  • Amy / Sales Manager

  • CONTENTS

    Technology1

    USCG Progress2

    Reference3

  • Headway Group

    Group

    Bio Enterprise Co., Ltd.

    Advanced Optronic

    Devices (China) Co., Ltd.

    Zhoushan IN Marine

    Engineering Co., Ltd

    Shanghai Baway

    Technology Co., Ltd.

    North Ship & Ocean

    Engineering Co., Ltd.

    Qingdao Headway

    Technology Co., Ltd.

  • Headway products

    Automation

    Navigation

    Environment

    BWMS Sewage Water Treatment system

    ODME EXAUST Gas Treatment Device

    VDR ECDIS BNWAS LOG

    WIAS Dewatering System

    ProductRange

  • Factory area19500㎡

    Headway Factory

    Completion timeDec 2016

    Production capacity2000 sets/year

  • OceanGuard BWMS

    Ballast

    Filtration + AEOP

    Deballast

    Direct Discharge

  • Patent no: PCT/CN2008/070783

    ·Special semiconductor materials

    · Hydroxyl radicals (·OH) formed

    · Destroy the membrane of organism

    Technology

    AEOP - Advanced Electrocatalysis Oxidation Process

    ·OHElectro-catalysis reactions Anode surface: H2O + h

    + →·OH + H+①Cathode surface: O2 + e

    - → ·O2- ②

    The overall reaction equation: O2+2H2O====4·OH

  • Advantage

    effected by temperature

    CHEMICAL Cl2effected by

    salinityeffected by

    turbidity

    corrosionH2

  • Advantage

    On line Sterilization

    small footprint

    one waytreatment

    less maintenance

    Lowerpower

  • CONTENTS

    Technology1

    USCG Progress2

    Reference3

  • Start from June.2014 in

    DHI Lab

    Finish Land based test in

    May.2015

    Finish Environment test Jul 2016

    Submit Final Approval end

    2016

    USCG Process

    CMFDA

  • DNV-GL supervises and review system's operation during land based testing.

    USCG Final Type Approval

  • Start of shipboard testing.

    USCG Final Type Approval

  • USCG Upgrading

    Version A - Candle Type Version B - Screen Type

  • Filter TEST BASE

    ZHOUSHAN

  • CONTENTS

    Technology1

    USCG Progress2

    Reference3

  • Reference List

    01

    03

    04 02

    Contracted Delivered

    CommissionedRegular use

    1300 sets / 630vsl 830sets / 416vsl

    450sets / 220 vsl100sets / 50vsl

  • Greece Europe US Asia SHIPYARD

    Reference List

  • Page 26Retrofit Procedure

    Delivery- 3

    months

  • Vessel Type Installation Time BWTS Class

    37,500Tanker 2014 HMT-600Exx2 DNV

    Retrofitting Projects

  • Vessel Type Installation Time BWTS Class

    205,000BC 2014 HMT-3000x2 ABS

    Retrofitting Projects

  • Vessel Type Installation Time BWTS Class

    Bulk Carrier 2015 HMT-1000x2 DNV

    Retrofitting Projects

  • Vessel Type Installation Time BWTS Class

    Tanker 2014 HMT-2000EX x 2 + HMT-300 CCS

    Retrofitting Projects

  • Vessel Type Installation Time BWTS Class

    Container 2016 HMT-600 ABS

    Retrofitting Projects

  • Vessel Type Installation Time BWTS Class

    VLOC 2014 HMT-4000x2 LR

    Retrofitting Projects

  • Page 26Retrofitting Projects

  • Thank you!