2012.11.29 council meeting

Teaneck Municipal coMplex

1-1

• Approval needed to begin bid process

• Discuss goals informing current plan

• Recap Design Process

agenda / purpose of MeeTing

AeriAl context: existing

2-1

N

teAn

eck

RoAD

libRARy

bRo

AD s

tRee

t

couRt /chAmbeR

foRmeR Police

AeriAl context: phAse 1

2-2

N

teAn

eck

RoAD

foRmeR Police

PhAse 1link + foRmeR Police

libRARy

bRo

AD s

tRee

t

couRt /chAmbeR

AeriAl context: phAse 2

2-3

N

teAn

eck

RoAD

foRmeR Police

PhAse 2futuRe woRk

libRARy

bRo

AD s

tRee

t

couRt /chAmbeR

3-1

building imAges: existing view from pArking lot

3-2

building imAges: view from pArking lot

3-3

building imAges: existing view from teAneck roAd

3-4

building imAges: view from teAneck roAd

4-1

• All employees out of basement • building Department • Zoning Department • health Department • Violations (Phase 2)

• ADA Accessibility

• long term storage and access to records

• improve / increase meeting spaces

goals inforMing currenT plan

5-1

proposed building plAns: ground floor

5-2

proposed building plAns: bAsement level

5-3

proposed building plAns: second level

6-1

• Automatic and low flow Plumbing fixtures

• high efficiency hVAc system (VRV heat Pump system)

• high efficiency lighting (leDs and occupancy sensors)

• efficient window and building envelope systems

• Recycled and low off-Gassing materials

• Reuse of former Police building

green poinTs

7-1

Addition and Renovation to be supported by new emergency generator.

eMergency generaTor

locAtion of new emeRGency GeneRAtoR

8-1

TiMeline1) council meeting and Project Presentation

2) owner / building Dept Review Period and final coordination for 100% construction Documents (3 weeks)

3) Public bidding Period (6 weeks)

4) contact and Award Period (6 weeks)

5) construction (14 months)

11.29.2012

11.29.2012 - 12.20.2012

12.27.2012 - 02.07.2013

02.07.2013 - 03.21.2013

04.2013 - 06.2013

9-1

phAse 2 composite plAns: ground floor

PhAse 2

9-2

phAse 2 composite plAns: bAsement level

PhAse 2

9-3

phAse 2 composite plAns: second level

PhAse 2