C. ANALISA HARGA SATUAN PEKERJAAN PONDASI
No. URAIAN SATUAN VOLUME HARGA SATUAN HARGA
(Rp) (Rp)
C-01 1 M3 Pasanag Pondasi batu Kali adk 1pc : 3 ps
- Batu Belah M3 1.1 205,500.00 226,050.00
- Semen Portland Kg 202 1,406.00 284,012.00
- Pasir Pasang M3 0.485 233,400.00 113,199.00
- Pekerja Oh 1.5 42,000.00 63,000.00
- Tukang Batu Oh 0.6 65,000.00 39,000.00
- Kepala Tukang Oh 0.06 75,000.00 4,500.00
- Mandor Oh 0.075 80,000.00 6,000.00
Jumlah 735,761.00
Dibulatkan 735,761.00
C-02 1 M3 Pasang Pondasi Batu kali adk 1pc : 4ps
- Batu Belah M3 1.1 205,500.00 226,050.00
- Semen Portland Kg 163 1,406.00 229,178.00
- Pasir Pasang M3 0.52 233,400.00 121,368.00
- Pekerja Oh 1.5 42,000.00 63,000.00
- Tukang Batu Oh 0.6 65,000.00 39,000.00
- Kepala Tukang Oh 0.06 75,000.00 4,500.00
- Mandor Oh 0.075 80,000.00 6,000.00
Jumlah 689,096.00
Dibulatkan 689,096.00
C-03 1 M3 Pasang Pondasi Batu kali adk 1pc : 5ps
- Batu Belah M3 1.1 205,500.00 226,050.00
- Semen Portland Kg 136 1,406.00 191,216.00
- Pasir Pasang M3 0.544 233,400.00 126,969.60
- Pekerja Oh 1.5 42,000.00 63,000.00
- Tukang Batu Oh 0.6 65,000.00 39,000.00
- Kepala Tukang Oh 0.06 75,000.00 4,500.00
- Mandor Oh 0.075 80,000.00 6,000.00
Jumlah 656,735.60
Dibulatkan 656,736.00
C-04 1 M3 Pasang Pondasi Batu Kosong (aanstamping)
- Batu Belah M3 1.2 205,500.00 246,600.00
- Pasir Urug M3 0.3 175,300.00 52,590.00
- Pekerja Oh 0.78 42,000.00 32,760.00
- Tukang Batu Oh 0.39 65,000.00 25,350.00
- Kepala Tukang Oh 0.039 75,000.00 2,925.00
- Mandor Oh 0.039 80,000.00 3,120.00
Jumlah 363,345.00
Dibulatkan 363,345.00