  • What you should know before work.BY KRITTAPAS P. [ESV]

  • 1. Job step2. Gantt chart3. PDCA4. KPI5. Work control system model6. 4 qualifications that you need for working

    Content

  • DefinitionJob step is jobs that you need to do and step numbers in procedure.

    Example : Making a Cups of Instant Coffee1. Place the instant coffee in the mug.2. Boil some water in an electric kettle, then wait for the water to stop simmering.3. Fill 3/4 of the cup with the boiled water, then stir with a teaspoon until all the instant coffee is dissolved.4. Fill the remaining 1/4 of the mug with milk or cream, then stir again.

    Job step

  • DefinitionA Gantt chart is a type of bar chart that illustrate the start and finish dates

    of the terminal elements and summary elements of a project.

    Example : Relay testing preparation

    Gantt chart

  • DefinitionPDCA (plandocheckact or plandocheckadjust) is an iterative four-step

    management method used in business for the control and continuous improvement of processes and products.

    Example : Making a Cups of Instant Coffee

    PDCA

    Plan-prepare Ingredients.-prepare tools.-find method.

    Do- Make a Cups of

    Instant Coffee.

    Check- Taste coffee.

    Act- Serve.

    Not pass

    New PDCA

    KPI KPI KPI

  • Definitionperformance indicator or key performance indicator (KPI) is a type of performance

    measurement and target is number of quantities that tell you succeed in KPI.

    Example : Making a Cups of Instant Coffee

    KPI Target

    - Every cups have a good taste. 100% of vote- Every cups have a good smell. 100% of vote- Every cups have the same temperature at 75 C. 75 C- Coffee in each cup has the same amount. 160 ml

    KPI&Target

  • KPI Target1.Safety Accident = 02.Quality CAR = 03.Delivery Finish job within 3 days.4.Productivity work fast (3 projects per days).

    KPI&Target for working

  • Definition Work control system model is model that is used for product design and quality

    defect prevention.

    Work control system model

    KPI

    Not good enough

    Not good enoughNot good enough

    KPI

    KPI

    Deliver work to customer.

  • Definition Man: Anyone involved with the process.Machines: Any equipment, computers, tools, etc. required to accomplish the job.Materials: Raw materials, parts, pens, paper, etc. used to produce the final productProcess: A series of actions or steps taken in order to achieve a target

    *In each part of model must be checked with KPI before go to next part.

    Work control system model

  • 1. Knowledge2. Ability3. Responsibility4. Experience

    4 qualifications that you need for working.