tuy hoa - nha trang 220kv transmission...
Post on 04-Jun-2018
238 Views
Preview:
TRANSCRIPT
SOCIALIST REPUBLIC OF VIET NAM
ELECTRICITY OF VIET NAM
PECC4 POWER ENGINEERING CONSULTING COMPANY 4SO990012O
RP287Project No.: 14 - 02 VOL. 4
TUY HOA - NHA TRANG 220kV TRANSMISSION LINE
FEASIBILITY STUDY REPORT
RESETTLEMENT ACTION PLAN (RAP)(FIRST REVISION)
Khanh Hoa Province - 2005
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
SOCIALIST REPUBLIC OF VIET NAM
ELECTRICITY OF VIET NAM
PECC4 POWER ENGINEERING CONSULTING COMPANY 4ISO 900 2
PROJECT: 14 - 02
TUY HOA - NHA TRANG 220kV TRANSMISSION LINE
FEASIBILITY STUDY REPORT
RESETTLEMENT ACTION PLAN (RAP)(FIRST REVISION)
Head of Department : Nguyen Kim Dong
Head of Project Design: Le Hoang Thuong -
Khanh Hoa Province, 2005
FOR AND ON BEHALF OF
POWER ENGINEERING CONSULTING COMPANY 4
DEN HUU TAP
DEPUTY DIRECTOR |
Tuy Hoa - Nha Trang 220kV transmission line Feasibility Study
The staffs participating in RAP establishment including of:
No. Full name Content prepared Signature
In charge of presiding RAP1 Tran Van Luyen enestablishment i2 Mai Thi Hop Establishing RAP
Resettlement Action Plan
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
CONTENTS
ABREVIATION 4
SUMMARY 5
1. Policy framework 5
2. Project impacts 5
3. Resetlement policy 6
4. Public consultation 6
5. Grievance 7
6. Management organization 7
7. Implemetation schedule 7
8. Cost estimate 8
9. Information dissemination 8
CHAPTER 1: GENERAL INTRODUCTION 9
1.1 The basis of the report 9
1.2 Objectives 9
1.3 Validity of RAP implementation 10
1.4 Description of the project 10
1.4.1 Characteristic of the project 10
1.4.2 Project impacts 13
1.5 Project impacts minimizing measures 13
1.6 Implementation cost estimate 14
CHAPTER 2: IMPLEMENTATION ORGANIZATION AND LEGAL 15
FRAMEWORK FOR COMPENSA TIONAND RESETTLEMENT
2. 1. Institutional arrangements 15
2.2. Organizational'responsibility 15
2.3. Staffing organization and responsibilities 20
2.4 Legal framework 21
CHAPTER 3: ENTITLEMENT POLICY 26
Resettlement Action Plan 1
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
3.1 Definition of PAP and limitation to eligibility 26
3.2 Resettlement and compensation principles 26
3.3 Eligibility to get compensation entitlements 27
3.4 Entilement policy 28
3.5 Inpacted categories 31
CHAPTER 4: SOCIO-ECONOMIC SITUATION OFPROJECTAREA 33
AND THE PROJECT IMPACTS
4.1 Survey work, inventory of project impacts 33
4.2 The socio-economic condition of project area 33
4.2.1 Phu Yen Province 33
4.2.2 Khanh Hoa Province 34
4.3 Project impacts 34
CHAPTER 5: PULICPARTICIPATIONAND CONSULTATION 36
5.1 Objectives of information campaign and consultation program 36
5.2 Consultation and inform to people 36
5.3 Information dissemination and PAPs'consultation 37
CHAPTER 6. COMPLAINTSAND GRIEVANCE 40
CHAPTER 7: SUPERVISIONAND MONITORING 42
7.1 Internal supervision 42
7.2 Independent supervision 42
CHAPTER 8: IMPLEMENTATION ORGANIZATION FOR 44
COMPENSA TIONAND RESETTLEMENT PLAN
8.1 Measures for the project implementation 44
8.1.1 Announcement to PAPs 44
8.1.2 Compensation and Resettlement deadlines 44
8.2 RAP implementation process 44
8.3 RAP implementation schedule 46
Resettlement Action Plan 2
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
CHAPTER 9: COSTS AND BUDGET 47
9.1 Budget 47
9.2 Compensation price determination 47
9.2.1 Land 47
9.2.2 Impacted trees and crops 47
9.3 Compensation cost estimate 48
9.3.1 Cost for RAP establishment 48
9.3.2 Compensation cost 49
9.3.3 Management cost 49
9.3.4 Supervision cost 49
9.3.5 Reserved cost 49
9.3.6 Total compensation cost for project 49
CHAPTER 10: CONCLUSIONAND PROPOSALS 50
10.1 Conclusion 50
10.1 Proposals 50
APPENDICES 51
Appendix 1: Entitlement Matrix 52
Appendix 2: Table of compensation quantity for Quy Nhon - Tuy Hoa 220kV T/L 59
Appendix 3: Inventory of Project Affected People 62
Appendix 4: Entitlements of Project Affected People 75
Appendix 5: Socio-Economic Household Data Sheet of Project Affected People 87
Appendix 6: Minutes of public consultation 96
Resettlement Action Plan 3
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
ABREVIATION
- RAP Resettlement Plan
- PAPs Project Affected Persons
- WB World Bank
- PC People's Committee
- EVN Electricity of Vietnam
- LC Land Clearance
- PMB Project Management Board
- PECC4 Power Engineering Consulting Company 4
- ER Environmental Resource
-GC General Company
- VND Viet Nam Dong
- SC Safe Corridor
- ROW Right-Of-Way
- CPPMB Central Power Projects Management Board
Resettlement Action Plan 4
l
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
SUMMARY
Pursuant to the Government policy, the power energy develops in advance of
other sectors to serve as the engine for development with purposes of rich people,
strong country and an equitable, democratic and civilized society. In order to
strengthen the capacity of supplying power source, a vitual infrastructure, Electricity
of Vietnam (EVN) has established the project "Transmission, distribution and
overcoming natural disasters" (3034-VN) financed by World Bank (WB). One of its
component is "Tuy Hoa - Nha Trang 220kV transmission line" project with total route
length of 131,528m going through the territory of Phu Hoa and Tuy Hoa districts, Phu
Yen Province; Van Ninh and Ninh Hoa districts, Nha Trang City of Khanh Hoa
Province.
Tuy Hoa - Nha Trang 220kV transmission line project is constructed in line
with Quy Nhon - Tuy Hoa 220kV transmission line and 220kV Tuy Hoa Substation
projects targeting to combine the local 110kV, 220kV power grid, to receive energy
source from power source of Ha Song Ba hydropower project, etc.. .into power grid
and to upgrade the reliability in supplying power, the quality of power energy of the
local power grid.
1. Policy framework
The plan on project compensation and resettlement is established based on Decree
197/2004/ND-CP dated December 3rd, 2004 of the Government regarding the
compensation, resettlement support when the State takes back the land; Decree
198/2004fND-CP dated November 16th,2004 of the Govermment regarding the method
to determine the land price and the price framework of land kinds; Decree
181/2004/ND-CP of the Government regarding the implementation of Land Law, etc...
and guideline on RAP establishment of WB (the policy framework of unvoluntary
resettlement OD 4.30). According to this policy, PAPs are people, households, entities
with or without juridical personality for their assets on project impacted land and
inventoried before the cut-off-date (September 9th, 2004) are entitled to compensation
and resettlement.
2. Project impacts
The project causes impacts to the followings:
Resettlement Action Plan 5
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
- Perpetual land acquisition at tower foundation positions, ect. (the
perpetual acquisition area of 47,345m2).
- Causing damage to trees, crops and other assets at tower foundation
positions and within ROW.
- Temporary land acquisition under project construction
Results of project data collection show that there are 135 households whose houses
and structures are impacted within the safe corridor of the line route, whereas:
+ No household loses over 25% area of agricultural land
+ No affect to cultural relics area, preservation area, pagoda and sensitive areas
+ No ethnic minority household among impacted households.
During public consultation process, impacted households were agreed to select the
compensation procedure on land and assets in cash.
3. Compensation policy
The cut-off-date is September 96, 2004. The price for making compensation on land,
assets and crops is based on the compensation unit price of Phu Yen and Khanh Hoa
Provinces.
All impacted households are entitled according to the policy framework and Vietnam
Decrees such as displacement support, support for production stabilization, etc... Up
till now, the survey result and damage inventory shows that no remarkable impacts to
people, the community and the public assets. As a result, it is unnecessary to have
economical recovery measures.
4. Public consultation
PAPs consultation to get feedback comments will restrict the contradictions and delay
when implementing the project. The resettlement plan will be implemented following
to the reference comments from the authorities and people in order to maximize their
participation in the resettlement plan and implementation as well as socio-economical
benefits. The authorities and people are consulted about line route location, the
resettlement policy, implementation of resettlement plan, grievance mechanism and
the checking, appraisal towards the recovery of life for impacted people after project
implementation.
Resettlement Action Plan 6
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
5. Grievance
During project implementation, grievances of impacted people will be solved based on
GOV law. All grievances will be solved equitably and the grievance procedures will
be guided by related authorities. The griever will pay no cost for this grievance.
CPPMB and the local authority are responsible for monitoring the RAP
implementation process. In addition, an independent consulting agency will be
assigned to supervise independently and appraise the compensation and resettlement
implementation process in accordance with the policy stated in this dossier. This
agency can be selected and awarded the contract by the PMB after the approved
resettlement plan or selected and awarded the contract by WB. The supervising
activities are implemented from the beginning of project implementation stage. This
independent supervising agency will report to PMB or WB about its results of
supervising activities.
6. Management organization
CPPMB is the project coordinating unit and cooperates with other agencies such as the
Provincial People's Committee of Phu Yen and Khanh Hoa, the local authority, Power
Company of Phu Yen and Khanh Hoa provinces and WB in implementing detailed
works of project, especially the RAP implementation plan.
7. Project implementation schedule
Contents Time
Technical investigation, technical design and 03/2005
approval
Ask for land acquisition, compensation work and 05/2005 - 09/2005
land clearance
Establish and submit bidding document 07/2005 - 10/2005
Preparation of construction drawings 10/2005 - 12/2005
Procurement of equipment and materials 12/2005 - 09/2006
Construction, revising, testing and hand-over 01/2006-11/2006
Commissioning and put the project into service 12/2006
Resettlement Action Plan 7
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
8. Cost estimate
Total project compensation cost is about VND 13,805,670,307 (or USD873,777)
Total investment cost of the whole project is VND 345,455,973,050 (or
USD21,864,302)
9. Information dissemination
The draft RAP will be disclosed in Phu Yen and Khanh Hoa provinces and the
infonnation Development Center of WB (VDC) at 63 Ly Thai To, Ha Noi. CPPMB
will send copies of entitlement statement form to the project district authority. All
feedbacks from the local authority and people are considered and supplemented into
the RAP.
R esettle m entlA cti o n
Resettlement Action Plan 8
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
CHAPTER 1
GENERAL INTRODUCTION
1.1 THE BASIS OF THE REPORT
Basics for project establishment:
- Pursuant to Official Letter No.1127 EVN/AMT - KH dated March 25, 2004
issued by CPPMB regarding the FS establishment of power grid projects.
- Based on the above instruction, CPPMB has signed a contract with PECC4 for
preparing Feasibility Study Report, RAP and EIA of the project.
Carrying out the contract (with CPPMB), PECC4 has been gathering data,
surveying at sites and preparing RAP report for the project.
1.2 OBJECTIVES
This report is set up with following purpose:
+ Study on policies of compensation, resettlement for households having land
acquisition for construction of substation, foundation, tower, temporary road for work
execution, etc ...according to Vietnam laws and WB guidelines.
+ Propose the alternatives of compensation, resettlement and the most efficient
way of implementation to the households affected.
+ Help to choose the right design alternative, minimize the degree of damage at
the implementation of project and ensure the highest socio-economic interests of the
project.
+ Making livelihood-socio-economic damage survey of project area and work
with local authorities concerning the compensation and resettlement policy for affected
households. The survey and data collecting work focuses mainly on the right of way.
The principle objective of the Policy Framework on involuntary resettlement
OD4.30 is:
All PAP's residing, working, doing business or cultivating land in right of way
(ROW) of transmission line (T/L), surrounding areas of tower foundation, the
substation areas, in the service roads under the Project as of the date of the baseline
surveys are entitled to be provided with rehabilitation measures sufficient to assist
them to improve or at least maintain their pre-project living standards, income earning
Resettlement Action Plan 9
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
capacity and production level. Lack of legal rights to the assets lost will not bar the
PAP from entitlement to such rehabilitation measures.
During RAP'preparation, Decrees and Circulars of Vietnamese Government
such as Decree 197/20041ND-CP, Decree 181/2004/ND-CP, Decree 188/2004/ND-CP,
etc and Decisions about compensation unit price issued by the provincial peoples'
committees are applied. The entitlement policy in this RAP are suggested as follows:
+ Apply a compensation rate according to the market price or replacement
price: Compensation of land and crops (short-day trees) at market price. Compensation
of houses and trees (perennial trees) at conversion price.
+ All affected properties are legible from the cut-off-date (September 9th 2004).
The affected households who have been registered will be compensated.
This RAP will be furnished to GOV and WB for concurrence.
1.3 VALIDITY OF RAP IMPLEMENTATION
Resettlement and compensation program for PAPs, policy and provisions on
resettlement and compensation entitlement in RAP will only be applied after approval
of WB and Vietnamese Government. To meet RAP's objectives such as minimizing
the resettlement and land acquisition, PAPs will be supplied the information on
project, compensation and resettlement, the compensation costs will be paid at
replacement cost or market cost. Thus, before implementing resettlement and
compensation program, the project owner and local authorities should check and revise
the applied compensation costs in this report. If there is any compensation unit price
non-conforming at'the time of program implementation, the local authorities and
Resettlement and Compensation Board (RCB) need to revise them to ensure sufficient
compensation payment for PAPs according to principles stated in RAP.
Survey data in this report base on the technical design report and is updated as
per the approved alter'native.
1.4 DESCRIPTION OF THE PROJECT
1.4.1 The project characteristics
Main technical specification and scale:
- Voltage level: 220kV.
- Number of circuit: 02 circuits
Resettlement Action Plan 10
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
On the route, most of the I OkV and 220kV trnsmission lines go on double circuit
. tower row. Especially for the section about 0.9km away from Nha Trang substation, the route
goes with two (2) single circuit tower rows for each transmission line. For the section about
1.5km away from Tuy Hoa substation, the route goes on the single circuit tower row with
220kV transnission line and on both double circuit and single circuit tower row with lOkV
transmission line (only one circuit is suspended at the 1 lOkV double circuit tower section, the
remaining circuit is blank for redundancy of 1 1 OkV tansmission line to Son Hoa in the future).
- Number ofturning angle: 91 angles whereas:
+ 220kV T/L goesjointlywith 1 lOkVT/L: 81 turning angles
+ 1l OkVT/L goes separately: IO turning angles
- Total route length: 131,528mwhereas:
+ 22OkVT/L goes jointlywith 1 lOkVT/L: 128,755m
+ 1 lOkVT/L goes separately. 2,773m
The sections which the line route goes through namely: Phu Hoa and Tuy Hoa
Districts (Phu Yen province); Van Ninh and Ninh Hoa Districts, Nha Trang City
(Khanh Hoa province).
- Staring-point: 220-1 lOkVkV busbar of 220/110kV Tuy Hoa susbtation (will be
constructed ) belonging to Phu Hoa District - Phu Yen Province.
- End-point: 220-lOkV busbar of 220/llOkV Nha Trang substation (existing)
belonging to Nha Trang City- Khanh Hoa Province.
- Conductor:
+ 220kV transmission line: ACSR - 400/51
+ 11 OkV transmission line: ACSR-240/39, for the section crossing Da Rang
river: ACSR-400/51
According to the direction looked from the starting-point to the end-point, the
conductor of 220kV T/L is arranged on the right (to the Western direction) and the
conductor of 11 OkV T/L is arranged on the left (to the Eastern direction).
- Ground-wire:
+ 220kV TAL: composite optical fiber overhead ground-wire OPGW-70. For
the incoming section of the substation suspended another galvanized steel wire
GSW-70.
Resettlement Action Plan
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
+ lOkV T/L: galvanized steel wire GSW-70. For section from the starting
tower and ending tower of the incoming and outgoing section of the substation,
suspended another galvanized steel wire GSW-70.
- Insulator: glass insulator or equivalent standard is used.
+ 220kV T/L: 7OkN insulator type is used for suspension string; 160kN, 2lOkN
for tension string. For the accessories, the type with 7OkN durability is used for
suspension string and l6OkN for the tension string.
The suspension insulated disc gets the creepage distance of 295mm, the tension
insulated disc gets the creepage distance of 295mm (for 12OkN type), 340mm (for
16OkN type) and 370mm (21OkN type).
- Eartiing: as per ray type and ray in combination with pile type, 4 types are
used: TD4x4O, TD4x6O, TD4x6O-16 and TD4x6O-16a.
- Towers: galvanized steel tower with 2 circuits, 220kV structure. Especially for
the incoming section of Nha Trang substation, the single circuit steel tower is used for
each 220kV and lOkV T/L; for the incoming section of Tuy Hoa substation, the
single circuit steel tower is used for each 220kV T/L and the double circuit, single
circuit steel tower for I1 OkV T/L.
- Arms: anns with towers all-in one block are manufactured
- Foundation: there are 4 pier foundations cast in place for each position; the
raft foundation is used for weak soil and the pile foundation is used only for the
suspension tower position in the section crossing Da Rang river.
* Extension of the feeder bay of 220kV Nha Trang substation
In order to construct the 220kV feeder bay, it is necessary to transfer the
220kV switchgear from "quadrangle" diagram into the diagram "two busbar systems
with ring busbar, the bus - section circuit breaker and bus coupling breaker", details as
follows:
- New construction of one 220kV transmission line feeder
- New construction of one feeder of the bus - section circuit breaker and bus
coupling breaker
Resettlement Action Plan 12
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
- Dismantling and new installation of some 220kV disconnectors, 220kV
suspension strings in the existing feeders to comply with the new connection
diagram.
Construction of 110kV outgoing feeder: it is necessary to completely construct
one 110kV transmission line feeder complying with the existing diagram "two
busbar systems with ring busbar, the bus - section circuit breaker and bus
coupling breaker".
1.4.2 Project impacts
Impacts on land and properties:
a Permanent impacts:
- Permanent land acquisition for tower foundations
b. Temporary impacts:
- Trees, crops in ROW and temporary service road
- All trees and crops surrounding the tower foundation areas
The safe corridor of the above-mentioned line route is not regulated in Decree
54/1999/ND-CP dated July 8th, 1999 of the Government regarding the safe protection
of high voltage power grid and Decree 118/2004/ND-CP of the Government
concerning the amendment of some articles in Decree 54/1999/ND-CP.
With the above-mentioned characteristics and scale, land acquired for the
project construction as follows:
- Number of tower foundations : 390
- Permanent land acquisition area : 47,345m2
- Temporary acquisition land area in safe corridor of power grid: 1,602,546m2
On Tuy Hoa - Nha Trang 220kV line route, there are 135 households with
impacted houses and structures.
1.5 PROJECT IMPACTS MITIGATION MEASURES
Selection of logical line route and tower location: For the investigation and
design of line route completely avoid passing:
- Market areas, densely populated areas.
- Airport, military areas.
Resettlement Action Plan 13
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
- Near or parallel with communication system
- Temple, pagoda
- Protection forests, natural preserved areas
- Historic and cultural heritage etc.
Technical solutions thoroughly exploited:
Rational design of tower span, foundation structure is designed with different
measures in conformity with the chosen site.
Before the construction is implemented, the Owner and the Civil Contractor
need to do necessary procedures as per the prevailing regulations such as making
agreement with the local authority, the transport agency, making plan on every work
item, e.g designing a rational work execution alternative, choosing time for work
execution at periods of harvest and complete work when next crop is not yet cultivated
(land is at rest). If the cultivated period cannot be avoided then manual construction
measures are used in order to diminish the surface of land acquired for work
execution, road for big trucks are not constructed, organize work according to many
shifts at high productivity, reducing the time of lay-out acquisition. During the process
of stringing conductor, make scaffold and pull conductor neatly on belt of land about
5m to avoid causing damages of trees and agricultural crops. Make definetely each
item of work, each part of route line to reduce the time of land appropriation. Make
full use of the existing roads for transportation of equipments and for other purposes
during the time of work execution, limiting the construction of new road.
During investigation and work execution process, the workers's camps are set up
on vacant lot, on communal office area, not on private land or cultivated land.
The result of these minimizing measures is that affected houses on the line route
are the least.
During the stage'of operation management, when making repairs and overcoming
incidents, following safety measures must be applied:
- Safety measures when making contact with electrical equipments
-Safety measures when carrying out operation management works, repairs of
electric grid.
Resettlement Action Plan 14
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
1.6 PROJECT COST ESTIMATE
Total investment capital (In round) VND 345,455,973,050
Resettlement Action Plan 15
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
CHAPTER 2
IMPLEMENTATION ORGANIZATION AND LEGAL FRAMEWORK
FOR COMPENSATION AND RESETTLEMENT
Project Management Board and Local Authority of all levels will be responsible for
implementing RAP. The RAP implementation must be made in line with the approved
schedule of the project. The coordination between the project owner and local
authorities will be made closely in order to implement RAP smoothly and effectively
and to avoid the interruption or delay of RAP implementation.
2.1 INSTITUTIONAL ARRANGEMENTS
The following institutions/agencies will be involved in implementing RAP:
- PCs of 02 provinces: Phu Yen and Khanh Hoa
- Electricity of Viet Nam (EVN)
- Project Management Board - Central Power Projects Management Board
- Consultant Company - Power Engineering Consulting Company No.4.
- Departments of Finance and Goods Price of the above project provinces
- Land Clearance Boards of the above project provinces
- People's Committees of Nha Trang City, Phu Hoa, Tuy Hoa, van Ninh, Ninh
Hoa Districts.
- Land offices of the above project city and districts.
- Land clearance Committees of city and districts.
- People's Committees of project affected communes such as Hoa Quang Bac,
Hoa Quang Nam, Hoa Dinh Dong, Hoa Phong, Hoa Dong, Hoa Tan Tay, Hoa Tan
Dong, Hoa Xuan Tay, Hoa Xuan Dong, Hoa Xuan Nam, Dai Lanh, Van Tho, Van
Phuoc, Van Long, Van Khanh, Van Thang, Van Binh, Van Phu, Van Luong, Van
Hung, Ninh An, Ninh Trung, Ninh Than, Ninh Xuan, Ninh Binh, Ninh Quang, Ninh
Hung, Ninh Loc, Ninh Ich, Vinh Luong, Vinh Phuong and Vinh Ngoc.
- Project affected persons
2.2 FUNCTIONS, TASKS FORCE AND RESPONSIBILITY
*: Electricity of Viet Nam (EVN)
Resettlement Action Plan 16
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
EVN is the owner of the project and is responsible for managing and organizing
of investment policy, investigation, design, construction as well as supervision for
RAP implementation. EVN controls the project preparation and implementation via
professional agencies, approving decisions concerning resettlement work submitted by
PMB; assigning Central Power Projects Management Board (CPPMB) to directly
manage the whole process of project implementation.
*: Project Management Board (PMB)
Central Power Projects Management Board is assigned by EVN in directing the
whole project including the implementation of RAP from impact survey, inventory,
making plans for RAP implementation. Main tasks of PMB will be:
+ Making Master Plan, management and supervision of land clearance
implementation to ensure full determination of relating PAPs, set out satisfied
entitlements as per site clearance policy.
+ To ensure that all PAPs are announced of applied policies for RAP
preparation. Entitlements of PAPs, project information and RAP are popularized under
announcement form. This is considered the proof of their entitlement towards interests
of RAP work.
+ Disseminate project information to PCs of all levels
+ Send RAP to Resettlement Committees, explaining applied models and
entitlements in the project.
+ Supervision/monitoring for compensation payment, coordinate to implement
land acquisition and site clearance.
+ Independent monitoring for RAP implementation, assigning an experienced
and competent agency to do this.
+ Report the implementation process on land clearance work to EVN and WB.
To meet this r'esponsibility, PMB needs to establish a department or a group
including experienced officers to monitor RAP and environment implementation.
* Provincial People's Committees (PPCs): Phu Yen and Khanh Hoa
PPC is the agency approving and directing matters concerning the RAP within
the provincial area. The Project PPC are responsible for:
Resettlement Action Plan 17
Tuy Hoa- Nha Trang 22OkVJtransmission line Feasibility Study
* Directing departments, branches and local areas in province related to RAP
preparation and implementation such as Land Department, Construction Department,
Department of Finance and Goods Price and project affected PAPCs.
* Approving the costs of compensation in provincial area.
* Approving dossiers of land delivery and recovery in provincial area.
* Establishing Provincial Resettlement and Compensation Committee and
directly manages the activities of this Board.
* Directing and managing the coordination between Branches and local
authorities in RAP implementation.
*: Departments of Finance and Goods Price of Phu Yen and Khanh Hoa
Provinces
To be responsible for issuing detailed compensation unit prices applied in the
provincial area. During the implementation process, Department of Finance-Goods
Price needs to make cooperation with other departments such as Construction
Department, Land Department, Department of Agriculture and Rural Development
and People's Committee of District where the project constructed in order to establish
the compensation unit price for premises, land, trees and crops.
* Provincial Compensation Committees: Phu Yen and Khanh Hoa
PCCs are consulting institutions for provinces about RAP approval and RAP
implementation management according to the provincial approved plan. Provincial
Resettlement Committee will be headed by a Vice Chairman of Provincial People's
Committee. Provincial Resettlement Committee is mainly responsible for:
* Assisting owner and compensation committees of districts in preparing
detailed plans for compensation and resettlement.
* Checking all inventories of project impacts and detailed implementation plans
prepared and submit'ted by Compensation Committees of districts. Approval for
implementation plans within 10 days after receiving the plans submitted by District
Resettlement Committees.
* Checking and submitting RAP implementation plans in provinces to PPCs for
approval.
Resettlement Action Plan 18
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
* Directing and supervising the RAP implementation in province as per the
schedule and policies approved in RAP.
* Solving outstanding problems due to the unsatisfied solution at the District
Resettlement Committees.
* Compensation payment for PAPs via District Resettlement Committees.
Provincial Compensation Committees will consist the representatives of:
- Department of Finance and Goods Price
- Construction Department
- Industrial Department
- Department for Agriculture and Rural Development
- Department of Natural Resources and Environment
- Chairmen of People's Committee of related districts
- Representative of Provincial Project Management Boards.
Staffs of Provincial Resettlement Boards will be work concurrently and get allowances
according to PPC's decisions. Assistants work during the project implementation and
get salary during the work period.
*.* People's Committees of Nha Trang City, Phu Hoa, Tuy Hoa, Van Ninh,
and Ninh Hoa Districts.
Being responsible for guiding compensation and resettlement activities in
district, town and city areas. People's Committees of Districts, Towns and Cities are
responsible for:
+ Creating good conditions and coordinate with relating agencies in survey,
inventory of project impact; organize community consultation activities, information
dissemination on the project implementation policy and land acquisition plan to people
of commune (ward) where project constructed.
+ Establishment of Resettlement Committees of Districts (Cities)
+ Directing and monitoring RAP implementation in districts (cities)
+ Solving relating matters during RAP implementation together with
Resettlement Committees of district (city).
*. Resettlement Committees of Nha Trang City, Phu Hoa, Tuy Hoa, Van
Ninh, and Ninh Hoa Districts
Resettlement Action Plan 19
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
These are key institutions being mainly responsible for implementing RAP in
district (city) area. Resettlement Committees of districts consist of experienced
officers of the data-gathering inventory. Resettlement Committees of districts (Cities)
are mainly responsible for:
* Checking all survey documents concerning affected households and assets,
making Detailed Measurement Survey (DMS) for each household including of
affected assets, total compensation cost based on entitlement policies regulated in
RAP.
* Checking the unit prices of compensation stated in RAP, suggest adjustment
to comply with market prices at the plan implementation period.
* Co-ordinating with PMB, consultant agency to organize RAP meetings in
local section and organize community consultation together with project owner.
* Summarize and submit data affected in local section to Provincial
Resettlement Committee.
* Based on the policy and approved schedule in RAP, preparing the detailed
implementation plan and submit it to Provincial Resettlement Committee.
* Directly make payment on compensation and allowances to PAPs in a timely
manner.
* Settling the complaints and grievances of PAPs, solving any difficulties
during the implementation period, and suggest the solutions for the outstanding issues
to Provincial Resettlement Committees and Owner.
* Making monthly report and send them to PRCs, Owner and Chairmen of
PAPCs.
Resettlement Committees of districts (town, city) will be headed by Vice
Chairnen of districts (cities) and consist of following members:
- Representative 'of Economic Office
- Representative of Land Office.
- Representative of Agricultural and Rural Development Office
- Representative of Statistic Office
- Representative of Industrial Office
- Representative of affected Commune.
Resettlement Action Plan 20
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
- Representative of PAPs
Staffs of Resettlement Boards of Districts (towns, cities) will work concurrently
and enjoy allowances according to PAPC's decision. Assistants work during the
project implementation and get salary during the work period.
* Commune (ward) People's Committees
* Contributing to Overall Detailed Measurements Surveys.
* Co-ordinate with Resettlement Committees of districts for classifying
impacted assets, determine the legality and legibility of assets.
* Certify affected assets in general survey for compensation dossier of each
household (in the survey note).
* Assisting local people in overcoming the difficulties during the process of
construction or rehabilitation of damages caused by project implementation. Making
public information about the project and disseminating policies in RAP.
*: Project Affected Persons (PAPs)
* Directly participate in the general survey, consider thoroughly their
entitlement and responsibility policy. After getting full entitlements, PAPs should
transfer the construction surface on time.
* Propose expectation, requirement for the above mentioned institutions and
monitor their implementation.
PMBs and all project provinces will arrange full experienced staffs to ensure
that the RAP will be implemented smoothly as the schedule accepted.
2.3 STAFFING ORGANIZATION AND RESPONSIBLES
Table 2.1: Responsibilities of RAP implementing Institutions
No. Activities Institutions
Organizing meetings with PAPs to Compensation Committees
1 disseminate all RAP activities of
project
Monitoring and certifying Project Management Board and
2 impacted households and their Resettlement Committees of district
assets (town, city) coordinate with Commune
Resettlement Action Plan 21
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
People's Committees
Project Management Board, Land
Clearance Committee coordinate with
3 Detailed measurement survey Commune People's Committees and
relevant Units of local authority.
4 Informing for PAPs Project Management Board
Decision on compensation Compensation Committees5
problems
Compensation payment Compensation Committees and Project6
Management Board
7 Internal Monitoring Project Management Board
Department of Natural Resources and
Environment or provincial socio-l ~~~8 Independent Monitoring
science Units selected by Project
Management Board.
2.4 LEGAL FRAMEWORK
This is a project with loan from World Bank so the legal grounds applied will
be a combination of Vietnam and WB policies.
a. The Legal Documents of the Government of Vietnam
The Constitution of Vietnam, 1992 confirms the right of citizens to own a house
and to protect the ownership of the house.
According to Vietnam Law on land passed by National Assembly Term XI,
Session IV on Nove mber 26th, 2003 and come into force from July 1st, 2004.
Article 5: Land Tenure
1. Land is sub ect to the ownership of all people and the State is the owner's
representative.
2. The State carries out land decision right as follows:
a. Deciding the land using purpose via the decision, approval of land using plan
(hereinafter called plan, land using plan).
b. Regulating land delivery limit and land using period.
Resettlement Action Plan 22
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
c. Deciding land delivery, land leasing, land recovery and permit the changing
of land using purpose.
d. Fixing land price.
3. The Stated carries out the regulating right of income sources from land via
financial policies about land as follows:
a. Collecting land use charge, land leasing charge.
b. Collecting land use tax, income tax from land use right transfer.
c. Regulating on the value added part from land not due to investments of land
user.
4. The State offers LUR for land user via forms of land delivery, land leasing,
acknowledging LUR for stable land users; stipulating right and responsibility of land
user.
Article 7: The State carries out the owner representative right of all people
about land and implements common state management about land.
1. The National Assembly passes law on land, decides the plan and land use
plan of the whole country, carrying out the supreme supervision right towards the land
management and use in the whole country.
2. The Government decides the plan and land use plan of provinces, Central
cities and the plan, land use plan on the purpose of defense, security; implements
common state management about land in all country.
Ministry of Natural Resources and Environment is responsible with GOV
concerning the state management about land.
3. People's Councils of all levels carry out the supervision right on land law
implementation in local section.
4. People's Committees of all levels carry out the representative right of land
owner and right of sta'te management about land at local section as per the competence
stipulated by law.rd* Decree No. 197/2004/ND-CP issued by GOV on December 3 , 2004 regulates
compensation, resettlement support for recovered land by GOV.
* Circular No.1 16/2004/TT-BTC issued December 7t, 2004 by the Ministry of
Finance provides guidelines to implement Decree No. 197/2004/ND-CP issued
Resettlement Action Plan 23
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
by GOV on December 3rd, 2004 regulates compensation, resettlement support
for recovered land by GOV.
* Decree No 188/2004/ND-CP of November 16t, 2004 on the stipulation ofmethod to determine the land price and the frame for the price of land types.
* Circular No.1 14/2004/TT-BTC issued November 16th, 2004 by the Ministry ofFinance provides guidelines to implement Decree No 188/2004/ND-CP ofNovember 16th, 2004 on the stipulation of method to determine the land priceand the frame for the price of land types.
* Decree No.181/2004/ND-CP issued by the GOV concerning theimplementation of Land Law.
* The Government Decree 54/1999/ND-CP, July 8th, 1999 on the protection ofthe high voltage networks.
* Decree No.1 18/2004/ND-CP dated May 10t, 2004 regarding the amendment ofsome articles in Decree No.54-1999/ND-CP dated July 8th, 1999.
* Law on Petition and Accusation approved by National Assembly on December
02, 1998
* Decree No. 67/1999/ND - CP, issued by GOV on 7/81999 regulates in detail
the Law on Petition and Accusation.
b. World Bank Policy on Involuntary Resettlement (OD 4.30)
* The primary objective of this policy is to ensure that PAPs who have lost
assets are compensated at replacement cost and are provided with recovery measures
to help them improve better or at least maintain their standard of life and their income
capacity as in pre-project conditions.
* The policy framework is established based on the principles and objectives,
selection criteria for PAPs, entitlements, legal framework and institutions, mode of
rehabilitation and compensation, the participation of people. Furthermore, procedures
of grievance will be guided in the process of compensation, resettlement and
rehabilitation for PAPs.
c. Comparison between Government of Vietnam and World Bank
Approaches
* There are a number of ways in which the approaches of the Vietnam
Government- both in policy and practice - are compatible with World Bank guidelines
so that PAPs can have legitimate entitlements. The most important compatibilities are:
Resettlement Action Plan 24
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
* Vietnam has a process whereby most people without legal land rights may meet
conditions of legalization and receive compensation for losses.
* Permanent residents are provided with options that include relocation to an
improved site, or cash, or a combination of the two.
* Resettlement sites offer not only better-improved infrastructure and services but
also represent a higher standard of living.
* Allowances are provided to help the PAPs in the transition period and there is
an institutional structure through which people are informed, can negotiate
compensation, and can appeal.
* Differences between the approaches and measures that need to be addressed
within the program also exist. However, in this context, procedures exist within
national and City governments that allow the granting of waivers of domestic
law on specific projects that may be in conflict with that of the funding agency.
d. Required Waivers
In order to meet the requirements of the World Bank OD4.30 on Involuntary
Resettlement a number of articles in various Vietnamese laws and regulations which
do not ensure compensation at replacement cost or set eligibility provisions which do
not extend the right to rehabilitation and or assistance to households without proper
land paper, will be waived.
The articles of law and regulations that will be waived are mentioned below:
* Price of Land for Calculation of Compensation
According to Vietnam regulations, the calculation of land price for
compensation will be based on Decree 188/2004/ND-CP, Decree 181/2004/ND-CP,
etc and Circulars No. 116/2004/TT-BTC, No.1 14/2004/TT-BTC.
To ensure that the objectives of the project resettlement policy are met, unit
price for land compensation established by the Project Provincial/City People's
Committees will be adjusted to meet at replacement costs.
The Item 4, Article 2 of Decree 17/2001/ND-CP dated May 04, 2001 to guide
on the ODA management stipulates that "in the case of the international agreements on
ODA have been signed between GOV and sponsor stipulates other contents, then that
international agreements will be followed".
Resettlement Action Plan 25
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
CHAPTER 3
ENTITLEMENT POLICY
3.1 DEFINITION OF ELIGIBILITY AND LIMITATION TO ELIGIBILITY
Project Affected Persons (PAPs) including people confinned by data collected
from the survey and investigation process as follows:
- PAPs have houses which are partially or totally affected (temporarily or
permanently) by the project.
- PAPs with partial or total impacted residental land or agriculture land by the
project, temporarily or permanently.
- PAPs with businesses and related income which are partially or totally affected
(temporarily or permanently) by the project.
- PAPs have crops (annual and perennial) and trees which are partially or totally
affected by the project.
- Encroachers who settled into the proposed affected area after the cut-off date
(June 18th, 2004) will have no entitlement to compensation and resettlement. They will
* be required to demolish their structure and cut the trees or harvest their crops for land
clearance to the project. In the case necessary, they will be forced to be removed out of
the proposed project area. Nevertheless, they do not have to pay any fine or sanction.
3.2 RESETTLEMENT AND COMPENSATION PRINCIPLES
The compensation and resettlement plan is established based on fundamental
principles, i.e conforming to laws, decrees, policies regulated by Vietnamese
Government and WB's guidelines consisting of:
1. Acquisition of land and other assets, and resefflement of people will be
minimized as much as possible.
2. All PAP's residing, working, doing business or cultivating land in right of
way (ROW) of transmission line (T/L), surrounding areas of tower
foundation, the substation areas, in the service roads under the project as of
the date of the baseline surveys are entitled to be provided with rehabilitation
measures sufficient to assist them to improve or at least maintain their pre-
project living standards, income earning capacity and production levels. Lack
Resettlement Action Plan 26
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
of legal rights to the assets lost should not bar the PAP from entitlement to
such rehabilitation measures.
3. The rehabilitation measures to be provided are: (i) compensation at
replacement cost, without deduction for depreciation or salvage materials for
houses and other structures; (ii) agricultural land for land of equal productive
capacity acceptable to the PAPs or in cash at replacement cost according to
PAP's choice; (iii) replacement of residential/premise land of equal size
acceptable* to the PAP or in cash at replacement cost according to PAP's
choice; and (iv) transfer and subsistence allowances.
4. Location of resettlement and relocation should be as close as possible to
existing residential area of PAPs.
5. The resettlement transition period will be minimiized and the rehabilitation
means will be provided to the PAPs not over one month prior to the expected
start-up date of works in the respective Project site.
6. Plans for acquisition of land and other assets and provision of rehabilitation
measures will be carried out in consultation with the PAPs, to ensure minimal
disturbance. Entitlements will be provided to PAPs not over one month prior to
the expected start-up date of works in the respective Project site.
7. The standard of life, the infrastructure of community must be maintained or
improved better than their prior place.
8. Financial and physical resources for resettlement and rehabilitation will be
made available and as where and when required.
9. Institutional arrangements will ensure effective and timely design, planning,
consultation and iimplementation of RAP.
10. Effective and timely supervision, monitoring and evaluation of the
implementation of RAP will be carried out.
3.3 ELIGIBILITY TO COMPENSATION ENTITLEMENT
Legitimate PAPs are all the affected households and institutions included in the
inventory with or without legal title included in the RAP inventory or able to
demonstrate with other means that prior to RAP cut-off date they owned, rented or
used land, and properties associated with land as defined in 3.1 item.
Resettlement Action Plan 27
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
3.4 ENTITLEMENT POLICY
PAP's will be entitled to the following types of rehabilitation and assistancemeasures as per the.policy framework OD 4.30:
* PAP's losing agricultural land and crops
(i) The general mechanism for compensation of lost agricultural land
will be through provision of "land for land" arrangements of equal
productive capacity, satisfactory to the PAP.
However, if the PAP prefers to receive cash compensation then the
following applies:
! - if the portion of the land to be lost represents 25% or less than
25% of the total area of the landholding, and the remaining
land is still a viable economic holding, cash compensation, at
full replacement cost, may be provided to the PAP; or
i - if more than 25% of a villager's agricultural land is acquired
and the remaining holding is not viable then the Project will
acquire the entire landholding and provide cash
compensation at full replacement cost.
(ii) PAP's will be compensated for the loss of standing crops and fruit
or industrial trees at market price. Productive trees will be
compensated at replacement cost. Fruit trees will be compensated
for the remaining harvests.
(iii) PAP's whose land is temporarily taken by the works under the each
sub-Project will be compensated for their loss of income, standing
crops and for the cost of soil restoration and damaged
infrastructure. Land will be rehabilitated after the project
construction by PMB.
* PAP's losing residential land and house/structure
(i) The mechanism for compensating loss of residential land and
structures will be: (1) the provision of replacement residential land
(house site and garden) of equivalent size, satisfactory to the PAP or
Resettlement Action Plan 28
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
cash compensation at replacement cost according to PAPs' options;
and (2) cash compensation reflecting full replacement cost of the
house/structures, without deduction for depreciation or salvage
materials or compensate in kind according to PAPs' options.
(ii) If residential land is only partially being affected by the Project and
the remaining areas are not sufficient for reorganizing PAPs' then at
the request of the PAP, the entire residential land will be acquired at
fall replacement cost.
(iii) If house/other structure is only partially being affected by the Project
and the remaining areas are not convenient to using, the house/
structure will be acquired at full replacement cost, without
depreciation.
* PAP's will also be provided compensation at full replacement cost, without
deduction for depreciation and salvage materials for any other fixed assets affected in
part or in total by the project, such as tombs and water wells, etc.
Pursuant to Decree 197/2004/ND-CP issued by the GOV concerning compensation,
resettlement support for recovered land by GOV, then PAPs will be supported as
follows:
- As per Article 27: Transportation allowance
Households getting land recovered by GOV must relocate within the province, city are
entitled to a maximum of 3 million VND, relocating out of the province are entitled to
a maximum of 5 million VND. The level of allowance in details will be regulated by
the Provincial People's Committee.
Entities getting fully conditions to be compensated on land and assets when
being recovered, however they must change the location then they will be supported
completely the actual displacement cost, dismantling and installation.
People who are recovered the residential land, having no other residential place then
within time waiting for rehabilitating the new place, will be arranged in the temporary
houses or supported with money for house renting; the time and the support level in
details are regulated by Provincial PC in accordance with the local reality.
- As per Article 28: Restoration allowance
Resettlement Action Plan 29
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
Households, people directly make agricultural production, when being recovered more
than 30% area of assigned agricultural land, will be supported for stabilizing the life
within 3 months without relocation and within 6 months with relocation; in case
relocate in areas with difficult or especially difficult socio-economical conditions then
the support time is maximum of 12 months. The support level in cash for one person
per month equivalent to 30 kg of rice calculated as per the average price in local
region.
When the GOV recovers land of economical entities, registered business households
and causes business pausing, the maximum support level is 30% of an annual income
after tax, according to the average income of three subsequent years before confirmed
by the tax agency. The support level in details are regulated by Provincial PC in
accordance with the local reality.
- As per Article 29: Support for changing the career and creating
employment.
- As per Article 30: Support for the hirer not belonging to the state
ownership
Households, people who are renting houses not belonging to the state ownership, when
being recovered the land by GOV and must dismantle the house and relocate then will
be supported with the displacement cost equivalent to the level regulated at Item 1
Article 27 of this Decree. Pursuant to the local reality condition, the Provincial PC
regulates the support level to stabilize their life and production.
- As per Article 31: Support level when recovering the public land of
communes, wards or towns.
- Other support such as beside the support regulated in Articles 27, 28, 29,
30 and 31 of Decree 197/2004/ND-CP, pursuant to the local actual
situation, the Chairman of Provincial PC decides the other support
measures to ensure the life and production stabilization for people who
were recovered the land; in special cases, this will be submitted to the
Prime Minister for decision.
Resettlement Action Plan 30
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
Forms of subsidy and bonus for PAPs
Type of subsidy Amount
- Monthly subsidy for relocated PAPs 30kg rice/month for each person in 6months, subsidy granted at one time foreach household with total or partial landarea that impossible to substitute.
- Displacing subsidy 1,000,000 - 3,000,OOOVND for insideprovince; 3,000,000 - 5,000,OOOVND foroutside province.
- Displacement subsidy Maximum of VND 3,000,000 for insideprovince and VND 5,000,000 for outsideprovince.
Supporting for the whole cost fordismantling, installation.
Supporting the house-renting money (dueto the decision of the Chairman ofProvincial PC)
- Subsidy for life and production 30 kg of rice/month/person within 3stabilization months if not displace; within 6 months if
displacing the accommodation and within12 months if displacing to the difficultaccommodation.
Supporting 30% of the income in oneyear if affecting to the business.
- Subsidy for changing career and The impacted household losing over 30%creating the employment area of the agricultural production land
will be supported for changing career.
- Other subsidy levels Due to the decision of the Chairman ofProvincial PC.
3.5 IMPACTED CATEGORIES
By the nature of the project impacts as described above and based on the survey
of the PAPs the impacted categories are classified into 7 categories.
Categorv 1: Temporary acquisition of productive land in ROW.
Categorv 2: Temporary acquisition of residential land and garden land in ROW
without houses or structures in ROW.
Categorv 3: Temporary impact on residential and garden land. Partial
house/building within ROW (the impacted area is less than 25% but not affect to the
Resettlement Action Plan 31
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
common structure. Residential and garden land outside of ROW is sufficient for re-
organizing (over 60m2 in urban area and lOOm2 in rural area).
Category 4: Temporary impact on residential and garden land. Impact more than
25% or less than 25% of total house/building area and impact to the common structure.
Land outside of ROW is sufficient for re-organizing (over 60m2 in urban area and
100m2 in rural area).
Categorv 5: Temporary impact on residential or garden land in ROW.
House/structure is partially or totally affected. Land outside of ROW is not sufficient
for re-organizing (less than 60m2 in urban area and 100m2 in rural area).
Cate2ory 6 : Permanent land acquisition for tower foundation.
Categorv 7: PAP impacted on business or other services
Refer to Appendix 1 for details of impacted categories.
Resettlement Action Plan 32
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
CHAPTER 4
SOCIO-ECONOMIC CONDITION OF PROJECT AREA &
PROJECT IMPACTS
4.1. Inventory of project impacts
Inventory of project impacts is implemented by PECC4 with coordination and
assistance of project local authorities. The content of inventory focuses on:
- Overall survey of project affected households
- Survey of affected public assets, enterprises, collective farm,
afforestration yards,...
- Survey of land acquisition area for project construction.
The survey is implemented by Survey Group in coordination with project
affected local sections. Each survey group consists of 3 or 4 people. General survey
votes concerning the socio-economical condition as well as impacts on land, trees,
crops, etc... are established for 100% households with houses affected byproject.
Socio-economic survey was implemented with households for so as to
determine characteristics of affected community, evaluating the population condition,
premises, main economic activities, income of households,... The data of this socio-
economic survey are used to orient the resettlement and compensation policy and to
make base for measurement of life rehabilitation level in the process of resettlement
implementation later on.
4.2. Socio-economic condition of project area
4.2.1. Phu Yen Province
Economy: Phu Yen Province gets low point of departure in economy but in the
period 1991 - 1995, GDP has increased in average 9.4% each year, in 1995 - 1998
increased correlatively 1,037 milliards VND, 1,168 milliards VND and 1,355 milliards
VND.
Society: Phu Yen is divided in 8 administrative units: Tuy Hoa city and 07
districts: Tuy An, Song Cau, Dong Xuan, Son Hoa, Song Hinh, Phu Hoa and Tuy Hoa.
Tuy Hoa city is the socio-economic and cultural centre of the province. Phu Yen has
many ethnic groups among which the Kinh people occupies 95.5% of the total
Resettlement Action Plan 33
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
population, the remaining ethnic minorities are Ede, Bana, Chami Hroi and others living
mainly in mountainous districts: Song Hinh, Dong Xuan, Son Hoa with irregular
distribution. The population living in countryside is 81.1%, city is 18.9%.
Socio-economic development objectives in the period 2000 - 2010
- GDP growth rate on average annually 12 -13%.
- GDP per capita on average in 2010 reaching 700 -800 USD.
- Export turnover striving to reach 30 millions USD in 2010.
- Budget revenue striving to reach 12% GDP in 2010.
- Population increase rate will be reduced to 1.7% in the period 2001 - 2010.
4.2.2. Khanh Hoa Province
Khanh Hoa is a province belonging to the coastal of Central South region,
adjacent to Phu Yen province in the North, to Ninh Thuan province in the South, to
Dak Lak and Lam Dong provinces in the West and to the Eastern Sea in the East. For
administrative mechanism, Khanh Hoa is divided into Nha Trang city (the political,
economic and cultural centre of the province), Cam Ranh town and 6 districts namely
Van Ninh, Ninh Hoa, Dien Khanh, Khanh Son, Khanh Vinh and Truong Sa (Truong
Sa is an island district). The population of the whole province to 2000 is 1,055,372
people. Khanh Hoa is a province with many ethnic groups in which Kinh people takes
majority and the remaining ethnic minorities are Rakley, Cham,etc...
4.3 PROJECT IMPACTS
Categories of Project impacts:
Safe corridor for the line route is defined on the Decree No.54-1999/ND-CP
dated 8 July 1999 by Gov on security protection for high voltage power network and
Decree No. 118/2004/ND-CP dated May 10th, 2004 regarding the amendment of some
articles in No.54-1999/ND-CP dated July 8th, 1999.
Project impacts'including of:
+ Perpetual land acquisition for tower construction.
+ Temporary land acquisition consisting of:
- All high trees over 4 meters high in the safe corridor of T/L will be cut.
- All structures out of the safe corridor but it is supposed to impact to the
project or be affected by the project such as bomb and mine warehouse, gas station,
Resettlement Action Plan 34
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
stone mine, communication centers, etc will be removed. It should avoid these
structures during process of investigation; if it is impossible due to difficult
topography, removal of these structures must be considered and discussed.
- Areas of safe corridor of T/L and land area during the process of pulling
conductors, etc... The impacted land area will be expected temporarily acquired from
01 month to 12 months.
Results of survey
Inventory survey workfor project impacts was carried out from 2004. Results are
as below tables:
Table 4.1: Inventory ofproject land impacts
No. Kind of impacts Unit Phu Yen Khanh Hoa Total
1. Houses
Compensation on
houses, upgrading the 2
connection of earth- 551 5,100 5,651
wire.
2. Trees
a) Paddy, crops m2 146,359 211,187 357,546
b) Cashew tree 133 5,079 5,212
c) Eucalyptus tree 20,946 50,615 71,561
d) Fruit trees tree 1,524 10,642 12,166
e) Natural forest ha 11.52 23.38 34.9
Area of perihanent land 23. ... m2 20,213 27,132 47,345
acquisition
Categories of affected households
Due to the specific characteristic of the T/L development project, affected
households are classified as per Appendix 1.
Resettlement Action Plan 35
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
CHAPTER 5
PUBLIC PARTICIPATION AND CONSULTATION
5.1 Objectives of information campaign and consultation program
Information dissemination to consultation with and participation of the affected
people and involved agencies (i) reduce the potential for conflicts (ii) minimize the
risk of project delays and (iii) enable the project to design the resettlement andrehabilitation program as a comprehensive development program to fit the needs and
priorities of the affected people thereby maximizing the economic and social benefits
of the project investment.
The objectives of the Public Information Campaign and PAP Consultation
Program are as follows:
* To share fully information about the proposed project its components and its
activities with the affected people.
* To obtain the cooperation and participation of the affected people and* communities required to be undertaken for resettlement planning and implementation.
* To ensure transparency in all activities related to land recovering,
compensation, resettlement and rehabilitation for PAPs.
* To obtain information about the needs and priorities of the affected people as
well as information about their reaction/feedback to proposed policies and activities.
PAPs will be entitled to participate in different stages during the process ofinvestigation, survey, RAP preparation and implementation. They will be invited to
participate in meetings organized by the owner and local authorities in order to offeropinions on replacement alternatives, entitlement policies, listening to procedures,
process of grievance implementation, responsibility of competent institutions and
responsibility of PAPs during the process of RAP implementation.
5.2. Information campaign, PAPs & agency consultation
There are two phases of the public information campaign and RAPconsultation:
Resettlement Action Plan 36
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
Phase 1:
During RAP survey and establishment, make interviews with PAPs for their
expectation and selection of compensation measures, During the process of
investigation, make coordination with local authorities for agreement on line route
selection.
Phase 2:
After RAP's approval, PMB and local authorities will organize meetings with
PAPs to announce information of project, compensation policy and entitlement,
replacement solutions, allowances, subsidy mentioned in RAP plan.
To ensure that PAPs, their representatives and local governments of the affected
areas fully understand on the details of RAP, PMB will also announce to all PAPs the
compensation and rehabilitation policy applied in the project before making
compensation and resettlement payment for PAPs.
The information announced to all PAPs consists of:
Part 1 - Project description,
- Project objectives
- Implementation schedule
- Project impacts
- PAPs' entitlements
- Institutions are responsible for resettlement
Part 2 - Specific entitlements of PAPs
- Description of the detailed impact of the project on the specific
household
- Compensation rates for each type of impact
- Legality and Eligibility to compensation
- Resettfement and rehabilitation alternatives
- Implementation schedule for compensation and resettlement
5.3. Information dissemination and PAPs' consultation
According to policy applied in this project, all PAPs are entitled to project
infonnation, entitlement to compensation. All PAPs have the right to take part in RAP
implementation to ensure that they enjoy proper compensation.
Resettlement Action Plan 37
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
PAPs will be informed and consulted through the following stages:
+ Staffs of PMBs and Resettlement Committees of provinces, districts (town)
and commune (ward) authority confinn the land acquisition part and make inventory
of all structures, land, crops and trees affected by the project with the help of PAPs as
well as the public structures affected.
+ PMP and Resettlement Committees of provinces, districts, commune
authority will organize meetings with participants of land recovering process,
announce the project information to them, discuss on their suggestion and opinions,
All PAPs and people are invited to participate in this meeting.
The meetings schedule and participants are expected as follows:
The first time:
It is expected to organize after the project's approval with the above mentioned
content, but the project impacts and resettlement and compensation policy are pressed
in order to take advantage of PAP's participation in the inventory and survey work.
Participants are:
- Representative of PMB
- Representative of Provincial Resettlement Committee
- Representative of District level authority
- Representative of Commune level authority
- PAPs or representatives of PAPs
The second time:
It is expected to organize before resettlement and compensation payment, with
the same content of the I" time but compensation policy and schedule are pressed to
ensure the fair and give favorable condition for site clearance work.
Participants are:
- Representative of PMB
- Representative of Provincial Resettlement Committee
- Representative of District level authority
- Representative of Conmmune level authority
- PAPs or representatives of PAPs
- Representative of PECC4
Resettlement Action Plan 38
moI
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
The meetings are organized with following content:
+ Cadres of PECC4 state the project objectives, make detailed description of the
project impact on land, agricultural crops, the policies, principles of implementation as
well as inform the policies of compensation on properties, land, agricultural crops of
the project Compensation Committee.
+ Reference to opinions during the project execution stage
+ General information on the project
Right after signing credit agreement and preparation for project
commencement, the. Project Management Board will organize meetings with involved
Provincial People's Committees of Binh Dinh, Phu Yen, and Quy Nhon city; District
People's Committees of Song Cau, Tuy An, Tuy Hoa, Phu Hoa and PC of affected
communes in order to inform local authorities of all levels on project policy,
suggesting them to coordinate their activities concerning the site clearance work.
+ General information on RAP
When carrying investigation on project impact, a campaign of information and
reference on opinions about RAP must be taken including: socio-economic documents,
investigation sheet on statistics of land, properties, agricultural crops being affected;
giving instructions on filling all necessary information in the available investigation
sheet, organize people meetings to inform the policies of compensation price applying,
the progress of project for affected households and local authorities of all levels.
+ Information spread on local multi-media means
The PMB works in combination with the local authorities for information on
multi-media means such as local radio system about the project such as the stages of
project development, information on RAP and project impact on the community in the
project area.
After obtaining the public comments, summarizing the results collected with
the agreement of local inhabitants in the project area and RAP is approved,
compensation measures will be carried out, and from then implementing the site
clearance work and preparing for work execution.
Resettlement Action Plan 39
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
CHAPTER 6
GRIEVANCE AND APPEALS
The main objective of RAP implementation is to ensure the fair and adequacy
during compensation payment for PAPs. The resettlement and compensation program
should be implemented in such a way that satisfies both partners: the owner and PAPs,
grievance, complaint and solution are the process related to the owner and PAPs
during the process of RAP implementation. To solve them timely and effectively,
relevant institutions such as PMB, DRC, PRC need to respond to the complaints of the
PAPs speedily and sensibly, avoid project delays and difficulty for PAPs. The solution
should be agreed by PAPs.
During the project implementation, PAP's complaints and grievances will be
dealt with according to the regulation of Vietnamese laws. PAPs raising complaints
will be treated fairly and guided by related agencies on the order, procedures and
complaints of RAP, in addition no charge will be paid for their complaints.
Since the entire resettlement and rehabilitation program is being carried out
with the participation of the PAPs and the impacted scale of this project will be
relatively snall, it is expected that no grievance issue will arise. However, to ensure
that the PAPs have avenues for redressing their grievances related to any aspect of
compensation and resettlement, detailed procedures of redresses of grievances have
been established for the project. The mechanism is designed to be easy, transparent
and fair. By resolving grievances at the project level, the progress of the project would
be more effective ascertained.
Complaints and grievances related to any aspect of RAP's, including the
determined area and price of the lost assets, will be handled as follows:
First step:
If any person is aggrieved by any aspect of the resettlement and rehabilitation
program, he/she can lodge an oral or written grievance with commune authorities.
Commune People's Committee will resolve the issue within fifteen days from the date
it receive the complaint.
Resettlement Action Plan 40
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
Second step:
If any aggrieved person is not satisfied with the decision in stage 1, he/she can
bring the complaint to the District People's Committee (PAPC) or District
Resettlement Committee (DRC) within fifteen days from the date of the receipt of the
decision in stage 1. The District People's Committee (DRC) or District Resettlement
Committee (DRC) will reach a decision on the complaint within fifteen days.
Third step:
If the PAP is still not satisfied with the decision at district level, he/she can
appeal to the Provincial People's Committee (PCC) or Provincial Resettlement
Committee (PRC) within 15 days of receiving the decision of the PAPC or DRC. The
Provincial People's Committee (PRC) or Provincial Resettlement Committee (CRC)
will reach a decision on the complaint within fifteen days.
Fourth step:
If the PAP is not satisfied with the decision of the Provincial level, the case may
be submitted for consideration by the District Court within 15 days of receiving
the decision of the PPC or PRC.
PAP's will be exempted from all administrative and legal fees.
Coercion for site clearance can not be applied while PAPs are waiting for solving
the complaints.
In case an oral compliant is made, it will be written on paper by the commune
and processed. Commune People's Committee will resolve the issue within 02 weeks.
In case of PAPs are illiterate persons, they can make an oral complaint with the
representatives of affected households and their representatives will record all queries
to submit to authority levels.
Every authority level will resolve the complaints as per the time regulated above.
The disputes are organized publicly and implemented in accordance with law.
Detailed procedures for redress of grievances and appeal process shown publicized
among the PAPs during participation meetings and also in the offices of RBs.
Resettlement Action Plan 41
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
CHAPTER 7
MONITORING & SUPERVISION
Inplementation of RAPs will be regularly supervised and monitored by the
respective PCs/PMB in coordination with the respective District and Communes
Peoples' Committees and Communes. The findings will be recorded in quarterly reports
to be furnished to EVN or MOI.
7.1. INTERNAL MONITORING & SUPERVISION
Internal supervision and monitoring include the following activities:
- Verify that the baseline infonnation of all PAP's has been carried out and
that the valuation of assets lost or damaged, and the provision of
compensation, resettlement and other rehabilitation entitlements has been
carried out in accordance with the provisions of this Policy Framework
and the respective RAP.
- Oversee that the Inventories and RAP's are implemented as designed and
approved.
- Verify that funds for implementing the Inventories and RAP's are
provided to the respective PMBs at local level (provincial/district) in a
timely manner and in amounts sufficient for their purposes, and that such
funds are used by the respective PMB's in accordance with the provisions
of RAP.
- Record all grievances and their resolution and ensure that complaints are
dealt with in a timely manner.
7.2. Independent monitoring
An independent agency or individual consultant will be retained by PMB of the
MOI and EVN to periodically carry out external monitoring and evaluation of the
implementation of RAP's. The independent agencies will be academic or research
institutions, non-Govermnental Organizations (NGO) or independent consulting firns,
all with qualified and experienced staff and terms of reference acceptable to the World
Bank.
Resettlement Action Plan 42
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
In addition to verifying the infonnation furnished in the internal supervision and
monitoring reports of the respective PMBs, the external monitoring agency will visit a
sample of 20% of household PAPs in each relevant province six months after each RAP
implementation to:
- Determine whether the procedures for PAPs participation and delivery of
compensation and other rehabilitation entitlements has been done in
accordance with this Policy Framework and RAP.
- Assess if the Policy Framework objective of enhancement or at least
restoration of living standards and income levels of PAPs have been met.
- Gather qualitative indications of the social and economic impact of
Project implementation on the PAPs.
- Suggest modification in the implementation procedures of RAPs, as the
case may be, to achieve the principles and objectives of this Policy
Framework.
n
Resettlement Action Plan 43
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
CHAPTER 8
IMPLEMENTATION ORGANIZATION ON
COMPENSATION AND RESETTLEMENT PLAN
8.1. MEASURES FOR THE PROJECT IMPLEMENTATION
8. 1.1. Announcement to PAPs
All PAPs shall be thorough informed about the rights and policies of RAP
including entitlement policies, rate of compensation for every type of impact, the
active participation right in land acquisition process, complaint and grievance. RAP
information will be prepared by PMB and announced to all PAPs or informed at the
meetings in province, district and commune levels; on television, radio, newspaper,
hung in public places such as administrative quarters of communes and schools.
Public announcement tasks shall be implemented immediately after EVN and WB's
approval of project is obtained. The information announced consists of:
+ Schedule of project implementation
+ Eligibility and non-eligibility to compensation and resettlement
+ The compensation principle of households using land before inventory
making, official announcement about land acquisition of State
8.1.2. Compensation deadlines
The project impacts conclude of households with areas of residential land,
agricultural land, forestry land, etc... affected permanently or temporarily. PAPs
agreed to displace and receive compensation amount so the RAP is carried out in
package to PAPs. Compensation payment for land, assets, paddy and crops; land
delivery for resettlement -should be done at least 02 months before the project land
acquisition.
PAPs will receive subsidies at the beginning of months and after their
receiving, they will have to transfer land for Site Clearance Board at least one month
before construction time.
8.2. RAP implementation process
RAP implementation will be included in 3 actions as below:
Resettlement Action Plan 44
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
+ General action: Just at once when beginning the RAP implementation work of the
project.
+ Continuously action: Continuously action for the stages of RAP implementation.
Basic actions of the project
Action 1:
After RAP approved, PMB hires qualified agency for independent monitoring, this
agency must be approved by EVN and WB.
Action 2:
Provincial authorities and PMB are required to supply Resettlement Committees with
fully costs and declare the tasks for RAP implementation.
Action 3:
District Resettlement Committees carry out the Detail Measurement Survey of affected
assets and socio-economic conditions, determining the compensation unit price and if
necessary, checking and readjusting it in order to make compensation at market price
and conversion price.
Action 4:
Immediately the ends of final inventory survey, Resettlement Committees of Districts
will inspect and define the official number of PAPs, impacted properties and total
compensation amount for PAPs.
Action 5:
Resettlement Committees will officially announce the RAP policy, schedule of project
implementation and information for RAP to PAPs at public meetings including issues
related to compensation, resettlement and land clearance.
Action 6:
It is suggested to give priority to compensation payment for households with
permanent impacts, as'sisting them in transferring the production mode and mechanism
or with land for resettlement and life stabilizing. After that, making compensation
payment for PAPs affected on other properties.
Action 7:
During the project implementation, Independent and Internal Monitoring Institutions
will supervise/ monitor all actions of RAP implementation, at the same time giving
Resettlement Action Plan 45
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
proposals, discussions or report the changes during project implementation as well as
suggest solutions.
8.3. RAP implementation schedule
RAP will be implemented as per the schedule established to ensure the site clearance
work and schedule on project construction.
Payment of rehabilitation and furnishing of other restoration/assistance entitlements is
made in cash.
Organizational arrangement
Power companies and all project provinces will arrange full experienced staffs to
ensure that RAP will be implemented smoothly as per the accepted schedule.
Resettlement Action Plan 46
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
CHAPTER 10
CONCLUSION AND PROPOSALS
10.1. Conclusion
After investigation, summing up data on damages in the ROW, consulting
opinions of the relevant local authorities and community of affected households,
Through the making of RAP, we have the following conclusions:
* Investment for works construction is necessary in order to receive energy
power from Song Ha Ha Hydropower Plant and energy power transmitted on the line
meets the requirements of energy use in local sections.
* As the secure corridor of route line and construction site of substation
spreading on the area of 02 provinces, at development of compensation and making
land clearance works of the project, the relevant local committees and services have to
work in combination to ensure favorable results.
* Report on determination of land surface, trees and agricultural crops being
* affected by the project.
* Summing up report and calculation on damages due to the project, then
bringing up common compensation price.
* Study and submission of RAP planning for community of affected inhabitants.
10.2. Proposals
* Detailed investigation of affected items must be carried out so as to supply
detailed compensation price for each affected household.
* Deep and broad propagation of information on the project by multi-media
system, etc.. .to the habitants in order to minimize the negative impact of individuals
profiting of the standpoint, investment policy of the government.
* The Project Management Committee, Resettlement Committee and
Compensation Committee have to inspect closely the execution of compensation and
land clearance works in preparation of work execution.
* Appointment of a standing team to solve in a timely way the complaints and
claims of affected households.
Resettlement Action Plan 50
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
APPENDICES
R
Resettlement Action Plan 51~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
ANNEX 1: ENTITLEMENT MATRIX
No Type of loss Applicati Definition of Compensation Policy Implementation Issueson entitled PAPs
I Temporary All PAPs PAPs - Cash compensation for affected - Trees have to be cut are regulated by Article 1-acquisition of have trees, with/without trees at the replacement cost plus Item 2 of Decree No.11 8/2004/ND-CP dated Mayproductive land in crops, land cost for cutting trees, crops at 10th, 2004 regarding the amendment of someROW other certificate market price. Number of crop article in No.54-1999/ND-CP dated July 8th, 1999.
assets in included in patterns to be compensated based on the protection of the high voltage networks.ROW the inventory on the time of temporarily acquired - PMB and local authorities determine and ensure
or able to of land. that compensation for trees wili be at theprove land - No compensation for land replacement cost and for crops at the market price.occupancy - Rehabilitate land after the project If PAP is requested for cutting affected trees, PMBpror to cut- construction. will pay money for this work. PAP has right foroff date. using salvageable trees.
- Full compensation at least 01 month before landclearance. Payment to PAPs will be delivered byPMB and Resettlement Committees (RCs).- Affected land in ROW will be rehabilitated bycontractors after the project construction and landcould be used with the restricted purposes.- Finance available for compensation and wellinformation disclose/ disseminate
2 Temporary All PAPs -do- - Cash compensation for affected - Trees have to be cut are regulated by Article 1-acquisition of with fruit trees and trees at replacement Item 2 of Decree No.11 8/2004/ND-CP dated Mayresidential and orchards cost. 10th, 2004 regarding the amendment of somegarden land in or trees in - No compensation for land article in No.54-1999/ND-CP dated July 8th, 1999ROW without ROW - Rehabilitate land after the project on the protection of the high voltage networks.house or structuresin ROW construction. - PMB and local authorities determine and ensure
Resettlement Action Plan 52
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
No Type of loss Applicati Definition of Compensation Policy Implementation Issueson entitled PAPs
that compensation for trees will be at thereplacement cost. If PAP is requested for cuttingaffected trees, PMB will pay money for this work.PAP has right for using salvageable trees.
- Full compensation to PAPs at least 01 monthbefore land clearance. Affected land in ROW willbe rehabilitated by contractors after the projectconstruction- Payment to PAPs will be delivered by PMB andRCs
- Finance available for compensation and wellinfbrmation disclose/ disseminate
3 Temporary impact All PAPs -do- House/ building: - House and building have to be demolished oron residential and have - PAP can opt for i) Remain their could be existed are regulated by Article 1- Item 3garden land. Partial house/buil houses or building in ROW with the of Decree No.118/2004/ND-CP dated May 10th,house/building ding and conditions regulated by - Trees have 2004 regarding the amendment of some article inwithin ROW (area trees/fruit to be cut are regulated by Article 1- No.54-1999/ND-CP dated July 8th, 1999 on thein ROW less than trees in Item 3 of Decree No.11 8/2004/Nf)- protection of the high voltage networks.25% of total area) ROW CP dated May 10th, 2004 regarding - Consultation for PAP's options on remain theirand the demolished the amendment of some article in house in ROW or move out of ROW.area does not No.54-1999/ND-CP dated July 8th, - PMB and local authorities determine and ensureimpact to the 1999 on the protection of the high that compensation will be at the replacement cost,remaining voltage networks.Subsidy allowance without deduction for salvageable materialshouse/building. for fireproof materials and lightning - PAPs will demolish the impacted part/ room andResidential land arrestors for the existing reconstruct/or improve their houses themselves.and garden land house/building; or ii) Cashoutside of ROW is compensation for the directly - Full compensation for trees and fruit trees at leastsufficient for re- affected rooms at the replacement 01 month before land clearance. If PAP is requestedorganizing (more - cost and cost for demolishing an for cutting affected trees, PMB will pay money for
Resettlement Action Plan 53
* . * . *~~~~~~~~~~~~~~~~~~~~~. . {#
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
No Type of loss Applicati Definition of Compensation Policy Implementation Issueson entitled PAPs
than 60 m2 in the cost and cost for demolishing an this work. PAP has right for using salvageableurban area and 100 affected room. trees.mt in the rural - No compensation for land. - Full entitlement to PAPs impacted onarea). - Rehabilitate land after the project house/building at least 03 months before land
construction by contractors. clearance.Tree and fruit tree - Payment to PAPs will be delivered by PMB and- Compensation for affected trees RCsand fruit trees at the replacement - land in ROW could be used with restrictedcost.Allowances: purposes.Allowances: - Finance available for compensation and well
- Relocating allowance of 30 kg of information disclose/ disseminaterice equivalent per person per monthin six months.
4 Temporary impact All PAPs -do- House/ building: - House and building have to be demolished oron residential and have - PAP can opt for i) Remain their could be existed are regulated by by Article 1- Itemor garden land. house/buil houses or building in ROW with the 3 of Decree No.1 18/2004/ND-CP dated May 10th,Impact more than ding and conditions regulated by - Trees have 2004 regarding the amendment of some article in25% or less than trees/fruit to be cut are regulated by Article 1- No.54-1999/ND-CP dated July 8th, 1999 on the25% of total trees in Item 3 of Decree No.1 18/2004/ND- protection of the high voltage networks.house/building ROW CP dated May 10th, 2004 regarding - Consultation for PAP's options on remain theirarea but the the amendment of some article in house in ROW or move out of ROWdemolished area No.54-1999/ND-CP dated July 8th, - PMB and local authorities determine and ensurewill impact to the 1999 on the protection of the high that compensation will be replacement cost at theremaining of voltage networks. Subsidy time of payment.house/structure. allowance for fireproof materials - PAPs will demolish the impacted areas andLand outside of and lightning arrestors for the reconstruct/orempoves theirmhosesthemsaelvs.anROW is sufficient existing house/building; or ii) Cash reconstruct/or improve their houses themselves.for reorganizing compensation at replacement cost - Full compensation for trees and fruit trees to PAPs(more than 60 m2 for full areas of imoacted at least 01 month before land clearance. If PAP is
Resettlement Action Plan 54
I~~~~~~SSI
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
No Type of loss Applicati Definition of Compensation Policy Implementation Issueson entitled PAPs
in the urban area for full areas of impacted requested for cutting affected trees, PMIB will payand 100 m2 in the house/building. money for this work. PAP has right for usingrural area). - No compensation for land. salvageable trees.
- Rehabilitate land after the project - Full compensation for impacted house andconstruction by contractors. allowances to PAPs at least 03 months before land
, clearance.Tree and fruit tree - Payment to PAPs will be delivered by PMB and- Compensation for affected trees RCsand fruit trees at the replacement - Cleared residential could be reused with restrictedcost.
. ~~~~~~~~purposes.Allowances:-upssAllowances: - Finance available for compensation/
- relocating allowance of 30 kg of rehabilitation and well information disclose/rice equivalent per person per month disseminatein six months.
5 Temporary impact All PAPs -do- PAPs can opt for one of the - House and building have to be demolished oron residential and have followings: could be existed are regulated by Article 1- Item 3or garden land in house/build i) Remain their houses or building of Decree No.118/2004/ND-CP dated May 10th,ROW. Full or ing and in ROW with the conditions 2004 regarding the amendment of some article inpartial trees, fruit regulated by Article 1- Item 3 of No.54-1999/ND-CP dated July 8th, 1999 on thehouse/building trees in Decree No.118/2004/ND-CP dated protection of the high voltage networks.impacted and land ROW May 10th, 2004 regarding the - Consultation for PAP's options on remain theiroutside of is not amendment of some article in house in ROW or move out of ROWsufficient for No.54-1999/ND-CP dated July 8th, - PMB and local authorities determine and ensurereorganizing (less 1999 on the protection of the high that compensation will be at replacement cost atthan voltage networks. Subsidy the time of payment.60 m2 in the urban allowance for fireproof materials - Replacement land, and resettlement sitesarea and 100 m2 in and lightning arrestors for the development.thi, r,rl m r02d oyictlntr hr ai-r ii r_h development.
Resettlement Action Plan 55
a . a.,
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
No Type of loss Applicati Definition of Compensation Policy Implementation Issueson entitled PAPs
the rural area) existing house/building; or ii) Cash - PAP receivecompensation for the whole - PAPs receiving compensation will demolish theresidential area which PAP occupied impacted areas and reconstruct/or improve their(not only for the impacted areas) and houses themselves.properties associated with occupied . .land at replacement cost. Impacted - Full compensation for trees and fruit trees toland will be obtained by local PAPs at least 01 month before land clearance. Ifauthorities; or ii) "Land for land" PAP is requested for cutting affected trees, PMBwith the same area PAP occupied will pay money for this work. PAP has right forand cash at replacement cost for the using salvageable trees.affected assets associated with land. - Full compensation for land impacted house andLand occupied by PAP will be allowances to PAPs at least 05 months before landobtained by local authorities. clearance.
- Compensation for affected trees - Payment to PAPs will be delivered by PMB andand fruit trees at the replacement RC(scost. - Cleared residential could be used with restricted
Allowances: purposes.. elcaig llwac o 30 gof - Finance/ land available for compensation/
-. eoaigalwneo 0k rehabilitation and well information disclose/rice equivalent per person per month disseminate.in six months dseiae
fo - PMB consult with PAP who are eligible to- Transportation allowance for rehabilitation for their options and prepare proposalrelocating PAP according to the for rehabilitation programs in the period of RAPCompensation Decree 22/1998 CPimlenao.dated April 22, 1998 of GOV. implementation.
- Rehabilitation assistance if PAPspermanently losing business or morethan 25% of their incomes.- Incentive for relocating in a timely _
ResettlementAction Plan 56
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
No Type of loss Applicati Definition of Compensation Policy Implementation Issueson entitled PAPs
manner: 5,000,000 VND/HH
6 Permanent All PAPs -do- For PAP losing productive land: - Consultation for PAP's options on landacquisition of land occupied a Land loss less than 25% of their compensation.for tower land and total landholdings - PMB and local authorities determine and ensurefoundations, properties - Cash compensation for the lost area that compensation will be at replacement* cost atsubstation and associated if the remaining plot is still the time of payment.access roads etc. with land economically viable. - Replacement land, and resettlement sites
permanently impacted - Cash compensation for the whole development.by towers impacted plot if the remaining plot - PAPs receiving compensation will demolish thefoundations is not economically viable. impacted areas and reconstruct/or improve their, substation - Cash compensation for properties houses themselves.and access associated with land - Full compensation for trees and fruit trees toroads etc. h. Land loss equal or more than PAPs at least 01 month before land clearance. If
25% of lseir total landholdings: PAP is requested for cutting affected trees, PMB25 APof their toptallandhol s t will pay money for this work. PAP has right for
followings: using salvageable trees.- Full compensation for impacted house and
i)"Land for land" with the same area allowances to PAPs at least 05 months before landand productive of impacted area if clearance.the remaining plots are still..economicviable and for the whole - No award civil work contract before completionimpacted plots if the remaining of compensation and reorganizing houses orimpaced pots f theremaningrelocation.plots are not economicviable.
- Payment to PAPs will be delivered by PMB andii) Cash for land at the replacement RCscost.
cost. - Finance/ land available for compensation/- Compensation for trees and affected rehabilitation and well information disclose/fruit trees at the replacement cost. disseminate.
Resettlement Action Plan 57
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
No Type of loss Applicati Definition of Compensation Policy Implementation Issueson entitled PAPs
- Rehabilitation assistance. - PMB consult with PAP who are eligible toFor PAP losing Residential and rehabilitation for their options and prepare proposalgarden land: for rehabilitation programs in the period of RAP- If remaining land is sufficient implementation.for reorganizing (more than 60 m2. - PAPs will be granted with Land Use Rightin the urban area and 100 m2 in the Certificaterural area): Cash compensation for without payment of administrative fees.lost area and assets associated withland.
- If remaining land is not sufficientfor reorganizing:PAP can opt for i) cash compensationat replacement cost for land andassets on land, or ii) "land for land"compensation for the wholeresidential area which PAP occupied(not only for the impacted areas) andproperties associated with occupiedland. For affected house and building,the same entitlement to PAP ofcategories 3 or 4 or 5.
7 PAP impacted on All PAPs -do- (a) Temporary impact on business or - Full compensation for incomes lost to PAPs atbusiness or other impacted other services. least 01 month before land clearance.services on business Compensation for income lost in the _ PivB consult with PAP who are eligible to
and other affected time rehabilitation for their options and prepare proposal
other sermanvices, for rehabilitation programs in the period of RAPother services. ~implementation.Rehabilitation assistance.
Resettlement Action Plan 58
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
APPENDIX 2: TABLE OF COMPENSATION QUANTITY
IN PHU YEN PROVINCE
TotalNo. Items Unit Quantity Unit pricel . ~~~~~~~~~~~~~(VND)l
Costs for compensation 3,051,806,820of houses and land fees. l1 Compensation on houses, 2 551 161,358,3201 upgrading the earthwire m ,2. Eucalyptus tree 20,946 20,000VND/tree 418,920,0003. Cashew tree 133 50,000VND/tree 6,650,0004. Fruit tree tree 1,524 500,OOOVND/tree 762,000,0005. Paddy, crops 146,359 1,500VND/m 2 219,538,5006. Natural forest ha 11.52 20,000,OOOVND/ha 230,400,000
Cost for changing the7. transfering right of m2 20,213 54,000VND/m2 1,091,502,000
perpetual acquisitiontower positionCost for life stabilization
8. for PAPs. people 54 75,OOOVND/person 24,300,000(6 people/household; rice x 6 months3,000VND/kg)
9. Purchasing land for m2 551 200,000 VND/HH 110,138,000resettlement, class 3 k= 1,0 (1
Displacement of10. impacted HHs to the new HH 9 3,000,000 VND/HH 27,000,000
place l
Costs for Compensation 30,518,068H_ Committee I% (I) 30__518_068
Total compensationcost of Phu Yen 3,082,324,888
l___ Province
Resettlement Action Plan 59
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
COSTS FOR COMPENSATION IN KHANH HOA PROVINCE
TotalNo. Items Unit Quantity Unit price
Costs for compensation 8,741,723170of houses and landfees.
1 Compensation on houses, 2
upgrading the earthwire m 5,100 964,246,670
2. Eucalyptus tree 50,615 30,000VND/tree 1,518,450,000
3. Cashew tree 5,079 30,OOOVND/tree 152,370,000
4. Fruit tree tree 10,642 250,OOOVND/tree 2,660,500,000
5. Paddy, crops m2 211,187 1,500VND/m 2 316,780,500
6. Natural forest ha 23.38 20,000,OOOVND/ha 467,600,000
Cost for changing the
7. perpetual acquisition m2 27,132 54,000VND/m2 1,465,128,000
tower positionlCost for life stabilizafionl8. for PAPs. people 186 75,OOOVND/person I
8. (6 people/household; nce e x 6months
3,OOOVND/kg) __.
Purchasing land for 2 200,000 VND/HH9. resettlement, class 3 m 5,100 k= 1,0 1,019,948,000
Displacement of impacted 3,000,00010. DipaeetHH[ 31 VN/H 93,000,000
HHs to the new place VND/HH
Costs for CompensationCommittee 1%(I)
Total compensation costof Khanh Hoa Province 8,829,140,402
Resettlement Action Plan 60
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
Total cost for RAP implementation for
Tuy Hoa - Nha Trang 220kV transmission line
No. Item Amount (VND) Remarks
1 Compensation cost for Phu Yen province 3,082,324,888
2 Compensation cost for Khanh Hoa province 8,829,140,40
3 Total compensation cost 11,911,465,290
4 Cost for RAP establshment 308,673,686
Total cost for compensation and RAP
5 establishment 12,220,138,976
6 Management cost 119,114,653
7 Supervision cost 244,402,780
8 Contingency cost 1,222,013,898
9 Total cost for implementation 13,805,670,30 7
Resettlement Action Plan 61
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
Annex 3: Inventory of Project Affected People
Loss of TempName of Head of No. of Loss of Assets Loss of oOter assets Other Losses orary
surve Household rn Hhold Total Land to be Loss as % Number and type of Structures Structure Area of Fruit trees Eg., Losse
y No. Landholding Acquired m of lost structures pennanent s residential lost Type Paddy Other Tombs, well, Residence Business Income s
Of Hhold in 2 MIl by Type tota (M2) texnporar land lost and area (Specify) etc. (rented) Lost Loss (speciy (Mh) (M) Number (M2) (No. &type _Y)
Mau Lam Bk village- Hoa Quang Bac commune- Phi HoA district- Phu Yen province
I Nguyen Van Ly 4 200 20 10 house foundation 20 _
2 Nguyen Van That 4 200 13.94 6.97 cow shed 13.94
3 Nguyen Dinh Han 5 200 8.28 4.14 pig shed 8.28 _ _
4 Nguyen Van Thoai 4 200 12 6 cow shed 12
5 Le Van Thuan 4 200 kitchen
Dinh Thai village-HoA Djnh Dong commune- Tuy Hoa district- Phu Yen province
6 NguyenL8 1 200 22.5 11.25 1 temporarY house 9
_ _ _ _ _ _ _ _ _ _ _ _ _ _ I _ _ _ _ _ _ I _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ cow shed _____ 13.5 _____ c s e1
MY Thnh Dong village- HoA Phong commune- Tuy Hoa district- Phu Yen province
house 78
7 TranThiDien 4 908 111 12.22 kitchen 7
________ ____| _ | yard 26
. 5 l 1 1 1 ~~~~~~~lean-to 68 TrAnCung 5 200 26 13 |
_______ _______ cow shed 20 _
9 NguyenHongThinh 7 608 11.17 house 47.3
_ _________________ _______ __________ ________ _______ kiosk 20.64 _______ _______ _______ _______kosk_20_6
Resettlement Action Plan 62
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
. ~~~~~~~~~~~~~~~~~~~~extra house 40 01 well
10 Nguyen Thi An 3 200 92 46 kitchen 106
brick yard 36 .
Phir6c Thinh village- HoA Phong commune- Tuy HoA district - Phu Yen province
11 Nguyen Van D9ong 7 750 cow shed
12 NguyenNamHoA 6 o450 cw shed_ _ _ _ pig shed _ _ _ _ _ _
13 Nguy6n Hfru Th8ng 3 200
14 Nguyen Hfu Danh 6 750 cow shed_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ p id shed_ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _
cow shed
15 Nguyen Hfu Minh 2 750 pig shed
toilet _M hanh ong 2 village- H Phong commune- Tuy ]oa district- Phu YEn province
16 LeVanMinh 4 162 kitchen____ ____ ____ ____ __ ____ ___ ____ ___ le an -to__ _ __ _ _ ___ _ _ ___ _ _ _ _ _ _ __ _ _ _
17 Vo Thi Phan 4 192 cowshed_______ ~~~~~~~~pid shed _ _ _ _ _ _ _ _ _ _
kitchen
18 Le Tan Vinh 8 1264 lean-to
_________________ ~~~~~~~cow shed__ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Phurfc Thinh village- Hoa Binh 2 commue-Tuy HoA district- Phui Y& province
19 Nguy8riHfruNhi 4 576 | _ _ _ _ _ _ _ _ _ _ _ _
guy l l l | | ~~~~~~~ ~~ ~~lean-to
20 Nguyen ThanhlIHien 4 700 pig shed _ _ _ _ _ _ _ _ _ _
Phui KhAnh village- HoA Tan Tay corimune- Tuy HoA district- Phui Yen province | | | | | | | | | | =
Resettlement Action Plan 63
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
21 Nguyn Vi Thanh 4 680 _ ____ e _ | 637 ____
22 Nguyen Van Hu6ng 5 200 57.37 yard 51 ________ _________ ~~ ~~yard 5 1 _ _ _ _
rice paper house 10.523 NguynVnSn 7 200 14.25shed 18
Hoa Xuan Tay commune- Tuy HoA district- Phui Yen province _
24 Lrong NgQc Huyen 9 ,, 200 20 10 cow shed 20 _ = = =
camp 17.5
25 T rangDinhLQng 3 200 50 25 kitchen 22.5
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ av iary 1 0 _ _ _ _
HAo Son village- HoA Xuin Namn comn e- Tuy Hoa district- Phi Yen province
26 Dang Thira 5 200 _ _
27 Le Thi Tuyet 3 361 _ _ _ = =
28 Vo Thi Thuy 2 211 | | kitchen = = =
29 Huynh Thi Hi6ng 4 211 | rear eaves = = = = =
30 Nguyen Thi Hong Nff 3 427.5 | | kitchen = = =
31 Nguyen Thi HoA 5 750 _ _ = =
front lean-to32 Dang Dinh L 4 200 b s
_______ ~ ~ ~ __ _ _ buffalo shed _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
33 Phan Tbanh Hieu 3 152 _ f
front lean-to34 Phan Thanh ThAo 4 189.75
_______ _____ ~~kitchen_ _ _
35 Nguyen Van Hieu 6 f
Co MA village- Van Tho commune- Van Ninh district- Khainh HoA province
36 D| ng DOcHun 7 200 201 10 |cowshed 20 |
Resettlement Action Plan 64
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
37 Tran Van Danh 5 200 12 6 cow shed = _= 12 = = = = =
38 Nguyen Van Hien 5 693 kitchen .
39 Nguyen C8ng Hieu 5 100
40 D.ng Ba 2 100 _ _ = =
41 Tran Th Nam 5 500 24.75 4.95 cow shed 24.75 = _
42 Tran GAm 10 500 27 5.4 cow shed 27 = =
43 Nguyn oCn 3 '2.850 12 0.4 cow shed =_= 12 = = = = =
Van Phu6c commune- Van Ninh district- KhAnh Hoa Drovince
44 Nguyen Van Chin 3 200 |
45 ThanThiDinh 4 200 |
46 Nguyen Vn Luc 8 6.250 |
house 45
47 DoThanhD6ng 5 500 71 14.2 kitchen 18
________________ _ | cow shed 8 |
r E I~~house T 45t 01 TowellI I T I48 Nguyen Thi Mai 2 200 60.75 30.37 house 4 0 well
_______ ~~pig shed _ __ 15.75 _ _ _ _ _ _ _ _
49 Ph4mThiLam 6 300 39 13 house _ _ 39 01 well
house 1 22 01 well
house 2 16.5
50 NguyenThuLim 7 1,000 98 9.8 frontlean-to 17.5
kitchen 10.5
__________ ~~~~~cow shed __ _ _ 31.5
house 20.25
51 TrAnNgQc Dfc 2 200 42.75 21.37 front lean-to 11.25
I rear lean-to ____ |_ 11.25 | 1 ___
[52 Dinh Van Dftng 3 3.000 42 1.4 | cow shed T _ I_ r_ 42 T I _ r T _ I I
Resettlement Action Plan 65
Tuy Hda- Nha Trang 220kV transmission line Feasibility Study
HOi Khanh village- Van KbAnh commune- Van Ninh district- Khanh HoA pronce
camp 17.5
53 TrAn Hat 4 600 52.5 8.75 cow shed 5
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ~~~~~~aviary _ _ _30 _ _ __ _ _ _ _
camp ~~~~~~~~27.554 Nguy&n Mai 7 200 29.75 14.87 Pamp 2.5_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ aviary _ _ _ _ _ _ _ 2 .2 5 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
55 Ha Van A 7 600 24 4 cow shed 24 _
Su6i village- Vnln KhAnh commune- Vn Ninh district- KhAnhHoA province
56 Nguye-n Chuit 9 200 pig shed_ _ _ _ cow shed__ __ _ _ ___ _ _
house
57 L Van TuAn 3 200 pig shed
I _ _ __ _ _ _I_ __ _ _cow shed _ _ _ __ _ _
58 V6 Thi Nam 7 200 kitchen
59 NguyenNgoc Kim 5 100 kitchen_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ pig ~~sh ed _ _ _ __ _ _ __ _ _
60 Nguyen Thi Kim Anh 7 200 kitchen _____
61 ThAiThanh 4 100 toilet
62 D8 Kim Dinh 8 150 kithenbath-room ____ _____ _ _
63 D6 Tran Thuang 4 50 aviary
64 HuynhhThjHJieu 3 1,500 40 2.66 cow shed ____40 |
TAn Dan village- Van Tlhng commune- Vgn Ninh district- Khanh Hoa province
I l l | l | house J 32
65 Duang Cng Ly 3 200 49.5 24.75 kitchen 10| cow shed _ 1 | 7.5 | _ _ _ _ _ _ I
Resettlement Action Plan , 66
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
Suoi Luon village- Van Thang commune- Van Ninh district -Khanh Hoa province
66 TranChin | 5_ | 200 | | | cowshed
67 TrAnCon | _2 | 200 |
Trun Dung 3 village- V@n Binh commune- V,an Ninh district- Kh nh Hoa province
house 26.2468 NguyenThiNhi I 200 36.24 18.12 cow shed 10
Binh Loc I village- Van Binh commune- Van I9inh district- Khanh Hoa province _
69 Truong Khac Lenh . house 32.86
4 760 72.26 9.5 kitchen 15.9
Tan Phu village- Van Phii commune- Van Ninh district- KhAnh Hoa province I
house 60
70 TranVanNamt 4 200 102 51 lean-to 36
_______ ______ |cow shed ____|_6 |
71 NguyenThiTha | 2 200 |
72 Nguyen Thi kim Nga 6 200 kitchen I I I I73 Nguy8n HfuTun m 2 200 T _ I T I _
74_ Dang Thi Hoa 5 206 T I T ITTII
75 Nguyen C6n 5 200 yard__________________ ________ ~~cow shed_ _ ___ _ _
kitchen76 NguyenM,ap 3 200
Vinh Hue village- V,an Phui commune- Van Ninh district- KhAnh Hoa province
Resettlement Action Plan 67
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
main house 45.6 01 water
extra house 39 tub
77 Ho ThanhDAng 7 200 196.11 98 kitchen 24.8lean-to 1 19.76
lean-to 2 10.95
cement yard 56
78 Phu'ngMinh TuAn 10 1630 56 3.4 cow shed 56
Nguyen Van DOng 2 3,500 12 0.34 gardem house 12
Van Lunog commune- Van Ninh district- Khanh Hoa province
80 PhamVanHfing 110 13,000 24 [ 0.18 cowshed I _ | 24 _ == = = = =
Xufn Tay village- V,n Hung conimune- Van Ninh district- KhAnh Hoa province
house 48
81 D AuKhc Ky 8 200 94 47 ithen 6pig shed 14
_______ _________ _______ cow shed _ __1 6 _ _ _ _ _
82 DAu Thi Sang 4 200 housekitchenn
kitchen83 LDong Dinh Thu 5 200 | shed
house 42.75
84 Trn The Quyen 5 200 126.1 63.05 kitchen 28pig shed 6.6
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ard_ _ _ _ 48 75 _ _ _ _ _ _ _ _ _ _ _ _ __yard 4 8 .7 5 . . .
Resettlement Action Plan 68
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
house 34.56
kitchen 11.4
85 Trinh Dinh Cr 6 200 108.2 54.1 pig shed 14
aviary 8.64
yard 39.6
Ngoc San village- Ninh An commune- Ninh HoA district- KhAnh Hoa vincepo house -35
86 Nguyen Thi Thanh 6 3,500 39 1.11 house 4_ _ _ _ _ _ _ ~~~~~~aviary 4 _ _ __ _
87 Nguyen Gi6 5 500 _
88 La Van Tu 7 4,000 pig shedI _________________ ________ __________ ________ cow shed
89 N8ng Van Di6m 4 3,840 kitchen _ _
Lac village- NinhAn commune- Ninh HoA district- Khanh HoA province _
house 72 01 well
kitchen 9.6
extra house 18.04
90 HuynhThjNhu 4 12830 216.16 1.68 lean-to 32.4
pig shed 13.8
bathroom 3
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ y ar'd _ _ _ _ _ _ _ 6 7 .3 2 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Phfr Son village- Ninh Trnig commune- Ninh HoA district- Khnh Ho province
Resettlement Action Plan 69
Y * . S
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
house 59.04
kitchen 15
91 Nguyen Quanh 6 3,500 176.38 5.04 extra house 36lean-to 1 8
pig shed 6
__yard 42.34
92 Hoang Xuan Y 7 200 16 8 cow shed 16 6
Tan Ninh village- Ninh Trung commune- Ninh Hoa district- Khanh Hoa province
93 Truang Nggc ThiEn 8 200 55 27.5 camp 35_cow shed 20
house 47.594 Phan Anh 7 414 62.5 15.1 kitchen 15
Ninh Than commune- Ninh Hoa district- KhAnh HoA province
95 BiLi Vn Luan 3 122.85 5 1 41.51 c casp _ 6 35
l l | ~~~~cow shed 1 16_
HoA Thu4n village- Ninh Binh commune- Ninh HoA district- Khanh HoA province
96 Tran TAn Tai 9 2 1 6 watch-tower on 12l | 9 | 200 | 12 | 6 | the mounain 12
Van Khe village - Ninh L8c commune- Ninh HoA district- KhAnh Hoa province
97 HA Thj Chirong house 45.5663 200 4551.56 25.78
_ _ _ _ kitchen _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
98 HoANgscAnh 5 200 | | kitchen _ _ _ == = = = =
house 72
99 TrAnNgoc Lg 9 200 165.6 rear lean-to 36
Resettlem ent___ _ _____ ______ ___ _ ______ _____ _ yar Action_ Plan__ 5706 ____yard_57_6
Resettlement Action Plan 70
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
Phong Thanh village- Ninh Loc commune- Ninh HoA district- KhAinh Hoa pronce
house 1 56 Gitng (1
house 2 54 cii)
yard 42
100 Tran VAn Ttrng 7 1,350 220.92 16.36 kitchen 48.72
rear lean-to 4.2
pig shed 10
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ a v iary _ _ _ _6 _ _ _ _ _ _ __ _ _ _ _ _
Van Thu$n village- Ninh ich commune- Ninh Hoa district- Klinh Hoa pronnce
101 PhanVanHiSn 5 200 34.2 17.1 he 22S8_________________ _______ ~~~~~~lean-to __ _ _ _ _ _ 11.4 _ _ _ _ _ _ _ _ _ _ _ _ _ _
house 34.96
102 Nguyen Thi Thu 5 200 40.96 20.48 kitchen
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ________ ________ ~aviary _ _ _ _6 _ _ _
main house 34
103 Tran Thi DAo 10 200 62 31 kitchen 24
________________ _______ pig ~~~~~~shed __ _ _ _ _ _4
house 49.92
104 Huynh Thi Kim Quy 5 337.5 79.92 23.68 kitchen 4pig shed 5
house 2 21
105 Tran Van Tuan 5 3034
Ninh ich commune- Ninh Hoa district- Khanh Hoa province
106|Vo Thi Tuyet Mai |||Iwatch-tower on6 200 16 8 the mountain 16
Vmnh Luang commune- Nha Trang city- Khanh Hoa province
Resettlement Action Plan 71
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
house 22.09
107 Nguyn VknLong 200 33.34 16.67 aviary 9
_______ __________ _______ kitchen 2.25 _ _ _ _ _ __ _ _
house
108 Le Quang Hfng 11 200 front lean-to
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ k itch en_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _
Dac ,oc village- Vinh Phuaron commune- NhaTrang city - KhAnh HoA provinoce _ 24 . 5 _ _
house 24.5
109 Nguyen Duc Dfng 3 warehouse 30
pig shed _ 150
110 Dig Van Sy 3 430 58.95 13.71 pig shed 25.2
_ _______________ _______ _______ cow shed 33.75 _
111 Le Dng 5 200 _
house 20
112 HoVtnHing 4 200 40 20 front eaves 12
___________________ ________ ________ lean -to 8 _ _ _ _ _ _ _ _ _ _ _
11-3 LeTran 13 200 12 6 camp on the 12
_____________ ______ ~ ~~~~~~~niomo tain field _ _ __ _ _ _ _ _ _ _ __ _
114 Nguyen Van Thep 7 250 lean-to _ _ _
115 Nguyen VnKhiem 5 196 extra house
116 Nguy&nVan Truxng lean-to
6 844
117 Nguyen VRnGiAu 6 510 _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Nhu Xuan village- Vmh Phuang commune- Nha city- Kh6nh HoA province
1 ~~ 1 house 1 1 1 1 1exrafh1u1
[ 18 NguyRnVstLeni i onPan7 23605 | _ _ _ _ _ |
Resettlement Action Plan 72
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
house 27
- ~~~~~~~~~~ ~~~extra house 34.65119 D06Tuoc 4 2,010 82.9 4.1 extchen 34.65
kitc-hen 14.85
aviary 6.4
house120 DoAn Van Son 3
______ onmamental plant
121 Doan Van Trang 4 house________ omnamental plant
house122 Le Minh Vit 4 230
________ ____________ rear lean-to
house
123 NguyenThiNga 7 240 kitchen
k itchen
house
124 L8 Hong 4 200 extra house- ~~~~~~~~~~~~~~~~~~pig shed
____________ ________ rear lean-to
125 Nguyen Van Tan 4 102 house____________________ ____________ ~~rear lean-to
house
126 Le Thi Muon 6 64 kitchen
_______ _ _ _ _ _ _ _ _ _ _______Dig shed _ _ _ _ _ _ _
127 NguyennVanTien 4 55 housekitchen _ _
Resettlement Action Plan 73
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
128 NgQggc Dieu 8 52 camp on theNguy&i ~~~~~~~~~~~~~~mountain field________toilet
129 Le Hong Scn 4 84aviary__ _ __ _ _ _ _
house 70
toilet 7.5
130 BiiiThanh Chi 4 225 103.5 46 aviary 7.5
front lean-to 14
_________ _______ ~w ater tub 4.5 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
131 NguyP n NgQc 4 aviary_________ ~~ ~~pig shed__ _ _ _ _ __ _ __ _ _
house
132 Hu~nhfMc Nhon 4 pig shed
cow shed ___
lean-to133 Phan Ng9c 6 kitchen _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
134 D 6 O 7 __ _ _ _ _ _ _ house__ _ __ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ __ _ _
Xuan Lac village Vnh NgQC commune- Nha Trang ciy - Khinh HoA province _ _
rear house
Resettlement Action Plan 74
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
Annex 4: Entitlements of Project Affected People
Compensation for Land Compensation for Structures Compensation for Crops & Compensation for Other AssetsSurvey Name of Head of Trees Total in DongSoe Housead| Unit Unit Price
No. Household ~~~~Quantity Price Entitlement Quantity Unit Price Entfitement in Quantity Unit Entitlement Quantity in Dong Entitlement inSq. Sq. Sq. Sq. Meters Dog Unit Price in Dong Unit Dong
Meters Meters in Dong Meters Dn in*_______ __________ ~~ ~~Dong I__ __ _
1 Nguyen Van Ly _ 20 35,000 700,000 _ 700,000
2 NguyeinVan That 13.94 50,000 697,000 . 697,000
3 Nguyen Dinh Han 8.28 50,000 414,000 414,000
4 Nguyen Van Thoai 12 50,000 600,000 600,000
S Le Van Thuan 8 1,470,000 1,470,000
6 Nguyen Le 9 200,000 1,800,000 13.5 50,000 675,000 2,475,000
7 Trabn Thi Dien 78 500,000 39,000,000 26 35,000 910,00078 ~~~~~~~~~~~~~~~~~~43,410,000_____ 7 500,000 3,500,000
8 TrAn Cung 6 100,000 600,000 _ 20 50,000 1,000,000 1,600,000
9 Nguyen Hong Thinh _ 47.3 450,000 21,285,000 20.64 450,000 9,288,000 30,573,000
10 Nguyen Thi An 40 180,000 7,200,000 36 20,000 720,000 11,000,000_____ 16 180,000 2,880,000 2 200,000
11 Nguyen Vn DAong 14 200,000 200,000
12 Nguyen Nam Hoa 5 474,080 948,160_____ _____ _____ _____ ________ __________ ~~~~~~ ~~~~ ~~~~5 474,080 _ _ _ _ _ _
13 Nguyen HwTu Th6ng 0
Resettlement Action Plan 75
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
14 Nguyen Huru Danh 948,160_____ _______ ~~ ~~~~~ ~ ~~~~~3 __ _ _ _ 474,080
6 200,000
15 Nguyen Hnuu Minh 6 200,000 874,080
9 _ _ 474,080
16 Le Van Minh 6.25 1,225,000 5,479,08038 4,254,080
17 V Thi Phan 10 200,000 400,0009 200,000
13.5 2,049,080
18 Le Tan Vinh 27 200,000 3,929,080
__ 12 1,680000_19 Nguyen Hiuu Nhi 0
20 Nguyen Thanh Hien 26 3,267,080 3,467,080. ___ 8 200,000 .
21 Nguyen Van Thanh 0
22 Nguyen Van Hu6ng 63.75 500 000 31,875,000 _ 51 3500 1,785000 33,660,00023 Nguyen Van San 10.5 140,000 1,470,000 18 50,000 900,000 2,370,000
24 LIoxng NgQc Huyen 20 50,000 1,000,000 1,000,000
25 Trtrang Dinh Long 17.5 180,000 3,150,000 10 50,000 500,000 7,025,00022.5 150,000 3,375,000
26 DangThiia l l l l l l l | 16 50,000 800,000 800,000
Resettlement Action Plan 76
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
27 Le Thi Tuyet === 0
28 Vo Thi Thuy 10.75 474,080 474,080
29 Huynh Thi Hu6ng 9 474,080 474,08030 Nguyen Thi Hong 5.4 1,990,280 1,990,280
31 Nguyen Thi Hoa 0
32 DIng Dinh Le . 12.4 474,080 14.85 200,000 674,08033 Phan Thanh Hieu 0
34 Phan Thanh Thao = = 16 474,080 = = 9 2,154,080 2,628,160
35 Nguyen Van Hi8u 0
36 DOng DOc Hung _ 20 50,000 1,000,000 1,000,000
37 Tran Van Danh 12 50,000 600,000 600,000
38 Nguyen Van Hien 6 1,050,000 1,050,000
39 Nguyen Cong Hieu 0
40 DEng Ba 0
41 Tran Thi Nam = = 24.75 50,000 1,237,500 1,237,500
42 Tran G iam 27 50,000 1,350,000 1,350,000
43 Nguyen Con 12 50,000 600,000 - 600,000
44 Nguyen Van Chin 0
45 Thn Thi Dinh 0
46 Nguy&n Van Luc 0
47 Do Thanh D5)ng 45 180,000 8,100,000 8 50,000 400,000 11,740,00018 180,000 3,240,000
Resettlement Action Plan 77
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
48 Nguyen Thi Mai 45 220,000 9,900,000 200,000 10,887,500_________________ . 15.75 50,000 787,500
49 Pham Thi Laim 39 180,000 7,020,000 200,000 7,220,000
22 500,000 11,000,000
16.5 450,000 7,425,000
50 Nguyen Thu Lam. 17.5 450,000 7,875,000 200,000 29,965,000
10.5 180,000 1,890,000
31.5 50,000 1,575,00 _
20.25 150,000 3,037,500
51 Tran Ngoc DOTc 11.25 150,000 1,687,500 6,412,500
11.25 150,000 1,687,500
52 Dinh Van Dfing 42 50,000 2,100,000 2,100,000
17.5 140,000 2,450,000
53 Tran Hat 5 50,000 250,000 4,200,000
_______________30 50,000 1,500,000
54 Nguyen Mai 27.5 140,000 3,850,000 3,962,500._______________ 2.25 50,000 112,500 .
55 Ha Van A 24 50,000 1,200,000 1,200,000
5 6 Nguyen Chut 200,000 400,000_____ ________ ________ ~~ ~~~200,000 _ _ _ _ _
57 LWm |TuAu 8.75 50,000 911,580 474,080
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___ _ _ _ _ _ _ _ _ __ ____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___ ___ 4 7 4 ,0 8 0 1, 5 97 4058 Vo Thi Nam0
Resettlement Action Plan 78
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
Nguy~~~~~~~n Ngoc I'~~~~~~~~~~~~~im ~~~1,314,0805 i9 Nguye gc Kim 2,488, <| 1640S0|24 _____ __________ _____ ~~~~~~ ~~~ ~ ~~1,174,080 2, 8 16
60 NguyenThi Kim Anh _ 17.5 2,082,500 2,082,500
61 Thai ThAinh 1.5 824,080 824,080
62 Do Kim Dinh 10 1,365,000 2.25 630,000 1,995,000
63 Do' Tran Thuong . 10 200,000 200,000
64 Huynh Thi Hieu 40 50,000 2,000,000 2,000,000
32 400,000 12,800,000
65 Duang Cong Ly 10 300,000 3,000,000 16,175,000
7.5 50,000 375,000
66 Tran Chin 29.25 200,000 200,000
67 Tran Con _ 0
68 Nguyen Thi Nhi 26.24 450,000 11,808,000 12,308,000
10 50,000 500,000 _
32.86 350,000 11,501,000
69 Trto-ng Khac Lenh 15.9 450,000 7,155,000 19,831,000
I 1 _ 23.5 50,000 1,175,000
60 450,000 27,000,000
70 Tran Van Nan 36 300,000 10,800,000 38,100,000
6 50,000 300,000 _
71 Nguyen Thi Tha _ 0
72 Nguyen&T Kim Nga 13.75 474,080 474,080
Resettlement Action Plan 79
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
73 Nguyen Huu Tuan = == = 0
74 Dang Thi Hoa 0
75 Nguyen C6n 6 200,000 200,000
76 Nguyen Map 8 474,080 4 200,000 674,080
45.6 550,000 25,080,000
39 550,000 21,450,000
24.8 300,000 7,440,00077 Ho Thanh DOng 19.76 300,000 5,928,000 65,443,000
10.95 300,000 3,285,000
56 35,000 1,960,000
2 150,000 300,000
78 Phung Miah Tuan 56 50,000 2,800,000 2,800,000
79 Nguyen Van D6ng 12 140,000 1,680,000 1,680,000
80 Pham Van Hung 24 50,000 1,200,000 1,200,000
48 140,000 6,720,000
81 DAu Khc Ky 16 140,000 2,240,000 10,460,00014 50,000 700,000
16 50,000 800,000
82 Dau Thi Sang 30.66 474,080 948,16014.7 474,080
83 Luang Dinh Thu 15 _ 474,080 = 6.4 200,000 674,080
A AA 42.75 500,000 21 375,00084 TrAn The Quyen 42 5000 21,37,000 27,331,250Resettlement Action Plan__ _____ ____________ 28 140,000 3,920,000 _
Resettlement Action Plan 80
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
6.6 50,000 330,000
48.75 35,000 1,706,250
85 34.56 140,000 4,838,400
11.4 140,000 1,596,000
Trinh Dinh C* 14 50,000 700,000 8,952,400
8.64 50,000 432,000
39.6 35,000 1,386,000 1 __ _
86 Nguyen TN Thanh 35 140,000 4,900,000 5,100,0004 50,000 200,000 _
87 Nguyen Gi6 I 0
88 La Van Tu 15 474,080 948,1609 474,080 .
89 N6ng Van Diem 17 474,080 474,080
72 550,000 39,600,000
9.6 550,000 5,280,000
18.04 550,000 9,922,000
90 Huynh Thi Nhu 32.4 140,000 4,536,000 23 200,000 64,234,200
13.8 50,000 690,000
3 550,000 1,650,000
67.32 35,000 2,356,200
59.04 550,000 32,472,000
91 Nguyen Quanh 15 450,000 6,750,000 62,603,900
36 450,000 16,200,000 1 _ 1 1 1
Resettlement Action Plan 81
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
18 300,000 5,400,000
6 50,000 300,000
.______ 42.34 35,000 1,481,900 _
92 Hoang Xuan Y 16 50,000 800,000 800,000
93 Truong NgQc Thien 35 100,000 3,500,000 4,500,000
. . . 20 50,000 1,000,000 . . .
94 PhamnAnh 47.5 450,000 21,375,000 23,475,000
.____ _________________ _____ 15 140,000 2,100,000
95 Bui Van Lua.n 35 140,000 4,900,000 5,700,000
_____ _____ 16 50,000 800,000
96 Tran Tan Tai 12 50,000 600,000 600,000
97 HaThi Chuoang 45.56 500,000 22,780,000 23,620,000
_____ _____ 6 140,000 840,000 . -
98 Ho;Ngoc Anh 30.96 3,381,000 3,381,000
72 500,000 36,000,000
99 Tram Ngoc Le 36 140,000 5,040,000 43,056,000
_____ 57.6 35,000 2,016,000 _
56 500,000 28,000,000
54 500,000 27,000,000
100 Tran Van Tu6ng 42 35,000 1,470,000 5 200,000 82,268,00048.72 500,000 24,360,000
4.2 140,000 588,000
10 50,000 500,000
Resettlement Action Plan 82
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
6 25,000 150,000 _
101 Phan Van IHie'n 22.8 400,000 9,120,000101 PhanV~~~~~~~~~~~~~~~~~~nHien ~~~~~~~~~9,405,000_____ 11.4 25,000 285,000
34.96 500,000 17,480,000
102 Nguyen Thi Thu 1815 50,000 90,750,000 108,380,000
.____ _______ 6 25,000 150,000 . .
34 450,000 15,300,000
103 Tran Thi Dao 24 140,000 3,360,000 18,860,000
___. _4 50,000 200,000
49.92 450,000 22,464,000
104 Hu4nhThi Kim Qui 4 140,000 560,000 31,674,0005 50,000 250,000
21 400,000 8,400,000 _
105 Tran Van Tuan 0
106 V6 Thi Tuyet Mai 16 50,000 800,000 800,000
22.09 140,000 3,092,600
107 Nguyen Van Long 9 50,000 450,000 3,857,600
2.25 140,000 315,000
20 474,080
108 Le Quang Himg 15.75 2,154,080 4,782,240
15 2,154,080
109 Nguy,n D -cDfing 24.5 400,000 9,800,000109__ Nguyen_____________ Ouc__ Dung_________ 30 140,000 4,200,000 00,000 21,500,000
Resettlement Action Plan 83
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
= _____________ _ = =130 50,000 7,500,000 _ _ = =
110 DOng Van Sy 25.2 50,000 1,260,000 2,947,50033.75 50,000 1,687,500
III L8 Dng _ 0
20 400,000 8,000,000
112 Ho VanHung 12 140,000 1,680,000 10,800,000
8 140,000 1,120,000
113 L8 Tran _____ _______ 12 50,000 600,000 1 1 600,000
114 Nguyen Van Thep 15.9 474,080 474,080
115 Nguyen Van Khiem 15 474,080 474,080
116 Nguyen Van Trtng 21.6 474,080 474,080
117 Nguyen Van Giiu 0
'x ~~~~~~~68.25 474,080118 Nguyen Van L(i 948,160
22.5 474,080 -
27 500,000 13,500,000
119 Do Tuac 34.65 450,000 15,592,500 36,717,500
14.85 500,000 7,425,000
6.4 200,000 _
120 Doon Van Son 83.5 474,080 948,160144 474,080 1
121 Don Van Trang 71.81 474,080 948,160.____ ___ __ __ __ __ __ _ __ _ __120 474,080
Resettlement Action Plan 84
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
55 474,080122 LEMinhVic 3,414,080
_____ _____ ~3 3 _ _ _ 2,940,000 _ _ _ _ _ _ _ _ _ _ _
64 474,080
123 Nguyen ThiNgi -4 474,080 2,680,32010.56 474,080
. _____ .__________________ _____ 4 . 1,258,080 _
42.56 474,080
124 Le Hong 34.02 47,080 2,829,2409 474,080
10.5 1,407,000
125 NguyenVAnTaln 72.5 474,080 948,1601 1~~_ _ ___ _ _ 16.5 474,080 1 1_ _ _ ___ _ _ _
17.5 2,380,000
126 Le Thi MuOn 8 1,260,000 4,114,080
_ __ ___ 9 474,080 _127 Nguyen Van Tien 25.2 474,080 2,042,080
_____ _____ _______ ~~ ~~~7.48 1,568,000 _ _ _ _ _ _ _ _
128 NguyenNgoc Dieu 21.62 474,080 474,080
129 LIHoAng Son 6 1I11,250,000_ ~~~1 2 00 - _
70 500,000 35,000,000 45,925,000
130 BuiiThanh Chi 7.5 500,000 3,750,000
______ _ _ __ 4.5 150,000 675,000 85
Resettlement Action Plan 85
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
7.5 200,000
14 450,000 6,300,000
131 Nguyen Ngoc 19.25 1,927,800 2,401,880_____ _____ ____ _ _ _ _ _ __ __ __ ____ 15 4 74 ,0 80 _ _ _ _ _ _ _ _ _ _
24.5 2,940,000
132 Huynh Dfic NIhn 38.5 3,062,500 7,577,500
I_____ ______ ______ ________ 13.5 _ _ 1,575,000 ___
133 Phan Ngoc 25 3,974,080 5,024,0806 1,050,000
134 Dox 6 49.5 6,441,580 _ _ 6,441,580
135 Hu4nh Tan Vi 67.8 474,080 948,160_____ ___ ___ _ _ __ 20.8 474,080 .
Resettlement Action Plan 86
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
Annex 5: Socio-Economic Household Data Sheet of Project Affected People
No. Address of Household Name of Household Member Ethnic ~~~~~Occupation and Estimated TotalNo. Address of Household Name of Household Member Sex Gpe Ethnic Education Sources of Income Employm Income per Year
Age upent (VND)
I Nguyen Van L male Kinh secondary agriculture, 16,000,000_______ ~ ~ ~ 1 school blacksmith ____
2 Nguyen Van That male Kin secondary agriculture 12,000,000Mau Lim Bac village- Hoa school
3 Quang Bac commune - Phfi Hoa Nguyen Dinh H3n male Kinh secondary agculture 13,500,000district- Phu6 Yen province male secondary
4 Nguyen Van Thoai Kinh school agriculture, cadres 9,800,000
5 Le Vain Thua.n male Kinh high school agnculture, hired 4,000,000_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _______ ~~~~ ~~lab o r _ _ _ _ _ _ _ _
Dinh ThAi village- Hoa Dinh male6 Dong commune- Tuy H6a Nguyen Le Kinh school agnculture 20,000,000
district- Phi Yen province7 Tran Thi Dien female Kinh college agriculture, cadres 14,000,0008 My Thanh Mung village- H6a Tran Cung male Kinh agriculture 6,000,000
9 distrct- Phu Yen provinceY Nguy&n Hong Thinh male Kinlh primary agculture, trade 45,000,000
10 Nguyen Thi An female Kinh secondary agriculture 17,000,000Nguyen ~~~~~~~~~~~school ___
11 Nguyen Van DA male Kinh primary agriulture 20,000,00001ng school ___
Phu6c ThAnh village - H6a12 Phong commune - Tuy H6a Nguyen Nam HoA male Kinh school agriculture, trade 30,000,000
. district - Phui Yn province scool13 Nguyen Hiu Th6ng male Kinh secondo agriculture, mason 10,000,000
Phuac Thanh village - Hoa secondary agriculture,14 Phong commune - Tuy Hoa Nguyen Hiuu Danh male Kinh school carpenter 30,000,000
_ district - Phu Yen province I II_
Resettlement Action Plan 87
*~~~~~~~~~~~~~ 9 *6
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
15 Nguyen Huu Minh male Kinh primary agriculture 15,000,000school
16 Le Van Minh Nam Kinh secondary agriculture, trade, 25,000,000. My Thanh D6ng 2 village - H6a school carpenter
- ~~~~~~~~ ~~~~~~~~primary arclue3,0,017 Phong commune - Tuy H6a V6 Thi Phan female Kinh agriculture 30,000,000district - Phui Yen province school
18 Le Tan Vinh male Kinh school agriculture, trade 30,000,000
19 Phu6c Thinh village - Hpa Binh Nguyen Huru Nhi male Kinh college agriculture, cadres 30,000,000
20 2 commune - Tuy H6a district - Nguyen Thanh Hien male Kinh high school agriculture, 25,000,000___Phi- Yan province carpenter______
21 Nguyen Vn Thanh male Kinh secondary agriculture, 20,000,000Phul Khiinh village - H6a Tain _________school carpenter
22 Tay commune - Tuy H6a district- Nguyn Van Hu6ng male Kinh_ high school agriculture, trade 40,000,000
23 Phui Yen province Nguyen Van Sai male Kinh secondary agriculture 6,000,000_____ ______________________________ ~~ ~~ ~~~school
24 Da Dung village - Hoa Xuan Tay Luang Ngoc Huyen male Kinh primary agriculture 20,000,000_______ school 20___ _000__ __ _000__
commune - Tuy Hoa district - schoo primaiy agriculture25 Phui Yen province Truang Dinh Long male Kinh srima agriculture 4,100,000
26 Hao Son village - Hoa Xuan Dang Thira male . primary agriculture 4,000,000Nam commune - Tuy Hoa Kinh school 4_000_000
27 district - Phi Yen province Le Thi Tuyet female Kinh school trade 3,600,000
28 Vo Thi Thuy female Kinh primay agriculture 8,000,000female ~ ~ high school
29 Huynh Thi Huong female = Kinh high school trade 10,000,000
30 Nguyen Thi Hong Nu female Kinh secondary agriculture, trade 14,000,000
31 Nguyen Thi Hoa female Kinh school agriculture 7,000,000
Resettlement Action Plan 88
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
32 Dang Dinh Le male Kinh secondary cadres, trade 8,400,000_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ sch o o l _ _ _ _ _ _ _ _ _ _ _
33 Phan Thanh Hieu male Kinh primary agnculture 5,000,000_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ sc h o o la g i u t r5, 0 0 0
34 Phan Thanh Thao male Kinh secondary trade 7,000,00035_________Van_______ male =_ Kinh school
35 ,, lE)aNguycn Hiun male Kinh primary agnculture, rock 9,000,00038__ _____ Van Hien female Kinh school hirexploiter 12,0000
male K secondary agnculture 15,000,00036 Dang DB Hi g_ Kinh school agriculture 10,000,000
37 Tran VTn Danh male Kinh secondary agriculture, hired 11,500,000________ _______ ~school labor _ _ _ _
38 Nguyen Ga n m Hn female Kinh prmary hired labor 12,000,000_________ ~~~sch ool __ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _
39 Co Ma village Van Tho Nguyen C6ng h male K secondary agriculture 1,000,000
.... ~ ~ ~ ~ ~ ~ ~ ~ _ __ _ _ __ _ _ schoo .-__ _ _ _ _ __ _ _ _ _ _ __ _ _ _ _ _
45 Vcommune - V~n Ninh d Nisi en Van Chnml_ Kinh sechondar agnculture 15,000,00040 KhAnh Ho& province DAng Ba male Khih primary agriculture 10,000,000
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _sc h o o l _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
41 Tr~~~~~n Tin N~~~~~m female K~~~~~~~h ~ primnary agriculture, hired41 Than Th,i Ninh female Kinh school labor 11,000,000
42 TrANn GAam male Kinh primary agncultue, hired 15,000,000________ ______ ~school labor
43 Nguyen Con male Kinh primary agriculture 7,000,000N g u y~~~~~~~~~n ~~~sch o o l _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
V4n Phir6c commune - Van Ninh V~ ae ~secondary agriculture 1,0,0district - Khinh HoA province N ye Chnschool
46 Thf.n Thi Dinh female Kinh fiinaiy priest 10,000,000________ ~~~school
Ngye' n Lvic male KiIIh secondary agricuture 12,000,000Nguy~~~~~~~~~n ~~~school
47 DR Th& D6ng male Kinh primary agriculture 00,000_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _s c h o l _ _ _ _ _ _ _ _ _ _ _ _ _ __sc h o o l_ _ _ _ _ _ _ _ _
Resettlement Action Plan 89
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
48 Nguyen Thi Mai female secondary agriculture 10,000,000Nguy~~~~~~~~~n ~~~school____
49 Pham Thi Lam female Kinh agriculture 10,000,000
50 Nguyen Thu Lam female Kinh secondary agriculture 20,000,000Nguy~~~~~~~~~n ~~~school ___
51 Tran Ngoc DO*c male = Kinh pnmary agriculture 20,000,000_________ ~~~school _ _ _ _ _ _ _ _ _ _ _ _ _ _
52 Dinh Van Dung male Kinh secondary agnculture 20,000,000school
53 Tran Hat male Kinh primary agriculture 22,600,000
Ho.i Khanh village - Van Khanh .er y school agri cultur
54 commune - Van Ninh district - Nguyen Mai male K primary agrculture 12,000,000Khinh Hoa province
55 Ha Van A male Kinh pomary agriculture 18,000,000______________________________ _______ ~~ ~~sch ool _ _ _ _ _ _ _ _ _
56 Nguyen Chut male Kinh pimary agriculture 20,000,00056 Chi~~~~~~~~~~~~~~~tt ~~~~~~school
57 Le Van Tuan male Kinh _ _ agriculture 7,000,000
58 V6 Thi Nam female Kinh primary agriculture 20,000,000_____ ~~~~~school
59 . NguyenNgoc Kim male Kinh secondary agriculture 15,000,000
Su6i Han village - V,an Khanh s o60 commne - Van Ninh district - NguyenThi Kim Anh female Kinh phmary agriculture 15,000,000
Khanh Hoa province school61 Thai Thanh male Kinh agriculture 10,000,000
62 Do Kim Dinh male Kinh secondary agriculture 20,000,000_______ ~~~~school
63 Do Tran Thuong male Kinh secondary agriculture 15,000,000_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ school _ _ _
64 Huynh Thi Hieu female Kinh sehool agriculture 20,000,000Res ttlmen Action_________________ Plan______________ 90_____ _____ _____ school 20_000 000
Resettlement Action Plan 90
TuyHoa- N/ha Trang 220kV transmission line Feasibility Study
Tan Dan village - Van Thang65 commune - Van Ninh district - Duang Cong Ly male Kinh secondary agriculture 12,000,000
Khanh Hoa province
66 Suoi Luon village - Van Thang Tran Chin male Kinh prihoy agriculture 10,000,000commune - Van Ninh district -schoo
67 Khanh Hoa province Tran C6n male Kinh primary agriculture 7,000,000
Trung Dung 3 village -Van Binh primary agriculture68 commune- Van Ninh di,trict - Nguy6n Thi Nhi female Kinh school 3,000,000
Khanh Hoa province _Binh LQc 1 village - V,n Binh secondary agriculture
69 commune - Van Ninh district - Truang Kh&c Lenh male Kinh school 10,000,000____ Khanh Hoa province
70 Tran Vaun Nam male Kinh secondary agriculture 10,000,000school
71 Nguyen Thi Thu female Kiih primary agriculture 8,000,000Nguy~~~~~~~~~n ~~~school
72 Tan Phu village - Van Phu Nguyen Thi Kim Nga female Kinh prmary agriculture 10,000,00072 ~~~~~~~~~~~~~~~~~~~~~~~~school 1,0,073 commune - Van Ninh district - Nguyen Huu Tuan male Kinh pimary agriculture, service 12,000,000
Kh&ffh Ho& province school agiutr,svce10000
74 DOng Thi Hoa female Kinh college agriculture 16,000,000
75 Nguyen C6n male Kinh secondary agriculture 20,000,000._______ school
76 Nguyen Mp male Kinh primary, agriculture 15,000,000.____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ sc h o o l , _
77 Ho Thanh DAong male Kinh secondary agriculture 30,000,000
Vinh Hue village- Van Phu school
78 commune - Van Ninh district - Phung Minh Tuan male Kinh secondary agriculture 20,000,000Khanh Hoa province s o
79 Nguyen Van D6ng male Kinh p.mary agriculture 6,000,000.__ _ _ _ _ _ _ _ _ _ _ _ _ __._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __._ _ _ _ _ _ _ _ _ _ _ _ _ ____ _ _ _ _ _s c o o _ _ _ _ __._ _ _ _ _ _ _ _ _ _ _ _ _ _ ____sc h o o l
80 Van Luang commune - Van Pham Van Hing male Kinh primary agriculture 44,000,000
Resettlement Action Plan 91
Z * ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~* I ..
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
Ninh district - Khanh Hoa schoolprovince
81 DAu Khac Ky male Kinlh secondary aolcuture 20,000,000, ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ___ ___ sho
82 D "au Thi Sang female Kinh primary agriculture 6,500,000-Xuan Tay village - Van Hurng school ___________ _____________hoXwk Tiy village - V~m Hungmale K ~ secondary agriculture 2,0,0
83 commune - Van Ninh district - Luong Dinh Thu Kinh 25,000,000Khainh Hoa province . .
84 , Tran The Quyen male Kinh primary agriculture 15,000,000_________ ~~~school _ _ _ _
815 Trinh Dinh Cu nmale Kinh primary agriculture 10,000,000school
86 Nguyen Thi Thanh female Kinh pnalry agriculture 15,000,000
87 NgQc Son village - Ninh An sho87 commune - Ninh H6a district - Nguyn Gi6 male Kinh agriculture, trade 21,000,000
88 Khanh Hoa province La Van Tu male Tay secondary agriculture 20,000,000school __ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _
89 N6ng Van Diem male Tay agriculture 40,000,000Lac H6a village - Ninh An primary agriculture
90 commune -Ninh H6a district - Huynh Thi Nhu female Kinh school 30,000,000Khanh Hoa province _
91 Phii Son village - Ninh Trung Nguyen Quanh male Kinh primary agricultsre 20,000,000commune - Ninh H6a district - school
92 Khanh Hoa province Hoang Xuan Y male Kinh high school agriculture 21,000,000
93 Tan Ninh village - Ninh Trung Truang Ngoc Thien male Kinh secondary agriculture 15,000,000commune -Ninh H6a district -sconl
94 Khnh Hoa province Pham Anh male Kinh secondary agriculture 10,000,000
95 Ninh Than commune - Ninh Hoa Bui Van Luan male Kinh primary agriculture 12,600,000district - Khanh Hoa province schoolH6a Thuan village - Ninh Binh
96 commune - Ninh H6a district - Tran Tn Tai male Kinh secondary agriculture 24,000,000Khanh Hoa province school
Resettlement Action Plan 92
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
97 female Kinh ~~~~~~~~~~~~~2flfl1~~~~~1riar agriculture 1,0,097 Van KhM village - Ninh Loc Ha Thi Churang female Kinh schour 10,000,000
98 comimune - Ninh Hot district -HOA Ngoc An male primary agriculture 1,0,098 Khanh Hoa provimce Ho_Ngoc_Anh _male_Kinh school agnculture lS,000,000
99 Tra.m Ngoc Le male Kinh high school agriculture 30,000,000
Phong Thanh village - Ninh Loc male secondary agriculture
100 commune - Ninh Hoa district - TrAn Van Tu6ng Kinh school 12,000,000
Khinh Hoa province
101 Phan Van Hien male Kinh secondary service 30,000,000___________ ___________ _ _________sch o o l
102 . ,ch Nguyen Thi Thu female Kinh school trade, cadres 12,000,000V,an Thuan village - Nmnh Ich y . school ________
103 commune - Ninh Hoa district - TrAn Thi DAo female Kinh servive 60,000,000
104 Khanh Hoa province Huynh Thi Kim Qui female Kinh school agnculture 12,000,000
105 TrAan Van Tuan male Kinh secondary agiculture 36,000,000
106 Ninh ich commune - Ninh Hoa Vo Tbi Tuyet Mai female Kinh secondary agriculture 20,000,000district - Khanh Hoa rovince . school ,
107 Nguyen Van Long secondary agricultureVinh Luang commune Nha school________
108 Trang city - Khanh Hoa provice Le Quang Hung male Kinh secondary agriculture 36,000,000Trang city - Kh~nh Ho~ prvince L~ Quang Wing maleschool _______
109 Wc L6c village - V-mh Phang Nguyexn*cDung male Kinh secondary agriculture 600,000,000commffune - Nha Trang city scoo
110 Khanh Hoa province DOng Van Sy male Kinh secondary agricultre, mason 8,000,000school arclue ao ,0,0111 LE Dang male Kinh high school agriculture 15,000,000
112 Ho Van Hing male Kinh secondary service, trade 15,850,000school _ _ _ _ _ _ _ _ _ _ _ _
113 Le Tran male Kinh primary agriculture 5,000,000
Resettlement Action Plan 93
Tuy Hoa- NAa Trang 220kV transmission line Feasibility Study
114 Nguyen Van Thep male Kinh secondarY agriculture 28,630,000___________ ___________ _ _________sch o o l
115 Nguyen Van Khiem male = Kimh secondary agriculture, mason 26,275,000115 Nguy~~~~n V~~n Khi&n male Kinli ~~~~~ school____
116 Nguyen Van Trung male Kinh school service, trade 50,425,000
117 Nguyen Van Giau male Kinh pehool agriculture 30,000,000_________ ______ sch o ol__ _ _ _ _ _ _ _ _ _ _ _ _
118 Nhu Xuan village , Vnmh Nguyen Vn Lai male Kinh high school cadres 23,790,000
119 Phucing comnune - Nha Trang Do Tuqc male Kinh school agriculture 13,300,00019 city - Khinh HoA province school________
120 Doon Van Soan male Kinh secondary cadres 25,000,000_________ ______ sch ool _ _ _ _ _ _ _ _ _
121 Dooan Van Trang male Kinh secondary 21,200,000______ ~~~~~school_ _ _ _ _ _
122 Le Minh Vie.t male Kinh secondary agriculture 24,900,000122 L8 Mmli Vi& ~~~~~~~~~~~~~~~~~school _______
123 Nguyen Thi Nga female Kinh secondary agriculture, mason 18,000,000_________ ~~~school _ _ _ _
124 Le Hong male = Kinh school agriculture 24,900,000
125 Nguyen V Tanmale Kinh secondary cadres 21,600,000
126 Le Thi Muon female Kinh primary agriculture 7,450,000_________ ______schooi
127 Nguyen V en Tien male Kinh primary agriculture 9,575,000
128 Nguyen NgQc Diu male primary agriculture 29,300,000
school129 Le Hoang Son mlKih sechoolar agriculture, mason 1,0,0
1l 3 01 Buii Thanh Chi male = primary agriculture 21,200,000130 ettlem en t Bcino n T hanh C9 4I school _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __sc o
Resettlement Action Plan 94
Tuy Hoa- Nha Trang 220kV transmission line Feasibility Study
131 Nguyen Ngoc male Kinh pnmary | agriculture 24,900,000school
132 Huynhfi DOuc Nhorn male K secondary agriculture 28,000,000132 Hu~~~~~~~~~~nh Duc ~~~~~~~~~ ~school _______
133 Phan NgQc male Kinh secondary agriculture 30,000,000_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ~~sc h o o l_ _ _ _ _ _ _ _ _ _ _ _ _ _
134 . D'o, ( male Kinh secondary agriculture, driver 72,000,000
Xuan Lac village, Vinh,Ngoc male secondary135 commune, Nha Trang city, Hu'nh Tan Vu Kinh school agriculture, mason 36,000,000
Khinh HoA province
Resettlement Action Plan 95
CQNG IaOA XA HQI CHU NGHIA V1JT NAMDQc Iap - Ttr do - IH.uh1i phliic
---- --------oOo -ngiy..ffthdng..iL.ndin 200.'1
BIEIN BAN TH1AM VAN CQNG DONGVE K1E IIOACEI DiN BU VA TAI DINH Clf
Tlu'inh phiAalu thalln dtu: ,1. Dai die.n UBND OVCV ..lA.'. . .. ; ..I,XI.2. Nhting ngUW i lnlihhiJ4 g: ...................... ................ Nal ll ......... . ............3. Dai dien Cly TVXD Dien 4: ....fi4s..Set .
Cac van dl titam vani cQng dlong:1. Plho bieji nlifruig cinixl s6chx Iien quan den dln bix, tai dinll ctr.- Nlirng khu vtrc trtrg dvung dat clio dr ain.- Dur kien tli&i gian tien Itanh cho d.r 6n.- I'llo bien cac clinii s6ch cua Viet Nant va WB.- Cac quy dinli plhip luat Viet Nam vai chlinh s6ch WB c6 lien quan.- Cac clhinli sdch den bui cho Du an.
- Cac kliu tai dinii cur (neu c6).
2. Y Icien cua dia plitorxg ve ke lioaclh deix bii vi tii djiili cu:- Kdi udag xay ra dilh Itriung bht loi cdia dllr di+ DOi v6i nha cira:...... ' •.. A.... <v r
~~~~~~~~~~~.. ,
+ D6Si voii cORy c& i:..'2hz~, lj 1' (w~.............&.. ............. :. .... . l' . .i... .... 6. .c.:u.' .
.. )..................................................................................................................................
+ DEi v61 moi truaing tA.n llin, x a I-Ioi: .............t.2I.......... ....- Cd(C' 1ielt phl di gidiii thiieu:
86
'j~~~~~~~':)V's DNWI5 'ttU ;." " )¢ ctva WTJI'2
2u.onqd ei' naXCnb qlui u x
j, USX([ 211hp XX URA .11jL A.110UO
Nr9nq quop Wn2u una3 utqu aX uS:p IUp u na u*qu 3X
......................................................................... .................... PZ.............. -. . . . .. .. . . . .
........................................................... ....................... .N. . i.@.. :I s w i tu fnai ?. 5.ni +.n.XL
.................................................... ...... ... ti y y
............................................................ ...........................................................,~qu ujpO.,lf TUt 1'qUp 1
........--.-.----------------------------------- :tJ U1341A U1POp 11 SUOJI +
.p o p uo ~~ UJ .............................................................................................................................................................................................;-7f... ... ..... ...................
i3'~~~~~~~~~~~~~~~~~~~ 17'1
......................... ..... .... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
............................................................. .................................... ...... ..... ..... ..... ..... .....
.......... :... :O q i utop !ieI2 uojL +
6 :n1i tp tupiff dzid ONq p,pD -
* CONG u-1oA XA IIQI CtlIU NGHiA VIJ,T NAMDQc Iap - Tui (lo - Ilaiili plifc
* ~~~~~~~~~~oOo -.... :J;ho, nagty.-.Dth6ng .. ........... 5nam 200.+
BIR N BAN THJAM VAN CONG DONGVft K1l HOACIH DItN BU VA TAI DINH CU
Thhnijl pli"ant thlam clur:
1. Dai dien . ........ lk.w .... Xlr)u
2. Nlhrrng ngtrui anli hturng: ................................... Nain .. Nu Z3. Dai diein Cty TVXD Dien ..................
Cic van de tlain van cQng dlong:
1. Phi6 bie& iiii-hig ciiiiii sicli lieln qtplan d6n deAn bil, tii djiih cu.- Nliriing kilu virc truing dung dat clio dur an.
- Dur kien th6i gian tien h?ailn clio dkr in.
- Plio bie^n cac clilnli sfich cuia Vie.t Naimi va WB.
- Cac quy dijni plap ILuit Viet Namn vai cliinl sich WB c6 lien quaii.
- Cac clhinli schl den bi clio D fr an.
- Cac khu tai dinljn cur (neu co).
2. Y Iien cfia dia plitrorng ve ke^ loacli d"el bix va tai dinli cu:- Iflid iaeig xdy ra dilih hIn'eiig bait tli ciUa dlr in d+ Doi v&i nhiA cira: .... 4A2J2 A. . .. s.sc .S ..Xzn..k;4 ..............
......................................................................................................................................
+ Doi v6i dat dai: ..... ... ...;.. .. . . . . .............................................................. .......................................................................................................
.......................................................................................... I ..................................................................................................
+ D oi v(i cay coi:... ..........................
................................ . . . . . . . . . . ; . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . .
-1- DOi v&i m6i trLr&nlg tUr nlihin, x,t H-l.i:...Ciwv'-
- Cic bieit phdp giadini thiiu:
+ Trong giai doa?n thiet ke: . .. .......................................................................................................................................................................
......................................................................................................................................
+ Tronig giai doa?n tlii c6ng: ................................................. ' .......................................................................................................................................
;
......................................................................................................................................
+ I'rong giai doan vwin hAli:...............................................................................................................................................................................................................................
......................................................................................................................................
- Cdc phiwo7ltg adit diM bit, quy t1-inih cli It-d d4n bit:+ Gia (leldi bi,, hinh tlIifc d& bil:... .4.
......................................................................................................................................
...................................................................... ............................................................................................2
+ Tli&i gian tlhkrc Iiien clii tra deii bui:..-x.Q ... i. w . ... ......................................................................................................................................
...........................................................................................................................I...........
+ Quy clie kieu nai giam sat:..Ak tyvl.............................................................................
......................................................................................................................................
......................................................................................................................................
Xac nlifan cuia dai dlien Xac nilia.l cuia liguObi anhl lmU'Ong
C8ng ty Tun van Xay dtrig Die.n 4
Xic iili(iii cuia chinikl quyeAii dia plitronig
CQNG HOAk XA HQI CHU NGHIA VIE T NAMDoc Iap - Tir do - Hanlh phlikc
-oOo-'A.]J.v:......, ngaiy Zithdng.,5..nd,m 2001.
Bit'N BAN TIIAM VAN CONG DONGVE KIt HOACH DEItN BU VA TAI DINH CU'
Tl'atnli plilhn thlanx dur:
1. Dai die .UBND. t ....(.. 5 X..
2. NliCr nguai.inlh htnung: ....................... Nain .... ... Nur..
3. DEai dien Cty TVXD Dien 4: .................................... h4
C:ic val) de till Vanl cQlig dOllg:
1. Phoo bien iihinig chiihi s4ch li'en quan den den bii, tai djini cir.
- Nlirng khu vurc trung dilng dat ciho dur n.
- Dkr kiein t1iA gian tien li.Anh clio dtr an.
- Plho bie^n cac cliili salch cuia Viet Nani va WB3.
- Caic quy dijni plAp ludt Viet Naiii vat chlilih Slich WB c6 liein quan.
- Cac cliiiili saeh den bCi cho Dtr an.
- Cac kimi tai diflih cr (neu c6).
2. Y ltien cia dlia phitrong ve ke lioacic dle; btt va tai diinil cu:
- I(Iid ntdng xay ea dith hiicng bA't 1oi ciia duiadu 2
+ D6oi VCJi uila c k ...i &.h . .4.e .AL ' ki.....&
+ Doi voi n1at dai:...... 4 vi. 14.S4..n &A
....................................................................................................................... ...............
+ D6i v&i cay
......................................................................................................................................
............................................................................................ ..........................................
+ Doi v6i m6i tinrng tLr nhi8n, xai 116i:...A...s, . ... YiA.4 .
..X.rX...X.a..l,/.S;r....AP..48?..............................................................................
Cdic biI p cip gidini tllie l:
e~~~~~~~~~~~~~~~~~~~~~
+ Trong giai do4al thiet .. C........... .t tL ...- ~ ~ ~ ~~~~~~~~~~~~~~~ ....... ..,,...--------.-'.''''''''''''''-'''---''''''''''''''''''-'''-'''''''''. .........................................................................
.......................................................
.................. + Trong giai dosin thi c6ng:. .......................................................................................................................................
......................................................................................................................................
+- rojng giai doaii vain hAinh:.....................................................................................................................................................................................
............................................................... ......................................................................................................................................
- Cdc p/tl-wog dii den bit, quy trilith clti tl-ri del bit: ,+ Gia {l e1^n bi, lhinli tlirc dei b u: ... T .. . . . ...4. «kk .j t %.>' '... 1.).X.v. .... .^..z.. . ..
......................................................................................................................................
+ Tlih i giani tlh rc Iien clii tra den bit:...........................................................................
......................................................................................................................................
± Quy che ki&e nai giAm sit:..............................................................................................................................................................................................................................
......................................................................................................................................
X-Ac nilAn cua dlai (liv'll Xac n111,11 t71a ngtroi filil 1lltrongC0ng ty 'Fir vani Xfiy dung Di'it 4
Xac 1111,5n c;la cliiili qtuye'ji iia phiiroriig
,{04
:mauijj zitivi diV1d uJiq ,p) -
............................................... ...... ............ >y C). .... . . . . . .. . . . . . .. . . . . .
...............................................................-.-. -:1611 ex 'LI! L i il n. I O LLI !L A IOC1 +
......................................................................................................................................
.................................. ...... .... - ~i - - ..--..-.---.-.-....................''.'
........................................................ - --3 X------- 3 Ses OA !g ( -t................................................ .....................................................................................
............................................................... ......................... ., 4 ...... ....
~~~~~~~~~~...................................... ......................... ---)Z*o*8------------------------:113P Myt OA !Q( +
.......... ......... .........-.-------.-....... ......... ........... - - .... ......... ......... .........
~~ ~~~~~~~~~~~~~~~~~~~~~~m T-i................ ......-.--..............--- a--n 4 v*-- **@**s--e¢** n llI!A Q
.:13p11 VIP !9OA JOG +
12~~~~~~~0IIV .lip Viii 7.4f ipq gUI,.o.f llV i U V1 i4iUX XllULl P'II -
:nma luip !,') ii nq ?aLp ilaeoll a)[ 3A 1.o.nild uBp uip trail A Z
-(go fliu) no iluip !V1 nil-j oDE -
tw,1 fiC ot0o niq uiap IaL,s IljtUl4 aLeD -
iLnilb uail 03 gA/ tjIOLS tllIilO EA LIIL'N 151A tle1 dct,ijd tliUp Xnb 3D -
'G A tBA tElBN 13!A BLI tPLs tt11111 31o uiiaq 91t1d -
U,B ilp Oo LjUL'Lt UVa!1 U! !P2 l 'tl1 u3 ' UEa -
U, np oq1 )Up 2UIpP 2LTT1 OaAA n'IN 2untlhN -
-.no luip? Iu; 'nq uYap uiapl uenb) uail ip,es quila2 unillti tlaiq otld *1y ~y '~~
.: 4AU4.: p u4 ax ux . c & u6ip !ua eJY% ........... ....... 111 fLI.......... ......... .. z.. ...... :2ua;q qLA 1:)nty 2 i'm £
......... .....&J;A/ .- NIufl UalP !dl' 1
:.nip mtuml tiuqld qtuuqj
.fl3 HNIG IVJ VA flf KJM IHDVO 1X ffAO9QG DONO;) MVA TVILHSL MVfI N IjtI
,~.0-000---u
nIid 1U=uH - op i1 - d- j a
NVN JIGaA VIYIDN fll-ID I6i-I VX yOu DKOID
+ Trong giai doan thiet ke: ...... ..... ... 4 ..-............ . x! . ........................................................
....................................................................................................................................
± Trong giai doajn thli cong: ........... + T o g g a do n t icol .............. ........... ;;.. ... .. w,....... /t.o....... lk'... c.... v;. ....... 0. ...c.id........... C.7.j...... . A.C........... ... . ...f
+Tronggiiv .................... ; ;;.. ; ....
li ..................~ ~~~ .............................................. ........... I..G .S. d
......................................................................................................................................
- Cdc phirot g di den bih, qtiy tr-illl clii tr,t titLI bit:+ G ia cle'i bui, hiilih th*irc den bi:.................................................................................
. LL4A....~~~~~...... kl~ 4 ~ ..............................................................................................................................................................
............................................................................. + ThMi giani thlrc hien chi tra den bt: -..................................... ..... .fi 4 kt ̂:.'0r.
+ Quy clhe kieu nai giam salt: .AL ....................§......:.........................................................................................................................................
......................................................................................................................................
Xac nlOn cuia dai dilei Xac il4an cua lgU'O iiibh hir&ngCong ty,Tir van Xaiy duig Die@n 4