Spokane River Hydroelectric Project FERC Project No. 2545. Recreation Plan. Avista Water Access Projects. Trailer Park Wave Access Nine Mile Dam non-motorized Take-Out site Long Lake Dam non-motorized Put-in site Lake Spokane Boat-in-Only campsite development. Trailer Park Wave Access. - PowerPoint PPT Presentation

TRANSCRIPT

Spokane River Hydroelectric ProjectFERC Project No. 2545

Recreation Plan

• Trailer Park Wave Access• Nine Mile Dam non-motorized Take-Out site• Long Lake Dam non-motorized Put-in site• Lake Spokane Boat-in-Only campsite development

Avista Water Access Projects

Trailer Park Wave Access• Play wave feature on the north shore of the Spokane River

• Class II rapid

• 3,300cfs to 5,000cfs

• Public access challenge

Trailer Park Wave

Trailer Park Wave• 2011 Feasibility assessment

• 2012 Property purchase

• 2013-2015 Site development

Nine Mile Dam Take -Out

Nine Mile Dam Take-out• Property owned by WSPRC

• 2015 Site development

Lake Spokane Boat-in-Only Campsites

Lake Spokane Boat-in-Only Campsites• 2014 Site development

• Washington State Parks management

Long Lake Dam Put-in• Constructed in 2012• Renovated facilities

Lake Spokane Management• Cooperatively Managed by Washington State Parks• DNR Lake Spokane Campground

Questions?