### 1.80 ### 1.00

03.02.03 RELLENO CON MATERIAL PROPIO M ### 15.00 ### 1.00

03.02.04 COMPACTACIÓN MANUAL Y MEJORAMIENTO DE CALZADA M ### 50.00 ### 1.00

03.02.05 MATERIAL DE AFIRMADO DE e=6" M ### 90.00 ### 1.00

03.02.06 EXTRACCIÓN DE MATERIAL DE CANTERA M.### 5.00 ### 1.00

03.02.07 TRASLADO DE MATERIAL DE CANTERA M ### 3.00 ### 1.00

03.02.08 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE d=50m M ### 12.00 ### 1.00

03.03 PISOS Y VEREDAS

03.03.01 PISO DE LAJA DE PIEDRA IRREGULAR M ### 22.00 ### 1.00

03.04 MUROS DE ALBAÑILERIA

03.04.01 EXCAVACIÓN EN TERRENO NATURAL MANUAL M ### 2.50 ### 1.00

03.04.02 MURO DE MAMPOSTERIA DE PIEDRA ASENTADA CON MORTERO C:A 1:8 M ### 9.00 ### 1.00

Subpresupuesto 006 PARADORES

Item Descripción Partida

04 PARADOR

04.01 TRABAJOS PELIMINARES

04.01.01 TRAZO, NIVELES Y REPLANTEO M ### 500.00 ### 1.00

04.02 CORTE EN TERRENO NATURAL

04.02.01 CORTE MANUAL EN MATERIAL SUELTO M ### 3.00 ### 1.00

Und.

Metrad

o

Rendimiento(Ru)

TiempoUnit

FactorMultiplicidad(f)

Und.

Metrad

o

Rendimiento(Ru)

TiempoUnit

FactorMultiplicidad(f)

04.02.02 CORTE MANUAL EN ROCA FIJA M ### 1.80 ### 1.00

04.02.03 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE d=50m M ### 12.00 ### 1.00

04.03 CUBIERTAS

04.03.01 CONCRETO CICLÓPEO f'c=140 Kg/cm² +50 % PM. M ### 9.00 ### 1.00

04.03.02 ESTRUCTURA DE SOPORTE DE MADERA Un### 15.00 ### 1.00

04.03.03 COBERTURA CON PLANCHA ONDULINE M ### 50.00 ### 1.00

Subpresupuesto 007 SEÑALIZACIÓN

Item Descripción Partida

05 SEÑALIZACION

05.01 TRABAJOS PELIMINARES

05.01.01 TRAZO NIVELES Y REPLANTEO M ### 500.00 ### 1.00

05.01.02 EXCAVACION MANUAL NO CLASIFICADA DE ESTRUCTURAS M ### 2.50 ### 1.00

05.01.03 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE d=50m M ### 12.00 ### 1.00

05.01.04 CIMENTACION DE SEÑAL M ### 8.00 ### 1.00

05.01.05 ACERO CORRUGADO Fy=4200 Kg/cm² Ø=3/8" Kg### 250.00 ### 1.00

05.02 PANEL INFORMATIVO

05.02.01 ESTRUCTURA DE MADERA DE PANEL INFORMATIVO Un### 15.00 ### 1.00

05.02.02 COBERTURA CON PLANCHA ONDULINE M ### 50.00 ### 1.00

05.02.03 Pz### 1.00 ### 1.00

05.03 SEÑAL TIPO - 1

05.03.01 Un### 3.00 ### 1.00

05.04 SEÑAL TIPO - 2

05.04.01 Un### 5.00 ### 1.00

05.05 SEÑAL TIPO - 4

05.05.01 Un### 5.00 ### 1.00

05.06 SEÑAL TIPO - 5

05.06.01 SEÑAL TIPO 5 (PLANCHA FIERRO GALV. - SEGÚN DISEÑO) Un### 5.00 ### 1.00

05.07 SEÑAL TIPO - 6

05.07.01 SEÑAL TIPO 6 (PLANCHA FIERRO GALV. - SEGÚN DISEÑO) Un### 5.00 ### 1.00

05.08 HITO INFORMATIVO

05.08.01 HITO INFORMATIVO (SEGUN DISEÑO) Un### 5.00 ### 1.00

05.09 HITO KILOMETRICO

05.09.01 HITO KILOMETRICO (SEGUN DISEÑO) Un### 3.00 ### 1.00

05.10 SEÑAL DE PISO

05.10.01 SEÑAL DE PISO (SEGUN DISEÑO) Un### 5.00 ### 1.00

Subpresupuesto 008 FLETES

Item Descripción Partida

06 FLETES

06.01 FLETE TERRESTRE

06.01.01 FLETE TERRESTRE DE MATERIALES To### 15.00 ### 1.00

06.02 FLETE EN CAMINO RURAL

06.02.01 FLETE EN CAMINO RURAL DE AGREGADOS To### 0.80 ### 1.00

06.02.02 FLETE EN CAMINO RURAL DE MATERIALES To### 0.40 ### 1.00

Und.

Metrad

o

Rendimiento(Ru)

TiempoUnit

FactorMultiplicidad(f)

PANEL INFORMATIVO RETROREFLEJANTE CUBIERTA CON POLICARBONATO MACIZO 1.00 x 1.20

SEÑAL TIPO 1 (PLANCHA FIERRO GALV., PARANTES METALICOS - SEGÚN DISEÑO)

SEÑAL TIPO 2 (PLANCHA FIERRO GALV., PARANTES METALICOS - SEGÚN DISEÑO)

SEÑAL TIPO 4 (PLANCHA FIERRO GALV., PARANTES METALICOS - SEGÚN DISEÑO)

Und.

Metrad

o

Rendimiento(Ru)

TiempoUnit

FactorMultiplicidad(f)

Fech 26/08/2011 07:50:15 PM

Página : 1

Tiempo para programación (Mano de Obra)

MEJORAMIENTO INFRESTRUCTURA I.E. 50441 DE UMANA - PAUCARTAMBO

MEJORAMIENTO DE CAMINOS

1.00 13

1.00 1

1.00 17

1.00 1,774

1.00 123

1.00 1,042

1.00 334

1.00 119

1.00 754

1.00 48

1.00 48

1.00 25

1.00 155

1.00 46

1.00 58

1.00 7

1.00 143

1.00 4

1.00 5

1.00 5

1.00 48

1.00 29

1.00 3

1.00 8

1.00 4

1.00 4

FactorMultiplicidad(f)

Duracion(D=Tu/f)

1.00 9

1.00 1

1.00 1

1.00 1

1.00 1

1.00 47

1.00 42

1.00 62

1.00 363

1.00 191

1.00 6

1.00 36

1.00 11

1.00 2

1.00 4

1.00 10

1.00 19

1.00 26

1.00 18

1.00 12

1.00 9

1.00 80

1.00 180

1.00 26

1.00 10

SSHH TIPO - 1

1.00 1

1.00 1

1.00 3

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

FactorMultiplicidad(f)

Duracion(D=Tu/f)

1.00 2

1.00 2

1.00 1

1.00 2

1.00 1

1.00 1

1.00 3

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 17

1.00 5

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 4

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 4

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

MIRADOR PLATAFORMA CAMPING

1.00 1

1.00 9

1.00 2

1.00 1

1.00 2

1.00 1

1.00 3

1.00 4

1.00 5

1.00 1

1.00 5

1.00 1

PARADORES

1.00 1

1.00 5

FactorMultiplicidad(f)

Duracion(D=Tu/f)

FactorMultiplicidad(f)

Duracion(D=Tu/f)

1.00 3

1.00 2

1.00 2

1.00 1

1.00 1

SEÑALIZACIÓN

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 1

1.00 5

1.00 15

FLETES

1.00 16

1.00 619

1.00 565

FactorMultiplicidad(f)

Duracion(D=Tu/f)

FactorMultiplicidad(f)

Duracion(D=Tu/f)

26/08/2011 07:50:15 PM

S10 Página

Presupuesto

Presupuesto 0601066 ACCESO PEATONAL AL NEVADO PITUSIRAY - SAHUASIRAY - MAQUIMAQUICliente PROYECTO ESPECIAL PLAN COPESCO - PROYECTO VILCANOTA Costo al 15/03/2011Lugar CUSCO - CALCA - CALCA

Item Descripción Und. Metrado Precio S/.

01 MEJORAMIENTO DE CAMINO

01.01 CAMINO PEATONAL

01.01.01 OBRAS PRELIMINARES

01.01.01.01 TRAZO DE NIVELES Y REPLANTEO ML 15,500.02 0.67

01.01.01.02 CARTEL DE IDENTIFICACION DE OBRA 4.80 x 2.40 m. Und 1.00 693.42

01.01.01.03 CONSTRUCCION CAMPAMENTO, OFICINA, ALMACEN M2 200.00 87.73

01.01.02 MOVIMIENTO DE TIERRAS

01.01.02.01 CORTE MANUAL EN MATERIAL SUELTO M3 5,321.14 28.36

01.01.02.02 CORTE MANUAL EN ROCA SUELTA CON BOLONERIA M3 122.24 83.47

01.01.02.03 CORTE MANUAL EN ROCA SUELTA M3 2,603.83 34.04

01.01.02.04 CORTE MANUAL EN ROCA FIJA M3 333.52 83.47

01.01.02.05 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO M3 1,425.45 27.06

01.01.02.06 ELIMINACION MANUAL DE MATERIAL EXCEDENTE DIST 50 m M3 9,041.86 14.19

01.01.03 MEJORAMIENTO DE CAMINO EN TRAMOS ARCILLOSOS

01.01.03.01 EXTRACCION Y SELECCION DE MATERIAL DE CANTERA M3 143.72 31.51

01.01.03.02 TRASLADO DE MATERIAL DE CANTERA DIST 1200 m M3 143.72 71.73

01.01.03.03 EXTENDIDO Y COMPACTADO MANUAL DE MATERIAL DE CANTERA M2 2,211.00 2.63

01.02 OBRAS DE ARTE

01.02.01 PUENTE DE CONCRETO ARMADO

01.02.01.01 MOVIMIENTO DE TIERRAS

01.02.01.01.01 CORTE MANUAL EN MATERIAL SUELTO M3 464.00 28.36

01.02.01.01.02 CORTE MANUAL EN ROCA FIJA M3 82.70 47.27

01.02.01.01.03 ELIMINACION MANUAL DE MATERIAL EXCEDENTE DIST 50 m M3 695.78 14.19

01.02.01.01.04 CONFORMACION MANUAL DE TERRAPLENES M3 69.84 23.96

01.02.01.02 ENCAUSAMIENTO Y REENCAUSAMIENTO

01.02.01.02.01 ENCAUSAMIENTO DE RIOS M3 143.00 85.09

01.02.01.03 FALSO PUENTE

01.02.01.03.01 CONCRETO CICLOPEO f'c=140 Kg/cm² +50 % PM. M3 34.50 324.18

01.02.01.03.02 ENCOFRADO Y DESENCOFRADO BAJO AGUA M2 35.00 42.32

01.02.01.03.03 CONSTRUCCION Y DESMONTAJE FALSO PUENTE DE ROLLIZOS DE EUCALIPTO M2 57.50 85.99

01.02.01.04 ESTRIBOS

01.02.01.04.01 ENCOFRADO Y DESENCOFRADO M2 473.82 29.80

01.02.01.04.02 MUROS DE PIEDRA ASENTADOS CON CONCRETO F'C=175 KG/CM² M3 196.84 235.21

01.02.01.05 LOSAS ARMADAS

01.02.01.05.01 CONCRETO f`c=210 Kg/cm² DE LOSAS M3 31.50 432.89

01.02.01.05.02 ENCOFRADO Y DESENCOFRADO NORMAL DE LOSAS M2 75.00 29.80

01.02.01.05.03 ACERO CORRUGADO Fy=4200 Kg/cm² Grado 60 Kg 856.06 5.06

01.02.01.06 BARANDAS DE ROLLIZO

01.02.01.06.01 BARANDA DE MADERA ROLLIZO DE EUCALIPTO Ml 50.00 40.32

01.02.02 ALCANTARILLAS DE C°

01.02.02.01 MOVIMIENTO DE TIERRAS

01.02.02.01.01 CORTE MANUAL EN MATERIAL SUELTO M3 25.51 28.36

01.02.02.02 OBRAS DE CONCRETO

01.02.02.02.01 ENCOFRADO Y DESENCOFRADO M2 3.51 29.80

01.02.02.02.02 CONCRETO f`c=210 Kg/cm² DE LOSAS M3 0.88 432.89

01.02.02.02.03 ACERO CORRUGADO Fy=4200 Kg/cm² Grado 60 Kg 44.65 5.06

01.02.02.02.04 MUROS DE PIEDRA ASENTADOS CON CONCRETO F'C=175 KG/CM² M3 4.91 235.21

01.02.03 ALCANTARILLAS TIPO TAJEA

01.02.03.01 CORTE MANUAL EN MATERIAL SUELTO M3 139.48 28.36

01.02.03.02 ALCANTARILLAS DE PIEDRA ML 221.40 175.79

01.02.03.03 ALIVIADERO Y POZA DE AMORTIGUAMIENTO Und 124.00 372.89

01.02.04 CUNETAS LATERALES

01.02.04.01 CONST. CUNETAS SIN REVESTIR SEC. TRIANG. H=0.20 , B=0.30 Ml 10,875.02 2.84

01.02.04.02 CUNETAS EN ROCA SUELTA Sección Triangular b=0.30, h=0.20m Ml 3,805.00 4.25

01.02.05 CUNETAS DE CORONACIÓN

01.02.05.01 CUNETAS EN TEIRRA Sección Triangular b=0.30, h=0.20m Ml 162.00 2.84

01.02.06 SUB DRENAJE

01.02.06.01 CORTE MANUAL EN MATERIAL SUELTO M3 108.00 28.36

01.02.06.02 RELLENO Y COMPACTADO DE ZANJAS M3 131.04 27.06

01.02.06.03 TUBERIA DE DRENAJE PVC SAP Ø=4" CRIBADO Ml 120.00 27.90

01.02.06.04 SUMINISTRO Y COLOCACIÓN DE GEOTEXTIL CLASE 2 M2 240.00 36.63

01.02.06.05 MATERIAL FILTRANTE M3 43.20 134.49

01.02.06.06 TRASLADO DE MATERIAL DE CANTERA M3 56.16 71.73

01.02.07 MUROS DE SOSTENIMIENTO

01.02.07.01 CORTE MANUAL EN MATERIAL SUELTO M3 75.85 28.36

01.02.07.02 EXTRACCIÓN Y TRANSPORTE DE PIEDRA DE CANTERA M.3 88.14 34.04

01.02.07.03 MUROS SECOS DE PIEDRA M3 88.14 59.68

01.02.07.04 ELIMINACION MANUAL DE MATERIAL EXCEDENTE DIST 50 m M3 98.61 14.19

01.02.08 GRADAS DE PIEDRA

01.02.08.01 CORTE MANUAL EN MATERIAL SUELTO M3 239.52 28.36

01.02.08.02 GRADAS DE PIEDRA RÚSTICA M3 359.58 376.31

01.02.08.03 ELIMINACION MANUAL DE MATERIAL EXCEDENTE DIST 50 m M3 311.38 14.19

01.03 PLAN DE MANEJO AMBIENTAL

01.03.01 REPOSICIÓN DE CANTERAS M3 97.47 34.04

02 SSHH TIPO - 1

02.01 ESTRUCTURAS

02.01.01 TRABAJOS PELIMINARES

02.01.01.01 LIMPIEZA DE TERRENO MANUAL M2 24.74 0.17

02.01.01.02 TRAZO NIVELES Y REPLANTEO M2 24.74 11.51

02.01.02 MOVIMIENTO DE TIERRAS

02.01.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS MAT. SUELTO H=1.2m M3 8.12 28.36

02.01.02.02 ELIMINACIÓN MANUAL DE MATERIAL DE CORTE d=50m M3 10.55 28.36

02.01.02.03 PERFILADO DE ZANJAS M2 9.55 3.83

02.01.03 OBRAS DE CONCRETO SIMPLE

02.01.03.01 CIMIENTO CORRIDO C:H=1:10+30% PG M3 8.12 280.51

02.01.03.02 SOBRECIMIENTO CORRIDO C:H=1:8+25% PG M3 2.33 280.51

02.01.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO M2 9.87 29.80

02.01.04 ESTRUCTURAS DE MADERA

02.01.04.01 TIJERAL MADERA AGUANO ENCUADRADA 2" x 6" Und 6.00 359.25

02.01.04.02 COLOCACION DE TIJERALES Und 6.00 219.86

02.01.04.03 VIGAS DINTEL DE MADERA Und 4.00 134.65

02.01.04.04 MACHIHEMBRADO MADERA AGUANO 3/4" x 4" x 10' M2 24.74 32.71

02.01.04.05 PILARES DE MADERA AGUANO 6" x 6" x 2.85 m Pza 1.00 121.77

02.01.04.06 VIGA DE MADERA AGUANO 6" x 4" Pza 2.00 366.00

02.01.05 ALBAÑILERIA

02.01.05.01 MURO DE PIEDRA e=0.50m M2 47.20 72.03

02.02 ARQUITECTURA

02.02.01 PISOS Y PAVIMENTOS

02.02.01.01 VEREDA DE LAJA DE PIEDRA IRREGULAR M2 5.78 71.74

02.02.01.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VEREDAS M2 0.97 24.00

02.02.01.03 FALSO PISO DE CONCRETO1:10 INC/EMPEDRADO e=10cm M2 8.45 37.94

02.02.01.04 PISO DE LAJA DE PIEDRA IRREGULAR M2 8.45 57.93

02.02.02 CUBIERTAS

02.02.02.01 COBERTURA CON PLANCHA ONDULINE M2 24.74 30.8402.02.03 CARPINTERIA DE MADERA

02.02.03.01 Puertas tableros rebajados águano 4.5 cm. M2 3.15 206.73

02.02.03.02 VENTANA DE MADERA TIPO V3 Und 2.00 285.46

02.02.04 CERRAJERIA

02.02.04.01 Bisagras capuchinas de 4" Und 6.00 7.09

02.02.04.02 Cerradura para puerta principal pesada Pza 2.00 96.10

02.02.05 PINTURA

02.02.05.01 PINTURA BARNIZ EN PUERTAS M2 6.30 8.24

02.03 INSTALACIONES SANITARIAS

02.03.01 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO

02.03.01.01 EXCAVACION MANUAL DE ZANJAS M3 50.35 28.36

02.03.01.02 RELLENO Y COMPACTA DE ZANJAS M3 65.46 21.65

02.03.01.03 Instalación Tubería PVC SAP C-10 Ø=3/4" Ml 186.66 3.46

02.03.01.04 Instalación Tubería PVC SAP C-10 Ø=1/2" Ml 4.50 2.85

02.03.01.05 Salida de agua fría Tubería PVC SAP 1/2" Pto 3.00 66.50

02.03.01.06 Reducción PVC SAP 3/4"*1/2" Und 3.00 7.28

02.03.01.07 TEE PVC SAP 3/4" x 3/4" Und 2.00 10.04

02.03.01.08 Codo PVC SAP 3/4" x 90° Und 3.00 8.08

02.03.01.09 Codo PVC SAP 1/2"*90° Und 2.00 2.58

02.03.01.10 VALVULA COMPUERTA BRONCE 3/4" Und 1.00 61.79

02.03.01.11 Grifería cromada de lavatorio Und 1.00 63.62

02.03.02 SISTEMA DE DESAGUE

02.03.02.01 Instalación Tubería PVC SAL 2" Ml 6.90 7.80

02.03.02.02 Instalación Tubería PVC SAL 4" Ml 30.30 11.15

02.03.02.03 Salida tubería de desague de 4" Pto 2.00 60.57

02.03.02.04 Sumidero cromado Ø=2" Und 3.00 72.03

02.03.02.05 Yee PVC SAL Ø=2" Und 2.00 9.68

02.03.02.06 Yee PVC SAL Ø=4" Und 4.00 12.97

02.03.02.07 Registro roscado de bronce 2" Und 1.00 43.38

02.03.02.08 Salida tubería de desague de 2" Pto 5.00 73.87

02.03.02.09 Sombrero de ventilación PVC Ø=2" Pza 1.00 11.24

02.03.02.10 Caja de registro de desague 12" * 24" Und 1.00 122.06

02.03.03 APARATOS Y ACCESORIOS SANITARIOS

02.03.03.01 Inodoro tanque bajo blanco Pza 1.00 253.07

02.03.03.02 LAVATORIO DE MAMPOSTERIA DE PIEDRA 1 llave Pza 1.00 120.04

02.03.03.03 DUCHA CROMADA Und 1.00 52.61

02.04 CAPTACION DE AGUA

02.04.01 MOVIMIENTO DE TIERRAS

02.04.01.01 EXCAVACION MANUAL DE ESTRUCTURAS M3 10.13 28.36

02.04.01.02 ELIMINACION DE MATERIAL EXCEDENTE MANUAL D=30m M3 13.17 6.80

02.04.02 OBRAS DE CONCRETO SIMPLE

02.04.02.01 Solado para zapatas y cimentaciones e=2" mezcla 1:12 C:H M2 1.00 25.81

02.04.03 OBRAS DE CONCRETO ARMADO

02.04.03.01 Encofrado y desencofrado M2 9.84 29.41

02.04.03.02 ACERO CORRUGADO Fy=4200 Kg/cm² Grado 60 Kg 193.86 5.06

02.04.03.03 Concreto f`c=210 Kg/cm² M3 0.65 404.58

02.04.03.04 Tarrajeo con mortero C:A 1:2 e=1.5cm con impermeabilizante M2 3.84 55.18

02.04.03.05 Tarrajeo con mortero C:A 1:3 e=1cm obras de arte M2 6.00 28.48

02.04.04 ACCESORIOS

02.04.04.01 Tapa metálica 0.60m * 0.60m Und 1.00 82.63

02.04.04.02 SUMINISTRO ACCESORIOS CAPTACIÓN GLB 1.00 766.92

02.04.04.03 TUBERIA F°G° Ø=3/4" Ml 5.00 25.0802.04.04.04 MATERIAL FILTRANTE M3 15.84 134.49

02.05 BIODIGESTOR

02.05.01 RED DE CONDUCCIÓN

02.05.01.01 Instalación Tubería PVC SAL 4" Ml 9.50 11.15

02.05.02 OBRAS DE CONCRETO SIMPLE

02.05.02.01 Solado para zapatas y cimentaciones e=2" mezcla 1:12 C:H M2 2.66 25.81

02.05.03 ACCESORIOS

02.05.03.01 Tapa de C° f'c=175 kg/cm² e=0.15m 0.60*0.60m Und 1.00 90.50

02.05.03.02 Caja de registro de desague 12" * 24" Und 1.00 122.06

02.05.03.03 SUMINSITRO E INSTALACIÓN BIODIGESTOR 1300LTS GLB 1.00 766.92

03 MIRADORES TURÍSTICOS PLATAFORMA CAMPING

03.01 TRABAJOS PELIMINARES

03.01.01 TRAZO, NIVELES Y REPLANTEO M2 13.20 2.57

03.02 CORTE EN TERRENO NATURAL

03.02.01 CORTE MANUAL EN MATERIAL SUELTO M3 25.00 28.36

03.02.02 CORTE MANUAL EN ROCA FIJA M3 2.16 47.27

03.02.03 RELLENO CON MATERIAL PROPIO M3 7.50 21.65

03.02.04 COMPACTACIÓN MANUAL Y MEJORAMIENTO DE CALZADA M2 75.00 11.55

03.02.05 MATERIAL DE AFIRMADO DE e=6" M2 75.00 2.63

03.02.06 EXTRACCIÓN DE MATERIAL DE CANTERA M.3 10.50 35.04

03.02.07 TRASLADO DE MATERIAL DE CANTERA M3 10.50 71.73

03.02.08 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE d=50m M3 58.58 14.19

03.03 PISOS Y VEREDAS

03.03.01 PISO DE LAJA DE PIEDRA IRREGULAR M2 9.90 57.93

03.04 MUROS DE ALBAÑILERIA

03.04.01 EXCAVACIÓN EN TERRENO NATURAL MANUAL M3 10.12 34.04

03.04.02 MURO DE MAMPOSTERIA DE PIEDRA ASENTADA CON MORTERO C:A 1:8 M3 3.08 195.37

04 PARADOR

04.01 TRABAJOS PELIMINARES

04.01.01 TRAZO, NIVELES Y REPLANTEO M2 23.08 2.57

04.02 CORTE EN TERRENO NATURAL

04.02.01 CORTE MANUAL EN MATERIAL SUELTO M3 12.35 28.36

04.02.02 CORTE MANUAL EN ROCA FIJA M3 4.68 47.27

04.02.03 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE d=50m M3 22.60 14.19

04.03 CUBIERTAS

04.03.01 CONCRETO CICLÓPEO f'c=140 Kg/cm² +50 % PM. M3 16.73 325.38

04.03.02 ESTRUCTURA DE SOPORTE DE MADERA Und 7.00 768.15

04.03.03 COBERTURA CON PLANCHA ONDULINE M2 43.50 30.84

05 SEÑALIZACION

05.01 TRABAJOS PELIMINARES

05.01.01 TRAZO NIVELES Y REPLANTEO M2 50.15 2.28

05.01.02 EXCAVACION MANUAL NO CLASIFICADA DE ESTRUCTURAS M3 2.03 34.04

05.01.03 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE d=50m M3 2.63 28.36

05.01.04 CIMENTACION DE SEÑAL M3 1.38 420.93

05.01.05 ACERO CORRUGADO Fy=4200 Kg/cm² Ø=3/8" Kg 5.90 2.17

05.02 PANEL INFORMATIVO

05.02.01 ESTRUCTURA DE MADERA DE PANEL INFORMATIVO Und 1.00 647.74

05.02.02 COBERTURA CON PLANCHA ONDULINE M2 2.45 30.84

05.02.03 Pza 1.00 875.71

05.03 SEÑAL TIPO - 1

05.03.01 SEÑAL TIPO 1 (PLANCHA FIERRO GALV., PARANTES METALICOS - SEGÚN DISEÑO) Und 3.00 463.48

05.04 SEÑAL TIPO - 2

PANEL INFORMATIVO RETROREFLEJANTE CUBIERTA CON POLICARBONATO MACIZO 1.00 x 1.20

05.04.01 SEÑAL TIPO 2 (PLANCHA FIERRO GALV., PARANTES METALICOS - SEGÚN DISEÑO) Und 1.00 223.08

05.05 SEÑAL TIPO - 4

05.05.01 SEÑAL TIPO 4 (PLANCHA FIERRO GALV., PARANTES METALICOS - SEGÚN DISEÑO) Und 4.00 229.08

05.06 SEÑAL TIPO - 5

05.06.01 SEÑAL TIPO 5 (PLANCHA FIERRO GALV. - SEGÚN DISEÑO) Und 1.00 104.68

05.07 SEÑAL TIPO - 6

05.07.01 SEÑAL TIPO 6 (PLANCHA FIERRO GALV. - SEGÚN DISEÑO) Und 2.00 229.08

05.08 HITO INFORMATIVO

05.08.01 HITO INFORMATIVO (SEGUN DISEÑO) Und 1.00 456.83

05.09 HITO KILOMETRICO

05.09.01 HITO KILOMETRICO (SEGUN DISEÑO) Und 15.00 229.40

05.10 SEÑAL DE PISO

05.10.01 SEÑAL DE PISO (SEGUN DISEÑO) Und 75.00 84.91

06 FLETES

06.01 FLETE TERRESTRE

06.01.01 FLETE TERRESTRE DE MATERIALES Ton 225.67 102.29

06.02 FLETE EN CAMINO RURAL

06.02.01 FLETE EN CAMINO RURAL DE AGREGADOS Ton 494.63 224.63

06.02.02 FLETE EN CAMINO RURAL DE MATERIALES Ton 225.67 429.25

COSTO DIRECTO 1,258,681.54

Materiales 175,815.81

Mano de obra 988,723.52

Equipo y Herramientas 94,142.21

________________

Sub Total 1,258,681.54

Gastos generales 14.41% 181,408.59

Gastos de Supervisión 3.57% 44,909.87

________________

TOTAL PRESUPUESTO 1,485,000.00

Página 1

Presupuesto

ACCESO PEATONAL AL NEVADO PITUSIRAY - SAHUASIRAY - MAQUIMAQUI15/03/2011

Parcial S/.

964,227.67

493,737.87

28,624.43

10,385.01

693.42

17,546.00

444,460.85

150,907.53

10,203.37

88,634.37

27,838.91

38,572.68

128,303.99

20,652.59

4,528.62

10,309.04

5,814.93

467,171.92

141,029.75

28,614.76

13,159.04

3,909.23

9,873.12

1,673.37

12,167.87

12,167.87

17,609.84

11,184.21

1,481.20

4,944.43

60,418.58

14,119.84

46,298.74

20,202.70

13,636.04

2,235.00

4,331.66

2,016.00

2,016.00

2,589.81

723.46

723.46

1,866.35

104.60

380.94

225.93

1,154.88

89,113.92

3,955.65

38,919.91

46,238.36

47,056.31

30,885.06

16,171.25

460.08

460.08

28,586.35

3,062.88

3,545.94

3,348.00

8,791.20

5,809.97

4,028.36

11,810.88

2,151.11

3,000.29

5,260.20

1,399.28

146,524.82

6,792.79

135,313.55

4,418.48

3,317.88

3,317.88

28,926.37

13,156.59

288.97

4.21

284.76

566.06

230.28

299.20

36.58

3,225.46

2,277.74

653.59

294.13

5,676.28

2,155.50

1,319.16

538.60

809.25

121.77

732.00

3,399.82

3,399.82

3,519.79

1,248.04

414.66

23.28

320.59

489.51

762.98

762.981,222.12

651.20

570.92

234.74

42.54

192.20

51.91

51.91

5,671.93

3,900.04

1,427.93

1,417.21

645.84

12.83

199.50

21.84

20.08

24.24

5.16

61.79

63.62

1,346.17

53.82

337.85

121.14

216.09

19.36

51.88

43.38

369.35

11.24

122.06

425.72

253.07

120.04

52.61

5,424.00

376.85

287.29

89.56

25.81

25.81

1,916.07

289.39

980.93

262.98

211.89

170.88

3,105.27

82.63

766.92

125.402,130.32

1,154.06

105.93

105.93

68.65

68.65

979.48

90.50

122.06

766.92

5,542.97

33.92

33.92

3,989.32

709.00

102.10

162.38

866.25

197.25

367.92

753.17

831.25

573.51

573.51

946.22

344.48

601.74

13,113.68

59.32

59.32

892.16

350.25

221.22

320.69

12,162.20

5,443.61

5,377.05

1,341.54

15,809.48

851.71

114.34

69.10

74.59

580.88

12.80

1,599.01

647.74

75.56

875.71

1,390.44

1,390.44

223.08

223.08

916.32

916.32

104.68

104.68

458.16

458.16

456.83

456.83

3,441.00

3,441.00

6,368.25

6,368.25

231,061.37

23,083.78

23,083.78

207,977.59

111,108.74

96,868.85

1,258,681.54

175,815.81

988,723.52

94,142.21

________________

1,258,681.54

181,408.59

44,909.87

________________

1,485,000.00

S10 Página :JP Contratistas

Precios y cantidades de recursos requeridos

Obra 0801010 MEJORAMIENTO INFRESTRUCTURA I.E. 50441 DE UMANA - PAUCARTAMBOFecha 01/09/2011 MUNICIPALIDAD DE PAUCARTAMBOLugar 081101 CUSCO - PAUCARTAMBO - PAUCARTAMBO

Código Recurso Unidad Cantidad Precio S/. Presupuestad

MANO DE OBRA0147000022 OPERADOR DE EQUIPO LIVIANO Hh 466.0600 4.34 2,017.500147000032 TOPOGRAFO Hh 28.3400 5.12 265.710147010002 OPERARIO Hh 14,872.3900 5.12 76,079.020147010003 OFICIAL Hh 6,215.3100 4.34 26,994.730147010004 PEON Hh 20,056.5600 3.55 71,219.37

176,576.33

MATERIALES UND. P.U CANTIDAD SUB TOTAL0239980004 ACCESORIOS PVC PARA DESAGUE GLB 1.0000 110.08 110.080256990026 ACERO CORRUGADO fy= 4200 Kg/cm² G-60 Kg 22,368.9900 4.50 100,762.530239010093 AGUA M3 803.1100 1.00 814.220229550100 AISLADOR REDUCTOR CAMPANA DE 3" A 3/4" Pza 1.0000 70.00 70.000229550101 AISLADOR TIPO CARRETE CLASE ANSI 53-1 Pza 12.0000 10.00 120.000202000005 ALAMBRE GALVANIZADO # 18 Kg 47.2700 5.46 255.240202040009 ALAMBRE NEGRO N°16 Kg 1,164.1200 4.50 5,225.130202040010 ALAMBRE NEGRO N°8 Kg 430.9600 4.50 1,951.990202130040 ANCLAJES DE FIERRO CORRUGADO DE 1/2" Ml 14.1600 3.00 42.480243550001 ANDAMIO DE MADERA P2 2,035.6000 3.00 6,106.800204000000 ARENA FINA M3 43.6300 90.00 3,926.980205010004 ARENA GRUESA M3 238.5600 90.00 21,470.450211210046 ARTEFACTO LAMPARA AHORRADORA 20W Pza 30.0000 15.97 479.100213010003 ASFALTO RC-250 Gln 50.1000 8.00 400.810265170071 BARRAS DE ESTRUCTURA METÁLICA SEGÚN DISEÑOUnd 2.0000 184.87 369.740211700062 BASE DE ACERO (SEGUN DETALLE) Pza 1.0000 60.00 60.000229030018 BENTONITA SODICA (BOLSA x 30Kg) BOL 10.0000 37.00 370.000226020006 BISAGRAS DE FIERRO DE 4" Pza 72.0000 3.36 241.920217020000 BLOQUE DE CONCRETO MURO 10x20x40 CM 8.8Kg Und 359.0400 1.50 538.560281010013 CABLE DE RED INTERNET UTP CATEGORIA 6 Ml 250.0000 5.00 1,250.000207010039 CABLE MELLIZO POLARIZADO DE 2 x 2.5MM2 Ml 40.0000 3.00 120.000207010038 CABLE NH-80 4MM2 Ml 3,183.0000 2.00 6,366.000298010084 CABLE NYY 1 * 10MM2 Ml 344.0000 6.50 2,236.000298010085 CABLE NYY 1 * 16MM2 Ml 42.0000 12.00 504.000298010083 CABLE NYY 1 * 6MM2 Ml 360.0000 3.80 1,368.000207010000 CABLE TW # 14 AWG 2.5 MM2 Ml 100.0000 2.50 250.000207010018 CABLE TW # 14 AWG 2.5 mm2 Ml 18.0000 3.50 63.000281010010 CAJA CUADRADA GALVAN. PESADA 8"x8"x6" Und 31.0000 15.00 465.000250010000 CAJA DE DESAGUE DE 12"X24" Und 7.0000 12.61 88.270212090057 CAJA DE PASO 100 x 50MM (OCTOGONAL) Und 3.0000 5.00 15.000212090056 CAJA DE PASO 100 x 55 x 50MM Und 1.0000 5.00 5.000212090053 CAJA DE PASO ALIMENTADORES 150 x 150 x 100MM Und 2.0000 10.00 20.000212090054 CAJA DE PASO ALIMENTADORES 200 x 200 x 100MM Und 3.0000 14.00 42.000212090055 CAJA DE PASO TERMINAL DE INTERNET 300 x 300 x Und 1.0000 12.00 12.000250010001 CAJA DE REGISTRO Und 5.0000 40.00 200.000212090058 CAJA METALICA PARA MEDIDOR Und 1.0000 80.00 80.000212090051 CAJA OCTOGONAL GALV. LIVIANA 4"x2"x2 1/2 Und 133.0000 3.00 399.00

0212090003 CAJA OCTOGONAL GALV. LIVIANA 4"x4"x2 1/2 Und 179.0000 1.20 214.800212090052 CAJA RECTANG LIVIANA 100*55*50mm Und 3,847.0000 1.50 5,770.500256010097 CALAMINAS GALVANIZADAS Und 76.3300 25.00 1,908.250229030016 CARBON VEGETAL Kg 150.0000 5.00 750.000239020073 CARRIZO DE PRIMERA CGA 380.3500 18.00 6,846.250239900008 CARTEL DE OBRA 3.60x2.4 m. INC.INSTALACION Y T GLB 1.0000 750.00 750.000221000000 CEMENTO PORTLAND TIPO IP (42.5KG) BOL 5,010.3700 23.50 117,745.880224030033 CERÁMICO ANTIDESLIZANTE 0.30*0.30M COLOR PIE M2 537.2500 25.00 13,431.280224030034 CERAMICO COLOR DE 20X30 cm. M2 156.9900 25.00 3,924.850226070055 CERRADURA EXTERIOR DE DOS GOLPES Und 24.0000 75.00 1,800.000229810056 CERRADURA P/PUERTA BAÑO T/PERILLA ALUMINIZA Und 14.0000 60.00 840.000229040001 CINTA AISLANTE Rll 107.2400 1.80 197.220229040005 CINTA TEFLON Pza 23.3000 1.80 41.940229040008 CINTA VULCANIZANTE Rll 2.2500 25.00 56.250202010061 CLAVOS C/C 3" Kg 485.6500 4.50 2,205.300202010063 CLAVOS C/C 4" Kg 307.6200 4.50 1,399.280202010062 CLAVOS C/C 5" Kg 56.5200 4.50 254.340202130021 CLAVOS PARA CALAMINA Kg 10.1000 4.50 45.450202010000 CLAVOS PARA MADERA C/C 1 1/2 " Kg 9.5300 4.50 43.820272140006 CODO DE 90 PVC SAL DE 2" Und 20.0000 3.50 70.000265020055 CODO DE Fo.GALV. DE 2" x 900 Und 128.3300 15.00 1,924.880272530074 CODO PVC SAP 1" * 90° Pza 2.0000 2.00 4.000272530066 CODO PVC SAP 1/2" X 90° Und 168.0000 1.80 302.400273110002 CODOS PVC SAL 2" X 90° Pza 9.0000 4.00 36.000273110006 CODOS PVC SAL 6" X 90° Pza 3.0000 15.00 45.000265170067 COLUMPIO DE ESTRUCTURA METÁLICA SEGÚN DISEUnd 1.0000 1,300.00 1,300.000206030050 CONDUCTOR DE COBRE DESNUDO 16 MM2 Ml 75.0000 6.00 450.000206030051 CONDUCTOR DE COBRE DESNUDO CABLEADO DE 25Ml 41.0000 12.00 492.000206030052 CONDUCTOR DE COBRE DESNUDO CABLEADO DE 50Ml 41.0000 18.00 738.000229550097 CONECTOR ANDERSON 25MM Und 5.0000 15.00 75.000274040001 CONEXION A CAJA PVC SAP 1/2" Pza 1.2000 2.00 2.400243020007 CONTRAZOCALO DE AGUANO 3/4"X4" Ml 196.2600 10.00 1,962.560272090000 CURVA PESADO PVC SAP P/INST. ELECT. 3/4" Und 40.0000 1.50 60.000274020007 CURVA PVC SAP NPT 399.006 DE 20MM Pza 472.0000 2.50 1,180.000274020006 CURVA PVC SAP NPT 399.006 DE 25MM Pza 32.0000 4.00 128.000274020005 CURVA PVC SAP NPT 399.006 DE 40MM Pza 8.0000 6.50 52.000274020004 CURVA PVC SAP NPT 399.006 DE 50MM Pza 4.0000 9.00 36.000274020003 CURVA PVC SAP NPT 399.006 DE 65MM Pza 18.0000 12.00 216.000252500001 DIVISIONES DE BAÑOS EN ALUMINIO Y ACLILICO M2 35.4000 150.00 5,310.000210100057 DUCHA CROMADA Und 6.0000 45.00 270.000274020014 EMBONE PARA TUBO INST/ELECT NPT 399.006 DE 2 Pza 4.0000 1.00 4.000274020013 EMBONE PARA TUBO INST/ELECT NPT 399.006 DE 2 Pza 10.0000 1.00 10.000211210057 EMPALME UNIDADES ALUMBRADO PUBLICOALUMINIUnd 9.0000 15.00 135.000265170064 ESTRUCTURA METALICA PARA PORTICO Y TABLEROUnd 2.0000 1,500.00 3,000.000211210055 FAROLA T/CONICA JP-250 C/EQ. MERCURIO 75W E2 Pza 9.0000 350.00 3,150.000202020055 FIERRO LISO Ø 1/2" X 6 M. Vll 90.8900 30.00 2,726.700232000033 FLETE TERRESTRE GLB 1.0000 74,537.70 74,537.700211210053 FLUORESCENTE CIRCULAR DE 1X32W Pza 1.0000 55.00 55.000212030049 GABINETE DE PARED CON ACCESORIOS PARA ALOJAPza 1.0000 110.00 110.000212030050 GABINETE DE PARED CON ACCESORIOS PARA ALOJAPza 1.0000 120.00 120.000205000034 GRAVA CANTO RODADO 10 - 100mm M3 7.2100 80.00 577.080210110023 GRIFO DE LAVADERO PESADO CROMADO 1/2" Und 10.0000 60.00 600.000238000000 HORMIGON M3 416.1700 80.00 33,293.570230110015 IMPERMEABILIZANTE Gln 5.5500 29.41 163.450210020034 INODORO TIPO TURCO INC/ACCESORIOS Und 3.0000 75.00 225.000210020011 INODORO TQUE. BAJO NORMAL BLANCO C/A. CON Und 10.0000 220.00 2,200.000212030042 INTERRUPTOR DIFERENCIAL BIPOLAR DE 220V, 25A, Und 5.0000 95.00 475.00

0281010012 INTERRUPTOR DOBLE Und 20.0000 12.00 240.000281010011 INTERRUPTOR SIMPLE Und 11.0000 8.00 88.000212030041 INTERRUPTOR TERMOMAGNETICO 2X15A Und 5.0000 45.00 225.000281010008 INTERRUPTOR TERMOMAGNETICO 2x15A-220V Und 11.0000 56.30 619.300212030040 INTERRUPTOR TERMOMAGNETICO 2X20A Und 10.0000 70.00 700.000212030039 INTERRUPTOR TERMOMAGNETICO 3X20A Und 5.0000 100.00 500.000212030034 INTERUPTOR BIPOLAR DOBLE Pza 3.0000 6.30 18.900228000024 KEROSENE Gln 23.2900 9.24 213.840298010088 KIT DE DERIVACION EN "T" PARA CABLE SUBTERRANKit 9.0000 40.00 360.000265170070 LABERINTO DE ESTRUCTURA DE MADERA SEGÚN DUnd 1.0000 319.33 319.330254510005 LACA TRANSPARENTE Gln 7.3700 30.25 223.680217080003 LADRILLO ARCILLA KK 10 X 14 X 24 CM Und 153,619.9600 0.60 92,171.980210040093 LAVATORIO LOSA BLANCA CON ACCESORIOS Pza 8.0000 120.00 960.000243510062 LEÑA QQ 31.3800 8.00 251.020239020024 LIJA PARA CONCRETO hja 30.5200 1.50 61.050239020075 LIJA PARA MADERA Und 1.2300 1.50 2.460211210052 LUMINARIA CIRCULAR CON LÁMPARA FLUORESCENTPza 3.0000 75.00 225.000211210050 LUMINARIA FLUORESCENTE LINEAL DE 1 X 36W CONPza 18.0000 60.00 1,080.000211210049 LUMINARIA FLUORESCENTE LINEAL DE 2 X 36W CONPza 35.0000 80.00 2,800.000211210048 LUMINARIA FLUORESCENTE LINEAL DE 4 X 18W CONPza 64.0000 70.00 4,480.000211210051 LUMINARIA TIPO SPOT ADOSADO LÁMPARA FLUORESPza 34.0000 120.00 4,080.000211210056 LUZ DE EMERGENCIA CON FLUORESCENTE DE 8W., -Pza 4.0000 80.00 320.000244000018 MADERA ACERRADA DE EUCALIPTO P2 11,736.0000 3.00 35,208.000244000027 MADERA AGUANO 1 1/2"*8"*10' Pza 1,328.3000 40.00 53,132.000244000020 MADERA AGUANO 2"*3"*10' Pza 1,337.4800 20.00 26,749.580243990008 MADERA CORRIENTE 1" * 8" * 10' Pza 2.0000 20.00 40.000243990002 MADERA CORRIENTE 1 1/2" * 8" * 10' Pza 147.8500 25.00 3,698.640243990003 MADERA CORRIENTE 2" *3" * 10' Pza 826.6700 6.30 5,211.330244000028 MADERA MACHIHEMBRADA AGUANO 3/4"*3"*10' Pza 2,205.5200 7.50 16,541.370202120002 MASTIL DE FºGº DE 6M DE 3" CON BASE DE ACERO DUnd 1.0000 210.00 210.000298010087 MONTAJE DE LUMINARIA Eqp 9.0000 30.00 270.000239010083 PAJA DE FIBRA GRUESA CGA 954.1900 5.00 4,770.960243680001 Palo Rollizo de Eucalipto 4" * 3m Pza 75.0000 6.00 450.000206000011 PARARRAYOS IONIZANTE THOR NO RADIACTIVO R=1Und 1.0000 2,200.00 2,200.000265170068 PASAMANOS DE ESTRUCTURA METÁLICA SEGÚN DI Und 2.0000 500.00 1,000.000212030052 PATCH CORD DE 5 PIES CATEGORIA 6 Pza 26.0000 90.00 2,340.000212030051 PATCH PANELS DE 24 PUERTOS CATEGORIA 6 Pza 1.0000 80.00 80.000230460019 PEGAMENTO PLASTICO P/PVC CCP Gln 0.3100 90.00 27.540230010006 PEGAMENTO PLASTICO PVC Gln 2.8700 105.00 298.880230010098 PEGAMENTO PLÁSTICO PVC Gln 1.5400 90.00 138.170202460095 PERNOS 3/8" * 2"+VOLANDAS Und 864.0000 1.50 1,296.000253100003 PETROLEO Gln 111.8500 13.50 1,514.190205000003 PIEDRA CHANCADA DE 1/2" M3 146.6800 90.00 13,201.460205000004 PIEDRA CHANCADA DE 3/4" M3 64.4900 90.00 5,804.360205000009 PIEDRA GRANDE DE 8" M3 82.7700 60.00 4,966.010205020020 PIEDRA MEDIANA M3 258.5400 60.00 15,512.530205000032 PIEDRA MEDIANA DE 5" M3 16.0200 90.00 1,441.890254060004 PINTURA ANTICORROSIVA CPP Gln 15.9300 38.00 605.340254110091 PINTURA DE TRAFICO Gln 14.9500 60.00 897.150254830001 PINTURA IMPRIMANTE Gln 311.7000 15.13 4,727.110254010051 PINTURA LATEX DE PRIMERA Gln 137.3500 26.89 3,693.110252270025 PLACA RECORDATORIA Pza 1.0000 546.22 546.220239060021 PLANTONES DE ESPECIES EXOTICAS Und 60.0000 4.20 252.000230150016 PORCELANA Kg 71.6100 3.00 214.840230290021 PORCELANA BLANCA Kg 0.7800 3.00 2.350298010086 POSTE DE CºAºCº DE 6 METROS Und 9.0000 260.00 2,340.000230000023 PRUEBA ELECTRICA (DE CONTINUIDAD Y AISLAMIENUnd 3.8500 90.00 346.50

0230000024 PRUEBAS ELECTRICAS(RESISTENCIA DE PUESTA A TUnd 5.0000 120.00 600.000243810014 PUERTA DE MADERA AGUANO TABLERO REBAJADO M2 64.5200 450.00 29,035.130251990013 PUERTA METALICA DE ALUMINIO Y ACLILICO M2 18.3000 180.00 3,294.270251990014 PUERTA METÁLICA DE TIPO REJA CON MARCO DE F°Und 1.0000 2,000.00 2,000.000212030038 PULSADOR DE TIMBRE Pza 1.0000 25.00 25.000272200005 REDUCCION PVC SAL P/DESAGUE DE 6" A 4" Und 3.0000 12.00 36.000272020026 REDUCCION PVC SAP 1 1/2" A 3/4" Und 48.0000 1.80 86.400210150020 REGISTRO DE BRONCE DE 2" Und 4.0000 10.00 40.000243160052 REGLA DE MADERA P2 7.9300 4.50 36.490243160002 REGLA DE MADERA 3/4"*3"*10' Pza 47.3600 18.00 855.000243020008 RODONES DE AGUANO Ml 196.2600 2.00 392.510242010011 ROLLIZO DE EUCALIPTO 4"*20' Und 4.0000 12.00 48.000239060019 SAL INDUSTRIAL Kg 500.0000 1.00 500.000254610001 SELLADOR Gln 6.7600 25.00 169.600239060020 SEMILLA DE GRAS Kg 47.1200 30.00 1,413.670230460032 SILICONA Und 12.6300 12.00 151.620229550004 SOLDADURA CELLOCORD PUNTO AZUL 3/16 Kg 31.8600 8.00 254.880272210001 SOMBRERO DE VENTILACION PVC SAL DE 2" Und 5.0000 5.00 25.000202120001 SOPORTE METALICO PARA AISLADORES TIPO CARRUnd 1.0000 120.00 120.000211210054 SPOT DICROICO DE 40W., REBATIBLE. Pza 5.0000 150.00 750.000265170066 SUBIBAJA DE ESTRUCTURA METÁLICA SEGÚN DISE Und 1.0000 450.00 450.000210150059 SUMIDERO CROMADO DE 2" Und 6.0000 4.50 27.000212030048 SWITCH (CONMUTADOR) DE 26 PUERTOS 10/100/100Pza 1.0000 15.00 15.000212030047 TABLERO DE DISTRIBUCION DE 10 POLOS (ENGRAMPPza 1.0000 75.00 75.000212030043 TABLERO DE DISTRIBUCION DE 16 POLOS (ENGRAMPPza 1.0000 80.00 80.000212030045 TABLERO DE DISTRIBUCION DE 20 POLOS (ENGRAMPPza 1.0000 90.00 90.000212030046 TABLERO DE DISTRIBUCION DE 24 POLOS (ENGRAMPPza 1.0000 95.00 95.000212030044 TABLERO DE DISTRIBUCION DE 30 POLOS (ENGRAMPPza 1.0000 100.00 100.000273500011 TAPA CIEGA PARA CAJA OCTOGONAL Pza 1.0000 3.20 3.200250550010 TAPA Y MARCO F°GAL. P/REGISTRO 12" X 24" Pza 7.0000 29.00 203.000272070058 TEE PVC SAP 1"*3/4" Und 1.0000 4.00 4.000273130008 TEE PVC SAL 4" X 2" Pza 10.0000 5.00 50.000272070057 TEE PVC SAP 3/4"*1/2" Und 29.0000 4.00 116.000272130020 TEE PVC SAP ROSCADO 1/2" Pza 132.0000 2.00 264.000217510002 TEJA ANDINA DE ARCILLA 32*15CM Und 43,657.3400 0.45 19,645.810206030053 TERMINAL DE COBRE PARA CONDUCTOR 16 MM2 Und 5.0000 4.00 20.000204010004 TIERRA SARANDEADA M3 71.8200 45.00 3,232.090211210058 TIMBRE DE 8" IP 66 Pza 1.0000 30.00 30.000265170065 TOBOGÁN DE ESTRUCTURA METÁLICA SEGÚN DISE Und 1.0000 6,000.00 6,000.000229030017 TORGEL Kg 50.0000 10.00 500.000272190009 TRAMPA "S" PVC SAL DE 2" Und 6.0000 6.00 36.000265020080 TUBERIA F°G° 2"*6.4m Ml 13.8100 60.00 828.360272010030 TUBERÍA P/INST. ELECTRICAS PVC - SAP NTP 399.006Und 330.6400 12.00 3,968.000272010029 TUBERÍA P/INST. ELECTRICAS PVC - SAP NTP 399.006Und 54.0000 15.00 810.000272010028 TUBERÍA P/INST. ELECTRICAS PVC - SAP NTP 399.006Und 83.9000 18.00 1,510.200272010027 TUBERÍA P/INST. ELECTRICAS PVC - SAP NTP 399.006Und 8.3300 22.00 183.250272010026 TUBERÍA P/INST. ELECTRICAS PVC - SAP NTP 399.006Und 33.3300 25.00 833.000272720021 TUBERIA PVC SAP C-10 Ø 1" Und 7.0100 32.50 228.120272720022 TUBERIA PVC SAP C-10 Ø 1/2" Und 20.5100 22.50 461.980272010032 TUBERIA PVC SAP C-10 Ø=3/4" Und 142.5400 27.50 3,920.360265000058 TUBO DE VENTILACION DE F°.G° Ø 2" Und 2.0000 29.00 58.000272010031 TUBO PROTECTOR DE PVC SAP 2" x 3m C/ABRAZAD Und 1.0000 70.00 70.000273010013 TUBO PVC SAL 2" X 3M Pza 32.7000 15.00 490.500273010008 TUBO PVC SAL 3" X 3M Pza 2.7700 22.00 60.910273010009 TUBO PVC SAL 4" x 3M Pza 41.1600 15.00 617.460272130089 TUBO PVC SAL 6" X 5M Pza 2.0000 60.00 120.200274020012 UNION PVC SAP NPT 399.006 DE 20MM Pza 524.0000 3.50 1,834.00

0274020011 UNION PVC SAP NPT 399.006 DE 25MM Pza 22.0000 4.00 88.000274020010 UNION PVC SAP NPT 399.006 DE 40MM Pza 8.0000 6.50 52.000274020009 UNION PVC SAP NPT 399.006 DE 50MM Pza 6.0000 9.00 54.000274020008 UNION PVC SAP NPT 399.006 DE 65MM Pza 6.0000 12.00 72.000277000009 VALVULA COMPUERTA DE BRONCE DE 3" Und 1.0000 95.00 95.000277000003 VALVULA COMPUERTA DE BRONCE DE 3/4" Und 6.0000 45.00 270.000229080012 VARILLA DE COBRE D=5/8" DE 2.4M Und 5.0000 210.00 1,050.000243130072 VENTANA DE MADERA AGUANO ACERCHADO MARCO M2 117.3800 250.00 29,345.000279010078 VIDRIO DOBLE P2 1,288.7400 6.00 7,732.440272320001 YEE PVC SAL 4" Und 30.0000 10.00 300.000273160002 YEE PVC SAL DE 2" X 2" Pza 2.0000 6.00 12.000273160003 YEE PVC SAL DE 3" X 2" Pza 1.0000 8.00 8.000230020097 YESO de 46 Kg QQ 1,371.5100 5.00 6,865.18

903,536.17

EQUIPOS0337010001 HERRAMIENTAS MANUALES %MO 5,558.840348120001 CAMION CISTERNA 4X2 (AGUA) 1,500 GAL. Hm 59.6300 120.00 7,151.220349040010 CARGADOR S/LLANTAS 125-155 HP 3 YD3. Hm 20.5000 180.00 3,690.180348960002 CIZALLA Hm 96.1300 10.00 922.690349030001 COMPACTADOR VIBR. TIPO PLANCHA 4 HP Hm 217.7400 10.00 2,174.190348210066 IZAJE DEPOSTE DE CºAºCº CON CONCRETO CICLOP Hm 18.0000 110.00 1,980.000348210064 MAQUINA SOLDADORA Hm 8.8500 10.00 88.500349100011 MEZCLADORA CONCRETO TROMPO 8 HP 9 P3 Hm 536.6900 12.50 6,710.260348010011 MEZCLADORA DE CONCRETO DE 9 -11P3 Hm 20.7900 12.50 259.940349880007 MIRA 4 MTS Pza 3.5400 5.00 17.710349700003 MOTONIVELADORA DE 145-150 HP Hm 11.4800 220.00 2,523.980349190003 NIVEL HE 28.3400 8.00 230.270349040096 RODILLO LISO VIBRATORIO AUTOP 101-135 HP 10-12 Hm 11.4800 220.00 2,523.980349190001 TEODOLITO Hm 28.3400 7.50 212.550349040095 TRACTOR ORUGA de 140-160 HP Hm 3.1200 220.00 687.090349070004 VIBRADOR DE CONCRETO 4 HP 2.40" Hm 163.5700 8.00 1,309.350349170005 VOLQUETE 6 M3 Hm 34.5500 110.00 3,802.020348810002 WINCHE CON BALDE Hm 89.5400 15.00 1,343.20

41,185.97

TOTAL S/. 1,121,298.47

S/. 1,121,298.47

La columna parcial es el producto del precio por la cantidad requerida; y en la última columna se muestra el Monto Real que se está utilizando

Fecha : ###

1

MEJORAMIENTO INFRESTRUCTURA I.E. 50441 DE UMANA - PAUCARTAMBO

Parcial S/.

2,022.70 OPERADOR DE EQUIPO LIVIANO Hh 571.3100 4.34

261.87 OPERADOR DE EQUIPO PESADO Hh 815.2500 5.12

76,146.65 TOPOGRAFO Hh 1,498.8400 5.12

26,974.45 CAPATAZ Hh 269.6200 5.12

71,200.80 OPERARIO Hh 6,223.3900 5.12

OFICIAL Hh 7,275.4800 4.34

176,606.48 PEON Hh 15,766.2600 3.55

CONTROLADOR OFICIAL Hh 91.7800 4.34

110.08100,660.45

803.1170.00

120.00258.08

5,238.541,939.33

42.486,106.793,926.98

21,470.43479.10400.81369.74

60.00370.00241.92538.56

1,250.00120.00

6,366.002,236.00

504.001,368.00

250.0063.00

465.0088.2715.00

5.0020.0042.0012.00

200.0080.00

399.00

214.805,770.501,908.25

750.006,846.26

750.00117,743.80

13,431.283,924.851,800.00

840.00193.03

41.9456.25

2,185.421,384.28

254.3545.4542.8770.00

1,924.874.00

302.4036.0045.00

1,300.00450.00492.00738.00

75.002.40

1,962.5660.00

1,180.00128.00

52.0036.00

216.005,310.00

270.004.00

10.00135.00

3,000.003,150.002,726.70

74,537.7055.00

110.00120.00577.08600.00

33,293.58163.33225.00

2,200.00475.00

240.0088.00

225.00619.30700.00500.00

18.90215.22360.00319.33223.06

92,171.98960.00251.02

45.781.84

225.001,080.002,800.004,480.004,080.00

320.0035,208.0053,132.0026,749.58

40.003,696.295,208.04

16,541.37210.00270.00

4,770.96450.00

2,200.001,000.002,340.00

80.0027.54

301.77138.16

1,296.001,509.96

13,201.455,804.374,966.01

15,512.531,441.90

605.34897.15

4,716.043,693.27

546.22252.00214.84

2.352,340.00

346.50

600.0029,035.12

3,294.272,000.00

25.0036.0086.4040.0035.70

852.40392.51

48.00500.00168.99

1,413.67151.62254.88

25.00120.00750.00450.00

27.0015.0075.0080.0090.0095.00

100.003.20

203.004.00

50.00116.00264.00

19,645.8020.00

3,232.0830.00

6,000.00500.00

36.00828.36

3,967.62809.96

1,510.15183.32833.25227.96461.49

3,919.9858.0070.00

490.5060.91

617.46120.20

1,834.00

88.0052.0054.0072.0095.00

270.001,050.00

29,345.007,732.44

300.0012.00

8.006,857.53

903,338.42

5,558.847,155.823,689.86

961.292,177.381,980.00

88.506,708.58

259.8817.71

2,526.39226.73

2,526.39212.56686.33

1,308.593,800.841,343.16

41,228.85

1,121,173.75

La columna parcial es el producto del precio por la cantidad requerida; y en la última columna se muestra el Monto Real que se está utilizando