situaȚia proiectelor de infrastructurĂ - iunie 2021 1
Post on 05-Nov-2021
14 Views
Preview:
TRANSCRIPT
NR.
CRT.CATEGORIE DRUM RANG DRUM INDICATIV DRUM
DE LA
(km)
PANA LA
(km)ANTREPRENOR SECTORUL LOTUL LUNGIME (km) STADIUL FIZIC ACTUAL
STADIUL FINANCIAR
ACTUALDATA INCEPERII DATA FINALIZARII AN DESCHIDERE VALOARE PROIECT OBSERVATII
DETALII
PROCEDURA
1 AUTOSTRAZI IN EXECUTIE / PROIECTARE SI EXECUTIE LUCRARI AUTOSTRADAAUTOSTRADA BRASOV - TARGU MURES - CLUJ -
ORADEA30+550 59+100
ASOCIEREA TRAMECO SA – VAHOSTAV -SK A.S. – DRUMURI BIHOR
SA – DRUM ASFALT SRL – EAST WATER DRILLINGS SRL
SECTIUNEA 3C, SUBSECTIUNEA 3C2
CHIRIBIS - BIHARIA
SUBSECTIUNEA 3C2: CHIRIBIS -
BIHARIA28.55 0.50% 0%
14.09.2020 - EMITERE ORDIN DE
INCEPERE PENTRU ETAPA DE
PROIECTARE (PROIECT TEHNIC)
MARTIE 2022 (CONFORM
CONTRACT)
IUNIE 2022 (CONFORM PROGRAM)
ANUL 2022 6 LUNI - ETAPA DE
PROIECTARE; 18 LUNI - ETAPA DE
EXECUTIE LUCRARI; 120 LUNI -
PERIOADA DE GARANTIE
326.51 MIL. LEI FARA TVA
CONTRACT PROIECTARE SI EXECUTIE SEMNAT IN DATA DE 11.08. 2020.
A FOST TRANSMISA CATRE ANTREPRENOR ADRESA CU ORDINUL DE INCEPERE PENTRU DATA DE 14.09.2020. A FOST ACORDAT DREPTUL DE ACCES IN
SANTIER ANTREPRENORULUI.
DURATA CONTRACTULUI ESTE DE 144 DE LUNI DIN CARE:
6 LUNI - ETAPA DE PROIECTARE; FINALIZARE PUNCT DE REFERINTA NR. 1 IN 09.11.2020.
18 LUNI - ETAPA DE EXECUTIE LUCRARI
120 LUNI - PERIOADA DE GARANTIE
2 AUTOSTRAZI IN EXECUTIE / PROIECTARE SI EXECUTIE LUCRARI AUTOSTRADAAUTOSTRADA BRASOV - TARGU MURES - CLUJ -
ORADEA8+700 38+760
ASOCIEREA S.C. SPEDITION UMB S.R.L. – S.C. TEHNOSTRADE S.R.L. –
S.C. ELECTROMONTAJ S.A
SECTIUNEA 3A SI SECTIUNEA 3B,
SUBSECTIUNEA 3A2: NADASELU -
MIHAIESTI SI 3B1: MIHAESTI
ZIMBOR
SUBSECTIUNEA 3A2 NADASELU -
MIHAIESTI KM 8+700 - 25+500+
3B1, MIHAIESTI – ZIMBOR KM 0+000 -
13+260
30.06 0% 0% 25.01.2021 2023 ANUL 2023 1.390,614 MIL. LEI FARA TVA
SEMNARE CONTRACT PROIECTARE SI EXECUTIE IN DATA DE 28.12.2020. PRETUL PE KM DE AUTOSTRADA ESTE DE CCA. 46,261,293.92 LEI FARA TVA,
REPREZENTAND CCA. 9,383,629 EURO FARA TVA.
DURATA CONTRACTULUI ESTE DE 96 DE LUNI, DIN CARE:
• 12 LUNI PERIOADA DE PROIECTARE,
• 24 LUNI PERIOADA DE EXECUTIE A LUCRARILOR,
• 60 DE LUNI PERIOADA DE GARANTIE A LUCRARILOR.
AUTORIZATIE DE CONSTRUIRE EMISA PENTRU SECTORUL 3A2 IN LUNA APRILIE2021. PROIECT TEHNIC IN CURS DE ELABORARE PENTRU 3A2 - TERMEN
ESTIMAT AVIZARE PROIECT TEHNIC: IULIE 2021
PENTRU SECTORUL 3B1 - AVIZARE DTAC SI OBTINERE AUTORIZATIE DE CONSTRUIRE : IUNIE 2021
3 AUTOSTRAZI IN EXECUTIE / PROIECTARE SI EXECUTIE LUCRARI AUTOSTRADAAUTOSTRADA BRASOV - TARGU MURES - CLUJ -
ORADEA66+500 80+054 NUROL INSAAT VE TICARET S.A
SECTIUNEA 3B, SUBSECTIUNEA 3B5
NUSFALAU - SUPLACU DE BARCAU
SUBSECTIUNEA 3B5: NUSFALAU -
SUPLACU DE BARCAU13.55 0% 15% 01.02.2021 FEBRUARIE 2023 FEBRUARIE 2023 384.14 MIL. LEI FARA TVA
CONTRACT PROIECTARE SI EXECUTIE SEMNAT IN 30.09.2020;
6 LUNI PERIOADA DE PROIECTARE
; 18 LUNI PERIOADA DE EXECUTIE
; 120 LUNI PERIOADA DE GARANTIE
LUCRARILE PENTRU REALIZAREA ACESTUI SECTOR DE AUTOSTRADA PREVAD SI CONSTRUCTIA A 12 STRUCTURI (4 PASAJE SI 8 PODURI), RESPECTIV UN
NOD RUTIER LA KM 67+500
FINALIZARE ETAPA PROIECTARE (PTE) - IULIE 2021
4 AUTOSTRAZI IN EXECUTIE / PROIECTARE SI EXECUTIE LUCRARI AUTOSTRADAAUTOSTRADA BRASOV - TARGU MURES - CLUJ -
ORADEA13+260 25+500
ASOCIEREA SC SA&PE CONSTRUCT SRL - SC SPEDITION UMB SRL - SC
TEHNOSTRADE SRL
SECTIUNEA 3B, SUBSECTIUNEA 3B2:
ZIMBOR - POARTA SALAJULUI
SUBSECTIUNEA 3B2: ZIMBOR -
POARTA SALAJULUI12.24 0% 0% 31.05.2021 - ORDIN DE INCEPERE 2023 ANUL 2023 680.40 MIL. LEI FARA TVA
CONTRACT PROIECTARE SI EXECUTIE SEMNAT IN DATA DE 01.07.2020;
DURATA CONTRACTULUI ESTE DE 156 DE LUNI, DIN CARE:
12 LUNI PERIOADA DE PROIECTARE,
24 LUNI PERIOADA DE EXECUTIE A LUCRARILOR,
120 DE LUNI PERIOADA DE GARANTIE A LUCRARILOR
A FOST CONSTITUITA GARANTIA DE BUNA EXECUTIE A LUCRARILOR, ORDINUL DE INCEPERE A LUCRARILOR EMIS IN DATA DE 10.08.2020 A FOST
SUSPENDAT PANA LA EMITEREA HG PENTRU DECLANSAREA PROCEDURII DE EXPROPRIERE
5 AUTOSTRAZI IN EXECUTIE / PROIECTARE SI EXECUTIE LUCRARI AUTOSTRADAAUTOSTRADA BRASOV - TARGU MURES - CLUJ -
ORADEA0+000 4+500 S.C. STRABAG S.R.L. SECTOR 1C: TG. MURES - OGRA
LOT 1 - TARGU MURES - UNGHENI
(4.5 KM) + DRUM DE LEGATURA (4.7
KM)
9.2 57.40% 42.45%ORDIN DE INCEPERE PENTRU
EXECUTIE - 22 IULIE 2020
2022 (CONFORM CONTRACT)
2021 - CONFORM ESTIMARE
ANTREPRENOR/ CNAIR SA
ANUL 2022 192.06 MIL. LEI FARA TVA
1. CONTRACT DE EXECUTIE SEMNAT IN DATA DE 29.05.2020.
2. AUTORIZATIE DE CONSTRUIRE VALABILA PENTRU ACEST SECTOR.
3. DURATA DE REALIZARE A ACESTUI CONTRACT ESTE URMATOAREA:
18 LUNI - PERIOADA DE EXECUTIE A LUCRARILOR;
108 LUNI (9 ANI) - PERIOADA DE GARANTIE A LUCRARILOR;
LUCRARILE PENTRU REALIZAREA ACESTUI SECTOR DE AUTOSTRADA PREVAD SI CONSTRUCTIA A 3 PODURI SI PASAJE PE DRUMURI DE LEGATURA, 6
PODURI SI PASAJE PE AUTOSTRADA, PRECUM SI DOUA NODURI RUTIERE PENTRU CONECTAREA AUTOSTRAZII LA RETEAUA DE DRUMURI EXISTENTA.
6 AUTOSTRAZI IN EXECUTIE / PROIECTARE SI EXECUTIE LUCRARI AUTOSTRADAAUTOSTRADA BRASOV - TARGU MURES - CLUJ -
ORADEA21+500 37+191
ASOCIEREA SC STRACO GRUP SRL & SPECIALIST CONSULTING SRL &
SC TOTAL ROAD SRL
TRONSON OGRA - CAMPIA TURZII
(2A3 CHETANI - CAMPIA TURZII)LOT 3 15.691 37.86% 41.97% 04.05.2016
18.09.2020 - NOD CHETANI (1.3 KM) -
DESCHIDEREA TRAFICULUI
2021 - INTARZIERI MAJORE ALE
CONTRACTULUI DE PROIECTARE SI
EXECUTIE - CONTRACT REZILIAT
REZILIAT 279.74 MIL. LEI FARA TVA
IN DATA DE 11.03.2021 S-A TRANSMIS ANTREPRENORULUI INSTIINTAREA DE REZILIERE A CONTRACTULUI.
PROCEDURA DE REZILIERE A FOST SUSPENDATA IN URMA DECIZIEI TRIBUNALULUI BUCURESTI.
DUPĂ DECIZIA INSTANȚEI PRIVIND REZILIEREA, PROCEDURA VA FI RELUATĂ URMÂND SĂ FIE PARCURSE URMĂTOARELE ETAPE:
- FINALIZARE CAIET DE SARCINI, REFERAT DE NECESITATE SI TRANSMITERE LA DIRECTIA ACHIZITII PUBLICE;
- FINALIZARE DOCUMENTATIE DE ATRIBUIRE (CRITERII DE CALIFICARE, MODEL CONTRACT, FACTORI EVALUARE);
- TRANSMITERE DOCUMENTATIE DE ATRIBUIRE SPRE VALIDARE LA ANAP;
PUBLICARE ANUNT DE PARTICIPARE IN SICAP;
- DEPUNERE OFERTE;
- ANALIZA SI EVALUAREA OFERTELOR CU STABILIREA OFERTANTULUI CASTIGATOR;
- COMUNICAREA REZULTATULUI PROCEDURII DE ACHIZITIE PUBLICA;
CONTESTATII;
- SEMNARE CONTRACT.
7 AUTOSTRAZI IN EXECUTIE / PROIECTARE SI EXECUTIE LUCRARI AUTOSTRADAAUTOSTRADA DE CENTURA A MUNICIPIULUI
BUCURESTI (A0) 47+600 52+070
ASOCIEREA S.C. SA&PE CONSTRUCT S.R.L. - S.C. SPEDITION UMB
S.R.L. - S.C. TEHNOSTRADE S.R.L. SECTOR NORD LOT 4 4.47 0% 0% 31.08.2020
2023
DURATA CONTRACTULUI ESTE DE 90
LUNI SI CUPRINDE 12 LUNI
PERIOADA DE PROIECTARE, 18 LUNI
PERIOADA DE EXECUTIE A
LUCRARILOR SI 60 DE LUNI
PERIOADA DE GARANTIE A
LUCRARILOR.
ESTIMAT 2023 312.63 MIL. LEI FARA TVACONTRACT SEMNAT IN DATA DE 31.08.2020.
ESTIMAT EMITERE ORDIN DE INCEPERE A ETAPEI DE PROIECTARE (ELABORARE PROIECT TEHNIC) - TRIM. IV 2021
8 AUTOSTRAZI IN EXECUTIE / PROIECTARE SI EXECUTIE LUCRARI AUTOSTRADAAUTOSTRADA DE CENTURA A MUNICIPIULUI
BUCURESTI (A0) 20+000 39+000
ASOCIEREA SC SA & PE CONSTRUCT SRL (LIDER DE ASOCIERE) -
SPEDITION UMB - TEHNOSTRADE S.R.L.SECTOR NORD LOT 2 19 0% 0% 2021 2024 831.92 MIL. LEI FARA TVA
IN DATA DE 12.05.2021, C.N.A.I.R. S.A. A SEMNAT CONTRACTUL ""PROIECTARE SI EXECUTIE AUTOSTRADA DE CENTURA BUCURESTI KM 0+000-KM
100+900, SECTOR CENTURA NORD KM 0+000-KM 52+770, LOT 2 KM 20+000 - KM 39+000”, CU OFERTANTUL DECLARAT CASTIGTOR, ASOCIEREA SC SA &
PE CONSTRUCT SRL (LIDER DE ASOCIERE) - SPEDITION UMB - TEHNOSTRADE S.R.L.
VALOAREA CONTRACTULUI: 831.920.653,34 LEI FARA TVA.
LUNGIME: 19 KM
SURSA DE FINANȚARE: FONDURI EUROPENE NERAMBURSABILE.
DURATA CONTRACTULUI ESTE DE 154 LUNI, DIN CARE:
12 LUNI PERIOADA DE PROIECTARE,
22 LUNI PERIOADA DE EXECUȚIE A LUCRĂRILOR
120 LUNI PERIOADA DE GARANȚIE A LUCRĂRILOR
9 AUTOSTRAZI IN EXECUTIE / PROIECTARE SI EXECUTIE LUCRARI AUTOSTRADAAUTOSTRADA DE CENTURA A MUNICIPIULUI
BUCURESTI (A0)69+000 85+300 ALSIM ALARKO SANAYI TESISLERI VE TICARET A.S. SECTOR SUD LOT 2: VIDRA - BRAGADIRU 16.3 17.36%
22.78% - PROGRES FINANCIAR
(INCLUSIV AVANS LUCRARI SI
ACTUALIZARI PRETURI)
10.04.2019 - ORDIN DE INCEPERE A
ACTIVITATII DE PROIECTARE
18.08.2020 - ORDIN INCEPERE
LUCRARI KM 69+000 - KM 70+700
FEBRUARIE 2023 FEBRUARIE 2023 750.85 MIL. LEI FARA TVA
ORDIN DE INCEPERE A LUCRARILOR 18.08.2020 ETAPA 1: KM 69+000 - KM 70+700
DECIZIA PENTRU EXPROPRIERI AFERENTA HG 675/2020 A FOST EMISA IN DATA DE 15.10.2020
A FOST ACORDAT AVANSUL PENTRU EXECUTIE LUCRARI (15% DIN VALOAREA LUCRARILOR)
ORDINUL DE INCEPERE PENTRU ETAPA 2, CONSTAND IN INTREG ALINIAMENTUL LOTULUI 2, A FOST EMIS IN DATA DE 29.10.2020, DATA DE INCEPERE
FIIND 05.11.2020 (14,6 KM)
A FOST PUBLICAT IN MONITORIUL OFICIAL HG NR. 1139/30.12.2020 PRIVIND IMOBILELE AFLATE PE CULOARUL SUPLIMENTAR, INCLUSIV DECIZIA DE
EXPROPRIERE NR. 378/17.02.2021.
IN DATA DE 12.03.2021 A FOST OBTINUTA AUTORIZATIA DE CONSTRUIRE NR. 11 PENTRU ETAPA III, EXPROPRIERI SUPLIMENTARE
10 AUTOSTRAZI IN EXECUTIE / PROIECTARE SI EXECUTIE LUCRARI AUTOSTRADAAUTOSTRADA DE CENTURA A MUNICIPIULUI
BUCURESTI (A0)52+070 69+000 ALSIM ALARKO SANAYI TESISLERI VE TICARET A.S.
SECTOR NORD - KM 52+070 – KM
52+770; SECTOR SUD - KM 52+770 –
KM 69+000
LOT 1: GLINA - VIDRA 16.93 3.69%19.73% - PROGRES FINANCIAR
(INCLUSIV AVANS LUCRARI)
03.10.2019 - DATA DE INCEPERE A
ACTIVITATII DE PROIECTAREIUNIE 2023 ANUL 2023 830.68 MIL. LEI FARA TVA
A FOST EMISA AUTORIZATIA DE CONSTRUIRE NR. 66/25.11.2020
A FOST APROBAT PROIECTUL TEHNIC DE EXECUTIE IN DATA DE 11.02.2021.
ORDIN DE INCEPERE LUCRARI 01.03.2021
11 AUTOSTRAZI IN EXECUTIE / PROIECTARE SI EXECUTIE LUCRARI AUTOSTRADAAUTOSTRADA DE CENTURA A MUNICIPIULUI
BUCURESTI (A0)
85+300 -
100+765 SUD
0+000 - 2+500
NORD
ASOCIEREA AKTOR TECHNICAL SOCIETE ANONYME (AKTOR S.A.) -
S.C. EURO CONSTRUCT TRADING 98 S.R.L.
SECTOR SUD - KM 85+300 - KM
100+765; SECTOR NORD - KM 0+000
+ KM 2+500
LOT 3: BRAGADIRU - JOITA 17.965 0.00%1,03% (PROGRES FINANCIAR
INCLUSIV AVANS PROIECTARE)
23.05.2019 - DATA DE INCEPERE A
ACTIVITATII DE PROIECTAREDECEMBRIE 2022 DECEMBRIE 2022 853.42 MIL. LEI FARA TVA
IN PREZENT ANTREPRENORUL A REUSIT SA FINALIZEZE DECLARATIA DE PROIECTARE (INREGISTRAND INTARZIERI MAJORE IN ACTIVITATEA DE
PROIECTARE), FIIND PENALIZAT CONFORM CONTRACTULUI PENTRU NEINDEPLINIREA PUCTULUI DE REFERINTA NR 1 (FINALIZAREA DECLARATIEI DE
PROIECTARE).
PAC A FOST ANALIZAT SI APROBAT IN CADRUL CTE CNAIR IN DATA DE 11.06.2021.
LA DATA PREZENTEI, ANTREPRENORUL ELABOREAZA PTE.
12 AUTOSTRAZI IN EXECUTIE / PROIECTARE SI EXECUTIE LUCRARI AUTOSTRADA AUTOSTRADA SEBES - TURDA 17+000 41+250ASOCIEREA AKTOR TECHNICAL SOCIETE ANONYME (AKTOR S.A.) -
S.C. EURO CONSTRUCT TRADING 98 S.R.L.SANTIMBRU - AIUD LOT 2 24.25 85.90% 76.98% 02.12.2014
APRILIE 2022 - CONFORM GRAFIC DE
LUCRARIESTIMARE DESCHIDERE TRAFIC -
NOIEMBRIE 2021549.33 MIL. LEI FARA TVA
CONTRACT PROIECTARE SI EXECUTIE CU INTARZIERI MAJORE INREGISTRATE, DATORATE SLABEI MOBILIZARI A CONSTRUCTORULUI DIN ANII ANTERIORI,
DAR SI DIN PREZENT, DATORATA LIPSEI RESURSELOR FINANCIARE PROPRII PENTRU SUSTINEREA SANTIERULUI;
PE ROLUL INSTANTELOR, SE AFLA DOUA DOSARE PRIVIND CONTESTATII ALE UNOR EXECUTARI SILITE PENTRU IMOBILELE NECESARE EXECUTIEI
LUCRARILOR. STADIU PROCESUAL: FOND.
IN DATA DE 18.06.2021, ANTREPRENORUL SI-A ASUMAT SOLUTIA FINALA IN VEDEREA STABILIZARII NECESARE IN ZONA KM 19+300
1. AUTOSTRĂZI
SITUAȚIA PROIECTELOR DE INFRASTRUCTURĂ - IUNIE 2021
1.1. AUTOSTRAZI IN EXECUTIE / PROIECTARE SI EXECUTIE LUCRARI - IUNIE 2021
13 AUTOSTRAZI IN EXECUTIE / PROIECTARE SI EXECUTIE LUCRARI AUTOSTRADA AUTOSTRADA SEBES - TURDA 0+000 17+000ASOCIEREA IMPRESA PIZZAROTTI & C SPA POMPONIO
CONSTRUCTII SRLLANCRAM - SANTIMBRU LOT 1 17 96.01%
93.86 % (DIN VALOAREA DE
CONTRACT ACCEPTATA)02.12.2014
DESCHIDERE TRAFIC - 03.12.2020
FINALIZARE CONTRACT: AUGUST
2021
DESCHIDERE TRAFIC (RESPECTIV 14,8
KM AUTOSTRADA, BRETELE 5,6 - NOD
RUTIER SEBES, BRETELE - 1,3 NOD
RUTIER ALBA IULIA NORD, RESPECTIV
NOD RUTIER ALBA IULIA SUD IN
DATA DE 03.12.2020.
541.73 MIL. LEI FARA TVA
CONFORM GRAFICULUI DE LUCRARI INAINTAT DE ANTREPRENOR CONTRACTUL SE VA FINALIZA IN LUNA IUNIE 2021, DUPA FINALIZAREA LUCRARILOR A
CELOR 2.2 KM DE AUTOSTRADA, A PASAJULUI PESTE CF 201A DE LA KM 15+350 CALEA 2, NODULUI RUTIER SEBES CU 4 BRETELE RESPECTIV BRETEA
NR.1,2,3,4 SI STRUCTURI AFERENTE ACESTOR BRETELE, RESPECTIV NOD RUTIER ALBA IULIA NORD CU BRETELE 2 SI 4, AFLATE IN EXECUTIE.
DESCHIDEREA TRAFICULUI PE TOATA LUNGIMEA SECTORULUI DE AUTOSTRADA VA AVEA LOC DOAR DUPA FINALIZAREA LUCRARILOR SI PE LOTUL 2,
DEOARECE DESCARCAREA TRAFICULUI ESTE POSIBILA DOAR PRIN NODUL ALBA IULIA NORD DE LA KM 15+500.
14 AUTOSTRAZI IN EXECUTIE / PROIECTARE SI EXECUTIE LUCRARI AUTOSTRADA AUTOSTRADA SIBIU - PITESTI 91+761 122+110 ASTALDI SPA (ITALIA) CURTEA DE ARGES - PITESTI SECTIUNEA 5 30.35 0% 1.34%
IUNIE 2020 - EMITERE ORDIN ETAPA
DE PROIECTARE, AUTORIZATIA DE
CONSTRUIRE NR.31/17.06.2021
2025 IN CF CU PREVEDERILE CTR
DURATA DE REALIZARE A ACESTUI
CTR ESTE DE 60 DE LUNI, RESPECTIV:
12 LUNI PERIODA DE PROIECTARE SI
48 DE LUNI PENTRU EXECUTIA
LUCRARILOR. PERIOADA DE
GARANTIE A LUCRARILOR OFERTATA
DE ASTALDI SPA ESTE DE 120 DE LUNI
ANUL 2025 1710 MIL. LEI FARA TVA
22.06.2020 – ORDIN DE INCEPERE FAZA PROIECTARE (12 LUNI)
CONTRACT DE SERVICII NR.92/58937/11.09.2020: „SUPERVIZARE AUTOSTRADA SIBIU – PITESTI, SECTIUNEA 5 – CURTEA DE ARGES – PITESTI KM 92+600-
KM 122+950" SEMNAT CU ASOCIAREA EGIS INTERNATIONAL S.A.S – SEARCH CORPORATION S.R.L.- ITALROM INGINERIE INTERNATIONALA S.R.L.-
METROUL S.A, A INLOCUIT SUPERVIZORUL DRDP BUCURESTI INCEPAND CU DATA DE 01.10.2020
In data de 30.12.2020 a fost publicata Hotararea de Guvern nr.1134 pentru realizarea exproprierilor pentru suprafetele de teren aflate pe aza localităţilor
Budeasa, Curtea de Argeș, Mălureni și Municipiul Pitești, din județul Argeș.
17.02.2021 - S-A EMIS DECIZIA DE EXPROPRIERE NR. 377/2020 PENTRU IMOBILELE DE PE RAZA LOCALITATILOR BUDEASA, CURTEA DE ARGES,
MALURENI SI MUN. PITESTI
PROCEDURA DE EXPROPRIERE INTERGAL FINALIZATA
15 AUTOSTRAZI IN EXECUTIE / PROIECTARE SI EXECUTIE LUCRARI AUTOSTRADA AUTOSTRADA SIBIU - PITESTI 0+000 13+170 PORR CONSTRUCT SRL LOT 1: KM 0+000 - KM 13+170SECTIUNEA 1: SIBIU - BOITA (KM
0+000 - KM 14+150), LOT 113.17 42.45% 35.83%
29.05.2019 - EMITERE ORDIN DE
INCEPERE ETAPA DE PROIECTARE,
30.03.2020 - EMITERE ORDIN DE
INCEPERE ETAPA EXECUTIE LUCRARI
28.05.2023 ANUL 2023 612.65 MIL. LEI FARA TVA
PROIECTUL TEHNIC A FOST FINALIZAT SI APROBAT DE CATRE CNAIR SA IN DATA DE 01.04.2020.
AUTORIZATIA DE CONSTRUIRE A FOST EMISA IN DATA DE 09.03.2020.
CONTRACT DE SERVICII NR. 92/61673/22.09.2020: „SUPERVIZARE AUTOSTRADA SIBIU – PITESTI, SECTIUNEA 1 –SIBIU – BOITA KM 0+000-KM 14+150""
ASOCIEREA TPF INGINERIE S.R.L. - SEPTEMBRIE CONSULTING S.R.L. A INLOCUIT SUPERVIZORUL DRDP BUCURESTI INCEPAND CU DATA DE 19.10.2020
16 AUTOSTRAZI IN EXECUTIE / PROIECTARE SI EXECUTIE LUCRARI DRUM NATIONAL POD BRAILA ASOCIEREA ASTALDI S.P. A - IHI INFRASTRUCTURE SYSTEM CO. LTD.POD SUSPENDAT PESTE DUNARE IN
ZONA BRAILA1
DRUM BRAILA-JIJILA - 19,095 KM;
DRUM DE LEGATURA CU DN22
SMARDAN-MACIN - 4,328 KM
39.00% 48.66% 21.12.2018
SECTIUNEA 2 DECEMBRIE 2021
TOTAL CONTRACT: ESTIMAT
DECEMBRIE 2022
DECEMBRIE 2021 SECTIUNEA 2
PODUL SUSPENDAT 1.996 MLD. LEI FARA TVA CONTRACT IN DERULARE.
NR.
CRT.CATEGORIE DRUM RANG DRUM INDICATIV DRUM
DE LA
(km)
PANA LA
(km)ANTREPRENOR SECTORUL LOTUL LUNGIME (km) STADIUL FIZIC ACTUAL
STADIUL FINANCIAR
ACTUALDATA INCEPERII DATA FINALIZARII AN DESCHIDERE VALOARE PROIECT OBSERVATII
DETALII
PROCEDURA
1AUTOSTRAZI IN LICITATIE FAZA EXECUTIE / PROIECTARE SI EXECUTIE
LUCRARIAUTOSTRADA
AUTOSTRADA BRASOV - TARGU MURES - CLUJ -
ORADEA4+200 30+550
SE VA STABILI IN URMA FINALIZARII PROCEDURII DE LICITATIE
ATRIBUIRE CONTRACT PROIECTARE SI EXECUTIE
SECTIUNEA 3C, SUBSECTIUNEA 3C1
SUPLACUL DE BARCAU - CHRIBIS
SUBSECTIUNEA 3C1: SUPLACU DE
BARCAU - CHIRIBIS *KM 4+200
COINCIDE CU KM 80+054.044 DIN
3B5
26.35 0% 0% 2021 2023 ANUL 2023 465.14 MIL. LEI FARA TVA DETALII PRIVIND PROCEDURA DE ATRIBUIRE A CONTRACTULUI IN LINK-UL DE MAI JOS
http://www.cnadnr.ro/
sites/default/files/AUTO
STRADA_BRA%C8%98O
V_T%C3%82RGU%20M
URE%C8%98_CLUJ_ORA
DEA_CALENDAR.pdf
2AUTOSTRAZI IN LICITATIE FAZA EXECUTIE / PROIECTARE SI EXECUTIE
LUCRARIAUTOSTRADA
AUTOSTRADA BRASOV - TARGU MURES - CLUJ -
ORADEA25+500 66+500
SE VA STABILI IN URMA FINALIZARII PROCEDURII DE LICITATIE
ATRIBUIRE CONTRACT PROIECTARE SI EXECUTIE
SECTIUNEA 3B,SUBSECTIUNEA 3B3:
POARTA SALAJULUI - ZALAU (KM
25+500- KM 40+637) +
SUBSECTIUNEA 3B4: ZALAU -
NUSFALAU (KM 40+660- KM
66+500), INCLUSIV TUNEL RUTIER
MESES
SUBSECTIUNEA 3B3: POARTA
SALAJULUI - ZALAU (KM 25+500 - KM
40+637) +
SUBSECTIUNEA 3B4: ZALAU -
NUSFALAU (KM 40+660 - KM
66+500), INCLUSIV TUNEL RUTIER
MESES
41 2021 2025 ANUL 2025
3926.81 MIL. LEI FARA TVA, DIN
CARE VALOAREA TUNELULUI MESES
ESTE DE 1075.36 MIL LEI FARA TVA
DETALII PRIVIND PROCEDURA DE ATRIBUIRE A CONTRACTULUI IN LINK-UL DE MAI JOS
http://www.cnadnr.ro/
sites/default/files/AUTO
STRADA_BRA%C8%98O
V_T%C3%82RGU%20M
URE%C8%98_CLUJ_ORA
DEA_CALENDAR.pdf
3AUTOSTRAZI IN LICITATIE FAZA EXECUTIE / PROIECTARE SI EXECUTIE
LUCRARIAUTOSTRADA
AUTOSTRADA DE CENTURA A MUNICIPIULUI
BUCURESTI (A0) 2+500 20+000
SE VA STABILI IN URMA FINALIZARII PROCEDURII DE LICITATIE
ATRIBUIRE CONTRACT PROIECTARE SI EXECUTIESECTOR NORD LOT 1 17.5 0% 0% 2020 2023 ANUL 2023
842.14 MIL. LEI FARA TVA (VALOARE
ESTIMATA PROCEDURA DE LICITATIE)
746.763.568,57 LEI, FARA TVA
(VALOARE OFERTA CASTIGATOARE)
http://www.cnadnr.ro/
sites/default/files/AUTO
STRADA_DE_CENTURA_
A_MUNICIPIULUI_BUC
URE%C8%98TI_CALEND
AR.pdf
4AUTOSTRAZI IN LICITATIE FAZA EXECUTIE / PROIECTARE SI EXECUTIE
LUCRARIAUTOSTRADA
AUTOSTRADA DE CENTURA A MUNICIPIULUI
BUCURESTI (A0) 39+000 47+600
SE VA STABILI IN URMA FINALIZARII PROCEDURII DE LICITATIE
ATRIBUIRE CONTRACT PROIECTARE SI EXECUTIESECTOR NORD LOT 3 8.5 0% 0% 2020 2024 466.28 MIL. LEI FARA TVA
http://www.cnadnr.ro/
sites/default/files/AUTO
STRADA_DE_CENTURA_
A_MUNICIPIULUI_BUC
URE%C8%98TI_CALEND
AR.pdf
5AUTOSTRAZI IN LICITATIE FAZA EXECUTIE / PROIECTARE SI EXECUTIE
LUCRARIAUTOSTRADA AUTOSTRADA SIBIU - PITESTI 44+500 81+900
SE VA STABILI IN URMA FINALIZARII PROCEDURII DE LICITATIE
ATRIBUIRE CONTRACT PROIECTARE SI EXECUTIECORNETU - TIGVENI SECTIUNEA 3 37.4 0% 0% 2021 2025 4784.02 MIL. LEI FARA TVA
TERMEN DEPUNERE OFERTE PROCEDURA DE ATRIBUIRE CONTRACT DE PROIECTARE SI EXECUTIE - 27.11.2020
PANA LA TERMENUL LIMITA AU DEPUS OFERTE 15 AGENTI ECONOMICI.
VALOAREA ESTIMATA A CONTRACTULUI ESTE DE 5.324.779.469,00 LEI FARA TVA.
DURATA CONTRACTULUI ESTE DE: 14 LUNI PERIOADA DE PROIECTARE, 59 LUNI PERIOADA DE EXECUTIE ŞI 60 LUNI PERIOADA DE GARANTIE A
LUCRARILOR.
TRASEUL ARE O LUNGIME DE 37.4 KM
SURSA DE FINANTARE: FONDURI EUROPENE NERAMBURSABILE.
PRINCIPALELE LUCRARI ALE ACESTEI SECTIUNI SUNT:
• 95 DE PODURI SI PASAJE
• TUNEL CU DOUA GALERII INDEPENDENTE IN LUNGIME DE 1.7 KM/ GALERIE
• NOD RUTIER CORNETU SI NOD RUTIER VALENI
• ECODUCT IN ZONA LOCALITATII CALINESTI
http://www.cnadnr.ro/
sites/default/files/AUTO
STRADA_SIBIU_PITE%C
8%98TI_CALENDAR.pdf
6AUTOSTRAZI IN LICITATIE FAZA EXECUTIE / PROIECTARE SI EXECUTIE
LUCRARIAUTOSTRADA AUTOSTRADA SIBIU - PITESTI 13+170 44+500
SE VA STABILI IN URMA FINALIZARII PROCEDURII DE LICITATIE
ATRIBUIRE CONTRACT PROIECTARE SI EXECUTIESECTIUNEA 1, LOT 2 SI SECTIUNEA 2
SECTIUNEA 1: SIBIU - BOITA, LOT 2 SI
SECTIUNEA 2: BOITA - CORNETU31.33 0% 0% 2021 2025 ANUL 2025 4081.78 MIL. LEI FARA TVA
http://www.cnadnr.ro/
sites/default/files/AUTO
STRADA_SIBIU_PITE%C
8%98TI_CALENDAR.pdf
7AUTOSTRAZI IN LICITATIE FAZA EXECUTIE / PROIECTARE SI EXECUTIE
LUCRARIAUTOSTRADA AUTOSTRADA SIBIU - PITESTI 81+900 91+761
SE VA STABILI IN URMA FINALIZARII PROCEDURII DE LICITATIE
ATRIBUIRE CONTRACT PROIECTARE SI EXECUTIETIGVENI - CURTEA DE ARGES SECTIUNEA 4 9.86 0% 0% 2021 2025
ESTIMAT 2025 IN FUNCTIE DE DATA
LA CARE VA FI FINALIZATA
PROCEDURA DE ATRIBUIRE
2000.17 MIL. LEI FARA TVA
IN DATA DE 04.03.2021 AU FOST TRANSMISE ADRESELE DE COMUNICARE A REZULTATULUI PROCEDURII DE ATRIBUIRE A CONTRACTULUI.
OFERTANTUL DESEMNAT CASTIGATOR ESTE S.C. PORR CONSTRUCT S.R.L., CU PRETUL DE 1.678.873.121,77 LEI FARA TVA.
AU FOST DEPUSE 2 CONTESTATII
CONTRACTUL VA FI SEMNAT IN FUNCTIE DE SOLUTIA INSTANTEI
http://www.cnadnr.ro/
sites/default/files/AUTO
STRADA_SIBIU_PITE%C
8%98TI_CALENDAR.pdf
8AUTOSTRAZI IN LICITATIE FAZA EXECUTIE / PROIECTARE SI EXECUTIE
LUCRARIAUTOSTRADA AUTOSTRADA PLOIESTI - BUZAU 0+000 63+250
SE VA STABILI IN URMA FINALIZARII PROCEDURII DE LICITATIE
ATRIBUIRE CONTRACT PROIECTARE SI EXECUTIEPLOIESTI - BUZAU 63.25
ORDIN DE INCEPERE 12.11.2018 -
ETAPA PROIECTARE2021 1146.6 MIL. LEI FARA TVA
A FOST LANSATA PROCEDURA DE LICITATIE PENTRU ATRIBUIREA CONTRACTULUI DE EXECUTIE LUCRARI 01.06.2021. TERMEN DE DEPUNERE A
OFERTELOR 04.08.2021
http://www.cnadnr.ro/
sites/default/files/A7%2
0PLOIE%C8%98TI%20-
%20BUZ%C4%82U.pdf
1.2. AUTOSTRAZI IN LICITATIE FAZA EXECUTIE / PROIECTARE SI EXECUTIE LUCRARI - IUNIE 2021
9AUTOSTRAZI IN LICITATIE FAZA EXECUTIE / PROIECTARE SI EXECUTIE
LUCRARIAUTOSTRADA AUTOSTRADA LUGOJ - DEVA 27+620 56+220
SE VA STABILI IN URMA FINALIZARII PROCEDURII DE LICITATIE
ATRIBUIRE CONTRACT PROIECTARE SI EXECUTIE
MARGINA - HOLDEA
SECTIUNEA E (KM 47+090 - KM
56+220) SI FINALIZARE SECTIUNEA D
LOT 228.6 (9.13 KM SECTIUNEA E SI
FINALIZARE SECTIUNE D)27.11.2013
1. FINALIZAT SECT. A - C (KM 27+620 -
KM 43+060);
2. SECTIUNEA E SI REST DE EXECUTAT
DIN SECTIUNEA D (KM 43+060 - KM
56+220) - ESTIMAT DECEMBRIE 2023
ANUL 2025
1560.50 MIL LEI FARA TVA -
REPREZINTA VAL ESTIMATA TOTALA,
CARE CONTINE ATAT VAL ESTIMATA
A LUCRARILOR, CAT SI VAL
POSIBILELOR LUCRARI NOI SIMILARE
AU FOST DEPUSE NOUA CANDIDATURI PENTRU REALIZAREA ACESTEI PORTIUNI, DINTRE CARE SASE APARTIN UNOR ASOCIERI DE FIRME:
AKTOR S.A. (GRECIA)
ASOCIEREA SC ALSIM ALARKO SANAYI TESISLERI VE TICARET A.Ș – MAKYOL INSAAT SANAYI TURIZM VE TICARET A.S. (TURCIA)
ASOCIEREA FCC CONSTRUCCION SA – GULERMAK AGIR SANAYI INSAAT VE TAAHHUT A.S. (SPANIA – TURCIA)
ASOCIEREA IMPRESA PIZZAROTTI & CSPA – PIZZAROTTI SA – RETTER PROJECT MANAGEMENT SRL (ITALIA – ROMANIA)
ASOCIEREA TERNA SA – INTRACOM CONSTRUCTIONS SOCIETE ANONYME TECHNICAL AND STEEL CONSTRUCTIONS (INTRAKAT) (GRECIA)
KOLIN INSAAT TURIZM SANAYI VE TICARET ANONIM SIRKETI (TURCIA)
ASOCIEREA MAPA INSAAT VE TICARET A.S. – CENGIZ INSAAT SANAYI VE TICARET A.S. (TURCIA)
ASOCIEREA RIZZANI DE ECCHER SPA – OZGUN INSAAT TAAHHUT SANAYI VE TICARET LIMITED STI – CIPA SPA (ITALIA – TURCIA)
STRABAG SRL (ROMANIA)
DETALII PRIVIND CALENDARUL PROCEDURII SE VOR VIZUALIZA LA LINK-UL DE MAI JOS:
http://www.cnadnr.ro/
sites/default/files/AUTO
STRADA_LUGOJ_DEVA_
CALENDAR.pdf
10AUTOSTRAZI IN LICITATIE FAZA EXECUTIE / PROIECTARE SI EXECUTIE
LUCRARIAUTOSTRADA DRUM DE LEGATURA A3 0+000 18+960
PROCEDURA DE LICITATIE ATRIBUIRE CONTRACT PROIECTARE SI
EXECUTIE IN DERULARE
LEGATURA CENTURA ORADEA
(GIRATIA SANTANDREI) -
AUTOSTRADA A3 (BIHARIA)
18.96 0% 0% 2020 2023 DECEMBRIE 2023 546.4 MIL. LEI FARA TVA DETALII PRIVIND PROCEDURA DE ATRIBUIRE A CONTRACTULUI IN LINK-UL ALATURAT
http://www.cnadnr.ro/
sites/default/files/DRU
MURI_NA%C8%9AIONA
LE_%C8%98I_VARIANTE
_DE_OCOLIRE_CALEND
AR.pdf
NR.
CRT.CATEGORIE DRUM RANG DRUM INDICATIV DRUM
DE LA
(km)
PANA LA
(km)ANTREPRENOR SECTORUL LOTUL LUNGIME (km) STADIUL FIZIC ACTUAL
STADIUL FINANCIAR
ACTUALDATA INCEPERII DATA FINALIZARII AN DESCHIDERE VALOARE PROIECT OBSERVATII
DETALII
PROCEDURA
1 AUTOSTRAZI IN PREGATIRE FAZA PROIECTARE (SF, PT) AUTOSTRADA AUTOSTRADA BRASOV - BACAU 0+000 165+000
SEARCH CORPORATION& PRIMACONS GRUP SRL - CONTRACT
PROIECTARE ELABORARE STUDIU DE FEZABILITATE SI PROIECT
TEHNIC
(VALOARE CONTRACT PROIECTARE: 20.093.359,86 LEI FARA TVA)
BRASOV - BACAU LOT 1 165 0% 0%
22.05.2020 - DATA SEMNARII
CONTRACTULUI DE PRESTARI
SERVICII DE PROIECTARE (STUDIU DE
FEZABILITATE SI ELABORARE PROIECT
TEHNIC)
10.07.2020 - ORDIN INCEPERE ETAPA
DE PROIECTARE
2023 - FINALIZARE PROIECTARE
(SF+PT)
ANUL 2023 - FINALIZARE
PROIECTARE (SF+PT)8858.21 MIL. LEI FARA TVA
DURATA CONTRACTULUI ESTE DE 30 LUNI.
ORDINUL DE INCEPERE: 10.07.2020
PRESTATORUL A ELABORAT ANALIZA MULTICRITERIALA PRIVIND ALEGEREA ALTERNATIVELOR DE TRASEU, ETAPA 1.
A FOST AVIZAT IN CTE CNAIR SA - ANALIZA MULTICRITERIALA ETAPA 1.
AU FOST FINALIZATE STUDIILE DE TEREN AFERENT PROIECTULUI PRELIMINAR (STUDII TOPOGRAFICE SI GEOTEHNICE).
ESTE IN DERULARE ANALIZA MULTICRITERIALA NR. 2
2 AUTOSTRAZI IN PREGATIRE FAZA PROIECTARE (SF, PT) AUTOSTRADA A1 SI A3 SEARCH CORPORATION SRL
ELABORARE STUDIU DE FEZABILITATE
SI PROIECT TEHNIC DE EXECUTIE
PENTRU 6 NODURI RUTIERE PE A1 SI
A3 IN ZONA DE VEST A ROMANIEI
A1(KM 326+155) - DJ
704(CUGHIR),A1(KM 362+813) - DC
129(SANTUHALM),A1(KM 485+030 -
DJ 609E(RECAS),A1(KM 450+210) - DJ
609(BETTHAUSEN),A1(KM 528+509) -
DJ 682G(CRUCENI),A3(KM 39+940) -
DN1P(SPINUS)
0% 0% 22.04.2021 22.06.2022
CONTRACT SEMNAT IN DATA DE 17.03.2021
ORDINUL DE INCEPERE A ACTIVITATII DE PROIECTARE A FOST EMIS IN DATA DE 22.04.2021
DURATA CONTRACTULUI ESTE DE 14 LUNI DE LA DATA DE INCEPERE A CONTRACTULUI, DIN CARE:
-6 LUNI PENTRU ELABORAREA STUDIULUI DE FEZABILITATE,
- 4 LUNI PENTRU REALIZAREA PROIECTULUI PENTRU AUTORIZAREA LUCRARILOR DE CONSTRUIRE,
- 3 LUNI PENTRU ELABORAREA PROIECTULUI TEHNIC DE EXECUTIE SI
- 1 LUNI PENTRU ACORDAREA SERVICIILOR DE ASISTENTA TEHNICA BENEFICIARULUI.
A AVUT LOC SEDINTA DE INCEPUT IN DATA DE 22.04.2021. A FOST TRANSMIS RAPORTUL DE INCEPUT. AU FOST FORMULATE OBSERVATII LA RAPORTUL
DE INCEPUT.A FOST APROBAT RAPORTUL DE INCEPUT.
3 AUTOSTRAZI IN PREGATIRE FAZA PROIECTARE (SF, PT) AUTOSTRADAAUTOSTRADA TARGU NEAMT - IASI -
UNGHENI0+000 100+140 SC CONSITRANS S.R.L.
TARGU NEAMT - IASI (LETCANI) -
UNGHENI100.14
2021 -SERVICII DE PROIECTARE FAZA
S.F. + P.A.C. + P.T.E. SECTIUNE TARGU
NEAMT - IASI-UNGHENI
2023 - FINALIZARE PROIECTAREANUL 2025 - PERIOADA ESTIMATA
DESCHIDERE TRAFIC PENTRU
PRIMELE SECTIUNI
58.83 MIL. LEI FARA TVA (VALOARE
CONTRACT
COMPLETARE/REVIZUIRE/ACTUALIZA
RE S.F. SI ELABORARE P.A.C. + P.A.D.
+ P.T.E)
IN DATA DE 08.04.2021 A FOST SEMNAT CONTRACTUL DE SERVICII „COMPLETARE/ REVIZUIRE/ ACTUALIZARE STUDIU DE FEZABILITATE SI ELABORARE
P.A.C., P.A.D. SI P.T.E. PENTRU OBIECTIVUL „AUTOSTRADA TARGU-NEAMT – IASI – UNGHENI” CU SC CONSITRANS S.R.L.
PRETUL CONTRACTULUI ESTE DE 58.830.448,35 LEI FARA TVA
IN DATA DE 07.05.2021 A AVUT LOC SEDINTA DE INCEPUT
DURATA DE REALIZARE A SERVICIILOR DE PROIECTARE ESTE DUPA CUM URMEAZA:
12 LUNI PENTRU REALIZAREA STUDIULUI DE FEZABILITATE;
5 LUNI PENTRU REALIZAREA PROIECTULUI PENTRU AUTORIZAREA EXECUTARII LUCRARILOR DE CONSTRUIRE (PAC) SI OBTINEREA AUTORIZATIEI DE
CONSTRUIRE;
5 LUNI PENTRU REALIZAREA PROIECTULUI TEHNIC DE EXECUTIE (PTE)
4 AUTOSTRAZI IN PREGATIRE FAZA PROIECTARE (SF, PT) AUTOSTRADA AUTOSTRADA SIBIU - BRASOV 0+000 68+050CONSITRANS
(VALOARE CONTRACT PROIECTARE: 16.313.855,49 FARA TVA)SIBIU - FAGARAS LOT 1 68.05 22.00% ORDIN DE INCEPERE 11.05.2015
TRIM III 2021/ FINALIZARE
PROIECTARE FAZA REVIZUIRE STUDIU
DE FEZABILITATE
FINALIZARE PROIECTARE (EMITERE
ACORD DE MEDIU) - TRIM. III 20215170 MIL. LEI FARA TVA
CONTRACT REVIZUIRE STUDIU DE FEZABILITATE IN DERULARE - STUDIUL DE FEZABILITATE A FOST AVIZAT IN CADRUL CTE, PROCEDURA DE MEDIU IN
DERULARE
5 AUTOSTRAZI IN PREGATIRE FAZA PROIECTARE (SF, PT) AUTOSTRADA AUTOSTRADA SIBIU - BRASOV 0+000 48+410 FAGARAS - BRASOV LOT 2 48.41 0% 0% 2021 2023 17.712 MIL LEI FARA TVA
http://www.cnadnr.ro/
sites/default/files/STUD
II_DE_FEZABILITATE_%
C8%98I_PROIECTE_TEH
NICE_CALENDAR.pdf
6 AUTOSTRAZI IN PREGATIRE FAZA PROIECTARE (SF, PT) AUTOSTRADA AUTOSTRADA TARGU MURES - TARGU NEAMT 0+000 211+000PROIECTANT: INGENIERIA ESPECIALIZADA OBRA CIVIL E
INDUSTRIAL SATARGU MURES - TARGU NEAMT LOT 1 211 52% 11% 28.05.2019
25.07.2021 (CONFORM ACT
ADITIONAL LA CTR DE PRESTARI
SERVICII)
ANUL 2021 - FINALIZARE
PROIECTARE
2025 - PERIOADA ESTIMATA PENTRU
DESCHIDEREA PRIMELOR SECTIUNI
17.58 MIL. LEI FARA TVA
IN DATA DE 28.05.2019 A FOST SEMNAT CONTRACTUL DE SERVICII 92/36788 AFERENT „COMPLETARE STUDIU DE FEZABILITATE PENTRU AUTOSTRADA
TARGU MURES – TARGU NEAMT”.
TERMEN INITIAL DE FINALIZARE A REVIZUIRII STUDIULUI DE FEZABILITATE - 25.01.2021.
CONTRACT DE REVIZUIRE SF IN DERULARE
IN DATA DE 31.07.2020 A FOST SEMNAT ADITIONALUL NR. 1, PRIN CARE SE PRELUNGESTE TERMENUL DE FINALIZARE AL SERVICIILOR DE PROIECTARE
CU 6 LUNI.
TERMEN DE FINALIZARE CONFORM ACT ADITIONAL - 25.07.2021
EMITEREA DECIZIEI ETAPEI DE INCADRARE INITIALE ANPM IN DATA DE 18.09.2020.
IN DATA DE 31.09.2020 A AVUT LOC SEDINTA PENTRU AVIZAREA IN CTE / CNAIR A TRASEULUI CORECTAT CONFORM CONSTRANGERILOR IDENTIFICATE.
PENTRU FINALIZAREA AVIZARII CTE A FOST SOLICITATA COMPLETAREA DOCUMENTATIEI.
IN DATA DE 05.11.2020 A FOST AVIZAT TRASEUL FINAL IN COMISIA CTE CNAIR.
IN DATA DE 27.01.2021 A FOST APROBAT STUDIU TOPOGRAFIC. MASURATORI TOPOGRAFICE CU TEHNOLOGIA LIDAR
IN DATA DE 25.03.2021 A FOST APROBAT STUDIUL GEOTEHNIC AFERENT TRONSON: DITRAU - TARGU NEAMT, SECTOR 4 KM 95+600 – KM 118+800.
AU FOST FINALIZATE INVESTIGATIILE IN SITU PE JUD. MURES SI JUD. HARGHITA SI AU FOST AVIZATE STUDIILE ARHEOLOGICE ETAPA 2 JUD. HARGHITA
SI JUD. MURES
- IN DATA DE 16.04.2021 A FOST INAINTATA O VARIANTA PRELIMINARA A STUDIULUI DE FEZABILITATE
AU FOST FINALIZATE INVESTIGATIILE IN SITU PE JUD. NEAMT SI JUD. IASI SI AU FOST AVIZATE STUDIILE ARHEOLOGICE ETAPA 2 JUD. NEAMT SI JUD. IAS
7 AUTOSTRAZI IN PREGATIRE FAZA PROIECTARE (SF, PT) AUTOSTRADA AUTOSTRADA TIMISOARA - MORAVITA 0+000 60+000
SEARCH CORPORATION & EGIS ROMANIA- CONTRACT PROIECTARE
ELABORARE SF SEMNAT IN DATA DE 4 MARTIE 2020
(VALOARE CONTRACT PROIECTARE: 8.727.474,68 FARA TVA)
TIMISOARA – MORAVITA LOT 1 60 04.03.2020 - ELABORARE SF
MAI 2022 - TERMEN FINALIZARE
PROIECTARE; PERIOADA
CONTRACTUALA DE PRESTARE A
SERVICIILOR - 24 LUNI
MAI 2022 - TERMEN FINALIZARE
PROIECTARE141.6 MIL. LEI FARA TVA
ETAPA DE PROIECTARE (ELABORARE STUDIU DE FEZABILITATE) IN DERULARE.
S-A AVIZAT IN CTE-CNAIR ANALIZA MULTICRITERIALA A VARIANTELOR DE TRASEU, ETAPA 1
A FOST TRANSMISA DOCUMENTATIA AMC ETAPA 2. DOCUMENTATIA IN CURS DE ANALIZA LA BENEFICIAR SI LA EXPERTII JASPERS.IN DATA DE
27.05.2021 RESPECTIV 02.06.2021 A FOST ORGANIZATA O SEDINTA DE ANALIZA CU EXPERTII JASPERS.PRESTATORUL IMPLEMENTEAZA OBSERVATIILE
JASPERS
8 AUTOSTRAZI IN PREGATIRE FAZA PROIECTARE (SF, PT) AUTOSTRADA AUTOSTRADA BACAU - PASCANI 0+000 77+394
INGINERIA ESPECIALIZADA OBRA CIVIL E INDUSTRIAL SA -
CONTRACT ELABORARE SF SI PT IN DERULARE
(VALOARE CONTRACT PROIECTARE: 16.950.944,23 FARA TVA)
BACAU - PASCANI LOT 1 77.283 0% 21%ORDIN DE INCEPERE 01.03.2019 -
ETAPA PROIECTARE2021
ANUL 2021 - FINALIZARE ETAPA
PROIECTARE1750.27 MIL. LEI FARA TVA
ETAPA DE PROIECTARE (ELABORARE STUDIU DE FEZABILITATE) IN DERULARE
S-A AVIZAT IN CTE-CNAIR ANALIZA MULTICRITERIALA A VARIANTELOR DE TRASEU, ETAPA 1 SI ETAPA 2 (AMC1 + AMC2).
SE EFECTUEAZA INVESTIGATII GEOTEHNICE - PROCENT DE REALIZARE 95%.
SE EFECTUEAZA INVESTIGATII ARHEOLOGICE - IN CURS DE ANALIZA RAPORTUL DE DIAGNOSTIC INTRUZIV.
S-AU OBTINUT TOATE CELE 3 CERTFICATE DE URBANISM.
IN PREZENT SUNT IN CURS DE OBTINERE AVIZELE.
PRESTATORUL A INAINTAT STUDIUL DE FEZABILITATE -Au fost emise observatiiA FOST ANALIZAT IN CADRUL CTE SIGURANTA CIRCULATIEI PROIECTUL-IN CURS DE IMPLEMENTARE OBSERVATII.
9 AUTOSTRAZI IN PREGATIRE FAZA PROIECTARE (SF, PT) AUTOSTRADA AUTOSTRADA BUZAU - FOCSANI 0+000 82+440CONSITRANS - CONTRACT ELABORARE SF SI PT
(VALOARE CONTRACT PROIECTARE: 13.933.291,10 LEI, FARA TVA)BUZAU - FOCSANI 82.44 10.35%
ORDIN DE INCEPERE 12.11.2018 -
ETAPA PROIECTARE2021 FINALIZARE 2021 1270.62 MIL. LEI FARA TVA
CONTRACT PROIECTARE IN DERULARE - ETAPA ELABORARE STUDIU DE FEZABILITATE ANALIZA MULTICRITERIALA ETAPA 1 SI ETAPA 2.
A FOST AVIZAT IN CADRUL CTE CNAIR STUDIUL SI RAPORTUL ALTERNATIVELOR DE TRASEU (AMC 1 SI AMC 2)
INVESTIGATIILE GEOTEHNICE AU FOST REALIZATE IN PROPORTIE DE 100%. IN CURS DE ELABORARE TESTELE DE LABORATOR.
A FOST AVIZAT IN CADRUL COMISIEI TEHNICE PENTRU SIGURANTA CIRCULATIEI NODURILE RUTIERE SI DOTARILE AUTOSTRAZII.
A FOST INAINTAT STUDIUL DE FEZABILITATE - IN CURS DE ANALIZA
10 AUTOSTRAZI IN PREGATIRE FAZA PROIECTARE (SF, PT) AUTOSTRADA AUTOSTRADA FOCSANI - BACAU 0+000 96+052CONSITRANS - CONTRACT ELABORARE SF SI PT
(VALOARE CONTRACT PROIECTARE: 20.123.408,52 LEI, FARA TVA)FOCSANI - BACAU 96.052 0% 0.37%
ORDIN DE INCEPERE 10.01.2019 -
ETAPA PROIECTARE2021
ANUL 2021 - FINALIZARE ETAPA
PROIECTARE1927.35 MIL. LEI FARA TVA
ETAPA DE PROIECTARE (ELABORARE STUDIU DE FEZABILITATE) IN DERULARE.
S-A AVIZAT IN CADRUL CTE CNAIR SA - STUDIUL SI RAPORTUL ALTERNATIVELOR DE TRASEU (ANALIZA MULTICRITERIALA ETAPA 1 SI ANALIZA
MULTICRITERIALA ETAPA 2).
AU INCEPUT INVESTIGATIILE ARHEOLOGICE.
STUDIILE GEOTEHNICE IN CURS DE REALIZARE-PROCENTUL DE REALIZARE ESTE DE 61%.
STUDIUL ARHEOLOGIC ETAPA NR. 2 A FOST TRANSMIS LA MINISTERELE DE CULTURA DE PE RAZA JUDETELOR VRANCEA SI BACAU IN VEDEREA OBTINERII
AVIZELOR.
IN DATA DE 09.03.2021 AU FOST ANALIZATE IN CADRUL COMISIEI TEHNICE PENTRU SIGURANTA CIRCULATIEI NODURILE RUTIERE SI DOTARILE
AUTOSTRAZII
IN DATA DE 05.05.2021 A FOST INAINTAT STUDIUL DE FEZABILITATE SUB FORMA DRAFT- Au fost emise observatii
1.3. AUTOSTRAZI IN PREGATIRE FAZA PROIECTARE (SF, PT) - IUNIE 2021
11 AUTOSTRAZI IN PREGATIRE FAZA PROIECTARE (SF, PT) AUTOSTRADA AUTOSTRADA SIBIU - PITESTI 44+800 68+000
SECTIUNEA 6, CONEXIUNE DN 73C CU
AUTOSTRADA SIBIU - PITESTI (NOD
TIGVENI) SI MODERNIZARE DN 73C
(KM 44+800 – KM 68+000)
SECTIUNEA 6 23.2 0% 0% 2020 2021ANUL 2021 - FINALIZARE
PROIECTARE4364.7 MIL. LEI FARA TVA
http://www.cnadnr.ro/
sites/default/files/STUD
II_DE_FEZABILITATE_%
C8%98I_PROIECTE_TEH
NICE_CALENDAR.pdf
12 AUTOSTRAZI IN PREGATIRE FAZA PROIECTARE (SF, PT) AUTOSTRADAAUTOSTRADA BAIA MARE - DEJ - BISTRITA -
VATRA DORNEI - SUCEAVA
BAIA MARE - DEJ - BISTRITA - VATRA
DORNEI - SUCEAVA
LOT 1 BAIA MARE - BISTRITA
LOT 2 BISTRITA - VATRA DORNEI
LOT 3 VATRA DORNEI - SUCEAVA
335 2020 2022 ANUL 2022 6681.19 MIL. LEI FARA TVA
IN DATA DE 10.03.2021, CNAIR A SEMNAT CONTRACTELE PENTRU LOTURILE 2 SI 3, CU URMATORII ANTREPRENORI:
LOTUL 2: BISTRITA - VATRA DORNEI - SC EXPLAN SRL., CU PRETUL DE 15.793.026,12 LEI FARA TVA.
LOTUL 3: VATRA DORNEI – SUCEAVA - ASOCIEREA BEST CONSULTING & DESIGN SRL – INGENIERIA ESPECIALIZADA OBRA CIVIL E INDUSTRIAL, CU PRETUL
DE 14.475.000,00 LEI FARA TVA.
PENTRU FIECARE DINTRE CELE TREI LOTURI, DURATA CONTRACTULUI ESTE DE 18 LUNI DE LA DATA DE INCEPERE A CONTRACTULUI.
LOTUL 1: BAIA MARE – BISTRITA
A FOST DESEMNATA CASTIGATOARE ASOCIEREA SEARCH CORPORATION – EGIS INTERNATIONAL SAS – EGIS ROMANIA S.A. – SC FORMIN S.A., CU PRETUL
DE 15.206.688,64 LEI FARA TVA.
A FOST DEPUSA O CONTESTIE PENTRU LOTUL 1
DETALII STADIU PROCEDURA DE ATRIBUIRE IN LINK-UL DE MAI JOS.
http://www.cnadnr.ro/
sites/default/files/STUD
II_DE_FEZABILITATE_%
C8%98I_PROIECTE_TEH
NICE_CALENDAR.pdf
13 AUTOSTRAZI IN PREGATIRE FAZA PROIECTARE (SF, PT) AUTOSTRADA AUTOSTRADA PLOIESTI - BRASOV SC CONSITRANS S.R.L.
PLOIESTI - BRASOV (FARA VARIANTA
DE OCOLIRE COMARNIC SI SECTOR
RASNOV - CRISTIAN)
97.3 0% 0%
2021 - DEMARARE SERVICII DE
PROIECTARE FAZA S.F. + P.A.C. +
P.T.E.
2023 - FINALIZARE SERVICII DE
PROIECTARE FAZA S.F. + P.A.C. +
P.T.E.
1000.8 MIL. LEI FARA TVA
CONTRACT IN DERULARE.
S-AU EFECTUAT VIZITE IN TEREN CU REPREZENTANTI DIN PARTEA BENEFICIARULUI SI DIN PARTEA PRESTATORULUI PENTRU IDENTIFICAREA
EVENTUALELOR CONSTRANGERI.
A FOST APROBAT DE CATRE BENEFICIAR RAPORTUL DE INCEPUT SI RAPORTUL DE PROGRES NR. 1.
https://ploiesti-
brasov.ro/
14 AUTOSTRAZI IN PREGATIRE FAZA PROIECTARE (SF, PT) AUTOSTRADAPOD PESTE PRUT LA UNGHENI
S.C. EXPERT PROIECT 2002 S.R.L. POD PESTE PRUT LA UNGHENI 1 80% 45%
2016 - DEMARARE PROIECTARE POD
UNGHENI; 2020 - DEMARARE
PROIECTARE SECTIUNEA IASI -
UNGHENI
2021 - FINALIZARE PROIECTARE FAZA
SF, DEMARARE SERVICII DE
PROIECTARE SI EXECUTIE POD
UNGHENI
ANUL 2024 - DESCHIDERE TRAFIC
POD PESTE PRUT LA UNGHENI0.8 MIL. LEI FARA TVA
2.POD UNGHENI - STUDIU DE FEZABILITATE FINALIZAT CU EXCEPTIA ACORDULUI DE MEDIU ;
PROCEDURA DE MEDIU IN DERULARE
OBTINERE DEROGARE DE LA ART ART. 23 ALIN. (2) SI ALE ART. 27 ALIN. (1) DIN ORDONANTA DE URGENTA A GUVERNULUI
NR. 57/2007 PRIVIND REGIMUL ARIILOR NATURALE PROTEJATE, PRIN OUG NR. 105/2020, SEMNARE MEMORANDUM IN VEDERE PROMOVARII
ACORDULUI BILATERAL ROMANIA-MOLDOVA NECESAR OBTINERII ACORDULUI DE MEDIU.
ESTE IN PREGATIRE LA MTIC ACORDUL BILATEARAL ROMANIA-MOLDOVA.
IN DATA DE 24.08.2020 A FOST EMISA DECIZIA ETAPEI DE EVALUARE INITIALA DE CATRE A.N.P.M. IASI.
IN DATA DE 24.08.2020 A FOST EMISA DECIZIA ETAPEI DE INCADRARE INITIALA NR. 133/2020 ANMP .
PENTRU CONTINUAREA PROCEDURII DE OBTINERE A ACORDULUI DE MEDIU S-A TRANSMIS MEMORIUL DE PREZENTARE CATRE APM IASI.
IN DATA DE 22.02.2021 A FOST EMISA DECIZIA ETAPEI DE INCADRARE NR. 15 DE CATRE APM IASI.
15 AUTOSTRAZI IN PREGATIRE FAZA PROIECTARE (SF, PT) AUTOSTRADA A4 16+700 16+700 SEARCH CORPORATION SRL
ELABORARE STUDIU DE FEZABILITATE
SI PROIECT TEHNIC DE EXECUTIE
PENTRU NOD RUTIER CUMPANA A4
(KM 16+700)-DN 39E
0% 0% 26.10.2020 26.06.2021 674,39 MIL LEI FARA TVA
CONTRACT SEMNAT IN DATA DE 23.09.2020.
ORDINUL DE INCEPERE A ACTIVITATII DE PROIECTARE A FOST EMIS IN DATA DE 26.10.2020
DURATA CONTRACTULUI ESTE DE 8 LUNI DE LA DATA DE INCEPERE A CONTRACTULUI, DIN CARE:
-3 LUNI PENTRU ELABORAREA STUDIULUI DE FEZABILITATE,
- 2 LUNI PENTRU REALIZAREA PROIECTULUI PENTRU AUTORIZAREA LUCRARILOR DE CONSTRUIRE,
- 1 LUNI PENTRU ELABORAREA PROIECTULUI TEHNIC DE EXECUTIE SI
- 1 LUNI PENTRU ACORDAREA SERVICIILOR DE ASISTENTA TEHNICA BENEFICIARULUI.
A AVUT LOC SEDINTA DE INCEPUT IN DATA DE 26.10.2020.
S-A EMIS ORDINUL ADMINISTRATIV NR. 1 - APROBARE EXPERTI NON CHEIE.
A FOST TRANSMISA DE CATRE PRESTATOR ANALIZA MULTICRITERIALA A VARIANTELOR DE TRASEU ETAPA 1-S-AU TRANSMIS OBSERVATII.
A FOST RELUATA ACTIVITATEA PROIECTANTULUI INCEPAND CU DATA DE 16.04.2021
A FOST AVIZATA IN CADRUL CTE CNAIR IN DATA DE 20.05.2021 ANALIZA MULTICRITERIALA ETAPA 1
16 AUTOSTRAZI IN PREGATIRE FAZA PROIECTARE (SF, PT) AUTOSTRADAAUTOSTRADA BAIA MARE - DEJ - BISTRITA -
VATRA DORNEI - SUCEAVASC EXPLAN SRL BISTRITA - VATRA DORNEI LOT 2 83 2021 2022 ANUL 2022
15,79 MIL LEI FARA TVA (VALOARE
PROIECT SF)
IN DATA DE 10.03.2021, A FOST SEMNAT CONTRACTUL NR. 92/19393 – ELABORARE S.F DRUM DE MARE VITEZA BISTRITA-SUCEAVA: LOT 2 BISTRITA –
VATRA DORNEI.
DURATA CONTRACTULUI ESTE DE 18 LUNI.
ORDINUL DE INCEPERE AL CONTRACTULUI ESTE 22.04.2021.
IN DATA DE 04.06.2021 A AVUT LOC SEDINTA CU REPREZENTANTII PRIMARIILOR UNITATILOR ADMINISTRATIV TERITORIALE INTERSECTATE DE
VARIANTELE DE TRASEU, IN VEDEREA IDENTIFICARII CONSTRANGERILOR. - 14 LUNI ELABORARE STUDIU DE FEZABILITATE;
- 3 LUNI PREGATIRE DOCUMENTATIE DE ATRIBUIRE A CONTRACTULUI DE PROIECTARE SI EXECUTIE LUCRARI SI ACORDAREA SERVICIILOR DE ASISTENTA
TEHNICA BENEFIICIARULUI IN PERIOADA DERULARII PROCEDURII DE LICITATIE SI IN VEDEREA DEPUNERII SI APROBARII APLICATIEI DE FINANTARE DIN
FONDURI STRUCTURALE;
- 1 LUNA INTOCMIREA RAPORTULUI DE FINALIZARE A SERVICILOR;
17 AUTOSTRAZI IN PREGATIRE FAZA PROIECTARE (SF, PT) AUTOSTRADAAUTOSTRADA BAIA MARE - DEJ - BISTRITA -
VATRA DORNEI - SUCEAVA
ASOCIEREA BEST CONSULTING & DESIGN S.R.L. – INGENIERIA
ESPECIALIZADA OBRA CIVIL E INDUSTRIAL S.A.VATRA DORNEI-SUCEAVA LOT 3 107 2021 2022
14,47 MIL LEI FARA TVA (VALOARE
PROIECT SF)
IN DATA DE 15.03.2021, A FOST SEMNAT CONTRACTUL NR. 92/20422 ELABORARE S.F DRUM DE MARE VITEZA BISTRITA-SUCEAVA: LOT 3 VATRA DORNEI-
SUCEAVA.
DURATA CONTRACTULUI ESTE DE 18 LUNI.
ORDINUL DE INCEPERE AL CONTRACTULUI ESTE 28.04.2021.
IN DATA DE 10.03.2021, A FOST SEMNAT CONTRACTUL NR. 92/19393 – ELABORARE S.F DRUM DE MARE VITEZA BISTRITA-SUCEAVA: LOT 2 BISTRITA –
VATRA DORNEI.
DURATA CONTRACTULUI ESTE DE 18 LUNI.
ORDINUL DE INCEPERE AL CONTRACTULUI ESTE 22.04.2021.
IN DATA DE 04.06.2021 A AVUT LOC SEDINTA CU REPREZENTANTII PRIMARIILOR UNITATILOR ADMINISTRATIV TERITORIALE INTERSECTATE DE
VARIANTELE DE TRASEU, IN VEDEREA IDENTIFICARII CONSTRANGERILOR.
- 14 LUNI ELABORARE STUDIU DE FEZABILITATE;
- 3 LUNI PREGATIRE DOCUMENTATIE DE ATRIBUIRE A CONTRACTULUI DE PROIECTARE SI EXECUTIE LUCRARI SI ACORDAREA SERVICIILOR DE ASISTENTA
TEHNICA BENEFIICIARULUI IN PERIOADA DERULARII PROCEDURII DE LICITATIE SI IN VEDEREA DEPUNERII SI APROBARII APLICATIEI DE FINANTARE DIN
FONDURI STRUCTURALE;
- 1 LUNA INTOCMIREA RAPORTULUI DE FINALIZARE A SERVICILOR;
NR.
CRT.CATEGORIE DRUM RANG DRUM INDICATIV DRUM
DE LA
(km)
PANA LA
(km)ANTREPRENOR SECTORUL LOTUL LUNGIME (km) STADIUL FIZIC ACTUAL
STADIUL FINANCIAR
ACTUALDATA INCEPERII DATA FINALIZARII AN DESCHIDERE VALOARE PROIECT OBSERVATII
DETALII
PROCEDURA
1 DRUMURI EXPRES PROIECTE IN EXECUTIE DRUM EXPRES DRUM EXPRES BRAILA - GALATI 0+000 11+088ASOCIEREA SC SA & PE CONSTRUCT SRL (LIDER DE ASOCIERE) -
SPEDITION UMB - TEHNOSTRADE S.R.L.BRAILA - GALATI LOT 1 11.08 0% 0%
ORDIN DE INCEPERE 01.07.2021 -
ETAPA PROIECTAREMAI 2024 ANUL 2024 371.42 MIL. LEI FARA TVA
IN DATA DE 15.04.2021, CNAIR A SEMNAT CONTRACTUL PENTRU ""PROIECTAREA SI EXECUTIA DRUMULUI EXPRES BRAILA - GALATI” CU ASOCIEREA SC
SA & PE CONSTRUCT SRL (LIDER DE ASOCIERE) - SPEDITION UMB - TEHNOSTRADE S.R.L.
VALOAREA CONTRACTULUI ESTE DE 371.416.131,09 LEI FARA TVA.
SURSA DE FINANTARE: FONDURI EUROPENE NERAMBURSABILE.
DURATA CONTRACTULUI ESTE DE 34 LUNI, DIN CARE 10 LUNI PERIOADA DE PROIECTARE SI 24 LUNI PERIOADA DE EXECUTIE A LUCRARILOR. PERIOADA
DE GARANTIE ESTE DE 120 DE LUNI.
http://www.cnadnr.ro/
sites/default/files/DRU
MURI%20EXPRES_PROI
ECTARE_%C8%98I_EXEC
U%C8%9AIE_CALENDAR
2 DRUMURI EXPRES PROIECTE IN EXECUTIE DRUM EXPRESDRUM EXPRES CRAIOVA - PITESTI
0+000 17+700 TIRRENA SCAVI S.P.A. (ITALIA)TRONSON 1 - CRAIOVA - ROBANESTI
(KM 0+000 - KM 17+700)
SECTOR 1: 0+000 - 1+800
SECTOR 2: 1+800 - 10+000
SECTOR 3: 10+000 - 17+700
17.7
24.97% (PROGRES CONSOLIDAT)
SECTOR 1: 12%
SECTOR 2: 10.11%
SECTOR 3: 44.65%
22.89%
27.12.2018 - PROIECTARE;
16.09.2019 - EXECUTIE SECTOR 3 ;
13.07.2020 - EXECUTIE SECTOR 1;
01.03.2021 - EXECUTIE SECTOR 2 -
km 5+245 - km 10+000
TRIM IV 2021 ANUL 2022 358.18 MIL. LEI FARA TVA
SECTOR 1: 0+000 - 1+850
IN DATA DE 03.07.2020 A FOST OBTINUTA AUTORIZATIA DE CONSTRUIRE.
INCEPAND CU DATA DE 13.07.2020 A FOST EMIS ORDINUL DE INCEPERE EXECUTIE LUCRARI
SECTOR 2: 1+850 - 10+000
A FOST EMISA HG EXPROPRIERE NR. 843/2020 (aporx. de la km 5+190 -km 10+000). IN DATA DE 22.02.2021 A FOST OBTINUTA AUTORIZATIA DE
CONSTRUIRE.
PENTRU RESTUL ZONELE RAMASE NEEXPROPRIATE URMEAZA A FI INTOCMITA DOC. PENTRU HG DE EXPROPRIERE
SECTOR 3: 10+000 - 17+700 – IN EXECUTIE
3 DRUMURI EXPRES PROIECTE IN EXECUTIE DRUM EXPRESDRUM EXPRES CRAIOVA - PITESTI
17+700 36+200ASOCIEREA SA & PE CONSTRUCT SRL - SC SPEDITION UMB SRL - SC
TEHNOSTRADE SRL - SC CONSITRANS SRL
TRONSON 2 - ROBANESTI - BALS -
VALEA MARE (KM 17+700 - KM
57+550)
Lot 1 km 17+700 - km 36+200
LOT 1: KM 17+700 - KM 36+200 18.5 80.93% 41.81%
21.12.2018 - ACTIVITATEA DE
PROIECTARE, 24.09.2019 - EXECUTIE
(ETAPELE I, II SI III), 21.11.2019 -
EXECUTIE (ETAPA IV)
TRIM IV 2021 ANUL 2022 661.45 MIL. LEI FARA TVA
4 DRUMURI EXPRES PROIECTE IN EXECUTIE DRUM EXPRESDRUM EXPRES CRAIOVA - PITESTI
36+000 57+500ASOCIEREA SA & PE CONSTRUCT SRL - SC SPEDITION UMB SRL - SC
TEHNOSTRADE SRL - SC CONSITRANS SRL
TRONSON 2 - ROBANESTI - BALS -
VALEA MARE (KM 17+700 - 57+550)
Lot 2 - km 36+200 - km 57+550LOT 2: KM 36+200 - KM 57+550 21.35 80.16% 47.94%
21.12.2018 - ACTIVITATEA DE
PROIECTARE, 24.09.2019 - EXECUTIE
(ETAPELE I, II SI III), 21.11.2019 -
EXECUTIE (ETAPA IV)
TRIM IV 2021 ANUL 2022 792.18 MIL. LEI FARA TVA
5 DRUMURI EXPRES PROIECTE IN EXECUTIE DRUM EXPRES DRUM EXPRES CRAIOVA - PITESTI 57+550 89+300ASOCIEREA SA & PE CONSTRUCT SRL - SC SPEDITION UMB SRL - SC
TEHNOSTRADE SRL
TRONSON 3, VALEA MARE -
COLONESTITRONSON 3 31.75 0% 0% 18.01.2021 2024 ANUL 2024 670.71 MIL. LEI FARA TVA
ANTREPRENORUL A CONSTITUIT GARANTIA DE BUNA EXECUTIE, IN CONFORMITATE CU PREVEDRILE CONTRACTUALE, ACEASTA FIIND APROBATA DE
CATRE C.N.A.I.R. S.A. IN DATA DE 10.11.2020.
DURATA CONTRACTULUI ESTE DE 156 DE LUNI, DIN CARE:
• 12 LUNI PERIOADA DE PROIECTARE,
• 24 LUNI PERIOADA DE EXECUTIE A LUCRARILOR,
• 120 DE LUNI PERIOADA DE GARANTIE A LUCRARILOR.
INCEPAND CU DATA DE 18.01.2021 A FOST EMIS ORDIN DE INCEPERE.
PAC AVIZAT IN CADRUL CTE IN LUNA MARTIE 2021
2.1. DRUMURI EXPRES PROIECTE IN EXECUTIE - IUNIE 2021
2. DRUMURI EXPRES
NR.
CRT.CATEGORIE DRUM RANG DRUM INDICATIV DRUM
DE LA
(km)
PANA LA
(km)ANTREPRENOR SECTORUL LOTUL LUNGIME (km) STADIUL FIZIC ACTUAL
STADIUL FINANCIAR
ACTUALDATA INCEPERII DATA FINALIZARII AN DESCHIDERE VALOARE PROIECT OBSERVATII
DETALII
PROCEDURA
1 DRUMURI EXPRES PROIECTE IN LICITATIE EXECUTIE DRUM EXPRES DRUM EXPRES CRAIOVA - PITESTI 89+300 121+115TRONSON 4
COLONESTI - OARJA - PITESTITRONSON 4 31.82 0% 0% 2021 2024 ANUL 2024 ESTIMAT 617.08 MIL. LEI FARA TVA
http://www.cnadnr.ro/
sites/default/files/DRU
MURI%20EXPRES_PROI
ECTARE_%C8%98I_EXEC
U%C8%9AIE_CALENDAR
NR.
CRT.CATEGORIE DRUM RANG DRUM INDICATIV DRUM
DE LA
(km)
PANA LA
(km)ANTREPRENOR SECTORUL LOTUL LUNGIME (km) STADIUL FIZIC ACTUAL
STADIUL FINANCIAR
ACTUALDATA INCEPERII DATA FINALIZARII AN DESCHIDERE VALOARE PROIECT OBSERVATII
DETALII
PROCEDURA
1 DRUMURI EXPRES IN PREGATIRE FAZA PROIECTARE (SF, PT) DRUM EXPRES DRUM EXPRES BACAU - PIATRA NEAMT 0+000 61+000SEARCH CORPORATION & EGIS ROMANIA
(VALOARE CONTRACT PROIECTARE: 8,923,930.03 LEI, FARA TVA)BACAU - PIATRA NEAMT LOT 1 61 0% 0% MARTIE 2020 - ETAPA PROIECTARE
SEPTEMBRIE 2021 - TERMEN
FINALIZARE PROIECTARE; PERIOADA
CONTRACTUALA DE PRESTARE A
SERVICIILOR - 18 LUNI
IANUARIE 2022 - TERMEN
FINALIZARE PROIECTARE (CONFORM
AA NR. 1 DIN 01.07.2021)
1123.86 MIL. LEI FARA TVA
CONTRACT ELABORARE SF IN DERULARE.
AU FOST TRANSMISE CATRE CNAIR SA VARIANTELE DE TRASEU ANALIZATE IN BAZA STUDIILOR PRELIMINARE - AMC ETAPA 1 REVIZIA 4.
AMC ETAPA 1 REVIZIA 4 A FOST TRANSMIS CATRE CONSULTANTUL JASPERS PENTRU PUNCT DE VEDERE IN DATA DE 02.04.2021. IN DATA DE 18.05.2021
A FOST ORGANIZATA O NOUA SEDINTA CU CONSULTANTII JASPERS. IN DATA DE 07.06.2021 A FOST TRANSMISA CONSULTANTILOR JASPERS
DOCUMENTATIA REVIZUITA DE CATRE PRESTATOR CA URMARE A SEDINTEI DIN DATA DE 18.05.2021.
2 DRUMURI EXPRES IN PREGATIRE FAZA PROIECTARE (SF, PT) DRUM EXPRESDRUM EXPRES BRAILA - TULCEA (JIJILA -
CATALOI)0+000 59+700
INGINERIA ESPECIALIZADA OBRA CIVIL E INDUSTRIAL SA -
CONTRACT PROIECTARE (ELABORARE STUDIU DE FEZABILITATE SI
PROIECT TEHNIC) SEMNAT IN LUNA MAI 2020.
(VALOARE CONTRACT PROIECTARE: 14.159.206,13 LEI, FARA TVA)
BRAILA - TULCEA LOT 1 59.7 0% 0% IUNIE 2020 - ETAPA PROIECTARE IUNIE 2022 1674.75 MIL. LEI FARA TVA
CONTRACT ELBORARE S.F. IN DERULARE.
DOCUMENTATIA AMC ETAPA 1 REVIZIA 2 A FOST TRANSMISA CONSULTANTILOR JASPERS PENTRU OBSERVATII.
DOCUMENTATIA AMC ETAPA 1 REVIUITA A FOST RETRANSMISA CONSULTANTILOR JASPERS PENTRU OBSERVATII IN DATA DE 10.05.2021.
IN DATA DE 09.06.2021 FOST ORGANIZATA O NOUA SEDINTA CU EXPERTII JASPERS.
IN PREZENT PRESTATORUL IMPLEMENTEAZA OBSERVATIILE DE CATRE EXPERTII JASPERS IN CADRUL DOCUMENTATIEI AMC ETAPA 1.
3 DRUMURI EXPRES IN PREGATIRE FAZA PROIECTARE (SF, PT) DRUM EXPRES DRUM EXPRES BUZAU - BRAILA 0+000 98+000
INGINERIA ESPECIALIZADA OBRA CIVIL E INDUSTRIAL SA -
CONTRACT ELABORARE SF SI PT IN DERULARE
(VALOARE CONTRACT PROIECTARE: 16.591.031,97 LEI, FARA TVA)
BUZAU - BRAILA LOT 1 98 0% 0% 03.04.2020 - ETAPA PROIECTARE APRILIE 2022APRILIE 2022 - TERMEN FINALIZARE
PROIECTARE1805.55 MIL. LEI FARA TVA
CONTRACT ELABORARE SF IN DERULARE.
AMC - ETAPA 1 SE AFLA IN ANALIZA CONSULTANTILOR JASPERS.
DOCUMENTATIA AMC 1 SE AFLA IN CURS DE REVIZUIRE CONFORM OBSERVATIILOR JASPERS.
DOCUMENTATIA AMC 1 REVIZUIT A FOST TRANSMISA CATRE CNAIR, CARE A EMIS NOI OBSERVATII CATRE PRESTATOR.
IN DATA DE 26.05.2021 A FOST ORGANIZATA O NOUA SEDINTA CU CONSULTANTII JASPERS.IN PREZENT PRESTATORUL IMPLEMENTEAZA OBSERVATIILE
DE CATRE EXPERTII JASPERS IN CADRUL DOCUMENTATIEI AMC ETAPA 1.
4 DRUMURI EXPRES IN PREGATIRE FAZA PROIECTARE (SF, PT) DRUM EXPRES DRUM EXPRES CRAIOVA - TARGU JIU ASOCIEREA EGIS ROMANIA S.A. – SEARCH CORPORATION S.R.L CRAIOVA - TARGU JIU 108 0% 0%ORDIN DE INCEPERE 16.04.2021 -
ETAPA PROIECTAREAPRILIE 2023 20.25 MIL LEI FARA TVA
IN DATA DE 17.03.2021 CNAIR A SEMNAT CU OFERTANTUL DECLARAT CASTIGATOR - ASOCIEREA EGIS ROMANIA S.A. – SEARCH CORPORATION S.R.L.
VALOAREA CONTRACTULUI ESTE DE 20.247.133,77 LEI FARA TVA, SURSA DE FINANTARE FIIND DIN FONDURI EUROPENE NERAMBURSABILE.
IN DATA DE 16.04.2021 A FOST SEDINTA DE INCEPUT (ORDINUL DE INCEPERE)
A FOST APROBAT RAPORTUL DE INCEPUT DE CATRE BENEFICIAR. A FOST APROBAT RAPORTUL DE PROGRES NR. 1 DE CATRE BENEFICIAR.
5 DRUMURI EXPRES IN PREGATIRE FAZA PROIECTARE (SF, PT) DRUM EXPRES DRUM EXPRES FOCSANI - BRAILA 0+000 76+000
INGENIERIA ESPECIALIZADA OBRA CIVIL E INDUSTRIAL S.A.
SEMNAT IN DATA DE 19.06.2020
(VALOARE CONTRACT PROIECTARE: 15.001.446,99 LEI, FARA TVA)
FOCSANI - BRAILA 76 0% 15%ORDIN DE INCEPERE 27.07.2020 -
ETAPA PROIECTAREIULIE 2022
ANUL 2022 - FINALIZARE ETAPA
PROIECTARE1400.22 MIL. LEI FARA TVA
CONTRACT SEMNAT IN DATA DE 19.06.2020.
ORDINUL DE INCEPERE 27.07.2020
DURATA CONTRACTULUI ESTE DE 24 LUNI DE LA DATA DE INCEPERE A CONTRACTULUI
ANALIZA MULTICRITERIALA A VARIANTELOR DE TRASEU, ETAPA 1 (AMC1) FOST AVIZATA IN CTE CNAIR SA.
A FOST APROBATA TEMA PENTRU STUDII ARHEOLOGICE ETAPA1 SI STUDIUL ARHEOLOGIC ETAPA 1.
IN CURS DE ELABORARE ANALIZA MULTICRITERIALA A VARIANTELOR DE TRASEU ETAPA 2 (AMC 2).
6 DRUMURI EXPRES IN PREGATIRE FAZA PROIECTARE (SF, PT) DRUM EXPRESDRUM EXPRES OVIDIU (CONSTANTA) -
TULCEA0+000 112+000
SEARCH CORPORATION & EGIS ROMANIA- CONTRACT PROIECTARE
ELABORARE SF SI PROIECT TEHNIC SEMNAT IN DATA DE 13.07. 2020
(VALOARE CONTRACT PROIECTARE: 17.845.626,28 LEI, FARA TVA)
CONSTANTA - TULCEA 112.5 0% 0%ORDIN DE INCEPERE 10.08.2020 -
ETAPA PROIECTAREAug-22
AUGUST 2022 - TERMEN FINALIZARE
PROIECTARE2664.38 MIL. LEI FARA TVA
CONTRACT IN DERULARE.
AMC ETAPA 1 ESTE IN CURS DE REVIZURIRE CONFORM OBSERVATIILOR JASPERS. PRESTATORUL ANALIZEAZA REALIZAREA UNOR DRUMURI DE LEGATURA
CU MUN. TULCEA.
7 DRUMURI EXPRES IN PREGATIRE FAZA PROIECTARE (SF, PT) DRUM EXPRES DRUM EXPRES PASCANI - SUCEAVA 0+000 61+000
SEARCH CORPORATION SRL - EGIS ROMANIA S.A - EGIS
INTERNATIONAL SAS.
CONTRACT PROIECTARE ELABORARE SF SI PROIECT TEHNIC SEMNAT
IN DATA DE 07.09.2020 (VALOARE CONTRACT DE PROIECTARE:
11,721,430.96 LEI FARA TVA)
PASCANI - SUCEAVA 61 0% 0% OCTOMBRIE 2020OCTOMBRIE 2022 - FINALIZARE
ETAPA DE PROIECTARE1304.96 MIL. LEI FARA TVA
CONTRACT IN DERULARE.
IN DATA DE 14.04.2021 A FOST AVIZATA IN CADRUL CTE-CNAIR SA DOCUMENTATIA AMC ETAPA 1. IN CURS DE ELABORARE DOCUMENTATIA AMC ETAPA
2. IN DATA DE 16.06.2021 PRESTATORUL A INTAINTAT DOCUMENTATIA AMC ETAPA 2. DOCUMENTATIA AMC ETAPA 2 ESTE IN ANALIZA LA BENEFICIAR.
8 DRUMURI EXPRES IN PREGATIRE FAZA PROIECTARE (SF, PT) DRUM EXPRES DRUM EXPRES PLOIESTI - GAESTI 0+000 76+000
SEARCH CORPORATION & – MEGA MUHENDISLIK MUSAVIRLIK A.S.
(MEGA ENGINEERING CONSULTING INC.) - CONTRACT PROIECTARE
ELABORARE STUDIU DE FEZABILITATE SI PROIECT TEHNIC DE
EXECUTIE SEMNAT IN DATA DE 25.08.2020 (VAL CTR PROIECTARE:
15.86 MIL LEI FARA TVA)
PLOIESTI - GAESTI 76 0% 0%AUGUST 2020 – DEMARARE ETAPA
DE PROIECTARE
OCTOMBRIE 2022 - FINALIZARE
ETAPA DE PROIECTARE
OCTOMBRIE 2022 - TERMEN
FINALIZARE PROIECTARE1671.37 MIL. LEI FARA TVA
CONTRACT IN DERULARE.
PRESTATORUL A TRANSMIS DOCUMENTATIA ANALIZA MULTICRITERIALA DE TRASEU.
AU FOST EMISE OBSERVATII DIN PARTEA BENEFICIARULUI SI PRESTATORUL A TRANSMIS DOCUMENTATIA REVIZUITA.
IN DATA DE 09.04.2021 ANALIZA MULTICRITERIALA ETAPA 1 A FOST AVIZATA IN CADRUL C.T.E. CNAIR.
A FOST SUSPENDAT CONTRACTUL PENTRU O PERIOADA DE 3 LUNI INCEPAND CU DATA DE 18.05.2021.
9 DRUMURI EXPRES IN PREGATIRE FAZA PROIECTARE (SF, PT) DRUM EXPRES DRUM EXPRES SUCEAVA - SIRET 0+000 40+000
SEARCH CORPORATION SRL - EGIS ROMANIA S.A - EGIS
INTERNATIONAL SAS.
CONTRACT PROIECTARE ELABORARE SF SI PROIECT TEHNIC SEMNAT
IN DATA DE 07.09.2020 (VALOARE CONTRACT DE PROIECTARE:
10,092,839.13 LEI FARA TVA)
SUCEAVA- SIRET 40 0% 0% OCTOMBRIE 2020 OCTOMBRIE 2022 882.9 MIL. LEI FARA TVA
CONTRACT IN DERULARE.
DOCUMENTATIA ANALIZA MULTICRITERIALA DE TRASEU ESTE REVIZUITA CONFORM OBSERVATIILOR BENEFICIARULUI.
IN DATA DE 14.04.2021 A FOST AVIZATA IN CADRUL CTE-CNAIR SA DOCUMENTATIA AMC ETAPA 1. IN CURS DE ELABORARE DOCUMENTATIA AMC ETAPA
2. IN DATA DE 16.06.2021 PRESTATORUL A INTAINTAT DOCUMENTATIA AMC ETAPA 2. DOCUMENTATIA AMC ETAPA 2 ESTE IN ANALIZA LA BENEFICIAR.
10 DRUMURI EXPRES IN PREGATIRE FAZA PROIECTARE (SF, PT) DRUM EXPRES DRUM EXPRES TISITA - ALBITA 0+000 160+000
SEARCH CORPORATION & EGIS ROMANIA- CONTRACT PROIECTARE
ELABORARE STUDIU DE FEZABILITATE SEMNAT IN DATA DE 09.07.
2020
(VALOARE CONTRACT PROIECTARE: 11.057.073,07 LEI FARA TVA)
TISITA - ALBITA 160 0% 0%AUGUST 2020 DEMARARE ETAPA DE
PROIECTARE
OCTOMBRIE 2022 - FINALIZARE
ETAPA DE PROIECTARE
OCTOMBRIE 2022 - TERMEN
FINALIZARE ETAPA DE PROIECTARE3563.3 MIL. LEI FARA TVA
CONTRACTUL IN DERULARE
A FOST TRANSMIS AMC ETAPA 1 SE AFLA IN CURS DE REVIZUIRE CONFORM OBSEVATIILOR BENEFICIARULUI.
PRESTATORUL ANALIZEAZA ETAPIZAREA SI FAZAREA OBIECTIVULUI DE INVESTITII CONFORM CERINTELOR CNAIR SI MTI. IN DATA DE 09.06.2021
PRESTATORUL A INTAINTAT DOCUMENTATIA AMC ETAPA 2. DOCUMENTATIA AMC ETAPA 2 ESTE IN ANALIZA LA BENEFICIAR.
11 DRUMURI EXPRES IN PREGATIRE FAZA PROIECTARE (SF, PT) DRUM EXPRES DRUM EXPRES OAR - SATU MARE 0+000 10+900
SEARCH CORPORATION SRL
SEMNAT IN DATA DE 10.07. 2020
(VALOARE CONTRACT PROIECTARE: 3.646.308,36 LEI FARA TVA)
SATU MARE - OAR (GRANITA RO/HU) 10.9 0% 3%
AUGUST 2020 - DEMARARE SERVICII
DE PROIECTARE FAZA S.F. + P.A.C. +
P.T.E.
2022 - FINALIZARE SERVICII DE
PROIECTARE FAZA S.F. + P.A.C. +
P.T.E.
ANUL 2022 - TERMEN FINALIZARE
FAZA DE PROIECTARE311.79 MIL. LEI FARA TVA
IN DATA DE 10.07.2020 A FOST SEMNAT CONTRACTUL PROIECTARE SF+PAC/DTAC+PT
DURATA DE REALIZARE A CONTRACTULUI DE SERVICII ESTE DE 18 LUNI
IN DATA DE 10.08.2020 S-A DAT ORDINUL DE INCEPERE.
IN DATA DE 05.03.2021 A FOST AVIZATA IN CADRUL CTE CNAIR ANALIZA MULTICRITERIALA A VARIANTELOR DE TRASEU AMC1 + AMC2 (VARIANTA 1)
INVESTIGATIILE GEOITEHNICE SUNT REALIZATE IN PROCENT DE 70%.
IN DATA DE 17.05.2021 A FOST EMIS CERTIFICATUL DE URBANISM.
12 DRUMURI EXPRES IN PREGATIRE FAZA PROIECTARE (SF, PT) DRUM EXPRES A1 (PITESTI) - MIOVENI 0+000 10+000 SEARCH CORPORATION S.R.L. A1 (PITESTI) - MIOVENI 10 0% 0%ORDIN DE INCEPERE 09.12.2020 -
ETAPA DE PROIECTARE
IULIE 2022 - TERMEN FINALIZARE
ETAPA DE PROIECTARE222.71 MIL. LEI FARA TVA
CONTRACT IN DERULARE.
DOCUMENTATIA AMC ETAPA 1 A FOST ANALIZATA SI S-AU EMIS OBSERVATII.
DOCUMENTATIA REVIZUITA AMC 1 A PRIMIT AVIZUL C.T.E. IN DATA DE 01.04.2021.
IN DATA DE 08.04.2021 A FOST TRANSMISA DOCUMENTATIA AMC ETAPA 2 SI SE AFLA IN ANALIZA IN CADRUL CNAIR.
IN DATA DE 21.04.2021 AU FOST TRANSMISE OBSERVATII ASUPRA DOCUMENTATIEI AMC 2 CATRE PRESTATOR. DOCUMENTATIA AMC ETAPA 2
REVIZUITA CONFORM OBSERVATIILOR FORMULATE DE CATRE BENEFICIAR (SOLICITARE PRIM. PITESTI RECONFIGURARE NOD A1-DEX) A FOST
TRANSMISA BENEFICIARULUI. DOCUMENTATIA ESTE IN CURS DE ANALIZA LA BENEFICIAR. DOCUMENTATIA AMC ETAPA 2 SE VA ANALIZA IN CADRUL CTE-
CNAIR SA.
2.2. DRUMURI EXPRES PROIECTE IN LICITATIE EXECUTIE - IUNIE 2021
2.3. DRUMURI EXPRES IN PREGATIRE FAZA PROIECTARE (SF, PT) - IUNIE 2021
NR.
CRT.CATEGORIE DRUM RANG DRUM INDICATIV DRUM
DE LA
(km)
PANA LA
(km)ANTREPRENOR SECTORUL LOTUL LUNGIME (km) STADIUL FIZIC ACTUAL
STADIUL FINANCIAR
ACTUALDATA INCEPERII DATA FINALIZARII AN DESCHIDERE VALOARE PROIECT OBSERVATII
DETALII
PROCEDURA
1 DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE DRUM NATIONALDN79
4+150 107+745 ASTALDI S.P.A. ARAD - ORADEA, KM 4+150 – KM
107+745 103.55 98% 98% 03.02.2009 REZILIAT IN FOLOSINTA 266.31 MIL. LEI FARA TVA
PROBLEME:
CONTRACTUL A FOST REZILIAT DE CATRE BENEFICIAR IN DATA DE 02.10.2020 DATORITA INTARZIERILOR SI NEEXECUTARII LUCRARILOR RAMASE DE
EXECUTAT DE CATRE ANTREPRENOR.
1. NEEXECUTAREA LUCRARILOR PENTRU PODUL DE LA KM 41+635
2. INTARZIEREA FINALIZARII EXECUTIEI LUCRARILOR
2 DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE DRUM NATIONAL DN 52 1+350 44+600
ASOCIEREA S.C. ALEXCOR TRADING S.R.L. - IMPRESA DI
COSTRUZIONI ING. E. MANTOVANI S.P.A. – S.C. PEGASUS
ENGINEERING S.R.L.
ALEXANDRIA - TURNU MAGURELE 43.25DATA INCEPERII ACTIVITATII DE
PROIECTARE: 09.06.2020
126.323 MII LEI FARA TVA - VALOARE
PROIECTARE ȘI EXECUȚIE PENTRU
AMBELE SECTOARE
3 DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE DRUM NATIONAL DN 52 49+194 52+649
ASOCIEREA S.C. ALEXCOR TRADING S.R.L. - IMPRESA DI
COSTRUZIONI ING. E. MANTOVANI S.P.A. – S.C. PEGASUS
ENGINEERING S.R.L.
TURNU MAGURELE - PORT TURNU
MAGURELE3.455
DATA INCEPERII ACTIVITATII DE
PROIECTARE: 09.06.2020
126.323 MII LEI FARA TVA - VALOARE
PROIECTARE ȘI EXECUȚIE PENTRU
AMBELE SECTOARE
4 DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE DRUM NATIONAL DN7 251+475 254+315S.C GEIGER TRANSILVANIA SRL – SERVICII DE PROIECTARE SC
CONSIS PROIECT SRL IN CALITATE DE SUBCONTRACTANT
REALIZARE LARGIRE VALEA OLTULUI
LA 4 BENZI DE CIRCULATIE INTRE KM
251+475 – KM 254+315
2.84 40% 25% 01.11.2019 SEPTEMBRIE 2021 22.141 MIL. LEI FARA TVA A FOST OBTINUTA AC NR. 50 DIN DATA DE 04 SEPTEMBRIE 2020. ORDINUL ADMINITRATIV DE RELUARE A FOST DAT CU 21.09.2020.
5 DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE DRUM NATIONAL DN5 7+573 19+220ASOCIEREA EUROCOGEN - FILIALA ANINOASA SRL & ALEANDRI SPA
& BEOZZO COSTRUZIONI SRL & SMART BUILDING PROJET SRL
MODERNIZARE DN 5,
BUCURESTI – ADUNATII COPACENI
KM 7+573 - KM 19+220
DRUM MODERNIZAT - LUCRARI
FINALIZATE IN ANUL 202011.647 98.00% 93.80% 23.04.2015 ESTIMAT SEPTEMBRIE 2021 76.13 MIL. LEI FARA TVA EXECUTIE LUCRARI
6 DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE DRUM NATIONAL DN73 13+800 128+250 ASOCIEREA AZVI SA - STRACO GRUP SRL - TRACTEBEL
MODERNIZARE: PITESTI -
CAMPULUNG - BRASOV
KM 13+800 - KM 42+850; KM 54+050
- KM 128+250
103.25 49.82% 51.00% 19.05.2014 DECEMBRIE 2023 275.86 MIL. LEI FARA TVA
A FOST RECEPTIONAT UN SECTOR DE 28,85 KM.
PENTRU RESTUL SECTORULUI CONTRACTUL ESTE IN CURS DE REZILIERE SI SE VA LANSA O PROCEDURA DE LICITATIE AVAND CA OBIECT ACTUALIZAREA
PROIECTULUI PENTRU REST DE EXECUTAT.
DOCUMENTATIA DE ATRIBUIRE PENTRU SERVICII DE ACTUALIAZARE PROIECT FINALIZATA, PROCEDURA DE LICITATIE SUSPENDATA CA URMARE A UNOR
CONTESTATII .
7 DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE DRUM NATIONAL DN76 55+425 69+350 ASOCIEREA SC SYLC CON TRANS SRL/HIDROSTROY AD IONESTI - VARFURILE LOT 3 13.93 98.90% 74.35% 15.03.2019
RECEPTIE LA TERMINAREA
LUCRARILOR - PREVIZIUNE
SEPTEMBRIE 2021
55.95 MIL. LEI FARA TVARECEPTIE LA TERMINAREA LUCRARILOR - PREVIZIUNE SEPTEMBRIE 2021, INCLUSIV CONSOLIDAREA ZONELOR CU ALUNECARI KM 65+358 - KM 65+448
DREAPTA SI KM 65+843 - KM 65+996 STANGA
8 DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE DRUM NATIONAL DN56 47+000 84+020 MOCHLOS S.A. GALICEA MARE - CALAFAT LOT 2 33.83 100% 91.43% 03.09.2012 16.06.2021 81.94 MIL. LEI FARA TVAPROCESUL VERBAL DE RECEPTIE LA TERMINAREA LUCRARILOR A FOST APROBAT DE DIRECTORUL GENERAL AL CNAIR IN DATA DE 16.06.2021.
9 DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE DRUM NATIONAL DN76 69+350 102+660ASOCIEREA SC DRUM ASFALT SRL – VAHOSTAV SK A.S. – TRAMECO
SA – ILE VIOREL CONSTRUCT SRL.VARFURILE - STEI LOT 4 33.31 51.28% 30.65% 29.06.2020
DECEMBRIE 2021 - RECEPTIE LA
TERMINAREA LUCRARILOR
DECEMBRIE 2026 - RECEPTIE FINALA
ANUL 2021 74.78 MIL LEI FARA TVA
CONTRACTUL PENTRU FINALIZAREA LUCRARILOR A FOST SEMNAT IN DATA DE 08.05.2020;
ORDINUL DE INCEPERE A LUCRARILOR A FOST EMIS IN DATA DE 29.06.2020;
PREDARE AMPLASAMENT - 02.07.2020.
10 DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE DRUM NATIONAL DN71 0+000 109+905
LOT 1 - ASOCIEREA SC AQUA PARC
SRL - SC MAVGO HOLDING SRL -
HYDROSTROY AD - VDH AD
(VODSTROI 98 AD) - SC BDU MAXI
CONSTRUCT SRL
CONSTRUCTORUL A FOST NOTIFICAT
PENTRU REZILIERE
LOT 1 (SECTOR 1): BALDANA -
TARGOVISTE KM. 0+000 - KM 44+130
LARGIRE LA 4 BENZI DE CIRCULATIE;
LOT 2 (SECTOR 2): TARGOVISTE -
SINAIA KM. 51+041 - KM 109+905 -
DRUM LA 2 BENZI)
102.99 0% 0% 1567.03 MIL. LEI FARA TVA
LOTUL 1 - IN DATA DE 14.01.2021 A FOST INAINTATA NOTIFICAREA DE REZILIERE.
LOTUL 2 - PROCEDURA RELUATA
PROCEDURA DE ACHIZITIE PUBLICA IN DERULARE
http://www.cnadnr.ro/
sites/default/files/DRU
MURI_NA%C8%9AIONA
LE_%C8%98I_VARIANTE
_DE_OCOLIRE_CALEND
AR.pdf
11 DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE DRUM NATIONAL DN28B 0+000 76+758ASOCIEREA SC AQUA PARC SRL - SC MAVGO HOLDING SRL -
VAHOSTAV - SK A.S. - TRAMECO SA
MODERNIZARE DN28B, TARGU
FRUMOS – BOTOSANI, KM 0+000 –
KM 76+758
71.512 0% 0%15.07.2020 - ORDIN INCEPERE
PENTRU ETAPA PROIECTAREDECEMBRIE 2023 DECEMBRIE 2023 267.31 MIL LEI FARA TVA
CONTRACT PROIECTARE SI EXECUTIE IN DERULARE - SEMNAT IN DATA DE 20.05.2020
AVIZAT PT CTE DRDP IASI - 09.06.2021 - AVIZAT DTAC DRDP IASI - 10.03.2021; AVIZAT DTAC CNAIR SA - 16.03.2021. AUTORIZATIE DE CONSTRUIRE NR.
21/12.05.2021 EMISA DE MTIC.
12 DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE DRUM NATIONAL DN29D 2+800 48+146ASOCIEREA SC AUTOTEHNOROM SRL - SC OPR ASFALT SRL - OBRAS
PUBLICAS-Y REGADIOS SA - SC EVALCONS TECH SRL
MODERNIZARE DN29D BOTOSANI -
STEFANESTI KM 2+800 – KM 18+500
SI KM 18+800 – KM 48+146
45.046 0 0%
22.06.2020 - EMITERE ORDIN DE
INCEPERE PENTRU ETAPA
PROIECTARE
DECEMBRIE 2023 208.44 MIL LEI FARA TVA
IN DATA DE 29.06.2020 A FOST DEPUSA APLICATIA DE FINANTARE PENTRU ANGAJAREA CHELTUIELILOR AFERENTE ACESTUI PROIECT, DIN FONDURI
NERAMBURSABILE, ALOCALTE IN CADRUL POIM 2014 - 2020
CONTRACT PROIECTARE SI EXECUTIE IN DERULARE
IN DATA DE 08.01.2021 A FOST OBTINUTA AUTORIZATIA DE CONSTRUCTIE
TERMEN DE PREDARE A PROIECTULUI TEHNIC DE EXECUTIE: 28.02.2021
PT - AVIZAT CNAIR SA NR. 5035/26.03.2021
13 DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE DRUM NATIONAL DN7 30+950 52+350LARGIRE LA 4 BENZI A DN7, BALDANA-
TITU, KM 30+950-KM 52+35021.4
ESTIMAT SEMNARE CONTRACT IN
IPOTEZA FARA CONTESTATIE:
MARTIE 2021
DECEMBRIE 2023 DECEMBRIE 2023 210.63 MIL. LEI FARA TVA
04.11.2020 A AVUT LOC DEPUNEREA OFERTELOR PENTRU PROCEDURA DE ATRIBUIRE A CONTRACTULUI "PROIECTARE TI EXECUTIE LARGIRE LA 4 BENZI A
DN 7, BALDANA-TITU, KM 30+950 – KM 52+350”.
PANA LA TERMENUL LIMITA AU DEPUS OFERTE URMATORII AGENTI ECONOMICI:
1. ASOCIEREA CLAY WORK BUCHAREST - DIMAKS TURIZM INSAAT ENERJI AKARYAKIT NAK. VE TAS. GIDA TEM. OTOM. OTO. KIR.ITH. IHR.
SAN.VE.TIC.LTD.STI. ISTANBUL;
2. ASOCIEREA COSEDIL SPA – SC BIT INVEST SRL - CHIRULLI ANDREA IMPRESA INDIVIDUALE – SC TOTAL ROAD SRL;
3. ASOCIEREA SC G&M ROAD BUILDING ENGINEERING SRL – SC KIRLIC GROUP SRL – SC BUILDING DESIGN 2000 TOP SRL – SC IRIMAT CONS S.R.L. -
D'AGOSTINO ANGELO ANTONIO COSTRUZIONI GENERALI S.R.L. – SC CONCORDIA CON. STRADE S.R.L – SC SERCONSTRUCT ROADS S.R.L.;
4. ASOCIEREA SC MAVGO HOLDING S.R.L. – SC BDU MAXI CONSTRUCT S.R.L.;
5. OZALTIN INSAAT TICARET VE SANAYI A.S.
VALOAREA ESTIMATA A CONTRACTULUI ESTE CUPRINSA IN INTERVALUL 243.801.103,00 - 289.093.324,00 LEI FARA TVA.
DURATA CONTRACTULUI ESTE DE 6 LUNI PERIOADA DE PROIECTARE TI 20 DE LUNI PENTRU EXECUTIA LUCRARILOR.
COMISIA DE EVALUARE VA ANALIZA OFERTELE IN CONFORMITATE CU PREVEDERILE DOCUMENTATIILOR DE ATRIBUIRE TI CU LEGISLATIA IN VIGOARE IN
DOMENIUL ACHIZITIILOR PUBLICE.
ANALIZA SI EVALUAREA OFERTELOR CU STABILIREA OFERTANTULUI CASTIGATOR: 29.04.2021;
COMUNICAREA REZULTATULUI PROCEDURII: 29.04.2021;
TERMEN DEPUNERE CONTESTATII: 10.05.2021;
ESTIMAT SEMNARE CONTRACT, IN IPOTEZA FARA CONTESTATII: 25.05.2021
14 DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE DRUM NATIONAL DN6 132+435 185+230
REABILITARE DN 6, ALEXANDRIA -
CRAIOVA, KM 90+190 - KM 222+182
LOT 2: KM 132+435 - KM 185+230
(RELICITARE)
48.009 2021 2024 ANUL 2024 267.15 MIL. LEI FARA TVA
CONTRACT REALIZARE EXPERTIZA TEHNICA SEMNAT IN DATA DE 06.06.2020
ORDINUL DE INCEPERE A FOST EMIS IN DATA DE 10.07.2020, CU O DURATA CONTRACTUALA DE 90 DE ZILE, TERMEN DE FINALIZARE 08.10.2020
CALENDAR PROCEDURA DE LICITATIE LOTUL 2, KM 132+435 - 185+230 - RELICITARE
DEPUNERE OFERTE: 24.05.2021;
ANALIZA SI EVALUAREA OFERTELOR CU STABILIREA OFERTANTULUI CASTIGATOR: 26.07.2021;
COMUNICAREA REZULTATULUI PROCEDURII DE ACHIZITIE PUBLICA: 26.07.2021;
CONTESTATII: 05.08.2021
ESTIMARE SEMNARE CONTRACT: 20.08.2021
3.1. DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE - IUNIE 2021
3. DRUMURI NATIONALE
15 DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE DRUM NATIONAL DN66 106+220 106+965 ASOCIEREA S.C. FREYROM S.A. - PROCONS GROUP S.R.L
REABILITARE DN66 PRIN
REAMENAJAREA SECTORULUI
CUPRINS INTRE KM 105+000 – KM
105+580 IN VEDEREA CONSTRUIRII
UNUI POD NOU PESTE JIU DE LA
MERI LA KM 105+250, REAMENAJARE
SECTOR KM 106+220 – KM 106+965
1.325 10.00% 8.39% 12.11.2020 12.07.2022 ANUL 2022 19.85 MIL. LEI FARA TVA
CONTRACT EXECUTIE LUCRARI SEMNAT IN DATA DE 02.11.2020
DURATA DE REALIZARE A INVESTITIEI: 12 LUNI (EXCLUSIV PERIOADA DE TIMP FRIGUROS, DE REGULA, CUPRINSA IN PERIOADA 15.11- 15.03 ), CU O
PERIOADA DE GARANTIE A LUCRARILOR ACORDATA DE EXECUTANT DE 96 LUNI (8 ANI).
APROBATA SITUATIA DE LUCRARI NR. 1 IN VALOARE DE 673.083,63 LEI FARA TVA. IN CURS DE APROBARE SITUATIA DE LUCRARI NR. 2 IN VALOARE DE
991.685,77 LEI FARA TVA.
16 DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE DRUM NATIONAL DN2L 60+165 76+277MODERNIZARE DN 2L, SOVEJA -
LEPSA, KM 60+165 - KM 76+27716.112 PROIECTARE IN DERULARE
ORDINUL DE INCEPERE PENTRU
PROIECTARE A FOST EMIS IN DATA
DE 22.09.2020
DECEMBRIE 2023 DECEMBRIE 2023 106.54 MIL. LEI FARA TVA
CONTRACT DE PROIECTARE SI EXECUTIE LUCRARI SEMNAT IN DATA DE 24.07.2020.
VALOARE CONTRACT PROIECTARE + EXECUTIE LUCRARI: 126.778.219,70 LEI CU TVA, DIN CARE:
PROIECTARE: 3.655.098,42 LEI CU TVA
EXECUTIE LUCRARI: 123.123.121,28 LEI CU TVA
AVIZAT DTAC CTE DRDP IASI 16918/ 10.05.2021; AVIZAT DTAC CTE CNAIR SA - 08.06.2021
DURATA CONTRACTULUI ESTE: 30 LUNI PERIOADA DE PROIECTARE SI EXECUTIE A LUCRARILOR:
- 6 LUNI PROIECTARE;
- 24 LUNI EXECUTIE LUCRARI;
- 84 DE LUNI PERIOADA DE GARANTIE A LUCRARILOR.
PTE IN CURS DE REVIZUIRE.
17 DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE DRUM NATIONAL DN7 256+675 258+950
PROIECTARE SI EXECUTIE "REALIZARE
BANDA A TREIA DN 7 VALEA OLTULUI
INTRE KM 256+675 – KM 258+950”
2.274 8.46 MIL. LEI FARA TVA
18 DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE DRUM NATIONAL DN69 0+000 10+000 TODINI COSTRUZIONI GENERALI S.P.A. DRUM DE LEGATURA INTRE DN69 SI
AUTOSTRADA A110 CTR SEMNAT IN DATA DE 29.01.2021 2021 2023 ANUL 2023 189.95 MIL. LEI FARA TVA CONTRACT SEMNAT IN DATA DE 29.01.2021, CU O PERIOADA CONTRACTUALA DE 2 ANI (6 LUNI PROIECTAREA) ȘI ARE O GARANȚIE DE 84 DE LUNI.
19 DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE DRUM NATIONAL DN7 0+000 14+300
DRUM DE LEGATURA A1 - DN7 (TITU)
(DJ 711A) - LARGIRE LA 4 BENZI DE
CIRCULATIE
14.3 OCTOMBRIE 2019 Aug-21 73.33 MIL. LEI FARA TVA
STUDIUL DE FEZABILITATE IN VARIANTA DRAFT PREDAT DE CATRE PRESTATOR IN CURS DE ANALIZA.
S-AU EMIS OBSERVATII ASUPRA VARIANTEI DRAFT A STUDIUL DE FEZABILITATE SI SE ASTEAPTA VARIANTA FINALA.
IN DATA DE 29.04.2021 PRESTATORUL A TRANSMIS STUDIUL DE FEZABILITATE. STUDIUL DE FEZABILITATE SE AFLA IN ANALIZA LA BENEFICIAR. IN DATA
DE 25.05.2021 AU FOST TRANSMISE OBSERVATIILE BENEFICIARULUI LA DOCUMENTATIA INAINTATA IN DATA DE 29.04.2021. PRESTATORUL
IMPLEMENTEAZA OBSERVATIILE FORMULATE PENTRU SF.
20 DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE DRUM NATIONAL DRUM TRANSREGIO GILAU - APAHIDA 0+000 38+800 GILAU - APAHIDA 38.8
CONTRACT SERVICII DE PROIECTARE
DERULAT IN BAZA UNUI PROTOCOL
DE CATRE UAT CLUJ NAPOCA
2345.52 MIL. FARA TVASTUDIU DE FEZABILITATE IN ELABORARE
FINALIZARE SF - TRIM. IV 2021
21 DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE DRUM NATIONAL DN24C 106+650 142+250S.C. SEARCH CORPORATION S.R.L. - ELABORARE SF / S.C. BEST
CONSULTING & DESIGN S.R.L. BUCURESTI - REVIZUIRE S.F.MANOLEASA - RADAUTI PRUT 35.6 33.63% 0% 109.69 MIL. LEI FARA TVA
SF REVIZUIT IN ANUL 2016 / HG NR. 460/28.06.2018 PENTRU APROBAREA INDICATORILOR TEHNICO-ECONOMICI
LIPSA FINANTARE LUCRARI
22 DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE DRUM NATIONALPOD PE DN13C PESTE RAUL TARNAVA MARE
LA VANATORI1+200 1+252
POD PE DN 13C PESTE RAUL
TARNAVA MARE LA VANATORI0.0521 5.45 MIL. LEI FARA TVA CONTRACT SEMNAT IN LUNA OCTOMBRIE 2020.
23 DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE DRUM NATIONAL DN1H 6+000 12+000 SC MECANO BAU TRADING SRLREMEDIERE DEFECTIUNI PE DN1H KM
6+000 - KM 12+0006 90.50% 47.88% 15.10.2020 31.08.2021 ANUL 2021 12.761 MIL. LEI FARA TVA ORDINUL DE INCEPERE A FOST EMIS INCEPAND CU DATA DE 15.10.2020
24 DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE DRUM NATIONAL DN51 2+600 43+783 ZIMNICEA - ALEXANDRIA 41.183 0.1953 MIL. LEI FARA T.V.A. DOCUMENTATIE INTOCMITA IN VEDEREA PROMOVARII SPRE LICITATIE.
25 DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE DRUM NATIONAL DN2PASAJ SUPERIOR PE DN2, PESTE CF
LA ROMAN, KM 332+9612 841.094 MIL. LEI FARA TVA
26 DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE DRUM NATIONAL DN57 152+990 200+745152+990 - 200+745 (ORAVITA -
MORAVITA)47.755 1.638 MII LEI FARA TVA DOCUMENTATIE PREDATA LA DIRECTIA ACHIZITI
27DRUMURI NATIONALE IN REABILITARE/ MODERNIZARE DRUM NATIONAL
DN21 104+160 106+900PROIECTARE SI EXECUTIE PASAJ
SUPERIOR PE DN 21, KM105+5002.74 0% 0% 15.03.2021 01.09.2023 ANUL 2023 98.120 MIL LEI FARA TVA
S-A EMIS ORDINUL DE INCEPERE IN DATA DE 15.03.2021.
DURATA DE EXECUTIE CONTRACT :
- 360 ZILE PERIOADA DE PROIECTARE
- 540 ZILE PERIOADA DE EXECUTIE.
STADIU:IN CURS DE ELABORARE/ PREDARE DECLARATIE DE PROIECTARE (TERMEN PREDARE -120 ZILE DE LA ORDINUL DE INCEPERE.)
NR.
CRT.CATEGORIE DRUM RANG DRUM INDICATIV DRUM
DE LA
(km)
PANA LA
(km)ANTREPRENOR SECTORUL LOTUL LUNGIME (km) STADIUL FIZIC ACTUAL
STADIUL FINANCIAR
ACTUALDATA INCEPERII DATA FINALIZARII AN DESCHIDERE VALOARE PROIECT OBSERVATII
DETALII
PROCEDURA
1 VARIANTE OCOLITOARE PROIECTE IN EXECUTIE VARIANTA OCOLITOARE CENTURA BUCURESTISTRACO GRUP SRL - SC COMNORD SRL - SPECIALIST CONSULTING
SRL
PASAJ SUPRATERAN PE DJ 602
CENTURA BUCURESTI DOMNESTIDOMNESTI - DJ 602 0.536 33.57% 32.27%
15.01.2019 - PENTRU LUCRARILE
AUTORIZATE PRIN AC 140/
20.12.2018
16.09.2019 PENTRU LUCRARILE
AUTORIZATE PRIN AC 69/28.08.2019
23.09.2020 - PENTRU LUCRARILE
AUTORIZATE PRIN AC 54/23.09.2020
24 LUNI DE LA EMITEREA
AUTORIZATIEI DE CONSTRUIRE
(ESTIMAT LUNA 09.2022)
ANUL 2022 91.55 MIL. LEI FARA TVA
CONTRACTUL DE PROIECTARE SI EXECUTIE PASAJ DOMNESTI A FOST SEMNAT IN DATA DE 10.05.2017
AUTORIZATIA DE CONSTRUIRE NR. 140/ 20.12.2018, NR. 69/ 28.08.2019 SI NR. 54/ 23.09.2020
LUCRARI CE SE EXECUTA: GRINDA PARAPET SECTOR INEL CENTRAL CATRE DN 6, SUDARE ANTRETOAZA SI LONJERONI TABLIER METALIC - OBIECTELE ST2
SI ST3, MONTARE GRINZI PRINCIPALE TABLIER METALIC - OBIECT ST2, EPUISMENTE RETEA TRANSGAZ, CANALIZARE PLUVIALA, SAPATURA RAMPA
COBORARE PRELUNGIREA GHENCEA, EXECUTIE STRAT DE FUNDATIE DIN BALAST PE LARGIRE DN CB SECTOR INEL CENTRAL CATRE A1, EXECUTIE STRAT DE
FUNDATIE DIN BALAST LA PUNTUL DE INTOARCERE PRELUNGIREA GHENCEA, ASTERNERE STRAT DE BAZA DIN MIXTURI ASFALTICE AB 31,5, STABILIZARE
TEREN FUNDARE - RAMPA PAMANT ARMAT.
2 VARIANTE OCOLITOARE PROIECTE IN EXECUTIE VARIANTA OCOLITOARE VARIANTA OCOLITOARE BACAU 0+000 30+842 SPEDITION UMB SRL – TEHNOSTRADE SRL BACAU
OBIECT 1: 0+000 -20+299,
OBIECT 2: 0+000 - 3+177
OBIECT 3: 0+000 -7+366
30.842 91.42% 96.81%
23.01.2019 - DATA DE INCEPERE
PERIOADA DE PROIECTARE
08.03.2019 - DATA DE INCEPERE A
LUCRARILOR IN BAZA AC
040/15.07.201503.07.2019 - DATA
DE INCEPERE A LUCRARILOR IN BAZA
AC 051/28.06.2019
IANUARIE 2022 ANUL 2020 668.33 MIL. LEI FARA TVA
DESCHIDERE TRAFIC
03.09.2020 - OBIECT 3
02.12.2020 - OBIECT 1
3 VARIANTE OCOLITOARE PROIECTE IN EXECUTIE VARIANTA OCOLITOARE VARIANTA OCOLITOARE BARLAD 0+000 11+281 ASOCIEREA SC TEHNIC ASIST SRL – SC TASS INFRA LOGISTIC SRL BARLAD 1 11.281 22.50% 13.62%
05.12.2018
(DATA DE INCEPERE A ACTIVITATII
DE PROIECTARE) 06.08.2020 - DATA
DE INCEPERE A LUCARILOR)
ESTIMAT IUNIE 2022 132.051 MIL. LEI FARA TVA
CONTRACTUL A FOST SEMNAT IN DATA DE 24.10.2018. ORDINUL DE INCEPERE PENTRU PROIECTAREA LUCRARILOR A FOST EMIS.
A FOST AVIZAT PROIECTUL TEHNIC IN SEDINTA CTE DIN DATA DE 19.06.2020
AUTORIZATIE DE CONSTRUIRE A FOST EMISA.
ORDINULL DE INCEPERE A LUCRARILPR A FOST EMIS IN DATA DE 06.08.2020
AMPLASAMENTUL LUCRARILOR A FOST PREDAT CATRE ANTREPRENOR IN DATA DE 06.08.2020.
4 VARIANTE OCOLITOARE PROIECTE IN EXECUTIE VARIANTA OCOLITOARE VARIANTA OCOLITOARE GALATI 0+000 33+600ASOCIEREA S.C. SA&PE CONSTRUCT S.R.L. – S.C. SPEDITION UMB
S.R.L. – S.C. TEHNOSTRADE S.R.L.GALATI 1 33.6 0% 0% IUNIE 2021 DECEMBRIE 2025 ANUL 2025 705.28 MIL. LEI FARA TVA
PRETUL PE KM ESTE DE CCA. 20.990.555 LEI FĂRĂ TVA, REPREZENTAND CCA. 4,327,949 EURO FARA TVA.
DURATA CONTRACTULUI ESTE DE 174 DE LUNI, DIN CARE:
• 12 LUNI PERIOADA DE PROIECTARE,
• 42 LUNI PERIOADA DE EXECUTIE A LUCRĂRILOR,
• 64 DE LUNI PERIOADĂ DE GARANȚIE A LUCRĂRILOR.
5 VARIANTE OCOLITOARE PROIECTE IN EXECUTIE VARIANTA OCOLITOARE VARIANTA OCOLITOARE MIHAILESTI 0+000 3+180 S.C. VIAROM CONSTRUCT S.R.L. MIHAILESTI RELICITARE 3.18
30.7% - PROGRES IN CADRUL
CONTRACTULUI REZILIAT;
32% IN CADRUL NOULUI CONTRACT
31.94% - PROGRES IN CADRUL
CONTRACTULUI REZILIAT;
18.65% IN CADRUL NOULUI
CONTRACT
FEBRUARIE 2021 - DEMARARE
LUCRARI RAMASE DE EXECUTAT2022 36.9 MIL. LEI FARA TVA
CONTRACT REZILIAT IN DATA DE 04.04.2019 DE CATRE CNAIR SA PENTRU NEINDEPLINIREA DE CATRE ANTREPRENOR A MAI MULTOR INSTIINTARI DE
REMEDIERE.
EXPERTIZA TEHNICA REALIZATA - 2019
IN DATA DE 23.12.2020 CNAIR A SEMNAT CONTRACTUL AVAND CA OBIECT “CONSTRUCTIA VARIANTEI DE OCOLIRE MIHAILESTI - FINALIZARE LUCRARI”,
CU OFERTANTUL DECLARAT CASTIGATOR S.C. VIAROM CONSTRUCT S.R.L.
VALOAREA CONTRACTULUI ESTE DE 36.862.651,20 LEI FARA TVA.
SURSA DE FINANTARE: FONDURI EUROPENE NERAMBURSABILE.
TRASEUL ARE O LUNGIME DE 3,18 KM.
DURATA CONTRACTULUI ESTE DE 72 DE LUNI, DIN CARE:
12 LUNI PERIOADA DE EXECUTIE A LUCRARILOR,
60 DE LUNI PERIOADA DE GARANTIE A LUCRARILOR.
A FOST EMIS ORDINUL DE INCEPERE LUCRARI PENTRU DATA DE 15.02.2021. URMEAZA PREDAREA AMPLASAMENTULUI.
6 VARIANTE OCOLITOARE PROIECTE IN EXECUTIE VARIANTA OCOLITOARE VARIANTA OCOLITOARE SATU MARE 0+000 19+540 ASOCIEREA ITINERA SPA COLLINI LAVORI SPA - VIA DESIGN SRL SATU MARE 1 19.54 67.50% 58.66%
30.06.2017 (SERVICII DE
PROIECTARE)
28.06.2018
(EXECUTIE LUCRARI)
ESTIMAT DECEMBRIE 2021 304.791 MIL. LEI FARA TVA
CONTRACTUL DE PROIECTARE SI EXECUTIA VARIANTEI DE OCOLIRE SATU MARE A FOST SEMNAT IN DATA DE16.11.2015
DATA DE INCEPERE A PERIOADEI DE PROIECTARE ESTE 30.06.2017.
DATA DE INCEPERE EXECUTIE LUCRARi ESTE 28.06.2019-ETAPA I.
DATA DE INCEPERE EXECUTIE LUCRARI ETAPA II ESTE 02.12.2020
7 VARIANTE OCOLITOARE PROIECTE IN EXECUTIE VARIANTA OCOLITOARE VARIANTA OCOLITOARE TARGU JIU 0+000 19+987
"COLLINI LAVORI SPA - CONTRACT REZILIAT
CONTRACT RELICITAT - ASOCIEREA SECOL SOCIETA EDILE
COSTRUZIONI E LAVORI S.A."
TARGU JIU RELICITARE 19.987
40% PROGRES INREGISTRAT IN
CADRUL CONTRACTULUI DE LUCRARI
REZILIAT;
9.00% -IN CADRUL NOULUI
CONTRACT
37.5% PROGRES INREGISTRAT IN
CADRUL CONTRACTULUI DE LUCRARI
REZILIAT;
0% IN CADRUL NOULUI CONTRACT
14.10.2014 - CTR REZILIAT
NOV. 2020 - CONTRACT RELICITAT
SEMNAT
CONTRACT REZILIAT DE CATRE
ANTREPRENOR IN LUNA 05.2018.
CONFORM CONTRACT RELICITAT -
AUGUST 2022
207 MIL. LEI FARA TVA
IN DATA DE 24.11.2020 A FOST SEMNAT CONTRACTUL NR 92/79265.
A FOST EMIS ORDINUL DE INCEPERE LUCRARI PENTRU DATA DE 15.02.2021.
IN DATA DE 18.02.2021 A FOST PREDAT AMPLASAMENTUL.
8 VARIANTE OCOLITOARE PROIECTE IN EXECUTIE VARIANTA OCOLITOARE VARIANTA OCOLITOARE TECUCI 0+000 6+945
ASOCIEREA S.C. MAVGO HOLDING S.R.L. – S.C. ANTREPRIZA DE
CONSTRUCȚII DRUMURI ȘI AUTOSTRĂZI S.R.L. (FOSTA S.C. AQUA
PARC S.R.L.) – S.C. BDU MAXI CONSTRUCT S.R.L. – HYDROSTROY AD
TECUCI (RELICITARE) RELICITARE 6.945
58% - PROGRES FIZIC INREGISTRAT
LA DATA REZILIERII
0% IN CADRUL NOULUI CONTRACT
29.63% - PROGRES INREGISTRAT IN
CADRUL CONTRACTULUI DE LUCRARI
REZILIAT
0% IN CADRUL NOULUI CONTRACT
03.08.2015
CONTRACT REZILIAT IN DATA DE
20.05.2019.CONTRACTUL PENTRU
"CONSTRUCTIA VARIANTEI DE
OCOLIRE TECUCI - REST DE
EXECUTAT” A FOST SEMNAT IN
16.04.2021. A FOST EMIS ORDINUL
DE INCEPE LUCRARI IN 20.05.2021.IN
21.05.2021 A AVUT LOC PREDAREA
AMPLASAMENTULUI
41.74 MIL. LEI FARA TVA
VINERI, 16.04.2021, C.N.A.I.R. S.A. A SEMNAT CONTRACTUL PENTRU "CONSTRUCTIA VARIANTEI DE OCOLIRE TECUCI - REST DE EXECUTAT”, CU
ASOCIEREA S.C. MAVGO HOLDING S.R.L. – S.C. ANTREPRIZA DE CONSTRUCTII DRUMURI SI AUTOSTRAZI S.R.L. (FOSTA S.C. AQUA PARC S.R.L.) – S.C. BDU
MAXI CONSTRUCT S.R.L. – HYDROSTROY AD.
VALOAREA CONTRACTULUI ESTE DE 41.735.534,38 LEI FARA TVA.
SURSA DE FINANTARE: FONDURI EUROPENE NERAMBURSABILE.
VARIANTA DE OCOLIRE TECUCI ARE O LUNGIME DE 6,945 KM.
VARIANTA SE DESPRINDE DIN DN24, TRAVERSEAZĂ CU UN PASAJ SUPERIOR DN24 ȘI LINA CF MARASESTI - TECUCI LA KM 0+385,95, CONTINUA IN
ALINIAMENT PANA LA INTERSECTIA LA NIVEL CU DJ252H LA KM 2+490, TRAVERSEAZA CU PASAJ SUPERIOR LINIA CF FAUREI - TECUCI LA KM 6+416,29 SI
SE FINALIZEAZA LA KM 6+945 (ECHIVALENT CU KM 6+801,29), LA INTERSECȚIA CU DN25.
PERIOADA CONTRACTUALA DE EXECUTIE A LUCRARILOR ESTE DE 12 DE LUNI, IAR PERIOADA DE GARANTIE ESTE DE 60 DE LUNI.
9 VARIANTE OCOLITOARE PROIECTE IN EXECUTIE VARIANTA OCOLITOARE VARIANTA OCOLITOARE TIMISOARA SUD 0+000 25+690 TIRRENA SCAVI S.P.A TIMISOARA - SECTOR SUD 25.69 30.24% 29,59%
29.01.2019 - DATA DE INCEPERE
PERIOADA DE PROIECTARE
25.03.2020 - ORDIN - INCEPERE
EXECUTIE LUCRARI
ESTIMAT 2022 ANUL 2022 272.43 MIL. LEI FARA TVA
PROIECT TEHNIC FINALIZAT
AUTORIZATIE DE CONSTRUIRE EMISA IN LUNA MARTIE 2020.
EXECUTIE LUCRARI IN DERULARE.
10 VARIANTE OCOLITOARE PROIECTE IN EXECUTIE VARIANTA OCOLITOARE VARIANTA OCOLITOARE ZALAU 0+000 5+535ASOCIEREA SINOHYDRO CORPORATION LIMITED – SC GOOD
PROOD S.R.L.
ETAPA 2 - 7 KM INTRE DN 1F KM
79+625 - DJ 191C1
5.535 KM (5 VIADUCTE, 2 PODURI, 2
INTERSECTII TIP GIRATIE)1% 15% 2020 2023 185.54 MIL. LEI FARA TVA
ORDINUL DE INCEPERE A CONTRACTULUI A FOST COMUNICAT CA FIIND 25.09.2020 (PROIECTARE+EXECUTIE). PERIOADA DE PROIECTARE ESTE DE 6
LUNI (FINALIZARE 24.03.2021) SI 24 LUNI EXECUTIE LUCRARI (FINALIZARE 23.03.2023).
DECIZIA DE EXPROPRIERE NR. 1848 DIN 10.11.2020.
A FOST ACORDATA ANTREPRENORULUI POSESIA SANTIERULUI.
A FOST OBTINUTA AUTORIZATIA DE CONSTRUIRE NR. 17/26.03.2021.
A FOST EMISA HOTARAREA DE GUVERN NR.622 DIN 03.06.2021 PRIVIND SCOATEREA DEFINITIVA DIN FONDUL FORESTIER NATIONAL.
11 VARIANTE OCOLITOARE PROIECTE IN EXECUTIE VARIANTA OCOLITOAREDRUM DE LEGATURA DN5 - SOSEAUA DE
CENTURA - POD PRIETENIEI0+000 5+720 PORR CONSTRUCT S.R.L.
DRUM DE LEGATURA DN5 - SOSEAUA
DE CENTURA - POD PRIETENIEI5.72 36.00% 24.29% APRILIE 2020 ESTIMAT 2022 ESTIMAT 2022 106.638 MIL. LEI FARA TVA
IN DATA DE 19.11.2019 A FOST SEMNAT CONTRACTUL DE PROIECTARE SI EXECUTIE AFERENT ACESTUI OBIECTIV.
IN DATA DE 05.03.2020 A FOST SEMNAT CONTRACTUL DE SUPERVIZARE AFERENT LUCRARILOR.
IN DATA DE 15.04.2020 A FOST EMIS ORDINUL DE INCEPERE PENTRU PROIECTARE
IN DATA DE 21.10.2020 A FOST EMIS ORDINUL DE INCEPRE PENTRU EXECUTIA LUCRARILOR
4.1. VARIANTE OCOLITOARE PROIECTE IN EXECUTIE - IUNIE 2021
4. VARIANTE OCOLITOARE
NR.
CRT.CATEGORIE DRUM RANG DRUM INDICATIV DRUM
DE LA
(km)
PANA LA
(km)ANTREPRENOR SECTORUL LOTUL LUNGIME (km) STADIUL FIZIC ACTUAL
STADIUL FINANCIAR
ACTUALDATA INCEPERII DATA FINALIZARII AN DESCHIDERE VALOARE PROIECT OBSERVATII
DETALII
PROCEDURA
1 VARIANTE OCOLITOARE IN PREGATIRE FAZA EXECUTIE LUCRARI VARIANTA OCOLITOARE VARIANTA OCOLITOARE SFANTU GHEORGHE 0+000 8+000 CONTRACT ELABORARE SF FINALIZAT SFANTU GHEORGHE 1 8 07.05.20182020 - FINALIZARE PROIECTARE,
ETAPA STUDIU DE FEZABILITATE41.47 MIL. LEI FARA TVA PROCEDURA DE ATRIBUIRE CONTRACT PROIECTARE SI EXECUTIE - IN DERULARE, ETAPA EVALUARE OFERTE.
2 VARIANTE OCOLITOARE IN PREGATIRE FAZA EXECUTIE LUCRARI VARIANTA OCOLITOARE CENTURA BUCURESTI 35+600 55+465
LARGIRE LA 4 BENZI A CENTURII
RUTIERE A MUNICIPIULUI BUCURESTI
SUD INTRE A1 (KM 55+520) SI DN 5
(KM 40+000) - LOT 1 SI LOT 2
18,68
http://www.cnadnr.ro/
sites/default/files/DRU
MURI_NA%C8%9AIONA
LE_%C8%98I_VARIANTE
_DE_OCOLIRE_CALEND
AR.pdf
3 VARIANTE OCOLITOARE IN PREGATIRE FAZA EXECUTIE LUCRARI VARIANTA OCOLITOARE VARIANTA OCOLITOARE SIGHISOARA 0+000 13+057PROCEDURA DE LICITATIE ATRIBUIRE CONTRACT PROIECTARE SI
EXECUTIE IN DERULARESIGHISOARA 13.057 0.00% 0.00% 6/14/2021 ESTIMAT 23.11.2021 ESTIMAT 2021 293.084 MIL LEI fara TVA 14.06.2021 - DATA PUBLICARII ANUNTULUI, 31.08.2021 DATA DE DEPUNERE A OFERTELOR, 23.11.2021 - DATA FINALIZARE PROCEDURA DE EVALUARE
NR.
CRT.CATEGORIE DRUM RANG DRUM INDICATIV DRUM
DE LA
(km)
PANA LA
(km)ANTREPRENOR SECTORUL LOTUL LUNGIME (km) STADIUL FIZIC ACTUAL
STADIUL FINANCIAR
ACTUALDATA INCEPERII DATA FINALIZARII AN DESCHIDERE VALOARE PROIECT OBSERVATII
DETALII
PROCEDURA
2 VARIANTE OCOLITOARE IN PREGATIRE FAZA SF/PT/DTAC VARIANTA OCOLITOARE VARIANTA OCOLITOARE RAMNICU VALCEA 0+000 21+837 SC SEARCH CORPORATION SRL RAMNICU VALCEA PROIECTARE 21.84 30% 0% 16.12.2019 2022 276.36 MIL. LEI FARA TVA
CONTRACT DE SERVICII DE PROIECTARE ACTUALIZARE A STUDIULUI INITIAL INCLUSIV DOCUMENTATII PENTRU AVIZE,OBTINERE AVIZE SI ACORDURI,
ELABORARE PROIECT TEHNIC INCLUSIV DTAC, DETALII DE EXECUTIE SI ASISTENTA TEHNICA PENTRU OBIECTIVUL VARIANTA DE OCOLIRE RM. VALCEA NR.
148 /04.10.2019, CU ORDIN DE INCEPERE ACTIVITATI EMIS IN DATA DE 16.12.2019, IN DERULARE. PRESTATOR SC SEARCH CORPORATION SRL.
VALOAREA CONTRACT PROIECTARE: 3,832,075.75 LEI FARA TVA.
DOCUMENT DE AVIZARE CTE-CNAIR NR. 4915/09.04.2020 - ACTUALIZARE SF - ALTERNATIVE DE TRASEU.
CERTIFICATUL DE URBANISM NR. 12/10054/06.08.2020 EMIS DE C.J. VALCEA ""NU POATE FI UTILIZAT IN SCOPUL DECLARAT"" URMARE A AVIZULUI
NEFAVORABIL AL PRIMARIEI ORASULUI CALIMANESTI.
DOCUMENT DE AVIZARE CTE-CNAIR NR. 4992/19.10.2020 - ACTUALIZARE SF - ALTERNATIVE DE TRASEU (AMC ETAPA 4) - VARIANTE PENTRU
RACORDAREA LA CENTURA CALIMANESTI.
C.J. VALCEA A EMIS UN NOU CERTIFICAT DE URBANISM, NR. 70/16141/23.11.2020, CARE SPECIFICA FAPTUL CA ""NU POATE FI UTILIZAT IN SCOPUL
DECLARAT"" URMARE A AVIZULUI NEFAVORABIL AL PRIMARULUI COMUNEI DAESTI.
DOCUMENT DE AVIZARE CTE-DRDP CRAIOVA NR. 3/20.01.2021 - STUDIUL ALTERNATIVELOR DE TRASEU IN ZONA LOCALITATII FEDELESOIU, COMUNA
DAESTI - ETAPA 5. DOCUMENTATIA TEHNICA A FOST INAINTATA LA CJ VALCEA CARE A EMIS CERTIFICATUL DE URBANISM NR. 05/19899/26.01.2021
CARE ""NU POATE FI UTILIZAT IN SCOPUL DECLARAT"" URMARE A AVIZULUI NEFAVORABIL AL PRIMARULUI COMUNEI DAESTI.
S-A EMIS ORDIN DE SISTARE DIN DATA DE 29.01.2021. AU FOST INITIATE DEMERSURI IN VEDEREA ADRESARII INSTANTELOR JUDECATORESTI
COMPETENTE PENTRU CHEMARE IN JUDECATA A C.J. VALCEA SI A REPREZENTANTULUI UAT DAESTI.
3 VARIANTE OCOLITOARE IN PREGATIRE FAZA SF/PT/DTAC VARIANTA OCOLITOARE VARIANTA OCOLITOARE REGHIN 0+000 10+440 SC TPF INGINERIE SRL REGHIN 1 10.44 05.12.2019 2021 108.11 MIL. LEI FARA TVACONTRACT PRESTARI SERVICII COMPLETARE STUDIU DE FEZABILITATE SEMNAT LA DATA DE 05.12.2019, IN DERULARE.
CONTRACT COMPLETARE SF IN DERULARE
4 VARIANTE OCOLITOARE IN PREGATIRE FAZA SF/PT/DTAC VARIANTA OCOLITOARE VARIANTA OCOLITOARE TARGU MURES 0+000 11+643 TARGU MURES
RELICITAREA LUCRARILOR RAMASE
DE EXECUTAT SE VA REALIZA IN 2
ETAPE:
ETAPA 1: REVIZUIRE PROIECT TEHNIC
ETAPA 2: LICITATIE LUCRARI RAMASE
DE EXECUTAT, CORELATE CU
PROIECTUL TEHNIC REVIZUIT
11.643
34.26% -PROGRES INREGISTRAT IN
CADRUL CONTRACTULUI DE LUCRARI
REZILIAT
37.55% - PROGRES FINANCIAR
INREGISTRAT LA DATA REZILIERII
09.10.2014 (ORDIN DE INCEPERE
PENTRU CONTRACTUL REZILIAT)
ORDIN DE INCEPERE A LUCRARILOR -
PENTRU CONTRACTUL RELICITAT - VA
FI SPECIFICAT ULTERIOR SEMNARII
ACESTUIA
CONTRACT 1 INCETAT PE CALE
AMIABILA IN 29.12.2017 ANUL 2023 134.80 MIL. LEI FARA TVA
COPISA CONSTRUCTORA PIRENAICA SA - CONTRACT REZILIAT
LICITATIE ATRIBUIRE CONTRACT REST LUCRARI RAMASE DE EXECUTAT, CU TERMEN DEPUNERE OFERTE: 26.08.2020
PROCEDURA ANULATA ADMINISTRATIV PENTRU NEDEPUNERE DE OFERTE
DEMERSURILE IN VEDEREA ACTUALIZARII PROIECTULUI TEHNIC SUNT DEMARATE DE CATRE DRDP BRASOV.
IN DATA DE 23.02.2021, A FOST PUBLICAT IN SEAP ANUNTUL NR. CN1029446 CU PRIVIRE LA ACHIZITIA PUBLICA CARE VA AVEA CA SCOP ACTUALIZAREA
DOCUMENTATIEI TEHNICE PT+DDE VARIANTA DE OCOLIRE TARGU MURES.
PROCEDURA DE LICITATIE IN DERULARE LA NIVELUL DRDP BRASOV
5 VARIANTE OCOLITOARE IN PREGATIRE FAZA SF/PT/DTAC VARIANTA OCOLITOARE ALTERNATIVA TECHIRGHIOL 0+000 28+833SC CONSITRANS SRL - CONTRACT PROIECTARE ELABORARE SF, PT SI
DTACTECHIRGHIOL 1 28.833 30% 0% FEBRUARIE 2020 DECEMBRIE 2021 DECEMBRIE 2021 5.372 MIL. LEI FARA TVA
"CONTRACTUL PENTRU ELABORARE SF, PT SI DTAC A FOST SEMNAT IN DATA DE 26.07.2019 .
ORDINUL DE INCEPERE A FOST EMIS IN LUNA FEBRUARIE 2020.
STUDIU DE FEZABILITATE FINALIZAT, URMEAZA PARCURGEREA PROCEDURII PRIVIND APROBAREA INDICATORILOR TEHNICO-ECONOMICI (AVIZ CTE
CNAIR, AVIZ MT, AVIZ CI SI HG). DUPA EMITEREA HG, TERMENUL CONTRACTUAL PENTRU EMITERE PT ESTE 3 LUNI.
AMC 1+2 A FOST AVIZAT IN CADRUL CTE CNAIR SA.
IN CURS DE FINALIZARE INVESTIGATIILE GEOTEHNICE DE TEREN."
6 VARIANTE OCOLITOARE IN PREGATIRE FAZA SF/PT/DTAC VARIANTA OCOLITOARE VARIANTA OCOLITOARE VASLUI 0+000 14+940 CONTRACT REVIZUIRE SF IN DERULARE VASLUI 1 14.94 2019 2021 142.8 MIL. LEI FARA TVA
SF - 2006 (AVIZ MT 36/27/19.03.2007).
CONTRACT REVIZUIRE SF SI ELABORARE PT + DTAC SEMNAT IN LUNA MAI 2019 - IN DERULARE, CU TERMEN DECALAT FINALIZARE SEPTEMBRIE 2021
DURATA REVIZUIRE SF – 8 LUNI AVIZ CTE DRDP IASI NR. 16891/19.04.2021
DURATA ELABORARE PT – 6 LUNI
VALOARE CONTRACT PROIECTARE: 1.478.500 LEI
7 VARIANTE OCOLITOARE IN PREGATIRE FAZA SF/PT/DTAC VARIANTA OCOLITOARE VARIANTA OCOLITOARE PITESTI VEST 0+000 20+000 TPF INGINERIE SRL PITESTI VEST 20 0% 0%
CONTRACT IN DERULARE.
A AVUT LOC SEDINTA NR. 1 DE PROGRES IN DATA DE 25.03.2021.
IN DATA DE 26.04.2021 PRESTATORUL A TRANSMIS STUDIUL DE PREFEZABILITATE CONFORM GRAFICULUI ACTIVITATILOR. AU FOST FORMULATE
OBSERVATII ASUPRA DOCUMENTATIE STUDIUL DE PREFEZABILITATE. PRESTATORUL A TRANSMIS SPF-ul REVIZUIT.
A FOST PREDAT STUDIUL DE TRAFIC REVIZUIT. IN CURS DE ANALIZA LA BENEFICIAR (TRANSMIS LA CESTRIN)
14.03.2018
2021 - FINALIZARE ETAPA DE
PROIECTARE.
DURATA DE EXECUTIE A LUCRARILOR
: 36 DE LUNI DE LA ORDINUL DE
INCEPERE, DUPA FINALIZAREA
SERVICIILOR DE PROIECTARE SI
OBTINEREA AUTORIZATIEI DE
CONSTRUCTIE
ANUL 2020
VALOARE PROIECT 1.6 MIL LEI FARA
TVA;
VALOARE LUCRARI CF. SF - VARIANTA
4 AVIZATA: TOTAL GENERAL - 343.36
MIL LEI FARA TVA
1
4.2. VARIANTE OCOLITOARE IN PREGATIRE FAZA EXECUTIE LUCRARI - IUNIE 2021
4.3. VARIANTE OCOLITOARE IN PREGATIRE FAZA SF/PT/DTAC -- IUNIE 2021
CONTRACT PRESTARI SERVICII DE PROIECTARE FAZELE SF+PT+DE+DATC+AT SEMNAT IN DATA DE 14.03.2018
IN DATA DE 26.03.2018 S-A EMIS ORDINUL DE INCEPERE NR.3B/4773/26.03.2018 PENTRU SERVICII DE PROIECTARE IN FAZA SF.
SF FINALIZAT SI APROBAT PRIN HG INDICATORI TEHNICO-ECONOMICI NR. 58/24.02.2021.
ORDIN DE INCEPERE PENTRU PT+DTAC SI AVIZE - NR. 3B/4773/26.03.2018 - INCEPAND CU 01.10.2020.
PROIECTUL TEHNIC A FOST PREDAT IN 29.01.2021.
MAI SUNT DE ELABORAT : DETALII DE EXECUTIE 1 LUNA, PREGATIRE DOCUMENTATIE DE ATRIBUIRE PENTRU ACHIZITIA LUCRARI DE EXECUTIE: 2 LUNI,
DOCUMENTATIA CADASTRALA PENTRU HG DE EXPROPRIERI DE UTILITATE PUBLICA;
MAI SUNT DE OBTINUT: CTE CNAIR PENTRU PT+DTAC, AUTORIZATIA DE CONSTRUIRE SI HG DE EXPROPRIERI DE UTILITATE PUBLICA;
DOCUMENTATIA PENTRU PROMOVAREA HG DE EXPROPRIERI SI DOCUMENTATIA PT + DTAC SUNT CONDIȚIONATE DE UN PUNCT DE VEDERE AFIR CU
PRIVIRE LA SUPRAPUNEREA OBIECTIVULUI VO GIURGIU PESTE UN OBIECTIV PRIVAT FINANTAT PE FONDURI EUROPENE AFIR.
IN DATA DE 25.05.2021 A AVUT LOC O SEDINTA DE LUCRU LA SEDIUL MINISTERULUI TRANSPORTURILOR LA CARE PROIECTANTUL VO GIURGIU A
PREZENTAT O SOLUTIE DE PROIECTARE PRIN MODIFICAREA PROFILULUI TRANSVERSAL AL VO, PRIN CARE SE EVITA DEMOLAREA HALEI DE
PROCESARE(SERA DE LEGUME), DAR CARE VA AFECTA BAZINUL DE RETENTIE IMPREJMUIREA SI DOUA CONSTRUCTII ANEXE.
IN DATA DE 02.06.2021 AFIR A TRANSMIS ACORDUL CA BENEFICIARUL PRIVAT S-A MODIFICE AMPLASAMENTUL AFECTAT DE EXPROPRIERE NECESARA
REALIZARII VO GIURGIU CU CONDITIA MENTINERII CONDITIILOR DE ELIGIBILITATE SI SELECTIE INSCRISE IN CEREREA DE FINANTARE.
IN DATA 04.06.2021 A FOST AVIZATA IN CTE DRDP BUCURESTI DOCUMENTATIE PT+DTAC.
IN DATA DE 16.06.2021 A FOST INAINTATA LA CNAIR DOCUMENTATIA IN FAZA PT +DTAC PENTRU PROGRAMARE ANALIZA SI AVIZARE IN CTE CNAIR SI
PENTRU APROBAREA MODIFICARILOR NECESARE FATA DE SOLUTIA APROBATA LA FAZA SF .
IN DATA DE 25.06.2021 CA URMARE A SOLICITARII CNAIR - DEPARTAMENT OBTINERE FINANTARI PRIN ADRESA NR. 3B/ 2737/25.06.2021, DRDP
BUCURESTI A INAINTAT DOCUMENTATIILE TEHNICE IN FAZELE SF - FINAL AVIZAT, PT + DTAC IN VARIANTA INAINTATA LA CTE CNAIR, PENTRU A FI PUSE
LA DISPOZITIA CONSILIULUI JUDETEAN GIURGIU PENTRU INCHEIEREA UNUI PARTENERIAT PENTRU IMPLEMENTAREA OBIECTIVULUI IN TEMEIUL OUG
NR. 101/2020.
VARIANTE OCOLITOARE IN PREGATIRE FAZA SF/PT/DTAC VARIANTA OCOLITOARE VARIANTA OCOLITOARE GIURGIU 0+000 12+068CONTRACT ELABORARE FAZE DE PROIECTARE SF+PT+DE+DTAC+AT
IN DERULAREGIURGIU 1
12.068 CONFORM VARIANTEI DE
TRASEU APROBATA
70% - SF FINALIZAT SI APROBAT PRIN
HG INDICATORI TEHNICO -
ECONOMICI NR. 58/24.02.2021
57%
8 VARIANTE OCOLITOARE IN PREGATIRE FAZA SF/PT/DTAC VARIANTA OCOLITOARE VARIANTA OCOLITOARE DOROHOI 0+000 13+900 SC NV CONSTRUCT SRL DOROHOI 13.9 0% 0% 429.22 MII LEI IN CURS DE FINALIZARE STUDIUL DE FEZABILITATE, DUPA APROBARE PUZ DOROHOI
9 VARIANTE OCOLITOARE IN PREGATIRE FAZA SF/PT/DTAC VARIANTA OCOLITOARE VARIANTA OCOLITOARE TIMISOARA VEST 0+000 22+000 SEARCH CORPORATION SRL TIMISOARA 22 18.01.2021 18.04.2022 3.66 MIL. LEI FARA TVA
CONTRACT IN DERULARE.
IN DATA DE 20.05.2021 FOST AVIZAT IN CTE CNAIR SA - ANALIZA MULTICRITERIALA ETAPA 1.
IN CURS DE ELABORARE DOCUMENTATIA AMC ETAPA 2
NR.
CRT.CATEGORIE DRUM RANG DRUM INDICATIV DRUM
DE LA
(km)
PANA LA
(km)ANTREPRENOR SECTORUL LOTUL LUNGIME (km) STADIUL FIZIC ACTUAL
STADIUL FINANCIAR
ACTUALDATA INCEPERII DATA FINALIZARII AN DESCHIDERE VALOARE PROIECT OBSERVATII
DETALII
PROCEDURA
1 VARIANTE OCOLITOARE IN PREGATIRE FAZA PROIECTARE VARIANTA OCOLITOARE VARIANTA OCOLITOARE BISTRITA 0+000 15+000 BISTRITA 1 152.33 MIL LEI FARA TVA (VALOARE
ESTIMATA CONTRACT S.F.)
PROCEDURA DE ACHIZITIE PUBLICA PENTRU CONTRACTUL DE SERVICII DE „ELABORARE STUDIU DE FEZABILITATE PENTRU VARIANTA DE OCOLIRE
BISTRITA”, A FOST ANULATA.
OBIECTIVUL FACE PARTE DIN ,,AUTOSTRADA NORDULUI” – FIIND SPECIFICAT IN STUDIUL DE FEZABILITATE CA DRUMUL DE MARE VITEZA BAIA MARE-
SUCEAVA: LOT 1 BAIA MARE-BISTRITA SI LOT 2 BISTRITA-VATRA DORNEI, VA INDEPLINI SI FUNCTIA DE VARIANTA DE OCOLIRE PENTRU LOCALITATILE
INTERSECTATE DE ACESTA.
2 VARIANTE OCOLITOARE IN PREGATIRE FAZA PROIECTARE VARIANTA OCOLITOAREDRUM DE LEGATURA DN6 - DRUM EXPRES
CRAIOVA-PITEȘTI (TRONSONUL 1)- -
INITIERE PROCEDURA DE ACHIZITIE ATRIBUIRE CONTRACT DE
PRESTARI SERVICII DE PROIECTARE- - 10 km - -
CNAIR SA A TRANSMIS CATRE MINISTERUL TRANSPORTURILOR SI INFRASTRUCTURII CEREREA DE FINANTARE PENTRU PROIECTUL: "ELABORARE STUDIU
DE FEZABILITATE, PROIECT TEHNIC DE EXECUȚIE INCLUSIV PAC, DETALII DE EXECUTIE, ASIGURAREA ASISTENTEI TEHNICE PE PARCURSUL EXECUȚIEI DE
LUCRARI SI IN PERIOADA DE GARANTIE A LUCRARILOR EXECUTATE PENTRU OBIECTIVUL DE INVESTIȚIE: DRUM DE LEGATURA PENTRU SPORIREA
CAPACITATII DE TRAFIC INTRE DN6 (ZONA UZINEI FORD) SI DRUMUL EXPRES CRAIOVA – PITESTI (TRONSONUL 1)".
DRDP CRAIOVA A INTOCMIT CAIETUL DE SARCINI PENTRU ACHIZITIA SERVICIILOR DE PROIECTARE AFERENTE PROIECTULUI, PRECUM SI REFERATUL DE
NECESITATE PENTRU INTRODUCEREA IN PAAP 2021 A PROCEDURII DE ACHIZITIE CU O VALOARE ESTIMATA A CONTRACTULUI DE 1.500.000 LEI
INCLUSIV TVA. OBIECTIVUL A FOST INCLUS IN PAAP PENTRU ANUL 2021 AL DRDP CRAIOVA.
DURATA ESTIMATA A PRESTARII SERVICIILOR ESTE DE 89 LUNI (3 LUNI – ELABORARE SF INCLUSIV DOCUMENTATII PENTRU OBTINERE AVIZE/ACORDURI;
2 LUNI – ELABORARE PT INCLUSIV DTAC SI DE; 24 LUNI – ASISTENTA TEHNICA PE PARCURSUL EXECUTIEI LUCRARILOR; 60 LUNI – ASISTENTA TEHNICA IN
PERIOADA DE GARANTIE A LUCRARILOR).
NR.
CRT.CATEGORIE DRUM RANG DRUM INDICATIV DRUM
DE LA
(km)
PANA LA
(km)ANTREPRENOR SECTORUL LOTUL LUNGIME (km) STADIUL FIZIC ACTUAL
STADIUL FINANCIAR
ACTUALDATA INCEPERII DATA FINALIZARII AN DESCHIDERE VALOARE PROIECT OBSERVATII
DETALII
PROCEDURA
1 VARIANTE OCOLITOARE IN REABILITARE/MODERNIZARE VARIANTA OCOLITOARE CENTURA BUCURESTI 29+500 33+190 ITINERA SPA
LARGIRE LA 4 BENZI A CENTURII
RUTIERE A MUNICIPIULUI BUCURESTI
SUD INTRE A2 KM 23+600 SI A1 KM
55+520
AMENAJARE NOD RUTIER LOT 1:
OLTENITA - DN 43.69 22.00% 32.00%
31.07.2019 - DATA DE INCEPERE
PERIOADA DE PROIECTAREESTIMAT 2022 SEPTEMBRIE 2022 169.5 MIL. LEI FARA TVA
CONTRACTUL DE EXECUTIE LUCRARI A FOST SEMNAT IN DATA DE 20.06.2019/ AUTORIZATIE DE CONSTRUIRE VALABILA.
LUCRARI IN EXECUTIE: LA DRUM - EXCAVATII PE DN CB SI PE BRETELE TRANSPORT AGABARITIC AG 1 SI AG2, EXECUTIE STRAT DE FORMA PE DN 4, PE AG1
SI AG2 SI PE DNCB.
LA PASAJ - ARMARE SI COFRARE RIGLE P3B, P4B SI P4B1, ARMARE SI COFRARE RADIERE P5A, P4A SI SP1A, ARMARE SI COFRARE ELEVATII PILE P3A1, P2A
SI P2A1.
RELOCARE UTILITATI - RELOCARE DE RETELE ELECTRICE SI RETEA GAZ, CONTINUARE MONTARE CONDUCTA NOUA GAZ PE DNCB, TELECOM - INTREGIRE
TRASEU FIBRA OPTICA RELOCATA PE DNCB SI RELOCARE RETELE ELECTRICE PE AG2 SI MONTARE CABLU JT, CONTINUARE EXECUTIE CANALIZARE PE DN 4
CU PVC SI PE DNCB CU PAFSIN.
2 VARIANTE OCOLITOARE IN REABILITARE/MODERNIZARE VARIANTA OCOLITOARE CENTURA BUCURESTI 12+300 23+750 TIRRENA SCAVI S.P.A
MODERNIZAREA CENTURII RUTIERE A
MUNICIPIULUI BUCURESTI INTRE A1 -
DN7 SI DN2 - A2
SECTIUNEA DN 2 - A2 11.524 7.59% 17.61% 04.05.2020 ESTIMAT AUGUST 2021 ANUL 2022 235.75 MIL. LEI FARA TVA
1. CONTRACTUL DE EXECUTIE LUCRARI A FOST SEMNAT IN DATA DE 02.03.2020/ AUTORIZATIE DE CONSTRUIRE VALABILA.
LUCRARI IN EXECUTIE: DEMONTARE ESAFODAJ PILA P12, DECOFRARE CUZINETI SI OPRITOR ANTISEISMIC PILA Pila P12, DECOFRARE CUZINETI SI
OPRITOR ANTISEISMIC PILA P11, MONTARE ESAFODAJ PILA P1, EVACUARE APE DIN ZONA RADIERE CULEE C1, PILA P8 SI PILA P9
3 VARIANTE OCOLITOARE IN REABILITARE/MODERNIZARE VARIANTA OCOLITOARE CENTURA BUCURESTI 33+190 35+600
ASOCIEREA S.C. TRAMECO S.A. - VAHOSTAV -SK,
A.S. - CONSTRUCTII ERBASU S.A. - GRAFIC TENDS S.R.L. S.C. (LIDER
DE ASOCIERE TRAMECO S.A.)
LARGIRE LA 4 BENZI A CENTURII
RUTIERE A MUNICIPIULUI BUCURESTI
SUD INTRE A2 KM 23+600 SI A1 KM
55+520
AMENAJARE NOD RUTIER LOT 2:
BERCENI - DJ 4012.41 20.21% 13.87% 06.05.2019 ESTIMAT 2022 IUNIE 2022 146 MIL. LEI FARA TVA
CONTRACTUL DE PROIECTARE SI EXECUTIE PASAJ BERCENI A FOST SEMNAT IN DATA DE 19.03.2019.
LUCRARI CE SE EXECUTA: CANALIZARE PLUVIALA, STRAT DE FUNDATIE DIN BALAST, STRAT SUPERIOR DE FUNDATIE DIN BALAST STABILIZAT, RELOCARI
FIBRA OPTICA PE ZONA SOSEAUA BERCENI, MONTARE IZOLATORI SEISMICI, UMPLUTURI DIN PAMANT LA TERSAMENTE SI UMPLUTURI ARMATE DIN
BALAST LA RAMPE PASAJ, ASTERNERE STRAT DE BAZA AB31,5.
4 VARIANTE OCOLITOARE IN REABILITARE/MODERNIZARE VARIANTA OCOLITOARE CENTURA BUCURESTI 55+465 64+160ASOCIEREA S.C. DELTA A.C.M. 93 SRL & AZVIRT LLC & S.C.
MAXIDESIGN S.R.L. - CONTRACT REZILIAT
MODERNIZAREA CENTURII RUTIERE A
MUNICIPIULUI BUCURESTI INTRE A1 -
DN 7 SI DN 2-A2:SECTIUNEA A1 (KM
55+465) - DN 7 (KM 64+160)
SECTIUNEA A1 KM 55+465 - DN7 KM
64+1608.695
86.5% - PROGRES FIZIC LA DATA
REZILIERII
77.73% - PROGRES FINANCIAR LA
DATA REZILIERII2021 TRIM IV 2022 106.6 MIL. LEI FARA TVA
A FOST DEMARATA PROCEDURA DE ACHIZITIE PUBLICA PENTRU LUCRARI DE REMEDIERE SI FINALIZARE LUCRARI - REST DE EXECUTAT.
A FOST PUBLICAT ANUNTUL DE PARTICIPARE.
DETALII IN LINK-UL DE MAI JOS:
http://www.cnadnr.ro/
sites/default/files/DRU
MURI_NA%C8%9AIONA
LE_%C8%98I_VARIANTE
_DE_OCOLIRE_CALEND
AR.pdf
5 VARIANTE OCOLITOARE IN REABILITARE/MODERNIZARE VARIANTA OCOLITOARE CENTURA BUCURESTI SC STRABAG SRL
PROIECTARE SI EXECUTIE PASAJ
MOGOSOAIA PE CENTURA
BUCURESTI PESTE DN 1A
MOGOSOAIA/ DN 1A 0.8 49.63% 37.29%04.12.2018 - PROIECTARE;
02.04.2020 - EXECUTIE
2021- CONFORM ASUMARI
ANTREPRENOR
ANUL 2022 CONFORM GRAFIC
CONTRACT32.26 MIL. LEI FARA TVA
CONTRACT SEMNAT IN DATA DE 23.10.2018.
AUTORIZATIA DE CONSTRUIRE NR. 13 DIN DATA DE 16.03.2020.
ORDINUL DE INCEPERE PENTRU PROIECTARE A FOST DAT IN DATA DE 04.12.2018.
ORDINUL DE INCEPERE PENTRU LUCRARI A FOST EMIS IN DATA DE 02.04.2020
LUCRARI CE SE EXECUTA: ARMARE GRINDA CORONAMENT RAMPA OTOPENI, ARMARE ANANTRETOAZA PILA P1, ARMARE PLACA DE SUPRABETONARE
INTRE PILA P3 SI CULEEA OTOPENI, UMPLUTURA RAMPA CHITILA, MONTARE ELEMENTE PREFABRICATE RAMPA CHITILA
6 VARIANTE OCOLITOARE IN REABILITARE/MODERNIZARE VARIANTA OCOLITOARE CENTURA BUCURESTI
PENETRATIE PRELUNGIREA GHENCEA
– DOMNESTI SI SUPRALARGIRE
BULEVARDUL GHENCEA INTRE
STRADA BRASOV SI TERMINAL
TRAMVAI 41” CU PROIECTUL “PASAJ
SUPRATERAN PE DJ 602, CENTURA
BUCURESTI - DOMNESTI
1.1139.255 MII lei FARA TVA - VALOARE
PROIECTARE
4.4. VARIANTE OCOLITOARE IN PREGATIRE FAZA PROIECTARE - IUNIE 2021
4.5. VARIANTE OCOLITOARE IN REABILITARE/MODERNIZARE - IUNIE 2021
NR.
CRT.CATEGORIE DRUM RANG DRUM INDICATIV DRUM
DE LA
(km)
PANA LA
(km)ANTREPRENOR SECTORUL LOTUL LUNGIME (km) STADIUL FIZIC ACTUAL
STADIUL FINANCIAR
ACTUALDATA INCEPERII DATA FINALIZARII AN DESCHIDERE VALOARE PROIECT OBSERVATII
DETALII
PROCEDURA
1VARIANTE OCOLITOARE - PROIECTE IN COLABORARE CU AUTORITATILE
LOCALEVARIANTA OCOLITOARE VARIANTA OCOLITOARE ALESD 0+000 16+840 ALESD 16.84
OBIECTIVUL A FOST TRANSFERAT CATRE CJ BIHOR IN VEDEREA REVIZUIRII DOCUMENTATIEI TEHNICE SI IMPLEMENTARII ACESTUIA IN BAZA OUG
101/2020.
DECEMBRIE 2020 - A FOST SEMNAT UN PARTENERIAT INTRE CNAIR SI CJ BIHOR IN ACEST SENS
IN DATA DE 20.05.2021 A FOST AVIZAT IN CADRUL CTE CNAIR SA STUDIUL DE FEZABILITATE.
IN DATA DE 21.05.2021 A FOST AVIZAT IN CADRUL CTE MTI STUDIUL DE FEZABILITATE
IUNIE 2021- URMEAZA AVIZAREA IN CADRUL CTE IM SI PROMOVAREA HG DE APROBARE A INDICATORILOR TEHNICO ECONOMICI
2VARIANTE OCOLITOARE - PROIECTE IN COLABORARE CU AUTORITATILE
LOCALEVARIANTA OCOLITOARE VARIANTA OCOLITOARE IASI
19+690
(SELGROS)
26+460
(DN28)
ETAPA I – VARIANTA SUD OBIECT 3 –
VARIANTA TRAFIC GREU6.77
126.88 MIL. LEI FARA TVA (VALOARE
ESTIMATA)
PENTRU IMPLEMENTAREA ACESTUI OBIECTIV PRIMARIA MUNICIPIULUI IASI A INAINTAT O PROPUNERE DE SCHIMBARE A TRASEULUI, CA URMARE A
IMPOSIBILITATII PASTRARII TRASEULUI PE BULEVARDUL POITIERS SI STRADA TREI FANTANI (KM 19+690 - KM 26+460).
PROPUNEREA A FOST ACCEPTATA DE CNAIR, URMAND A SE IDENTIFICA SURSA DE FINANTARE.
3VARIANTE OCOLITOARE - PROIECTE IN COLABORARE CU AUTORITATILE
LOCALEVARIANTA OCOLITOARE VARIANTA OCOLITOARE MEDIAS 0+000 8+500 MEDIAS 1 8.5 2022 2024
PENTRU IMPLEMENTAREA ACESTUI OBIECTIV A FOST SEMNAT UN PARTENERIAT DE IMPLEMENTARE INTRE CNAIR SA SI PRIMARIA MEDIAS IN BAZA
PREVEDERILOR OUG 101/2020.
OBIECTIVUL SE IMPLEMENTEAZA DE CATRE UAT MEDIAS.
A FOST SEMNAT CONTRACTUL DE REVIZUIRE A STUDIULUI DE FEZABILITATE DE CATRE PRIMARIA MEDIAS IN LUNA IUNIE 2021.
A FOST EMIS ORDINUL DE INCEPERE IN DATA DE 10.06.2021 - TERMEN PENTRU EMITEREA RAPORTULUI DE INCEPUT- 31.07.2021
4VARIANTE OCOLITOARE - PROIECTE IN COLABORARE CU AUTORITATILE
LOCALEVARIANTA OCOLITOARE VARIANTA OCOLITOARE STEI 0+000 27+230
COPISA CONSTRUCTORA PIRENAICA SA - CONTRACT REZILIAT
LICITATIE ATRIBUIRE CONTRACT REST LUCRARI RAMASE DE
EXECUTAT, CU TERMEN DEPUNERE OFERTE : 22.06.2020
STEI 1 27.23 0% 0%CONTRACT REZILIAT DE CATRE
ANTREPRENOR
CONTRACT REZILIAT DE CATRE
ANTREPRENOR
CONTRACT REZILIAT DE CATRE
ANTREPRENOR257.413 MIL. LEI FARA TVA
OBIECTIVUL A FOST TRANSFERAT CATRE CJ BIHOR IN VEDEREA REVIZUIRII DOCUMENTATIEI TEHNICE SI IMPLEMENTARII ACESTUIA IN BAZA OUG
101/2020.
A FOST SEMNAT IN LUNA DECEMBRIE 2020, PARTENERIATUL INTRE CNAIR SI CJ BIHOR IN ACEST SENS.
CONTRACT REVIZUIRE STUDIU DE FEZABILITATE IN DERULARE - ESTIMAT FINALIZARE TRIM. III 2021
4.6. VARIANTE OCOLITOARE - PROIECTE IN COLABORARE CU AUTORITATILE LOCALE - IUNIE 2021
NR.
CRT.CATEGORIE DRUM RANG DRUM INDICATIV DRUM
DE LA
(km)
PANA LA
(km)ANTREPRENOR SECTORUL LOTUL LUNGIME (km) STADIUL FIZIC ACTUAL
STADIUL FINANCIAR
ACTUALDATA INCEPERII DATA FINALIZARII AN DESCHIDERE VALOARE PROIECT OBSERVATII
DETALII
PROCEDURA
1 VARIANTE OCOLITOARE IN FOLOSINTA VARIANTA OCOLITOARE VARIANTA OCOLITOARE RADAUTI 0+000 16+580 SPEDITION UMB - SC TEHNOSTRADE SRL RADAUTI 1 16.58 08.10.2018 20.11.2020 ANUL 2020 97.44 MIL. LEI FARA TVA
LUCRARI FINALIZATE - 20.11.2020
PENTRU ACEST PROIECT A FOST FINALIZAT PROCESUL DE ACCESARE A FINANTARII NERAMBURSABILE ALOCATE IN CADRUL POIM 2014-2020, FIIND
EMISA NOTA DE APROBARE A FINANTARII ACESTUIA DIN FONDURI NERAMBURSABILE IN LUNA DEC. 2020.
CONTRACT DE FINANTARE A LUCRARILOR EXECUTATE IN CADRUL POIM 2014-2020 SEMNAT IN LUNA IANUARIE 2021
2 VARIANTE OCOLITOARE IN FOLOSINTA VARIANTA OCOLITOARE VARIANTA OCOLITOARE SACUENI 0+000 7+620 SC ANTREPRIZA DE REPARATII SI LUCRARI ARL CLUJ SA SACUENI 7.62 10.09.2019 12.08.2020 DECEMBRIE 2020 42.83 MIL. LEI FARA TVA
LUCRARILE AU FOST FINALIZATE SI VARIANTA DE OCOLIRE SACUENI ESTE IN DATA IN CIRCULATIE INCEPAND CU 09.12.2020.
MOMENTAN SE AFLA IN PROCEDURA DE RECEPTIE LA TERMINAREA LUCRARILOR, FIIND REALIZATA INSPECTIA PRELIMINARA (10.06.2021) IN URMA
CAREIA ANTREPRENORUL ARE LA DISPOZITIE 30 ZILE PENTRU REMEDIEREA DEFECTIUNILOR CONSTATATE DE COMISIE. SE ESTIMEAZA CA R.T.L. SE VA
REALIZA IN LUNA IULIE 2021.
3 VARIANTE OCOLITOARE IN FOLOSINTA VARIANTA OCOLITOARE VARIANTA OCOLITOARE SUCEAVA 0+000 7+285
ASOCIEREA S.C. AUTOTEHNOROM S.R.L. (LIDER) – S.C.
OPERATIONAL AUTOLEASING S.R.L. – S.C. OPR ASFALT S.R.L. –
OBRAS PUBLICAS Y REGADIOS S.A. – S.C. FLORCONSTRUCT S.R.L. –
S.C. CALCARUL S.A.
SUCEAVA 1 7.285DESCHISA TRAFICULUI - IN DATA DE
27 SEPT. 201977% 01.10.2018
IUNIE 2021 - RECEPTIE LA
TERMINAREA LUCRARILOR
IUNIE 2028 - RECEPTIE FINALA
IUNIE 2021 - FINALIZARE LUCRARI
AUXILIARE63.85 MIL. LEI FARA TVA
4 VARIANTE OCOLITOARE IN FOLOSINTA VARIANTA OCOLITOAREVARIANTA OCOLITOARE CARACAL -
RELICITARE0+000 10+345 ASOCIEREA SECOL S.A. - S.E.C.O.L S.P.A. CARACAL 10.345 100% 97.05% 16.10.2014 RTL: 24.05.2018 41.69 MIL. LEI FARA TVA
24.05.2018 - A FOST REALIZATA RTL
IN DATA DE 10.11.2020 A FOST REALIZATA RECEPTIA FINALA
5 VARIANTE OCOLITOARE IN FOLOSINTA VARIANTA OCOLITOARE VARIANTA OCOLITOARE BRASOV 0+000 7+292ASOCIEREA CHIRULLI ANDREA IMPRESA INDIVIDUALE - ALEANDRI
SPA - SMART BUILDING PROJECT- PASQUALE ALO' SRLTRONSON I, DN1 - DN 11 LOT 1 - RELICITARE 100% 90.18% 16.12.2014
RTL: 28.11.2016;
RF:19.12.201959.56 MIL. LEI FARA TVA
IN DATA DE 29.11.2016 A AVUT LOC RECEPTIA LA TERMINAREA LUCRARILOR. LA DATA PREZENTEI CONTRACTUL SE AFLA IN PERIOADA DE NOTIFICARE A
DEFECTIUNILOR.
IN DATA DE 19.12.2019 A FOST APROBAT PROCESUL VERBAL DE RECEPTIE FINALA.
6 VARIANTE OCOLITOARE IN FOLOSINTA VARIANTA OCOLITOARE VARIANTA OCOLITOARE BRASOV 0+000 4+924ASOCIEREA SC VIAROM CONSTRUCT SA - SC BETA COPS SRL - SC
MAXIDESIGN SRLTRONSON II, DN11 - DN13 LOT 3 4.924 100% 98.77% 07.08.2014
RECEPTIE LA TERMINAREA
LUCRARILOR: 29.11.201964.42 MIL. LEI FARA TVA PROCESUL VERBAL DE RECEPTIE LA TERMINAREA LUCRARILOR A FOST APROBAT DE DIRECTORUL GENERAL AL CNAIR IN DATA DE 29.11.2019.
4.7. VARIANTE OCOLITOARE IN FOLOSINTA - IUNIE 2021