1
SmartGrid Implications of Cloud Computing
New Technology in the Utility Environment
2
PG&E
• 70,000 square miles of diverse topography
• Approximately 20,000 employees
• Energy Services to approximately 15 million
people
• Over 9 million SmartMeters (Electric & Gas)
• 1,008,186 Transformers
• 6,833 MW of Generation
• 18,616 miles of electric transmission circuits
• 120,000 miles of electric distribution circuits
• Regulated by the California Public Utilities
Commission (CPUC)
Territory Characteristics
3
Vendor
Hosted
Electric Head
End System
Utility Application Landscape
Hosted off site today
• SmartMeter Systems
• Demand Response
CAISO
Hosted
PG&E Data Center
Gas Head End
Meter Data
Management
Customer
The Cloud – Data at Rest
4
Security – Risk Management
PG&E utilizes the following five information classifications:
• PG&E Public
Anything produced for public review and available to anyone inside or outside the
company. This includes materials such as press releases, advertisements, or bill inserts.
• PG&E Internal
Information intended primarily for use within PG&E, such as organization charts,
personnel numbers, and company email messages. Distribution should be limited based
on business need to know, and access controls are required.
• PG&E Confidential
Information such as trade secrets, customer or employee information, and passwords
that should be shared solely on a business need to know basis. PG&E Confidential data
must be encrypted for storage and transmission if electronic and, if printed, protected
through controlled physical access, such as a locked filing cabinet.
• PG&E Restricted or PG&E Privileged (Law only)
Information such as Social Security Numbers, undisclosed financial information, and
protected health information should be shared solely on a business need to know basis.
Data must be for storage and transmission encrypted if electronic and, if printed,
protected through controlled physical access.
Note that PG&E Privileged is only used by Law.
5
Networks - Critical Infrastructure ODN (air-gapped secure network) - SCADA
UDN – Traditional IT
MPLS – Physical Isolation and Connectivity
Operational Data
Network Utility Data Network
Multiprotocol Label Switching – Packet Level Network Path
6
Volt / VAR on the test network Test Network
UDN ODN
UPS #1
Set Voltage 2
Set Voltage 3
Set Voltage 1
LabView Interface
LabView Driver
Access PointUIQ System
CVR Software Load Tap Changer
Line Regulator
Line Capacitor
Read Voltage
Adjust Voltage
Node Simulator
4.1
LabView Driver
TCP/IP
Meter Farm
Remote Access Firewall
Negotiating Network
Access in the test
environment is
not trivial
7
Security is Physical
Control of assets is critical to our business:
• San Jose Mercury News June 4th, 2013
In the early-morning hours of April 16, someone opened fire at
the utility's substation on Metcalf Road near Highway 101. The
gunshots damaged five transformers and caused cooling oil to
leak from a transformer bank, and the damage prompted state
regulators to urge electricity conservation in the ensuing days.
AT&T phone service in the area was also affected.
8
The Cloud SmartMeter™
Performance Statistics
Interval data supplied from SmartMeter™ systems for
billing within 48 hours of expected delivery as a percentage
of expected interval data.
Safety and Reliability
9
Thank you Art Anderson
arthur.anderson@pge.com
10
North American Electric Reliability Corporation
Critical Infrastructure Protection (CIP) standards
Version 5 now requires the following:
• Encryption
• Role-based instead of risk-based classifications
• Multiple levels of compliance – Low, Medium and High Impact (in theory, a company could
have 10 facilities of which six are low impact facilities, three are medium impact facilities, and
one is a high impact facility)
• New terminology (such as BES Cyber Asset)
• All serial connections are to be considered
• Multi-factor authentication requirements
• Triggers are required to be defined for recovery plans
• All software (COTS and custom) must be known
• All security patches from the beginning of time on each device must be known