status on clic long quadrupole prototype for stabilization studies (m. modena, cern –te/msc)

Post on 02-Jan-2016

21 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

DESCRIPTION

Status on CLIC Long Quadrupole Prototype for Stabilization Studies (M. Modena, CERN –TE/MSC). “CLIC 6 th Stabilization Meeting’ on 9 June 2009”. Long (2-m) Main Beam Quadrupole prototype a remind…. Aim of this quadrupole prototype: - PowerPoint PPT Presentation

TRANSCRIPT

Status on CLIC Long Quadrupole Prototype for Stabilization Studies

(M. Modena, CERN –TE/MSC)

“CLIC 6th Stabilization Meeting’ on 9 June 2009”

Long (2-m) Main Beam Quadrupole prototype

a remind….

Aim of this quadrupole prototype:

• Provide quickly a prototype for the stabilization studies

• Test different poles and coils assembly solutions (towards stabilization performances)

• Provide a magnet for developing and testing magnetic measurement system (very small and long magnet bore!)

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

2

a remind…. 3 assembly options

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

3

Quadrupole Cross-Section: Final EM Optimization

(Courtesy of A.Vorozhtsov)

a remind…. NOTE: a gap of 3 mm between iron poles and coils is left to test different solutions for coils support/dumping system

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

4

Quadrupole Prototype procurement Status:

• Copper conductor : Ordered (with Luvata- Finland)• Iron: Ordered (AFNOR C10 R type)• Tender Drawings: Completed this week• Coils Call for Tender: Send out hopefully this week to 3 Companies• Iron machining: Selecting potential bidders

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

5

Courtesy of R. Leuxe EN-MME

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

6

Courtesy of R. Leuxe EN-MME

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

7

Courtesy of R. Leuxe EN-MME

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

8

Courtesy of R. Leuxe EN-MME

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

9

Courtesy of R. Leuxe EN-MME

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

10

Courtesy of R. Leuxe EN-MME

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

11

Courtesy of R. Leuxe EN-MME

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

12

Courtesy of R. Leuxe EN-MME

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

13

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

14

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

15

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

16

top related