DESCRIPTION

ITU Workshop on “ICT as an Enabler for Smart Water Management ” (Luxor, Egypt, 14-15 April 2013). Utilization of ICT for Enhanced Water Resources Management &Monitoring Networks at MWRI. Ayman Ibrahim, General Director for Studies and Projects , Telemetry, MWRI ayman16@hotmail.com - PowerPoint PPT Presentation

TRANSCRIPT

Luxor, Egypt, 14-15 April 2013

Utilization of ICT for Enhanced Water Resources Management

&Monitoring Networks at MWRI

Ayman Ibrahim,General Director for Studies and

Projects , Telemetry, MWRIayman16@hotmail.comayman16@mwri.gov.eg

ITU Workshop on “ICT as an Enabler for Smart Water Management”

(Luxor, Egypt, 14-15 April 2013)

ChallengesLimited Water Resources Increased Population, Share 55.5 billion m3 /year according to the 1959 Agreement

Population increase, thereby increasing the requirements of drinking waterIndustry growth9 million acres cultivated area

Luxor, Egypt, 14-15 April 2013 2

Challenges

Pollution & Water Quality deterioration Horizontal Expansion Plan

National Programs adopted by the State to increase the cultivated area in the near future (reclamation and cultivation of 3.4 million acres)

Conflicts between users Illegal Agricultural LandAgricultural Policies

Luxor, Egypt, 14-15 April 2013 3

To face these challenges

Improving the overall water use efficiency in order to minimize the losses out of the system and distributing the available water for agriculture in an equitable way.Improved planning and management procedures are key measures generally prescribed to make the optimum use of the available water resources.

Luxor, Egypt, 14-15 April 2013 4

To face these Challenges

Satisfying future demands in Egypt will highly depend on better utilization and efficient use of present water resources.Development of additional water resources

Re-use of agricultural drainage water,Groundwater, Rain and storm water

Luxor, Egypt, 14-15 April 2013 5

To face these challenges

The Egyptian Ministry of Water Resources and Irrigation MWRI is currently adopting the Integrated Water Resources Management IWRM approach and also actively involved in National Water Policy which is also based on integrated water management.

Luxor, Egypt, 14-15 April 2013 6

مصر بجمهورية الرى شبكةالعربية

الترع • شبكة كم 33000 طولالمصارف • شبكة كم 20000طولالطلمبات • محطات 1600عدد

الطوارئ • محطات 200عدد

اآلبار • 200 الحكوميةعدد

مصر فى الترع شبكة

نهرالنيل

1إدارة القنطرة الفاصلة 2إدارة

مسقىهندسة رى

ICT & Water Resources

The Information technology, Supervisory Control and Data Acquisition SCADA Systems, telemetry, Remote Sensing and automatic control systems are disciplines that highly contribute in achieving such MWRI goals to face Limited water resources challenges.

Luxor, Egypt, 14-15 April 2013 10

ICT & Water Resources

A main engine to achieve such goals and face these challenges is the availability of accurate and continuous (real time) water related data about the behavior of the irrigation system. This will help decision makers and water distribution managers take the appropriate and right decisions at the right times.

Luxor, Egypt, 14-15 April 2013 11

ICT & Water Resources

Information technology and rapid development of communication systems definitely help implement such IT systems in a very cost effective way.

Luxor, Egypt, 14-15 April 2013 12

Monitoring Networks

During the last few years the Ministry of Water Resources and Irrigation has adopted many programs that aim to establishment of different monitoring networks that provides real time data on water quantity and water quality.

Luxor, Egypt, 14-15 April 2013 13

الهدف من أعمال الرصد والمتابعة

التحقق من وصول المياه لكل أجزاء الشبكةkونوعا kعدالة توزيع المياه كما

استالم الحصة عند مداخل االدارة أو check pointsالهندسة

وجود قاعدة بيانات تفيد فى اتخاذ القرارات المستقبلية وتطوير الرى والسياسات

المائيةالحد من النزاعات بين المنتفعين

عدم حدوث غرق أو جفاف

Telemetry Monitoring Network

Implementation of water level monitoring network at the main irrigation structures along the Nile River and main canals. This monitoring system covers now 103 sites on the Nile barrages and main canals and some second order canals.

Luxor, Egypt, 14-15 April 2013 15

04/21/2316

Monitoring Network

The network design key elements include:Selection of the sites locations where monitoring is requiredIdentification of the parameters to be measured at each site.Identification of the frequency of measurementNaming of the involved partners .

Telemetry System Components

At Sites:Data LoggerGSM/GPRS ModemWater Level SensorsPower Supply

Solar Cell & BatteryNEMA Box

Luxor, Egypt, 14-15 April 2013 17

04/21/23 18

Telemetry System

GSM Modem

Battery

DSWL Sensor

Office

WIRELESSTELEPHONE

USWL Sensor

Water Flow

Irrigation Structure

GSM Modem

Telemetry System Components

At Irrigation Directorates GDWater Distribution ManagerTelemetry Department

Computer System Equipped with S/W and GSM/GPRS modem

At Ministry CenterServers and GSM/GPRS Modems equipped

with needed S/W

Luxor, Egypt, 14-15 April 2013 19

Data Monitored

MeasuredUp Stream Water LevelDown Stream Water LevelTemperatureBattery VoltagePump Units Status On/Off

CalculatedPump Working HoursWater Flow

Luxor, Egypt, 14-15 April 2013 20

Data Types

Real Time Data Historic Data

Communication Dedicated APN Access Point NameSupports up to GPRS - Edge

Luxor, Egypt, 14-15 April 2013 21

22

23

04/21/2324

المسجلة القراءات و البحاري قراءةيوم الخلف مايو 18لمنسوب

12.312.412.512.612.712.812.91313.1

1357911131517192123

04/21/2325

المسجلة القراءات و البحاري قراءةيوم االمام مايو 18لمنسوب

12.9

13

13.1

13.2

13.3

13.4

135791113151719212325

04/21/2326

GSM Based System

04/21/2327

Pump Monitoring

Luxor, Egypt, 14-15 April 2013 28

Luxor, Egypt, 14-15 April 2013 29

Luxor, Egypt, 14-15 April 2013 30

04/21/23 31

04/21/2347

Warning System Example

Ahnasi pumping station is main drainage pumping station at Bani Suef Directorate. Maintaining the water level is primary concern. The designed water level value at upstream pumping station is 23 meter, however, at some times it reaches 25 meter. Reaching this value for long period of times is very harmful for the irrigation bodies and may end up with floods and possible damage of drainage banks.

04/21/2348

اهناسيا صرف طلمبات بمحطة االنذار نظام

في المياه مستوى على لتجنب الالمحافظة محطة الفيضانات.

الوحدات توقف عند ظهرت المشكلة العمل أحدي عنالزمن من معينة المياه فأن لفترة يرتفع مستوى

ال قيمة فوق و تصميمالمنسوب ، 23هو ي مترااألوقات بعض في إلى يولكن . 25صل متر

س االنذار نظام يقدم ان المبكر وف لإلنذار رسالةمن يلزم ما التخاذ الفيضانات . اجراءاتلتفادي

04/21/2349

اهناسيا صرف طلمبات بمحطة االنذار نظام

االنذار محليا يمكن نظام إنذار بواسطةتحقيقه صفارةعلى و القصيرة الرسائل خدمة طريق عن بعد عن

الجوال الهاتفالمبكر اإلنذار هذا في وبعد المساعدة العمليات من

وقت في المشاكل آثار تقليل و القرار صنع عمليةتحديد مبكر لخفض و اتخاذها يمكن التي اإلجراءات

الصيانة ال عملية تسريع أو بدائل واستخدام بواباتمحطة.لل

من أيضا القرار صانعي يساعد سوف النظام هذاالحالة هذه مثل في البديلة القرارات بعض تقديم خالل

. .

Water Quality Monitoring

Water quality monitoring system includes 25 sites located along the Nile River and main canals and drains. The measured data includes

Dissolved Oxygen , PH, Conductivity and Turbidity

 

Luxor, Egypt, 14-15 April 2013 50

IQ 2020 Data Logger System

Luxor, Egypt, 14-15 April 2013 51

HMI at Site

Luxor, Egypt, 14-15 April 2013 52

Communication System

Dial Up Data SIMPay as you GoOnly SIM at the center pays bill

Luxor, Egypt, 14-15 April 2013 53

Lake Nasser Evaporation Monitoring Network

Number of sites : 8 sites distributed along lake Nasser

Luxor, Egypt, 14-15 April 2013 54

Measured Parameters

Net RadiationWind Speed at 2m & 4mWind Direction at 2m & 4mWater Temperature at different Depths

Surface2m5m10m15m20m

Luxor, Egypt, 14-15 April 2013 55

Measured Parameters

Humidity at2m4m

Air Temperature at2m4m

Luxor, Egypt, 14-15 April 2013 56

Communication System

APN GPRS/EdgeSatellite

Luxor, Egypt, 14-15 April 2013 57

Luxor, Egypt, 14-15 April 2013 58

Luxor, Egypt, 14-15 April 2013 59

Satellite

Luxor, Egypt, 14-15 April 2013 60

2 Km US High Aswan Dam Station

Luxor, Egypt, 14-15 April 2013 61

240 Km US High Aswan Dam StationToshka

Luxor, Egypt, 14-15 April 2013 62

280 Km US High Aswan Dam StationAbo Sambel

Luxor, Egypt, 14-15 April 2013 63

Luxor, Egypt, 14-15 April 2013 64

Main User Interface Screen

Luxor, Egypt, 14-15 April 2013 65

Luxor, Egypt, 14-15 April 2013 66

Luxor, Egypt, 14-15 April 2013 67

Water flow Monitoring system

Water flow monitoring system include 30 sites located at IWMDs in Gharbyia, Behra and kafr El Sheik directorates The measured data is directly water flow via ultra sonic flow sensors

Luxor, Egypt, 14-15 April 2013 68

Water flow sites

Luxor, Egypt, 14-15 April 2013 69

Conclusions and Recommendations

The Ministry, to some extent, has achieved many of the planned goals by implementing such monitoring networks.

Even though of the great benefits provided by these monitoring networks, more effort towards optimizing its operation is still required.

Luxor, Egypt, 14-15 April 2013 70

Conclusions and Recommendations

The areas of the needed efforts could be summarized as follows:

Information technology part of the system that will utilize the huge collected data. A reliable Information system design is a need at this stage of the project. The system design should carefully define data flows among different users.

Luxor, Egypt, 14-15 April 2013 71

Conclusions and Recommendations

This should also include design and implementation of Decision Support System DSS to support decision makers at different management levels

The existing water level monitoring network should be generalized to allow monitoring of water flows and water volumes to follow Ministry policies related to water volume based allocation.

Luxor, Egypt, 14-15 April 2013 72

Conclusions and Recommendations

The existing monitoring network should be extended to cover the key points at the irrigation network. In order to achieve the Ministry integrated approach in water resources management,

These monitoring networks should be linked together.

Luxor, Egypt, 14-15 April 2013 73

Conclusions and Recommendations

Utilize the data collection network to build a remote control system Design for irrigation structures for possible generalization.

design of sustainable Geographical Information System GIS Decision Support System DSS,

Luxor, Egypt, 14-15 April 2013 74

top related