Springfield Data CenterSpringfield Data Center

Massachusetts GovernmentInformation Systems AssociationMassachusetts GovernmentInformation Systems Association

Stephen DennehyStephen Dennehy13 June 201313 June 2013

Stephen DennehyStephen Dennehy13 June 201313 June 2013

AgendaAgenda

– BackgroundBackground– DesignDesign– StatusStatus– Service OfferingsService Offerings– BenefitsBenefits– Key DatesKey Dates– Q & AQ & A

Background —Site Background —Site SelectionSelection

1905

Former Technical High School Former Technical High School SelectedSelected

BackgroundBackground

– Closed in 1986Closed in 1986

– Broke Ground June 2010Broke Ground June 2010

– First Comprehensive Commonwealth DR SiteFirst Comprehensive Commonwealth DR Site

– Supplements Chelsea Primary DCSupplements Chelsea Primary DC

Design DriversDesign Drivers

– ReliabilityReliability

– Flexibility Flexibility

– Security Security

– Efficiency Efficiency

Design SpecificationsDesign Specifications

–Total of 147,000 Sq. Ft. Total of 147,000 Sq. Ft.

Computer roomsComputer rooms:: 11,500 Sq. Ft. 11,500 Sq. Ft.

10,000 Sq. Ft. Future10,000 Sq. Ft. Future

–No Raised FloorNo Raised Floor

–Operations ~20 StaffOperations ~20 Staff

–General seating capacity = 70General seating capacity = 70

–Max OccupancyMax Occupancy == 160 in DR Event160 in DR Event

888

Facade PreservedFacade Preserved

8

9

10

11

12

13

14

15

16

17

1818

Service OfferingsService Offerings

– ITD Managed HostingITD Managed Hosting

– Co-LocationCo-Location

– Private CabinetsPrivate Cabinets

– Caged Computer SpaceCaged Computer Space

– Data BackupData Backup

– Tape StorageTape Storage

– Disaster RecoveryDisaster Recovery

– ITD Managed HostingITD Managed Hosting

– Co-LocationCo-Location

– Private CabinetsPrivate Cabinets

– Caged Computer SpaceCaged Computer Space

– Data BackupData Backup

– Tape StorageTape Storage

– Disaster RecoveryDisaster Recovery

19

BenefitsBenefits

– High RedundancyHigh Redundancy

– Predictable Restoration TimesPredictable Restoration Times

– On-Demand DR TestingOn-Demand DR Testing

– Remote Office ConnectivityRemote Office Connectivity

19

20

First CustomersFirst Customers

– Managed DR Apps & ServicesManaged DR Apps & Services

− IBM Mainframe Critical Apps For 6 AgenciesIBM Mainframe Critical Apps For 6 Agencies

− Open Systems Critical Apps For 5 AgenciesOpen Systems Critical Apps For 5 Agencies

– TenantsTenants

− TreasuryTreasury

− Public Safety & SecurityPublic Safety & Security

− Department of RevenueDepartment of Revenue

21

Key DatesKey Dates

− Began ITD App Testing Began ITD App Testing 5 June 5 June

− SDC Fully Operational SDC Fully Operational 1 August 1 August

22

More General Information More General Information At:At:

https://wiki.state.ma.us/confluence/display/spflddcphttps://wiki.state.ma.us/confluence/display/spflddcp

ContactContact

Tim Sullivan Tim Sullivan 617.626.4407617.626.4407Tim.L.Sullivan@state.ma.usTim.L.Sullivan@state.ma.us

Tim Sullivan Tim Sullivan 617.626.4407617.626.4407Tim.L.Sullivan@state.ma.usTim.L.Sullivan@state.ma.us

http://www.mass.gov/anf/research-and-tech/it-http://www.mass.gov/anf/research-and-tech/it-serv-and-support/itds-services-catalogserv-and-support/itds-services-catalog/

Rate Information At:Rate Information At:

top related