technology budget and status report

Post on 13-Feb-2017

215 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

SOUTH ORANGETOWN CENTRAL SCHOOL DISTRICT

TECHNOLOGY BUDGET AND STATUS REPORT

1

Presented by George Brady

2

Summer 2015

• Replaced outdated technology –desktops and laptops

• Re‐imaged existing desktop and laptops (except TZHS)

• Reconnected all instructional desktops after work and cleaning crews

Back to School

• Extended Power Outage at high school prohibited summer work at TZHS

• We were able to get into the high school a few days before start of school to get classrooms in order

• (300) New Chromebooks TZHS incoming 9th grade

3

4

5

Fiber Infrastructure Upgrades

• Summer 2014 upgraded INTRA‐building connectivity• 10 GB between buildings

• 2015‐16 UPGRADED the INTER‐building fiber connections• Original fiber installed nearly (15) years ago• Existing fiber not able to support higher speeds required (1 GB)• Upgraded to 10 GB between network closets

6

Storage Area Network

• Data Center Replication and Load Balancing

• High Availability• Data Integrity

• Site Recovery Manager• Automated restarting of network systems in a coordinated manner

Backup Generator Power

• Installed a High Capacity Generator at Tappan Zee HS

• Provides electrical backup services for key areas including the Primary Data Center

• As part of the 5 Year Facilities Plan tie SOMS Data Center into generator

7

Replaced End of Life Network Switches8

9

Long Range Planning

21st Century Learning

10Critical Thinking, Communication, Collaboration and Creativity

11

stemtosteam.org

12

13

Coding

Digital Electronics

Robotics

3D Printing

14

Access to Instructional Resourcesto support 

Teaching and Learning

Mobile Learning ‐ Chromebook Initiative

• Tappan Zee HS continue 1‐to‐1 program to include remaining grades• 2015‐16 grade 10• 2016‐17 grade 11• 2017‐18 grade 12

• Elementary / Middle Schools – Classroom Model• Chromebook Rack up to (16) Chromebooks• Access to shared Chromebook Cart

15

BYOD Wireless Access

• Guest Wireless Network for personal devices

• Securely configured to protect District’s physical and wireless network

• 2015‐16 researching ways to enhance “Ease of Use” of the Guest Wireless Network for students, staff and community members

16

Remote Access – MyDesktop

• Leverages the District’s Virtualized Desktop Infrastructure

• Provide secured Remote Access to user desktop

• Available on most devices (e.g. desktop, laptop, tablet, or phone)

• 2015‐16 provide Open Access to instructional staff

17

State Mandated Online Testing• Online Computer Based Testing we knew it is inevitable

• Continue our efforts to prepare for online testing

• 2015‐16 Online Testing is here• NYSESLAT• Alternate Assessments

18

InfoSNAP

• Online Registration Solution designed specifically for public schools

• Data is cleaned and uploaded directly into PowerSchool

• Goal is to make the enrollment process more efficient

• Begin use of InfoSNAP for the 2016‐17 school year enrollments

19

Finance Manager Upgrade 

• Significant enhancement to existing product:• More efficient user interface• Email Response System• Workflow management with Event Notification• Built on Microsoft SQL database• Dashboard to view real‐time operational information• Customizable Report Writer

• Spring 2015 implementation

• Migrate to BOCES Support 2016‐17

20

Smart Schools Bond Act

• January 2014, Governor Cuomo called for New York State to invest $2 billion in state schools

• South Orangetown allocation ‐ $1,029,143

• Recommending allocation for the following priorities:• Instructional devices and classroom technology• Enhance network and wireless infrastructure• Enhance District Security Implementation

21

22

District Technology Support

23

BOCES Shared Service

• During the 2015‐16 school year – BOCES informed school districts that they would No Longer be able to provide Full‐time Staffing

• NY State regulation stipulate that BOCES are NOT allowed to provide onsite personnel full time

• Onsite personnel must be a shared service between multiple districts

60% primary district / 40% shared with other district(s)24

BOCES Shared Service

• Historically support was “Call and Dispatch” 

• District use of technology is more complex and comprehensive now

• Normal ”Break Fix” support can be done in a call and dispatch manner

• Project work does NOT lend itself to a part‐time model (60 / 40 split)

25

FUTURE CLASSROOM

27

2014 Rockland Youth Film Festivalhttps://youtu.be/uZ73ZsBkcus

Thank You

top related