April 10 through 12, 2014

“21 for 21” A 21st Century Green Vision for the 21st Street Corridor

Study Area A

Study Area B

Study Area C

http://www.southsidegreen.com

ContributorsTom BatroneyJeremy BrownKathy ChavaraHeather FullerJen KullgrenTim PrevostPatrick RobertsMike TakacsAnna WerleMegan Zeigler

Study Area A – Team 1

April 10 through 12, 2014

• Goals:– Accommodate Pedestrian, Bicycle and Vehicles– Traffic calming and safety– Cycling as transportation – Minimize parking impacts– Balance access and circulation– Stormwater capture for 1” of rainfall runoff– Separate stormwater system

April 10 through 12, 2014

April 10 through 12, 2014

Study Area A – Transportation Design Featureshttp://www.southsidegreen.com

• Pedestrian, Bicycle, and Business Friendly and Integrated– Two Way Bicycle Traffic – Loading Docks Accommodated – Reallocating Two Parking Spaces

April 10 through 12, 2014

April 10 through 12, 2014

Birmingham Bridge

New Bicycle Lane to 21st Street

April 10 through 12, 2014 http://www.southsidegreen.com

Study Area A

April 10 through 12, 2014 http://www.southsidegreen.com

Study Area A - East Carson Street to Fox Way

April 10 through 12, 2014 http://www.southsidegreen.com

Study Area A - Fox Way to Merriman Way

April 10 through 12, 2014 http://www.southsidegreen.com

Study Area A - Merriman Way to the River

April 10 through 12, 2014 http://www.southsidegreen.com

Before

April 10 through 12, 2014 http://www.southsidegreen.com

After

April 10 through 12, 2014

21st Street Cross Section

April 10 through 12, 2014

Wharton Street Cross Section

April 10 through 12, 2014

Study Area A – Stormwater Design Features

http://www.southsidegreen.com

• Designed Ground Level Impervious Area and Building Roof Area– Permeable Paver Subsurface Storage – Bioinfiltration Rain Gardens – Stormwater Day Lighting and Stepped Wetlands

Stormwater Management of 1.1 inches

3.5’ Deep

April 10 through 12, 2014

Study Area A – Stormwater Design Features

http://www.southsidegreen.com

• Increased Green Space Area – 5000 Sq Ft Added– Landscaped Traffic Calming Bumpouts– Planter Boxes and Trees

• Additional Tree Canopy – Approx. 38 Trees Total• ~23 Large Sized Trees and ~15 Smaller Size

April 10 through 12, 2014

Staghorn Sumac Sweetbay Magnolia Bald Cypress

BlackgumAmerican HophornbeamSwamp White Oak

April 10 through 12, 2014