suprash engineering
Post on 03-Sep-2014
39 Views
Preview:
DESCRIPTION
TRANSCRIPT
Advisors: WORBUS Management Consultants Ltd.
SUPRASHENGINEERING
WORKS
SUPRASH ENGG WORKS
SUPRASH ENGG SUPRASH ENGG WORKS WORKS
COMPANY COMPANY PRESENTATION PRESENTATION
SUPRASH ENGINEERING WORKS
Suprash Engineering WorksSuprash Engineering Works
ORGANIZATION INTRODUCTION
SUPRASHENGINEERING
WORKS
Advisors: WORBUS Management Consultants Ltd.SUPRASH ENGG WORKS
About UsAbout Us
▲ Suprash Engineering Works (SEW) was incorporated in 1994.
▲ SEW is specialist in all types of Automotive Sheet Metal
Components.
▲ The company has been accredited with ISO 9001 – 2008 policy in
2005, and will be soon acquiring TS as well in the next year.
SUPRASHENGINEERING
WORKS
Advisors: WORBUS Management Consultants Ltd.SUPRASH ENGG WORKS SUPRASH ENGG WORKS
Unit SEW – CHIKALI UNIT 1LAND AND BUILDING DETAILSLocation . GAT no 1605-1606 , Chikhali Pune
412162Power 100 HPTurnover Rs. 3.58 Crores (FY 13-14)Land and Building 7200 sq ftMANPOWER DETAILSStaff & Q.C 5nos.Skilled Operators 15 nos.Semi-Skilled Operators 5 nos.
Organisation DetailsOrganisation Details
SUPRASHENGINEERING
WORKS
Advisors: WORBUS Management Consultants Ltd.SUPRASH ENGG WORKS
Picture of Plant
SUPRASHENGINEERING
WORKS
Advisors: WORBUS Management Consultants Ltd.SUPRASH ENGG WORKS
Force Motors –Major Parts Force Motors –Major Parts
SEW is specialist for all Types of Automotive Sheet Metal Components.
SUPRASHENGINEERING
WORKS
Advisors: WORBUS Management Consultants Ltd.SUPRASH ENGG WORKS
Product Gallery-Other CustomersProduct Gallery-Other Customers
Sheet Metal Components and assemblies
SUPRASHENGINEERING
WORKS
Advisors: WORBUS Management Consultants Ltd.SUPRASH ENGG WORKS
Manufacturing Facilities
PRESS LINE – 10TON TO 200 TONSHEARING FACILITY -7X2500 mm
WELL EQUIPPED TOOLROOM WELDING ASSEMBLY LINE
SUPRASHENGINEERING
WORKS
Advisors: WORBUS Management Consultants Ltd.SUPRASH ENGG WORKS
Our CustomersOur Customers
FORCE MOTORS LTD
MAN TRUCKS INDIA PVT LTD
SHARADA INDUSTRIES
RANE GROUP OF INDUSTRIES
MAHINDRA UGINE STEEL
CHROMEWELL ENGINEERING PVT LTD
MITTAL GROUP OF INDUSTRIES
POONA TOOLS PVT LTD
FORCE MOTORS
SUPRASHENGINEERING
WORKS
Advisors: WORBUS Management Consultants Ltd.SUPRASH ENGG WORKS
QMS CertificateQMS Certificate
SUPRASHENGINEERING
WORKS
Advisors: WORBUS Management Consultants Ltd.SUPRASH ENGG WORKS
Organisation Structure
M.D
MR+Q/A INCHARGE
PROD. INCHARGE
STORE INCHARGE ACCOUNTS
PROD SUPERVISER
OPERATORS
Q/A ENGR
Q/A SUPERVISOR
INSPECTORS
SUPRASHENGINEERING
WORKS
Advisors: WORBUS Management Consultants Ltd.SUPRASH ENGG WORKS
Views about QMS Before
QMS
Only Customer requirement
Organizational activities were uncontrolled
Only paper work
Organizational activities were uncontrolled
SUPRASHENGINEERING
WORKS
Advisors: WORBUS Management Consultants Ltd.SUPRASH ENGG WORKS
Views about QMSAfter
QMS
Not just Paper Work
Not just for customer
requirement .
New Plant Layout, defined control Plans for every
part Process Plan Display at Shop
floor
Defined System
SUPRASHENGINEERING
WORKS
Advisors: WORBUS Management Consultants Ltd.SUPRASH ENGG WORKS
1s -2s Before
• Unplanned, Complex M/c. Layout .
Neat and Clean shop with Gangways Identification Neat & Clean, Well Organised, Single piece Flow.
After
• Uncleaned ,Unorganised Shop Floor
SUPRASHENGINEERING
WORKS
Advisors: WORBUS Management Consultants Ltd.SUPRASH ENGG WORKS
1s -2sBefore
• Improper shopfloor e.g. : tool storage
Tools storage in Racks, with location no., color coding as per customer wise
After
SUPRASHENGINEERING
WORKS
Advisors: WORBUS Management Consultants Ltd.SUPRASH ENGG WORKS
1s-2s Before
• WIP parts lying on ground• Assly. Child parts lying
anywhere in the shopfloor
WIP & Assly. Child parts with defined Location
After
SUPRASHENGINEERING
WORKS
Advisors: WORBUS Management Consultants Ltd.SUPRASH ENGG WORKS
Process Control
Before
Process Control
Inadequate Control Plan
No PM of Dies & Tool life
monitoring
In house Rejection only
data basis without analysis
Identification system missing for WIP parts
Only Routine Inspection
SUPRASHENGINEERING
WORKS
Advisors: WORBUS Management Consultants Ltd.SUPRASH ENGG WORKS
Process Control
After
Process Control
Control Plan Reviewed & Displayed
PM of Dies & Tool life
monitoring implemented
Inhouse Rejection only data evident & analysis done
WIP parts are identified by Tags in Bins
Routine Inspection &
SPC
SUPRASHENGINEERING
WORKS
Advisors: WORBUS Management Consultants Ltd.SUPRASH ENGG WORKS
Process Control
SPC IMPLEMENTATION PROCESS PLAN DISPLAY
SUPRASHENGINEERING
WORKS
Advisors: WORBUS Management Consultants Ltd.SUPRASH ENGG WORKS
PM of M/c. & Dies BEFORE• PM of M/c. check sheet
not addressing all PM checkpoints.
• No Check sheet for PM of dies , no PM Plan
• No die history card
AFTER PM of M/c. check sheet
addressing all PM checkpoints.
Define Check sheet for PM of dies , PM Plan Define
Die history card Implementation
SUPRASHENGINEERING
WORKS
Advisors: WORBUS Management Consultants Ltd.SUPRASH ENGG WORKS
Calibration Before • Unplanned
Calibration activity.
After Calibration plan Identification on
instrumentsHistory card for
instrumentsMSA for instruments
SUPRASHENGINEERING
WORKS
Advisors: WORBUS Management Consultants Ltd.SUPRASH ENGG WORKS
Control of Finished Products BEFORE• PDI report not addressing
all Force Motors Requirements.
• No proper storage & identification for finished products
• CAPA Philosophy for customer complaints. –on customer calls only
AFTER PDI report addressing all
Force Motors Requirements .
Rack system introduced with identification tags
8D Philosophy followed and action taken for every customer complaints
SUPRASHENGINEERING
WORKS
Advisors: WORBUS Management Consultants Ltd.SUPRASH ENGG WORKS
Inhouse Quality
QMS Implementation
Rej. Analysis Started from Oct -13
SUPRASHENGINEERING
WORKS
Advisors: WORBUS Management Consultants Ltd.SUPRASH ENGG WORKS
Other Improvements
Separate N.C Area • SQPD Board Display
SUPRASHENGINEERING
WORKS
Advisors: WORBUS Management Consultants Ltd.SUPRASH ENGG WORKS
Implementation of PPE
Safety Shoe Safety
Shoe
Hand sleeve
Hand Gloves
Nose Mask
GoggleFor welding & Deburring
WelderHand Gloves
Helmet
0 Accidents from Dec-13
SUPRASHENGINEERING
WORKS
Advisors: WORBUS Management Consultants Ltd.SUPRASH ENGG WORKS
Expansion Plan :
Increase capacity in Chakan –Target : FY 15-16
• Plant is under Construction • Electricity sanctioned - load 200 HP • Plant for Finished Machining components
setup
SUPRASHENGINEERING
WORKS
Advisors: WORBUS Management Consultants Ltd.SUPRASH ENGG WORKS
Our Commitment • We believe “System is a medium of
improvement ”.
• We are committed to maintain quality and service by continual improvement through QMS system.
& • Last but Most Heartly commitment from us :
“Customer is God For Us’’
SUPRASHENGINEERING
WORKS
Advisors: WORBUS Management Consultants Ltd.SUPRASH ENGG WORKS
THANK YOU !!!!
top related