soil runoff area unstablized banks under constructionloam

Post on 15-Oct-2021

5 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

johnjr
Polygonal Line
johnjr
Polygon
johnjr
Line
johnjr
Line
johnjr
Line
johnjr
Line
johnjr
Line
johnjr
Line
johnjr
Line
johnjr
Line
johnjr
Text Box
Basin #1
johnjr
Text Box
Basin #2
johnjr
Line
johnjr
Line
johnjr
Line
johnjr
Polygon
johnjr
Text Box
Soil Runoff Area Unstablized Banks Under Construction
johnjr
Line
johnjr
Polygon
johnjr
Polygon
johnjr
Line
johnjr
Text Box
Loam and Seed w/Jute Netting
johnjr
Polygon
johnjr
Text Box
Stone Swale w/Straw Waddle Check Dams
johnjr
Line
johnjr
Rectangle
johnjr
Line
johnjr
Text Box
Approx Location of CB on DOT ROW fitted with silt bag
johnjr
Text Box
3'x3' trench filled with traprock to Divert Runoff to Basin #2 from the existing roadway
johnjr
Line

top related