BengalBengalBengalBengal UniversalUniversalUniversalUniversal ConsultantsConsultantsConsultantsConsultants PvtPvtPvtPvt.... LtdLtdLtdLtd.... Welcome’sWelcome’sWelcome’sWelcome’sGuestsGuestsGuestsGuests totototo thethethethe WorldWorldWorldWorld ofofofof ModernModernModernModern CommercialCommercialCommercialCommercialOfficeOfficeOfficeOffice &&&& RetailRetailRetailRetail----”The”The”The”The Chambers”Chambers”Chambers”Chambers”.... AnAnAnAn IntegratedIntegratedIntegratedIntegratedcomplexcomplexcomplexcomplex totototo meetmeetmeetmeet everyeveryeveryevery needsneedsneedsneeds ofofofof thethethethe CorporateCorporateCorporateCorporateOOOOfficefficefficeffice EEEEnvironmentnvironmentnvironmentnvironment &&&& RetailRetailRetailRetail BBBBusinessusinessusinessusiness....

Complex Address: The Chambers, Complex Address: The Chambers, Complex Address: The Chambers, Complex Address: The Chambers, KasbaKasbaKasbaKasba, Premises , Premises , Premises , Premises no. 1865, no. 1865, no. 1865, no. 1865, RajdangaRajdangaRajdangaRajdanga Main Road, Main Road, Main Road, Main Road, KolkataKolkataKolkataKolkata----700107700107700107700107

Registered Office Address: Registered Office Address: Registered Office Address: Registered Office Address: UnitechUnitechUnitechUnitech Signature Towers, LevelSignature Towers, LevelSignature Towers, LevelSignature Towers, Level---- 1, South City1, South City1, South City1, South City----1, NH1, NH1, NH1, NH————8, Gurgaon8, Gurgaon8, Gurgaon8, Gurgaon---- 122001 122001 122001 122001 PhPhPhPh: +91 124 4552000: +91 124 4552000: +91 124 4552000: +91 124 4552000

Regional Office Address: Bengal Universal Consultants Pvt. Ltd., 22 Regional Office Address: Bengal Universal Consultants Pvt. Ltd., 22 Regional Office Address: Bengal Universal Consultants Pvt. Ltd., 22 Regional Office Address: Bengal Universal Consultants Pvt. Ltd., 22 CamacCamacCamacCamac Street, Block C, 4Street, Block C, 4Street, Block C, 4Street, Block C, 4thththth FloorFloorFloorFloor, Kolkata, Kolkata, Kolkata, Kolkata----700016, 700016, 700016, 700016, PhPhPhPh: +91 : +91 : +91 : +91 33 228920033 228920033 228920033 2289200

Web Web Web Web Address: Address: Address: Address: www.unitechgroup.comwww.unitechgroup.comwww.unitechgroup.comwww.unitechgroup.com

For Enquiry: +91For Enquiry: +91For Enquiry: +91For Enquiry: +91----9903974742, +919903974742, +919903974742, +919903974742, +91----9830139235, +919830139235, +919830139235, +919830139235, +91----9903043487990304348799030434879903043487

“The Chambers” “The Chambers” “The Chambers” “The Chambers” ––––Aerial Location MapAerial Location MapAerial Location MapAerial Location Map

Ruby Hospital

Siemens Office

“The Chambers”-Actual Photographs

Main Elevation

Office Passage

Basement ParkingBasement Parking

EscalatorsInternal Passages

Retail (Left) & Office (Right) Atrium

“The Chambers” “The Chambers” “The Chambers” “The Chambers” –––– Project Project Project Project HighlightsHighlightsHighlightsHighlights

• An Integrated commercial complex, comprising of Office Units and Retail Units and is offering an excellent

opportunity with a mix of cutting edge design, neo-age architecture.

• Optimum space utilization.

• Ample circulation areas in the complex for the guests visiting the complex.

• Double level basement, parking along with adequate surface parking.

• Building ready with Completion Certificate from the Governing Authorities.

• Possession of the Units Started.

• Axis Bank already operational.

• Prominent brands showing considerable interests.

Axis Bank Operational

“The Chambers” “The Chambers” “The Chambers” “The Chambers” –––– Project Project Project Project AmenitiesAmenitiesAmenitiesAmenities

• 100% Power back up for a smooth & uninterrupted Office and Retail experience.

• Centralized air conditioned Retail Block.

• Ground and First Floor offices air conditioned.

• High speed Mitsubishi & Schindler Elevators & Mitsubishi Escalators.

• BMS System monitored complex

• Modern Firefighting system in place

• Common Toilet Facilities in each floor of Retail and Office Block

• 24*7 security monitored Complex

• CCTV monitored Complex

• Ample Advertising Options

“The Chambers”“The Chambers”“The Chambers”“The Chambers”---- Ground Floor PlanGround Floor PlanGround Floor PlanGround Floor Plan(Office Section: Ground +8 Floors; Retail Section: Ground +2 Floors)(Office Section: Ground +8 Floors; Retail Section: Ground +2 Floors)(Office Section: Ground +8 Floors; Retail Section: Ground +2 Floors)(Office Section: Ground +8 Floors; Retail Section: Ground +2 Floors)

(Retail Section)(Retail Section)(Retail Section)(Retail Section)

(Office (Office (Office (Office Section)Section)Section)Section)

“The Chambers”“The Chambers”“The Chambers”“The Chambers”---- First Floor PlanFirst Floor PlanFirst Floor PlanFirst Floor Plan(Office Section: Ground +8 Floors; Retail Section: Ground +2 Floors)(Office Section: Ground +8 Floors; Retail Section: Ground +2 Floors)(Office Section: Ground +8 Floors; Retail Section: Ground +2 Floors)(Office Section: Ground +8 Floors; Retail Section: Ground +2 Floors)

(Retail Section)(Retail Section)(Retail Section)(Retail Section)

(Office (Office (Office (Office Section)Section)Section)Section)

(Retail Section)(Retail Section)(Retail Section)(Retail Section)

“The Chambers”“The Chambers”“The Chambers”“The Chambers”---- Second Floor PlanSecond Floor PlanSecond Floor PlanSecond Floor Plan(Office Section: Ground +8 Floors; Retail Section: Ground +2 Floors)(Office Section: Ground +8 Floors; Retail Section: Ground +2 Floors)(Office Section: Ground +8 Floors; Retail Section: Ground +2 Floors)(Office Section: Ground +8 Floors; Retail Section: Ground +2 Floors)

(Office (Office (Office (Office Section)Section)Section)Section)

Fourth, Fifth & Seventh Floor Eighth FloorSixth Floor

“The Chambers”“The Chambers”“The Chambers”“The Chambers”---- Third Floor to Eighth Floor PlanThird Floor to Eighth Floor PlanThird Floor to Eighth Floor PlanThird Floor to Eighth Floor Plan(Office Section: Ground +8 Floors)(Office Section: Ground +8 Floors)(Office Section: Ground +8 Floors)(Office Section: Ground +8 Floors)

Third Floor

“The Chambers” “The Chambers” “The Chambers” “The Chambers” –––– Detailed Detailed Detailed Detailed SpecificationsSpecificationsSpecificationsSpecifications

Structure

-Walls - earthquake resistant RCC framed construction with infill brick wall

Wall Finish

Internal

- Entrance Lobby - Paint

- Lift Lobby & Corridor - Stone cladding and Paint.

- Office - Cement Plastering

External

False Ceiling

- Entrance lobby, Lift lobby, Shop Corridor, Office Corridor & Toilets

Air Conditioning

- Shop - High-side up to AHU/FCU/CSU to be done by developers

Low-side to be done by end users

- Shop Corridor & Atrium - Centrally air conditioned

- Office (Ground and first floor)-High-side up to AHU/FCU/CSU to be done by developers-Combination of stone & textured paint finish

Flooring

- Entrance Lobby - Vitrified Tiles

- Lift Lobby - Vitrified Tiles

- Shop/ Office corridor - Vitrified Tiles

- Office - Bare shell slab

- Staircase - Polished Kota Stone

Common Toilets

- Walls - Ceramic Tiles up to false ceiling level

- Flooring - Vitrified Tiles

- Fittings - Marble/ Granite counter, white sanitary fixtures & CP fittings

Windows

- Powder coated/ anodized aluminium glazing

- Office (Ground and first floor)-High-side up to AHU/FCU/CSU to be done by developers

Low-side to be done by end users

- Office Corridor (Ground and first floor), Reception area-Centrally air conditioned

Amenities- Power back up

Note: All buildings, layouts,specifications,etc are tentative and subject to variation & modification by the company or the competent authorities sanctioning such plans

Thank YouThank You