value engineering change proposals - dot · pdf filevecps • post-award value engineering...
Post on 30-Mar-2018
219 Views
Preview:
TRANSCRIPT
• What is a Value Engineering Change Proposal?1
• Value Engineering Manual2• Update to Construction
Records Manual - Section 53• Keys to successful VECP
submittals4
Today’s Overview
VECPs• Post-award value
engineering proposals made by Construction Contractors
• Lowers construction costs
• Shortens project completion time
• Improves project performance
How to submit a VECP• Follow procedures laid
out in the Standard Specification for Road and Bridge Construction
• Section 104.07
VIII. Value Engineering Change Proposals
• Follow Spec Book for guidelines• Engineer sends VECP to ETS – Technical
Services Section
Value EngineeringChange orders containing Value Engineering must be submitted for review to ETS – Technical Services before they are signed by the Project Engineer.
CHANGE ORDERS
Experimental Features
No VECPs that include experimental features
Submit experimental ideas to the Transportation Innovation Program (TRIP)