subdivisional guideli nes - central desert region · lgant version revision date description...
Post on 08-Jul-2020
7 Views
Preview:
TRANSCRIPT
Subdivisional Guidelines
Central Desert Regional Council
Adopted 6 December 2013
Subdivisional Guidelines – Central Desert Regional Council
Forward
December 2013 Cardno (NT) Pty Ltd i
Cardno (NT) Pty Ltd
Level 6 93 Mitchell Street
Darwin NT 0800
GPO Box 1162
Darwin NT 0801
Telephone: 08 8942 8200
Facsimile: 08 8942 8211
International: +61 8 8942 8200
cardno@cardno.com.au
www.cardno.com.au
Document Control
Version Date Author Reviewer
Draft 16 October 2011 Tony Parsons AWP
90% 14 November 2011 Tony Parsons AWP
Final 16 January 2012 Tony Parsons AWP Ryan Prescott RP
"© 2011 Cardno (NT) Pty Ltd All Rights Reserved. Copyright in the whole and every part of this document
belongs to Cardno (NT) Pty Ltd and may not be used, sold, transferred, copied or reproduced in whole or in part
in any manner or form or in or on any media to any person without the prior written consent of Cardno (NT) Pty
Ltd.”
Subdivisional Guidelines – Central Desert Regional Council
Forward
December 2013 Cardno (NT) Pty Ltd ii
Background
As part of the Strategic Indigenous Housing and Infrastructure Program (SIHIP), a set of Guidelines
were established to provide direction for each Alliance to expected subdivisional standards.
Unfortunately, these guidelines were not sufficient. As a result, LGANT is seeking a comprehensive
set of guidelines that cater for the needs of both densely populated areas as well as smaller towns.
The following Guidelines are provided for the information of subdividers of land in the Northern
Territory wherever assets are to be handed over to a local Government Authority (hereafter referred
to as 'Council') for it to maintain.
These Guidelines represent minimum standards acceptable to Council for the planning and layout of
a new Development as well as the design and construction of roads, stormwater drainage, street
lighting, footpaths, driveways, open space, landscaping and ancillary items.
These Guidelines are not intended to remove responsibility from or limit the creativity of the planning,
engineering and construction professionals engaged in the development of subdivision proposals.
Rather, these Guidelines shall be employed as a common reference from which mutually recognised
and current standards of work and procedures can be applied.
These Guidelines and the Australian Standards are subject to regular review - hence it is important to
confirm this edition remains current prior to applying these guidelines for a subdivision development
proposal.
The Guidelines which follow are those applicable to the subdivision layout as well as the physical
infrastructure relating to roads, footpaths, driveways, verge areas, stormwater drainage, street
lighting, open space and landscaping which are the responsibility of the Council.
It is necessary that all Developers read these Guidelines in their entirety prior to submitting a proposal
for a new development.
Structure of Guidelines
The following Subdivision and Development Guidelines are provided for the information of subdividers
of land and developers in the Northern Territory. While they define prescriptive requirements, they are
not intended to limit the creativity of the planning, engineering and construction professionals
engaged.
These guidelines should be referred to when planning any new or redevelopment of a site of any size.
These guidelines deal mainly with the requirements for large developments of multiple allotment
properties and less with single lot redevelopment.
The Guidelines represent minimum standards acceptable to Council for the planning, design,
construction and maintenance of infrastructure associated with developments. They are written in
support of Councils policy and procedure manual and standard drawings. Nothing within the
Guidelines removes responsibility from any parties for their actions within the process.
The Guidelines recognise the planning philosophy, technical requirements and needs and
expectations of stakeholders necessary to create a viable, sustainable, environmentally friendly, safe
and liveable community.
The development process is viewed by Council as a partnership between all parties involved that
provides positive outcomes for stakeholders. The Guidelines assume that the developer is informed
and willing to adopt current and innovative practices common to development within the NT and
Australia wide.
Subdivisional Guidelines – Central Desert Regional Council
Forward
December 2013
Cardno (NT) Pty Ltd iii
The Subdivision Development Guidelines document consists of eight parts plus Annexures.
These Guidelines are designed to provide the minimum standard for applicable for delivering a
subdivision within the Northern Territory. Consequently the Guidelines are divided into a number of
sections, these been:
Section 1 General Overview of Building a Community
Discusses the general intent of the Guidelines. It places emphasis on Council's objective of building
new communities that are sustainable, safe, vibrant, efficient and adaptable to change. Applicants
should incorporate the design principles within their projects.
Section 2 General Requirements
Provides a flow chart to guide the Developer through the Planning Process, Design Process and
Construction Process.
Section 3 The Planning Process
Discusses the general planning and development process with reference to the Planning Act, the
Northern Territory Planning Scheme and identifies the NT Government and Council’s roles and
responsibilities.
Section 4 The Design Process
Discusses information gathering, approval process, drafting and presentation standards and As
Constructed requirements.
Section 5, 6, 7, 8, 9 Design Standards
Discusses all design and specification requirements. Includes Roads, Pathways, Drainage, Lighting
and Landscaping.
Section 10 The Construction Process
Discusses the construction process has it relates to communicating with Council and the public.
Section 11 Construction General Conditions
Outlines the general conditions of contract to be supplemented with the Technical Specification as
discussed in the Design Standards.
Section 12 References
Annexures
Provides additional information on aspects of the guidelines that may need further investigation. They
also provide the specific information on each Council’s requirements.
Subdivisional Guidelines – Central Desert Regional Council
Forward
December 2013
Cardno (NT) Pty Ltd iv
Disclaimer by Council
The Guidelines shall be read in conjunction with relevant legislation and any Council approved
policies or documentation.
All due care has been taken in producing these Guidelines and its consistency with relevant legislation
and standards however if any inconsistency is noted Council will provide the necessary clarifications.
Council does not guarantee the completeness of the information contained within these Guidelines and
does not accept any loss or damage that may result from the use of the Guidelines.
Council reserves the right to deviate from particular aspects of the Guidelines for any Subdivision or
Development where it deems to be warranted.
Status of the Document
LGANT version
Revision Date Description Approved
Draft October 2011 Draft Peter McLinden
90% November 2011 90% Peter McLinden
Final January 2012 Final Peter McLinden
Central Desert Regional Council version
Revision Date Description Approved
Final November 2013 Final Glenn Marshall
Prepared by
Cardno (NT) Pty Ltd
Level 6, 93 Mitchell Street
Darwin NT 0800
GPO Box 1162
Darwin NT 0801
Telephone: 08 8942 8200
Facsimile: 08 8942 8211
International: +61 8 8942 8200
darwin@cardno.com.au
www.cardno.com.au
LGANT Profile
LGANT provides a united voice for Local Government at the Territory level and at the national level
through membership of the Australian Local Government Association (ALGA).
LGANT was first incorporated in 1992 as the single peak body representing local government in the
Northern Territory.
The Association is established as an incorporation body under Section 242 of the Local Government
Act of the Northern Territory. It has a constitution which deals with a range of corporate governance
issues including membership, subscription and finances. The constitution is available on the
Association’s website.
Subdivisional Guidelines – Central Desert Regional Council
Forward
December 2013
Cardno (NT) Pty Ltd v
LGANT Membership
Membership of the Association is voluntary and is open to all 16 local government councils in the
Northern Territory that are constituted under the Local Government Act. The Association is also able
to admit members under Clause 6.4 of its constitution.
Members of LGANT are:
Alice Springs Town Council 93 Todd Street
Alice Springs NT 0870
PO Box 1071
Alice Springs NT 0871
Telephone (08) 8950 0500
Facsimile (08) 8953 0558
Email astc@astc.nt.gov.au
Website www.alicesprings.nt.gov.au
Barkly Shire Council 41 Peko Road
Tennant Creek NT 0860
PO Box 821
Tennant Creek NT 0861
Telephone (08) 8962 0000
Facsimile (08) 8962 3066
Email pamela.hodges@barkly.nt.gov.au
Website www.barkly.nt.gov.au
Belyuen Shire Council CMB 18
Darwin NT 0801
Telephone (08) 8978 5071
Facsimile (08) 8978 5154
Email info@belyuen.nt.gov.au
Website www.belyuen.nt.gov.au
Central Desert Shire Council 1 Bagot Street
Alice Springs NT 0870
PO Box 2257,
Alice Springs NT 0871
Telephone 1300 360 605
Facsimile (08) 8958 9501
Email info@centraldesert.nt.gov.au
Website www.centraldesert.nt.gov.au
Subdivisional Guidelines – Central Desert Regional Council
Forward
December 2013
Cardno (NT) Pty Ltd vi
City of Darwin Harry Chan Avenue
Darwin NT 0800
GPO Box 84
Darwin NT 0801
Telephone (08) 8930 0300
Facsimile (08) 8930 0311
Email dcc@darwin.nt.gov.au
Website www.darwin@nt.gov.au
City of Palmerston 2 Chung Wah Terrace
Palmerston NT 0831
PO Box 1
Palmerston NT 0831
Telephone (08) 8935 9922
Facsimile (08) 8935 9900
Email palmerston@palmerston.nt.gov.au
Website www.palmerston.nt.gov.au
Coomalie Shire Council 141 Cameron Road
Batchelor NT 0845
Telephone (08) 8976 0058
Facsimile (08) 8976 0293
Email ceo@coomalie.nt.gov.au
Website www.coomalie.nt.gov.au
East Arnhem Shire Council PO Box 1060
Nhulunbuy NT 0881
Telephone 1300 764 573
Facsimile (08) 8986 8999
Email info@eastarnhem.nt.gov.au
Website http://www.eastarnhem.net.au/
Katherine Town Council Lot 1865 Stuart Highway
Katherine NT 0850
PO Box 1071
Katherine NT 0851
Telephone (08) 8972 5500
Facsimile (08) 8971 0305
Email records@ktc.nt.gov.au
Website www.ktc.nt.gov.au
Subdivisional Guidelines – Central Desert Regional Council
Forward
December 2013
Cardno (NT) Pty Ltd vii
Litchfield Council 7 Bees Creek Road
Freds Pass NT 0836
PO Box 446
Humpty Doo NT 0836
Telephone (08) 8983 0600
Facsimile (08) 8983 1165
Email council@lsc.nt.gov.au
Website www.litchfield.nt.gov.au
MacDonnell Shire Council Corner Bagot Street and South Terrace,
Alice Springs NT 0870
Telephone (08) 8951 6412
Facsimile (08) 8951 6461
Email info@macdonnell.nt.gov.au
Website www.macdonnell.nt.gov.au
Roper Gulf Shire Council 29 Crawford Street
Katherine NT 0851
PO Box 1321
Katherine NT 0851
Telephone (08) 8972 9000
Facsimile (08) 8971 2607
Email info@ropergulf.nt.gov.au
Website www.ropergulf.nt.gov.au
Tiwi Islands Shire Council Puti Drive
Nguiu, Bathurst Island NT 0822
PO Box 104
Parap NT 0804
Telephone (08) 8970 9500
Facsimile (08) 8970 9555
Email david.kirikino@tiwiislands.nt.gov.au
Website www.tiwiislands.nt.gov.au
Subdivisional Guidelines – Central Desert Regional Council
Forward
December 2013
Cardno (NT) Pty Ltd viii
Victoria Daly Shire Council 14 Katherine Terrace
Katherine NT 0850
PO Box 19
Katherine NT 0851
Telephone (08) 8972 0777
Facsimile (08) 8971 0856
Email admin@vicdaly.nt.gov.au
Website www.victoriadaly.nt.gov.au
Wagait Shire Council PMB 10
Wagait Beach NT 0801
Telephone (08) 8978 5185
Facsimile (08) 8978 5100
Email ceo@wagait.nt.gov.au
Website www.wagait.nt.gov.au
West Arnhem Shire Council 13 Tasman Crescent
Jabiru NT 0886
GPO Box 4246
Darwin NT 0801
Telephone (08) 8979 9444
Facsimile (08) 8979 2488
Email info@westarnhem.nt.gov.au
Website www.westarnhem.nt.gov.au
SubdlvlslonalGuidelines- NT Local GovernmentPr1:par1:d for LGANf
Forward
December 2013 Cardno (Nl) Pty Ltd iX
Roper GuH Shire
MacDonnell Shire
Subdivisional Guidelines - Central Desert Regional Council Forward
December 2013
Cardno (NT) Pty Ltd x
Acknowledgements
The authors acknowledge the role and contribution of the review panel in providing guidance and
information during the preparation of this guide.
The panel comprised the following members:
• Peter McLinden (LGANT)
• Tim Day (Central Desert Shire Council)
• Ted Vivian (City of Palmerston)
• Errorl Montorio (East Arnhem Shire Council)
• Alex Douglas (West Arnhem Shire Council)
The authors acknowledge the use of the existing subdivisional standards of the following Council
members:
• Alice Springs Town Council
• City of Darwin
• City of Palmerston
• Katherine Town Council
• Litchfield Council
The panel and LGANT members would like to thank The Northern Territory Government, Department
of Local Government and Regional Services (Remote Housing) for their funding of this project.
Subdivisional Guidelines - Central Desert Regional Council Forward
December 2013
Cardno (NT) Pty Ltd xi
Table of Contents
Background ........................................................................................................................................... ii
Structure of Guidelines ........................................................................................................................ ii
Disclaimer by Council.......................................................................................................................... iv
Status of the Document ....................................................................................................................... iv
Prepared by .......................................................................................................................................... iv
LGANT Profile....................................................................................................................................... iv
LGANT Membership.............................................................................................................................. v
Acknowledgements .............................................................................................................................. x
Glossary ............................................................................................................................................... xv
Service Authorities ............................................................................................................................ xix
1 GENERAL OVERVIEW OF BUILDING A COMMUNITY............................................................... 1
1.1 Type of Community ................................................................................................................. 1
1.2 Overview ................................................................................................................................. 1
1.3 Integration ............................................................................................................................... 2
1.4 Movement................................................................................................................................ 2
1.5 Land Use and Housing Diversity/Employment........................................................................ 3
1.6 Environmental Management ................................................................................................... 3
1.7 Water Sensitive Urban Design ................................................................................................ 3
1.8 Public Open Space ................................................................................................................. 4
1.9 Sense of Place ........................................................................................................................ 5
2 GENERAL REQUIREMENTS......................................................................................................... 6
2.1 Developer Requirements ........................................................................................................ 6
2.2 Subdivision Flow Chart ........................................................................................................... 6
3 THE PLANNING PROCESS......................................................................................................... 10
3.1 Scope .................................................................................................................................... 10
3.2 Concept Stage....................................................................................................................... 10
4 DESIGN PROCESS ...................................................................................................................... 12
4.1 Field Work ............................................................................................................................. 12
4.2 Requirements Prior to Commencement................................................................................ 13
Subdivisional Guidelines - Central Desert Regional Council Forward
December 2013
Cardno (NT) Pty Ltd xii
4.3 As Constructed Drawings...................................................................................................... 17
5 ROADS AND PATHWAYS ........................................................................................................... 18
5.1 Road Hierarchy ..................................................................................................................... 18
5.2 Traffic Management .............................................................................................................. 20
5.3 Traffic Control Devices .......................................................................................................... 21
5.4 Road Pavement and Surface Design.................................................................................... 22
5.5 Road Geometry ..................................................................................................................... 23
5.6 Typical Cross Sections.......................................................................................................... 24
5.7 Kerbs ..................................................................................................................................... 25
5.8 Driveways .............................................................................................................................. 25
5.9 Footpaths and Cycle paths ................................................................................................... 25
5.10 Walkways / Pedestrian Linkages .......................................................................................... 27
5.11 Battle Axe Allotments ............................................................................................................ 27
6 STORMWATER DRAINAGE........................................................................................................ 28
6.1 Preliminary Drainage Proposal and Investigation ................................................................. 28
6.2 Water Sensitive Design and Erosion and Sediment Control ................................................ 29
6.3 Allotment Drainage................................................................................................................ 31
6.4 Ground Water and Special Drainage Measures ................................................................... 32
7 LIGHTING ..................................................................................................................................... 35
7.1 Street Lighting ....................................................................................................................... 35
7.2 Pathway and Open Space Lighting....................................................................................... 35
8 LANDSCAPING ............................................................................................................................ 37
8.1 Amenity ................................................................................................................................. 37
8.2 Trees and Vegetation ............................................................................................................ 38
8.3 Streetscapes ......................................................................................................................... 39
8.4 Parks and Open Spaces ....................................................................................................... 39
8.5 Street and Park Furniture ...................................................................................................... 42
8.6 Services Infrastructure for Parks and Open Space............................................................... 42
8.7 Landscape Construction Requirements ................................................................................ 42
8.8 Irrigation for Landscaping...................................................................................................... 43
Subdivisional Guidelines - Central Desert Regional Council Forward
December 2013
Cardno (NT) Pty Ltd xiii
9 MISCELLANEOUS ....................................................................................................................... 45
9.1 Waste Bin Infrastructure........................................................................................................ 45
9.2 Fencing of Allotments............................................................................................................ 45
9.3 Development and Redevelopment within CBD and single Allotments ................................. 46
10 THE CONSTRUCTION PROCESS .......................................................................................... 47
10.1 Supervision and Certification of Works ................................................................................. 47
10.2 Pre-Start Meeting .................................................................................................................. 47
10.3 Construction Hold Points....................................................................................................... 49
10.4 ON Maintenance ................................................................................................................... 55
10.5 Asset Documentation ............................................................................................................ 59
10.6 OFF Maintenance ................................................................................................................. 61
11 CONSTRUCTION GENERAL CONDITIONS ........................................................................... 63
11.1 Protection of cadastral reference marks (crm’s) ................................................................... 63
11.2 Supervision and Certification of Works ................................................................................. 63
11.3 Conformance Testing ............................................................................................................ 63
11.4 Vegetation Clearing and Topsoil ........................................................................................... 64
11.5 Subgrade Evaluation ............................................................................................................. 65
11.6 Work, Health and Safety Requirements................................................................................ 65
11.7 Environmental Requirements................................................................................................ 65
11.8 Works On Council Property................................................................................................... 66
11.9 Traffic Control and Pedestrians............................................................................................. 70
11.10 Landscaping Works........................................................................................................... 70
12 REFERENCES.......................................................................................................................... 73
Subdivisional Guidelines - Central Desert Regional Council Forward
December 2013
Cardno (NT) Pty Ltd xiv
Annexes
Annex A Site Analysis Annex
B Design Standards
Annex C Standard Drawings
Annex D Standard Forms
Annex E Road Hierarchy
Annex F Council Policies
Annex G Fees and Charges
Annex H Approved Street Tree List
Annex I Environmental Considerations
Annex J Crime prevention through environmental design
Annex K Standards for purchasing container-grown landscape trees
Annex L Commentary
Subdivisional Guidelines - Central Desert Regional Council Forward
December 2013
Cardno (NT) Pty Ltd xv
Glossary
Access Provision of infrastructure to cater for the adequate movement
of vehicles, pedestrians and cyclists to each allotment.
The Act Planning Act (Northern Territory)
Application Fee
The Fee payable to Council to lodge an application for
approval of any works based on the current Fees and Charges.
For a comprehensive list of fees and charges contact the
individual Council.
Approved Drawings
Those Drawings submitted by the Developer or Consultant and
approved by the Officer for construction purposes. If no
Drawings are submitted on the submitted drawings are
deficient then the Standard Drawings shall be deemed to be
the Approved Drawings be it in part or full.
The Authority The Authority established under the Act that determines Development
Building Code of Australia The current version of the Building Code of Australia
Certifier The person engaged to certify the construction work. (Ideally
this person should not be the Superintendent)
Construction Cost
The Fee payable to the Council by the Developer for
administration, management and supervision of approved
Construction Works. For a comprehensive list of fees and
charges contact the individual Council.
Consultant
The Consultant(s) and/or their duty authorised representative(s)
appointed by the Developer to undertake various design and/or
construction Certification associated with
a Subdivision or Development.
Contractor The person bound to execute the Subdivision or Development Works.
Contribution Plan
A plan developed by Council under Part 6 of the Planning Act
to facilitate payment of a Contribution as assessed by Council
towards the upgrade of Infrastructure and/or Facilities as a
consequence of the Development.
Council The local authority area in which the work is been performed.
Council Property Any land owned or maintained by Council, either by licence,
statutory requirement of agreement.
Deed of Agreement
The formal agreement entered into between the Developer and
Council describing the works required by Council to be carried
out under the subdivision or development and the conditions
under which Council’s requirements may be met.
Subdivisional Guidelines - Central Desert Regional Council Forward
December 2013
Cardno (NT) Pty Ltd xvi
Defect
Unsatisfactory or non-complying items of work noted by the
Superintendent, Certifier or officer. All defects are to be
rectified to the satisfaction of the Officer
Defects Liability Period
That period (usually 12 months) from Practical Completion or
On Maintenance until such time as the Developer or
Contraction can apply for an Off Maintenance inspection and
the Officer deems the works to be Off Maintenance
The Department
The Northern Territory Government Department which is
responsible for the administration, compliance and/or approval
of Government requirements referred to within these
Guidelines.
Design Approval Fee
The Fee payable to Council by the Developer for
administration, management and approval of Design
Documentation. For a comprehensive list of fees and charges
contact the individual Council.
Design Documentation
Technical Specification, Drawings, Calculations, Reports and
any other such documents required by Council to satisfactory
show intended works for the Subdivision or Development.
Developer The Owner(s) or Lessee of the land proposed to be subdivided / developed
Development
Includes Subdivision Development and/or re-Development and
any other Development that Council can make formal
requirements upon.
Development Assessment Services The section of The Department that assesses Development Applications.
Development Consent Authority
The Permit issued by the Development Consent Authority
which permits the Developer to proceed with Subdivision or
development Works subject to the conditions stated therein.
Development Works
The Development works shall include, but are not limited to,
road works and associated earth works and site works, drains,
pathways, and cycle ways, street lighting, streetscapes, and
landscaping of the public spaces owned and maintained by
Council. The works are not restricted to the proposed
development, but may be extended to include existing or other
proposed roads, drains, reserves or public or privately owned
lands giving access to or affected by or having an effect on the
proposed development.
Disability Discrimination Act The Federal Government of Australia Disability Discrimination Act 2009 and any amendments made thereto. (DDA)
Fees and Charges
The published Fees and Charges currently adopted by
Council. A list of fees and changes contact each individual
Council.
Subdivisional Guidelines - Central Desert Regional Council Forward
December 2013
Cardno (NT) Pty Ltd xvii
Local Authority The local Council
Local Government Act The Local Government Act of the Northern Territory of Australia
Maintenance Bond
The Monetary Bond lodged by the Developer or Contractor for
the duration for the Maintenance Period and may be drawn
upon by Council to carry out defect rectification, if after due
process; no appropriate action is taken by the
Contractor/Developer. The Maintenance bond is calculated at
the Actual Construction Cost of the works and is to be lodged
prior to the Works being places On Maintenance. The
Maintenance Bond for each Authority is available from each
Council.
Maintenance Period
The statutory period as specified, in which the Works, having
been deemed to have reached Practical Completion and
placed On Maintenance by the Council, remain the
responsibility of the Developer to care for and maintain and
repair defects resulting from faulty workmanship, and/or
defective materials and design defects and omissions. This is
usually the same as the Defects Liability Period.
The Minister The Minister (of the Northern Territory) for the Appropriate Department.
Occupational Health and Safety
Reference to the provisions of the Work Place Safety and
Health Act (Northern Territory) and the Work Place Safety and
Health Regulations (Northern Territory).
The Officer
The Chief Executive Officer of the Council or the duly
authorised or delegated person acting on behalf of the Officer
in the matter(s) of subdivision or development – usually the
Council’s Director of Technical Services or an authorised
representative.
Off Maintenance
When Works have reached the end of the Maintenance Period
and have been deemed to be accepted by the Officer, at which
point in time Council takes responsibility for maintenance of the
completed works. All defects raised at the Off Maintenance
Inspection must be adequately addresses before Council
accepts responsibility.
On Maintenance
When works have reached the end of the Maintenance Period
and have been deemed to be accepted by the Officer, at which
point in time the Maintenance Period begins. The Officer may
accept minor defects on the proviso that they are adequately
addressed by the Developer or Contractor before the Council
accepts responsibility.
Permit Holder
The person or party taking out the Permit(s) from Council who
is contracted to carry out or be responsible for carrying out any
works on the Council Property.
Subdivisional Guidelines - Central Desert Regional Council Forward
December 2013
Cardno (NT) Pty Ltd xviii
Planning Authority The Northern Territory Planning Authority (NTPA). The Development Consent Authority established under the Act.
Planning Scheme The Northern Territory Planning Scheme.
Practical Completion
The stage reached when all works have been constructed to
the true intent and meaning of the approved Drawings and
Technical Specification; the whole of the works being able to
be used for the purpose for which they have been designed
and on the proviso that the relevant requirements of the
Development Permit have been complied with. The Officer is
the only person that can deem Practical Completion.
Road Hierarchy That classification of roads as adopted by Council, into a series
of categories dependent upon functionality.
Security Bond
That Monetary Bond lodged by the Developer or Contraction
for an indefinite duration to cover the specific works that have
yet to be completed, are deemed to be defective of non-
compliant or in cases where a specific risk or liability has been
identified. Council may draw on the Security Bond to carry out
defect rectification or to rectify damages incurred, if after due
process, no appropriate action is taken by the Contractor /
Developer. A Security Bend is calculated at the Estimated
Construction Cost of the work to be secured against or the
estimated Cost of the Risk.
Standard Drawings The current Council Standard Drawings
Superintendent The person employed to oversee the progress and standard of
site works. Generally the consultant fills this position.
Subdivision Works
Subdivision works shall include, but are not limited to, road
works and associated earthworks and site works, drains,
pathways and cycle ways, street lighting, streetscapes and
landscaping of public spaces owned or maintained by Council.
The works are not restricted to the proposed development, but
may extend to include existing or other proposed roads, drains,
reserves or public or privately owned lands giving access to or
affected by or having effect on, the proposed Subdivision.
Technical Specification
That Technical Specification lodged by the Developer or
Consultant and approved by Council for construction purposes.
Where no Technical Specification has been approved or the
approved Technical Specification is deficient, Council’s
Standard Technical Specification shall be deemed to be the
technical Specification be it in part or full.
Subdivisional Guidelines - Central Desert Regional Council Forward
December 2013
Cardno (NT) Pty Ltd xix
Service Authorities
Name Contact Details
Development Assessment
Services
Darwin Office – Urban enquiries
Phone: 08 8999 6046
Fax: 08 8999 6055
GPO Box 1680
Darwin NT 0801
Darwin Office – Rural enquiries
Phone: 08 8999 6807
Fax: 08 8999 6055
GPO Box 1680
Darwin NT 0801
Regional Enquires (including Katherine)
Phone: 08 8973 8926
Fax: 08 8973 8666
PO Box 1171
Katherine NT 0851
Alice Springs Office
Phone: 08 8951 9242
Fax: 08 8951 9222
PO Box 2130
Alice Springs NT 0871
Development Consent Authority
Phone: 08 8999 6044
Fax: 08 8999 6055
GPO Box 1680
Darwin NT 0801
Subdivisional Guidelines - Central Desert Regional Council Forward
December 2013
Cardno (NT) Pty Ltd xx
Environmental Protection
Authority
Darwin
Phone: (08) 8924 4218
Fax: (08) 8924 4053
Environment, Heritage and the Arts Division
PO Box 496
Palmerston NT 0831
Alice Springs
Phone: (08) 8951 9201
Fax: (08) 8951 9222
PO Box 1120
Alice Springs NT 0871
Northern Territory Fire
Department
Northern Region
Phone: (08) 8946 4107
Southern Region
Phone: (08) 8951 6663
Northern Territory Fire and
Rescue Services
Northern Region
Phone: (08) 8946 4107
Southern Region
Phone: (08) 8951 6663
Natural Resources Environment
The Arts and Sport
PO Box 496
Palmerston NT 0831
Phone: (08) 8999 5511
Northern Territory Government
Place Names Committee
GPO Box 1680
Darwin NT 0801
Phone: (08) 8995 5333
Fax: (08) 8995 5365
Planning Authority
GPO Box 1680
Darwin NT 0801
Phone: 08 8999 8963
Fax: 08 8999 7189
Subdivisional Guidelines - Central Desert Regional Council Forward
December 2013
Cardno (NT) Pty Ltd xxi
Power Water Corporation Northern Region
Services Development North
Ben Hammond Complex
Illiffe Street, Stuart Park
Southern Region
Services Development South
Sadadeen Valley
Berger Court, Alice Springs
Subdivisional Guidelines – Central Desert Regional Council
Section 1 – General Overview
of Building a Community
December 2013
Cardno (NT) Pty Ltd 1
1 GENERAL OVERVIEW OF BUILDING A COMMUNITY
1.1 Type of Community
While not limiting the intent of these Guidelines and the need for developers to engage Council in
discussions at the planning stage, the following guidance is offered in determining the extent as to
what needs to be investigated with the guidelines.
For the City Councils and other established Councils the full subdivisional standard is expected.
For other areas a full standard of physical infrastructure (such as sealed roads, pathways, drainage
and parks) is expected. Some consideration will be given to the social infrastructure (such as public
transport and irrigation of parks). Notwithstanding this, the ultimate goal is to create a fully
incorporated community.
1.2 Overview
Contemporary approaches to residential urban development projects focus on the creation of
communities that are sustainable (economically, socially and environmentally), safe, vibrant, efficient
and adaptable to change. New developments cannot be designed in isolation and instead should be
integrated into existing communities without compromising their qualities.
Movement systems should consider the broader needs of pedestrians, cyclists and those dependent
on public transport.
Responsible environmental management requires that natural resource conservation and
management be given a high priority. This requires careful consideration of the protection and
management of native and other significant vegetation, habitat, layouts that facilitate climate
responsive design, protection of waterways and more sustainable approaches to urban stormwater
and wastewater management.
Reasonable access to appropriately located public open space, opportunities for integration with
natural drainage systems, the protection of vegetation corridors, more sustainable methods for
stormwater management and the creation of linear reserve systems that also accommodate off-street
movement networks all need to be explored and incorporated to the satisfaction of Council.
Building communities also requires a commitment to community planning, taking account of the social
aspects of urban development. Community planning contributes to good residential environments by
influencing other planning and development activities, including ensuring the timely and coordinated
delivery of human services, community facilities and employment opportunities. It also involves
existing and incoming residents in the planning and development of the area, helping to create social
networks and community identity.
Strong, vibrant and sustainable communities are also safe communities. Crime prevention through
environmental design (CPTED) principles are important considerations in new community planning
that can discourage crime and increase residents' sense of security. Security not only protects people
from injury and property from damage, but also reduces anxiety and fear. Security can be improved
through active management or through planning, community and economic development initiatives,
neighbourhood and site planning, and building design.
Finally, the design of new development projects requires consideration of the context of the site - its
characteristics and its relationships to adjoining areas - in short, a site responsive approach to design.
Subdivisional Guidelines – Central Desert Regional Council
Section 1 – General Overview
of Building a Community
December 2013
Cardno (NT) Pty Ltd 2
1.3 Integration
All development sites have edges that can consist of established communities, land earmarked for
future urban development, areas set aside for natural resource protection, primary production areas
or industry.
Where the site abuts an established community, the Developer must achieve integration with existing
networks (roads, public transport systems, pedestrian/cycle paths) and access to existing or proposed
facilities and services (centres, employment, educational facilities, public open space). This also
requires attention to the capacity of existing networks to accommodate likely future traffic volumes
and avoid congestion and other potential impacts.
Where adjacent areas are earmarked for future urban development thought will need to be given to
future integration. Adjacent land uses that may generate undesirable impacts on residential areas,
such as noise, fumes, dust and chemical spraying will require consideration of how best to design and
manage this interface without compromising the ability of these activities to continue.
In many cases human services and community facilities will be shared between adjacent
communities, further helping to integrate new and existing residents and create sustainable
neighbourhoods.
1.4 Movement
Movement network planning should consider the needs of all road users, including motorists,
pedestrians, cyclists, users of public transport, children, the aged and those with disabilities.
Connected road networks that allow for alternative route selection are generally preferred to
hierarchical street systems that tend to channel traffic movements to particular roads that are
designed to accommodate high traffic volumes. The former approach distributes traffic movements
more evenly, thereby creating safer roads for other users, such as pedestrians and cyclists.
Developments shall include off-road paths that allow for safe pedestrian and cycle movements,
preferably linking major attractions such as centres or educational facilities. These off-road paths
could correspond to natural drainage and habitat corridors and also serve stormwater management
and passive open space functions.
CPTED design principles need to be incorporated throughout the proposed movement network,
particularly regarding passive surveillance of the network, the design of path systems and landscape
treatments and the provision of appropriate public lighting and vandal resistant street furniture.
Lighting types and locations are to be approved by Council and should be in keeping with adjoining
areas.
Developments shall ensure that all public areas provide access for persons with disabilities in
accordance with AS1428 and all other Standards and requirements.
The road network may need to accommodate bus routes, requiring attention to road reserve widths,
bus stop requirements, adequate width for passing parked vehicles and turning movements. The
surrounding layout also needs to facilitate pedestrian access to bus stops. Developers must consult
with the Public Transport Agency in considering the appropriate locations for bus routes.
Subdivisional Guidelines – Central Desert Regional Council
Section 1 – General Overview
of Building a Community
December 2013
Cardno (NT) Pty Ltd 3
1.5 Land Use and Housing Diversity/Employment
Typically, residential developments of the recent past have resulted in low density 'dormitory' suburbs
with little land use or dwelling diversity. It is now accepted that higher residential densities and greater
housing diversity combined with safe and convenient movement networks, greater land use diversity
and access to services, facilities and employment opportunities will improve the liveability of
neighbourhoods and minimise the need for car travel, congestion, greenhouse gas emissions and air
pollution.
Higher residential densities should generally be located around centres, adjacent to or within
commercial development, in close proximity to public transport stops and adjacent to larger areas of
public open space. Maximising housing diversity and affordability will result in diverse communities
which in turn, enables efficiencies in the provision of community services.
The distribution and the types of centres will need to be considered on a district-wide basis. However,
all residential areas should have convenient access to a reasonable level of convenience good outlets
to satisfy day-to-day requirements. Preferably, this access should encourage walking and cycling
rather than requiring dependence on private motor vehicles.
1.6 Environmental Management
Responsible environmental management can be realised in the way existing valued natural resources
are protected and enhanced, the manner in which physical infrastructure is designed and the
behaviours that are entrenched through the physical design and layout of neighbourhoods.
The site analysis will identify areas of natural significance, such as remnant native vegetation, other
significant vegetation, wetlands, watercourses and/or areas that provide valuable biodiversity, habitat
or wildlife corridors. Design and management strategies will vary according to the particular
circumstances, possibly involving integration with other urban elements (e.g., stormwater
management, provision of public open space).
The design of physical infrastructure also offers opportunities for more effective environmental
management. This can take place in the form of the collection, treatment, storage and reuse of urban
stormwater or wastewater; the orientation of street networks to facilitate climate responsive design
approaches for future dwellings; or the consideration of renewable energy sources, such as solar or
wind.
Neighbourhoods consisting of low density housing with poor access to public transport, remote from
employment opportunities, services and other facilities and designed with little regard to the needs of
pedestrians and cyclists will inevitably result in lifestyles that are highly car dependent with associated
high greenhouse gas emissions.
Further discussion on Environmental Management can be found throughout the document and in the
references.
1.7 Water Sensitive Urban Design
Water Sensitive Urban Design (WSUD) is a key design principle inherent to achieving the overall goal
of providing ecologically sustainable developments. WSUD is a design philosophy aimed at
minimising the impact that a development has on the natural water cycle and the health of aquatic
ecosystems by ensuring the integration of stormwater, water supply, sewerage management and
groundwater management.
Subdivisional Guidelines – Central Desert Regional Council
Section 1 – General Overview
of Building a Community
December 2013
Cardno (NT) Pty Ltd 4
Developments shall embrace the philosophy of WSUD and in doing so protect the existing natural
features and ecological processes as well as the quality of both surface water and ground water. As
an overarching principle, the natural hydrologic behaviour of all catchments should be protected.
WSUD will aim to minimise the demand for potable water by providing alternative water supply (bore
water, treated wastewater, sewer mining, groundwater, harvested stormwater etc.) for uses such as
irrigation and toilet flushing. It will also minimise wastewater generation and discharge to the natural
environment by reusing wastewater for these purposes.
WSUD will also have a social impact by integrating water into the landscape to enhance urban design
as well as visual, social, cultural and ecological values.
1.8 Public Open Space
The distribution, size and function of public open space should be considered on a district-wide basis.
Ideally, every resident should have reasonable access to public open space to satisfy both active and
passive recreational and leisure needs. The higher the residential densities the more important it is to
consider access to public open space.
Opportunities for the integration of public open space planning with natural resource management
and infrastructure planning should always be explored. Similarly, the dispersal implications for urban
form and the creation of walkable neighbourhoods will need to be considered.
The location and design of public open space must be based on CPTED principles in order to create
safe and enjoyable places that attract as many people as possible of all age groups to them.
1.8.1 Passive Surveillance
The concept of "passive surveillance" is particularly relevant to public open space. It requires that
public spaces are designed and located to be in full and direct view of residents and passing
motorists. This engenders a sense of public ownership, allows for ongoing surveillance of public
spaces and deters antisocial behaviour, which, in turn, encourages more use of public open space
and further enhances perceptions of safety.
The simple implication for designing public open space is to maximise areas that are bound by public
streets and fronted by houses, rather than being lined with side or rear fences. This not only improves
the safety of public open space, it improves the value of the adjacent properties.
In the limited circumstances where allotments are to directly abut areas of public open space, then
consideration should be given to locating two storey housing forms on such allotments (to allow some
form of passive surveillance from the second storey) and special attention will be required to the
design and materials of fencing.
Good design of public open spaces will also encourage the active use of these spaces at various times
of the day and night which will minimise the opportunity for vandalism and anti-social behaviour.
1.8.2 Social, Health and Community Safety
Land use diversity, reasonable access to services and facilities, public transport and public open
space, and the creation of walkable neighbourhoods can all contribute to improved social and
community outcomes relative to conventional developments. The creation of neighbourhoods that
encourage walking can increase the level of physical activity, community safety and social interaction.
Increased levels of activity within the public realm, on the streets and within parks, increases natural
surveillance which in turn improves perceptions of safety. Based on this philosophy, front fences will
not be allowed on lots in residential areas.
Subdivisional Guidelines – Central Desert Regional Council
Section 1 – General Overview
of Building a Community
December 2013
Cardno (NT) Pty Ltd 5
Developers have a responsibility to ensure all community members have reasonable access to
municipal facilities including not only open space but recreation venues, community centres, schools
and service centres.
The planning for a new development creates a need to strengthen social infrastructure.
Neighbourhoods require the development of flexible, adaptable human service and facilities to meet
the present and future needs of the community. Innovative approaches will be necessary to develop
new facilities in partnership with all spheres of Government and the private sector. Local community
facilities (such as family centres) should be located where they meet the greatest need, be most
accessible and have least impact on the amenity of the surrounding area.
Other social objectives include ensuring that there is a range of housing types, tenures, sizes and
styles to meet the broad market needs, as well as a range of affordable housing types and
opportunities for the integration of public housing.
As discussed above, urban design using CPTED principles can enhance community safety and
perceptions of safety in many different ways. Annex J includes a wide range of information useful in
the design process, covering areas such as surveillance, lighting, landscaping, boundary delineation,
street furniture, pedestrian/cycle route, centres, public open space and vandalism.
1.9 Sense of Place
The creation of a unique sense of place can be achieved by identifying and enhancing the
characteristics that distinguish one place from another. It might be the landform or other natural
features, remaining cultural heritage, or the preservation of highly valued views. The design of the
public realm (streets, public open space) and public buildings (schools, libraries, neighbourhood
centres) can also contribute to the creation of a unique sense of place or identity.
1.9.1 Adaptability and Ongoing Management
The recent attention to climate change illustrates how our urban environments need to be adaptable to
change. Whether it is sea level rise, increased storm activity, a decline in fossil fuel reserves or the
community’s interest in pursuing more physically active lifestyles, the level of investment fixed in our
urban environments requires the careful consideration and design of public infrastructure and the
associated ongoing management burden. For example, road reserves need to be designed to
accommodate all users and all street elements, including services, landscaping, and
telecommunications in a manner which minimises future public costs and maximises opportunities for
retrofitting and possible adaptation.
December 2013
Cardno (NT) Pty Ltd 6
Subdivisional Guidelines – Central Desert Regional Council
Section 2 – General Requirements
2 GENERAL REQUIREMENTS
Subdivisions include all works where property is developed or redeveloped, and infrastructure is
constructed to be handed over to Council. Developments include all works within properties that may
or may not directly impact on Council’s infrastructure.
2.1 Developer Requirements
The subdivision / development works are to be carried out at the Developer’s cost. The developer is
to provide all designs, drawings, specifications, construction and certifications for all works associated
with the subdivision / development to Council for approval.
The Developer will be held accountable for all actions during the development process and is
responsible for all damage to existing facilities, services and structures in both public and private
ownership sustained as a result of the subdivision / development.
Sufficient public risk insurance must be carried by the Developer to cover the proposed development.
The insurance is to specifically indemnify Council. Evidence of appropriate insurance must be
demonstrated prior to commencement of any construction works.
A copy of the current development permit for the proposed works is to be provided to Council prior to
the commencement of works
The Developer is responsible for all construction activities. The Developer is to ensure that a suitably
qualified Superintendent is responsible for certification of the works, including overall supervision of
the works.
Council does not supervise or project manage developments. However, Council will carry out random
inspections from time to time and joint inspections as scheduled and requested. Inspections by the
Officer shall in no way diminish the responsibility of the Developer to adequately supervise the works.
Final approval and acceptance will only be given when all works have been executed to the true intent
and meaning of the approved drawings and specifications.
2.2 Subdivision Flow Chart
Stage of Development
Developers’ Prompts
Council’s Role
PLANNING PROCESS (Section 3)
Concept Stage
(Site Analysis and Master Planning)
Initiate preliminary discussions with Council. Develop
subdivision layout and address technical matters
Provide initial feedback to Developer with respect to subdivision layout
and Council's requirements.
Prior to Development
Application to Planning
Authority
(Preliminary Design) Conduct
further discussions with
Council to ensure that the submission would be
acceptable to Council.
Provide feedback to Developer with
respect to Council's requirements.
This should specifically relate to technical matters at this stage
Lodgement of Development Application
Make submission to the Development Consent
Authority.
December 2013
Cardno (NT) Pty Ltd 7
Subdivisional Guidelines – Central Desert Regional Council
Section 2 – General Requirements
Stage of Development
Developers’ Prompts
Council’s Role
Assessment of Development Application
The Development Consent Authority
forwards a copy of the Application to Council for comments. Council assesses the Application in
respect to all matters relevant to Council.
Other issues relevant to the Local Government Act will also be
assessed. Council’s Town Planning Committee
assesses applications.
All comments are forwarded to the DCA with a copy to the Applicant.
The authority may have queries and
request feedback from Council. Council will inform applicant /
developer if this is the case.
Approval of Development
Approval is either declined or
granted by the Development Consent Authority. Approval is
subject to the conditions stated
on the Development Permit.
DESIGN PROCESS (Sections 4 and 5)
Design Approval
Submit Development Approval
Form (Annex D) along with all relevant design documentation (Drawings, Masterplans, Specifications and Reports) to
Council for design approval.
Development application fee to be paid to Council.
Complete Design Approval Checklist (Annex D).
Assess design documents and provide comments as necessary. The Developer / Consultant may be
required to supply additional information or amend documents to
meet Council requirements. Design approval is granted when Council is
satisfied with all development
requirements.
CONSTRUCTION PROCESS (Sections 6 and 7)
Approval for Construction
Issue a notice to commence works to Council.
Ensure all approvals have been obtained from Council
and other Authorities.
Organise a pre- commencement meeting with
the Council Officer.
Assess construction program and
inspection plan.
When Council is satisfied,
construction may commence.
December 2013
Cardno (NT) Pty Ltd 8
Subdivisional Guidelines – Central Desert Regional Council
Section 2 – General Requirements
Stage of Development
Developers’ Prompts
Council’s Role
During Construction
Developer / Contractor to inform Council at
predetermined hold points
during Construction. Developer ‘s certifier is
responsible for the satisfactory certification of the works.
Council to inspect works at predetermined hold points during
Construction and at any other time deemed necessary.
Council may conduct random audits.
Completion of Construction
Developer to inform Council once all construction has reached practical completion, and arrange an inspection with
the Officer.
Council to conduct a practical
completion inspection with the Developer / Contractor and
complete the ON Maintenance Site
Inspection Checklist (Annex D). Defects to be recorded.
ON Maintenance periods to be determined.
ON Maintenance or Certificate of Acceptance
Developer to apply for ON
Maintenance to Council.
Ensure that all necessary information is provided to
Council and the construction approval fee and relevant
maintenance and security
bonds have been lodged.
ON Maintenance will be granted once Council is satisfied that all
relevant information, fees, bonds have been lodged.
A Certificate of Acceptance will be
issued for the works when all
conditions of the Development
Permit have been completed to the satisfaction of the Officer.
Maintenance Period (Defects Liability Period)
The Developer is solely
responsible for the
maintenance of works during this period. Defects to be rectified as nominated during this period or by stated dates.
Council will conduct inspections as necessary to ensure that an acceptable level of maintenance is
being achieved. Council will notify the Developer of
defects as they occur.
The maintenance period will be extended accordingly to
accommodate defects.
Outstanding Defects
Developer / Contractor is
solely responsible to rectify all defects to the satisfaction of
Council. Once any defect has been
rectified the Developer /
Contractor is to notify the
Officer to arrange an
inspection.
Council will conduct inspections as necessary to ensure that defects are being or have been adequately rectified.
December 2013
Cardno (NT) Pty Ltd 9
Subdivisional Guidelines – Central Desert Regional Council
Section 2 – General Requirements
Stage of Development
Developers’ Prompts
Council’s Role
OFF Maintenance
Developer to inform Council
once the maintenance period has been completed and apply
for OFF Maintenance and
arrange a site inspection with
the Officer. Ensure that all necessary information is provided to Council.
Complete OFF Maintenance Site
Inspection Checklist (Annex D). Complete OFF Maintenance Procedure Checklist (Annex D) Once Council is satisfied that the
works have been satisfactorily
maintained and no outstanding defects have been identified a
Certificate of Acceptance will be issued (Annex D). Relevant maintenance and security bonds will
be returned only once OFF Maintenance is granted.
December 2013
Cardno (NT) Pty Ltd 10
Subdivisional Guidelines – Central Desert Regional Council
Section 3 – The Planning Process
3 THE PLANNING PROCESS
3.1 Scope
This section deals with the initial Subdivision Planning in the Northern Territory as it affects
Developers dealing with Council.
The Northern Territory Planning Act establishes the Development Consent Authority (DCA) as the
body responsible for approving subdivision and development in the Territory.
The Northern Territory Government (NTG) and the relevant Minister are responsible for administering
the Northern Territory Planning Act and NT Planning Scheme.
In order to undertake any subdivision, consolidation or redevelopment an application must be lodged
with the Development Assessment Services section (DAS) of the Department of Lands and Planning.
It is essential that applicants discuss their submission proposals at an early stage with:
• Development Assessment Services (DAS)
• Council
• Other Authorities (ie Power Water Corporation)
As every development is unique, design criteria and standards are considered on their merits. This
should be discussed with Council prior to and during planning submission.
The Developer and/or the Developer’s Consultant(s) are advised to discuss the proposed concept,
design, construction and maintenance requirements for the proposed development with Council
throughout the process.
3.2 Concept Stage
The concept stage should be an initial attempt to satisfy the need of the Developer to maximise the
yield of a site while Building a Community.
3.2.1 Site Analysis
The planning and design process involved in building a quality and sustainable community should
start with a comprehensive analysis of the site and its context.
Prior to preparing a residential concept, designers will need to visit the site, study maps and other
information and discuss the opportunities and constraints with Council and various authorities in order
to better understand the characteristics and context of the site. Ultimately, this site analysis process
will inform the design choices that are made and signal to the planning authority why particular design
choices may have been favoured above others. It will also allow the designer to maximise the
potential of a particular piece of land.
It is therefore a useful tool in reconciling the sometimes competing design objectives for a particular
site. For example, the site analysis process may explain why the design concept has responded more
sensitively to the prevailing landform at the expense of achieving the ideal orientation of allotments for
solar access purposes.
The site analysis process generally results in an annotated plan of the site and adjacent land, which
then forms the basis for generating design options. This annotated plan can then be submitted to the
planning authority along with the plan of division, and will usually assist the approval process and
minimise delays. An example of a Site Analysis Plan is provided in Annex A.
December 2013
Cardno (NT) Pty Ltd 11
Subdivisional Guidelines – Central Desert Regional Council
Section 3 – The Planning Process
The detail and extent of information that should be collected and considered will vary depending on
the size, complexity and context of a development project. Annex A also provides a checklist which
would generally apply in varying degrees of detail for any new land division project.
3.2.2 Master Planning
Through the development application process, master plans will be required. Prior to submitting a
development application it is advisable to discuss all aspects of the development with Council.
Master plans are to be submitted with the development application and as a minimum, will provide the
following detail (either in one Master Plan, or separately);
• Overall connectivity with adjacent subdivisions or properties including but not limited to traffic
movement and density, drainage, landscape, conservation, pedestrian and cyclist movement
and environmental considerations.
• Overall subdivision road layout including road reserve widths, road pavement widths, road
and intersection priorities, public transport routes, speed zones, traffic control devices,
proposed services infrastructure, land use types and proposed allotment densities.
• Stormwater drainage - for entire development including WSUD strategy and features, major
flow paths, necessary infrastructure upgrades and required widths for drainage reserves.
• Environmental management - indicating areas of significance, native flora and fauna to be
protected, land clearing requirements, erosion and sediment control, construction ‘no go
zones’, fencing, provision of waste facilities, sustainable land and water use.
• Landscape - including location and types of open space areas, art, WSUD features, location
of play equipment and park furniture, indication of planting philosophy and species including
streetscapes, sources of irrigation water (bores) and weed management requirements.
• Waste management - including collection availability for residential properties during
construction, provisions for collection in accordance with Council Policies and management of
waste during construction.
Prior to the commencement of each individual stage of development, master plans shall be provided
with the development application to Council for review and approval.
3.2.3 Preliminary Design
A preliminary design is beneficial in establishing the intent of the development and also highlighting
any potential issues that may arise.
Preliminary design work includes, but is not limited to:
• Road layout and design, including access,
• Stormwater drainage,
• Pathways,
• Lighting,
• Waste requirements,
• Streetscapes and landscaping of public open space, road reserves and property owned or
maintained by Council,
• Effects on surrounding suburbs or properties,
• External and other associated works associated with or affected by the proposed
development.
Works are to be carried out in accordance with the approved drawings, specifications and Australian
Standards the requirements of the Development Permit and as per these Guidelines.
The developer should work towards the inclusion of Council’s values and outcomes which are
identified in Council’s vision, strategic publications and policies. Links to these are available at each
Council’s web site, a full list of policies have been included in Annex F.
December 2013
Cardno (NT) Pty Ltd 12
Subdivisional Guidelines – Central Desert Regional Council
Section 4 – Design Process
4 DESIGN PROCESS
4.1 Field Work
As part of any design accurate field work is required to determine the existing conditions.
4.1.1 Survey
Included in this investigation the following minimum survey standards are required:
• Digital Ground Survey – Road Projects Construction Division
4.1.2 Geotechnical
Geotechnical testing shall comply with the following standard:
• Austroads, “Guide to Pavement Technology” series, and
• DCI, “Materials Testing Manual”, June 2003.
The frequency of testing shall be determined in consultation with the Council, however as a guide the
following test regime is recommended:
• One test minimum every road,
• One test every 100 metres, and
• One test every significant feature, (particularly drains and changes in soil type).
4.1.3 Condition of Existing Services
Video camera inspections (CCTV) may be required for selected stormwater drainage pipelines and
will be undertaken by Council. The cost of inspecting the stormwater pipes in the subdivision will be
borne by Council. However, in the event that there are defects within the system the Developer will
be required to pay for all additional inspection and testing costs.
The Officer will determine whether a CCTV inspection is required, it will depend on the results of on-
site inspections and the certified construction report. Council will arrange with the Developer a
suitable time for the inspection and the Developer must ensure the pipes are clean and accessible for
the inspection.
4.1.4 Documentation Standards
All drawings are to be drafted in accordance with Council’s mandatory CAD requirements, which are
to be obtained from the Officer. This is particularly important for ‘As Constructed’ electronic copies.
Unless stated otherwise the following standards shall be adhered to:
• CADD Drawing and Data Systems Information
• CADD Manual
• Current Australian Standards for Technical Drafting.
December 2013
Cardno (NT) Pty Ltd 13
Subdivisional Guidelines – Central Desert Regional Council
Section 4 – Design Process
Preferred Drawing Scales at A1
DRAWING SCALE (Horizontal) SCALE (Vertical)
Locality Plan 1 : 5000
Site Works, Erosion and Drainage Control Plan 1 : 1000
Overall Layout Plans various 1 : 1000
Road Plan 1 : 500 Preferred 1 : 1000 Min
Road Longitudinal Section Horiz 1 :1000 Vert 1 : 100
Road and Landscape Cross Sections 1 : 250
Intersections, Cul de sacs, Traffic Devices,
Roundabouts
1 : 250
Drainage Plans 1 : 500 Preferred 1 : 1000 Min
Drainage Longitudinal Sections Horiz 1: 1000 Vert 1 : 100
Landscape/Irrigation 1:1000
4.1.5 Variations to Guidelines
Where a design has been unable to meet the specific requirements of the Guidelines and/or current
Australian Standards or agreed requirements, the Developer is to submit all non-conformances in the
design report. Each non-conformance shall have reasoning and any relevant standards of the design
explained. Non-conformances will then be assessed and approved or not approved on a case-by-
case basis. . The officer is under no obligation to approve any non-conformance.
4.2 Requirements Prior to Commencement
Council encourages progressive design reviews to assist developers and their consultants. Typically,
these reviews could be at conceptual design stage, during design development and at the completion
of detailed design/documentation. The latter is a compulsory review by Council and must be
undertaken in accordance with the requirements outlined below.
4.2.1 Detailed Design Review
One (1) copy of all engineering documents shall be submitted to the Technical Services Department
for a detailed review. The documents submitted for a review shall include as a minimum the detailed
drawings, technical specification, calculations and a design report, all presented in accordance with
current standard engineering practice.
The design report shall summarise all aspects of the design of Council infrastructure including design
criteria and assumptions. The report shall focus on the requirements of these Guidelines and shall
specifically identify any aspects of the development where the criteria set out in these Guidelines have
not been met. In such circumstances, detailed reasons for varying from the Guidelines shall be
provided.
December 2013
Cardno (NT) Pty Ltd 14
Subdivisional Guidelines – Central Desert Regional Council
Section 4 – Design Process
Detailed calculations should be provided for all infrastructure including road pavement design,
stormwater drainage, erosion control, traffic management and 100 year flood paths. The developer
shall provide information for asset valuation and pavement management.
Technical specifications should be produced based generally on the standard DCI Master
Specification for Road works but in full compliance with all criteria set out in these Guidelines.
The following is considered to be the minimum information to be conveyed on the drawings. All
drawings must clearly convey the design intent be adequately cross-referenced and show sufficient
detail for construction purposes.
Locality Plan
• Existing Roads;
• New roads;
• All relevant street names;
• Any other significant features.
Site Works Drawing
• All existing and proposed roads and property boundaries;
• Existing and proposed contours with appropriate contour intervals;
• Detailed areas of cut and fill;
• Levels along existing roads and properties adjacent to re-contoured areas;
• Details of existing vegetation and extent of clearing and vegetation protection.
Layout Drawing
• Existing and new roads with allocated street names(if already approved);
• Pavement widths;
• Lots with lot numbers;
• Existing and proposed street drainage and allotment drains and easements;
• Services and fence lines(where applicable);
• Traffic management devices;
• Footpaths, footways, cycle paths;
• Survey and benchmarks.
Road Drawings
Plans
• Widths for all pavements, verges and medians;
• Distances (chainages) and stations along centre line of road;
• Horizontal curve data;
• Existing and proposed levels;
• Existing and proposed street drainage including drainage structures;
• Lots facing onto streets;
• Proposed traffic management devices of signage location;
• Existing and proposed services in the road reserve;
• Footways, footpaths, cycle paths;
• Survey and bench marks;
• Street names (if already approved).
December 2013
Cardno (NT) Pty Ltd 15
Subdivisional Guidelines – Central Desert Regional Council
Section 4 – Design Process
Cross Sections
To show the offset from the road reserve centre line and levels of the following points at maximum
20 metre intervals:
• Road centre line;
• Toe and top of kerb;
• Any change in cross fall;
• Road reserve boundary;
• Cuts and fills extending into properties.
Longitudinal Sections
• Running distance (chainage) along the centre line of the road;
• Existing surface levels along centre line (optional both property lines);
• Design levels for road centre line and kerbs where applicable. Levels at 20m maximum
spacing for straight grades and 10m maximum for vertical curves. Levels to be shown at
horizontal curve tangent points and other required locations;
• Lengths of grade lines with grades expressed as percentages;
• Intersection and tangent point changes of grade;
• Length of vertical curves and other information;
• Transition and super elevation details.
Intersections, Cul-de-sac, Roundabouts, Bends, Traffic Management Devices
• All adjacent lot boundaries;
• Geometric details;
• Design levels at appropriate points;
• Design grades and vertical curve details around kerb and curve radials;
• Drainage and other services;
• Pram crossings and footpaths etc.
Drainage Drawings
Plans
• Existing and proposed drainage line detailing pipe sizes, types, connections, grades, lengths,
drainage pits and structures and special backfill requirements;
• Upstream and downstream levels on all existing drainage and outfalls to which connections
are being made;
• Sub soil drainage details;
• Existing and proposed sewer lines and any other services which may effect. the proposed
drainage works;
• Existing and proposed contours/finished levels;
• Streets, street names and lots and lot numbers;
• Existing and proposed drainage easements and other easements including description and
widths;
• Stormwater connection points;
• Open drains, table drains, outlet and overflow structures, head walls retardation and siltation
basins etc.
December 2013
Cardno (NT) Pty Ltd 16
Subdivisional Guidelines – Central Desert Regional Council
Section 4 – Design Process
Longitudinal Sections
• All pipe sizes, grades, type and class of pipe;
• Existing and finished surface levels on the line of the pipe(s);
• The running distances(chainages) between pits and drainage structures
• Location and level of other services or connections crossing or in close proximity to, including
parallel to, the drainage line;
• Details and identification fall pits and drainage structures;
Master Services Plans
The Master Services Plan shall show locations fall services and shall provide sufficient information to
enable the invert levels of the storm water and sewer pipes to be calculated at any point. At each
location where storm water and sewer pipes cross, the invert level of each pipe shall be shown.
Where Telstra and Power and Water Corporation ducting and water mains are laid at nonstandard
depths, the depth to these services shall be indicated on the plan.
Landscape Plans
The scope of landscaped areas and the complexity of the design will determine the number of
drawings and detail of technical specification required to convey the information for construction. This
will be negotiated by consultation with Council’s Landscape Architect.
A plant schedule is to be shown on the appropriate plan, listing botanical name, container size, and
quantity/density.
The graphic presentation should incorporate a legend to clearly identify each of the following:
• Existing trees to be retained or removed
• Proposed trees, shrubs and groundcovers
• Lawn areas and garden bed edging
• Paved surfaces
• Furniture
• Lighting
• Proposed and existing fencing
A coloured plan will assist in legibility of the surface treatments but is not a prerequisite for
endorsement.
Council will review all of the submitted documents and provide comments which shall be incorporated
into final documents.
4.2.2 Final Review of Plans and Specifications
The Consultant shall produce final documents that incorporate all comments provided by Council. The
final documents shall be presented in accordance with the following sections and shall be
accompanied by a letter from the Consultant summarising the changes required by Council and how
those changes have been incorporated.
The final documentation shall be reviewed by Council to ensure that all corrections have been made
and that the plans and specification fall within the Guidelines. When satisfied, the documents shall be
approved and signed by the Director of Technical Services subject to any conditions required.
The approval to use such documentation for construction purposes shall not imply that the Council
accepts any responsibility for the technical adequacy of the design. This accountability remains the
absolute responsibility of the Developer.
December 2013
Cardno (NT) Pty Ltd 17
Subdivisional Guidelines – Central Desert Regional Council
Section 4 – Design Process
4.2.3 Final Documentation
All final documents (including those listed below) shall be provided to Council digitally in PDF format.
These documents shall be sent by email to Council.
• Design Plans
• Specifications
• Design Report
• Instrument of Determination
• Site investigation reports
Each of these documents shall also be provided on CD to the Director of Technical Services or their
delegate. The CD shall also include all drawings in files compatible with the program in which they
were produced (AutoCAD, Microstation etc.).
4.2.4 Stamping of Drawings
Drawings shall include a digital stamp which should be placed in the title block. A copy of the required
stamp is shown in Annex D.
4.2.5 Other Service Authorities
Council’s drawing approval does not equate to approval from other Service Authorities. Each Service
Authority has their own approval process which is exclusive to Council’s. It is recommended that the
same drawing revision set be signed by all approving authorities.
4.2.6 Specification
The Consultant shall produce a specification with both General Conditions and Technical Conditions
for approval by the Council. The General Conditions shall be based on those contained within
Section 7 of these Guidelines. The Technical Conditions shall be either based on the Council’s own
Technical Conditions or the DCI Standard Specification available from
http://www.nt.gov.au/infrastructure/techspecs/index.shtml.
Council reserves the right to add addition conditions to DCI Standard Specification.
4.3 As Constructed Drawings
4.3.1 Overview
As constructed drawings shall be produced upon completion of the construction of any development.
These drawings shall show the actual finished levels and position of all new infrastructure constructed
as part of the development.
4.3.2 Drawing Presentation
Final construction drawings as approved and signed by Council shall be used as a base for the As
Constructed Drawings. The information on the drawings shall be revised to match the actual position
and level of all infrastructure constructed on site.
4.3.3 Survey
A licensed surveyor shall be engaged to undertake all survey necessary to produce accurate As
Constructed Drawings. All surveys are to be on the following datum:
• HORIZONTAL - The horizontal datum for control points is Australian Map Grid (AMG 94)
based on the AMG coordinates of the Permanent Survey Mark Control Network. (See the
relevant contact person with the DCI for Information on the location of these Control Points).
• VERTICAL - The vertical datum for control points is the Australian Height Datum (AHD).
December 2013
Cardno (NT) Pty Ltd 18
Subdivisional Guidelines – Central Desert Regional Council
Section 5 – Roads and Pathways
5 ROADS AND PATHWAYS This section sets out the minimum standards required by Council for the Design and Construction of
roads and pathways in residential, commercial and industrial subdivisions. Annex B provides the
specific requirements for each Council.
These Guidelines, along with Standard Drawings and Policies are to be utilised by the Developer.
When Council standards are not available, the NT Government Department of Construction and
Infrastructure standards should be applied. Design outside of these guidelines may be considered if
supporting documentation is provided, including all engineering aspects of the design and risk
analysis. This is to be included in the design report submitted with the initial plans.
Road designs must conform to the relevant current Australian Standards, AustRoads, Australian
Road Research Board (ARRB) and all other relevant publications.
In all circumstances, access is to comply with the objectives and intent of the Disability Discrimination
Act.
The Contractor will be deemed to have made all necessary investigations to judge the nature of
materials to be excavated. For all subdivisions this is to be included in the geotechnical report
submitted as part of the design approval application.
The Developer/Contractor shall be diligent in design and construction of all roads, drainage, and
associated structures in salt water environments.
All sediment from construction is to be managed in accordance with the approved sediment and
erosion control plan. It is the developers’ responsibility to ensure that all subcontractors working within
the site manage their discharges into the stormwater and ensure that all litter and rubbish is contained
on site and removed accordingly.
5.1 Road Hierarchy
A road hierarchy is to be established for the proposed development which can be achieved by
reference to Council’s guidelines (Annex E) and/or by reference to a site specific traffic design report
prepared by a qualified traffic engineer commissioned by the Developer. For remote areas the report
“East Arnhem Shire Council – Road Hierarchy Methodology – Draft for Council Consideration”, July
2009 can be used in consultation with the Council.
The allocation of road hierarchy will be dependent on the roads intended use and proposed traffic
volumes which will then determine its minimum design requirements in accordance with Council’s
guidelines.
5.1.1 Residential Roads
5.1.1.1 Minor Roads
Minor roads include short loops (Local Access Road) and cul-de-sac providing direct access to
residential lots.
5.1.1.2 Collector Roads
Collector roads have a primary purpose is to connect the residential cells of a suburb to the traffic
carrying distributor roads. The roads generally have a number of access roads branching from them
and can provide direct access to residential lots. The will also typically be single carriageway with a
speed limit of 50 - 60 km/hr. Traffic generation is typically 1000-3000 vehicles per day (AADT).
December 2013
Cardno (NT) Pty Ltd 19
Subdivisional Guidelines – Central Desert Regional Council
Section 5 – Roads and Pathways
5.1.1.3 Arterial Roads
Arterial roads are designed to carry traffic between regions; they have little direct local access and
often have higher speed limits of 60 – 100 km/hr. The can be broken up into two types, distributor (or
sub arterial) and arterial. Traffic generation is typically greater than 3000 vehicles per day (AADT).
5.1.2 Industrial Roads
5.1.2.1 Local Access Road
Street of relatively short length providing access for up to 70 lots primarily or wholly servicing traffic
whose origin or destination is a lot fronting the street.
5.1.2.2 Cul-de-sac
Cul-de-sac are to be avoided wherever possible, but may be accepted if the road is no more than
100m long and has a catchment of 10 lots or less.
5.1.2.3 Collector Road
Industrial collector roads act as feeder or connecting roads, linking industrial areas with the arterial or
distributor road system and having a significant traffic handling function not associated with properties
that front the street.
Industrial collectors will provide direct frontage to industrial lots and access to industrial access roads.
5.1.3 Rural / Rural Residential Roads
5.1.3.1 Rural Limited Access
A road or laneway primarily provides access to cultural significant or hunting areas, non-residential,
recreational and emergency services access. Does not carry regular traffic. May be no through traffic
function.
5.1.3.2 Rural Access
A road or laneway in this Classification services and direct access for abutting residences,
commercial or industry and connect into either the Link, Collector or Territory road.
5.1.3.3 Rural Collector
Roads of this Classification primarily provide a route between, and through, residential, industrial,
tourist traffic nodes and the rural link and or Territory road network.
5.1.3.4 Rural Link
Roads for this classification primarily provide a direct linkage between significant population centres
and major traffic generators such as residential, industrial, commercial, tourist areas and Territory
roads. These roads generally have an identifiable origin and destination (e.g. Townships, Outstation,
and places of significance).
5.1.4 Matching to Existing Networks
The main road and pathway network for each of the councils is generally defined and fixed in relation
to any proposed works. Developers must join into this network, forming their development and pattern
of land use to be an integral part of the total network.
Master plans for all road and path networks within a development shall be submitted to Council for
approval before the commencement of any stage of the subdivision.
December 2013
Cardno (NT) Pty Ltd 20
Subdivisional Guidelines – Central Desert Regional Council
Section 5 – Roads and Pathways
5.1.5 Creating Sustainability with Road Network
The road, cycle and pedestrian network should be well connected, shaded and direct in order to
provide residents with a choice of transport modes, encouraging alternatives to driving to reach local
destinations. Disabled access shall be paramount with the design of all roads and pathways, and
steep grades shall be avoided in all instances. CPTED principles (e.g. providing natural surveillance
and well lit areas) shall also be adopted in order to encourage the use of pedestrian and cycle paths
during both day and night.
Where possible, road and lot orientation shall be designed to encourage houses facing due north or
south with neighbouring houses shading each other’s eastern and western facades (e.g. through
predominant east-west road layout). Subdivision master planning and design shall note the prevailing
breeze directions and aim to maximise building access to prevailing breezes (particularly during the
wet season).
Water Sensitive Urban Design (WSUD) shall be adopted within new road networks, particularly along
distributor roads where central medians can incorporate drainage swales and bioretention systems.
The Darwin WSUD Strategy prepared by the NT Government shall be used to develop WSUD design
standards on new developments. The current version of the strategy shall be used whether it be in
draft, interim or final form.
5.2 Traffic Management
Traffic management design is to comply with the following minimum standards:
• Guide to Traffic Engineering Practice – (Austroads All Parts)
• Turning Path Templates (Austroads)
• Traffic Acts and Regulations
5.2.1 Desirable Speed Environment
An urban speed environment uses road structure to make motorists feel that it is unsafe to drive at
high speed. Generally the design speed of roads is not reduced; instead restrictions are used to form
a picture in the driver's mind of a low speed/safe-driving environment.
The developer is to consider the speed environment when designing a new subdivision and make
recommendations of appropriate treatments.
Subdivision development may require that traffic calming works be carried out in existing roads
abutting or providing access to the proposed development. This will require traffic studies to be
carried out. All outcomes require Community consultation to be carried out at the Developer’s
expense.
The following should be considered and included as required;
• A 50 km/hr default speed limit applies to all areas within the Northern Territory.
• A master plan shall be provided showing the proposed speed limits on all new roads.
Developers are encouraged to make use of the following restrictions, features and measures to create
an urban speed environment within their subdivision:
• Varying horizontal geometry;
• Isolated width restrictions;
• Variations to pavement surface texture;
• Variations to pavement surface colour (at boundaries to low speed areas, etc.);
• Street furniture placement;
• Landscaping to verges and traffic control devices;
December 2013
Cardno (NT) Pty Ltd 21
Subdivisional Guidelines – Central Desert Regional Council
Section 5 – Roads and Pathways
• Local Area Traffic Management (LATM) or Traffic Calming devices.
The traffic management plan for the development should include all required traffic calming devices to
provide safe thoroughfare for traffic. All infrastructure required must be constructed by the developer
at the time the road is built.
5.2.2 Parking to be Provided
Roads abutting public open space and other areas specifically denoted as requiring parking are to be
provided with car parking bays at appropriate locations designed to accommodate either angle or
parallel parking, depending on the available road width, verge width, length of road frontage and
defined road hierarchy.
5.2.3 School Sites
Council considers that parking and set down and pick up at school sites is a core requirement of the
school design and should be accommodated on the school site.
The design of subdivision roads abutting school sites must incorporate provision for safe routes to
schools and crossing facilities as required.
5.2.4 Public Transport Routes and Stops
The Developer shall provide an approved master plan developed at the planning stage in liaison with
Public Transport showing the location of proposed public transport routes and stops including
nominated sheltered stops and/or where stops include other types of street furniture (e.g. seats, bins
etc.).
5.2.5 On Road Bicycle Lanes
No general requirements. See Austroads standards for on road bicycle lanes.
5.3 Traffic Control Devices
All warning, regulatory, direction signs and road marking are to conform to current Australian Road
Rules and current versions of the Australian Standards and Guidelines, including;
• Austroads Guides to Traffic Control Devices;
• AS1742.1 and 1742.2 Manual of Uniform Traffic Control devices;
• Guide to Road Design - Part 6A - Pedestrians and Cycle Paths (Austroads)
• Design for Access and Mobility (AS 1428 Parts 1 & 2);
• Other relevant publications and standards.
A Traffic Management Plan is required indicating
• The location and type of street name signs,
• All regulatory signs including speed signs where the default speed limit does not apply,
• All other hazard, warning and advisory signage,
• Line marking and pavement markers,
• Bicycle and shared path signage and line marking.
5.3.1 Line marking and Signage
As a minimum the following signage and line marking shall be provided for each development:
• Minimum regulatory signage;
• Warning signs at the approach to all hazards;
• Advisory signs as required;
• At a temporary termination of road construction, such as a subdivision or stage boundary, a
diagonal striped sight board shall be erected;
December 2013
Cardno (NT) Pty Ltd 22
Subdivisional Guidelines – Central Desert Regional Council
Section 5 – Roads and Pathways
• Parking signs where required;
• Bicycle and shared path signage and line marking;
• Road marking as required on distributor and collector roads;
• Single unbroken lines on road centreline at locations on two-way roads where the sight
distance available is less than the desirable minimum;
• Separation lines on distributors and collectors;
• Holding lines at intersections as required, including the following as a minimum;
• All roundabouts;
• All T intersections with Collector or Arterial roads;
• All T intersections with non-perpendicular centrelines;
• All T intersections not meeting minimum sightlines;
• All other advisory and traffic control devices necessary for effective traffic control.
5.3.2 Street Name Signs
Council’s Standard Drawings are to be used for the design of street name signage. The preferred
location for street name signs is on the through road adjacent to the centreline of the intersecting
road.
5.3.3 Naming of Streets
The Developer is to liaise with and make submissions to the NT Government Place Names
Committee, commencing at the planning stage of the development. Refer to Council’s Land Use
Planning Policy.
5.4 Road Pavement and Surface Design
All design must be in accordance with the Australian Standards and the Northern Territory
Department of Construction and Infrastructure (DCI) specifications, unless otherwise specified. All
testing must be carried out according the DCI specifications and documents provided at hold points,
or as required for handover.
The Design Consultant shall submit their pavement design including proposed Design ESA’s to
Council for review and approval.
5.4.1 Design Loadings
The design consultant shall undertake an analysis of design traffic and is responsible for determining
design traffic loadings and appropriate pavement structure.
Assessment of construction traffic shall include consideration of subdivision staging and construction
vehicles and associated access for construction of infrastructure for new stages of development and
construction vehicles through completed stages.
5.4.2 Special Treatments
Where the developer proposes to construct an alternative surface treatment such as a form of
subdivision entry statement, driveway delineation or special feature throughout the subdivision, plans
and specifications for the alternative treatment are to be submitted for Council approval.
Alternative surface treatments may be considered.
The preferred road pavement material is a manufactured crushed rock in accordance with DCI
standard specification. Natural gravel or a blended material consisting of quarry products and
naturally occurring gravels which conforms to grading and material properties as described in the DCI
standard roadworks specification for “Pavements and shoulders” may be approved at the discretion of
Council. All pavement materials must be tested insitu after compaction to comply with all DCI
December 2013
Cardno (NT) Pty Ltd 23
Subdivisional Guidelines – Central Desert Regional Council
Section 5 – Roads and Pathways
materials requirements for grading, Plasticity Index (PI), Linear Shrinkage (LS), soaked CBR,
compaction etc. As constructed thicknesses shall also be measured during pavement testing.
5.5 Road Geometry
Roads are to be designed for traffic speeds set out in Section 1.2.1 of these Guidelines and the
Developer is expected to use the geometrical layout of the roads to help encourage traffic usage of
the roads to the traffic design speeds. Where the Development relies on access through existing
roads it may be necessary to control the speed in the existing road and retrofitting of traffic calming
devices may be required as part of the development.
5.5.1 Intersections
Y-junctions and crossroads are not acceptable. Staggered “T” intersections or roundabouts are to be
provided and separated to meet Austroads Guidelines. The traffic management plan should address
all proposed intersection design.
Adequate stopping sight distance is to be provided at all intersections.
At all intersections the through road having the higher road hierarchy is to maintain its cross section.
The terminating road is to match its longitudinal grade with the pavement cross fall of the through
road.
Crossroads will not be approved without the installation of a roundabout as a minimum treatment.
Other controls (e.g. signalised intersections) may be considered by Council where considered
appropriate based on road hierarchy and traffic.
5.5.2 Gradients and Radii
Roads are to be designed to provide the best possible grade to suit the natural / existing ground and
conditions and minimise the amount of cut and fill.
Grades are to comply with the object and intent of the Disability Discrimination Act and the
requirements and provisions of relevant standards.
5.5.3 Horizontal Curves on Road Alignment
Widening on bends is required as per the relevant current Australian design standards. The bend and
widening shall be treated so that vehicles turning the bend do not cross over the centreline and the
required separation of 1.00m shall be achieved for opposing vehicles. The bend shall be line marked
accordingly.
5.5.4 Vertical Curves
Vertical curves are to be used where the change of grade exceeds 1%.
Absolute Minimum – Special consideration to be given to the length of vertical curves especially
where flat grades and ponding of stormwater occurs in kerb and channels and to the retention of
minimum velocity of channel flows for intersection design.
5.5.5 Cul-de-sac End Radius
Cul-de-sac must be designed to accommodate the minimum verge width and all relevant turning
movements in a single forward action (i.e. no three-point turns). Access from properties also must be
considered within the cul-de-sac.
December 2013
Cardno (NT) Pty Ltd 24
Subdivisional Guidelines – Central Desert Regional Council
Section 5 – Roads and Pathways
5.6 Typical Cross Sections
Typical cross sections must be designed in accordance with the Standard Drawings.
All road design must be developed for the living environment with the objectives of accommodating
roads and verges, on street parking and sustaining shade street trees, services, pedestrian access
and shared footways, bus stops / services and appropriate disabled access. Road reserve widths may
be increased to accommodate all items.
5.6.1 Road Widths
The minimum cross section details depend upon a number of criteria including but not limited to:
• Living environment requirements,
• The proposed widths, areas and depths of allotments,
• The proposed minimum setbacks to building frontages,
• Intersection treatment,
• Local area traffic controls,
• The provision of access, footpaths, shared footpaths,
• Service locations,
• Bus stops,
• Streetscape,
• On road bicycle lanes.
Road widths will take into consideration the need for on road bicycle lanes and the wider shared
footways located in some streets as agreed with Council. Where indented parking is provided, the
road widths may be adjusted accordingly and the verge width not reduced.
5.6.2 Pavement Cross Fall
Two way cross fall is preferred for all roads as per Councils’ Standard Drawings. However, one way
cross fall may be permitted when specific conditions are met and will be approved at the discretion of
the Officer. All cross sections must be designed in accordance with the Standard Drawings.
One way cross fall will only be considered when the adjacent property is a dedicated drainage
reserve, or a public reserve with specifically designed stormwater infrastructure to cater for the water.
This includes medians within road reserves. One way cross fall will not be permitted where private
properties are adjacent to the low side. This includes all residential, commercial and industrial
properties.
The following design requirements are to be followed;
Nominal 3% cross fall.
Stormwater design to suit, including width of water across road during storms and all other stormwater
design requirements.
Kerbing to be either flush, gapped or barrier depending on stormwater design requirements.
Drainage from all properties on the ‘high side’ of a one way cross fall road must be connected to
Council’s underground system and all internal flows must be collected internally and discharged at
this point.
December 2013
Cardno (NT) Pty Ltd 25
Subdivisional Guidelines – Central Desert Regional Council
Section 5 – Roads and Pathways
5.6.3 Verges
All verges are to be designed in accordance with the Standard Drawings and reference Policies. See
objectives and intent as set out in Council policy on the following criteria - Council Policy on Access,
Footpaths and Verge widths and the Disability Discrimination Act.
Verge widths for all roads depends on a number of criteria including but not limited to the location of
footpaths, shared paths, services, bus stops, landscaping and the provision of access.
Verge grading is to be as indicated on the Standard Drawings. Where shared paths are
accommodated within the road reserve verge, the slope of the verge must be such that it does not
exceed the stated grade limits and it must be demonstrated that vehicle access can be
accommodated without scraping.
5.6.4 Lot Truncation
Lot truncation is required at all corner blocks.
5.6.5 Conduits
Conduits shall be provided for the conveyance of communication, irrigation lines and electrical cables
under roadways, footpaths, access strips and elsewhere as required, with consultation with the
appropriate authority or as directed by the Officer.
Conduits for irrigation purposes shall be provided to all landscaped traffic islands and roundabouts
and beneath footpaths and driveways constructed at the time of subdivision construction.
All conduit locations are to be marked on as constructed drawings and on site.
5.6.6 Traffic Islands and Roundabouts
All traffic islands are to be finished with a maintenance free or minimum maintenance surface.
Generally speaking, traffic islands less than 5 square metres in area shall be concrete paving with a
finished surface as specified by the Officer. Larger traffic islands may require landscaping to the
approval of the Officer.
5.7 Kerbs
The choice of kerbing is dependent on the road use, stormwater requirements and all design must
comply with Australian Standards and the Local Authority’s Standard Drawings.
5.8 Driveways
All driveways must be designed and constructed in accordance with Council’s Standard Drawings,
Policies and all relevant Australian Standards.
5.9 Footpaths and Cycle paths
Subdivision Design is to incorporate a system of footpaths, shared pedestrian/cycle paths and on
road bicycle routes connecting residential areas, and open space to provide access through the
subdivision and connecting with other pathway systems in adjoining suburbs and eventually to the
City Centre.
Footpath design and construction must comply with Council’s Policies and Standard drawings.
Council also requires that all pedestrian access meets or exceeds Australian Standards for Access
and Mobility.
December 2013
Cardno (NT) Pty Ltd 26
Subdivisional Guidelines – Central Desert Regional Council
Section 5 – Roads and Pathways
Cycle paths shall be provided in accordance with AUSTROADS Part 14 – Bicycles and the Australian
Standard AS 1742.9, Manual of Uniform traffic control Devices – Part 9 – Bicycle Facilities.
Shared use paths are shared between pedestrians and cyclists, and are the most common type of
facility due to the cost to construct separated path facilities, as well as limitations of space.
However, shared use paths are not desirable within public road reserves where there is direct
vehicular access to multiple abutting allotments. This is due to safety concerns of vehicles reversing
out and having to cross the shared use path before gaining access to the roadway. These paths
should therefore be used along roads where there is no or limited vehicle crossovers or on the public
reserve side of a roadway adjacent to parkland.
Shared use paths should have a minimum width of 3.0 metres. Construction of shared use paths shall
be concrete as detailed for footpaths.
A master plan for subdivision design developed during the planning process is to incorporate a
system of footpaths, shared paths and on road bicycle routes to provide access through the
subdivision and connecting with neighbouring suburb pathway systems, proposed schools, shops,
unit/ flat developments, residential areas, open space and playing fields.
The need for any form of shared path, bicycle path or on-road cyclist facility is to be determined as an
outcome of subdivision design traffic studies. In the absence of a traffic study, the Officer will
determine the requirement.
5.9.1 Disabled Access Ramps
Disabled access ramps are to be provided at all kerbs where footpaths and shared pedestrian/cycle
paths cross roadways. These shall be constructed in accordance with AS 1428.
Typically crossing points will be at intersections or where designated paths change from one side of a
road to the other. Developers shall provide other appropriate crossing points in consultation with and
at the direction of Council.
The provision of safe and convenient facilities for pedestrians and cyclists (and in some more rural
areas horses and riders) is a prime consideration in designing a road network within any subdivision.
5.9.2 Cyclist Facilities
Council requires Developers to provide facilities for pedestrians and cyclists in all proposed
developments in accordance with the overall network plan.
Many councils have an existing road hierarchy and network of bicycle and pedestrian paths, which is
constantly being extended and upgraded.
Off-road facilities comprise of footpaths, share paths, bicycle only paths, pedestrian only paths and
pedestrian access way paths.
On-road facilities comprise cycle ways constructed as an integral part of the roadway.
Shared paths and cycle paths are to be constructed in accordance with the Standard Drawings. The
standard drawings detail asphalt or concrete surfacing, however alternative treatments may be
considered at the discretion of the Officer.
The Officer shall determine the need for any form of cyclist facilities.
December 2013
Cardno (NT) Pty Ltd 27
Subdivisional Guidelines – Central Desert Regional Council
Section 5 – Roads and Pathways
5.10 Walkways / Pedestrian Linkages
Walkways shall only be designed as landscaped open space for pedestrian linkages.
5.11 Battle Axe Allotments
Where urban, rural or semi-rural type subdivisions contain proposed battle-axe allotment, the access
must be constructed at the time of the subdivision.
Council will not take over these accesses for future care and maintenance either as road reserve or
right of way easement.
5.11.1 Urban Areas
Battle axe legs with lengths more than 20m, are to be treated as roads, i.e., access ways. All relevant
design and construction requirements apply, including lighting and drainage. Drainage from the
properties is to be contained within the site and connected to the underground infrastructure. All
access pavements are to be centrally located to allow equal access to all properties.
5.11.2 Rural or Semi-Rural Type Developments
Rural battle-axe accesses are to be treated as per the urban standard. The construction material is a
minimum chip seal to the minimum width plus 500mm shoulders.
December 2013
Cardno (NT) Pty Ltd 28
Subdivisional Guidelines – Central Desert Regional Council
Section 6 – Stormwater drainage
6 STORMWATER DRAINAGE All subdivisions / developments are required to be provided with an adequate stormwater drainage
system in accordance with Council’s Drainage Philosophy and Design Criteria. This includes
consideration for safety and future maintenance requirements.
While roadways may form a floodway, they are not to be viewed as primary drains and flood ways.
Public amenity, usability, risk and safety are to be paramount considerations.
Consideration is to be given to the impact of the proposed drainage system on existing drains and
buildings and downstream catchments. Council will require approval from affected properties for the
proposed treatment of the stormwater discharge through the properties.
To avoid mosquito breeding and associated issues, all drainage systems and associated structures
should be designed in consultation with NRETAS and NT Government Entomology Section of the
Department of Health and Community Services. Council will not accept large bodies of standing
water for periods of longer than 5 days after wet weather. Council will consider standing water bodies
where used in conjunction with wetland environments and supported by the above Agencies.
6.1 Preliminary Drainage Proposal and Investigation
Prior to making a Development Application a preliminary drainage proposal and investigation will be
required:
• Defining the drainage requirements for initial and major storms,
• Recommending types and locations for WSUD strategies,
• Considering upstream and downstream catchments,
• Consideration to future high tide occurrences,
• Identifying necessary flood ways and any upgrades required to existing infrastructure.
Results of this investigation shall be included on a master plan for drainage which shall be provided to
Council for approval prior to commencing any stage of development.
If a new development is to be staged, an overall drainage plan for the whole of the catchment is to be
provided before approval will be given for any individual stage. Drainage for each individual stage will
need to be designed and constructed in accordance with the master plan.
6.1.1 Flood Management and Control
The stormwater management system shall incorporate flood retardation to the satisfaction of Council
where it is considered feasible and practical in the context of the proposed development, with the aim
of preserving post-development peak flows discharged from the site close to pre-development levels.
Flood retardation storages can be co-located with WSUD systems such as wetlands and bio-retention
systems and can be located in naturally waterlogged areas. Wetlands and bio-retention systems are
to be designed in conjunction with NRETAS and Entomology and provide an easily maintainable
sustainable system. These facilities should ensure that the size of downstream infrastructure is
managed and favour the creation of ‘natural’ waterways rather than hard engineered open drainage
channels.
6.1.2 Design Criteria
Stormwater drainage design is to conform to the current version of the following publications:
• Australian Rainfall and Runoff - (IEAust).
• Stormwater Drainage Design in Small Urban Catchments – (ARRB Report No 34 - Argue).
December 2013
Cardno (NT) Pty Ltd 29
Subdivisional Guidelines – Central Desert Regional Council
Section 6 – Stormwater drainage
• Sub-surface Drainage of Road Structures – (ARRB Report – Gerke).
• Managing Urban Stormwater - Soils and Construction -NSW Department of Housing.
• Resources Management for the NT - Erosion and Sediment Control - Nat. Res. DLPE.
6.1.3 Easements
Easement width shall be designed to allow for the following:
6.1.3.1 Pipes
• Pipe width,
• The width of a service vehicles including mowers, small trucks and excavators, and
• Benching requirements for excavation.
6.1.3.2 Open Channels
• Channel size (including freeboard), and
• The width of a service vehicle clear of the channel.
6.1.4 Rainfall Intensity and Recurrence Intervals
Consultants shall be responsible for determining suitable runoff coefficients and characteristics for a
drainage system based on the ultimate development of all allotments for the relevant land zoning.
Generally a minimum time of concentration of 5 minutes can be used for a standard allotment.
The design intensity for a calculated time of concentration is to be determined from the appropriate
Design Rainfall intensity Diagram contained in Australian Rainfall and Run-off.
6.1.4.1 Freeboard for Drainage Systems
All developments along water courses and main drains will require floor levels of buildings to be
constructed at least 300 mm above the major flood level.
For existing buildings, provisions are to be made in the design to achieve the freeboard.
A plan is to be submitted at the design stage indicating the minimum design floor level of any affected
building on the development. The plan must also indicate the minimum design levels of the affected
allotments and in the case where it is determined that not all of the allotment(s) require filling to the
100 year flood level, the allotment must show the nominated building envelope(s) and the proposed
filling level(s).
6.2 Water Sensitive Design and Erosion and Sediment Control
Environmental considerations are major design requirements for all drainage infrastructure and
subdivision / development designs must be undertaken in consultation with NRETAS, the EPA and
other relevant Agencies.
At the development application stage, developers shall include a WSUD Strategy with the application,
to specifically describe what WSUD elements are proposed and explain how the WSUD targets will
be achieved.
WSUD is a holistic approach to the planning and design of urban development that aims to minimise
the impacts of urban development on the natural water cycle and protect the health of aquatic
ecosystems. WSUD promotes the integration of stormwater, groundwater, water supply and
wastewater management and is supported by the following principles:
• To reduce both the peak flow and total volume of stormwater runoff.
• To control pollution and minimise effect on downstream waterways and the environment.
December 2013
Cardno (NT) Pty Ltd 30
Subdivisional Guidelines – Central Desert Regional Council
Section 6 – Stormwater drainage
• To collect stormwater and reuse (stormwater harvesting).
• Protect and enhance natural water systems (creeks and rivers etc.).
• Treat urban stormwater to meet water quality objectives for reuse and/or discharge to
receiving waters.
• Match the natural water runoff regime as closely as possible (where appropriate).
• Reduce potable water demand through water efficient fittings and appliances, rainwater
harvesting and wastewater reuse.
• Minimise wastewater generation and treat wastewater to a standard suitable for effluent reuse
opportunities.
• Integrate stormwater management into the landscape, creating multiple use corridors that
maximise the visual and recreational amenity of urban development.
• Compensating basins, retardation basins, artificial wetlands, nutrient stripping basins, gross
pollutant traps, sedimentation and erosion control and silt basins are to be considered for
incorporation where possible.
These are to be designed in accordance with Australian Rainfall and Run-off and other relevant
publications and are to be sited to suit the requirements of the drainage system.
Stormwater from Greenfield subdivisions is to be treated to reduce the load targets. These targets
relate to stormwater leaving a development site and therefore all treatment must be within the
development boundaries.
At the development application stage, developers shall include a WSUD Strategy with the application,
to specifically describe what WSUD elements are proposed and explain how the WSUD targets will
be achieved.
As a minimum, retardation basins should reduce peak flows from a development to the capacity of the
downstream drainage facilities. At the Development Approval stage, Council will require additional
restrictions on stormwater quantity discharge, including reducing peak flows to the undeveloped state
from a catchment.
All WSUD elements that may hold water for periods of time shall be designed and located so as to
ensure public safety (especially children) and to restrict mosquito breeding and the impact of
mosquitoes on residents.
Stormwater harvesting through retention and reuse shall be adopted for all new Developments. In
particular, stormwater should be harvested for use in irrigation of reserves and open space.
Applications of third pipe and bores are to be considered in the strategy. Where harvesting is not
proposed, reasons for its omission shall be discussed in the WSUD Strategy and shall be subject to
the approval of Council.
Developers shall utilise the guidelines provided in the Darwin WSUD Strategy to develop appropriate
WSUD features within the stormwater drainage network in consultation with Council.
Developers shall include a discussion of the WSUD elements proposed within a development within
the design report and specifically describe what elements have been put in place and explain reasons
for where treatments have been excluded.
6.2.1 Sediment and Erosion Control and Stormwater Management
It is essential to thoroughly plan for stormwater management and erosion control in any proposed
development. NRETAS must approve Sediment and Erosion Control Plans for all developments prior
to Council.
December 2013
Cardno (NT) Pty Ltd 31
Subdivisional Guidelines – Central Desert Regional Council
Section 6 – Stormwater drainage
The Developer is to maintain all sediment and erosion control structures throughout the whole
development period, including the maintenance period. Private land which is not required to be
excavated or filled should be left uncleared to assist in erosion control.
Consideration must be given to curtailment of construction activities during the wet season. Extensive
erosion and stormwater controls will be required for any work carried out during this time.
6.2.2 Water Quality, Gross Pollutant and Litter Traps
Council will not accept any polluted stormwater run-off into its drainage systems. Stormwater
discharged from a development must be of suitable quality to not adversely affect the downstream
environment.
All drainage systems and structures are to be designed with limited water retention to avoid mosquito
breeding.
It is the Developer's responsibility to incorporate gross pollutant traps and other water cleansing
facilities throughout the development. These should be appropriately designed and located to produce
optimum removal of pollutants, consider and minimise ongoing maintenance requirements/costs and
provide suitable maintenance access.
6.2.3 Tidal Action, Surge Levels and Climate Change
Where drainage outlets or outfalls are influenced by tidal action, an appropriate analysis is to be
undertaken to ensure major storm design criteria are met and that there is no surcharge at stormwater
pits during the minor design storm.
The recorded surge levels and future estimated sea level increases must be taken into consideration
for the design of both the subdivision layout and drainage system.
Climate change and rising sea levels must be a consideration within the design.
6.3 Allotment Drainage
Sediment and erosion control measures shall be put in place on all lots until they are fully developed
and landscaped.
Where practicable, all lots shall have a minimum surface grade of 0.5%, be self-draining and shall be
graded so as to sheet flow to the adjacent road reserve. Drainage shall not be directed from one lot
to another unless the natural terrain is too steep to make lot regrading practicable. In such situations,
rear or side of lot drainage shall be provided with suitable infrastructure to convey drainage
underground to the public drainage system in the nearest road reserve, open space or drainage
reserve. Council will not accept ownership or maintenance responsibility of rear lot drainage.
Ponding of water on allotments is not acceptable.
Generally clearing of lots shall be avoided where not required for lot regrading purposes. Sediment
and erosion control measures shall be put in place on all lots until they are fully developed and
landscaped. Refer to section 6 of these Guidelines.
6.3.1 Adjacent Catchments and Drainage Networks
Where a new subdivision is located at the upstream end of a catchment in common with existing
developed land for which there is no master drainage plan, the existing Council drainage system may
not have sufficient capacity to carry the design flows generated by the new development.
December 2013
Cardno (NT) Pty Ltd 32
Subdivisional Guidelines – Central Desert Regional Council
Section 6 – Stormwater drainage
In these circumstances, the Developer is to prepare and submit an overall drainage plan which
examines the complete downstream drainage network and evaluates the maximum quantity of
stormwater that can be discharged into the existing network.
If the capacity of the existing network is exceeded, then the surplus water shall be detained within the
new subdivision or the existing network shall be upgraded to the satisfaction of Council and at the
Developers cost.
In situations where the new subdivision is at the upstream end of privately owned land, arrangements
are to be made by the Developer with the owner of the downstream land to provide drainage rights
and easements as required over the route of the drain and to construct or upgrade the drainage
system as required and to the satisfaction of Council. These easements shall be granted to Council
and provided at no cost to the Council.
Where an existing drainage path or formal system from an upstream catchment passes through a
new subdivision, the drainage system within the new development must be designed to cater for the
ultimate flow from the upstream catchment.
For staged developments, the trunk drainage system shall be constructed from the downstream end
of the catchment up front regardless of where the actual development works commence.
6.4 Ground Water and Special Drainage Measures
If groundwater seepage problems occur in the developed area within the stipulated defects liability
period, the developer is responsible to carry out remedial works to ensure that each lot remains
suitable for its intended residential use.
Any failure resulting from high wet season ground water levels shall be reinstated together with any
additional sub-soil drainage required, by the Developer at their cost. The following issues need to be
taken into consideration.
• The effect of drainage measures on aquifers,
• Adequate drains for road construction and maintenance purposes,
• Adequate separation of future building floor levels from the ground water,
• The effects of salinity and acid sulphate,
• Climate change and rising sea levels.
6.4.1 Sub Soil Drainage
The Consultant shall be responsible for undertaking a detailed investigation of the site to determine
the scope of sub surface drainage works required.
Sub soil drains are to be provided to all road infrastructure to protect road pavements from the effects
of groundwater seepage and are to be located and constructed as per Councils Standard Drawings.
All roundabouts and islands must also contain sub soil drainage.
Where necessary, subsoil drainage shall also be incorporated into new allotments, walkways,
drainage reserves and open space to ensure adequate protection of buildings, structures and public
amenities from groundwater.
6.4.2 Open Drains and Open Drainage Structures
Open drains and open drainage structures are not permitted within, or in easily accessible proximity to
residential subdivisions and other areas of high public use such as shopping centres, business
complexes, parks with designated meeting places, playgrounds and picnic/barbeque facilities, etc.
December 2013
Cardno (NT) Pty Ltd 33
Subdivisional Guidelines – Central Desert Regional Council
Section 6 – Stormwater drainage
Large open drains will only be approved within dedicated drainage reserves (granted to Council) and
must be designed to ensure public’s safety and amenity is maintained as a priority.
With the exception of ornamental lakes and wet lands, all other structures or facilities are to be
designed to retain water only during storm conditions and for a short time thereafter.
The size and extent of major open drains may be controlled through the use of retardation basins
combined with other WSUD features as recommended in the Darwin WSUD Strategy.
6.4.2.1 Table Drains
Table drains must be designed to ensure public’s safety and amenity is maintained as a priority.
6.4.3 Criteria for Design of Major Open Drains
No general requirements. See Annex B for each council’s specific requirements.
6.4.4 Rural Major Open Drains
In rural areas all drains are to be a minimum dry land grassed and be accommodated by open drains
both alongside roads within the road reserve and through drainage easements.
6.4.5 Walkway Drainage
Walkway reserves may serve as storm water drainage reserves but must meet specific requirements.
6.4.6 Use of Roads, Open Space and Drainage Reserves for Run-off
Roadways are to primarily serve the purpose of catering for vehicular and pedestrian traffic as well as
providing access to abutting property. Whilst forming part of the formal drainage system, roadways
are not considered primary drains or flood ways and public amenity and safety shall be paramount
considerations.
6.4.7 Drainage Infrastructure
All concrete drainage structures shall conform to AS3600 and are to be constructed in accordance
with the Standard Drawings and Technical Specification and these Guidelines.
All concrete infrastructure material must be reinforced concrete or fibre reinforced concrete
manufactured to Australian Standards.
All infrastructure within marine environments, including areas subject to tidal influences ((RL 3.95
AHD or lower), must be designed and constructed to be seawater resistant over the life of the
structure.
6.4.7.1 Pipes and Culverts
All drainage pipes and culverts must meet the following requirements;
• The minimum pipe diameter for a drain located within the road reserve is 375 mm.
• The minimum pipe strength is Class 2 reinforced concrete pipe or equivalent.
• Sealed joints are to be used for all drainage lines - external bands or rubber ring joints.
6.4.7.2 Pits
All pit design must be in accordance with Council’s Standard Drawings. However, regardless of
standard details, internal dimensions for all drainage pits shall be in accordance with AS3500.3.2 and
work health requirements for access into structures.
Alternatives including precast concrete inlet structures may be used subject to approval by the Officer.
December 2013
Cardno (NT) Pty Ltd 34
Subdivisional Guidelines – Central Desert Regional Council
Section 6 – Stormwater drainage
Grates are to be avoided as they are susceptible to blockage, if they are included then alternative
means for the flow to enter the system must be considered in the design. They must also be safely
traversed by cyclists, pedestrians and vehicles.
All pits deemed to be at high-risk of vehicles driving over them must be designed to withstand the
expected loads.
6.4.8 Intersection Low Points
No drainage low points and the subsequent ponding that may result are permitted within the kerb
radial section of intersections. The low point is to be located in the side road of the intersection before
the tangent point.
In the case of minor, steeper than usual intersections with minor drainage flows, if a low point must be
designed within the kerb radial, the gutter of the kerb and channel may be designed to fall out across
the road pavement. In this case, stormwater drainage may be required to be collected by means of
drainage pits located at the tangent points each side of the low point.
December 2013
Cardno (NT) Pty Ltd 35
Subdivisional Guidelines – Central Desert Regional Council
Section 7 – Design Standards:
Lighting
7 LIGHTING The Developer is to provide street lighting, including lighting of traffic management treatments,
external works, parks, walkways, footpaths and shared paths and other public areas of the proposed
subdivision / development in accordance with Australian Standards for illumination level, materials and
installation and the requirements and specifications of Council and the Power Water Corporation.
Sustainable low energy lights should be promoted by the Developer.
The works are not restricted to the internal subdivision / development, but may be extended to include
associated and development generated external works.
Designers are reminded that elderly people and people with a disability are at a higher risk at night.
Accordingly, in some situations, lighting in excess of minimum Australian Standards may be required.
The Consultant must consider the ramifications of long term maintenance, environmental and
replacement issues. The proposed use of non-standard lanterns and/or poles is to be justified to the
Officer.
All lighting shall be designed by an appropriately qualified electrical engineer with consideration for
energy efficient lighting technology.
The Developer is to arrange to have the works transferred to Council’s name as soon as possible
after the works have been placed ON Maintenance.
7.1 Street Lighting
No general requirements. See Annex B for each council’s specific requirements.
7.2 Pathway and Open Space Lighting
No general requirements. See Annex B for each council’s specific requirements.
December 2013
Cardno (NT) Pty Ltd 36
Subdivisional Guidelines – Central Desert Regional Council
Section 7 – Design Standards:
Lighting
December 2013
Cardno (NT) Pty Ltd 37
Subdivisional Guidelines – Central Desert Regional Council
Section 8 – Design Standards:
Landscaping
8 LANDSCAPING Landscape works are viewed as an integral part of the subdivision works, not as add-ons to the major
civil works. A master plan of the whole subdivision outlining all landscaping is to be produced at the
development application stage.
The Developer is to ensure that all works are carried out in accordance with the requirements of the
Development Permit, the Deed of Agreement, the approved drawings and specifications and the
requirements of these Guidelines.
All access design and construction is to comply with the intent of the Disability Discrimination Act, the
access and mobility standards and requirements of the Building Code of Australia.
During the planning process for any proposed development / subdivision, the Developer is required to
plan, investigate and ensure the following matters are fully addressed.
• Landscape and Site Analysis;
• Existing Tree Survey and Vegetation Plan;
• Flora and Fauna Study;
• Environment and Sustainability;
• Investigation of Native Title / Sacred Site claims.
The developer will be responsible for all construction and establishment works including the cost of
power and water. Council will not construct landscape design works on behalf of the developer.
The landscape plans and technical specifications, whether a master plan or construction
documentation, are to be designed and certified by a qualified Landscape Architect. Certification of
this compliance is to be provided with all landscape plans submitted to Council for approval.
The irrigation system is to be designed and certified by a qualified irrigation designer and is required
for approval by Council at the same time as the final landscape design is submitted.
WSUD developments shall be incorporated within public open space and street scapes to the
satisfaction of Council but shall take into account maintenance issues and the structural integrity of
road pavements.
Erosion and sediment control is to be a consideration of the design and construction for landscape
works. Strategies to effectively address these issues should be developed prior to work commencing
at any site and will be required before approval can be given.
All planting and grassing is to be in accordance with Councils Standard Drawings.
8.1 Amenity
The landscape plays an important role in ensuring a high quality amenity for the community.
Important attributes of amenity which the landscape can contribute to positively include providing
shade and allowing cooling breezes to enter buildings, to moderate undesirable winds and for visual
impact.
While appropriate building design is essential to ensure privacy between buildings the landscape can
also assist in this process. The Developer shall ensure that the landscape design achieves the
following objectives:
• Assists in providing privacy between developments.
• Provides sun shading.
December 2013
Cardno (NT) Pty Ltd 38
Subdivisional Guidelines – Central Desert Regional Council
Section 8 – Design Standards:
Landscaping
• Allows free flow of cooling breezes.
• Improves visual amenity.
• Softens the landscape.
Public use of preserved bushland areas should be encouraged and enhanced with the use of signage
to interpret the value of the species and why they have been protected.
The Developer should provide for public information displays on the value of preserving native habitat
and incorporate remnant habitat into the living spaces of the subdivision.
8.2 Trees and Vegetation
During the works, the following conditions apply to existing vegetation:
• Pruning, cutting or removal of vegetation (including roots) will not be permitted without
permission of the Officer;
• Vegetation roots or limbs will be bored under or bypassed if so determined by the Officer;
• Works will be required to be redesigned if a tree is determined to be endangered by the works
and another solution is achievable.
Valuation of vegetation damaged or proposed to be damaged by the Permit Holder is to be assessed
under the Draft Australian Standard, “Trees – Amenity Valuation”. The Permit Holder will be required
to reinstate / replace any damaged vegetation to the value determined by the Officer and maintained
to the satisfaction of the Officer.
No trees are to be removed without the specific permission of the Officer. Where trees are to be
affected by excavations, no works will be designed or construction commenced without consultation
with the Officer.
8.2.1 Plant Selection for Roads and Parks
All proposals are to be referred to / discussed with the Officer.
Council approves suitable species of street trees and shrubs for the municipality’s streetscapes based
on the standards for purchasing container grown landscape trees, Annex K. The Developer is to supply
all plants from an accredited nursery under NIASA guidelines.
• Trees will preferably be native to the development area,
• Be aesthetically complimentary to the development theme and design,
• Tend to exhibit stable deep rooted structure,
• Require low maintenance following establishment,
• Council has a preference for native and indigenous species being used in the planting
designs,
• Street trees are to have a dominant leader trunk.
All shrubs, palms and groundcovers used in sub-division / development work must be:
• True to type specified.
• Be hardened off to full sun, (if appropriate), upon receipt for planting.
• Be free of any spiralling, kinked or coiling roots.
• Have an even spread of foliage from main stem.
• No evidence of pest or disease damage, chlorosis, nutrient deficiency, or mechanical
damage.
• Have sufficiently developed root system to sustain expected growth for the species and not
require supplementary care once planted.
December 2013
Cardno (NT) Pty Ltd 39
Subdivisional Guidelines – Central Desert Regional Council
Section 8 – Design Standards:
Landscaping
The Officer reserve the right to reject any/all plants to be used in sub division landscaping if they do
not conform to the specified requirements. Any diseased or dying plants identified prior to acceptance
are to be removed immediately and replaced at the Contractor's expense.
8.2.1 Turfing
All verges and parklands shall be finished with 150mm minimum topsoil after aerating with VertiDrain
or similar.
Turf to be established by rolls (sod), plugs (if approved by the Council Officer), or seed.
All forms of traffic are to be excluded from the area established with turf by effective barrier until
establishment, (to the satisfaction of the Officer). Complete and thorough watering is to follow
establishment of grass to ensure correct settling of soil fines.
The establishment and maintenance of turf shall be in accordance with the Technical Specification.
Council does not maintain verges after on maintenance requirements and will require individual
connectional irrigation to private residences prior to off maintenance hand over.
8.3 Streetscapes
Streetscapes are an important visual element in our cities and provide one of the first impressions for
new residents and visitors.
The term streetscape refers to the street and all of the different elements which go to make up the
publicly visible areas surrounding and within the street which includes:
• Street trees, planting, grassing and irrigation of verges,
• Street furniture,
• Pavement textures and colours,
• Road and path widths,
• Fencing and building facades,
• Entry statements,
• Landscaping of roundabouts, traffic islands and other traffic calming/control works.
Landscape treatments are to be designed to be low maintenance which includes the provision of
access for maintenance vehicles. Staff should be able to maintain the landscaping with minimal
disturbance to traffic flow.
8.4 Parks and Open Spaces
8.4.1 Master Planning of Open Spaces
The Design Master Plan should clearly demonstrate the following elements:
• Locations, size and function of open space including a summary of the total area and the
proportion of the area designated to different types of open space (active, passive, wildlife
corridors etc.);
• How the proposed open space works and coordinates with the open space in adjoining
residential areas. Consideration must be given to the range of recreation activities and play
equipment to be provided across the open space system including facilities for all ages and
lifestyles;
• Linkages of open space throughout the subdivision and connections to external linkages,
open space in neighbouring suburbs or adjacent shopping / educational facilities incorporating
safety, CPTED principles;
December 2013
Cardno (NT) Pty Ltd 40
Subdivisional Guidelines – Central Desert Regional Council
Section 8 – Design Standards:
Landscaping
• How the proposed network of pedestrian and shared paths in the development will link to
each other and adjoining subdivisions/ developments, provide a clear hierarchy of pedestrian
movement to critical destinations;
• How the proposed open space will provide for adequate biodiversity and wildlife corridors
between and within developments and provide links to areas of significant biodiversity.
• WSUD elements and strategies to be included in the development. These shall be integral
with the open space and landscape design;
• A street tree framework and hierarchy, which clearly notes which tree species, will be planted
in which street.
8.4.2 Open Space Calculations
Applications should be made to Council including detailed supporting documentation for approval of
the area and function of open space to be provided.
Council may consider changes to the area of open space required where developers can add value
through the inclusion of other forms of social infrastructure including but not limited to public
amenities, play equipment, sporting facilities and wildlife corridors.
Public open space calculations associated with particular land subdivision proposals are in
accordance with the NT Government requirements (i.e.100 square metres per allotment created for
subdivisions in excess of 10 allotments).
8.4.3 Open Space Linkages
The Developer shall ensure that an adequate and safe hierarchy of linkage and pathways is achieved
throughout the open space areas such that pedestrians and cyclists can move around and between
areas of open space easily and with a high level of amenity.
Pathways shall be designed to comply with all disabled access requirements and standards and shall
meet the CPTED design principles.
Pathway construction shall be in accordance with these Guidelines.
All pathways in open space areas will need to be planted with shade trees and include rest areas /
shelters in strategic locations such as at the junction of pathways or viewing areas.
Where trees are planted less than 3 metres from infrastructure (roads, pathways, shelters, buildings
etc.), root barriers will be required.
8.4.4 Open Space Network
No general requirements. See Annex B for each council’s specific requirements.
8.4.5 Function and Types of Open Space
Developers are required to liaise with Council in determining appropriate open space and shall
consider the specific needs of the development with respect to the natural landform, environmental
and ecological issues, remnant vegetation, cultural issues, adjacent existing developments and likely
future developments.
8.4.6 Typical Facilities for Open Space
No general requirements. See Annex B for each council’s specific requirements.
8.4.7 Playgrounds and Play Equipment/Features
All open space areas are to be provided with suitable playground equipment to the satisfaction of the
Officer, designed and installed to meet current Australian Standards. The overall approach to
December 2013
Cardno (NT) Pty Ltd 41
Subdivisional Guidelines – Central Desert Regional Council
Section 8 – Design Standards:
Landscaping
provision of play equipment and recreation range should be outlined in the landscape master planning
phase.
Developers shall provide a range of play opportunities and equipment/features for users of a variety of
ages. They shall liaise with the Officer prior to commencement of open space design to agree on
necessary play equipment/features and appropriate age group areas.
8.4.8 Access to Open Spaces (Park) Areas
For each open space area:
• Generally, public vehicular access to Council Open Space or Parklands shall be prevented
and lockable service access is required to Open Space areas.
• Emergency vehicle access must be provided as well as service access for plant and
equipment for landscape and stormwater maintenance to open space areas.
• General vehicle access is to be prevented.
• The location and number of accesses required shall depend upon size, shape and location of
the open spaces.
The following indicates the minimum requirements to each Open Space area;
• One service access;
• 300 metres maximum between accesses in elongated areas;
• Preferably the proposed access from a Local Road rather than a Collector Road; and
• Access points shall contain barriers that are removable and lockable.
8.4.9 Access/Exit for Parks/Reserves
Parks / reserves are to be designed and positioned to ensure that width of access points are
maximised.
• Laneway type access will not be acceptable.
• The main area of reserves is to be immediately accessible from the adjacent road reserve
and areas of open space recessed between private lots are to be avoided. Absolute minimum
access width is 10 metres.
• A vehicle crossover and driveway is to be provided from the road reserve to the property
boundary.
The following requirements generally apply to fencing:
• Design and locate fencing to control vehicle access and provide easy access for pedestrians,
cyclists and maintenance vehicles in all parks and other areas of open space.
• Consider the use of bollards or other permeable fencing instead of solid fences where
appropriate.
• Use bollards to control vehicle access at entry points to pedestrian or shared use paths.
• Use safety fencing in conjunction with chicanes to deter entry straight onto the road from a
pedestrian or shared use path running through a park.
• Common design standards should apply so that single thematic elements are used across the
subdivision, or on a precinct by precinct basis.
8.4.10 Planting
The Developer shall ensure that all open space areas are appropriately landscaped and that high
quality spaces are created. Open space areas shall be landscaped to a minimum standard, which
includes grassing or other stabilisation of all surfaces and shade tree planting.
December 2013
Cardno (NT) Pty Ltd 42
Subdivisional Guidelines – Central Desert Regional Council
Section 8 – Design Standards:
Landscaping
Open areas are required for active recreation purposes, but elsewhere, especially near play
equipment, seats and along pathways, shade trees should be provided for aesthetic and comfort
reasons.
Planting of shrubs and groundcovers should conform to the requirements of CPTED.
For all areas where grassing is proposed, the Developer shall obtain approval from Council for
appropriate species of grass to be used.
In all cases, grass species shall be suitable for the intended use and location and shall be low
maintenance. All areas of open space and the adjoining verges, other than natural areas and dry land
grass areas are to be irrigated with automatic irrigation systems conforming to Council irrigation
requirements.
Council has a preference for native and indigenous plant species being used in the planting designs.
Areas of remnant vegetation are to be improved with additional planting of native species, mulch and
kerbed edges. All trees are to be individually watered during establishment.
8.4.11 Naming of Parks
The Developer is to liaise with and make submissions to the NT Government Place Names
Committee, commencing at the planning stage of the development. Refer to Council’s Land Use
Planning Policy.
8.5 Street and Park Furniture
The palette of proposed street furniture is to be submitted and approved at the master planning
approval stage.
The Developer shall ensure that adequate street and park furniture approved by Council is placed at
appropriate sites throughout the development / subdivision.
In general, street furniture shall be provided in accordance with the following guidelines:
• Exhibit high resistance to vandalism.
• Conform to the relevant local and national building codes.
• Be durable against weathering and deterioration.
• Be suitable for use by people with a wide range of needs including children, the aged and
people with disabilities.
• Have a low whole-of-life cost.
• Where possible, recycled materials shall be used for furniture to the satisfaction of Council.
• Furniture should be sited to focus on activities or views.
• Where possible, furniture should be sited to provide shelter from the sun and rain.
• Street furniture should be selected and sited to reduce visual clutter.
8.5.1 Public Art
Where the Developer intends to provide public art it shall be developed in consultation with Council
and in accordance with Council policy.
8.6 Services Infrastructure for Parks and Open Space
No general requirements. See Annex B for each council’s specific requirements.
8.7 Landscape Construction Requirements
No general requirements. See Annex B for each council’s specific requirements.
December 2013
Cardno (NT) Pty Ltd 43
Subdivisional Guidelines – Central Desert Regional Council
Section 8 – Design Standards:
Landscaping
8.8 Irrigation for Landscaping
No general requirements. See Annex B for each council’s specific requirements.
8.8.1 Monitoring Equipment
No general requirements. See Annex B for each council’s specific requirements.
8.8.2 Water Sources for Irrigation
No general requirements. See Annex B for each council’s specific requirements.
8.8.3 Grass Irrigation for Roads and Verges
No general requirements. See Annex B for each council’s specific requirements.
8.8.4 Inspections and Testing
No general requirements. See Annex B for each council’s specific requirements.
December 2013
Cardno (NT) Pty Ltd 44
Subdivisional Guidelines – Central Desert Regional Council
Section 8 – Design Standards:
Landscaping
December 2013
Cardno (NT) Pty Ltd 45
Subdivisional Guidelines – Central Desert Regional Council
Section 9 – Design Standards:
Miscellaneous
9 MISCELLANEOUS
9.1 Waste Bin Infrastructure
The Developer is responsible for providing appropriate waste bin infrastructure to Relevant Standards
and in accordance with Council Policies and requirements.
Developers of residential, commercial and industrial property will adequately show details of proposed
waste and recycling bin storage enclosure/s on a drawing to scale with site and elevation plans. Design
shall be based on the requirements stated in Council‘s Bin Policy.
Residential
All detached dwellings and cluster dwellings with 3 or less dwellings per lot, will be provided with
Council’s kerbside collection service.
All flats and cluster dwellings (with 4 or more dwellings per development) will be provided with
Council’s manual collection service. The number of waste and recycling bins provided will vary
according to the size of the development, as stated in the above Policy. Council’s waste bin contractor
will service the receptacles from a designated bin storage enclosure/s within the property.
Commercial and Industrial
Council does not provide a waste collection service to commercial and industrial premises. Council
requires commercial and industrial premises to have on-site, dedicated waste bin and recycling
storage enclosures and to arrange for private waste collection and recycling services.
9.2 Fencing of Allotments
There are many different fencing elements which contribute to neighbourhood character including
solid fences, permeable fences, bollards, height and design, allotment size and materials and
finishes. Fencing of front yards at the road reserve boundary shall not be approved. Any front fences
shall be set back at the front of building line. Internal and rear of lot fencing are not under the
Council’s jurisdiction.
The Developer shall ensure that fencing fosters a sense of community identity and does not lead to
alienation of public areas such as streetscapes. The following requirements generally apply to
fencing:
a) Design and locate fencing to control vehicle access and provide easy access for pedestrians,
cyclists and maintenance vehicles in all parks and other areas of open space.
b) Consider the use of bollards or other permeable fencing instead of solid fences where
appropriate.
c) Use bollards to control vehicle access at entry points to cycle, pedestrian or shared use
paths.
d) Use safety fencing in conjunction with chicanes to deter entry straight onto the road from a
cycle, pedestrian or shared use path running through a park.
e) Common design standards should apply so that single thematic elements are used across the
subdivision, or on a precinct by precinct basis. The use of common colour, style or materials
in community furniture and fencing will further add to the sense of local ownership and
identity.
f) Fencing of public spaces shall be powder coated and be either a minimum of 1.5 metres high
pool surround style fencing or 1.8 metres high chain mesh style fencing.
December 2013
Cardno (NT) Pty Ltd 46
Subdivisional Guidelines – Central Desert Regional Council
Section 9 – Design Standards:
Miscellaneous
9.2.1.1 Entry Statements
Entry statements can take many forms and are generally used to indicate the main entrance into the
suburb or precinct.
Developers shall ensure that all entry statements are attractive, vandal resistant and easy to maintain.
Generally, entry statements shall comply with the following:
a) Entry statements are to be located within Council property.
b) A minimum 300mm gap is to be provided between the entry statement and private property.
c) Entry walls shall have a concrete surround between private property and the wall for ease of
maintenance.
d) Entry statements must state the suburb or precinct name if it is different from the subdivision
name.
e) All entry statements must conform to Councils Signs Code.
9.3 Development and Redevelopment within CBD and single Allotments
No general requirements. See Annex B for each council’s specific requirements.
December 2013
Cardno (NT) Pty Ltd 47
Subdivisional Guidelines – Central Desert Regional Council
Section 10 – The Construction
Process
10 THE CONSTRUCTION PROCESS All aspects of the Development Technical Specification and the Approved Drawings shall be strictly
adhered to. Council’s Technical Specification and/or Standard Drawings may be used for inclusion in
contracts between Developers and Contractors, for Development Work and may also be used for
contracts between Council and Contractors.
10.1 Supervision and Certification of Works
The Developer/Contractor is responsible for all construction activities carried out during the course of
the Development Works. Inspections by the Officer shall in no way diminish the responsibility of the
Developer/Contractor to adequately supervise the works.
The Developer is to ensure that all works are carried out in accordance with the requirements of the
Development Permit, the Deed of Agreement, the approved Inspection and Testing Plan, the
Approved Drawings and Specifications and these Guidelines and as agreed at the Pre-start Meeting.
The Developer shall ensure that a suitably qualified Consultant carries out the supervision of the
works. The Consultant is responsible for the certification of the works.
Final approval and acceptance will only be given when all works have been executed to the true intent
and meaning of the approved drawings and specifications and when all the requirements set out
hereafter have been complied with and are in accordance with Section 4.
For inspections of other areas of works, i.e., landscaping and structural works, inspections are to be
carried out as specified, required and agreed with the Officer.
10.2 Pre-Start Meeting
The Developer or Consultant is to initiate a Pre-start Meeting with the Officer. The Developer (if no
Consultant required), Consultant(s), Contractor(s), Council and other Authorities (if required) are
required to attend to outline all parties’ requirements and to discuss the items set out below.
• Engineering, other plans and other Authorities approvals;
• Council Inspections and Hold points;
• Workplace Health and Safety – Safety Management Scheme and General Risk Management;
• Inspection and Testing Plan;
• Traffic control/traffic;
• Spoil offsite/import fill;
• Working Hours;
• Parks/landscaping – Landscape Section 4;
• Environmental – vegetation clearing, stormwater management, erosion and sediment control,
dust suppression and noise control;
• Reinstatement works to Council and other property;
• Protection of and permission to enter private property;
• Design alterations during construction;
• Geotechnical and Blasting details;
• Contractor‘s Insurances and Council indemnities;
• Certifier and Certification of works;
• Proposed Construction Programme;
• Public Consultant; and
• Other matters.
The meeting is to be minuted by the Officer with the minutes then forwarded onto the Consultant
(Developer if Consultant not required).
December 2013
Cardno (NT) Pty Ltd 48
Subdivisional Guidelines – Central Desert Regional Council
Section 10 – The Construction
Process
Prior to commencing construction, the Developer is to give the Officer at least 24 hours notice in
writing, which is to include the following information:
• Subdivision Estate/Development Name/Stage/Brief description of Works;
• Developer: Name, Address, Contact Person and Contact Number;
• Developer‘s Representative(s): Firm’s name, Discipline, Address, Contact Person and
Contact Number;
• Contractor: Name, Address, Contact Person and Contact Number;
• Date of Council Approval of Design; and
• Proposed Working Hours – All works will be contained between the hours as specified and
agreed.
10.2.1.1 Permits for Works on Land Controlled by Council
Where works are to be carried out within an existing road reserve or land owned or under the control
of Council external to the development site, a works permit to construct is to be obtained.
If the Officer is of the opinion that there is a risk of damage to Council property or a liability has been
identified, the Officer may determine that an appropriate security bond is to be lodged prior to the
permit being issued and the works commenced.
10.2.1.2 Council Requirements for Development on Crown Land
Where subdivision development is to take place on Crown Land leased from the Government, The
Department generally acts for the Owner under a Deed of Agreement.
Where Council is to take over and maintain any of the infrastructure, Council becomes the
responsible authority and Council’s requirements, as per these Guidelines, apply.
10.2.1.3 Work zone traffic management
All works within or indirectly affecting Council’s road reserves or land requires a Works Permit. A
condition of this permit for a traffic management plan developed in accordance with all relevant
Australian Standards, including risk assessment and management.
The developer / permit holders are solely responsible for all sub-contractors, plant, machinery, visitors
and all movement of traffic and pedestrians within and surrounding the immediate development site.
This responsibility exists twenty-four (24) hours per day, seven (7) days a week for the entire duration
of works, including reinstatement works.
The traffic management plan is to be prepared by a certified person for acceptance by Council prior to
works commencing and should include a minimum of the following:
• Access point(s) and proposed route for construction works; and
• Details of vehicle and equipment trafficking Councils roads and accessing the site from
surrounding and connecting roads.
All personnel implementing Traffic Control shall have Work Zone licences, or a copy of their
Statement of Attainment, on site and readily available for inspection.
It is the developer’s responsibility to notify all affected residents, owners and service providers of
works and disruptions
Dilapidation reports may also be required at the discretion of the approving Officer.
10.2.1.4 Consultants
The Developer may employ suitably qualified agent(s) or consultant(s) to act as the Developer’s
Representative(s) to design, construct, supervise and certify works in all disciplines associated with
the subdivision / development. Ideally, the Certifier should not be the Superintendent.
December 2013
Cardno (NT) Pty Ltd 49
Subdivisional Guidelines – Central Desert Regional Council
Section 10 – The Construction
Process
10.3 Construction Hold Points
With respect to all works, the Officer, Consultant and Contractor are to jointly inspect the site at
Construction Hold Points. The Consultant shall give the Officer a minimum of two business days’
notice of impending Hold Points. The Officer may request additional inspections (Hold Points) at any
time.
The Consultant is to ensure that any particular lot of work to be inspected has been satisfactorily
completed before requesting any such scheduled inspection. Each stage will be inspected prior to the
next stage works being commenced.
In circumstances where there is concern about workmanship or materials, works are not to proceed
until the Officer is satisfied by the adequacy of the work.
The Contractor is to ensure that the site is prepared and that the specific elements of works are
readily visible and accessible so that the Officer can conduct the necessary inspection. If the
Contractor is not Quality Assured, then additional inspections may be required at the Officer‘s
discretion.
The following is a list of the mandatory Construction Hold Points; The Officer reserves the right to
introduce additional Hold Points for specific Developments or segments of work.
• Completion of sub-grade preparation;
• Completion of sub-base;
• Completion of base;
• At commencement of kerbing;
• Prior to pouring of concrete for foot paths or driveways;
• After excavation and before pipe laying to assess bedding and fabric requirements;
• When drainage lines and pits are laid on bedding prior to backfill;
• Subsoil drains prior to backfill;
• Irrigation and potable water (public use) pipework and valves in place prior to backfill to
conduct hydrostatic testing;
• Electrical supply to irrigation controller prior to backfilling;
• At hole preparation prior to tree planting and root barrier installation;
• Prior to seeding of top soil or laying of turf; and
• Prior to installation of furniture, fittings and other structures (following subsurface preparation
prior to backfilling)
Council will not accept works that has not been adequately inspected by the Officer at the prescribed
Hold Points.
10.3.1 The Officer’s Rights of Inspection
The Officer will make inspections of the works on a random audit basis. These inspections may take
place without any prior notice to the Superintendent or Contractor.
Inspections by the Officer will not diminish the responsibility of the Developer to adequately supervise
the works.
The Consultant may be required to progressively submit copies of test results to the Officer. The
Officer may also request progressive construction certification from the Consultant for all or any of the
main stages of construction.
The Officer reserves the right to have the work proven in the field whether by inspection or specific
testing.
December 2013
Cardno (NT) Pty Ltd 50
Subdivisional Guidelines – Central Desert Regional Council
Section 10 – The Construction
Process
10.3.2 Standard Inspection Plan
The following table outlines the Superintendent’s and Council’s inspection regime, including Hold
Points.
HOLD POINT INSPECTION
Before commencement of clearing
Significant vegetation, site office location,
haulage routes, ESC measures
After stormwater pipes laid, before backfilling
Soil type, bedding material, pipe condition,
CCTV inspection if deemed necessary
After subsoil drainage laid, before backfilling
Soil type, bedding material, pipe condition
After road sub-base construction
Grades, vegetation, stormwater catchment,
ESC.
Before asphalt laying (including tack coat)
Grades, surface quality, kerb levels
Before tree planting
Tree quality, maturity, locations
Elements of Work
Consultant’s Responsibility
Council’s
Responsibility
PRE-START MEETING
See Prestart meeting requirements. See Prestart meeting
requirements.
CLEARING
Ensure all environmental plans are
in place, including location of
haulage routes
HOLD POINT –
inspection required prior
to earthworks
commencing
EARTHWORKS
Material Quality
Compaction
Levels
Level of supervision to be
determined by consulting engineer
but minimum Level 2 in accordance
with AS 3798 to apply.
Examine and assess all test results
and levels and report to Officer
Visit site for random audit
inspection.
December 2013
Cardno (NT) Pty Ltd 51
Subdivisional Guidelines – Central Desert Regional Council
Section 10 – The Construction
Process
Elements of Work
Consultant’s Responsibility
Council’s
Responsibility
ROAD EMBANKMENT
Material Quality
Compaction
Make routine visits.
Examine and assess all test results
and levels.
Visit site for random audit
inspections.
SUBGRADE
Compaction
CBR Tests
Horizontal Alignment
Vertical Alignment
Cross fall
Make routine visits.
Attend during proof rolling.
Examine and assess all test results
and cross section geometry.
Certify adequacy designed
pavement/or submit new pavement
design for approval.
Visit site for random audit
inspections.
Inspection and attend
proof rolling.
SUBGRADE REPLACEMENT
Material Quality
Compaction
Profile and Depth
Make sufficient routine visits to
assess quality of materials and that
operations will achieve a sound
compacted layer.
Attend proof rolling.
Examine and assess all test
results.
Visit site for random audit
inspections.
Inspection and attend
proof rolling.
SUB-BASE LAYER
Material Quality
AS1289
Compaction
Pavement Depth
Horizontal Alignment
Vertical Alignment
Make routine visits.
Examine and assess all test
results.
Attend proof rolling
Visit site for random
inspections.
HOLD POINT –
inspection required prior
to base course
construction
December 2013
Cardno (NT) Pty Ltd 52
Subdivisional Guidelines – Central Desert Regional Council
Section 10 – The Construction
Process
Elements of Work
Consultant’s Responsibility
Council’s
Responsibility
BASE COURSE LAYER
Material Quality AS1289
By NTTM 216.1
By WA312.1
AS1289
Compaction
Pavement Depth
Horizontal Alignment
Vertical Alignment
Make routine visits.
Attend proof rolling.
Examine and assess all test results
and report to Officer.
Visit site for random
inspections.
Inspection and attend
proof rolling.
KERB AND GUTTER
Concrete - Slump, Strength
Horizontal Alignment
Vertical Alignment
Kerb Transition
Inspect prior to kerb placement and
completed kerb.
Examine and assess all test results
and level.
Inspect with straight edge.
Visit site for random
inspections.
Attend water test.
SUB SOIL DRAINAGE
Material Quality
Location
Surface and Invert Level
Construction
Make random audit inspections of
Contractors performance
Visit site for random
inspections.
HOLD POINT –
inspection required prior
to backfilling
December 2013
Cardno (NT) Pty Ltd 53
Subdivisional Guidelines – Central Desert Regional Council
Section 10 – The Construction
Process
Elements of Work
Consultant’s Responsibility
Council’s
Responsibility
SURFACING – ASPHALT
Material Quality
Aggregate By AS1141
By NSW t239
Bitumen By AS 1141
NTTM 305.1
NTTM 304.1
Compaction Thickness
Horizontal Alignment
Profile
Undertake an inspection prior to
commencement of laying operation.
Examine and assess all test results
and report to Council.
Visit site for random
inspections.
HOLD POINT –
inspection prior to tack
coat.
STORMWATER DRAINAGE
Material Quality
Culverts By AS1597
Bedding
Reinforcement
Concrete - Slump, Strength
Location
Surface and Invert Level
Construction
Drainage Lines (Underground)
Horizontal Alignment
Vertical Alignment
Backfilling
Inspection of pipes and bedding
prior to installation. Make sufficient
visits to assess compliance with
specification.
View progress and works.
For structural pours inspect prior to
placing concrete.
Examine and assess all test results
and level.
Visit site for random
inspection.
HOLD POINT –
inspection required prior
to backfilling
Internal pipe survey with
CCTV will be arranged if
deemed necessary.
ROAD CROSSING CONDUITS
Location
Backfilling
Markers
Make random audit inspections of
Contractors performance
prior to backfill
Visit site for random
inspection
December 2013
Cardno (NT) Pty Ltd 54
Subdivisional Guidelines – Central Desert Regional Council
Section 10 – The Construction
Process
Elements of Work
Consultant’s Responsibility
Council’s
Responsibility
TOPSOILAND GRASS
Confirm all affected areas are
topsoiled, grassed and maintained.
Visit site for inspection.
EROSION, SEDIMENTATION
AND WATER QUALITY
CONTROL MEASURES
Ensure implementation and
continuous maintenance of relevant
plans.
Visit site for random
inspection.
ALL WORKS PRIOR TO
ON-MAINTENANCE
Confirm all works comply with
design intent before arranging “ON
Maintenance” inspection.
Complete the “ON Maintenance”
inspection checklist prior to joint
inspection with Council.
Joint “ON Maintenance”
inspection with
Consulting Engineer and
notify requirements, if
any.
PRIOR TO ACCEPTANCE
“ON-MAINTENANCE”
Forward “As Constructed”
submission to Council.
Ensure Licensed Surveyors
certificate is attached and also
attach Engineers Certification.
Finalise all other Documentation in
accordance with Section 6.
Council to accept and
conduct Audit checks of
As Constructed Drawings
and advise of any
requirements.
When complete advise in
writing of acceptance of
“ON Maintenance”.
DURING MAINTENANCE
PERIOD
Confirm all minor omissions and
defects have received suitable
attention.
Examine and approve site prior to
asking for “Off Maintenance”
Inspection.
Council to advise
Consulting Engineer of
any defects.
PRIOR TO ACCEPTANCE
“OFF MAINTENANCE”
Accompany Council Inspector and
to note any requirements.
Council Inspector to
accompany Consulting
Engineer and Contractor
to advise of any
requirements.
When complete, advise
in writing of acceptance
of “OFF Maintenance”.
December 2013
Cardno (NT) Pty Ltd 55
Subdivisional Guidelines – Central Desert Regional Council
Section 10 – The Construction
Process
10.4 ON Maintenance
The Developer is to notify the Officer in writing that the works have been completed in accordance
with the approved drawings, specifications and permit conditions and request an inspection for
practical completion and to have the works placed “ON Maintenance”.
The Consultant is to issue a statement of compliance certifying that the works have been constructed
in accordance with the intent of the design drawings and specifications prior to being accepted ON
maintenance
In order for ON Maintenance to be approved, a series of inspections and checklist are required to be
completed, including payment of the maintenance bond and any other bonds relevant to the works.
Any defects will be identified at inspections and throughout the ON Maintenance Period and must be
rectified prior to final handover. Significant defects may require longer maintenance periods and/or
security bonds.
Once works have been placed ON Maintenance the development is to be maintained at the minimum
levels required by Council.
10.4.1 Certificate of Completion (Single lot developments)
In the case of single or multiple dwellings being developed on individual lots i.e. within the CBD a
certificate of completion is required. The certificate of completion involves an inspection of the
property against the development permit requirements. The developer is to provide a copy of the
development permit at the time of requesting the inspection.
The inspection will require the presence of the Officer, the Consultant and the Contractor. All drainage
pit covers are to be temporarily removed and all drainage lines flushed for the inspection. The Officer
may have other specific requirements prior to inspection.
All landscape works are to be finalised and irrigation in place and working.
The Consultant shall organise the inspection at a mutually convenient time.
10.4.2 ON Maintenance Inspection
The ON maintenance inspection is to be arranged following the practical completion of all construction
works. The ON Maintenance Site Inspection Checklist (Annex D) will be used as a basis for the
inspection. Following the inspection, the Officer will confirm with the Consultant/Developer/Contractor
any items not in accordance with the requirements of the drawings and specification and the
conditions set out in the permit.
The non-complying items (defects) shall be divided into:
• Items requiring completion or rectification prior to clearance being issued.
• A further inspection of these works when completed or rectified shall be an extension of the
practical completion / conditions clearance inspection.
• These works are to be completed prior to works being placed ON Maintenance or the
conditions cleared;
• Other items to be completed, repaired or altered by an agreed date during the maintenance
period.
• These works may require a security bond(s) to be lodged;
• Items that are to be monitored for performance during the maintenance period.
• These works may require a security bond to be lodged.
• Any other outstanding matters requiring attention
December 2013
Cardno (NT) Pty Ltd 56
Subdivisional Guidelines – Central Desert Regional Council
Section 10 – The Construction
Process
10.4.3 ON Maintenance Acceptance
When all works are completed in accordance with the foregoing and after the following information,
payments and documentation is submitted for acceptance, the Officer shall issue the Consultant with
an acceptance and ON maintenance certificate.
• Completed ON maintenance checklist;
• Development Inspection Fee;
• Maintenance bond.
• Lodgement of all outstanding works bonds,
• Asset information (civil, structural, landscape, environment)
• As constructed and other documentation (civil, structural, landscape, environment)
• Appropriately certified as constructed drawings compatible with the latest version of AutoCAD
• The drawings are to be clearly marked “AS CONSTRUCTED”.
• Certification of works
• Statement of compliance
• Non-compliance report(s)
• Inspection and testing and re-testing results and reports;
• Other documentation such as:
• Structural certification
• Certifications by other disciplines and trades.
• Materials testing and compaction and other test results (civil, structural, landscape,
environment):
• Clearances from other authorities and private owners;
• Proposed cadastral survey plan showing all easements;
• The Officer will sign off the survey plans on aspects of easements and any other matter that
affects the plan.
Any other documentation deemed necessary by the Officer.
10.4.4 Video Camera Inspection Records for Drainage Pipelines
Video camera inspections (CCTV) may be required for selected stormwater drainage pipelines and
will be undertaken by Council. The cost of inspecting the stormwater pipes in the subdivision will be
borne by Council. However, in the event that there are defects within the system the Developer will
be required to pay for all additional inspection and testing costs.
The Officer will determine whether a CCTV inspection is required, it will depend on the results of on-
site inspections and the certified construction report. Council will arrange with the Developer a
suitable time for the inspection and the Developer must ensure the pipes are clean and accessible for
the inspection.
10.4.5 Service Levels
During the ON maintenance period the following minimum service levels are expected, these are the
minimum generally applied to Council’s established infrastructure. Increased maintenance activities
will be expected for the establishment of new infrastructure, particularly landscape and may be
directed at the discretion of the Officer.
These service levels don’t include reactive maintenance works, such as pipe cleaning or additional
weeding, which will be required throughout the ON Maintenance period. The service level regimes
will be used as a basis for formulating bonds.
Records of all maintenance activities must be kept and provided to Council prior to OFF Maintenance
to enable a seamless handover with Council’s maintenance activities.
December 2013
Cardno (NT) Pty Ltd 57
Subdivisional Guidelines – Central Desert Regional Council
Section 10 – The Construction
Process
Item Category Frequency Comment
1 Weekly
2 Fortnightly
Mowing
3 Monthly
1 Daily
2 Weekly
Litter collection
3 Monthly
Irrigation Weekly in dry As required to maintain vigour
and growth, which may be daily
for newly planted areas.
Pruning Yearly As required to ensure formative
growth of new plants.
Includes hedge trimming, tip and
under pruning
Mulching Three per annum
Weeding Monthly
Fertiliser Two per annum Slow release
First week Daily
Next month Weekly
Planting
inspection
Thereafter Monthly
Drainage
cleaning Yearly Pits to be inspected prior to the
wet season
Gross Pollutant
Traps Following storm
events
As required during the wet
season
Road sweeping Every 3 months More frequent in high-traffic areas
All Roads 6 Months after
initial marking
Arterial Roads 2 Yearly
Collector Roads 3 Yearly
Line marking
Minor Roads 4-5 yearly More often at School Crossings
and high-traffic areas
10.4.6 Maintenance and Defects Periods
At any time during the maintenance period, Council will undertake random inspections to determine
the satisfactory maintenance of the works.
If, in the opinion of Council, and after due process, the works are not appropriately maintained, the
Council may call up the maintenance and any other applicable Bonds and undertake rectification
works.
The Council’s time in these matters will be charged to the Developer.
December 2013
Cardno (NT) Pty Ltd 58
Subdivisional Guidelines – Central Desert Regional Council
Section 10 – The Construction
Process
The minimum maintenance and defects periods are listed below. Additional defect periods will be
instigated in the event that major rectification works are required during the maintenance period or at
the discretion of the Officer. The maintenance and defects periods will be extended as required to
ensure all requirements of the Development have been completed to Councils satisfaction.
Maintenance Period Additional Defects Period
Multi Lot Subdivision/Developments
Civil works 24 Months 12 Months
Environmental 24 Months 12 Months
Landscape/Irrigation 24 Months 12 Months
Single lot/CBD developments (as per Council’s verge Policy)
Landscape Ongoing
Trees 12 Months
Paths 2 Months
Driveways 2 Months
10.4.7 Defect Requirements
The repair of construction defects or the rectification of design errors and omissions are to be
undertaken as they are identified.
Any defect occurring because of non-compliance with any of the relevant policies laws, codes,
specifications and after acceptance of any or all of the constructed works, is to be rectified
immediately by the developer at the developer’s cost.
Council will not be responsible for damage caused as a result of builder’s or others’ operations. This
applies to all works. All damaged works are to be rectified prior to being accepted OFF maintenance
by Council. If the works are not rectified, the cost of any works deemed to be necessary to repair the
damage will be deducted from the maintenance bond and/or any other relevant bond that is in place.
The Consultant is to certify that the relevant conditions imposed on the development permit have
been complied with and that the works as constructed comply with the approved drawings and
specifications.
The consultant is to submit non-compliance reports as part of the as constructed and asset
documentation referring to the items of construction not in accordance with the approved drawings
and specifications.
The following is a list of maintenance and defects liability period requirements for all works applicable
to subdivision / development and minor development and includes, but is not limited to:
Maintenance – Civil, Environmental and Landscape Works
• Remove silt and debris washed into kerbs, kerb and channel and underground drainage
pipes, drainage structures and overland drains;
• Clear temporary and permanent stormwater control and erosion control structures of debris
and silt on a regular basis and as necessary when filled to 50%;
• Repair all scours, replace topsoil and grassing to areas eroded by stormwater.
• Upgrade existing erosion control measures or install new temporary or permanent control
structures where severe scouring indicates the need:
• Replace all construction providing a risk to the public;
• Maintain to the manufacturer’s and Council’s specifications and requirements all structures
located within the defined development;
December 2013
Cardno (NT) Pty Ltd 59
Subdivisional Guidelines – Central Desert Regional Council
Section 10 – The Construction
Process
• Seed, water and fertilise all disturbed areas to obtain 80% grass coverage within six months
of the works being accepted On Maintenance;
• Check on growth and health, water, weed, fertilise and carry out all necessary maintenance to
all landscaped areas provided as part of the works.
• Mow road verges, pathways and park areas and other areas under Council’s future control to
maintain a grass length as specified and agreed,
• Maintain all landscaped areas weed free.
Defects – Civil, Environmental and Landscape Works
• Repair and/or reinstate all defects identified by Council occurring during the maintenance
period
• Repair all trench subsidence flush with surrounding infrastructure;
• Repaint line marking as necessary;
• Repair or replace all failed, cracked and subsided pipes,
• Replace or repair any cracked, chipped and subsided or broken kerbs, paving,
Notification of Defects during the Maintenance Period
Where maintenance requirements or defects are noted, written advice will be issued to the Developer
requiring works to be carried out within a stipulated time.
• Verbal advice will be given followed up by written advice.
• In this instance appropriate action will be required within 24 hours from the time of the verbal
advice.
• Where public safety or health is at risk, Council will take immediate action to make an area
safe at the Developer’s cost.
• Where notifications are not complied with by the due date, Council will, without further
reference, undertake the works at the Developer’s cost.
• If at any time after the works have been declared Practically Complete, Accepted and placed
ON Maintenance by Council, the Works are found to be non-complying, then the works are to
be rectified at the Developer’s cost.
10.5 Asset Documentation
To meet legislated financial reporting, operational and maintenance needs Council maintains a
Corporate Asset Register of Council owned and maintained infrastructure.
When assets are placed ‘On Maintenance” all relevant information about the asset must be provided,
and in a suitable format, to Council. If defects are identified at the ‘On Maintenance’ inspection then
the information of any changes must be provided as they occur.
As “On Maintenance” is the time Council signs off on relevant development permit conditions which
affects the release of Land Title, it is imperative that Council’s requirements of this section are
observed.
The information must be presented in such a way that Council staff can easily translate the
information provided into Council’s systems. An exact detail of how this information is provided is to
be determined in consultation with Council staff. The information may be presented in any single, or
combination, of the formats listed below.
• As-constructed drawings, both hard copy and electronic copies
• Spatial data tables, preferably MapInfo
• Asset information forms
• Reports containing specific information
The details required for each asset class are listed in the following sections.
December 2013
Cardno (NT) Pty Ltd 60
Subdivisional Guidelines – Central Desert Regional Council
Section 10 – The Construction
Process
10.5.1 Asset Information Required
The details and value of groups of assets to be contributed to Council constructed as part of any
development are to include the following.
Road assets group
• Road pavement and surface
• Kerb and Guttering
• Traffic Control
• Street Furniture
• Landscaping
• Off Street Car parks
Stormwater assets group
• Pipes
• Pits and Gross Pollutant Traps
• Open Drains
• Culverts
• Subsoil drains
Parklands assets group
• Landscaping
• Trees
• Irrigation system
• Furniture
• Equipment
• Structures
• Services
The Pathways group
• Walkways
• Shared paths and bicycle paths
• Driveways
• Footpaths
Lighting
• Comprises all elements of the lighting network metered and owned by Council
Property Group
• Land (owned by Council)
• Buildings and other structures
Specific Asset Data Requirements (where applicable)
Detailed asset information required includes but is not limited to the following items:
• Asset Description
• Asset Location – suburb; segment; street; park
• Asset Dimensions – specific to asset type; segment etc.,
• Asset Type – e.g. Road; building, park; tree, pathway; stormwater network, plant, equipment,
etc.
• Date / Year of manufacture or construction
• Creation Costs – cost of purchase or construction
December 2013
Cardno (NT) Pty Ltd 61
Subdivisional Guidelines – Central Desert Regional Council
Section 10 – The Construction
Process
Contact Council’s Asset Manager for access to templates and precise details on how the asset
information is to be identified, segmented and detailed.
10.6 OFF Maintenance
10.6.1 Acceptance of Works OFF Maintenance
A written request is to be submitted to Council at least 30 days prior to the end of the maintenance
period for acceptance of the works OFF maintenance and for the release of the maintenance bonds.
The Developer / Consultant is responsible for ensuring that the works are finalised and in such
condition that they can be accepted OFF Maintenance and taken over by Council for future care and
maintenance.
The OFF maintenance inspection checklist Annex D is to be referred to in the estimation of whether
the works are satisfactory to be taken over by Council during the OFF maintenance inspection and
submitted with any other relevant OFF maintenance information and documentation.
OFF maintenance will not be issued unless all outstanding defects and omissions are completed to
the satisfaction of the Officer.
10.6.2 OFF Maintenance Certificate
When all requirements and inspections have been complied with, the Officer will issue the Developer
with an OFF Maintenance certificate. The certificate will confirm that the whole of the works are
satisfactory to Council and that the Council will place the works OFF maintenance;
The certificate will have no effect until both the Officer and the Developer have executed the
document.
The original of the OFF maintenance certificate will then be issued to the Developer.
Any Maintenance and other bonds being held will then be returned to the Developer.
December 2013
Cardno (NT) Pty Ltd 62
Subdivisional Guidelines – Central Desert Regional Council
Section 10 – The Construction
Process
December 2013
Cardno (NT) Pty Ltd 63
Subdivisional Guidelines – Central Desert Regional Council
Section 11 – Construction General
Conditions
11 CONSTRUCTION GENERAL CONDITIONS All aspects of the Development Technical Specification and the Approved Drawings shall be strictly
adhered to. Council’s Technical Specification and/or Standard Drawings may be used for inclusion in
contracts between Developers and Contractors, for Development Work and may also be used for
contracts between Council and Contractors.
11.1 Protection of cadastral reference marks (crm’s)
Any permanent survey mark affected by the works is to be identified and reported to the Department
of Lands and the Surveyor Generals Office for replacement or relocation.
The Contractor shall investigate the location of any CRM’s in the vicinity of works, prior to the
commencement of construction.
The Contractor should be aware the destruction of Survey marks is an offence under the Licensed
Surveyors Act.
11.2 Supervision and Certification of Works
The Developer/Contractor is responsible for all construction activities carried out during the course of
the Development Works. Inspections by the Officer shall in no way diminish the responsibility of the
Developer/Contractor to adequately supervise the works.
The Developer is to ensure that all works are carried out in accordance with the requirements of the
Development Permit, the Deed of Agreement, the approved Inspection and Testing Plan, the
Approved Drawings and Specifications and these Guidelines and as agreed at the Pre-start Meeting.
The Developer shall ensure that a suitably qualified Consultant carries out the supervision of the
works. The Consultant is responsible for the certification of the works.
Final approval and acceptance will only be given when all works have been executed to the true intent
and meaning of the approved drawings and specifications and when all the requirements set out
hereafter have been complied with and are in accordance with Section 6.
For inspections of other areas of works, i.e., landscaping and structural works, inspections are to be
carried out as specified, required and agreed with the Officer.
11.3 Conformance Testing
The Consultant shall comply with the requirements of The Northern Territory Government Department of
Construction and Infrastructure Technical Specifications for Conformance Testing. No other Conformance
Testing regime shall be accepted unless approved in writing by the Officer.
All testing shall be undertaken by an approved testing authority in accordance with the Technical
Specifications and Relevant Standards.
The Consultant will be responsible for ensuring that all required quality control checks are carried out
during construction. If requested the Consultant is to progressively submit a copy of test results to the
Officer.
In addition to the normal inspection and testing requirements as detailed in the Technical
Specification, the Officer reserves the right to inspect and require additional samples to be tested to
ascertain the quality and quantity of materials being used. The cost of this testing will be met by the
Developer. The Consultant will be informed of any works requiring remedial action.
December 2013
Cardno (NT) Pty Ltd 64
Subdivisional Guidelines – Central Desert Regional Council
Section 11 – Construction General
Conditions
The Officer may make inspections of the works on a random audit basis. Such inspections may include
but are not limited to items such as Traffic Control, Occupational Work, Health and Safety Issues and
Environmental Management. These inspections may take place without any prior notice to the
Consultant or Contractor.
The Officer may request progressive certification from the Consultant indicating correctness of
construction in accordance with the approved plans and specifications for all or any of the stages of
construction.
In the absence of an inspection by the Officer, certification by the Consultant will not necessarily be
accepted. The Officer reserves the right to have the work proven in the field whether by inspection or
specific testing.
The Consultant shall submit Non-Compliance Reports to the Officer immediately. These Reports shall
identify the nature and number of non-complying items and state the Consultant‘s justifications for
Council acceptance.
11.4 Vegetation Clearing and Topsoil
The Developer /Contractor shall not remove any tree or shrub without prior approval of the Council.
The natural vegetation is to be retained where stated on the Vegetation Plan and in instances where
no such plan exists, wherever it is possible.
The developer is responsible for consulting the Tree Preservation and Historic Tree Registers and
providing evidence that no trees are affected.
All tree roots, boulders and other deleterious material are to be removed to a depth of 600 mm below
the natural surface or finished levels of the road reserve whichever is greater. Stumps are to be
completely removed.
All vegetation shall be mulched onsite, burning off of vegetation is not permitted.
Upon completion of the clearing operations, natural topsoil shall be stripped from the road reserve
areas of cut and fill and proposed utility service locations to an appropriate depth. The topsoil shall
then be stockpiled for re-spreading.
When earthworks have been completed, the site topsoil shall be blended as required to meet the
Technical Specification and re-spread to a minimum compacted depth of100mm on all exposed areas
of earthworks as required, to match approved finish surface levels. Note, in the absence of adequate
topsoil quantities being available, it will be the Developers responsibility to import approved topsoil to
the satisfaction of the Officer.
During the works, the following conditions apply to existing vegetation:
• Pruning, cutting or removal of vegetation (including roots) will not be permitted without the
permission of the Officer.
• Vegetation roots or limbs will be bored under or bypassed if so determined by the Officer
• Works may be required to be redesigned if a tree is determined to be endangered by the
works and another solution is achievable;
• Refer to the Relevant Standards for vegetation removal or pruning.
• Valuation of vegetation damaged or proposed to be damaged by the Permit Holder is to be
assessed under to the Relevant Standards. The Permit Holder will be required to
reinstate/replace any damaged vegetation to the value determined by the Officer and
maintained to the satisfaction of the Officer.
December 2013
Cardno (NT) Pty Ltd 65
Subdivisional Guidelines – Central Desert Regional Council
Section 11 – Construction General
Conditions
11.5 Subgrade Evaluation
After subgrade excavation, the Consultant is required to submit a detailed geotechnical report, the
results of which are to be used as a basis of formulating a pavement design.
Council will not inspect pavement subgrades, or approve the placement of pavement materials, until a
pavement design has been submitted and approved by the Council.
11.6 Work, Health and Safety Requirements
The Contractor must have in place a Policy Document setting out all occupational work, health and
safety requirements and be issued to all sub-contractors prior to them commencing any works or
entering the worksite.
In the case of contracts between Council and Contractors, the Officer has the right to suspend or
terminate the works if statutory work, health and safety requirements are not met.
Contractors are to comply with the following:
• Health and Safety Legislative Requirements;
• Demonstrate evidence of OH&S management and system;
• Develop Health and Safety Plan;
• OH&S Performance Reporting;
• OH&S Incident Notification.
The Contractor must have in place a Policy for on site health and safety requirements to be issued to
and displayed for all sub-contractors and site visitors.
11.7 Environmental Requirements
The Developer/Contractor is to ensure that all reasonable measures are taken in respect of
environmental matters. In particular the following shall be properly addressed to Council‘s satisfaction.
• The requirements of the relevant Regulations and Acts are to be accorded with;
• The approved plans and specifications, setting out the environmental requirements and
measures are to be strictly adhered to;
• Dust, air and noise emissions are to be controlled such that nuisance is not caused to
surrounding properties. Council reserves the right to direct any and all such measures as
deemed necessary to ensure compliance, including cessation of works. The Developer shall
be responsible for all such costs;
• Any Environmental Bond lodged may be drawn on if the Developer does not take immediate
action to address environmental issues.
The Developer/Contractor shall notify the Officer immediately there is any measurable environmental
damage or impact caused by the Development or when there is a deviation from the approved plans
or specifications.
The Developer/Contractor is to adhere to the requirements set out in the approved Sediment and
Erosion Control Plan, unless the Officer considers such measures are to be amended. Maintain all
sediment and erosion control structures throughout the whole construction period, including the
maintenance period.
The Developer/Contractor must ensure that the wheels, tracks and body surfaces of all plant and
vehicles leaving the site are free of mud, etc. The Developer/Contractor is to provide and maintain
slopes, crowns and drains on all excavations and embankments to ensure satisfactory drainage at all
times. Water is not to pond on the works unless such ponding is part of the approved Sediment and
Erosion Control Plan.
December 2013
Cardno (NT) Pty Ltd 66
Subdivisional Guidelines – Central Desert Regional Council
Section 11 – Construction General
Conditions
11.7.1 Solid, Liquid and Gaseous Contaminants
The contractor is to be responsible for the proper storage and disposal of all contaminants in
accordance with all statutory and contractual obligations.
11.7.2 Disposal of Waste
Waste from construction operations, including food scraps and the like, are to be removed from the
site.
11.7.3 Trucking
All trucks entering and leaving the site of works are to be loaded and the load constrained in such a
manner as to prevent the dropping or tracking of materials onto streets. This includes ensuring that all
wheels, tracks and body surfaces are free of mud and other contaminants.
11.7.4 Dust and Water and Erosion Control
Adjoining owners, residents and the general public are to be protected against dust, dirt and water
nuisance. Dust screens and watering are to be used to reduce dust nuisance.
All proper precautions are to be taken by the Contractor to ensure that erosion and sedimentation
from any lands or location used, occupied or controlled by the Contractor is kept to an absolute
minimum during the course of the works.
11.7.5 Hours of work
Working hours are restricted to times that provide minimum disturbance to nearby residents,
business, traffic and any other service. Dependent upon the location, it may be necessary to carry out
the works within restricted working hours. This shall be recognised, determined and specified by the
Officer prior to approval of plans and specifications.
As a guide work should only occur Monday to Friday, (excluding public holidays) between 7:00 am
and 5:30 pm.
Traffic should not be during the following hours, from Monday to Friday, excluding Public Holidays:
0700 hours
to 0900 hours.
1530 hours
to 1730 hours.
11.8 Works On Council Property
Works within Council Property include:
• Works carried out within Council‘s property, i.e., road reserves, parks, public spaces or any
other place owned by or defined as owned by or maintained by the Council. This includes the
installation of cable and other structures for the delivery of cable television services in the
Municipality.
• Works carried out by Contractors under Contract to Council, by Other Authorities that have a
statutory right to carry out works within Council road reserves or by private persons or
organisations that wish to carry out works within Council property.
• Works conducted underground, above ground or ground level including aerial cabling.
All necessary Permits to carry out works are to be obtained by the Developer/Contractor.
Works will only be carried out as per the approved design, in the manner and under the terms and
conditions specified and at the times agreed to by the Consultant/Contractor and approved by the
Officer. Any variations to the design will require the approval of the Officer.
December 2013
Cardno (NT) Pty Ltd 67
Subdivisional Guidelines – Central Desert Regional Council
Section 11 – Construction General
Conditions
No works may be commenced without the approval of the Officer.
All works carried out on Council property shall not degrade Council’s assets. Any degradation of an
asset shall be compensated for in a manner approved by the Officer. The works are to be reinstated
to the condition of the existing or better as deemed by the Officer.
This includes permits for the installation of cable and other structures for the delivery of cable television
services in the Municipality. Permits will be required even if the works form part of proposed internal
subdivision construction.
The works may be of such a nature, size or in such a location, that the Officer will require a specific
security bond or bond(s) to be lodged prior to the commencement of works
The Permit is issued for a stipulated period and if works are not completed within the stipulated time
frame then the Permit must be extended. The Permit will terminate at the satisfactory completion of the
works. The Officer may revoke the permit if it is deemed that the Permit Holder is not acting within the
Conditions of the Permit.
All residents and owners within the works area and any other areas deemed by the Officer to be
affected by the works, are to be advised of the proposed works by individual written advice, not less
than 14 days prior to the proposed commencement of works.
All relevant authorities as defined by the Officer are to be advised at least 14 days prior to the
proposed commencement of works and any statutory requirements of the authorities satisfied.
Relevant Authorities may include public or private individuals or bodies, which may have a direct or
indirect interest in the proposed works.
The safety of the public is paramount and Council‘s exposure to Public Risk also must be considered
at all times. The Permit Holder is to appoint a Safety Officer who is to be totally responsible for all
aspects of safety throughout the works site.
The Permit Holder must have in place all necessary insurances, which are to indemnify Council
against any claims arising out of the works. Proof of insurance must be lodged with Council prior to
commencement of works.
The Permit Holder is to assume responsibility for the safe conduct of the traffic through or around the
worksite 24 hours per day from possession of the site to Final Completion of the Works.
The works are to be organised and carried out in such a way as to minimise obstruction and
inconvenience to the public.
Working hours are restricted to times that provide minimum disturbance to nearby residents, business,
traffic and any other service in the Council land. Dependent upon the location, it may be necessary to
carry out the works within restricted working hours. This shall be recognised, determined and specified
by the Officer prior to approval of plans and specifications.
If the Officer is required to be present outside normal Council working hours, then the Permit Holder is
to be responsible for overtime costs at rates as agreed under the Permit.
The Officer has the ultimate decision in the matter of working hours.
December 2013
Cardno (NT) Pty Ltd 68
Subdivisional Guidelines – Central Desert Regional Council
Section 11 – Construction General
Conditions
When designs for cabling and/or any other service are being carried out in existing Council road
reserves, the following is to apply:
• All roads, pavements, footpaths and vehicular crossing/driveways are to be underbored
unless otherwise approved by the Officer
• The appropriate alignment for cabling for the delivery of cable television services is in the 00-
800mm corridor behind the kerb.
• Alignments for other services are to comply with the requirements of the services corridors as
set out in the Standard Drawings; and
• If a footpath covers the permitted alignment behind the kerb, the Permit Holder may choose to
demolish the existing footpath and excavate to lay cables and replace the footpath with a new
path to Councils standard in leiu of boring.
Any trenching across a road, footpath or driveway (if approved by the Officer) is to have saw-cut
edges. In the case of footpaths and crossings driveways, whole slabs are to be replaced rather than
narrow saw-cut trenches. The Officer is to agree to the width of the trench to be saw cut.
No trench is to be over excavated in width and depth without the specific approval of the Officer. All
trenching is to be adequately drained and de-watered.
Where the trenching intercepts coffee rock, cavities and/or crab-holes, the Officer will approve the
necessary remedial works to be carried out prior to the laying of services and backfilling. The Officer
may recommend:
• Fill cavities with lean mix concrete; and/or
• Prepare and place a lean mix slurry bedding; and/or
• Encase the backfill and bedding material in an approved geotextile fabric in accordance with
the manufacturer’s specification.
The Permit Holder is to open only as much trenching as can be closed again in one day. All works are
to be carried out in stages so that no more than an agreed length or 100 metres maximum of trench is
open at any one time.
Where the trench base is deemed as unsuitable, additional material is to be removed as necessary
and backfilled to the design level with approved material.
All backfill is to achieve the specified degree of compaction as defined in the Technical Specification.
11.8.1 Trenches in the verge/footway
To be backfilled to the established grading from top of kerb to the reserve boundary and flush with the
edges of pavement /top of kerb.
Material used for backfilling can be material won on site.
Compact to 85% minimum MMDD ratio in verge areas and 90% minimum MMDD ratio under
pathways.
Verges are generally to be turfed where grass existed prior to the works. Adequate provision is to be
made for irrigation of the turfing until established.
Grassing as a means of surface re-instatement is only to be carried out where specifically approved
by the Officer. If grassing is approved, it shall be placed as detailed in the Technical Specification.
December 2013
Cardno (NT) Pty Ltd 69
Subdivisional Guidelines – Central Desert Regional Council
Section 11 – Construction General
Conditions
11.8.2 Trenches across and/or adjacent to Roadways and Footpaths
The material used for backfilling under road pavements or adjacent to, or in close proximity or parallel
to road pavements and/or existing kerbs, is to be fine crushed rock with 3% (by weight) cement
stabilisation. Wearing surface shall be 50mm minimum asphalt surfacing. The Officer may specify that
deep lift asphalt be placed in lieu of this.
Trenches are to be backfilled in 150mm maximum layers.
Density tests are required for every trench across a road trafficked area or along the kerb/edge of
pavement and/or along the footpath at the rate indicated in the Technical Specification.
The Permit Holder is required to submit a security bond based on Council‘s current adopted rate for
future reinstatement of subsidence of the road trench under traffic. The bond, if not drawn upon, will
be returned after a defects liability period as determined by the Officer.
11.8.3 Concrete Surfaces
Reinstate cast in situ concrete surfaces to the requirements of the Officer as detailed or specified.
Finish to the same surface texture, colour and shape as the existing/adjoining concrete work.
11.8.4 Paved Surfaces
Reinstatement works are to be carried out to the requirements and standard current practice for the
paving material. Finish to the same surface texture, colour and laying patterns as the
existing/adjoining work.
11.8.5 Pavements and Asphalt Surfacing
Reinstatement works are to be carried out in accordance with the provisions of fine crushed rock
pavements and Asphalt Surfacing as specified in the Technical Specification. A 50 mm minimum thick
asphalt layer is to be placed in any asphalt paved or sealed areas.
The Permit Holder is to take whatever measures are necessary (this includes dial before you dig
service) to prove the location of existing services and is wholly responsible for any damage and
reinstatement to the services. This includes existing irrigation systems.
Any connection or disconnection is to be carried out by or under the direct supervision of the
appropriate authority to which appropriate notice will have been given.
The Contractor is to pay all costs and charges to the appropriate authorities for supervision and
materials and for any other purpose as is necessary to carry out the works.
Where deemed by the Officer, all works are to be supervised by an appropriately qualified
Superintendent. The degree of supervision will be agreed upon at the Pre-start Meeting and will be
dependent upon the contract entered into between the Contractor with the Developer and/or Other
Authority, the degree of Quality Assurance supporting the Superintendent and/or the Contractor,
Public Risk and the Conditions of the Permit.
The Permit Holder is to be responsible for ensuring that the provisions of the following and any other
relevant clauses contained in the Guidelines are complied with and is to submit to the Officer any
proposals for traffic movements, temporary structures, clearing, cleaning up (including burning off),
erosion and sediment control, demolition and the like for approval prior to the commencement of
works.
December 2013
Cardno (NT) Pty Ltd 70
Subdivisional Guidelines – Central Desert Regional Council
Section 11 – Construction General
Conditions
11.9 Traffic Control and Pedestrians
A Traffic Control Plan is to be submitted at or prior to the Pre-start Meeting detailing proposed
temporary road closures, detours and control arrangements, including afterhours control, road
maintenance and provision of access to and notification of residents. Only experienced traffic
controllers are to be used.
Supply, erect and maintain necessary warning devices.
The Contractor is to liaise with owners of adjacent properties and ensure access is provided and
maintained at all times.
Any road closures and significant detours are to be advertised in the Katherine Times newspaper and
by other means so required by the Officer 14 days prior to the proposed closure /detour.
All temporary traffic detours or deviations in high traffic areas shall have a sealed surface and the
public adequately notified to the satisfaction of the Officer prior to instigation.
Temporary pedestrian detours shall conform to Anti-Discrimination Act requirements.
The Consultant/Contractor shall inform the Officer immediately if there is an incident or issue involving
a member of the public.
11.10 Landscaping Works
All landscaping works shall be carried out in accordance with the Technical Specifications, Approved
Drawings and Standard Drawings. Maintenance of all new plantings shall continue until such time as
Off Maintenance is declared for the Development.
11.10.1 Vegetation Plan
The "Vegetation Plan" if submitted and endorsed by the Officer must be adhered to in respect to
whether a tree is to be removed or retained.
For the retention of trees (including those under the control of Significant Tree Register), the following
measures are to be undertaken by the applicant:
The tree is to be physically protected by the fencing off of the tree canopy and root zones using 1.8
metre high star picketing/chain wire before the commencement of any demolition or construction
works. The fencing shall be located along the Tree Protection Zone and shall remain in place until all
works are completed.
Within this zone there is to be no storage of materials or machinery or site office/sheds, nor is cement
to be mixed or chemicals spilt/disposed of in the area, soil levels altered or excavations undertaken,
or stockpiling of soil or rubble. Any works required within this zone shall be under the direction of a
suitably qualified Arborist, and to the satisfaction of the Officer.
Prior to demolition or construction, the applicant shall contact the Officer for a site inspection to
confirm the accuracy of Tree Protection Zones required for those trees to be retained.
Approved works to be carried out within the drip line (canopy area) of vegetation, should be kept to an
absolute minimum (including the storage of equipment, machinery, or driving of vehicles and plant
equipment in the vicinity of the vegetation) using excavation techniques that will preserve the root
system of the plant. Where the root system has to be cut, a method of cutting the root, while not
disturbing the rest of the root system, shall be employed.
December 2013
Cardno (NT) Pty Ltd 71
Subdivisional Guidelines – Central Desert Regional Council
Section 11 – Construction General
Conditions
All work requiring root pruning of vegetation to be retained is to be performed by qualified Arborist.
Roots with diameter greater than 50mm are to be clean cut with hand saw outside of excavation zone.
11.10.2 Trees, Shrubs and Ground Covers
The Developer is to supply all plants from an accredited nursery under NIAA guidelines.
They are to be available locally in sufficient quantities for installation and maintenance replacement,
and in a healthy and vibrant state prior to commencement of work.
Trees, shrubs and ground covers used in Developments, shall be a minimum of three months in their
container, have sturdy and well hardened trunks/stems, a vigorous and well developed root system
and have been maintained by early training/pruning to aid sound structural development.
Trees with a single central leader will only be accepted. The only exception will be where specific
species do not exhibit this characteristic at any stage of their development. The planting stock must
be inspected by the Officer prior to installation.
All plants are to be healthy and free from insect pests, plant diseases, sunscalds or other
disfigurements. Any diseased or dying plants are to be removed immediately and replaced at the
Contractor’s expense.
The location of street trees/shrubs is to be accurately set out in accordance with the approved
drawings and the alignment and depth of all services confirmed prior to the excavation of holes for
planting.
Planting pits, root directional guides and bollards are to be constructed in accordance with the
Standard Drawings and Development Technical Specifications.
11.10.3 Turfing
All verges and parklands shall be finished with 150mm minimum topsoil after aerating with VertiDrain
or similar.
Turf to be established by rolls (sod), plugs (if approved by the Officer), or seed.
All forms of traffic are to be excluded from the area established with turf by effective barrier until
establishment, (to the satisfaction of the Officer). Complete and thorough watering is to follow
establishment of grass to ensure correct settling of soil fines.
The establishment and maintenance of turf shall be in accordance with the Development Technical
Specification.
11.10.4 Irrigation
Irrigation where required is to be designed and constructed by Certified Irrigation Designers.
Permanent and temporary irrigation works are required for street trees and grassing and these are to
be located clear of other services and works in the road reserve.
December 2013
Cardno (NT) Pty Ltd 72
Subdivisional Guidelines – Central Desert Regional Council
Section 11 – Construction General
Conditions
December 2013
Cardno (NT) Pty Ltd 73
Subdivisional Guidelines – Central Desert Regional Council
Section 12 - References
12 REFERENCES
Alderson, A 2006, The collection and discharge of stormwater from the road infrastructure, ARRB Group Ltd, Vermont South VIC.
Australian Building Codes Board, Building Code of Australia 2011, Australian Building Codes Board,
Camberra.
Australian Government 2011, Disability Discrimination Act 1992, Office of Legislative Drafting and Publishing, Canberra.
Australian Model Code for Residential Development (AMCORD) 1995, Book 1 AMCORD: A national resource document for residentialdevelopment, Creation Corporation Pty Ltd, Florey ACT.
Austroads, Design Vehicles andTurning Path Templates
Austroads 2009, Guide to Traffic Management – Part 1: Introduction to Traffic Management, AP-
AGTM01/09, Austroads, Sydney NSW.
Austroads 2008, Guide to Traffic Management – Part 2: Traffic Theory, AP-AGTM02/08, Austroads, Sydney NSW.
Austroads 2009, Guide to Traffic Management – Part 3: Traffic Studies and Analysis, AP-AGTM03/09,
Austroads, Sydney NSW.
Austroads 2009, Guide to Traffic Management – Part 4: Network Management, AP-AGTM04/09,
Austroads, Sydney NSW.
Austroads 2008, Guide to Traffic Management – Part 5: Road Management, AP-AGTM05/08,
Austroads, Sydney NSW.
Austroads 2007, Guide to Traffic Management – Part 6: Intersections, Interchanges and Crossings,
AP-AGTM06/07, Austroads, Sydney NSW.
Austroads 2009, Guide to Traffic Management – Part 7: Traffic Management in Activity Centres, AP-
AGTM07/09, Austroads, Sydney NSW.
Austroads 2008, Guide to Traffic Management – Part 8: Local Area Traffic Management, AP-
AGTM08/08, Austroads, Sydney NSW.
Austroads 2009, Guide to Traffic Management – Part 9: Traffic Operations, AP-AGTM09/09,
Austroads, Sydney NSW.
Austroads 2009, Guide to Traffic Management – Part 10: Traffic Control and Communtication
Devices, AP-AGTM10/09, Austroads, Sydney NSW.
Austroads 2008, Guide to Traffic Management – Part 11: Parking, AP-AGTM11/08, Austroads,
Sydney NSW.
Austroads 2009, Guide to Traffic Management – Part 12: Traffic Impacts of Development, AP-
AGTM12/09, Austroads, Sydney NSW.
Austroads 2009, Guide to Traffic Management – Part 13: Road Environment Safety, AP-AGTM13/09,
Austroads, Sydney NSW.
December 2013
Cardno (NT) Pty Ltd 74
Subdivisional Guidelines – Central Desert Regional Council
Section 12 - References
Austroads 2009, Guide to Road Design – Part 1: Introduction to Road Design, AP-AGRD01/09,
Austroads, Sydney NSW.
Austroads 2006, Guide to Road Design – Part 2: Design Considerations, AP-AGRD02/06, Austroads,
Sydney NSW.
Austroads 2009, Guide to Road Design – Part 3: Geometric Design, AP-AGRD03/09, Austroads,
Sydney NSW.
Austroads 2009, Guide to Road Design – Part 4: Intersection and Crossings General, AP-
AGRD04/09, Austroads, Sydney NSW.
Austroads 2009, Guide to Road Design – Part 4A: Unsignallised and Signallised Intersections, AP-
AGRD04A/09, Austroads, Sydney NSW.
Austroads 2009, Guide to Road Design – Part 4B: Roundabouts, AP-AGRD04B/09, Austroads,
Sydney NSW.
Austroads 2009, Guide to Road Design – Part 4C: Interchanges, AP-AGRD04C/09, Austroads,
Sydney NSW.
Austroads 2008, Guide to Road Design – Part 5: Drainage Design, AP-AGRD05/08, Austroads,
Sydney NSW.
Austroads 2009, Guide to Road Design – Part 6: Roadside Design, Safety and Barriers, AP-
AGRD06/09, Austroads, Sydney NSW.
Austroads 2009, Guide to Road Design – Part 6A: Pedestrian and Cyclist Paths, AP-AGRD06A/09,
Austroads, Sydney NSW.
Austroads 2009, Guide to Road Design – Part 6B: Roadside Environment, AP-AGRD06B/09,
Austroads, Sydney NSW.
Austroads 2008, Guide to Road Design – Part 7: Geotechnical Investigation and Design, AP-
AGRD07/08, Austroads, Sydney NSW.
Austroads 2009, Guide to Road Design – Part 8: Process and Documentation, AP-AGRD08/09,
Austroads, Sydney NSW.
Austroads 2009, Guide to Pavement Technology – Part 1: Introduction to Pavement Technology, AP-
AGPT01/09, Austroads, Sydney NSW.
Austroads 2010, Guide to Pavement Technology – Part 2: Pavement Structure Design, AP-
AGPT02/10, Austroads, Sydney NSW.
Austroads 2009, Guide to Pavement Technology – Part 3: Pavement Surfacings, AP-AGPT03/09,
Austroads, Sydney NSW.
Austroads 2007, Guide to Pavement Technology – Part 4: Pavement Materials, AP-AGPT04/07,
Austroads, Sydney NSW.
Austroads 2008, Guide to Pavement Technology – Part 4A: Granular Base and Sub Base Materials,
AP-AGPT04A/08, Austroads, Sydney NSW.
December 2013
Cardno (NT) Pty Ltd 75
Subdivisional Guidelines – Central Desert Regional Council
Section 12 - References
Austroads 2007, Guide to Pavement Technology – Part 4B: Asphalt, AP-AGPT04B/07, Austroads,
Sydney NSW.
Austroads 2009, Guide to Pavement Technology – Part 4C: Materails for Concrete Road Pavements,
AP-AGPT04C/09, Austroads, Sydney NSW.
Austroads 2006, Guide to Pavement Technology – Part 4D: Stabilised Materials, AP-AGPT04D/06,
Austroads, Sydney NSW.
Austroads 2009, Guide to Pavement Technology – Part 4E: Recycled Materials, AP-AGPT04E/09,
Austroads, Sydney NSW.
Austroads 2008, Guide to Pavement Technology – Part 4F: Bituminous Binders, AP-AGPT04F/08,
Austroads, Sydney NSW.
Austroads 2009, Guide to Pavement Technology – Part 4G: Geotextiles and Geogrids, AP-
AGPT04G/09, Austroads, Sydney NSW.
Austroads 2008, Guide to Pavement Technology – Part 4H: Test methods, AP-AGPT04H/08,
Austroads, Sydney NSW.
Austroads 2009, Guide to Pavement Technology – Part 4I: Earthworks Materials, AP-AGPT04I/09,
Austroads, Sydney NSW.
Austroads 2008, Guide to Pavement Technology – Part 4J: Agregate and Source Rock, AP-
AGPT04J/08, Austroads, Sydney NSW.
Austroads 2009, Guide to Pavement Technology – Part 4K: Seals, AP-AGPT04K/09, Austroads,
Sydney NSW.
Austroads 2009, Guide to Pavement Technology – Part 4L: Stabilising Binders, AP-AGPT04L/09,
Austroads, Sydney NSW.
Austroads 2009, Guide to Pavement Technology – Part 5: Pavement Evaluation and Treatment
Design, AP-AGPT05/09, Austroads, Sydney NSW.
Austroads 2009, Guide to Pavement Technology – Part 6: Unsealed Pavements, AP-AGPT06/09,
Austroads, Sydney NSW.
Austroads 2009, Guide to Pavement Technology – Part 7: Pavement Maintenance, AP-AGPT07/09,
Austroads, Sydney NSW.
Austroads 2009, Guide to Pavement Technology – Part 8: Pavement Construction, AP-AGPT08/09,
Austroads, Sydney NSW.
Austroads 2008, Guide to Pavement Technology – Part 9: Pavement Work Practices, AP-
AGPT09/08, Austroads, Sydney NSW.
Austroads 2009, Guide to Pavement Technology – Part 10: Sub-Surface Drainage, AP-AGPT10/09,
Austroads, Sydney NSW.
Australian Rainfall and Runnoff 2001, Book 1 Introduction, The Institue of Engineers, Barton ACT
December 2013
Cardno (NT) Pty Ltd 76
Subdivisional Guidelines – Central Desert Regional Council
Section 12 - References
Australian Rainfall and Runnoff 2001, Book 2 Design rainfall considerations, The Institue of
Engineers, Barton ACT
Australian Rainfall and Runnoff 2001, Book 3 Choice of flood estimation methods and design
standards, The Institue of Engineers, Barton ACT
Australian Rainfall and Runnoff 2001, Book 4 Estimation of design peak discharge, The Institue of
Engineers, Barton ACT
Australian Rainfall and Runnoff 2001, Book 5 Estimationof design flood hydrographs, The Institue of
Engineers, Barton ACT
Australian Rainfall and Runnoff 2001, Book 6 Estimatinoo of large to extreme floods, The Institue of
Engineers, Barton ACT
Australian Rainfall and Runnoff 2001, Book 7 Aspects of hydraulic calculation, The Institue of
Engineers, Barton ACT
Australian Rainfall and Runnoff 2001, Book 8 Urban stormwater management, The Institue of
Engineers, Barton ACT
Department of Construction and Infrastructure 2010, CADD Drawing & Data Systems Information,
Northern Territory Government, Darwin, NT.
Department of Construction and Infrastructure 2007, CADD Manual Version 1.3, Northern Territory
Government, Darwin, NT.
Department of Construction and Infrastructure, Digital Ground Survey – Road Projects Construction
Division, Northern Territory Government, Darwin, NT.
Department of Construction and Infrastructure 2011, Roadworks Schedule of rates (Technical
Specification), Northern Territory Government, Darwin NT.
Department of Environment and Climate Change NSW 2008. Managing Urban Stormwater: Volumes
1 and 2, Department of Environment and Climate Change NSW, Sydney NSW.
Department of Infrastructure, Planning and Environment: Road Projects Division 2003, Materials
Testing Manual, Northern Territort Government, Palmerston, NT.
Department of Lands and Planning 2011, NT Traffic Act, Northern Territort Government, NT Australia.
Department of Lands and Planning 2011, NT Traffic Regulations, Northern Territory Governemmt, NT
Australia.
Institute of Public Works Engineering 2011, Australia Asset Management for Small, Rural or Remote
Communities, Institute of Public Works Engineering 2011, Sydney NSW.
Natural Resources, Environment, The Arts and Sport 2011, Erosions and Sediment Control,
Available: http://www.nretas.nt.gov.au/national-resource-management/soil/management/technotes,
[Accessed 12 January 2012].
Northern Territory Lands Group 2011, Northern Terrirtory Planning Scheme, Nothern Territory
Government, Darwin, NT.
December 2013
Cardno (NT) Pty Ltd 77
Subdivisional Guidelines – Central Desert Regional Council
Section 12 - References
Northern Territory Lands Group 2011, Water Sensitive Urban Design (WSUD): Stratergy for Darwin
Harbour, Nothern Territory Government, Darwin, NT.
Northern territory Government 2011, Anti-Discrimination Act, Northern Territory Government, Darwin,
NT.
Northern territory Government 1995, Anti-Discrimination Regulations, Northern Territory Government,
Darwin, NT.
Northern territory Government 2008, Disability Services Act, Northern Territory Government, Darwin,
NT.
Northern territory Government 2011, Local Government Act, Northern Territory Government, Darwin,
NT.
Northern territory Government 2009, Planning Act, Northern Territory Government, Darwin, NT.
Northern territory Government 2011, Planning Regulations, Northern Territory Government, Darwin,
NT.
Northern territory Government 2011, Work Place Safety and Health Act, Northern Territory
Government, Darwin, NT.
Northern territory Government 2011, Work Place Safety and Health Regulations, Northern Territory
Government, Darwin, NT.
Nursery Industry Accreditation Scheme Australia (NIASA) 2005, Best Management Practice
Guidelines - 3rd Edition, Nursing and Gardening Industy Australia.
Transport: Roads and Maratime Services 2011, NSW t239: Test Methods Volume 1, NWS
Goverments, NSW.
Power and Water Corporation – www.powerwater.com.au
Standards Australia
AS 1141-1974, Methods for sampling and testing aggregates.
AS 1289-2000, Methods of testing soils for engineering purposes.
AS 1289.5.8.1-2007, Methods of testing soils for engineering purposes - Soil compaction and density
tests - Determination of field density and field moisture content of a soil using a nuclear surface
moisture–Density gauge - Direct transmission mode.
AS 1428.1-2009, Design for access and mobility - General requirements for access - New building
work.
AS 1428.2-1992, Design for access and mobility - Enhanced and additional requirements - Buildings
and facilities.
AS1597-2010, Precast reinforced concrete box culverts.
AS 1742.1-2003, Manual of uniform traffic control devices - General introduction and index of signs.
Subdivisional Guidelines – Central Desert Regional Council
Section 12 - References
December 2013 Cardno (NT) Pty Ltd
AS 1742.2-2009, Manual of uniform traffic control devices - Traffic control devices for general
use. AS2890.1-2004, Parking facilities - Off-street car parking
AS2890.2-2002, Parking facilities - Off-street commercial vehicle facilities
AS3500.2-2003, Plumbing and drainage - Sanitary plumbing and drainage
AS 3798-2007, Guidelines on earthworks for commercial and residential developments
WSA 05-2008, Conduit Inspection Reporting Code of AustraliaA
ANNEX A
Annex A
Site Analysis
Subdivisional Guidelines – Central Desert Regional Council
December 2013 Cardno (NT) Pty Ltd
Q
' ' ' ....... 0
I \
-
I
-
-
Subdivisional Guidelines – Central Desert Regional Council ANNEX A
SITE ANALYSIS PLAN
creek valley leading to hilltop
rural land interface issues (e.g. dust, spray drift,
existing dwelling
and driveway
..... ' '"'"
odours, noise,fencing)
\
''' ' .
I I existing trees
1 along fenceline / I
' ' '
rural residential area
... I
I I
I I I
\
ignific)n reesJk' ,.._ ...._ ..._ ..._ _
existing school --
\
/
0" ' ' '-
' '
........ -
I existing heritage listed /
building to be retained
ews to valley ......_ -....
poor sight-lines due
to bend in road and existing vegetation
existing large lot housing
address street
December 2013 Cardno (NT) Pty Ltd
Subdivisional Guidelines – Central Desert Regional Council ANNEX A
Prepared for LGANT
CHECKLIST
Site Information � Contours and geotechnical conditions where relevant (e.g. contaminated soils, filled
areas, rocky outcrops).
� Existing drainage, creek lines, wetlands, groundwater soaks, services and easements.
� Existing vegetation including the location of significant trees and remnant vegetation.
� Buildings including any that could be retained or that may be heritage listed.
� Views to and from the site.
� Access and connection points.
� Orientation, microclimate and noise or other pollution sources.
� Fencing and boundary locations.
Surrounding Context � Location and use of adjacent and nearby buildings and sites.
� The nature of adjacent land uses (e.g. industry, primary production, schools, community facilities, centres).
� Views and solar access enjoyed by adjacent residents.
� Street reserve features such as services poles, street trees, kerb crossovers, bus stops, other services.
� Built form and character of adjacent and nearby development, including character housing, fencing, garden styles.
� Direction to and distances from local shops, schools, public transport stops, public open space and other community facilities.
� Relationships to existing public open space and opportunities for integration including possible linkages with existing walking and cycling paths.
� Up-stream and down-stream stormwater management considerations.
� Significant vegetation on adjacent properties.
� Differences in levels between the site and adjacent land.
� Likely long term development outcomes for adjacent land (e.g. retained as primary production or earmarked for urban development).
� Proposals for traffic management in the adjacent streets.
� Potential for connections to existing movement networks (e.g. roads, off-road paths).
Subdivisional Guidelines – Central Desert Regional Council ANNEX B04
CENTRAL DESERT REGIONAL COUNCIL
SUBDIVISION DESIGN STANDARDS
December 2013 Cardno (NT) Pty Ltd
Subdivisional Guidelines – NT Local Government ANNEX B04 Prepared for LGANT
Central Desert Shire Council
1 ROADS AND PATHWAYS This section sets out the minimum standards required Central Desert Shire Council for the Planning, Design and Construction of roads and pathways in residential, rural residential, rural and industrial subdivisions. It defines the road hierarchy and classification of road types for planning the layout of a subdivision, sets the standard road cross sections and details the design requirements for both road geometry and road structure.
1.1 Road Hierarchy The main road and pathway network is generally defined and fixed in relation to any proposed works. Developers must match into this network, forming their development and pattern of land use to be an integral part of the total network.
1.1.1 Residential Roads
1.1.1.1 Minor Roads No specific requirements. See Section 5 for general comments.
1.1.1.2 Collector Roads No specific requirements. See Section 5 for general comments.
1.1.1.3 Arterial Roads No specific requirements. See Section 5 for general comments.
1.1.2 Industrial Roads
Industrial Roads should include Local Access Roads and Collectors Road. Cul-de-sac should be avoided where possible.
1.1.2.1 Local Access Road No specific requirements. See Section 5 for general comments.
1.1.2.2 Cul-de-sac No specific requirements. See Section 5 for general comments.
1.1.2.3 Collector Road No specific requirements. See Section 5 for general comments.
1.1.3 Rural / Rural Residential Roads
1.1.3.1 Rural Limited Access No specific requirements. See Section 5 for general comments.
1.1.3.2 Rural Access No specific requirements. See Section 5 for general comments.
1.1.3.3 Rural Collector No specific requirements. See Section 5 for general comments.
1.1.3.4 Rural Link No specific requirements. See Section 5 for general comments.
December 2013 Cardno (NT) Pty Ltd
Cul-de-sac
Local Secondary Collector
Primary Collector
Arterial
Maximum desirable operating speed km/h
50
50
60
60
As advised
Local
Collector
Maximum desirable operating speed km/h
50
60
Cul-de-sac
Local Secondary Collector
Primary Collector
Arterial
Maximum desirable operating speed km/h
50
50
60
60
As advised
Subdivisional Guidelines – NT Local Government ANNEX B04 Prepared for LGANT
Central Desert Shire Council
1.1.4 Matching to Existing Networks
No specific requirements. See Section 5 for general comments.
1.1.5 Creating Sustainability with Road Network
No specific requirements. See Section 5 for general comments.
1.2 Traffic Management
1.2.1 Desirable Speed Environment
The design of roads within the subdivision development shall conform to the following design speed requirements:
Residential Roads
Industrial Roads
Rural / Rural Residential Roads
1.2.2 Parking to be Provided
No specific requirements. See Section 5 for general comments.
1.2.3 School Sites
No specific requirements. See Section 5 for general comments.
1.2.4 Public Transport Routes and Stops
No specific requirements. See Section 5 for general comments.
1.2.5 On Road Bicycle Lanes
No specific requirements. See Section 5 for general comments.
1.3 Traffic Control Devices
1.3.1 Linemarking and Signage
No specific requirements. See Section 5 for general comments.
December 2013 Cardno (NT) Pty Ltd
Subdivisional Guidelines – NT Local Government Prepared for LGANT
ANNEX B04
Central Desert Shire Council
December 2013 Cardno (NT) Pty Ltd
Road Classification Residential design
loading (E.S.A) Industrial design loading (E.S.A)
Average Annual DailyTraffic (AADT)
Distributor 1.0 x 106 5.0 x 106
>3000
Collector 5.0 x 105 2.0 x 106
1000-3000
Minor - Local Access 5.0 x 104 8.0 x 105
150-1000
Minor – Cul-de-sac 8.0 x 106 6.0 x 105
<150
1.3.2 Street Name Signs
No specific requirements. See Section 5 for general comments.
1.3.3 Naming of Streets
No specific requirements. See Section 5 for general comments.
1.4 Road Pavement and Surface Design Notwithstanding anything stated in the design standards, guides or recommendations in the report(s), the minimum design life for a pavement is 30 years.
Minimum Design Pavement Thickness and Make-up
Pavement Course
Compacted Thickness
CompactionMMDD
Pavement
Material
Compaction
MMDD
Subgrade 150mm min 95% In Situ 95%
Sub-base - 98% Type 2 Natural Gravel 98%
Base courses 150mm min 100% Type 2 Natural Gravel 100%
Wearing surfaces
N/A
- Single coat seal – 20
mm aggregate.
-
1.4.1 Design Loadings
The minimum requirements for design loading and wearing course are tabulated below for various road classifications.
The road classifications are further defined in terms of the anticipated Average Annual Daily Traffic (AADT) as follows.
Formatted Table
The design loadings provided in the above table are a minimum requirement for design.
Council will consider alternative pavements such as Concrete Segmental Pavements and Rigid Pavements.
The Consultant is to prepare detailed designs for all pavements in accordance with current versions of relevant guides, standards or manuals as necessary.
Cul-de-sac Local Collector Arterial
Local
No
No
Yes
Yes
Collector
No
Yes
Yes
Yes
Residential Industrial
Local Collector Arterial All Roads
Local
SU
SU
SU
SA
Collector SU SA SA LSA
Industrial All Roads SA LSA LSA LSA
Subdivisional Guidelines – NT Local Government ANNEX B04 Prepared for LGANT
Central Desert Shire Council
1.4.2 Special Treatments
No specific requirements. See Section 5 for general comments.
1.5 Road Geometry
1.5.1 Intersections
1.5.1.1 Channelised Intersections Intersections, except those being treated with roundabouts or signals are to be channelled (minimum 3000mm wide line marking) as follows:
1.5.1.2 Intersection Turning Criteria Including Roundabouts Intersections are to be designed for the movement of Austroads Design Vehicles as follows:
SA denotes an Austroads design 19m single articulated truck with a turning path radius of 12.5m.
SU denotes an Austroads design 12.5m single unit truck with a turning path radius of 12.5m.
LSA denotes an Austroads design 25m long single articulated truck with a turning path radius of 15m.
The Officer reserves the right to nominate other design vehicles (such as buses and heavy vehicles) to be catered for especially in the case of arterial and industrial roads.
December 2013 Cardno (NT) Pty Ltd
Residential, Rural and Rural Residential Industrial
Local Collectors / Arterials
All Roads
Desirable Maximum %
10
8
6
Absolute Maximum %
12
10
8
Desirable Minimum %
1.00
1.00
1.00
Straight alignment down to 60m radius bends
0.50
0.50
0.50 Absolute Minimum % All kerb returns and kerbs in the cul-
de-sac head
0.75
0.75
0.75
Residential, Rural and Rural Residential Industrial
Deflection Angle Degrees
Local
Collector
Local
Collector
75 or greater
20
60
60
100
60
35
70
70
110
40
65
80
80
120
30
75
100
100
130
20 or less
100
120
120
150
Subdivisional Guidelines – NT Local Government ANNEX B04 Prepared for LGANT
Central Desert Shire Council
1.5.2 Gradients and Radii
General Maximum and Minimum Longitudinal Grades
The absolute maximum grades will be approved only in special cases and must be addressed in the design report.
1.5.3 Horizontal Curves on Road Alignment
Minimum horizontal curve radii for roads alignments shall be as follows:
December 2013 Cardno (NT) Pty Ltd
Subdivisional Guidelines – NT Local Government Prepared for LGANT
ANNEX B04
Central Desert Shire Council
1.5.4 Vertical Curves
Minimum vertical curve lengths (m)
Residential, Rural and Rural Residential Industrial
Local
Collector
Arterial
All Roads
Minimum VC length (m) to be
applied at intersection approaches or special drainage points
20
25
30
25
Minimum Radii for Intersection Kerb Returns and Turning in Culs de Sac
Residential, Rural and Rural Residential Industrial
Residential, Rural
Cul-de-sac
Local Collector Arterial All Roads
and Rural Residential
Cul-de-sac & Local 7.5 m 7.5 m 7.5 m
Collector 7.5 m 15 m As advised
7.5 m
15 m
Industrial All Roads 7.5 m 15 m As advised 15 m
1.5.5 Cul-de-sac End Radius
1.5.5.1 Cross-section without kerb
Rural and Rural Residential Roads
Cul-de-sac 9 m radius
Industrial Roads
Cul-de-sac 13.5 m radius
Verge Width
Cul-de-sac 12.0 m minimum
1.5.5.2 Cross-section with kerb
The minimum acceptable radius for circular turning are as at the Cul-de-sac head is as follows:
Residential Roads 8.5m radius Industrial Roads 13.5m radius (or such radius to cater for the Design Vehicle) The verge reserved for the location of services shall not be less than 4.5 metres at any
location.
1.6 Typical Cross Sections All road design must be developed for tropical rural living with the objectives of accommodating roads and verges, services, pedestrian access and bus stops / services. Road reserve widths may be increased to accommodate all items.
Subdivisional Guidelines – NT Local Government Prepared for LGANT
ANNEX B04
Central Desert Shire Council
Local Road
10.0 10.0
(8.0 m seal)
30.0
Collector Road 10.0 10.0
(9.0 m seal) 30.0
1.6.1 Road Widths
1.6.1.1 Cross-section without kerb The minimum road, verge and reserve widths required are;
Verge
Carriageway
Road Reserve
Cul-de-sac and Local Roads
10.0
10.0
(8.0 m seal)
30.0
Collector
10.0 10.0
(9.0 m seal)
30.0
Distributor (single lane) / Arterial
As advised by Council
Distributor (dual lane central median 4.0m min width) / Arterial
As advised by Council
Industrial Roads
Formatted Table
1.6.1.2 Cross-section with kerb The minimum cross-section details depend upon a number of criteria including the location of footpaths, services and the provision of access. Typically road and road reserve widths are as follows:
Residential Cul-de-sac
Residential Local
Residential Collector
Industrial Local
Industrial Collector
Verge width 4.5 4.5 4.5 4.5 4.5
Carriageway width
6.0
6.0
11.0
11.0
13.0
Verge width 4.5 4.5 4.5 4.5 4.5
Exceptions to the above criteria can only be granted by the Officer.
1.6.2 Pavement Cross Fall
Nominal 3% for sealed roads.
Nominal 4% for unsealed roads and shoulders.
Subdivisional Guidelines – NT Local Government ANNEX B04 Prepared for LGANT
Central Desert Shire Council
1.6.3 Verges
Minimum standards include;
A minimum of 10.0m verge width between the carriageway and property boundary 2% to 8% grade falling to the road including compliance with minimum access standards All services to be located as per the Standard Drawings Verges to be designed for easy maintenance Bus stop design and location to be considered Services, driveways, road infrastructure, landscaping and footpaths to be considered Cut and fill batters may be extended into allotments where the design cross section cannot be
contained within the road reserve. In these cases the batter slope should not exceed 1 in 6 unless in special cases, geotechnical testing indicates that steeper slopes are sustainable and maintainable.
In all cases the maximum grade for vehicular access from the property line to within the allotment is to be 1 in 6.
1.6.4 Lot Truncation
1.6.4.1 Residential The minimum truncation is 2m by 2m, but may be increased to allow for intersection sight distances, verge width and path installation.
1.6.4.2 Rural and Rural Residential The minimum truncation is 10m by 10m, but may be increased to allow for intersection sight distances, verge width and path installation.
3 chord truncations for Arterial Roads.
1.6.5 Conduits
No specific requirements. See Section 5 for general comments.
1.6.6 Traffic Islands and Roundabouts
No specific requirements. See Section 5 for general comments.
1.7 Kerbs
1.7.1.1 Residential Kerb profiles shall be in accordance with the City of Darwin Standard Drawings.
1.7.1.2 Rural and Rural Residential Slotted kerb to be provided at intersections as per City of Darwin Standard Drawings.
December 2013 Cardno (NT) Pty Ltd
Subdivisional Guidelines – NT Local Government ANNEX B04 Prepared for LGANT
Central Desert Shire Council
1.8 Driveways
1.8.1.1 Residential Access must be provided to every part of the Development. All verges, whether they contain a constructed footpath or not, are to be provided with access.
Driveways shall be constructed as per the Standard Drawings and in accordance with Council’s Driveway Policy.
The Officer will determine the acceptable location or relocation fall driveways in accordance with the following criteria:
All R1 zoned allotments (including duplex allotments) shall have one 3.0 metre wide driveway access to the roadway.
All R2, R3 and R4 allotments shall have one 6.0 metre wide driveway access to the roadway. Two driveway accesses may be considered by the officer based of safety, traffic management and serviceability issues. Entry only and exit only driveways may also be considered by the Officer based on safety, traffic management and serviceability issues.
All Commercial and Industrial allotments shall have one 6.0 metre wide driveway access to the roadway. Wider driveways may be considered where serviceability of an acceptable design vehicle is an issue. Two driveway accesses may be considered based on safety, traffic management and serviceability issues. Entry only and Exit only driveways may also be considered based on safety, traffic.
Where allotments abut or front onto more than one roadway, then Council prefers that the driveway(s) shall access the roadway with the lower road hierarchy status. I.e. if the allotment abuts a Collector Road and a Local Road then driveway access be to the Local Road.
The location of the driveway shall be at least 15 meters from any intersecting roadway.
The driveway shall meet Austroads sight distance criteria for both entry and exit.
Where practical, driveways shall be located such to have minimal impact to on-road parking.
Under certain circumstances Council may require deceleration or turning lanes to the allotment or the elimination of certain turning movements based on safety and traffic management issues.
1.8.1.2 Rural and Rural Residential The Officer will determine the acceptable location or relocation of all driveways in accordance with the following criteria:
Where allotments abut or front onto more than one roadway, the driveway(s) shall access the
roadway with the lower road hierarchy. The location of the driveway shall be 15 metres from any intersecting roadway. The driveway shall meet Austroad sight distance criteria for both entry and exit. Driveway locations must take into consideration the location of other services including
stormwater infrastructure, streetlights and other service pits that may exist in the verge. Any changes to infrastructure to accommodate driveways are to be approved by and at no cost to Council.
Dual accesses with adjoining properties is acceptable.
December 2013 Cardno (NT) Pty Ltd
Zoning Width Construction Single Dwelling 4.0m 125mm deep, SL72 mesh Dual Properties 8.0m 125mm deep, SL72 mesh Commercial 6.0m 150mm deep, SL82 mesh Industrial 6.0m 150mm deep, SL82 mesh
Subdivisional Guidelines – NT Local Government Prepared for LGANT
ANNEX B04
Central Desert Shire Council
Driveways must be provided by the developer for each property. The table below summarises the minimum requirements. The minimum material is 25MPa plain, broom finished concrete with reinforcing mesh. Where footpaths exist, the material of that section of the driveway must be the same as the footpath.
Formatted Table
Wider driveways and/or or additional driveways may be approved at the Officers discretion.
1.9 Footpaths and Cycle paths Not required unless directed to by Council. In this instance use Annex B05 - City of Darwin Standards. Generally only for residential areas.
1.9.1 Disabled Access Ramps
Not required unless directed to by Council. In this instance use Annex B05 - City of Darwin Standards. Generally only for residential areas.
1.9.2 Cyclist Facilities
No specific requirements. See Section 5 for general comments.
1.10 Walkways / Pedestrian Linkages Not required unless directed to by Council. In this instance use Annex B05 - City of Darwin Standards. Generally only for residential areas.
1.11 Battle Axe Allotments
1.11.1 Urban Areas
Not required unless directed to by Council. In this instance use Annex B05 - City of Darwin Standards.
1.11.2 Rural or Semi-Rural Type Developments
No specific requirements, however their use is discouraged. See Section 5 for general comments.
December 2013 Cardno (NT) Pty Ltd
Subdivisional Guidelines – NT Local Government ANNEX B04 Prepared for LGANT
Central Desert Shire Council
2 STORMWATER DRAINAGE The stormwater drainage design is to be based on a system of sealed roads and table drains supplemented where applicable by a system of flood ways, preferably located in open spaces or drainage reserves isolated from residential or other critical risk areas
To achieve this outcome:
Council will not accept any polluted stormwater run-off into its drainage systems nor will it
allow other forms of pollution or nuisance to be generated to the detriment of the public, Council assets or receiving waterways.
Council will require an Environment Management Plan, relevant to the types of works being proposed prior to the commencement of construction.
Due to the limitations inherent in the Central Deserts climate, all stormwater drainage within the any development must embrace the principles of Water Sensitive Urban Design (WSUD). Developers shall follow the guidelines set out in the Darwin WSUD Strategy (prepared by the NT Government) in its current version.
The drainage system shall be designed to cater for two different storm events, the initial storm and the major storm (usually Q100).
All stormwater runoff generated under the initial storm is to be collected and connected to the open drain system.
The additional stormwater runoff generated below the major storm may be contained within flood ways.
If necessary all of the major storm flow may have to be under-grounded.
2.1 Preliminary Drainage Proposal and Investigation No specific requirements. See Section 5 for general comments.
2.1.1 Flood Management and Control
No specific requirements. See Section 5 for general comments.
2.1.2 Design Criteria
No specific requirements. See Section 5 for general comments.
2.1.3 Easements
The minimum easement width is to be 3.0 m for pipe diameters of 450 mm or less and depths up to 1.5 m.
An increase in easement widths is to be provided for pipe diameters and depths greater than above as advised by the Officer.
Open drains need to be the width of the drain, plus the freeboard allowance, plus a 4.5 metre wide access strip.
Council will not take possession of or accept rear allotment drainage for future care or maintenance nor will it accept responsibility for easements over the drainage.
December 2013 Cardno (NT) Pty Ltd
Catchment Zoning Initial Storm Major Storm
Open Space and Drainage Reserves Industrial, Residential Rural & Rural Residential
2
100
Commercial 10 100
All other Zones - to be confirmed by the Officer 5-10 100
Subdivisional Guidelines – NT Local Government ANNEX B04 Prepared for LGANT
Central Desert Shire Council
2.1.4 Rainfall Intensity and Recurrance Intervals
The design intensity for a calculated time of concentration is to be determined from the Central Desert Design Rainfall Intensity Diagram contained in Australian Rainfall and Run-off. The minimum time of concentration to be used for a fully developed catchment is 5 minutes. The designer is to adopt the following minimum Storm Recurrence Intervals.
2.2 Water Sensitive Design and Erosion & Sediment Control No specific requirements. See Section 5 for general comments.
2.2.1 Sediment and Erosion Control and Stormwater Management
No specific requirements. See Section 5 for general comments.
2.2.2 Water Quality, Gross Pollutant and Litter Traps
No specific requirements. See Section 5 for general comments.
2.2.3 Tidal Action, Surge Levels and Climate Change
Not applicable.
2.3 Allotment Drainage Drainage run-off from SD Residential lots may be discharged (sheet flow) across the lot surface to the main drainage system or by the use of an approved alternate connection.
If it is proposed by the developer that drainage run-off from residential SD lots is to be concentrated (e.g. downpipes to dwellings and other buildings, by a system piped to the Council road reserve or to the rear due to lot falls), then it will not be discharged in that form onto road reserves, public land or over adjacent private property.
This connection is to be constructed at the time of subdivision development.
This includes the control of storm water runoff emanating from within the site and/or from exterior catchments by means of underground drainage and/or open cut-off drains as warranted.
2.3.1 Adjacent Catchments and Drainage Networks
No specific requirements. See Section 5 for general comments.
2.4 Ground Water and Special Drainage Measures Ground water level must be taken into consideration for drainage and all other aspects of sustainable design for the subdivision / development.
2.4.1 Sub Soil Drainage
No specific requirements. See Section 5 for general comments.
December 2013 Cardno (NT) Pty Ltd
Subdivisional Guidelines – NT Local Government ANNEX B04 Prepared for LGANT
Central Desert Shire Council
2.4.2 Open Drains and Open Drainage Structures
No specific requirements. See Section 5 for general comments.
2.4.3 Criteria for Design of Major Open Drains
Not specific requirements. In this instance use Annex B05 - City of Darwin Standards.
2.4.4 Rural Major Open Drains
Roadside open drains in rural and semi rural subdivisions shall be designed to accommodate the 1 in 5 year storm (minimum), with the road reserve and open drains in easements capable of conveying the 1 in 100 year storm.
The maximum concentration time to be used is 10 minutes.
The top water level for the design water flow is to be 300 mm below the level of the road shoulder.
Scour protection will be required at changes of direction, drop structures and at the inlet and outlet to pipe or culvert structures.
2.4.5 Walkway Drainage
Walkway reserves may serve as storm water drainage reserves but must meet the following requirements;
The walkway drainage is to be designed to cater for particular design storm events and must
be such that the drain must not function as an open drain to the extent that it excludes the use as a walkway and endangers pedestrians,
Inverts to centres of walkways are not acceptable.
December 2013 Cardno (NT) Pty Ltd
Initial Storm Major Storm
Local Road
Flow may spread to crown of road for two-way cross fall or road centreline for one-way cross fall or to flush kerbs in dished drains
Flow may spread to road reserve boundary but maximum depth in roadway is not to exceed 400mm nor should D x V exceed 0.45 where D =depth (m) and V =velocity (m/s)
8m Collector Roads
Flow shall not overtop crown of road or kerbs.
Flow may spread to road reserve boundary but maximum depth in roadway is not to exceed 400mm nor should D x V exceed 0.45 where D =depth (m) and V =velocity (m/s)
11m Collector Roads or Arterial Road
Flow shall not overtop kerbs and shall leave at least 3.0m width of roadway free of water.
Flow may spread to road reserve boundary but maximum depth in roadway is not to exceed 400mm nor should D x V exceed 0.45 where D =depth (m) and V =velocity (m/s)
Open Space & Drainage Reserves
Flow to be contained within boundaries and velocities not to exceed scour velocity (1.5 m/sin OUD's)
Subdivisional Guidelines – NT Local Government ANNEX B04 Prepared for LGANT
Central Desert Shire Council
2.4.6 Use of Roads, Open Space and Drainage Reserves for Run-off
2.4.6.1 Residential and Industrial (with Kerb)
Stormwater must be contained within the absolute maximum limits tabulated below for the Initial and Major Storms. In all cases the flow is to be contained totally within the road reserve.
Residential
Industrial
Flow may spread to road reserve
Flow shall not overtop kerbs and boundary but maximum depth in
All Roads shall leave at least 3.0m width of roadway is not to exceed 400mm nor roadway free of water. should D exceed 0.45 where
D =depth (m) and V =velocity (m/s)
December 2013 Cardno (NT) Pty Ltd
Road or space classification
Initial Storm
Major Storm where D = depth (m) and V = velocity (m/s)
Local Road
Subject to Risk Assessment.
Flow may spread to road reserve boundary but maximum depth in roadway is not to exceed 400mm nor should D x V exceed 0.40
Collector Roads or Arterial Road
Subject to Risk Assessment.
Flow may spread to road reserve boundary but maximum depth in roadway is not to exceed 400mm nor should D x V exceed 0.40
Open Space & Drainage Reserves
Subject to Risk Assessment.
Flow to be contained within boundaries and meet all open drainage requirements.
Subject to Risk Assessment.
Walkways
2m of pathway to be maintained at all times. Subject to Risk Assessment.
Flow to be contained within boundaries and meet all walkways drainage requirements. Subject to Risk Assessment.
Industrial Commercial
All Roads
Subject to Risk Assessment.
Flow may spread to road reserve boundary but maximum depth in roadway is not to exceed 400mm nor should D x V exceed 0.40
Subdivisional Guidelines – NT Local Government ANNEX B04 Prepared for LGANT
Central Desert Shire Council
Rural / Rural Residential
2.4.7 Drainage Infrastructure
2.4.7.1 Pipes and Culverts Not required unless directed to by Council. In this instance use Annex B05 - City of Darwin Standards.
2.4.7.2 Pits Not required unless directed to by Council. In this instance use Annex B05 - City of Darwin Standards.
2.4.7.3 Side Entry Pits Not required unless directed to by Council. In this instance use Annex B05 - City of Darwin Standards.
2.4.7.4 Junction Pits / Manholes Not required unless directed to by Council. In this instance use Annex B05 - City of Darwin Standards.
2.4.7.5 Letter Box Pits Not required unless directed to by Council. In this instance use Annex B05 - City of Darwin Standards.
2.4.7.6 Underground (Blind) Pits Not required unless directed to by Council. In this instance use Annex B05 - City of Darwin Standards.
December 2013 Cardno (NT) Pty Ltd
Subdivisional Guidelines – NT Local Government ANNEX B04 Prepared for LGANT
Central Desert Shire Council
2.4.7.7 Bandage Joints Not required unless directed to by Council. In this instance use Annex B05 - City of Darwin Standards.
2.4.8 Intersection Low Points
No specific requirements. See Section 5 for general comments.
December 2013 Cardno (NT) Pty Ltd
Subdivisional Guidelines – NT Local Government ANNEX B04 Prepared for LGANT
Central Desert Shire Council
3 LIGHTING
3.1 Street Lighting Street lighting design in land subdivisions (residential, rural residential, commercial and industrial) is to meet the following criteria:
Intersections, culs-de-sac, traffic calming devices and pedestrian crossings shall be directly
lit. Street lights are to be placed at each end and each bend of a walkway and at appropriate
intervals in between. Lights are to be placed opposite the boundaries of allotments where possible. Light poles shall not conflict with any infrastructure including stormwater pits, pedestrian
crossing points or driveway crossovers. Consideration must be given to minimising the problem of light shining into private properties. Where there is an unacceptable risk of collision with a light pole, consideration is to be given
to the use of frangible slip base poles. Lamps are to be high pressure sodium unless approved otherwise. PE cells are not to be used (refer PWC document NP07 – Capture of Newly Installed Street
Lighting). Lighting category and types to be consistent with adjacent surrounding areas and to
consider/minimise ongoing maintenance requirements and costs. For shared paths, lanterns are to be side entry unless otherwise approved. For roads and car parks and parks, bottom entry lamps are preferred. Bollard style lighting is not acceptable to Council.
Consideration is to be given to complimenting and integrating proposed lighting into the proposed and existing streetscape / landscape works, particularly the location with respect to the mature development of street trees.
3.2 Pathway and Open Space Lighting Intersections and change in direction of paths to be lit to the satisfaction of Council.
A separate “metered” supply is required for Council property, a Power Water Corporation (PWC) metering panel is required.
All open space areas intended to be used or traversed at night should allow appropriate levels of visibility and conform to CPTED.
Lighting should be designed so that it is resistant to vandalism.
All fittings/luminaries, PE switches, poles, rag bolt assemblies/pole footings shall be to the satisfaction of Council and should incorporate the use of energy efficient technologies.
Lighting category and types to conform to Australian Standards.
Alternatives to reticulated power should be considered (e.g. solar, battery etc).
December 2013 Cardno (NT) Pty Ltd
Subdivisional Guidelines – NT Local Government ANNEX B04 Prepared for LGANT
Central Desert Shire Council
4 LANDSCAPING Not required unless directed to by Council. In this instance use Annex B09 -Katherine Town Council.
4.1 Amenity Not required unless directed to by Council. In this instance use Annex B09 -Katherine Town Council.
4.2 Trees and Vegetation Not required unless directed to by Council. In this instance use Annex B09 -Katherine Town Council.
4.2.1 Plant Selection for Roads and Parks
No specific requirements. See Section 5 for general comments.
4.2.2 Turfing
No specific requirements. See Section 5 for general comments.
4.3 Streetscapes Not required unless directed to by Council. In this instance use Annex B09 -Katherine Town Council.
4.4 Parks and Open Spaces
4.4.1 Master Planning of Open Spaces
No specific requirements. See Section 5 for general comments.
4.4.2 Open Space Calculations
In calculating the total area of private open space required, the following applies:
Parks and reserves are to be a minimum of 3000 sq/m in area not including adjacent road reserves. Buffer strips of land that do not provide any usable open space or environmental function must be excluded from the open space calculation;
No more than 20% of the total area of public open space can be allocated for: stormwater management / drainage purposes (e.g. creeks, drainage channels, wetlands, detention basins etc); and/or the retention of remnant vegetation; Any drainage or detention area that does not have a recreation or natural area value all year
round (e.g. concrete lined drains) can not be included as part of the open space area calculation;
In any individual park, no more than 40% of the area can be allocated for stormwater management purposes required for the 1 in 10 year event.
4.4.3 Open Space Linkages
No specific requirements. See Section 5 for general comments.
4.4.4 Open Space Network
Not required unless directed to by Council. In this instance use Annex B09 -Katherine Town Council.
4.4.5 Function and Types of Open Space
Open space can be assigned a functional classification, which reflects its primary use, as follows:
December 2013 Cardno (NT) Pty Ltd
Recreation
Recreation / sport either associated with clubs or for social reasons, as well as informal recreation activities such as picnicking and relaxing.
Physical activity / linkage Walking, cycling and other shared use trails.
Cultural / heritage Sites of special cultural or heritage significance
Water management Sites that incorporate urban water management measures.
Tourism Sites that are tourist destinations in their own right.
Visual amenity / environmental / buffer
Sites that provide visual relief from the urban environment, contain valued natural features (e.g. remnant vegetation, habitat, wetlands) and/or are created to provide a buffer between urban development and incompatible land uses.
Community purpose Sites that contain community facilities such as libraries, neighbourhood or community centres, kindergartens
Combined Sites that include a combination of two or more of the above functions.
Subdivisional Guidelines – NT Local Government ANNEX B04 Prepared for LGANT
Central Desert Shire Council
The functions provide further guidance on the different types of open space and the types of development or facilities that can potentially occur within each, as detailed in the table below.
4.4.6 Typical Facilities for Open Space
Not required unless directed to by Council. In this instance use Annex B05 –City of Darwin Standards.
4.4.7 Playgrounds and Play Equipment/Features
Not required unless directed to by Council. In this instance use Annex B05 –City of Darwin Standards.
4.4.8 Access to Open Spaces (Park) Areas
No specific requirements. See Section 5 for general comments.
4.4.9 Access/Exit for Parks/Reserves
No specific requirements. See Section 5 for general comments.
4.4.10 Planting
No specific requirements. See Section 5 for general comments.
4.4.11 Naming of Parks
No specific requirements. See Section 5 for general comments.
4.5 Street and Park Furniture No specific requirements. Developers are required to liaise with Council in determining appropriate requirements.
December 2013 Cardno (NT) Pty Ltd
Subdivisional Guidelines – NT Local Government ANNEX B04 Prepared for LGANT
Central Desert Shire Council
Seats/Tables
Not required unless directed to by Council. In this instance use Annex B05 –City of Darwin Standards.
Litter Bins
Not required unless directed to by Council. In this instance use Annex B05 –City of Darwin Standards.
Planter Boxes
Not required unless directed to by Council. In this instance use Annex B05 –City of Darwin Standards.
Tree Grates
Not required unless directed to by Council. In this instance use Annex B05 –City of Darwin Standards.
Tree Guards
Not required unless directed to by Council. In this instance use Annex B05 –City of Darwin Standards.
Drinking Fountains
Not required unless directed to by Council. In this instance use Annex B05 –City of Darwin Standards.
Barbecues
Not required unless directed to by Council. In this instance use Annex B05 –City of Darwin Standards.
4.5.1 Public Art
No specific requirements. See Section 5 for general comments.
4.6 Services Infrastructure for Parks and Open Space Not required unless directed to by Council. In this instance use Annex B05 –City of Darwin Standards.
4.7 Landscape Construction Requirements Not required unless directed to by Council. In this instance use Annex B05 –City of Darwin Standards.
4.8 Irrigation for Landscaping Not required unless directed to by Council. In this instance use Annex B05 –City of Darwin Standards.
4.8.1 Monitoring Equipment
Not required unless directed to by Council. In this instance use Annex B05 –City of Darwin Standards.
4.8.2 Water Sources for Irrigation
Not required unless directed to by Council. In this instance use Annex B05 –City of Darwin Standards.
4.8.3 Grass Irrigation for Roads and Verges
Not required unless directed to by Council. In this instance use Annex B05 –City of Darwin Standards.
4.8.4 Inspections and Testing
Not required unless directed to by Council. In this instance use Annex B05 –City of Darwin Standards.
December 2013 Cardno (NT) Pty Ltd
Subdivisional Guidelines – NT Local Government ANNEX B04 Prepared for LGANT
Central Desert Shire Council
5 MISCELLANEOUS
5.1 Waste Bin Infrastructure No specific requirements. See Section 5 for general comments.
5.2 Fencing of Allotments The Developer shall ensure that fencing fosters a sense of community identity and does not lead to alienation of public areas.
5.3 Development and Redevelopment within CBD and single Allotments Not required unless directed to by Council. In this instance use Annex B05 –City of Darwin Standards.
December 2013 Cardno (NT) Pty Ltd
Subdivisional Guidelines – Central Desert Regional Council
ANNEX C04
December 2013 Cardno (NT) Pty Ltd
CENTRAL DESERT REGIONAL COUNCIL
STANDARD DRAWINGS
Subdivisional Guidelines – Central Desert Regional Council
ANNEX C04
December 2013 Cardno (NT) Pty Ltd
Please refer to the following hierarchy of Standard Drawings;
1. Council’s standard drawings,
2. Department of Construction and Infrastructure’s standard drawings,
3. City of Darwin’s standard drawings, or
4. Other standard drawings as directed by Council.
Subdivisional Guidelines – Central Desert Regional Council
ANNEX D04
Standard Forms
Central Desert Regional Council
Please refer to the following hierarchy of Standard Forms;
1. Council’s standard forms,
2. Department of Construction and Infrastructure’s standard forms, or
3. Other forms as directed by Council.
Subdivisional Guidelines – Central Desert Regional Council
ANNEX D04
GUIDELINES AMENDMENT REQUEST FORM
Attention: General Manager Infrastructure Subdivision and Development Guidelines Planning and Design Section Central Desert Shire Council PO Box 2257 Alice Springs NT 0871
CC: Manager Transport and Infrastructure Services Subdivision and Development Guidelines Local Government Association of the Northern Territory PO Box 2017 Parap NT 0804
This form may be reproduced for the purposes of submission of a proposed amendment without breaching copyright.
REQUESTOR’S DETAILS
Name ………………………………………………………………………………………….
Firm ………………………………………………………………………………………….
Address ………………………………………………………………………………………….
………………………………………………………………………………………….
………………………………………………………………………………………….
PROPOSED AMENDMENT DETAILS Please use separate forms for each amendment requested.
Part ………………………………………………………………………………………….
Section …………...…………………………………………………………………….
Details
………………………………………………………………………………………….
………………………………………………………………………………………….
………………………………………………………………………………………….
………………………………………………………………………………………….
Please attach further details if required
Subdivisional Guidelines – Central Desert Regional Council
ANNEX D04
REVIEW
Comments ………………………………………………………………………………………….
………………………………………………………………………………………….
………………………………………………………………………………………….
Approved / Not Approved ……………………………… Date…………………
Returned to Applicant ……………………………… Date…………………
Subdivisional Guidelines – Central Desert Regional Council
ANNEX D04
SUBDIVISION DEVELOPMENT APPLICATION FORM
NEW APPLICATION / VARIATION
DEVELOPMENT …………………………………………………………………
TYPE OF WORKS ………………………………………………………………….
DEVELOPER …………………………………………………………………..
Address ………………………………………………………………….
………………….……………………………………………….
Tel ……………………… Fax …………………………
Email …………………………………………………………………….…………..
CONSULTANT …………………..………………………………………………
Address ……………………………………..……………………………
………………………………………………………...…………
Tel ……………………… Fax ………………………….
Email ……………………………………………………………………….………..
The following Plans and Specifications are submitted herewith for comment / approval together with other information and Development Application items required. See – Civil Design Approval Checklist (below).
Plans Nos (including Amendment Numbers)
...………………………………………………….…
…………………………….………………………...
The design conforms with the requirements of the CDSC Subdivision and Development Guidelines and all items required for the submission are attached.
…………………………… ……………………….. ……………………… Developer’s Consultant Signed Date
ATTACHED
� Development Permit � Civil Drawings � Landscape / Landscape Concept Drawings � Civil Specifications � Landscape Specifications
Subdivisional Guidelines – Central Desert Regional Council
ANNEX D04
� Civil Design Report � Approvals from Other Authorities � Development Application and Design Approval Fees � Estimate of Costs � Drainage Calculations and Plans � Certifications � Any other items required, ie, structural drawings, certifications and computations
Subdivisional Guidelines – Central Desert Regional Council
ANNEX D04
CIVIL DESIGN APPROVAL CHECKLIST
For Internal Council Use as well as Consultant / Developer Use
PROJECT ………………………………………… SUBMISSION – Rev 1, 2, 3, 4, 5
CONSULTANT ……………………………….. DATE SUBMITTED / /
� Initial Design Discussions with Council � Design Submission to Council for Comment / Approval. The following items are to be
submitted:
DOCUMENTS � Proof of Appointment to Act for the Developer � Copy of relevant Agreements and supporting documentation if development is to be
carried out on Crown Land � Copy of current Development Permit(s) � Copy of Permission to Carry out Works on Other’s Land � Executed Development Application Form (together with Application Fee – see below) � Design Plans including Landscape design or Concept Landscape Design � Civil Design Report(s) and Landscape Design Report or Concept Design Statement � Drainage calculations and plans � Pavement design calculations � Geotechnical and Soil Types Report � Proposed Subdivision Plan � Approvals from Other Authorities � Estimate of Cost for Construction of Works � Specification and Standard Drawings for Civil Works � Specification and Details for Stormwater Management and Erosion Control Works � Necessary certifications � Any other items required, ie, Structural drawings and computations, etc. � Copy of appropriate Public Risk Insurance
PLANS �
All plans must be signed as Checked and Approved by the appropriately qualified person. One electronic and two A3 copies are required as a minimum.
� Concept Landscape and Irrigation Drawings if Detail Drawings not finalised � Stormwater Management and Erosion Control Drawings � Structural Drawings if required, ie, retaining walls, fences, footings, etc � Civil Drawings made up as follows:
� Site Works � Services � Roadwork & Drainage & Subsoil Drainage Layout � Roadworks Longitudinal and Corss Sections � Drainage Longitudinal Sections � Intersection, Bends, and Court Details � Typical Sections, General Notes, Locality Plan � Footpath Layout � Any other relevant drawings
Subdivisional Guidelines – Central Desert Regional Council
ANNEX D04
PAYMENTS � Design Approval Fee as per Council Fees and Charges) � Development Application Fee (together with executed Application Form)
CHECKED ……………………………… DATE CHECKED / /
Subdivisional Guidelines – Central Desert Regional Council
ANNEX D04
DEED OF AGREEMENT EXAMPLE
DEED OF AGREEMENT
This Deed of Agreement (“The Deed”) is made on the date shown below
BETWEEN: THE DEVELOPER, ABC Industries (NT) Pty Ltd of 123 Fourteenth Street, Darwin NT 0800 (“The Developer”).
AND: THE CENTRAL DESERT SHIRE COUNCIL, the Council for the Central Desert Shire in the Northern Territory of Australia, and having its office at 1 Bagot St, Alice Springs (“The Council”).
WHEREAS:
The Developer is the owner of the land described as Lot 9876 Town of Darwin that is to be developed for the purposes of a residential subdivision.
This Deed contains the SCHEDULE, which describes Council’s requirements and procedures for the works for the subdivision of the subject land, as set out and referred to in the Conditions on Development Permit No DP01/0253.
IT IS AGREED AS FOLLOWS:
The Developer will construct and/or provide the works/items set out in the SCHEDULE at the Developer’s cost. All works are to be in accordance with designs and specifications and Council’s technical requirements and procedures as set out in Council’s current Guidelines for Subdivision Development, all to the satisfaction of the General Manager Infrastructure, Central Desert Shire Council.
THE SCHEDULE
1. Any easements or reserves required for the purposes of stormwater drainage, roads, or for any other purpose stipulated by Council, shall be made available to Council.
2. Engineering designs and specifications for the proposed and affected roads, stormwater drainage, kerb crossovers and driveways to the lot boundaries, street lighting and streetscape/ landscape works.
3. A cycle/footway to be constructed along Sixteenth Street for the full length abutting the subdivision.
4. The existing footpath in Fourteenth Street is to be reconstructed in exposed aggregate concrete.
5. Provision and installation of playground equipment in the existing park.
Executed as a Deed this day of 201
Subdivisional Guidelines – Central Desert Regional Council
ANNEX D04
The common Seal of ABC INDUSTRIES (NT) PTY LTD as affixed in the presence of:
……………………………………………. ………………………………… DIRECTOR DIRECTOR
………………………………………. ………………………………… NAME OF DIRECTOR (print) NAME OF DIRECTOR(print)
The Common Seal of the CENTRAL DESERT SHIRE COUNCIL was affixed in the presence of
……………………………………… ………………………………… LORD MAYOR CHIEF EXECUTIVE OFFICER
Subdivisional Guidelines – Central Desert Regional Council
ANNEX D04
ON MAINTENANCE PROCESS CHECKLIST
For Internal Council Use as well as Consultant / Developer Use
PROJECT …………………………………………………………………………
CONSULTANT ……………………………………………………………………
APPLICATION DATE / / INSPECTION DATE / /
� Application for Works to be Placed on Maintenance
� Bond Application for outstanding Works to Council
� Confirmation of Outstanding Works or other Security Bonds and Fee Details
� Submission of Certification of works Roads and Drains Landscape / Irrigation Structural Other Authorities
Other
� Submission of As Constructed Drawings Hard Copy Digital (PDF and Autocad)
� Submission of Clearances Private Owners Other Authorities
� Submission of Test Results and Reports
� Submission of Cadastral Survey Plan with Final Easement Details
� Submission of completed electronic Asset Register Forms
� On Maintenance Inspection
� Submission of Maintenance Bond Construction Approval Fee Outstanding Works or other Security Bonds Footpath, Crossover and Driveway Payment
� Issue of On Maintenance Certificate
CHECKED ……………………… DATE CERTIFICATE ISSUED / /
COMMENTS ……………………………………………………………………….
Subdivisional Guidelines – Central Desert Regional Council
ANNEX D04
ON MAINTENANCE SITE INSPECTION CHECKLIST
All test results, inspections, certifications, as constructed drawings and clearances in place. The Works have been visually inspected and the following constructed to approved drawings and satisfactory standards:
ALLOTMENTS
� Pegged; � Lots graded to minimum design levels; � Lots grassed; � Soil and stormwater management in place.
ALLOTMENT DRAINAGE
� Catch drains – location, profile, line, level, outlet with erosion control; � Field inlets – location and property drain and sub soil drain connection provided; � Overland flow path including Q100 open drains – profile, line, level, grassing established,
erosion control, concrete lining; � Pipe work – size, line, level; � Soil and stormwater management in place.
STORMWATER DRAINAGE SYSTEM
� Compliance with acceptable criteria of conduit inspection cond. � Pipe/Drainage layout – size, line, level, location; � Gully pits and manholes to correct standards – transitions; � Covers – good order, level, grade; � End walls, headwalls and outlet structures – erosion control, free from scour and
siltation; � All connections to pits mortared flush, all walls smooth mortared flush, no reinforcement
projections; � All step irons, rungs, ladders, cages in position; � Open cut channels – profile, line, level, grassing, erosion control measures; � Overland flow – clear of obstruction, profile, line, level, grassing established, concrete
lining, erosion control; � Sub soil drainage connections to pits, flush points, discharges to gullies or other
approved outlet; � Grassing to swales, outlets, inlets, allotments, batters; � Soil and stormwater management in place.
EARTHWORKS
� Retaining walls located clear of road reserves; � Batter slopes stabilised, free from erosion; � All disturbed areas grassed, free from erosion; � Soil and stormwater management in place; � Compaction test results, inspection records, certifications.
Subdivisional Guidelines – Central Desert Regional Council
ANNEX D04
ROAD SURFACING
� Hot mix wearing course sound in appearance and showing no signs of cracking, blemishes, erosion and oxidation;
� Bitumen seal sound in appearance, no blemishes, adequate aggregate cove, no bitumen bleeding through surface, excess aggregate removed from site.
� Joints are flush; � Kerbs and pavements free of overspray, splashes and marks; � Final profile is regular, crowns correctly located, no obvious high points, hollows, low
points and ponding of water; � Joints with concrete works are sound and to the correct level. No gaps for water
intrusion.
CONCRETE KERBS, KERB & CHANNEL, MEDIANS AND ISLANDS
� Correct type and profile; � Laid to true line and level; � Finish is smooth, hard, sound and durable in appearance, free from bumps, rain
damage, erosion, irregularities, surface blemishes, cracking, equipment grazes and marks and chipped and broken joints;
� Ponding of stormwater does not occur; � Transitions to existing work and gully pits are smooth, regular, correct length; � Service markers have been placed to the kerb face; � Lip and back of kerb are flush with road surface, footpaths and verges; � All channelisation works and medians completed – signage, markers, pavement marking
and traffic measures; � Subsoil drains and flushing points to medians and islands;
FOOTPATHS, BIKEWAYS AND PAVING INCLUDING INTERLOCKING AND OTHER
� Finish is appropriate to use, hard, sound and durable in appearance, free from bumps, rain damage, erosion, irregularities, surface blemishes, cracking, marks, chipping and broken joints;
� True to line and level width; � Jointing as required, expansion joints provided; � Concrete appropriately cured; � Pram ramps as per access requirements and plans; � Safety rails, hardware, pavement marking and signs installed.
STREETSCAPE, LANDSCAPE, PARKS, FENCING AND FEATURES
� All turfing, grassing, weed control, tree planting, bollards, drainage, irrigation and other works as necessary to approval of the Officer.
� Erosion and stormwater management in place; � All fences other than approved entrance structures have been constructed within
allotments; � Entrance features have planning and building approvals and certifications; � Approvals from manufacturers and submission of guarantees, warrantees. � Approvals from Council’s Parks section; � Installation of playgrounds to Australian Standards as inspected by the Officer � Structural certifications; � Childproof fencing; � Approvals from other authorities and other trades and disciplines.
Subdivisional Guidelines – Central Desert Regional Council
ANNEX D04
OTHER SERVICES
� All approvals as constructed received and submitted; � All pit and manhole covers constructed to correct levels and slopes; � All services, road crossings permanently marked as required on kerbs or by approved
markers;
OTHER
� Street names signs with house numbers; � Traffic signs and markers and pavement marking.
Subdivisional Guidelines – Central Desert Regional Council
ANNEX D04
CERTIFICATE OF ACCEPTANCE (EXAMPLE)
CERTIFICATE OF ACCEPTANCE AND
ON MAINTENANCE OF WORKS
DEVELOPER: ABC Industries (NT) Pty Ltd
PROPOSED LOT NOS: 6623, 6624, 6666 to 6671 and 6692
SURVEY PLAN: S2006/999
DETERMINATION NO: DP2006/0876B
CONDITIONS: 2, 6, 7 & 10
WORKS: Roads, stormwater drainage, kerb crossovers, driveways, street lighting, landscaping in road verges and footpaths. Easement requirements for these works
Central Desert Shire Council confirms that the above works as prescribed by the plans and specifications previously submitted have been satisfactorily constructed and are hereby accepted for maintenance purposes subject to a Maintenance Period (Defects Liability Period) as follows.
1. Roads, Stormwater Drainage, Kerb Crossovers, Driveways and Footpaths
Commences 3 May 2006 Finishes 3 May 2008
2. Landscape Street trees, Verges and associated Irrigation
Commences 3 May 2006 Finishes 3 May 2007
3. Landscape Hard works for Park
Commences 3 May 2006 Finishes 3 May 2007
Notes The Developer is required to contact the Central Desert Shire Council thirty (30) days prior to the expiry of the Defects Liability Period and arrange an inspection of the site. The Developer acknowledges that final Handover of Works to Council for ongoing care and maintenance and the release of the Security (Maintenance Bond), will not occur until such notification has been given and such an inspection has taken place and all outstanding defects are remedied.
The Darwin City Council has the right to retain any such portion of the Security as it deems necessary to cover the defects corrected during the Defects Liability Period. This shall be returned to the Developer progressively upon the expiry of the relevant individual Defect Liability Periods of each defect.
Subdivisional Guidelines – Central Desert Regional Council
ANNEX D04
Defects The following listed items are exceptions to the above and must be completed by the date agreed below. The Developer agrees to rectify the defects in accordance with Council ‘s minimum requirements. The Defects Liability Period for these particular items shall commence on the date they are completed.
ITEM DATE OF COMPLETION
1. Erosion Control Works 31 May 2006 2. Street name signs 31 May 2006 3. Rectification of damaged kerb and channel 31 May 2006
Signed……………………………………… Signed……………………………………. GENERAL MANAGER INFRASTRUCTURE DEVELOPER’S REPRESENTATIVE
SERVICES
Date……………………………………… Date…………………………………….
Subdivisional Guidelines – Central Desert Regional Council
ANNEX D04
OFF MAINTENANCE PROCEDURE CHECKLIST
For Internal Council Use as well as Consultant / Developer Use
PROJECT ………………………………………………………………………….
DATE REQUEST SUBMITTED / /
CONSULTANT …………………………………………………………………………..
� Request from Developer for Off Maintenance Inspection and Return of Security(s)
� Off Maintenance Inspection
� Issue of Off Maintenance Certificate by Council - Works Taken Over by Council
INSPECTION DATE / /
DATE MAINTENANCE CERTIFICATE ISSUED / /
COMMENTS ………………………………………………………………………………………….
Subdivisional Guidelines – Central Desert Regional Council
ANNEX D04
OFF MAINTENANCE SITE INSPECTION CHECKLIST All further test results, inspections, certifications, as constructed drawings and clearances in place. The works have been visually inspected and are satisfactory allowing for normal wear and tear. The requirements are as follows but not limited to:
EARTHWORKS, SITEWORKS & ALLOTMENTS: Those still in the title of the developer.
� Lots grassed, batter slopes established; � Soil and stormwater management still in place.
STORMWATER DRAINAGE SYSTEM
� All pits, manholes and drainage structures in good condition; � All covers, lintels and frames free from damage; � Erosion control at outlets and open drains free from erosion, siltation and scour; � All pits, pipes and culverts free from obstruction, siltation; � Erosion and stormwater management still in place and adequately maintained.
ROAD PAVEMENTS AND SURFACING
� Hot mix wearing course / bitumen seal, sound in appearance, no cracking, blemishes, erosion and oxidation;
� Joints are flush, no signs of cracking, rutting or other types of failures; � Surfaces are still straight and true to line and level, no low points and ponding of water.
CONCRETE AND INTERLOCKING PAVING, KERBS, KERB & CHANNEL, MEDIANS AND ISLANDS
� Finish is still hard, sound, durable, smooth, unblemished, no cracking, chipping of joints and pavers, free from erosion and rain damage;
� Surfaces are still straight and true to line and level, drain well, no ponding of water; � Lip of kerb is still flush with road surface, no gap between kerb and pavement; � All siltation cleaned out of kerb and channel etc.
STREETSCAPE, PARKS, LANDSCAPE, FENCING AND OTHER FEATURES
� Inspections have been carried out with Council’s Parks section; � All plants, shrubs, trees, grassed areas well maintained and in good healthy condition; � All grassed areas, verges, under surfaces to playgrounds, etc draining well; � All structures and equipment well maintained, free from rust and blemishes, structurally
sound; � All under surfaces to playgrounds in good order; � All irrigation systems in full working order and where necessary, controllers on line and
functioning.
OTHER
� All clearances from Other Authorities and Others received; � All pit, valve, manhole, service boxes to correct levels and slopes, no obstructions in
verges, grassed areas, etc; � Line marking re-marked where necessary. � Street name and other signs still in place.
Subdivisional Guidelines – Central Desert Regional Council
ANNEX E04
December 2013 Cardno (NT) Pty Ltd
CENTRAL DESERT REGIONAL COUNCIL
ROAD HIERARCHY
Subdivisional Guidelines – Central Desert Regional Council
ANNEX E04
December 2013 Cardno (NT) Pty Ltd
In the absence of a Road Hierarchy Map the road hierarchy should be determined based on;
“East Arnhem Shire Council – Road Hierarchy Methodology – Draft for Council
Consideration”, July 2009; or
Some other method acceptable to the Council.
Subdivisional Guidelines – Central Desert Regional Council
ANNEX F04
December 2013 Cardno (NT) Pty Ltd
CENTRAL DESERT SHIRE COUNCIL POLICIES
Subdivisional Guidelines – Central Desert Regional Council
ANNEX F04
December 2013 Cardno (NT) Pty Ltd
Please refer to the following hierarchy of Policies;
1. Council’s Policies,
2. City of Darwin’s Policies, or
3. Other Council’s Policies as directed by Council.
Subdivisional Guidelines – Central Desert Regional Council
ANNEX G04
December 2013 Cardno (NT) Pty Ltd
CENTRAL DESERT REGIONAL COUNCIL
FEES AND CHARGES
Subdivisional Guidelines – Central Desert Regional Council
ANNEX G04
December 2013 Cardno (NT) Pty Ltd
See Council for current fees.
Subdivisional Guidelines – Central Desert Regional Council
ANNEX H04
December 2013 Cardno (NT) Pty Ltd
CENTRAL DESERT REGIONAL COUNCIL
APPROVED STREET TREE LIST
Subdivisional Guidelines – Central Desert Regional Council
ANNEX H04
December 2013 Cardno (NT) Pty Ltd
Council approves suitable species of street trees and shrubs for the municipality’s streetscapes
based on the standards for purchasing container grown landscape trees, Annex K. The Developer is
to supply all plants from an accredited nursery under NIASA guidelines.
Trees will preferably be native to the development area, Be aesthetically complimentary to the development theme and design, Tend to exhibit stable deep rooted structure, Require low maintenance following establishment, Council has a preference for native and indigenous species being used in the planting
designs, Street trees are to have a dominant leader trunk.
Subdivisional Guidelines – Central Desert Regional Council
ANNEX I04
December 2013 Cardno (NT) Pty Ltd
CENTRAL DESERT REGIONAL COUNCIL
ENVIRONMENTAL CONSIDERATIONS
Subdivisional Guidelines – Central Desert Regional Council
ANNEX I04
December 2013 Cardno (NT) Pty Ltd
The areas listed below are considered to be of environmental significance. Additional conditions may be required, above those outlined within these guidelines, for subdivisions or developments which may have an impact on these areas.
Any National parks
Co (NT) Pty Ltd
Subdivisional Guidelines –
Central Desert Regional Council
ANNEX J
Annex J
Crime Prevention Through Environmental
Design
Subdivisional Guidelines – Central Desert Regional Council ANNEX J
December 2013 Cardno (NT) Pty Ltd
GUIDELINES FOR CRIME PREVENTION
Acknowledgement:
The following material has been extracted from AMCORD: A National Resource Document for Residential Development, Practice Note 17 - published by the Commonwealth of Australia in 1995.
Scope
The need to design for community safety in neighbourhoods and other urban areas has been increasing over recent times. Although crime statistics are of growing community concern, research suggests that fear of crime affects people more than the actual risk to their safety. In turn, this perceived risk tends to limit the mobility of the more vulnerable, including women, children and the elderly. Where actual criminal activity is prevalent there is evidence to suggest that much of this is opportunistic and can be influenced by reducing the opportunities for unobserved crime and ease of escape.
Two issues, in particular, that can be addressed through urban design are:
• Increasing the public’s sense of safety when using streets and other public spaces
which, in turn, may lead to increasing public use and safety in numbers;
• Discouraging the potential for crime, including breaking into buildings and damaging property, through a combination of obvious security measures and other more subtle deterrents.
Designing for safe environments should be an integral part of the initial design process, whether for single dwellings, a medium-density housing project, shopping centres, infill land divisions or entire neighbourhoods.
Surveillance
Casual surveillance from private homes or public streets is often a most effective means of deterring antisocial behaviour. There are a number of techniques to consider during the design process:
• Orientate the fronts and entrances of buildings towards the public street and avoid
screens, high walls, carports and landscaping which would obscure direct views to public areas.
• Place entrances of buildings opposite each other across the street, or group entrances of multiple-dwelling developments on to a commonly visible area to provide maximum mutual surveillance.
• Arrange living areas, windows, accessways and balconies to overlook recreation areas and provide observation points to all areas of a site, particularly entrances and carparks.
• Restrict access to the rear of sites, thereby reducing the opportunity for people to wander around (eg with gates or a continuation of side fencing to the building).
• Reduce the opportunity for people to be unobserved in foyers of buildings by providing direct access from the street and by placing windows to ensure that the area can be observed before entering.
• Install peepholes and chains on doors to monitor visitors and increase the feeling of security.
• Clearly display street numbers where they can be readily seen by emergency vehicles.
Subdivisional Guidelines – Central Desert Regional Council ANNEX J
December 2013 Cardno (NT) Pty Ltd
Lighting
The veil of darkness can hide and encourage inappropriate or criminal behaviour. The provision of lighting both on private property and in public spaces can be an effective deterrent. Artificial lighting has the disadvantages of ongoing costs and possible vandalism. However, solar and low-wattage technology has made lighting an efficient investment in relation to total benefits. Toughened glass lamps or shields may be required in higher-risk areas and are essential where human-scale lighting is used in public areas.
Achieving continuous lighting of public spaces in low-density areas is not always feasible. In these circumstances it may be more appropriate to identify popular routes along which lighting is concentrated. To be effective 'safe routes' should include other measures such as signage, opportunities for casual surveillance, clear sight lines, appropriate paving, accompanying night-time patrols by police, straight routes, and appropriate landscaping.
Other considerations when designing for lighting are:
• Achieve consistency of lighting to reduce contrast between shadows and illuminated
areas.
• Ensure lighting is directed towards pedestrian pathways and public spaces rather than on the road or into the windows of housing. The design of lighting must also take into account the mature height of landscaping and other potential impediments.
• Ensure adequate lighting of common areas such as corridors, entrances, laundries, lifts, stairwells and parking areas.
• Locate bright lights in heavily used spaces, but ensure that they do not create a 'wall of darkness' or create glare for pedestrians and motorists.
Figure 1: Select lighting appropriate to conditions and requirements.
Subdivisional Guidelines – Central Desert Regional Council ANNEX J
December 2013 Cardno (NT) Pty Ltd
Appropriate Land-Use Mix
Encouraging a range of complementary land-use activities, which extends the duration and level of intensity of public activity in particular areas is one of the more effective means of discouraging antisocial behaviour. This will increase the possibility of casual surveillance during the day and night, and increase the feeling of 'safety in numbers'. Some factors to consider are:
• Mix uses of a compatible scale, such as primary schools adjacent to local or
neighbourhood centres, and secondary schools adjacent to district centres, major recreation and leisure centres, within regional and town centres.
• Mixed uses should provide a range of day and night-time activities in close proximity, and should not segregate perceived 'nuisance' users such as youth from other age groups after hours.
• Mix land uses vertically as well as horizontally (eg shop-top housing with views to public areas).
• Provide for street-related after-hour activities such as theatres, restaurants and street vendors, and limit areas that are accessible to pedestrians only (eg malls).
• Design the premises of such after-hour activities so that the public realm is visible to patrons within (eg provide for outdoor seating).
• Encourage night-time activities within public parks (eg tennis, netball, basketball) with suitable lighting.
Landscaping
The landscaping of parks, streets, public and private car parks and private property should take account of opportunities for informal surveillance by drivers, pedestrians and residents. Accordingly landscaping schemes should consider these principles:
• Avoid vegetation which conceals paths or building entrances or which is close to
windows. The use of plants with repelling characteristics such as thorns, spikes or nettles may be a useful deterrent to gaining access to ground-floor windows or other areas that need to be protected.
• Provide low to medium shrub planting with a height no greater than 1.5m and/or taller clear-stemmed trees. This allows sight lines for motorists to be retained, as well as encouraging informal surveillance of potential car vandalism and theft. Dense planting in corners and behind high walls should be avoided.
• The mature height and spread of landscaping should be considered in order to preserve the sight lines of pedestrian and cyclist pathways.
Subdivisional Guidelines – Central Desert Regional Council ANNEX J
December 2013 Cardno (NT) Pty Ltd
Boundary Delineation
Clear delineation of public and private space can assist in deterring trespass. The use of building features, shrubbery, changes of level and low to medium-height fencing should clearly delineate property boundaries and private spaces. Fencing should be used to prevent easy access to the site from outsiders, without creating a fortress. High courtyard walls obscure opportunities for resident surveillance of the street and vice versa. Exceptions may need to be considered where traffic noise is a problem or where screening for private open space is required.
Figure 2: Symbolic barriers defining zones of transition.
Public Telephones, Toilets, Street Furniture and Bus Shelters
The location, design and material selection of public facilities such as telephones and toilets can go some of the way to preventing deliberate vandalism. Some measures which should be considered include:
• Locate public toilets at well-illuminated park entrances or close to commercial areas
where they are more visible to casual surveillance by passers-by. Facilities should be well-lit with vandal-proof lighting, be clear of landscaping which might obscure sight lines from roads, paths and houses, and have pedestrian paths concentrated in the vicinity.
• Street furniture should be selected for its quality of workmanship and materials to ensure long-term durability. A high-quality finish which contributes in a positive way to a pleasant streetscape may have an effect on reducing vandalism.
• The design should vary depending on location and circumstances. However, preference should be given to robust materials which do not have components that can be easily removed.
• There should be clear visibility of bus stops with well-maintained and lit shelters that allow direct views to and from the public street.
• Provide passenger information of routes and timetables at each bus stop.
• Avoid locating bus stops adjacent to vacant land, lanes, car parks or buildings set back from the street.
Subdivisional Guidelines – Central Desert Regional Council ANNEX J
December 2013 Cardno (NT) Pty Ltd
Pedestrian and Cycle Routes
• Focus pedestrian movement after dark along a few, well-used and observable entry and
exit routes.
• Ensure that those routes are the most direct and logical routes between commonly visited locations.
• Provide comfortable places to sit and socialise adjacent to building entrances.
• Provide separate areas for teenagers to sit or socialise so that territorial conflicts do not occur. Ensure, however, that these 'territories' do not violate the security of dwellings or other buildings, or compromise the safety of pedestrians or cyclists.
• Locate the dwellings of particular groups (elderly people, families with small children) close to the services and facilities they frequently use (eg shops, seating area, play space).
• Minimise the likelihood of a potentially intimidating group (ie young men or teenagers) taking over some space en route by locating facilities for them elsewhere. For example, if the route older people must take from their homes to shops or the bank passes through a park dominated by young people, consider re-aligning the path or allocating units to older people in less vulnerable locations.
Figure 3: Infill development should attempt to retain and reinforce established lines of communication.
Subdivisional Guidelines – Central Desert Regional Council ANNEX J
December 2013 Cardno (NT) Pty Ltd
• Provide clearly marked 'exit' points to an area of high pedestrian or vehicular traffic every 500m along recreational bicycle and pedestrian paths.
• Provide bicycle parking which can be informally surveyed from streets and buildings or by parking attendants.
• Pedestrian and cyclist paths should be well-lit and signed, and should avoid underpasses and dense clusters of trees next to the path and at stop points such as road crossings.
• Avoid the necessity for grade separation along pedestrian and cyclist paths, or provide safe, alternative, and clearly marked at-grade crossing points.
Centres
• Development within centres should provide carparking areas and other transport
facilities next to after-hour uses such as video stores, fast food outlets, late-night chemists and entertainment facilities.
• There should be an appropriate mix of activities and uses aimed at extending hours and levels of activity.
• Public spaces should be bounded by a range of compatible day and after-hour activities (eg schools, local shopping facilities, community facilities).
• Pathways and public spaces in centres should be identifiable, legible, appropriately lit and visible.
• Entry and exit points to centres should be well-defined and signposted.
• Casual surveillance should be possible from adjacent developments.
• Public and private spaces should be clearly defined.
• Automatic teller facilities should be located in well-lit and highly visible areas, preferably adjacent to other after-hour activities.
Subdivisional Guidelines – Central Desert Regional Council ANNEX J
December 2013 Cardno (NT) Pty Ltd
Figure 4: Crime prevention for new town centres.
Subdivisional Guidelines – Central Desert Regional Council ANNEX J
December 2013 Cardno (NT) Pty Ltd
Public Open Space and Public Spaces
• Provide seats on the perimeter of the park or other space for use by people with mobility
problems or concerns about security and to encourage viewing into the space.
• Ensure that the path system and overall layout allows pedestrians to observe an area of potential social contact before entering it.
• Ensure that open space, community buildings and other structures are capable of casual surveillance from the activity rooms of adjacent dwellings.
• Ensure that open space is attractive to legitimate users so that heavy use will discourage antisocial activities.
Figure 5: Crime prevention considerations when designing pedestrians/bicycle paths.
• Accommodate shortcuts through public spaces and ensure that there are several clearly
visible escape routes.
• Encourage people to stop and linger by incorporating dense furnishing, attractive focal elements and defined edges.
• Design public spaces for year-round use.
• Ensure that no boundaries render the public space visually or functionally inaccessible to passers-by.
• Encourage ground-level uses in buildings which can contribute to the enlivening of the public space (eg cafes with comfortable outdoor seating, rather than offices or blank walls).
Subdivisional Guidelines – Central Desert Regional Council ANNEX J
December 2013 Cardno (NT) Pty Ltd
• Design subspaces so that a person sitting there alone will not feel uncomfortable or unsafe.
• Design public space as part of the central area’s pedestrian and cycle circulation systems, linked to safe neighbourhood pedestrian and cycle paths.
• In terms of public art, consider both the maintenance and ecological costs of various designs and operating systems.
• Display names and addresses of all buildings clearly on walls in high-contrast letters in well-lit positions and ensure that building entrances are easily identified.
• Consider providing a clear, well-lit, glass-enclosed map of the central area, showing 'you are here', names of nearby streets, public transport stops, taxi ranks, safe pedestrian night routes, cycle paths etc.
• Develop management policies that encourage extended hours of usage through special events and involve the community in planning and managing festivals, exhibitions, concerts and performances.
Vandalism
• Specify materials that withstand normal hard use and can easily be replaced.
• Use standard-sized panels, light globes, panes, fittings etc to facilitate speedy replacement.
• Avoid obvious 'problem' materials which encourage wilful damage. These include:
- soft-textured wall finishes which can be easily scratched or damaged (especially in entry or accessways);
- large, long areas of light-coloured wall finishes susceptible to spray-paint graffiti;
- light-coloured wall finishes next to planting beds (or any but paved surfaces) where rainfall or irrigation is likely to cause unsightly staining;
- glass (especially full-length glass) in vulnerable positions, particularly along much- used public access routes;
- tiles or glass below the height of ground-level windowsills;
- external copper and lead piping, which are vulnerable to theft;
- painted metal or wood posts or fences in public spaces;
- flimsy panelling or lightly constructed timber fencing in public areas;
- Use textured or 'fluted' surfaces, paint walls different colours, or plant vines to cover large wall spaces to avoid graffiti.
Subdivisional Guidelines – Central Desert Regional Council ANNEX J
December 2013 Cardno (NT) Pty Ltd
Figure 6: Crime prevention for new neighbourhoods
References
Sarkissian, W (1984) Safe as Houses: A Manual for Crime Prevention in the Design of Medium Density Public Housing.
Bell, W (1992) Crime Prevention: A Planning and Urban Design Approach.
Bell Planning Associates (1995) Role of Urban Design in Crime Prevention and Community Safety.
The Centre for Residential Security Design (1973) A Design Guide for Improving Residential
Security.
Subdivisional Guidelines – Central Desert Regional Council ANNEX K
Annex K
Standards for Purchasing Container-Grown
Landscape Trees
Subdivisional Guidelines – Central Desert Regional Council ANNEX K
December 2013
Cardno (NT) Pty Ltd
STANDARDS FOR PURCHASING CONTAINER-GROWN LANDSCAPE TREES
1. PROPER IDENTIFICATION
All trees shall be true to name as ordered or shown on the planting plans and shall be labelled individually or in groups by species and cultivar (where appropriate).
2. COMPLIANCE
All trees shall comply with federal and state laws and regulations requiring inspection for plant disease, pests and weeds. Inspection certificates required by law shall accompany each shipment of plants.
3. TREE CHARACTERISTICS AT THE TIME OF SALE OR DELIVERY
A. TREE HEALTH
As typical for the species/cultivar, trees shall be healthy and vigorous, as indicated by:
• foliar crown density • length of shoot growth (throughout crown)
• size, colour and appearance of leaves • uniform distribution of roots in the container media
• appearance of roots
• absence of twig and/or branch dieback • relative freedom from insects and diseases
B. CROWN
Form: Trees shall have a symmetrical form as typical for the species/cultivar and growth form.
Central Leader: Trees shall have a single, relatively straight central leader and tapered trunk, free of co-dominant stems and vigorous, upright branches that compete with the central leader. Preferably, the central leader should not have been headed. However, in cases where the original leader has been removed, an upright branch at least ½ (one-half) the diameter of the original leader just below the pruning point shall be present.
Note: This section applies to single trunk trees grown with normal straightness, as typically used for street or landscape planting. This specification does not apply to plants that have been specifically cultured in the nursery or selected for unusual or unique shape, such as contorted forms, topiary forms, espalier forms, multi-stem, or clump forms.
Evaluating trunk and branch structure
Trunk structure: Shade trees that are large at maturity, and most evergreen trees, with the best quality have a dominant or central leader or trunk up to the top of the canopy. Shade trees of lesser quality have two or more leaders or trunks; they could split apart as they grow older. Small ornamental trees can have several trunks. (Note: Trees are drawn without leaves or small diameter branches to show their trunk and branch structure only. The end portions of large diameter branches are also cut off to save space in the illustration. These drawings apply to evergreens as well as deciduous trees).
Subdivisional Guidelines – Central Desert Regional Council ANNEX K
December 2013
Cardno (NT) Pty Ltd
Potential Main Branches:
• Branches shall be distributed radially around and vertically along the trunk, forming a
generally symmetrical crown typical for the species.
• Potential main branches shall be evenly spaced and have appropriate space between them.
• Branches shall be no larger than 2/3 (two thirds) the diameter of the trunk, measured 25mm above the branch.
• The attachment of scaffold branches shall be free of included bark.
Branch structure: The better quality, large-maturing shade trees (lower extreme left) have all branches less than about two-thirds the trunk diameter. Poor quality shade trees (lower left centre) have larger upright branches. Trees such as crape myrtle and other small- maturing trees can have several trunks. Trees with extensive defects in branches such as cracks and included bark (lower right) represent lesser quality than trees free of these potential problems. Included bark can be seen between the two arrows below. Branches with bark inclusions are weakly attached to the tree and can split easy.
Subdivisional Guidelines – Central Desert Regional Council ANNEX K
December 2013
Cardno (NT) Pty Ltd
Temporary branches: Unless otherwise specified, small "temporary" branches should be present along the lower trunk below the first potential permanent branch, particularly for trees less than 25-35mm in trunk diameter. Temporary branches should be distributed around and vertically along the lower trunk. They should be no greater than 5mm in diameter and no greater than ½ (one-half) the diameter of the trunk at the point of attachment. Heading of temporary branches is usually necessary to limit their growth.
C. TRUNK
� Trunk diameter and taper shall be sufficient so that the tree will remain vertical
without the support of a nursery stake. � The trunk shall be free of wounds (except properly-made pruning cuts), sunburned
areas, conks (fungal fruiting-bodies), wood cracks, bleeding areas, signs of boring insects, galls, cankers and/or lesions.
� Trunk diameter at 150mm above the soil surface shall be greater than the diameter range shown for each container size below:
Container
Soil Volume
Trunk Diameter (mm) Soil level from Container Top (mm)
150 0.6 1.5-2 2.5-5 200 3.3 2-3.5 4-7 25L 10.5 5-8 5-8
* Approximate soil volume in gallons
D. ROOTS
� The trunk, root collar (root crown) and large roots shall be free of circling and/or
kinked roots. Soil removal near the root collar may be necessary in order to verify that circling and/or kinked roots are not present.
� The tree shall be well rooted in the container. When the trunk is carefully lifted both the trunk and root system shall move as one.
� The upper-most roots or root collar shall be within 25mm above or below the soil surface. The soil level should be within 50mm of the top of the container (see table above)
� When the container is removed, the root ball shall remain intact. � The root ball periphery should be free of large circling and bottom-matted roots. The
acceptable diameter of circling peripheral roots depends on species and size of root ball. The maximum acceptable size should be indicated for the species (if necessary).
� On grafted or budded trees, there shall be no suckers from the root stock.
Subdivisional Guidelines – Central Desert Regional Council ANNEX K
December 2013
Cardno (NT) Pty Ltd
E. MOISTURE STATUS
At time of inspection and delivery, the root ball shall be moist throughout, and the tree crown shall show no signs of moisture stress, as indicated by wilt. Roots shall show no signs of being subjected to excess soil moisture conditions, as indicated by root discoloration, distortion, death, or foul odour.
Subdivisional Guidelines – Central Desert Regional Council ANNEX L
Annex L
Commentary
Subdivisional Guidelines – Central Desert Regional Council ANNEX L
December 2013
Cardno (NT) Pty Ltd
1.1 ENVIRONMENTAL CONSIDERATIONS
It is the obligation of the Developer to design and construct works in an environmentally sensitive
manner and to limit the environmental impact of the works within the development area and on the
surrounding areas. Development and Natural Resource should be consulted with in a way that meets
the needs of the present generation without compromising the ability of the future generations to meet
their own needs.
Developers have a social responsibility to plan environmentally sustainable developments for the
future benefit of its community. Councils key environmental management goals over the next ten
years, which will assist developers in design are:
WATER - to contribute to the efficient management, water conservation efforts and water quality
improvements of our groundwater, creeks, wetlands.
LAND - to develop a better urban environment through leadership in environmentally sustainable
planning, design and construction, and better operational outcomes in open space and natural areas
management and protection, including weed management and soil erosion control.
AIR QUALITY - to effectively manage energy use and reduce greenhouse gas emissions.
WASTE - to provide residents with modern and cost effective waste disposal using best practice
operational methods, and to efficiently manage litter and improve recycling opportunities and
participation rates.
BIODIVERSITY - to enhance biodiversity through contributions to natural area and foreshore habitat
protection programs and interpretation and promotion of the natural and cultural values.
A list of specific areas of Environmental Consideration are including in Annex I.
Issues relating to Climate Change mitigation and adaption need to be identified and addressed by the
developer particularly in the following areas:
• Where developments occur close to the coast, waterways and drainage lines
• In the design and location of stormwater infrastructure
• In building design and construction and subdivision layout.
• Transport options
• Landscaping
A master plan will be required prior to the commencement of any stage of a development which
shows, as a minimum, areas of significance, native flora and fauna to be protected, land clearing
requirements, sediment and erosion control measures, construction ‘no go zones’ and protective
fencing. It will also demonstrate the Developers intentions in meeting Councils environmental
management goals.
Developers are encouraged to do more than the minimum and liaise with and seek technical advice
from Government authorities, in particular NRETAS and the EPA. Where applicable, approval shall be
sought from these agencies. All relevant Regulations and Acts are to be adhered to.
The cost of installation, maintenance, inspection, removal and restoration of affected areas is to be
borne by the Developer. An Environmental Bond may be required to be lodged at the time of drawing
approval if deemed necessary by Council.
Subdivisional Guidelines – Central Desert Regional Council ANNEX L
December 2013
Cardno (NT) Pty Ltd
Dust, air and noise emissions are to be controlled such that nuisance is not caused to surrounding
properties. Council reserves the right to direct any and all such measures as deemed necessary to
ensure compliance, including cessation of works. The Developer shall be responsible for all such
costs.
The contractor is to be responsible for the proper storage and disposal of all contaminants in
accordance with all statutory and contractual obligations.
• Storage space on site is to be as agreed by the Officer.
• Flammable, combustible or hazardous materials are to be stored and maintained in an
appropriate manner to Australian Standards.
All trucks entering and leaving the site of works are to be loaded and the load constrained in such a
manner as to prevent the dropping or tracking of materials onto streets. This includes ensuring that all
wheels, tracks and body surfaces are free of mud and other contaminants.
The developer should be aware of Councils requirements for domestic, commercial and industrial
waste collection in accordance with Council Policy. Council actively promotes recycling and waste
minimisation.
1.2 COUNCIL REQUIREMENTS FOR UPGRADE OF EXISTING
INFRASTRUCTURE
Upgrades of existing infrastructure will be carried out at the Developer’s cost and the extent of works
will be determined by the Office. All upgrades must be designed and submitted for approval as part of
the subdivision scope of works. Upgrades are often identified by;
• Development Permit conditions
• Where the Officer determines that the development creates a need
Infrastructure upgrades may include:
• Partial construction or full reconstruction of the abutting road and/or the surrounding road(s)
including road pavements, kerbs and gutters, footpaths, crossovers and driveways, shared
footways and bikeways, verges and landscaping / streetscape works;
• Removal of existing driveways and crossings where necessary and replacement with kerbing
and/or kerb and channel.
• Partial construction or full reconstruction of the abutting, internal and/or out-falling drainage
system;
• Internal drainage and/or appropriate easements where necessary and the provision of
proposed drainage where drainage discharge from one site or allotment is concentrated and
discharges over another allotment being created or downstream.
• Construction of future infrastructure upgrades.
• Links to Contribution Plans are available on LGANT’s website, www.lgant.nt.gov.au or from
each individual Council.
1.3 MAJOR DEPARTURES FROM DESIGN INTENT – NON-COMPLIANCE
REPORTS
Notwithstanding the most diligent efforts of the Contractor, Consultant and Officer to comply with the
intent of the approved drawings and specification, some non-complying construction works may
occur.
Non-compliances are to be reported to Council through submission of Non-Compliance Reports.
These reports shall identify the nature and number of non-complying items and state the Consultant’s
justifications for Council acceptance.
Subdivisional Guidelines – Central Desert Regional Council ANNEX L
December 2013
Cardno (NT) Pty Ltd
1.4 THE WORKS
Refers to all works conducted underground, above ground or at ground level including aerial cabling
within Council’s road reserves, parks, public spaces or any other place owned by or defined as owned
by or maintained by Council. These works all require approval and a Works Permit obtained prior to
commencement.
Works are only to be carried out in accordance with Council approved design and under the terms
and conditions specified in the Works Permit.
• Any variations to the design will require the approval of the Officer.
• No works will commence without the approval of the Officer.
• All works carried out on Council property will not degrade Council’s assets. The property is to
be reinstated to the condition of the pre development/works or better or compensated for in a
manner as deemed by the Officer.
• The Developer / Contractor / Permit Holder shall be wholly responsible for all reinstatement to
the Officer’s requirements.
• The Contractor must have in place all necessary insurances, indemnifying Council against
any claims arising out of the works. Proof of insurance must be lodged with Council prior to
commencement of the works
• The works may be of such a nature, size or in such a location, that the Officer will require a
security bond or bond(s) to be lodged prior to the issue of a works permit.
• No materials or equipment are to be stockpiled on Council's road reserve during the course of
the works without permission of the Officer
• Parking bays are only to be hired when there is a requirement for a specific area to be used
either as part of a works are and/or for the purpose of construction vehicles and
loading/unloading work materials.
• All required hoardings and safety fences and barriers are erected in appropriate locations to
protect the public
• All necessary shoring and bracing to the excavated vertical faces are to be in place to protect
the public and Council property
• All reinstatements must be completed to Council’s satisfaction, bonds may be held to ensure
reinstatements don’t fail over time
1.4.1 Notification to Residents, Authorities and Affected Parties
• All residents and owners within the works area and any other area affected by or deemed by
the Officer to be affected by the works are to be advised of the proposed works by individual
written advice fourteen (14) days prior to the proposed commencement of works.
• Any disruption to property access must be arranged with residents and the Officer notified in
advance
• All relevant authorities and service providers (bus, emergency, police etc) are to be advised
and any statutory requirements of the authorities satisfied.
• It is the Permit Holder’s responsibility to investigate the site of works for possible public
functions or other works that may be affected.
1.5 Provision of Services
Alignments for services are to comply with the requirements of the services corridors as set out in
Councils Standard Drawings.
All roads, pavements, footpaths and vehicular crossings are to be under-bored wherever possible.
Justification for all proposed trenching is to be specifically provided to Council for approval. The
technical requirements of reinstatements will be determined by the Officer at the time of approval, the
timing and location of reinstatement will determine the details.
Subdivisional Guidelines – Central Desert Regional Council ANNEX L
December 2013
Cardno (NT) Pty Ltd
The Permit Holder, at their cost, is to take whatever measures are necessary, including Dial-Before-
You-Dig to identify the location of existing services.
• The Permit Holder is wholly responsible for any damage and reinstatement to the services.
This includes existing irrigation systems.
• Any service connection or disconnection is to be carried out by or under the direct supervision
of the appropriate Authority
• The Contractor/Permit Holder is to pay all costs and charges to the appropriate authorities for
supervision and materials and for any other purpose necessary to carry out the works.
Inspections will be paid for by the Permit Holder at the current rate as per Council’s Fees and
Charges. The need for and timing of inspections will be decided by the officer. Typical inspections;
• Prior to the commencement of works
• At random times during the construction of the works
• Prior to backfilling of trenches/excavations
• Prior to the laying of services
• Final inspection for sign-off
• Testing of irrigation systems during and following works
1.6 Fires, Fire Legislation and Control
All people within the Northern Territory are subject to the Bushfires Act and the Fire Brigade Act, and
in the case of fire subject to the emergency powers of the Chief Fire Officer or their delegate.
Burning of existing or felled vegetation cannot be justified as necessary unless it is used as a land
management tool.
Fire breaks are to be included adjacent to all new developments to the approval of Council and the
NT Fire Department. In all instances, fire breaks shall allow for full access by fire appliance vehicles.
The Developer is required to have written acceptance by the NT Fire Service for all fire breaks at the
time of practical completion.
1.7 Clearing
All areas of a development which are intended to be cleared shall be identified in the Sediment and
Erosion Control Plan, including all significant or heritage listed trees and/or areas. It is Council’s
preference for sites to remain vegetated as much as possible in order to retain the native flora and
fauna and reduce the effects of erosion.
Any clearing in Council owned or controlled land is not permitted without a Works Approval Permit
and must be discussed with The Officer.