U.S.EPA’sCleanPowerPlan

2

Presenter• KenSnell,J.D.,P.E.

S&L’sCleanPowerPlanPanel• AndrewCarstens,P.E.• MattThibodeau,P.E.• MarkLemmons,P.E.• DaveHelm,P.E.

3

Agenda:• OverviewofEPA’sCleanPowerPlan

• PerformanceStandards• State‐SpecificGoals

• Implementation• CompliancePlanning• Questions/Answers

4

• OverviewofEPA’sCleanPowerPlan• PerformanceStandards• State‐SpecificGoals

• Implementation

• CompliancePlanning

• Questions/Answers/PanelDiscussion

5

August3,2015,EPAsignedforpublication:

• StandardsofPerformanceforGreenhouseGasEmissionsfromNew,Modified,andReconstructedStationarySources:ElectricUtilityGeneratingUnitsFinalRule§111(b)

• CarbonPollutionEmissionGuidelinesforExistingStationarySources:ElectricUtilityGeneratingUnits‐ FinalRule§111(d)

• CarbonPollutionEmissionGuidelinesforExistingStationarySources:ElectricUtilityGeneratingUnits‐ FinalRule§111(d)– the“CleanPowerPlan”

6

CleanPowerPlan Appliesto:

Existingfossilfuel‐firedsteamelectricgeneratingunits(EGUs)(coal,oil,andgas‐firedboilers);

IGCCUnits; NaturalGasCombined‐Cycle(NGCC)andCombined‐HeatandPower(CHP)Units

…capableofselling>25MWtoautilitypowerdistributionsystemandwasinoperationorhadcommencedconstructionasofJanuary8,2014.

ANewSourcePerformanceStandardforExistingUnits

7

CleanPowerPlan– AffectedUnits

Source:U.S.EPA

Approximately:

1,004Coal‐firedEGUs

1,507NGCCUnits425Oil/GasEGUs

8

CleanPowerPlan

“AffectedUnits”donotinclude: Units<25MW Simple‐cyclecombustionturbines Non‐fossilfuelfiredgeneratingunits Existingrenewableenergygeneratingunits Existingnucleargeneratingunits NewUnitsthataresubjecttothe§111(b)NewSourcePerformanceStandardsforGreenhouseGasEmissions

9

CleanPowerPlan

Verysimply,theCPPappliesCO2 performancestandardstoaffectedEGUsthatmustbeachievedby2030:

EGU Subcategory Final Ratelb CO2/MWh‐net

Fossil Steam EGU or IGCC 1,305

NGCC 771

2012 Baseline Datalb CO2/MWh‐net

%Reduction

2,204 41%

894 16%

10

CleanPowerPlanPerformanceStandardsarebasedonEPA’sassessmentofBestSystemofEmissionReduction(BSER):

Building Block 1Heat Rate improvement at existing coal‐fired power plants

Building Block 2Shifting electricity generation from existing coal‐fired power plants 

to existing NGCC units

Building Block 3Shifting electricity generation from existing coal‐fired power plants 

and existing NGCC units to NEW zero‐CO2 emitting resources

11

BSERDetermination:

CleanPowerPlan

CoalCO2 –BB1 OGFSCO2 ∆NGCCCO2FSMWh REMWh ∆NGCCMWh

FSGoal lb/MWh

NGCCGoal lb/MWh NGCCCO2

NGCCMWh REMWh

‐ RECO2 ‐ ∆NGCCCO2BaselineFSMWh

NGCCCO2 ‐ RECO2NGCCBaselineMWh

12

BSERDetermination:

BuildingBlock1:ImprovedHeatRate Appliedtoexistingcoal‐firedEGUs BasedonHeatRateImprovementsof:

4.3%inEasternInterconnect 2.1%inWesternInterconnect 2.3%inTexas

ReducedbaselineCO2 emissionratefrom2,204lb/MWhto2,109lb/MWh(EasternInterconnect)

ReducedtotalbaselineCO2 emissionsbyapproximately66,105,000tons/year(2.9%)

CleanPowerPlan

13

BSERDetermination:BuildingBlock3:NewREGeneration SubstitutedexistingFSandNGCCgenerationwithnewRE

generation.

NewREGenerationwascalculatedby: Applying2010‐2014capacityincreases(MW)going

forwardthrough2030andapplying“representative”capacityfactors

EPAconcludedthat: REgenerationwillincreaseby: 28,796,222MWh/year(2013– 2023)and 62,796,222MWh/year(2024– 2030)

CleanPowerPlan

14

CleanPowerPlan

CoalCO2 –BB1 OGFSCO2

FSMWh REMWhFSGoal lb/MWh

NGCCGoal lb/MWh NGCCCO2

NGCCMWh REMWh

‐ RECO2BaselineFSMWh

NGCCCO2 ‐ RECO2NGCCBaselineMWh

BSERDetermination:BuildingBlock3:NewREGeneration

ReducedtotalbaselineCO2 emissionsbyapproximately530,889,000tons/year(24%)

15

CleanPowerPlan

CoalCO2 –BB1 OGFSCO2

FSMWh REMWhFSGoal lb/MWh

BSERDetermination:BuildingBlock2:IncrementalNGCC(“∆NCGG”)

SubstitutedexistingFSgenerationwith∆NGCCgeneration ∆NGCCGeneration

NGCCMWh@75%CF‐ BaselineNGCCMWh post‐BB3

ReducedtotalbaselineCO2 emissionsbyapproximately123,617,000tons/year(8.1%)

∆NGCCMWh

∆NGCCCO2BaselineFSMWh

‐ RECO2 ‐ ∆NGCCCO2

16

BSERDetermination:

BuildingBlock1wasappliedtoallcoal‐firedgeneratingunitsbeginningin2022

BuildingBlock2wasappliedbeginningin2022 BuildingBlock3wasphasedinstartingin2022with

incrementalincreasesinRenewableEnergygenerationthrough2030

Basedonthisapproach,thesubcategoryspecificperformancestandardsbecomeincreasinglymorestringentbeginningin2022

CleanPowerPlan

0

200

400

600

800

1000

1200

1400

1600

1800

2000

2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031

Rat

e (lb

CO

2/M

Wh)

Year

Fossil Steam NGCC

1,741lb/MWh

1,305lb/MWh

898lb/MWh771lb/MWh

17

BSER Determination:

CleanPowerPlan

BuildingBlock1:2.9%reductionintotalCO2 emissions

BuildingBlock3:24%reductionintotalCO2 emission

BuildingBlock2:8.1%reductionintotalCO2 emissions

18

BSERDetermination:

CleanPowerPlan

BaselineCO2 2,265,735,254tons

ReductionsfromBaseline:

BuildingBlock1:66,105,000

BuildingBlock2:123,617,000

BuildingBlock3:530,889,000

19

CleanPowerPlan

RenewableEnergywillplayasignificantruleineitherarate‐basedormass‐basedprogram:

Source:U.S.EPA

• Baseline Generation vs. Projected 2030 Generation

• Assumes no increase in total generation 2012 to 2030

• Based on EPA’s BSER Plan• Shows emphasis on RE

20

CleanPowerPlan

EmissionPerformanceStandards

XState‐SpecificBaseline

GenerationMix

State‐SpecificRateBasedGoals

=State‐SpecificMassBased

Goals

Source:U.S.EPA

CleanPowerPlanInadditiontothesubcategoryspecificperformancestandards,theCleanPowerPlanalsoincludesstate‐specificemissionrategoals:

• Rate‐basedgoal(lb/MWh)• Mass‐basedgoal(totaltonsofCO2)

21

CleanPowerPlan

Rate‐BasedGoals EPAappliedthesubcategory‐specificemissionratestoeachstates’baselinegenerationlevels.

Example:ArkansasFSBaseline =32,154,992MWhNGCCBaseline =15,615,185ArkansasGenerationMix:67%FSand33%NGCC

2022Rate‐BasedGoal:(1,741lb/MWhx0.67)+(898lb/MWhx0.33)=1,465lb/MWh

2030Rate‐BasedGoal:(1,305lb/MWhx0.67)+(771lb/MWhx0.33)=1,131lb/MWh

22

CleanPowerPlan

State-Specific Rate-Based Goals:

FunctionoftheState’suniquebaseline

generationmix

InterimCO2 Rate‐BasedGoal

FinalRate‐BasedGoals

23

CleanPowerPlan

Rate-Based Goals – Eastern States (group 1):

24

CleanPowerPlan

Mass‐BasedGoals EPAappliedthesubcategory‐specificratestoeachstates’

baselinegenerationlevels;and

addedbackaportionofBuildingBlock3thatwasnotneededforcomplianceintheWestern&Texasinterconnections.

(FSBaseline xFSRate)+(NGCCBaseline xNGCCRate)+BB3Adj

BaselineMassEmissions:47,806,056tons1st InterimPeriodMass‐BasedGoal:35,189,232tonsFinalMass‐BasedGoal:30,170,750tons

Example:Arkansas

25

CleanPowerPlan

Mass-Based Goals – Eastern States (group 1):

26

• OverviewofEPA’sCleanPowerPlan• PerformanceStandards• State‐SpecificGoals

• Implementation

• CompliancePlanning

• Questions/Answers/PanelDiscussion

27

Implementation

1. TheCleanPowerPlanwillbeimplementedthroughStateImplementationPlans(SIPs)

2. SIPsmust:“IncludeemissionstandardsforeachaffectedEGUtoensurethatthepowerplants– eitherindividually,together,orincombinationwithothermeasures– achievetheinterimCO2emissionperformanceratesovertheperiodof2022– 2029andthefinalCO2 performancerates,rate‐basedgoals,ormass‐basedgoalsby2030.”

CleanPowerPlan

28

Implementation– Timeline

CleanPowerPlan

Fall2015 August3:EPASignedCleanPowerPlanforPublication

Sept.62016

StatesmakeinitialSIPsubmittalwithextensionrequestorsubmitFinalPlan

Sept.62018

StateswithanextensionsubmitFinalPlanFIPforstatesthatfailtosubmitanapprovableplan

Jan.12022 FirstCompliancePeriodbegins

Jan.12030 FinalCO2 EmissionGoals

29

Implementation– ProposedFIP

August3,2015,EPAalsosignedforpublication:

FederalPlanRequirementsforGreenhouseGasEmissionsfromElectricUtilityGeneratingUnitsConstructedonor

BeforeJanuary8,2014:ModelTradingRule

CleanPowerPlan

30

Implementation– ProposedFIP

EPA’sproposedFIPincludestwoalternativecomplianceprogramsbasedonemissionstrading:

CleanPowerPlan

Rate‐basedtradingprogram• AffectedEGUspurchaseemissionreductioncredits(ERCs)fromunitsthatemitbelowaspecifiedemissionrate.

Mass‐basedtradingprogram• AffectedEGUscanpurchaseemissionallowances(tons)fromunitsthatemitbelowtheirallowanceallocation.

31

ImplementationEPA’sProposedRate‐BasedTrading

CleanPowerPlan

32

ProposedRate‐BasedProgram:

CleanPowerPlan

lbCO2MWh

ReduceCO2MWh

lbCO2MWh

State‐SpecificRate‐BasedGoal

ERCs

ExistingunitsarerequiredtoreduceCO2emissionsorpurchaseERCsfromunitsthatemitbelowaspecifiedemissionrate.

ERCswouldbeissuedfor:

Measuresthatprovidesubstitutegeneration,and

Measuresthatavoidtheneedforgeneration.

33

ProposedRate‐BasedProgram:

PotentialmeasurestoreduceCO2 Emissions (lb/MWh):

HeatRateImprovements NaturalGasCo‐firing; NaturalGasConversion QualifiedBiomassCo‐firing PartialCarbonCapture CarbonCapture&Sequestration…

CleanPowerPlan

34

MeasurestoReduceCO2 Emissions(lb/MWh)• HeatRateImprovements:

Facility Coal1 Coal2 TotalCapacity(MW) 580 720 1,300Generation(MWh) 3,971,000 4,366,500 8,157,500

CO2 Emissions(tons) 4,150,950 4,944,100 9,095,050

CO2 Rate(lb/MWh) 2,190 2,265 2,2302,091 2,163 2,130

3,964,300 4,722,500 8,686,800

Assume4.5%heatrateimprovement

408,250ton/yearreductioninCO2 emissions.

ProposedRate‐BasedProgram

1st InterimStateGoal=1,411lb/MWhFinalStateGoal=1,130lb/MWh

35

MeasurestoReduceCO2 Emissions(lb/MWh)• NaturalGasConversion:

Facility Unit1 Unit2 TotalCapacity(MW) 580 720 1,300Generation(MWh) 3,971,000 4,366,500 8,157,500

CO2 Emissions(tons) 3,964,300 4,722,500 8,686,800

CO2 Rate(lb/MWh) 2,091 2,163 2,1301,270 2,163 1,748

Unit1:100%NGConversion

2,407,200 4,722,500 7,129,700

2,561,605ton/yearreductioninCO2 emissions(frombaseline).

ProposedRate‐BasedProgram

1st InterimStateGoal=1,411lb/MWhFinalStateGoal=1,130lb/MWh

36

Measuresthatprovidesubstitutegeneration:

IncrementalNGCCGeneration• Increasedgeneration(MWh)fromexistingNGCCunitsabove2012baseline(“GasShift”)

NewREgeneration• Wind,solar,geothermal,hydropower,biomass,waveandtidalpower

ProposedRate‐BasedProgram

NewNuclearGeneration ExistingREornuclearuprates(addedafter2012) CombinedHeat&PowerProjects InternationalREimports

37

EmissionReductionCredits Gas‐ShiftERCs(GS‐ERCs)

• CreditedtoexistingNGCCUnits• CalculatedtorepresentCO2 emissionreductionsfromincrementalNGCCgeneration.

RenewableEnergyERCs(RE‐ERCs)• CreditedtoeligibleRenewableEnergyresources

ProposedRate‐BasedProgram

38

Gas‐ShiftERCs(GS‐ERCs)

GS‐ERC NGCCMWh XIncrementalGenerationFactor

GS‐ERCEmissionFactor

X

IncrementalGenerationFactor

BaselineNGCCMWh

NGCCMWh @75%CF

0.22infirstcomplianceperiod

GS‐ERCEmissionFactor

NGCCRate

FSStandard1‐ approximately

0.45

ProposedRate‐BasedProgram

E.g.,1,000,000MWhx0.22x0.45=99,000ERCs

39

ProposedRate‐BasedProgram

GS‐ERC=2,000,000x0.22x0.45=198,000allowances NewRate=Emissions/MWh+ERC

CO2 Emissions=RemainingCoalxBaselineRate

Rate‐BasedExample:Unit1 Unit2 Total

BaselineGeneration(MWh) 3,791,000 4,366,500 8,157,500

BaselineEmissions(tons) 3,964,157 4,721,616 8,685,733

BaselineRate(lb/MWh) 2,091 2,163 2,130

∆NGCCGeneration(MWh)

RemainingCoal(MWh)

CO2 Emissions(tons)

GS‐ERCs(tons)

NewRate(lb/MWh)

1,000,000 1,000,000 2,000,000

2,791,000 3,366,500 6,167,5002,918,481 3,640,288 6,558,770

2,020 2,101 2,060

99,000 99,000 198,000

40

RenewableEnergyERCs(RE‐ERCs)• RE‐ERCswillbecreditedtoeligibleREresources• EligibleREresourcesincludenewwind,solar,geothermal,hydropower,biomass,waveandtidalpower…

• 1ERC/zeroCO2‐emittingMWh

ProposedRate‐BasedProgram

RE‐ERCs 6,187,000MWh

6,558,770tons

6,167,500MWh 198,000GS‐ERCs2,060lb/MWh

Example:

6,167,500MWh 198,000GS‐ERCs RE‐ERCs1,045lb/MWh

41

ImplementationEPA’sProposedMass‐BasedTrading

CleanPowerPlan

42

ProposedFIPMass‐BasedProgram:

CleanPowerPlan

1Allowance

TonCO2

State‐SpecificMassBasedGoal

(tons)

Set‐AsideAllowancesfor:

• NewRE• ∆NGCC• CEIP

IssueRemainingAllowancestoAffectedEGUs

ReduceCO2 PurchaseAdditionalAllowances

43

RenewableEnergy(RE)Set‐Aside: Reserveapercentageofeachstates’allowancesinaREset‐aside

EPA proposed the following specific RE measures for eligibility: on-shore wind, solar, geothermal power, and hydropower

Newnuclearunitsandcapacityupratesatexitingnuclearunitsarenotproposedtobeeligibletoreceiveset‐asideallowances.

ProposedMass‐BasedProgram

44

RenewableEnergy(RE)Set‐Aside:

OnlyREmeasuresinstalled,orcapacityincreases,after2012areeligibleforset‐asideallowances.

EPAproposed5%ofeachstates’allowanceswillbereservedfortheREset‐aside.

ProposedMass‐BasedProgram

EPAproposedtoissueREset‐asideallowancesbasedonprojectedgeneration(MWh)fromeligibleREcapacity.

EPArequestedcommentoninclusionofotherREmeasures

45

Output‐BasedSet‐Aside(∆NGCCSet‐Aside):

Set‐asideforincreasedgenerationfromexistingNGCCUnits Set‐asidecalculatedforeachstateas:

State’sNGCCcapacity(MW)x10%CapacityFactor AllowanceswillbeallocatedtoexitingNGCCunitsbasedontheirlevelofelectricitygenerationinthepreviouscomplianceperiod

Allocationratewillbecalculatedas:NGCCCapacity (MW)x(CF– 0.5)x8,760x1,030/2,000

ProposedMass‐BasedProgram

CapacityFactorabove50%

§111(b)NSPS(lb/MWh)

46

Mass‐BasedExample(StateAllowancePool):1st InterimPeriod

2nd InterimPeriod Final

TotalAllowances 35,189,232 32,953,521 30,170,750

RESet‐Aside

CEIPSet‐Aside

∆NGCCSet‐Aside

Remainder

RESet‐Asidecalculatedat5%ofstatebudget CleanEnergyIncentivePrograminfirstcomplianceperiod.

OBSet‐Asidecalculatedat10%ofstate’sNGCCcapacity

1,801,634 1,647,676 1,516,132

2,187,230 ‐ ‐

‐ 2,102,538 2,102,538

31,200,368 29,203,307 26,552,080

ProposedMass‐BasedProgram

47

Coal1 Coal2BaselineGeneration(MWh) 3,791,000 4,366,500BaselineCO2 Emissions(tons) 4,150,950 4,944,100

%ofTotalStateGeneration

2030Allowances

Surplus/(Deficit)

%ofAllowancesNeeded

TotalBaselineStateGeneration:47,806,056MWh

2030AllowancePool(afterset‐asides):26,552,080

Needtoacquireadditionalcomplianceallowances

7.93% 9.13%

2,105,569 2,425,209

(2,045,381) (2,518,891)

51% 49%

ProposedMass‐BasedProgram

Mass‐BasedExample(Coal‐FiredEGU):

48

NGCCExample: NGCC1 NGCC2 NGCC3Capacity(summer)MW 47 145 170BaselineGeneration(MWh) 30,316 718,446 142,924BaselineCO2 Emissions(tons) 15,348 311,844 62,930

CO2 EmissionRate(lb/MWh) 1,013 868 881

BaselineCapacityFactor 7% 56% 10%

%ofStateGeneration

AllowancePoolAllocation

TotalBaselineStateGeneration:47,806,056 MWh

2030AllowancePool(afterset‐asides):26,552,080 NGCCUnitswillrequireallowancesforincreasedgeneration

ProposedMass‐BasedProgram

Mass‐BasedExample(NGCCUnits):

0.063% 1.5% 0.30%16,838 399,034 79,282

49

NGCCExample: NGCC1 NGCC2 NGCC3Capacity(summer)MW 47 145 170Generation@70%CF(MWh) 308,790 952,650 1,116,900CO2 Emissions@70%(tons) 156,329 413,500 491,770

AllowancePoolAllocation 16,838 399,034 79,382

∆NGCCSet‐AsideAllowances

TotalAllowances

OBAllowances=MWCap x(0.7– 0.5)x8,760x1,030/2,000

AssumesthatOBAllowancesareavailable

ProposedMass‐BasedProgram

Mass‐BasedExample(NGCCUnits):

42,407 130,831 153,388

59,245 529,865 153,388Surplus/(Deficit) (97,084) 116,365 (259,005)

NGCCUnitswithlowbaselinecapacityfactorswillneedtoacquireadditionalcomplianceallowances

50

ProposedMass‐BasedProgram

Generation (MWh)

Emissions (tons)

Allowances (tons)

Coal-Fired EGU

Low CF NGCC Unit

High CF NGCC Unit

No

Sca

le

51

• OverviewofEPA’sCleanPowerPlan• PerformanceStandards• State‐SpecificGoals

• Implementation

• CompliancePlanning

• Questions/Answers/PanelDiscussion

52

GeneralConclusions:1. HeatRateimprovementswillplayonlyaminor

roleincomplianceatexistingcoal‐firedEGUsundereitherarate‐basedormass‐basedprogram.

2. OtherCO2 emissionreductionmeasures,includingnaturalgasco‐firing andnaturalgasconversion,couldprovidesignificantCO2 emissionreductionsforexistingcoal‐firedEGUsandshouldbeevaluatedasapartofeitherprogram.

3. RenewableEnergywillplayasignificantroleinoverallcompliancewitheitherarate‐basedprogram(RE‐ERCs)ormass‐basedprogram(RESet‐AsideAllowances)

CleanPowerPlan

53

GeneralConclusions:

CleanPowerPlan

Rate‐BasedERCs

1. GS‐ERCsmaybelimitedbasedonthemethodologyusedtocalculatetheERCs.

2. GS‐ERCscannotbyusedbyNGCCunitsforcompliancewitharate‐basedprogram.

3. RE‐ERCswilllikelybeneededbycoal‐firedunitsandNGCCunitsforcompliance.

Mass‐BasedAllowances

1. OutputBased(∆NGCC)set‐asideallowancesmaybeneededtooffsetincreasedCO2 emissionsfromNGCCunits,especiallyunitswithlowbaselinecapacityfactors.

2. REset‐asideallowanceswilllikelybeneededbycoal‐firedEGUsandlowcapacityfactorNGCCunitsforcompliance.

54

CleanPowerPlan

Building Block 1

Building Block 3

Building Block 2

PlanningforCompliance:BuildingBlock1

• IdentifypotentialCO2 emissionreductionopportunities:heatRateimprovements,fuelco‐firing,naturalgas‐conversion,carboncapture.

BuildingBlock2• IdentifyopportunitiestoincreaseNGCCgenerationandgenerateGS‐ERCsorOBSet‐AsideAllowances

BuildingBlock3 EvaluatepotentialNEWREcapacityandgeneratingopportunities

55

CleanPowerPlan

PlanningforCompliance

REGeneration‐ GeneralEligibilityRequirements:• OnlyREmeasuresinstalledafter2012areeligiblefor

adjustingCO2 emissionratesorgeneratingCO2allowances.

• OnlythequantifiableandverifiableMWhofREgenerationproducedin2022andfutureyearsmaybeappliedtoadjustingCO2 emissionratesorgeneratingallowances.

56

CleanPowerPlan

PlanningforCompliance:CompliancePlansNeedtoIntegrateanEvaluationof:

• Overallimpactsongeneration:• UnitRetirements• MeetingDemand• MeetingPeakDemand

• UnitDispatch• ReliabilityandGridStability• Operations

• Operatingbaseloadunitascyclingunit• RespondingtofluctuationinREgeneration

• CostofElectricity

57

CleanPowerPlan

PlanningforCompliance:PreliminaryEvaluations

• Reviewexistinggeneratingportfolio:AffectedUnits,NGCCcapacityandcapacityfactors,baselineemissions&emissionrates

• ReviewandunderstandtheproposedFIPRate‐BasedandMass‐Basedtradingprograms

• Evaluatepros/consoftheRate‐BasedandMass‐Basedtradingoptions,aswellasotheralternatives

• ParticipateinstakeholdermeetingsandcloselyfollowdevelopmentofyourState’sSIP

• WorkwithyourstatetodevelopSIPrequirementsthataremostadvantageous

58

CleanPowerPlan

Questions/AnswersForadditionalinformation,pleasecontact:

Ken SnellSr. Manager Environmental 312-269-2318kenneth.j.snell@sargentlundy.com

Andrew CarstensDirector Environmental Services312-269-3640andrew.j.carstens@sargentlundy.com

59

The information provided by Sargent & Lundy ("S&L") in this presentation is intended to provide general information on a particular topic and is not intendedto be a substitute for a discussion, consultation, or advice with an appropriate professional. There are no express or implied representations or warrantiesrelated to the information presented or contained in any presentation materials, nor is there any guarantee that the information is error-free, or that it meetsany sort of performance or quality criteria. In no event shall S&L be held liable to any party for any direct, indirect, implied, punitive, special, incidental orother consequential damages arising directly or indirectly from any use of this information and material, which is provided as is. S&L, it affiliates, officers,and employees, shall not be liable for any decision made or action taken in reliance on the information provided. The materials provided are owned by S&Land may only be used for personal or internal use, and may not be copied, redistributed, or otherwise provided to third parties without the express writtenauthorization of S&L

top related