Page 1 =========================================================== DAFTAR UPAH DAN BAHAN UNTUK PEKERJAAN SIPIL BANGUNAN DINAS PEKERJAAN UMUM KOTA PADANG PANJANG tahun anggaran 2010 (triwulan I) NO. URAIAN SATUAN HARGA A. UPAH 1 Driver OH Rp. 60,000.00 2 Kepala Tukang OH Rp. 67,500.00 3 Mandor OH Rp. 67,500.00 4 Pekerja OH Rp. 45,000.00 5 Pembantu Driver OH Rp. 45,000.00 6 Pembantu Tukang OH Rp. 45,000.00 7 Penjaga Malam OH Rp. 45,000.00 8 Tukang Masak Aspal OH Rp. 60,000.00 9 Tukang Anyam OH Rp. 67,500.00 10 Tukang Batu OH Rp. 67,500.00 11 Tukang Besi OH Rp. 45,000.00 12 Tukang Besi Konstruksi OH Rp. 45,000.00 13 Tukang Cat OH Rp. 45,000.00 14 Tukang Gali OH Rp. 45,000.00 15 Tukang Kayu OH Rp. 60,000.00 16 Tukang Las OH Rp. 67,500.00 17 Tukang Lebur Aspal OH Rp. 67,500.00 18 Tukang Masak Aspal OH Rp. 45,000.00 19 Tukang Pelitur OH Rp. 45,000.00 B. BAHAN I. Semen 1 PC Warna Kg Rp. 2,250.00 2 Semen (50 kg) zak Rp. 52,000.00 3 Semen Abu-abu Kg Rp. 1,040.00 4 Semen Merah M3 Rp. 1,200,000.00 5 Semen Merah/Bata Merah Tumbuk Kg Rp. 2,250.00 6 Semen Nat Kg Rp. 5,000.00 7 Semen Portland Kg Rp. 1,040.00 8 Semen Putih Kg Rp. 2,250.00 9 Semen Putih (40 kg) zak Rp. 90,000.00 10 Semen Tahan Asam Kg Rp. 2,250.00 11 Semen Warna Kg Rp. 2,250.00 II. Bahan Galian, Pasangan dan Beton 1 Abu Batu / Pasir Saring M3 Rp. 95,000.00 2 Aspal Kg Rp. 8,300.00 3 Bata Berongga Bh Rp. 1,850.00 4 Bata Kerawang Bh Rp. 5,000.00 5 Bata Merah Bh Rp. 650.00 6 Bata Pelapis Dinding Bh Rp. 600.00 7 Bata Pelapis Klinker Bh Rp. 575.00 8 Batako Bh Rp. 1,850.00 9 Batu Apung Kg Rp. 1,000.00 10 Batu Bata Bh Rp. 650.00 11 Batu Bata (M3) M3 Rp. 467,121.81

Upload: umariswa

Post on 07-Jul-2016

423 views

Category:

Documents


82 download

DESCRIPTION

Analisa SNI 2011

TRANSCRIPT

Page 1: Analisa Sni 2011

Page 1

=======================================================================================================

DAFTAR UPAH DAN BAHAN UNTUK PEKERJAAN SIPIL BANGUNAN

DINAS PEKERJAAN UMUMKOTA PADANG PANJANG

tahun anggaran 2010 (triwulan I)

NO. URAIAN SATUAN HARGA

A. UPAH1 Driver OH Rp. 60,000.00 2 Kepala Tukang OH Rp. 67,500.00 3 Mandor OH Rp. 67,500.00 4 Pekerja OH Rp. 45,000.00 5 Pembantu Driver OH Rp. 45,000.00 6 Pembantu Tukang OH Rp. 45,000.00 7 Penjaga Malam OH Rp. 45,000.00 8 Tukang Masak Aspal OH Rp. 60,000.00 9 Tukang Anyam OH Rp. 67,500.00

10 Tukang Batu OH Rp. 67,500.00 11 Tukang Besi OH Rp. 45,000.00 12 Tukang Besi Konstruksi OH Rp. 45,000.00 13 Tukang Cat OH Rp. 45,000.00 14 Tukang Gali OH Rp. 45,000.00 15 Tukang Kayu OH Rp. 60,000.00 16 Tukang Las OH Rp. 67,500.00 17 Tukang Lebur Aspal OH Rp. 67,500.00 18 Tukang Masak Aspal OH Rp. 45,000.00 19 Tukang Pelitur OH Rp. 45,000.00

B. BAHANI. Semen

1 PC Warna Kg Rp. 2,250.00 2 Semen (50 kg) zak Rp. 52,000.00 3 Semen Abu-abu Kg Rp. 1,040.00 4 Semen Merah M3 Rp. 1,200,000.00 5 Semen Merah/Bata Merah Tumbuk Kg Rp. 2,250.00 6 Semen Nat Kg Rp. 5,000.00 7 Semen Portland Kg Rp. 1,040.00 8 Semen Putih Kg Rp. 2,250.00 9 Semen Putih (40 kg) zak Rp. 90,000.00

10 Semen Tahan Asam Kg Rp. 2,250.00 11 Semen Warna Kg Rp. 2,250.00

II. Bahan Galian, Pasangan dan Beton1 Abu Batu / Pasir Saring M3 Rp. 95,000.00 2 Aspal Kg Rp. 8,300.00 3 Bata Berongga Bh Rp. 1,850.00 4 Bata Kerawang Bh Rp. 5,000.00 5 Bata Merah Bh Rp. 650.00 6 Bata Pelapis Dinding Bh Rp. 600.00 7 Bata Pelapis Klinker Bh Rp. 575.00 8 Batako Bh Rp. 1,850.00 9 Batu Apung Kg Rp. 1,000.00

10 Batu Bata Bh Rp. 650.00 11 Batu Bata (M3) M3 Rp. 467,121.81

Page 2: Analisa Sni 2011

Page 2

=======================================================================================================

NO. URAIAN SATUAN HARGA

12 Batu Kali M3 Rp. 90,000.00 13 Batu Granito Kg Rp. 3,500.00 14 Batu Kerikil M3 Rp. 90,000.00 15 Batu Koral M3 Rp. 95,000.00 16 Batu Palimanan M2 Rp. 85,000.00 17 Batu Paros Bh Rp. 700.00 18 Batu Tempel Hitam Bh Rp. 700.00 19 Cincin Sumuran Bh Rp. 195,000.00 20 Concrete Block (CB.10) Bh Rp. 1,500.00 21 Concrete Block (CB.15) Bh Rp. 1,750.00 22 Concrete Block (CB.20) Bh Rp. 2,000.00 23 Cyclopen Beton M3 Rp. 1,469,247.13 24 Formtie / Penjaga Jarak Bekisting / Spacer Bh Rp. 500.00 25 Hollow Block (HB.10) Bh Rp. 1,500.00 26 Hollow Block (HB.15) Bh Rp. 1,700.00 27 Hollow Block (HB.20) Bh Rp. 2,000.00 28 Hollowbrick Bh Rp. 1,700.00 29 Kerikil Beton M3 Rp. 90,000.00 30 Kerikil Saring M3 Rp. 125,000.00 31 Kerikil Timbunan M3 Rp. 50,000.00 32 Kolom Beton Pracetak Btg Rp. 350,000.00 33 Koral 2/3 M3 Rp. 135,000.00 34 Koral Beton M3 Rp. 85,000.00 35 Kerikil Beton (kg) Kg Rp. 66.67 36 Panel Beton Pracetak Lbr - 37 Pasir Beton M3 Rp. 80,000.00 38 Pasir Beton (kg) Kg Rp. 57.14 39 Pasir Pasang M3 Rp. 90,000.00 40 Pasir Silika Kg Rp. 60.00 41 Pasir Urug M3 Rp. 45,000.00 42 Paving Block Bh Rp. 1,300.00 43 Pipa Beton Dia. 15 - 20 cm Bh Rp. 40,000.00 44 Pipa Beton Dia. 30 - 100 cm Bh Rp. 150,000.00 45 Pipa Tanah Dia. 15 cm Bh Rp. 40,000.00 46 Pipa Tanah Dia. 20 cm Bh Rp. 50,000.00 47 Roster/terawang Bh Rp. 3,500.00 48 Sirtu M3 Rp. 80,000.00 49 Split 0,5 - 1 M3 Rp. 150,000.00 50 Split 0,5 - 1 Kg Rp. 107.14 51 Stronox - 100 Kg Rp. 10,000.00 52 Tanah Liat M3 Rp. 35,000.00 53 Timbunan M3 Rp. 30,000.00

III. Bahan Kayu dan Tumbuhan1 Alang-alang Ikat Rp. 2,500.00 2 Bambu Ø 6-8/600 cm Btg Rp. 5,000.00 3 Gebalan Rumput M2 Rp. 13,250.00 4 Ijuk Kg Rp. 15,000.00 5 Ijuk Saringan Kg Rp. 15,000.00 6 Kayu M3 Rp. 2,300,000.00 7 Kayu 2/3 Klas IV M3 Rp. 1,600,000.00 8 Kayu 2/3 Klas II M3 Rp. 2,300,000.00 9 Kayu 3/4 Klas IV Btg Rp. 1,600,000.00

10 Kayu 3/4 Klas II M3 Rp. 2,300,000.00

Page 3: Analisa Sni 2011

Page 3

=======================================================================================================

NO. URAIAN SATUAN HARGA

11 Kayu 3/4 (Btg) Klas II M3 Rp. 2,760.00 12 Kayu 5/7 Klas IV M3 Rp. 1,600,000.00 13 Kayu 5/7 Klas II M3 Rp. 2,300,000.00 14 Kayu 5/7 (BTG) Klas IV Btg Rp. 5,600.00 15 Kayu Api M3 Rp. 400,000.00 16 Kayu Bakar M3 Rp. 400,000.00 17 Kayu Banio Klas I M3 Rp. 4,200,000.00 18 Kayu Borneo M3 Rp. 4,200,000.00 19 Kayu Borneo Balok M3 Rp. 4,200,000.00 20 Kayu Borneo Damar Laut Balok M3 Rp. 4,200,000.00 21 Kayu Borneo Papan M3 Rp. 4,200,000.00 22 Kayu Cetakan M3 Rp. 1,600,000.00 23 Kayu Dolken ø 8-10/400 cm Btg Rp. 16,800.00 24 Kayu Dolken Ø-8 cm / 4 m Btg Rp. 16,800.00 25 Kayu Dolken Ø-8-10/4 m Galam Btg Rp. 16,800.00 26 Kayu Dolken Ø-8-4-10/4 m Galam Btg Rp. 16,800.00 27 Kayu Jati Balok M3 Rp. 4,000,000.00 28 Kayu Jati Papan M3 Rp. 4,000,000.00 29 Kayu Klas I Balok M3 Rp. 4,200,000.00 30 Kayu Klas I Papan M3 Rp. 4,200,000.00 31 Kayu Klas II Balok M3 Rp. 2,300,000.00 32 Kayu Klas II Papan M3 Rp. 2,300,000.00 33 Kayu Klas III Papan M3 Rp. 1,600,000.00 34 Kayu Klas IV M3 Rp. 1,600,000.00 35 Kayu Marsawa Klas II M3 Rp. 2,300,000.00 36 Kayu Merantih M3 Rp. 2,300,000.00 37 Kayu Merantih Balok M3 Rp. 2,300,000.00 38 Kayu Merantih Papan M3 Rp. 2,300,000.00 39 Kayu Perancah M3 Rp. 1,600,000.00 40 Kayu Profil M1 Rp. 3,750.00 41 Kayu Tiang Pancang M1 Rp. 6,650.00 42 Kisi-kisi Btg Rp. 4,000.00 43 Les 1 x 4 Btg Rp. 4,000.00 44 Les Kaca M1 Rp. 1,520.00 45 List Kayu 2/4 M3 Rp. 2,300,000.00 46 List Kayu Profil M1 Rp. 3,750.00 47 Pohon Btg Rp. 50,000.00

IV. Bahan Allumunium, Baja, Besi dan Kawat1 Alluminium Strip M1 Rp. 25,000.00 2 Besi Angker Pembuka Kg Rp. 7,500.00 3 Besi Begol Bh Rp. 500.00 4 Besi Beton (Polos / Ulir) Kg Rp. 8,000.00 5 Besi Beton Polos Kg Rp. 8,000.00 6 Besi Got Btg Rp. 500.00 7 Besi Jaring Kawat Baja Kg Rp. 10,000.00 8 Besi Lis Kaca (1x1) cm M1 Rp. 5,000.00 9 Besi Plat Baja Kg Rp. 11,400.00

10 Besi Presstressed Polos Kg Rp. 10,000.00 11 Besi Profil IWF Kg Rp. 9,000.00 12 Besi Scuare Tube M1 Rp. 10,000.00 13 Besi Siku L.30.30.3 Kg Rp. 8,000.00 14 Besi Strip (0,2x2)cm Kg Rp. 8,000.00 15 Besi Strip 2 x 3 M1 Rp. 17,500.00

Page 4: Analisa Sni 2011

Page 4

=======================================================================================================

NO. URAIAN SATUAN HARGA

16 Besi Strip Tebal 5 mm Kg Rp. 15,000.00 17 Kawat Beton Kg Rp. 14,000.00 18 Kawat Burung M2 Rp. 15,000.00 19 Kawat Digalvano Kg Rp. 23,000.00 20 Kawat Duri Kg Rp. 12,000.00 21 Kawat Harmonika M2 Rp. 20,000.00 22 Kawat Kassa M2 Rp. 15,000.00 23 Kawat Las Kg Rp. 22,000.00 24 Kawat Nyamuk M2 Rp. 15,000.00 25 Kawat Seng Polos Kg Rp. 15,000.00 26 Paku 1 cm - 2,5 cm Kg Rp. 13,000.00 27 Paku 1,5" Kg Rp. 13,000.00 28 Paku 10 cm Kg Rp. 13,000.00 29 Paku 12 cm Kg Rp. 13,000.00 30 Paku 2 - 5" Kg Rp. 13,000.00 31 Paku 2 - 6" Kg Rp. 13,000.00 32 Paku 5 cm - 10 cm Kg Rp. 13,000.00 33 Paku 5 cm - 12 cm Kg Rp. 13,000.00 34 Paku 5 cm - 7 cm Kg Rp. 13,000.00 35 Paku Hak Panjang 15 cm Kg Rp. 16,000.00 36 Paku Pancing Kg Rp. 16,000.00 37 Paku Pancing 60 x 230 Kg Rp. 16,000.00 38 Paku Pancing 60 x 230 Bh Rp. 16,000.00 39 Paku RRC Kg Rp. 22,000.00 40 Paku Sekrup 1 cm - 2,5 cm Bh Rp. 100.00 41 Paku Sekrup 3,5" Bh Rp. 100.00 42 Paku Sekrup 3,5" (Kg) Kg Rp. 16,000.00 43 Paku Skrup 10 cm Kg Rp. 16,000.00 44 Paku Triplek Kg Rp. 13,000.00

V. Bahan Pelapis Dinding dan Lantai1 Carpet M2 Rp. 50,000.00 2 Carpet 80 % Wool, 20 % Nylon M2 Rp. 200,000.00 3 Floor Hardener Ferrovax Kg Rp. 15,000.00 4 Gymfloor M2 Rp. 35,000.00 5 Internal Cove (5 x 5 x 20) cm Bh Rp. 3,000.00 6 Keramik 10 x 10 cm Plint Artistik Bh Rp. 800.00 7 Keramik 10 x 20 Ktk Rp. 45,000.00 8 Keramik 10 x 20 cm Bh Rp. 900.00 9 Keramik 10 x 20 cm Artistik Bh Rp. 900.00

10 Keramik 10 x 20 cm Plint Artistik Bh Rp. 900.00 11 Keramik 15 x 15 cm Bh Rp. 1,000.00 12 Keramik 20 x 20 cm Bh Rp. 1,800.00 13 Keramik 20 x 20 Motif Timbul Ktk Rp. 47,000.00 14 Keramik 20 x 20 Polos Ktk Rp. 45,000.00 15 Keramik 20 x 25 Motif Ktk Rp. 46,000.00 16 Keramik 30 x 30 cm Granito Ktk Rp. 95,000.00 17 Keramik 30 x 30 cm Mosaik Bh Rp. 4,000.00 18 Keramik 30 x 30 Motif Ktk Rp. 46,000.00 19 Keramik 30 x 30 Polos Ktk Rp. 37,000.00 20 Keramik 40 x 40 Polos Ktk Rp. 57,500.00 21 Keramik 60 x 60 cm Granito Bh Rp. 58,333.33 22 Keramik 5 x 20 cm Artistik Bh Rp. 450.00 23 Keramik 5 x 20 cm Plint Artistik Bh Rp. 450.00

Page 5: Analisa Sni 2011

Page 5

=======================================================================================================

NO. URAIAN SATUAN HARGA

24 Parquet Jati M2 Rp. 35,000.00 25 Porselin 10 x 20 cm Warna Bh Rp. 850.00 26 Porselin 11 x 11 cm Bh Rp. 435.60 27 Porselin 11 x 11 cm Warna Bh Rp. 544.50 28 Porselin 15 x 15 cm Putih Bh Rp. 810.00 29 Porselin 15 x 15 cm Warna Bh Rp. 1,012.50

30 Porselin 20 x 20 cm Warna Bh Rp. 1,800.00 31 Tegel Biasa Plint Bh Rp. 450.00 32 Teralux Cor M3 #N/A33 Teraso Cor M3 #N/A34 Ubin 10 x 10 cm Keramik Artistik Bh #N/A35 Ubin 10 x 20 cm Keramik Artistik Bh #N/A36 Ubin 10 x 20 cm PC Warna Plint Bh #N/A37 Ubin 10 x 30 cm Granito Plint Bh #N/A38 Ubin 10 x 30 cm PC Warna Plint Bh #N/A39 Ubin 10 x 30 cm Plint Bh #N/A40 Ubin 10 x 30 cm Teralux Kerang Plint Bh #N/A41 Ubin 10 x 30 cm Teralux Marmer Plint Bh #N/A42 Ubin 10 x 30 cm Teraso Plint Bh #N/A43 Ubin 10 x 33 cm Keramik Bh #N/A44 Ubin 10 x 40 cm Granito Plint Bh #N/A45 Ubin 10 x 40 cm PC Warna Plint Bh #N/A46 Ubin 10 x 40 cm Plint Bh #N/A47 Ubin 10 x 40 cm Teralux Kerang Plint Bh #N/A48 Ubin 10 x 40 cm Teralux Marmer Plint Bh #N/A49 Ubin 10 x 40 cm Teraso Plint Bh #N/A50 Ubin 10 x 60 cm Teralux Marmer Plint Bh #N/A51 Ubin 100 x 100 cm Teralux Marmer Bh #N/A52 Ubin 15 x 15 cm Keramik Bh #N/A53 Ubin 15 x 20 cm Keramik Bh #N/A54 Ubin 15 x 20 cm Plint Bh #N/A55 Ubin 20 x 20 cm Abu-abu Bh #N/A56 Ubin 20 x 20 cm Keramik Bh Rp. 1,760.00 57 Ubin 20 x 20 cm Warna Bh #N/A58 Ubin 25 x 25 cm Keramik Bh Rp. 3,125.00 59 Ubin 30 x 30 cm Abu-abu Bh Rp. 6,000.00 60 Ubin 30 x 30 cm Granito Bh Rp. 8,750.00 61 Ubin 30 x 30 cm Keramik Bh Rp. 6,000.00 62 Ubin 30 x 30 cm Teralux Kerang Bh Rp. 6,000.00 63 Ubin 30 x 30 cm Teralux Marmer Bh Rp. 6,000.00 64 Ubin 30 x 30 cm Teraso Bh Rp. 6,000.00 65 Ubin 30 x 30 cm Warna Bh Rp. 6,000.00 66 Ubin 33 x 33 cm Keramik Bh Rp. 6,000.00 67 Ubin 33 x 33 cm Keramik Anti Slip Bh Rp. 6,000.00 68 Ubin 40 x 40 cm Abu-abu Bh Rp. 22,400.00 69 Ubin 40 x 40 cm Granito Bh Rp. 22,400.00 70 Ubin 40 x 40 cm Teralux Kerang Bh Rp. 22,400.00 71 Ubin 40 x 40 cm Teralux Marmer Bh Rp. 22,400.00 72 Ubin 40 x 40 cm Teraso Bh Rp. 22,400.00 73 Ubin 40 x 40 cm Warna Bh Rp. 22,400.00 74 Ubin 5 x 20 cm Keramik Artistik Bh Rp. 10,666.67 75 Ubin 60 x 60 cm Granito Bh Rp. 43,750.00 76 Ubin PC Bh Rp. 2,000.00 77 Ubin Porselen M2 Rp. 50,000.00

Page 6: Analisa Sni 2011

Page 6

=======================================================================================================

NO. URAIAN SATUAN HARGA

78 Ubin Tahan Asam M2 Rp. 50,000.00 79 Vinyil Karet 30 x 30 kwl I Bh Rp. 3,000.00 80 Vinyl Asbest 30 x 30 cm Bh Rp. 3,000.00 81 Vinyl Karet 30 x 30 cm KL I Bh Rp. 3,000.00 82 Vinyl Karet 30 x 30 cm KL II Bh Rp. 3,000.00 83 Vinyl Motif Kembang Ex DN Bh Rp. 3,000.00 84 Vinyl Wall Covering, Lebar 50 cm Bh Rp. 15,000.00 85 Wall Paper M2 Rp. 12,500.00

VI. Bahan Pelapis Plafond1 Akustik 30 x 30 cm Lbr Rp. 15,000.00 2 Akustik 30 x 60 cm Lbr Rp. 20,000.00 3 Akustik 60 x 120 cm Lbr Rp. 80,000.00 4 Akustik Arm Atrong 60 x 120 cm Lbr Rp. 80,000.00 5 Eternit lbr Rp. 16,000.00 6 Formica Lbr Rp. 51,299.43 7 Formica 4' x 3' Lbr Rp. 51,299.43 8 Formica 4' x 8' Lbr Rp. 120,000.00 9 Gypsum Board (120 x 240 x 9) mm Lbr Rp. 125,000.00

10 Lambersering Lbr Rp. 14,000.00 11 Plywood Tebal 4 mm Lbr Rp. 48,250.00 12 Plywood Tebal 6 mm Lbr Rp. 65,000.00 13 Plywood Tebal 9 mm Lbr Rp. 87,500.00 14 Plywood Ukuran 120 x 240 x 4 mm Lbr Rp. 48,250.00 15 Plywood Ukuran 90 x 220 x 4 mm Lbr Rp. 24,125.00 16 Ramset / Dina Boft Bh Rp. 15,000.00 17 Soft Board 4" x 8" x 4 mm Lbr Rp. 70,000.00 18 Tadir M2 Rp. 7,000.00 19 Teackwood M2 Rp. 26,388.89 20 Teakwood Ukuran 120 x 240 x 4 mm Lbr Rp. 76,000.00 21 Teakwood Ukuran 90 x 220 x 4 mm Lbr Rp. 51,562.50 22 Triplek Tebal 4 mm M2 Rp. 16,208.68 23 Triplek Tebal 6 mm M2 Rp. 21,835.53 24 GRC Tebal 6 mm M2 Rp. 29,897.88 25 Underlyer Tebal 6 mm / Rubber Corrugated M2 Rp. 22,675.36

VII. Bahan Pintu dan Jendela1 Door Close Bh Rp. 10,000.00 2 Door Holder Bh Rp. 10,000.00 3 Door Stop Bh Rp. 10,000.00 4 Engsel Angin Bh Rp. 7,750.00 5 Engsel Jendela Bh Rp. 15,000.00 6 Engsel Pintu Bh Rp. 20,000.00 7 Jendela Besi M3 #NUM!8 Jendela Besi Tahan Api M3 #NUM!9 Jendela Nako Bh Rp. 3,300.00

10 Jendela Nako (Rangka + Kaca 5 mm) M2 Rp. 75,000.00 11 Kaca Buram 12 mm M2 Rp. 100,000.00 12 Kaca Cermin 12 mm M2 Rp. 125,000.00 13 Kaca Cermin 6 mm M2 Rp. 70,000.00 14 Kaca Cermin 8 mm M2 Rp. 85,000.00 15 Kaca Patri 5 mm M2 Rp. 55,000.00 16 Kaca Tebal 3 mm M2 Rp. 45,000.00 17 Kaca Tebal 5 mm M2 Rp. 55,000.00

Page 7: Analisa Sni 2011

Page 7

=======================================================================================================

NO. URAIAN SATUAN HARGA

18 Kaca Wireglass 5 mm M2 Rp. 60,000.00 19 Kait Angin Bh Rp. 10,000.00 20 Kunci Lemari Bh Rp. 10,000.00 21 Kunci Selot Bh Rp. 15,000.00 22 Kunci Silinder Bh Rp. 55,000.00 23 Kunci Tanam Antik Bh Rp. 150,000.00 24 Kunci Tanam Biasa Bh Rp. 55,000.00 25 Kunci Tanam Kamar Mandi Bh Rp. 50,000.00 26 Kuzen Alumunium M1 Rp. 55,000.00 27 Pintu Alluminium M2 Rp. 300,000.00 28 Pintu Besi Baja M3 #NUM!29 Pintu Gulung Besi M3 Rp. 200,000.00 30 Pintu Lipat M2 Rp. 450,000.00 31 Profil Alluminium M1 Rp. 55,000.00 32 Profil Kaca M1 Rp. 5,000.00 33 Rel Pintu Dorong Bh #NUM!34 Roll Door Tebal 5mm M2 Rp. 500,000.00 35 Roll Door Tebal 8mm M2 Rp. 800,000.00 36 Rolling Door Aluminium M2 Rp. 200,000.00 37 Spring Knip Bh #NUM!38 Sunscreen Alluminium M2 #NUM!39 Venetions Blinds M2 Rp. 85,000.00 40 Vertikals Blinds M2 Rp. 85,000.00

VIII. Bahan Atap1 Asbes 1.00 x 1.00 m Lbr Rp. 14,146.09 2 Asbes Bubungan Gelombang 0,92 Lbr Rp. 23,392.86 3 Asbes Gelombang (1,50 x 1,05 m) x 4 mm Lbr Rp. 23,392.86 4 Asbes Gelombang (1,80 x 0,92 m) x 5 mm Lbr Rp. 23,392.86 5 Asbes Gelombang (1,80 x 1,08 m) x 6 mm Lbr Rp. 24,000.00 6 Asbes Gelombang (2,00 x 0,92 m) x 5 mm Lbr Rp. 24,000.00 7 Asbes Gelombang (2,10 x 1,05 m) x 4 mm Lbr Rp. 32,750.00 8 Asbes Gelombang (2,10 x 1,08 m) x 6 mm Lbr Rp. 32,083.33 9 Asbes Gelombang (2,25 x 0,92 m) x 5 mm Lbr Rp. 32,083.33

10 Asbes Gelombang (2,40 x 1,05 m) x 4 mm Lbr Rp. 36,750.00 11 Asbes Gelombang (2,40 x 1,08 m) x 6 mm Lbr Rp. 36,666.67 12 Asbes Gelombang (2,50 x 0,92 m) x 5 mm Lbr Rp. 36,666.67 13 Asbes Gelombang (2,70 x 1,05 m) x 4 mm Lbr Rp. 41,250.00 14 Asbes Gelombang (2,70 x 1,08 m) x 6 mm Lbr Rp. 41,250.00 15 Asbes Gelombang (3,00 x 1,05 m) x 4 mm Lbr Rp. 64,000.00 16 Asbes Gelombang (3,00 x 1,08 m) x 6 mm Lbr Rp. 45,833.33 17 Atap Alluminium Gelombang Tebal 0,55 M2 Rp. 55,000.00 18 Atap Seng BJLS 20 Lbr Rp. 37,000.00 19 Atap Seng BJLS 20 Warna Lbr Rp. 55,000.00 20 Atap Seng BJLS 30 Lbr Rp. 60,000.00 21 Bubungan Gentang Metal Lbr Rp. 18,000.00 22 Bubungan Seng BJLS 20 Lbr Rp. 13,000.00 23 Genteng Aspal Lbr Rp. 50,750.00 24 Genteng Beton Bh Rp. 50,750.00 25 Genteng Bubung Kodok Bh Rp. 23,000.00 26 Genteng Bubung Palentong Bh Rp. 23,000.00 27 Genteng Decra Bond Bh Rp. 50,750.00 28 Genteng Kodok Bh Rp. 50,750.00 29 Genteng Metal Lbr Rp. 32,500.00

Page 8: Analisa Sni 2011

Page 8

=======================================================================================================

NO. URAIAN SATUAN HARGA

30 Genteng Palentong Bh Rp. 50,750.00 31 Genteng Palentong Super Bh Rp. 50,750.00 32 Genteng Sirap Bh Rp. 50,750.00 33 Nok Genteng Beton Bh Rp. 23,000.00 34 Nok Paten 0,92 m Lbr Rp. 23,000.00 35 Nok Paten 1,05 m Lbr Rp. 23,000.00 36 Nok Paten 1,08 m Lbr Rp. 23,000.00 37 Nok Standar 40 cm 18, swg 22 M2 Rp. 23,000.00 38 Nok Stek Gelombang 1,05 m Lbr Rp. 23,000.00 39 Nok Stek Gelombang 1,08 m Lbr Rp. 23,000.00 40 Nok Stel Rata 0,92 m Lbr Rp. 23,000.00 41 Nok Stel Rata 1,05 m Lbr Rp. 23,000.00 42 Pelat Asbes Tebal 3,5 mm Lbr Rp. 28,750.00 43 Pelat Asbes Tebal 4 mm Lbr Rp. 30,000.00 44 Pelat Asbes Tebal 5 mm Lbr Rp. 32,500.00 45 Pelat Asbes Tebal 6 mm Lbr Rp. 35,000.00 46 Atap Fiber Lbr Rp. 55,000.00 47 Seng Gelombang 3" x 5" Lbr Rp. 40,000.00 48 Seng Gelombang 3" x 6" BJLS 20 Lbr Rp. 37,000.00 49 Seng Plat Lbr Rp. 40,000.00 50 Seng Plat 3" x 6" BJLS 20 Lbr Rp. 34,500.00 51 Seng Plat 3" x 6" BJLS 30 Lbr Rp. 52,500.00 52 Seng Plat BJLS 20 M2 Rp. 34,500.00 53 Sisalation / Alluminium foil M2 #NUM!54 Waterproof Batacote Kg Rp. 45,000.00 55 Reng / Topspan M1 Rp. 16,000.00 56 Baut/Srew 14/20 Pcs Rp. 650.00 57 Baut/Srew 16/16 Pcs Rp. 600.00 58 Dynabolt Pcs Rp. 2,640.00 59 Baja Ringan Profil C. 75. 100 M1 Rp. 26,500.00 60 Baja Ringan Profil C. 75. 0.75 M1 Rp. 25,500.00 61 Reng/Topspan M1 Rp. 23,000.00 62 Baut/Screw 14/20 Pcs Rp. 750.00 63 Baut/Screw 16/16 Pcs Rp. 650.00 64 Talang M1 Rp. 58,000.00

IX. Bahan Sanitasi1 Badkip Bh #NUM!2 Bak Cuci Stainles Steel Bh Rp. 180,000.00 3 Bak Cuci Teraso Bh Rp. 210,000.00 4 Bak Fiberglass Bh Rp. 225,000.00 5 Bak Teraso Bh Rp. 210,000.00 6 Floor Drain Plastik Bh Rp. 10,000.00 7 Floor Drain Stainless Steel Bh Rp. 50,000.00 8 Kloset Duduk / Monoblok Bh Rp. 400,000.00 9 Kloset Duduk / Otomatis Bh Rp. 1,350,000.00

10 Kloset Jongkok Bh Rp. 180,000.00 11 Kloset Jongkok Porselen Bh Rp. 180,000.00 12 Kloset Jongkok Teraso Bh Rp. 180,000.00 13 Kran Air (Plastik) Bh Rp. 10,000.00 14 Kran Air (Stainless Steel) Bh Rp. 35,000.00 15 Pipa Galvanis Dia. 0,5" M1 Rp. 16,000.00 16 Pipa Galvanis Dia. 0,75" M1 Rp. 25,000.00 17 Pipa Galvanis Dia. 1" M1 Rp. 40,000.00

Page 9: Analisa Sni 2011

Page 9

=======================================================================================================

NO. URAIAN SATUAN HARGA

18 Pipa Galvanis Dia. 1,5" M1 Rp. 55,000.00 19 Pipa Galvanis Dia. 2" M1 Rp. 65,000.00 20 Pipa Galvanis Dia. 3" M1 Rp. 75,000.00 21 Pipa Galvanis Dia. 4" M1 Rp. 90,000.00 22 Pipa Hawa Dia. 0,75 " M1 Rp. 25,000.00 23 Pipa Hawa Dia. 1,5 " M1 Rp. 55,000.00 24 Pipa Paralon Dia. 4 " M1 Rp. 42,500.00 25 Pipa PVC Dia. 0,5" M1 Rp. 3,750.00 26 Pipa PVC Dia. 0,75" M1 Rp. 5,000.00 27 Pipa PVC Dia. 1" M1 Rp. 6,250.00 28 Pipa PVC Dia. 1,5" M1 Rp. 8,750.00 29 Pipa PVC Dia. 2" M1 Rp. 13,750.00 30 Pipa PVC Dia. 2,5" M1 Rp. 20,000.00 31 Pipa PVC Dia. 3" M1 Rp. 27,500.00 32 Pipa PVC Dia. 4" M1 Rp. 42,500.00 33 Seal Tape Bh Rp. 3,000.00 34 Sealent Tube Rp. 9,000.00 35 Urinoir Bh Rp. 650,000.00 36 Washtafel Bh Rp. 450,000.00 37 Water Drain + Asesories Set Rp. 35,000.00 38 Waterstop Lebar 150 mm M1 Rp. 150,000.00 39 Waterstop Lebar 200 mm M1 Rp. 200,000.00 40 Waterstop Lebar 230 mm M1 Rp. 230,000.00 41 Waterstop Lebar 250 mm M1 Rp. 250,000.00 42 Waterstop Lebar 300 mm M1 Rp. 300,000.00 43 Waterstop Lebar 320 mm M1 Rp. 320,000.00

X. Bahan Pengecatan1 Aluminium B Kg Rp. 35,000.00 2 Aluminium C Kg Rp. 35,000.00 3 Ampelas Lbr Rp. 2,500.00 4 Cat Kg Rp. 42,000.00 5 Cat Air Kg Rp. 15,000.00 6 Cat Antara Kg Rp. 42,000.00 7 Cat Dasar Kg Rp. 15,000.00 8 Cat Menie Kg Rp. 15,000.00 9 Cat Penutup (Cat Air) Kg Rp. 15,000.00

10 Cat Penutup (Cat Minyak) Kg Rp. 42,000.00 11 Cat Vinil / Matex Kg Rp. 15,000.00 12 Cat Warna Kg Rp. 42,000.00 13 Dempul Kg Rp. 35,000.00 14 Dempul Jadi Kg Rp. 17,500.00 15 Dempul Wall Putih Kg Rp. 15,000.00 16 Flincote / Meni Besi Kg Rp. 15,000.00 17 Kalkarium Kg Rp. 20,000.00 18 Kapur Padam M3 Rp. 125,000.00 19 Kapur Pasang Kg Rp. 281.25 20 Kapur Sirih M3 Rp. 150,000.00 21 Kapur Sirih Kg Rp. 281.25 22 Kuas Bh Rp. 15,000.00 23 Meni (Read Lead) A Kg Rp. 17,500.00 24 Meni (Read Lead) B Kg Rp. 20,000.00 25 Meni Besi Kg Rp. 15,000.00 26 Minyak Bekisting Ltr Rp. 20,000.00

Page 10: Analisa Sni 2011

Page 10

=======================================================================================================

NO. URAIAN SATUAN HARGA

27 Minyak Cat Kg Rp. 15,000.00 28 Minyak Pelumas Ltr Rp. 20,000.00 29 Pelumas ltr Rp. 20,000.00 30 Pengencer Ltr Rp. 12,000.00 31 Plamur Tembok Kg Rp. 11,000.00 32 Plastic Aerator Bh Rp. 5,000.00 33 Politur Ltr Rp. 15,000.00 34 Politur Jadi Ltr Rp. 30,000.00 35 Polytur Melamide Kg Rp. 30,000.00 36 Residu Kg Rp. 15,000.00 37 Residu Ltr Rp. 9,000.00 38 Residu Atau Ter Ltr Rp. 9,000.00 39 Sabun Kg Rp. 10,000.00 40 Soda Api Kg Rp. 5,000.00 41 Solar ltr Rp. 4,600.00 42 Spiritus ltr Rp. 13,500.00 43 Teak Oil Ltr Rp. 20,000.00 44 Vernis Ltr Rp. 17,500.00

XI. Bahan Lain1 BBM Ltr Rp. 4,500.00 2 Bilik Bambu M2 Rp. 8,000.00 3 Kompresor, Blasting Pot, Selang Dan Nozzle Hari Rp. 100,000.00 4 Lem Kayu Kg Rp. 12,000.00 5 Lem Vinyl Kg Rp. 12,000.00 6 Menggilas Hari Rp. 90,000.00 7 Pagar kawat Jaring Lbr Rp. 160,000.00 8 Perekat Kg Rp. 10,000.00 9 Sewa Alat Konsruksi Jam Rp. 40,000.00

10 Sewa Mesin & Spare Part Hari Rp. 90,000.00 11 Tali Ijuk Kg Rp. 12,500.00 12 Ongkos Mematri M1 Rp. 5,000.00

Page 11: Analisa Sni 2011

Page 11

=======================================================================================================

DAFTAR UPAH DAN BAHAN UNTUK PEKERJAAN SIPIL BANGUNAN

DINAS PEKERJAAN UMUMKOTA PADANG PANJANG

tahun anggaran 2010 (triwulan I)

KETERANGAN

BJ (kg/m3) = 1,250

Vol 1 bh : 0.0013915

Page 12: Analisa Sni 2011

Page 12

=======================================================================================================

KETERANGAN

Dia 1 M

BJ (kg/m3) = 1,350

BJ (kg/m3) = 1,400

BJ (kg/m3) = 1,500

BJ (kg/m3) = 1,400

Page 13: Analisa Sni 2011

Page 13

=======================================================================================================

KETERANGAN

50.00000

50.00000

1 btg = Rp. 50,000

Page 14: Analisa Sni 2011

Page 14

=======================================================================================================

KETERANGAN

1 rol = Rp. 120,000

1 KTK 17,500

isi (bh) 50

Luas (M2) 0.02

isi (bh) 25

isi (bh) 20 isi (bh) 11

isi (bh) 11 isi (bh) 11 isi (bh) 6 1 ktk 175,000 Luas (M2) 0.01

Page 15: Analisa Sni 2011

Page 15

=======================================================================================================

KETERANGAN

Luas (M2) 0.02 Luas (M2) 0.012 Luas (M2) 0.012 Luas (M2) 0.023 Luas (M2) 0.023

Luas (M2) 0.040

Luas (M2) 0.010

Luas (M2) 0.040

Luas (M2) 0.063

1 ktk = 95,000 Luas (M2) 0.090

Luas (M2) 0.090

Luas (M2) 0.160 1 ktk 140,000 isi (bh) 6

1 ktk 175,000 Luas (M2) 0.040

Page 16: Analisa Sni 2011

Page 16

=======================================================================================================

KETERANGAN

Luas (M2) 0.090

Luas (M2) 2.98

Luas (M2) 2.88 Luas (M2) 1.98 1 lbr = Rp. 48,250 1 lbr = Rp. 65,000 1 lbr = Rp. 89,000 1 lbr = Rp. 67,500

Page 17: Analisa Sni 2011

Page 17

=======================================================================================================

KETERANGAN

Folding Gate

Luas (m2) 1.00

Luas (m2) 1.58 Luas (m2) 1.66 Luas (m2) 1.94 Luas (m2) 1.84 Luas (m2) 2.21 Luas (m2) 2.27

Luas (m2) 2.52 Luas (m2) 2.59

Luas (m2) 2.84 Luas (m2) 2.92 Luas (m2) 3.15 Luas (m2) 3.24

1 m2 = 51,069

Page 18: Analisa Sni 2011

Page 18

=======================================================================================================

KETERANGAN

Page 19: Analisa Sni 2011

Page 19

=======================================================================================================

KETERANGAN

1 btg : 15,000 1 btg : 20,000 1 btg : 25,000 1 btg : 35,000 1 btg : 55,000 1 btg : 80,000 1 btg : 110,000 1 btg : 170,000

Lengkap

Page 20: Analisa Sni 2011

Page 20

=======================================================================================================

KETERANGAN

Page 21: Analisa Sni 2011

Page 21

========================================================================================================================

DAFTAR HARGA SATUAN PEKERJAAN UNTUK PEKERJAAN SIPIL BANGUNAN

DINAS PEKERJAAN UMUMKOTA PADANG PANJANG

tahun anggaran 2010 (triwulan I)

NO URAIAN SAT HARGA SATUAN

A Analisa Biaya Konstruksi Pekerjaan Persiapan

1 Pagar Sementara Dari Kayu (T. 2M) M1 Rp. 179,490.00 2 Pagar Sementara Dari Seng Gelombang (T.2M) M1 Rp. 228,240.00 3 Pagar Sementara Dari Kawat Duri (T.1,8M) M1 Rp. 349,070.00 4 Pengukuran dan Pemasangan Bouwplank M1 Rp. 42,172.50 5 Pembuatan Kantor Sementara dengan Lantai Plesteran M2 Rp. 886,720.00 6 Pembuatan Gudang Semen dan Alat-alat M2 Rp. 770,655.00 7 Pembuatan Rumah Jaga / Konstruksi Kayu M2 Rp. 898,300.00 8 Membersihkan Lapangan dan Peralatan M2 Rp. 7,875.00 9 Pembuatan Bedeng Buruh M2 Rp. 780,832.50

10 Pembuatan Bak Adukan Ukuran (40 x 50 x 20) cm M2 Rp. 107,541.25 11 Pembuatan Stegger dari Bambu, Ukuran (40 x 50 x 20) cm M2 Rp. 21,407.50 12 Pembuatan Jalan Sementara M2 Rp. 70,875.00 13 Bongkaran Beton Bertulang M3 Rp. 322,492.50 14 Bongkaran Dinding Tembok Batu Bata M3 Rp. 300,217.50 15 Bongkaran Lantai Beton M2 Rp. 5,175.00 16 Mengupas Plesteran Lama M2 Rp. 24,187.50 17 Menurunkan Atap Genteng/Sirap M2 Rp. 9,675.00 18 Bongkaran Atap Seng M2 Rp. 2,475.00 19 Bongkaran Rangka Atap M2 Rp. 6,506.25 20 Bongkaran Loteng Papan M2 Rp. 13,680.00 21 Bongkaran Kayu Kuda-Kuda M3 Rp. 594,000.00 22 Bongkaran Lantai Keramik M2 Rp. 9,675.00 23 Bongkaran Pondasi M3 Rp. 207,000.00 24 Bongkaran Kuzen M2 Rp. 13,680.00 25 Bongkaran Jalan M2 Rp. 207,000.00 26 Pasang pagar kawat Jaring Galvanis (Tinggi 1 M) M1 Rp. 74,255.00 27 Pasang Pagar Beton Pracetak (5 x 50 x 213) cm M1 #VALUE!

B Analisa Biaya Konstruksi Pekerjaan Tanah

28 Galian Tanah Biasa Sedalam 1 meter M3 Rp. 35,437.50 29 Galian Tanah Biasa Sedalam 2 meter M3 Rp. 43,537.50 30 Galian Tanah Biasa Sedalam 3 meter M3 Rp. 51,772.50 31 Galian Tanah Keras Sedalam 1 meter M3 Rp. 47,160.00 32 Galian Tanah Cadas Sedalam 1 meter M3 Rp. 71,550.00 33 Galian Tanah Lumpur Sedalam 1 meter M3 Rp. 57,037.50 34 Pekerjaan Stripping Tebing Setinggi 1 M M2 Rp. 2,587.50 35 Pembuangan Tanah Sejauh 30 meter M3 Rp. 15,525.00 36 Urugan Kembali M3 Rp. 9,922.50 37 Pemadatan Tanah (per 20 cm) M3 Rp. 25,875.00 38 Urugan Pasir M3 Rp. 68,175.00 39 Lapisan Pudel campuran 1 Kp : 3 Ps : 7 TL M3 Rp. 139,155.00 40 Lapisan Pudel Campuran 1 Kp : 5 TL M3 Rp. 145,780.00 41 Pemasangan Lapisan Ijuk Tebal 10 cm M2 Rp. 97,762.50 42 Urugan Sirtu Padat untuk peninggian lantai bangunan M3 Rp. 108,937.50

C Analisa Biaya Konstruksi Pekerjaan Pondasi

43 Pasang Pondasi Batu Kali, 1 Pc : 3 Ps M3 Rp. 478,842.50 44 Pasang Pondasi Batu Kali, 1 Pc : 4 Ps M3 Rp. 441,432.50 45 Pasang Pondasi Batu Kali, 1 Pc : 5 Ps M3 Rp. 415,512.50 46 Pasang Pondasi Batu Kali, 1 Pc : 6 Ps M3 Rp. 397,282.50

Page 22: Analisa Sni 2011

Page 22

========================================================================================================================

NO URAIAN SAT HARGA SATUAN

47 Pasang Pondasi Batu Kali, 1 Pc : 8 Ps M3 Rp. 370,242.50 48 Pasang Pondasi Batu Kali, 1 Kp : 1 Sm : 2 Ps M3 Rp. 459,760.31 49 Pasang Pondasi Batu Kali, 1 Pc : 3 Kp : 10 Ps M3 Rp. 332,873.84 50 Pasang Pondasi Batu Kali, 1/4 Pc : 1 Kp : 4 Ps M3 Rp. 314,859.34 51 Pasang Pondasi Batu Kosong (Aanstampang) M3 Rp. 194,130.00 52 Pasang Pondasi Siklop 60 % Beton 1PC : 2PB : 3KR M3 Rp. 1,510,277.50 53 Pasang Pondasi Sumuran Diameter 100 cm M3 Rp. 444,115.00 54 Pekerjaan Cincin Sumuran Dia. 1 m' BH Rp. 231,056.58 55 Pekerjaan Cincin Sumuran Dia. 1,2 m' BH Rp. 304,154.68 56 Menurunkan Cincin Sumuran Sedalam 1 M BH Rp. 81,421.88 57 Menurunkan Cincin Sumuran Sedalam 2 M BH Rp. 90,281.25 58 Menurunkan Cincin Sumuran Sedalam 3 M BH Rp. 108,000.00 59 Campuran Batu Kali + Stamp Beton 1:2:3 M3 Rp. 376,123.82 60 Cyclopen Beton 1:2:3 + 40 % Batu Kali M3 Rp. 507,947.96 61 Pekerjaan Pondasi Sumuran Dia. 1 M Kedalamam 1 M TTK Rp. 711,216.08 62 Pekerjaan Pondasi Sumuran Dia. 1 M Kedalamam 2 M TTK Rp. 1,349,872.69 63 Pekerjaan Pondasi Sumuran Dia. 1 M Kedalamam 3 M TTK Rp. 1,997,387.16 64 Pekerjaan Pondasi Sumuran Dia. 1,2 M Kedalamam 1 M TTK Rp. 959,760.93 65 Pekerjaan Pondasi Sumuran Dia. 1,2 M Kedalamam 2 M TTK Rp. 1,846,959.36 66 Pekerjaan Pondasi Sumuran Dia. 1,2 M Kedalamam 3 M TTK Rp. 2,743,017.16

D Analisa Biaya Konstruksi Pekerjaan Beton

67 Pekerjaan Beton K 100 M3 Rp. 473,442.14 68 Pekerjaan Beton K 125 M3 Rp. 502,125.95 69 Pekerjaan Beton K 150 M3 Rp. 524,722.14 70 Pekerjaan Beton K 100 Lantai Kerja M3 Rp. 431,595.24 71 Pekerjaan Beton K 175 M3 Rp. 457,773.57 72 Pekerjaan Beton K 200 M3 Rp. 576,889.76 73 Pekerjaan Beton K 225 M3 Rp. 595,830.71 74 Pekerjaan Beton K 250 M3 Rp. 608,474.52 75 Pekerjaan Beton K 275 M3 Rp. 630,030.71 76 Pekerjaan Beton K 300 M3 Rp. 636,805.95 77 Pekerjaan Beton K 325 M3 Rp. 689,487.38 78 Pekerjaan Beton K 350 M3 Rp. 689,487.38 79 Membuat Beton Kedap Air Dengan Stronox - 100 M3 Rp. 665,975.00 80 Memasang PVC Waterstop Lebar 150 mm M1 Rp. 162,630.00 81 Memasang PVC Waterstop Lebar 200 mm M1 Rp. 216,255.00 82 Memasang PVC Waterstop Lebar 230 mm - 320 mm M1 Rp. 248,340.00 83 Pembesian Dengan Besi Polos Atau Besi Ulir Kg Rp. 9,314.25 84 Kabel Presstressed Polos / Strands Kg Rp. 11,144.00 85 Jaring Kawat Baja / Wire Mesh Kg Rp. 10,670.50 86 Pasang Bekisting untuk Pondasi M2 Rp. 108,510.00 87 Pasang Bekisting Untuk Sloof M2 Rp. 116,510.00 88 Pasang Bekisting Untuk Kolom M2 Rp. 225,880.00 89 Pasang Bekisting Untuk Balok M2 Rp. 232,780.00 90 Pasang Bekisting Untuk Lantai M2 Rp. 293,080.00 91 Pasang Bekisting Untuk Dinding M2 Rp. 240,180.00 92 Pasang Bekisting Untuk Tangga M2 Rp. 208,880.00 93 Pasangan Jembatan Pengecoran Beton M2 Rp. 69,067.50 94 Membuat Pondasi Beton Bertulang (150 Kg Besi + Bekisting) M3 Rp. 2,522,627.50 95 Membuat Sloof Beton Bertulang (200 Kg Besi + Bekisting) M3 Rp. 3,127,407.50 96 Membuat Kolom Beton Bertulang (300 Kg Besi + Bekisting) M3 Rp. 5,348,132.50 97 Membuat Balok Beton Bertulang (200 Kg Besi + Bekisting) M3 Rp. 4,119,195.00 98 Membuat Balok Beton Bertulang (150 Kg Besi + Bekisting) M3 Rp. 3,819,327.50 99 Membuat Dinding Beton Bertulang (150 Kg Besi + Bekisting) M3 Rp. 3,648,725.00

100 Membuat Tangga Beton Bertulang (200 Kg Besi + Bekisting) M3 Rp. 3,816,307.50 101 Membuat Kolom Penguat Beton Bertulang (11 x 11) cm M1 Rp. 51,642.50

Page 23: Analisa Sni 2011

Page 23

========================================================================================================================

NO URAIAN SAT HARGA SATUAN

102 Membuat Ring Balok Beton Bertulang (10 x 15) cm M1 Rp. 63,095.00

E Analisa Biaya Konstruksi Pekerjaan Dinding

103 Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 2 Ps M2 Rp. 187,315.00 104 Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 3 Ps M2 Rp. 177,333.00 105 Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 4 Ps M2 Rp. 170,857.00 106 Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 5 Ps M2 Rp. 167,143.00 107 Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 6 Ps M2 Rp. 165,095.00 108 Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 3 Kp : 10 Ps M2 Rp. 153,690.93 109 Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 2 Ps M2 Rp. 90,565.50 110 Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 3 Ps M2 Rp. 85,982.30 111 Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 4 Ps M2 Rp. 83,267.50 112 Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 5 Ps M2 Rp. 81,554.70 113 Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 6 Ps M2 Rp. 80,500.30 114 Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 8 Ps M2 Rp. 78,697.50 115 Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 3 Kp : 10 Ps M2 Rp. 78,492.50 116 Pasangan Batu Bata Tebal 1/2 Bata, 1 Kp : 1 Sm : 1 Ps M2 Rp. 92,907.50 117 Pasangan Batu Bata Tebal 1/2 Bata, 1 Kp : 1 Sm : 2 Ps M2 Rp. 71,722.06 118 Pasangan Dinding Hollowblock (HB.20), 1PC : 3PP M2 Rp. 132,450.00 119 Pasangan Dinding Hollowblock (HB.20), 1PC : 4PP M2 Rp. 147,850.00 120 Pasangan Dinding Hollowblock (HB.15), 1PC : 3PP M2 Rp. 122,964.60 121 Pasangan Dinding Hollowblock (HB.15), 1PC : 4PS M2 Rp. 121,123.00 122 Pasangan Dinding Hollowblock (HB.10), 1PC : 3PS M2 Rp. 91,453.90 123 Pasangan Dinding Hollowblock (HB.10), 1PC : 4PS M2 Rp. 89,742.70 124 Pasang Dinding Roster/terawang (12 x 11 x 24) cm, 1PC : 3PP M2 Rp. 164,399.50 125 Pasang Dinding Roster/terawang (12 x 11 x 24) cm, 1PC : 4PP M2 Rp. 141,527.50 126 Pasang Bata Berongga Ukuran (5 x 11 x 24) cm, 1PC : 3PP M2 Rp. 172,590.00 127 Pasang Dinding Partisi M2 Rp. 140,065.42 128 Pasang Dinding Partisi Double M2 Rp. 239,680.83 129 Pasang Dinding Partisi Teakwood M2 Rp. 152,281.67 130 Pasang Dinding Partisi Teakwood Double M2 Rp. 264,113.33 131 Pasang Teakwood Rangkap, Rangka Expose Kayu Klas I M2 Rp. 332,752.50 132 Pasang Teakwood Rangkap Lapis Formica, Rangka Expose Kayu Klas II M2 Rp. 350,277.21 133 Pasang Rangka Dinding Pemisah (60 x 120) cm Kayu Klas II M2 Rp. 103,677.50 134 Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu Klas II M2 Rp. 173,897.50 135 Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Klas II M2 Rp. 157,570.00 136 Pasang Dinding Lambrizing Dari Papan Kayu Klas I M2 Rp. 182,275.00 137 Pasang Dinding Lambrizing Dari Plywood (120 x 240) cm M2 Rp. 26,169.00 138 Pasang Dinding Bilik Rangka Kayu Klas III M2 Rp. 42,640.00

F Analisa Biaya Konstruksi Pekerjaan Plesteran

139 Plesteran 1 Pc : 1 Ps, Tebal 15 mm M2 Rp. 38,376.66 140 Plesteran 1 Pc : 2 Ps, Tebal 15 mm M2 Rp. 33,245.46 141 Plesteran 1 Pc : 3 Ps, Tebal 15 mm M2 Rp. 30,969.54 142 Plesteran 1 Pc : 4 Ps, Tebal 15 mm M2 Rp. 29,462.10 143 Plesteran 1 Pc : 5 Ps, Tebal 15 mm M2 Rp. 28,543.86 144 Plesteran 1 Pc : 6 Ps, Tebal 15 mm M2 Rp. 27,835.14 145 Plesteran 1 Pc : 7 Ps, Tebal 15 mm M2 Rp. 27,425.94 146 Plesteran 1 Pc : 8 Ps, Tebal 15 mm M2 Rp. 27,016.74 147 Plesteran 1 Pc : 0,5 Kp : 3 Ps, Tebal 15 mm M2 Rp. 27,087.90 148 Plesteran 1 Pc : 2 Kp : 8 Ps, Tebal 15 mm M2 Rp. 25,097.50 149 Plesteran 1 Pc : 1 Kp : 1 Ps, Tebal 15 mm M2 Rp. 21,496.86 150 Plesteran 1 Pc : 1 Kp : 2 Ps, Tebal 15 mm M2 Rp. 21,784.78 151 Plesteran 1 Pc : 2 Ps, Tebal 20 mm M2 Rp. 44,034.78 152 Plesteran 1 Pc : 3 Ps, Tebal 20 mm M2 Rp. 41,000.22 153 Plesteran 1 Pc : 4 Ps, Tebal 20 mm M2 Rp. 38,960.30 154 Plesteran 1 Pc : 5 Ps, Tebal 20 mm M2 Rp. 37,765.98

Page 24: Analisa Sni 2011

Page 24

========================================================================================================================

NO URAIAN SAT HARGA SATUAN

155 Plesteran 1 Pc : 6 Ps, Tebal 20 mm M2 Rp. 36,791.02 156 Plesteran 1 Pc : 1 Sm : 2 Ps, Tebal 20 mm M2 Rp. 43,695.00 157 Plesteran Berapen 1 Pc : 5 Ps, Tebal 15 mm M2 Rp. 20,218.86 158 Plesteran Skoning 1 Pc : 2 Ps, Tebal 10 mm M2 Rp. 32,672.50 159 Plesteran Granito, 1 Pc Warna : 2 Granito, Tebal 10 mm M2 Rp. 87,172.50 160 Plesteran Teraso, 1 Pc Warna : 2 Batu Teraso, Tebal 10 mm M2 Rp. 111,787.50 161 Plesteran Ciprat, 1 Pc : 2 Ps M2 Rp. 24,585.30 162 Plesteran Siar Dinding Batu Bata 20 m' M2 Rp. 17,069.82 163 Plesteran Siar Dinding Conblock 8 m' M2 Rp. 7,941.50 164 Plesteran Siar Pasangan Batu Kali, 1PC : 2PP M2 Rp. 32,581.10 165 Plesteran Acian M2 Rp. 19,445.00

G Analisa Biaya Konstruksi Kuzen, Pintu dan Jendela

166 Pasang Kusen Pintu dan Jendela Kayu Klas I M3 Rp. 6,273,500.00 167 Pasang Kusen Pintu dan Jendela Kayu Klas II M3 Rp. 4,293,500.00 168 Pasang Pintu Klamp Standar Kayu Klas II M2 Rp. 179,702.50 169 Pasang Pintu Klamp Sederhana Kayu Klas III M2 Rp. 151,702.50 170 Pasang Daun Pintu Panel Kayu Klas II M2 Rp. 319,250.00 171 Pasang Pintu dan Jendela Kaca Kayu Klas II M2 Rp. 231,000.00 172 Pasang Pintu dan Jendela Jalusi Kayu Klas II M2 Rp. 401,825.00 173 Pasang Pintu Plywood Rangkap, Rangka Tertutup Kayu Klas II (lebar < 90 cm) M2 Rp. 238,120.00 174 Pasang Pintu Plywood Rangkap, Rangka Expose Kayu Klas II M2 Rp. 261,595.00 175 Pasang Jalusi Kusen Kayu Klas II M2 Rp. 205,637.50 176 Pasang Jendela Besi Plat Baja Rangkap Tebal 2 mm Rangka Baja Siku M2 Rp. 600,117.50 177 Pasang Rangka Jendela Besi Scuare Tube (25 x 5) cm M2 Rp. 176,697.50 178 Pasang Rolling Door M2 Rp. 916,505.00 179 Pasang Pintu Lipat (Folding Door) M2 Rp. 494,055.00 180 Pasang Pintu Sunscreen Alluminium M2 #NUM!181 Pasang Pintu Rolling Door Alluminium M2 Rp. 300,125.00 182 Pasang Kusen Pintu Alluminium M2 Rp. 93,302.00 183 Pasang Pintu Alluminium Strip Lebar 8 cm M2 Rp. 615,507.25 184 Pasang Pintu Kaca Rangka Alluminium M2 Rp. 275,390.00 185 Pasang Venetions Blinds M2 Rp. 124,230.63 186 Pasang Vertikals Blinds M2 Rp. 124,230.63 187 Pasang Terali Besi Strip (2x3) cm M2 Rp. 368,957.26 188 Pasang Kawat Nyamuk M2 Rp. 27,764.59 189 Pasang Jendela Nako & Tralis M2 Rp. 228,417.50

H Analisa Biaya Konstruksi Pekerjaan Kunci Dan Kaca

190 Pasang Kunci Tanam Antik Bh Rp. 192,952.50 191 Pasang Kunci Tanam Biasa Bh Rp. 86,057.50 192 Pasang Kunci Tanam amar Mandi Bh Rp. 80,731.25 193 Pasang Kunci Silinder Bh Rp. 85,731.25 194 Pasang Engsel Pintu Bh Rp. 30,738.13 195 Pasang Engsel Jendela Kupu-kupu Bh Rp. 22,158.75 196 Pasang Engsel Angin Bh Rp. 22,675.00 197 Pasang Spring Knip Bh #NUM!198 Pasang Kait Angin Bh Rp. 20,738.13 199 Pasang Door Closer Bh Rp. 45,793.75 200 Pasang Kunci Selot Bh Rp. 29,317.50 201 Pasang Pegangan Pintu / Door Holder Bh Rp. 45,793.75 202 Pasang Door Stop Bh Rp. 17,158.75 203 Pasang Rel Pintu dorong Bh #NUM!204 Pasang Kunci Lemari Bh Rp. 27,896.88 205 Pasang Kaca, Tebal 3 mm M2 Rp. 60,238.13 206 Pasang Kaca, Tebal 5 mm M2 Rp. 71,238.13 207 Pasang Kaca Buram, Tebal 12 mm M2 Rp. 128,346.88

Page 25: Analisa Sni 2011

Page 25

========================================================================================================================

NO URAIAN SAT HARGA SATUAN

208 Pasang Kaca Cermin, Tebal 12 mm M2 Rp. 148,238.13 209 Pasang Kaca Cermin, Tebal 6 mm M2 Rp. 87,738.13 210 Pasang Kaca Cermin, Tebal 8 mm M2 Rp. 105,306.88 211 Pasang Kaca "Wireglass", Tebal 5 mm M2 Rp. 77,806.88 212 Pasang Kaca Patri, Tebal 5 mm M2 Rp. 72,306.88

I Analisa Biaya Konstruksi Pekerjaan Atap

213 Pasang Rangka Kuda-kuda Baja IWF Kg Rp. 13,745.25 214 Pasang Konstruksi Kuda-kuda Konvensional Kayu Klas II M3 Rp. 3,822,300.00 215 Pasang Konstruksi Kuda-kuda Expose Kayu Klas I M3 Rp. 5,943,050.00 216 Pasang Konstruksi Gording Kayu Klas II M3 Rp. 3,390,700.00 217 Pasang Rangka Atap Genteng Keramik Kayu Klas II M2 Rp. 129,762.50 218 Pasang Rangka Atap Genteng Beton Kayu Klas II M2 Rp. 178,062.50 219 Pasang Rangka Atap Sirap Kayu Klas II M2 Rp. 395,915.00 220 Pasangan Rangka Atap Seng M2 Rp. 19,601.25 221 Pasang Atap Genteng Palentong Kecil M2 Rp. 1,281,080.00 222 Pasang Atap Genteng Kodok / Glazzur M2 Rp. 1,281,080.00 223 Pasang Atap Genteng Palentong Super / Besar M2 Rp. 621,330.00 224 Pasang Genteng Bubung Palentong M2 Rp. 156,470.00 225 Pasang Bubung Genteng Kodok Glazzur M2 Rp. 156,470.00 226 Pasang Bubung Genteng Palentong Besar M2 Rp. 133,470.00 227 Pasang Atap Fiber (180 x 90) cm M2 Rp. 43,910.00 228 Pasang Atap Asbes Gelombang (2,50 x 0,92 m) x 5 mm M2 Rp. 32,133.33 229 Pasang Atap Asbes Gelombang (2,25 x 0,92 m) x 5 mm M2 Rp. 33,050.00 230 Pasang Atap Asbes Gelombang (2,00 x 0,92 m) x 5 mm M2 Rp. 27,765.00 231 Pasang Atap Asbes Gelombang (1,80 x 0,92 m) x 5 mm M2 Rp. 30,909.64 232 Pasang Atap Asbes Gelombang (3,00 x 1,05 m) x 4 mm M2 Rp. 35,765.00 233 Pasang Atap Asbes Gelombang (2,70 x 1,05 m) x 4 mm M2 Rp. 30,690.00 234 Pasang Atap Asbes Gelombang (2,40 x 1,05 m) x 4 mm M2 Rp. 29,355.00 235 Pasang Atap Asbes Gelombang (2,10 x 1,05 m) x 4 mm M2 Rp. 29,887.50 236 Pasang Atap Asbes Gelombang (1,5 x 1,05 m) x 4 mm M2 Rp. 31,899.29 237 Pasang Atap Asbes Gelombang (3,00 x 1,08m) x 6 mm M2 Rp. 30,143.33 238 Pasang Atap Asbes Gelombang (2,70 x 1,08m) x 6 mm M2 Rp. 28,860.00 239 Pasang Atap Asbes Gelombang (2,4 x 1,08m) x 6 mm M2 Rp. 30,051.67 240 Pasang Atap Asbes Gelombang (2,1 x 1,08m) x 6 mm M2 Rp. 28,905.83 241 Pasang Atap Asbes Gelombang (1,80 x 1,08m) x 6 mm M2 Rp. 26,865.00 242 Pasang Bubung Stel Gelombang 0,92 M1 Rp. 69,170.36 243 Pasang Non Stek Gelombang 1,05 m M1 Rp. 61,327.50 244 Pasang Non Stek Gelombang 1,08 m M1 Rp. 60,177.50 245 Pasang Nok Paten 0,92 m M1 Rp. 40,627.50 246 Pasang Nok Paten 1,05 m M1 Rp. 40,627.50 247 Pasang Nok Paten 1,08 m M1 Rp. 40,627.50 248 Pasang Nok Stel Rata 0,92 m M1 Rp. 40,547.50 249 Pasang Nok Stel Rata 1,05 m M1 Rp. 38,327.50 250 Pasang Atap Genteng Beton M2 Rp. 574,990.00 251 Pasang Atap Genteng Aspal M2 Rp. 392,165.00 252 Pasang Atap Genteng Metal M2 Rp. 76,150.00 253 Pasang Atap Sirap M2 Rp. 3,072,297.50 254 Pasang Nok Genteng Beton M1 Rp. 130,212.00 255 Pasang Nok Genteng Aspal M1 Rp. 139,567.50 256 Pasang Nok Genteng Metal M1 Rp. 78,615.00 257 Pasang Nok Sirap M1 Rp. 61,947.50 258 Pasang Atap Seng Gelombang BJLS 20 M2 Rp. 35,970.00 261 Pasang Atap Nok Seng M2 Rp. 27,905.00 781 Pasang Atap Alluminium M2 Rp. 110,765.00 782 Pasang Nok Alluminium M2 Rp. 94,090.00 783 Pasang Alluminium Foll / Sisalation M2 #NUM!

Page 26: Analisa Sni 2011

Page 26

========================================================================================================================

NO URAIAN SAT HARGA SATUAN

784 Pasang Lesplank Ukuran (3 x 20) cm, Kayu Klas II M1 Rp. 44,665.00 785 Pasang Lesplank Ukuran (3 x 30) cm, Kayu Klas II M1 Rp. 44,137.50 786 Pasang Talang Datar/Jurai Seng Bjls 28 Lebar 90 cm M1 Rp. 134,382.50 787 Pasang Talang Lingkaran D15 cmSeng Bjls 30 Lebar 45 cm M1 Rp. 86,502.50 788 Pasang Talang Miring, Seng Bjls 28 M1 Rp. 102,216.88 789 Memasang Rangka Atap Baja Ringan M2 Rp. 198,931.59 790 Memasang Rangka Atap Konsul Baja Ringan M2 Rp. 144,902.13

J Analisa Biaya Konstruksi Pekerjaan Langit-langit

791 Pasang Rangka Langit-langit (50 x 100) cm, Kayu Klas II M2 Rp. 66,520.00 792 Pasang Rangka Langit-langit (60 x 60) cm, Kayu Klas II M2 Rp. 70,440.00 793 Langit-langit Asbes Tebal 6 mm M2 Rp. 44,787.50 794 Langit-langit Asbes Tebal 5 mm M2 Rp. 42,037.50 795 Langit-langit Asbes Tebal 4 mm M2 Rp. 44,787.50 796 Langit-langit Akustik (30 x 30) cm M2 Rp. 191,562.50 797 Langit-langit Akustik (30 x 60) cm M2 Rp. 120,827.50 798 Langit-langit Akustik (60 x 120) cm M2 Rp. 124,827.50 799 Langit-langit Plywood (120 x 240) cm, Tebal 4 mm M2 Rp. 28,578.75 800 Langit-langit Lamberziring Kayu, Tebal 9 mm M2 Rp. 115,232.50 801 Langit-langit Gypsum Board (120 x 240), Tebal 9 mm M2 Rp. 55,435.00 802 Langit-langit Akustik (60 x 120) cm Rangka Allumunium M2 Rp. 395,415.00 803 Langit-langit Kayu Profil M1 Rp. 10,195.00

K Analisa Biaya Konstruksi Pekerjaan Sanitasi

804 Memasang Kloset Duduk / Monoblok Bh Rp. 657,617.50 805 Memasang Kloset Duduk Otomatis Bh Rp. 1,664,617.50 806 Memasang Kloset Jongkok Porselen Bh Rp. 445,440.00 807 Memasang Kloset Jongkok Teraso Bh Rp. 365,615.00 808 Memasang Urinoir Bh Rp. 978,140.00 809 Memasang Wastafel Bh Rp. 679,890.00 810 Memasang Bak Mandi Teraso Volume 0,30 m3 Bh Rp. 217,140.00 811 Memasang Bak Mandi Fiberglass Volume 0,30 m3 Bh Rp. 572,625.00 812 Memasang Bak Mandi Batu Bata Volume 0,30 m3 Bh Rp. 1,038,464.72 813 Memasang Badkip Porselen Bh #NUM!814 Memasang Bak Fiberglass Volume 1 m3 Air Bh Rp. 812,250.00 815 Memasang pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 15 cm M1 Rp. 71,468.45 816 Memasang pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 20 cm M1 Rp. 89,837.30 817 Memasang Pipa Beton, Diameter 15 - 20 cm Bh Rp. 78,779.09 818 Memasang Pipa Beton, Diameter 30 - 100 cm Bh Rp. 473,714.00 819 Memasang Bak Kontrol Pasangan Batu Bata Ukuran (30 x 30) cm Bh Rp. 357,386.41 820 Memasang Bak Kontrol Pasangan Batu Bata Ukuran (45 x 45) cm Bh Rp. 342,152.95 821 Memasang Bak Kontrol Pasangan Batu Bata Ukuran (60 x 60) cm Bh Rp. 522,407.19 822 Memasang Pipa Galvanis Diameter 1/2" M1 Rp. 36,855.00 823 Memasang Pipa Galvanis Diameter 3/4" M1 Rp. 51,435.00 824 Memasang Pipa Galvanis Diameter 1" M1 Rp. 75,735.00 825 Memasang Pipa Galvanis Diameter 1 1/2" M1 Rp. 107,689.50 826 Memasang Pipa Galvanis Diameter 3" M1 Rp. 140,089.50 827 Memasang Pipa Galvanis Diameter 4" M1 Rp. 169,040.25 828 Memasang Pipa PVC Tipe AW Diameter 1/2" M1 Rp. 12,271.50 829 Memasang Pipa PVC Tipe AW Diameter 3/4" M1 Rp. 14,296.50 830 Memasang Pipa PVC Tipe AW Diameter 1" M1 Rp. 16,321.50 831 Memasang Pipa PVC Tipe AW Diameter 1 1/2" M1 Rp. 20,371.50 832 Memasang Pipa PVC Tipe AW Diameter 2" M1 Rp. 31,569.75 833 Memasang Pipa PVC Tipe AW Diameter 2 1/2" M1 Rp. 38,596.50 834 Memasang Pipa PVC Tipe AW Diameter 3" M1 Rp. 58,495.50 835 Memasang Pipa PVC Tipe AW Diameter 4" M1 Rp. 82,795.50 836 Memasang Bak Cuci Piring Stainles Steel Bh Rp. 238,726.25

Page 27: Analisa Sni 2011

Page 27

========================================================================================================================

NO URAIAN SAT HARGA SATUAN

837 Memasang Bak Cuci Piring Teraso Bh Rp. 309,843.75 838 Memasang Kran Diameter 3/4" Atau 1/2" Bh Rp. 43,287.50 839 Memasang Floor Drain Bh Rp. 58,212.50 840 Bak Kontrol BH Rp. 551,696.67 841 Pekerjaan Septictank Kap. 50 Orang BH Rp. 1,030,000.00 842 Pekerjaan Septictank Kap. 25 Orang BH Rp. 967,500.00 843 Pekerjaan Septictank Kap. 15 Orang BH Rp. 817,500.00

L Analisa Biaya Konstruksi Pekerjaan Besi

844 Pasang Besi Profil Kg Rp. 13,745.25 845 Pekerjaan Perakitan Kg Rp. 578.55 846 Pengelasan Dengan Listrik CM Rp. 2,072.00 847 Pasang Kawat Harmonika M2 Rp. 37,608.75 848 Pasang Kawat Kassa M2 Rp. 32,108.75 849 Pasang Kawat Burung M2 Rp. 32,108.75

M Analisa Biaya Konstruksi Pekerjaan Penutup Dinding dan Lantai

850 Pasang Lantai Paving Block M2 Rp. 61,700.00 851 Pasang Lantai Ubin PC Abu-abu Ukuran 40 x 40 cm M2 Rp. 183,791.50 852 Pasang Lantai Ubin PC Abu-abu Ukuran 30 x 30 cm M2 Rp. 107,562.50 853 Pasang Lantai Ubin PC Abu-abu Ukuran 20 x 20 cm M2 #N/A854 Pasang Lantai Ubin Warna Ukuran 40 x 40 cm M2 Rp. 186,716.50 855 Pasang Lantai Ubin Warna Ukuran 30 x 30 cm M2 Rp. 110,937.50 856 Pasang Lantai Ubin Warna Ukuran 20 x 20 cm M2 #N/A857 Pasang Lantai Ubin Teraso Ukuran 40 x 40 cm M2 Rp. 186,716.50 858 Pasang Lantai Ubin Teraso Ukuran 30 x 30 cm M2 Rp. 110,937.50 859 Pasang Lantai Ubin Granito Ukuran 40 x 40 cm M2 Rp. 186,716.50 860 Pasang Lantai Ubin Granito Ukuran 30 x 30 cm M2 Rp. 143,580.00 861 Pasang Lantai Ubin Teralux Kerang Ukuran 40 x 40 cm M2 Rp. 186,784.00 862 Pasang Lantai Ubin Teralux Kerang Ukuran 30 x 30 cm M2 Rp. 110,937.50 863 Pasang Lantai Keramik Ukuran 60 x 60 cm Granito M2 Rp. 219,279.83 864 Pasang Lantai Ubin Teralux Marmer Ukuran 40 x 40 cm M2 Rp. 186,716.50 865 Pasang Lantai Ubin Teralux Marmer Ukuran 30 x 30 cm M2 Rp. 110,937.50 866 Pasang Plint Ubin PC Abu-abu Ukuran 15 x 20 cm M1 #N/A867 Pasang Plint Ubin PC Abu-abu Ukuran 10 x 30 cm M1 #N/A868 Pasang Plint Ubin PC Abu-abu Ukuran 10 x 40 cm M1 #N/A869 Pasang Plint Ubin PC Warna Ukuran 10 x 20 cm M1 #N/A870 Pasang Plint Ubin PC Warna Ukuran 10 x 30 cm M1 #N/A871 Pasang Plint Ubin PC Warna Ukuran 10 x 40 cm M1 #N/A872 Pasang Plint Ubin Teraso Ukuran 10 x 30 cm M1 #N/A873 Pasang Plint Ubin Teraso Ukuran 10 x 40 cm M1 #N/A874 Pasang Plint Ubin Granito Ukuran 10 x 40 cm M1 #N/A875 Pasang Plint Ubin Granito Ukuran 10 x 30 cm M1 #N/A876 Pasang Plint Ubin Teralux Kerang Ukuran 10 x 40 cm M1 #N/A877 Pasang Plint Ubin Teralux Kerang Ukuran 10 x 30 cm M1 #N/A878 Pasang Plint Ubin Teralux Marmer Ukuran 10 x 60 cm M1 #N/A879 Pasang Plint Ubin Teralux Marmer Ukuran 10 x 40 cm M1 #N/A880 Pasang Plint Ubin Teralux Marmer Ukuran 10 x 30 cm M1 #N/A881 Pasang Teraso Cor Ditempat Tebal 3 cm M2 #N/A882 Pasang Lantai Keramik Artistik 10 x 20 cm M2 #N/A883 Pasang Lantai Keramik Artistik 10 x 10 cm M2 #N/A884 Pasang Lantai Keramik Artistik 5 x 20 cm M2 Rp. 1,206,346.77 885 Pasang Lantai Keramik 33 x 33 cm M2 Rp. 132,125.10 886 Pasang Lantai Keramik 30 x 30 cm M2 Rp. 113,264.60 887 Pasang Lantai Keramik 40 x 40 cm M2 Rp. 136,628.13 888 Pasang Lantai Keramik 20 x 20 cm M2 Rp. 121,063.50 889 Pasang Lantai Keramik 10 x 33 cm, variasi/border M2 #N/A

Page 28: Analisa Sni 2011

Page 28

========================================================================================================================

NO URAIAN SAT HARGA SATUAN

890 Pasang Lantai Mosaik 30 x 30 cm, Camp. 1PC : 3PP M2 Rp. 126,118.50 891 Pasang Plint Keramik Artistik 10 x 20 cm M1 Rp. 17,351.85 892 Pasang Plint Keramik Artistik 10 x 10 cm M1 Rp. 21,118.10 893 Pasang Plint Keramik Artistik 5 x 20 cm M1 Rp. 14,212.05 894 Internal Cove Artistik (5 x 5 x 20) cm M1 Rp. 87,308.10 895 Pasang Lantai Marmer (100 x 100) cm M2 #N/A896 Pasang Lantai Karpet M2 Rp. 77,580.00 897 Pasang Underlyer, Tebal 6 mm M2 Rp. 42,724.12 898 Pasang Lantai Parquet M2 Rp. 101,415.00 899 Pasang Lantai Kayu (Gymfloor) M2 Rp. 102,090.00 900 Pasang Dinding Porselin 11 x 11 cm M2 Rp. 119,178.60 901 Pasang Dinding Porselin 10 x 20 cm M2 Rp. 124,967.00 902 Pasang Dinding Porselin 20 x 20 cm M2 Rp. 125,794.50 903 Pasang Dinding Keramik Artistik 10 x 20 cm M2 Rp. 127,617.00 904 Pasang Dinding Keramik Artistik 5 x 20 cm M2 Rp. 127,954.50 905 Pasang Dinding Keramik 10 x 20 cm M2 Rp. 127,617.00 906 Pasang Dinding Keramik 20 x 20 cm M2 Rp. 125,794.50 907 Pasang Dinding Marmer 100 x 100 cm M2 #N/A908 Pasang Dinding Bata Pelapis 7 x 3 x 24 cm M2 Rp. 130,725.10 909 Pasang Dinding Batu Paros M2 Rp. 72,052.50 910 Pasang Dinding Batu Tempel Hitam M2 Rp. 72,052.50 911 Pasang Lantai Vinyl Karet 30 x 30 cm Klas I M2 Rp. 58,237.50 912 Pasang Wallpaper Lebar 50 cm M2 Rp. 89,900.00 913 Floor Hardener M2 Rp. 89,715.00 914 Pasang Lantai Vinyl Karet 30 x 30 cm dengan lem M2 Rp. 16,050.00 915 Pasang Plint Kayu Klas II Ukuran 2 x 10 cm M3 Rp. 21,620.00 916 Pasang Lantai Vinyl Motif Kembang 30 x 30 cm M2 Rp. 55,743.75

N Analisa Biaya Konstruksi Pekerjaan Pengecatan

917 Mengikis / Mengorek Permukaan Cat Tembok Lama M2 Rp. 7,168.75 918 Mencuci Bidang Permukaan Tembok Yang Pernah Di Cat M2 Rp. 7,418.75 919 Mengorek Karat Cat Lama Permukaan Baja Dengan Cara Manual M2 Rp. 7,418.75 920 Menyabun Permukaan Tembok Lama M2 Rp. 7,418.75 921 M2 Rp. 272,150.00

922 Mendempul Dan Menggosok Kayu M2 Rp. 5,748.75 923 Pengecatan Bidang Kayu Lama M2 Rp. 18,540.00 924

M2 Rp. 25,320.00

925M2

Rp. 30,213.75

926 Pelaburan Bidang Kayu Dengan Teak Oil M2 Rp. 16,256.25 927 Pelaburan Bidang Kayu Dengan Politur M2 Rp. 22,358.75 928 Pelaburan Bidang Kayu Dengan Cat Residu Dan Ter M2 Rp. 8,055.00 929 Pelaburan Bidang Kayu dengan Vernis M2 Rp. 20,423.75 930

Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)M2 Rp. 10,829.00

931 Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup) M2 Rp. 8,102.25 932 Melabur Tembok Dengan Kalkarium M2 Rp. 5,602.25 933 Melabur Tembok Dengan Kapur Sirih M2 Rp. 33,545.50 934 Melabur Tembok Lama Dengan Kapur Sirih (Untuk Pemeliharaan) M2 Rp. 50,427.50 935 Pemasangan Wall Paper M2 Rp. 27,203.75 936 Pengecatan Permukaan Baja Dengan Meni Besi M2 Rp. 13,575.00 937 Pengecatan Permukaan Baja Dengan Meni Besi Dan Perancah M2 Rp. 28,250.00 938 M2 Rp. 12,435.00

Mengorek Karat Atau Cat Lama Permukaan Baja Dengan Pancar Pasir (Sanblasting) Dengan ingkat Kebersihan sa 2 1/2

Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup

Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup

Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Manual Sistem 4 Lapis Cat Konvensional Dengan Tebal 200 um

Page 29: Analisa Sni 2011

Page 29

========================================================================================================================

NO URAIAN SAT HARGA SATUAN

939 M2 Rp. 16,785.00

940 M2 Rp. 122,400.00

941 M2 Rp. 81,000.00

Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Manual Sistem 1 Lapis Cat Mutakhir Dengan Tebal 200 um

Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Manual Sistem 3 Lapis Cat Konvensional Dengan Tebal 200 um

Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Semprot (Airless Spray) Dengan Sistem 1 Lapis Cat Mutakhir Dengan Tebal 200 um

Page 30: Analisa Sni 2011

Page 30

========================================================================================================================

DAFTAR HARGA SATUAN PEKERJAAN UNTUK PEKERJAAN SIPIL BANGUNAN

DINAS PEKERJAAN UMUMKOTA PADANG PANJANG

tahun anggaran 2010 (triwulan I)

KETERANGAN

Page 31: Analisa Sni 2011

Page 31

========================================================================================================================

KETERANGAN

Page 32: Analisa Sni 2011

Page 32

========================================================================================================================

KETERANGAN

Page 33: Analisa Sni 2011

Page 33

========================================================================================================================

KETERANGAN

Page 34: Analisa Sni 2011

Page 34

========================================================================================================================

KETERANGAN

Page 35: Analisa Sni 2011

Page 35

========================================================================================================================

KETERANGAN

Page 36: Analisa Sni 2011

Page 36

========================================================================================================================

KETERANGAN

Page 37: Analisa Sni 2011

Page 37

========================================================================================================================

KETERANGAN

Page 38: Analisa Sni 2011

Page 38

========================================================================================================================

KETERANGAN

Page 39: Analisa Sni 2011

Page 39

DAFTAR ANALISA HARGA SATUAN PEKERJAAN UNTUK PEKERJAAN SIPIL BANGUNANDINAS PEKERJAAN UMUMKOTA PADANG PANJANG

tahun anggaran 2010 (triwulan I)

NO URAIAN H. SATUAN UPAH

A Analisa Biaya Konstruksi Pekerjaan Persiapan

1 1 M1 Pagar Sementara Dari Kayu (T. 2M) Rp. 32,700.00

0.0200 OH Mandor Rp. 67,500.00 Rp. 1,350.00

0.0200 OH Kepala Tukang Rp. 67,500.00 Rp. 1,350.00

0.2000 OH Tukang Kayu Rp. 60,000.00 Rp. 12,000.00

0.4000 OH Pekerja Rp. 45,000.00 Rp. 18,000.00

1.2500 Btg Kayu Dolken ø 8-10/400 cm Rp. 16,800.00

2.5000 Kg Semen Portland Rp. 1,040.00

0.0050 M3 Pasir Beton Rp. 80,000.00

0.0090 M3 Kerikil Beton Rp. 90,000.00

0.0720 M3 Kayu 5/7 Klas IV Rp. 1,600,000.00

0.0600 Kg Paku 5 cm - 10 cm Rp. 13,000.00

0.4000 Kg Residu Rp. 15,000.00

2 1 M1 Pagar Sementara Dari Seng Gelombang (T.2M) Rp. 32,700.00

0.0200 OH Mandor Rp. 67,500.00 Rp. 1,350.00

0.0200 OH Kepala Tukang Rp. 67,500.00 Rp. 1,350.00

0.2000 OH Tukang Kayu Rp. 60,000.00 Rp. 12,000.00

0.4000 OH Pekerja Rp. 45,000.00 Rp. 18,000.00

1.2500 Btg Kayu Dolken ø 8-10/400 cm Rp. 16,800.00

2.5000 Kg Semen Portland Rp. 1,040.00

1.2000 Lbr Seng Gelombang 3" x 5" Rp. 40,000.00

0.0050 M3 Pasir Beton Rp. 80,000.00

0.0090 M3 Kerikil Beton Rp. 90,000.00

0.0720 M3 Kayu 5/7 Klas IV Rp. 1,600,000.00

0.0600 Kg Paku 5 cm - 10 cm Rp. 13,000.00

0.4500 Kg Meni Besi Rp. 15,000.00

3 1 M1 Pagar Sementara Dari Kawat Duri (T.1,8M) Rp. 28,200.00

0.0200 OH Mandor Rp. 67,500.00 Rp. 1,350.00

0.0200 OH Kepala Tukang Rp. 67,500.00 Rp. 1,350.00

0.2000 OH Tukang Kayu Rp. 60,000.00 Rp. 12,000.00

0.3000 OH Pekerja Rp. 45,000.00 Rp. 13,500.00

1.0000 Btg Kayu Dolken ø 8-10/400 cm Rp. 16,800.00

2.0000 Kg Semen Portland Rp. 1,040.00

25.0000 Kg Kawat Duri Rp. 12,000.00

0.0050 M3 Pasir Beton Rp. 80,000.00

0.0090 M3 Kerikil Beton Rp. 90,000.00

0.0600 Kg Paku 5 cm - 10 cm Rp. 13,000.00

4 1 M1 Pengukuran dan Pemasangan Bouwplank Rp. 11,512.50

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Kayu Rp. 60,000.00 Rp. 6,000.00

0.1000 OH Pekerja Rp. 45,000.00 Rp. 4,500.00

0.0120 M3 Kayu 5/7 Klas IV Rp. 1,600,000.00

0.0200 Kg Paku 5 cm - 10 cm Rp. 13,000.00

0.0070 M3 Kayu Klas III Papan Rp. 1,600,000.00

5 1 M2 Pembuatan Kantor Sementara dengan Lantai Plesteran Rp. 301,125.00

0.0500 OH Mandor Rp. 67,500.00 Rp. 3,375.00

0.3000 OH Kepala Tukang Rp. 67,500.00 Rp. 20,250.00

2.0000 OH Tukang Kayu Rp. 60,000.00 Rp. 120,000.00

1.0000 OH Tukang Batu Rp. 67,500.00 Rp. 67,500.00

2.0000 OH Pekerja Rp. 45,000.00 Rp. 90,000.00

1.2500 Btg Kayu Dolken ø 8-10/400 cm Rp. 16,800.00

0.1800 M3 Kayu Rp. 2,300,000.00

0.8500 Kg Paku 5 cm - 10 cm Rp. 13,000.00

1.1000 Kg Besi Strip Tebal 5 mm Rp. 15,000.00

35.0000 Kg Semen Portland Rp. 1,040.00

0.1500 M3 Pasir Pasang Rp. 90,000.00

0.1000 M3 Pasir Beton Rp. 80,000.00

0.1500 M3 Kerikil Beton Rp. 90,000.00

30.0000 Bh Batu Bata Rp. 650.00

0.2500 Lbr Seng Plat Rp. 40,000.00

2.0000 Bh Jendela Nako Rp. 3,300.00

0.0800 M2 Kaca Tebal 5 mm Rp. 55,000.00

0.1500 Bh Kunci Tanam Biasa Rp. 55,000.00

0.0600 Lbr Plywood Tebal 4 mm Rp. 48,250.00

6 1 M2 Pembuatan Gudang Semen dan Alat-alat Rp. 181,875.00

0.0500 OH Mandor Rp. 67,500.00 Rp. 3,375.00

0.2000 OH Kepala Tukang Rp. 67,500.00 Rp. 13,500.00

2.0000 OH Tukang Kayu Rp. 60,000.00 Rp. 120,000.00

1.0000 OH Pekerja Rp. 45,000.00 Rp. 45,000.00

1.7000 Btg Kayu Dolken ø 8-10/400 cm Rp. 16,800.00

0.2100 M3 Kayu Rp. 2,300,000.00

0.3000 Kg Paku 5 cm - 10 cm Rp. 13,000.00

10.5000 Kg Semen Portland Rp. 1,040.00

0.0300 M3 Pasir Beton Rp. 80,000.00

0.0500 M3 Kerikil Beton Rp. 90,000.00

1.5000 Lbr Atap Seng BJLS 20 Rp. 37,000.00

Page 40: Analisa Sni 2011

Page 40

NO URAIAN H. SATUAN UPAH

7 1 M2 Pembuatan Rumah Jaga / Konstruksi Kayu Rp. 148,500.00

0.0500 OH Mandor Rp. 67,500.00 Rp. 3,375.00

0.1500 OH Kepala Tukang Rp. 67,500.00 Rp. 10,125.00

1.5000 OH Tukang Kayu Rp. 60,000.00 Rp. 90,000.00

1.0000 OH Pekerja Rp. 45,000.00 Rp. 45,000.00

3.0000 Btg Kayu Dolken ø 8-10/400 cm Rp. 16,800.00

0.2760 M3 Kayu Rp. 2,300,000.00

0.7000 Kg Paku 5 cm - 10 cm Rp. 13,000.00

1.5000 Lbr Atap Seng BJLS 20 Rp. 37,000.00

8 1 M2 Membersihkan Lapangan dan Peralatan Rp. 7,875.00

0.0500 OH Mandor Rp. 67,500.00 Rp. 3,375.00

0.1000 OH Pekerja Rp. 45,000.00 Rp. 4,500.00

9 1 M2 Pembuatan Bedeng Buruh Rp. 181,875.00

0.0500 OH Mandor Rp. 67,500.00 Rp. 3,375.00

0.2000 OH Kepala Tukang Rp. 67,500.00 Rp. 13,500.00

2.0000 OH Tukang Kayu Rp. 60,000.00 Rp. 120,000.00

1.0000 OH Pekerja Rp. 45,000.00 Rp. 45,000.00

1.2500 Btg Kayu Dolken ø 8-10/400 cm Rp. 16,800.00

0.1860 M3 Kayu Rp. 2,300,000.00

0.3000 Kg Paku 5 cm - 10 cm Rp. 13,000.00

18.0000 Kg Semen Portland Rp. 1,040.00

0.0300 M3 Pasir Beton Rp. 80,000.00

0.0500 M3 Kerikil Beton Rp. 90,000.00

1.5000 Lbr Atap Seng BJLS 20 Rp. 37,000.00

1.3500 Lbr Plywood Tebal 4 mm Rp. 48,250.00

10 1 M2 Pembuatan Bak Adukan Ukuran (40 x 50 x 20) cm Rp. 18,101.25

0.0015 OH Mandor Rp. 67,500.00 Rp. 101.25

0.3000 OH Tukang Kayu Rp. 60,000.00 Rp. 18,000.00

0.0360 M3 Kayu Merantih Rp. 2,300,000.00

0.0800 Kg Paku 5 cm - 10 cm Rp. 13,000.00

1.0000 Btg Kayu 5/7 (btg) Klas IV Rp. 5,600.00

11 1 M2 Pembuatan Stegger dari Bambu, Ukuran (40 x 50 x 20) cm Rp. 13,282.50

0.0130 OH Mandor Rp. 67,500.00 Rp. 877.50

0.0020 OH Kepala Tukang Rp. 67,500.00 Rp. 135.00

0.0170 OH Tukang Kayu Rp. 60,000.00 Rp. 1,020.00

0.2500 OH Pekerja Rp. 45,000.00 Rp. 11,250.00

1.0000 Btg Bambu Ø 6-8/600 cm Rp. 5,000.00

0.2500 Kg Tali Ijuk Rp. 12,500.00

12 1 M2 Pembuatan Jalan Sementara Rp. 48,375.00

0.0500 OH Mandor Rp. 67,500.00 Rp. 3,375.00

1.0000 OH Pekerja Rp. 45,000.00 Rp. 45,000.00

0.1500 M3 Batu Kali Rp. 90,000.00

0.0900 M3 Batu Kali Rp. 90,000.00

0.0100 M3 Pasir Pasang Rp. 90,000.00

13 1 M3 Bongkaran Beton Bertulang Rp. 322,492.50

0.3330 OH Mandor Rp. 67,500.00 Rp. 22,477.50

6.6670 OH Pekerja Rp. 45,000.00 Rp. 300,015.00

14 1 M3 Bongkaran Dinding Tembok Batu Bata Rp. 300,217.50

0.0030 OH Mandor Rp. 67,500.00 Rp. 202.50

6.6670 OH Pekerja Rp. 45,000.00 Rp. 300,015.00

15 1 M2 Bongkaran Lantai Beton Rp. 5,175.00

0.1000 OH Pekerja Rp. 45,000.00 Rp. 4,500.00

0.0100 OH Mandor Rp. 67,500.00 Rp. 675.00

16 1 M2 Mengupas Plesteran Lama Rp. 24,187.50

0.5000 OH Pekerja Rp. 45,000.00 Rp. 22,500.00

0.0250 OH Mandor Rp. 67,500.00 Rp. 1,687.50

17 1 M2 Menurunkan Atap Genteng/Sirap Rp. 9,675.00

0.2000 OH Pekerja Rp. 45,000.00 Rp. 9,000.00

0.0100 OH Mandor Rp. 67,500.00 Rp. 675.00

18 1 M2 Bongkaran Atap Seng Rp. 2,475.00

0.0500 OH Tukang Besi Rp. 45,000.00 Rp. 2,250.00

0.0050 OH Pekerja Rp. 45,000.00 Rp. 225.00

19 1 M2 Bongkaran Rangka Atap Rp. 6,506.25

0.1000 OH Pekerja Rp. 45,000.00 Rp. 4,500.00

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0250 OH Tukang Kayu Rp. 60,000.00 Rp. 1,500.00

0.0025 OH Kepala Tukang Rp. 67,500.00 Rp. 168.75

20 1 M2 Bongkaran Loteng Papan Rp. 13,680.00

0.2000 OH Pekerja Rp. 45,000.00 Rp. 9,000.00

0.0100 OH Mandor Rp. 67,500.00 Rp. 675.00

0.0600 OH Tukang Kayu Rp. 60,000.00 Rp. 3,600.00

0.0060 OH Kepala Tukang Rp. 67,500.00 Rp. 405.00

21 1 M3 Bongkaran Kayu Kuda-Kuda Rp. 594,000.00

4.0000 OH Pekerja Rp. 45,000.00 Rp. 180,000.00

0.2000 OH Mandor Rp. 67,500.00 Rp. 13,500.00

6.0000 OH Tukang Kayu Rp. 60,000.00 Rp. 360,000.00

0.6000 OH Kepala Tukang Rp. 67,500.00 Rp. 40,500.00

Page 41: Analisa Sni 2011

Page 41

NO URAIAN H. SATUAN UPAH

22 1 M2 Bongkaran Lantai Keramik Rp. 9,675.00

0.2000 OH Pekerja Rp. 45,000.00 Rp. 9,000.00

0.0100 OH Mandor Rp. 67,500.00 Rp. 675.00

23 1 M3 Bongkaran Pondasi Rp. 207,000.00

4.0000 OH Pekerja Rp. 45,000.00 Rp. 180,000.00

0.4000 OH Mandor Rp. 67,500.00 Rp. 27,000.00

24 1 M2 Bongkaran Kuzen Rp. 13,680.00

0.0600 OH Tukang Kayu Rp. 60,000.00 Rp. 3,600.00

0.0060 OH Kepala Tukang Rp. 67,500.00 Rp. 405.00

0.2000 OH Pekerja Rp. 45,000.00 Rp. 9,000.00

0.0100 OH Mandor Rp. 67,500.00 Rp. 675.00

25 1 M2 Bongkaran Jalan Rp. 207,000.00

4.0000 OH Pekerja Rp. 45,000.00 Rp. 180,000.00

0.4000 OH Mandor Rp. 67,500.00 Rp. 27,000.00

26 1 M1 Pasang pagar kawat Jaring Galvanis (Tinggi 1 M) Rp. 4,815.00

0.0020 OH Mandor Rp. 67,500.00 Rp. 135.00

0.0040 OH Kepala Tukang Rp. 67,500.00 Rp. 270.00

0.0420 OH Tukang Kayu Rp. 60,000.00 Rp. 2,520.00

0.0420 OH Pekerja Rp. 45,000.00 Rp. 1,890.00

0.4340 Lbr Pagar kawat Jaring Rp. 160,000.00

27 1 M1 Pasang Pagar Beton Pracetak (5 x 50 x 213) cm Rp. 27,405.00

0.0190 OH Mandor Rp. 67,500.00 Rp. 1,282.50

0.0120 OH Kepala Tukang Rp. 67,500.00 Rp. 810.00

0.1250 OH Tukang Batu Rp. 67,500.00 Rp. 8,437.50

0.3750 OH Pekerja Rp. 45,000.00 Rp. 16,875.00

0.9860 Lbr Panel Beton Pracetak -

0.5250 Btg Kolom Beton Pracetak Rp. 350,000.00

0.0740 M3 Pasir Beton Rp. 80,000.00

0.1460 M3 Koral 2/3 Rp. 135,000.00

45.0000 Kg Semen Abu-abu Rp. 1,040.00

B Analisa Biaya Konstruksi Pekerjaan Tanah

28 1 M3 Galian Tanah Biasa Sedalam 1 meter Rp. 35,437.50

0.0250 OH Mandor Rp. 67,500.00 Rp. 1,687.50

0.7500 OH Pekerja Rp. 45,000.00 Rp. 33,750.00

29 1 M3 Galian Tanah Biasa Sedalam 2 meter Rp. 43,537.50

0.0450 OH Mandor Rp. 67,500.00 Rp. 3,037.50

0.9000 OH Pekerja Rp. 45,000.00 Rp. 40,500.00

30 1 M3 Galian Tanah Biasa Sedalam 3 meter Rp. 51,772.50

0.0670 OH Mandor Rp. 67,500.00 Rp. 4,522.50

1.0500 OH Pekerja Rp. 45,000.00 Rp. 47,250.00

31 1 M3 Galian Tanah Keras Sedalam 1 meter Rp. 47,160.00

0.0320 OH Mandor Rp. 67,500.00 Rp. 2,160.00

1.0000 OH Pekerja Rp. 45,000.00 Rp. 45,000.00

32 1 M3 Galian Tanah Cadas Sedalam 1 meter Rp. 71,550.00

0.0600 OH Mandor Rp. 67,500.00 Rp. 4,050.00

1.5000 OH Pekerja Rp. 45,000.00 Rp. 67,500.00

33 1 M3 Galian Tanah Lumpur Sedalam 1 meter Rp. 57,037.50

0.0450 OH Mandor Rp. 67,500.00 Rp. 3,037.50

1.2000 OH Pekerja Rp. 45,000.00 Rp. 54,000.00

34 1 M2 Pekerjaan Stripping Tebing Setinggi 1 M Rp. 2,587.50

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0500 OH Pekerja Rp. 45,000.00 Rp. 2,250.00

35 1 M3 Pembuangan Tanah Sejauh 30 meter Rp. 15,525.00

0.0100 OH Mandor Rp. 67,500.00 Rp. 675.00

0.3300 OH Pekerja Rp. 45,000.00 Rp. 14,850.00

36 1 M3 Urugan Kembali Rp. 9,922.50

0.0190 OH Mandor Rp. 67,500.00 Rp. 1,282.50

0.1920 OH Pekerja Rp. 45,000.00 Rp. 8,640.00

37 1 M3 Pemadatan Tanah (per 20 cm) Rp. 25,875.00

0.0500 OH Mandor Rp. 67,500.00 Rp. 3,375.00

0.5000 OH Pekerja Rp. 45,000.00 Rp. 22,500.00

38 1 M3 Urugan Pasir Rp. 14,175.00

0.0100 OH Mandor Rp. 67,500.00 Rp. 675.00

0.3000 OH Pekerja Rp. 45,000.00 Rp. 13,500.00

1.2000 M3 Pasir Urug Rp. 45,000.00

39 1 M3 Lapisan Pudel campuran 1 Kp : 3 Ps : 7 TL Rp. 71,100.00

0.0800 OH Mandor Rp. 67,500.00 Rp. 5,400.00

0.0400 OH Kepala Tukang Rp. 67,500.00 Rp. 2,700.00

0.4000 OH Tukang Batu Rp. 67,500.00 Rp. 27,000.00

0.8000 OH Pekerja Rp. 45,000.00 Rp. 36,000.00

0.4000 M3 Pasir Urug Rp. 45,000.00

0.1350 M3 Kapur Padam Rp. 125,000.00

0.9480 M3 Tanah Liat Rp. 35,000.00

40 1 M3 Lapisan Pudel Campuran 1 Kp : 5 TL Rp. 71,100.00

0.0800 OH Mandor Rp. 67,500.00 Rp. 5,400.00

0.0400 OH Kepala Tukang Rp. 67,500.00 Rp. 2,700.00

0.4000 OH Tukang Batu Rp. 67,500.00 Rp. 27,000.00

0.8000 OH Pekerja Rp. 45,000.00 Rp. 36,000.00

Page 42: Analisa Sni 2011

Page 42

NO URAIAN H. SATUAN UPAH

0.2480 M3 Kapur Padam Rp. 125,000.00

1.2480 M3 Tanah Liat Rp. 35,000.00

41 1 M2 Pemasangan Lapisan Ijuk Tebal 10 cm Rp. 7,762.50

0.0150 OH Mandor Rp. 67,500.00 Rp. 1,012.50

0.1500 OH Pekerja Rp. 45,000.00 Rp. 6,750.00

6.0000 Kg Ijuk Rp. 15,000.00

42 1 M3 Urugan Sirtu Padat untuk peninggian lantai bangunan Rp. 12,937.50

0.0250 OH Mandor Rp. 67,500.00 Rp. 1,687.50

0.2500 OH Pekerja Rp. 45,000.00 Rp. 11,250.00

1.2000 M3 Sirtu Rp. 80,000.00

C Analisa Biaya Konstruksi Pekerjaan Pondasi

43 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 3 Ps Rp. 117,112.50

0.0750 OH Mandor Rp. 67,500.00 Rp. 5,062.50

0.0600 OH Kepala Tukang Rp. 67,500.00 Rp. 4,050.00

0.6000 OH Tukang Batu Rp. 67,500.00 Rp. 40,500.00

1.5000 OH Pekerja Rp. 45,000.00 Rp. 67,500.00

1.2000 M3 Batu Kali Rp. 90,000.00

202.0000 Kg Semen Portland Rp. 1,040.00

0.4850 M3 Pasir Pasang Rp. 90,000.00

44 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 4 Ps Rp. 117,112.50

0.0750 OH Mandor Rp. 67,500.00 Rp. 5,062.50

0.0600 OH Kepala Tukang Rp. 67,500.00 Rp. 4,050.00

0.6000 OH Tukang Batu Rp. 67,500.00 Rp. 40,500.00

1.5000 OH Pekerja Rp. 45,000.00 Rp. 67,500.00

1.2000 M3 Batu Kali Rp. 90,000.00

163.0000 Kg Semen Portland Rp. 1,040.00

0.5200 M3 Pasir Pasang Rp. 90,000.00

45 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 5 Ps Rp. 117,112.50

0.0750 OH Mandor Rp. 67,500.00 Rp. 5,062.50

0.0600 OH Kepala Tukang Rp. 67,500.00 Rp. 4,050.00

0.6000 OH Tukang Batu Rp. 67,500.00 Rp. 40,500.00

1.5000 OH Pekerja Rp. 45,000.00 Rp. 67,500.00

1.2000 M3 Batu Kali Rp. 90,000.00

136.0000 Kg Semen Portland Rp. 1,040.00

0.5440 M3 Pasir Pasang Rp. 90,000.00

46 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 6 Ps Rp. 117,112.50

0.0750 OH Mandor Rp. 67,500.00 Rp. 5,062.50

0.0600 OH Kepala Tukang Rp. 67,500.00 Rp. 4,050.00

0.6000 OH Tukang Batu Rp. 67,500.00 Rp. 40,500.00

1.5000 OH Pekerja Rp. 45,000.00 Rp. 67,500.00

1.2000 M3 Batu Kali Rp. 90,000.00

117.0000 Kg Semen Portland Rp. 1,040.00

0.5610 M3 Pasir Pasang Rp. 90,000.00

47 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 8 Ps Rp. 117,112.50

0.0750 OH Mandor Rp. 67,500.00 Rp. 5,062.50

0.0600 OH Kepala Tukang Rp. 67,500.00 Rp. 4,050.00

0.6000 OH Tukang Batu Rp. 67,500.00 Rp. 40,500.00

1.5000 OH Pekerja Rp. 45,000.00 Rp. 67,500.00

1.2000 M3 Batu Kali Rp. 90,000.00

91.0000 Kg Semen Portland Rp. 1,040.00

0.5610 M3 Pasir Pasang Rp. 90,000.00

48 1 M3 Pasang Pondasi Batu Kali, 1 Kp : 1 Sm : 2 Ps Rp. 117,112.50

0.0750 OH Mandor Rp. 67,500.00 Rp. 5,062.50

0.0600 OH Kepala Tukang Rp. 67,500.00 Rp. 4,050.00

0.6000 OH Tukang Batu Rp. 67,500.00 Rp. 40,500.00

1.5000 OH Pekerja Rp. 45,000.00 Rp. 67,500.00

1.2000 M3 Batu Kali Rp. 90,000.00

0.1700 Kg Kapur Pasang Rp. 281.25

0.1700 M3 Semen Merah Rp. 1,200,000.00

0.3400 M3 Pasir Pasang Rp. 90,000.00

49 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 3 Kp : 10 Ps Rp. 117,112.50

0.0750 OH Mandor Rp. 67,500.00 Rp. 5,062.50

0.0600 OH Kepala Tukang Rp. 67,500.00 Rp. 4,050.00

0.6000 OH Tukang Batu Rp. 67,500.00 Rp. 40,500.00

1.5000 OH Pekerja Rp. 45,000.00 Rp. 67,500.00

1.2000 M3 Batu Kali Rp. 90,000.00

61.0000 Kg Semen Portland Rp. 1,040.00

0.1470 Kg Kapur Pasang Rp. 281.25

0.4920 M3 Pasir Pasang Rp. 90,000.00

50 1 M3 Pasang Pondasi Batu Kali, 1/4 Pc : 1 Kp : 4 Ps Rp. 117,112.50

0.0750 OH Mandor Rp. 67,500.00 Rp. 5,062.50

0.0600 OH Kepala Tukang Rp. 67,500.00 Rp. 4,050.00

0.6000 OH Tukang Batu Rp. 67,500.00 Rp. 40,500.00

1.5000 OH Pekerja Rp. 45,000.00 Rp. 67,500.00

1.2000 M3 Batu Kali Rp. 90,000.00

41.0000 Kg Semen Portland Rp. 1,040.00

0.1310 Kg Kapur Pasang Rp. 281.25

0.5230 M3 Pasir Pasang Rp. 90,000.00

Page 43: Analisa Sni 2011

Page 43

NO URAIAN H. SATUAN UPAH

51 1 M3 Pasang Pondasi Batu Kosong (Aanstampang) Rp. 66,690.00

0.0390 OH Mandor Rp. 67,500.00 Rp. 2,632.50

0.0390 OH Kepala Tukang Rp. 67,500.00 Rp. 2,632.50

0.3900 OH Tukang Batu Rp. 67,500.00 Rp. 26,325.00

0.7800 OH Pekerja Rp. 45,000.00 Rp. 35,100.00

1.2000 M3 Batu Kali Rp. 90,000.00

0.4320 M3 Pasir Urug Rp. 45,000.00

52 1 M3 Pasang Pondasi Siklop 60 % Beton 1PC : 2PB : 3KR Rp. 208,237.50

0.1500 OH Mandor Rp. 67,500.00 Rp. 10,125.00

0.0850 OH Kepala Tukang Rp. 67,500.00 Rp. 5,737.50

0.8500 OH Tukang Batu Rp. 67,500.00 Rp. 57,375.00

3.0000 OH Pekerja Rp. 45,000.00 Rp. 135,000.00

126.0000 Kg Besi Beton Polos Rp. 8,000.00

194.0000 Kg Semen Portland Rp. 1,040.00

0.3120 M3 Pasir Beton Rp. 80,000.00

0.4680 M3 Kerikil Beton Rp. 90,000.00

1.8000 Kg Kawat Beton Rp. 14,000.00

53 1 M3 Pasang Pondasi Sumuran Diameter 100 cm Rp. 134,775.00

0.0800 OH Mandor Rp. 67,500.00 Rp. 5,400.00

0.0300 OH Kepala Tukang Rp. 67,500.00 Rp. 2,025.00

0.3000 OH Tukang Batu Rp. 67,500.00 Rp. 20,250.00

2.3800 OH Pekerja Rp. 45,000.00 Rp. 107,100.00

0.4500 M3 Batu Kali Rp. 90,000.00

194.0000 Kg Semen Portland Rp. 1,040.00

0.3120 M3 Pasir Beton Rp. 80,000.00

0.4680 M3 Kerikil Beton Rp. 90,000.00

54 1 BH Pekerjaan Cincin Sumuran Dia. 1 m' Rp. -

0.3500 M3 Pekerjaan Beton K 225 Rp. 595,830.71

0.2075 M2 Pasang Bekisting untuk Pondasi Rp. 108,510.00

55 1 BH Pekerjaan Cincin Sumuran Dia. 1,2 m' Rp. -

0.5000 M3 Pekerjaan Beton K 225 Rp. 595,830.71

0.0575 M2 Pasang Bekisting untuk Pondasi Rp. 108,510.00

56 1 BH Menurunkan Cincin Sumuran Sedalam 1 M Rp. 81,421.88

0.7500 OH Pekerja 1.250 x Rp. 45,000.00 Rp. 42,187.50

0.0250 OH Mandor 1.250 x Rp. 67,500.00 Rp. 2,109.38

0.5000 OH Tukang Batu Rp. 67,500.00 Rp. 33,750.00

0.0500 OH Kepala Tukang Rp. 67,500.00 Rp. 3,375.00

57 1 BH Menurunkan Cincin Sumuran Sedalam 2 M Rp. 90,281.25

0.7500 OH Pekerja 1.500 x Rp. 45,000.00 Rp. 50,625.00

0.0250 OH Mandor 1.500 x Rp. 67,500.00 Rp. 2,531.25

0.5000 OH Tukang Batu Rp. 67,500.00 Rp. 33,750.00

0.0500 OH Kepala Tukang Rp. 67,500.00 Rp. 3,375.00

58 1 BH Menurunkan Cincin Sumuran Sedalam 3 M Rp. 108,000.00

0.7500 OH Pekerja 2.000 x Rp. 45,000.00 Rp. 67,500.00

0.0250 OH Mandor 2.000 x Rp. 67,500.00 Rp. 3,375.00

0.5000 OH Tukang Batu Rp. 67,500.00 Rp. 33,750.00

0.0500 OH Kepala Tukang Rp. 67,500.00 Rp. 3,375.00

59 1 M3 Campuran Batu Kali + Stamp Beton 1:2:3 Rp. -

1.2000 M3 Batu Kali Rp. 90,000.00

0.4500 M3 Pekerjaan Beton K 225 Rp. 595,830.71

60 1 M3 Cyclopen Beton 1:2:3 + 40 % Batu Kali Rp. -

0.6000 M3 Pekerjaan Beton K 225 Rp. 595,830.71

0.4000 M3 Campuran Batu Kali + Stamp Beton 1:2:3 Rp. 376,123.82

61 1 TTK Pekerjaan Pondasi Sumuran Dia. 1 M Kedalamam 1 M Rp. 81,421.88

1.0000 BH Pekerjaan Cincin Sumuran Dia. 1 m' Rp. 231,056.58

1.0000 BH Menurunkan Cincin Sumuran Sedalam 1 M Rp. 81,421.88 Rp. 81,421.88

0.7850 M3 Cyclopen Beton 1:2:3 + 40 % Batu Kali Rp. 507,947.96

62 1 TTK Pekerjaan Pondasi Sumuran Dia. 1 M Kedalamam 2 M Rp. 90,281.25

2.0000 BH Pekerjaan Cincin Sumuran Dia. 1 m' Rp. 231,056.58

1.0000 BH Menurunkan Cincin Sumuran Sedalam 2 M Rp. 90,281.25 Rp. 90,281.25

1.5700 M3 Cyclopen Beton 1:2:3 + 40 % Batu Kali Rp. 507,947.96

63 1 TTK Pekerjaan Pondasi Sumuran Dia. 1 M Kedalamam 3 M Rp. 108,000.00

3.0000 BH Pekerjaan Cincin Sumuran Dia. 1 m' Rp. 231,056.58

1.0000 BH Menurunkan Cincin Sumuran Sedalam 3 M Rp. 108,000.00 Rp. 108,000.00

2.3550 M3 Cyclopen Beton 1:2:3 + 40 % Batu Kali Rp. 507,947.96

64 1 TTK Pekerjaan Pondasi Sumuran Dia. 1,2 M Kedalamam 1 M Rp. 81,421.88

1.0000 BH Pekerjaan Cincin Sumuran Dia. 1,2 m' Rp. 304,154.68

1.0000 BH Menurunkan Cincin Sumuran Sedalam 1 M Rp. 81,421.88 Rp. 81,421.88

1.1304 M3 Cyclopen Beton 1:2:3 + 40 % Batu Kali Rp. 507,947.96

65 1 TTK Pekerjaan Pondasi Sumuran Dia. 1,2 M Kedalamam 2 M Rp. 90,281.25

2.0000 BH Pekerjaan Cincin Sumuran Dia. 1,2 m' Rp. 304,154.68

1.0000 BH Menurunkan Cincin Sumuran Sedalam 2 M Rp. 90,281.25 Rp. 90,281.25

2.2608 M3 Cyclopen Beton 1:2:3 + 40 % Batu Kali Rp. 507,947.96

66 1 TTK Pekerjaan Pondasi Sumuran Dia. 1,2 M Kedalamam 3 M Rp. 108,000.00

3.0000 BH Pekerjaan Cincin Sumuran Dia. 1,2 m' Rp. 304,154.68

1.0000 BH Menurunkan Cincin Sumuran Sedalam 3 M Rp. 108,000.00 Rp. 108,000.00

3.3912 M3 Cyclopen Beton 1:2:3 + 40 % Batu Kali Rp. 507,947.96

D Analisa Biaya Konstruksi Pekerjaan Beton

67 1 M3 Pekerjaan Beton K 100 Rp. 100,305.00

0.0830 OH Mandor Rp. 67,500.00 Rp. 5,602.50

Page 44: Analisa Sni 2011

Page 44

NO URAIAN H. SATUAN UPAH

0.0280 OH Kepala Tukang Rp. 67,500.00 Rp. 1,890.00

0.2750 OH Tukang Batu Rp. 67,500.00 Rp. 18,562.50

1.6500 OH Pekerja Rp. 45,000.00 Rp. 74,250.00

247.0000 Kg Semen Portland Rp. 1,040.00

869.0000 Kg Pasir Beton (kg) Rp. 57.14

999.0000 Kg Kerikil Beton (kg) Rp. 66.67

68 1 M3 Pekerjaan Beton K 125 Rp. 100,305.00

0.0830 OH Mandor Rp. 67,500.00 Rp. 5,602.50

0.0280 OH Kepala Tukang Rp. 67,500.00 Rp. 1,890.00

0.2750 OH Tukang Batu Rp. 67,500.00 Rp. 18,562.50

1.6500 OH Pekerja Rp. 45,000.00 Rp. 74,250.00

276.0000 Kg Semen Portland Rp. 1,040.00

828.0000 Kg Pasir Beton (kg) Rp. 57.14

1,012.0000 Kg Kerikil Beton (kg) Rp. 66.67

69 1 M3 Pekerjaan Beton K 150 Rp. 100,305.00

0.0830 OH Mandor Rp. 67,500.00 Rp. 5,602.50

0.0280 OH Kepala Tukang Rp. 67,500.00 Rp. 1,890.00

0.2750 OH Tukang Batu Rp. 67,500.00 Rp. 18,562.50

1.6500 OH Pekerja Rp. 45,000.00 Rp. 74,250.00

299.0000 Kg Semen Portland Rp. 1,040.00

799.0000 Kg Pasir Beton (kg) Rp. 57.14

1,017.0000 Kg Kerikil Beton (kg) Rp. 66.67

70 1 M3 Pekerjaan Beton K 100 Lantai Kerja Rp. 72,900.00

0.0600 OH Mandor Rp. 67,500.00 Rp. 4,050.00

0.0200 OH Kepala Tukang Rp. 67,500.00 Rp. 1,350.00

0.2000 OH Tukang Batu Rp. 67,500.00 Rp. 13,500.00

1.2000 OH Pekerja Rp. 45,000.00 Rp. 54,000.00

230.0000 Kg Semen Portland Rp. 1,040.00

893.0000 Kg Pasir Beton (kg) Rp. 57.14

1,027.0000 Kg Kerikil Beton (kg) Rp. 66.67

71 1 M3 Pekerjaan Beton K 175 Rp. 100,305.00

0.0830 OH Mandor Rp. 67,500.00 Rp. 5,602.50

0.0280 OH Kepala Tukang Rp. 67,500.00 Rp. 1,890.00

0.2750 OH Tukang Batu Rp. 67,500.00 Rp. 18,562.50

1.6500 OH Pekerja Rp. 45,000.00 Rp. 74,250.00

236.0000 Kg Semen Portland Rp. 1,040.00

760.0000 Kg Pasir Beton (kg) Rp. 57.14

1,029.0000 Kg Kerikil Beton (kg) Rp. 66.67

72 1 M3 Pekerjaan Beton K 200 Rp. 100,305.00

0.0830 OH Mandor Rp. 67,500.00 Rp. 5,602.50

0.0280 OH Kepala Tukang Rp. 67,500.00 Rp. 1,890.00

0.2750 OH Tukang Batu Rp. 67,500.00 Rp. 18,562.50

1.6500 OH Pekerja Rp. 45,000.00 Rp. 74,250.00

352.0000 Kg Semen Portland Rp. 1,040.00

731.0000 Kg Pasir Beton (kg) Rp. 57.14

1,031.0000 Kg Kerikil Beton (kg) Rp. 66.67

73 1 M3 Pekerjaan Beton K 225 Rp. 100,305.00

0.0830 OH Mandor Rp. 67,500.00 Rp. 5,602.50

0.0280 OH Kepala Tukang Rp. 67,500.00 Rp. 1,890.00

0.2750 OH Tukang Batu Rp. 67,500.00 Rp. 18,562.50

1.6500 OH Pekerja Rp. 45,000.00 Rp. 74,250.00

371.0000 Kg Semen Portland Rp. 1,040.00

698.0000 Kg Pasir Beton (kg) Rp. 57.14

1,047.0000 Kg Kerikil Beton (kg) Rp. 66.67

74 1 M3 Pekerjaan Beton K 250 Rp. 100,305.00

0.0830 OH Mandor Rp. 67,500.00 Rp. 5,602.50

0.0280 OH Kepala Tukang Rp. 67,500.00 Rp. 1,890.00

0.2750 OH Tukang Batu Rp. 67,500.00 Rp. 18,562.50

1.6500 OH Pekerja Rp. 45,000.00 Rp. 74,250.00

384.0000 Kg Semen Portland Rp. 1,040.00

692.0000 Kg Pasir Beton (kg) Rp. 57.14

1,039.0000 Kg Kerikil Beton (kg) Rp. 66.67

75 1 M3 Pekerjaan Beton K 275 Rp. 100,305.00

0.0830 OH Mandor Rp. 67,500.00 Rp. 5,602.50

0.0280 OH Kepala Tukang Rp. 67,500.00 Rp. 1,890.00

0.2750 OH Tukang Batu Rp. 67,500.00 Rp. 18,562.50

1.6500 OH Pekerja Rp. 45,000.00 Rp. 74,250.00

406.0000 Kg Semen Portland Rp. 1,040.00

684.0000 Kg Pasir Beton (kg) Rp. 57.14

1,026.0000 Kg Kerikil Beton (kg) Rp. 66.67

76 1 M3 Pekerjaan Beton K 300 Rp. 100,305.00

0.0830 OH Mandor Rp. 67,500.00 Rp. 5,602.50

0.0280 OH Kepala Tukang Rp. 67,500.00 Rp. 1,890.00

0.2750 OH Tukang Batu Rp. 67,500.00 Rp. 18,562.50

1.6500 OH Pekerja Rp. 45,000.00 Rp. 74,250.00

413.0000 Kg Semen Portland Rp. 1,040.00

681.0000 Kg Pasir Beton (kg) Rp. 57.14

1,021.0000 Kg Kerikil Beton (kg) Rp. 66.67

77 1 M3 Pekerjaan Beton K 325 Rp. 127,575.00

0.1050 OH Mandor Rp. 67,500.00 Rp. 7,087.50

0.0350 OH Kepala Tukang Rp. 67,500.00 Rp. 2,362.50

0.3500 OH Tukang Batu Rp. 67,500.00 Rp. 23,625.00

Page 45: Analisa Sni 2011

Page 45

NO URAIAN H. SATUAN UPAH

2.1000 OH Pekerja Rp. 45,000.00 Rp. 94,500.00

439.0000 Kg Semen Portland Rp. 1,040.00

670.0000 Kg Pasir Beton (kg) Rp. 57.14

1,006.0000 Kg Kerikil Beton (kg) Rp. 66.67

78 1 M3 Pekerjaan Beton K 350 Rp. 127,575.00

0.1050 OH Mandor Rp. 67,500.00 Rp. 7,087.50

0.0350 OH Kepala Tukang Rp. 67,500.00 Rp. 2,362.50

0.3500 OH Tukang Batu Rp. 67,500.00 Rp. 23,625.00

2.1000 OH Pekerja Rp. 45,000.00 Rp. 94,500.00

439.0000 Kg Semen Portland Rp. 1,040.00

670.0000 Kg Pasir Beton (kg) Rp. 57.14

1,006.0000 Kg Kerikil Beton (kg) Rp. 66.67

79 1 M3 Membuat Beton Kedap Air Dengan Stronox - 100 Rp. 127,575.00

0.1050 OH Mandor Rp. 67,500.00 Rp. 7,087.50

0.0350 OH Kepala Tukang Rp. 67,500.00 Rp. 2,362.50

0.3500 OH Tukang Batu Rp. 67,500.00 Rp. 23,625.00

2.1000 OH Pekerja Rp. 45,000.00 Rp. 94,500.00

400.0000 Kg Semen Portland Rp. 1,040.00

0.4800 M3 Pasir Beton Rp. 80,000.00

0.8000 M3 Kerikil Beton Rp. 90,000.00

1.2000 Kg Stronox - 100 Rp. 10,000.00

80 1 M1 Memasang PVC Waterstop Lebar 150 mm Rp. 5,130.00

0.0030 OH Mandor Rp. 67,500.00 Rp. 202.50

0.0030 OH Kepala Tukang Rp. 67,500.00 Rp. 202.50

0.0300 OH Tukang Batu Rp. 67,500.00 Rp. 2,025.00

0.0600 OH Pekerja Rp. 45,000.00 Rp. 2,700.00

1.0500 M1 Waterstop Lebar 150 mm Rp. 150,000.00

81 1 M1 Memasang PVC Waterstop Lebar 200 mm Rp. 6,255.00

0.0070 OH Mandor Rp. 67,500.00 Rp. 472.50

0.0040 OH Kepala Tukang Rp. 67,500.00 Rp. 270.00

0.0350 OH Tukang Batu Rp. 67,500.00 Rp. 2,362.50

0.0700 OH Pekerja Rp. 45,000.00 Rp. 3,150.00

1.0500 M1 Waterstop Lebar 200 mm Rp. 200,000.00

82 1 M1 Memasang PVC Waterstop Lebar 230 mm - 320 mm Rp. 6,840.00

0.0040 OH Mandor Rp. 67,500.00 Rp. 270.00

0.0040 OH Kepala Tukang Rp. 67,500.00 Rp. 270.00

0.0400 OH Tukang Batu Rp. 67,500.00 Rp. 2,700.00

0.0800 OH Pekerja Rp. 45,000.00 Rp. 3,600.00

1.0500 M1 Waterstop Lebar 230 mm Rp. 230,000.00

83 1 Kg Pembesian Dengan Besi Polos Atau Besi Ulir Rp. 704.25

0.0004 OH Mandor Rp. 67,500.00 Rp. 27.00

0.0007 OH Kepala Tukang Rp. 67,500.00 Rp. 47.25

0.0070 OH Tukang Besi Rp. 45,000.00 Rp. 315.00

0.0070 OH Pekerja Rp. 45,000.00 Rp. 315.00

1.0500 Kg Besi Beton (Polos / Ulir) Rp. 8,000.00

0.0150 Kg Kawat Beton Rp. 14,000.00

84 1 Kg Kabel Presstressed Polos / Strands Rp. 504.00

0.0003 OH Mandor Rp. 67,500.00 Rp. 20.25

0.0005 OH Kepala Tukang Rp. 67,500.00 Rp. 33.75

0.0050 OH Tukang Besi Rp. 45,000.00 Rp. 225.00

0.0050 OH Pekerja Rp. 45,000.00 Rp. 225.00

1.0500 Kg Besi Presstressed Polos Rp. 10,000.00

0.0100 Kg Kawat Beton Rp. 14,000.00

85 1 Kg Jaring Kawat Baja / Wire Mesh Rp. 400.50

0.0001 OH Mandor Rp. 67,500.00 Rp. 6.75

0.0025 OH Kepala Tukang Rp. 67,500.00 Rp. 168.75

0.0025 OH Tukang Besi Rp. 45,000.00 Rp. 112.50

0.0025 OH Pekerja Rp. 45,000.00 Rp. 112.50

1.0200 Kg Besi Jaring Kawat Baja Rp. 10,000.00

0.0050 Kg Kawat Beton Rp. 14,000.00

86 1 M2 Pasang Bekisting untuk Pondasi Rp. 38,610.00

0.0260 OH Mandor Rp. 67,500.00 Rp. 1,755.00

0.0260 OH Kepala Tukang Rp. 67,500.00 Rp. 1,755.00

0.2600 OH Tukang Besi Rp. 45,000.00 Rp. 11,700.00

0.5200 OH Pekerja Rp. 45,000.00 Rp. 23,400.00

0.0400 M3 Kayu Klas III Papan Rp. 1,600,000.00

0.3000 Kg Paku 5 cm - 10 cm Rp. 13,000.00

0.1000 Ltr Minyak Bekisting Rp. 20,000.00

87 1 M2 Pasang Bekisting Untuk Sloof Rp. 38,610.00

0.0260 OH Mandor Rp. 67,500.00 Rp. 1,755.00

0.0260 OH Kepala Tukang Rp. 67,500.00 Rp. 1,755.00

0.2600 OH Tukang Besi Rp. 45,000.00 Rp. 11,700.00

0.5200 OH Pekerja Rp. 45,000.00 Rp. 23,400.00

0.0450 M3 Kayu Klas III Papan Rp. 1,600,000.00

0.3000 Kg Paku 5 cm - 10 cm Rp. 13,000.00

0.1000 Ltr Minyak Bekisting Rp. 20,000.00

Page 46: Analisa Sni 2011

Page 46

NO URAIAN H. SATUAN UPAH

88 1 M2 Pasang Bekisting Untuk Kolom Rp. 53,955.00

0.0330 OH Mandor Rp. 67,500.00 Rp. 2,227.50

0.0330 OH Kepala Tukang Rp. 67,500.00 Rp. 2,227.50

0.3300 OH Tukang Kayu Rp. 60,000.00 Rp. 19,800.00

0.6600 OH Pekerja Rp. 45,000.00 Rp. 29,700.00

0.0400 M3 Kayu Klas III Papan Rp. 1,600,000.00

0.4000 Kg Paku 5 cm - 10 cm Rp. 13,000.00

0.2000 Ltr Minyak Bekisting Rp. 20,000.00

0.0150 M3 Kayu Klas II Balok Rp. 2,300,000.00

0.3500 Lbr Plywood Tebal 9 mm Rp. 87,500.00

2.0000 Btg Kayu Dolken Ø-8-10/4 m Galam Rp. 16,800.00

89 1 M2 Pasang Bekisting Untuk Balok Rp. 53,955.00

0.0330 OH Mandor Rp. 67,500.00 Rp. 2,227.50

0.0330 OH Kepala Tukang Rp. 67,500.00 Rp. 2,227.50

0.3300 OH Tukang Kayu Rp. 60,000.00 Rp. 19,800.00

0.6600 OH Pekerja Rp. 45,000.00 Rp. 29,700.00

0.0400 M3 Kayu Klas III Papan Rp. 1,600,000.00

0.4000 Kg Paku 5 cm - 10 cm Rp. 13,000.00

0.2000 Ltr Minyak Bekisting Rp. 20,000.00

0.0180 M3 Kayu Klas II Balok Rp. 2,300,000.00

0.3500 Lbr Plywood Tebal 9 mm Rp. 87,500.00

2.0000 Btg Kayu Dolken Ø-8-10/4 m Galam Rp. 16,800.00

90 1 M2 Pasang Bekisting Untuk Lantai Rp. 53,955.00

0.0330 OH Mandor Rp. 67,500.00 Rp. 2,227.50

0.0330 OH Kepala Tukang Rp. 67,500.00 Rp. 2,227.50

0.3300 OH Tukang Kayu Rp. 60,000.00 Rp. 19,800.00

0.6600 OH Pekerja Rp. 45,000.00 Rp. 29,700.00

0.0400 M3 Kayu Klas III Papan Rp. 1,600,000.00

0.4000 Kg Paku 5 cm - 10 cm Rp. 13,000.00

0.2000 Ltr Minyak Bekisting Rp. 20,000.00

0.0150 M3 Kayu Klas II Balok Rp. 2,300,000.00

0.3500 Lbr Plywood Tebal 9 mm Rp. 87,500.00

6.0000 Btg Kayu Dolken Ø-8-10/4 m Galam Rp. 16,800.00

91 1 M2 Pasang Bekisting Untuk Dinding Rp. 53,955.00

0.0330 OH Mandor Rp. 67,500.00 Rp. 2,227.50

0.0330 OH Kepala Tukang Rp. 67,500.00 Rp. 2,227.50

0.3300 OH Tukang Kayu Rp. 60,000.00 Rp. 19,800.00

0.6600 OH Pekerja Rp. 45,000.00 Rp. 29,700.00

0.0300 M3 Kayu Klas III Papan Rp. 1,600,000.00

0.4000 Kg Paku 5 cm - 10 cm Rp. 13,000.00

0.2000 Ltr Minyak Bekisting Rp. 20,000.00

0.0200 M3 Kayu Klas II Balok Rp. 2,300,000.00

0.3500 Lbr Plywood Tebal 9 mm Rp. 87,500.00

3.0000 Btg Kayu Dolken Ø-8-10/4 m Galam Rp. 16,800.00

4.0000 Bh Formtie / Penjaga Jarak Bekisting / Spacer Rp. 500.00

92 1 M2 Pasang Bekisting Untuk Tangga Rp. 53,955.00

0.0330 OH Mandor Rp. 67,500.00 Rp. 2,227.50

0.0330 OH Kepala Tukang Rp. 67,500.00 Rp. 2,227.50

0.3300 OH Tukang Kayu Rp. 60,000.00 Rp. 19,800.00

0.6600 OH Pekerja Rp. 45,000.00 Rp. 29,700.00

0.0300 M3 Kayu Klas III Papan Rp. 1,600,000.00

0.4000 Kg Paku 5 cm - 10 cm Rp. 13,000.00

0.1500 Ltr Minyak Bekisting Rp. 20,000.00

0.0150 M3 Kayu Klas II Balok Rp. 2,300,000.00

0.3500 Lbr Plywood Tebal 9 mm Rp. 87,500.00

2.0000 Btg Kayu Dolken Ø-8-10/4 m Galam Rp. 16,800.00

93 1 M2 Pasangan Jembatan Pengecoran Beton Rp. 10,627.50

0.0080 OH Mandor Rp. 67,500.00 Rp. 540.00

0.0050 OH Kepala Tukang Rp. 67,500.00 Rp. 337.50

0.0500 OH Tukang Kayu Rp. 60,000.00 Rp. 3,000.00

0.1500 OH Pekerja Rp. 45,000.00 Rp. 6,750.00

0.0264 M3 Kayu Klas III Papan Rp. 1,600,000.00

0.6000 Kg Paku 5 cm - 12 cm Rp. 13,000.00

0.5000 Btg Kayu Dolken Ø-8-10/4 m Galam Rp. 16,800.00

94 1 M3 Membuat Pondasi Beton Bertulang (150 Kg Besi + Bekisting) Rp. 418,087.50

0.2650 OH Mandor Rp. 67,500.00 Rp. 17,887.50

0.2650 OH Kepala Tukang Rp. 67,500.00 Rp. 17,887.50

1.0500 OH Tukang Besi Rp. 45,000.00 Rp. 47,250.00

0.2750 OH Tukang Batu Rp. 67,500.00 Rp. 18,562.50

1.3000 OH Tukang Kayu Rp. 60,000.00 Rp. 78,000.00

5.3000 OH Pekerja Rp. 45,000.00 Rp. 238,500.00

0.2000 M3 Kayu Klas III Papan Rp. 1,600,000.00

1.5000 Kg Paku 5 cm - 12 cm Rp. 13,000.00

Page 47: Analisa Sni 2011

Page 47

NO URAIAN H. SATUAN UPAH

0.4000 Ltr Minyak Bekisting Rp. 20,000.00

157.5000 Kg Besi Beton Polos Rp. 8,000.00

2.2500 Kg Kawat Beton Rp. 14,000.00

336.0000 Kg Semen Portland Rp. 1,040.00

0.5400 M3 Pasir Beton Rp. 80,000.00

0.8100 M3 Kerikil Beton Rp. 90,000.00

95 1 M3 Membuat Sloof Beton Bertulang (200 Kg Besi + Bekisting) Rp. 469,867.50

0.2830 OH Mandor Rp. 67,500.00 Rp. 19,102.50

0.3230 OH Kepala Tukang Rp. 67,500.00 Rp. 21,802.50

1.4000 OH Tukang Besi Rp. 45,000.00 Rp. 63,000.00

0.2750 OH Tukang Batu Rp. 67,500.00 Rp. 18,562.50

1.5600 OH Tukang Kayu Rp. 60,000.00 Rp. 93,600.00

5.6400 OH Pekerja Rp. 45,000.00 Rp. 253,800.00

0.2700 M3 Kayu Klas III Papan Rp. 1,600,000.00

2.0000 Kg Paku 5 cm - 12 cm Rp. 13,000.00

0.6000 Ltr Minyak Bekisting Rp. 20,000.00

210.0000 Kg Besi Beton Polos Rp. 8,000.00

3.0000 Kg Kawat Beton Rp. 14,000.00

336.0000 Kg Semen Portland Rp. 1,040.00

0.5400 M3 Pasir Beton Rp. 80,000.00

0.8100 M3 Kerikil Beton Rp. 90,000.00

96 1 M3 Membuat Kolom Beton Bertulang (300 Kg Besi + Bekisting) Rp. 580,342.50

0.3530 OH Mandor Rp. 67,500.00 Rp. 23,827.50

0.4030 OH Kepala Tukang Rp. 67,500.00 Rp. 27,202.50

2.1000 OH Tukang Besi Rp. 45,000.00 Rp. 94,500.00

0.2750 OH Tukang Batu Rp. 67,500.00 Rp. 18,562.50

1.6500 OH Tukang Kayu Rp. 60,000.00 Rp. 99,000.00

7.0500 OH Pekerja Rp. 45,000.00 Rp. 317,250.00

0.4000 M3 Kayu Klas III Papan Rp. 1,600,000.00

4.0000 Kg Paku 5 cm - 12 cm Rp. 13,000.00

2.0000 Ltr Minyak Bekisting Rp. 20,000.00

315.0000 Kg Besi Beton Polos Rp. 8,000.00

4.5000 Kg Kawat Beton Rp. 14,000.00

336.0000 Kg Semen Portland Rp. 1,040.00

0.5400 M3 Pasir Beton Rp. 80,000.00

0.8100 M3 Kerikil Beton Rp. 90,000.00

0.1500 M3 Kayu Klas II Balok Rp. 2,300,000.00

3.5000 Lbr Plywood Tebal 9 mm Rp. 87,500.00

20.0000 Btg Kayu Dolken Ø-8 cm / 4 m Rp. 16,800.00

97 1 M3 Membuat Balok Beton Bertulang (200 Kg Besi + Bekisting) Rp. 510,255.00

0.3180 OH Mandor Rp. 67,500.00 Rp. 21,465.00

0.3330 OH Kepala Tukang Rp. 67,500.00 Rp. 22,477.50

1.4000 OH Tukang Besi Rp. 45,000.00 Rp. 63,000.00

0.2750 OH Tukang Batu Rp. 67,500.00 Rp. 18,562.50

1.6500 OH Tukang Kayu Rp. 60,000.00 Rp. 99,000.00

6.3500 OH Pekerja Rp. 45,000.00 Rp. 285,750.00

0.3200 M3 Kayu Klas III Papan Rp. 1,600,000.00

3.2000 Kg Paku 5 cm - 12 cm Rp. 13,000.00

1.6000 Ltr Minyak Bekisting Rp. 20,000.00

210.0000 Kg Besi Beton Polos Rp. 8,000.00

3.0000 Kg Kawat Beton Rp. 14,000.00

336.0000 Kg Semen Portland Rp. 1,040.00

0.5400 M3 Pasir Beton Rp. 80,000.00

0.8100 M3 Kerikil Beton Rp. 90,000.00

0.1400 M3 Kayu Klas II Balok Rp. 2,300,000.00

2.8000 Lbr Plywood Tebal 9 mm Rp. 87,500.00

16.0000 Btg Kayu Dolken Ø-8 cm / 4 m Rp. 16,800.00

98 1 M3 Membuat Balok Beton Bertulang (150 Kg Besi + Bekisting) Rp. 418,087.50

0.2650 OH Mandor Rp. 67,500.00 Rp. 17,887.50

0.2650 OH Kepala Tukang Rp. 67,500.00 Rp. 17,887.50

1.0500 OH Tukang Besi Rp. 45,000.00 Rp. 47,250.00

0.2750 OH Tukang Batu Rp. 67,500.00 Rp. 18,562.50

1.3000 OH Tukang Kayu Rp. 60,000.00 Rp. 78,000.00

5.3000 OH Pekerja Rp. 45,000.00 Rp. 238,500.00

0.3200 M3 Kayu Klas III Papan Rp. 1,600,000.00

3.2000 Kg Paku 5 cm - 12 cm Rp. 13,000.00

1.6000 Ltr Minyak Bekisting Rp. 20,000.00

Page 48: Analisa Sni 2011

Page 48

NO URAIAN H. SATUAN UPAH

157.5000 Kg Besi Beton Polos Rp. 8,000.00

2.2500 Kg Kawat Beton Rp. 14,000.00

336.0000 Kg Semen Portland Rp. 1,040.00

0.5400 M3 Pasir Beton Rp. 80,000.00

0.8100 M3 Kerikil Beton Rp. 90,000.00

0.1200 M3 Kayu Klas II Balok Rp. 2,300,000.00

2.8000 Lbr Plywood Tebal 9 mm Rp. 87,500.00

32.0000 Btg Kayu Dolken Ø-8 cm / 4 m Rp. 16,800.00

99 1 M3 Membuat Dinding Beton Bertulang (150 Kg Besi + Bekisting) Rp. 417,885.00

0.2650 OH Mandor Rp. 67,500.00 Rp. 17,887.50

0.2620 OH Kepala Tukang Rp. 67,500.00 Rp. 17,685.00

1.0500 OH Tukang Besi Rp. 45,000.00 Rp. 47,250.00

0.2750 OH Tukang Batu Rp. 67,500.00 Rp. 18,562.50

1.3000 OH Tukang Kayu Rp. 60,000.00 Rp. 78,000.00

5.3000 OH Pekerja Rp. 45,000.00 Rp. 238,500.00

0.2400 M3 Kayu Klas III Papan Rp. 1,600,000.00

3.2000 Kg Paku 5 cm - 12 cm Rp. 13,000.00

1.6000 Ltr Minyak Bekisting Rp. 20,000.00

157.5000 Kg Besi Beton Polos Rp. 8,000.00

2.2500 Kg Kawat Beton Rp. 14,000.00

336.0000 Kg Semen Portland Rp. 1,040.00

0.5400 M3 Pasir Beton Rp. 80,000.00

0.8100 M3 Kerikil Beton Rp. 90,000.00

0.1600 M3 Kayu Klas II Balok Rp. 2,300,000.00

2.8000 Lbr Plywood Tebal 9 mm Rp. 87,500.00

24.0000 Btg Kayu Dolken Ø-8 cm / 4 m Rp. 16,800.00

100 1 M3 Membuat Tangga Beton Bertulang (200 Kg Besi + Bekisting) Rp. 470,317.50

0.2830 OH Mandor Rp. 67,500.00 Rp. 19,102.50

0.3230 OH Kepala Tukang Rp. 67,500.00 Rp. 21,802.50

1.4000 OH Tukang Besi Rp. 45,000.00 Rp. 63,000.00

0.2750 OH Tukang Batu Rp. 67,500.00 Rp. 18,562.50

1.5600 OH Tukang Kayu Rp. 60,000.00 Rp. 93,600.00

5.6500 OH Pekerja Rp. 45,000.00 Rp. 254,250.00

0.2500 M3 Kayu Klas III Papan Rp. 1,600,000.00

3.0000 Kg Paku 5 cm - 12 cm Rp. 13,000.00

1.2000 Ltr Minyak Bekisting Rp. 20,000.00

210.0000 Kg Besi Beton Polos Rp. 8,000.00

3.0000 Kg Kawat Beton Rp. 14,000.00

336.0000 Kg Semen Portland Rp. 1,040.00

0.5400 M3 Pasir Beton Rp. 80,000.00

0.8100 M3 Kerikil Beton Rp. 90,000.00

0.1050 M3 Kayu Klas II Balok Rp. 2,300,000.00

2.5000 Lbr Plywood Tebal 9 mm Rp. 87,500.00

14.0000 Btg Kayu Dolken Ø-8 cm / 4 m Rp. 16,800.00

101 1 M1 Membuat Kolom Penguat Beton Bertulang (11 x 11) cm Rp. 12,562.50

0.0090 OH Mandor Rp. 67,500.00 Rp. 607.50

0.0060 OH Kepala Tukang Rp. 67,500.00 Rp. 405.00

0.0200 OH Tukang Besi Rp. 45,000.00 Rp. 900.00

0.0200 OH Tukang Batu Rp. 67,500.00 Rp. 1,350.00

0.0200 OH Tukang Kayu Rp. 60,000.00 Rp. 1,200.00

0.1800 OH Pekerja Rp. 45,000.00 Rp. 8,100.00

0.0020 M3 Kayu Klas III Papan Rp. 1,600,000.00

0.0100 Kg Paku 5 cm - 12 cm Rp. 13,000.00

3.0000 Kg Besi Beton Polos Rp. 8,000.00

0.4500 Kg Kawat Beton Rp. 14,000.00

4.0000 Kg Semen Portland Rp. 1,040.00

0.0060 M3 Pasir Beton Rp. 80,000.00

0.0090 M3 Kerikil Beton Rp. 90,000.00

102 1 M1 Membuat Ring Balok Beton Bertulang (10 x 15) cm Rp. 20,745.00

0.0150 OH Mandor Rp. 67,500.00 Rp. 1,012.50

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.0330 OH Tukang Besi Rp. 45,000.00 Rp. 1,485.00

0.0330 OH Tukang Batu Rp. 67,500.00 Rp. 2,227.50

0.0330 OH Tukang Kayu Rp. 60,000.00 Rp. 1,980.00

0.2970 OH Pekerja Rp. 45,000.00 Rp. 13,365.00

0.0030 M3 Kayu Klas III Papan Rp. 1,600,000.00

0.0200 Kg Paku 5 cm - 12 cm Rp. 13,000.00

3.6000 Kg Besi Beton Polos Rp. 8,000.00

Page 49: Analisa Sni 2011

Page 49

NO URAIAN H. SATUAN UPAH

0.0500 Kg Kawat Beton Rp. 14,000.00

5.5000 Kg Semen Portland Rp. 1,040.00

0.0090 M3 Pasir Beton Rp. 80,000.00

0.0150 M3 Kerikil Beton Rp. 90,000.00

E Analisa Biaya Konstruksi Pekerjaan Dinding

103 1 M2 Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 2 Ps Rp. 43,875.00

0.0300 OH Mandor Rp. 67,500.00 Rp. 2,025.00

0.0200 OH Kepala Tukang Rp. 67,500.00 Rp. 1,350.00

0.2000 OH Tukang Batu Rp. 67,500.00 Rp. 13,500.00

0.6000 OH Pekerja Rp. 45,000.00 Rp. 27,000.00

140.0000 Bh Batu Bata Rp. 650.00

43.5000 Kg Semen Portland Rp. 1,040.00

0.0800 M3 Pasir Pasang Rp. 90,000.00

104 1 M2 Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 3 Ps Rp. 43,875.00

0.0300 OH Mandor Rp. 67,500.00 Rp. 2,025.00

0.0200 OH Kepala Tukang Rp. 67,500.00 Rp. 1,350.00

0.2000 OH Tukang Batu Rp. 67,500.00 Rp. 13,500.00

0.6000 OH Pekerja Rp. 45,000.00 Rp. 27,000.00

140.0000 Bh Batu Bata Rp. 650.00

32.9500 Kg Semen Portland Rp. 1,040.00

0.0910 M3 Pasir Pasang Rp. 90,000.00

105 1 M2 Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 4 Ps Rp. 43,875.00

0.0300 OH Mandor Rp. 67,500.00 Rp. 2,025.00

0.0200 OH Kepala Tukang Rp. 67,500.00 Rp. 1,350.00

0.2000 OH Tukang Batu Rp. 67,500.00 Rp. 13,500.00

0.6000 OH Pekerja Rp. 45,000.00 Rp. 27,000.00

140.0000 Bh Batu Bata Rp. 650.00

26.5500 Kg Semen Portland Rp. 1,040.00

0.0930 M3 Pasir Pasang Rp. 90,000.00

106 1 M2 Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 5 Ps Rp. 43,875.00

0.0300 OH Mandor Rp. 67,500.00 Rp. 2,025.00

0.0200 OH Kepala Tukang Rp. 67,500.00 Rp. 1,350.00

0.2000 OH Tukang Batu Rp. 67,500.00 Rp. 13,500.00

0.6000 OH Pekerja Rp. 45,000.00 Rp. 27,000.00

140.0000 Bh Batu Bata Rp. 650.00

22.2000 Kg Semen Portland Rp. 1,040.00

0.1020 M3 Pasir Pasang Rp. 90,000.00

107 1 M2 Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 6 Ps Rp. 43,875.00

0.0300 OH Mandor Rp. 67,500.00 Rp. 2,025.00

0.0200 OH Kepala Tukang Rp. 67,500.00 Rp. 1,350.00

0.2000 OH Tukang Batu Rp. 67,500.00 Rp. 13,500.00

0.6000 OH Pekerja Rp. 45,000.00 Rp. 27,000.00

140.0000 Bh Batu Bata Rp. 650.00

18.5000 Kg Semen Portland Rp. 1,040.00

0.1220 M3 Pasir Pasang Rp. 90,000.00

108 1 M2 Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 3 Kp : 10 Ps Rp. 43,875.00

0.0300 OH Mandor Rp. 67,500.00 Rp. 2,025.00

0.0200 OH Kepala Tukang Rp. 67,500.00 Rp. 1,350.00

0.2000 OH Tukang Batu Rp. 67,500.00 Rp. 13,500.00

0.6000 OH Pekerja Rp. 45,000.00 Rp. 27,000.00

140.0000 Bh Batu Bata Rp. 650.00

10.0800 Kg Semen Portland Rp. 1,040.00

0.0925 M3 Pasir Pasang Rp. 90,000.00

0.0275 Kg Kapur Pasang Rp. 281.25

109 1 M2 Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 2 Ps Rp. 21,937.50

0.0150 OH Mandor Rp. 67,500.00 Rp. 1,012.50

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Batu Rp. 67,500.00 Rp. 6,750.00

0.3000 OH Pekerja Rp. 45,000.00 Rp. 13,500.00

70.0000 Bh Batu Bata Rp. 650.00

18.9500 Kg Semen Portland Rp. 1,040.00

0.0380 M3 Pasir Pasang Rp. 90,000.00

110 1 M2 Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 3 Ps Rp. 21,937.50

0.0150 OH Mandor Rp. 67,500.00 Rp. 1,012.50

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Batu Rp. 67,500.00 Rp. 6,750.00

0.3000 OH Pekerja Rp. 45,000.00 Rp. 13,500.00

70.0000 Bh Batu Bata Rp. 650.00

14.3700 Kg Semen Portland Rp. 1,040.00

0.0400 M3 Pasir Pasang Rp. 90,000.00

111 1 M2 Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 4 Ps Rp. 21,937.50

0.0150 OH Mandor Rp. 67,500.00 Rp. 1,012.50

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Batu Rp. 67,500.00 Rp. 6,750.00

Page 50: Analisa Sni 2011

Page 50

NO URAIAN H. SATUAN UPAH

0.3000 OH Pekerja Rp. 45,000.00 Rp. 13,500.00

70.0000 Bh Batu Bata Rp. 650.00

11.5000 Kg Semen Portland Rp. 1,040.00

0.0430 M3 Pasir Pasang Rp. 90,000.00

112 1 M2 Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 5 Ps Rp. 21,937.50

0.0150 OH Mandor Rp. 67,500.00 Rp. 1,012.50

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Batu Rp. 67,500.00 Rp. 6,750.00

0.3000 OH Pekerja Rp. 45,000.00 Rp. 13,500.00

70.0000 Bh Batu Bata Rp. 650.00

9.6800 Kg Semen Portland Rp. 1,040.00

0.0450 M3 Pasir Pasang Rp. 90,000.00

113 1 M2 Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 6 Ps Rp. 21,937.50

0.0150 OH Mandor Rp. 67,500.00 Rp. 1,012.50

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Batu Rp. 67,500.00 Rp. 6,750.00

0.3000 OH Pekerja Rp. 45,000.00 Rp. 13,500.00

70.0000 Bh Batu Bata Rp. 650.00

8.3200 Kg Semen Portland Rp. 1,040.00

0.0490 M3 Pasir Pasang Rp. 90,000.00

114 1 M2 Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 8 Ps Rp. 21,937.50

0.0150 OH Mandor Rp. 67,500.00 Rp. 1,012.50

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Batu Rp. 67,500.00 Rp. 6,750.00

0.3000 OH Pekerja Rp. 45,000.00 Rp. 13,500.00

70.0000 Bh Batu Bata Rp. 650.00

6.5000 Kg Semen Portland Rp. 1,040.00

0.0500 M3 Pasir Pasang Rp. 90,000.00

115 1 M2 Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 3 Kp : 10 Ps Rp. 21,937.50

0.0150 OH Mandor Rp. 67,500.00 Rp. 1,012.50

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Batu Rp. 67,500.00 Rp. 6,750.00

0.3000 OH Pekerja Rp. 45,000.00 Rp. 13,500.00

70.0000 Bh Batu Bata Rp. 650.00

4.5000 Kg Semen Portland Rp. 1,040.00

0.0500 M3 Pasir Pasang Rp. 90,000.00

0.0150 M3 Kapur padam Rp. 125,000.00

116 1 M2 Pasangan Batu Bata Tebal 1/2 Bata, 1 Kp : 1 Sm : 1 Ps Rp. 21,937.50

0.0150 OH Mandor Rp. 67,500.00 Rp. 1,012.50

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Batu Rp. 67,500.00 Rp. 6,750.00

0.3000 OH Pekerja Rp. 45,000.00 Rp. 13,500.00

70.0000 Bh Batu Bata Rp. 650.00

0.0180 M3 Semen Merah Rp. 1,200,000.00

0.0180 M3 Pasir Pasang Rp. 90,000.00

0.0180 M3 Kapur padam Rp. 125,000.00

117 1 M2 Pasangan Batu Bata Tebal 1/2 Bata, 1 Kp : 1 Sm : 2 Ps Rp. 21,937.50

0.0150 OH Mandor Rp. 67,500.00 Rp. 1,012.50

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Batu Rp. 67,500.00 Rp. 6,750.00

0.3000 OH Pekerja Rp. 45,000.00 Rp. 13,500.00

70.0000 Bh Batu Bata Rp. 650.00

0.0140 Kg Semen Portland Rp. 1,040.00

0.0280 M3 Pasir Pasang Rp. 90,000.00

0.0140 M3 Kapur padam Rp. 125,000.00

118 1 M2 Pasangan Dinding Hollowblock (HB.20), 1PC : 3PP Rp. 25,650.00

0.0150 OH Mandor Rp. 67,500.00 Rp. 1,012.50

0.0150 OH Kepala Tukang Rp. 67,500.00 Rp. 1,012.50

0.1500 OH Tukang Batu Rp. 67,500.00 Rp. 10,125.00

0.3000 OH Pekerja Rp. 45,000.00 Rp. 13,500.00

12.5000 Bh Hollow Block (HB.20) Rp. 2,000.00

13.5000 Kg Semen Portland Rp. 1,040.00

0.7280 M3 Pasir Pasang Rp. 90,000.00

0.2800 Kg Besi Beton Polos Rp. 8,000.00

119 1 M2 Pasangan Dinding Hollowblock (HB.20), 1PC : 4PP Rp. 25,650.00

0.0150 OH Mandor Rp. 67,500.00 Rp. 1,012.50

0.0150 OH Kepala Tukang Rp. 67,500.00 Rp. 1,012.50

0.1500 OH Tukang Batu Rp. 67,500.00 Rp. 10,125.00

0.3000 OH Pekerja Rp. 45,000.00 Rp. 13,500.00

12.5000 Bh Hollow Block (HB.20) Rp. 2,000.00

24.5000 Kg Semen Portland Rp. 1,040.00

0.7720 M3 Pasir Pasang Rp. 90,000.00

0.2800 Kg Besi Beton Polos Rp. 8,000.00

120 1 M2 Pasangan Dinding Hollowblock (HB.15), 1PC : 3PP Rp. 26,325.00

0.0180 OH Mandor Rp. 67,500.00 Rp. 1,215.00

0.0120 OH Kepala Tukang Rp. 67,500.00 Rp. 810.00

0.1200 OH Tukang Batu Rp. 67,500.00 Rp. 8,100.00

0.3600 OH Pekerja Rp. 45,000.00 Rp. 16,200.00

Page 51: Analisa Sni 2011

Page 51

NO URAIAN H. SATUAN UPAH

12.5000 Bh Hollow Block (HB.15) Rp. 1,700.00

22.7400 Kg Semen Portland Rp. 1,040.00

0.5500 M3 Pasir Pasang Rp. 90,000.00

0.2800 Kg Besi Beton Polos Rp. 8,000.00

121 1 M2 Pasangan Dinding Hollowblock (HB.15), 1PC : 4PS Rp. 26,325.00

0.0180 OH Mandor Rp. 67,500.00 Rp. 1,215.00

0.0120 OH Kepala Tukang Rp. 67,500.00 Rp. 810.00

0.1200 OH Tukang Batu Rp. 67,500.00 Rp. 8,100.00

0.3600 OH Pekerja Rp. 45,000.00 Rp. 16,200.00

12.5000 Bh Hollow Block (HB.15) Rp. 1,700.00

18.2000 Kg Semen Portland Rp. 1,040.00

0.5820 M3 Pasir Pasang Rp. 90,000.00

0.2800 Kg Besi Beton Polos Rp. 8,000.00

122 1 M2 Pasangan Dinding Hollowblock (HB.10), 1PC : 3PS Rp. 21,937.50

0.0150 OH Mandor Rp. 67,500.00 Rp. 1,012.50

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Batu Rp. 67,500.00 Rp. 6,750.00

0.3000 OH Pekerja Rp. 45,000.00 Rp. 13,500.00

12.5000 Bh Hollow Block (HB.10) Rp. 1,500.00

15.1600 Kg Semen Portland Rp. 1,040.00

0.3640 M3 Pasir Pasang Rp. 90,000.00

0.2800 Kg Besi Beton Polos Rp. 8,000.00

123 1 M2 Pasangan Dinding Hollowblock (HB.10), 1PC : 4PS Rp. 21,937.50

0.0150 OH Mandor Rp. 67,500.00 Rp. 1,012.50

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Batu Rp. 67,500.00 Rp. 6,750.00

0.3000 OH Pekerja Rp. 45,000.00 Rp. 13,500.00

12.5000 Bh Hollow Block (HB.10) Rp. 1,500.00

12.1300 Kg Semen Portland Rp. 1,040.00

0.3800 M3 Pasir Pasang Rp. 90,000.00

0.2800 Kg Besi Beton Polos Rp. 8,000.00

124 1 M2 Pasang Dinding Roster/terawang (12 x 11 x 24) cm, 1PC : 3PP Rp. 21,937.50

0.0150 OH Mandor Rp. 67,500.00 Rp. 1,012.50

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Batu Rp. 67,500.00 Rp. 6,750.00

0.3000 OH Pekerja Rp. 45,000.00 Rp. 13,500.00

36.0000 Bh Roster/terawang Rp. 3,500.00

12.8000 Kg Semen Portland Rp. 1,040.00

0.0350 M3 Pasir Pasang Rp. 90,000.00

125 1 M2 Pasang Dinding Roster/terawang (12 x 11 x 24) cm, 1PC : 4PP Rp. 21,937.50

0.0150 OH Mandor Rp. 67,500.00 Rp. 1,012.50

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Batu Rp. 67,500.00 Rp. 6,750.00

0.3000 OH Pekerja Rp. 45,000.00 Rp. 13,500.00

30.0000 Bh Roster/terawang Rp. 3,500.00

11.0000 Kg Semen Portland Rp. 1,040.00

0.0350 M3 Pasir Pasang Rp. 90,000.00

126 1 M2 Pasang Bata Berongga Ukuran (5 x 11 x 24) cm, 1PC : 3PP Rp. 25,650.00

0.0150 OH Mandor Rp. 67,500.00 Rp. 1,012.50

0.0150 OH Kepala Tukang Rp. 67,500.00 Rp. 1,012.50

0.1500 OH Tukang Batu Rp. 67,500.00 Rp. 10,125.00

0.3000 OH Pekerja Rp. 45,000.00 Rp. 13,500.00

70.0000 Bh Bata Berongga Rp. 1,850.00

14.0000 Kg Semen Portland Rp. 1,040.00

0.0320 M3 Pasir Pasang Rp. 90,000.00

127 1 M2 Pasang Dinding Partisi Rp. 40,050.00

0.6000 OH Tukang Kayu Rp. 60,000.00 Rp. 36,000.00

0.0600 OH Kepala Tukang Rp. 67,500.00 Rp. 4,050.00

1.2000 Lbr Plywood Tebal 4 mm 0.336 x Rp. 48,250.00

0.0350 M3 Kayu Merantih Balok Rp. 2,300,000.00

0.0050 Kg Paku Triplek Rp. 13,000.00

128 1 M2 Pasang Dinding Partisi Double Rp. 120,150.00

1.8000 OH Tukang Kayu Rp. 60,000.00 Rp. 108,000.00

0.1800 OH Kepala Tukang Rp. 67,500.00 Rp. 12,150.00

2.4000 Lbr Plywood Tebal 4 mm 0.336 x Rp. 48,250.00

0.0350 M3 Kayu Merantih Balok Rp. 2,300,000.00

0.0100 Kg Paku Triplek Rp. 13,000.00

129 1 M2 Pasang Dinding Partisi Teakwood Rp. 40,050.00

0.6000 OH Tukang Kayu Rp. 60,000.00 Rp. 36,000.00

0.0600 OH Kepala Tukang Rp. 67,500.00 Rp. 4,050.00

1.2000 M2 Teackwood Rp. 26,388.89

0.0350 M3 Kayu Merantih Balok Rp. 2,300,000.00

0.0050 Kg Paku Triplek Rp. 13,000.00

130 1 M2 Pasang Dinding Partisi Teakwood Double Rp. 120,150.00

Page 52: Analisa Sni 2011

Page 52

NO URAIAN H. SATUAN UPAH

1.8000 OH Tukang Kayu Rp. 60,000.00 Rp. 108,000.00

0.1800 OH Kepala Tukang Rp. 67,500.00 Rp. 12,150.00

2.4000 M2 Teackwood Rp. 26,388.89

0.0350 M3 Kayu Merantih Balok Rp. 2,300,000.00

0.0100 Kg Paku Triplek Rp. 13,000.00

131 1 M2 Pasang Teakwood Rangkap, Rangka Expose Kayu Klas I Rp. 172,200.00

0.0400 OH Mandor Rp. 67,500.00 Rp. 2,700.00

0.2000 OH Kepala Tukang Rp. 67,500.00 Rp. 13,500.00

2.0000 OH Tukang Kayu Rp. 60,000.00 Rp. 120,000.00

0.8000 OH Pekerja Rp. 45,000.00 Rp. 36,000.00

0.0250 M3 Kayu Klas I Papan Rp. 4,200,000.00

0.0300 Kg Paku 1 cm - 2,5 cm Rp. 13,000.00

0.3000 Kg Lem Kayu Rp. 12,000.00

1.0000 Lbr Teakwood Ukuran 90 x 220 x 4 mm Rp. 51,562.50

132 1 M2 Pasang Teakwood Rangkap Lapis Formica, Rangka Expose Kayu Klas II Rp. 205,575.00

0.0400 OH Mandor Rp. 67,500.00 Rp. 2,700.00

0.2500 OH Kepala Tukang Rp. 67,500.00 Rp. 16,875.00

2.5000 OH Tukang Kayu Rp. 60,000.00 Rp. 150,000.00

0.8000 OH Pekerja Rp. 45,000.00 Rp. 36,000.00

0.0250 M3 Kayu Klas II Papan Rp. 2,300,000.00

0.0300 Kg Paku 1 cm - 2,5 cm Rp. 13,000.00

0.8000 Kg Lem Kayu Rp. 12,000.00

1.0000 Lbr Teakwood Ukuran 90 x 220 x 4 mm Rp. 51,562.50

0.5000 Lbr Formica Rp. 51,299.43

133 1 M2 Pasang Rangka Dinding Pemisah (60 x 120) cm Kayu Klas II Rp. 37,327.50

0.0080 OH Mandor Rp. 67,500.00 Rp. 540.00

0.0450 OH Kepala Tukang Rp. 67,500.00 Rp. 3,037.50

0.4500 OH Tukang Kayu Rp. 60,000.00 Rp. 27,000.00

0.1500 OH Pekerja Rp. 45,000.00 Rp. 6,750.00

0.0280 M3 Kayu Klas II Balok Rp. 2,300,000.00

0.1500 Kg Paku 5 cm - 7 cm Rp. 13,000.00

134 1 M2 Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu Klas II Rp. 42,187.50

0.0800 OH Mandor Rp. 67,500.00 Rp. 5,400.00

0.0450 OH Kepala Tukang Rp. 67,500.00 Rp. 3,037.50

0.4500 OH Tukang Kayu Rp. 60,000.00 Rp. 27,000.00

0.1500 OH Pekerja Rp. 45,000.00 Rp. 6,750.00

0.0280 M3 Kayu Klas II Balok Rp. 2,300,000.00

0.1500 Kg Paku 5 cm - 7 cm Rp. 13,000.00

0.8600 Lbr Teakwood Ukuran 120 x 240 x 4 mm Rp. 76,000.00

135 1 M2 Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Klas II Rp. 49,725.00

0.0100 OH Mandor Rp. 67,500.00 Rp. 675.00

0.0600 OH Kepala Tukang Rp. 67,500.00 Rp. 4,050.00

0.6000 OH Tukang Kayu Rp. 60,000.00 Rp. 36,000.00

0.2000 OH Pekerja Rp. 45,000.00 Rp. 9,000.00

0.0280 M3 Kayu Klas II Balok Rp. 2,300,000.00

0.1500 Kg Paku 5 cm - 7 cm Rp. 13,000.00

0.8600 Lbr Plywood Ukuran 120 x 240 x 4 mm Rp. 48,250.00

136 1 M2 Pasang Dinding Lambrizing Dari Papan Kayu Klas I Rp. 149,175.00

0.0300 OH Mandor Rp. 67,500.00 Rp. 2,025.00

0.1800 OH Kepala Tukang Rp. 67,500.00 Rp. 12,150.00

1.8000 OH Tukang Kayu Rp. 60,000.00 Rp. 108,000.00

0.6000 OH Pekerja Rp. 45,000.00 Rp. 27,000.00

0.0070 M3 Kayu Klas I Balok Rp. 4,200,000.00

0.1000 Kg Paku 5 cm - 10 cm Rp. 13,000.00

0.1500 Kg Paku Skrup 10 cm Rp. 16,000.00

137 1 M2 Pasang Dinding Lambrizing Dari Plywood (120 x 240) cm Rp. 6,219.00

0.0013 OH Mandor Rp. 67,500.00 Rp. 87.75

0.0075 OH Kepala Tukang Rp. 67,500.00 Rp. 506.25

0.0750 OH Tukang Kayu Rp. 60,000.00 Rp. 4,500.00

0.0250 OH Pekerja Rp. 45,000.00 Rp. 1,125.00

0.4000 Lbr Plywood Ukuran 120 x 240 x 4 mm Rp. 48,250.00

0.0500 Kg Paku 1 cm - 2,5 cm Rp. 13,000.00

138 1 M2 Pasang Dinding Bilik Rangka Kayu Klas III Rp. 8,175.00

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0050 OH Kepala Tukang Rp. 67,500.00 Rp. 337.50

0.0500 OH Tukang Kayu Rp. 60,000.00 Rp. 3,000.00

0.1000 OH Pekerja Rp. 45,000.00 Rp. 4,500.00

1.5000 M2 Bilik Bambu Rp. 8,000.00

0.0140 M3 Kayu 5/7 Klas IV Rp. 1,600,000.00

0.0050 Kg Paku 5 cm - 7 cm Rp. 13,000.00

F Analisa Biaya Konstruksi Pekerjaan Plesteran

139 1 M2 Plesteran 1 Pc : 1 Ps, Tebal 15 mm Rp. 20,812.50

0.0100 OH Mandor Rp. 67,500.00 Rp. 675.00

0.0150 OH Kepala Tukang Rp. 67,500.00 Rp. 1,012.50

0.1500 OH Tukang Batu Rp. 67,500.00 Rp. 10,125.00

0.2000 OH Pekerja Rp. 45,000.00 Rp. 9,000.00

15.5040 Kg Semen Portland Rp. 1,040.00

Page 53: Analisa Sni 2011

Page 53

NO URAIAN H. SATUAN UPAH

0.0160 M3 Pasir Pasang Rp. 90,000.00

140 1 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm Rp. 20,812.50

0.0100 OH Mandor Rp. 67,500.00 Rp. 675.00

0.0150 OH Kepala Tukang Rp. 67,500.00 Rp. 1,012.50

0.1500 OH Tukang Batu Rp. 67,500.00 Rp. 10,125.00

0.2000 OH Pekerja Rp. 45,000.00 Rp. 9,000.00

10.2240 Kg Semen Portland Rp. 1,040.00

0.0200 M3 Pasir Pasang Rp. 90,000.00

141 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 15 mm Rp. 20,812.50

0.0100 OH Mandor Rp. 67,500.00 Rp. 675.00

0.0150 OH Kepala Tukang Rp. 67,500.00 Rp. 1,012.50

0.1500 OH Tukang Batu Rp. 67,500.00 Rp. 10,125.00

0.2000 OH Pekerja Rp. 45,000.00 Rp. 9,000.00

7.7760 Kg Semen Portland Rp. 1,040.00

0.0230 M3 Pasir Pasang Rp. 90,000.00

142 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 15 mm Rp. 20,812.50

0.0100 OH Mandor Rp. 67,500.00 Rp. 675.00

0.0150 OH Kepala Tukang Rp. 67,500.00 Rp. 1,012.50

0.1500 OH Tukang Batu Rp. 67,500.00 Rp. 10,125.00

0.2000 OH Pekerja Rp. 45,000.00 Rp. 9,000.00

6.2400 Kg Semen Portland Rp. 1,040.00

0.0240 M3 Pasir Pasang Rp. 90,000.00

143 1 M2 Plesteran 1 Pc : 5 Ps, Tebal 15 mm Rp. 20,812.50

0.0100 OH Mandor Rp. 67,500.00 Rp. 675.00

0.0150 OH Kepala Tukang Rp. 67,500.00 Rp. 1,012.50

0.1500 OH Tukang Batu Rp. 67,500.00 Rp. 10,125.00

0.2000 OH Pekerja Rp. 45,000.00 Rp. 9,000.00

5.1840 Kg Semen Portland Rp. 1,040.00

0.0260 M3 Pasir Pasang Rp. 90,000.00

144 1 M2 Plesteran 1 Pc : 6 Ps, Tebal 15 mm Rp. 20,812.50

0.0100 OH Mandor Rp. 67,500.00 Rp. 675.00

0.0150 OH Kepala Tukang Rp. 67,500.00 Rp. 1,012.50

0.1500 OH Tukang Batu Rp. 67,500.00 Rp. 10,125.00

0.2000 OH Pekerja Rp. 45,000.00 Rp. 9,000.00

4.4160 Kg Semen Portland Rp. 1,040.00

0.0270 M3 Pasir Pasang Rp. 90,000.00

145 1 M2 Plesteran 1 Pc : 7 Ps, Tebal 15 mm Rp. 20,812.50

0.0100 OH Mandor Rp. 67,500.00 Rp. 675.00

0.0150 OH Kepala Tukang Rp. 67,500.00 Rp. 1,012.50

0.1500 OH Tukang Batu Rp. 67,500.00 Rp. 10,125.00

0.2000 OH Pekerja Rp. 45,000.00 Rp. 9,000.00

3.9360 Kg Semen Portland Rp. 1,040.00

0.0280 M3 Pasir Pasang Rp. 90,000.00

146 1 M2 Plesteran 1 Pc : 8 Ps, Tebal 15 mm Rp. 20,812.50

0.0100 OH Mandor Rp. 67,500.00 Rp. 675.00

0.0150 OH Kepala Tukang Rp. 67,500.00 Rp. 1,012.50

0.1500 OH Tukang Batu Rp. 67,500.00 Rp. 10,125.00

0.2000 OH Pekerja Rp. 45,000.00 Rp. 9,000.00

3.4560 Kg Semen Portland Rp. 1,040.00

0.0290 M3 Pasir Pasang Rp. 90,000.00

147 1 M2 Plesteran 1 Pc : 0,5 Kp : 3 Ps, Tebal 15 mm Rp. 19,552.50

0.0110 OH Mandor Rp. 67,500.00 Rp. 742.50

0.0120 OH Kepala Tukang Rp. 67,500.00 Rp. 810.00

0.1200 OH Tukang Batu Rp. 67,500.00 Rp. 8,100.00

0.2200 OH Pekerja Rp. 45,000.00 Rp. 9,900.00

5.7600 Kg Semen Portland Rp. 1,040.00

0.0030 M3 Kapur Padam Rp. 125,000.00

0.0130 M3 Pasir Pasang Rp. 90,000.00

148 1 M2 Plesteran 1 Pc : 2 Kp : 8 Ps, Tebal 15 mm Rp. 19,552.50

0.0110 OH Mandor Rp. 67,500.00 Rp. 742.50

0.0120 OH Kepala Tukang Rp. 67,500.00 Rp. 810.00

0.1200 OH Tukang Batu Rp. 67,500.00 Rp. 8,100.00

0.2200 OH Pekerja Rp. 45,000.00 Rp. 9,900.00

3.0000 Kg Semen Portland Rp. 1,040.00

0.0050 M3 Kapur Padam Rp. 125,000.00

0.0200 M3 Pasir Pasang Rp. 90,000.00

149 1 M2 Plesteran 1 Pc : 1 Kp : 1 Ps, Tebal 15 mm Rp. 19,552.50

0.0110 OH Mandor Rp. 67,500.00 Rp. 742.50

0.0120 OH Kepala Tukang Rp. 67,500.00 Rp. 810.00

0.1200 OH Tukang Batu Rp. 67,500.00 Rp. 8,100.00

0.2200 OH Pekerja Rp. 45,000.00 Rp. 9,900.00

0.0090 Kg Semen Portland Rp. 1,040.00

0.0090 M3 Kapur Padam Rp. 125,000.00

0.0090 M3 Pasir Pasang Rp. 90,000.00

150 1 M2 Plesteran 1 Pc : 1 Kp : 2 Ps, Tebal 15 mm Rp. 19,552.50

Page 54: Analisa Sni 2011

Page 54

NO URAIAN H. SATUAN UPAH

0.0110 OH Mandor Rp. 67,500.00 Rp. 742.50

0.0120 OH Kepala Tukang Rp. 67,500.00 Rp. 810.00

0.1200 OH Tukang Batu Rp. 67,500.00 Rp. 8,100.00

0.2200 OH Pekerja Rp. 45,000.00 Rp. 9,900.00

0.0070 Kg Semen Portland Rp. 1,040.00

0.0070 M3 Kapur Padam Rp. 125,000.00

0.0150 M3 Pasir Pasang Rp. 90,000.00

151 1 M2 Plesteran 1 Pc : 2 Ps, Tebal 20 mm Rp. 27,427.50

0.0130 OH Mandor Rp. 67,500.00 Rp. 877.50

0.0200 OH Kepala Tukang Rp. 67,500.00 Rp. 1,350.00

0.2000 OH Tukang Batu Rp. 67,500.00 Rp. 13,500.00

0.2600 OH Pekerja Rp. 45,000.00 Rp. 11,700.00

13.6320 Kg Semen Portland Rp. 1,040.00

0.0270 M3 Pasir Pasang Rp. 90,000.00

152 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 20 mm Rp. 27,427.50

0.0130 OH Mandor Rp. 67,500.00 Rp. 877.50

0.0200 OH Kepala Tukang Rp. 67,500.00 Rp. 1,350.00

0.2000 OH Tukang Batu Rp. 67,500.00 Rp. 13,500.00

0.2600 OH Pekerja Rp. 45,000.00 Rp. 11,700.00

10.3680 Kg Semen Portland Rp. 1,040.00

0.0310 M3 Pasir Pasang Rp. 90,000.00

153 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 20 mm Rp. 27,427.50

0.0130 OH Mandor Rp. 67,500.00 Rp. 877.50

0.0200 OH Kepala Tukang Rp. 67,500.00 Rp. 1,350.00

0.2000 OH Tukang Batu Rp. 67,500.00 Rp. 13,500.00

0.2600 OH Pekerja Rp. 45,000.00 Rp. 11,700.00

8.3200 Kg Semen Portland Rp. 1,040.00

0.0320 M3 Pasir Pasang Rp. 90,000.00

154 1 M2 Plesteran 1 Pc : 5 Ps, Tebal 20 mm Rp. 27,427.50

0.0130 OH Mandor Rp. 67,500.00 Rp. 877.50

0.0200 OH Kepala Tukang Rp. 67,500.00 Rp. 1,350.00

0.2000 OH Tukang Batu Rp. 67,500.00 Rp. 13,500.00

0.2600 OH Pekerja Rp. 45,000.00 Rp. 11,700.00

6.9120 Kg Semen Portland Rp. 1,040.00

0.0350 M3 Pasir Pasang Rp. 90,000.00

155 1 M2 Plesteran 1 Pc : 6 Ps, Tebal 20 mm Rp. 27,427.50

0.0130 OH Mandor Rp. 67,500.00 Rp. 877.50

0.0200 OH Kepala Tukang Rp. 67,500.00 Rp. 1,350.00

0.2000 OH Tukang Batu Rp. 67,500.00 Rp. 13,500.00

0.2600 OH Pekerja Rp. 45,000.00 Rp. 11,700.00

5.8880 Kg Semen Portland Rp. 1,040.00

0.0360 M3 Pasir Pasang Rp. 90,000.00

156 1 M2 Plesteran 1 Pc : 1 Sm : 2 Ps, Tebal 20 mm Rp. 30,150.00

0.0140 OH Mandor Rp. 67,500.00 Rp. 945.00

0.0220 OH Kepala Tukang Rp. 67,500.00 Rp. 1,485.00

0.2200 OH Tukang Batu Rp. 67,500.00 Rp. 14,850.00

0.2860 OH Pekerja Rp. 45,000.00 Rp. 12,870.00

0.0090 M3 Semen Merah Rp. 1,200,000.00

0.0090 M3 Kapur Padam Rp. 125,000.00

0.0180 M3 Pasir Pasang Rp. 90,000.00

157 1 M2 Plesteran Berapen 1 Pc : 5 Ps, Tebal 15 mm Rp. 12,487.50

0.0080 OH Mandor Rp. 67,500.00 Rp. 540.00

0.0070 OH Kepala Tukang Rp. 67,500.00 Rp. 472.50

0.0700 OH Tukang Batu Rp. 67,500.00 Rp. 4,725.00

0.1500 OH Pekerja Rp. 45,000.00 Rp. 6,750.00

5.1840 Kg Semen Portland Rp. 1,040.00

0.0260 M3 Pasir Pasang Rp. 90,000.00

158 1 M2 Plesteran Skoning 1 Pc : 2 Ps, Tebal 10 mm Rp. 30,982.50

0.0030 OH Mandor Rp. 67,500.00 Rp. 202.50

0.0380 OH Kepala Tukang Rp. 67,500.00 Rp. 2,565.00

0.3800 OH Tukang Batu Rp. 67,500.00 Rp. 25,650.00

0.0570 OH Pekerja Rp. 45,000.00 Rp. 2,565.00

0.5000 Kg Semen Portland Rp. 1,040.00

0.0130 M3 Pasir Pasang Rp. 90,000.00

159 1 M2 Plesteran Granito, 1 Pc Warna : 2 Granito, Tebal 10 mm Rp. 12,172.50

0.0250 OH Mandor Rp. 67,500.00 Rp. 1,687.50

0.0020 OH Kepala Tukang Rp. 67,500.00 Rp. 135.00

0.0200 OH Tukang Batu Rp. 67,500.00 Rp. 1,350.00

0.2000 OH Pekerja Rp. 45,000.00 Rp. 9,000.00

10.0000 Kg PC Warna Rp. 2,250.00

15.0000 Kg Batu Granito Rp. 3,500.00

160 1 M2 Plesteran Teraso, 1 Pc Warna : 2 Batu Teraso, Tebal 10 mm Rp. 36,787.50

0.0250 OH Mandor Rp. 67,500.00 Rp. 1,687.50

0.0200 OH Kepala Tukang Rp. 67,500.00 Rp. 1,350.00

0.2000 OH Tukang Batu Rp. 67,500.00 Rp. 13,500.00

0.4500 OH Pekerja Rp. 45,000.00 Rp. 20,250.00

Page 55: Analisa Sni 2011

Page 55

NO URAIAN H. SATUAN UPAH

10.0000 Kg PC Warna Rp. 2,250.00

15.0000 Kg Batu Granito Rp. 3,500.00

161 1 M2 Plesteran Ciprat, 1 Pc : 2 Ps Rp. 19,552.50

0.0130 OH Mandor Rp. 67,500.00 Rp. 877.50

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Batu Rp. 67,500.00 Rp. 6,750.00

0.2500 OH Pekerja Rp. 45,000.00 Rp. 11,250.00

4.3200 Kg Semen Portland Rp. 1,040.00

0.0060 M3 Pasir pasang Rp. 90,000.00

162 1 M2 Plesteran Siar Dinding Batu Bata 20 m' Rp. 12,487.50

0.0080 OH Mandor Rp. 67,500.00 Rp. 540.00

0.0070 OH Kepala Tukang Rp. 67,500.00 Rp. 472.50

0.0700 OH Tukang Batu Rp. 67,500.00 Rp. 4,725.00

0.1500 OH Pekerja Rp. 45,000.00 Rp. 6,750.00

3.1080 Kg Semen Portland Rp. 1,040.00

0.0150 M3 Pasir pasang Rp. 90,000.00

163 1 M2 Plesteran Siar Dinding Conblock 8 m' Rp. 6,277.50

0.0040 OH Mandor Rp. 67,500.00 Rp. 270.00

0.0040 OH Kepala Tukang Rp. 67,500.00 Rp. 270.00

0.0350 OH Tukang Batu Rp. 67,500.00 Rp. 2,362.50

0.0750 OH Pekerja Rp. 45,000.00 Rp. 3,375.00

1.6000 Kg Semen Portland Rp. 1,040.00

164 1 M2 Plesteran Siar Pasangan Batu Kali, 1PC : 2PP Rp. 24,907.50

0.0150 OH Mandor Rp. 67,500.00 Rp. 1,012.50

0.0140 OH Kepala Tukang Rp. 67,500.00 Rp. 945.00

0.1400 OH Tukang Batu Rp. 67,500.00 Rp. 9,450.00

0.3000 OH Pekerja Rp. 45,000.00 Rp. 13,500.00

6.3400 Kg Semen Portland Rp. 1,040.00

0.0120 M3 Pasir pasang Rp. 90,000.00

165 1 M2 Plesteran Acian Rp. 14,715.00

0.0080 OH Mandor Rp. 67,500.00 Rp. 540.00

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Batu Rp. 67,500.00 Rp. 6,750.00

0.1500 OH Pekerja Rp. 45,000.00 Rp. 6,750.00

3.2500 Kg Semen Portland Rp. 1,040.00

0.0150 M3 Pasir pasang Rp. 90,000.00

G Analisa Biaya Konstruksi Kuzen, Pintu dan Jendela

166 1 M3 Pasang Kusen Pintu dan Jendela Kayu Klas I Rp. 1,625,250.00

0.3000 OH Mandor Rp. 67,500.00 Rp. 20,250.00

2.0000 OH Kepala Tukang Rp. 67,500.00 Rp. 135,000.00

20.0000 OH Tukang Kayu Rp. 60,000.00 Rp. 1,200,000.00

6.0000 OH Pekerja Rp. 45,000.00 Rp. 270,000.00

1.1000 M3 Kayu Klas I Balok Rp. 4,200,000.00

1.2500 Kg Paku 10 cm Rp. 13,000.00

1.0000 Kg Lem Kayu Rp. 12,000.00

167 1 M3 Pasang Kusen Pintu dan Jendela Kayu Klas II Rp. 1,505,250.00

0.3000 OH Mandor Rp. 67,500.00 Rp. 20,250.00

2.0000 OH Kepala Tukang Rp. 67,500.00 Rp. 135,000.00

18.0000 OH Tukang Kayu Rp. 60,000.00 Rp. 1,080,000.00

6.0000 OH Pekerja Rp. 45,000.00 Rp. 270,000.00

1.2000 M3 Kayu Klas II Balok Rp. 2,300,000.00

1.2500 Kg Paku 10 cm Rp. 13,000.00

1.0000 Kg Lem Kayu Rp. 12,000.00

168 1 M2 Pasang Pintu Klamp Standar Kayu Klas II Rp. 87,052.50

0.0180 OH Mandor Rp. 67,500.00 Rp. 1,215.00

0.1050 OH Kepala Tukang Rp. 67,500.00 Rp. 7,087.50

1.0500 OH Tukang Kayu Rp. 60,000.00 Rp. 63,000.00

0.3500 OH Pekerja Rp. 45,000.00 Rp. 15,750.00

0.0400 M3 Kayu Klas II Papan Rp. 2,300,000.00

0.0500 Kg Paku 5 cm - 7 cm Rp. 13,000.00

169 1 M2 Pasang Pintu Klamp Sederhana Kayu Klas III Rp. 87,052.50

0.0180 OH Mandor Rp. 67,500.00 Rp. 1,215.00

0.1050 OH Kepala Tukang Rp. 67,500.00 Rp. 7,087.50

1.0500 OH Tukang Kayu Rp. 60,000.00 Rp. 63,000.00

0.3500 OH Pekerja Rp. 45,000.00 Rp. 15,750.00

0.0400 M3 Kayu Klas III Papan Rp. 1,600,000.00

0.0500 Kg Paku 5 cm - 7 cm Rp. 13,000.00

170 1 M2 Pasang Daun Pintu Panel Kayu Klas II Rp. 215,250.00

0.0500 OH Mandor Rp. 67,500.00 Rp. 3,375.00

0.2500 OH Kepala Tukang Rp. 67,500.00 Rp. 16,875.00

2.5000 OH Tukang Kayu Rp. 60,000.00 Rp. 150,000.00

1.0000 OH Pekerja Rp. 45,000.00 Rp. 45,000.00

0.0400 M3 Kayu Klas II Papan Rp. 2,300,000.00

1.0000 Kg Lem Kayu Rp. 12,000.00

171 1 M2 Pasang Pintu dan Jendela Kaca Kayu Klas II Rp. 172,200.00

0.0400 OH Mandor Rp. 67,500.00 Rp. 2,700.00

0.2000 OH Kepala Tukang Rp. 67,500.00 Rp. 13,500.00

2.0000 OH Tukang Kayu Rp. 60,000.00 Rp. 120,000.00

0.8000 OH Pekerja Rp. 45,000.00 Rp. 36,000.00

0.0240 M3 Kayu Klas II Papan Rp. 2,300,000.00

0.3000 Kg Lem Kayu Rp. 12,000.00

Page 56: Analisa Sni 2011

Page 56

NO URAIAN H. SATUAN UPAH

172 1 M2 Pasang Pintu dan Jendela Jalusi Kayu Klas II Rp. 248,625.00

0.0500 OH Mandor Rp. 67,500.00 Rp. 3,375.00

0.3000 OH Kepala Tukang Rp. 67,500.00 Rp. 20,250.00

3.0000 OH Tukang Kayu Rp. 60,000.00 Rp. 180,000.00

1.0000 OH Pekerja Rp. 45,000.00 Rp. 45,000.00

0.0640 M3 Kayu Klas II Papan Rp. 2,300,000.00

0.5000 Kg Lem Kayu Rp. 12,000.00

173 1 M2 Rp. 162,525.00

0.0300 OH Mandor Rp. 67,500.00 Rp. 2,025.00

0.2000 OH Kepala Tukang Rp. 67,500.00 Rp. 13,500.00

2.0000 OH Tukang Kayu Rp. 60,000.00 Rp. 120,000.00

0.6000 OH Pekerja Rp. 45,000.00 Rp. 27,000.00

0.0196 M3 Kayu Klas II Papan Rp. 2,300,000.00

0.0300 Kg Paku 1 cm - 2,5 cm Rp. 13,000.00

0.5000 Kg Lem Kayu Rp. 12,000.00

1.0000 Lbr Plywood Ukuran 90 x 220 x 4 mm Rp. 24,125.00

174 1 M2 Pasang Pintu Plywood Rangkap, Rangka Expose Kayu Klas II Rp. 172,200.00

0.0400 OH Mandor Rp. 67,500.00 Rp. 2,700.00

0.2000 OH Kepala Tukang Rp. 67,500.00 Rp. 13,500.00

2.0000 OH Tukang Kayu Rp. 60,000.00 Rp. 120,000.00

0.8000 OH Pekerja Rp. 45,000.00 Rp. 36,000.00

0.0256 M3 Kayu Klas II Papan Rp. 2,300,000.00

0.0300 Kg Paku 1 cm - 2,5 cm Rp. 13,000.00

0.5000 Kg Lem Kayu Rp. 12,000.00

1.0000 Lbr Plywood Ukuran 90 x 220 x 4 mm Rp. 24,125.00

175 1 M2 Pasang Jalusi Kusen Kayu Klas II Rp. 157,687.50

0.0250 OH Mandor Rp. 67,500.00 Rp. 1,687.50

0.2000 OH Kepala Tukang Rp. 67,500.00 Rp. 13,500.00

2.0000 OH Tukang Kayu Rp. 60,000.00 Rp. 120,000.00

0.5000 OH Pekerja Rp. 45,000.00 Rp. 22,500.00

0.0200 M3 Kayu Klas II Papan Rp. 2,300,000.00

0.1500 Kg Paku 1 cm - 2,5 cm Rp. 13,000.00

176 1 M2 Pasang Jendela Besi Plat Baja Rangkap Tebal 2 mm Rangka Baja Siku Rp. 105,097.50

0.0520 OH Mandor Rp. 67,500.00 Rp. 3,510.00

0.1050 OH Kepala Tukang Rp. 67,500.00 Rp. 7,087.50

1.0500 OH Tukang Besi Konstruksi Rp. 45,000.00 Rp. 47,250.00

1.0500 OH Pekerja Rp. 45,000.00 Rp. 47,250.00

15.0000 Kg Besi Siku L.30.30.3 Rp. 8,000.00

32.8000 Kg Besi Plat Baja Rp. 11,400.00

0.0500 Kg Kawat Las Rp. 22,000.00

177 1 M2 Pasang Rangka Jendela Besi Scuare Tube (25 x 5) cm Rp. 65,047.50

0.0320 OH Mandor Rp. 67,500.00 Rp. 2,160.00

0.0650 OH Kepala Tukang Rp. 67,500.00 Rp. 4,387.50

0.6500 OH Tukang Besi Konstruksi Rp. 45,000.00 Rp. 29,250.00

0.6500 OH Pekerja Rp. 45,000.00 Rp. 29,250.00

4.7600 M1 Besi Scuare Tube Rp. 10,000.00

4.5220 M1 Besi Lis Kaca (1x1) cm Rp. 5,000.00

20.0000 CM Pengelasan Dengan Listrik Rp. 2,072.00

178 1 M2 Pasang Rolling Door Rp. 116,505.00

0.0060 OH Mandor Rp. 67,500.00 Rp. 405.00

0.1200 OH Kepala Tukang Rp. 67,500.00 Rp. 8,100.00

1.2000 OH Tukang Besi Rp. 45,000.00 Rp. 54,000.00

1.2000 OH Pekerja Rp. 45,000.00 Rp. 54,000.00

1.0000 M2 Roll Door Tebal 8mm x Rp. 800,000.00

179 1 M2 Pasang Pintu Lipat (Folding Door) Rp. 44,055.00

0.0220 OH Mandor Rp. 67,500.00 Rp. 1,485.00

0.0440 OH Kepala Tukang Rp. 67,500.00 Rp. 2,970.00

0.4400 OH Tukang Besi Konstruksi Rp. 45,000.00 Rp. 19,800.00

0.4400 OH Pekerja Rp. 45,000.00 Rp. 19,800.00

1.0000 M2 Pintu Lipat Rp. 450,000.00

180 1 M2 Pasang Pintu Sunscreen Alluminium Rp. 45,270.00

0.0040 OH Mandor Rp. 67,500.00 Rp. 270.00

0.0800 OH Kepala Tukang Rp. 67,500.00 Rp. 5,400.00

0.0800 OH Tukang Besi Rp. 45,000.00 Rp. 3,600.00

0.8000 OH Pekerja Rp. 45,000.00 Rp. 36,000.00

1.0000 M2 Sunscreen Alluminium #NUM!

181 1 M2 Pasang Pintu Rolling Door Alluminium Rp. 100,125.00

0.0500 OH Mandor Rp. 67,500.00 Rp. 3,375.00

0.1000 OH Kepala Tukang Rp. 67,500.00 Rp. 6,750.00

1.0000 OH Tukang Besi Rp. 45,000.00 Rp. 45,000.00

1.0000 OH Pekerja Rp. 45,000.00 Rp. 45,000.00

1.0000 M2 Rolling Door Aluminium Rp. 200,000.00

182 1 M2 Pasang Kusen Pintu Alluminium Rp. 4,302.00

0.0021 OH Mandor Rp. 67,500.00 Rp. 141.75

Pasang Pintu Plywood Rangkap, Rangka Tertutup Kayu Klas II (lebar < 90 cm)

Page 57: Analisa Sni 2011

Page 57

NO URAIAN H. SATUAN UPAH

0.0043 OH Kepala Tukang Rp. 67,500.00 Rp. 290.25

0.0430 OH Tukang Besi Rp. 45,000.00 Rp. 1,935.00

0.0430 OH Pekerja Rp. 45,000.00 Rp. 1,935.00

1.0000 M1 Profil Alluminium Rp. 55,000.00

1.0000 M1 Alluminium Strip Rp. 25,000.00

1.0000 Tube Sealent Rp. 9,000.00

183 1 M2 Pasang Pintu Alluminium Strip Lebar 8 cm Rp. 8,507.25

0.0042 OH Mandor Rp. 67,500.00 Rp. 283.50

0.0085 OH Kepala Tukang Rp. 67,500.00 Rp. 573.75

0.0850 OH Tukang Besi Rp. 45,000.00 Rp. 3,825.00

0.0850 OH Pekerja Rp. 45,000.00 Rp. 3,825.00

4.4000 M1 Profil Alluminium Rp. 55,000.00

14.6000 M1 Alluminium Strip Rp. 25,000.00

184 1 M2 Pasang Pintu Kaca Rangka Alluminium Rp. 8,460.00

0.0040 OH Mandor Rp. 67,500.00 Rp. 270.00

0.0080 OH Kepala Tukang Rp. 67,500.00 Rp. 540.00

0.0850 OH Tukang Besi Rp. 45,000.00 Rp. 3,825.00

0.0850 OH Pekerja Rp. 45,000.00 Rp. 3,825.00

4.4000 M1 Profil Alluminium Rp. 55,000.00

4.5000 M1 Profil Kaca Rp. 5,000.00

0.2700 Tube Sealent Rp. 9,000.00

185 1 M2 Pasang Venetions Blinds Rp. 39,230.63

0.0018 OH Mandor Rp. 67,500.00 Rp. 118.13

0.0350 OH Kepala Tukang Rp. 67,500.00 Rp. 2,362.50

0.3500 OH Tukang Kayu Rp. 60,000.00 Rp. 21,000.00

0.3500 OH Pekerja Rp. 45,000.00 Rp. 15,750.00

1.0000 M2 Venetions Blinds Rp. 85,000.00

186 1 M2 Pasang Vertikals Blinds Rp. 39,230.63

0.0018 OH Mandor Rp. 67,500.00 Rp. 118.13

0.0350 OH Kepala Tukang Rp. 67,500.00 Rp. 2,362.50

0.3500 OH Tukang Kayu Rp. 60,000.00 Rp. 21,000.00

0.3500 OH Pekerja Rp. 45,000.00 Rp. 15,750.00

1.0000 M2 Vertikals Blinds Rp. 85,000.00

187 1 M2 Pasang Terali Besi Strip (2x3) cm Rp. 204,750.00

0.0830 OH Mandor Rp. 67,500.00 Rp. 5,602.50

0.1670 OH Kepala Tukang Rp. 67,500.00 Rp. 11,272.50

1.6700 OH Tukang Las Rp. 67,500.00 Rp. 112,725.00

1.6700 OH Pekerja Rp. 45,000.00 Rp. 75,150.00

6.1770 M1 Besi Strip 2 x 3 Rp. 17,500.00

27.0800 CM Pengelasan Dengan Listrik Rp. 2,072.00

188 1 M2 Pasang Kawat Nyamuk Rp. 11,208.75

0.0005 OH Mandor Rp. 67,500.00 Rp. 33.75

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Kayu Rp. 60,000.00 Rp. 6,000.00

0.1000 OH Pekerja Rp. 45,000.00 Rp. 4,500.00

1.1000 M2 Kawat Nyamuk Rp. 15,000.00

0.0200 CM Pengelasan Dengan Listrik Rp. 2,072.00

0.0018 Kg Besi Strip (0,2x2)cm Rp. 8,000.00

189 1 M2 Pasang Jendela Nako & Tralis Rp. 22,417.50

0.0010 OH Mandor Rp. 67,500.00 Rp. 67.50

0.0200 OH Kepala Tukang Rp. 67,500.00 Rp. 1,350.00

0.2000 OH Tukang Kayu Rp. 60,000.00 Rp. 12,000.00

0.2000 OH Pekerja Rp. 45,000.00 Rp. 9,000.00

1.1000 M2 Jendela Nako (Rangka + Kaca 5 mm) Rp. 75,000.00

10.0000 Bh Paku Sekrup 1 cm - 2,5 cm Rp. 100.00

7.0000 M1 Besi Strip 2 x 3 Rp. 17,500.00

H Analisa Biaya Konstruksi Pekerjaan Kunci Dan Kaca

190 1 Bh Pasang Kunci Tanam Antik Rp. 42,952.50

0.0030 OH Mandor Rp. 67,500.00 Rp. 202.50

0.0600 OH Kepala Tukang Rp. 67,500.00 Rp. 4,050.00

0.6000 OH Tukang Kayu Rp. 60,000.00 Rp. 36,000.00

0.0600 OH Pekerja Rp. 45,000.00 Rp. 2,700.00

1.0000 Bh Kunci Tanam Antik Rp. 150,000.00

191 1 Bh Pasang Kunci Tanam Biasa Rp. 31,057.50

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.5000 OH Tukang Kayu Rp. 60,000.00 Rp. 30,000.00

0.0010 OH Pekerja Rp. 45,000.00 Rp. 45.00

1.0000 Bh Kunci Tanam Biasa Rp. 55,000.00

192 1 Bh Pasang Kunci Tanam amar Mandi Rp. 30,731.25

0.0025 OH Mandor Rp. 67,500.00 Rp. 168.75

0.0050 OH Kepala Tukang Rp. 67,500.00 Rp. 337.50

0.5000 OH Tukang Kayu Rp. 60,000.00 Rp. 30,000.00

0.0050 OH Pekerja Rp. 45,000.00 Rp. 225.00

1.0000 Bh Kunci Tanam Kamar Mandi Rp. 50,000.00

193 1 Bh Pasang Kunci Silinder Rp. 30,731.25

0.0025 OH Mandor Rp. 67,500.00 Rp. 168.75

0.0050 OH Kepala Tukang Rp. 67,500.00 Rp. 337.50

0.5000 OH Tukang Kayu Rp. 60,000.00 Rp. 30,000.00

0.0050 OH Pekerja Rp. 45,000.00 Rp. 225.00

1.0000 Bh kunci Silinder Rp. 55,000.00

Page 58: Analisa Sni 2011

Page 58

NO URAIAN H. SATUAN UPAH

194 1 Bh Pasang Engsel Pintu Rp. 10,738.13

0.0008 OH Mandor Rp. 67,500.00 Rp. 50.63

0.0150 OH Kepala Tukang Rp. 67,500.00 Rp. 1,012.50

0.1500 OH Tukang Kayu Rp. 60,000.00 Rp. 9,000.00

0.0150 OH Pekerja Rp. 45,000.00 Rp. 675.00

1.0000 Bh Engsel Pintu Rp. 20,000.00

195 1 Bh Pasang Engsel Jendela Kupu-kupu Rp. 7,158.75

0.0005 OH Mandor Rp. 67,500.00 Rp. 33.75

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Kayu Rp. 60,000.00 Rp. 6,000.00

0.0100 OH Pekerja Rp. 45,000.00 Rp. 450.00

1.0000 Bh Engsel Jendela Rp. 15,000.00

196 1 Bh Pasang Engsel Angin Rp. 14,925.00

0.0100 OH Mandor Rp. 67,500.00 Rp. 675.00

0.0200 OH Kepala Tukang Rp. 67,500.00 Rp. 1,350.00

0.2000 OH Tukang Kayu Rp. 60,000.00 Rp. 12,000.00

0.0200 OH Pekerja Rp. 45,000.00 Rp. 900.00

1.0000 Bh Engsel Angin Rp. 7,750.00

197 1 Bh Pasang Spring Knip Rp. 10,738.13

0.0008 OH Mandor Rp. 67,500.00 Rp. 50.63

0.0150 OH Kepala Tukang Rp. 67,500.00 Rp. 1,012.50

0.1500 OH Tukang Kayu Rp. 60,000.00 Rp. 9,000.00

0.0150 OH Pekerja Rp. 45,000.00 Rp. 675.00

1.0000 Bh Spring Knip #NUM!

198 1 Bh Pasang Kait Angin Rp. 10,738.13

0.0008 OH Mandor Rp. 67,500.00 Rp. 50.63

0.0150 OH Kepala Tukang Rp. 67,500.00 Rp. 1,012.50

0.1500 OH Tukang Kayu Rp. 60,000.00 Rp. 9,000.00

0.0150 OH Pekerja Rp. 45,000.00 Rp. 675.00

1.0000 Bh Kait Angin Rp. 10,000.00

199 1 Bh Pasang Door Closer Rp. 35,793.75

0.0025 OH Mandor Rp. 67,500.00 Rp. 168.75

0.0500 OH Kepala Tukang Rp. 67,500.00 Rp. 3,375.00

0.5000 OH Tukang Kayu Rp. 60,000.00 Rp. 30,000.00

0.0500 OH Pekerja Rp. 45,000.00 Rp. 2,250.00

1.0000 Bh Door Close Rp. 10,000.00

200 1 Bh Pasang Kunci Selot Rp. 14,317.50

0.0010 OH Mandor Rp. 67,500.00 Rp. 67.50

0.0200 OH Kepala Tukang Rp. 67,500.00 Rp. 1,350.00

0.2000 OH Tukang Kayu Rp. 60,000.00 Rp. 12,000.00

0.0200 OH Pekerja Rp. 45,000.00 Rp. 900.00

1.0000 Bh Kunci Selot Rp. 15,000.00

201 1 Bh Pasang Pegangan Pintu / Door Holder Rp. 35,793.75

0.0025 OH Mandor Rp. 67,500.00 Rp. 168.75

0.0500 OH Kepala Tukang Rp. 67,500.00 Rp. 3,375.00

0.5000 OH Tukang Kayu Rp. 60,000.00 Rp. 30,000.00

0.0500 OH Pekerja Rp. 45,000.00 Rp. 2,250.00

1.0000 Bh Door Holder Rp. 10,000.00

202 1 Bh Pasang Door Stop Rp. 7,158.75

0.0005 OH Mandor Rp. 67,500.00 Rp. 33.75

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Kayu Rp. 60,000.00 Rp. 6,000.00

0.0100 OH Pekerja Rp. 45,000.00 Rp. 450.00

1.0000 Bh Door Stop Rp. 10,000.00

203 1 Bh Pasang Rel Pintu dorong Rp. 42,952.50

0.0030 OH Mandor Rp. 67,500.00 Rp. 202.50

0.0600 OH Kepala Tukang Rp. 67,500.00 Rp. 4,050.00

0.6000 OH Tukang Kayu Rp. 60,000.00 Rp. 36,000.00

0.0600 OH Pekerja Rp. 45,000.00 Rp. 2,700.00

1.0000 Bh Rel Pintu Dorong #NUM!

204 1 Bh Pasang Kunci Lemari Rp. 17,896.88

0.0013 OH Mandor Rp. 67,500.00 Rp. 84.38

0.0250 OH Kepala Tukang Rp. 67,500.00 Rp. 1,687.50

0.2500 OH Tukang Kayu Rp. 60,000.00 Rp. 15,000.00

0.0250 OH Pekerja Rp. 45,000.00 Rp. 1,125.00

1.0000 Bh Kunci Lemari Rp. 10,000.00

205 1 M2 Pasang Kaca, Tebal 3 mm Rp. 10,738.13

0.0008 OH Mandor Rp. 67,500.00 Rp. 50.63

0.0150 OH Kepala Tukang Rp. 67,500.00 Rp. 1,012.50

0.1500 OH Tukang Kayu Rp. 60,000.00 Rp. 9,000.00

0.0150 OH Pekerja Rp. 45,000.00 Rp. 675.00

1.1000 M2 Kaca Tebal 3 mm Rp. 45,000.00

206 1 M2 Pasang Kaca, Tebal 5 mm Rp. 10,738.13

0.0008 OH Mandor Rp. 67,500.00 Rp. 50.63

0.0150 OH Kepala Tukang Rp. 67,500.00 Rp. 1,012.50

0.1500 OH Tukang Kayu Rp. 60,000.00 Rp. 9,000.00

0.0150 OH Pekerja Rp. 45,000.00 Rp. 675.00

1.1000 M2 Kaca Tebal 5 mm Rp. 55,000.00

207 1 M2 Pasang Kaca Buram, Tebal 12 mm Rp. 17,896.88

Page 59: Analisa Sni 2011

Page 59

NO URAIAN H. SATUAN UPAH

0.0013 OH Mandor Rp. 67,500.00 Rp. 84.38

0.0250 OH Kepala Tukang Rp. 67,500.00 Rp. 1,687.50

0.2500 OH Tukang Kayu Rp. 60,000.00 Rp. 15,000.00

0.0250 OH Pekerja Rp. 45,000.00 Rp. 1,125.00

1.1000 M2 Kaca Buram 12 mm Rp. 100,000.00

0.0500 Tube Sealent Rp. 9,000.00

208 1 M2 Pasang Kaca Cermin, Tebal 12 mm Rp. 10,738.13

0.0008 OH Mandor Rp. 67,500.00 Rp. 50.63

0.0150 OH Kepala Tukang Rp. 67,500.00 Rp. 1,012.50

0.1500 OH Tukang Kayu Rp. 60,000.00 Rp. 9,000.00

0.0150 OH Pekerja Rp. 45,000.00 Rp. 675.00

1.1000 M2 Kaca Cermin 12 mm Rp. 125,000.00

209 1 M2 Pasang Kaca Cermin, Tebal 6 mm Rp. 10,738.13

0.0008 OH Mandor Rp. 67,500.00 Rp. 50.63

0.0150 OH Kepala Tukang Rp. 67,500.00 Rp. 1,012.50

0.1500 OH Tukang Kayu Rp. 60,000.00 Rp. 9,000.00

0.0150 OH Pekerja Rp. 45,000.00 Rp. 675.00

1.1000 M2 Kaca Cermin 6 mm Rp. 70,000.00

210 1 M2 Pasang Kaca Cermin, Tebal 8 mm Rp. 11,806.88

0.0008 OH Mandor Rp. 67,500.00 Rp. 50.63

0.0165 OH Kepala Tukang Rp. 67,500.00 Rp. 1,113.75

0.1650 OH Tukang Kayu Rp. 60,000.00 Rp. 9,900.00

0.0165 OH Pekerja Rp. 45,000.00 Rp. 742.50

1.1000 M2 Kaca Cermin 8 mm Rp. 85,000.00

211 1 M2 Pasang Kaca "Wireglass", Tebal 5 mm Rp. 11,806.88

0.0008 OH Mandor Rp. 67,500.00 Rp. 50.63

0.0165 OH Kepala Tukang Rp. 67,500.00 Rp. 1,113.75

0.1650 OH Tukang Kayu Rp. 60,000.00 Rp. 9,900.00

0.0165 OH Pekerja Rp. 45,000.00 Rp. 742.50

1.1000 M2 Kaca Wireglass 5 mm Rp. 60,000.00

212 1 M2 Pasang Kaca Patri, Tebal 5 mm Rp. 11,806.88

0.0008 OH Mandor Rp. 67,500.00 Rp. 50.63

0.0165 OH Kepala Tukang Rp. 67,500.00 Rp. 1,113.75

0.1650 OH Tukang Kayu Rp. 60,000.00 Rp. 9,900.00

0.0165 OH Pekerja Rp. 45,000.00 Rp. 742.50

1.1000 M2 Kaca Patri 5 mm Rp. 55,000.00

I Analisa Biaya Konstruksi Pekerjaan Atap

213 1 Kg Pasang Rangka Kuda-kuda Baja IWF Rp. 3,395.25

0.0003 OH Mandor Rp. 67,500.00 Rp. 20.25

0.0060 OH Kepala Tukang Rp. 67,500.00 Rp. 405.00

0.0060 OH Tukang Besi Rp. 45,000.00 Rp. 270.00

0.0600 OH Pekerja Rp. 45,000.00 Rp. 2,700.00

1.1500 Kg Besi Profil IWF Rp. 9,000.00

214 1 M3 Pasang Konstruksi Kuda-kuda Konvensional Kayu Klas II Rp. 994,500.00

0.2000 OH Mandor Rp. 67,500.00 Rp. 13,500.00

1.2000 OH Kepala Tukang Rp. 67,500.00 Rp. 81,000.00

12.0000 OH Tukang Kayu Rp. 60,000.00 Rp. 720,000.00

4.0000 OH Pekerja Rp. 45,000.00 Rp. 180,000.00

1.1000 M3 Kayu Klas II Balok Rp. 2,300,000.00

15.0000 Kg Besi Strip Tebal 5 mm Rp. 15,000.00

5.6000 Kg Paku 12 cm Rp. 13,000.00

215 1 M3 Pasang Konstruksi Kuda-kuda Expose Kayu Klas I Rp. 1,025,250.00

0.3000 OH Mandor Rp. 67,500.00 Rp. 20,250.00

2.0000 OH Kepala Tukang Rp. 67,500.00 Rp. 135,000.00

10.0000 OH Tukang Kayu Rp. 60,000.00 Rp. 600,000.00

6.0000 OH Pekerja Rp. 45,000.00 Rp. 270,000.00

1.1000 M3 Kayu Klas I Balok Rp. 4,200,000.00

15.0000 Kg Besi Strip Tebal 5 mm Rp. 15,000.00

5.6000 Kg Paku 12 cm Rp. 13,000.00

216 1 M3 Pasang Konstruksi Gording Kayu Klas II Rp. 596,700.00

0.1200 OH Mandor Rp. 67,500.00 Rp. 8,100.00

0.7200 OH Kepala Tukang Rp. 67,500.00 Rp. 48,600.00

7.2000 OH Tukang Kayu Rp. 60,000.00 Rp. 432,000.00

2.4000 OH Pekerja Rp. 45,000.00 Rp. 108,000.00

1.1000 M3 Kayu Klas II Balok Rp. 2,300,000.00

15.0000 Kg Besi Strip Tebal 5 mm Rp. 15,000.00

3.0000 Kg Paku 12 cm Rp. 13,000.00

217 1 M2 Pasang Rangka Atap Genteng Keramik Kayu Klas II Rp. 11,512.50

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Kayu Rp. 60,000.00 Rp. 6,000.00

0.1000 OH Pekerja Rp. 45,000.00 Rp. 4,500.00

0.0140 M3 Kayu 5/7 Klas II Rp. 2,300,000.00

0.0360 M3 Kayu 2/3 Klas II Rp. 2,300,000.00

0.2500 Kg Paku 5 cm - 10 cm Rp. 13,000.00

218 1 M2 Pasang Rangka Atap Genteng Beton Kayu Klas II Rp. 11,512.50

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Kayu Rp. 60,000.00 Rp. 6,000.00

0.1000 OH Pekerja Rp. 45,000.00 Rp. 4,500.00

0.0140 M3 Kayu 5/7 Klas II Rp. 2,300,000.00

Page 60: Analisa Sni 2011

Page 60

NO URAIAN H. SATUAN UPAH

0.0570 M3 Kayu 2/3 Klas II Rp. 2,300,000.00

0.2500 Kg Paku 5 cm - 10 cm Rp. 13,000.00

219 1 M2 Pasang Rangka Atap Sirap Kayu Klas II Rp. 13,815.00

0.0060 OH Mandor Rp. 67,500.00 Rp. 405.00

0.0120 OH Kepala Tukang Rp. 67,500.00 Rp. 810.00

0.1200 OH Tukang Kayu Rp. 60,000.00 Rp. 7,200.00

0.1200 OH Pekerja Rp. 45,000.00 Rp. 5,400.00

0.1650 M3 Kayu Klas II Balok Rp. 2,300,000.00

0.2000 Kg Paku 5 cm - 10 cm Rp. 13,000.00

220 1 M2 Pasangan Rangka Atap Seng Rp. 13,931.25

0.1500 org Pekerja Rp. 45,000.00 Rp. 6,750.00

0.0075 org Mandor Rp. 67,500.00 Rp. 506.25

0.1000 org Tukang Kayu Rp. 60,000.00 Rp. 6,000.00

0.0100 org Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.0019 m3 Kayu Klas II Balok Rp. 2,300,000.00

0.1000 kg Paku 1,5" Rp. 13,000.00

221 1 M2 Pasang Atap Genteng Palentong Kecil Rp. 12,330.00

0.0080 OH Mandor Rp. 67,500.00 Rp. 540.00

0.0080 OH Kepala Tukang Rp. 67,500.00 Rp. 540.00

0.0750 OH Tukang Kayu Rp. 60,000.00 Rp. 4,500.00

0.1500 OH Pekerja Rp. 45,000.00 Rp. 6,750.00

25.0000 Bh Genteng Palentong Rp. 50,750.00

222 1 M2 Pasang Atap Genteng Kodok / Glazzur Rp. 12,330.00

0.0080 OH Mandor Rp. 67,500.00 Rp. 540.00

0.0080 OH Kepala Tukang Rp. 67,500.00 Rp. 540.00

0.0750 OH Tukang Kayu Rp. 60,000.00 Rp. 4,500.00

0.1500 OH Pekerja Rp. 45,000.00 Rp. 6,750.00

25.0000 Bh Genteng Kodok Rp. 50,750.00

223 1 M2 Pasang Atap Genteng Palentong Super / Besar Rp. 12,330.00

0.0080 OH Mandor Rp. 67,500.00 Rp. 540.00

0.0080 OH Kepala Tukang Rp. 67,500.00 Rp. 540.00

0.0750 OH Tukang Kayu Rp. 60,000.00 Rp. 4,500.00

0.1500 OH Pekerja Rp. 45,000.00 Rp. 6,750.00

12.0000 Bh Genteng Palentong Super Rp. 50,750.00

224 1 M2 Pasang Genteng Bubung Palentong Rp. 30,270.00

0.0020 OH Mandor Rp. 67,500.00 Rp. 135.00

0.0020 OH Kepala Tukang Rp. 67,500.00 Rp. 135.00

0.2000 OH Tukang Kayu Rp. 60,000.00 Rp. 12,000.00

0.4000 OH Pekerja Rp. 45,000.00 Rp. 18,000.00

5.0000 Bh Genteng Bubung Palentong Rp. 23,000.00

8.0000 Kg Semen Portland Rp. 1,040.00

0.0320 M3 Pasir Pasang Rp. 90,000.00

225 1 M2 Pasang Bubung Genteng Kodok Glazzur Rp. 30,270.00

0.0020 OH Mandor Rp. 67,500.00 Rp. 135.00

0.0020 OH Kepala Tukang Rp. 67,500.00 Rp. 135.00

0.2000 OH Tukang Kayu Rp. 60,000.00 Rp. 12,000.00

0.4000 OH Pekerja Rp. 45,000.00 Rp. 18,000.00

5.0000 Bh Genteng Bubung Kodok Rp. 23,000.00

8.0000 Kg Semen Portland Rp. 1,040.00

0.0320 M3 Pasir Pasang Rp. 90,000.00

226 1 M2 Pasang Bubung Genteng Palentong Besar Rp. 30,270.00

0.0020 OH Mandor Rp. 67,500.00 Rp. 135.00

0.0020 OH Kepala Tukang Rp. 67,500.00 Rp. 135.00

0.2000 OH Tukang Kayu Rp. 60,000.00 Rp. 12,000.00

0.4000 OH Pekerja Rp. 45,000.00 Rp. 18,000.00

4.0000 Bh Genteng Bubung Palentong Rp. 23,000.00

8.0000 Kg Semen Portland Rp. 1,040.00

0.0320 M3 Pasir Pasang Rp. 90,000.00

227 1 M2 Pasang Atap Fiber (180 x 90) cm Rp. 10,845.00

0.0070 OH Mandor Rp. 67,500.00 Rp. 472.50

0.0070 OH Kepala Tukang Rp. 67,500.00 Rp. 472.50

0.0600 OH Tukang Kayu Rp. 60,000.00 Rp. 3,600.00

0.1400 OH Pekerja Rp. 45,000.00 Rp. 6,300.00

0.6000 Lbr Atap Fiber Rp. 55,000.00

0.0050 Kg Paku 1 cm - 2,5 cm Rp. 13,000.00

228 1 M2 Pasang Atap Asbes Gelombang (2,50 x 0,92 m) x 5 mm Rp. 11,880.00

0.0080 OH Mandor Rp. 67,500.00 Rp. 540.00

0.0080 OH Kepala Tukang Rp. 67,500.00 Rp. 540.00

0.0750 OH Tukang Kayu Rp. 60,000.00 Rp. 4,500.00

0.1400 OH Pekerja Rp. 45,000.00 Rp. 6,300.00

0.5000 Lbr Asbes Gelombang (2,50 x 0,92 m) x 5 mm Rp. 36,666.67

0.1200 Kg Paku Pancing 60 x 230 Rp. 16,000.00

229 1 M2 Pasang Atap Asbes Gelombang (2,25 x 0,92 m) x 5 mm Rp. 11,880.00

0.0080 OH Mandor Rp. 67,500.00 Rp. 540.00

0.0080 OH Kepala Tukang Rp. 67,500.00 Rp. 540.00

0.0750 OH Tukang Kayu Rp. 60,000.00 Rp. 4,500.00

0.1400 OH Pekerja Rp. 45,000.00 Rp. 6,300.00

0.6000 Lbr Asbes Gelombang (2,25 x 0,92 m) x 5 mm Rp. 32,083.33

0.1200 Kg Paku Pancing 60 x 230 Rp. 16,000.00

Page 61: Analisa Sni 2011

Page 61

NO URAIAN H. SATUAN UPAH

230 1 M2 Pasang Atap Asbes Gelombang (2,00 x 0,92 m) x 5 mm Rp. 11,445.00

0.0070 OH Mandor Rp. 67,500.00 Rp. 472.50

0.0070 OH Kepala Tukang Rp. 67,500.00 Rp. 472.50

0.0700 OH Tukang Kayu Rp. 60,000.00 Rp. 4,200.00

0.1400 OH Pekerja Rp. 45,000.00 Rp. 6,300.00

0.6000 Lbr Asbes Gelombang (2,00 x 0,92 m) x 5 mm Rp. 24,000.00

0.1200 Kg Paku Pancing 60 x 230 Rp. 16,000.00

231 1 M2 Pasang Atap Asbes Gelombang (1,80 x 0,92 m) x 5 mm Rp. 11,445.00

0.0070 OH Mandor Rp. 67,500.00 Rp. 472.50

0.0070 OH Kepala Tukang Rp. 67,500.00 Rp. 472.50

0.0700 OH Tukang Kayu Rp. 60,000.00 Rp. 4,200.00

0.1400 OH Pekerja Rp. 45,000.00 Rp. 6,300.00

0.7500 Lbr Asbes Gelombang (1,80 x 0,92 m) x 5 mm Rp. 23,392.86

0.1200 Kg Paku Pancing 60 x 230 Rp. 16,000.00

232 1 M2 Pasang Atap Asbes Gelombang (3,00 x 1,05 m) x 4 mm Rp. 11,445.00

0.0070 OH Mandor Rp. 67,500.00 Rp. 472.50

0.0070 OH Kepala Tukang Rp. 67,500.00 Rp. 472.50

0.0700 OH Tukang Kayu Rp. 60,000.00 Rp. 4,200.00

0.1400 OH Pekerja Rp. 45,000.00 Rp. 6,300.00

0.3500 Lbr Asbes Gelombang (3,00 x 1,05 m) x 4 mm Rp. 64,000.00

0.1200 Kg Paku Pancing Rp. 16,000.00

233 1 M2 Pasang Atap Asbes Gelombang (2,70 x 1,05 m) x 4 mm Rp. 11,445.00

0.0070 OH Mandor Rp. 67,500.00 Rp. 472.50

0.0070 OH Kepala Tukang Rp. 67,500.00 Rp. 472.50

0.0700 OH Tukang Kayu Rp. 60,000.00 Rp. 4,200.00

0.1400 OH Pekerja Rp. 45,000.00 Rp. 6,300.00

0.4200 Lbr Asbes Gelombang (2,70 x 1,05 m) x 4 mm Rp. 41,250.00

0.1200 Kg Paku Pancing Rp. 16,000.00

234 1 M2 Pasang Atap Asbes Gelombang (2,40 x 1,05 m) x 4 mm Rp. 11,265.00

0.0070 OH Mandor Rp. 67,500.00 Rp. 472.50

0.0070 OH Kepala Tukang Rp. 67,500.00 Rp. 472.50

0.0670 OH Tukang Kayu Rp. 60,000.00 Rp. 4,020.00

0.1400 OH Pekerja Rp. 45,000.00 Rp. 6,300.00

0.4400 Lbr Asbes Gelombang (2,40 x 1,05 m) x 4 mm Rp. 36,750.00

0.1200 Kg Paku Pancing Rp. 16,000.00

235 1 M2 Pasang Atap Asbes Gelombang (2,10 x 1,05 m) x 4 mm Rp. 11,265.00

0.0070 OH Mandor Rp. 67,500.00 Rp. 472.50

0.0070 OH Kepala Tukang Rp. 67,500.00 Rp. 472.50

0.0670 OH Tukang Kayu Rp. 60,000.00 Rp. 4,020.00

0.1400 OH Pekerja Rp. 45,000.00 Rp. 6,300.00

0.5100 Lbr Asbes Gelombang (2,10 x 1,05 m) x 4 mm Rp. 32,750.00

0.1200 Kg Paku Pancing Rp. 16,000.00

236 1 M2 Pasang Atap Asbes Gelombang (1,5 x 1,05 m) x 4 mm Rp. 11,265.00

0.0070 OH Mandor Rp. 67,500.00 Rp. 472.50

0.0070 OH Kepala Tukang Rp. 67,500.00 Rp. 472.50

0.0670 OH Tukang Kayu Rp. 60,000.00 Rp. 4,020.00

0.1400 OH Pekerja Rp. 45,000.00 Rp. 6,300.00

0.8000 Lbr Asbes Gelombang (1,50 x 1,05 m) x 4 mm Rp. 23,392.86

0.1200 Kg Paku Pancing Rp. 16,000.00

237 1 M2 Pasang Atap Asbes Gelombang (3,00 x 1,08m) x 6 mm Rp. 11,265.00

0.0070 OH Mandor Rp. 67,500.00 Rp. 472.50

0.0070 OH Kepala Tukang Rp. 67,500.00 Rp. 472.50

0.0670 OH Tukang Kayu Rp. 60,000.00 Rp. 4,020.00

0.1400 OH Pekerja Rp. 45,000.00 Rp. 6,300.00

0.3700 Lbr Asbes Gelombang (3,00 x 1,08 m) x 6 mm Rp. 45,833.33

0.1200 Kg Paku Pancing Rp. 16,000.00

238 1 M2 Pasang Atap Asbes Gelombang (2,70 x 1,08m) x 6 mm Rp. 11,265.00

0.0070 OH Mandor Rp. 67,500.00 Rp. 472.50

0.0070 OH Kepala Tukang Rp. 67,500.00 Rp. 472.50

0.0670 OH Tukang Kayu Rp. 60,000.00 Rp. 4,020.00

0.1400 OH Pekerja Rp. 45,000.00 Rp. 6,300.00

0.3800 Lbr Asbes Gelombang (2,70 x 1,08 m) x 6 mm Rp. 41,250.00

0.1200 Kg Paku Pancing Rp. 16,000.00

239 1 M2 Pasang Atap Asbes Gelombang (2,4 x 1,08m) x 6 mm Rp. 11,265.00

0.0070 OH Mandor Rp. 67,500.00 Rp. 472.50

0.0070 OH Kepala Tukang Rp. 67,500.00 Rp. 472.50

0.0670 OH Tukang Kayu Rp. 60,000.00 Rp. 4,020.00

0.1400 OH Pekerja Rp. 45,000.00 Rp. 6,300.00

0.4600 Lbr Asbes Gelombang (2,40 x 1,08 m) x 6 mm Rp. 36,666.67

0.1200 Kg Paku Pancing Rp. 16,000.00

240 1 M2 Pasang Atap Asbes Gelombang (2,1 x 1,08m) x 6 mm Rp. 11,265.00

0.0070 OH Mandor Rp. 67,500.00 Rp. 472.50

0.0070 OH Kepala Tukang Rp. 67,500.00 Rp. 472.50

0.0670 OH Tukang Kayu Rp. 60,000.00 Rp. 4,020.00

0.1400 OH Pekerja Rp. 45,000.00 Rp. 6,300.00

0.4900 Lbr Asbes Gelombang (2,10 x 1,08 m) x 6 mm Rp. 32,083.33

0.1200 Kg Paku Pancing Rp. 16,000.00

241 1 M2 Pasang Atap Asbes Gelombang (1,80 x 1,08m) x 6 mm Rp. 11,265.00

0.0070 OH Mandor Rp. 67,500.00 Rp. 472.50

Page 62: Analisa Sni 2011

Page 62

NO URAIAN H. SATUAN UPAH

0.0070 OH Kepala Tukang Rp. 67,500.00 Rp. 472.50

0.0670 OH Tukang Kayu Rp. 60,000.00 Rp. 4,020.00

0.1400 OH Pekerja Rp. 45,000.00 Rp. 6,300.00

0.5700 Lbr Asbes Gelombang (1,80 x 1,08 m) x 6 mm Rp. 24,000.00

0.1200 Kg Paku Pancing Rp. 16,000.00

242 1 M1 Pasang Bubung Stel Gelombang 0,92 Rp. 12,427.50

0.0040 OH Mandor Rp. 67,500.00 Rp. 270.00

0.0130 OH Kepala Tukang Rp. 67,500.00 Rp. 877.50

0.1250 OH Tukang Kayu Rp. 60,000.00 Rp. 7,500.00

0.0840 OH Pekerja Rp. 45,000.00 Rp. 3,780.00

2.4000 Lbr Asbes Bubungan Gelombang 0,92 Rp. 23,392.86

6.0000 Bh Paku sekrup 3,5" Rp. 100.00

243 1 M1 Pasang Non Stek Gelombang 1,05 m Rp. 12,427.50

0.0040 OH Mandor Rp. 67,500.00 Rp. 270.00

0.0130 OH Kepala Tukang Rp. 67,500.00 Rp. 877.50

0.1250 OH Tukang Kayu Rp. 60,000.00 Rp. 7,500.00

0.0840 OH Pekerja Rp. 45,000.00 Rp. 3,780.00

2.1000 Lbr Nok Stek Gelombang 1,05 m Rp. 23,000.00

6.0000 Bh Paku sekrup 3,5" Rp. 100.00

244 1 M1 Pasang Non Stek Gelombang 1,08 m Rp. 12,427.50

0.0040 OH Mandor Rp. 67,500.00 Rp. 270.00

0.0130 OH Kepala Tukang Rp. 67,500.00 Rp. 877.50

0.1250 OH Tukang Kayu Rp. 60,000.00 Rp. 7,500.00

0.0840 OH Pekerja Rp. 45,000.00 Rp. 3,780.00

2.0500 Lbr Nok Stek Gelombang 1,08 m Rp. 23,000.00

6.0000 Bh Paku sekrup 3,5" Rp. 100.00

245 1 M1 Pasang Nok Paten 0,92 m Rp. 12,427.50

0.0040 OH Mandor Rp. 67,500.00 Rp. 270.00

0.0130 OH Kepala Tukang Rp. 67,500.00 Rp. 877.50

0.1250 OH Tukang Kayu Rp. 60,000.00 Rp. 7,500.00

0.0840 OH Pekerja Rp. 45,000.00 Rp. 3,780.00

1.2000 Lbr Nok Paten 0,92 m Rp. 23,000.00

6.0000 Bh Paku sekrup 3,5" Rp. 100.00

246 1 M1 Pasang Nok Paten 1,05 m Rp. 12,427.50

0.0040 OH Mandor Rp. 67,500.00 Rp. 270.00

0.0130 OH Kepala Tukang Rp. 67,500.00 Rp. 877.50

0.1250 OH Tukang Kayu Rp. 60,000.00 Rp. 7,500.00

0.0840 OH Pekerja Rp. 45,000.00 Rp. 3,780.00

1.2000 Lbr Nok Paten 1,05 m Rp. 23,000.00

6.0000 Bh Paku sekrup 3,5" Rp. 100.00

247 1 M1 Pasang Nok Paten 1,08 m Rp. 12,427.50

0.0040 OH Mandor Rp. 67,500.00 Rp. 270.00

0.0130 OH Kepala Tukang Rp. 67,500.00 Rp. 877.50

0.1250 OH Tukang Kayu Rp. 60,000.00 Rp. 7,500.00

0.0840 OH Pekerja Rp. 45,000.00 Rp. 3,780.00

1.2000 Lbr Nok Paten 1,08 m Rp. 23,000.00

6.0000 Bh Paku sekrup 3,5" Rp. 100.00

248 1 M1 Pasang Nok Stel Rata 0,92 m Rp. 14,647.50

0.0040 OH Mandor Rp. 67,500.00 Rp. 270.00

0.0130 OH Kepala Tukang Rp. 67,500.00 Rp. 877.50

0.1500 OH Tukang Kayu Rp. 60,000.00 Rp. 9,000.00

0.1000 OH Pekerja Rp. 45,000.00 Rp. 4,500.00

1.1000 Lbr Nok Stel Rata 0,92 m Rp. 23,000.00

6.0000 Bh Paku sekrup 3,5" Rp. 100.00

249 1 M1 Pasang Nok Stel Rata 1,05 m Rp. 12,427.50

0.0040 OH Mandor Rp. 67,500.00 Rp. 270.00

0.0130 OH Kepala Tukang Rp. 67,500.00 Rp. 877.50

0.1250 OH Tukang Kayu Rp. 60,000.00 Rp. 7,500.00

0.0840 OH Pekerja Rp. 45,000.00 Rp. 3,780.00

1.1000 Lbr Nok Stel Rata 1,05 m Rp. 23,000.00

6.0000 Bh Paku sekrup 3,5" Rp. 100.00

250 1 M2 Pasang Atap Genteng Beton Rp. 16,350.00

0.0100 OH Mandor Rp. 67,500.00 Rp. 675.00

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Kayu Rp. 60,000.00 Rp. 6,000.00

0.2000 OH Pekerja Rp. 45,000.00 Rp. 9,000.00

11.0000 Bh Genteng Beton Rp. 50,750.00

0.0300 Kg Paku 5 cm - 7 cm Rp. 13,000.00

251 1 M2 Pasang Atap Genteng Aspal Rp. 16,350.00

0.0100 OH Mandor Rp. 67,500.00 Rp. 675.00

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Kayu Rp. 60,000.00 Rp. 6,000.00

0.2000 OH Pekerja Rp. 45,000.00 Rp. 9,000.00

6.9000 Lbr Genteng Aspal Rp. 50,750.00

0.3500 Lbr Plywood Tebal 6 mm Rp. 65,000.00

0.0300 Kg Paku 1 cm - 2,5 cm Rp. 13,000.00

0.5000 Bh Plastic Aerator Rp. 5,000.00

252 1 M2 Pasang Atap Genteng Metal Rp. 16,350.00

0.0100 OH Mandor Rp. 67,500.00 Rp. 675.00

Page 63: Analisa Sni 2011

Page 63

NO URAIAN H. SATUAN UPAH

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Kayu Rp. 60,000.00 Rp. 6,000.00

0.2000 OH Pekerja Rp. 45,000.00 Rp. 9,000.00

1.7600 Lbr Genteng Metal Rp. 32,500.00

0.2000 Kg Paku 5 cm - 7 cm Rp. 13,000.00

253 1 M2 Pasang Atap Sirap Rp. 24,697.50

0.0080 OH Mandor Rp. 67,500.00 Rp. 540.00

0.0250 OH Kepala Tukang Rp. 67,500.00 Rp. 1,687.50

0.2500 OH Tukang Kayu Rp. 60,000.00 Rp. 15,000.00

0.1660 OH Pekerja Rp. 45,000.00 Rp. 7,470.00

60.0000 Bh Genteng Sirap Rp. 50,750.00

0.2000 Kg Paku 1 cm - 2,5 cm Rp. 13,000.00

254 1 M1 Pasang Nok Genteng Beton Rp. 32,700.00

0.0200 OH Mandor Rp. 67,500.00 Rp. 1,350.00

0.0200 OH Kepala Tukang Rp. 67,500.00 Rp. 1,350.00

0.2000 OH Tukang Kayu Rp. 60,000.00 Rp. 12,000.00

0.4000 OH Pekerja Rp. 45,000.00 Rp. 18,000.00

3.5000 Bh Nok Genteng Beton Rp. 23,000.00

0.0500 Kg Paku 5 cm - 7 cm Rp. 13,000.00

10.8000 Kg Semen Abu-abu Rp. 1,040.00

0.0320 M3 Pasir Pasang Rp. 90,000.00

1.0000 Kg Semen Warna Rp. 2,250.00

255 1 M1 Pasang Nok Genteng Aspal Rp. 22,717.50

0.0060 OH Mandor Rp. 67,500.00 Rp. 405.00

0.0250 OH Kepala Tukang Rp. 67,500.00 Rp. 1,687.50

0.2500 OH Tukang Kayu Rp. 60,000.00 Rp. 15,000.00

0.1250 OH Pekerja Rp. 45,000.00 Rp. 5,625.00

2.0000 Lbr Genteng Aspal Rp. 50,750.00

0.0500 Kg Paku 1 cm - 2,5 cm Rp. 13,000.00

0.0035 M3 Kayu Borneo Balok Rp. 4,200,000.00

256 1 M1 Pasang Nok Genteng Metal Rp. 22,140.00

0.0130 OH Mandor Rp. 67,500.00 Rp. 877.50

0.0150 OH Kepala Tukang Rp. 67,500.00 Rp. 1,012.50

0.1500 OH Tukang Kayu Rp. 60,000.00 Rp. 9,000.00

0.2500 OH Pekerja Rp. 45,000.00 Rp. 11,250.00

1.1000 Bh Genteng Decra Bond Rp. 50,750.00

0.0500 Kg Paku 1 cm - 2,5 cm Rp. 13,000.00

257 1 M1 Pasang Nok Sirap Rp. 22,717.50

0.0060 OH Mandor Rp. 67,500.00 Rp. 405.00

0.0250 OH Kepala Tukang Rp. 67,500.00 Rp. 1,687.50

0.2500 OH Tukang Kayu Rp. 60,000.00 Rp. 15,000.00

0.1250 OH Pekerja Rp. 45,000.00 Rp. 5,625.00

0.4000 Lbr Seng Plat 3" x 6" BJLS 30 Rp. 52,500.00

0.0600 Kg Paku 1 cm - 2,5 cm Rp. 13,000.00

0.0500 Kg Paku 5 cm - 7 cm Rp. 13,000.00

0.0040 M3 Kayu Borneo Papan Rp. 4,200,000.00

258 1 M2 Pasang Atap Seng Gelombang BJLS 20 Rp. 9,810.00

0.0060 OH Mandor Rp. 67,500.00 Rp. 405.00

0.0060 OH Kepala Tukang Rp. 67,500.00 Rp. 405.00

0.0600 OH Tukang Kayu Rp. 60,000.00 Rp. 3,600.00

0.1200 OH Pekerja Rp. 45,000.00 Rp. 5,400.00

0.7000 Lbr Atap Seng BJLS 20 Rp. 37,000.00

0.0200 Kg Paku 1 cm - 2,5 cm Rp. 13,000.00

259 1 M2 Pasang Atap Seng Gelombang BJLS 20 Warna Rp. 9,810.00

0.0060 OH Mandor Rp. 67,500.00 Rp. 405.00

0.0060 OH Kepala Tukang Rp. 67,500.00 Rp. 405.00

0.0600 OH Tukang Kayu Rp. 60,000.00 Rp. 3,600.00

0.1200 OH Pekerja Rp. 45,000.00 Rp. 5,400.00

0.7000 Lbr Atap Seng BJLS 20 Warna Rp. 55,000.00

0.0200 Kg Paku 1 cm - 2,5 cm Rp. 13,000.00

260 1 M2 Pasang Atap Seng Gelombang BJLS 30 Rp. 9,810.00

0.0060 OH Mandor Rp. 67,500.00 Rp. 405.00

0.0060 OH Kepala Tukang Rp. 67,500.00 Rp. 405.00

0.0600 OH Tukang Kayu Rp. 60,000.00 Rp. 3,600.00

0.1200 OH Pekerja Rp. 45,000.00 Rp. 5,400.00

0.7000 Lbr Atap Seng BJLS 30 Rp. 60,000.00

0.0200 Kg Paku 1 cm - 2,5 cm Rp. 13,000.00

261 1 M2 Pasang Atap Nok Seng Rp. 11,895.00

0.0060 OH Mandor Rp. 67,500.00 Rp. 405.00

0.0080 OH Kepala Tukang Rp. 67,500.00 Rp. 540.00

0.0700 OH Tukang Kayu Rp. 60,000.00 Rp. 4,200.00

0.1500 OH Pekerja Rp. 45,000.00 Rp. 6,750.00

0.3000 Lbr Seng Plat 3" x 6" BJLS 30 Rp. 52,500.00

0.0200 Kg Paku 1 cm - 2,5 cm Rp. 13,000.00

781 1 M2 Pasang Atap Alluminium Rp. 52,695.00

0.0060 OH Mandor Rp. 67,500.00 Rp. 405.00

0.0080 OH Kepala Tukang Rp. 67,500.00 Rp. 540.00

0.7500 OH Tukang Kayu Rp. 60,000.00 Rp. 45,000.00

Page 64: Analisa Sni 2011

Page 64

NO URAIAN H. SATUAN UPAH

0.1500 OH Pekerja Rp. 45,000.00 Rp. 6,750.00

1.0500 M2 Atap Alluminium Gelombang Tebal 0,55 Rp. 55,000.00

0.0200 Kg Paku Hak Panjang 15 cm Rp. 16,000.00

782 1 M2 Pasang Nok Alluminium Rp. 65,850.00

0.0100 OH Mandor Rp. 67,500.00 Rp. 675.00

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

1.0000 OH Tukang Kayu Rp. 60,000.00 Rp. 60,000.00

0.1000 OH Pekerja Rp. 45,000.00 Rp. 4,500.00

1.2000 M2 Nok Standar 40 cm 18, swg 22 Rp. 23,000.00

0.0400 Kg Paku Hak Panjang 15 cm Rp. 16,000.00

783 1 M2 Pasang Alluminium Foll / Sisalation Rp. 10,627.50

0.0080 OH Mandor Rp. 67,500.00 Rp. 540.00

0.0050 OH Kepala Tukang Rp. 67,500.00 Rp. 337.50

0.0500 OH Tukang Kayu Rp. 60,000.00 Rp. 3,000.00

0.1500 OH Pekerja Rp. 45,000.00 Rp. 6,750.00

1.0500 M2 Sisalation / Alluminium foil #NUM!

784 1 M1 Pasang Lesplank Ukuran (3 x 20) cm, Kayu Klas II Rp. 18,525.00

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0250 OH Kepala Tukang Rp. 67,500.00 Rp. 1,687.50

0.2000 OH Tukang Kayu Rp. 60,000.00 Rp. 12,000.00

0.1000 OH Pekerja Rp. 45,000.00 Rp. 4,500.00

0.0108 M3 Kayu Klas II Papan Rp. 2,300,000.00

0.1000 Kg Paku 5 cm - 7 cm Rp. 13,000.00

785 1 M1 Pasang Lesplank Ukuran (3 x 30) cm, Kayu Klas II Rp. 18,187.50

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0200 OH Kepala Tukang Rp. 67,500.00 Rp. 1,350.00

0.2000 OH Tukang Kayu Rp. 60,000.00 Rp. 12,000.00

0.1000 OH Pekerja Rp. 45,000.00 Rp. 4,500.00

0.0110 M3 Kayu Klas II Papan Rp. 2,300,000.00

0.0500 Kg Paku 5 cm - 7 cm Rp. 13,000.00

786 1 M1 Pasang Talang Datar/Jurai Seng Bjls 28 Lebar 90 cm Rp. 35,362.50

0.0100 OH Mandor Rp. 67,500.00 Rp. 675.00

0.0250 OH Kepala Tukang Rp. 67,500.00 Rp. 1,687.50

0.4000 OH Tukang Kayu Rp. 60,000.00 Rp. 24,000.00

0.2000 OH Pekerja Rp. 45,000.00 Rp. 9,000.00

1.0500 Lbr Seng Plat 3" x 6" BJLS 30 Rp. 52,500.00

0.0150 Kg Paku 1 cm - 2,5 cm Rp. 13,000.00

0.0190 M3 Kayu Klas II Papan Rp. 2,300,000.00

787 1 M1 Pasang Talang Lingkaran D15 cmSeng Bjls 30 Lebar 45 cm Rp. 27,247.50

0.0070 OH Mandor Rp. 67,500.00 Rp. 472.50

0.0300 OH Kepala Tukang Rp. 67,500.00 Rp. 2,025.00

0.3000 OH Tukang Kayu Rp. 60,000.00 Rp. 18,000.00

0.1500 OH Pekerja Rp. 45,000.00 Rp. 6,750.00

1.0500 Lbr Seng Plat 3" x 6" BJLS 30 Rp. 52,500.00

0.0100 Kg Paku 1 cm - 2,5 cm Rp. 13,000.00

0.5000 Kg Besi Strip (0,2x2)cm Rp. 8,000.00

788 1 M1 Pasang Talang Miring, Seng Bjls 28 Rp. 27,571.88

0.0013 OH Mandor Rp. 67,500.00 Rp. 84.38

0.0250 OH Kepala Tukang Rp. 67,500.00 Rp. 1,687.50

0.4000 OH Tukang Kayu Rp. 60,000.00 Rp. 24,000.00

0.0400 OH Pekerja Rp. 45,000.00 Rp. 1,800.00

0.5000 Lbr Seng Plat 3" x 6" BJLS 30 Rp. 52,500.00

0.0150 Kg Paku 1 cm - 2,5 cm Rp. 13,000.00

0.0190 M3 Kayu Klas II Papan Rp. 2,300,000.00

0.3000 Kg Flincote / Meni Besi Rp. 15,000.00

789 1 M2 Memasang Rangka Atap Baja Ringan Rp. 9,303,750.00

Pemotongan Bahan Kuda - kuda Rp. 945,000.00

1.0000 OH Tukang Besi Rp. 45,000.00 Rp. 45,000.00

1.0000 OH Pekerja Rp. 45,000.00 Rp. 45,000.00

0.5000 OH Mandor Rp. 67,500.00 Rp. 33,750.00

0.5000 OH Kepala Tukang Rp. 67,500.00 Rp. 33,750.00

Rp. 157,500.00

6.0000 Hari Kerja Biaya Permeter Persegi Rp. 945,000.00

Pemotongan Bahan Kuda - kuda Rp. 630,000.00

1.0000 OH Tukang Besi Rp. 45,000.00 Rp. 45,000.00

1.0000 OH Pekerja Rp. 45,000.00 Rp. 45,000.00

0.5000 OH Mandor Rp. 67,500.00 Rp. 33,750.00

0.5000 OH Kepala Tukang Rp. 67,500.00 Rp. 33,750.00

Rp. 157,500.00

4.0000 Hari Kerja Biaya Permeter Persegi Rp. 630,000.00

Analisa Pabrikasi Kuda - Kuda Rp. 1,980,000.00

2.0000 OH Tukang Besi Rp. 45,000.00 Rp. 90,000.00

2.0000 OH Pekerja Rp. 45,000.00 Rp. 90,000.00

0.5000 OH Mandor Rp. 67,500.00 Rp. 33,750.00

0.5000 OH Kepala Tukang Rp. 67,500.00 Rp. 33,750.00

Rp. 247,500.00

8.0000 Hari Kerja Biaya Permeter Persegi Rp. 1,980,000.00

Analisa Instalasi Kuda - Kuda Diatas Ring Balok Rp. 3,780,000.00

2.0000 OH Tukang Besi Rp. 45,000.00 Rp. 90,000.00

2.0000 OH Pekerja Rp. 45,000.00 Rp. 90,000.00

1.0000 OH Mandor Rp. 67,500.00 Rp. 67,500.00

Page 65: Analisa Sni 2011

Page 65

NO URAIAN H. SATUAN UPAH

1.0000 OH Kepala Tukang Rp. 67,500.00 Rp. 67,500.00

Rp. 315,000.00

12.0000 Hari Kerja Biaya Permeter Persegi Rp. 3,780,000.00

Analisa Pemasangan Reng Rp. 1,968,750.00

2.0000 OH Tukang Besi Rp. 45,000.00 Rp. 90,000.00

2.0000 OH Pekerja Rp. 45,000.00 Rp. 90,000.00

1.0000 OH Mandor Rp. 67,500.00 Rp. 67,500.00

0.5000 OH Kepala Tukang Rp. 67,500.00 Rp. 33,750.00

Rp. 281,250.00

7.0000 Hari Kerja Biaya Permeter Persegi Rp. 1,968,750.00

Analisa Pemasangan Material

405.0000 M1 Baja Ringan Profil C. 75. 100 Rp. 26,500.00

957.0000 M1 Baja Ringan Profil C. 75. 0.75 Rp. 25,500.00

1,960.0000 M1 Reng/Topspan Rp. 23,000.00

3,100.0000 Pcs Baut/Screw 14/20 Rp. 750.00

5,465.0000 Pcs Baut/Screw 16/16 Rp. 650.00

65.0000 M1 Talang Rp. 58,000.00

75.0000 Pcs Dynabolt Rp. 2,640.00

Alat dan Material Bantu

0.0010 Ls Alat Bantu Peralatan Rp. 90,061,250.00

0.0010 Ls Material Bantu Kerja Rp. 10,732,500.00

790 1 M2 Memasang Rangka Atap Konsul Baja Ringan Rp. 105,062.50

Analisa Pemotongan Bahan Kuda-kuda Rp. 15,000.00

1.0000 OH Pekerja Rp. 45,000.00 Rp. 45,000.00

0.5000 OH Mandor Rp. 67,500.00 Rp. 33,750.00

0.5000 OH Tukang Besi Rp. 45,000.00 Rp. 22,500.00

0.5000 OH Kepala Tukang Rp. 67,500.00 Rp. 33,750.00

Rp. 135,000.00

Untuk 9 Hari Kerja Biaya Permeter Persegi Rp. 15,000.00

Analisa Pemas. Wallplate/Metal Beam Rp. 36,562.50

1.0000 OH Pekerja Rp. 45,000.00 Rp. 45,000.00

0.5000 OH Mandor Rp. 67,500.00 Rp. 33,750.00

0.7500 OH Tukang Besi Rp. 45,000.00 Rp. 33,750.00

0.5000 OH Kepala Tukang Rp. 67,500.00 Rp. 33,750.00

Rp. 146,250.00

Untuk 4 Hari Kerja Biaya Permeter Persegi Rp. 36,562.50

Analisa Fabrikasi Kuda-Kuda Rp. 17,250.00

2.0000 OH Pekerja Rp. 45,000.00 Rp. 90,000.00

1.0000 OH Mandor Rp. 67,500.00 Rp. 67,500.00

1.5000 OH Tukang Besi Rp. 45,000.00 Rp. 67,500.00

0.5000 OH Kepala Tukang Rp. 67,500.00 Rp. 33,750.00

Rp. 258,750.00

15.0000 Hari Kerja Biaya Permeter Persegi Rp. 17,250.00

Analisa Instalasi Kuda-Kuda Diatas Ring Balok Rp. 17,500.00

2.0000 OH Pekerja Rp. 45,000.00 Rp. 90,000.00

1.0000 OH Mandor Rp. 67,500.00 Rp. 67,500.00

2.0000 OH Tukang Besi Rp. 45,000.00 Rp. 90,000.00

1.0000 OH Kepala Tukang Rp. 67,500.00 Rp. 67,500.00

Rp. 315,000.00

18.0000 Hari Kerja Biaya Permeter Persegi Rp. 17,500.00

Analisa Pemasangan Reng Rp. 18,750.00

2.0000 OH Pekerja Rp. 45,000.00 Rp. 90,000.00

1.0000 OH Mandor Rp. 67,500.00 Rp. 67,500.00

2.0000 OH Tukang Besi Rp. 45,000.00 Rp. 90,000.00

0.5000 OH Kepala Tukang Rp. 67,500.00 Rp. 33,750.00

Rp. 281,250.00

15 Hari Kerja Biaya Permeter Persegi Rp. 18,750.00

Analisa Pemakaian Material

1,465.0000 M1 Baja Ringan Profil C. 75. 0.75 Rp. 25,500.00

1,825.0000 M1 Reng / Topspan Rp. 16,000.00

3,850.0000 Pcs Baut/Srew 14/20 Rp. 650.00

4,950.0000 Pcs Baut/Srew 16/16 Rp. 600.00

65.0000 Pcs Dynabolt Rp. 2,640.00

Alat dan Material Bantu

0.0010 Ls Alat Bantu Peralatan Rp. 72,201,600.00

0.0010 Ls Material Bantu Kerja Rp. 72,201,600.00

J Analisa Biaya Konstruksi Pekerjaan Langit-langit

791 1 M2 Pasang Rangka Langit-langit (50 x 100) cm, Kayu Klas II Rp. 28,500.00

Page 66: Analisa Sni 2011

Page 66

NO URAIAN H. SATUAN UPAH

0.0750 OH Mandor Rp. 67,500.00 Rp. 5,062.50

0.0250 OH Kepala Tukang Rp. 67,500.00 Rp. 1,687.50

0.2500 OH Tukang Kayu Rp. 60,000.00 Rp. 15,000.00

0.1500 OH Pekerja Rp. 45,000.00 Rp. 6,750.00

0.0154 M3 Kayu 5/7 Klas II Rp. 2,300,000.00

0.2000 Kg Paku 5 cm - 10 cm Rp. 13,000.00

792 1 M2 Pasang Rangka Langit-langit (60 x 60) cm, Kayu Klas II Rp. 29,700.00

0.0100 OH Mandor Rp. 67,500.00 Rp. 675.00

0.0300 OH Kepala Tukang Rp. 67,500.00 Rp. 2,025.00

0.3000 OH Tukang Kayu Rp. 60,000.00 Rp. 18,000.00

0.2000 OH Pekerja Rp. 45,000.00 Rp. 9,000.00

0.0163 M3 Kayu 5/7 Klas II Rp. 2,300,000.00

0.2500 Kg Paku 5 cm - 10 cm Rp. 13,000.00

793 1 M2 Langit-langit Asbes Tebal 6 mm Rp. 6,157.50

0.0020 OH Mandor Rp. 67,500.00 Rp. 135.00

0.0070 OH Kepala Tukang Rp. 67,500.00 Rp. 472.50

0.0700 OH Tukang Kayu Rp. 60,000.00 Rp. 4,200.00

0.0300 OH Pekerja Rp. 45,000.00 Rp. 1,350.00

1.1000 Lbr Pelat Asbes Tebal 6 mm Rp. 35,000.00

0.0100 Kg Paku Triplek Rp. 13,000.00

794 1 M2 Langit-langit Asbes Tebal 5 mm Rp. 6,157.50

0.0020 OH Mandor Rp. 67,500.00 Rp. 135.00

0.0070 OH Kepala Tukang Rp. 67,500.00 Rp. 472.50

0.0700 OH Tukang Kayu Rp. 60,000.00 Rp. 4,200.00

0.0300 OH Pekerja Rp. 45,000.00 Rp. 1,350.00

1.1000 Lbr Pelat Asbes Tebal 5 mm Rp. 32,500.00

0.0100 Kg Paku Triplek Rp. 13,000.00

795 1 M2 Langit-langit Asbes Tebal 4 mm Rp. 6,157.50

0.0020 OH Mandor Rp. 67,500.00 Rp. 135.00

0.0070 OH Kepala Tukang Rp. 67,500.00 Rp. 472.50

0.0700 OH Tukang Kayu Rp. 60,000.00 Rp. 4,200.00

0.0300 OH Pekerja Rp. 45,000.00 Rp. 1,350.00

1.1000 Lbr Pelat Asbes Tebal 6 mm Rp. 35,000.00

0.0100 Kg Paku Triplek Rp. 13,000.00

796 1 M2 Langit-langit Akustik (30 x 30) cm Rp. 10,912.50

0.0030 OH Mandor Rp. 67,500.00 Rp. 202.50

0.0120 OH Kepala Tukang Rp. 67,500.00 Rp. 810.00

0.1200 OH Tukang Kayu Rp. 60,000.00 Rp. 7,200.00

0.0600 OH Pekerja Rp. 45,000.00 Rp. 2,700.00

12.0000 Lbr Akustik 30 x 30 cm Rp. 15,000.00

0.0500 Kg Paku Triplek Rp. 13,000.00

797 1 M2 Langit-langit Akustik (30 x 60) cm Rp. 4,177.50

0.0030 OH Mandor Rp. 67,500.00 Rp. 202.50

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.0100 OH Tukang Kayu Rp. 60,000.00 Rp. 600.00

0.0600 OH Pekerja Rp. 45,000.00 Rp. 2,700.00

5.8000 Lbr Akustik 30 x 60 cm Rp. 20,000.00

0.0500 Kg Paku Triplek Rp. 13,000.00

798 1 M2 Langit-langit Akustik (60 x 120) cm Rp. 4,177.50

0.0030 OH Mandor Rp. 67,500.00 Rp. 202.50

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.0100 OH Tukang Kayu Rp. 60,000.00 Rp. 600.00

0.0600 OH Pekerja Rp. 45,000.00 Rp. 2,700.00

1.5000 Lbr Akustik 60 x 120 cm Rp. 80,000.00

0.0500 Kg Paku Triplek Rp. 13,000.00

799 1 M2 Langit-langit Plywood (120 x 240) cm, Tebal 4 mm Rp. 10,095.00

0.0040 OH Mandor Rp. 67,500.00 Rp. 270.00

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Kayu Rp. 60,000.00 Rp. 6,000.00

0.0700 OH Pekerja Rp. 45,000.00 Rp. 3,150.00

0.3750 Lbr Plywood Ukuran 120 x 240 x 4 mm Rp. 48,250.00

0.0300 Kg Paku Triplek Rp. 13,000.00

800 1 M2 Langit-langit Lamberziring Kayu, Tebal 9 mm Rp. 80,602.50

0.0030 OH Mandor Rp. 67,500.00 Rp. 202.50

0.0800 OH Kepala Tukang Rp. 67,500.00 Rp. 5,400.00

0.8000 OH Tukang Kayu Rp. 60,000.00 Rp. 48,000.00

0.6000 OH Pekerja Rp. 45,000.00 Rp. 27,000.00

0.0150 M3 Kayu Klas II Papan Rp. 2,300,000.00

0.0100 Kg Paku Triplek Rp. 13,000.00

801 1 M2 Langit-langit Gypsum Board (120 x 240), Tebal 9 mm Rp. 8,175.00

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0050 OH Kepala Tukang Rp. 67,500.00 Rp. 337.50

0.0500 OH Tukang Kayu Rp. 60,000.00 Rp. 3,000.00

0.1000 OH Pekerja Rp. 45,000.00 Rp. 4,500.00

0.3640 Lbr Gypsum Board (120 x 240 x 9) mm Rp. 125,000.00

0.1100 Kg Paku Skrup 10 cm Rp. 16,000.00

802 1 M2 Langit-langit Akustik (60 x 120) cm Rangka Allumunium Rp. 40,665.00

0.0080 OH Mandor Rp. 67,500.00 Rp. 540.00

Page 67: Analisa Sni 2011

Page 67

NO URAIAN H. SATUAN UPAH

0.0500 OH Kepala Tukang Rp. 67,500.00 Rp. 3,375.00

0.5000 OH Tukang Kayu Rp. 60,000.00 Rp. 30,000.00

0.1500 OH Pekerja Rp. 45,000.00 Rp. 6,750.00

3.6000 M1 Profil Alluminium Rp. 55,000.00

1.5000 Kg Kawat Beton Rp. 14,000.00

1.0500 Bh Ramset / Dina Boft Rp. 15,000.00

1.5000 Lbr Akustik 60 x 120 cm Rp. 80,000.00

803 1 M1 Langit-langit Kayu Profil Rp. 6,127.50

0.0030 OH Mandor Rp. 67,500.00 Rp. 202.50

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.0500 OH Tukang Kayu Rp. 60,000.00 Rp. 3,000.00

0.0500 OH Pekerja Rp. 45,000.00 Rp. 2,250.00

1.0500 M1 List Kayu Profil Rp. 3,750.00

0.0100 Kg Paku Triplek Rp. 13,000.00

K Analisa Biaya Konstruksi Pekerjaan Sanitasi

804 1 Bh Memasang Kloset Duduk / Monoblok Rp. 233,617.50

0.1600 OH Mandor Rp. 67,500.00 Rp. 10,800.00

0.0010 OH Kepala Tukang Rp. 67,500.00 Rp. 67.50

1.1000 OH Tukang Batu Rp. 67,500.00 Rp. 74,250.00

3.3000 OH Pekerja Rp. 45,000.00 Rp. 148,500.00

1.0000 Bh Kloset Duduk / Monoblok Rp. 400,000.00

0.0600 Set Perlengkapan Rp. 400,000.00

805 1 Bh Memasang Kloset Duduk Otomatis Rp. 233,617.50

0.1600 OH Mandor Rp. 67,500.00 Rp. 10,800.00

0.0010 OH Kepala Tukang Rp. 67,500.00 Rp. 67.50

1.1000 OH Tukang Batu Rp. 67,500.00 Rp. 74,250.00

3.3000 OH Pekerja Rp. 45,000.00 Rp. 148,500.00

1.0000 Bh Kloset Duduk / Otomatis Rp. 1,350,000.00

0.0600 Set Perlengkapan Rp. 1,350,000.00

806 1 Bh Memasang Kloset Jongkok Porselen Rp. 258,300.00

0.1600 OH Mandor Rp. 67,500.00 Rp. 10,800.00

1.5000 OH Kepala Tukang Rp. 67,500.00 Rp. 101,250.00

1.5000 OH Tukang Batu Rp. 67,500.00 Rp. 101,250.00

1.0000 OH Pekerja Rp. 45,000.00 Rp. 45,000.00

1.0000 Bh Kloset Jongkok Porselen Rp. 180,000.00

6.0000 Kg Semen Portland Rp. 1,040.00

0.0100 M3 Pasir Pasang Rp. 90,000.00

807 1 Bh Memasang Kloset Jongkok Teraso Rp. 173,925.00

0.1100 OH Mandor Rp. 67,500.00 Rp. 7,425.00

0.3000 OH Kepala Tukang Rp. 67,500.00 Rp. 20,250.00

1.5000 OH Tukang Batu Rp. 67,500.00 Rp. 101,250.00

1.0000 OH Pekerja Rp. 45,000.00 Rp. 45,000.00

1.0000 Bh kloset Jongkok Teraso Rp. 180,000.00

7.0000 Bh Batu Bata Rp. 650.00

6.0000 Kg Semen Portland Rp. 1,040.00

0.0100 M3 Pasir Pasang Rp. 90,000.00

808 1 Bh Memasang Urinoir Rp. 126,000.00

0.1000 OH Mandor Rp. 67,500.00 Rp. 6,750.00

0.1000 OH Kepala Tukang Rp. 67,500.00 Rp. 6,750.00

1.0000 OH Tukang Batu Rp. 67,500.00 Rp. 67,500.00

1.0000 OH Pekerja Rp. 45,000.00 Rp. 45,000.00

1.0000 Bh Urinoir Rp. 650,000.00

0.3000 Set Perlengkapan Rp. 650,000.00

6.0000 Kg Semen Portland Rp. 1,040.00

0.0100 M3 Pasir Pasang Rp. 90,000.00

809 1 Bh Memasang Wastafel Rp. 168,750.00

0.1000 OH Mandor Rp. 67,500.00 Rp. 6,750.00

0.1500 OH Kepala Tukang Rp. 67,500.00 Rp. 10,125.00

1.4500 OH Tukang Batu Rp. 67,500.00 Rp. 97,875.00

1.2000 OH Pekerja Rp. 45,000.00 Rp. 54,000.00

1.0000 Bh Washtafel Rp. 450,000.00

0.1200 Set Perlengkapan Rp. 450,000.00

6.0000 Kg Semen Abu-abu Rp. 1,040.00

0.0100 M3 Pasir Pasang Rp. 90,000.00

810 1 Bh Memasang Bak Mandi Teraso Volume 0,30 m3 Rp. -

0.1100 OH Mandor Rp. 67,500.00 Rp. 7,425.00

0.0700 OH Kepala Tukang Rp. 67,500.00 Rp. 4,725.00

0.7500 OH Tukang Batu Rp. 67,500.00 Rp. 50,625.00

2.1000 OH Pekerja Rp. 45,000.00 Rp. 94,500.00

1.0000 Bh Bak Teraso Rp. 210,000.00

6.0000 Kg Semen Portland Rp. 1,040.00

0.0100 M3 Pasir Pasang Rp. 90,000.00

811 1 Bh Memasang Bak Mandi Fiberglass Volume 0,30 m3 Rp. 307,125.00

0.1100 OH Mandor Rp. 67,500.00 Rp. 7,425.00

0.5400 OH Kepala Tukang Rp. 67,500.00 Rp. 36,450.00

2.7000 OH Tukang Batu Rp. 67,500.00 Rp. 182,250.00

1.8000 OH Pembantu Tukang Rp. 45,000.00 Rp. 81,000.00

Page 68: Analisa Sni 2011

Page 68

NO URAIAN H. SATUAN UPAH

1.0000 Bh Bak Fiberglass Rp. 225,000.00

0.1800 Set Perlengkapan Rp. 225,000.00

812 1 Bh Memasang Bak Mandi Batu Bata Volume 0,30 m3 Rp. 513,000.00

0.3000 OH Mandor Rp. 67,500.00 Rp. 20,250.00

0.3000 OH Kepala Tukang Rp. 67,500.00 Rp. 20,250.00

3.0000 OH Tukang Batu Rp. 67,500.00 Rp. 202,500.00

6.0000 OH Pekerja Rp. 45,000.00 Rp. 270,000.00

0.4000 M3 Batu Bata (M3) Rp. 467,121.81

120.0000 Kg Semen Portland Rp. 1,040.00

0.3000 M3 Pasir Pasang Rp. 90,000.00

360.0000 Bh Porselin 11 x 11 cm Rp. 435.60

6.0000 Kg Semen Nat Rp. 5,000.00

813 1 Bh Memasang Badkip Porselen Rp. 72,562.50

0.2500 OH Mandor Rp. 67,500.00 Rp. 16,875.00

0.7500 OH Kepala Tukang Rp. 67,500.00 Rp. 50,625.00

0.0750 OH Tukang Batu Rp. 67,500.00 Rp. 5,062.50

1.0000 Bh Badkip #NUM!

0.2000 Set Perlengkapan #NUM!

814 1 Bh Memasang Bak Fiberglass Volume 1 m3 Air Rp. 560,250.00

0.9000 OH Mandor Rp. 67,500.00 Rp. 60,750.00

0.9000 OH Kepala Tukang Rp. 67,500.00 Rp. 60,750.00

4.5000 OH Tukang Batu Rp. 67,500.00 Rp. 303,750.00

3.0000 OH Pekerja Rp. 45,000.00 Rp. 135,000.00

1.0000 Bh Bak Fiberglass Rp. 225,000.00

0.1200 Set Perlengkapan Rp. 225,000.00

815 1 M1 Memasang pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 15 cm Rp. 5,096.25

0.0025 OH Mandor Rp. 67,500.00 Rp. 168.75

0.0030 OH Kepala Tukang Rp. 67,500.00 Rp. 202.50

0.0300 OH Tukang Batu Rp. 67,500.00 Rp. 2,025.00

0.0600 OH Pekerja Rp. 45,000.00 Rp. 2,700.00

1.6000 Bh Pipa Tanah Dia. 15 cm Rp. 40,000.00

0.6800 Kg Semen Portland Rp. 1,040.00

0.0130 M3 Pasir Pasang Rp. 90,000.00

0.0110 M3 Pasir urug Rp. 45,000.00

816 1 M1 Memasang pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 20 cm Rp. 7,042.50

0.0070 OH Mandor Rp. 67,500.00 Rp. 472.50

0.0040 OH Kepala Tukang Rp. 67,500.00 Rp. 270.00

0.0400 OH Tukang Batu Rp. 67,500.00 Rp. 2,700.00

0.0800 OH Pekerja Rp. 45,000.00 Rp. 3,600.00

1.6000 Bh Pipa Tanah Dia. 20 cm Rp. 50,000.00

0.8700 Kg Semen Portland Rp. 1,040.00

0.0140 M3 Pasir Pasang Rp. 90,000.00

0.0140 M3 Pasir urug Rp. 45,000.00

817 1 Bh Memasang Pipa Beton, Diameter 15 - 20 cm Rp. 11,970.00

0.0070 OH Mandor Rp. 67,500.00 Rp. 472.50

0.0070 OH Kepala Tukang Rp. 67,500.00 Rp. 472.50

0.0700 OH Tukang Batu Rp. 67,500.00 Rp. 4,725.00

0.1400 OH Pekerja Rp. 45,000.00 Rp. 6,300.00

1.1000 Bh Pipa Beton Dia. 15 - 20 cm Rp. 40,000.00

0.0270 M3 Batu Bata (M3) Rp. 467,121.81

3.9200 Kg Semen Portland Rp. 1,040.00

0.0560 M3 Pasir Pasang Rp. 90,000.00

0.0240 M3 Pasir urug Rp. 45,000.00

818 1 Bh Memasang Pipa Beton, Diameter 30 - 100 cm Rp. 32,490.00

0.0190 OH Mandor Rp. 67,500.00 Rp. 1,282.50

0.0190 OH Kepala Tukang Rp. 67,500.00 Rp. 1,282.50

0.1900 OH Tukang Batu Rp. 67,500.00 Rp. 12,825.00

0.3800 OH Pekerja Rp. 45,000.00 Rp. 17,100.00

1.1000 Bh Pipa Beton Dia. 30 - 100 cm Rp. 150,000.00

0.5500 M3 Batu Bata (M3) Rp. 467,121.81

10.3000 Kg Semen Portland Rp. 1,040.00

0.0610 M3 Pasir Pasang Rp. 90,000.00

0.0690 M3 Pasir urug Rp. 45,000.00

819 1 Bh Memasang Bak Kontrol Pasangan Batu Bata Ukuran (30 x 30) cm Rp. 213,693.75

0.0160 OH Mandor Rp. 67,500.00 Rp. 1,080.00

0.0015 OH Kepala Tukang Rp. 67,500.00 Rp. 101.25

1.0150 OH Tukang Batu Rp. 67,500.00 Rp. 68,512.50

3.2000 OH Pekerja Rp. 45,000.00 Rp. 144,000.00

0.1450 M3 Batu Bata (M3) Rp. 467,121.81

44.0000 Kg Semen Portland Rp. 1,040.00

0.0700 M3 Pasir Pasang Rp. 90,000.00

0.0700 M3 Batu Kerikil Rp. 90,000.00

1.6000 Kg Besi Beton Polos Rp. 8,000.00

0.0600 M3 Pasir Beton Rp. 80,000.00

820 1 Bh Memasang Bak Kontrol Pasangan Batu Bata Ukuran (45 x 45) cm Rp. 103,792.50

0.0710 OH Mandor Rp. 67,500.00 Rp. 4,792.50

0.0470 OH Kepala Tukang Rp. 67,500.00 Rp. 3,172.50

0.4730 OH Tukang Batu Rp. 67,500.00 Rp. 31,927.50

1.4200 OH Pekerja Rp. 45,000.00 Rp. 63,900.00

Page 69: Analisa Sni 2011

Page 69

NO URAIAN H. SATUAN UPAH

0.2500 M3 Batu Bata (M3) Rp. 467,121.81

77.0000 Kg Semen Portland Rp. 1,040.00

0.1300 M3 Pasir Pasang Rp. 90,000.00

0.0200 M3 Batu Kerikil Rp. 90,000.00

2.6000 Kg Besi Beton Polos Rp. 8,000.00

0.0900 M3 Pasir Beton Rp. 80,000.00

821 1 Bh Memasang Bak Kontrol Pasangan Batu Bata Ukuran (60 x 60) cm Rp. 162,450.00

0.1080 OH Mandor Rp. 67,500.00 Rp. 7,290.00

0.0720 OH Kepala Tukang Rp. 67,500.00 Rp. 4,860.00

0.7200 OH Tukang Batu Rp. 67,500.00 Rp. 48,600.00

0.1000 OH Tukang Gali Rp. 45,000.00 Rp. 4,500.00

2.1600 OH Pekerja Rp. 45,000.00 Rp. 97,200.00

0.3710 M3 Batu Bata (M3) Rp. 467,121.81

114.0000 Kg Semen Portland Rp. 1,040.00

0.1840 M3 Pasir Pasang Rp. 90,000.00

0.0330 M3 Batu Koral Rp. 95,000.00

4.8500 Kg Besi Beton Polos Rp. 8,000.00

0.1200 M3 Pasir Beton Rp. 80,000.00

822 1 M1 Memasang Pipa Galvanis Diameter 1/2" Rp. 10,935.00

0.0270 OH Mandor Rp. 67,500.00 Rp. 1,822.50

0.0090 OH Kepala Tukang Rp. 67,500.00 Rp. 607.50

0.0900 OH Tukang Batu Rp. 67,500.00 Rp. 6,075.00

0.0540 OH Pekerja Rp. 45,000.00 Rp. 2,430.00

1.2000 M1 Pipa Galvanis Dia. 0,5" Rp. 16,000.00

0.3500 Set Perlengkapan Rp. 19,200.00

823 1 M1 Memasang Pipa Galvanis Diameter 3/4" Rp. 10,935.00

0.0270 OH Mandor Rp. 67,500.00 Rp. 1,822.50

0.0090 OH Kepala Tukang Rp. 67,500.00 Rp. 607.50

0.0900 OH Tukang Batu Rp. 67,500.00 Rp. 6,075.00

0.0540 OH Pekerja Rp. 45,000.00 Rp. 2,430.00

1.2000 M1 Pipa Galvanis Dia. 0,75" Rp. 25,000.00

0.3500 Set Perlengkapan Rp. 30,000.00

824 1 M1 Memasang Pipa Galvanis Diameter 1" Rp. 10,935.00

0.0270 OH Mandor Rp. 67,500.00 Rp. 1,822.50

0.0090 OH Kepala Tukang Rp. 67,500.00 Rp. 607.50

0.0900 OH Tukang Batu Rp. 67,500.00 Rp. 6,075.00

0.0540 OH Pekerja Rp. 45,000.00 Rp. 2,430.00

1.2000 M1 Pipa Galvanis Dia. 1" Rp. 40,000.00

0.3500 Set Perlengkapan Rp. 48,000.00

825 1 M1 Memasang Pipa Galvanis Diameter 1 1/2" Rp. 18,589.50

0.0054 OH Mandor Rp. 67,500.00 Rp. 364.50

0.0180 OH Kepala Tukang Rp. 67,500.00 Rp. 1,215.00

0.1800 OH Tukang Batu Rp. 67,500.00 Rp. 12,150.00

0.1080 OH Pekerja Rp. 45,000.00 Rp. 4,860.00

1.2000 M1 Pipa Galvanis Dia. 1,5" Rp. 55,000.00

0.3500 Set Perlengkapan Rp. 66,000.00

826 1 M1 Memasang Pipa Galvanis Diameter 3" Rp. 18,589.50

0.0054 OH Mandor Rp. 67,500.00 Rp. 364.50

0.0180 OH Kepala Tukang Rp. 67,500.00 Rp. 1,215.00

0.1800 OH Tukang Batu Rp. 67,500.00 Rp. 12,150.00

0.1080 OH Pekerja Rp. 45,000.00 Rp. 4,860.00

1.2000 M1 Pipa Galvanis Dia. 3" Rp. 75,000.00

0.3500 Set Perlengkapan Rp. 90,000.00

827 1 M1 Memasang Pipa Galvanis Diameter 4" Rp. 23,240.25

0.0068 OH Mandor Rp. 67,500.00 Rp. 459.00

0.0225 OH Kepala Tukang Rp. 67,500.00 Rp. 1,518.75

0.2250 OH Tukang Batu Rp. 67,500.00 Rp. 15,187.50

0.1350 OH Pekerja Rp. 45,000.00 Rp. 6,075.00

1.2000 M1 Pipa Galvanis Dia. 4" Rp. 90,000.00

0.3500 Set Perlengkapan Rp. 108,000.00

828 1 M1 Memasang Pipa PVC Tipe AW Diameter 1/2" Rp. 6,196.50

0.0018 OH Mandor Rp. 67,500.00 Rp. 121.50

0.0060 OH Kepala Tukang Rp. 67,500.00 Rp. 405.00

0.0600 OH Tukang Batu Rp. 67,500.00 Rp. 4,050.00

0.0360 OH Pekerja Rp. 45,000.00 Rp. 1,620.00

1.2000 M1 Pipa PVC Dia. 0,5" Rp. 3,750.00

0.3500 Set Perlengkapan Rp. 4,500.00

829 1 M1 Memasang Pipa PVC Tipe AW Diameter 3/4" Rp. 6,196.50

0.0018 OH Mandor Rp. 67,500.00 Rp. 121.50

0.0060 OH Kepala Tukang Rp. 67,500.00 Rp. 405.00

0.0600 OH Tukang Batu Rp. 67,500.00 Rp. 4,050.00

0.0360 OH Pekerja Rp. 45,000.00 Rp. 1,620.00

1.2000 M1 Pipa PVC Dia. 0,75" Rp. 5,000.00

0.3500 Set Perlengkapan Rp. 6,000.00

830 1 M1 Memasang Pipa PVC Tipe AW Diameter 1" Rp. 6,196.50

0.0018 OH Mandor Rp. 67,500.00 Rp. 121.50

0.0060 OH Kepala Tukang Rp. 67,500.00 Rp. 405.00

Page 70: Analisa Sni 2011

Page 70

NO URAIAN H. SATUAN UPAH

0.0600 OH Tukang Batu Rp. 67,500.00 Rp. 4,050.00

0.0360 OH Pekerja Rp. 45,000.00 Rp. 1,620.00

1.2000 M1 Pipa PVC Dia. 1" Rp. 6,250.00

0.3500 Set Perlengkapan Rp. 7,500.00

831 1 M1 Memasang Pipa PVC Tipe AW Diameter 1 1/2" Rp. 6,196.50

0.0018 OH Mandor Rp. 67,500.00 Rp. 121.50

0.0060 OH Kepala Tukang Rp. 67,500.00 Rp. 405.00

0.0600 OH Tukang Batu Rp. 67,500.00 Rp. 4,050.00

0.0360 OH Pekerja Rp. 45,000.00 Rp. 1,620.00

1.2000 M1 Pipa PVC Dia. 1,5" Rp. 8,750.00

0.3500 Set Perlengkapan Rp. 10,500.00

832 1 M1 Memasang Pipa PVC Tipe AW Diameter 2" Rp. 9,294.75

0.0027 OH Mandor Rp. 67,500.00 Rp. 182.25

0.0090 OH Kepala Tukang Rp. 67,500.00 Rp. 607.50

0.0900 OH Tukang Batu Rp. 67,500.00 Rp. 6,075.00

0.0540 OH Pekerja Rp. 45,000.00 Rp. 2,430.00

1.2000 M1 Pipa PVC Dia. 2" Rp. 13,750.00

0.3500 Set Perlengkapan Rp. 16,500.00

833 1 M1 Memasang Pipa PVC Tipe AW Diameter 2 1/2" Rp. 6,196.50

0.0018 OH Mandor Rp. 67,500.00 Rp. 121.50

0.0060 OH Kepala Tukang Rp. 67,500.00 Rp. 405.00

0.0600 OH Tukang Batu Rp. 67,500.00 Rp. 4,050.00

0.0360 OH Pekerja Rp. 45,000.00 Rp. 1,620.00

1.2000 M1 Pipa PVC Dia. 2,5" Rp. 20,000.00

0.3500 Set Perlengkapan Rp. 24,000.00

834 1 M1 Memasang Pipa PVC Tipe AW Diameter 3" Rp. 13,945.50

0.0041 OH Mandor Rp. 67,500.00 Rp. 276.75

0.0135 OH Kepala Tukang Rp. 67,500.00 Rp. 911.25

0.1350 OH Tukang Batu Rp. 67,500.00 Rp. 9,112.50

0.0810 OH Pekerja Rp. 45,000.00 Rp. 3,645.00

1.2000 M1 Pipa PVC Dia. 3" Rp. 27,500.00

0.3500 Set Perlengkapan Rp. 33,000.00

835 1 M1 Memasang Pipa PVC Tipe AW Diameter 4" Rp. 13,945.50

0.0041 OH Mandor Rp. 67,500.00 Rp. 276.75

0.0135 OH Kepala Tukang Rp. 67,500.00 Rp. 911.25

0.1350 OH Tukang Batu Rp. 67,500.00 Rp. 9,112.50

0.0810 OH Pekerja Rp. 45,000.00 Rp. 3,645.00

1.2000 M1 Pipa PVC Dia. 4" Rp. 42,500.00

0.3500 Set Perlengkapan Rp. 51,000.00

836 1 Bh Memasang Bak Cuci Piring Stainles Steel Rp. 23,726.25

0.0015 OH Mandor Rp. 67,500.00 Rp. 101.25

0.0300 OH Kepala Tukang Rp. 67,500.00 Rp. 2,025.00

0.3000 OH Tukang Batu Rp. 67,500.00 Rp. 20,250.00

0.0300 OH Pekerja Rp. 45,000.00 Rp. 1,350.00

1.0000 Bh Bak Cuci Stainles Steel Rp. 180,000.00

1.0000 Set Water Drain + Asesories Rp. 35,000.00

837 1 Bh Memasang Bak Cuci Piring Teraso Rp. 39,543.75

0.0025 OH Mandor Rp. 67,500.00 Rp. 168.75

0.0500 OH Kepala Tukang Rp. 67,500.00 Rp. 3,375.00

0.5000 OH Tukang Batu Rp. 67,500.00 Rp. 33,750.00

0.0500 OH Pekerja Rp. 45,000.00 Rp. 2,250.00

1.0000 Bh Bak Cuci Teraso Rp. 210,000.00

1.0000 Set Water Drain + Asesories Rp. 35,000.00

20.0000 Kg Semen Portland Rp. 1,040.00

0.0500 M3 Pasir Pasang Rp. 90,000.00

838 1 Bh Memasang Kran Diameter 3/4" Atau 1/2" Rp. 8,212.50

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Batu Rp. 67,500.00 Rp. 6,750.00

0.0100 OH Pekerja Rp. 45,000.00 Rp. 450.00

1.0000 Bh Kran Air (Stainless Steel) Rp. 35,000.00

0.0250 Bh Seal Tape Rp. 3,000.00

839 1 Bh Memasang Floor Drain Rp. 8,212.50

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Batu Rp. 67,500.00 Rp. 6,750.00

0.0100 OH Pekerja Rp. 45,000.00 Rp. 450.00

1.0000 Bh Floor Drain Stainless Steel Rp. 50,000.00

840 1 BH Bak Kontrol Rp. 97,650.00

0.3000 OH Tukang Batu Rp. 67,500.00 Rp. 20,250.00

0.0300 OH Kepala Tukang Rp. 67,500.00 Rp. 2,025.00

1.0000 OH Pekerja Rp. 45,000.00 Rp. 45,000.00

0.4500 OH Mandor Rp. 67,500.00 Rp. 30,375.00

0.1000 M3 Pasang Pondasi Batu Kali, 1 Pc : 3 Ps Rp. 478,842.50

0.1000 M3 Pasir Urug Rp. 45,000.00

0.8333 M2 Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 2 Ps Rp. 90,565.50

0.0500 M3 Pekerjaan Beton K 225 Rp. 595,830.71

5.0000 Kg Pembesian Dengan Besi Polos Atau Besi Ulir Rp. 9,314.25

0.5000 M2 Pasang Bekisting Untuk Lantai Rp. 293,080.00

3.0000 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm Rp. 33,245.46

0.4440 Kg Besi Beton Polos Rp. 8,000.00

841 1 BH Pekerjaan Septictank Kap. 50 Orang Rp. -

Page 71: Analisa Sni 2011

Page 71

NO URAIAN H. SATUAN UPAH

14.8000 M3 Galian Tanah Biasa Sedalam 2 meter Rp. 43,537.50

3.6000 M3 Urugan Kembali Rp. 9,922.50

0.5000 M3 Pekerjaan Beton K 100 Rp. 473,442.14

20.8333 M2 Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 2 Ps Rp. 90,565.50

20.7200 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm Rp. 33,245.46

0.5000 M3 Pekerjaan Beton K 225 Rp. 595,830.71

50.0000 Kg Pembesian Dengan Besi Polos Atau Besi Ulir Rp. 9,314.25

5.0000 M2 Pasang Bekisting Untuk Lantai Rp. 293,080.00

2.5000 M3 Kerikil Saring Rp. 125,000.00

2.0000 M3 Abu Batu / Pasir Saring Rp. 95,000.00

5.0000 M1 Pipa PVC Dia. 4" Rp. 42,500.00

3.0000 M1 Pipa PVC Dia. 0,75" Rp. 5,000.00

20.0000 Kg Ijuk Saringan Rp. 15,000.00

842 1 BH Pekerjaan Septictank Kap. 25 Orang Rp. -

6.3200 M3 Galian Tanah Biasa Sedalam 2 meter Rp. 43,537.50

1.6000 M3 Urugan Kembali Rp. 9,922.50

0.2000 M3 Pekerjaan Beton K 100 Rp. 473,442.14

16.1667 M2 Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 2 Ps Rp. 90,565.50

16.5000 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm Rp. 33,245.46

0.3000 M3 Pekerjaan Beton K 225 Rp. 595,830.71

30.0000 Kg Pembesian Dengan Besi Polos Atau Besi Ulir Rp. 9,314.25

3.0000 M2 Pasang Bekisting Untuk Lantai Rp. 293,080.00

2.0000 M3 Kerikil Saring Rp. 125,000.00

2.0000 M3 Abu Batu / Pasir Saring Rp. 95,000.00

5.0000 M1 Pipa PVC Dia. 4" Rp. 42,500.00

3.0000 M1 Pipa PVC Dia. 0,75" Rp. 5,000.00

20.0000 Kg Ijuk Saringan Rp. 15,000.00

843 1 BH Pekerjaan Septictank Kap. 15 Orang Rp. -

2.9000 M3 Galian Tanah Biasa Sedalam 2 meter Rp. 43,537.50

0.8000 M3 Urugan Kembali Rp. 9,922.50

0.1400 M3 Pekerjaan Beton K 100 Rp. 473,442.14

8.5833 M2 Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 2 Ps Rp. 90,565.50

2.2500 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm Rp. 33,245.46

0.1400 M3 Pekerjaan Beton K 225 Rp. 595,830.71

14.0000 Kg Pembesian Dengan Besi Polos Atau Besi Ulir Rp. 9,314.25

1.4000 M2 Pasang Bekisting Untuk Lantai Rp. 293,080.00

2.0000 M3 Kerikil Saring Rp. 125,000.00

2.0000 M3 Abu Batu / Pasir Saring Rp. 95,000.00

5.0000 M1 Pipa PVC Dia. 4" Rp. 42,500.00

3.0000 M1 Pipa PVC Dia. 0,75" Rp. 5,000.00

10.0000 Kg Ijuk Saringan Rp. 15,000.00

L Analisa Biaya Konstruksi Pekerjaan Besi

844 1 Kg Pasang Besi Profil Rp. 3,395.25

0.0003 OH Mandor Rp. 67,500.00 Rp. 20.25

0.0060 OH Kepala Tukang Rp. 67,500.00 Rp. 405.00

0.0060 OH Tukang Besi Rp. 45,000.00 Rp. 270.00

0.0600 OH Pekerja Rp. 45,000.00 Rp. 2,700.00

1.1500 Kg Besi Profil IWF Rp. 9,000.00

845 100 Kg Pekerjaan Perakitan Rp. 118.55

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0010 OH Kepala Tukang Rp. 67,500.00 Rp. 67.50

0.1000 OH Tukang Besi Rp. 45,000.00 Rp. 4,500.00

0.1000 OH Pekerja Rp. 45,000.00 Rp. 4,500.00

0.1000 Ltr BBM Rp. 4,500.00 Rp. 450.00

0.1000 Ltr Minyak Pelumas Rp. 20,000.00 Rp. 2,000.00

1.1500 Jam Sewa Alat Konsruksi Rp. 40,000.00

846 1 CM Pengelasan Dengan Listrik Rp. 297.00

0.0002 OH Mandor Rp. 67,500.00 Rp. 13.50

0.0002 OH Kepala Tukang Rp. 67,500.00 Rp. 13.50

0.0020 OH Tukang Besi Rp. 45,000.00 Rp. 90.00

0.0040 OH Pekerja Rp. 45,000.00 Rp. 180.00

0.0400 Kg Kawat Las Rp. 22,000.00

0.0300 Ltr BBM Rp. 4,500.00

0.0040 Ltr Minyak Pelumas Rp. 20,000.00

0.0170 Jam Sewa Alat Konsruksi Rp. 40,000.00

847 1 M2 Pasang Kawat Harmonika Rp. 11,208.75

0.0005 OH Mandor Rp. 67,500.00 Rp. 33.75

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Kayu Rp. 60,000.00 Rp. 6,000.00

0.1000 OH Pekerja Rp. 45,000.00 Rp. 4,500.00

1.1000 M2 Kawat Harmonika Rp. 20,000.00

0.0200 Kg Paku 1 cm - 2,5 cm Rp. 13,000.00

0.0018 M3 Kayu Merantih Papan Rp. 2,300,000.00

848 1 M2 Pasang Kawat Kassa Rp. 11,208.75

0.0005 OH Mandor Rp. 67,500.00 Rp. 33.75

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Kayu Rp. 60,000.00 Rp. 6,000.00

0.1000 OH Pekerja Rp. 45,000.00 Rp. 4,500.00

1.1000 M2 Kawat Kassa Rp. 15,000.00

Page 72: Analisa Sni 2011

Page 72

NO URAIAN H. SATUAN UPAH

0.0200 Kg Paku 1 cm - 2,5 cm Rp. 13,000.00

0.0018 M3 Kayu Merantih Papan Rp. 2,300,000.00

849 1 M2 Pasang Kawat Burung Rp. 11,208.75

0.0005 OH Mandor Rp. 67,500.00 Rp. 33.75

0.0100 OH Kepala Tukang Rp. 67,500.00 Rp. 675.00

0.1000 OH Tukang Kayu Rp. 60,000.00 Rp. 6,000.00

0.1000 OH Pekerja Rp. 45,000.00 Rp. 4,500.00

1.1000 M2 Kawat Burung Rp. 15,000.00

0.0200 Kg Paku 1 cm - 2,5 cm Rp. 13,000.00

0.0018 M3 Kayu Merantih Papan Rp. 2,300,000.00

M Analisa Biaya Konstruksi Pekerjaan Penutup Dinding dan Lantai

850 1 M2 Pasang Lantai Paving Block Rp. 13,050.00

0.2000 OH Pekerja Rp. 45,000.00 Rp. 9,000.00

0.0600 OH Tukang Batu Rp. 67,500.00 Rp. 4,050.00

35.0000 Bh Paving Block Rp. 1,300.00

0.0350 M3 Pasir Pasang Rp. 90,000.00

851 1 M2 Pasang Lantai Ubin PC Abu-abu Ukuran 40 x 40 cm Rp. 21,037.50

0.0130 OH Mandor Rp. 67,500.00 Rp. 877.50

0.0120 OH Kepala Tukang Rp. 67,500.00 Rp. 810.00

0.1200 OH Tukang Batu Rp. 67,500.00 Rp. 8,100.00

0.2500 OH Pekerja Rp. 45,000.00 Rp. 11,250.00

6.6300 Bh Ubin 40 x 40 cm Abu-abu Rp. 22,400.00

9.8000 Kg Semen Portland Rp. 1,040.00

0.0450 M3 Pasir Pasang Rp. 90,000.00

852 1 M2 Pasang Lantai Ubin PC Abu-abu Ukuran 30 x 30 cm Rp. 21,892.50

0.0130 OH Mandor Rp. 67,500.00 Rp. 877.50

0.0130 OH Kepala Tukang Rp. 67,500.00 Rp. 877.50

0.1250 OH Tukang Batu Rp. 67,500.00 Rp. 8,437.50

0.2600 OH Pekerja Rp. 45,000.00 Rp. 11,700.00

11.8700 Bh Ubin 30 x 30 cm Abu-abu Rp. 6,000.00

10.0000 Kg Semen Portland Rp. 1,040.00

0.0450 M3 Pasir Pasang Rp. 90,000.00

853 1 M2 Pasang Lantai Ubin PC Abu-abu Ukuran 20 x 20 cm Rp. 22,747.50

0.0140 OH Mandor Rp. 67,500.00 Rp. 945.00

0.0130 OH Kepala Tukang Rp. 67,500.00 Rp. 877.50

0.1300 OH Tukang Batu Rp. 67,500.00 Rp. 8,775.00

0.2700 OH Pekerja Rp. 45,000.00 Rp. 12,150.00

26.5000 Bh Ubin 20 x 20 cm Abu-abu #N/A

10.4000 Kg Semen Portland Rp. 1,040.00

0.0135 M3 Pasir Pasang Rp. 90,000.00

854 1 M2 Pasang Lantai Ubin Warna Ukuran 40 x 40 cm Rp. 21,037.50

0.0130 OH Mandor Rp. 67,500.00 Rp. 877.50

0.0120 OH Kepala Tukang Rp. 67,500.00 Rp. 810.00

0.1200 OH Tukang Batu Rp. 67,500.00 Rp. 8,100.00

0.2500 OH Pekerja Rp. 45,000.00 Rp. 11,250.00

6.6300 Bh Ubin 40 x 40 cm Warna Rp. 22,400.00

9.8000 Kg Semen Portland Rp. 1,040.00

0.0450 M3 Pasir Pasang Rp. 90,000.00

1.3000 Kg Semen Warna Rp. 2,250.00

855 1 M2 Pasang Lantai Ubin Warna Ukuran 30 x 30 cm Rp. 21,892.50

0.0130 OH Mandor Rp. 67,500.00 Rp. 877.50

0.0130 OH Kepala Tukang Rp. 67,500.00 Rp. 877.50

0.1250 OH Tukang Batu Rp. 67,500.00 Rp. 8,437.50

0.2600 OH Pekerja Rp. 45,000.00 Rp. 11,700.00

11.8700 Bh Ubin 30 x 30 cm Warna Rp. 6,000.00

10.0000 Kg Semen Portland Rp. 1,040.00

0.0450 M3 Pasir Pasang Rp. 90,000.00

1.5000 Kg Semen Warna Rp. 2,250.00

856 1 M2 Pasang Lantai Ubin Warna Ukuran 20 x 20 cm Rp. 22,747.50

0.0140 OH Mandor Rp. 67,500.00 Rp. 945.00

0.0130 OH Kepala Tukang Rp. 67,500.00 Rp. 877.50

0.1300 OH Tukang Batu Rp. 67,500.00 Rp. 8,775.00

0.2700 OH Pekerja Rp. 45,000.00 Rp. 12,150.00

26.5000 Bh Ubin 20 x 20 cm Warna #N/A

10.4000 Kg Semen Portland Rp. 1,040.00

0.0450 M3 Pasir Pasang Rp. 90,000.00

1.6200 Kg Semen Warna Rp. 2,250.00

857 1 M2 Pasang Lantai Ubin Teraso Ukuran 40 x 40 cm Rp. 21,037.50

0.0130 OH Mandor Rp. 67,500.00 Rp. 877.50

0.0120 OH Kepala Tukang Rp. 67,500.00 Rp. 810.00

0.1200 OH Tukang Batu Rp. 67,500.00 Rp. 8,100.00

0.2500 OH Pekerja Rp. 45,000.00 Rp. 11,250.00

6.6300 Bh Ubin 40 x 40 cm Teraso Rp. 22,400.00

9.8000 Kg Semen Portland Rp. 1,040.00

0.0450 M3 Pasir Pasang Rp. 90,000.00

1.3000 Kg Semen Warna Rp. 2,250.00

Page 73: Analisa Sni 2011

Page 73

NO URAIAN H. SATUAN UPAH

858 1 M2 Pasang Lantai Ubin Teraso Ukuran 30 x 30 cm Rp. 21,892.50

0.0130 OH Mandor Rp. 67,500.00 Rp. 877.50

0.0130 OH Kepala Tukang Rp. 67,500.00 Rp. 877.50

0.1250 OH Tukang Batu Rp. 67,500.00 Rp. 8,437.50

0.2600 OH Pekerja Rp. 45,000.00 Rp. 11,700.00

11.8700 Bh Ubin 30 x 30 cm Teraso Rp. 6,000.00

10.0000 Kg Semen Portland Rp. 1,040.00

0.0450 M3 Pasir Pasang Rp. 90,000.00

1.5000 Kg Semen Warna Rp. 2,250.00

859 1 M2 Pasang Lantai Ubin Granito Ukuran 40 x 40 cm Rp. 21,037.50

0.0130 OH Mandor Rp. 67,500.00 Rp. 877.50

0.0120 OH Kepala Tukang Rp. 67,500.00 Rp. 810.00

0.1200 OH Tukang Batu Rp. 67,500.00 Rp. 8,100.00

0.2500 OH Pekerja Rp. 45,000.00 Rp. 11,250.00

6.6300 Bh Ubin 40 x 40 cm Granito Rp. 22,400.00

9.8000 Kg Semen Portland Rp. 1,040.00

0.0450 M3 Pasir Pasang Rp. 90,000.00

1.3000 Kg Semen Warna Rp. 2,250.00

860 1 M2 Pasang Lantai Ubin Granito Ukuran 30 x 30 cm Rp. 21,892.50

0.0130 OH Mandor Rp. 67,500.00 Rp. 877.50

0.0130 OH Kepala Tukang Rp. 67,500.00 Rp. 877.50

0.1250 OH Tukang Batu Rp. 67,500.00 Rp. 8,437.50

0.2600 OH Pekerja Rp. 45,000.00 Rp. 11,700.00

11.8700 Bh Ubin 30 x 30 cm Granito Rp. 8,750.00

10.0000 Kg Semen Portland Rp. 1,040.00

0.0450 M3 Pasir Pasang Rp. 90,000.00

1.5000 Kg Semen Warna Rp. 2,250.00

861 1 M2 Pasang Lantai Ubin Teralux Kerang Ukuran 40 x 40 cm Rp. 21,105.00

0.0130 OH Mandor Rp. 67,500.00 Rp. 877.50

0.0130 OH Kepala Tukang Rp. 67,500.00 Rp. 877.50

0.1200 OH Tukang Batu Rp. 67,500.00 Rp. 8,100.00

0.2500 OH Pekerja Rp. 45,000.00 Rp. 11,250.00

6.6300 Bh Ubin 40 x 40 cm Teralux Kerang Rp. 22,400.00

9.8000 Kg Semen Portland Rp. 1,040.00

0.0450 M3 Pasir Pasang Rp. 90,000.00

1.3000 Kg Semen Warna Rp. 2,250.00

862 1 M2 Pasang Lantai Ubin Teralux Kerang Ukuran 30 x 30 cm Rp. 21,892.50

0.0130 OH Mandor Rp. 67,500.00 Rp. 877.50

0.0130 OH Kepala Tukang Rp. 67,500.00 Rp. 877.50

0.1250 OH Tukang Batu Rp. 67,500.00 Rp. 8,437.50

0.2600 OH Pekerja Rp. 45,000.00 Rp. 11,700.00

11.8700 Bh Ubin 30 x 30 cm Teralux Kerang Rp. 6,000.00

10.0000 Kg Semen Portland Rp. 1,040.00

0.0450 M3 Pasir Pasang Rp. 90,000.00

1.5000 Kg Semen Warna Rp. 2,250.00

863 1 M2 Pasang Lantai Keramik Ukuran 60 x 60 cm Granito Rp. 21,037.50

0.0130 OH Mandor Rp. 67,500.00 Rp. 877.50

0.0120 OH Kepala Tukang Rp. 67,500.00 Rp. 810.00

0.1200 OH Tukang Batu Rp. 67,500.00 Rp. 8,100.00

0.2500 OH Pekerja Rp. 45,000.00 Rp. 11,250.00

3.1000 Bh Keramik 60 x 60 cm Granito x Rp. 58,333.33

9.6000 Kg Semen Portland Rp. 1,040.00

0.0450 M3 Pasir Pasang Rp. 90,000.00

1.5000 Kg Semen Warna Rp. 2,250.00

864 1 M2 Pasang Lantai Ubin Teralux Marmer Ukuran 40 x 40 cm Rp. 21,037.50

0.0130 OH Mandor Rp. 67,500.00 Rp. 877.50

0.0120 OH Kepala Tukang Rp. 67,500.00 Rp. 810.00

0.1200 OH Tukang Batu Rp. 67,500.00 Rp. 8,100.00

0.2500 OH Pekerja Rp. 45,000.00 Rp. 11,250.00

6.6300 Bh Ubin 40 x 40 cm Teralux Marmer Rp. 22,400.00

9.8000 Kg Semen Portland Rp. 1,040.00

0.0450 M3 Pasir Pasang Rp. 90,000.00

1.3000 Kg Semen Warna Rp. 2,250.00

865 1 M2 Pasang Lantai Ubin Teralux Marmer Ukuran 30 x 30 cm Rp. 21,892.50

0.0130 OH Mandor Rp. 67,500.00 Rp. 877.50

0.0130 OH Kepala Tukang Rp. 67,500.00 Rp. 877.50

0.1250 OH Tukang Batu Rp. 67,500.00 Rp. 8,437.50

0.2600 OH Pekerja Rp. 45,000.00 Rp. 11,700.00

11.8700 Bh Ubin 30 x 30 cm Teralux Marmer Rp. 6,000.00

10.0000 Kg Semen Portland Rp. 1,040.00

0.0450 M3 Pasir Pasang Rp. 90,000.00

1.5000 Kg Semen Warna Rp. 2,250.00

866 1 M1 Pasang Plint Ubin PC Abu-abu Ukuran 15 x 20 cm Rp. 11,070.00

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0090 OH Kepala Tukang Rp. 67,500.00 Rp. 607.50

0.0900 OH Tukang Batu Rp. 67,500.00 Rp. 6,075.00

0.0900 OH Pekerja Rp. 45,000.00 Rp. 4,050.00

Page 74: Analisa Sni 2011

Page 74

NO URAIAN H. SATUAN UPAH

5.3000 Bh Ubin 15 x 20 cm Plint #N/A

1.6500 Kg Semen Portland Rp. 1,040.00

0.0040 M3 Pasir Pasang Rp. 90,000.00

867 1 M1 Pasang Plint Ubin PC Abu-abu Ukuran 10 x 30 cm Rp. 11,070.00

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0090 OH Kepala Tukang Rp. 67,500.00 Rp. 607.50

0.0900 OH Tukang Batu Rp. 67,500.00 Rp. 6,075.00

0.0900 OH Pekerja Rp. 45,000.00 Rp. 4,050.00

3.5300 Bh Ubin 10 x 30 cm Plint #N/A

1.2400 Kg Semen Portland Rp. 1,040.00

0.0030 M3 Pasir Pasang Rp. 90,000.00

868 1 M1 Pasang Plint Ubin PC Abu-abu Ukuran 10 x 40 cm Rp. 11,070.00

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0090 OH Kepala Tukang Rp. 67,500.00 Rp. 607.50

0.0900 OH Tukang Batu Rp. 67,500.00 Rp. 6,075.00

0.0900 OH Pekerja Rp. 45,000.00 Rp. 4,050.00

2.6500 Bh Ubin 10 x 40 cm Plint #N/A

1.2400 Kg Semen Portland Rp. 1,040.00

0.0030 M3 Pasir Pasang Rp. 90,000.00

869 1 M1 Pasang Plint Ubin PC Warna Ukuran 10 x 20 cm Rp. 11,070.00

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0090 OH Kepala Tukang Rp. 67,500.00 Rp. 607.50

0.0900 OH Tukang Batu Rp. 67,500.00 Rp. 6,075.00

0.0900 OH Pekerja Rp. 45,000.00 Rp. 4,050.00

5.3000 Bh Ubin 10 x 20 cm PC Warna Plint #N/A

1.1400 Kg Semen Portland Rp. 1,040.00

0.0030 M3 Pasir Pasang Rp. 90,000.00

0.1000 Kg Semen Warna Rp. 2,250.00

870 1 M1 Pasang Plint Ubin PC Warna Ukuran 10 x 30 cm Rp. 11,070.00

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0090 OH Kepala Tukang Rp. 67,500.00 Rp. 607.50

0.0900 OH Tukang Batu Rp. 67,500.00 Rp. 6,075.00

0.0900 OH Pekerja Rp. 45,000.00 Rp. 4,050.00

3.5300 Bh Ubin 10 x 30 cm PC Warna Plint #N/A

1.1400 Kg Semen Portland Rp. 1,040.00

0.0030 M3 Pasir Pasang Rp. 90,000.00

0.1000 Kg Semen Warna Rp. 2,250.00

871 1 M1 Pasang Plint Ubin PC Warna Ukuran 10 x 40 cm Rp. 11,070.00

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0090 OH Kepala Tukang Rp. 67,500.00 Rp. 607.50

0.0900 OH Tukang Batu Rp. 67,500.00 Rp. 6,075.00

0.0900 OH Pekerja Rp. 45,000.00 Rp. 4,050.00

2.6500 Bh Ubin 10 x 40 cm PC Warna Plint #N/A

1.1400 Kg Semen Portland Rp. 1,040.00

0.0030 M3 Pasir Pasang Rp. 90,000.00

0.1000 Kg Semen Warna Rp. 2,250.00

872 1 M1 Pasang Plint Ubin Teraso Ukuran 10 x 30 cm Rp. 11,070.00

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0090 OH Kepala Tukang Rp. 67,500.00 Rp. 607.50

0.0900 OH Tukang Batu Rp. 67,500.00 Rp. 6,075.00

0.0900 OH Pekerja Rp. 45,000.00 Rp. 4,050.00

5.5300 Bh Ubin 10 x 30 cm Teraso Plint #N/A

1.1400 Kg Semen Portland Rp. 1,040.00

0.0030 M3 Pasir Pasang Rp. 90,000.00

0.1000 Kg Semen Warna Rp. 2,250.00

873 1 M1 Pasang Plint Ubin Teraso Ukuran 10 x 40 cm Rp. 11,070.00

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0090 OH Kepala Tukang Rp. 67,500.00 Rp. 607.50

0.0900 OH Tukang Batu Rp. 67,500.00 Rp. 6,075.00

0.0900 OH Pekerja Rp. 45,000.00 Rp. 4,050.00

2.6500 Bh Ubin 10 x 40 cm Teraso Plint #N/A

1.1400 Kg Semen Portland Rp. 1,040.00

0.0030 M3 Pasir Pasang Rp. 90,000.00

0.1000 Kg Semen Warna Rp. 2,250.00

874 1 M1 Pasang Plint Ubin Granito Ukuran 10 x 40 cm Rp. 11,070.00

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0090 OH Kepala Tukang Rp. 67,500.00 Rp. 607.50

0.0900 OH Tukang Batu Rp. 67,500.00 Rp. 6,075.00

0.0900 OH Pekerja Rp. 45,000.00 Rp. 4,050.00

2.6500 Bh Ubin 10 x 40 cm Granito Plint #N/A

1.1400 Kg Semen Portland Rp. 1,040.00

0.0030 M3 Pasir Pasang Rp. 90,000.00

0.1000 Kg Semen Warna Rp. 2,250.00

Page 75: Analisa Sni 2011

Page 75

NO URAIAN H. SATUAN UPAH

875 1 M1 Pasang Plint Ubin Granito Ukuran 10 x 30 cm Rp. 11,070.00

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0090 OH Kepala Tukang Rp. 67,500.00 Rp. 607.50

0.0900 OH Tukang Batu Rp. 67,500.00 Rp. 6,075.00

0.0900 OH Pekerja Rp. 45,000.00 Rp. 4,050.00

3.5300 Bh Ubin 10 x 30 cm Granito Plint #N/A

1.1400 Kg Semen Portland Rp. 1,040.00

0.0030 M3 Pasir Pasang Rp. 90,000.00

0.1000 Kg Semen Warna Rp. 2,250.00

876 1 M1 Pasang Plint Ubin Teralux Kerang Ukuran 10 x 40 cm Rp. 11,070.00

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0090 OH Kepala Tukang Rp. 67,500.00 Rp. 607.50

0.0900 OH Tukang Batu Rp. 67,500.00 Rp. 6,075.00

0.0900 OH Pekerja Rp. 45,000.00 Rp. 4,050.00

2.6500 Bh Ubin 10 x 40 cm Teraso Plint #N/A

1.1400 Kg Semen Portland Rp. 1,040.00

0.0030 M3 Pasir Pasang Rp. 90,000.00

0.1000 Kg Semen Warna Rp. 2,250.00

877 1 M1 Pasang Plint Ubin Teralux Kerang Ukuran 10 x 30 cm Rp. 11,070.00

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0090 OH Kepala Tukang Rp. 67,500.00 Rp. 607.50

0.0900 OH Tukang Batu Rp. 67,500.00 Rp. 6,075.00

0.0900 OH Pekerja Rp. 45,000.00 Rp. 4,050.00

3.5300 Bh Ubin 10 x 30 cm Teralux Kerang Plint #N/A

1.1400 Kg Semen Portland Rp. 1,040.00

0.0030 M3 Pasir Pasang Rp. 90,000.00

0.1000 Kg Semen Warna Rp. 2,250.00

878 1 M1 Pasang Plint Ubin Teralux Marmer Ukuran 10 x 60 cm Rp. 11,070.00

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0090 OH Kepala Tukang Rp. 67,500.00 Rp. 607.50

0.0900 OH Tukang Batu Rp. 67,500.00 Rp. 6,075.00

0.0900 OH Pekerja Rp. 45,000.00 Rp. 4,050.00

1.7000 Bh Ubin 10 x 60 cm Teralux Marmer Plint #N/A

1.1400 Kg Semen Portland Rp. 1,040.00

0.0030 M3 Pasir Pasang Rp. 90,000.00

0.1000 Kg Semen Warna Rp. 2,250.00

879 1 M1 Pasang Plint Ubin Teralux Marmer Ukuran 10 x 40 cm Rp. 11,070.00

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0090 OH Kepala Tukang Rp. 67,500.00 Rp. 607.50

0.0900 OH Tukang Batu Rp. 67,500.00 Rp. 6,075.00

0.0900 OH Pekerja Rp. 45,000.00 Rp. 4,050.00

2.6500 Bh Ubin 10 x 40 cm Granito Plint #N/A

1.1400 Kg Semen Portland Rp. 1,040.00

0.0030 M3 Pasir Pasang Rp. 90,000.00

0.1000 Kg Semen Warna Rp. 2,250.00

880 1 M1 Pasang Plint Ubin Teralux Marmer Ukuran 10 x 30 cm Rp. 11,070.00

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0090 OH Kepala Tukang Rp. 67,500.00 Rp. 607.50

0.0900 OH Tukang Batu Rp. 67,500.00 Rp. 6,075.00

0.0900 OH Pekerja Rp. 45,000.00 Rp. 4,050.00

3.5300 Bh Ubin 10 x 30 cm Teralux Marmer Plint #N/A

1.1400 Kg Semen Portland Rp. 1,040.00

0.0030 M3 Pasir Pasang Rp. 90,000.00

0.1000 Kg Semen Warna Rp. 2,250.00

881 1 M2 Pasang Teraso Cor Ditempat Tebal 3 cm Rp. 30,780.00

0.0180 OH Mandor Rp. 67,500.00 Rp. 1,215.00

0.0180 OH Kepala Tukang Rp. 67,500.00 Rp. 1,215.00

0.1800 OH Tukang Batu Rp. 67,500.00 Rp. 12,150.00

0.3600 OH Pekerja Rp. 45,000.00 Rp. 16,200.00

0.0360 M3 Teraso Cor #N/A

882 1 M2 Pasang Lantai Keramik Artistik 10 x 20 cm Rp. 55,912.50

0.0300 OH Mandor Rp. 67,500.00 Rp. 2,025.00

0.0350 OH Kepala Tukang Rp. 67,500.00 Rp. 2,362.50

0.3500 OH Tukang Batu Rp. 67,500.00 Rp. 23,625.00

0.6200 OH Pekerja Rp. 45,000.00 Rp. 27,900.00

53.0000 Bh Ubin 10 x 20 cm Keramik Artistik #N/A

8.1900 Kg Semen Portland Rp. 1,040.00

0.0450 M3 Pasir Pasang Rp. 90,000.00

2.7500 Kg Semen Warna Rp. 2,250.00

883 1 M2 Pasang Lantai Keramik Artistik 10 x 10 cm Rp. 55,912.50

0.0300 OH Mandor Rp. 67,500.00 Rp. 2,025.00

0.0350 OH Kepala Tukang Rp. 67,500.00 Rp. 2,362.50

0.3500 OH Tukang Batu Rp. 67,500.00 Rp. 23,625.00

Page 76: Analisa Sni 2011

Page 76

NO URAIAN H. SATUAN UPAH

0.6200 OH Pekerja Rp. 45,000.00 Rp. 27,900.00

106.0000 Bh Ubin 10 x 10 cm Keramik Artistik #N/A

8.1900 Kg Semen Portland Rp. 1,040.00

0.0450 M3 Pasir Pasang Rp. 90,000.00

3.2000 Kg Semen Warna Rp. 2,250.00

884 1 M2 Pasang Lantai Keramik Artistik 5 x 20 cm Rp. 55,912.50

0.0300 OH Mandor Rp. 67,500.00 Rp. 2,025.00

0.0350 OH Kepala Tukang Rp. 67,500.00 Rp. 2,362.50

0.3500 OH Tukang Batu Rp. 67,500.00 Rp. 23,625.00

0.6200 OH Pekerja Rp. 45,000.00 Rp. 27,900.00

106.0000 Bh Ubin 5 x 20 cm Keramik Artistik Rp. 10,666.67

8.1900 Kg Semen Portland Rp. 1,040.00

0.0450 M3 Pasir Pasang Rp. 90,000.00

3.2000 Kg Semen Warna Rp. 2,250.00

885 1 M2 Pasang Lantai Keramik 33 x 33 cm Rp. 55,912.50

0.0300 OH Mandor Rp. 67,500.00 Rp. 2,025.00

0.0350 OH Kepala Tukang Rp. 67,500.00 Rp. 2,362.50

0.3500 OH Tukang Batu Rp. 67,500.00 Rp. 23,625.00

0.6200 OH Pekerja Rp. 45,000.00 Rp. 27,900.00

10.0000 Bh Ubin 33 x 33 cm Keramik Rp. 6,000.00

8.1900 Kg Semen Portland Rp. 1,040.00

0.0450 M3 Pasir Pasang Rp. 90,000.00

1.6200 Kg Semen Warna Rp. 2,250.00

886 1 M2 Pasang Lantai Keramik 30 x 30 cm Rp. 55,912.50

0.0300 OH Mandor Rp. 67,500.00 Rp. 2,025.00

0.0350 OH Kepala Tukang Rp. 67,500.00 Rp. 2,362.50

0.3500 OH Tukang Batu Rp. 67,500.00 Rp. 23,625.00

0.6200 OH Pekerja Rp. 45,000.00 Rp. 27,900.00

11.8700 Bh Keramik 30 x 30 Polos Rp. 3,330.00

10.0000 Kg Semen Portland Rp. 1,040.00

0.0450 M3 Pasir Pasang Rp. 90,000.00

1.5000 Kg Semen Warna Rp. 2,250.00

887 1 M2 Pasang Lantai Keramik 40 x 40 cm Rp. 55,912.50

0.0300 OH Mandor Rp. 67,500.00 Rp. 2,025.00

0.0350 OH Kepala Tukang Rp. 67,500.00 Rp. 2,362.50

0.3500 OH Tukang Batu Rp. 67,500.00 Rp. 23,625.00

0.6200 OH Pekerja Rp. 45,000.00 Rp. 27,900.00

6.5625 Bh Keramik 40 x 40 Polos Rp. 9,583.33

10.0000 Kg Semen Portland Rp. 1,040.00

0.0450 M3 Pasir Pasang Rp. 90,000.00

1.5000 Kg Semen Warna Rp. 2,250.00

888 1 M2 Pasang Lantai Keramik 20 x 20 cm Rp. 55,912.50

0.0300 OH Mandor Rp. 67,500.00 Rp. 2,025.00

0.0350 OH Kepala Tukang Rp. 67,500.00 Rp. 2,362.50

0.3500 OH Tukang Batu Rp. 67,500.00 Rp. 23,625.00

0.6200 OH Pekerja Rp. 45,000.00 Rp. 27,900.00

26.5000 Bh Ubin 20 x 20 cm Keramik Rp. 1,760.00

10.4000 Kg Semen Portland Rp. 1,040.00

0.0450 M3 Pasir Pasang Rp. 90,000.00

1.6200 Kg Semen Warna Rp. 2,250.00

889 1 M2 Pasang Lantai Keramik 10 x 33 cm, variasi/border Rp. 84,037.50

0.0470 OH Mandor Rp. 67,500.00 Rp. 3,172.50

0.0530 OH Kepala Tukang Rp. 67,500.00 Rp. 3,577.50

0.5250 OH Tukang Batu Rp. 67,500.00 Rp. 35,437.50

0.9300 OH Pekerja Rp. 45,000.00 Rp. 41,850.00

33.0000 Bh Ubin 10 x 33 cm Keramik #N/A

9.8000 Kg Semen Portland Rp. 1,040.00

0.0450 M3 Pasir Pasang Rp. 90,000.00

4.3700 Kg Semen Warna Rp. 2,250.00

890 1 M2 Pasang Lantai Mosaik 30 x 30 cm, Camp. 1PC : 3PP Rp. 55,912.50

0.0300 OH Mandor Rp. 67,500.00 Rp. 2,025.00

0.0350 OH Kepala Tukang Rp. 67,500.00 Rp. 2,362.50

0.3500 OH Tukang Batu Rp. 67,500.00 Rp. 23,625.00

0.6200 OH Pekerja Rp. 45,000.00 Rp. 27,900.00

11.8700 Bh Keramik 30 x 30 cm Mosaik Rp. 4,000.00

14.1500 Kg Semen Portland Rp. 1,040.00

0.0390 M3 Pasir Pasang Rp. 90,000.00

2.0000 Kg Semen Warna Rp. 2,250.00

891 1 M1 Pasang Plint Keramik Artistik 10 x 20 cm Rp. 11,070.00

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0090 OH Kepala Tukang Rp. 67,500.00 Rp. 607.50

0.0900 OH Tukang Batu Rp. 67,500.00 Rp. 6,075.00

0.0900 OH Pekerja Rp. 45,000.00 Rp. 4,050.00

5.3000 Bh Keramik 10 x 20 cm Plint Artistik Rp. 900.00

1.1400 Kg Semen Portland Rp. 1,040.00

0.0030 M3 Pasir Pasang Rp. 90,000.00

0.0250 Kg Semen Warna Rp. 2,250.00

Page 77: Analisa Sni 2011

Page 77

NO URAIAN H. SATUAN UPAH

892 1 M1 Pasang Plint Keramik Artistik 10 x 10 cm Rp. 11,070.00

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0090 OH Kepala Tukang Rp. 67,500.00 Rp. 607.50

0.0900 OH Tukang Batu Rp. 67,500.00 Rp. 6,075.00

0.0900 OH Pekerja Rp. 45,000.00 Rp. 4,050.00

10.6000 Bh Keramik 10 x 10 cm Plint Artistik Rp. 800.00

1.1400 Kg Semen Portland Rp. 1,040.00

0.0030 M3 Pasir Pasang Rp. 90,000.00

0.0500 Kg Semen Warna Rp. 2,250.00

893 1 M1 Pasang Plint Keramik Artistik 5 x 20 cm Rp. 11,070.00

0.0050 OH Mandor Rp. 67,500.00 Rp. 337.50

0.0090 OH Kepala Tukang Rp. 67,500.00 Rp. 607.50

0.0900 OH Tukang Batu Rp. 67,500.00 Rp. 6,075.00

0.0900 OH Pekerja Rp. 45,000.00 Rp. 4,050.00

5.3000 Bh Keramik 5 x 20 cm Plint Artistik Rp. 450.00

0.5700 Kg Semen Portland Rp. 1,040.00

0.0015 M3 Pasir Pasang Rp. 90,000.00

0.0130 Kg Semen Warna Rp. 2,250.00

894 1 M1 Internal Cove Artistik (5 x 5 x 20) cm Rp. 69,727.50

0.0380 OH Mandor Rp. 67,500.00 Rp. 2,565.00

0.0450 OH Kepala Tukang Rp. 67,500.00 Rp. 3,037.50

0.4500 OH Tukang Batu Rp. 67,500.00 Rp. 30,375.00

0.7500 OH Pekerja Rp. 45,000.00 Rp. 33,750.00

5.3000 Bh Internal Cove (5 x 5 x 20) cm Rp. 3,000.00

1.1400 Kg Semen Portland Rp. 1,040.00

0.0030 M3 Pasir Pasang Rp. 90,000.00

0.1000 Kg Semen Warna Rp. 2,250.00

895 1 M2 Pasang Lantai Marmer (100 x 100) cm Rp. 55,912.50

0.0300 OH Mandor Rp. 67,500.00 Rp. 2,025.00

0.0350 OH Kepala Tukang Rp. 67,500.00 Rp. 2,362.50

0.3500 OH Tukang Batu Rp. 67,500.00 Rp. 23,625.00

0.6200 OH Pekerja Rp. 45,000.00 Rp. 27,900.00

1.0600 Bh Ubin 100 x 100 cm Teralux Marmer #N/A

8.1900 Kg Semen Portland Rp. 1,040.00

0.0450 M3 Pasir Pasang Rp. 90,000.00

0.6500 Kg Semen Warna Rp. 2,250.00

896 1 M2 Pasang Lantai Karpet Rp. 20,880.00

0.0090 OH Mandor Rp. 67,500.00 Rp. 607.50

0.0170 OH Kepala Tukang Rp. 67,500.00 Rp. 1,147.50

0.1700 OH Tukang Batu Rp. 67,500.00 Rp. 11,475.00

0.1700 OH Pekerja Rp. 45,000.00 Rp. 7,650.00

1.0500 M2 Carpet Rp. 50,000.00

0.3500 Kg Lem Vinyl Rp. 12,000.00

897 1 M2 Pasang Underlyer, Tebal 6 mm Rp. 14,715.00

0.0060 OH Mandor Rp. 67,500.00 Rp. 405.00

0.0120 OH Kepala Tukang Rp. 67,500.00 Rp. 810.00

0.1200 OH Tukang Batu Rp. 67,500.00 Rp. 8,100.00

0.1200 OH Pekerja Rp. 45,000.00 Rp. 5,400.00

1.0500 M2 Underlyer Tebal 6 mm / Rubber Corrugated Rp. 22,675.36

0.3500 Kg Lem Vinyl Rp. 12,000.00

898 1 M2 Pasang Lantai Parquet Rp. 57,465.00

0.0330 OH Mandor Rp. 67,500.00 Rp. 2,227.50

0.0350 OH Kepala Tukang Rp. 67,500.00 Rp. 2,362.50

0.3500 OH Tukang Batu Rp. 67,500.00 Rp. 23,625.00

0.6500 OH Pekerja Rp. 45,000.00 Rp. 29,250.00

1.0500 M2 Parquet Jati Rp. 35,000.00

0.6000 Kg Lem Vinyl Rp. 12,000.00

899 1 M2 Pasang Lantai Kayu (Gymfloor) Rp. 58,140.00

0.0330 OH Mandor Rp. 67,500.00 Rp. 2,227.50

0.0350 OH Kepala Tukang Rp. 67,500.00 Rp. 2,362.50

0.3500 OH Tukang Batu Rp. 67,500.00 Rp. 23,625.00

0.6650 OH Pekerja Rp. 45,000.00 Rp. 29,925.00

1.0500 M2 Gymfloor Rp. 35,000.00

0.6000 Kg Lem Vinyl Rp. 12,000.00

900 1 M2 Pasang Dinding Porselin 11 x 11 cm Rp. 67,050.00

0.0300 OH Mandor Rp. 67,500.00 Rp. 2,025.00

0.0500 OH Kepala Tukang Rp. 67,500.00 Rp. 3,375.00

0.5000 OH Tukang Batu Rp. 67,500.00 Rp. 33,750.00

0.6200 OH Pekerja Rp. 45,000.00 Rp. 27,900.00

86.0000 Bh Porselin 11 x 11 cm Rp. 435.60

9.3000 Kg Semen Portland Rp. 1,040.00

0.0180 M3 Pasir Pasang Rp. 90,000.00

1.5000 Kg Semen Warna Rp. 2,250.00

901 1 M2 Pasang Dinding Porselin 10 x 20 cm Rp. 62,437.50

0.0300 OH Mandor Rp. 67,500.00 Rp. 2,025.00

0.0450 OH Kepala Tukang Rp. 67,500.00 Rp. 3,037.50

0.4500 OH Tukang Batu Rp. 67,500.00 Rp. 30,375.00

0.6000 OH Pekerja Rp. 45,000.00 Rp. 27,000.00

53.0000 Bh Porselin 10 x 20 cm Warna Rp. 850.00

9.3000 Kg Semen Portland Rp. 1,040.00

0.0180 M3 Pasir Pasang Rp. 90,000.00

2.7500 Kg Semen Warna Rp. 2,250.00

Page 78: Analisa Sni 2011

Page 78

NO URAIAN H. SATUAN UPAH

902 1 M2 Pasang Dinding Porselin 20 x 20 cm Rp. 62,437.50

0.0300 OH Mandor Rp. 67,500.00 Rp. 2,025.00

0.0450 OH Kepala Tukang Rp. 67,500.00 Rp. 3,037.50

0.4500 OH Tukang Batu Rp. 67,500.00 Rp. 30,375.00

0.6000 OH Pekerja Rp. 45,000.00 Rp. 27,000.00

26.5000 Bh Porselin 20 x 20 cm Warna Rp. 1,800.00

9.3000 Kg Semen Portland Rp. 1,040.00

0.0180 M3 Pasir Pasang Rp. 90,000.00

1.9400 Kg Semen Warna Rp. 2,250.00

903 1 M2 Pasang Dinding Keramik Artistik 10 x 20 cm Rp. 62,437.50

0.0300 OH Mandor Rp. 67,500.00 Rp. 2,025.00

0.0450 OH Kepala Tukang Rp. 67,500.00 Rp. 3,037.50

0.4500 OH Tukang Batu Rp. 67,500.00 Rp. 30,375.00

0.6000 OH Pekerja Rp. 45,000.00 Rp. 27,000.00

53.0000 Bh Keramik 10 x 20 cm Artistik Rp. 900.00

9.3000 Kg Semen Abu-abu Rp. 1,040.00

0.0180 M3 Pasir Pasang Rp. 90,000.00

2.7500 Kg Semen Warna Rp. 2,250.00

904 1 M2 Pasang Dinding Keramik Artistik 5 x 20 cm Rp. 62,437.50

0.0300 OH Mandor Rp. 67,500.00 Rp. 2,025.00

0.0450 OH Kepala Tukang Rp. 67,500.00 Rp. 3,037.50

0.4500 OH Tukang Batu Rp. 67,500.00 Rp. 30,375.00

0.6000 OH Pekerja Rp. 45,000.00 Rp. 27,000.00

106.0000 Bh Keramik 5 x 20 cm Artistik Rp. 450.00

9.3000 Kg Semen Abu-abu Rp. 1,040.00

0.0180 M3 Pasir Pasang Rp. 90,000.00

2.9000 Kg Semen Warna Rp. 2,250.00

905 1 M2 Pasang Dinding Keramik 10 x 20 cm Rp. 62,437.50

0.0300 OH Mandor Rp. 67,500.00 Rp. 2,025.00

0.0450 OH Kepala Tukang Rp. 67,500.00 Rp. 3,037.50

0.4500 OH Tukang Batu Rp. 67,500.00 Rp. 30,375.00

0.6000 OH Pekerja Rp. 45,000.00 Rp. 27,000.00

53.0000 Bh Keramik 10 x 20 cm Rp. 900.00

9.3000 Kg Semen Abu-abu Rp. 1,040.00

0.0180 M3 Pasir Pasang Rp. 90,000.00

2.7500 Kg Semen Warna Rp. 2,250.00

906 1 M2 Pasang Dinding Keramik 20 x 20 cm Rp. 62,437.50

0.0300 OH Mandor Rp. 67,500.00 Rp. 2,025.00

0.0450 OH Kepala Tukang Rp. 67,500.00 Rp. 3,037.50

0.4500 OH Tukang Batu Rp. 67,500.00 Rp. 30,375.00

0.6000 OH Pekerja Rp. 45,000.00 Rp. 27,000.00

26.5000 Bh Keramik 20 x 20 cm Rp. 1,800.00

9.3000 Kg Semen Abu-abu Rp. 1,040.00

0.0180 M3 Pasir Pasang Rp. 90,000.00

1.9400 Kg Semen Warna Rp. 2,250.00

907 1 M2 Pasang Dinding Marmer 100 x 100 cm Rp. 83,025.00

0.0350 OH Mandor Rp. 67,500.00 Rp. 2,362.50

0.0650 OH Kepala Tukang Rp. 67,500.00 Rp. 4,387.50

0.6500 OH Tukang Batu Rp. 67,500.00 Rp. 43,875.00

0.7200 OH Pekerja Rp. 45,000.00 Rp. 32,400.00

1.0200 Bh Ubin 100 x 100 cm Teralux Marmer #N/A

2.0000 Kg Paku 12 cm Rp. 13,000.00

12.4400 Kg Semen Abu-abu Rp. 1,040.00

0.0250 M3 Pasir Pasang Rp. 90,000.00

0.6500 Kg Semen Warna Rp. 2,250.00

908 1 M2 Pasang Dinding Bata Pelapis 7 x 3 x 24 cm Rp. 68,400.00

0.0300 OH Mandor Rp. 67,500.00 Rp. 2,025.00

0.0500 OH Kepala Tukang Rp. 67,500.00 Rp. 3,375.00

0.5000 OH Tukang Batu Rp. 67,500.00 Rp. 33,750.00

0.6500 OH Pekerja Rp. 45,000.00 Rp. 29,250.00

63.0000 Bh Batu Bata Rp. 650.00

12.4400 Kg Semen Abu-abu Rp. 1,040.00

0.0250 M3 Pasir Pasang Rp. 90,000.00

2.7500 Kg Semen Warna Rp. 2,250.00

909 1 M2 Pasang Dinding Batu Paros Rp. 55,912.50

0.0300 OH Mandor Rp. 67,500.00 Rp. 2,025.00

0.0350 OH Kepala Tukang Rp. 67,500.00 Rp. 2,362.50

0.3500 OH Tukang Batu Rp. 67,500.00 Rp. 23,625.00

0.6200 OH Pekerja Rp. 45,000.00 Rp. 27,900.00

1.1000 Bh Batu Paros Rp. 700.00

11.7500 Kg Semen Abu-abu Rp. 1,040.00

0.0350 M3 Pasir Pasang Rp. 90,000.00

910 1 M2 Pasang Dinding Batu Tempel Hitam Rp. 55,912.50

0.0300 OH Mandor Rp. 67,500.00 Rp. 2,025.00

0.0350 OH Kepala Tukang Rp. 67,500.00 Rp. 2,362.50

0.3500 OH Tukang Batu Rp. 67,500.00 Rp. 23,625.00

0.6200 OH Pekerja Rp. 45,000.00 Rp. 27,900.00

Page 79: Analisa Sni 2011

Page 79

NO URAIAN H. SATUAN UPAH

1.1000 Bh Batu Tempel Hitam Rp. 700.00

11.7500 Kg Semen Abu-abu Rp. 1,040.00

0.0350 M3 Pasir Pasang Rp. 90,000.00

911 1 M2 Pasang Lantai Vinyl Karet 30 x 30 cm Klas I Rp. 18,427.50

0.0080 OH Mandor Rp. 67,500.00 Rp. 540.00

0.0150 OH Kepala Tukang Rp. 67,500.00 Rp. 1,012.50

0.1500 OH Tukang Batu Rp. 67,500.00 Rp. 10,125.00

0.1500 OH Pekerja Rp. 45,000.00 Rp. 6,750.00

11.8700 Bh Vinyl Karet 30 x 30 cm KL I Rp. 3,000.00

0.3500 Kg Lem Vinyl Rp. 12,000.00

912 1 M2 Pasang Wallpaper Lebar 50 cm Rp. 59,400.00

0.0400 OH Mandor Rp. 67,500.00 Rp. 2,700.00

0.1700 OH Kepala Tukang Rp. 67,500.00 Rp. 11,475.00

0.1700 OH Tukang Batu Rp. 67,500.00 Rp. 11,475.00

0.7500 OH Pekerja Rp. 45,000.00 Rp. 33,750.00

2.2000 M2 Wall Paper Rp. 12,500.00

0.2500 Kg Lem Vinyl Rp. 12,000.00

913 1 M2 Floor Hardener Rp. 14,715.00

0.0060 OH Mandor Rp. 67,500.00 Rp. 405.00

0.0120 OH Kepala Tukang Rp. 67,500.00 Rp. 810.00

0.1200 OH Tukang Batu Rp. 67,500.00 Rp. 8,100.00

0.1200 OH Pekerja Rp. 45,000.00 Rp. 5,400.00

5.0000 Kg Floor Hardener Ferrovax Rp. 15,000.00

914 1 M2 Pasang Lantai Vinyl Karet 30 x 30 cm dengan lem Rp. 9,810.00

0.0040 OH Mandor Rp. 67,500.00 Rp. 270.00

0.0080 OH Kepala Tukang Rp. 67,500.00 Rp. 540.00

0.0800 OH Tukang Batu Rp. 67,500.00 Rp. 5,400.00

0.0800 OH Pekerja Rp. 45,000.00 Rp. 3,600.00

1.7600 Bh Vinyl Karet 30 x 30 cm KL I Rp. 3,000.00

0.0800 Kg Lem Vinyl Rp. 12,000.00

915 1 M3 Pasang Plint Kayu Klas II Ukuran 2 x 10 cm Rp. 14,715.00

0.0060 OH Mandor Rp. 67,500.00 Rp. 405.00

0.0120 OH Kepala Tukang Rp. 67,500.00 Rp. 810.00

0.1200 OH Tukang Batu Rp. 67,500.00 Rp. 8,100.00

0.1200 OH Pekerja Rp. 45,000.00 Rp. 5,400.00

0.0030 M3 Kayu Klas II Papan Rp. 2,300,000.00

0.0500 Bh Paku Sekrup 3,5" Rp. 100.00

916 1 M2 Pasang Lantai Vinyl Motif Kembang 30 x 30 cm Rp. 18,393.75

0.0075 OH Mandor Rp. 67,500.00 Rp. 506.25

0.0150 OH Kepala Tukang Rp. 67,500.00 Rp. 1,012.50

0.1500 OH Tukang Batu Rp. 67,500.00 Rp. 10,125.00

0.1500 OH Pekerja Rp. 45,000.00 Rp. 6,750.00

11.0500 Bh Vinyl Motif Kembang Ex DN Rp. 3,000.00

0.3500 Kg Lem Vinyl Rp. 12,000.00

N Analisa Biaya Konstruksi Pekerjaan Pengecatan

917 1 M2 Mengikis / Mengorek Permukaan Cat Tembok Lama Rp. 6,918.75

0.0025 OH Mandor Rp. 67,500.00 Rp. 168.75

0.1500 OH Pekerja Rp. 45,000.00 Rp. 6,750.00

0.0500 Kg Soda Api Rp. 5,000.00

918 1 M2 Mencuci Bidang Permukaan Tembok Yang Pernah Di Cat Rp. 6,918.75

0.0025 OH Mandor Rp. 67,500.00 Rp. 168.75

0.1500 OH Pekerja Rp. 45,000.00 Rp. 6,750.00

0.0500 Kg Sabun Rp. 10,000.00

919 1 M2 Mengorek Karat Cat Lama Permukaan Baja Dengan Cara Manual Rp. 6,918.75

0.0025 OH Mandor Rp. 67,500.00 Rp. 168.75

0.1500 OH Pekerja Rp. 45,000.00 Rp. 6,750.00

0.0500 Kg Sabun Rp. 10,000.00

920 1 M2 Menyabun Permukaan Tembok Lama Rp. 6,918.75

0.0025 OH Mandor Rp. 67,500.00 Rp. 168.75

0.1500 OH Pekerja Rp. 45,000.00 Rp. 6,750.00

0.0500 Kg Sabun Rp. 10,000.00

921 1 M2 Mengorek Karat Atau Cat Lama Permukaan Baja Dengan Pancar Pasir (Sanblasting) Dengan ingkat Kebers Rp. 204,750.00

0.5000 OH Mandor Rp. 67,500.00 Rp. 33,750.00

0.8000 OH Kepala Tukang Rp. 67,500.00 Rp. 54,000.00

1.0000 OH Tukang Cat Rp. 45,000.00 Rp. 45,000.00

1.6000 OH Pekerja Rp. 45,000.00 Rp. 72,000.00

40.0000 Kg Pasir Silika Rp. 60.00

10.0000 Ltr BBM Rp. 4,500.00

0.2000 Hari Kompresor, Blasting Pot, Selang Dan Nozzle Rp. 100,000.00

922 1 M2 Mendempul Dan Menggosok Kayu Rp. 4,038.75

0.0025 OH Mandor Rp. 67,500.00 Rp. 168.75

0.0040 OH Kepala Tukang Rp. 67,500.00 Rp. 270.00

0.0400 OH Tukang Cat Rp. 45,000.00 Rp. 1,800.00

0.0400 OH Pekerja Rp. 45,000.00 Rp. 1,800.00

0.0800 Kg Dempul Jadi Rp. 17,500.00

Page 80: Analisa Sni 2011

Page 80

NO URAIAN H. SATUAN UPAH

0.0200 Kg Minyak Cat Rp. 15,000.00

0.0100 Kg Batu Apung Rp. 1,000.00

923 1 M2 Pengecatan Bidang Kayu Lama Rp. 7,200.00

0.0025 OH Mandor Rp. 67,500.00 Rp. 168.75

0.0075 OH Kepala Tukang Rp. 67,500.00 Rp. 506.25

0.0750 OH Tukang Cat Rp. 45,000.00 Rp. 3,375.00

0.0700 OH Pekerja Rp. 45,000.00 Rp. 3,150.00

0.1500 Kg Plamur Tembok Rp. 11,000.00

0.1700 Kg Cat Dasar Rp. 15,000.00

0.1700 Kg Cat Penutup (Cat Minyak) Rp. 42,000.00

924 1 M2 Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup Rp. 7,200.00

0.0025 OH Mandor Rp. 67,500.00 Rp. 168.75

0.0075 OH Kepala Tukang Rp. 67,500.00 Rp. 506.25

0.0750 OH Tukang Cat Rp. 45,000.00 Rp. 3,375.00

0.0700 OH Pekerja Rp. 45,000.00 Rp. 3,150.00

0.2000 Kg Cat Menie Rp. 15,000.00

0.1500 Kg Plamur Tembok Rp. 11,000.00

0.1700 Kg Cat Dasar Rp. 15,000.00

0.2600 Kg Cat Penutup (Cat Minyak) Rp. 42,000.00

925 1 M2 Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup Rp. 8,313.75

0.0025 OH Mandor Rp. 67,500.00 Rp. 168.75

0.0040 OH Kepala Tukang Rp. 67,500.00 Rp. 270.00

0.1050 OH Tukang Cat Rp. 45,000.00 Rp. 4,725.00

0.0700 OH Pekerja Rp. 45,000.00 Rp. 3,150.00

0.2000 Kg Cat Menie Rp. 15,000.00

0.1500 Kg Plamur Tembok Rp. 11,000.00

0.1700 Kg Cat Dasar Rp. 15,000.00

0.3500 Kg Cat Penutup (Cat Minyak) Rp. 42,000.00

926 1 M2 Pelaburan Bidang Kayu Dengan Teak Oil Rp. 9,056.25

0.0025 OH Mandor Rp. 67,500.00 Rp. 168.75

0.0630 OH Kepala Tukang Rp. 67,500.00 Rp. 4,252.50

0.0630 OH Tukang Cat Rp. 45,000.00 Rp. 2,835.00

0.0400 OH Pekerja Rp. 45,000.00 Rp. 1,800.00

0.3600 Ltr Teak Oil Rp. 20,000.00

927 1 M2 Pelaburan Bidang Kayu Dengan Politur Rp. 3,948.75

0.0025 OH Mandor Rp. 67,500.00 Rp. 168.75

0.0160 OH Kepala Tukang Rp. 67,500.00 Rp. 1,080.00

0.0600 OH Tukang Cat Rp. 45,000.00 Rp. 2,700.00

0.1500 Ltr Politur Rp. 15,000.00

0.3720 Ltr Politur Jadi Rp. 30,000.00

2.0000 Lbr Ampelas Rp. 2,500.00

928 1 M2 Pelaburan Bidang Kayu Dengan Cat Residu Dan Ter Rp. 4,905.00

0.0060 OH Mandor Rp. 67,500.00 Rp. 405.00

0.1000 OH Pekerja Rp. 45,000.00 Rp. 4,500.00

0.3500 Ltr Residu Atau Ter Rp. 9,000.00

929 1 M2 Pelaburan Bidang Kayu dengan Vernis Rp. 15,648.75

0.0025 OH Mandor Rp. 67,500.00 Rp. 168.75

0.0160 OH Kepala Tukang Rp. 67,500.00 Rp. 1,080.00

0.1600 OH Tukang Cat Rp. 45,000.00 Rp. 7,200.00

0.1600 OH Pekerja Rp. 45,000.00 Rp. 7,200.00

0.1500 Ltr Vernis Rp. 17,500.00

0.0500 Kg Dempul Rp. 35,000.00

0.1000 Lbr Ampelas Rp. 2,500.00

0.0100 Bh Kuas Rp. 15,000.00

930 1 M2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) Rp. 4,329.00

0.0025 OH Mandor Rp. 67,500.00 Rp. 168.75

0.0063 OH Kepala Tukang Rp. 67,500.00 Rp. 425.25

0.0630 OH Tukang Cat Rp. 45,000.00 Rp. 2,835.00

0.0200 OH Pekerja Rp. 45,000.00 Rp. 900.00

0.1000 Kg Plamur Tembok Rp. 11,000.00

0.1000 Kg Cat Dasar Rp. 15,000.00

0.2600 Kg Cat Penutup (Cat Air) Rp. 15,000.00

931 1 M2 Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup) Rp. 3,602.25

0.0025 OH Mandor Rp. 67,500.00 Rp. 168.75

0.0042 OH Kepala Tukang Rp. 67,500.00 Rp. 283.50

0.0420 OH Tukang Cat Rp. 45,000.00 Rp. 1,890.00

0.0280 OH Pekerja Rp. 45,000.00 Rp. 1,260.00

0.1200 Kg Cat Dasar Rp. 15,000.00

0.1800 Kg Cat Penutup (Cat Air) Rp. 15,000.00

932 1 M2 Melabur Tembok Dengan Kalkarium Rp. 3,602.25

0.0025 OH Mandor Rp. 67,500.00 Rp. 168.75

0.0042 OH Kepala Tukang Rp. 67,500.00 Rp. 283.50

0.0420 OH Tukang Cat Rp. 45,000.00 Rp. 1,890.00

0.0280 OH Pekerja Rp. 45,000.00 Rp. 1,260.00

0.1000 Kg Kalkarium Rp. 20,000.00

933 1 M2 Melabur Tembok Dengan Kapur Sirih Rp. 6,970.50

0.0025 OH Mandor Rp. 67,500.00 Rp. 168.75

0.0001 OH Kepala Tukang Rp. 67,500.00 Rp. 6.75

Page 81: Analisa Sni 2011

Page 81

NO URAIAN H. SATUAN UPAH

0.0010 OH Tukang Cat Rp. 45,000.00 Rp. 45.00

0.1500 OH Pekerja Rp. 45,000.00 Rp. 6,750.00

0.1000 Lbr Ampelas Rp. 2,500.00

0.2500 Ikat Alang-alang Rp. 2,500.00

0.0020 M3 Kayu Perancah Rp. 1,600,000.00

0.1500 M3 Kapur Sirih Rp. 150,000.00

934 1 M2 Melabur Tembok Lama Dengan Kapur Sirih (Untuk Pemeliharaan) Rp. 2,227.50

0.0025 OH Mandor Rp. 67,500.00 Rp. 168.75

0.0005 OH Kepala Tukang Rp. 67,500.00 Rp. 33.75

0.0050 OH Tukang Cat Rp. 45,000.00 Rp. 225.00

0.0400 OH Pekerja Rp. 45,000.00 Rp. 1,800.00

0.0020 M3 Kayu Perancah Rp. 1,600,000.00

0.3000 M3 Kapur Sirih Rp. 150,000.00

935 1 M2 Pemasangan Wall Paper Rp. 10,203.75

0.0025 OH Mandor Rp. 67,500.00 Rp. 168.75

0.0020 OH Kepala Tukang Rp. 67,500.00 Rp. 135.00

0.2000 OH Tukang Cat Rp. 45,000.00 Rp. 9,000.00

0.0200 OH Pekerja Rp. 45,000.00 Rp. 900.00

1.2000 M2 Wall Paper Rp. 12,500.00

0.2000 Kg Perekat Rp. 10,000.00

936 1 M2 Pengecatan Permukaan Baja Dengan Meni Besi Rp. 11,925.00

0.0100 OH Mandor Rp. 67,500.00 Rp. 675.00

0.0200 OH Kepala Tukang Rp. 67,500.00 Rp. 1,350.00

0.2000 OH Tukang Cat Rp. 45,000.00 Rp. 9,000.00

0.0200 OH Pekerja Rp. 45,000.00 Rp. 900.00

0.1000 Kg Meni Besi Rp. 15,000.00

0.0100 Bh Kuas Rp. 15,000.00

937 1 M2 Pengecatan Permukaan Baja Dengan Meni Besi Dan Perancah Rp. 23,400.00

0.0075 OH Mandor Rp. 67,500.00 Rp. 506.25

0.0225 OH Kepala Tukang Rp. 67,500.00 Rp. 1,518.75

0.2250 OH Tukang Cat Rp. 45,000.00 Rp. 10,125.00

0.2500 OH Pekerja Rp. 45,000.00 Rp. 11,250.00

0.1000 Kg Meni Besi Rp. 15,000.00

0.0100 Bh Kuas Rp. 15,000.00

0.0020 M3 Kayu Perancah Rp. 1,600,000.00

938 1 M2 Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Manual Sistem 4 Lapis Cat Konvensional Deng Rp. 2,565.00

0.0075 OH Mandor Rp. 67,500.00 Rp. 506.25

0.0225 OH Kepala Tukang Rp. 67,500.00 Rp. 1,518.75

0.0060 OH Tukang Cat Rp. 45,000.00 Rp. 270.00

0.0060 OH Pekerja Rp. 45,000.00 Rp. 270.00

0.1000 Kg Meni (Read Lead) A Rp. 17,500.00

0.1000 Kg Meni (Read Lead) B Rp. 20,000.00

0.0400 Kg Aluminium C Rp. 35,000.00

0.0400 Kg Aluminium B Rp. 35,000.00

0.0100 Ltr Pengencer Rp. 12,000.00

0.0020 M3 Kayu Perancah Rp. 1,600,000.00

939 1 M2 Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Manual Sistem 1 Lapis Cat Mutakhir Dengan T Rp. 4,185.00

0.0060 OH Mandor Rp. 67,500.00 Rp. 405.00

0.0120 OH Kepala Tukang Rp. 67,500.00 Rp. 810.00

0.0600 OH Tukang Cat Rp. 45,000.00 Rp. 2,700.00

0.0060 OH Pekerja Rp. 45,000.00 Rp. 270.00

0.3000 Kg Cat Rp. 42,000.00

940 1 M2 Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Manual Sistem 3 Lapis Cat Konvensional Deng Rp. 110,250.00

0.5000 OH Mandor Rp. 67,500.00 Rp. 33,750.00

0.8000 OH Kepala Tukang Rp. 67,500.00 Rp. 54,000.00

0.3000 OH Tukang Cat Rp. 45,000.00 Rp. 13,500.00

0.2000 OH Pekerja Rp. 45,000.00 Rp. 9,000.00

0.1100 Kg Cat Dasar Rp. 15,000.00

0.1700 Kg Cat Antara Rp. 42,000.00

0.0800 Kg Cat Penutup (Cat Minyak) Rp. 42,000.00

941 1 M2 Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Semprot (Airless Spray) Dengan Sistem 1 Lapi Rp. 76,500.00

0.2000 OH Mandor Rp. 67,500.00 Rp. 13,500.00

0.2000 OH Kepala Tukang Rp. 67,500.00 Rp. 13,500.00

0.7000 OH Tukang Cat Rp. 45,000.00 Rp. 31,500.00

0.4000 OH Pekerja Rp. 45,000.00 Rp. 18,000.00

0.3000 Kg Cat Dasar Rp. 15,000.00

Page 82: Analisa Sni 2011

Page 82

DAFTAR ANALISA HARGA SATUAN PEKERJAAN UNTUK PEKERJAAN SIPIL BANGUNANDINAS PEKERJAAN UMUMKOTA PADANG PANJANG

tahun anggaran 2010 (triwulan I)

BAHAN PEKERJAAN

Rp. 146,790.00 Rp. 179,490.00

Rp. 21,000.00

Rp. 2,600.00

Rp. 400.00

Rp. 810.00

Rp. 115,200.00

Rp. 780.00

Rp. 6,000.00

Rp. 195,540.00 Rp. 228,240.00

Rp. 21,000.00

Rp. 2,600.00

Rp. 48,000.00

Rp. 400.00

Rp. 810.00

Rp. 115,200.00

Rp. 780.00

Rp. 6,750.00

Rp. 320,870.00 Rp. 349,070.00

Rp. 16,800.00

Rp. 2,080.00

Rp. 300,000.00

Rp. 400.00

Rp. 810.00

Rp. 780.00

Rp. 30,660.00 Rp. 42,172.50

Rp. 19,200.00

Rp. 260.00

Rp. 11,200.00

Rp. 585,595.00 Rp. 886,720.00

Rp. 21,000.00

Rp. 414,000.00

Rp. 11,050.00

Rp. 16,500.00

Rp. 36,400.00

Rp. 13,500.00

Rp. 8,000.00

Rp. 13,500.00

Rp. 19,500.00

Rp. 10,000.00

Rp. 6,600.00

Rp. 4,400.00

Rp. 8,250.00

Rp. 2,895.00

Rp. 588,780.00 Rp. 770,655.00

Rp. 28,560.00

Rp. 483,000.00

Rp. 3,900.00

Rp. 10,920.00

Rp. 2,400.00

Rp. 4,500.00

Rp. 55,500.00

Page 83: Analisa Sni 2011

Page 83

BAHAN PEKERJAAN

Rp. 749,800.00 Rp. 898,300.00

Rp. 50,400.00

Rp. 634,800.00

Rp. 9,100.00

Rp. 55,500.00

Rp. - Rp. 7,875.00

Rp. 598,957.50 Rp. 780,832.50

Rp. 21,000.00

Rp. 427,800.00

Rp. 3,900.00

Rp. 18,720.00

Rp. 2,400.00

Rp. 4,500.00

Rp. 55,500.00

Rp. 65,137.50

Rp. 89,440.00 Rp. 107,541.25

Rp. 82,800.00

Rp. 1,040.00

Rp. 5,600.00

Rp. 8,125.00 Rp. 21,407.50

Rp. 5,000.00

Rp. 3,125.00

Rp. 22,500.00 Rp. 70,875.00

Rp. 13,500.00

Rp. 8,100.00

Rp. 900.00

Rp. - Rp. 322,492.50

Rp. - Rp. 300,217.50

Rp. 5,175.00

Rp. 24,187.50

Rp. 9,675.00

Rp. 2,475.00

Rp. 6,506.25

Rp. 13,680.00

Rp. 594,000.00

Page 84: Analisa Sni 2011

Page 84

BAHAN PEKERJAAN

Rp. 9,675.00

Rp. 207,000.00

Rp. 13,680.00

Rp. 207,000.00

Rp. 69,440.00 Rp. 74,255.00

Rp. 69,440.00

#VALUE! #VALUE!

#VALUE!

Rp. 183,750.00

Rp. 5,920.00

Rp. 19,710.00

Rp. 46,800.00

Rp. - Rp. 35,437.50

Rp. - Rp. 43,537.50

Rp. - Rp. 51,772.50

Rp. - Rp. 47,160.00

Rp. - Rp. 71,550.00

Rp. - Rp. 57,037.50

Rp. - Rp. 2,587.50

Rp. - Rp. 15,525.00

Rp. - Rp. 9,922.50

Rp. - Rp. 25,875.00

Rp. 54,000.00 Rp. 68,175.00

Rp. 54,000.00

Rp. 68,055.00 Rp. 139,155.00

Rp. 18,000.00

Rp. 16,875.00

Rp. 33,180.00

Rp. 74,680.00 Rp. 145,780.00

Page 85: Analisa Sni 2011

Page 85

BAHAN PEKERJAAN

Rp. 31,000.00

Rp. 43,680.00

Rp. 90,000.00 Rp. 97,762.50

Rp. 90,000.00

Rp. 96,000.00 Rp. 108,937.50

Rp. 96,000.00

Rp. 361,730.00 Rp. 478,842.50

Rp. 108,000.00

Rp. 210,080.00

Rp. 43,650.00

Rp. 324,320.00 Rp. 441,432.50

Rp. 108,000.00

Rp. 169,520.00

Rp. 46,800.00

Rp. 298,400.00 Rp. 415,512.50

Rp. 108,000.00

Rp. 141,440.00

Rp. 48,960.00

Rp. 280,170.00 Rp. 397,282.50

Rp. 108,000.00

Rp. 121,680.00

Rp. 50,490.00

Rp. 253,130.00 Rp. 370,242.50

Rp. 108,000.00

Rp. 94,640.00

Rp. 50,490.00

Rp. 342,647.81 Rp. 459,760.31

Rp. 108,000.00

Rp. 47.81

Rp. 204,000.00

Rp. 30,600.00

Rp. 215,761.34 Rp. 332,873.84

Rp. 108,000.00

Rp. 63,440.00

Rp. 41.34

Rp. 44,280.00

Rp. 197,746.84 Rp. 314,859.34

Rp. 108,000.00

Rp. 42,640.00

Rp. 36.84

Rp. 47,070.00

Page 86: Analisa Sni 2011

Page 86

BAHAN PEKERJAAN

Rp. 127,440.00 Rp. 194,130.00

Rp. 108,000.00

Rp. 19,440.00

Rp. 1,302,040.00 Rp. 1,510,277.50

Rp. 1,008,000.00

Rp. 201,760.00

Rp. 24,960.00

Rp. 42,120.00

Rp. 25,200.00

Rp. 309,340.00 Rp. 444,115.00

Rp. 40,500.00

Rp. 201,760.00

Rp. 24,960.00

Rp. 42,120.00

Rp. 231,056.58 Rp. 231,056.58

Rp. 208,540.75

Rp. 22,515.83

Rp. 304,154.68 Rp. 304,154.68

Rp. 297,915.36

Rp. 6,239.33

Rp. - Rp. 81,421.88

Rp. - Rp. 90,281.25

Rp. - Rp. 108,000.00

Rp. 376,123.82 Rp. 376,123.82

Rp. 108,000.00

Rp. 268,123.82

Rp. 507,947.96 Rp. 507,947.96

Rp. 357,498.43

Rp. 150,449.53

Rp. 629,794.21 Rp. 711,216.08

Rp. 231,056.58

Rp. 398,737.63

Rp. 1,259,591.44 Rp. 1,349,872.69

Rp. 462,113.15

Rp. 797,478.29

Rp. 1,889,387.16 Rp. 1,997,387.16

Rp. 693,169.73

Rp. 1,196,217.44

Rp. 878,339.05 Rp. 959,760.93

Rp. 304,154.68

Rp. 574,184.37

Rp. 1,756,678.11 Rp. 1,846,959.36

Rp. 608,309.36

Rp. 1,148,368.74

Rp. 2,635,017.16 Rp. 2,743,017.16

Rp. 912,464.05

Rp. 1,722,553.11

Rp. 373,137.14 Rp. 473,442.14

Page 87: Analisa Sni 2011

Page 87

BAHAN PEKERJAAN

Rp. 256,880.00

Rp. 49,657.14

Rp. 66,600.00

Rp. 401,820.95 Rp. 502,125.95

Rp. 287,040.00

Rp. 47,314.29

Rp. 67,466.67

Rp. 424,417.14 Rp. 524,722.14

Rp. 310,960.00

Rp. 45,657.14

Rp. 67,800.00

Rp. 358,695.24 Rp. 431,595.24

Rp. 239,200.00

Rp. 51,028.57

Rp. 68,466.67

Rp. 357,468.57 Rp. 457,773.57

Rp. 245,440.00

Rp. 43,428.57

Rp. 68,600.00

Rp. 476,584.76 Rp. 576,889.76

Rp. 366,080.00

Rp. 41,771.43

Rp. 68,733.33

Rp. 495,525.71 Rp. 595,830.71

Rp. 385,840.00

Rp. 39,885.71

Rp. 69,800.00

Rp. 508,169.52 Rp. 608,474.52

Rp. 399,360.00

Rp. 39,542.86

Rp. 69,266.67

Rp. 529,725.71 Rp. 630,030.71

Rp. 422,240.00

Rp. 39,085.71

Rp. 68,400.00

Rp. 536,500.95 Rp. 636,805.95

Rp. 429,520.00

Rp. 38,914.29

Rp. 68,066.67

Rp. 561,912.38 Rp. 689,487.38

Page 88: Analisa Sni 2011

Page 88

BAHAN PEKERJAAN

Rp. 456,560.00

Rp. 38,285.71

Rp. 67,066.67

Rp. 561,912.38 Rp. 689,487.38

Rp. 456,560.00

Rp. 38,285.71

Rp. 67,066.67

Rp. 538,400.00 Rp. 665,975.00

Rp. 416,000.00

Rp. 38,400.00

Rp. 72,000.00

Rp. 12,000.00

Rp. 157,500.00 Rp. 162,630.00

Rp. 157,500.00

Rp. 210,000.00 Rp. 216,255.00

Rp. 210,000.00

Rp. 241,500.00 Rp. 248,340.00

Rp. 241,500.00

Rp. 8,610.00 Rp. 9,314.25

Rp. 8,400.00

Rp. 210.00

Rp. 10,640.00 Rp. 11,144.00

Rp. 10,500.00

Rp. 140.00

Rp. 10,270.00 Rp. 10,670.50

Rp. 10,200.00

Rp. 70.00

Rp. 69,900.00 Rp. 108,510.00

Rp. 64,000.00

Rp. 3,900.00

Rp. 2,000.00

Rp. 77,900.00 Rp. 116,510.00

Rp. 72,000.00

Rp. 3,900.00

Rp. 2,000.00

Page 89: Analisa Sni 2011

Page 89

BAHAN PEKERJAAN

Rp. 171,925.00 Rp. 225,880.00

Rp. 64,000.00

Rp. 5,200.00

Rp. 4,000.00

Rp. 34,500.00

Rp. 30,625.00

Rp. 33,600.00

Rp. 178,825.00 Rp. 232,780.00

Rp. 64,000.00

Rp. 5,200.00

Rp. 4,000.00

Rp. 41,400.00

Rp. 30,625.00

Rp. 33,600.00

Rp. 239,125.00 Rp. 293,080.00

Rp. 64,000.00

Rp. 5,200.00

Rp. 4,000.00

Rp. 34,500.00

Rp. 30,625.00

Rp. 100,800.00

Rp. 186,225.00 Rp. 240,180.00

Rp. 48,000.00

Rp. 5,200.00

Rp. 4,000.00

Rp. 46,000.00

Rp. 30,625.00

Rp. 50,400.00

Rp. 2,000.00

Rp. 154,925.00 Rp. 208,880.00

Rp. 48,000.00

Rp. 5,200.00

Rp. 3,000.00

Rp. 34,500.00

Rp. 30,625.00

Rp. 33,600.00

Rp. 58,440.00 Rp. 69,067.50

Rp. 42,240.00

Rp. 7,800.00

Rp. 8,400.00

Rp. 2,104,540.00 Rp. 2,522,627.50

Rp. 320,000.00

Rp. 19,500.00

Page 90: Analisa Sni 2011

Page 90

BAHAN PEKERJAAN

Rp. 8,000.00

Rp. 1,260,000.00

Rp. 31,500.00

Rp. 349,440.00

Rp. 43,200.00

Rp. 72,900.00

Rp. 2,657,540.00 Rp. 3,127,407.50

Rp. 432,000.00

Rp. 26,000.00

Rp. 12,000.00

Rp. 1,680,000.00

Rp. 42,000.00

Rp. 349,440.00

Rp. 43,200.00

Rp. 72,900.00

Rp. 4,767,790.00 Rp. 5,348,132.50

Rp. 640,000.00

Rp. 52,000.00

Rp. 40,000.00

Rp. 2,520,000.00

Rp. 63,000.00

Rp. 349,440.00

Rp. 43,200.00

Rp. 72,900.00

Rp. 345,000.00

Rp. 306,250.00

Rp. 336,000.00

Rp. 3,608,940.00 Rp. 4,119,195.00

Rp. 512,000.00

Rp. 41,600.00

Rp. 32,000.00

Rp. 1,680,000.00

Rp. 42,000.00

Rp. 349,440.00

Rp. 43,200.00

Rp. 72,900.00

Rp. 322,000.00

Rp. 245,000.00

Rp. 268,800.00

Rp. 3,401,240.00 Rp. 3,819,327.50

Rp. 512,000.00

Rp. 41,600.00

Rp. 32,000.00

Page 91: Analisa Sni 2011

Page 91

BAHAN PEKERJAAN

Rp. 1,260,000.00

Rp. 31,500.00

Rp. 349,440.00

Rp. 43,200.00

Rp. 72,900.00

Rp. 276,000.00

Rp. 245,000.00

Rp. 537,600.00

Rp. 3,230,840.00 Rp. 3,648,725.00

Rp. 384,000.00

Rp. 41,600.00

Rp. 32,000.00

Rp. 1,260,000.00

Rp. 31,500.00

Rp. 349,440.00

Rp. 43,200.00

Rp. 72,900.00

Rp. 368,000.00

Rp. 245,000.00

Rp. 403,200.00

Rp. 3,345,990.00 Rp. 3,816,307.50

Rp. 400,000.00

Rp. 39,000.00

Rp. 24,000.00

Rp. 1,680,000.00

Rp. 42,000.00

Rp. 349,440.00

Rp. 43,200.00

Rp. 72,900.00

Rp. 241,500.00

Rp. 218,750.00

Rp. 235,200.00

Rp. 39,080.00 Rp. 51,642.50

Rp. 3,200.00

Rp. 130.00

Rp. 24,000.00

Rp. 6,300.00

Rp. 4,160.00

Rp. 480.00

Rp. 810.00

Rp. 42,350.00 Rp. 63,095.00

Rp. 4,800.00

Rp. 260.00

Rp. 28,800.00

Page 92: Analisa Sni 2011

Page 92

BAHAN PEKERJAAN

Rp. 700.00

Rp. 5,720.00

Rp. 720.00

Rp. 1,350.00

Rp. 143,440.00 Rp. 187,315.00

Rp. 91,000.00

Rp. 45,240.00

Rp. 7,200.00

Rp. 133,458.00 Rp. 177,333.00

Rp. 91,000.00

Rp. 34,268.00

Rp. 8,190.00

Rp. 126,982.00 Rp. 170,857.00

Rp. 91,000.00

Rp. 27,612.00

Rp. 8,370.00

Rp. 123,268.00 Rp. 167,143.00

Rp. 91,000.00

Rp. 23,088.00

Rp. 9,180.00

Rp. 121,220.00 Rp. 165,095.00

Rp. 91,000.00

Rp. 19,240.00

Rp. 10,980.00

Rp. 109,815.93 Rp. 153,690.93

Rp. 91,000.00

Rp. 10,483.20

Rp. 8,325.00

Rp. 7.73

Rp. 68,628.00 Rp. 90,565.50

Rp. 45,500.00

Rp. 19,708.00

Rp. 3,420.00

Rp. 64,044.80 Rp. 85,982.30

Rp. 45,500.00

Rp. 14,944.80

Rp. 3,600.00

Rp. 61,330.00 Rp. 83,267.50

Page 93: Analisa Sni 2011

Page 93

BAHAN PEKERJAAN

Rp. 45,500.00

Rp. 11,960.00

Rp. 3,870.00

Rp. 59,617.20 Rp. 81,554.70

Rp. 45,500.00

Rp. 10,067.20

Rp. 4,050.00

Rp. 58,562.80 Rp. 80,500.30

Rp. 45,500.00

Rp. 8,652.80

Rp. 4,410.00

Rp. 56,760.00 Rp. 78,697.50

Rp. 45,500.00

Rp. 6,760.00

Rp. 4,500.00

Rp. 56,555.00 Rp. 78,492.50

Rp. 45,500.00

Rp. 4,680.00

Rp. 4,500.00

Rp. 1,875.00

Rp. 70,970.00 Rp. 92,907.50

Rp. 45,500.00

Rp. 21,600.00

Rp. 1,620.00

Rp. 2,250.00

Rp. 49,784.56 Rp. 71,722.06

Rp. 45,500.00

Rp. 14.56

Rp. 2,520.00

Rp. 1,750.00

Rp. 106,800.00 Rp. 132,450.00

Rp. 25,000.00

Rp. 14,040.00

Rp. 65,520.00

Rp. 2,240.00

Rp. 122,200.00 Rp. 147,850.00

Rp. 25,000.00

Rp. 25,480.00

Rp. 69,480.00

Rp. 2,240.00

Rp. 96,639.60 Rp. 122,964.60

Page 94: Analisa Sni 2011

Page 94

BAHAN PEKERJAAN

Rp. 21,250.00

Rp. 23,649.60

Rp. 49,500.00

Rp. 2,240.00

Rp. 94,798.00 Rp. 121,123.00

Rp. 21,250.00

Rp. 18,928.00

Rp. 52,380.00

Rp. 2,240.00

Rp. 69,516.40 Rp. 91,453.90

Rp. 18,750.00

Rp. 15,766.40

Rp. 32,760.00

Rp. 2,240.00

Rp. 67,805.20 Rp. 89,742.70

Rp. 18,750.00

Rp. 12,615.20

Rp. 34,200.00

Rp. 2,240.00

Rp. 142,462.00 Rp. 164,399.50

Rp. 126,000.00

Rp. 13,312.00

Rp. 3,150.00

Rp. 119,590.00 Rp. 141,527.50

Rp. 105,000.00

Rp. 11,440.00

Rp. 3,150.00

Rp. 146,940.00 Rp. 172,590.00

Rp. 129,500.00

Rp. 14,560.00

Rp. 2,880.00

Rp. 100,015.42 Rp. 140,065.42

Rp. 19,450.42

Rp. 80,500.00

Rp. 65.00

Rp. 119,530.83 Rp. 239,680.83

Rp. 38,900.83

Rp. 80,500.00

Rp. 130.00

Rp. 112,231.67 Rp. 152,281.67

Rp. 31,666.67

Rp. 80,500.00

Rp. 65.00

Rp. 143,963.33 Rp. 264,113.33

Page 95: Analisa Sni 2011

Page 95

BAHAN PEKERJAAN

Rp. 63,333.33

Rp. 80,500.00

Rp. 130.00

Rp. 160,552.50 Rp. 332,752.50

Rp. 105,000.00

Rp. 390.00

Rp. 3,600.00

Rp. 51,562.50

Rp. 144,702.21 Rp. 350,277.21

Rp. 57,500.00

Rp. 390.00

Rp. 9,600.00

Rp. 51,562.50

Rp. 25,649.71

Rp. 66,350.00 Rp. 103,677.50

Rp. 64,400.00

Rp. 1,950.00

Rp. 131,710.00 Rp. 173,897.50

Rp. 64,400.00

Rp. 1,950.00

Rp. 65,360.00

Rp. 107,845.00 Rp. 157,570.00

Rp. 64,400.00

Rp. 1,950.00

Rp. 41,495.00

Rp. 33,100.00 Rp. 182,275.00

Rp. 29,400.00

Rp. 1,300.00

Rp. 2,400.00

Rp. 19,950.00 Rp. 26,169.00

Rp. 19,300.00

Rp. 650.00

Rp. 34,465.00 Rp. 42,640.00

Rp. 12,000.00

Rp. 22,400.00

Rp. 65.00

Rp. 17,564.16 Rp. 38,376.66

Rp. 16,124.16

Page 96: Analisa Sni 2011

Page 96

BAHAN PEKERJAAN

Rp. 1,440.00

Rp. 12,432.96 Rp. 33,245.46

Rp. 10,632.96

Rp. 1,800.00

Rp. 10,157.04 Rp. 30,969.54

Rp. 8,087.04

Rp. 2,070.00

Rp. 8,649.60 Rp. 29,462.10

Rp. 6,489.60

Rp. 2,160.00

Rp. 7,731.36 Rp. 28,543.86

Rp. 5,391.36

Rp. 2,340.00

Rp. 7,022.64 Rp. 27,835.14

Rp. 4,592.64

Rp. 2,430.00

Rp. 6,613.44 Rp. 27,425.94

Rp. 4,093.44

Rp. 2,520.00

Rp. 6,204.24 Rp. 27,016.74

Rp. 3,594.24

Rp. 2,610.00

Rp. 7,535.40 Rp. 27,087.90

Rp. 5,990.40

Rp. 375.00

Rp. 1,170.00

Rp. 5,545.00 Rp. 25,097.50

Rp. 3,120.00

Rp. 625.00

Rp. 1,800.00

Rp. 1,944.36 Rp. 21,496.86

Rp. 9.36

Rp. 1,125.00

Rp. 810.00

Rp. 2,232.28 Rp. 21,784.78

Page 97: Analisa Sni 2011

Page 97

BAHAN PEKERJAAN

Rp. 7.28

Rp. 875.00

Rp. 1,350.00

Rp. 16,607.28 Rp. 44,034.78

Rp. 14,177.28

Rp. 2,430.00

Rp. 13,572.72 Rp. 41,000.22

Rp. 10,782.72

Rp. 2,790.00

Rp. 11,532.80 Rp. 38,960.30

Rp. 8,652.80

Rp. 2,880.00

Rp. 10,338.48 Rp. 37,765.98

Rp. 7,188.48

Rp. 3,150.00

Rp. 9,363.52 Rp. 36,791.02

Rp. 6,123.52

Rp. 3,240.00

Rp. 13,545.00 Rp. 43,695.00

Rp. 10,800.00

Rp. 1,125.00

Rp. 1,620.00

Rp. 7,731.36 Rp. 20,218.86

Rp. 5,391.36

Rp. 2,340.00

Rp. 1,690.00 Rp. 32,672.50

Rp. 520.00

Rp. 1,170.00

Rp. 75,000.00 Rp. 87,172.50

Rp. 22,500.00

Rp. 52,500.00

Rp. 75,000.00 Rp. 111,787.50

Page 98: Analisa Sni 2011

Page 98

BAHAN PEKERJAAN

Rp. 22,500.00

Rp. 52,500.00

Rp. 5,032.80 Rp. 24,585.30

Rp. 4,492.80

Rp. 540.00

Rp. 4,582.32 Rp. 17,069.82

Rp. 3,232.32

Rp. 1,350.00

Rp. 1,664.00 Rp. 7,941.50

Rp. 1,664.00

Rp. 7,673.60 Rp. 32,581.10

Rp. 6,593.60

Rp. 1,080.00

Rp. 4,730.00 Rp. 19,445.00

Rp. 3,380.00

Rp. 1,350.00

Rp. 4,648,250.00 Rp. 6,273,500.00

Rp. 4,620,000.00

Rp. 16,250.00

Rp. 12,000.00

Rp. 2,788,250.00 Rp. 4,293,500.00

Rp. 2,760,000.00

Rp. 16,250.00

Rp. 12,000.00

Rp. 92,650.00 Rp. 179,702.50

Rp. 92,000.00

Rp. 650.00

Rp. 64,650.00 Rp. 151,702.50

Rp. 64,000.00

Rp. 650.00

Rp. 104,000.00 Rp. 319,250.00

Rp. 92,000.00

Rp. 12,000.00

Rp. 58,800.00 Rp. 231,000.00

Rp. 55,200.00

Rp. 3,600.00

Page 99: Analisa Sni 2011

Page 99

BAHAN PEKERJAAN

Rp. 153,200.00 Rp. 401,825.00

Rp. 147,200.00

Rp. 6,000.00

Rp. 75,595.00 Rp. 238,120.00

Rp. 45,080.00

Rp. 390.00

Rp. 6,000.00

Rp. 24,125.00

Rp. 89,395.00 Rp. 261,595.00

Rp. 58,880.00

Rp. 390.00

Rp. 6,000.00

Rp. 24,125.00

Rp. 47,950.00 Rp. 205,637.50

Rp. 46,000.00

Rp. 1,950.00

Rp. 495,020.00 Rp. 600,117.50

Rp. 120,000.00

Rp. 373,920.00

Rp. 1,100.00

Rp. 111,650.00 Rp. 176,697.50

Rp. 47,600.00

Rp. 22,610.00

Rp. 41,440.00

Rp. 800,000.00 Rp. 916,505.00

Rp. 800,000.00

Rp. 450,000.00 Rp. 494,055.00

Rp. 450,000.00

#NUM! #NUM!

#NUM!

Rp. 200,000.00 Rp. 300,125.00

Rp. 200,000.00

Rp. 89,000.00 Rp. 93,302.00

Page 100: Analisa Sni 2011

Page 100

BAHAN PEKERJAAN

Rp. 55,000.00

Rp. 25,000.00

Rp. 9,000.00

Rp. 607,000.00 Rp. 615,507.25

Rp. 242,000.00

Rp. 365,000.00

Rp. 266,930.00 Rp. 275,390.00

Rp. 242,000.00

Rp. 22,500.00

Rp. 2,430.00

Rp. 85,000.00 Rp. 124,230.63

Rp. 85,000.00

Rp. 85,000.00 Rp. 124,230.63

Rp. 85,000.00

Rp. 164,207.26 Rp. 368,957.26

Rp. 108,097.50

Rp. 56,109.76

Rp. 16,555.84 Rp. 27,764.59

Rp. 16,500.00

Rp. 41.44

Rp. 14.40

Rp. 206,000.00 Rp. 228,417.50

Rp. 82,500.00

Rp. 1,000.00

Rp. 122,500.00

Rp. 150,000.00 Rp. 192,952.50

Rp. 150,000.00

Rp. 55,000.00 Rp. 86,057.50

Rp. 55,000.00

Rp. 50,000.00 Rp. 80,731.25

Rp. 50,000.00

Rp. 55,000.00 Rp. 85,731.25

Rp. 55,000.00

Page 101: Analisa Sni 2011

Page 101

BAHAN PEKERJAAN

Rp. 20,000.00 Rp. 30,738.13

Rp. 20,000.00

Rp. 15,000.00 Rp. 22,158.75

Rp. 15,000.00

Rp. 7,750.00 Rp. 22,675.00

Rp. 7,750.00

#NUM! #NUM!

#NUM!

Rp. 10,000.00 Rp. 20,738.13

Rp. 10,000.00

Rp. 10,000.00 Rp. 45,793.75

Rp. 10,000.00

Rp. 15,000.00 Rp. 29,317.50

Rp. 15,000.00

Rp. 10,000.00 Rp. 45,793.75

Rp. 10,000.00

Rp. 10,000.00 Rp. 17,158.75

Rp. 10,000.00

#NUM! #NUM!

#NUM!

Rp. 10,000.00 Rp. 27,896.88

Rp. 10,000.00

Rp. 49,500.00 Rp. 60,238.13

Rp. 49,500.00

Rp. 60,500.00 Rp. 71,238.13

Rp. 60,500.00

Rp. 110,450.00 Rp. 128,346.88

Page 102: Analisa Sni 2011

Page 102

BAHAN PEKERJAAN

Rp. 110,000.00

Rp. 450.00

Rp. 137,500.00 Rp. 148,238.13

Rp. 137,500.00

Rp. 77,000.00 Rp. 87,738.13

Rp. 77,000.00

Rp. 93,500.00 Rp. 105,306.88

Rp. 93,500.00

Rp. 66,000.00 Rp. 77,806.88

Rp. 66,000.00

Rp. 60,500.00 Rp. 72,306.88

Rp. 60,500.00

Rp. 10,350.00 Rp. 13,745.25

Rp. 10,350.00

Rp. 2,827,800.00 Rp. 3,822,300.00

Rp. 2,530,000.00

Rp. 225,000.00

Rp. 72,800.00

Rp. 4,917,800.00 Rp. 5,943,050.00

Rp. 4,620,000.00

Rp. 225,000.00

Rp. 72,800.00

Rp. 2,794,000.00 Rp. 3,390,700.00

Rp. 2,530,000.00

Rp. 225,000.00

Rp. 39,000.00

Rp. 118,250.00 Rp. 129,762.50

Rp. 32,200.00

Rp. 82,800.00

Rp. 3,250.00

Rp. 166,550.00 Rp. 178,062.50

Rp. 32,200.00

Page 103: Analisa Sni 2011

Page 103

BAHAN PEKERJAAN

Rp. 131,100.00

Rp. 3,250.00

Rp. 382,100.00 Rp. 395,915.00

Rp. 379,500.00

Rp. 2,600.00

Rp. 5,670.00 Rp. 19,601.25

Rp. 4,370.00

Rp. 1,300.00

Rp. 1,268,750.00 Rp. 1,281,080.00

Rp. 1,268,750.00

Rp. 1,268,750.00 Rp. 1,281,080.00

Rp. 1,268,750.00

Rp. 609,000.00 Rp. 621,330.00

Rp. 609,000.00

Rp. 126,200.00 Rp. 156,470.00

Rp. 115,000.00

Rp. 8,320.00

Rp. 2,880.00

Rp. 126,200.00 Rp. 156,470.00

Rp. 115,000.00

Rp. 8,320.00

Rp. 2,880.00

Rp. 103,200.00 Rp. 133,470.00

Rp. 92,000.00

Rp. 8,320.00

Rp. 2,880.00

Rp. 33,065.00 Rp. 43,910.00

Rp. 33,000.00

Rp. 65.00

Rp. 20,253.33 Rp. 32,133.33

Rp. 18,333.33

Rp. 1,920.00

Rp. 21,170.00 Rp. 33,050.00

Rp. 19,250.00

Rp. 1,920.00

Page 104: Analisa Sni 2011

Page 104

BAHAN PEKERJAAN

Rp. 16,320.00 Rp. 27,765.00

Rp. 14,400.00

Rp. 1,920.00

Rp. 19,464.64 Rp. 30,909.64

Rp. 17,544.64

Rp. 1,920.00

Rp. 24,320.00 Rp. 35,765.00

Rp. 22,400.00

Rp. 1,920.00

Rp. 19,245.00 Rp. 30,690.00

Rp. 17,325.00

Rp. 1,920.00

Rp. 18,090.00 Rp. 29,355.00

Rp. 16,170.00

Rp. 1,920.00

Rp. 18,622.50 Rp. 29,887.50

Rp. 16,702.50

Rp. 1,920.00

Rp. 20,634.29 Rp. 31,899.29

Rp. 18,714.29

Rp. 1,920.00

Rp. 18,878.33 Rp. 30,143.33

Rp. 16,958.33

Rp. 1,920.00

Rp. 17,595.00 Rp. 28,860.00

Rp. 15,675.00

Rp. 1,920.00

Rp. 18,786.67 Rp. 30,051.67

Rp. 16,866.67

Rp. 1,920.00

Rp. 17,640.83 Rp. 28,905.83

Rp. 15,720.83

Rp. 1,920.00

Rp. 15,600.00 Rp. 26,865.00

Page 105: Analisa Sni 2011

Page 105

BAHAN PEKERJAAN

Rp. 13,680.00

Rp. 1,920.00

Rp. 56,742.86 Rp. 69,170.36

Rp. 56,142.86

Rp. 600.00

Rp. 48,900.00 Rp. 61,327.50

Rp. 48,300.00

Rp. 600.00

Rp. 47,750.00 Rp. 60,177.50

Rp. 47,150.00

Rp. 600.00

Rp. 28,200.00 Rp. 40,627.50

Rp. 27,600.00

Rp. 600.00

Rp. 28,200.00 Rp. 40,627.50

Rp. 27,600.00

Rp. 600.00

Rp. 28,200.00 Rp. 40,627.50

Rp. 27,600.00

Rp. 600.00

Rp. 25,900.00 Rp. 40,547.50

Rp. 25,300.00

Rp. 600.00

Rp. 25,900.00 Rp. 38,327.50

Rp. 25,300.00

Rp. 600.00

Rp. 558,640.00 Rp. 574,990.00

Rp. 558,250.00

Rp. 390.00

Rp. 375,815.00 Rp. 392,165.00

Rp. 350,175.00

Rp. 22,750.00

Rp. 390.00

Rp. 2,500.00

Rp. 59,800.00 Rp. 76,150.00

Page 106: Analisa Sni 2011

Page 106

BAHAN PEKERJAAN

Rp. 57,200.00

Rp. 2,600.00

Rp. 3,047,600.00 Rp. 3,072,297.50

Rp. 3,045,000.00

Rp. 2,600.00

Rp. 97,512.00 Rp. 130,212.00

Rp. 80,500.00

Rp. 650.00

Rp. 11,232.00

Rp. 2,880.00

Rp. 2,250.00

Rp. 116,850.00 Rp. 139,567.50

Rp. 101,500.00

Rp. 650.00

Rp. 14,700.00

Rp. 56,475.00 Rp. 78,615.00

Rp. 55,825.00

Rp. 650.00

Rp. 39,230.00 Rp. 61,947.50

Rp. 21,000.00

Rp. 780.00

Rp. 650.00

Rp. 16,800.00

Rp. 26,160.00 Rp. 35,970.00

Rp. 25,900.00

Rp. 260.00

Rp. 38,760.00 Rp. 48,570.00

Rp. 38,500.00

Rp. 260.00

Rp. 42,260.00 Rp. 52,070.00

Rp. 42,000.00

Rp. 260.00

Rp. 16,010.00 Rp. 27,905.00

Rp. 15,750.00

Rp. 260.00

Rp. 58,070.00 Rp. 110,765.00

Page 107: Analisa Sni 2011

Page 107

BAHAN PEKERJAAN

Rp. 57,750.00

Rp. 320.00

Rp. 28,240.00 Rp. 94,090.00

Rp. 27,600.00

Rp. 640.00

#NUM! #NUM!

#NUM!

Rp. 26,140.00 Rp. 44,665.00

Rp. 24,840.00

Rp. 1,300.00

Rp. 25,950.00 Rp. 44,137.50

Rp. 25,300.00

Rp. 650.00

Rp. 99,020.00 Rp. 134,382.50

Rp. 55,125.00

Rp. 195.00

Rp. 43,700.00

Rp. 59,255.00 Rp. 86,502.50

Rp. 55,125.00

Rp. 130.00

Rp. 4,000.00

Rp. 74,645.00 Rp. 102,216.88

Rp. 26,250.00

Rp. 195.00

Rp. 43,700.00

Rp. 4,500.00

Rp. 90,162,043.75 Rp. 198,931.59

Page 108: Analisa Sni 2011

Page 108

BAHAN PEKERJAAN

Rp. 90,061,250.00

Rp. 10,732,500.00

Rp. 24,403,500.00

Rp. 45,080,000.00

Rp. 2,325,000.00

Rp. 3,552,250.00

Rp. 3,770,000.00

Rp. 198,000.00

Rp. 100,793.75

Rp. 90,061.25

Rp. 10,732.50

Rp. 72,346,003.20 Rp. 144,902.13

Rp. 72,201,600.00

Rp. 37,357,500.00

Rp. 29,200,000.00

Rp. 2,502,500.00

Rp. 2,970,000.00

Rp. 171,600.00

Rp. 144,403.20

Rp. 72,201.60

Rp. 72,201.60

Rp. 38,020.00 Rp. 66,520.00

Page 109: Analisa Sni 2011

Page 109

BAHAN PEKERJAAN

Rp. 35,420.00

Rp. 2,600.00

Rp. 40,740.00 Rp. 70,440.00

Rp. 37,490.00

Rp. 3,250.00

Rp. 38,630.00 Rp. 44,787.50

Rp. 38,500.00

Rp. 130.00

Rp. 35,880.00 Rp. 42,037.50

Rp. 35,750.00

Rp. 130.00

Rp. 38,630.00 Rp. 44,787.50

Rp. 38,500.00

Rp. 130.00

Rp. 180,650.00 Rp. 191,562.50

Rp. 180,000.00

Rp. 650.00

Rp. 116,650.00 Rp. 120,827.50

Rp. 116,000.00

Rp. 650.00

Rp. 120,650.00 Rp. 124,827.50

Rp. 120,000.00

Rp. 650.00

Rp. 18,483.75 Rp. 28,578.75

Rp. 18,093.75

Rp. 390.00

Rp. 34,630.00 Rp. 115,232.50

Rp. 34,500.00

Rp. 130.00

Rp. 47,260.00 Rp. 55,435.00

Rp. 45,500.00

Rp. 1,760.00

Rp. 354,750.00 Rp. 395,415.00

Page 110: Analisa Sni 2011

Page 110

BAHAN PEKERJAAN

Rp. 198,000.00

Rp. 21,000.00

Rp. 15,750.00

Rp. 120,000.00

Rp. 4,067.50 Rp. 10,195.00

Rp. 3,937.50

Rp. 130.00

Rp. 424,000.00 Rp. 657,617.50

Rp. 400,000.00

Rp. 24,000.00

Rp. 1,431,000.00 Rp. 1,664,617.50

Rp. 1,350,000.00

Rp. 81,000.00

Rp. 187,140.00 Rp. 445,440.00

Rp. 180,000.00

Rp. 6,240.00

Rp. 900.00

Rp. 191,690.00 Rp. 365,615.00

Rp. 180,000.00

Rp. 4,550.00

Rp. 6,240.00

Rp. 900.00

Rp. 852,140.00 Rp. 978,140.00

Rp. 650,000.00

Rp. 195,000.00

Rp. 6,240.00

Rp. 900.00

Rp. 511,140.00 Rp. 679,890.00

Rp. 450,000.00

Rp. 54,000.00

Rp. 6,240.00

Rp. 900.00

Rp. 217,140.00 Rp. 217,140.00

Rp. 210,000.00

Rp. 6,240.00

Rp. 900.00

Rp. 265,500.00 Rp. 572,625.00

Page 111: Analisa Sni 2011

Page 111

BAHAN PEKERJAAN

Rp. 225,000.00

Rp. 40,500.00

Rp. 525,464.72 Rp. 1,038,464.72

Rp. 186,848.72

Rp. 124,800.00

Rp. 27,000.00

Rp. 156,816.00

Rp. 30,000.00

#NUM! #NUM!

#NUM!

#NUM!

Rp. 252,000.00 Rp. 812,250.00

Rp. 225,000.00

Rp. 27,000.00

Rp. 66,372.20 Rp. 71,468.45

Rp. 64,000.00

Rp. 707.20

Rp. 1,170.00

Rp. 495.00

Rp. 82,794.80 Rp. 89,837.30

Rp. 80,000.00

Rp. 904.80

Rp. 1,260.00

Rp. 630.00

Rp. 66,809.09 Rp. 78,779.09

Rp. 44,000.00

Rp. 12,612.29

Rp. 4,076.80

Rp. 5,040.00

Rp. 1,080.00

Rp. 441,224.00 Rp. 473,714.00

Rp. 165,000.00

Rp. 256,917.00

Rp. 10,712.00

Rp. 5,490.00

Rp. 3,105.00

Rp. 143,692.66 Rp. 357,386.41

Rp. 67,732.66

Rp. 45,760.00

Rp. 6,300.00

Rp. 6,300.00

Rp. 12,800.00

Rp. 4,800.00

Rp. 238,360.45 Rp. 342,152.95

Page 112: Analisa Sni 2011

Page 112

BAHAN PEKERJAAN

Rp. 116,780.45

Rp. 80,080.00

Rp. 11,700.00

Rp. 1,800.00

Rp. 20,800.00

Rp. 7,200.00

Rp. 359,957.19 Rp. 522,407.19

Rp. 173,302.19

Rp. 118,560.00

Rp. 16,560.00

Rp. 3,135.00

Rp. 38,800.00

Rp. 9,600.00

Rp. 25,920.00 Rp. 36,855.00

Rp. 19,200.00

Rp. 6,720.00

Rp. 40,500.00 Rp. 51,435.00

Rp. 30,000.00

Rp. 10,500.00

Rp. 64,800.00 Rp. 75,735.00

Rp. 48,000.00

Rp. 16,800.00

Rp. 89,100.00 Rp. 107,689.50

Rp. 66,000.00

Rp. 23,100.00

Rp. 121,500.00 Rp. 140,089.50

Rp. 90,000.00

Rp. 31,500.00

Rp. 145,800.00 Rp. 169,040.25

Rp. 108,000.00

Rp. 37,800.00

Rp. 6,075.00 Rp. 12,271.50

Rp. 4,500.00

Rp. 1,575.00

Rp. 8,100.00 Rp. 14,296.50

Rp. 6,000.00

Rp. 2,100.00

Rp. 10,125.00 Rp. 16,321.50

Page 113: Analisa Sni 2011

Page 113

BAHAN PEKERJAAN

Rp. 7,500.00

Rp. 2,625.00

Rp. 14,175.00 Rp. 20,371.50

Rp. 10,500.00

Rp. 3,675.00

Rp. 22,275.00 Rp. 31,569.75

Rp. 16,500.00

Rp. 5,775.00

Rp. 32,400.00 Rp. 38,596.50

Rp. 24,000.00

Rp. 8,400.00

Rp. 44,550.00 Rp. 58,495.50

Rp. 33,000.00

Rp. 11,550.00

Rp. 68,850.00 Rp. 82,795.50

Rp. 51,000.00

Rp. 17,850.00

Rp. 215,000.00 Rp. 238,726.25

Rp. 180,000.00

Rp. 35,000.00

Rp. 270,300.00 Rp. 309,843.75

Rp. 210,000.00

Rp. 35,000.00

Rp. 20,800.00

Rp. 4,500.00

Rp. 35,075.00 Rp. 43,287.50

Rp. 35,000.00

Rp. 75.00

Rp. 50,000.00 Rp. 58,212.50

Rp. 50,000.00

Rp. 454,046.67 Rp. 551,696.67

Rp. 47,884.25

Rp. 4,500.00

Rp. 75,471.25

Rp. 29,791.54

Rp. 46,571.25

Rp. 146,540.00

Rp. 99,736.38

Rp. 3,552.00

Rp. 1,030,000.00 Rp. 1,030,000.00

Page 114: Analisa Sni 2011

Page 114

BAHAN PEKERJAAN

Rp. 644,355.00

Rp. 35,721.00

Rp. 236,721.07

Rp. 1,886,781.25

Rp. 688,845.93

Rp. 297,915.36

Rp. 465,712.50

Rp. 1,465,400.00

Rp. 312,500.00

Rp. 190,000.00

Rp. 212,500.00

Rp. 15,000.00

Rp. 300,000.00

Rp. 967,500.00 Rp. 967,500.00

Rp. 275,157.00

Rp. 15,876.00

Rp. 94,688.43

Rp. 1,464,142.25

Rp. 548,550.09

Rp. 178,749.21

Rp. 279,427.50

Rp. 879,240.00

Rp. 250,000.00

Rp. 190,000.00

Rp. 212,500.00

Rp. 15,000.00

Rp. 300,000.00

Rp. 817,500.00 Rp. 817,500.00

Rp. 126,258.75

Rp. 7,938.00

Rp. 66,281.90

Rp. 777,353.88

Rp. 74,802.29

Rp. 83,416.30

Rp. 130,399.50

Rp. 410,312.00

Rp. 250,000.00

Rp. 190,000.00

Rp. 212,500.00

Rp. 15,000.00

Rp. 150,000.00

Rp. 10,350.00 Rp. 13,745.25

Rp. 10,350.00

Rp. 460.00 Rp. 578.55

Rp. 46,000.00

Rp. 1,775.00 Rp. 2,072.00

Rp. 880.00

Rp. 135.00

Rp. 80.00

Rp. 680.00

Rp. 26,400.00 Rp. 37,608.75

Rp. 22,000.00

Rp. 260.00

Rp. 4,140.00

Rp. 20,900.00 Rp. 32,108.75

Rp. 16,500.00

Page 115: Analisa Sni 2011

Page 115

BAHAN PEKERJAAN

Rp. 260.00

Rp. 4,140.00

Rp. 20,900.00 Rp. 32,108.75

Rp. 16,500.00

Rp. 260.00

Rp. 4,140.00

Rp. 48,650.00 Rp. 61,700.00

Rp. 45,500.00

Rp. 3,150.00

Rp. 162,754.00 Rp. 183,791.50

Rp. 148,512.00

Rp. 10,192.00

Rp. 4,050.00

Rp. 85,670.00 Rp. 107,562.50

Rp. 71,220.00

Rp. 10,400.00

Rp. 4,050.00

#N/A #N/A

#N/A

Rp. 10,816.00

Rp. 1,215.00

Rp. 165,679.00 Rp. 186,716.50

Rp. 148,512.00

Rp. 10,192.00

Rp. 4,050.00

Rp. 2,925.00

Rp. 89,045.00 Rp. 110,937.50

Rp. 71,220.00

Rp. 10,400.00

Rp. 4,050.00

Rp. 3,375.00

#N/A #N/A

#N/A

Rp. 10,816.00

Rp. 4,050.00

Rp. 3,645.00

Rp. 165,679.00 Rp. 186,716.50

Rp. 148,512.00

Rp. 10,192.00

Rp. 4,050.00

Rp. 2,925.00

Page 116: Analisa Sni 2011

Page 116

BAHAN PEKERJAAN

Rp. 89,045.00 Rp. 110,937.50

Rp. 71,220.00

Rp. 10,400.00

Rp. 4,050.00

Rp. 3,375.00

Rp. 165,679.00 Rp. 186,716.50

Rp. 148,512.00

Rp. 10,192.00

Rp. 4,050.00

Rp. 2,925.00

Rp. 121,687.50 Rp. 143,580.00

Rp. 103,862.50

Rp. 10,400.00

Rp. 4,050.00

Rp. 3,375.00

Rp. 165,679.00 Rp. 186,784.00

Rp. 148,512.00

Rp. 10,192.00

Rp. 4,050.00

Rp. 2,925.00

Rp. 89,045.00 Rp. 110,937.50

Rp. 71,220.00

Rp. 10,400.00

Rp. 4,050.00

Rp. 3,375.00

Rp. 198,242.33 Rp. 219,279.83

Rp. 180,833.33

Rp. 9,984.00

Rp. 4,050.00

Rp. 3,375.00

Rp. 165,679.00 Rp. 186,716.50

Rp. 148,512.00

Rp. 10,192.00

Rp. 4,050.00

Rp. 2,925.00

Rp. 89,045.00 Rp. 110,937.50

Rp. 71,220.00

Rp. 10,400.00

Rp. 4,050.00

Rp. 3,375.00

#N/A #N/A

Page 117: Analisa Sni 2011

Page 117

BAHAN PEKERJAAN

#N/A

Rp. 1,716.00

Rp. 360.00

#N/A #N/A

#N/A

Rp. 1,289.60

Rp. 270.00

#N/A #N/A

#N/A

Rp. 1,289.60

Rp. 270.00

#N/A #N/A

#N/A

Rp. 1,185.60

Rp. 270.00

Rp. 225.00

#N/A #N/A

#N/A

Rp. 1,185.60

Rp. 270.00

Rp. 225.00

#N/A #N/A

#N/A

Rp. 1,185.60

Rp. 270.00

Rp. 225.00

#N/A #N/A

#N/A

Rp. 1,185.60

Rp. 270.00

Rp. 225.00

#N/A #N/A

#N/A

Rp. 1,185.60

Rp. 270.00

Rp. 225.00

#N/A #N/A

#N/A

Rp. 1,185.60

Rp. 270.00

Rp. 225.00

Page 118: Analisa Sni 2011

Page 118

BAHAN PEKERJAAN

#N/A #N/A

#N/A

Rp. 1,185.60

Rp. 270.00

Rp. 225.00

#N/A #N/A

#N/A

Rp. 1,185.60

Rp. 270.00

Rp. 225.00

#N/A #N/A

#N/A

Rp. 1,185.60

Rp. 270.00

Rp. 225.00

#N/A #N/A

#N/A

Rp. 1,185.60

Rp. 270.00

Rp. 225.00

#N/A #N/A

#N/A

Rp. 1,185.60

Rp. 270.00

Rp. 225.00

#N/A #N/A

#N/A

Rp. 1,185.60

Rp. 270.00

Rp. 225.00

#N/A #N/A

#N/A

#N/A #N/A

#N/A

Rp. 8,517.60

Rp. 4,050.00

Rp. 6,187.50

#N/A #N/A

Page 119: Analisa Sni 2011

Page 119

BAHAN PEKERJAAN

#N/A

Rp. 8,517.60

Rp. 4,050.00

Rp. 7,200.00

Rp. 1,150,434.27 Rp. 1,206,346.77

Rp. 1,130,666.67

Rp. 8,517.60

Rp. 4,050.00

Rp. 7,200.00

Rp. 76,212.60 Rp. 132,125.10

Rp. 60,000.00

Rp. 8,517.60

Rp. 4,050.00

Rp. 3,645.00

Rp. 57,352.10 Rp. 113,264.60

Rp. 39,527.10

Rp. 10,400.00

Rp. 4,050.00

Rp. 3,375.00

Rp. 80,715.63 Rp. 136,628.13

Rp. 62,890.63

Rp. 10,400.00

Rp. 4,050.00

Rp. 3,375.00

Rp. 65,151.00 Rp. 121,063.50

Rp. 46,640.00

Rp. 10,816.00

Rp. 4,050.00

Rp. 3,645.00

#N/A #N/A

#N/A

Rp. 10,192.00

Rp. 4,050.00

Rp. 9,832.50

Rp. 70,206.00 Rp. 126,118.50

Rp. 47,480.00

Rp. 14,716.00

Rp. 3,510.00

Rp. 4,500.00

Rp. 6,281.85 Rp. 17,351.85

Rp. 4,770.00

Rp. 1,185.60

Rp. 270.00

Rp. 56.25

Page 120: Analisa Sni 2011

Page 120

BAHAN PEKERJAAN

Rp. 10,048.10 Rp. 21,118.10

Rp. 8,480.00

Rp. 1,185.60

Rp. 270.00

Rp. 112.50

Rp. 3,142.05 Rp. 14,212.05

Rp. 2,385.00

Rp. 592.80

Rp. 135.00

Rp. 29.25

Rp. 17,580.60 Rp. 87,308.10

Rp. 15,900.00

Rp. 1,185.60

Rp. 270.00

Rp. 225.00

#N/A #N/A

#N/A

Rp. 8,517.60

Rp. 4,050.00

Rp. 1,462.50

Rp. 56,700.00 Rp. 77,580.00

Rp. 52,500.00

Rp. 4,200.00

Rp. 28,009.12 Rp. 42,724.12

Rp. 23,809.12

Rp. 4,200.00

Rp. 43,950.00 Rp. 101,415.00

Rp. 36,750.00

Rp. 7,200.00

Rp. 43,950.00 Rp. 102,090.00

Rp. 36,750.00

Rp. 7,200.00

Rp. 52,128.60 Rp. 119,178.60

Rp. 37,461.60

Rp. 9,672.00

Rp. 1,620.00

Rp. 3,375.00

Rp. 62,529.50 Rp. 124,967.00

Rp. 45,050.00

Rp. 9,672.00

Rp. 1,620.00

Rp. 6,187.50

Page 121: Analisa Sni 2011

Page 121

BAHAN PEKERJAAN

Rp. 63,357.00 Rp. 125,794.50

Rp. 47,700.00

Rp. 9,672.00

Rp. 1,620.00

Rp. 4,365.00

Rp. 65,179.50 Rp. 127,617.00

Rp. 47,700.00

Rp. 9,672.00

Rp. 1,620.00

Rp. 6,187.50

Rp. 65,517.00 Rp. 127,954.50

Rp. 47,700.00

Rp. 9,672.00

Rp. 1,620.00

Rp. 6,525.00

Rp. 65,179.50 Rp. 127,617.00

Rp. 47,700.00

Rp. 9,672.00

Rp. 1,620.00

Rp. 6,187.50

Rp. 63,357.00 Rp. 125,794.50

Rp. 47,700.00

Rp. 9,672.00

Rp. 1,620.00

Rp. 4,365.00

#N/A #N/A

#N/A

Rp. 26,000.00

Rp. 12,937.60

Rp. 2,250.00

Rp. 1,462.50

Rp. 62,325.10 Rp. 130,725.10

Rp. 40,950.00

Rp. 12,937.60

Rp. 2,250.00

Rp. 6,187.50

Rp. 16,140.00 Rp. 72,052.50

Rp. 770.00

Rp. 12,220.00

Rp. 3,150.00

Rp. 16,140.00 Rp. 72,052.50

Page 122: Analisa Sni 2011

Page 122

BAHAN PEKERJAAN

Rp. 770.00

Rp. 12,220.00

Rp. 3,150.00

Rp. 39,810.00 Rp. 58,237.50

Rp. 35,610.00

Rp. 4,200.00

Rp. 30,500.00 Rp. 89,900.00

Rp. 27,500.00

Rp. 3,000.00

Rp. 75,000.00 Rp. 89,715.00

Rp. 75,000.00

Rp. 6,240.00 Rp. 16,050.00

Rp. 5,280.00

Rp. 960.00

Rp. 6,905.00 Rp. 21,620.00

Rp. 6,900.00

Rp. 5.00

Rp. 37,350.00 Rp. 55,743.75

Rp. 33,150.00

Rp. 4,200.00

Rp. 250.00 Rp. 7,168.75

Rp. 250.00

Rp. 500.00 Rp. 7,418.75

Rp. 500.00

Rp. 500.00 Rp. 7,418.75

Rp. 500.00

Rp. 500.00 Rp. 7,418.75

Rp. 500.00

Rp. 67,400.00 Rp. 272,150.00

Rp. 2,400.00

Rp. 45,000.00

Rp. 20,000.00

Rp. 1,710.00 Rp. 5,748.75

Rp. 1,400.00

Page 123: Analisa Sni 2011

Page 123

BAHAN PEKERJAAN

Rp. 300.00

Rp. 10.00

Rp. 11,340.00 Rp. 18,540.00

Rp. 1,650.00

Rp. 2,550.00

Rp. 7,140.00

Rp. 18,120.00 Rp. 25,320.00

Rp. 3,000.00

Rp. 1,650.00

Rp. 2,550.00

Rp. 10,920.00

Rp. 21,900.00 Rp. 30,213.75

Rp. 3,000.00

Rp. 1,650.00

Rp. 2,550.00

Rp. 14,700.00

Rp. 7,200.00 Rp. 16,256.25

Rp. 7,200.00

Rp. 18,410.00 Rp. 22,358.75

Rp. 2,250.00

Rp. 11,160.00

Rp. 5,000.00

Rp. 3,150.00 Rp. 8,055.00

Rp. 3,150.00

Rp. 4,775.00 Rp. 20,423.75

Rp. 2,625.00

Rp. 1,750.00

Rp. 250.00

Rp. 150.00

Rp. 6,500.00 Rp. 10,829.00

Rp. 1,100.00

Rp. 1,500.00

Rp. 3,900.00

Rp. 4,500.00 Rp. 8,102.25

Rp. 1,800.00

Rp. 2,700.00

Rp. 2,000.00 Rp. 5,602.25

Rp. 2,000.00

Rp. 26,575.00 Rp. 33,545.50

Page 124: Analisa Sni 2011

Page 124

BAHAN PEKERJAAN

Rp. 250.00

Rp. 625.00

Rp. 3,200.00

Rp. 22,500.00

Rp. 48,200.00 Rp. 50,427.50

Rp. 3,200.00

Rp. 45,000.00

Rp. 17,000.00 Rp. 27,203.75

Rp. 15,000.00

Rp. 2,000.00

Rp. 1,650.00 Rp. 13,575.00

Rp. 1,500.00

Rp. 150.00

Rp. 4,850.00 Rp. 28,250.00

Rp. 1,500.00

Rp. 150.00

Rp. 3,200.00

Rp. 9,870.00 Rp. 12,435.00

Rp. 1,750.00

Rp. 2,000.00

Rp. 1,400.00

Rp. 1,400.00

Rp. 120.00

Rp. 3,200.00

Rp. 12,600.00 Rp. 16,785.00

Rp. 12,600.00

Rp. 12,150.00 Rp. 122,400.00

Rp. 1,650.00

Rp. 7,140.00

Rp. 3,360.00

Rp. 4,500.00 Rp. 81,000.00

Rp. 4,500.00

Page 125: Analisa Sni 2011

DEP. PERMUKIMAN DAN PRASARANA WILAYAH

DITJEN PERUMAHAN DAN

PERMUKIMAN

ISI DATA HARGA BAHAN & UPAH KERJA

HSBGN

KONVERSI HSBGN

PERHITUNGAN BGN

PERHITUNGAN PAGAR

PENJELASAN UMUM

KOMPONEN BIAYA BGN KLASIFIKASI TIDAK SEDERHANA

KOMPONEN BIAYA BGN KLASIFIKASI SEDERHANA

KOMPONEN BIAYA BGN KLASIFIKASI KHUSUS

Page 126: Analisa Sni 2011
Page 127: Analisa Sni 2011

PERHITUNGAN HARGA SATUAN TERTINGGI BGN

KABUPATEN/KOTA KOTA PADANG PANJANG

PROVINSI SUMATERA BARATBULAN / TRIWULAN JANUARI / TRIWULAN I (SATU)

TAHUN ANGGARAN 2010

GEDUNG BERTINGKAT GEDUNG TIDAK BERTINGKAT RUMAH NEGARA

KLAS SEDERHANA KLAS TIDAK SEDERHANA KLAS SEDERHANA KLAS TIDAK SEDERHANA TIPE C TIPE B

2,657,000 3,720,000 1,998,000 2,797,000 1,922,000 2,306,000

GEDUNG RUMAH NEGARA

KLAS SEDERHANA KLAS TIDAK SEDERHANA TIPE C TIPE B

DEPAN 1,424,000 1,566,400 619,700 681,670

SAMPING 920,700 1,012,770 753,200 828,520

Padang Panjang, 01 January 2010

Diketahui Disetujui Dibuat olehKepala Dinas Pekerjaan Umum Kabid. Perencanaan dan Pengawasan Kasi Perencanaan Bid. Keciptakaryaan

Kota Padang Panjang Dinas Pekerjaan Umum Kota Padang Panjang Bidang Perencanaan dan PengawasanDinas Pekerjaan Umum Kota Padang Panjang

H. MAISUL, ST. MM D E F R I A L, ST HENDRA PUTRANIP. 19590402 198103 1 009 NIP. 19561206 198103 1 009 NIP. 19700107 199003 1 003

GEDUNG PER-M2

PAGAR PER-M1

MENU UTAMAMENU UTAMA

Page 128: Analisa Sni 2011

PERHITUNGAN HARGA SATUAN TERTINGGI BGN

(DALAM RUPIAH)

RUMAH NEGARA

TIPE A

2,306,000

RUMAH NEGARA

TIPE A

681,670

828,520

Kasi Perencanaan Bid. KeciptakaryaanBidang Perencanaan dan Pengawasan

Dinas Pekerjaan Umum Kota Padang Panjang

GEDUNG PER-M2

PAGAR PER-M1

MENU UTAMAMENU UTAMA

Page 129: Analisa Sni 2011

KONVERSI SISTEM PERHITUNGAN HSBGN BARU KE SISTEM PERHITUNGAN HSBGN LAMASTANDAR HARGA SATUAN BANGUNAN GEDUNG NEGARA PER-M2 TERTINGGI

BERTINGKAT TIDAK BERTINGKAT RUMAH DINAS

SEDERHANA TIDAK SEDERHANA SEDERHANA TIDAK SEDERHANA SEDERHANA TIDAK SEDERHANA

2,657,000 3,720,000 1,998,000 2,797,000 1,922,000 2,306,000

100% 140% 100% 140% 100% 120%

C B A C B A C B

2,922,700 3,887,191 4,354,823 2,197,800 2,923,074 3,274,722 2,114,200 2,346,762

100% 133% 149% 100% 133% 149% 100% 111%

BARU 332/2002

LAMA 295/1997

Page 130: Analisa Sni 2011

(DALAM RUPIAH)

RUMAH DINAS KETERANGAN

TIDAK SEDERHANA

2,306,000HARGA KONSTRUKSI FISIK

120%

A

2,621,608

124%

HARGA KESELURUHAN BANGUNAN

MENU UTAMAMENU UTAMA

Page 131: Analisa Sni 2011

DATA HARGA BAHAN BANGUNAN DAN UPAH KERJA

DATA HARGA BAHAN BANGUNAN

NO NAMA BAHAN SATUAN

A. BAHAN PASANGAN 1 PASIR BETON m3 80,0002 PASIR PASANG m3 90,0003 PASIR URUG m3 45,0004 SEMEN PC (50 Kg) zak 52,0005 KERIKIL BETON UK. 3 cm s/d 4 cm m3 85,0006 KERIKIL KORAL m3 85,000

B. BAHAN PONDASI 7 BATU KALI / BATU BELAH / BATU GUNUNG m3 90,000C. BAHAN LANTAI8 KERAMIK 30 X 30 m2 37,000D. BAHAN DINDING9 BATAKO UK. 20 X 40 X 10 bh 010 BATU BATA UK. 5.5 X 11 X 23 bh 65011 BATU TELA UK. 20 X 30 X 10 bh 012 BETON ROSTER / KERAWANG bh 3,500E. BAHAN PENUTUP LANGIT-LANGIT13 ETERNIT, UK. 100 X 100 lbr 014 KAYU LAPIS 4 MM UK 120 X 240 lbr 16,209F. BAHAN PENUTUP ATAP 15 BUBUNGAN GENTENG PLENTONG "S" bh 16 GENTENG PLENTONG "S" bh 17 SENG DATAR BJLS 0.3 m 018 SENG GELOMBANG KECIL lbr 37,00019 BUBUNGAN ASBES GELOMBANG m 020 ASBES GELOMBANG KECIL lbr 0G. BAHAN KAYU21 KAYU BALOK KLAS I m3 4,200,00022 KAYU BALOK KLAS II m3 2,300,00023 KAYU PAPAN KLAS II m3 2,300,00024 KAYU PAPAN KLAS III m3 1,600,00025 KAYU PAPAN KLAS IV m3 1,600,00026 KAYU LAPIS 4 mm UK. 8" X 4" lbr 16,20927 KAYU LAPIS 12 mm UK. 8" X 4" lbr 21,836H. BAHAN BESI28 BESI BETON POLOS DIA. 10 mm Kg 8,00029 BESI BETON ULIR DIA. 13 mm Kg 8,00030 KAWAT BENDRAT / BETON Kg 14,00031 PAKU UK. 3 CM - 7 CM Kg 13,00032 PAGAR BRC JADI (T 1M) m 80,00033 BESI PROFIL C a PIPA BESI DIA. 2" m 65,000I. BAHAN SANITAIR / SALURAN AIR

34 BAK MANDI FIBRE GLASS 70 X 70 X 66 bh 225,00035 BAK RESERVOIR FIGRE GLASS KAP. 1000 ltr bh 1,200,00036 BUIS BETON 1/2 DIA. 20 CM bh 40,00037 PIPA GIP DIA. 1" m 40,00038 PIPA GIP DIA. 1 1/2" m 55,00039 PIPA GIP DIA. 2" m 65,00040 PIPA PVC DIA. 1/2" m 3,75041 PIPA PVC DIA. 3/4" m 5,00042 PIPA PVC DIA. 2" m 13,75043 PIPA PVC DIA. 3" m 27,50044 PIPA PVC DIA. 4" m 42,500

HARGA SURVAI (Rp)

Page 132: Analisa Sni 2011

44 KLOSET DUDUK KERAMIK bh 1,350,00045 KLOSET JONGKOK KERAMIK STANDAR bh 180,00046 URINOAR KERAMIK STANDAR bh 650,00047 WASTAFEL GANTUNG KERAMIK bh 450,000J BAHAN FINISHING48 CAT BESI Kg 42,00049 CAT DINDING Kg 15,00050 CAT KAYU Kg 42,000K. BAHAN LAIN - LAIN51 KACA BENING 5 MM m2 55,00052 POMPA TANGAN bh 125,00053 INSTALASI LISTRIK titik 150,000

Page 133: Analisa Sni 2011

DATA UPAH KERJA

NO TENAGA KERJA SATUAN

1 MANDOR ORG 67,5002 KEPALA TUKANG ORG 67,5003 TUKANG BATU ORG 67,5004 LADEN TUKANG BATU ORG 45,0005 TUKANG BESI ORG 67,5006 LADEN TUKANG BESI ORG 45,0007 TUKANG KAYU ORG 67,5008 LADEN TUKANG KAYU ORG 45,0009 TUKANG CAT ORG 67,50010 LADEN TUKANG CAT ORG 45,00011 TUKANG BONGKAR ORG 45,00012 PEKERJA GALIAN & URUG ORG 45,00013 TUKANG LISTRIK ORG 67,50014 TUKANG PIPA ORG 67,500

HARGA SURVAI (Rp)

Page 134: Analisa Sni 2011

DATA HARGA BAHAN BANGUNAN DAN UPAH KERJA

KETERANGAN

x

PILIH SALAH SATU SESUAI DENGAN BAHAN YANG TERSEDIA

PILIH SALAH SATU SESUAI BAHAN YANG TERSEDIA

PILIH SALAH SATU SESUAI DENGAN BAHAN YANG TERSEDIA

Page 135: Analisa Sni 2011
Page 136: Analisa Sni 2011
Page 137: Analisa Sni 2011

PERHITUNGAN HARGA SATUAN TERTINGGI BANGUNAN GEDUNG NEGARA PER M2KAB/KOTA : KOTA PADANG PANJANGTANGGAL : 01 Januari 2010

KEBUTUHANRUMAH DINAS TIPE-70 GEDUNG TIDAK BERTINGKATNO SATUAN HARGA

VOLUME JUMLAH VOLUME JUMLAH1 2 3 4 5 6 9 10 KEBUTUHAN BAHAN DAN UPAH BAHAN

A. BAHAN PASANGAN 1 PASIR BETON m3 80,000.00 0.0952 7,616.00 0.1278 10,224.00 2 PASIR PASANG m3 90,000.00 0.8450 76,050.00 0.2781 25,029.00 3 PASIR URUG m3 45,000.00 0.1358 6,111.00 0.1121 5,044.50 4 SEMEN PC (50 Kg) zak 52,000.00 2.3285 121,082.00 2.3285 121,082.00 5 KERIKIL BETON UK. 3 cm s/d 4 cm m3 85,000.00 0.0853 7,250.50 0.2028 17,238.00 6 KERIKIL KORAL m3 85,000.00 - - 0.0050 425.00 B. BAHAN PASANGAN - ###7 BATU KALI / BATU BELAH / BATU GUNUNG m3 90,000.00 0.2476 22,283.63 0.2150 19,350.00 C. BAHAN LANTAI - - 8 KERAMIK 30 X 30 m2 37,000.00 1.0395 38,461.50 1.0395 38,461.50 D. BAHAN DINDING - - 9 BATAKO UK. 20 X 40 X 10 bh - 21.3553 - 10.4768 - 10 BATU BATA UK. 5.5 X 11 X 23 bh 650.00 115.7625 75,245.63 99.3850 64,600.25 11 BATU TELA UK. 20 X 30 X 10 bh - 28.4738 - 13.9691 - 12 BETON ROSTER / KERAWANG bh 3,500.00 - - 0.2131 745.85 E. BAHAN PENUTUP LANGIT-LANGIT - - 13 ETERNIT, UK. 100 X 100 lbr - 0.9450 - 0.9450 - 14 KAYU LAPIS 4 MM 120 X 240 bh 16,208.68 0.4784 7,754.23 0.8803 14,268.50 F. BAHAN PENUTUP ATAP - - 15 BUBUNGAN GENTENG PLENTONG "S" bh - 0.7784 - 0.8803 - 16 GENTENG PLENTONG "S" bh - 29.5191 - 30.0390 - 17 SENG DATAR BJLS 0.3 m - 0.0696 - 0.0185 - 18 SENG GELOMBANG KECIL lbr 37,000.00 0.8581 31,749.70 0.9038 33,440.60 19 BUBUNGAN ASBES GELOMBANG m - 0.0696 - 0.0185 - 20 ASBES GELOMBANG KECIL lbr - 0.8581 - 0.9038 - G. BAHAN KAYU - - 21 KAYU BALOK KLAS I m3 4,200,000.00 - - - - 22 KAYU BALOK KLAS II m3 2,300,000.00 0.1332 306,360.00 0.1557 358,110.00 23 KAYU PAPAN KLAS II m3 2,300,000.00 0.0318 73,140.00 0.0013 2,990.00 24 KAYU PAPAN KLAS III m3 1,600,000.00 0.0079 12,640.00 0.0495 79,200.00 25 KAYU PAPAN KLAS IV m3 1,600,000.00 - - 0.0014 2,240.00 26 KAYU LAPIS 4 mm UK. 8" X 4" lbr 16,208.68 0.5196 8,422.03 0.1349 2,186.55 27 KAYU LAPIS 12 mm UK. 8" X 4" lbr 21,835.53 - - - - H. BAHAN BESI - - 28 BESI BETON POLOS DIA. 10 mm Kg 8,000.00 12.2475 97,980.00 11.4648 91,718.40 29 BESI BETON ULIR DIA. 13 mm Kg 8,000.00 - - 13.4580 107,664.00 30 KAWAT BENDRAT / BETON Kg 14,000.00 0.1224 1,713.60 1.2712 17,796.80 31 PAKU UK. 3 CM - 7 CM Kg 13,000.00 0.0799 1,038.70 0.2476 3,218.80 I. BAHAN SANITAIR / SALURAN AIR - - 32 BAK MANDI FIBRE GLASS 70 X 70 X 66 bh 225,000.00 0.0118 2,655.00 - - 33 BAK RESERVOIR FIGRE GLASS KAP. 1000 ltr bh 1,200,000.00 0.0059 7,080.00 0.0036 4,320.00 34 BUIS BETON 1/2 DIA. 20 CM bh 40,000.00 0.0591 2,362.50 0.1132 4,528.13 35 PIPA GIP DIA. 1" m 40,000.00 - - - - 36 PIPA GIP DIA. 1 1/2" m 55,000.00 0.0142 781.00 - - 37 PIPA GIP DIA. 2" m 65,000.00 0.0709 4,608.50 - - 38 PIPA PVC DIA. 1/2" m 3,750.00 - - 0.0143 53.63 39 PIPA PVC DIA. 3/4" m 5,000.00 - - 0.0286 143.00 40 PIPA PVC DIA. 2" m 13,750.00 - - 0.0430 591.25 41 PIPA PVC DIA. 3" m 27,500.00 - - - - 42 PIPA PVC DIA. 4" m 42,500.00 0.0921 3,914.25 0.0358 1,521.50

MENU UTAMAMENU UTAMA

Page 138: Analisa Sni 2011

KEBUTUHANRUMAH DINAS TIPE-70 GEDUNG TIDAK BERTINGKATNO SATUAN HARGA

VOLUME JUMLAH VOLUME JUMLAH1 2 3 4 5 6 9 1043 KLOSET DUDUK KERAMIK bh 1,350,000.00 0.0059 7,965.00 0.0012 1,620.00 44 KLOSET JONGKOK KERAMIK STANDAR bh 180,000.00 0.0059 1,062.00 0.0072 1,296.00 45 URINOAR KERAMIK STANDAR bh 650,000.00 - - 0.0072 4,680.00 46 WASTAFEL GANTUNG KERAMIK bh 450,000.00 - - 0.0012 540.00 J. BAHAN FINISHING - - 47 CAT BESI Kg 42,000.00 - - - - 48 CAT DINDING Kg 15,000.00 1.2921 19,381.50 0.5346 8,019.00 49 CAT KAYU Kg 42,000.00 0.3169 13,309.80 0.3680 15,456.00 K. BAHAN LAIN - LAIN - - 50 KACA BENING 5 MM m2 55,000.00 0.0823 4,526.50 0.0376 2,068.00 51 POMPA TANGAN bh 125,000.00 0.0059 737.50 0.0018 225.00 52 INSTALASI LISTRIK titik 150,000.00 0.0059 885.00 0.0018 270.00 52 BAHAN LAIN - LAIN (5% dari total Bahan) - 52,980.51 - 58,305.24

- ###Sub Total Biaya Bahan Bangunan - 1,017,147.58 - 1,118,670.49

- ###UPAH - ###

1 MANDOR ORG 67,500.00 0.2867 19,352.25 0.2976 20,088.00 2 KEPALA TUKANG ORG 67,500.00 0.1077 7,269.75 0.2015 13,601.25 3 TUKANG BATU ORG 67,500.00 0.8190 55,282.50 0.5053 34,107.75 4 LADEN TUKANG BATU ORG 45,000.00 0.7371 33,169.50 0.4043 18,193.50 5 TUKANG BESI ORG 67,500.00 0.3667 24,752.25 0.4763 32,150.25 6 LADEN TUKANG BESI ORG 45,000.00 0.2465 11,092.50 0.3402 15,309.00 7 TUKANG KAYU ORG 67,500.00 1.8675 126,056.25 1.5298 103,261.50 8 LADEN TUKANG KAYU ORG 45,000.00 0.4047 18,211.50 0.3718 16,731.00 9 TUKANG CAT ORG 67,500.00 0.4986 33,655.50 0.4118 27,796.50 10 LADEN TUKANG CAT ORG 45,000.00 0.4301 19,354.50 0.2314 10,413.00 11 TUKANG BONGKAR ORG 45,000.00 0.0096 432.00 0.1270 5,715.00 12 TUKANG GALI & URUG ORG 45,000.00 0.8033 36,148.50 1.1271 50,719.50 13 TUKANG LISTRIK ORG 67,500.00 0.1815 12,251.25 0.1080 7,290.00 14 TUKANG PIPA ORG 67,500.00 0.0241 1,626.75 0.0225 1,518.75

Sub Total Biaya Upah Kerja 398,655.00 356,895.00

II BIAYA KONSTRUKSI (K) Sub Total Biaya Bahan Bangunan 1,017,147.58 1,118,670.49 Sub Total Biaya Upah Kerja 27.39% 398,655.00 23.62% 356,895.00 Sub Biaya Peralatan Kerja (10% Upah Kerja) 39,865.50 (10% Upah Kerja) 35,689.50

A. BIAYA NYATA BANGUNAN (A) 1,455,668.08 1,511,254.99 B. JASA KONTRAKTOR + OVERHEAD 10% (A) 145,566.81 151,125.50 C. PAJAK - PAJAK 174,680.17 181,350.60

a. PPh Pasal 21 & 23 2% (A) 29,113.36 30,225.10 b. PPn 10% (A) 145,566.81 151,125.50

D. SUB TOTAL (A) + (B) + (C) 1,775,915.06 1,843,731.09 E. ASURANSI 55,315.39 57,427.69

a. All Risk 3% (A) 43,670.04 45,337.65 b. Tenaga Kerja (ASTEK) 0,5% (A) 7,278.34 7,556.27 c. Pihak ke III 0,3% (A) 4,367.00 4,533.76

F. PERIZINAN 21,835.02 22,668.82 a. Izin Mendirikan Bangunan (IMB) 1% (A) 14,556.68 15,112.55 b. Sertifikat Laik Fungsi 0.5% (A) 7,278.34 7,556.27

G. TINGKAT INFLASI 5% Bahan 50,857.38 55,933.52 H. KESELAMATAN DAN KESEHATAN KERJA 1% (D) 17,759.15 18,437.31 I. SUB TOTAL BIAYA KONSTRUKSI FISIK 1,921,682.00 1,998,198.44

IV BIAYA KONSTRUKSI FISIK BANGUNAN SEDERHANA PER M2 1,922,000.00 1,998,000.00

V BIAYA KONSTRUKSI FISIK BANGUNAN TIDAK SEDERHANA PER M2 2,306,000.00 2,797,000.00

Page 139: Analisa Sni 2011

GEDUNGBERTINGKAT

VOLUME JUMLAH13 14

0.1767 14,136.00 0.1520 13,680.00 0.1620 7,290.00 2.9988 155,937.60 1.3524 114,954.00 1.3524 114,954.00 - 0.0938 8,442.00 - 0.9702 35,897.40 - 8.0898 - 86.9734 56,532.71 10.7864 - - - - 0.8820 - 0.0915 1,483.09 - 0.0915 - 14.0182 - 0.0006 - - - 0.0006 - - - - 0.0017 7,140.00 0.1660 381,800.00 0.0012 2,760.00 0.1001 160,160.00 0.0022 3,520.00 0.1728 2,800.86 0.0025 54.59 - 10.0361 80,288.80 19.8851 159,080.80 2.7362 38,306.80 0.2576 3,348.80 - - - 0.0013 1,560.00 0.0615 2,460.00 0.1257 5,028.00 0.0014 77.00 0.3098 20,137.00 - - - - 0.0041 56.38 - - 0.0082 348.50

Page 140: Analisa Sni 2011

GEDUNGBERTINGKAT

VOLUME JUMLAH13 14

0.0011 1,485.00 0.0021 378.00 0.0068 4,420.00 0.0012 540.00 - 0.0122 512.40 0.4456 6,684.00 0.2005 8,421.00 - 0.0525 2,887.50 0.0013 162.50 0.0013 195.00 - 77,974.86 - - 1,495,894.59 - - 0.2697 18,204.75 0.2617 17,664.75 0.3662 24,718.50 0.2946 13,257.00 1.0618 71,671.50 0.9910 44,595.00 1.8299 123,518.25 0.3183 14,323.50 0.3319 22,403.25 0.1041 4,684.50 0.9629 43,330.50 1.3715 61,717.50 0.0918 6,196.50 0.0086 580.50

466,866.00

1,495,894.59 23.23% 466,866.00

(20% Upah Kerja) 46,686.60 2,009,447.19 200,944.72 241,133.66 40,188.94 200,944.72 2,451,525.57 76,358.99 60,283.42 10,047.24 6,028.34 30,141.71 20,094.47 10,047.24 74,794.73 24,515.26 2,657,336.26

2,657,000.00

3,720,000.00

Page 141: Analisa Sni 2011

PERHITUNGAN HARGA SATUAN TERTINGGI PAGAR PER-M1 BGNKAB/KODYA : KOTA PADANG PANJANGTANGGAL : 01 Januari 2010

KEBUTUHANRUMAH DINAS GEDUNG

NO SATUAN HARGA PAGAR DEPAN PAGAR SAMPING PAGAR DEPANVOLUME JUMLAH VOLUME JUMLAH VOLUME

1 2 3 4 5 6 7 8 9 KEBUTUHAN BAHAN DAN UPAH BAHAN

A. BAHAN PASANGAN 1 PASIR BETON m3 80,000 0.0125 1,000.00 0.0481 3,848.00 0.01762 PASIR PASANG m3 90,000 0.3938 35,442.00 0.4760 42,840.00 0.47963 PASIR URUG m3 45,000 0.0614 2,763.00 0.0714 3,213.00 0.09154 SEMEN PC (50 Kg) zak 52,000 1.0162 52,842.40 2.4012 124,862.40 1.21625 KERIKIL BETON UK. 3 cm s/d 4 cm m3 85,000 0.0000 - 0.0000 - 0.00006 KERIKIL KORAL m3 85,000 0.0391 3,323.50 0.0890 7,565.00 0.0724B. BAHAN PASANGAN 0.0000 0.0000 0.00007 BATU KALI / BATU BELAH / BATU GUNUNG m3 90,000 0.3000 27,000.00 0.3750 33,750.00 0.3750C. BAHAN DINDING 0.0000 0.0000 0.00009 BATAKO UK. 20 X 40 X 10 bh 0 0.0000 - 0.0000 - 0.0000

10 BATU BATA UK. 5.5 X 11 X 23 bh 650 21.3333 13,866.67 102.8571 66,857.14 32.000011 BATU TELA UK. 20 X 30 X 10 bh 0 0.0000 - 0.0000 - 0.000012 BETON ROSTER / KERAWANG bh 3,500 0.0000 - 0.0000 - 0.0000D. BAHAN KAYU 0.0000 0.0000 0.000021 KAYU BALOK KLAS I m3 4,200,000 0.0000 - 0.0000 - 0.000022 KAYU BALOK KLAS II m3 2,300,000 0.0000 - 0.0000 - 0.000023 KAYU PAPAN KLAS II m3 2,300,000 0.0000 - 0.0000 - 0.000024 KAYU PAPAN KLAS III m3 1,600,000 0.0000 - 0.0000 - 0.000025 KAYU PAPAN KLAS IV m3 1,600,000 0.0053 8,533.33 0.0107 17,066.67 0.005326 KAYU LAPIS 4 mm UK. 8" X 4" lbr 16,209 0.0000 - 0.0000 - 0.000027 KAYU LAPIS 12 mm UK. 8" X 4" lbr 21,836 0.0000 - 0.0000 - 0.0000E. BAHAN BESI 0.0000 0.0000 0.000028 BESI BETON POLOS DIA. 10 mm Kg 8,000 6.2465 49,972.12 12.8260 102,608.00 17.481329 BESI BETON ULIR DIA. 13 mm Kg 8,000 0.0000 - 0.0000 - 0.000030 KAWAT BENDRAT / BETON Kg 14,000 0.0527 737.80 0.2310 3,234.00 0.266931 PAKU UK. 3 CM - 7 CM Kg 13,000 0.0499 648.70 0.2570 3,341.00 0.266932 PAGAR BRC JADI (T 1M) m 80,000 1.0000 80,000.00 0.0000 - 0.000033 PAGAR PROFIL C a PIPA BESI DIA.. 2" m 65,000 0.0000 - 0.0000 - 8.0000F. BAHAN FINISHING 0.0000 0.0000 0.000034 CAT BESI Kg 42,000 0.2906 12,205.20 0.0000 - 0.486135 CAT DINDING Kg 15,000 0.2066 3,099.00 0.8250 12,375.00 0.000036 CAT KAYU Kg 42,000 0.0000 - 0.0000 - 0.0000

Sub Total Biaya Bahan Bangunan 291,433.72 421,560.21

MENU UTAMAMENU UTAMA

Page 142: Analisa Sni 2011

- - - UPAH - -

1 MANDOR ORG 67,500 0.0553 3,732.01 0.0553 3,732.01 0.0642 2 KEPALA TUKANG ORG 67,500 0.0664 4,483.08 0.0664 4,483.08 0.0664 3 TUKANG BATU ORG 67,500 0.2350 15,863.88 0.4550 30,713.88 0.2350 4 LADEN TUKANG BATU ORG 45,000 0.1795 8,079.54 0.2895 13,029.54 0.1795 5 TUKANG BESI ORG 67,500 0.7873 53,144.25 0.1575 10,628.85 1.1448 6 LADEN TUKANG BESI ORG 45,000 0.2712 12,203.82 0.0586 2,636.91 0.2712 7 TUKANG KAYU ORG 67,500 0.0856 5,777.55 0.1127 7,605.91 0.0856 8 LADEN TUKANG KAYU ORG 45,000 0.0428 1,925.85 0.0563 2,535.30 0.0428 9 TUKANG CAT ORG 67,500 0.5484 37,017.80 0.5484 37,017.80 0.5484

10 LADEN TUKANG CAT ORG 45,000 0.4731 21,290.99 0.4731 21,290.99 0.4731 11 TUKANG BONGKAR ORG 45,000 0.0105 473.30 0.0105 473.30 0.0105 12 TUKANG GALI & URUG ORG 45,000 0.1532 6,893.49 0.1532 6,893.49 0.1532

Sub Total Biaya Upah Kerja 170,885.58 141,041.08

II BIAYA KONSTRUKSI (K) Sub Total Biaya Bahan Bangunan 291,433.72 421,560.21 Sub Total Biaya Upah Kerja 170,885.58 24.76% 141,041.08 Sub Biaya Peralatan Kerja 8,544.28 (5% Upah Kerja) 7,052.05

A. BIAYA NYATA BANGUNAN (A) 470,863.58 569,653.34 B. JASA KONTRAKTOR + OVERHEAD 10% (A) 47,086.36 10.0000 56,965.33 C. PAJAK - PAJAK 56,503.63 68,358.40

a. PPh Pasal 21 & 23 2% (A) 9,417.27 2.0000 11,393.07 b. PPn 10% (A) 47,086.36 10.0000 56,965.33

D. SUB TOTAL (A) + (B) + (C) 574,453.57 694,977.08 E. ASURANSI 17,892.82 21,646.83

a. All Risk 3% (A) 14,125.91 3.0000 17,089.60 b. Tenaga Kerja (ASTEK) 0,5% (A) 2,354.32 0.5000 2,848.27 c. Pihak ke III 0,3% (A) 1,412.59 0.3000 1,708.96

F. PERIZINAN 7,062.95 8,544.80 a. Izin Mendirikan Bangunan (IMB) 1% (A) 4,708.64 1.0000 5,696.53 b. Izin Penggunaan Bangunan (IPB) 0.5% (A) 2,354.32 0.5000 2,848.27

G. TINGKAT INFLASI 5% Bahan 14,571.69 5.0000 21,078.01 H. KESELAMATAN & KESEHATAN KERJA 1% (D) 5,744.54 1.0000 6,949.77 I. SUB TOTAL BIAYA KONSTRUKSI FISIK 619,725.56 753,196.48

IV BIAYA KONSTRUKSI FISIK BANGUNAN SEDERHANA PER M2 619,700.00 753,200.00

V BIAYA KONSTRUKSI FISIK BANGUNAN TIDAK SEDERHANA PER M2 681,700.00 828,500.00

Page 143: Analisa Sni 2011

GEDUNG PAGAR DEPAN PAGAR SAMPING

JUMLAH VOLUME JUMLAH10 11 12

1,408.00 0.0608 4,864.00 43,164.00 0.6021 54,189.00 4,117.50 0.0835 3,757.50 63,242.40 3.0376 157,955.20

0.0000 - 6,154.00 0.1126 9,571.00

0.0000 33,750.00 0.3750 33,750.00

0.0000 0.0000 -

20,800.00 114.2857 74,285.71 0.0000 - 0.0000 - 0.0000 0.0000 - 0.0000 - 0.0000 - 0.0000 -

8,533.33 0.0107 17,066.67 0.0000 - 0.0000 - 0.0000

139,850.40 16.2249 129,799.20 0.0000 -

3,736.60 0.2922 4,090.80 3,469.70 0.3251 4,226.30 - 0.0000 - 520,000.00 0.0000 -

0.0000 20,416.20 0.0000 -

1.0436 15,654.00 0.0000 -

868,642.13 509,209.38

Page 144: Analisa Sni 2011

- -

4,335.29 0.0699 4,720.99 4,483.08 0.0840 5,671.10 15,863.88 0.5756 38,853.06 8,079.54 0.3663 16,482.37 77,275.50 0.1992 13,446.00 12,203.82 0.0741 3,335.69 5,777.55 0.1425 9,621.47 1,925.85 0.0713 3,207.16 37,017.80 0.6937 46,827.52 21,290.99 0.5985 26,933.10 473.30 0.0133 598.73 6,893.49 0.1938 8,720.27

195,620.11 178,417.47

868,642.13 509,209.38 195,620.11 25.61% 178,417.47 9,781.01 (5% Upah Kerja) 8,920.87 1,074,043.25 696,547.72 107,404.33 69,654.77 128,885.19 83,585.73 21,480.87 13,930.95 107,404.33 69,654.77 1,310,332.77 849,788.22 40,813.64 26,468.81 32,221.30 20,896.43 5,370.22 3,482.74 3,222.13 2,089.64 16,110.65 10,448.22 10,740.43 6,965.48 5,370.22 3,482.74 43,432.11 25,460.47 13,103.33 8,497.88 1,423,792.50 920,663.60

1,424,000.00 920,700.00

1,566,000.00 1,013,000.00

Page 145: Analisa Sni 2011

a TABEL E1DAFTAR BIAYA KOMPONEN KEGIATANPEMBANGUNAN BANGUNAN GEDUNG NEGARA

Klasifikasi : SEDERHANA

(dalam ribuan rupiah)

1 2 3 4 5 6

20,000,000.00 #NAME? - #NAME? #NAME? #NAME?

CATATAN:

1.

2. SECARA OTOMATIS PROGRAM AKAN MENGHITUNG NILAI KOMPONEN-KOMPONEN BIAYA LAINNYA, DALAM RIBUAN RUPIAH.

UNTUK BANGUNAN KLASIFIKASI SEDERHANA TIDAK ADA BIAYA MANAJEMEN KONSTRUKSI.

3. BIAYA KESELURUHAN YANG DIBUTUHKAN UNTUK PEMBANGUNAN BGN ADALAH PADA KOLOM (6) YAITU TOTAL BIAYA PEMBANGUNAN.

BIAYA KONSTRUKSI FISIK

BIAYA PERENCANAANKONSTRUKSI

BIAYA MANAJEMEN KONSTRUKSI

BIAYA PENGAWASAN KONSTRUKSI

BIAYA PENGELOLAAN

PROYEK

TOTAL BIAYA PEMBANGUNAN

MASUKKAN NILAI BIAYA KONSTRUKSI PADA KOLOM BIAYA KONSTRUKSI FISIK (KOLOM 1) DALAM RIBUAN RUPIAH.

BIAYA KONSTRUKSI FISIK MERUPAKAN PERKALIAN HARGA STANDAR (KONSTRUKSI FISIK) YANG BERLAKU UNTUK KLASIFIKASI/TIPE BGN YANG BERSANGKUTAN DENGAN TOTAL LUASNYA.

MENU UTAMAMENU UTAMA

Page 146: Analisa Sni 2011

b TABEL E2DAFTAR BIAYA KOMPONEN KEGIATANPEMBANGUNAN BANGUNAN GEDUNG NEGARA

Klasifikasi : TIDAK SEDERHANA

TOTAL BIAYA PEMBANGUNAN

1 2 3 4 5 6

20,000,000.00 #NAME? #NAME? #NAME? #NAME? #NAME?

CATATAN:

1.

BIAYA KONSTRUKSI FISIK MERUPAKAN PERKALIAN HARGA STANDAR (KONSTRUKSI FISIK) YANG BERLAKU UNTUK KLASIFIKASI/TIPE BGN YANG BERSANGKUTAN DENGAN TOTAL LUASNYA.

2. SECARA OTOMATIS PROGRAM AKAN MENGHITUNG NILAI KOMPONEN-KOMPONEN BIAYA LAINNYA, DALAM RIBUAN RUPIAH.

3.

TERGANTUNG PADA KRITERIA LUASAN, JUMLAH LANTAI, ATAU JUMLAH PENYEDIA JASA.

4.

BIAYA KONSTRUKSI FISIK

BIAYA PERENCANAANKONSTRUKSI

BIAYA MANAJEMEN KONSTRUKSI

BIAYA PENGAWASAN KONSTRUKSI

BIAYA PENGELOLAAN

PROYEKDENGAN MANAJEMEN

KONSTRUKSI

MASUKKAN NILAI BIAYA KONSTRUKSI PADA KOLOM BIAYA KONSTRUKSI FISIK (KOLOM 1) DALAM RIBUAN RUPIAH.

UNTUK KLASIFIKASI TIDAK SEDERHANA, DIMUNGKINKAN PILIHAN MENGGUNAKAN KONSULTAN MANAJEMEN KONSTRUKSI ATAU KONSULTAN PENGAWAS,

BIAYA KESELURUHAN YANG DIBUTUHKAN UNTUK PEMBANGUNAN BGN ADALAH PADA KOLOM (6) UNTUK YANG MENGGUNAKAN KONSULTAN MANAJEMEN KONSTRUKSI, ATAU KOLOM (7) YANG MENGGUNAKAN KONSULTAN PENGAWAS.

Page 147: Analisa Sni 2011

TIDAK SEDERHANA

(dalam ribuan rupiah)

TOTAL BIAYA PEMBANGUNAN

7

#NAME?

BIAYA KONSTRUKSI FISIK MERUPAKAN PERKALIAN HARGA STANDAR (KONSTRUKSI FISIK) YANG BERLAKU UNTUK KLASIFIKASI/TIPE BGN YANG BERSANGKUTAN DENGAN TOTAL LUASNYA.

DENGAN PENGAWASAN

BIAYA KESELURUHAN YANG DIBUTUHKAN UNTUK PEMBANGUNAN BGN ADALAH PADA KOLOM (6) UNTUK YANG MENGGUNAKAN KONSULTAN MANAJEMEN KONSTRUKSI, ATAU KOLOM (7) YANG MENGGUNAKAN

MENU UTAMAMENU UTAMA

Page 148: Analisa Sni 2011

1 Tiang Utama 1.4400 5,348,132.50

2 Balok 0.5760 4,119,195.00

3 Tiang Praktis 0.2700

4 Balok Late 0.1620

5 Dinding 33.9840 83,267.50

M3

M3

M3

M3

M2

Page 149: Analisa Sni 2011

7,701,310.80

2,372,656.32

-

-

2,829,762.72

Page 150: Analisa Sni 2011

I 1 Tiang Utama

0.30 x 0.30 x 4.00 = 0.36

0.3

0

0.36 x 4.00 = 1.44

0.30

2 Balok

0.20 x 0.30 x 2.40 = 0.144

0.3

0

0.14 x 4.00 = 0.576

0.20

3 Tiang Praktis

0.15 x 0.15 x 4.00 = 0.09

0.1

5

0.09 x 3.00 = 0.27

0.15

4 Balok Late

0.15 x 0.15 x 2.40 = 0.054

0.1

5

0.05 x 3.00 = 0.162

0.15

5 Dinding 2.40 x 1.18 x 4.00 = 11.328

11.33 x 3.00 = 33.984

M3

M3

M3

M3

M2

Page 151: Analisa Sni 2011

Pas. Keramik 14.20 x 1.50 = 21.305.50 x 1.50 = 8.25

29.55

Meja Beton

Page 152: Analisa Sni 2011

Tempat Parkir Tiang Kayu 8 x 15

0.08 x 0.15 x 8.10 = 0.0972 0.08 x 0.15 x 9.00 = 0.1080

0.2052

0.2052 x 2.00 = 0.4104

Tiang 8 x 15 Kayu 6 x 12

0.06 x 0.12 x 8.10 = 0.0583

0.06 x 2.00 = 0.1166

Luas Atap

8.70 x 5.00 = 43.5000

Baut Anker Dia 150 mm = 14.00 Bh

M3

M3

M3

M2

Page 153: Analisa Sni 2011

Diketahui DisetujuiKepala Dinas Pekerjaan Umum Kabid. Perencanaan dan Pengawasan

Kota Padang Panjang Dinas Pekerjaan Umum Kota Padang Panjang

H. MAISUL, ST. MM D E F R I A L, STNIP. 19590402 198103 1 009 NIP. 19561206 198103 1 009

Page 154: Analisa Sni 2011

Padang Panjang, January/2010

Dibuat olehKasi Perencanaan Bid. KeciptakaryaanBidang Perencanaan dan Pengawasan

Dinas Pekerjaan Umum Kota Padang Panjang

HENDRA PUTRA, SST. MTNIP. 19700107 199003 1 003