TAYLOR’S UNIVERSITY

STRUCTURAL ANALYSIS OF A BUNGALOW

PROJECT 2

BUILDING STRUCTUREARC 2522 / 2523

Tutor: Mrs. Norita

Student name and ID :

1. Louis De Rozario

1. Roy Yiek Chin Hieng

1. Tristan Yu Tze - Xien

0327136

0317726

0317729

1

2

3

4

5

6

7

8

9

10

11

INTRODUCTIONA CONTEMPORARY DESIGN TWO STOREY BUNGALOW WITH A BUILT UP AREA OF 500 Sq METER. GROUND FLOORCONSISTS OF LIVING HALL, DINING AREA, KITCHEN, ONE BEDOOM, STORE AND TOILET. FIRST FLOOR CONSISTS OF THREEBEDROOM WITH ATTACH BATHROOM, BALCONY, STORE AND AN OPEN AREA.IN A GROUP OF THREE, EACH OF US DIVIDE ZONING AREA TO CARRY OUT STRUCTURAL FRAMING CALCULATION. EACHOF US ANALYSE AT LEAST 6 BEAMS AND 3 COLUMNS AT SELECTED ZONING AREA.

INDIVIDUAL ZONING AREA

PART 2 LOUIS DE ROZARIO

PART 1 ROY YIEK

PART 3TRISTAN YU

12

PART 2 LOUIS DE ROZARIO

PART 1 ROY YIEK

PART 3TRISTAN YU

13

ROY YIEK CHIN HIENG0317726

CHOOSEN BEAMS 1. FIRST FLOOR 4/A-E2. FIRST FLOOR A/1-33. FIRST FLOOR B/1-34. FIRST FLOOR D/1-35. FIRST FLOOR 3/A-E 6. FIRST FLOOR 3/E-H

14

1

2 3 4

5 6

ROY YIEK CHIN HIENG 0317726

15

ROY YIEK CHIN HIENG 0317726

16

1. BEAM (FIRST FLOOR 4/A-E)

FIRST FLOOR BEAM &

COLUMN LAYOUT

FIRST FLOOR PLAN

1.BEAM (FIRST FLOOR 4/A-E)

FIRST FLOOR SLAB LOAD

DISTRIBUTION DIAGRAM

ROY YIEK CHIN HIENG 0317726

17

• DEAD LOAD FROM BEAM SELF WEIGHT ( GRID 4/A-E )

• DEAD LOAD FROM BRICK WALL WEIGHT ( GRID 4/A-C )

• DEAD LOAD FROM SLAB :

- GRID A-C/3-4

- GRID C-E/3-4

- GRID A-E/4-5

• LIVE LOAD FROM SLAB :

- GRID A-C/3-4

- GRID C-E/3-4

- GRID A-E/4-5

• POINT LOAD AT POINT C/4

1.BEAM (FIRST FLOOR 4/A-E)

BEAM (FIRST FLOOR 4/A-E) CARRIES:

3m 2.6m

A C EDEAD LOAD FROM BEAM SELF WEIGHT

(GRID 4/A-E)

1.44Kn/m

11.4Kn/m

DEAD LOAD FROM BRICK WALL WEIGHT

(GRID 4/A-C)

DEAD LOAD FROM SLAB (A-C/3-4)

DEAD LOAD FROM SLAB (C-E/3-4)

*Beam size = 200mm x 300mm

*Wall size = 0.2m X 3m

*Slab thickness = 0.15m

(Density of reinforced concrete) x (Beam size)

=24Kn/m3 x 0.2m x 0.3m

= 1.44Kn/m

(Density of unreinforced concrete) x (Wall size)

=19Kn/m3 x 0.2m x 3.0m

= 11.4Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 2.25m/2

= 4.05Kn/m

4.05Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 2.25m/2

= 4.05Kn/m

4.05Kn/m

ROY YIEK CHIN HIENG 0317726

18

1.BEAM (FIRST FLOOR 4/A-E)

3m 2.6m

A C EDEAD LOAD FROM SLAB (A-E/4-5)

7.11Kn/m

33.6Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 3.95m/2

= 7.11Kn/m

17.64Kn/m

ULTIMATE DEAD LOAD

A-C : 24Kn/m x 1.4 = 33.6Kn/m

C-E : 12.6Kn/m x 1.4 = 17.64Kn/m

LIVE LOAD FROM SLAB (A-C/3-4)

LIVE LOAD FROM SLAB (C-E/3-4)

Toilet = 2.0Kn/m2 2.25Kn/m

(Toilet factor) x (Lx/2)

= 2.0Kn/m2 x 2.25m/2

= 2.25Kn/m

(Bedroom factor) x (Lx/2)

= 1.5Kn/m2 x 2.25m/2

= 1.69Kn/m

Bedroom = 1.5Kn/m2

TOTAL DEAD LOAD

A-C : (1.44+11.4+4.05+7.11)Kn/m = 24Kn/m

C-E : ( 1.44+4.05+7.11)Kn/m = 12.6Kn/m

1.69Kn/m

LIVE LOAD FROM SLAB (A-E/4-5)

(Bedroom factor) x (Lx/2)

= 1.5Kn/m2 x 3.95m/2

= 2.96Kn/m

Bedroom = 1.5Kn/m2 2.96Kn/m

ROY YIEK CHIN HIENG 0317726

19

1.BEAM (FIRST FLOOR 4/A-E)

8.34Kn/m7.44Kn/mULTIMATE LIVE LOAD

A-C : 5.21Kn/m x 1.6 = 8.34Kn/m

C-E : 4.65Kn/m x 1.6 = 7.44Kn/m

TOTAL LIVE LOAD

A-C : (2.25+2.96)Kn/m = 5.21Kn/m

C-E : (1.69+2.96)Kn/m = 4.65Kn/m

3m 2.6m

A C E

ULTIMATE LOAD

A-C : (33.6+8.34) = 41.94Kn/m

C-E : (17.64+7.44) = 25.08Kn/m

Point load at C/4 : 33.47 Kn (refer to page 23)

41.94Kn/m25.08Kn/m

Point load from C/433.47Kn

ROY YIEK CHIN HIENG 0317726

20

1.BEAM (FIRST FLOOR 4/A-E)

41.94Kn/m25.08Kn/m

3m 2.6m

A C E

33.47Kn

Ra Re

M = 0

= (5.6)(Ra) – (125.82)(4.1) – (33.47)(2.6) – (65.21)(1.3)

= 5.6Ra – 515.86 – 87.02 – 84.77

= 5.6Ra – 687.65

5.6Ra = 687.65 Kn

Ra = 122.79 Kn

F = 0

= Re + Ra – (41.94 x 3) – 33.47 – (25.08 x 2.6)

= Re + 122.79 – 224.5

= Re – 101.71Kn

Re = 101.71Kn

ROY YIEK CHIN HIENG 0317726

21

1.BEAM (FIRST FLOOR 4/A-E)

41.94Kn/m25.08Kn/m

3m 2.6m

A C E

33.47Kn

Ra= 122.79Kn Re= 101.71Kn

122.79 Kn

- 36.5 Kn

0 Kn -3.03 Kn

-101.71 Kn

0 Kn

(3.03 x 0.072 / 2) + (36.5 x 2.6) + (65.21 x 2.6 / 2)

= 179.89Kn/m

= 180Kn/m

X/3 = 3.03/(3.03+122.79)

X = 0.072

3.03

122.79

3

x

180Kn/m

LOAD DIAGRAM

SHEAR FORCE DIAGRAM

BENDING MOMENT

DIAGRAM

122.79 x (3 - 0.072) / 2

= 179.76Kn/m

=180Kn/m

ROY YIEK CHIN HIENG 0317726

22

SECONDARY BEAM (FIRST FLOOR C/3-4)

SECONDARY BEAM (FIRST FLOOR C/3-4)

FIRST FLOOR BEAM &

COLUMN LAYOUT

FIRST FLOOR PLAN

FIRST FLOOR SLAB LOAD

DISTRIBUTION DIAGRAM

ROY YIEK CHIN HIENG 0317726

23

SECONDARY BEAM (FIRST FLOOR C/3-4)

• DEAD LOAD FROM BEAM SELF WEIGHT ( GRID C/3-4 )

• DEAD LOAD FROM BRICK WALL WEIGHT ( GRID C/3-4 )

• DEAD LOAD FROM SLAB :

- GRID A-C/3-4

- GRID C-E/3-4

• LIVE LOAD FROM SLAB :

- GRID A-C/3-4

- GRID C-E/3-4

2.25m3 4DEAD LOAD FROM BEAM SELF WEIGHT

(GRID C/3-4)

1.44Kn/m

11.4Kn/mDEAD LOAD FROM BRICK WALL WEIGHT

(GRID 4/A-C)

DEAD LOAD FROM SLAB (A-C/3-4)

DEAD LOAD FROM SLAB (C-E/3-4)

*Beam size = 200mm x 300mm

*Wall size = 0.2m X 3m

*Slab thickness = 0.15m

(Density of reinforced concrete) x (Beam size)

=24Kn/m3 x 0.2m x 0.3m

= 1.44Kn/m

(Density of unreinforced concrete) x (Wall size)

=19Kn/m3 x 0.2m x 3.0m

= 11.4Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2 x 2/3

=24Kn/m3 x 0.15m x 2.25m/2 x 2/3

= 2.7Kn/m

2.7Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2 x 2/3

=24Kn/m3 x 0.15m x 2.25m/2 x 2/3

= 2.7 Kn/m

2.7Kn/m

SECONDARY BEAM (FIRST FLOOR C/3-4)

ROY YIEK CHIN HIENG 0317726

24

2.25m3 4TOTAL DEAD LOAD

25.54Kn/m

1.5Kn/m

3-4 : (1.44+11.4+2.7+2.7)Kn/m = 18.24Kn/m

1.13Kn/m

SECONDARY BEAM (FIRST FLOOR C/3-4)

ULTIMATE DEAD LOAD

18.24Kn/m x 1.4 = 25.54Kn/m

LIVE LOAD FROM SLAB (A-C/3-4)

LIVE LOAD FROM SLAB (C-E/3-4)

Toilet = 2.0Kn/m2

(Toilet factor) x (Lx/2) x 2/3

= 2.0Kn/m2 x 2.25m/2 x 2/3

= 1.5Kn/m

(Bedroom factor) x (Lx/2) x 2/3

= 1.5Kn/m2 x 2.25m/2 x 2/3

= 1.13Kn/m

Bedroom = 1.5Kn/m2

TOTAL LIVE LOAD

3-4 : (1.5+1.13)Kn/m = 2.63Kn/m

ULTIMATE LIVE LOAD

2.63Kn/m x 1.6 = 4.21Kn/m

4.21Kn/m

ULTIMATE LOAD

29.75Kn/m

25.54Kn/m + 4.21Kn/m = 29.75Kn/m

ROY YIEK CHIN HIENG 0317726

25

29.75Kn/m

2.25m

3 4

Ra Rb

Ra = POINT LOAD AT C/4

=(29.75Kn/m x 2.25m) / 2

= 33.47Kn

ROY YIEK CHIN HIENG 0317726

26

2. BEAM (FIRST FLOOR A/1-3)

2. BEAM (FIRST FLOOR A/1-3)

FIRST FLOOR BEAM &

COLUMN LAYOUT

FIRST FLOOR PLAN

FIRST FLOOR SLAB LOAD

DISTRIBUTION DIAGRAM

ROY YIEK CHIN HIENG 0317726

27

2. BEAM (FIRST FLOOR A/1-3)

• DEAD LOAD FROM BEAM SELF WEIGHT ( GRID A/1-3 )

• DEAD LOAD FROM BRICK WALL WEIGHT ( GRID A/1-3 )

• DEAD LOAD FROM SLAB :

- GRID A-B/1-2

- GRID A-B/2-3

• LIVE LOAD FROM SLAB :

- GRID A-B/1-2

- GRID A-B/2-3

• POINT LOAD AT POINT A/2

2. BEAM (FIRST FLOOR A/1-3) CARRIES:

2.59m 1.11m

1 2 3DEAD LOAD FROM BEAM SELF WEIGHT

(GRID A/1-3)

1.44Kn/m

11.4Kn/mDEAD LOAD FROM BRICK WALL WEIGHT

(GRID A/1-3)

DEAD LOAD FROM SLAB (A-B/1-2)

DEAD LOAD FROM SLAB (A-B/2-3)

*Beam size = 200mm x 300mm

*Wall size = 0.2m X 3m

*Slab thickness = 0.15m

(Density of reinforced concrete) x (Beam size)

=24Kn/m3 x 0.2m x 0.3m

= 1.44Kn/m

(Density of unreinforced concrete) x (Wall size)

=19Kn/m3 x 0.2m x 3.0m

= 11.4Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 2.1m/2

= 3.78Kn/m

3.78Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2 x 2/3

=24Kn/m3 x 0.15m x 1.11m/2 x 2/3

= 1.33Kn/m

1.33Kn/m

ROY YIEK CHIN HIENG 0317726

28

2. BEAM (FIRST FLOOR A/1-3)

2.59m 1.11m1 2 3

TOTAL DEAD LOAD

1-2 : (1.44 + 11.4 + 3.78) Kn/m = 16.62Kn/m

2-3 : (1.44 + 11.4 + 1.33) Kn/m = 14.17Kn/m 23.27Kn/m19.84Kn/m

ULTIMATE DEAD LOAD

1-2 : 16.62Kn/m x 1.4 = 23.27Kn/m

2-3 : 14.17Kn/m x 1.4 = 19.84Kn/m

LIVE LOAD FROM SLAB (A-B/1-2)

LIVE LOAD FROM SLAB (A-B/2-3)

2.1Kn/mToilet = 2.0Kn/m2

(Toilet factor) x (Lx/2)

= 2.0Kn/m2 x 2.1m/2

= 2.1Kn/m

0.56Kn/mBedroom = 1.5Kn/m2

(Bedroom factor) x (Lx/2) x 2/3

= 1.5Kn/m2 x 1.11m/2 x 2/3

= 0.56Kn/m

3.36Kn/m0.9Kn/m

TOTAL LIVE LOAD

1-2 : 2.1Kn/m

2-3 : 0.56Kn/m

1-2 : 2.1Kn/m x 1.6 = 3.36Kn/m

2-3 : 0.56Kn/m x 1.6 = 0.9kn/m

ULTIMATE DEAD LOAD

ULTIMATE LOAD

1-2 : (23.27+3.36) = 26.63Kn/m

2-3 : (19.84+0.9) = 20.74Kn/m

Point load at A/2 : 29.26 Kn (refer to page 32)

26.63Kn/m20.74Kn/m

Point load from A/229.26Kn

ROY YIEK CHIN HIENG 0317726

29

2. BEAM (FIRST FLOOR A/1-3)

2.59m 1.11m

1 2 3

26.63Kn/m

20.74Kn/m

Point load from A/229.26Kn

R1 R3

M = 0

= (3.7)(R1) – (68.97)(2.41) – (29.26)(1.11) – (23.02)(0.56)

= 3.7R1 – 166.22 – 32.48 – 12.89

= 3.7R1 – 211.59

3.7R1 = 211.59Kn

R1 = 57.19Kn

F = 0

= R1 + R3 – (26.63 x 2.59) – 21.26 – (20.74 x 1.11)

= 57.19 + R3 - 68.97 – 29.26 – 23.02

= R3 – 64.06Kn

R3 = 64.06Kn

ROY YIEK CHIN HIENG 0317726

30

26.63Kn/m20.74Kn/m

2.59m 1.11m

1 2 3

29.26Kn

R1= 57.19Kn R3= 64.06Kn

57.19 Kn

-41.06Kn

0 Kn -11.80 Kn

--64.06\Kn

0 Kn

(11.8 x 0.44 / 2) + (41.06 x 1.11) + (23 x 1.11 / 2)

= 60.94Kn/m

=61 Kn/m

X/2.59 = 11.8/(11.8+57.19)

X = 0.44

11.8

57.19

2.59

x

61Kn/m

LOAD DIAGRAM

SHEAR FORCE DIAGRAM

BENDING MOMENT

DIAGRAM

2. BEAM (FIRST FLOOR A/1-3)

(57.19 x (2.59 – 0.44) / 2

= 61.48Kn/m

=61 Kn/m

ROY YIEK CHIN HIENG 0317726

31

SECONDARY BEAM (FIRST FLOOR 2/A-B)

SECONDARY BEAM (FIRST FLOOR 2/A-B)

FIRST FLOOR BEAM &

COLUMN LAYOUT

FIRST FLOOR PLAN

FIRST FLOOR SLAB LOAD

DISTRIBUTION DIAGRAM

ROY YIEK CHIN HIENG 0317726

32

SECONDARY BEAM (FIRST FLOOR 2/A-B)

SECONDARY BEAM (FIRST FLOOR 2/A-B)

• DEAD LOAD FROM BEAM SELF WEIGHT ( GRID 2/A-B )

• DEAD LOAD FROM BRICK WALL WEIGHT ( GRID 2/A-B )

• DEAD LOAD FROM SLAB :

- GRID A-B/1-2

- GRID A-B/2-3

• LIVE LOAD FROM SLAB :

- GRID A-B/1-2

- GRID A-B/2-3

2.1mA BDEAD LOAD FROM BEAM SELF WEIGHT

(GRID 2/A-B)

1.44Kn/m

11.4Kn/mDEAD LOAD FROM BRICK WALL WEIGHT

(GRID 4/A-C)

DEAD LOAD FROM SLAB (A-B/1-2)

DEAD LOAD FROM SLAB (A-B/2-3)

*Beam size = 200mm x 300mm

*Wall size = 0.2m X 3m

*Slab thickness = 0.15m

(Density of reinforced concrete) x (Beam size)

=24Kn/m3 x 0.2m x 0.3m

= 1.44Kn/m

(Density of unreinforced concrete) x (Wall size)

=19Kn/m3 x 0.2m x 3.0m

= 11.4Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2 x 2/3

=24Kn/m3 x 0.15m x 2.1m/2 x 2/3

= 2.52Kn/m

2.52Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 1.11m/2

= 2Kn/m

2Kn/m

ROY YIEK CHIN HIENG 0317726

33

2.1mA B

TOTAL DEAD LOAD

A–B : 17.36Kn/m x 1.4 = 24.3 Kn/m

24.3Kn/m

ULTIMATE DEAD LOAD

LIVE LOAD FROM SLAB (A-B/1-2)

LIVE LOAD FROM SLAB (A-B/2-3)

1.4Kn/mToilet = 2.0Kn/m2

(Toilet factor) x (Lx/2) x 2/3

= 2.0Kn/m2 x 2.1m/2 x 2/3

= 1.4Kn/m

Bedroom = 1.5Kn/m2

(bedroom factor) x (Lx/2)

= 1.5Kn/m2 x 1.11m/2

= 0.83Kn/m

3.57Kn/m

ULTIMATE LOAD

A-B : 24.3Kn/m + 3.57Kn/m = 27.87 Kn/m

27.87Kn/m

SECONDARY BEAM (FIRST FLOOR 2/A-B)

A-B : (1.44 + 11.4 + 2.52 + 2) Kn/m = 17.36Kn/m

0.83Kn/m

TOTAL LIVE LOAD

A–B : 2.23Kn/m x 1.6 = 3.57Kn/m

ULTIMATE LIVE LOAD

A-B : (1.4 + 0.83) Kn/m = 2.23Kn/m

ROY YIEK CHIN HIENG 0317726

34

SECONDARY BEAM (FIRST FLOOR 2/A-B)

2.1m

A B

27.87Kn/m

Ra Rb

Point load at A/2 and B/2 = Ra = Rb

Ra = 27.87Kn/m x 2.1m/2 = 29.26 Kn

Point load from B/2= 29.26Kn

Point load from A/2= 29.26Kn

Point load from A/2 Point load from B/2

ROY YIEK CHIN HIENG 0317726

35

3. BEAM (FIRST FLOOR B/1-3)

3. BEAM (FIRST FLOOR B/1-3)

FIRST FLOOR BEAM &

COLUMN LAYOUT

FIRST FLOOR PLAN

FIRST FLOOR SLAB LOAD

DISTRIBUTION DIAGRAM

ROY YIEK CHIN HIENG 0317726

36

• DEAD LOAD FROM BEAM SELF WEIGHT ( GRID B/1-3 )

• DEAD LOAD FROM BRICK WALL WEIGHT ( GRID B/1-2 )

• DEAD LOAD FROM SLAB :

- GRID A-B/1-2

- GRID A-B/2-3

- GRID B-D/1-3

• LIVE LOAD FROM SLAB :

- GRID A-B/1-2

- GRID A-B/2-3

- GRID B-D/1-3

• POINT LOAD AT B/2

2.59m1 3DEAD LOAD FROM BEAM SELF WEIGHT

(GRID B/1-3)

1.44Kn/m

11.4Kn/mDEAD LOAD FROM BRICK WALL WEIGHT

(GRID B/1-2)

DEAD LOAD FROM SLAB (A-B/1-2)

DEAD LOAD FROM SLAB (A-B/2-3)

*Beam size = 200mm x 300mm

*Wall size = 0.2m X 3m

*Slab thickness = 0.15m

(Density of reinforced concrete) x (Beam size)

=24Kn/m3 x 0.2m x 0.3m

= 1.44Kn/m

(Density of unreinforced concrete) x (Wall size)

=19Kn/m3 x 0.2m x 3.0m

= 11.4Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2 x 2/3

=24Kn/m3 x 0.15m x 2.1m / 2

= 3.78Kn/m

3.78Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2 x 2/3

=24Kn/m3 x 0.15m x 1.11m / 2 x 2/3

= 1.33 Kn/m

1.33Kn/m

BEAM (FIRST FLOOR B/1-3) CARRIES:

21.11m

3. BEAM (FIRST FLOOR B/1-3)

ROY YIEK CHIN HIENG 0317726

37

2.59m3

4.68Kn/m

29.82Kn/m

DEAD LOAD FROM SLAB (B-D/1-3)

LIVE LOAD FROM SLAB (A-B/1-2)

(Density of reinforced concrete) x (slab thickness) x

Lx/2 x 2/3

=24Kn/m3 x 0.15m x 2.6m / 2

= 4.68Kn/m

0.56Kn/m

21.11m

3. BEAM (FIRST FLOOR B/1-3)

1

TOTAL DEAD LOAD

1–2 : 21.3Kn/m x 1.4 = 29.82 Kn/m

2-3 : 7.45Kn/m x 1.4 = 10.43 Kn/m

ULTIMATE DEAD LOAD

1-2 : (1.44 + 11.4 + 3.78 + 4.68)Kn/m = 21.3 Kn/m

2-3 : (1.44 + 1.33 + 4.68) = 7.45 Kn/m 10.43Kn/m

Toilet = 2.0 Kn/m2

(Toilet factor) x (Lx/2)

= 2.0Kn/m2 x 2.1m / 2

= 2.1Kn/m

2.1Kn/m

LIVE LOAD FROM SLAB (A-B/2-3)

Bedroom = 1.5 Kn/m2

(bedroom factor) x (Lx/2) x 2/3

= 1.5Kn/m2 x 1.11m /2 x 2/3

= 0.56Kn/m

LIVE LOAD FROM SLAB (B-D/1-3)

Bedroom = 1.5 Kn/m2

(bedroom factor) x (Lx/2)

= 1.5Kn/m2 x 2.6m /2

= 1.95Kn/m

1.95Kn/m

ROY YIEK CHIN HIENG 0317726

38

3. BEAM (FIRST FLOOR B/1-3)

2.59m3

6.48Kn/m

21.11m

1TOTAL LIVE LOAD

1–2 : 4.05Kn/m x 1.6 = 6.48 Kn/m

2-3 : 2.51 Kn/m x 1.6 = 4.02 Kn/m

ULTIMATE LIVE LOAD

1-2 : (2.1 + 1.95)Kn/m = 4.05 Kn/m

2-3 : (0.56 + 1.95) = 2.51 Kn/m 4.02Kn/m

1–2 : 29.82Kn/m + 6.48 Kn/m = 36.3Kn/m

2-3 : 10.43Kn/m + 4.02 Kn/m = 14.45Kn/m

Point load at B/2 = 29.26Kn (refer to page 42)

ULTIMATE LOAD 36.3Kn/m14.45Kn/m

Point load from B/229.26Kn

ROY YIEK CHIN HIENG 0317726

39

M = 0

= (3.7)(R1) – (94.02)(2.41) – (29.26)(1.11) – (16.04)(0.56)

= 3.7R1 – 226.59 – 32.48 – 8.98

= 3.7R1 – 268.05

3.7R1 = 268.05 Kn

R1 = 72.45 Kn

F = 0

= R1 + R3 – (36.3 x 2.59) – 29.26 – (14.45 x 1.11)

= 72.45+ R3 – 94.02 – 29.26 – 16.04

= R3 – 66.87Kn

R3 = 66.87Kn

2.59m32

1.11m

1

36.3Kn/m14.45Kn/m

Point load from B/229.26Kn

R1 R3

3. BEAM (FIRST FLOOR B/1-3)

ROY YIEK CHIN HIENG 0317726

40

72.45 Kn

-50.83Kn

0 Kn-21.56 Kn

-66.87Kn

0 Kn

(21.56 x 0.59/ 2) + (50.83 x 1.11) + (16.04 x 1.11 / 2)

= 71.68 Kn/m

= 72 Kn/m

X/2.59 = 21.56/(21.56+72.45)

X = 0.59

21.56

72.45

2.59

x

72Kn/m

LOAD DIAGRAM

SHEAR FORCE DIAGRAM

BENDING MOMENT

DIAGRAM

72.45 x (2.59-0.59)/ 2

= 72.45 Kn/m

= 72 Kn/m

2.59m32

1.11m1

36.3Kn/m14.45Kn/m

Point load from B/229.26Kn

R1=72.45Kn

R3=66.87Kn

3. BEAM (FIRST FLOOR B/1-3)

ROY YIEK CHIN HIENG 0317726

41

4. BEAM (FIRST FLOOR D/1-3)

FIRST FLOOR BEAM &

COLUMN LAYOUT

4.BEAM (FIRST FLOOR D/1-3)

FIRST FLOOR SLAB LOAD

DISTRIBUTION DIAGRAM

FIRST FLOOR PLAN

ROY YIEK CHIN HIENG 0317726

42

4.BEAM (FIRST FLOOR D/1-3)

• DEAD LOAD FROM BEAM SELF WEIGHT ( GRID D/1-3 )

• DEAD LOAD FROM BRICK WALL WEIGHT ( GRID D/1-2 )

• DEAD LOAD FROM SLAB :

- GRID B-D/1-3

- GRID D-F/1-3

• LIVE LOAD FROM SLAB :

- GRID B-D/1-3

- GRID D-F/1-3

2.59m1 3DEAD LOAD FROM BEAM SELF WEIGHT

(GRID D/1-3)

1.44Kn/m

11.4Kn/mDEAD LOAD FROM BRICK WALL WEIGHT

(GRID D/1-2)

DEAD LOAD FROM SLAB (B-D/1-3)

DEAD LOAD FROM SLAB (D-F/1-3)

*Beam size = 200mm x 300mm

*Wall size = 0.2m X 3m

*Slab thickness = 0.15m

(Density of reinforced concrete) x (Beam size)

=24Kn/m3 x 0.2m x 0.3m

= 1.44Kn/m

(Density of unreinforced concrete) x (Wall size)

=19Kn/m3 x 0.2m x 3.0m

= 11.4Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2 x 2/3

=24Kn/m3 x 0.15m x 2.6m / 2

= 4.68Kn/m

4.68Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2 x 2/3

=24Kn/m3 x 0.15m x 2.15m / 2

= 3.87 Kn/m

3.87Kn/m

BEAM (FIRST FLOOR D/1-3) CARRIES:

21.11m

ROY YIEK CHIN HIENG 0317726

43

4.BEAM (FIRST FLOOR D/1-3)

2.59m3

29.95Kn/m

LIVE LOAD FROM SLAB (B-D/1-3)

1.61Kn/m

21.11m

1TOTAL DEAD LOAD

1–2 : 21.39Kn/m x 1.4 = 29.95Kn/m

2-3 : 9.99Kn/m x 1.4 = 13.99 Kn/m

ULTIMATE DEAD LOAD

1-2 : (1.44 + 11.4 + 3.87 + 4.68)Kn/m = 21.39 Kn/m

2-3 : (1.44 + 4.68 + 43.87) = 9.99 Kn/m

13.99Kn/m

Bedroom = 1.5 Kn/m2

(bedroom factor) x (Lx/2)

= 1.5Kn/m2 x 2.6m / 2

= 1.95Kn/m

1.95Kn/m

LIVE LOAD FROM SLAB (D-F/1-3)

Bedroom = 1.5 Kn/m2

(bedroom factor) x (Lx/2)

= 1.5Kn/m2 x 2.15m /2

= 1.61Kn/m

5.7Kn/m

TOTAL LIVE LOAD

1–3 : 3.56 Kn/m x 1.6 = 5.7 Kn/m

ULTIMATE LIVE LOAD

1-3 : (1.95 + 1.61)Kn/m = 3.56 Kn/m

1–2 : 29.95Kn/m + 5.7Kn/m = 35.65Kn/m

2-3 : 13.99 Kn/m + 5.7Kn/m = 19.69Kn/m

ULTIMATE LOAD19.69Kn/m

35.65Kn/m

ROY YIEK CHIN HIENG 0317726

44

4.BEAM (FIRST FLOOR D/1-3)

M = 0

= (3.7)(R1) – (95.33)(2.41) – (21.86)(0.56)

= 3.7R1 – 229.74 – 12.24

= 3.7R1 – 241.98

3.7R1 = 241.98 Kn

R1 = 65.4 Kn

F = 0

= R1 + R3 – (35.65 x 2.59) – (19.69 x 1.11)

= 65.64 + R3 – 95.33 – 21.86

= R3 – 51.55Kn

R3 = 51.55Kn

2.59m32

1.11m

1

35.65Kn/m

19.69Kn/m

R1 R3

ROY YIEK CHIN HIENG 0317726

45

65.4 Kn

0 Kn

-29.52 Kn

-51.55Kn

0 Kn

(29.52 x 0.81/ 2) + (29.52 x 1.11) + (22.03 x 1.11 / 2)

= 56.95 Kn/m

= 57 Kn/m

X/2.59 = 29.52/(29.52+65.4)

X = 0.81

29.52

65.4

2.59

x

58Kn/m

LOAD DIAGRAM

SHEAR FORCE DIAGRAM

BENDING MOMENT

DIAGRAM

65.4 x (2.59-0.81)/ 2

= 58.21 Kn/m

= 58 Kn/m

2.59m32

1.11m1

36.65Kn/m19.69Kn/m

R1=65.4Kn

R3=51.55Kn

4.BEAM (FIRST FLOOR D/1-3)

Difference less than 5.

ROY YIEK CHIN HIENG 0317726

46

5. BEAM (FIRST FLOOR 3/A-E)

FIRST FLOOR BEAM &

COLUMN LAYOUT

5.BEAM (FIRST FLOOR 3/A-E)

FIRST FLOOR SLAB LOAD

DISTRIBUTION DIAGRAM

FIRST FLOOR PLAN

ROY YIEK CHIN HIENG 0317726

47

5.BEAM (FIRST FLOOR 3/A-E)

5. BEAM (FIRST FLOOR 3/A-E) CARRIES :

• DEAD LOAD FROM BEAM SELF WEIGHT ( GRID 3/A-E )

• DEAD LOAD FROM BRICK WALL WEIGHT ( GRID 3/A-E )

• DEAD LOAD FROM SLAB :

- GRID A-B/2-3

- GRID A-C/3-4

- GRID B-D/1-3

- GRID C-E/3-4

- GRID D-E/1-3

• LIVE LOAD FROM SLAB :

- GRID A-B/2-3

- GRID A-C/3-4

- GRID B-D/1-3

- GRID C-E/3-4

- GRID D-E/1-3

• POINT LOAD AT

- B/3 (refer to page x)

- C/3 (refer to page x)

- D/3 (refer to page x)

2.1m

ADEAD LOAD FROM BEAM SELF WEIGHT

(GRID 3/A-E)

1.44Kn/m

11.4Kn/m

DEAD LOAD FROM BRICK WALL WEIGHT

(GRID 3/A-E)

*Beam size = 200mm x 300mm

*Wall size = 0.2m X 3m

*Slab thickness = 0.15m

(Density of reinforced concrete) x

(Beam size)

=24Kn/m3 x 0.2m x 0.3m

= 1.44Kn/m

(Density of unreinforced concrete) x (Wall size)

=19Kn/m3 x 0.2m x 3.0m

= 11.4Kn/m

ROY YIEK CHIN HIENG 0317726

B C D E

0.9m 1.7m 0.9m

48

5.BEAM (FIRST FLOOR 3/A-E)

2.1m

ADEAD LOAD FROM SLAB (GRID A-B/2-3)

2Kn/m

4.05Kn/m

B C D E

0.9m 1.7m 0.9m(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 1.11m / 2

= 2Kn/m

DEAD LOAD FROM SLAB (GRID A-C/3-4)

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 2.25m / 2

= 4.05Kn/m

DEAD LOAD FROM SLAB (GRID B-D/1-3)

(Density of reinforced concrete) x (slab thickness) x

Lx/2 x 2/3

=24Kn/m3 x 0.15m x 2.6m /2 x 2/3

= 3.12Kn/m

3.12Kn/m

DEAD LOAD FROM SLAB (GRID C-E/3-4)

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 2.25m /2

= 4.05Kn/m

4.05Kn/m

DEAD LOAD FROM SLAB (GRID D-E/1-3)

(Density of reinforced concrete) x (slab thickness) x

Lx/2 x 2/3

=24Kn/m3 x 0.15m x 2.15m /2 X 2/3

= 2.58Kn/m

2.58Kn/m

TOTAL DEAD LOAD

A-B : (1.44 + 11.4 + 2 + 4.05)Kn/m = 18.89 Kn/m

B-C : (1.44 + 11.4 + 4.05 + 3.12) Kn/m = 20.01 Kn/m

C-D : (1.44 + 11.4 + 3.12 + 4.05) Kn/m = 20.01 Kn/m

D-E : (1.44 + 11.4 + 4.05 + 2.58) Kn/m = 19.47 Kn/m

ROY YIEK CHIN HIENG 0317726

49

5.BEAM (FIRST FLOOR 3/A-E)

ULTIMATE DEAD LOAD

A-B : 18.89 Kn/m x 1.4 = 26.45Kn/m

B-C : 20.01 Kn/m x 1.4 = 28.14 Kn/m

C-D : 20.01 Kn/m x 1.4 = 28.14 Kn/m

D-E : 19.47 Kn/m x 1.4 = 27.26 Kn/m

2.1m

A

26.45Kn/m

B C D E

0.9m 1.7m 0.9m

28.14Kn/m27.26Kn/m

2.25Kn/m

1.3Kn/m

1.69Kn/m

1.08Kn/m

LIVE LOAD FROM SLAB (A-B/2-3)

Bedroom = 1.5 Kn/m2

(bedroom factor) x (Lx/2)

= 1.5Kn/m2 x 1.11m / 2

= 0.83Kn/m

0.83Kn/m

LIVE LOAD FROM SLAB (A-C/3-4)

Toilet = 2.0 Kn/m2

(toilet factor) x (Lx/2)

= 2Kn/m2 x 2.25m / 2

= 2.25Kn/m

LIVE LOAD FROM SLAB (B-D/1-3)

Bedroom = 1.5 Kn/m2

(bedroom factor) x (Lx/2) x 2/3

= 1.5Kn/m2 x 2.6m /2 x 2/3

= 1.3Kn/m

LIVE LOAD FROM SLAB (C-E/3-4)

Bedroom = 1.5 Kn/m2

(bedroom factor) x (Lx/2)

= 1.5Kn/m2 x 2.25m /2

= 1.69Kn/m

LIVE LOAD FROM SLAB (D-E/1-3)

Bedroom = 1.5 Kn/m2

(bedroom factor) x (Lx/2) x 2/3

= 1.5Kn/m2 x 2.15m /2 x 2/3

= 1.08Kn/m

ROY YIEK CHIN HIENG 0317726

50

5.BEAM (FIRST FLOOR 3/A-E)

ULTIMATE LIVE LOAD

A-B : 3.08Kn/m x 1.6 = 4.91 Kn/m

B-C : 3.55Kn/m x 1.6 = 5.68 Kn/m

C-D : 2.99Kn/m x 1.6 = 4.78 Kn/m

D-E : 2.77Kn/m x 1.6 = 4.43 Kn/m

2.1m

A

4.91Kn/m

B C D E

0.9m 1.7m 0.9m

TOTAL LIVE LOAD

A-B : (0.83 + 2.25)Kn/m = 3.08 Kn/m

B-C : (2.25 + 1.3) Kn/m = 3.55 Kn/m

C-D : (1.3 + 1.69) Kn/m = 2.99 Kn/m

D-E : (1.69 + 1.08) Kn/m = 2.77 Kn/m

5.68Kn/m

4.78Kn/m4.43Kn/m

ULTIMATE LOAD

A-B : (26.45 + 4.91) Kn/m = 31.36 Kn/m

B-C : (28.14 + 5.68) Kn/m = 33.82 Kn/m

C-D : (28.14 + 4.78) Kn/m = 32.92 Kn/m

D-E : (24.26 + 4.43) Kn/m = 28.69 Kn/m

Point load at B/3 = 66.87Kn (refer to page 47)

Point load at C/3 = 33.47Kn (refer to page 55)

Point load at D/3 = 51.55Kn (refer to page 42)

31.36Kn/m

33.82Kn/m

32.92Kn/m 28.69

Kn/m

66.87Kn 33.47Kn 51.55Kn

ROY YIEK CHIN HIENG 0317726

51

5.BEAM (FIRST FLOOR 3/A-E)

2.1m

A B C D E

0.9m 1.7m 0.9m

31.36Kn/m

33.82Kn/m

32.92Kn/m 28.69

Kn/m

66.87Kn 33.47Kn 51.55Kn

M = 0

= (5.6)(Ra) – (31.36 x 2.1)(4.55) – (66.87)(3.5) – (33.82 x 0.9)(3.05) –(33.47)(2.6) – (32.92 x 1.7)(1.75) – (51.55)(0.9) – (28.69 x 0.9)(0.45)

= 5.6Ra – 299.64 – 234.04 – 92.84 – 87.02 – 97.94 – 46.40 – 11.62

= 5.6Ra – 869.5

5.6Ra = 869.5 Kn

Ra = 155.27 Kn

F = 0

= Ra + Re – (31.36 x 2.1) – 66.87 – (33.82 x 0.9) – 33.47 – (32.92 x 1.7) –51.55 - (28.69 x 0.9)

= 155.27 + Re – 65.86 – 66.87 – 30.44 – 33.47 – 55.96 – 51.55 – 25.82

= Re – 174.7Kn

Re = 174.7Kn

5.6m

Ra Re

ROY YIEK CHIN HIENG 0317726

52

5.BEAM (FIRST FLOOR 3/A-E)

2.1m

A B C D E

0.9m 1.7m 0.9m

31.36Kn/m

33.82Kn/m

32.92Kn/m 28.69

Kn/m

66.87Kn 33.47Kn 51.55Kn

Ra=155.27Kn

Re = 174.7Kn

LOAD DIAGRAM

SHEAR FORCE DIAGRAM

155.27 Kn

0 Kn -7.89 Kn

-174.7Kn

0 Kn

89.41Kn

22.54Kn

-41.36 Kn

-97.33 Kn

-148.88 Kn

ROY YIEK CHIN HIENG 0317726

53

5.BEAM (FIRST FLOOR 3/A-E)

155.27 Kn

0 Kn -7.89 Kn

-174.7Kn

0 Kn

89.41Kn

22.54Kn

-41.36 Kn

-97.33 Kn

-148.88 Kn

2.1m

A B C D E

0.9m 1.7m 0.9m

a

b

c d

e

f

g

hArea of :

(155.27-89.41) x 2.1 / 2

=69.15

a

c

d

e

f

g

h

bArea of :

89.41 x 2.1

= 187.76

c

d

0.9m

22.54

7.89

x0.9 – x

x / 0.9-x = 7.89 / 22.54

7.1-7.89x = 22.54x

30.43x = 7.1

x = 0.23

Area of :

22.54 x (0.9 - 0.23) / 2

= 7.55

Area of :

(148.88 - 41.36) x 0.9

=96.77

Area of :

7.89 x 0.23/ 2

= 0.91

Area of :

41.36 x 2.6

= 107.54

Area of :

(97.33 - 41.36) x 1.7 / 2

= 47.57

Area of :

(174.7 – 148.88) x 0.9 / 2

=11.62

BENDING MOMENT

DIAGRAM

a + b + c

= 264.46

=264.4

d + e + f + g + h

= 264.41

=264.4

264.4Kn/m

ROY YIEK CHIN HIENG 0317726

54

6. BEAM (FIRST FLOOR E/3-4)

FIRST FLOOR BEAM &

COLUMN LAYOUT

6.BEAM (FIRST FLOOR E/3-4)

FIRST FLOOR SLAB LOAD

DISTRIBUTION DIAGRAM

FIRST FLOOR PLAN

ROY YIEK CHIN HIENG 0317726

55

• DEAD LOAD FROM BEAM SELF WEIGHT ( GRID E/3-4 )

• DEAD LOAD FROM BRICK WALL WEIGHT ( GRID E/3-4 )

• DEAD LOAD FROM SLAB :

- GRID C-E/3-4

- GRID E-G/3-5

• LIVE LOAD FROM SLAB :

- GRID C-E/3-4

- GRID E-G/3-5

6. BEAM (FIRST FLOOR E/3-4) CARRIES:

2.25m3 4DEAD LOAD FROM BEAM SELF WEIGHT

(GRID A/1-3)

1.44Kn/m

11.4Kn/mDEAD LOAD FROM BRICK WALL WEIGHT

(GRID A/1-3)

DEAD LOAD FROM SLAB (C-E/3-4)

DEAD LOAD FROM SLAB (E-G/3-5)

*Beam size = 200mm x 300mm

*Wall size = 0.2m X 3m

*Slab thickness = 0.15m

(Density of reinforced concrete) x (Beam size)

=24Kn/m3 x 0.2m x 0.3m

= 1.44Kn/m

(Density of unreinforced concrete) x (Wall size)

=19Kn/m3 x 0.2m x 3.0m

= 11.4Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2 x 2/3

=24Kn/m3 x 0.15m x 2.25m/2 x 2/3

= 2.7Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 2.5m/2

= 4.5Kn/m

ROY YIEK CHIN HIENG 0317726

6.BEAM (FIRST FLOOR E/3-4)

2.7Kn/m

4.5Kn/m

56

6.BEAM (FIRST FLOOR E/3-4)

2.25m3 4

TOTAL DEAD LOAD

A–B : 20.04Kn/m x 1.4 = 28.06 Kn/m

28.06Kn/m

ULTIMATE DEAD LOAD

LIVE LOAD FROM SLAB (C-E/3-4)

LIVE LOAD FROM SLAB (E-G/3-5)

1.13Kn/m

Corridor = 4.0Kn/m2

(corridor factor) x (Lx/2)

= 4.0Kn/m2 x 2.5m/2

= 5Kn/m

Bedroom = 1.5Kn/m2

(bedroom factor) x (Lx/2) x 2/3

= 1.5Kn/m2 x 2.25m/2 x 2/3

= 1.12Kn/m

9.81Kn/m

ULTIMATE LOAD

A-B : 28.06Kn/m + 9.81Kn/m = 37.87 Kn/m

37.87Kn/m

3-4 : (1.44 + 11.4 + 2.7 + 4.5) Kn/m = 20.04Kn/m

5Kn/m

TOTAL LIVE LOAD

3-4 : 6.13Kn/m x 1.6 = 9.81Kn/m

ULTIMATE LIVE LOAD

3-4 : (1.13 + 5) Kn/m = 6.13Kn/m

ROY YIEK CHIN HIENG 0317726

57

6.BEAM (FIRST FLOOR E/3-4)

2.25m3 4

37.87Kn/m

ROY YIEK CHIN HIENG 0317726

R3= 42.6Kn

R4 = 42.46

R3=R4= 37.87 x 2.25 /2 = 42.6Kn

LOAD DIAGRAM

0 Kn

42.6Kn

-42.6Kn

0 Kn

SHEAR FORCE DIAGRAM

BENDING MOMENT

DIAGRAM

23.96Kn/m

58

CHOOSEN COLUMNS 1. E/32. E/43. A/3

ROY YIEK CHIN HIENG 0317726

GENERAL INFO

*Height of the floors=3m

*Brick wall 200mm thick

Dead Load= 3.0m x 0.2m x 19 kN/m3

= 11.4kN/m

*Beam size is 200mm x 300mm

Dead Load= 0.15 m x 0.3 m x 24 kN/m3

= 1.44kN/m

*Slab thickness is 150mm,

Dead Load= 0.15m x 24 kN/m3

= 3.6 kN/m2

*Column size=300 x 300mm

Dead Load= 0.3m x 0.3m x 3m x 24 kN/m3

= 6.48 kN

59

1

2

3

ROY YIEK CHIN HIENG 0317726

60

1

2

3

ROY YIEK CHIN HIENG 0317726

61

1

2

3

ROY YIEK CHIN HIENG 0317726

62

1. COLUMN E/3

1. COLUMN E/3ROY YIEK CHIN HIENG 0317726

1

1

1

ROOF BEAM & COLUMN LAYOUT

FIRST FLOOR BEAM & COLUMN LAYOUT

GROUND FLOOR BEAM & COLUMN LAYOUT

1

1

1

ROOF BEAM & COLUMN LAYOUT

FIRST FLOOR PLAN

GROUND FLOOR PLAN

2.9

8m

4.5m

2.9

8m

4.5m

2.9

8m

3m

corr

idor

63

Dead Load acting on column E/3.

ROY YIEK CHIN HIENG 0317726

Dead Load

1. COLUMN E/3

2.9

8m

4.5m

4.5m

E/3

1.1

3m

1.8

5m

2.6m 1.7m0.2m

1.9m 2.15m 0.45m

Roof Level

Slab dead load (assuming roof is concrete slab):

(Total slab area) x (reinforced concrete density) x (slab

thickness)

= 13.41m2 x 24Kn/m3 x 0.15 kN/m2

=48.28 Kn

Beam dead load :

(total beam length) x (reinforced concrete density) x

(Beam size)

= 10.46m x 24Kn/m3 x (0.2 x 0.3)m

= 15.06 Kn

63.34Kn

Walls dead load

(Total wall length) x (brick wall density) x ( wall size)

=(0.745 + 4.5 + 1.125 + 1.125)m x 19Kn/m3 x (0.2 x

3)m

=85.44 Kn

Slabs dead load

(Total slab area) x (reinforced concrete density) x (slab

thickness)

= 13.41m2 x 24Kn/m3 x 0.15 kN/m2

=48.28 Kn

Beam dead load :

(total beam length) x (reinforced concrete density) x

(Beam size)

= 10.46m x 24Kn/m3 x (0.2 x 0.3)m

= 15.06 Kn

Column

(reinforced concrete density) x (Column size)

= 24Kn/m3 x 0.3m x 0.3m x 3m

= 6.48 kN

155.26Kn

1st Floor

2.9

8m

4.5m

4.5m

E/3

1.1

3m

1.8

5m

2.6m 1.7m0.2m

1.9m 2.15m 0.45m

64

Walls dead load

(Total wall length) x (brick wall density) x ( wall size)

=(1.7 + 1.13) x 19Kn/m3 x (0.2 x 3)m

=32.26 Kn

Slabs dead load

(Total slab area) x (reinforced concrete density) x (slab

thickness)

= 13.41m2 x 24Kn/m3 x 0.15 kN/m2

=48.28 Kn

Beam dead load :

(total beam length) x (reinforced concrete density) x

(Beam size)

= (1.7 + 2.98)m x 24Kn/m3 x (0.2 x 0.3)m

= 6.74 Kn

Column

(reinforced concrete density) x (Column size)

= 24Kn/m3 x 0.3m x 0.3m x 3m

= 6.48 kN

93.76Kn

Grd Floor

2.9

8m

3m

E/3

1.7m1.3m

1.1

3m

1.8

5m

TOTAL DEAD LOAD

= (63.34 + 155.26 + 93.76)

=312.36Kn

ULTIMATE DEAD LOAD

= 312.36Kn x 1.4

= 437.30 Kn

65

ROY YIEK CHIN HIENG 0317726

1. COLUMN E/3

Live LoadRoof Level

1st Floor

Grd Floor

Slab live load :

(Total slab area) x (roof live load factor)

= 13.41m2 x 0.5Kn/m2

=6.71 Kn

6.71Kn

Bedroom

(Total bedroom areas) x (bedroom factor)

=(4.5m x 1.85m) (1.5Kn/m2) +

(2.6m x 1.13m) (1.5Kn/m2) +

=16.9 Kn

Toilet

(Total toilet area) x (toilet factor)

= (1.13m x 0.2m) x 2.0 kN/m2

=0.45 Kn

Corridor

(total corridor area) x (corridor factor)

= (1.7m x 1.13m) (4.0Kn/m2)

= 7.68 Kn

25.03Kn

Bedroom

(Total bedroom areas) x (bedroom factor)

=(3m x 1.85m) (1.5Kn/m2)

=8.33 Kn

Toilet

(Total toilet area) x (toilet factor)

= (1.3m x 2.98m) x 2.0 kN/m2

=7.75 Kn

Corridor

(total corridor area) x (corridor factor)

= (1.7m x 1.13m) (4.0Kn/m2)

= 7.68 Kn

23.76Kn

Live Load acting on column E/3.

2.9

8m

4.5m

4.5m

E/3

1.1

3m

1.8

5m

2.6m 1.7m0.2m

1.9m 2.15m 0.45m

2.9

8m

4.5m

4.5m

E/3

1.1

3m

1.8

5m

2.6m 1.7m0.2m

1.9m 2.15m 0.45m

BEDROOM BEDROOM

BEDROOM CORRIDOR

TOILET

2.9

8m

3m

E/3

1.7m1.3m

1.1

3m

1.8

5m BEDROOM

CORRIDORTOILET

66

ROY YIEK CHIN HIENG 0317726

So, ultimate load acting on column E/3= 526.1 Kn

TOTAL LIVE LOAD

= (6.71 + 25.03 + 23.76) Kn

55.5Kn

ULTIMATE LIVE LOAD

= 55.5Kn x 1.6

= 88.8 Kn

ULTIMATE LOAD

= Untimate Dead Load + Ultimate Live Load

= 437.30Kn + 88.8Kn

= 526.10 Kn

1. COLUMN E/3

67

2. COLUMN E/4

2. COLUMN A/1ROY YIEK CHIN HIENG 0317726

ROOF BEAM & COLUMN LAYOUT

FIRST FLOOR BEAM & COLUMN LAYOUT

GROUND FLOOR BEAM & COLUMN LAYOUT

ROOF PLAN

FIRST FLOOR PLAN

1.8

5m

2.35m

2

2 2

2

2 2

1.8

5m

1.5m

68

ROY YIEK CHIN HIENG 0317726

2. COLUMN A/1

Dead Load acting on column A/1.

Dead Load

TOTAL DEAD LOAD

= (24.37 + 59.48 + 6.48) Kn

= 90.33Kn

ULTIMATE DEAD LOAD

= 9.33Kn x 1.4

= 126.46 Kn

Roof Level

1st Floor

Grd Floor

Column

(reinforced concrete density) x (Column size)

= 24Kn/m3 x 0.3m x 0.3m x 3m

= 6.48 kN

6.48Kn

Walls dead load

(Total wall length) x (brick wall density) x ( wall size)

=(1.85 + 1.5)m x 19Kn/m3 x (0.2 x 3)m

=38.19 Kn

Slabs dead load

(Total slab area) x (reinforced concrete density) x (slab

thickness)

= 2.78m2 x 24Kn/m3 x 0.15 kN/m2

=9.99 Kn

Beam dead load :

(total beam length) x (reinforced concrete density) x

(Beam size)

= 3.35m x 24Kn/m3 x (0.2 x 0.3)m

= 4.82 Kn

Column

(reinforced concrete density) x (Column size)

= 24Kn/m3 x 0.3m x 0.3m x 3m

= 6.48 kN

59.48Kn

Slab dead load (assuming roof is concrete slab):

(Total slab area) x (reinforced concrete density) x (slab

thickness)

= 4.35m2 x 24Kn/m3 x 0.15 kN/m2

=15.66 Kn

Beam dead load :

(total beam length) x (reinforced concrete density) x

(Beam size)

= 6.05m x 24Kn/m3 x (0.2 x 0.3)m

= 8.71 Kn

24.37Kn

1.8

5m

2.35m

A/1

0.25m2.1m

A/1

1.8

5m

1.5m

69

2. COLUMN A/1

Live Load acting on column A/1.

Live LoadRoof Level

1st Floor

Grd Floor

1.8

5m

2.35m

A/1

0.25m2.1m

A/1

1.8

5m

1.5m

Slab live load :

(Total slab area) x (roof live load factor)

= 4.35m2 x 0.5Kn/m2

=2.18 Kn

2.18Kn

TOILET

Toilet

(Total toilet area) x (toilet factor)

= 2.78m2 x 2.0 kN/m2

=5.56 Kn

5.56Kn

No live load

ROY YIEK CHIN HIENG 0317726

70

TOTAL LIVE LOAD

= (2.18 + 5.56) Kn

= 7.74Kn

ULTIMATE LIVE LOAD

= 7.74Kn x 1.6

= 12.38 Kn

ROY YIEK CHIN HIENG 0317726

2. COLUMN A/1

ULTIMATE LOAD

= Ultimate Dead Load + Ultimate Live Load

= 126.46Kn + 12.38Kn

= 138.84 Kn

So, ultimate load acting on column A/1= 138.84 kN

71

3. COLUMN A/3

3. COLUMN A/3ROY YIEK CHIN HIENG 0317726

ROOF BEAM & COLUMN LAYOUT

FIRST FLOOR BEAM & COLUMN LAYOUT

GROUND FLOOR BEAM & COLUMN LAYOUT

ROOF PLAN

FIRST FLOOR PLAN

3 3

3 3

3 3

72

ROY YIEK CHIN HIENG 0317726

3. COLUMN A/3

DeadLoad acting on column A/3.

Dead LoadRoof Level

1st Floor

Grd Floor

Slab dead load (assuming roof is concrete slab):

(Total slab area) x (reinforced concrete density) x (slab

thickness)

=(2.8m x 2.98m) x 24Kn/m3 x 0.15 kN/m2

=30.04 Kn

Beam dead load :

(total beam length) x (reinforced concrete density) x

(Beam size)

= (2.1m + 2.8m + 1.85m + 2.98 ) x 24Kn/m3 x

(0.2 x 0.3)m

= 14.01 Kn

44.05Kn

Walls dead load

(Total wall length) x (brick wall density) x ( wall size)

=(0.74 + 2.1 + 2.98 + 2.8)m x 19Kn/m3 x (0.2 x 3)m

=98.27 Kn

Slabs dead load

(Total slab area) x (reinforced concrete density) x (slab

thickness)

= 8.34m2 x 24Kn/m3 x 0.15 kN/m2

=30.04 Kn

Beam dead load :

(total beam length) x (reinforced concrete density) x

(Beam size)

= 9.73m x 24Kn/m3 x (0.2 x 0.3)m

= 14.01 Kn

Column

(reinforced concrete density) x (Column size)

= 24Kn/m3 x 0.3m x 0.3m x 3m

= 6.48kN

148.8Kn

Column

(reinforced concrete density) x (Column size)

= 24Kn/m3 x 0.3m x 0.3m x 3m

= 6.48 kN 6.48Kn

A/3

A/3

A/3

2.9

8m

2.1m

1.1

3m

1.1

1m

0.7

4m

2.8m

0.7m

1.8

5m

2.9

8m

2.1m

1.1

3m

1.1

1m

0.7

4m

2.8m

0.7m

1.8

5m

ULTIMATE DEAD LOAD = 199.33Kn x 1.4

= 279.06 Kn

TOTAL DEAD LOAD = 44.05 + 148.8 + 6.48

= 199.33Kn

73

ROY YIEK CHIN HIENG 0317726

TOTAL LIVE LOAD

= (2.18 + 18.87) Kn

= 21.05Kn

ULTIMATE LIVE LOAD

= 21.05Kn x 1.6

= 33.68 Kn

3. DeadLoad acting on column A/3.

Dead LoadRoof Level

1st Floor

Grd Floor

A/3

A/3

A/3

2.9

8m

2.1m

1.1

3m

1.1

1m

0.7

4m

2.8m

0.7m

1.8

5m

2.9

8m

2.1m

1.1

3m

1.1

1m

0.7

4m

2.8m

0.7m

1.8

5m

Slab live load :

(Total slab area) x (roof live load factor)

= 4.35m2 x 0.5Kn/m2

=2.18 Kn

2.18Kn

Toilet

(Total toilet area) x (toilet factor)

= (2.1m x 0.74m) (2.0 kN/m2) +

(1.13m x 2.8m)(2.0Kn/m2)

= 9.44 Kn

Bedroom

(Total bedroom area) x (bedroom factor)

= (1.85m x 0.7m)( 2.0 kN/m2) +

(1.11m x 2.1m)( 2.0 kN/m2)

= 7.25 Kn

BEDROOM

TOILET

TOILET

BED

RO

OM

No live load

18.87Kn

3. COLUMN A/3 74

ROY YIEK CHIN HIENG 0317726

3. COLUMN A/3

ULTIMATE LOAD

= Ultimate Dead Load + Ultimate Live Load

= 279.06Kn + 33.68Kn

= 312.74Kn

So, ultimate load acting on column A/3= 312.74 kN

75

LOUIS DE ROZARIO0327136

CHOOSEN BEAMS 1. FIRST FLOOR 8/A-E2. FIRST FLOOR E/6-93. FIRST FLOOR 5/A-E4. FIRST FLOOR 6/A-E5. FIRST FLOOR 9/A-E 6. FIRST FLOOR C/8-9

76

12

3

4

5

6

77

78

1. BEAM (FIRST FLOOR 8/A-E)

FIRST FLOOR BEAM &

COLUMN LAYOUT

FIRST FLOOR PLAN

1.BEAM (FIRST FLOOR 8/A-E)

FIRST FLOOR SLAB LOAD

DISTRIBUTION DIAGRAM79

• DEAD LOAD FROM BEAM SELF WEIGHT ( GRID 8/A-E )

• DEAD LOAD FROM BRICK WALL WEIGHT ( GRID 8/A-C )

• DEAD LOAD FROM SLAB :

- GRID A-C/8-9

- GRID C-E/8-9

- GRID A-E/6-8

• LIVE LOAD FROM SLAB :

- GRID A-C/8-9

- GRID C-E/8-9

- GRID A-E/6-8

• POINT LOAD AT POINT C/8

1.BEAM (FIRST FLOOR 8/A-E)

BEAM (FIRST FLOOR 8/A-E) CARRIES:

3m 2.6m

A C EDEAD LOAD FROM BEAM SELF WEIGHT

(GRID 8/A-E)

1.44Kn/m

11.4Kn/m

DEAD LOAD FROM BRICK WALL WEIGHT

(GRID 8/A-C)

DEAD LOAD FROM SLAB (A-C/8-9)

DEAD LOAD FROM SLAB (C-E/8-9)

*Beam size = 200mm x 300mm

*Wall size = 0.2m X 3m

*Slab thickness = 0.15m

(Density of reinforced concrete) x (Beam size)

=24Kn/m3 x 0.2m x 0.3m

= 1.44Kn/m

(Density of unreinforced concrete) x (Wall size)

=19Kn/m3 x 0.2m x 3.0m

= 11.4Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 2m/2

= 3.6Kn/m

3.6Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 2m/2

= 3.6Kn/m

3.6Kn/m

80

1.BEAM (FIRST FLOOR 8/A-E)

3m 2.6m

A C EDEAD LOAD FROM SLAB (A-E/6-8)

6.3Kn/m

31.84Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 3.5m/2

= 6.3Kn/m

15.88Kn/m

ULTIMATE DEAD LOAD

A-C : 22.74Kn/m x 1.4 = 31.84Kn/m

C-E : 11.34Kn/m x 1.4 = 15.88Kn/m

LIVE LOAD FROM SLAB (A-C/8-9)

LIVE LOAD FROM SLAB (C-E/8-9)

Toilet = 2.0Kn/m2 2Kn/m

(Toilet factor) x (Lx/2)

= 2.0Kn/m2 x 2m/2

= 2Kn/m

(Bedroom factor) x (Lx/2)

= 1.5Kn/m2 x 2m/2

= 1.5Kn/m

Bedroom = 1.5Kn/m2

TOTAL DEAD LOAD

A-C : (1.44+11.4+3.6+6.3)Kn/m = 22.74Kn/m

C-E : ( 1.44+3.6+6.3)Kn/m = 11.34Kn/m

1.5Kn/m

LIVE LOAD FROM SLAB (A-E/6-7)

(Bedroom factor) x (Lx/2)

= 1.5Kn/m2 x 3. 5m/2

= 2.63Kn/m

Bedroom = 1.5Kn/m2 2.63Kn/m

81

1.BEAM (FIRST FLOOR 8/A-E)

7.41Kn/m6.31Kn/mULTIMATE LIVE LOAD

A-C : 4.63Kn/m x 1.6 = 7.41Kn/m

C-E : 3.95Kn/m x 1.6 = 6.31Kn/m

TOTAL LIVE LOAD

A-C : (2+2.63)Kn/m = 4.63Kn/m

C-E : (1.5+2.63)Kn/m = 3.95Kn/m

3m 2.6m

A C E

ULTIMATE LOAD

A-C : (7.41+31.84) = 39.25Kn/m

C-E : (6.31+15.88) = 22.19Kn/m

Point load at C/8 : 28.4 Kn (kindly refer to page

85)

39.25Kn/m22.19Kn/m

Point load from C/828.4Kn/m

82

1.BEAM (FIRST FLOOR 8/A-E)

39.25Kn/m22.19Kn/m

3m 2.6m

A C E

28.4Kn

Ra Re

M = 0

= (5.6)(Ra) – (117.75)(4.1) – (28.4)(2.6) – (57.69)(1.3)

= 5.6Ra – 482.78 – 73.84 – 75

= 5.6Ra – 631.62

5.6Ra = 631.62 Kn

Ra = 112.8 Kn

F = 0

= Re + Ra – (39.25 x 3) – 28.4 – (22.19 x 2.6)

= Re + 112.8 – 203.84

= Re – 91.04Kn

Re = 91.04Kn

83

1.BEAM (FIRST FLOOR 8/A-E)

39.25Kn/m22.19Kn/m

3m 2.6m

A C E

28.4Kn

Ra= 112.80Kn Re= 91.04Kn

112.8 Kn

- 33.35 Kn

0 Kn -4.95 Kn

-91.04 Kn

0 Kn

= 162Kn/m

X/3 = 4.95/(4.95+112.8)

X = 0.13

4.95

112.8

3

x

162Kn/m

LOAD DIAGRAM

SHEAR FORCE DIAGRAM

BENDING MOMENT

DIAGRAM

84

SECONDARY BEAM (FIRST FLOOR C/8-9)

SECONDARY BEAM (FIRST FLOOR C/8-9)

FIRST FLOOR BEAM &

COLUMN LAYOUT

FIRST FLOOR PLAN

FIRST FLOOR SLAB LOAD

DISTRIBUTION DIAGRAM85

SECONDARY BEAM (FIRST FLOOR C/8-9)

• DEAD LOAD FROM BEAM SELF WEIGHT ( GRID C/8-9 )

• DEAD LOAD FROM BRICK WALL WEIGHT ( GRID C/8-9 )

• DEAD LOAD FROM SLAB :

- GRID A-C/8-9

- GRID C-E/8-9

• LIVE LOAD FROM SLAB :

- GRID A-C/8-9

- GRID C-E/8-9

2m8 9DEAD LOAD FROM BEAM SELF WEIGHT

(GRID C/8-9)

1.44Kn/m

11.4Kn/mDEAD LOAD FROM BRICK WALL WEIGHT

(GRID C/8-9)

DEAD LOAD FROM SLAB (A-C/8-9)

DEAD LOAD FROM SLAB (C-E/8-9)

*Beam size = 200mm x 300mm

*Wall size = 0.2m X 3m

*Slab thickness = 0.15m

(Density of reinforced concrete) x (Beam size)

=24Kn/m3 x 0.2m x 0.3m

= 1.44Kn/m

(Density of unreinforced concrete) x (Wall size)

=19Kn/m3 x 0.2m x 3.0m

= 11.4Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 2m/2 x 2/3

= 2.4Kn/m

2.4Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 2m/2 x 2/3

= 2.4 Kn/m

2.4Kn/m

SECONDARY BEAM (FIRST FLOOR C/8-9)86

2m8 9TOTAL DEAD LOAD

24.67Kn/m

1.33Kn/m

3-4 : (1.44+11.4+2.4+2.4)Kn/m = 17.64Kn/m

1Kn/m

SECONDARY BEAM (FIRST FLOOR C/8-9)

ULTIMATE DEAD LOAD

17.64Kn/m x 1.4 = 24.67Kn/m

LIVE LOAD FROM SLAB (A-C/8-9)

LIVE LOAD FROM SLAB (C-E/3-4)

Toilet = 2.0Kn/m2

(Toilet factor) x (Lx/2) x 2/3

= 2.0Kn/m2 x 2 m/2 x 2/3

= 1.33Kn/m

(Bedroom factor) x (Lx/2) x 2/3

= 1.5Kn/m2 x 2m/2 x 2/3

= 1Kn/m

Bedroom = 1.5Kn/m2

TOTAL LIVE LOAD

8-9 : (1.33+1)Kn/m = 2.33Kn/m

ULTIMATE LIVE LOAD

2.33Kn/m x 1.6 = 3.73Kn/m

3.73Kn/m

ULTIMATE LOAD

28.4Kn/m

24.67Kn/m + 3.73Kn/m = 28.4Kn/m

87

28.4Kn/m

2m

8 9

Ra Rb

Ra = POINT LOAD AT C/8

=(28.4Kn/m x 2m) / 2

= 28.4Kn

88

2. BEAM (FIRST FLOOR E/6-9)

FIRST FLOOR BEAM &

COLUMN LAYOUT

2.BEAM (FIRST FLOOR E/6-9)

FIRST FLOOR SLAB LOAD

DISTRIBUTION DIAGRAM89

• DEAD LOAD FROM BEAM SELF WEIGHT ( GRID E/6-9 )

• DEAD LOAD FROM BRICK WALL WEIGHT ( GRID E/6-9 )

• DEAD LOAD FROM SLAB :

- GRID A-E/6-8

- GRID C-E/8-9

- GRID E-G/6-9

• LIVE LOAD FROM SLAB :

- GRID A-E/6-8

- GRID C-E/8-9

- GRID E-G/6-9

• POINT LOAD AT POINT E/8

2.BEAM (FIRST FLOOR E/6-9)

BEAM (FIRST FLOOR E/6-9) CARRIES:

3.5m 2m

6 8 9DEAD LOAD FROM BEAM SELF WEIGHT

(GRID E/6-9)

1.44Kn/m

11.4Kn/m

DEAD LOAD FROM BRICK WALL WEIGHT

(GRID E/6-9)

DEAD LOAD FROM SLAB (A-E/6-8)

DEAD LOAD FROM SLAB (C-E/8-9)

*Beam size = 200mm x 300mm

*Wall size = 0.2m X 3m

*Slab thickness = 0.15m

(Density of reinforced concrete) x (Beam size)

=24Kn/m3 x 0.2m x 0.3m

= 1.44Kn/m

(Density of unreinforced concrete) x (Wall size)

=19Kn/m3 x 0.2m x 3.0m

= 11.4Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 3.5m/2

= 6.3Kn/m

6.3Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 2m/2

= 3.6Kn/m

3.6Kn/m

90

2.BEAM (FIRST FLOOR E/6-9)

3.5m 2m

6 8 9DEAD LOAD FROM SLAB (E-G/6-9)

4.5Kn/m

33.1Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 2.5m/2

= 4.5Kn/m

29.32Kn/m

ULTIMATE DEAD LOAD

A-C : 23.64Kn/m x 1.4 = 33.1Kn/m

C-E : 20.94Kn/m x 1.4 = 29.32Kn/m

LIVE LOAD FROM SLAB (A-E/6-8)

LIVE LOAD FROM SLAB (C-E/8-9)

Bedroom = 1.5Kn/m2 2.63Kn/m

(Bedroom factor) x (Lx/2)

= 2.0Kn/m2 x 3.5m/2

= 2.63Kn/m

(Bedroom factor) x (Lx/2)

= 1.5Kn/m2 x 2m/2

= 1.5Kn/m

Bedroom = 1.5Kn/m2

TOTAL DEAD LOAD

6-8 : (1.44+11.4+4.5+6.3)Kn/m = 23.64Kn/m

8-9 : ( 1.44+11.4+3.6+4.5)Kn/m = 20.94Kn/m

1.5Kn/m

LIVE LOAD FROM SLAB (E-G/6-9)

(Living Room factor) x (Lx/2)

= 4Kn/m2 x 2. 5m/2

= 5Kn/m

Living Room = 4Kn/m2 5Kn/m

91

2.BEAM (FIRST FLOOR E/6-9)

12.21Kn/m10.4Kn/mULTIMATE LIVE LOAD

6-8 : 7.63Kn/m x 1.6 = 12.21Kn/m

8-9 : 6.5Kn/m x 1.6 = 10.4Kn/m

TOTAL LIVE LOAD

6-8 : (5+2.63)Kn/m = 7.63Kn/m

8-9 : (1.5+5)Kn/m = 6.5Kn/m

3.5m 2m

6 8 9

ULTIMATE LOAD

6-8 : (12.21+33.1) = 25.31Kn/m

8-9 : (10.4+29.32) = 39.72Kn/m

Point load at E/8 : 91.04 Kn (kindly refer to page

79)

45.31Kn/m39.72Kn/m

Point load from C/891.04Kn/m

92

2.BEAM (FIRST FLOOR E/6-9)

43.31Kn/m39.72Kn/m

3.5m 2m

6 8 9

91.04Kn

Ra Re

M = 0

= (5.5)(Ra) – (158.59)(3.75) – (91.04)(2) – (79.44)(1)

= 5.5Ra – 594.71 – 182.08 – 79.44

= 5.5Ra – 856.23

5.5Ra = 856.23 Kn

Ra = 155.68 Kn

F = 0

= Re + Ra – (45.31 x 3.5) – 91.04 – (39.72 x 2)

= Re + 155.68 – 329.07

= Re – 173.39Kn

Re = 173.39Kn

93

2.BEAM (FIRST FLOOR E/6-9)

45.31Kn/m39.72Kn/m

3.5m 2m

6 8 9

91.04Kn

Ra= 155.68Kn Re= 173.39Kn

155.68 Kn

- 93.95 Kn

0 Kn -2.91 Kn

-173.39 Kn

0 Kn

= 267Kn/m

X/3 = 2.91/(2.91+155.68)

X = 0.06

2.91

155.68

3.5

x

267Kn/m

LOAD DIAGRAM

SHEAR FORCE DIAGRAM

BENDING MOMENT

DIAGRAM

94

3. BEAM (FIRST FLOOR 5/A-E)

FIRST FLOOR BEAM &

COLUMN LAYOUT

FIRST FLOOR PLAN

3.BEAM (FIRST FLOOR 5/A-E)

FIRST FLOOR SLAB LOAD

DISTRIBUTION DIAGRAM95

• DEAD LOAD FROM BEAM SELF WEIGHT ( GRID 5/A-E )

• DEAD LOAD FROM BRICK WALL WEIGHT ( GRID 5/A-E )

• DEAD LOAD FROM SLAB :

- GRID A-C/5-6

- GRID C-G/5-6

- GRID A-E/4-5

• LIVE LOAD FROM SLAB :

- GRID A-C/5-6

- GRID C-G/5-6

- GRID A-E/4-5

• POINT LOAD AT POINT C/5

3.BEAM (FIRST FLOOR 5/A-E)

BEAM (FIRST FLOOR 5/A-E) CARRIES:

3m 2.6m

A C EDEAD LOAD FROM BEAM SELF WEIGHT

(GRID E/6-9)

1.44Kn/m

11.4Kn/m

DEAD LOAD FROM BRICK WALL WEIGHT

(GRID E/6-9)

DEAD LOAD FROM SLAB (A-C/5-6)

DEAD LOAD FROM SLAB (C-G/5-6)

*Beam size = 200mm x 300mm

*Wall size = 0.2m X 3m

*Slab thickness = 0.15m

(Density of reinforced concrete) x (Beam size)

=24Kn/m3 x 0.2m x 0.3m

= 1.44Kn/m

(Density of unreinforced concrete) x (Wall size)

=19Kn/m3 x 0.2m x 3.0m

= 11.4Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 2.6m/2

= 4.68Kn/m

4.68Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 2.6m/2

= 4.68Kn/m

4.68Kn/m

96

3.BEAM (FIRST FLOOR 5/A-E)

3m 2.6m

A C EDEAD LOAD FROM SLAB (E-G/6-9)

7.11Kn/m

34.48Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 3.95m/2

= 7.11Kn/m

34.48Kn/m

ULTIMATE DEAD LOAD

A-C : 24.63Kn/m x 1.4 = 34.48Kn/m

C-E : 24.63Kn/m x 1.4 = 34.48Kn/m

LIVE LOAD FROM SLAB (A-C/5-6)

LIVE LOAD FROM SLAB (C-G/5-6)

Toilet = 2Kn/m2 2.6Kn/m

(Toilet factor) x (Lx/2)

= 2.0Kn/m2 x 2.6m/2

= 2.6Kn/m

(Corridor factor) x (Lx/2)

= 4Kn/m2 x 2.6m/2

= 5.2Kn/m

Corridor = 4Kn/m2

TOTAL DEAD LOAD

A-C : (1.44+11.4+4.68+7.11)Kn/m = 24.63Kn/m

C-D : (1.44+11.4+4.68+7.11)Kn/m = 24.63Kn/m

5.2Kn/m

LIVE LOAD FROM SLAB (E-G/6-9)

(Bedroom factor) x (Lx/2)

= 1.5Kn/m2 x 3.95m/2

= 2.96Kn/m

Bedroom = 1.5Kn/m2 2.96Kn/m

97

3.BEAM (FIRST FLOOR 5/A-E)

8.9Kn/m13.06Kn/m

ULTIMATE LIVE LOAD

A-C : 5.56Kn/m x 1.6 = 8.9Kn/m

C-E : 8.16Kn/m x 1.6 = 13.06Kn/m

TOTAL LIVE LOAD

A-C : (2.96+2.6)Kn/m = 5.56Kn/m

C-E : (2.96+5.2)Kn/m = 8.16Kn/m

3m 2.6m

A C E

ULTIMATE LOAD

A-C : (34.48+8.9) = 43.38Kn/m

C-E : (34.48+13.06) = 47.54Kn/m

Point load at C/5 : 45.54 Kn (kindly refer to page

107)

43.38Kn/m47.54Kn/m

Point load from C/545.54Kn/m

98

3.BEAM (FIRST FLOOR 5/A-E)

43.38Kn/m47.54Kn/m

3m 2.6m

A C E

45.54Kn

Ra Re

M = 0

= (5.6)(Ra) – (130.14)(4.1) – (45.54)(2.6) – (123.6)(1.3)

= 5.6Ra – 533.57 – 118.40 – 160.68

= 5.6Ra – 812.65

5.6Ra = 812.65 Kn

Ra = 145.12 Kn

F = 0

= Re + Ra – (43.38 x 4.1) – 45.54 – (47.54 x 2.6)

= Re + 145.12 – 299.28

= Re – 154.16Kn

Re = 154.16Kn

99

3.BEAM (FIRST FLOOR 5/A-E)

43.38Kn/m47.54Kn/m

3m 2.6m

A C E

45.54Kn

Ra= 145.12Kn Re= 154.16Kn

145.12Kn

- 30.56Kn

0 Kn

14.98Kn

-154.16 Kn

0 Kn

= 240.15Kn/m

240.15Kn/m

LOAD DIAGRAM

SHEAR FORCE DIAGRAM

BENDING MOMENT

DIAGRAM

100

4. BEAM (FIRST FLOOR 6/A-E)

FIRST FLOOR BEAM &

COLUMN LAYOUT

FIRST FLOOR PLAN

4.BEAM (FIRST FLOOR 6/A-E)

FIRST FLOOR SLAB LOAD

DISTRIBUTION DIAGRAM101

• DEAD LOAD FROM BEAM SELF WEIGHT ( GRID 8/A-E )

• DEAD LOAD FROM BRICK WALL WEIGHT ( GRID 8/A-C )

• DEAD LOAD FROM SLAB :

- GRID A-C/5-6

- GRID A-E/5-6

- GRID A-E/6-8

• LIVE LOAD FROM SLAB :

- GRID A-C/5-6

- GRID A-E/5-6

- GRID A-E/6-8

• POINT LOAD AT POINT C/6

4.BEAM (FIRST FLOOR 6/A-E)

BEAM (FIRST FLOOR 8/A-E) CARRIES:

3m 2.6m

A C EDEAD LOAD FROM BEAM SELF WEIGHT

(GRID 8/A-E)

1.44Kn/m

11.4Kn/m

DEAD LOAD FROM BRICK WALL WEIGHT

(GRID 8/A-C)

DEAD LOAD FROM SLAB (A-C/5-6)

DEAD LOAD FROM SLAB (C-E/8-9)

*Beam size = 200mm x 300mm

*Wall size = 0.2m X 3m

*Slab thickness = 0.15m

(Density of reinforced concrete) x (Beam size)

=24Kn/m3 x 0.2m x 0.3m

= 1.44Kn/m

(Density of unreinforced concrete) x (Wall size)

=19Kn/m3 x 0.2m x 3.0m

= 11.4Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 2.6m/2

= 4.68Kn/m

4.68Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 2.6m/2

= 4.68Kn/m

4.68Kn/m

102

4.BEAM (FIRST FLOOR 6/A-E)

3m 2.6m

A C EDEAD LOAD FROM SLAB (A-E/6-8)

6.3Kn/m

33.35Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 3.5m/2

= 6.3Kn/m

33.35Kn/m

ULTIMATE DEAD LOAD

A-C : 23.82Kn/m x 1.4 = 33.35Kn/m

C-E : 23.82Kn/m x 1.4 = 33.35Kn/m

LIVE LOAD FROM SLAB (A-C/8-9)

LIVE LOAD FROM SLAB (C-E/8-9)

Toilet = 2.0Kn/m2 2.6Kn/m

(Toilet factor) x (Lx/2)

= 2.0Kn/m2 x 2.6m/2

= 2.6Kn/m

(Corridor factor) x (Lx/2)

= 4Kn/m2 x 2.6m/2

= 5.2Kn/m

Corridor = 4Kn/m2

TOTAL DEAD LOAD

A-C : (1.44+11.4+4.68+6.3)Kn/m = 23.82Kn/m

C-E : (1.44+11.4+4.68+6.3)Kn/m = 23.82Kn/m

5.2Kn/m

LIVE LOAD FROM SLAB (A-E/6-7)

(Bedroom factor) x (Lx/2)

= 1.5Kn/m2 x 3. 5m/2

= 2.63Kn/m

Bedroom = 1.5Kn/m2 2.63Kn/m

103

4.BEAM (FIRST FLOOR 6/A-E)

8.37Kn/m12.53Kn/m

ULTIMATE LIVE LOAD

A-C : 5.23Kn/m x 1.6 = 8.37Kn/m

C-E : 7.83Kn/m x 1.6 = 12.53Kn/m

TOTAL LIVE LOAD

A-C : (2.6+2.63)Kn/m = 5.23Kn/m

C-E : (5.2+2.63)Kn/m = 7.83Kn/m

3m 2.6m

A C E

ULTIMATE LOAD

A-C : (8.37+33.35) = 41.72Kn/m

C-E : (12.53+12.53) = 45.88Kn/m

Point load at C/6 : 45.54 Kn (kindly refer to page

107)

41.72Kn/m45.88Kn/m

Point load from C/645.54Kn/m

104

4.BEAM (FIRST FLOOR 6/A-E)

41.72Kn/m45.88Kn/m

3m 2.6m

A C E

45.54Kn

Ra Re

M = 0

= (5.6)(Ra) – (125.16)(4.1) – (45.54.4)(2.6) – (119.29)(1.3)

= 5.6Ra – 513.16 – 118.4 – 155.08

= 5.6Ra – 786.64

5.6Ra = 786.64 Kn

Ra = 140.47 Kn

F = 0

= Re + Ra – (41.72 x 3) – 45.54 – (45.88 x 2.6)

= Re + 140.47 – 289.99

= Re – 149.52Kn

Re = 149.52Kn

105

4.BEAM (FIRST FLOOR 6/A-E)

41.72Kn/m45.88Kn/m

3m 2.6m

A C E

45.54Kn

Ra= 140.47Kn Re= 149.52Kn

140.47 Kn

- 30.23 Kn

0 Kn

15.31Kn

-149.52 Kn

0 Kn

= 236Kn/m

236Kn/m

LOAD DIAGRAM

SHEAR FORCE DIAGRAM

BENDING MOMENT

DIAGRAM

106

SECONDARY BEAM (FIRST FLOOR C/5-6)

SECONDARY BEAM (FIRST FLOOR C/8-9)

FIRST FLOOR BEAM &

COLUMN LAYOUT

FIRST FLOOR PLAN

FIRST FLOOR SLAB LOAD

DISTRIBUTION DIAGRAM107

SECONDARY BEAM (FIRST FLOOR C/8-9)

• DEAD LOAD FROM BEAM SELF WEIGHT ( GRID C/5-6 )

• DEAD LOAD FROM BRICK WALL WEIGHT ( GRID C/5-6 )

• DEAD LOAD FROM SLAB :

- GRID A-C/5-6

- GRID C-G/5-6

• LIVE LOAD FROM SLAB :

- GRID A-C/5-6

- GRID C-G/5-6

2.6m5 6DEAD LOAD FROM BEAM SELF WEIGHT

(GRID C/8-9)

1.44Kn/m

11.4Kn/mDEAD LOAD FROM BRICK WALL WEIGHT

(GRID C/8-9)

DEAD LOAD FROM SLAB (A-C/5-6)

DEAD LOAD FROM SLAB (C-G/5-6)

*Beam size = 200mm x 300mm

*Wall size = 0.2m X 3m

*Slab thickness = 0.15m

(Density of reinforced concrete) x (Beam size)

=24Kn/m3 x 0.2m x 0.3m

= 1.44Kn/m

(Density of unreinforced concrete) x (Wall size)

=19Kn/m3 x 0.2m x 3.0m

= 11.4Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 2.6m/2 x 2/3

= 3.12Kn/m

3.12Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 2.6m/2 x 2/3

= 2.4 Kn/m

3.12Kn/m

SECONDARY BEAM (FIRST FLOOR C/5-6)108

2.6m5 6TOTAL DEAD LOAD

26.71Kn/m

1.73Kn/m

3-4 : (1.44+11.4+3.12+3.12)Kn/m = 19.08Kn/m

3.47Kn/m

SECONDARY BEAM (FIRST FLOOR C/5-6)

ULTIMATE DEAD LOAD

19.08Kn/m x 1.4 = 26.71Kn/m

LIVE LOAD FROM SLAB (A-C/5-6)

LIVE LOAD FROM SLAB (C-E/3-4)

Toilet = 2.0Kn/m2

(Toilet factor) x (Lx/2) x 2/3

= 2.0Kn/m2 x 2.6m/2 x 2/3

= 1.73Kn/m

(Corridor factor) x (Lx/2) x 2/3

= 4Kn/m2 x 2.6m/2 x 2/3

= 3.47Kn/m

Corridor = 4Kn/m2

TOTAL LIVE LOAD

5-6 : (1.73+3.47)Kn/m = 5.2Kn/m

ULTIMATE LIVE LOAD

5.2Kn/m x 1.6 = 8.32Kn/m

8.32Kn/m

ULTIMATE LOAD

30.03Kn/m

26.71Kn/m + 8.32Kn/m = 35.03Kn/m

109

35.03Kn/m

2.6m

5 6

Ra Rb

Ra = POINT LOAD AT C/6

=(35.03Kn/m x 2.6m) / 2

= 45.54Kn

110

5. BEAM (FIRST FLOOR 9/A-E)

FIRST FLOOR BEAM &

COLUMN LAYOUT

FIRST FLOOR PLAN

5.BEAM (FIRST FLOOR 9/A-E)

FIRST FLOOR SLAB LOAD

DISTRIBUTION DIAGRAM111

• DEAD LOAD FROM BEAM SELF WEIGHT ( GRID 9/A-E )

• DEAD LOAD FROM BRICK WALL WEIGHT ( GRID 9/A-E )

• DEAD LOAD FROM SLAB :

- GRID A-C/8-9

- GRID C-E/8-9

• LIVE LOAD FROM SLAB :

- GRID A-C/8-9

- GRID C-E/8-9

• POINT LOAD AT POINT C/9

5.BEAM (FIRST FLOOR 9/A-E)

BEAM (FIRST FLOOR 8/A-E) CARRIES:

3m 2.6m

A C EDEAD LOAD FROM BEAM SELF WEIGHT

(GRID 8/A-E)

1.44Kn/m

11.4Kn/m

DEAD LOAD FROM BRICK WALL WEIGHT

(GRID 8/A-C)

DEAD LOAD FROM SLAB (A-C/8-9)

DEAD LOAD FROM SLAB (C-E/8-9)

*Beam size = 200mm x 300mm

*Wall size = 0.2m X 3m

*Slab thickness = 0.15m

(Density of reinforced concrete) x (Beam size)

=24Kn/m3 x 0.2m x 0.3m

= 1.44Kn/m

(Density of unreinforced concrete) x (Wall size)

=19Kn/m3 x 0.2m x 3.0m

= 11.4Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 2m/2

= 3.6Kn/m

3.6Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 2m/2

= 3.6Kn/m

3.6Kn/m

112

5.BEAM (FIRST FLOOR 9/A-E)

3m 2.6m

A C E

23.02Kn/m 23.02Kn/m

ULTIMATE DEAD LOAD

A-C : 16.44Kn/m x 1.4 = 23.02Kn/m

C-E : 16.44Kn/m x 1.4 = 23.02Kn/m

LIVE LOAD FROM SLAB (A-C/8-9)

LIVE LOAD FROM SLAB (C-E/8-9)

Toilet = 2.0Kn/m2 2Kn/m

(Toilet factor) x (Lx/2)

= 2.0Kn/m2 x 2m/2

= 2Kn/m

(Bedroom factor) x (Lx/2)

= 1.5Kn/m2 x 2m/2

= 1.5Kn/m

Bedroom = 1.5Kn/m2

TOTAL DEAD LOAD

A-C : (1.44+11.4+3.6)Kn/m = 16.44Kn/m

C-E : (1.44+11.4+3.6)Kn/m = 16.44Kn/m

1.5Kn/m

113

5.BEAM (FIRST FLOOR 9/A-E)

3.2Kn/m2.4Kn/mULTIMATE LIVE LOAD

A-C : 2Kn/m x 1.6 = 3.2Kn/m

C-E : 1.5Kn/m x 1.6 = 2.4Kn/m

3m 2.6m

A C E

ULTIMATE LOAD

A-C : (3.2+23.02) = 26.22Kn/m

C-E : (2.4+23.02) = 25.42Kn/m

Point load at C/9 : 28.4 Kn (kindly refer to page

117)

26.22Kn/m25.42Kn/m

Point load from C/928.4Kn/m

114

5.BEAM (FIRST FLOOR 9/A-E)

26.22Kn/m25.42Kn/m

3m 2.6m

A C E

28.4Kn

Ra Re

M = 0

= (5.6)(Ra) – (78.66)(4.1) – (28.4)(2.6) – (66.09)(1.3)

= 5.6Ra – 322.15 – 73.84 – 85.92

= 5.6Ra – 482.37

5.6Ra = 482.27 Kn

Ra = 86.12 Kn

F = 0

= Re + Ra – (26.22 x 3) – 28.4 – (25.42 x 2.6)

= Re + 86.12 – 173.15

= Re – 87.03Kn

Re = 87.03Kn

115

5.BEAM (FIRST FLOOR 9/A-E)

26.22Kn/m25.42Kn/m

3m 2.6m

A C E

28.4Kn

Ra= 86.12Kn Re= 87.03Kn

86.12 Kn

- 20.94 Kn

0 Kn 7.46Kn

-87.03 Kn

0 Kn

= 140.36Kn/m

140.36Kn/m

LOAD DIAGRAM

SHEAR FORCE DIAGRAM

BENDING MOMENT

DIAGRAM

116

6. SECONDARY BEAM (FIRST FLOOR C/8-9)

FIRST FLOOR BEAM &

COLUMN LAYOUT

FIRST FLOOR PLAN

6. SECONDARY BEAM (FIRST FLOOR 8/A-E)

FIRST FLOOR SLAB LOAD

DISTRIBUTION DIAGRAM117

SECONDARY BEAM (FIRST FLOOR C/8-9)

• DEAD LOAD FROM BEAM SELF WEIGHT ( GRID C/8-9 )

• DEAD LOAD FROM BRICK WALL WEIGHT ( GRID C/8-9 )

• DEAD LOAD FROM SLAB :

- GRID A-C/8-9

- GRID C-E/8-9

• LIVE LOAD FROM SLAB :

- GRID A-C/8-9

- GRID C-E/8-9

2m8 9DEAD LOAD FROM BEAM SELF WEIGHT

(GRID C/8-9)

1.44Kn/m

11.4Kn/mDEAD LOAD FROM BRICK WALL WEIGHT

(GRID C/8-9)

DEAD LOAD FROM SLAB (A-C/8-9)

DEAD LOAD FROM SLAB (C-E/8-9)

*Beam size = 200mm x 300mm

*Wall size = 0.2m X 3m

*Slab thickness = 0.15m

(Density of reinforced concrete) x (Beam size)

=24Kn/m3 x 0.2m x 0.3m

= 1.44Kn/m

(Density of unreinforced concrete) x (Wall size)

=19Kn/m3 x 0.2m x 3.0m

= 11.4Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 2m/2 x 2/3

= 2.4Kn/m

2.4Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 2m/2 x 2/3

= 2.4 Kn/m

2.4Kn/m

6. SECONDARY BEAM (FIRST FLOOR 8/A-E)118

2m8 9TOTAL DEAD LOAD

24.67Kn/m

1.33Kn/m

3-4 : (1.44+11.4+2.4+2.4)Kn/m = 17.64Kn/m

1Kn/m

6. SECONDARY BEAM (FIRST FLOOR 8/A-E)

ULTIMATE DEAD LOAD

17.64Kn/m x 1.4 = 24.67Kn/m

LIVE LOAD FROM SLAB (A-C/8-9)

LIVE LOAD FROM SLAB (C-E/3-4)

Toilet = 2.0Kn/m2

(Toilet factor) x (Lx/2) x 2/3

= 2.0Kn/m2 x 2 m/2 x 2/3

= 1.33Kn/m

(Bedroom factor) x (Lx/2) x 2/3

= 1.5Kn/m2 x 2m/2 x 2/3

= 1Kn/m

Bedroom = 1.5Kn/m2

TOTAL LIVE LOAD

8-9 : (1.33+1)Kn/m = 2.33Kn/m

ULTIMATE LIVE LOAD

2.33Kn/m x 1.6 = 3.73Kn/m

3.73Kn/m

ULTIMATE LOAD

28.4Kn/m

24.67Kn/m + 3.73Kn/m = 28.4Kn/m

119

28.4Kn/m

2m

8 9

Ra Rb

Ra = POINT LOAD AT C/8

=(28.4Kn/m x 2m) / 2

= 28.4Kn

120

6. SECONDARY BEAM (FIRST FLOOR 8/A-E)

28.4Kn/m

2 m

8 9

Ra= 28.4Kn Re= 28.4Kn

28.4 Kn

0 Kn

-28.4 Kn

0 Kn

= 28.4Kn/m

28.4Kn/m

LOAD DIAGRAM

SHEAR FORCE DIAGRAM

BENDING MOMENT

DIAGRAM

121

CHOOSEN COLUMNS 1. E/62. E/93. G/9

LOUIS DE ROZARIO 0327136

GENERAL INFO

*Height of the floors=3m

*Brick wall 200mm thick

Dead Load= 3.0m x 0.2m x 19 kN/m3

= 11.4kN/m

*Beam size is 200mm x 300mm

Dead Load= 0.15 m x 0.3 m x 24 kN/m3

= 1.44kN/m

*Slab thickness is 150mm,

Dead Load= 0.15m x 24 kN/m3

= 3.6 kN/m2

*Column size=300 x 300mm

Dead Load= 0.3m x 0.3m x 3m x 24 kN/m3

= 6.48 kN

122

1

2 3

LOUIS DE ROZARIO 0327136

123

1

2 3

LOUIS DE ROZARIO 0327136

124

1

2 3

LOUIS DE ROZARIO 0327136

125

1. COLUMN E/6

1. COLUMN E/6LOUIS DE ROZARIO 0327136

1

ROOF BEAM & COLUMN LAYOUT

FIRST FLOOR BEAM & COLUMN LAYOUT

GROUND FLOOR BEAM & COLUMN LAYOUT

ROOF BEAM & COLUMN LAYOUT

FIRST FLOOR PLAN

GROUND FLOOR PLAN

3.8

5m

4.05m

1

3.8

5m

4.05m

1

3.8

5m

4.05m

1

3.8

5m

4.05m

1

3.8

5m

4.05m

126

LOUIS DE ROZARIO 0327136

Load acting on column E/6. Dead Load

Roof Level Slab dead load (assuming roof is concrete slab):

(Total slab area) x (reinforced concrete density) x

(slab thickness)

= 15.59m2 x 24Kn/m3 x 0.15 kN/m2

= 56.13 Kn

Beam dead load :

(total beam length) x (reinforced concrete density) x

(Beam size)

= 7.9m x 24Kn/m3 x (0.2 x 0.3)m

= 11.38 Kn

67.51Kn

E/6

3.8

5m

4.05m

2.6m 1.25m

1.3

m2

.75

m

1st Floor

Walls dead load

(Total wall length) x (brick wall density) x ( wall size)

=(2.6 + 1.25 + 1.3 + 2.75)m x 19Kn/m3 x (0.2 x 3)m

=90.06 Kn

Slabs dead load

(Total slab area) x (reinforced concrete density) x (slab

thickness)

= 15.59m2 x 24Kn/m3 x 0.15 kN/m2

= 56.13 Kn

Beam dead load :

(total beam length) x (reinforced concrete density) x

(Beam size)

= 7.9m x 24Kn/m3 x (0.2 x 0.3)m

= 11.38 Kn

Column

(reinforced concrete density) x (Column size)

= 24Kn/m3 x 0.3m x 0.3m x 3m

= 8.64 kN 164.05Kn

1. COLUMN E/6

E/6

3.8

5m

4.05m

2.6m 1.25m

1.3

m2

.75

m

127

LOUIS DE ROZARIO 0327136

Load acting on column E/6. Dead Load

E/6

3.8

5m

4.05m

2.6m 1.25m

1.3

m2

.75

m

1. COLUMN E/6

Grd Floor

Walls dead load

No walls = 0

Slabs dead load

(Total slab area) x (reinforced concrete density) x (slab

thickness)

= 15.59m2 x 24Kn/m3 x 0.15 kN/m2

= 56.13 Kn

Beam dead load :

(total beam length) x (reinforced concrete density) x

(Beam size)

= 7.9m x 24Kn/m3 x (0.2 x 0.3)m

= 11.38 Kn

Column

(reinforced concrete density) x (Column size)

= 24Kn/m3 x 0.3m x 0.3m x 3m

= 8.64 kN

73.99Kn

TOTAL DEAD LOAD

= 427.77Kn

ULTIMATE DEAD LOAD

= 427.77Kn x 1.4

= 598.88 Kn

128

LOUIS DE ROZARIO 0327136

Load acting on column E/6. Live Load

E/6

3.8

5m

4.05m

2.6m 1.25m

1.3

m2

.75

m

1. COLUMN E/6

E/6

3.8

5m

4.05m

2.6m

1.25m

1.3

m2

.75

m

Roof LevelSlab live load :

(Total slab area) x (roof live load factor)

= 15.59m2 x 0.5Kn/m2

=7.8 Kn

7.8Kn

1st Floor

Bedroom

(Total bedroom areas) x (bedroom factor)

=(2.6m x 2.75m) (1.5Kn/m2)

= 10.73 Kn

Living Room

(Total living room area) x (living room factor)

= (1.25m x 2.75m) x 4.0 kN/m2

= 13.75 Kn

Corridor

(total corridor area) x (corridor factor)

= (1.3m x 3.85m) (4.0Kn/m2)

= 20.02 Kn

44.5 Kn

E/6

3.8

5m

4.05m

2.6m

1.3

m2

.75

m

Grd Floor

Living Room

(Total living room area) x (living room factor)

=(2.75m x 2.6m) (4Kn/m2)

=28.6 Kn

Dining Room

(Total dining room area) x (dining room factor)

= (1.3m x 2.6m) x 2 kN/m2

=6.76 Kn

Corridor

(total corridor area) x (corridor factor)

= (1.25m x 4.05m) (4.0Kn/m2)

= 20.25 Kn

55.61Kn

129

LOUIS DE ROZARIO 0327136

So, ultimate load acting on column E/6= 771.54 kN

TOTAL LIVE LOAD

= 107.91Kn

ULTIMATE LIVE LOAD

= 107.91Kn x 1.6

= 172.66 Kn

ULTIMATE LOAD

= 598.88 Kn + 172.66 Kn

= 771.54 Kn

1. COLUMN E/6

130

2. COLUMN E/9

2. COLUMN E/9LOUIS DE ROZARIO 0327136

2

ROOF BEAM & COLUMN LAYOUT

FIRST FLOOR BEAM & COLUMN LAYOUT

GROUND FLOOR BEAM & COLUMN LAYOUT

ROOF BEAM & COLUMN LAYOUT

FIRST FLOOR PLAN

GROUND FLOOR PLAN

2.7

5m

4.05m

2

2.7

5m

4.05m

2

2.7

5m

4.05m

2

2.7

5m

4.05m

2

2.7

5m

4.05m

131

LOUIS DE ROZARIO 0327136

Load acting on column E/9. Dead Load

2. COLUMN E/9

E/9

4.05m

1.25m2.6m

2.7

5m

2m

1.8

5m

E/9

4.05m

2.6m

2.7

5m

2m

1.8

5m

Roof Level Slab dead load (assuming roof is concrete slab):

(Total slab area) x (reinforced concrete density) x (slab

thickness)

= 7.01m2 x 24Kn/m3 x 0.15 kN/m2

= 25.24 Kn

Beam dead load :

(total beam length) x (reinforced concrete density) x

(Beam size)

= 6.6m x 24Kn/m3 x (0.2 x 0.3)m

= 9.5 Kn

34.74Kn

1st Floor

Walls dead load

(Total wall length) x (brick wall density) x ( wall size)

=(1.3 + 1.25 + 2.75)m x 19Kn/m3 x (0.2 x 3)m

= 60.42 Kn

Slabs dead load

(Total slab area) x (reinforced concrete density) x (slab

thickness)

= 7.01m2 x 24Kn/m3 x 0.15 kN/m2

= 25.24 Kn

Beam dead load :

(total beam length) x (reinforced concrete density) x

(Beam size)

= 6.6m x 24Kn/m3 x (0.2 x 0.3)m

= 9.5 Kn

Column

(reinforced concrete density) x (Column size)

= 24Kn/m3 x 0.3m x 0.3m x 3m

= 6.48 kN 101.64Kn

132

LOUIS DE ROZARIO 0327136

Load acting on column E/9. Dead Load

2. COLUMN E/9

E/9

4.05m

1.25m2.6m

2.7

5m

2m

1.8

5m

Grd Floor

Walls dead load

(Total wall length) x (brick wall density) x ( wall size)

=(1.3 + 1.25) x 19Kn/m3 x (0.2 x 3)m

= 29.07 Kn

Slabs dead load

(Total slab area) x (reinforced concrete density) x (slab

thickness)

= 7.01m2 x 24Kn/m3 x 0.15 kN/m2

= 25.24 Kn

Beam dead load :

(total beam length) x (reinforced concrete density) x

(Beam size)

= 6.6m x 24Kn/m3 x (0.2 x 0.3)m

= 9.5 Kn

Column

(reinforced concrete density) x (Column size)

= 24Kn/m3 x 0.3m x 0.3m x 3m

= 6.48 kN

70.29Kn

TOTAL DEAD LOAD

= 289.34Kn

ULTIMATE DEAD LOAD

= 289.34Kn x 1.4

= 405.08 Kn

133

LOUIS DE ROZARIO 0327136

Load acting on column E/9. Live Load

2. COLUMN E/9

E/9

4.05m

1.25m2.6m

2.7

5m

2m

1.8

5m

E/9

4.05m

2.6m

2.7

5m

2m

1.8

5m

Roof LevelSlab live load :

(Total slab area) x (roof live load factor)

= 7.01m2 x 0.5Kn/m2

= 3.51 Kn

3.51Kn

1st Floor

Bedroom

(Total bedroom area) x (bedroom factor)

=(1.3m x 2.75m) (1.5Kn/m2)

= 5.36 Kn

Living Room

(Total living room area) x (living room factor)

= (1.25m x 2.75m) x 4.0 kN/m2

= 13.75 Kn

19.11Kn

E/9

4.05m

2.6m

2.7

5m

2m

1.8

5m

Grd Floor

Living Room

(Total living room area) x (living room factor)

= (1.3m x 2.75m) x 4.0 kN/m2

= 14.3 Kn

Corridor

(total corridor area) x (corridor factor)

= (1.25m x 2.75m) (4.0Kn/m2)

= 13.75 Kn 28.05Kn

134

LOUIS DE ROZARIO 0327136

TOTAL LIVE LOAD

= 50.67Kn

ULTIMATE LIVE LOAD

= 50.67Kn x 1.6

= 81.07 Kn

ULTIMATE LOAD = 405.08Kn + 81.07Kn

= 486.15 Kn

So, ultimate load acting on column E/6= 486.15 kN

135

3. COLUMN G/9

3. COLUMN G/9LOUIS DE ROZARIO 0327136

3

ROOF BEAM & COLUMN LAYOUT

FIRST FLOOR BEAM & COLUMN LAYOUT

GROUND FLOOR BEAM & COLUMN LAYOUT

ROOF BEAM & COLUMN LAYOUT

FIRST FLOOR PLAN

GROUND FLOOR PLAN

2.7

5m

4.05m

3

3 2.7

5m

4.05m

3 2.7

5m

4.05m

3 2.7

5m

4.05m

3 2.7

5m

4.05m

136

LOUIS DE ROZARIO 0327136

Load acting on column G/9. Dead Load

3. COLUMN G/9

G/9

4.05m

1.25m2.6m

2.7

5m

2m

1.8

5m

Roof Level Slab dead load (assuming roof is concrete slab):

(Total slab area) x (reinforced concrete density) x (slab

thickness)

= 9.63m2 x 24Kn/m3 x 0.15 kN/m2

=34.65 Kn

Beam dead load :

(total beam length) x (reinforced concrete density) x

(Beam size)

= 6.25m x 24Kn/m3 x (0.2 x 0.3)m

= 9 Kn 43.65Kn

G/9

4.05m

1.25m2.6m

2.7

5m

2m

1.8

5m

1st Floor

Walls dead load

(Total wall length) x (brick wall density) x ( wall size)

=(2.75 + 1.25)m x 19Kn/m3 x (0.2 x 3)m

= 45.6 Kn

Slabs dead load

(Total slab area) x (reinforced concrete density) x (slab

thickness)

= 9.63m2 x 24Kn/m3 x 0.15 kN/m2

=34.65 Kn

Beam dead load :

(total beam length) x (reinforced concrete density) x

(Beam size)

= 6.25m x 24Kn/m3 x (0.2 x 0.3)m

= 9 Kn

Column

(reinforced concrete density) x (Column size)

= 24Kn/m3 x 0.3m x 0.3m x 3m

= 6.48 kN 95.73Kn

137

LOUIS DE ROZARIO 0327136

Load acting on column G/9. Dead Load

3. COLUMN G/9

G/9

4.05m

1.25m2.6m

2.7

5m

2m

1.8

5m

Grd Floor

Walls dead load

(Total wall length) x (brick wall density) x ( wall size)

=(2.75 + 1.25)m x 19Kn/m3 x (0.2 x 3)m

= 45.6 Kn

Slabs dead load

(Total slab area) x (reinforced concrete density) x (slab

thickness)

= 9.63m2 x 24Kn/m3 x 0.15 kN/m2

=34.65 Kn

Beam dead load :

(total beam length) x (reinforced concrete density) x

(Beam size)

= 9m x 24Kn/m3 x (0.2 x 0.3)m

= 12.96 Kn

Column

(reinforced concrete density) x (Column size)

= 24Kn/m3 x 0.3m x 0.3m x 3m

= 6.48 kN 99.35Kn

TOTAL DEAD LOAD

= 238.73Kn

ULTIMATE DEAD LOAD

= 238.73Kn x 1.4

= 334.22 Kn

138

LOUIS DE ROZARIO 0327136

Load acting on column G/9. Live Load

3. COLUMN G/9

G/9

4.05m

1.25m2.6m

2.7

5m

2m

1.8

5m

G/9

4.05m

1.25m2.6m

2.7

5m

2m

1.8

5m

Roof LevelSlab live load :

(Total slab area) x (roof live load factor)

= 6.25m2 x 0.5Kn/m2

= 3.13Kn

3.13Kn

1st Floor

Living Room

(Total living room area) x (living room factor)

= (3.5m x 2.75m) x 4.0 kN/m2

= 38.52 Kn

38.52Kn

Grd Floor

Corridor

(total corridor area) x (corridor factor)

= (3.5m x 2.75m) x 4.0 kN/m2

= 38.52 Kn 38.52Kn

G/9

4.05m

1.25m2.6m

2.7

5m

2m

1.8

5m

139

LOUIS DE ROZARIO 0327136

TOTAL LIVE LOAD

= 80.65Kn

ULTIMATE LIVE LOAD

= 80.65Kn x 1.6

= 129.04 Kn

ULTIMATE LOAD = 334.22Kn + 80.65Kn

= 414.87 Kn

So, ultimate load acting on column G/9= 414.87 kN

140

TRISTAN YU TZE-XIEN

0317729

CHOOSEN BEAMS 1. GROUND FLOOR C-H/12. GROUND FLOOR E/1-33. GROUND FLOOR C/1-44. GROUND FLOOR C-E/35. GROUND FLOOR E-H/3 6. GROUND FLOOR G/3-5

141

1

2

3 4 5

6

142

GROUND FLOOR PLAN

143

1. BEAM (GROUND FLOOR C-H/1)

Z

GROUND FLOOR BEAM & COLUMN LAYOUT

GROUND FLOOR PLAN

1.BEAM (GROUND FLOOR C-H/1)

GROUND FLOOR SLAB LOAD DISTRIBUTION DIAGRAM

Z

Z

144

• DEAD LOAD FROM BEAM SELF WEIGHT ( GRID C-H/1 )

• DEAD LOAD FROM BRICK WALL WEIGHT ( GRID C-H/1 )

• DEAD LOAD FROM SLAB :

- GRID C-E/1-3

- GRID E-H/1-3

• LIVE LOAD FROM SLAB :

- GRID C-E/1-3

- GRID E-H/1-3

• POINT LOAD AT POINT E/1

BEAM (GROUND FLOOR 1/C-H) CARRIES:

2.6m 3.4m

C E HDEAD LOAD FROM BEAM SELF WEIGHT

(GRID 1/C-H)

1.44Kn/m

11.4Kn/m

DEAD LOAD FROM BRICK WALL WEIGHT

(GRID 4/C-H)

DEAD LOAD FROM SLAB (C-E/1-3)

DEAD LOAD FROM SLAB (E-H/1-3)

*Beam size = 200mm x 300mm

*Wall size = 0.2m X 3m

*Slab thickness = 0.15m

(Density of reinforced concrete) x (Beam size)

=24Kn/m3 x 0.2m x 0.3m

= 1.44Kn/m

(Density of unreinforced concrete) x (Wall size)

=19Kn/m3 x 0.2m x 3.0m

= 11.4Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 2.6m/2 x 2/3

= 3.12Kn/m

3.12Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 3.4m/2 x 2/3

= 4.08Kn/m

4.08Kn/m

1.BEAM (GROUND FLOOR C-H/1)145

2.6m 3.4m

C E H

22.33Kn/m23.69Kn/mULTIMATE DEAD LOAD

C-E : 15.95Kn/m x 1.4 = 22.33Kn/m

E-H : 16.92Kn/m x 1.4 = 23.69Kn/m

LIVE LOAD FROM SLAB (C-E/1-3)

LIVE LOAD FROM SLAB (E-H/1-3)

Bedroom = 1.5Kn/m2 1.3Kn/m

(Bedroom factor) x (Lx/2)

= 1.5Kn/m2 x 2.6m/2 x 2/3

= 1.5Kn/m2 x 1.3m

= 1.3Kn/m

(Bedroom factor) x (Lx/2)

= 1.5Kn/m2 x 3.4m/2 x 2/3

= 1.5Kn/m x 1.7Kn/m

= 1.7Kn/m

Bedroom = 1.5Kn/m2

TOTAL DEAD LOAD

C-E : (1.44+11.4+4.05+3.12)Kn/m = 15.95Kn/m

E-H : ( 1.44+11.4+4.08)Kn/m = 16.92Kn/m

1.7Kn/m

ULTIMATE LIVE LOAD

C-E : 1.3Kn/m x 1.6 = 2.08Kn/m

E-H : 1.7Kn/m x 1.6 = 2.72Kn/m

ULTIMATE LOAD

C-E : (22.33Kn/m x 2.08) = 24.41Kn/m

E-H : (23.69Kn/m x 2.72) = 26.41Kn/m

Point load at E/1

2.08Kn/m

2.72Kn/m

24.41Kn/m

26.41Kn/m

1.BEAM (GROUND FLOOR C-H/1)

Point load at E/1R1 = 44.99Kn

146

24.41Kn/m26.41Kn/m

2.6m 3.4m

C E H

44.99Kn

Ra Rb

M = 0

= (6)(Ra) – (24.41 x 2.6)(4.7) – (44.99)(3.4) – (26.41 x 3.4)(1.7)

= 6Ra – 298.29 – 152.97 – 152.65

= 6Ra – 603.91

6Ra = 603.91 Kn

Ra = 100.65 Kn

F = 0

= Rb + Ra – (24.41 x 2.6) – 44.99 – (26.41 x 3.4)

= Rb + 100.65 – 63.47 – 44.99 – 89.79

= Rb – 97.60Kn

Rb = 97.60n

1.BEAM (GROUND FLOOR C-H/1)147

24.41Kn/m26.41Kn/m

2.6m 3.4m

C E H

44.99Kn

Ra = 100.65Kn Rb = 97.60Kn

100.65Kn

0 Kn

-97.6 Kn

0 Kn

a = (100.65 – 37.18) x 2.6 / 2

= 82.51Kn/m

177.05Knm

LOAD DIAGRAM

SHEAR FORCE DIAGRAM

BENDING MOMENT

DIAGRAM

37.18 Kn

a

b

c

d

b = 37.18 x 2.6

= 96.67Kn/m

c = 7.18 x 3.4

= 24.41Kn/m

d = (97.6 – 7.81) x 3.4 / 2

= 152.64Kn/m

Conclusion

(a + b)- ( c + d) = 2.13 DIFFERENCE LESS THAN 5.

1.BEAM (GROUND FLOOR C-H/1)

-7.81 Kn

148

2. BEAM (GROUND FLOOR E/1-3)

Z

GROUND FLOOR BEAM & COLUMN LAYOUT

GROUND FLOOR PLAN

2.BEAM (GROUND FLOOR E/1-3)

GROUND FLOOR SLAB LOAD DISTRIBUTION DIAGRAM

Z

Z

149

• DEAD LOAD FROM BEAM SELF WEIGHT ( GRID E-1/3 )

• DEAD LOAD FROM SLAB :

- GRID C-E/1-3

- GRID E-H/1-3

• LIVE LOAD FROM SLAB :

- GRID C-E/1-3

- GRID E-H/1-3

BEAM (GROUND FLOOR E/1-3) CARRIES:

3.7m1 3DEAD LOAD FROM BEAM SELF WEIGHT

(GRID 1/C-H)

1.44Kn/m

4.68Kn/mDEAD LOAD FROM SLAB (C-E/1-3)

DEAD LOAD FROM SLAB (E-H/1-3)

*Beam size = 200mm x 300mm

*Wall size = 0.2m X 3m

*Slab thickness = 0.15m

(Density of reinforced concrete) x (Beam size)

=24Kn/m3 x 0.2m x 0.3m

= 1.44Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 2.6m/2

= 4.68Kn/m

6.12Kn/m(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 3.4m/2

= 6.12Kn/m

17.12Kn/m

ULTIMATE DEAD LOAD

1-3 : 12.24Kn/m x 1.4 = 17.12Kn/m

TOTAL DEAD LOAD

1-3 : (1.44 + 4.68 + 6.12)Kn/m = 12.24

2.BEAM (GROUND FLOOR E/1-3)150

LIVE LOAD FROM SLAB (C-E/1-3)

LIVE LOAD FROM SLAB (E-H/1-3)

BEDROOM = 1.5Kn/m

1.5Kn/m x 2.6m /2

= 1.95Kn/m

3.7m1 3

1.95Kn/m

2.55Kn/m

7.2Kn/m

BEDROOM = 1.5Kn/m

1.5Kn/m x 3.4m /2

= 2.55Kn/m

ULTIMATE LIVE LOAD

1-3 : 4.5Kn/m x 1.6 = 7.2Kn/m

TOTAL LIVE LOAD

1-3 : (1.95+2.55)Kn/m = 4.5Kn/m

ULTIMATE LOAD

= ULTIMATE DEAD LOAD + ULTIMATE LIVE

LOAD

= 7.2Kn/m + 17.12Kn/m

= 24.32Kn/m

R1

24.32Kn/m

R3

R1 = R3 = Point load at E/1= 24.32Kn/m x 3.7m /2= 44.99

2.BEAM (GROUND FLOOR E/1-3)151

24.32Kn/m

3.7m1 3

R1 = 44.99Kn R3= 44.99Kn

44.99 Kn

0 Kn

-44.99 Kn

0 Kn

41.61Knm

LOAD DIAGRAM

SHEAR FORCE DIAGRAM

BENDING MOMENT

DIAGRAM

Area of positive = area of negative

44.99 x (3.7/2) /2

= 41.61

2.BEAM (GROUND FLOOR E/1-3)152

3. BEAM (GROUND FLOOR C/1-4)

Z

GROUND FLOOR BEAM & COLUMN LAYOUT

GROUND FLOOR PLAN

3.BEAM (GROUND FLOOR C/1-4)

GROUND FLOOR SLAB LOAD DISTRIBUTION DIAGRAM

Z

Z

153

• DEAD LOAD FROM BEAM SELF WEIGHT ( GRID C/1-4 )

• DEAD LOAD FROM BRICK WALL WEIGHT ( GRID C/1-4 )

• DEAD LOAD FROM SLAB :

- GRID C-E/1-3

- GRID C-E/3-4

• LIVE LOAD FROM SLAB :

- GRID C-E/1-3

- GRID C-E/3-4

• POINT LOAD AT POINT C/3

3.BEAM (GROUND FLOOR C/1-4)

BEAM (GROUND FLOOR C/1-4) CARRIES:

2.25m 3.7m

4 3 1DEAD LOAD FROM BEAM SELF WEIGHT

(GRID C/1-4)

1.44Kn/m

11.4Kn/m

DEAD LOAD FROM BRICK WALL WEIGHT

(GRID C/1-4)

DEAD LOAD FROM SLAB (C-E/1-3)

DEAD LOAD FROM SLAB (C-E/3-4)

*Beam size = 200mm x 300mm

*Wall size = 0.2m X 3m

*Slab thickness = 0.15m

(Density of reinforced concrete) x (Beam size)

=24Kn/m3 x 0.2m x 0.3m

= 1.44Kn/m

(Density of unreinforced concrete) x (Wall size)

=19Kn/m3 x 0.2m x 3.0m

= 11.4Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 2.6m /2

= 4.68Kn/m

2.7Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2 x 2/3

=24Kn/m3 x 0.15m x 2.25m/2 x 2/3

= 2.7Kn/m

4.68Kn/m

154

2.25m 3.7m

4 3 1

21.76Kn/m 24.53Kn/mULTIMATE DEAD LOAD

1-3 : 17.52Kn/m x 1.4 = 24.53Kn/m

3-4 : 15.54Kn/m x 1.4 = 21.76Kn/m

LIVE LOAD FROM SLAB (C-E/1-3)

LIVE LOAD FROM SLAB (C/3-4)

Bedroom = 1.5Kn/m2

0.75Kn/m

(Bedroom factor) x (Lx/2)

= 1.5Kn/m2 x 2.6m/2

= 1.5Kn/m2 x 1.3m

= 1.95Kn/m

(Bedroom factor) x (Lx/2)

= 2.0Kn/m2 x 2.25m/2 x 2/3

= 0.75Kn/m

Toilet = 2.0Kn/m2

TOTAL DEAD LOAD

4-3 : (1.44+11.4+2.7)Kn/m = 15.54Kn/m

3-1: ( 1.44+11.4+4.68)Kn/m = 17.52Kn/m

1.95Kn/m

ULTIMATE LIVE LOAD

1-3 : 1.95Kn/m x 1.6 = 3.12Kn/m

3-4 : 0.75Kn/m x 1.6 = 1.2Kn/m

ULTIMATE LOAD

1-3 : (24.53Kn/m + 3.12) = 27.65Kn/m

3-4 : (21.76Kn/m + 1.2) = 22.96Kn/m

POINT LOAD AT C/3 = 43.8Kn (refer to page

158)

1.2Kn/m3.12Kn/m

22.96Kn/m 27.65Kn/m

3.BEAM (GROUND FLOOR C/1-4)

43.8 Kn

155

22.96Kn/m27.65Kn/m

2.25m 3.7m

4 3 1

43.8Kn

Ra Rb

M = 0

= (5.95)(Ra) – (22.96 x 2.25)(4.825) – (43.8)(3.7) – (27.65 x 3.4)(1.85)

= 5.95Ra – 249.26 – 162.06 – 189.26

= 5.95Ra – 600.58

5.6Ra = 600.58 Kn

Ra = 100.94 Kn

F = 0

= Rb + Ra – (22.96 x 2.25) – 43.8 – (27.65 x 3.7)

= Rb + 100.67 – 51.66 – 43.8 – 102.305

= Rb – 96.83Kn

Rb = 96.83Kn

3.BEAM (GROUND FLOOR C/1-4)156

22.96Kn/m27.65Kn/m

2.25m 3.7m

4 3 1

43.8Kn

Ra = 100.94Kn Rb = 96.83Kn

100.94 Kn

0 Kn

5.48 Kn

-96.83 Kn

0 Kn

a = (2.25 x 51.66) / 2

= 58.12Kn/m

3.7

5.48

x

169.5Kn/m

LOAD DIAGRAM

SHEAR FORCE DIAGRAM

BENDING MOMENT

DIAGRAM

49.28 Kna

bc

d

b = 2.25 x 49.28

= 110.88Kn/m

c = (5.48 x 0.2) / 2 = 0.548

d = (96.83 x 3.5 / 2

= 169.5Kn/m

Conclusion

a + b = c + d = 0

96.83

x

3.7

5.48

96.83 + 5.48=

=x 0.2

3.BEAM (GROUND FLOOR C/1-4)157

4. BEAM (GROUND FLOOR 3/C-E)

Z

GROUND FLOOR BEAM & COLUMN LAYOUT

GROUND FLOOR PLAN

4. BEAM (GROUND FLOOR 3/C-E)

GROUND FLOOR SLAB LOAD DISTRIBUTION DIAGRAM

158

• DEAD LOAD FROM BEAM SELF WEIGHT ( GRID 3/C-E )

• DEAD LOAD FROM BRICK WALL WEIGHT (GRID 3/C-E)

• DEAD LOAD FROM SLAB :

- GRID C-E/1-3

- GRID C-E/3-4

• LIVE LOAD FROM SLAB :

- GRID C-E/1-3

- GRID C-E/3-4

BEAM (GROUND FLOOR 3/C-E) CARRIES:

2.6mC EDEAD LOAD FROM BEAM SELF WEIGHT

(GRID 1/C-H)

1.44Kn/m

3.12Kn/mDEAD LOAD FROM SLAB (C-E/1-3)

DEAD LOAD FROM SLAB (C-E/3-4)

*Beam size = 200mm x 300mm

*Wall size = 0.2m X 3m

*Slab thickness = 0.15m

(Density of reinforced concrete) x (Beam size)

=24Kn/m3 x 0.2m x 0.3m

= 1.44Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2 x 2/3

=24Kn/m3 x 0.15m x 2.6m /2 x 2/3

= 3.12Kn/m

4.05Kn/m(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 2.25m /2

= 4.05Kn/m

11.4Kn/m

DEAD LOAD FROM BRICK WALL WEIGHT

(GRID E-H/3)

(Density of unreinforced concrete) x (Wall size)

=19Kn/m3 x 0.2m x 3.0m

= 11.4Kn/m

4. BEAM (GROUND FLOOR 3/C-E)159

LIVE LOAD FROM SLAB (C-E/1-3)

LIVE LOAD FROM SLAB (C-E/3-4)

BEDROOM = 1.5Kn/m

1.5Kn/m x 2.6m /2 x 2/3

= 1.3Kn/m

2.6mC E

1.3Kn/m

5.68Kn/m

TOILET = 2.0Kn/m

2.0Kn/m x 2.25m /2

= 2.25Kn/m

ULTIMATE LIVE LOAD

1-3 : 3.55Kn/m x 1.6 = 5.68Kn/m

TOTAL LIVE LOAD

1-3 : (1.3+2.25)Kn/m = 3.55Kn/m

ULTIMATE LOAD

= ULTIMATE DEAD LOAD + ULTIMATE LIVE

LOAD

= 28.01Kn/m + 5.68Kn/m

= 24.32Kn/m

Rc

33.69Kn/m

ReRc = Re = Point load at C/3

= 33.69Kn/m x 2.6m /2= 43.80

28.01Kn/m

ULTIMATE DEAD LOAD

1-3 : 20.01Kn/m x 1.4 = 28.01Kn/m

TOTAL DEAD LOAD

1-3 : (1.44 + 11.4 + 3.12 + 4.05)Kn/m = 20.01Kn/m

4. BEAM (GROUND FLOOR 3/C-E)

2.25Kn/m

160

33.69Kn/m

2.6mC E

R1 = 43.8Kn R3= 43.8Kn

43.8 Kn

0 Kn

-43.8 Kn

0 Kn

28.47Knm

LOAD DIAGRAM

SHEAR FORCE DIAGRAM

BENDING MOMENT

DIAGRAM

Area of positive = area of negative

43.8 x (2.6/2) /2

= 28.47

4. BEAM (GROUND FLOOR 3/C-E)161

5. BEAM (GROUND FLOOR 3/E-H)

Z

GROUND FLOOR BEAM & COLUMN LAYOUT

GROUND FLOOR PLAN

5.BEAM (GROUND FLOOR 3/E-H)

GROUND FLOOR SLAB LOAD DISTRIBUTION DIAGRAM

Z

Z

162

• DEAD LOAD FROM BEAM SELF WEIGHT ( GRID 3/E-H)

• DEAD LOAD FROM BRICK WALL WEIGHT ( GRID 3/E-H )

• DEAD LOAD FROM SLAB :

- GRID E-H/1-3

• LIVE LOAD FROM SLAB :

- GRID E-H/1-3

• POINT LOAD AT POINT G/3

BEAM (GROUND FLOOR 3/E-H) CARRIES:

3.4m

E G HDEAD LOAD FROM BEAM SELF WEIGHT

(GRID 3/E-H)

1.44Kn/m

11.4Kn/m

DEAD LOAD FROM BRICK WALL WEIGHT

(GRID 3/E-H)

DEAD LOAD FROM SLAB (E-H/1-3)

TOTAL DEAD LOAD

*Beam size = 200mm x 300mm

*Wall size = 0.2m X 3m

*Slab thickness = 0.15m

(Density of reinforced concrete) x (Beam size)

=24Kn/m3 x 0.2m x 0.3m

= 1.44Kn/m

(Density of unreinforced concrete) x (Wall size)

=19Kn/m3 x 0.2m x 3.0m

= 11.4Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2 x 2/3

=24Kn/m3 x 0.15m x 3.4m/2 x 2/3

= 4.08Kn/m

E-H : 1.44 + 11.4 + 4.08 = 16.92Kn/m

4.08Kn/m

5.BEAM (GROUND FLOOR 3/E-H)

0.9m

ULTIMATE DEAD LOAD

E-H : 16.92Kn/m x 1.4 = 23.69Kn/m

23.69Kn/m

163

3.4mE H

LIVE LOAD FROM SLAB (E-H/3)

Bedroom = 1.5Kn/m2

(Bedroom factor) x (Lx/2) x 2/3

= 1.5Kn/m2 x 3.4m/2 x 2/3

= 1.5Kn/m2 x 1.7m

= 1.7Kn/m

ULTIMATE LIVE LOAD

E-H : 1.7Kn/m x 1.6 = 2.72Kn/m

ULTIMATE LOAD

Ultimate dead load + ultimate live load

= 26.54 + 2.72

= 29.26Kn/m

Point load at G/3 = 100.07Kn(refer to page 167)

G

1.7Kn/m

2.72Kn/m

29.26Kn/m

5.BEAM (GROUND FLOOR 3/E-H)

0.9m

29.26Kn/m

100.07Kn/m

164

29.26Kn/m

2.56m 0.84m

E G H

100.07Kn

Ra Rb

M = 0

= (3.4)(Ra) – (29.26 x 2.56)(2.12) – (100.07)(0.84) – (29.26 x 0.84)(0.42)

= 3.4Ra – 158.8 – 84.06 – 10.32

= 3.4Ra – 253.183.4Ra = 253.18 Kn

Ra = 74.46 Kn

F = 0

= Rb + Ra – (29.26 x 2.56) – 100.07 – (29.26 x 0.84)

= Rb + 74.46 – 74.91 – 100.07 – 24.58

= Rb – 125.1Kn

Rb = 125.1Kn

1.BEAM (GROUND FLOOR C/1-4)165

29.26Kn/m

2.56m 0.84m

E G H

100.07Kn

Ra = 74.46Kn Rb = 125.1Kn

74.46 Kn

0 Kn -0.45 Kn

-125.1 Kn

0 Kn

a = (74.46 x 2.56) / 2

= 95.3Kn/m

2.56 x

95.3Kn/m

LOAD DIAGRAM

SHEAR FORCE DIAGRAM

BENDING MOMENT

DIAGRAM

100.52 Kn

a

b

c

d

b = 2.56 x 0.015 / 2

= 0.0192Kn/m

c = 100.52 x 0.84 = 84.44Kn/m

d = (24.58 x 0.84) / 2

= 10.32Kn/m

Conclusion

A = b + c + d = 0

74.46

x

2.56

0.45

74.46 + 0.45=

=x 0.015

1.BEAM (GROUND FLOOR C/1-4)166

6. BEAM (GROUND FLOOR G/3-5)

GROUND FLOOR BEAM & COLUMN LAYOUT

GROUND FLOOR PLAN

6. BEAM (GROUND FLOOR G/3-5)

GROUND FLOOR SLAB LOAD DISTRIBUTION DIAGRAM167

• DEAD LOAD FROM BEAM SELF WEIGHT ( GRID G/3-5 )

• DEAD LOAD FROM BRICK WALL WEIGHT (GRID G/3-5)

• DEAD LOAD FROM SLAB :

- GRID E-G/3-5

• LIVE LOAD FROM SLAB :

- GRID E-G/3-5

BEAM (GROUND FLOOR G/3-5) CARRIES:

6.2mE GDEAD LOAD FROM BEAM SELF WEIGHT

(GRID G/3-5)

1.44Kn/m

4.5Kn/mDEAD LOAD FROM SLAB (E-G/3-5)

*Beam size = 200mm x 300mm

*Wall size = 0.2m X 3m

*Slab thickness = 0.15m

(Density of reinforced concrete) x (Beam size)

=24Kn/m3 x 0.2m x 0.3m

= 1.44Kn/m

(Density of reinforced concrete) x (slab thickness) x

Lx/2

=24Kn/m3 x 0.15m x 2.5m /2

= 4.5Kn/m

24.28Kn/m

11.4Kn/m

DEAD LOAD FROM BRICK WALL WEIGHT

(GRID G/3-5) (assuming sliding door = brickwall)

(Density of unreinforced concrete) x (Wall size)

=19Kn/m3 x 0.2m x 3.0m

= 11.4Kn/m

6. BEAM (GROUND FLOOR G/3-5)168

ULTIMATE DEAD LOAD

17.34Kn/m x 1.4 = 24.28Kn/m

TOTAL DEAD LOAD

1-3 : (1.44 + 11.4 + 4.5)Kn/m = 17.34Kn/m

LIVE LOAD FROM SLAB (C-E/1-3)

CORRIDOR = 4.0Kn/m

4.0Kn/m x 2.5m /2

= 5Kn/m

6.2mC E

32.28Kn/m

ULTIMATE LIVE LOAD

5Kn/m x 1.6 = 8Kn/m

TOTAL LIVE LOAD

5Kn/m

ULTIMATE LOAD

= ULTIMATE DEAD LOAD + ULTIMATE LIVE

LOAD

= 24.28Kn/m + 8Kn/m

= 32.28Kn/m

Rc Re

Rc = Re = Point load at G/3= 32.28Kn/m x 6.2m /2= 100.07

5Kn/m

8Kn/m

6. BEAM (GROUND FLOOR G/3-5)169

32.28Kn/m

6.2mC E

Rc = 100.07Kn Re= 100.07Kn

100.07 Kn

0 Kn

-100.07Kn

0 Kn

155.12Knm

LOAD DIAGRAM

SHEAR FORCE DIAGRAM

BENDING MOMENT

DIAGRAM

Area of positive = area of negative

100.07 x (6.2/2) /2

= 155.12

6. BEAM (GROUND FLOOR G/3-5)170

CHOOSEN COLUMNS 1. H/12. H/33. G/5

TRISTAN YU TZE-XIEN 0317729

GENERAL INFO

*Height of the floors=3m

*Brick wall 200mm thick

Dead Load= 3.0m x 0.2m x 19 kN/m3

= 11.4kN/m

*Beam size is 200mm x 300mm

Dead Load= 0.15 m x 0.3 m x 24 kN/m3

= 1.44kN/m

*Slab thickness is 150mm,

Dead Load= 0.15m x 24 kN/m3

= 3.6 kN/m2

*Column size=300 x 300mm

Dead Load= 0.3m x 0.3m x 3m x 24 kN/m3

= 6.48 kN

171

1

2

3

TRISTAN YU TZE-XIEN 0317729

172

2

1

3

TRISTAN YU TZE-XIEN 0317729

173

1

2

3

TRISTAN YU TZE-XIEN 0317729

174

1. COLUMN H/1

1. COLUMN H/1

1

ROOF BEAM & COLUMN LAYOUT

FIRST FLOOR BEAM & COLUMN LAYOUT

GROUND FLOOR BEAM & COLUMN LAYOUT

ROOF BEAM & COLUMN LAYOUT

FIRST FLOOR PLAN

GROUND FLOOR PLAN

3.14m

TRISTAN YU TZE-XIEN 0317729

1.85m

3.14m

1.85m1

1

3.14m

1.85m

3.14m

1.85m 1

1

3.14m

1.85m

3.14m

1.85m 1

175

1.8

5m

3.15m

Dead Load acting on column H/1.

Dead Load

2.15m 0.99m

Roof Level

Roof Level Slab dead load (assuming roof is concrete slab):

(Total slab area) x (reinforced concrete density) x (slab

thickness)

= 5.8m2 x 24Kn/m3 x 0.15 kN/m2

=20.88 Kn

Beam dead load :

(total beam length) x (reinforced concrete density) x

(Beam size)

= 6.84m x 24Kn/m3 x (0.2 x 0.3)m

= 9.85 Kn

30.73Kn

1st Floor

1st Floor

Walls dead load

(Total wall length) x (brick wall density) x ( wall size)

=(2.15 + 1.85)m x 19Kn/m3 x (0.2 x 3)m

=45.6 Kn

Slabs dead load

(Total slab area) x (reinforced concrete density) x (slab

thickness)

= 5.8m2 x 24Kn/m3 x 0.15 kN/m2

=20.88 Kn

Beam dead load :

(total beam length) x (reinforced concrete density) x

(Beam size)

= 6.84m x 24Kn/m3 x (0.2 x 0.3)m

= 9.85 Kn

Column

(reinforced concrete density) x (Column size)

= 24Kn/m3 x 0.3m x 0.3m x 3m

= 6.48 kN 82.81Kn

1.8

5m

3.15m

2.15m

TRISTAN YU TZE-XIEN 0317729

176

Grd Floor

TOTAL DEAD LOAD

= (30.73 + 82.81 + 94.1)

=207.64Kn

ULTIMATE DEAD LOAD

= 207.64Kn x 1.4

= 290.7 Kn

1.8

5m

3.15m

2.15m

Grd Floor

Walls dead load

(Total wall length) x (brick wall density) x ( wall size)

=(2.15 + 0.99 + 1.85) x 19Kn/m3 x (0.2 x 3)m

=56.89 Kn

Slabs dead load

(Total slab area) x (reinforced concrete density) x (slab

thickness)

= 5.8m2 x 24Kn/m3 x 0.15 kN/m2

=20.88 Kn

Beam dead load :

(total beam length) x (reinforced concrete density) x

(Beam size)

= (2.15 + 0.99 + 1.85 + 1.85)m x 24Kn/m3 x (0.2 x 0.3)m

= 9.85 Kn

Column

(reinforced concrete density) x (Column size)

= 24Kn/m3 x 0.3m x 0.3m x 3m

= 6.48 kN 94.1Kn

TRISTAN YU TZE-XIEN 0317729

177

1.8

5m

3.15m

Live Load acting on column H/1. Live Load

2.15m 0.99m

Roof Level

Roof LevelSlab live load :

(Total slab area) x (roof live load factor)

= 5.8m2 x 0.5Kn/m2

=2.9 Kn

2.9Kn

1st Floor

1.8

5m

3.15m

2.15m1st Floor

Bedroom

(Total bedroom areas) x (bedroom factor)

=(2.15m x 1.85m) (1.5Kn/m2)

=5.97 Kn

Balcony

*Assume balcony is 1.5Kn/m2 similar to bedroom

factor

(Total balcony area) x (balcony factor)

= (0.99m x 1.85m) x 1.5 kN/m2

=2.75 Kn

8.72Kn

Grd Floor

1.8

5m

3.15m

2.15m

Grd Floor

Bedroom

(Total bedroom areas) x (bedroom factor)

=(2.15m x 1.85m) (1.5Kn/m2)

=5.97 Kn

Patio

*Assume patio is 1.5Kn/m2 similar to bedroom factor

(Total patio area) x (patio factor)

= (0.99m x 1.85m) x 1.5 kN/m2

=2.75 Kn

8.72Kn

TRISTAN YU TZE-XIEN 0317729

178

1. COLUMN H/1

So, ultimate load acting on column H/1= 323.24 Kn

TOTAL LIVE LOAD

= (2.9 + 8.72 + 8.72) Kn

= 20.34Kn

ULTIMATE LIVE LOAD

= 20.34Kn x 1.6

= 32.54 Kn

ULTIMATE LOAD

= Untimate Dead Load + Ultimate Live Load

= 290.7Kn + 32.54Kn

= 323.24 Kn

TRISTAN YU TZE-XIEN 0317729

179

1. COLUMN H/3

1. COLUMN H/3

2

ROOF BEAM & COLUMN LAYOUT

FIRST FLOOR BEAM & COLUMN LAYOUT

GROUND FLOOR BEAM & COLUMN LAYOUT

ROOF BEAM & COLUMN LAYOUT

FIRST FLOOR PLAN

GROUND FLOOR PLAN

TRISTAN YU TZE-XIEN 0317729

4.95m

2.66m

3.1m

24.95m

2.66m

3.1m

24.95m

2.66m

3.1m

24.95m

2.66m

3.1m

24.95m

2.66m

3.1m

24.95m

2.66m

3.1m

180

Dead Load acting on column H/3.

Dead LoadRoof Level

Roof Level Slab dead load (assuming roof is concrete slab):

(Total slab area) x (reinforced concrete density) x (slab

thickness)

= 7.49m2 x 24Kn/m3 x 0.15 kN/m2

=26.96 Kn

Beam dead load :

(total beam length) x (reinforced concrete density) x

(Beam size)

= 7.61m x 24Kn/m3 x (0.2 x 0.3)m

= 10.96 Kn

37.92Kn

1st Floor

24.95m

2.66m

3.1m

6.2

m

3.15m

3.7

m

24.95m

2.66m

3.1m

6.2

m

3.15m

3.7

m

1st Floor

Walls dead load

(Total wall length) x (brick wall density) x ( wall size)

=(1.67 + 1.85 + 3.1)m x 19Kn/m3 x (0.2 x 3)m

=75.47 Kn

Slabs dead load

(Total slab area) x (reinforced concrete density) x (slab

thickness)

= 7.49m2 x 24Kn/m3 x 0.15 kN/m2

=26.96 Kn

Beam dead load :

(total beam length) x (reinforced concrete density) x

(Beam size)

= 7.61m x 24Kn/m3 x (0.2 x 0.3)m

= 10.96 Kn

Column

(reinforced concrete density) x (Column size)

= 24Kn/m3 x 0.3m x 0.3m x 3m

= 6.48 kN

119.87Kn

TRISTAN YU TZE-XIEN 0317729

181

Grd Floor

TOTAL DEAD LOAD

= (37.92 + 119.87 + 131.15)

=382.17 Kn

ULTIMATE DEAD LOAD

= 382.17 Kn x 1.4

= 535.038 Kn

Grd Floor

Walls dead load

(Total wall length) x (brick wall density) x ( wall size)

=(1.67 + 1.85 + 3.1 + 0.99) x 19Kn/m3 x (0.2 x 3)m

=86.75 Kn

Slabs dead load

(Total slab area) x (reinforced concrete density) x (slab

thickness)

= 7.49m2 x 24Kn/m3 x 0.15 kN/m2

=26.96 Kn

Beam dead load :

(total beam length) x (reinforced concrete density) x

(Beam size)

= 7.61m x 24Kn/m3 x (0.2 x 0.3)m

= 10.96 Kn

Column

(reinforced concrete density) x (Column size)

= 24Kn/m3 x 0.3m x 0.3m x 3m

= 6.48 kN

131.15Kn

TRISTAN YU TZE-XIEN 0317729

24.95m

2.66m

3.1m

6.2

m

3.15m

3.7

m

182

Live Load acting on column H/3. Live LoadRoof Level

Roof LevelSlab live load :

(Total slab area) x (roof live load factor)

= 7.49m2 x 0.5Kn/m2

=3.75 Kn

3.75Kn

1st Floor

3.1

m

2.66m

1st Floor

Balcony

*Assume balcony is 1.5Kn/m2 similar to bedroom

factor

(Total balcony area) x (balcony factor)

= (0.99 x 1.85)m2 x 1.5 kN/m2

=2.75 Kn

Bedroom

(Total bedroom area) x (bedroom factor)

= (1.67 x 1.85)m2 x 1.5 kN/m2

=4.63 Kn

Corridor

(Total corridor area) x (corridor factor)

= (3.1 x 0.83)m2 x 4.0 kN/m2

=10.29 Kn

21.42Kn

Grd Floor Grd Floor

Patio

*Assume balcony is 1.5Kn/m2 similar to bedroom

factor

(Total bedroom area) x (bedroom factor)

= (0.99 x 1.85)m2 x 1.5 kN/m2

=2.75 Kn

Bedroom

(Total bedroom area) x (bedroom factor)

= (1.67 x 1.85)m2 x 1.5 kN/m2

=4.63 Kn

Corridor

(Total corridor area) x (corridor factor)

= (3.1 x 0.83)m2 x 4.0 kN/m2

=10.29 Kn

21.42Kn

TRISTAN YU TZE-XIEN 0317729

1.8

5m

3.1

m

2.66m

1.8

5m

3.1

m

2.66m

1.8

5m

183

1. COLUMN H/3

So, ultimate load acting on column H/3= 569.308 Kn

TOTAL LIVE LOAD

= (3.75 + 21.42 + 21.42) Kn

= 21.42Kn

ULTIMATE LIVE LOAD

= 21.42Kn x 1.6

= 34.27 Kn

ULTIMATE LOAD

= Ultimate Dead Load + Ultimate Live Load

= 535.038 + 34.27

= 569.308 Kn

TRISTAN YU TZE-XIEN 0317729

184

1. COLUMN G/5

1. COLUMN G/5

ROOF BEAM & COLUMN LAYOUT

FIRST FLOOR BEAM & COLUMN LAYOUT

GROUND FLOOR BEAM & COLUMN LAYOUT

ROOF BEAM & COLUMN LAYOUT

FIRST FLOOR PLAN

GROUND FLOOR PLAN

TRISTAN YU TZE-XIEN 0317729

3.1m

0.83m

1.3m

2.25m1.25m

3.1m

0.83m

1.3m

2.25m1.25m

3.1m

0.83m

1.3m

2.25m1.25m

3.1m

0.83m

1.3m

2.25m1.25m

3.1m

0.83m

1.3m

2.25m1.25m

3.1m

0.83m

1.3m

2.25m1.25m

185

Dead Load acting on column G/5.

Dead LoadRoof Level

Roof Level Roof Level Slab dead load (assuming roof is concrete slab):

(Total slab area) x (reinforced concrete density) x (slab

thickness)

= 8.43m2 x 24Kn/m3 x 0.15 kN/m2

=30.35 Kn

Beam dead load :

(total beam length) x (reinforced concrete density) x

(Beam size)

= 7.9m x 24Kn/m3 x (0.2 x 0.3)m

= 11.38 Kn

41.73Kn

1st Floor

1st Floor

Walls dead load

(Total wall length) x (brick wall density) x ( wall size)

=(3.1 + 2.25)m x 19Kn/m3 x (0.2 x 3)m

=60.99 Kn

Slabs dead load

(Total slab area) x (reinforced concrete density) x (slab

thickness)

= 8.43m2 x 24Kn/m3 x 0.15 kN/m2

=30.35 Kn

Beam dead load :

(total beam length) x (reinforced concrete density) x

(Beam size)

= 7.9m x 24Kn/m3 x (0.2 x 0.3)m

= 11.38 Kn

Column

(reinforced concrete density) x (Column size)

= 24Kn/m3 x 0.3m x 0.3m x 3m

= 6.48 kN

109.2Kn

TRISTAN YU TZE-XIEN 0317729

1.3

m

0.83m

3.1

m

2.25m

1.3

m

0.83m

3.1

m

186

Live Load acting on column H/3. Live LoadRoof Level

Roof LevelSlab live load :

(Total slab area) x (roof live load factor)

= 8.43m2 x 0.5Kn/m2

=4.22 Kn

4.22Kn

1st Floor 1st Floor

Corridor

(Total corridor areas) x (corridor factor)

= (3.875 + 1.625) (4.0Kn/m2)

= 22 Kn

Stair

(Total balcony area) x (balcony factor)

= (2.25 x 1.3) x 1.5 kN/m2

= 4.39 Kn

26.39Kn

Grd Floor Grd Floor

Corridor

(Total corridor areas) x (corridor factor)

= (3.875 + 1.625) (4.0Kn/m2)

= 22 Kn

Stair

(Total balcony area) x (balcony factor)

= (2.25 x 1.3) x 1.5 kN/m2

= 4.39 Kn

26.39Kn

TRISTAN YU TZE-XIEN 0317729

1.3

m

0.83m

3.1

m

2.25m

1.3

m

0.83m

3.1

m

2.25m

1.3

m

0.83m

3.1

m

187

1. COLUMN G/5

So, ultimate load acting on column G/5= 351.33 Kn

TOTAL LIVE LOAD

= (4.22 + 26.39 + 26.39) Kn

= 57 Kn

ULTIMATE LIVE LOAD

= 57 Kn x 1.6

= 91.2 Kn

ULTIMATE LOAD

= Ultimate Dead Load + Ultimate Live Load

= 260.13 + 91.2

= 351.33 Kn