956 Commentary from Westminster An Unhappy Computer Programme FROM A CORRESPONDENT WHAT is it worth to save 5 minutes per patient per appointment at a big hospital? That was a question which tt.P.s on the Commons Committee of Public Accounts faced recently when they examined the National Health Service experimental computer project aimed at exploring ways of improving patient care and clinical and administrative efficiency in Britain’s hospi- tals. The committee’s sixth report, published last week, tells the story of what has happened to that scheme, and it is not a happy story. Indeed, it led the committee to issue a general rebuke to the Department of Health and Social Security for defects in its financial control over hospital expenditure. Four times last summer, stretching over several hours, Sir Patrick Nairne, Permanent Secretary at the D.H.S.S., appeared before the committee and under- went some intensive cross-examination by Nt.P.s about hospital costs. The main investigation centred on the computer plans first approved by the then Ministry of Health in 1967. There was to be a five-year research and experimental phase, involving fifteen projects and cos- ting 13 million, followed by a five-year development phase, the whole affair to cost £ 55 million. But the best- laid plans of Ministry officials went sorely wrong and in 1971 seven of the original projects were wound up. The eight schemes which remained, originally estimated to cost 6-8 million, are now expected to cost nearly C20 million by March, 1978, or, after allowing for inflation, double the original estimate. To find out how this could happen, the committee ex- amined three of the eight projects in detail and they were not impressed by what they found. The most dis- turbing example was at King’s College Hospital where a pilot scheme was started in 1970 to establish whether patients’ clinical notes could be held on a computer with access by doctors and nurses. The estimated cost was ;572 000. After a feasibility study in the late 1960s, the project began on two wards. A computer was bought, a project liaison officer was appointed, and a project com- mittee, on which the D.H.S.S. was represented, was set up. In September, 1972, the hospital suspended the scheme. Yet the D.H.S.S. was not informed until Aug- ust, 1973, and by the time the Department closed down the experiment in February, 1974, it had cost £ 14 mil- lion. Sir Patrick admitted that the D.H.S.S. were "shocked at the way that this event has turned out" and the M.p.s expressed concern that the hospital had appar- ently concealed for a time its suspension of the scheme. The experiment failed because junior doctors found it too much of a strain to feed data into the computer at the same time as they were having to do their normal notes. But to the committee this simply raised doubts about the value of the feasibility study. The second case examined was at North Staffordshire Hospital Centre, Stoke, where an experimental project approved in 1968 was designed to improve outpace: appointments, the flow of inpatients through two hospi- tals, and the admission of non-emergency patients, and to establish links with outlying hospitals about admis- sions and discharges. The original estimate ofO 00(j has now risen to £ 2 25 million and initial hopes that the project would be operational by March, 1973, proved hopelessly wrong. The first stage alone is not expected to be complete until this year. Delays over staffing were one of the main reasons put forward by the D.H.S,S, for these increased costs. But evidence again revealed a fall- ure in liaison between the hospital and the D.H.S.S. As Sir Patrick explained to the committee, however, this is regarded as a successful experiment and one that is likely to be the basis for further applications. But his disclosure that the experiment had saved 5 minutes per patient did not impress one M.p., who said that after a 75-minute wait for an appointment 5 minutes saved was barely progress. The third scheme to come under the microscope was at the London Hospital. There the project was to pro- vide a communications system covering inpatients, allo- cation of nurses, and operating-theatres, and then out- patients and other activities. But the later stages have had to be dropped, and again costs and time scales extended well beyond original estimates. But the D.H.S.S. believes this scheme also to have been success- ful. The better planning of patients’ time has released the equivalent of 15 nurses and saved 38 hours a week. But in relation to the money spent on all eight projects, the committee has not been impressed by the results and is concerned at the Department’s own guarded view of the benefits emerging. The Department itself admits that it probably tried to move too fast and too ambitiously in the early stages and that the pace at which major changes could be intro- duced into complex organisations such as hospitals had been overestimated. The committee accepts that this experimental area is necessarily complex and difficult, but its report stresses the need to determine at the outset the exact objectives of each experiment and to ensure they are sufficiently limited to enable evaluations of the results to be carried out within a reasonable time. It must also be established from the first that the objectives are clinically acceptable and that they are likely to be cost-effective and to be of general application to other hospitals. If more attention had been paid to these prin- ciples, the report declares, there would have been fewer failures and modifications and a greater prospect of ben- efits to the N.H.S. commensurate with the total costs. The impact on the D.H.S.S. of the committee’s sharp strictures about its general lack of financial control was immediate. The day after the vt.P.s reported, Mr David Ennals, Secretary of State for Social Services, said that at a time when N.H.S. spending was being rigorouslv ’% pruned it was more than ever necessary to have careful accounting and scrupulous economies. Control over public spending must be ruthless. No further major experiments at hospitals are expected for the time being. But the main responsible for carrying forward computer applications now falls or. the health authorities. It remains to be seen whether regional control will prove to be any more enective th.,-. central control.

Upload: vutruc

Post on 03-Jan-2017

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: An Unhappy Computer Programme

956

Commentary from Westminster

An Unhappy Computer Programme

FROM A CORRESPONDENT

WHAT is it worth to save 5 minutes per patient perappointment at a big hospital? That was a questionwhich tt.P.s on the Commons Committee of PublicAccounts faced recently when they examined theNational Health Service experimental computer projectaimed at exploring ways of improving patient care andclinical and administrative efficiency in Britain’s hospi-tals. The committee’s sixth report, published last week,tells the story of what has happened to that scheme, andit is not a happy story. Indeed, it led the committee toissue a general rebuke to the Department of Health andSocial Security for defects in its financial control overhospital expenditure.Four times last summer, stretching over several

hours, Sir Patrick Nairne, Permanent Secretary at theD.H.S.S., appeared before the committee and under-went some intensive cross-examination by Nt.P.s abouthospital costs. The main investigation centred on thecomputer plans first approved by the then Ministry ofHealth in 1967. There was to be a five-year research andexperimental phase, involving fifteen projects and cos-ting 13 million, followed by a five-year developmentphase, the whole affair to cost £ 55 million. But the best-laid plans of Ministry officials went sorely wrong andin 1971 seven of the original projects were wound up.The eight schemes which remained, originally estimatedto cost 6-8 million, are now expected to cost nearly C20million by March, 1978, or, after allowing for inflation,double the original estimate.To find out how this could happen, the committee ex-

amined three of the eight projects in detail and theywere not impressed by what they found. The most dis-turbing example was at King’s College Hospital wherea pilot scheme was started in 1970 to establish whetherpatients’ clinical notes could be held on a computer withaccess by doctors and nurses. The estimated cost was;572 000. After a feasibility study in the late 1960s, theproject began on two wards. A computer was bought, aproject liaison officer was appointed, and a project com-mittee, on which the D.H.S.S. was represented, was setup. In September, 1972, the hospital suspended thescheme. Yet the D.H.S.S. was not informed until Aug-ust, 1973, and by the time the Department closed downthe experiment in February, 1974, it had cost £ 14 mil-lion. Sir Patrick admitted that the D.H.S.S. were

"shocked at the way that this event has turned out" andthe M.p.s expressed concern that the hospital had appar-ently concealed for a time its suspension of the scheme.The experiment failed because junior doctors found ittoo much of a strain to feed data into the computer atthe same time as they were having to do their normalnotes. But to the committee this simply raised doubtsabout the value of the feasibility study.The second case examined was at North Staffordshire

Hospital Centre, Stoke, where an experimental project

approved in 1968 was designed to improve outpace:appointments, the flow of inpatients through two hospi-tals, and the admission of non-emergency patients, andto establish links with outlying hospitals about admis-sions and discharges. The original estimate ofO 00(jhas now risen to £ 2 25 million and initial hopes that theproject would be operational by March, 1973, provedhopelessly wrong. The first stage alone is not expectedto be complete until this year. Delays over staffing wereone of the main reasons put forward by the D.H.S,S, forthese increased costs. But evidence again revealed a fall-ure in liaison between the hospital and the D.H.S.S. AsSir Patrick explained to the committee, however, this is

regarded as a successful experiment and one that is

likely to be the basis for further applications. But hisdisclosure that the experiment had saved 5 minutes perpatient did not impress one M.p., who said that aftera 75-minute wait for an appointment 5 minutes saved wasbarely progress.The third scheme to come under the microscope was

at the London Hospital. There the project was to pro-vide a communications system covering inpatients, allo-cation of nurses, and operating-theatres, and then out-patients and other activities. But the later stages havehad to be dropped, and again costs and time scalesextended well beyond original estimates. But theD.H.S.S. believes this scheme also to have been success-ful. The better planning of patients’ time has releasedthe equivalent of 15 nurses and saved 38 hours a week.But in relation to the money spent on all eight projects,the committee has not been impressed by the results andis concerned at the Department’s own guarded view ofthe benefits emerging.The Department itself admits that it probably tried to

move too fast and too ambitiously in the early stages andthat the pace at which major changes could be intro-duced into complex organisations such as hospitals hadbeen overestimated. The committee accepts that this

experimental area is necessarily complex and difficult,but its report stresses the need to determine at the outsetthe exact objectives of each experiment and to ensurethey are sufficiently limited to enable evaluations of theresults to be carried out within a reasonable time. It

must also be established from the first that the objectivesare clinically acceptable and that they are likely to becost-effective and to be of general application to otherhospitals. If more attention had been paid to these prin-ciples, the report declares, there would have been fewerfailures and modifications and a greater prospect of ben-efits to the N.H.S. commensurate with the total costs.

The impact on the D.H.S.S. of the committee’s sharpstrictures about its general lack of financial control wasimmediate. The day after the vt.P.s reported, Mr DavidEnnals, Secretary of State for Social Services, said thatat a time when N.H.S. spending was being rigorouslv ’%pruned it was more than ever necessary to have carefulaccounting and scrupulous economies. Control over

public spending must be ruthless.

No further major experiments at hospitals are

expected for the time being. But the main responsiblefor carrying forward computer applications now falls or.the health authorities. It remains to be seen whether

regional control will prove to be any more enective th.,-.central control.