wsn05, 5-9 sep.2005, toulouse, france 1 portable hrm station value verification package...

Post on 19-Jan-2016

214 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

WSN05, 5-9 Sep.2005, Toulouse, France 1

Portable HRM Station Value Verification Package “ORMVERIF”

Sultan Salim AL-YahyaiFauzi Bader Al-BusaidiKhalid Khamis Al-Jahwari

Directorate General of Civil Aviation and Meteorology, Sultanate of Oman

WSN05, 5-9 Sep.2005, Toulouse, France 2

Location of Oman

WSN05, 5-9 Sep.2005, Toulouse, France 3

Aim of the Project

MONITORING THE BEHAVIOR OF

THE MODELS

HIGHLIGHTS THE STRENTHS & WEAKMESSESOF THE MODELS

Try To TUNE THE MODEL

TO EVALUATE THE FORECASTS OF OMAN REGIONAL MODEL (ORM).

WSN05, 5-9 Sep.2005, Toulouse, France 4

Design Issues

Stations Grouping Station with similar topographical features

Costal Station Actual Station height – model grid point height <= X m

Verification Scheme Most representative Grid

Point.

Interpolation of the surrounding Grid Points

WSN05, 5-9 Sep.2005, Toulouse, France 5

Design Issues

T 2m ( C ) Max temp. 2m ( C ) Min Temp. 2m ( C ) TD 2m ( C ) MSL Pressure (hPa) FF 10m ( knots ) DD 10m (degrees).

Total Presp. Amount of low clouds DPD

Continuous Elements Categorical Elements

Elements to be verified

WSN05, 5-9 Sep.2005, Toulouse, France 6

Design Issues

OBS

utc 00 12 00 12 00 12 00

day A-3 A-3 A-2 A-2 A-1 A-1 A

12h fct

24h fct

36h fct

48h fct

60h fct

72h fct0h

fct

Mo

del ru

n

Forecast Range to be verified

WSN05, 5-9 Sep.2005, Toulouse, France 7

Design Issues

OBS Quality Control

1) Elements value thresholds

2) Comparing OBS with model first guess

WSN05, 5-9 Sep.2005, Toulouse, France 8

Design Issues

Hit rate with a margin of error Bias Root Mean Squared Error

(RMSE):

OBS

YesNo

FCTYesab

Nocd

Hit rateProbability of detection(POD) False Alarm Rate (FAR)Threat Score (TS)Frequecy bias(FB)Heidke Skill Score ( HSS )

Continuous Elements Categorical Elements

Statistics to be used

WSN05, 5-9 Sep.2005, Toulouse, France 9

Implementation

ormverif

NWP machine

DMO (FCT)

MOS

OBSMSS

Windows based

My SQL ODBC

WSN05, 5-9 Sep.2005, Toulouse, France 10

Main Menu

WSN05, 5-9 Sep.2005, Toulouse, France 11

Averaging Data Plotter

WSN05, 5-9 Sep.2005, Toulouse, France 12

Table Viewer

WSN05, 5-9 Sep.2005, Toulouse, France 13

Future Work

Implementing the Interpolation verif. Schema Superimposing the Results of the verif. For more than

one model Verifying the upper levels data Verifying the Wave Model

WSN05, 5-9 Sep.2005, Toulouse, France 14

ORMVERIF Availability

Package available on request for WMO members: Brazilian navy, UAE Met., Vietnam met., malaysia met.

User Manual Tech. Documentation

WSN05, 5-9 Sep.2005, Toulouse, France 15

Thank You

top related