ams q1 2010 mgmtreport pub - ietf iasa · 2013-04-23 · 4 ietf document management report q1 2010...

11
1 AMS Monthly Management Report to the IETF Q1 2010 Table of Contents Site Selection Status 2009 - 2011 2 Registration Report – IETF 77 Anaheim, CA 3 IETF Document Management Report New Internet Drafts Revised or Updated Internet Drafts IESG Last Call Internet Draft Activity Approved Internet Draft Activity 4 IETF Ticket Management 5 - 6 Intellectual Property Disclosures 7 Working Group Activity 8 IT Development Items 9 IETF Mail List Stats 10 -11 IETF Website Stats Ietf.org Iab.org Iaoc.ietf.org trustee.ietf.org Available online at: URL/usagedata

Upload: others

Post on 15-Feb-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AMS Q1 2010 MgmtReport Pub - IETF IASA · 2013-04-23 · 4 IETF Document Management Report Q1 2010 “New” refers to Internet Drafts presented for the first time “Revised or Updated”

1

AMS Monthly Management Report to the IETF Q1 2010

Table of Contents

Site Selection Status 2009 - 2011 2

Registration Report – IETF 77 Anaheim, CA

3

IETF Document Management Report • New Internet Drafts • Revised or Updated Internet Drafts • IESG Last Call Internet Draft Activity • Approved Internet Draft Activity

4

IETF Ticket Management 5 - 6

Intellectual Property Disclosures 7

Working Group Activity 8

IT Development Items 9

IETF Mail List Stats 10 -11

IETF Website Stats • Ietf.org • Iab.org • Iaoc.ietf.org • trustee.ietf.org

Available online at: URL/usagedata

Page 2: AMS Q1 2010 MgmtReport Pub - IETF IASA · 2013-04-23 · 4 IETF Document Management Report Q1 2010 “New” refers to Internet Drafts presented for the first time “Revised or Updated”

2

Site Selection Status 2010 – 2013

# Meeting Prequalify Site Visit Tech Visit Venue Contract

Hotel Contract

Host

77 Mar 2010 Anaheim COMPLETED IN 2007 NONE

__ April 2010 IAOC Retreat

Frankfurt pre-

qualified NA NA NA NA

__ May 2010 IESG Retreat

Boston and New York

pre-qualified

78 Jul 2010 Maastricht √ √ √ √ √ SIDN +

Others

79 Nov 2010 Atlanta

COMPLETED IN 2007 – Negotiated move to November 2012 to replace with Beijing venue NONE

79 Nov 2010 Beijing √ √ √ √ √

Tsinghua University/

CERNET

80 Mar 2011 Prague √ √ √ √ √ NONE

81 Jul 2011 Canada: Quebec City

√ √ √ √ √ NONE

82 Nov 2011 Asia: Taipei √ √ √ √ √ TWNIC

83 Mar 2012 Europe

Berlin Qualified

Other sites: In process

Berlin Completed

Berlin Completed NONE

84 Jul 2012 Asia In process

To be scheduled for 1st half

2010

To be scheduled for 1st half

2010

NONE

85

Nov 2012 North America: Atlanta (move from Fall 2010 )

√ N/A N/A √ √ NONE

86 Mar 2013 North America: Orlando

√ N/A N/A √ √ NONE

87 Jul 2013 Europe In process NONE

88 Nov 2013 North America: In process NONE

Page 3: AMS Q1 2010 MgmtReport Pub - IETF IASA · 2013-04-23 · 4 IETF Document Management Report Q1 2010 “New” refers to Internet Drafts presented for the first time “Revised or Updated”

3

Registration Report – IETF 77 – Anaheim, CA

Page 4: AMS Q1 2010 MgmtReport Pub - IETF IASA · 2013-04-23 · 4 IETF Document Management Report Q1 2010 “New” refers to Internet Drafts presented for the first time “Revised or Updated”

4

IETF Document Management Report Q1 2010

“New” refers to Internet Drafts presented for the first time “Revised or Updated” refers to Internet Drafts that were modified in some way, possibly more than once “Last Call” refers to the announcement to the community that the Internet Draft is about to be closed for comment “Approved” refers to Internet Drafts that are finished with the IESG Evaluation and have been passed to the RFC Editor for publication

Page 5: AMS Q1 2010 MgmtReport Pub - IETF IASA · 2013-04-23 · 4 IETF Document Management Report Q1 2010 “New” refers to Internet Drafts presented for the first time “Revised or Updated”

5

IETF Ticket Management (ALL TICKETS) Q1 2010

Registrar – registration assistance; Action – technical issues; General – general IETF information; IESG – IESG support; Liaisons – Liaison submissions; IPR – IPR submissions; Meeting – request a meeting session; Mgmt – Mgmt Queue for Ray/Russ; Webex – Webex Requests; List-Manager – list management support

Page 6: AMS Q1 2010 MgmtReport Pub - IETF IASA · 2013-04-23 · 4 IETF Document Management Report Q1 2010 “New” refers to Internet Drafts presented for the first time “Revised or Updated”

6

IESG Queue Ticket Management

Page 7: AMS Q1 2010 MgmtReport Pub - IETF IASA · 2013-04-23 · 4 IETF Document Management Report Q1 2010 “New” refers to Internet Drafts presented for the first time “Revised or Updated”

7

3rd Party Disclosures

Date Discloser Possible Patent Owner Relevant IETF document or RFC

Research Status Verified

February 27, 2007

Eric Rescorla

IBM Corporation Draft-housley-tls-authz-extns

IBM submitted response:

http://www.ietf.org/ietf-ftp/IPR/ibm-ipr-

response-3rd-party.txt

DONE

January 30, 2008

Dean Willis TELEFONAKTIEBOLAGET LM ERICSSON

Requesting Answering Modes for the Session Initiation Protocol (SIP)"

(draft-ietf-sip-answermode-07

ED is working with Taj Lovgren (Ericsson Legal Counsel) to determine validity

Unable to Verify

February 8, 2008

Russ Housley

The United States of America as represented by the Secretary of the

Navy

RFC 4359:-The Use of RSA/SHA-1 Signatures

within Encapsulating Security Payload (ESP)

and Authentication Header (AH)

ED sent an email to legal counsel at the

Navy Awaiting response. Unable to Verify

March 4, 2008

M. Wayne Wilson

Lauber, Pamela J RFC 3891: The Session Initiation Protocol (SIP)

'Replaces' Header

Unable to locate contact information for Pamela Lauber. Awaiting response from W. Wilson.

Unable to Verify

August 7, 2008

Eric Rescorla

Netscape (now AOL) RFC 2246, RFC 4346, and draft-ietf-tls-rfc4346-

bis-10

ED sent email to AOL legal counsel.

Awaiting response. Unable to Verify

August 7, 2008

Eric Rescorla

Ascom AG RFC 2246, RFC 4346, and draft-ietf-tls-des-idea-

02

ED sent an email to Ascom. Awaiting

response. Unable to Verify

February 2, 2009

Yaron Sheffer

AT&T Bell Laboratories (possibly Alcatel-Lucent)

draft-sheffer-emu-eap-eke-01

ED made contact with Joe Sommer who

stated would investigate. Awaiting

response

No

March 24, 2009

Yakov Rekhter

Cisco Systems draft-ietf-l3vpn-2547bis-

mcast-08

ED to make contact for verification No

March 31, 2009

Enke Chen Redback Networks draft-margues-idr-best-external-01

ED to make contact for verification No

January 29, 2010

Simon Josefsson

University of California RFC 3447 ED to make contact for verification No

Page 8: AMS Q1 2010 MgmtReport Pub - IETF IASA · 2013-04-23 · 4 IETF Document Management Report Q1 2010 “New” refers to Internet Drafts presented for the first time “Revised or Updated”

8

Working Group Activity Q1 2010

New Working Groups January Internet Wideband Audio Codec (codec) BiDirectional or Server-Initiated HTTP (hybi) Internationalized Resource identifies (iri) Messageing Abuse Reporting Format (marf) February Keying and Authentication for Routing Protocols (karp) March Internet Area Working Group (intarea) Peer to Peer Streaming Protocol (ppsp) SIP Recording (siprec) Concluded Working Groups

January NONE February Spatial Reuse Protocol (srp) Enhancements to Internet email to Support Diverse Service Environments (lemonade) March Robust Header Compression (rohc) Better-Than-Nothing-Security (btns) Internationalized Domain Names in Applications, Revised (idnabis)

Page 9: AMS Q1 2010 MgmtReport Pub - IETF IASA · 2013-04-23 · 4 IETF Document Management Report Q1 2010 “New” refers to Internet Drafts presented for the first time “Revised or Updated”

9

IT Development Items In Progress or Complete

Additional Technical Tasks performed in Q1 2010 Server Upgrades

IETF Server Upgrades – prepare ietfc server for server virtualization (28 hours)

COMPLETED

IDNITS Deploy IDNITS web interface from Henrik (20 hours) COMPLETED

Registration Created improved registration payment page (12.5 hours) COMPLETED

Registation Created registration delete/restore page (33.5 hours) COMPLETED

Registration Improved and deployed registration system for IETF78 (21.5 hours) Add ability to quickly enable / disable day passes per IAOC request Add support for multiple payments per registration

COMPLETED

Session Scheduling

Created ability to disable session scheduling tool for non-secretariat uses. (4.5 hours)

COMPLETED

Nudge Tracker Compiled Nudge Report for January & February (28 hours) COMPLETED

Announcement Tool

Provided ability to edit all announcements made from the I-D Datatracker that previously were not editable (15 hours)

COMPLETED

Mail Lists Migrated -forces (38 hours) -marf (4 hours) -subcribers from 6lowapp to core and closed 6lowapp Created -cicm, [email protected], ietf-outcomes, clouds, newprep, e2md, 77attendees, 77all, ietf77-1st-timers, ire, marf, smarpower-interest, smartpowerdir, core, lwip, sipapis, [email protected], vwrap with subscribers from ogpx, ogpx closed and senders redirected to vwrap.

COMPLETED

Draft Signing Project

Internet Draft Signing Project (27 hours) ONGOING

Proceedings Toos

Continued development of new Proceedings Tool to showcase along side old proceedings for IETF77 (425 hours)

ONGOING

Page 10: AMS Q1 2010 MgmtReport Pub - IETF IASA · 2013-04-23 · 4 IETF Document Management Report Q1 2010 “New” refers to Internet Drafts presented for the first time “Revised or Updated”

10

Mail List Activity – Q1 2010

Page 11: AMS Q1 2010 MgmtReport Pub - IETF IASA · 2013-04-23 · 4 IETF Document Management Report Q1 2010 “New” refers to Internet Drafts presented for the first time “Revised or Updated”

11