analisa bow fter

Upload: banung-subang-sunda-kiwari

Post on 05-Jul-2018

227 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/16/2019 Analisa BoW Fter

    1/344

    Lembar Pengesahan-1

    STANDARISASI ANALISA SATUAN BIAYA PEKERJAAN KONSTRUKSI

    LEMBAR PENGESAHAN

    NAMA :

    OPERATOR NAME

    INSTANSI : BAPPEDA KABUPATEN NAGAN RAYA

    INSTANCE FOR RESPONSIBLE

    KODE SATUAN KERJA : 01 0106

    INSTANCE CODE

    PROPINSI : NANGGROE ACEH DARUSSALAM

    PROVINCE

    KABUPATEN : ACEH BARAT

    DISTRIC

     TAHUN ANGGARAN : 2005

    BUDGET YEAR

    DIGUNAKAN UNTUK : LINGKUNGAN PEMERINTAH KABUPATEN NAGAN RAYA

    RESTRICTION USED

     JENIS ANALISA : SNI, BoW, K 

     TYPE OF ANALYSIS

    SUMBER DATA BAHAN : BAPPEDA KABUPATEN NAGAN RAYA

    MATERIAL ETC DATA SOURCES

     TANGGAL PENGESAHAN : 2 NOP 2005

    DATE OF ACNOLEDGEMENT 

    PENGESAHAN :

     AC!NOLEDGEMENT 

    INSTANSI NAMA NIP JABATAN TANDA TANGAN STEMPEL

    INSTANCES NAME NIP OFFICE POSITIONS SIGNATURES STAMPS

    DINAS PEKERJAAN UMUM I!" MUCHTARRUDDIN #0 011 #$$ KEPALA DINAS

    KAB" NAGAN RAYA

    BAPPEDA KABUPATEN I!" AMRI #0 010 %2% KEPALA BIDANG

    NAGAN RAYA FISIK DAN

    PRASARANA

    BAGIAN PEMBANGUNAN ENDANG SURYANATA 010 0$$ 52 KEPALA BAGIAN

    SETDAKAB NAGAN RAYA PEMBANGUNAN

    BAGIAN PERLENGKAPAN TR" KEUMANGAN, SH 20 01# 555 KEPALA BAGIAN

    SETDAKAB NAGAN RAYA PERLENGKAPAN

    DAN ASET

  • 8/16/2019 Analisa BoW Fter

    2/344

    Lembar Pengesahan-"

  • 8/16/2019 Analisa BoW Fter

    3/344

    U#ah$ Bahan %an Pera&a'an-(

    DAFTAR HARGA UPAH, BAHAN DAN PERALATAN

    PROPINSI : NANGGROE ACEH DARUSSALAM

    KABUPATEN : NAGAN RAYA

    TAHUN ANGGARAN : 2005

    OPERATOR :

    I. UPAH

    Kode Satuan Uraian Harga Satuan

    L.061 Org/hr M!"#r R$ 5%&'50.(

    L.0'1 Org/hr O$)r*#r T)r+*,h R$ 10-&000.(

    L.0'2 Org/hr O$)r*#r S), T)r+*,h R$ '-&000.(

    L.0' Org/hr P)!* O$)r*#r R$ 60&000.(

    L.01 Org/hr S$,r T)r+*,h R$ 65&000.(

    L.02 Org/hr S$,r Pr,", R$ 65&000.(

    L.0 Org/hr P)!* S$,r R$ 60&000.(

    L.0%1 Org/hr M)!, T)r+*,h R$ 5&000.(

    L.0%2 Org/hr M)!, S), T)r+*,h R$ 5-&000.(

    L.0%3 Org/hr K)$+ T!g R$ %%&000.(

    L.0%. Org/hr T!g B*/B)*#! R$ 65&000.(

    L.0%. Org/hr T!g B)4, R$ 65&000.(

    L.0%. Org/hr T!g B)4, K#!4*r4, R$ 65&000.(

    L.0%." Org/hr T!g L4 R$ 65&000.(

    L.0%.) Org/hr T!g K R$ 65&000.(

    L.0%.7 Org/hr T!g C* R$ 65&000.(

    L.0%.g Org/hr T!g L,4*r, R$ 65&000.(

    L.0%.h Org/hr T!g L)")!g R$ 65&000.(

    L.106 Org/hr P))r8 T)r+*,h R$ 3&000.(

    L.103 Org/hr P))r8 S), T)r+*,h R$ 35&000.(

    L.101 Org/hr P))r8 T," T)r+*,h R$ 30&000.(

    L.10% Org/hr P)!8g M+ R$ 35&000.(

    P001 9 P)!gg)rg8, R$ 2&000.(

    P002 Org/hr P)!)+ R$ %5&000.(

    II. BAHAN

    Material Batuan/Beton

    Kode Satuan Uraian Harga Satuan

    MB001 T!h T,!/Urg R$ -5&000.(

    MB002 P4,r T,!/Urg R$ 60&000.(

    MB003 T!h B)r*/B+,!#!g R$ %3&000.(

    MB00- T!h L,* R$ %5&000.(

    M.0-0 Bh! T,!!/P)!g,* P,+,h! R$ 65&000.(

    M.050 Urg! P,+,h! R$ %5&500.(

    MB006 P4,r L* R$ 50&%00.(

    MB00% P4,r S!g, R$ 60&000.(

    MB00' P4,r P4!g R$ %0&000.(

    M.0-1 P4,r B)*#! R$ '5&000.(

    MB010 Kg P4,r S,+, R$ 2&300.(

    M.0-2 S,r* R$ %0&000.(

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

  • 8/16/2019 Analisa BoW Fter

    4/344

    U#ah$ Bahan %an Pera&a'an-)

    MB012 K)r,,+ K4r R$ %0&000.(

    Kode Satuan Uraian Harga Satuan

    M.011 K)r,,+ S,r* R$ %5&000.(

    M.012 K)r,,+ S!g, D,4r,!g; R$ '0&000.(

    MR.12 K)r,,+ S!g, T," D,4r,!g; R$ 60&000.(

    MR.-2 K)r,,+ B)r$4,r A+, R$ 60&000.(

    M.020 B* P)h U. 10(15 R$ 1%5&000.(

    M.021 B* P)h U. %(10 R$ 1%5&000.(

    M.022 B* P)h U. 5(% R$ 1%5&000.(

    M.023 B* P)h U. 3(5 R$ 1'5&000.(

    M.02- K)r,,+ P)h 2(3 R$ 315&000.(

    M.025 K)r,,+ P)h 1(2 R$ 325&000.(

    M.026 K)r,,+ P)h 0&5(1 R$ 350&000.(

    MB01' K#r+ B)*#! R$ 150&000.(

    M.013 B* K+, B)4r; R$ 150&000.(

    M.01- B* K+, K),+ D,4r,!g; R$ 150&000.(

    M.010 B*

  • 8/16/2019 Analisa BoW Fter

    5/344

    U#ah$ Bahan %an Pera&a'an-*

    MB051 Bh B*# R$ -&000.(

    MB052 Bh B)*#! M)",! +! R$ 25&500.(

    MB053 Bh B)*#! Tr+,4 R$ 13&500.(

    Kode Satuan Uraian Harga Satuan

    MB05- Bh R#4*)r/T)r!g R$ %&000.(

    MB055 Bh C#!+# CB.10; R$ 31&500.(

    MB056 Bh C#!+# CB.15; R$ -3&000.(

    MB05% Bh C#!+# CB.20; R$ 60&000.(

    MB05' Bh H#++#+# HB.10; R$ 2&500.(

    MB05 Bh H#++#+# HB.15; R$ -0&300.(

    MB060 Bh H#++#+# HB.20; R$ 5'&%50.(

    MB061 Mr)r R$ -'&%50.(

    MB062 Bh U,! PC A( U. 30 = 30 R$ 3&-50.(

    MB063 Bh U,! PC A( U. -0 = -0 R$ 6&0'0.(

    MB06- Bh U,! PC A( U. 20 = 20 R$ 1&520.(

    MB065 Bh U,! PC S,4, B U. 30 = 30 R$ 3&-50.(

    MB066 Bh U,! PC @r! U. -0 = -0 R$ 6&0'0.(

    MB06% Bh U,! PC @r! U. 30 = 30 R$ 3&-50.(

    MB06' Bh U,! PC @r! U. 20 = 20 R$ 1&520.(

    MB06 Bh U,! T)r4# U. 20 = 20 R$ 1&520.(MB0%0 Bh U,! T)r4# U. 30 = 30 R$ 3&-50.(

    MB0%1 Bh U,! T)r4# U. -0 = -0 R$ 6&0'0.(

    MB0%2 Bh U,! Gr!,*# U. 30 = 30 R$ -&50.(

    MB0%3 Bh U,! Gr!,*# U. -0 = -0 R$ '&'00.(

    MB0%- Bh U,! T)r+= K)r!g U. 30 = 30 R$ &-50.(

    MB0%5 Bh U,! T)r+= K)r!g U. -0 = -0 R$ 16&'00.(

    MB0%6 Bh U,! T)r+= Mr)r U. 30 = 30 R$ 11&250.(

    MB0%% Bh U,! T)r+= Mr)r U. -0 = -0 R$ 20&000.(

    MB0%' Bh U,! T)r+= Mr)r U. 60 = 60 R$ -5&000.(

    MB0% Bh U,! K)r, U. 15 = 15 R$ 1&-60.(

    MB13 Bh U,! K)r, U. 15 = 20 R$ 1&50.(

    MB0'0 Bh U,! K)r, U. 10 = 20 R$ 1&300.(

    MB0'1 Bh U,! K)r, U. 20 = 20 R$ 2&600.(MB0'2 Bh U,! K)r, U. 25 = 25 R$ -&060.(

    MB0'3 Bh U,! K)r, U. 10 = 33 R$ 2&1-5.(

    MB0'- Bh U,! K)r, U. 30 = 30 R$ 5&'00.(

    MB0'5 Bh U,! K)r, U. 33 = 33 R$ %&0'0.(

    MB0'6 Bh U,! K)r, U. -0 = -0 R$ 10&-00.(

    MB0'% Bh U,! K)r, U. 50 = 50 R$ 16&250.(

    MB0'' Bh U,! K)r, U. 60 = 60 R$ 23&-00.(

    MB0' Bh U,! K)r, A!*, S+,$ U. 20 = 20 R$ 2&'60.(

    MB00 Bh U,! K)r, A!*, S+,$ U. 30 = 30 R$ 6&500.(

    MB01 Bh U,! K)r, A!*, S+,$ U. 33 = 33 R$ %&%'5.(

    MB02 U,! Th! A4 R$ 3&%00.(

    MB03 Bh P#r4)+,! P*,h U. 11 = 11 R$ 50.(

    MB0- Bh P#r4)+,! P*,h U. 15 = 15 R$ 1&%%0.(

    MB05 Bh P#r4)+,! @r! U. 11 = 11 R$ 0.(

    MB06 Bh P#r4)+,! @r! U. 15 = 15 R$ 1&'50.(

    MB0% Bh P#r4)+,! @r! U. 10 = 20 R$ 1&650.(

    MB0' Bh P#r4)+,! @r! U. 20 = 20 R$ 3&300.(

    MB0 Bh P#r4)+,! @r! U. 30 = 30 R$ %&-25.(

    MB13' Bh U,! K)r, Ar*,4*, U. 10 = 20 R$ 1&550.(

    MB100 Bh U,! K)r, Ar*,4*, U. 10 = 10 R$ %%5.(

    MB101 Bh U,! K)r, Ar*,4*, U. 5 = 20 R$ %%5.(

    MB102 Bh U,! K)r, Ar*,4*, U. 10 = 20 R$ 1&550.(

    2

    2

  • 8/16/2019 Analisa BoW Fter

    6/344

    U#ah$ Bahan %an Pera&a'an-+

    MB103 Bh P+,!* U,! PC A( U. 10 = 20 R$ %00.(

    MB10- Bh P+,!* U,! PC A( U. 10 = 30 R$ 1&050.(

    MB105 Bh P+,!* U,! PC A( U. 10 = -0 R$ 1&-00.(

    MB106 Bh P+,!* U,! PC A( U. 15 = 20 R$ 1&050.(

    MB10% Bh P+,!* U,! PC @r! U. 10 = 20 R$ %00.(

    Kode Satuan Uraian Harga Satuan

    MB10' Bh P+,!* U,! PC @r! U. 10 = 30 R$ 1&050.(

    MB10 Bh P+,!* U,! PC @r! U. 10 = -0 R$ 1&-00.(

    MB110 Bh P+,!* U,! T)r4# U. 10 = 30 R$ 1&050.(

    MB111 Bh P+,!* U,! T)r4# U. 10 = -0 R$ 1&-00.(

    MB112 Bh P+,!* U,! Gr!,*# U. 10 = 30 R$ 1&650.(

    MB113 Bh P+,!* U,! Gr!,*# U. 10 = -0 R$ 2&200.(

    MB11- Bh P+,!* U,! T)r+= K)r!g U. 10 = 30 R$ 3&150.(

    MB115 Bh P+,!* U,! T)r+= K)r!g U. 10 = -0 R$ -&200.(

    MB116 Bh P+,!* U,! T)r+= Mr)r U. 10 = 30 R$ 3&%50.(

    MB11% Bh P+,!* U,! T)r+= Mr)r U. 10 = -0 R$ 5&000.(

    MB11' Bh P+,!* U,! T)r+= Mr)r U. 10 = 60 R$ %&500.(

    MB11 Bh P+,!* K)r, Ar*,4*, U. 10 = 10 R$ %%5.(

    MB120 Bh P+,!* K)r, Ar*,4*, U. 5 = 20 R$ %%5.(

    MB121 Bh P+,!* K)r, Ar*,4*, U. 10 = 20 R$ 1&550.(MB122 Bh M#4, U. 30 = 30 R$ %&200.(

    MB123 Bh I!*)r!+ C#) Ar*,4*, U. 5 = 5 = 20 R$ 6&%00.(

    MB12- Bh K+#4)* D" L)!g$ R$ 2&2'5&000.(

    MB125 Bh K+#4)* D" T!$ @*)r C,r+*#r; R$ 335&000.(

    MB126 Bh K+#4)* #!g# T)r4# R$ 120&000.(

    MB12% Bh K+#4)* #!g# P#r4)+,! R$ 200&000.(

    MB12' Bh B C, P,r,!g T)r4# R$ 1&050&000.(

    MB12 Bh B M!", T)r4# R$ 1&165&000.(

    MB130 Bh B",$ P#r4)+)! R$ 2&%05&000.(

    MB131 Bh Ur,!#,r K)r, R$ 1&015&500.(

    MB132 Bh @4*7)+ R$ '-0&500.(

    MB133 Bh! T)r4# C#r R$ 1&2'5&000.(

    MB13- Bh! T)r+= C#r R$ 2&0'5&000.(

    MB135 Bh B#!") U. -0 = -0 = 20 R$ -&100.(

    MB136 Kg Gr!,*#& B* P)h R$ 2&'00.(

    MB13% Kg T)r4#& B* P)h R$ 2&250.(

    MB1-0 T!h B)r$4,r R$ --&600.(

    MB1-1 K)r,,+ B)r*!h R$ 53&000.(

    MB1-2 K)r,,+ H+4 R$ 650&000.(

    MB1-3 P,!g B+# R$ %3&000.(

    MB1-- Bh Ur,!#,r T)r4# R$ %30&500.(

    MB1-5 Bh B,4 T!h D,. 15 R$ 2-&500.(

    Material Besi 

    Kode Satuan Uraian Harga Satuan

    ML001 Kg B)4, B)*#! P#+#4 R$ 11&000.(

    ML002 Kg B)4, B)*#! U+,r R$ 15&500.(

    ML003 Kg K* B)*#! R$ 15&000.(

    ML00- Kg K* S)!g P#+#4 R$ 1-&200.(

    ML005 K* N L#g R$ 2%&000.(

    ML006 K* Br!g R$ 26&500.(

    ML00% K* Hr#!, R$ 2%&500.(

    3

    3

    3

    3

    3

    2

    2

    2

    2

  • 8/16/2019 Analisa BoW Fter

    7/344

    U#ah$ Bahan %an Pera&a'an-,

    M.161 Kg B8 G+!g! Ur! R,!g!; R$ 1'&500.(

    M.162 Kg B8 A!! Br#!8#!g; R$ 1'&500.(

    ML010 Kg B)4, r,!g K* B8 R$ 1-&300.(

    ML011 K* K44 R$ 2%&300.(

    ML012 Kg P B,4 R$ 30&000.(

    ML013 Kg P S)!g R$ 30&000.(

    ML013 Bh P S)!g R$ 125.(

    Kode Satuan Uraian Harga Satuan

    ML01- Kg P S)r$ R$ 35&000.(

    ML01- Bh P S)r$ R$ 200.(

    ML015 Kg P H P!8!g 15 R$ 35&000.(

    ML016 Kg P P!,!g R$ 1-&%00.(

    ML01% Kg P B)*#! R$ 15&'00.(

    M.165 Kg B8 S*r*r; R$ 26&000.(

    M.166 Kg B8 P($ )*!; R$ 1'&500.(

    ML01 Kg B*(* R$ 1-&000.(

    M.163 Kg B*(* )*! R$ 13&'00.(

    ML020 Bh R4)*/D,! B#+* R$ 5&100.(

    ML021 Lr. S)!g P+* U. 39 = 69& 8+4 2' R$ 6'&000.(

    ML022 Lr. S)!g P+* U. 39 = 69& 8+4 2- R$ 6'&000.(ML023 9 B)4, S*,$ 2 = 3 R$ 1-&%00.(

    ML02- B)4, S*r,$ R$ '3&500.(

    ML025 Kg B)4, S*r,$ R$ '&'00.(

    M.16- Kg B8 G+!,4; R$ 12&000.(

    M.16% Kg T+!g! "! K* B8/B)4, R$ %&500.(

    ML02% Kg B)4, Pr#7,+ @ R$ 15&000.(

    ML02' Kg Pr)44*r)44)" S*))+& P#+#4 R$ 12&'00.(

    ML02 )!")+ N# R!g "! D!; R$ 1'0&000.(

    ML030 )!")+ B)4, R$ 225&500.(

    ML031 )!")+ B)4, Th! A$, R$ 265&500.(

    ML032 P,!* B)4, B8 R$ 265&500.(

    ML033 P,!* G+!g B)4, R$ 2-5&000.(ML03- P,!* A+!, R$ 315&000.(

    ML035 P,!* L,$* A+!, R$ 325&500.(

    ML036 9 Pr#7,+ A+!, T R$ 12&300.(

    ML03% R#++,!g D##r R$ 255&000.(

    ML03' S!4r))! A+!, R$ 25&500.(

    ML03 )!)*,#! B+,!"4 R$ 12'&500.(

    ML0-0 )r*,+ B+,!"4 R$ 12'&%00.(

    ML0-1 Bh Kr! A,r D,. 1/2F R$ 1-&000.(

    ML0-2 Bh Kr! A,r D,. 3/-F R$ 15&500.(

    ML0-3 9 P,$ G+!,4 D,. 3/-F R$ %'&000.(

    ML0-- 9 P,$ G+!,4 D,. 1F R$ 105&000.(

    ML0-5 9 P,$ G+!,4 D,. 1/2F R$ 65&000.(ML0-6 9 P,$ G+!,4 D,. 3F R$ -50&000.(

    ML0-% 9 P,$ G+!,4 D,. 3/2F R$ 160&000.(

    ML0-' 9 P,$ G+!,4 D,. -F R$ 560&000.(

    ML0- Bh K!, T! A!*, R$ 2-5&000.(

    ML050 Bh K!, T! B,4 R$ 135&500.(

    ML051 Bh K!, T! Kr M!", R$ 132&000.(

    ML052 Bh K!, S,+,!")r R$ 6'&500.(

    ML053 Bh E!g4)+ P,!* R$ 2-&000.(

    ML05- Bh E!g4)+ )!")+ K$($ R$ 15&300.(

    ML055 Bh E!g4)+ A!g,! R$ 13&500.(

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

  • 8/16/2019 Analisa BoW Fter

    8/344

    U#ah$ Bahan %an Pera&a'an-

    ML056 Bh S$r,!g K!,$ R$ 11&500.(

    ML05% Bh K,* A!g,! R$ 2&200.(

    ML05' Bh D##r C+#4)r R$ %5&000.(

    ML05 Bh K!, S)+#* R$ 52&500.(

    ML060 Bh P)g!g! P,!*/D##r H#+")r R$ 5&000.(

    ML061 Bh D##r S*#$ R$ 21&500.(

    ML062 Bh R)+ P,!* D#r#!g R$ %5&000.(

    ML063 Bh K!, L)r, R$ 5&000.(

    ML06- Bh B C, P,r,!g S*,!+)44 S*))+ R$ 1&015&300.(

    Kode Satuan Uraian Harga Satuan

    ML065 A+!, #,+/S,4+*,#! R$ 2-&500.(

    ML066 Kg K* D,. 0&5 R$ 1-&500.(

    ML06% +4h,!g M)*+ R$ 21&500.(

    ML06' K* N A+!, R$ 23&500.(

    ML06 K* N P+4*, R$ -&500.(

    Material Pengatap

    Kode Satuan Uraian Harga Satuan

    MA001 Bh A*$ S,r$ R$ '00.(

    MA002 Lr. A*$ S)!g G)+#!g U. 39 = 69& 8+4 2' R$ -0&000.(

    MA003 Lr. A*$ S)!g G)+#!g U. 39 = %9& 8+4 2' R$ -5&000.(

    MA00- Lr. A*$ S)!g G)+#!g U. 39 = '9& 8+4 2' R$ 52&000.(

    MA005 Lr. A*$ A4)4 G)+#!g U. 1&50 = 1&05 & * - R$ 3%&500.(

    MA006 Lr. A*$ A4)4 G)+#!g U. 1&'0 = 0&2 & * 5 R$ -%&500.(

    MA00% Lr. A*$ A4)4 G)+#!g U. 1&'0 = 1&0' & * 6 R$ 5'&500.(

    MA00' Lr. A*$ A4)4 G)+#!g U. 2&00 = 0&2 & * 5 R$ 52&500.(

    MA00 Lr. A*$ A4)4 G)+#!g U. 2&10 = 1&05 & * - R$ 53&200.(

    MA010 Lr. A*$ A4)4 G)+#!g U. 2&10 = 1&0' & * 6 R$ %0&500.(

    MA011 Lr. A*$ A4)4 G)+#!g U. 2&25 = 0&2 & * 5 R$ 60&'00.(

    MA012 Lr. A*$ A4)4 G)+#!g U. 2&-0 = 1&05 & * - R$ 62&500.(

    MA013 Lr. A*$ A4)4 G)+#!g U. 2&-0 = 1&0' & * 6 R$ '1&%00.(

    MA01- Lr. A*$ A4)4 G)+#!g U. 2&50 = 0&2 & * 5 R$ 66&500.(

    MA015 Lr. A*$ A4)4 G)+#!g U. 2&%0 = 1&05 & * - R$ %0&500.(

    MA016 Lr. A*$ A4)4 G)+#!g U. 2&%0 = 1&0' & * 6 R$ 1&500.(

    MA01% Lr. A*$ A4)4 G)+#!g U. 3&00 = 1&05 & * - R$ %'&000.(

    MA01' Lr. A*$ A4)4 G)+#!g U. 3&00 = 1&0' & * 6 R$ 100&500.(

    MA01 A*$ A+!, G)+#!g& * 0&55 R$ 33&000.(

    MA020 Lr. R##7 L,gh* ,r)g+44 U. 1'0 = 0 R$ 33&%00.(

    MA021 Bh G)!*)!g S,r$ R$ %50.(

    MA022 Bh G)!*)!g A4$+ R$ 1&500.(

    MA023 Bh G)!*)!g B)*#! R$ 6&000.(

    MA02- Bh G)!*)!g P+)!*#!g K),+ R$ 5&200.(

    MA025 Bh G)!*)!g P+)!*#!g B)4r R$ 5&200.(MA026 Bh G)!*)!g K#"#/G+r R$ -&500.(

    MA02% Lr. G)!*)!g M)*+ R$ 115&500.(

    MA02' Bh G)!*)!g D)r B#!" R$ %&500.(

    MA02 Bh B!g/Kr$4 G)!*)!g P+)!*#!g K),+ R$ 5&000.(

    MA030 Bh B!g/Kr$4 G)!*)!g P+)!*#!g B)4r R$ 5&200.(

    MA031 Bh B!g/Kr$4 G)!*)!g K#"#/G+r R$ -&500.(

    MA032 Lr. B!g S)!g B8+4 2'& $ 2&13- 9 R$ -0&500.(

    MA033 Lr. B!g S*)+ G)+#!g 0&2 9 R$ 22&500.(

    MA03- Lr. N# S,r$ R$ %50.(

    2

    2

    2

    2

    2

  • 8/16/2019 Analisa BoW Fter

    9/344

    U#ah$ Bahan %an Pera&a'an-.

    MA035 N# S*!"r -0 1'& 4g 22 R$ -3&500.(

    MA036 Lr. N# P*)! 0&2 R$ 23&500.(

    MA03% Lr. N# P*)! 1&05 R$ 25&200.(

    MA03' Lr. N# P*)! 1&0' R$ 25&500.(

    MA03 Lr. N# S)!g 3F = 6F 8+4 2' R$ -1&000.(

    MA0-0 Lr. N# S*)+ R* 0&2 R$ 20&500.(

    MA0-1 Lr. N# S*)+ R* 1&05 R$ 21&500.(

    MA0-2 Lr. N# S*)+ G)+#!g U. 1&05 R$ 22&%00.(

    MA0-3 Lr. N# S*)+ G)+#!g U. 1&0' R$ 23&300.(MA0-- Bh N# G)!*)!g B)*#! R$ 6&300.(

    MA0-5 Bh G)!*)!g K)r, R$ 11&200.(

    Kode Satuan Uraian Harga Satuan

    MA0-6 Bh B!g/Kr$4 G)!*)!g K)r, R$ 11&200.(

    MA0-% Bh G)!*)!g + R$ %&200.(

    MA0-' Bh B!g/Kr$4 G)!*)!g + R$ %&200.(

    MA0- Lr. A*$ S)!g G)+#!g U. 39 = 69& 8+4 30 R$ --&500.(

    MA050 Lr. A*$ S)!g G)+#!g U. 39 = %9& 8+4 30 R$ 51&000.(

    MA051 Lr. A*$ S)!g G)+#!g U. 39 = '9& 8+4 30 R$ 5'&500.(

    MA052 Lr. A*$ S)!g G)+#!g @r! U. 39 = 69 R$ 55&600.(

    MA053 Lr. A*$ S)!g G)+#!g @r! U. 39 = %9 R$ 62&500.(MA05- Lr. A*$ S)!g G)+#!g @r! U. 39 = '9 R$ %3&500.(

    MA055 Lr. N# B+* G)!*)!g M)*+ R$ 2'&300.(

    MA056 Lr. B!g S)!g C* Pr, R$ 5%&500.(

    Material Polimer, Serat 

    Kode Satuan Uraian Harga Satuan

    MP001 Lr. P)+* A4)4 * 3.5 R$ 16&300.(

    MP002 Lr. P)+* A4)4 * -&0 R$ 1%&500.(

    MP003 Lr. P)+* A4)4 * 5&0 R$ 23&000.(

    MP00- Lr. P)+* A4)4 * 6&0 R$ 2'&%00.(

    MP005 Lr. G$4 B#r" U. 1&2 = 2&- & * R$ 665&000.(MP006 Lr. A4*, Ar S*r#!g U. 60 = 120 R$ 5'2&000.(

    MP00% Lr. A4*, U. 30 = 30 R$ %0&500.(

    MP00' Lr. A4*, U. 30 = 60 R$ 1-0&500.(

    MP00 9 P,$ PC T,$) A@ D,. 1F R$ 1&000.(

    MP010 9 P,$ PC T,$) A@ D,. 1/2F R$ 15&000.(

    MP011 9 P,$ PC T,$) A@ D,. 2F R$ 23&000.(

    MP012 9 P,$ PC T,$) A@ D,. 3F R$ 3-&000.(

    MP013 9 P,$ PC T,$) A@ D,. 3/2F R$ 21&000.(

    MP01- 9 P,$ PC T,$) A@ D,. 3/-F R$ 16&000.(

    MP015 9 P,$ PC T,$) A@ D,. -F R$ -3&000.(

    MP016 9 P,$ PC T,$) A@ D,. 5/2F R$ 2'&000.(

    MP01% @*)r4*#$ R$ 1&025.(

    MP01' 9 PC @*)r4*#$& + 150 R$ 12&'00.(

    MP01 9 PC @*)r4*#$& + 200 R$ 13&000.(

    MP020 9 PC @*)r4*#$& + 250 R$ 13&500.(

    MP021 9 PC @*)r4*#$& + 300 R$ 1-&000.(

    MP022 9 PC @*)r4*#$& + 320 R$ 1-&500.(

    MP023 G7+##r R$ 22&'00.(

    MP02- Kg +##r Hr")!)r )rr#= R$ 2&000.(

    MP025 Kr$)* R$ &%00.(

    MP026 )+*)r Cr$)* 100 @#++(T(21 R$ 15&500.(

    2

    3

    2

    2

    2

  • 8/16/2019 Analisa BoW Fter

    10/344

    U#ah$ Bahan %an Pera&a'an-1/

    MP02% Cr$)* '0 @##+& 20 N+#! R$ 13&'00.(

    MP02' U!")r+)r/R)r C#rrg*)"& * 6 R$ 12&500.(

    MP02 Bh ,!+ Kr)* 30 = 30 & KL I R$ -&000.(

    MP030 Bh ,!+ Kr)* 30 = 30 & KL II R$ 5&000.(

    MP031 Bh ,!+ A4)4 U. 30 = 30 R$ -&500.(

    MP032 Bh ,!+ M#*,7 K)!g U. 30 = 30 R$ 5&500.(

    MP033 ,!+ @++ C#)r,!g& + 50 R$ -1&300.(

    MP03- Bh P+4*, A)r*#r R$ 12&500.(

    MP035 L*r L) K R$ 2&300.(MP036 Kg L) ,!+ R$ %&-00.(

    MP03% @++$$)r R$ 6&000.(

    MP03' Bh B M!", ,r)g+44 R$ 3&0-0&000.(

    MP03 Bh B ,r)g+44 R$ 1-5&000.(

    Kode Satuan Uraian Harga Satuan

    MP0-0 Kg S*r#r#=(100 R$ 53&500.(

    MP0-1 Kg M4*)rr#! FSF R$ %5&500.(

    MP0-2 Bh P P!,!g 60 = 230 R$ 11&'00.(

    MP0-3 S)* @*)r "r,! J 4)4#r,)4 R$ 65&000.(

    MP0-- Bh +##r Dr,! R$ 105&000.(

    MP0-5 Kg S)+)!* G)+4/K R$ -5&000.(

    MP0-6 Bh S)+ T$) R$ 2&500.(

    MP0-% Kg P)r)* @++$$)r R$ 3&000.(

    MP0-' Kg L*)4 R$ -&500.(

    MP0- Bh B",$ P+4*, R$ 2&32&500.(

    Bahan Silika, Kaca

    Kode Satuan Uraian Harga Satuan

    MG001 K B,4/P#+#4& * 3 R$ %3&500.(

    MG002 K B,4/P#+#4& * 5 R$ '6&%00.(

    MG003 K B,4/P#+#4& * ' R$ '&500.(MG00- K Br& * 5 R$ 10%&500.(

    MG005 K C)r,!& * 5 R$ 105&200.(

    MG006 K C)r,!& * 6 R$ 110&000.(

    MG00% K C)r,!& * ' R$ 120&500.(

    MG00' K @,r)g+44& * 5 R$ 1-'&500.(

    MG00 K P*r,& * 5 R$ 130&500.(

    Material Kayu

    Kode Satuan Uraian Harga Satuan

    MK001 B,+, B R$ 1-&3%0.(M.0%0 K Br R$ 200&000.(

    M.1'0 K B),4*,!g/A! "r, K R$ 1&560&000.(

    MK003 K P)r!h R$ 1&500&000.(

    MK00- K T)r)!*!g R$ 1&600&000.(

    MK005 K K4# R$ 1&600&000.(

    MK006 K A+4,h R$ 3&500&000.(

    MK00% 9 K Pr#7,+& L,4* R$ '&500.(

    MK00' K R,!& P$! R$ 1&%00&000.(

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    3

    3

    3

    3

    3

    3

    3

  • 8/16/2019 Analisa BoW Fter

    11/344

    U#ah$ Bahan %an Pera&a'an-11

    MK00 K *,& P$! R$ 3&500&000.(

    MK010 K *,& B+# R$ 3&500&000.(

    MK011 K *,& L,4* R$ 3&500&000.(

    MK012 K K$)r& P$! R$ 2&000&000.(

    MK013 K K$)r& B+# R$ 2&000&000.(

    MK01- K K$)r& L,4* R$ 2&000&000.(

    MK015 K B#r!)#& P$! R$ 1&00&000.(

    MK016 K B#r!)#& B+# R$ 1&00&000.(

    MK01% K B#r!)#& L,4* R$ 1&00&000.(

    MK01' K Dr L*& P$! R$ 1&'50&000.(

    MK01 K Dr +*& B+# R$ 1&'50&000.(

    MK020 K Dr L*& L,4* R$ 1&'50&000.(

    MK021 K Kr,!g& P$! R$ 2&000&000.(

    MK022 K r,!g& B+# R$ 2&000&000.(

    Kode Satuan Uraian Harga Satuan

    MK023 K Kr,!g& L,4* R$ 2&000&000.(

    M.1'1 K S*r*r+ R$ 3&000&000.(

    MK02- K K)+4 I& B+# R$ 3&500&000.(MK025 K K)+4 I& P$! R$ 3&500&000.(

    MK026 K K)+4 I& L,4* R$ 3&500&000.(

    MK02% K K)+4 II& P$! R$ 2&500&000.(

    MK02' K K)+4 II& B+# R$ 2&500&000.(

    MK02 K K)+4 II& L,4* R$ 2&500&000.(

    MK030 K K)+4 III& P$! R$ 2&000&000.(

    MK031 K K)+4 III& B+# R$ 2&000&000.(

    MK032 K K)+4 III& L,4* R$ 2&000&000.(

    MK033 Lr. P+##"& * - R$ 60&000.(

    MK03- Lr. P+##"& * 6 R$ 0&000.(

    MK035 Lr. P+##"& * R$ 120&000.(

    MK036 Lr. P+##" *,& * - R$ 60&000.(MK03% Lr. P+##" @r!& * - R$ '0&000.(

    MK03' B*g D#+)! K G+ D,. '(10/- R$ -3&500.(

    MK03 Lr. S#7* B#r" U. -9 = '9& * - R$ -0&500.(

    MK0-0 Lr. T)##" U. -9 = '9& * - R$ 6-&500.(

    MK0-1 Lr. #r, R$ %'&000.(

    MK0-2 Pr)* *, R$ 22&500.(

    MK0-3 Bh #r,*,)/S$)r R$ 11&500.(

    MK0-- K S**/D+! R$ 1&500&000.(

    MK0-5 K R!g R$ 1&500&000.(

    MK0-6 K Trh! R$ 1&250&000.(

    MK0-' K K)+4 I& B+# R$ 1&250&000.(

    MK0- K K)+4 I& L,4* R$ 1&250&000.(

    MK050 K K)+4 I& P$! R$ 1&250&000.(

    MK051 K S)r!g& B+# R$ 1&000&000.(

    MK052 K S)r!g& L,4* R$ 1&000&000.(

    MK053 K S)r!g& P$! R$ 1&000&000.(

    MK05- Lr. P$! R#**)r/R,")r U. 0&025 = 0&2 = 5 9 R$ -0&500.(

    MK055 Kg S* P+ R$ 12&500.(

    Material Hindrakarbon

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    2

    3

    3

    3

    3

    3

    3

    3

    3

    3

  • 8/16/2019 Analisa BoW Fter

    12/344

    U#ah$ Bahan %an Pera&a'an-1"

    Kode Satuan Uraian Harga Satuan

    MH001 L*r. A7*r (

    M.1'- L*r. Pr),/B)!4,! R$ 5&500.(

    M.1'3 L*r. S#+r R$ 5&200.(

    M.065 L*r. K)r#4,! R$ 2&000.(

    MH005 L*r. M,! Br R$ 2&600.(

    MH006 L*r. Pr7,! R$ -&500.(

    MH00% L*r. A+#h#+ Br R$ 21&000.(

    M.062 T#! B,*)! A4*#!; R$ 52%&600.(

    M.061 Kg B,*)! A4$h+*; R$ 6&250.(

    M.063/6- L*r. += O,+ U!* E+4,; R$ 3&500.(

    M.1'5 L*r. P)+4 R$ 2'&000.(

    MH010 L*r. M,! B),4*,!g R$ %&200.(

    MH011 G+!. R$,"r!* R$ %2&300.(

    MH012 L*r. P",*h(100R R$ 2-&%50.(

    MH013 L*r. S$,r,*4 R$ 12&000.(

    Material Cat/Pelapis, Pengkilap, Pembersih, Dll 

    Kode Satuan Uraian Harga SatuanM.1'6 L*r R)4,"/T)r R$ %&200.(

    MC002 Kg M,! C* R$ '&000.(

    MC003 L*r P#+,*r ", R$ 10&'00.(

    MC00- L*r r!,4 R$ 12&%00.(

    MC005 L*r P#+,*r R$ &500.(

    MC006 Kg +,!#*)/M)!, B)4, R$ 22&100.(

    MC00% Kg C* M)!, R$ 22&100.(

    MC00' Kg P+r T)# R$ -0&%00.(

    MC00 Kg C* D4r R$ 1'&-'0.(

    MC010 Kg C* P)!*$ R$ 1&200.(

    MC011 Kg C* @r! R$ 30&300.(

    MC012 L*r T) O,+ R$ '&%00.(

    MC013 Kg D)$+ ", R$ 2'&'00.(MC01- Kg A+,!,& B*,r! R$ 22&150.(

    MC015 Kg K+r, R$ 1'&%00.(

    MC016 L*r P)!g)!)r R$ 15&000.(

    MC01% Kg C* B)4, R$ 32&%00.(

    MC01' Kg C* T)# R$ 13&000.(

    MC01 Kg C* K D4r R$ 20&-00.(

    MC020 Kg C* K K,+$ S!*h)*, E!)+; R$ 35&000.(

    MC021 Kg M,! K,+$ R$ 21&00.(

    MC022 Kg C* M*)= @*)r4) R$ 1%&000.(

    MC023 Kg C* @*)r$r##7 R$ %3&-00.(

    MC02- Kg S,r+ R$ 30&250.(

    MC025 Kg C* T)# Ar,+,; R$ 2'&000.(

    Material ain!lain

    Kode Satuan Uraian Harga Satuan

    MT001 Kg S#" A$, R$ 12&%00.(

    MT002 Kg S! R$ 12&000.(

    MT003 Lr. A$+4 R$ 6&500.(

    MT00- I* A+!g(+!g R$ %&500.(

    MT005 I8 R$ %-&100.(3

  • 8/16/2019 Analisa BoW Fter

    13/344

    U#ah$ Bahan %an Pera&a'an-1(

    III. PERALATAN

    Peralatan Sederhana/Bantu

    Kode Satuan Uraian Harga Satuan

    PS001 Bh K4 R$ 12&000.(

    PS002 S)* P!r P4,r R$ 60&000.(

    M.1%0 S)* A+*(+* K)r8 R$ %0&000.(

    Peralatan Berat 

    Kode Satuan Uraian Harga Satuan

    E.001 U!,*/ B++"#)r 1'5 HP R$ -61&02'.(

    E.003 U!,*/ B++"#)r 65 HP R$ 2%2&500.(

    E.010 U!,*/ M#*#r Gr")r 110 HP R$ 1%&%-5.(

    E.020 U!,*/ H"r+, E*#r 1&3 3 R$ 330&500.(

    Kode Satuan Uraian Harga Satuan

    E.031 U!,*/ Chr4h)r/Sr. 30 T/h R$ 335&01.(

    E.032 U!,*/ Chr4h)r/Sr. 20 T/h R$ 1&%31.(

    E.033 U!,*/ Chr4h)r/Sr. 10 T/h R$ %0&315.(

    E.0-0 U!,*/ Sr))!,!g P+!* M!+ R$ 13%&3'.(

    E.051 U!,*/ L#")r Tr)" R$ 213&-0.(

    E.052 U!,*/ L#")r @h))+)" 115 HP R$ 1'3&-33.(

    E.053 U!,*/ Tr*#r @h))+)" R$ '5&-01.(

    E.0'0 U!,*/ R#++)r& 3 @h))+)" '(10 T R$ 2&22'.(

    E.0'1 U!,*/ R#++)r& T!") 6(10 T R$ 25&5%6.(

    E.0'2 U!,*/ R#++)r& S)+7 ,r*,#! 10 T R$ 10%&5'%.(

    E.0'3 U!,*/ R#++)r& T#)" ,r*,#! 2(3 T R$ -%&%'.(

    E.0'- U!,*/ R#++)r& Ph)*, '(15 T R$ 1'1&16.(E.0'% U!,*/ R#++)r& ,r*,#! 1 T R$ 33&52'.(

    E.0'' U!,*/ P+*) ,r*#r T$)r R$ 1&011.(

    E.0' U!,*/ C#!r)*) ,r*#r - HP R$ 1%&122.(

    E.130 U!,*/ Ch,$ S$r)")r 3 T R$ 3&'.(

    E.152 U!,*/ S$r)r& S)+7 Pr#$)++)" R$ '%&1%-.(

    E.153 U!,*/ A4$h+* S$r)r T#)" 350 + R$ '-&13.(

    E.15- U!,*/ A4$h+* S$r)r T#)" -00 + R$ 0&'55.(

    E.155 U!,*/ A4$h+* M,=,!g P+!* 30 T/h R$ 1&2'0&2%-.(

    E.156 U!,*/ A4$h+* M,=,!g P+!* 10 T/h R$ -12&%02.(

    E.15% U!,*/ A4$h+* ,!,4h)r 1&'2 R$ 30&%%1.(

    E.1%2 U!,*/ )+ T! Tr 115 HP R$ 1'6&'20.(

    E.1'2 U!,*/ @*)r T! Tr R$ 163&15.(

    E.11 U!,*/ Tr,+)r& T#)" R$ %2&30'.(

    E.12 U!,*/ L# L#")r& Tr*#r R$ 6-5&511.(

    E.211 U!,*/ D$ Tr 3&5 T R$ 1-&-'0.(

    E.212 U!,*/ D$ Tr 5&0 T R$ 16&503.(

    E.213 U!,*/ D$ Tr '&0 T R$ 2-3&326.(

    E.221 U!,*/ +*)" Tr -&0 T R$ 10'&210.(

    E.222 U!,*/ P, U$ Tr R$ 6&-5%.(

    E.223 U!,*/ ))$ - @h))+ Dr,) R$ 10'&526.(

    E.22- U!,*/ +*)" Tr 5&0 T R$ 1-5&%16.(

    E.225 U!,*/ +*)" Tr @,*h Cr!) 110 HP R$ 151&151.(

  • 8/16/2019 Analisa BoW Fter

    14/344

    U#ah$ Bahan %an Pera&a'an-1)

    E.226 U!,*/ M#*#r C+) 125 R$ 1&330.(

    E.231 U!,*/ M#,+) @#r4h#$ 5 T R$ 226&3.(

    E.232 U!,*/ L) Tr 5 T R$ 205&-%.(

    E.251 U!,*/ C#!r)*) M,=)r 0&125 3 R$ 15&-%%.(

    E.252 U!,*/ C#!r)*) M,=)r 0&250 3 R$ 1&0-0.(

    E.253 U!,*/ C#!r)*) M,=)r 0&500 3 R$ 2&623.(

    E.301 U!,*/ A,r C#$r)4#r 150 3 R$ -0&551.(

    E.311 U!,*/ G)!)r*#r 3(5 KA R$ 16&012.(

    E.3-1 U!,*/ @*)r P$ 5 & 30 3/h R$ 1-&1-5.(

    E.3-2 U!,*/ @*)r P$ 10 & -0 3/h R$ 1%&613.(

    E.-01 U!,*/ Tr*#r E,$)!*& E* R$ 15&%2.(

  • 8/16/2019 Analisa BoW Fter

    15/344

    KODE : E031

    PEMERINTAH KABUPATEN BIAYA ALAT UNTUK PERHITUNGAN KODE ALAT  BHN. BAKAR HRG. SATUAN

    ACEH BARAT ANALISA BIAYA PEKERJAAN E.001 DIESEL  Rp 461,028.

    PROVINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL

    NANGGROE ACEH DARUSSALAM 11 ACEH BARAT 0 23 NOP 2005

    Jenis A!" # B$%&'e( 1)5 HPTen!*! # 1)5 HP

    H!(*! # 1+010.00 J$"! R$,i!-

    U$( Ke(/! # ) T!-$n +00 J!

    1 T!-$n 300 H!(i Ke(/!+ !"!$

    1 H!(i J! Ke(/!

    4!"&(6CR4 # 0.20)3 P!%! 12.50 7

     A. BIAYA KEPEMILIKAN (OWNERSHIP OST! DALAM RUPIAH PER "AM

    1. D#p$#%&'%&   0.0 8 H!(*! A!" 8 CR4 8 1

    J!6T!-$n

    0.0 8 1+010.00 8 0.20)3 8 1+000+000

    1+200

    R, 155+15).93

     2. L'&)*'&

    As$(!nsi 376T!-$n : PPN 107 3.3 7 8 H!(*!

    J!6T!-$n

    0.033 8 1+010.00 8 1+000+000

    1+200

    R, 29+995.00

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 182,933.73

    B. BIAYA OPERASIONAL (OPERATING OST! DALAM RUPIAH PER "AM

    K#+-' B'' B'/'$ ' P#*'% T&'p HP

    Diese 0.10 Li"e(6HP6J!

    Bensin 0.190 Li"e(6HP6J!

    Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 1)5 HP 8 5+200.00 R,. 153+20.00

    P#*'% 0.00 8 1)5 HP 8 2)+000.00 R,. 31+0)0.00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 155+15).93 R,. 3+05.2

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 278,095.24

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 461,028!6 "J#$ATAU ……………………………………………………………………………………… 4 J#$ % 461,028!6 = Rp 1,844,11&84 "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    16/344

    KODE : E031

    PEMERINTAH KABUPATEN BIAYA ALAT UNTUK PERHITUNGAN KODE ALAT  BHN. BAKAR HRG. SATUAN

    ACEH BARAT ANALISA BIAYA PEKERJAAN E.005 DIESEL  Rp 19,65.

    PROVINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGALNANGGROE ACEH DARUSSALAM 11 ACEH BARAT 0 23 NOP 2005

    Jenis A!" # B$%&'e( 5 HP

    Ten!*! # 5 HP

    H!(*! # 9).00 J$"! R$,i!-

    U$( Ke(/! # ) T!-$n +00 J!

    1 T!-$n 300 H!(i Ke(/!+ !"!$

    1 H!(i J! Ke(/!

    4!"&(6CR4 # 0.20)3 P!%! 12.50 7

     A. BIAYA KEPEMILIKAN (OWNERSHIP OST! DALAM RUPIAH PER "AM

    1. D#p$#%&'%&   0.0 8 H!(*! A!" 8 CR4 8 1

    J!6T!-$n

    0.0 8 9).00 8 0.20)3 8 1+000+000

    1+200

    R, 93+31.5

     2. L'&)*'&

    As$(!nsi 376T!-$n : PPN 107 3.3 7 8 H!(*!

    J!6T!-$n

    0.033 8 9).00 8 1+000+0001+200

    R, 13+15.00

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 86,576.56

    B. BIAYA OPERASIONAL (OPERATING OST! DALAM RUPIAH PER "AM

    K#+-' B'' B'/'$ ' P#*'% T&'p HP

    Diese 0.10 Li"e(6HP6J!

    Bensin 0.190 Li"e(6HP6J!

    Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 5 HP 8 5+200.00 R,. 5+0)0.00

    P#*'% 0.00 8 5 HP 8 2)+000.00 R,. 10+20.00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 93+31.5 R,. +05).3

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 109,058.93

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 1!&,6)&4! "J#$

    ATAU ……………………………………………………………………………………… 4 J#$ % 1!&,6)&4! = Rp *82,&41!& "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    17/344

    KODE : E031

    PEMERINTAH KABUPATEN BIAYA ALAT UNTUK PERHITUNGAN KODE ALAT  BHN. BAKAR HRG. SATUAN

    ACEH BARAT ANALISA BIAYA PEKERJAAN E.010 DIESEL  Rp 179,74.

    PROVINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL

    NANGGROE ACEH DARUSSALAM 11 ACEH BARAT 0 23 NOP 2005

    Jenis A!" # M&"&( G(!%e( 110 HP

    Ten!*! # 110 HP

    H!(*! # 31.00 J$"! R$,i!-

    U$( Ke(/! # ) T!-$n 12+000 J!

    1 T!-$n 300 H!(i Ke(/!+ !"!$

    1 H!(i 5 J! Ke(/!

    4!"&(6CR4 # 0.20)3 P!%! 12.50 7

     A. BIAYA KEPEMILIKAN (OWNERSHIP OST! DALAM RUPIAH PER "AM

    1. D#p$#%&'%&   0.0 8 H!(*! A!" 8 CR4 8 1

    J!6T!-$n

    0.0 8 31.00 8 0.20)3 8 1+000+000

    1+500

    R, 3+20.

     2. L'&)*'&

    As$(!nsi 376T!-$n : PPN 107 3.3 7 8 H!(*!

    J!6T!-$n

    0.033 8 31.00 8 1+000+000

    1+500

    R, 9+01).00

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 46,222.46

    B. BIAYA OPERASIONAL (OPERATING OST! DALAM RUPIAH PER "AM

    K#+-' B'' B'/'$ ' P#*'% T&'p HP

    Diese 0.10 Li"e(6HP6J!

    Bensin 0.190 Li"e(6HP6J!

    Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 110 HP 8 5+200.00 R,. 1+520.00

    P#*'% 0.00 8 110 HP 8 2)+000.00 R,. 1)+)0.00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 3+20. R,. 23+522.)

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 133,522.68

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 1*!,*4&14 "J#$

    ATAU ……………………………………………………………………………………… & J#$ % 1*!,*4&14 = Rp 8!8,*2&*0 "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    18/344

    KODE : E031PEMERINTAH KABUPATEN BIAYA ALAT UNTUK PERHITUNGAN KODE ALAT  BHN. BAKAR HRG. SATUAN

    ACEH BARAT ANALISA BIAYA PEKERJAAN E.020 DIESEL  Rp 550,00.

    PROVINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL

    NANGGROE ACEH DARUSSALAM 11 ACEH BARAT 0 23 NOP 2005

    Jenis A!" # H=%(!$i> E>!?!"&( 1+3 3

    Ten!*! # 0 HP

    H!(*! # 1+100.00 J$"! R$,i!-

    U$( Ke(/! # ) T!-$n 12+000 J!

    1 T!-$n 300 H!(i Ke(/!+ !"!$

    1 H!(i 5 J! Ke(/!

    4!"&(6CR4 # 0.20)3 P!%! 12.50 7

     A. BIAYA KEPEMILIKAN (OWNERSHIP OST! DALAM RUPIAH PER "AM

    1. D#p$#%&'%&   0.0 8 H!(*! A!" 8 CR4 8 1

    J!6T!-$n

    0.0 8 1+100.00 8 0.20)3 8 1+000+000

    1+500

    R, 135+1)9.)0

     2. L'&)*'&As$(!nsi 376T!-$n : PPN 107 3.3 7 8 H!(*!

    J!6T!-$n

    0.033 8 1+100.00 8 1+000+000

    1+500

    R, 2+200.00

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 159,387.80

    B. BIAYA OPERASIONAL (OPERATING OST! DALAM RUPIAH PER "AM

    K#+-' B'' B'/'$ ' P#*'% T&'p HP

    Diese 0.10 Li"e(6HP6J!

    Bensin 0.190 Li"e(6HP6J!

    Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 0 HP 8 5+200.00 R,. 9+))0.00

    P#*'% 0.00 8 0 HP 8 2)+000.00 R,. 15+120.00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 135+1)9.)0 R,. )1+112.)

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 171,112.68

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp ))0,&0048 "J#$

    ATAU ……………………………………………………………………………………… & J#$ % ))0,&0048 = Rp 1,6&2,&0240 "H#'(

  • 8/16/2019 Analisa BoW Fter

    19/344

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    20/344

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    21/344

  • 8/16/2019 Analisa BoW Fter

    22/344

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp *0,)1&11 "J#$

    ATAU ……………………………………………………………………………………… & J#$ % *0,)1&11 = Rp )&1,&*&&& "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    23/344

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 99,540.78

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 1)*,!)8*& "J#$

    ATAU ……………………………………………………………………………………… & J#$ % 1)*,!)8*& = Rp 68!,6!)*6 "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    24/344

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 +120.3) R,. 2+92.23

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 161,472.23

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 21),4!061 "J#$

    ATAU ……………………………………………………………………………………… & J#$ % 21),4!061 = Rp 1,06*,4&)06 "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    25/344

    B'' B'/'$  0.10 8 115 HP 8 5+200.00 R,. 5+)0.00

    P#*'% 0.00 8 115 HP 8 2)+000.00 R,. 1+320.00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 3)+9.09 R,. 23+0)0.2

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 138,080.24

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 18),4)))2 "J#$

    ATAU ……………………………………………………………………………………… & J#$ % 18),4)))2 = Rp !1*,166&! "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    26/344

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 0 HP 8 5+200.00 R,. +20.00

    P#*'% 0.00 8 0 HP 8 2)+000.00 R,. 10+0)0.00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 1+0)).3 R,. )+53.02

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 68,453.02

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 8&,401)8 "J#$

    ATAU ……………………………………………………………………………………… & J#$ % 8&,401)8 = Rp 42*,00688 "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    27/344

  • 8/16/2019 Analisa BoW Fter

    28/344

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 0 HP 8 5+200.00 R,. 33+2)0.00

    P#*'% 0.00 8 0 HP 8 2)+000.00 R,. +920.00P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 11+950.5) R,. )5+050.35

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 125,050.35

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 2!&,&*6!2 "J#$

    ATAU ……………………………………………………………………………………… & J#$ % 2!&,&*6!2 = Rp 1,4**,88461 "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    29/344

    Bensin 0.190 Li"e(6HP6J!

    Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 35 HP 8 5+200.00 R,. 2+120.00

    P#*'% 0.00 8 35 HP 8 2)+000.00 R,. 5+))0.00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 0+)02.1 R,. 2+)1.2)

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 59,481.28

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 10*,&8*42 "J#$

    ATAU ……………………………………………………………………………………… & J#$ % 10*,&8*42 = Rp &)*,!)*0! "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    30/344

    K#+-' B'' B'/'$ ' P#*'% T&'p HP

    Diese 0.10 Li"e(6HP6J!

    Bensin 0.190 Li"e(6HP6J!

    Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 HP 8 5+200.00 R,. +2.00

    P#*'% 0.00 8 HP 8 2)+000.00 R,. 1+00).00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 23+5.2 R,. 1+159.)5

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 20,157.85

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 4*,!*82* "J#$

    ATAU ……………………………………………………………………………………… & J#$ % 4*,!*82* = Rp 2)!,8!1)) "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET );15 T

    Ten!*! # 5 HP

    H!(*! # 1.00 J$"! R$,i!-

    U$( Ke(/! # 10 T!-$n 15+000 J!

    1 T!-$n 300 H!(i Ke(/!+ !"!$

    1 H!(i 5 J! Ke(/!

    4!"&(6CR4 # 0.1)02 P!%! 12.50 7

     A. BIAYA KEPEMILIKAN (OWNERSHIP OST! DALAM RUPIAH PER "AM

    1. D#p$#%&'%&   0.0 8 H!(*! A!" 8 CR4 8 1

    J!6T!-$n

    0.0 8 1.00 8 0.1)02 8 1+000+000

    1+500

    R, 9+92.05

     2. L'&)*'&

    As$(!nsi 376T!-$n : PPN 107 3.3 7 8 H!(*!J!6T!-$n

    0.033 8 1.00 8 1+000+000

    1+500

    R, +902.00

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 57,494.05

  • 8/16/2019 Analisa BoW Fter

    31/344

    B. BIAYA OPERASIONAL (OPERATING OST! DALAM RUPIAH PER "AM

    K#+-' B'' B'/'$ ' P#*'% T&'p HP

    Diese 0.10 Li"e(6HP6J!

    Bensin 0.190 Li"e(6HP6J!

    Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 5 HP 8 5+200.00 R,. 9+00.00

    P#*'% 0.00 8 5 HP 8 2)+000.00 R,. 15+0.00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 9+92.05 R,. 2)+95.23

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 123,675.23

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 181,16!28 "J#$

    ATAU ……………………………………………………………………………………… & J#$ % 181,16!28 = Rp !0&,84642 "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    32/344

    B. BIAYA OPERASIONAL (OPERATING OST! DALAM RUPIAH PER "AM

    K#+-' B'' B'/'$ ' P#*'% T&'p HP

    Diese 0.10 Li"e(6HP6J!

    Bensin 0.190 Li"e(6HP6J!

    Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 9 HP 8 5+200.00 R,. 5+)2.00

    P#*'% 0.00 8 9 HP 8 2)+000.00 R,. 1+19.00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 15+190.)2 R,. +102.

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 16,102.49

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp )),&28)1 "J#$

    ATAU ……………………………………………………………………………………… 4 J#$ % )),&28)1 = Rp 1)4,11)2& "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    33/344

    R, 1+29.00

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 9,860.46

    B. BIAYA OPERASIONAL (OPERATING OST! DALAM RUPIAH PER "AM

    K#+-' B'' B'/'$ ' P#*'% T&'p HP

    Diese 0.10 Li"e(6HP6J!Bensin 0.190 Li"e(6HP6J!

    Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 HP 8 5+200.00 R,. 3+32).00

    P#*'% 0.00 8 HP 8 2)+000.00 R,. 92.00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 )+5). R,. 5+150.)

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 9,150.68

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 1!,01114 "J#$

    ATAU ……………………………………………………………………………………… ) J#$ % 1!,01114 = Rp 4*,&2*86 "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    34/344

  • 8/16/2019 Analisa BoW Fter

    35/344

    J!6T!-$n

    0.033 8 51.00 8 1+000+000

    00

    R, 2+)05.00

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 21,676.02

    B. BIAYA OPERASIONAL (OPERATING OST! DALAM RUPIAH PER "AM

    K#+-' B'' B'/'$ ' P#*'% T&'p HP

    Diese 0.10 Li"e(6HP6J!

    Bensin 0.190 Li"e(6HP6J!

    Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 9 HP 8 5+200.00 R,. 5+)2.00

    P#*'% 0.00 8 9 HP 8 2)+000.00 R,. 1+19.00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 1)+)91.02 R,. 11+322.1

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 18,322.61

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp )!,!!86) "J#$

    ATAU ……………………………………………………………………………………… 2 J#$ % )!,!!86) = Rp *!,!!*26 "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    36/344

     2. L'&)*'&

    As$(!nsi 376T!-$n : PPN 107 3.3 7 8 H!(*!

    J!6T!-$n

    0.033 8 152.00 8 1+000+000

    1+200

    R, +1)0.00

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 32,301.52

    B. BIAYA OPERASIONAL (OPERATING OST! DALAM RUPIAH PER "AM

    K#+-' B'' B'/'$ ' P#*'% T&'p HP

    Diese 0.10 Li"e(6HP6J!

    Bensin 0.190 Li"e(6HP6J!

    Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 3) HP 8 5+200.00 R,. 31+1.00

    P#*'% 0.00 8 3) HP 8 2)+000.00 R,. +3).00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 2)+121.52 R,. 1+)92.1

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 54,872.91

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 8*,1*44) "J#$

    ATAU ……………………………………………………………………………………… 4 J#$ % 8*,1*44) = Rp )48,6!**) "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    37/344

    R, +55.33

     2. L'&)*'&

    As$(!nsi 376T!-$n : PPN 107 3.3 7 8 H!(*!

    J!6T!-$n

    0.033 8 150.52 8 1+000+000

    950 R, +22.))

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 51,179.21

    B. BIAYA OPERASIONAL (OPERATING OST! DALAM RUPIAH PER "AM

    K#+-' B'' B'/'$ ' P#*'% T&'p HP

    Diese 0.10 Li"e(6HP6J!

    Bensin 0.190 Li"e(6HP6J!

    Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 9 HP 8 5+200.00 R,. 5+)2.00

    P#*'% 0.00 8 9 HP 8 2)+000.00 R,. 1+19.00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 +55.33 R,. 2+933.)0

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 33,733.80

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 84,!1)01 "J#$ATAU ……………………………………………………………………………………… ) J#$ % 84,!1)01 = Rp 212,282&1 "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    38/344

    0.0 8 12.00 8 0.2) 8 1+000+000

    950

    R, 9+5.5

     2. L'&)*'&

    As$(!nsi 376T!-$n : PPN 107 3.3 7 8 H!(*!

    J!6T!-$n

    0.033 8 12.00 8 1+000+000

    950

    R, 9+12).00

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 55,082.59

    B. BIAYA OPERASIONAL (OPERATING OST! DALAM RUPIAH PER "AM

    K#+-' B'' B'/'$ ' P#*'% T&'p HP

    Diese 0.10 Li"e(6HP6J!

    Bensin 0.190 Li"e(6HP6J!

    Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 9 HP 8 5+200.00 R,. 5+)2.00

    P#*'% 0.00 8 9 HP 8 2)+000.00 R,. 1+19.00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 9+5.5 R,. 2)+992.9

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 35,772.76

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp !0,8&&)& "J#$

    ATAU ……………………………………………………………………………………… ) J#$ % !0,8&&)& = Rp 22*,1)8)* "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    39/344

    J!6T!-$n

    0.0 8 +930.00 8 0.1)02 8 1+000+000

    1+200

    R, 0+9.5

     2. L'&)*'&

    As$(!nsi 376T!-$n : PPN 107 3.3 7 8 H!(*!J!6T!-$n

    0.033 8 +930.00 8 1+000+000

    1+200

    R, 130+095.00

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 770,824.45

    B. BIAYA OPERASIONAL (OPERATING OST! DALAM RUPIAH PER "AM

    K#+-' B'' B'/'$ ' P#*'% T&'p HP

    Diese 0.10 Li"e(6HP6J!

    Bensin 0.190 Li"e(6HP6J!

    Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 125 HP 8 5+200.00 R,. 10+000.00

    P#*'% 0.00 8 125 HP 8 2)+000.00 R,. 21+000.00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 0+9.5 R,. 3)+.9

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 509,449.67

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 1,280,2*412 "J#$

    ATAU ……………………………………………………………………………………… 4 J#$ % 1,280,2*412 = Rp &,121,0!648 "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    40/344

    1. D#p$#%&'%&   0.0 8 H!(*! A!" 8 CR4 8 1

    J!6T!-$n

    0.0 8 1+)5.00 8 0.1)02 8 1+000+000

    1+200

    R, 201+15.53

     2. L'&)*'&

    As$(!nsi 376T!-$n : PPN 107 3.3 7 8 H!(*!

    J!6T!-$n

    0.033 8 1+)5.00 8 1+000+000

    1+200

    R, 0+)39.50

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 242,003.03

    B. BIAYA OPERASIONAL (OPERATING OST! DALAM RUPIAH PER "AM

    K#+-' B'' B'/'$ ' P#*'% T&'p HP

    Diese 0.10 Li"e(6HP6J!

    Bensin 0.190 Li"e(6HP6J!

    Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 50 HP 8 5+200.00 R,. 1+00.00

    P#*'% 0.00 8 50 HP 8 2)+000.00 R,. )+00.00P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 201+15.53 R,. 120+.32

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 170,699.32

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 412,*02)4 "J#$

    ATAU ……………………………………………………………………………………… 4 J#$ % 412,*02)4 = Rp 1,6&0,80!)6 "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    41/344

     A. BIAYA KEPEMILIKAN (OWNERSHIP OST! DALAM RUPIAH PER "AM

    1. D#p$#%&'%&   0.0 8 H!(*! A!" 8 CR4 8 1

    J!6T!-$n

    0.0 8 2.2 8 0.222 8 1+000+000

    1+200

    R, 3.1

     2. L'&)*'&

    As$(!nsi 376T!-$n : PPN 107 3.3 7 8 H!(*!

    J!6T!-$n

    0.033 8 2.2 8 1+000+000

    1+200

    R, 91.9

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 508.88

    B. BIAYA OPERASIONAL (OPERATING OST! DALAM RUPIAH PER "AM

    K#+-' B'' B'/'$ ' P#*'% T&'p HP

    Diese 0.10 Li"e(6HP6J!

    Bensin 0.190 Li"e(6HP6J!

    Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 30 HP 8 5+200.00 R,. 2+0.00

    P#*'% 0.00 8 30 HP 8 2)+000.00 R,. 5+00.00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 3.1 R,. 22.1

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 30,262.14

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp )0,**102 "J#$

    ATAU ……………………………………………………………………………………… 4 J#$ % )0,**102 = Rp 12),08408 "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    42/344

    4!"&(6CR4 # 0.2) P!%! 12.50 7

     A. BIAYA KEPEMILIKAN (OWNERSHIP OST! DALAM RUPIAH PER "AM

    1. D#p$#%&'%&   0.0 8 H!(*! A!" 8 CR4 8 1

    J!6T!-$n

    0.0 8 222.00 8 0.2) 8 1+000+000

    1+200

    R, 1+092.22

     2. L'&)*'&

    As$(!nsi 376T!-$n : PPN 107 3.3 7 8 H!(*!

    J!6T!-$n

    0.033 8 222.00 8 1+000+000

    1+200

    R, +105.00

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 47,177.22

    B. BIAYA OPERASIONAL (OPERATING OST! DALAM RUPIAH PER "AM

    K#+-' B'' B'/'$ ' P#*'% T&'p HP

    Diese 0.10 Li"e(6HP6J!

    Bensin 0.190 Li"e(6HP6J!

    Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 115 HP 8 5+200.00 R,. 5+)0.00

    P#*'% 0.00 8 115 HP 8 2)+000.00 R,. 1+320.00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 1+092.22 R,. 2+3.33

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 139,643.33

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 186,820&& "J#$

    ATAU ……………………………………………………………………………………… 4 J#$ % 186,820&& = Rp *4*,28221 "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

    Ten!*! # 115 HP

    H!(*! # 1).00 J$"! R$,i!-

    U$( Ke(/! # T!-$n +000 J!

  • 8/16/2019 Analisa BoW Fter

    43/344

    1 T!-$n 300 H!(i Ke(/!+ !"!$

    1 H!(i 5 J! Ke(/!

    4!"&(6CR4 # 0.2) P!%! 12.50 7

     A. BIAYA KEPEMILIKAN (OWNERSHIP OST! DALAM RUPIAH PER "AM

    1. D#p$#%&'%&   0.0 8 H!(*! A!" 8 CR4 8 1J!6T!-$n

    0.0 8 1).00 8 0.2) 8 1+000+000

    1+500

    R, 29+93.51

     2. L'&)*'&

    As$(!nsi 376T!-$n : PPN 107 3.3 7 8 H!(*!

    J!6T!-$n

    0.033 8 1).00 8 1+000+000

    1+500

    R, +15).00

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 32,131.51

    B. BIAYA OPERASIONAL (OPERATING OST! DALAM RUPIAH PER "AM

    K#+-' B'' B'/'$ ' P#*'% T&'p HP

    Diese 0.10 Li"e(6HP6J!

    Bensin 0.190 Li"e(6HP6J!

    Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 115 HP 8 5+200.00 R,. 5+)0.00

    P#*'% 0.00 8 115 HP 8 2)+000.00 R,. 1+320.00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 29+93.51 R,. 1+9).11

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 131,784.11

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 16),!1&62 "J#$

    ATAU ……………………………………………………………………………………… & J#$ % 16),!1&62 = Rp 81!,&*810 "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    44/344

    H!(*! # 5.00 J$"! R$,i!-

    U$( Ke(/! # 12 T!-$n +000 J!

    1 T!-$n 300 H!(i Ke(/!+ !"!$

    1 H!(i 3 J! Ke(/!

    4!"&(6CR4 # 0.151 P!%! 12.50 7

     A. BIAYA KEPEMILIKAN (OWNERSHIP OST! DALAM RUPIAH PER "AM

    1. D#p$#%&'%&   0.0 8 H!(*! A!" 8 CR4 8 1

    J!6T!-$n

    0.0 8 5.00 8 0.151 8 1+000+000

    950

    R, 11+5.5

     2. L'&)*'&

    As$(!nsi 376T!-$n : PPN 107 3.3 7 8 H!(*!

    J!6T!-$n

    0.033 8 5.00 8 1+000+000

    950

    R, 2+5.00

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 14,291.45

    B. BIAYA OPERASIONAL (OPERATING OST! DALAM RUPIAH PER "AM

    K#+-' B'' B'/'$ ' P#*'% T&'p HP

    Diese 0.10 Li"e(6HP6J!

    Bensin 0.190 Li"e(6HP6J!Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 51 HP 8 5+200.00 R,. 2+32.00

    P#*'% 0.00 8 51 HP 8 2)+000.00 R,. )+5).00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 11+5.5 R,. 9+019.29

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 58,017.27

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp *2,)08*2 "J#$

    ATAU ……………………………………………………………………………………… ) J#$ % *2,)08*2 = Rp 180,**181 "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    45/344

  • 8/16/2019 Analisa BoW Fter

    46/344

    NANGGROE ACEH DARUSSALAM 11 ACEH BARAT 0 23 NOP 2005

    Jenis A!" # D$, T($> 3+5 T

    Ten!*! # 10 HP

    H!(*! # 1).00 J$"! R$,i!-

    U$( Ke(/! # T!-$n +000 J!

    1 T!-$n 300 H!(i Ke(/!+ !"!$

    1 H!(i 5 J! Ke(/!4!"&(6CR4 # 0.2) P!%! 12.50 7

     A. BIAYA KEPEMILIKAN (OWNERSHIP OST! DALAM RUPIAH PER "AM

    1. D#p$#%&'%&   0.0 8 H!(*! A!" 8 CR4 8 1

    J!6T!-$n

    0.0 8 1).00 8 0.2) 8 1+000+000

    1+500

    R, 2+)5.3

     2. L'&)*'&

    As$(!nsi 376T!-$n : PPN 107 3.3 7 8 H!(*!

    J!6T!-$n

    0.033 8 1).00 8 1+000+000

    1+500

    R, 3+.00

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 28,561.34

    B. BIAYA OPERASIONAL (OPERATING OST! DALAM RUPIAH PER "AM

    K#+-' B'' B'/'$ ' P#*'% T&'p HP

    Diese 0.10 Li"e(6HP6J!

    Bensin 0.190 Li"e(6HP6J!

    Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 10 HP 8 5+200.00 R,. ))+12.00

    P#*'% 0.00 8 10 HP 8 2)+000.00 R,. 19+)0).00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 2+)5.3 R,. 1+1.21

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 120,919.21

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 14!,480&& "J#$

    ATAU ……………………………………………………………………………………… & J#$ % 14!,480&& = Rp *4*,402*& "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    47/344

    PROVINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL

    NANGGROE ACEH DARUSSALAM 11 ACEH BARAT 0 23 NOP 2005

    Jenis A!" # D$, T($> 5+0 T

    Ten!*! # 15 HP

    H!(*! # 1.00 J$"! R$,i!-

    U$( Ke(/! # T!-$n +000 J!1 T!-$n 300 H!(i Ke(/!+ !"!$

    1 H!(i 5 J! Ke(/!

    4!"&(6CR4 # 0.2) P!%! 12.50 7

     A. BIAYA KEPEMILIKAN (OWNERSHIP OST! DALAM RUPIAH PER "AM

    1. D#p$#%&'%&   0.0 8 H!(*! A!" 8 CR4 8 1

    J!6T!-$n

    0.0 8 1.00 8 0.2) 8 1+000+000

    1+500

    R, 2+53.5

     2. L'&)*'&

    As$(!nsi 376T!-$n : PPN 107 3.3 7 8 H!(*!

    J!6T!-$n

    0.033 8 1.00 8 1+000+000

    1+500

    R, +39).00

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 33,831.59

    B. BIAYA OPERASIONAL (OPERATING OST! DALAM RUPIAH PER "AM

    K#+-' B'' B'/'$ ' P#*'% T&'p HP

    Diese 0.10 Li"e(6HP6J!

    Bensin 0.190 Li"e(6HP6J!

    Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 15 HP 8 5+200.00 R,. 120+0.00

    P#*'% 0.00 8 15 HP 8 2)+000.00 R,. 2+30.00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 2+53.5 R,. 19+92.1

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 162,672.16

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 1!6,&0)*& "J#$

    ATAU ……………………………………………………………………………………… & J#$ % 1!6,&0)*& = Rp !82,&18*4 "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    48/344

    PEMERINTAH KABUPATEN BIAYA ALAT UNTUK PERHITUNGAN KODE ALAT  BHN. BAKAR HRG. SATUAN

    ACEH BARAT ANALISA BIAYA PEKERJAAN E.215 DIESEL  Rp 245,526.

    PROVINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL

    NANGGROE ACEH DARUSSALAM 11 ACEH BARAT 0 23 NOP 2005

    Jenis A!" # D$, T($> )+0 T

    Ten!*! # 195 HPH!(*! # 2.00 J$"! R$,i!-

    U$( Ke(/! # T!-$n +000 J!

    1 T!-$n 300 H!(i Ke(/!+ !"!$

    1 H!(i 5 J! Ke(/!

    4!"&(6CR4 # 0.2) P!%! 12.50 7

     A. BIAYA KEPEMILIKAN (OWNERSHIP OST! DALAM RUPIAH PER "AM

    1. D#p$#%&'%&   0.0 8 H!(*! A!" 8 CR4 8 1

    J!6T!-$n

    0.0 8 2.00 8 0.2) 8 1+000+000

    1+500

    R, 3+09.11

     2. L'&)*'&

    As$(!nsi 376T!-$n : PPN 107 3.3 7 8 H!(*!

    J!6T!-$n

    0.033 8 2.00 8 1+000+000

    1+500

    R, 5+)0).00Sub Total ………………………………………………………………………………………………………………………………………… Rp. 44,882.11

    B. BIAYA OPERASIONAL (OPERATING OST! DALAM RUPIAH PER "AM

    K#+-' B'' B'/'$ ' P#*'% T&'p HP

    Diese 0.10 Li"e(6HP6J!

    Bensin 0.190 Li"e(6HP6J!

    Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 195 HP 8 5+200.00 R,. 15+00.00

    P#*'% 0.00 8 195 HP 8 2)+000.00 R,. 2+00.00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 3+09.11 R,. 23+.9

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 198,444.47

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 24),)26&8 "J#$

    ATAU ……………………………………………………………………………………… & J#$ % 24),)26&8 = Rp 1,216,6)2!0 "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    49/344

    KODE : E031

    PEMERINTAH KABUPATEN BIAYA ALAT UNTUK PERHITUNGAN KODE ALAT  BHN. BAKAR HRG. SATUAN

    ACEH BARAT ANALISA BIAYA PEKERJAAN E.221 DIESEL  Rp 108,210.

    PROVINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL

    NANGGROE ACEH DARUSSALAM 11 ACEH BARAT 0 23 NOP 2005

    Jenis A!" # 4!"e% T($> +0 T

    Ten!*! # )0 HP

    H!(*! # 10.00 J$"! R$,i!-

    U$( Ke(/! # T!-$n +000 J!

    1 T!-$n 300 H!(i Ke(/!+ !"!$

    1 H!(i 5 J! Ke(/!

    4!"&(6CR4 # 0.2) P!%! 12.50 7

     A. BIAYA KEPEMILIKAN (OWNERSHIP OST! DALAM RUPIAH PER "AM

    1. D#p$#%&'%&   0.0 8 H!(*! A!" 8 CR4 8 1

    J!6T!-$n

    0.0 8 10.00 8 0.2) 8 1+000+000

    1+500

    R, 1+132.)9

     2. L'&)*'&

    As$(!nsi 376T!-$n : PPN 107 3.3 7 8 H!(*!

    J!6T!-$n

    0.033 8 10.00 8 1+000+000

    1+500

    R, 2+3).00

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 18,530.87

    B. BIAYA OPERASIONAL (OPERATING OST! DALAM RUPIAH PER "AM

    K#+-' B'' B'/'$ ' P#*'% T&'p HP

    Diese 0.10 Li"e(6HP6J!

    Bensin 0.190 Li"e(6HP6J!

    Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 )0 HP 8 5+200.00 R,. +50.00

    P#*'% 0.00 8 )0 HP 8 2)+000.00 R,. 13+0.00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 1+132.)9 R,. +9.92

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 89,679.72

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 108,21060 "J#$ATAU ……………………………………………………………………………………… & J#$ % 108,21060 = Rp &41,0&2!8 "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    50/344

    KODE : E031

    PEMERINTAH KABUPATEN BIAYA ALAT UNTUK PERHITUNGAN KODE ALAT  BHN. BAKAR HRG. SATUAN

    ACEH BARAT ANALISA BIAYA PEKERJAAN E.222 DIESEL  Rp 96,47.

    PROVINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGALNANGGROE ACEH DARUSSALAM 11 ACEH BARAT 0 23 NOP 2005

    Jenis A!" # Pi> U, T($>

    Ten!*! # 1 HP

    H!(*! # 139.00 J$"! R$,i!-

    U$( Ke(/! # T!-$n +000 J!

    1 T!-$n 300 H!(i Ke(/!+ !"!$

    1 H!(i 5 J! Ke(/!

    4!"&(6CR4 # 0.2) P!%! 12.50 7

     A. BIAYA KEPEMILIKAN (OWNERSHIP OST! DALAM RUPIAH PER "AM

    1. D#p$#%&'%&   0.0 8 H!(*! A!" 8 CR4 8 1

    J!6T!-$n

    0.0 8 139.00 8 0.2) 8 1+000+000

    1+500

    R, 20+299.10

     2. L'&)*'&

    As$(!nsi 376T!-$n : PPN 107 3.3 7 8 H!(*!

    J!6T!-$n

    0.033 8 139.00 8 1+000+000

    1+500

    R, 3+01.00

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 23,291.10

    B. BIAYA OPERASIONAL (OPERATING OST! DALAM RUPIAH PER "AM

    K#+-' B'' B'/'$ ' P#*'% T&'p HP

    Diese 0.10 Li"e(6HP6J!

    Bensin 0.190 Li"e(6HP6J!

    Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 1 HP 8 5+200.00 R,. 50+952.00

    P#*'% 0.00 8 1 HP 8 2)+000.00 R,. 10+2).00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 20+299.10 R,. 12+1.2

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 73,166.26

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp !6,4&*)& "J#$

    ATAU ……………………………………………………………………………………… & J#$ % !6,4&*)& = Rp 482,286** "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    51/344

    KODE : E031

    PEMERINTAH KABUPATEN BIAYA ALAT UNTUK PERHITUNGAN KODE ALAT  BHN. BAKAR HRG. SATUAN

    ACEH BARAT ANALISA BIAYA PEKERJAAN E.225 DIESEL  Rp 108,26.

    PROVINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL

    NANGGROE ACEH DARUSSALAM 11 ACEH BARAT 0 23 NOP 2005

    Jenis A!" # Jee, @-ee D(i?e

    Ten!*! # HP

    H!(*! # 230.00 J$"! R$,i!-

    U$( Ke(/! # T!-$n +000 J!

    1 T!-$n 300 H!(i Ke(/!+ !"!$

    1 H!(i 5 J! Ke(/!

    4!"&(6CR4 # 0.2) P!%! 12.50 7

     A. BIAYA KEPEMILIKAN (OWNERSHIP OST! DALAM RUPIAH PER "AM

    1. D#p$#%&'%&   0.0 8 H!(*! A!" 8 CR4 8 1

    J!6T!-$n

    0.0 8 230.00 8 0.2) 8 1+000+000

    1+500

    R, 3+01.)

     2. L'&)*'&

    As$(!nsi 376T!-$n : PPN 107 3.3 7 8 H!(*!J!6T!-$n

    0.033 8 230.00 8 1+000+000

    1+500

    R, 5+00.00

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 39,101.84

    B. BIAYA OPERASIONAL (OPERATING OST! DALAM RUPIAH PER "AM

    K#+-' B'' B'/'$ ' P#*'% T&'p HP

    Diese 0.10 Li"e(6HP6J!

    Bensin 0.190 Li"e(6HP6J!

    Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 HP 8 5+200.00 R,. 0+9).00

    P#*'% 0.00 8 HP 8 2)+000.00 R,. )+232.00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 3+01.) R,. 20+25.10

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 69,425.10

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 108,&26!4 "J#$

    ATAU ……………………………………………………………………………………… & J#$ % 108,&26!4 = Rp &42,6)4*2 "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    52/344

    KODE : E031PEMERINTAH KABUPATEN BIAYA ALAT UNTUK PERHITUNGAN KODE ALAT  BHN. BAKAR HRG. SATUAN

    ACEH BARAT ANALISA BIAYA PEKERJAAN E.224 DIESEL  Rp 14,716.

    PROVINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL

    NANGGROE ACEH DARUSSALAM 11 ACEH BARAT 0 23 NOP 2005

    Jenis A!" # 4!"e% T($> 5+0 T

    Ten!*! # 110 HP

    H!(*! # 13).00 J$"! R$,i!-

    U$( Ke(/! # T!-$n +000 J!

    1 T!-$n 300 H!(i Ke(/!+ !"!$

    1 H!(i 5 J! Ke(/!

    4!"&(6CR4 # 0.2) P!%! 12.50 7

     A. BIAYA KEPEMILIKAN (OWNERSHIP OST! DALAM RUPIAH PER "AM

    1. D#p$#%&'%&   0.0 8 H!(*! A!" 8 CR4 8 1

    J!6T!-$n

    0.0 8 13).00 8 0.2) 8 1+000+000

    1+500

    R, 20+25.10

     2. L'&)*'&

    As$(!nsi 376T!-$n : PPN 107 3.3 7 8 H!(*!

    J!6T!-$n

    0.033 8 13).00 8 1+000+000

    1+500

    R, 3+03.00

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 23,461.10

    B. BIAYA OPERASIONAL (OPERATING OST! DALAM RUPIAH PER "AM

    K#+-' B'' B'/'$ ' P#*'% T&'p HP

    Diese 0.10 Li"e(6HP6J!

    Bensin 0.190 Li"e(6HP6J!

    Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 110 HP 8 5+200.00 R,. 1+520.00

    P#*'% 0.00 8 110 HP 8 2)+000.00 R,. 1)+)0.00P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 20+25.10 R,. 12+255.0

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 122,255.06

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 14&,*161* "J#$

    ATAU ……………………………………………………………………………………… & J#$ % 14&,*161* = Rp *28,&808) "H#'(

  • 8/16/2019 Analisa BoW Fter

    53/344

    DATE 23 NOP 2005 OPERATOR 0 BUDGET @i"- C(!ne 110 HP

    Ten!*! # 110 HP

    H!(*! # 15.00 J$"! R$,i!-

    U$( Ke(/! # T!-$n +000 J!

    1 T!-$n 300 H!(i Ke(/!+ !"!$

    1 H!(i 5 J! Ke(/!

    4!"&(6CR4 # 0.2) P!%! 12.50 7

     A. BIAYA KEPEMILIKAN (OWNERSHIP OST! DALAM RUPIAH PER "AM

    1. D#p$#%&'%&   0.0 8 H!(*! A!" 8 CR4 8 1

    J!6T!-$n

    0.0 8 15.00 8 0.2) 8 1+000+000

    1+500

    R, 23+533.29

     2. L'&)*'&

    As$(!nsi 376T!-$n : PPN 107 3.3 7 8 H!(*!

    J!6T!-$n

    0.033 8 15.00 8 1+000+000

    1+500

    R, 3+).00

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 27,031.27

    B. BIAYA OPERASIONAL (OPERATING OST! DALAM RUPIAH PER "AM

    K#+-' B'' B'/'$ ' P#*'% T&'p HP

    Diese 0.10 Li"e(6HP6J!

    Bensin 0.190 Li"e(6HP6J!

    Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 110 HP 8 5+200.00 R,. 1+520.00

    P#*'% 0.00 8 110 HP 8 2)+000.00 R,. 1)+)0.00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 23+533.29 R,. 1+11.

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 124,119.96

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 1&1,1&124 "J#$

  • 8/16/2019 Analisa BoW Fter

    54/344

    ATAU ……………………………………………………………………………………… & J#$ % 1&1,1&124 = Rp *&&,*&618 "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET e 125 >>

    Ten!*! # 1 HP

    H!(*! # 1.00 J$"! R$,i!-

    U$( Ke(/! # 5 T!-$n +000 J!

    1 T!-$n 300 H!(i Ke(/!+ !"!$

    1 H!(i J! Ke(/!

    4!"&(6CR4 # 0.2)0)5 P!%! 12.50 7

     A. BIAYA KEPEMILIKAN (OWNERSHIP OST! DALAM RUPIAH PER "AM

    1. D#p$#%&'%&   0.0 8 H!(*! A!" 8 CR4 8 1

    J!6T!-$n

    0.0 8 1.00 8 0.2)0)5 8 1+000+0001+)00

    R, 2+2.)0

     2. L'&)*'&

    As$(!nsi 376T!-$n : PPN 107 3.3 7 8 H!(*!

    J!6T!-$n

    0.033 8 1.00 8 1+000+000

    1+)00

    R, 23.33

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 2,540.13

    B. BIAYA OPERASIONAL (OPERATING OST! DALAM RUPIAH PER "AM

    K#+-' B'' B'/'$ ' P#*'% T&'p HP

    Diese 0.10 Li"e(6HP6J!

    Bensin 0.190 Li"e(6HP6J!

    Pe$!s 0.00 Li"e(6HP6J!

    H'$' B'' B'/'$ 

    M.1) Diese R, 5+200.; 6Li"e(

    M.1)3 Bensin R, 5+500.; 6Li"e(M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.190 8 1 HP 8 5+500.00 R,. 13+00.00

    P#*'% 0.00 8 1 HP 8 2)+000.00 R,. 2+352.00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 2+2.)0 R,. 1+3).0)

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 16,790.08

  • 8/16/2019 Analisa BoW Fter

    55/344

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 1!,))021 "J#$

    ATAU ……………………………………………………………………………………… 6 J#$ % 1!,))021 = Rp 11&,!8128 "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    56/344

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 171,983.79

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 226,!)!26 "J#$

    ATAU ……………………………………………………………………………………… 4 J#$ % 226,!)!26 = Rp !0*,*&*06 "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    57/344

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 3+5.)9 R,. 20+95).12

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 165,758.12

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 20&,4!*4! "J#$

    ATAU ……………………………………………………………………………………… 4 J#$ % 20&,4!*4! = Rp 821,!8!!* "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    58/344

    B'' B'/'$  0.10 8 HP 8 5+200.00 R,. +2.00

    P#*'% 0.00 8 HP 8 2)+000.00 R,. 1+00).00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 5+9.5) R,. 3+2)5.5

    Sub Total ………………………………………………………………………………………………………………………………………… Rp. 9,285.95

    TOTAL BIAYA KEPEMILIKAN DAN BIAYA OPERASIONAL ALAT …………………………………………………………………… = Rp 1&,4**&2 "J#$ATAU ……………………………………………………………………………………… 4 J#$ % 1&,4**&2 = Rp 61,!1008 "H#'(

    DATE 23 NOP 2005 OPERATOR 0 BUDGET

  • 8/16/2019 Analisa BoW Fter

    59/344

    M.1)5 Pe$!s R, 2)+000.; 6Li"e(

    B'' B'/'$  0.10 8 HP 8 5+200.00 R,. +2.00

    P#*'% 0.00 8 HP 8 2)+000.00 R,. 1+00).00

    P#$+'&/' ' Sp'$#p'$- 

    (603 D#p$#%&'%&! 0.00 8 5+9.5) R,. 3+2)5.5

    Sub Total ………………………………………………………………�